JP3781916B2 - Seismic isolation building - Google Patents

Seismic isolation building Download PDF

Info

Publication number
JP3781916B2
JP3781916B2 JP10624099A JP10624099A JP3781916B2 JP 3781916 B2 JP3781916 B2 JP 3781916B2 JP 10624099 A JP10624099 A JP 10624099A JP 10624099 A JP10624099 A JP 10624099A JP 3781916 B2 JP3781916 B2 JP 3781916B2
Authority
JP
Japan
Prior art keywords
seismic isolation
foundation
base
building
isolation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP10624099A
Other languages
Japanese (ja)
Other versions
JP2000297559A (en
Inventor
正 長瀬
哲 日下
洸二 中原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP10624099A priority Critical patent/JP3781916B2/en
Publication of JP2000297559A publication Critical patent/JP2000297559A/en
Application granted granted Critical
Publication of JP3781916B2 publication Critical patent/JP3781916B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、基礎上に免震装置を設置して形成した免震ピットと、前記免震装置によって支持される建物本体とを設け、前記免震ピットの基礎梁を、逆梁で構成してある免震建物に関する。
【0002】
【従来の技術】
従来、この種の免震建物は、図11に示すように、免震ピットB1に前記免震装置B2を配置してある。そして、免震ピットB1の基礎梁5は、逆梁とすることで、基礎スラブ4より下方の地盤掘削を少なくして、工期の短縮化・コストダウンを図れるようにしてある。従って、免震ピットB1内には、前記基礎梁5が基礎スラブ4上に突出する状態に横たわって設けられている(例えば、特開平10−2126号公報参照)。
【0003】
【発明が解決しようとする課題】
そもそも、前記免震装置は、建物に免震機能を付加するものであるから、免震建物においては、その性能を充分発揮できる状態に維持する必要があり、免震装置のメンテナンスを実施したり、場合によっては取り替えを実施する必要がある。
この免震装置の取替作業は、前記免震装置設置部分をジャッキ等で仮受けした状態で免震装置を取り外し、その後に取替用の免震装置をセットするといった手順で実施されるが、その際、取替用の免震装置や、取り外した免震装置を免震ピットに出し入れするには、一般的に、免震ピット上の建物本体の最下層スラブに設けられた搬入出口を通して実施され、免震ピット内での免震装置の横移動は、前記基礎梁を夫々乗り越えながら実施される。因みに、前記搬入出口を、各免震装置設置部に対応させて各別に設けることができれば、免震装置の移動時に上述のように基礎梁を乗り越える必要はなくなる。しかし、現実的には、前記搬入出口を多数箇所に設けることは平面計画上困難で、特に、集合住宅等の建物においては、建物の一端側に一箇所のみ搬入出口を設けてある場合が多く、建物の多端側に設置された免震装置は、複数の基礎梁を乗り越えながら移動させなければならない。
上述した従来の免震建物によれば、前記基礎梁が基礎スラブ上に突出する状態に横たわって設けられているから、その基礎梁を乗り越えるに際しては、その都度、チェーンブロックやリフター等を設置しながら免震装置を上げ下げして実施しなければならず、免震装置の取替作業全体に非常に手間がかかっていた。
【0004】
従って、本発明の目的は、免震装置の取替作業を効率よく、短時間に実施できる免震建物を提供するところにある。
【0005】
【課題を解決するための手段】
請求項1の発明の特徴構成は、図1・図4〜10に例示するごとく、基礎1上に免震装置B2を設置して形成した免震ピットB1と、前記免震装置B2によって支持される建物本体B3とを設け、前記免震ピットB1の基礎梁5を、逆梁で構成してある免震建物において、前記基礎梁5は、その少なくとも一部を分離自在に形成してあると共に、基礎梁5の分離部分Sに、前記免震装置B2の横移動可能な移動路9を確保自在に形成してあるところにある。
請求項1の発明の特徴構成によれば、基礎梁を逆梁にしてあることによる効果(基礎スラブより下方の地盤掘削を無くして、工期の短縮化・コストダウンを図れる)を維持しながら、基礎梁を分離して、その部分に、免震装置を横移動可能な移動路を一時的に確保することが可能となる。従って、前記免震装置の取替時には、前記移動路を通した免震装置の横移動が可能となり、従来のように、基礎梁部を乗り越えるために免震装置を上げたり下げたりする必要が無くなり、効率的に免震装置の取替作業を実施することが可能となる。
また、前記免震装置の取替作業が終わると前記分離部分を連結することによって基礎梁に簡単に復元することが可能となる。
【0006】
請求項2の発明の特徴構成は、図1・図3〜6に例示するごとく、前記基礎梁5の内、少なくとも前記分離部分Sが属する部分は、鉄骨製であるところにある。
請求項2の発明の特徴構成によれば、請求項1の発明による作用効果を叶えることができるのに加えて、分離・連結機構を設けるあたって、鉄骨を細工するだけで簡単に形成することができるとともに、分離・連結操作が簡単な構造とすることが可能となる。更には、鉄筋コンクリートに比べて軽量化できるため、基礎梁の分離・連結の作業性を向上させることが可能となる。
【0007】
請求項3の発明の特徴構成は、図1・図3〜5・図10に例示するごとく、前記分離部分Sは、基礎梁5における内梁5Bの長手方向の中央部に設定してあるところにある。
請求項3の発明の特徴構成によれば、請求項1又は2の発明による作用効果を叶えることができるのに加えて、基礎梁の内、長手方向の中央部は、地震荷重の作用時や風荷重の作用時における作用応力が最も小さい部分であることから、この部分の有効断面積を小さくすることが可能となり、例えば、基礎梁を分離して、この中央部で取り外すような構成をとる場合には、取外梁部をより軽量化して、より簡単且つスピーディーに分離・連結作業を実施できるようになる。更には、中央部の方が作業空間を確保しやすいため、基礎梁の分離・連結操作をより効率的に実施することができる。
【0008】
請求項4の発明の特徴構成は、図1に例示するごとく、前記分離部分Sで基礎梁5から取り外される取外梁部7Bは、前記取外梁部7Bを載置して移動する取り外し具10をセット自在なセット空間11を、基礎スラブ4との間に確保した状態に取り付けてあるところにある。
請求項4の発明の特徴構成によれば、請求項1〜3の何れかの発明による作用効果を叶えることができるのに加えて、取外梁部を基礎梁から分離操作する際に、前記セット空間に前記取り外し具をセットして、よりスピーディーに取外梁部を分離することが可能となる。また、取り外した取外梁部を元の位置に連結する際も、同様に効率的に作業することが可能となる。
【0009】
尚、上述のように、図面との対照を便利にするために符号を記したが、該記入により本発明は添付図面の構成に限定されるものではない。
【0010】
【発明の実施の形態】
以下に本発明の実施の形態を図面に基づいて説明する。尚、図面において従来例と同一の符号で表示した部分は、同一又は相当の部分を示している。
【0011】
図1・図3〜5は、免震装置B2を組み込んだ免震建物Bの免震ピットB1部分を示すものである。
免震建物Bは、免震ピットB1の基礎フーチング(基礎に相当)1上に設置した前記免震装置B2を介して、建物本体B3を支持する状態に形成してある。従って、地震に伴う揺れが前記免震ピットB1に作用した場合、前記免震装置B2によってその震動を緩和し、前記建物本体B3の横揺れを低減できるものである。
【0012】
前記免震装置B2は、図2に示すように、複数の金属製薄板2aとゴム製薄板2bとを交互に積層させて一体化し、夫々の薄板2a・2bどうしが横方向に層間変位自在に形成してあることによって、基礎フーチング1と建物本体B3との横方向相対移動に抵抗しながら追従し、免震効果を発揮できるように構成してあるものである。尚、前記各薄板2a・2bの縦芯部には、夫々を貫通する状態に鉛製の棒状体2cを設けてあり、前記各薄板2a・2bの層間変位に対するダンパー効果をより増強できるように構成してある。尚、免震装置B2は、前記基礎フーチング1、及び、建物本体B3とは、それぞれボルトによって連結してあり、前記フーチング1と建物本体B3間にジャッキを設置して、建物本体B3の荷重を仮受けすると共に前記ボルトを取り外すことによって、免震装置B2を取り外すことができるように構成されている。因みに、当該免震装置B2は、定期的にメンテナンスされると共に、所定のサイクルで新しい免震装置B2と交換される。その交換の際は、建物本体B3のスラブに設けられた搬入出口Hを通して、免震ピットB1に出し入れされる(図3・図4参照)。
【0013】
前記免震ピットB1は、図1・図3に示すように、前記基礎フーチング1と、周壁3と、基礎スラブ4と、基礎梁5とを設けて構成してある。
前記基礎フーチング1は、支持杭6上に一体的に設けてあり、建物本体B3の主要な柱の直下で、前記免震装置B2を介して建物荷重を支持できるように構成してある。
前記周壁3、及び、前記基礎スラブ4は、免震ピットB1の外殻を形成するように構成してある。
前記基礎梁5は、免震ピットB1の外周部に配置された外梁5Aと、免震ピットB1の内側に配置された内梁5Bとから構成され、何れも、基礎スラブ4から上方に突出する形状に形成された逆梁で構成されている。従って、免震ピットB1内の空間は、前記内梁5Bによって複数の小空間Vに仕切られている。
また、各梁が逆梁に形成してあることによって、免震ピット形成のための地盤掘削は、基礎スラブ4が形成できる深度まで実施すればよく、通常の梁形状(スラブの下方に突出する梁形状)に比べて、掘削手間の低減化を図ることができる。
尚、前記周壁3・基礎スラブ4・外梁5Aは、何れも鉄筋コンクリート製で形成してある。
また、前記内梁5Bについては、両端部は鉄筋コンクリート製で構成してあると共に、中央部は、鉄骨(具体例としては、H形鋼)7によって構成してある。そして、その中央部H形鋼は、長手方向に三分割の部材から構成してあり、両端部に位置する第一分割形鋼7A・第三分割形鋼7Cの二部材の基端部は、内梁5B両端部の鉄筋コンクリート部8に埋設してある。
また、両分割形鋼7A・7C間に位置する第二分割形鋼(取外梁部に相当)7Bは、両分割形鋼7A・7Cとボルト連結してあり、着脱自在に構成されている。従って、連結ボルトを外すことによって、この第二分割形鋼7Bを分離することが可能となる。前記第二分割形鋼7Bの設置部分が、中梁5Bの分離部分Sとなり、第二分割形鋼7Bを取り外すことによって、内梁5Bによって仕切られた前記小空間Vどうしが基礎スラブ4上で連続することになる(図3〜5参照)。因みに、前記第二分割形鋼7Bの長さ寸法L1は、前記免震装置B2の最大幅寸法L0より大きく設定してあり、前記分離部分Sを通して、隣接する前記小空間V相互にわたって前記免震装置B2を移動させることができるように構成してある。即ち、この分離部分Sが、免震装置の横移動可能な移動路9となる。
一方、前記鉄骨7は、内梁中央部に配置してあることにより、端部に比べて内部応力を小さく見積もることができ、鉄骨断面寸法は、前記鉄筋コンクリート部8の断面寸法より小さく設定してある。また、鉄筋コンクリート部8と鉄骨7とは、互いの部材軸芯が同一軸芯上に位置する状態に配置してある。その結果、鉄骨7と基礎スラブ4との間には、空間が形成された状態となる。この空間は、前記鉄骨7を着脱する際に、例えば、リフターや台車等の取り外し具10を挿入して鉄骨7を支持しながら作業ができると共に、第二分割形鋼7Bを載置したまま取り外し具10を移動させることによって、簡単に内梁5Bの着脱操作を実施することが可能となる。前記鉄骨7と基礎スラブ4との間の空間を、セット空間11という(図1参照)。
【0014】
前記免震装置B2の取替手順の一例について説明する。但し、ここに説明するのは、一つの免震装置B2についての取替工程であり、複数の免震装置B2を対象とした取替作業は、時間をずらして順次実施されるものである。
[1] 予め、図4・5に示すように、前記搬入出口Hと、取替対象の免震装置B2が設置されている部分間に位置する第二分割形鋼7Bを取り外して、前記移動路9を確保しておく。
[2] 前記搬入出口Hから、交換用の新しい免震装置B2を免震ピットB1内に搬入し、前記移動路9を通して取替対象部へ移動すると共に、取替対象部においては、建物本体B3をジャッキJによって仮受けすると共に、古い免震装置B2を取り外し、前記移動路9を通して基礎スラブ上を搬入出口H側へ移動する。
[3] 新しい免震装置B2を、取替対象部へセットして取り付けると共に、古い免震装置B2は、前記搬入出口Hから搬出する。
[4] 前記第二分割形鋼7Bを元通り取り付ける。
【0015】
本実施形態の免震建物によれば、軽量化された第二分割形鋼7Bを取り外すだけで免震ピットB1内に前記移動路9を簡単に形成することができ、前記免震装置B2の取替作業を、短時間に効率的に実施することが可能となる。
【0016】
〔別実施形態〕
以下に他の実施の形態を説明する。
【0017】
〈1〉 当該免震建物は、先の実施形態で説明した鉄筋コンクリート造を主構造とすると共に、分離部分Sを鉄骨造で構成してあるものに限るものではなく、例えば、全体を鉄筋コンクリート造で構成したり、全体を鉄骨造や鉄骨鉄筋コンクリート造で構成したり、又は、それらの組み合わせによる構造であってもよい。
〈2〉 前記基礎梁5は、先の実施形態で説明したように中梁5Bにのみ分離部分Sを備えたものに限るものではなく、前記搬入出口Hとの位置関係により、例えば、外梁5Aに分離部分Sを設けることもある。
〈3〉 前記分離部分Sは、先の実施形態で説明したように、基礎梁5の中央部分に設けた取外梁部7Bに限らず、例えば、図6・図9に示すように、基礎梁5の一端部に、着脱自在な取外梁部7Bを設けて構成するものであってもよい。
〈4〉 前記取外梁部7Bは、基礎梁5を長手方向に分割して構成するものに限らず、例えば、図7・図8に示すように、基礎梁5を径方向に分割して形成する構成を採用することも可能である。図7の場合、基礎梁5の上半断面部を取外梁部7Bに構成してあり、基礎スラブ4には、基礎梁5下半断面部の高さに合わせたスロープ部12を設けてあることによって、分離部分Sが前記移動路9となるように構成してある。また、図9の場合、基礎梁5の下半断面部を取外梁部7Bに構成してあり、梁背が高い場合には、免震装置B2が通過できる高さ分だけ分離部分Sとするだけで、移動路9を確保することができるものである。これら二つの実施形態の免震建物によれば、取外梁部7Bを取り外して前記移動路9を確保している最中でも、基礎梁5そのものは、長手方向につながった状態であり、外力を負担できるから、より安全に免震装置の交換作業を実施することが可能となる。
〈5〉 前記分離部分Sは、先の実施形態で説明したように、取り外すように構成した取外梁部7Bを必ず設けた構成に限るものではなく、例えば、図9・図10に示すように、基礎梁5を基礎1に対して水平揺動自在に取り付け、基礎梁5の端部、又は、中間部に分離部分Sに相当する連結部13を設ける構成であってもよい。これらの実施形態の場合、先の実施例のように取外梁部7Bを移動するための取り外し具10を設けることなく、分離部分Sを再現することが可能となる。
〈6〉 前記免震装置は、先の実施形態で説明した鉛プラグ入り積層ゴムからなるものに限らず、例えば、高減衰ゴム(ゴム自体を特殊配合して粘りをもたせることでダンパー効果を期待できるようにしたもの)や、天然ゴム系積層ゴム(オイルダンパーや、金属製ダンパー等を別装置として設置することが必要)等で構成してあってもよい。
【図面の簡単な説明】
【図1】免震建物の要部を示す側面視断面図
【図2】免震装置を示す一部切欠き斜視図
【図3】免震ピットを示す平面図
【図4】免震ピットを示す平面図
【図5】免震ピットを示す側面視断面図
【図6】別実施形態の基礎梁を示す平面図
【図7】別実施形態の基礎梁を示す断面図
【図8】別実施形態の基礎梁を示す断面図
【図9】別実施形態の基礎梁を示す平面図
【図10】別実施形態の基礎梁を示す平面図
【図11】従来例の基礎梁を示す断面図
【符号の説明】
1 基礎
4 基礎スラブ
5 基礎梁
7B 取外梁部
9 移動路
10 取り外し具
11 セット空間
B1 免震ピット
B2 免震装置
B3 建物本体
S 分離部分
[0001]
BACKGROUND OF THE INVENTION
The present invention provides a base isolation pit formed by installing a base isolation device on a foundation and a building body supported by the base isolation device, and the base beam of the base isolation pit is configured by a reverse beam. It relates to a base-isolated building.
[0002]
[Prior art]
Conventionally, in this type of base-isolated building, as shown in FIG. 11, the base isolation device B2 is arranged in the base isolation pit B1. The foundation beam 5 of the seismic isolation pit B1 is a reverse beam, so that ground excavation below the foundation slab 4 can be reduced so that the construction period can be shortened and the cost can be reduced. Therefore, in the seismic isolation pit B1, the foundation beam 5 is provided so as to protrude on the foundation slab 4 (see, for example, JP-A-10-2126).
[0003]
[Problems to be solved by the invention]
In the first place, since the seismic isolation device adds a seismic isolation function to the building, it is necessary to maintain the seismic isolation building in a state where it can fully exhibit its performance. In some cases, replacement is necessary.
This seismic isolation device replacement work is carried out by a procedure in which the seismic isolation device is removed in a state where the seismic isolation device installation portion is temporarily received with a jack or the like, and then a replacement seismic isolation device is set. In that case, in order to put in and take out the seismic isolation device for replacement and the seismic isolation device removed from the seismic isolation pit, it is generally through a loading / unloading port provided in the lowest slab of the building body on the seismic isolation pit. The lateral movement of the seismic isolation device in the seismic isolation pit is performed while getting over the foundation beams. Incidentally, if the carry-in / out port can be provided separately corresponding to each seismic isolation device installation section, it is not necessary to get over the foundation beam as described above when the seismic isolation device moves. However, in reality, it is difficult to provide the carry-in / out ports at a number of locations in plan planning. Particularly, in buildings such as apartment buildings, there are many cases where a carry-in / out port is provided only at one end of the building. The seismic isolation device installed on the multi-end side of the building must be moved over the foundation beams.
According to the conventional base-isolated building described above, the foundation beam is provided so as to protrude on the foundation slab, so a chain block, a lifter, etc. must be installed each time the bridge is over the foundation beam. However, the seismic isolation device had to be raised and lowered, and the entire replacement work of the seismic isolation device was very laborious.
[0004]
Accordingly, an object of the present invention is to provide a seismic isolation building which can efficiently replace the seismic isolation device in a short time.
[0005]
[Means for Solving the Problems]
The characteristic configuration of the invention of claim 1 is supported by the seismic isolation pit B1 formed by installing the seismic isolation device B2 on the foundation 1 and the seismic isolation device B2, as illustrated in FIGS. In the base-isolated building in which the base beam 5 of the base isolation pit B1 is formed of a reverse beam, at least a part of the base beam 5 is separably formed. In the separation part S of the foundation beam 5, there is a movable passage 9 that can be moved laterally of the seismic isolation device B 2.
According to the characteristic configuration of the invention of claim 1, while maintaining the effect (the ground excavation below the foundation slab can be eliminated, the construction period can be shortened and the cost can be reduced) by making the foundation beam reverse. By separating the foundation beam, it is possible to temporarily secure a moving path in which the seismic isolation device can be moved laterally. Therefore, when the seismic isolation device is replaced, it is possible to move the seismic isolation device through the moving path, and it is necessary to raise or lower the seismic isolation device to get over the foundation beam as in the past. It is possible to eliminate the seismic isolation device efficiently.
When the seismic isolation device replacement work is completed, it is possible to easily restore the foundation beam by connecting the separated portions.
[0006]
The characteristic configuration of the invention of claim 2 is that, as illustrated in FIGS. 1 and 3 to 6, at least a portion to which the separation portion S belongs is made of steel frame in the foundation beam 5.
According to the characteristic configuration of the invention of claim 2, in addition to being able to achieve the function and effect of the invention of claim 1, in order to provide a separation / connection mechanism, it can be formed simply by crafting a steel frame In addition, it is possible to make the structure easy to separate and connect. Furthermore, since the weight can be reduced as compared with reinforced concrete, it is possible to improve the workability of separating and connecting the foundation beams.
[0007]
The characteristic configuration of the invention of claim 3 is that the separation portion S is set at the center in the longitudinal direction of the inner beam 5B in the foundation beam 5 as illustrated in FIGS. It is in.
According to the characteristic configuration of the invention of claim 3, in addition to being able to achieve the operational effects of the invention of claim 1 or 2, the longitudinal central portion of the foundation beam is Since the working stress at the time of the action of wind load is the smallest part, it is possible to reduce the effective cross-sectional area of this part. For example, the foundation beam is separated and removed at this central part. In this case, it is possible to reduce the weight of the detaching beam and to perform the separation / connection operation more easily and speedily. Furthermore, since it is easier to secure the work space in the central part, the separation and connection operation of the foundation beam can be performed more efficiently.
[0008]
The characteristic configuration of the invention of claim 4 is as follows. As shown in FIG. 1, the detaching beam portion 7B removed from the base beam 5 at the separation portion S is a detachable tool that moves by placing the detaching beam portion 7B. A set space 11 in which 10 can be freely set is attached to the base slab 4 in a secured state.
According to the characteristic configuration of the invention of claim 4, in addition to being able to achieve the function and effect of any one of claims 1 to 3, the separation beam portion is separated from the foundation beam, The removal tool can be separated more quickly by setting the removal tool in the set space. Moreover, when connecting the removed removal beam part to the original position, it becomes possible to work efficiently as well.
[0009]
In addition, as mentioned above, although the code | symbol was written in order to make contrast with drawing convenient, this invention is not limited to the structure of an accompanying drawing by this entry.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings. In the drawings, the parts denoted by the same reference numerals as those in the conventional example indicate the same or corresponding parts.
[0011]
1 and 3 to 5 show the seismic isolation pit B1 portion of the seismic isolation building B incorporating the seismic isolation device B2.
The seismic isolation building B is formed in a state of supporting the building body B3 via the seismic isolation device B2 installed on the foundation footing (corresponding to the foundation) 1 of the seismic isolation pit B1. Therefore, when a vibration associated with an earthquake acts on the seismic isolation pit B1, the seismic isolation device B2 can reduce the vibration and reduce the rolling of the building body B3.
[0012]
As shown in FIG. 2, the seismic isolation device B2 is formed by alternately laminating a plurality of metal thin plates 2a and rubber thin plates 2b so that the respective thin plates 2a and 2b can be displaced between layers in the lateral direction. By being formed, the base footing 1 and the building main body B3 are configured to follow the resistance while resisting the relative movement in the lateral direction, and to exhibit a seismic isolation effect. In addition, the rod-like body 2c made of lead is provided in the vertical core portion of each of the thin plates 2a and 2b so that the damper effect against the interlayer displacement of each of the thin plates 2a and 2b can be further enhanced. It is configured. The seismic isolation device B2 is connected to the foundation footing 1 and the building body B3 by bolts, and a jack is installed between the footing 1 and the building body B3 to load the building body B3. The seismic isolation device B2 can be removed by temporarily receiving and removing the bolt. Incidentally, the seismic isolation device B2 is regularly maintained and replaced with a new seismic isolation device B2 in a predetermined cycle. In the case of the exchange, it is taken in and out of the seismic isolation pit B1 through the loading / unloading outlet H provided in the slab of the building body B3 (see FIGS. 3 and 4).
[0013]
As shown in FIGS. 1 and 3, the seismic isolation pit B <b> 1 includes the foundation footing 1, a peripheral wall 3, a foundation slab 4, and a foundation beam 5.
The said foundation footing 1 is integrally provided on the support pile 6, and it has comprised so that a building load can be supported via the said seismic isolation apparatus B2 directly under the main pillar of the building main body B3.
The peripheral wall 3 and the foundation slab 4 are configured to form an outer shell of the seismic isolation pit B1.
The foundation beam 5 is composed of an outer beam 5A disposed on the outer periphery of the seismic isolation pit B1 and an inner beam 5B disposed on the inner side of the seismic isolation pit B1, both of which protrude upward from the foundation slab 4 It is made up of reverse beams formed in a shape. Therefore, the space in the seismic isolation pit B1 is partitioned into a plurality of small spaces V by the inner beam 5B.
Further, since each beam is formed as an inverted beam, the ground excavation for forming the seismic isolation pit may be carried out to a depth at which the foundation slab 4 can be formed, and a normal beam shape (projecting below the slab is formed). Compared to the beam shape), the excavation effort can be reduced.
The peripheral wall 3, the foundation slab 4, and the outer beam 5A are all made of reinforced concrete.
The inner beam 5B has both ends made of reinforced concrete, and the central portion made of steel (specifically, H-shaped steel) 7. And the center part H-section steel is comprised from the member divided into three in the longitudinal direction, and the base end part of the two members of the first divided section steel 7A and the third divided section steel 7C located at both ends is It is embed | buried in the reinforced concrete part 8 of the both ends of the inner beam 5B.
Further, a second split section steel (corresponding to the detaching beam portion) 7B located between the two split section steels 7A and 7C is bolted to both the split section steels 7A and 7C and is configured to be detachable. . Therefore, it is possible to separate the second split section steel 7B by removing the connecting bolt. The installation part of the second split section steel 7B becomes a separation part S of the intermediate beam 5B, and the small space V partitioned by the inner beam 5B is formed on the foundation slab 4 by removing the second split section steel 7B. It will be continuous (see FIGS. 3-5). Incidentally, the length dimension L1 of the second split section steel 7B is set to be larger than the maximum width dimension L0 of the seismic isolation device B2, and the seismic isolation is performed across the adjacent small spaces V through the separation portion S. The apparatus B2 is configured to be able to move. That is, the separation portion S becomes a moving path 9 in which the seismic isolation device can move laterally.
On the other hand, since the steel frame 7 is arranged at the center part of the inner beam, the internal stress can be estimated to be smaller than that of the end part, and the cross-sectional dimension of the steel frame is set smaller than the cross-sectional dimension of the reinforced concrete part 8. is there. Moreover, the reinforced concrete part 8 and the steel frame 7 are arrange | positioned in the state in which a mutual member axial center is located on the same axial center. As a result, a space is formed between the steel frame 7 and the foundation slab 4. This space can be removed when the steel frame 7 is attached / detached, for example, by inserting a removal tool 10 such as a lifter or a carriage to support the steel frame 7 and with the second divided steel 7B placed. By moving the tool 10, the inner beam 5B can be easily attached and detached. A space between the steel frame 7 and the foundation slab 4 is referred to as a set space 11 (see FIG. 1).
[0014]
An example of the replacement procedure of the seismic isolation device B2 will be described. However, what is described here is a replacement process for one seismic isolation device B2, and replacement operations for a plurality of seismic isolation devices B2 are sequentially performed at different times.
[1] As shown in FIGS. 4 and 5, the second split section steel 7B located between the loading / unloading port H and the part where the seismic isolation device B2 to be replaced is installed is removed and moved. The road 9 is secured.
[2] A new seismic isolation device B2 for replacement is carried into the seismic isolation pit B1 from the loading / unloading port H and moved to the replacement target part through the moving path 9, and the replacement target part has a building body. B3 is provisionally received by the jack J, the old seismic isolation device B2 is removed, and the base slab is moved to the loading / unloading port H side through the moving path 9.
[3] The new seismic isolation device B2 is set and attached to the replacement target part, and the old seismic isolation device B2 is carried out from the loading / unloading port H.
[4] Reattach the second split section steel 7B.
[0015]
According to the seismic isolation building of this embodiment, the moving path 9 can be easily formed in the seismic isolation pit B1 simply by removing the weight-reduced second section steel 7B. Replacement work can be performed efficiently in a short time.
[0016]
[Another embodiment]
Other embodiments will be described below.
[0017]
<1> The seismic isolation building is not limited to the main structure of the reinforced concrete structure described in the previous embodiment, and is not limited to one in which the separation portion S is formed of a steel structure. The structure may be configured, the entire structure may be formed of steel or steel reinforced concrete, or a combination thereof.
<2> The foundation beam 5 is not limited to the intermediate beam 5B provided with the separation portion S as described in the previous embodiment. For example, depending on the positional relationship with the loading / unloading port H, an outer beam, for example, The separation part S may be provided in 5A.
<3> As described in the previous embodiment, the separation portion S is not limited to the detaching beam portion 7B provided in the central portion of the foundation beam 5, but for example, as shown in FIGS. One end of the beam 5 may be provided with a detachable detachable beam portion 7B.
<4> The detaching beam portion 7B is not limited to the structure in which the foundation beam 5 is divided in the longitudinal direction. For example, as shown in FIGS. 7 and 8, the foundation beam 5 is divided in the radial direction. It is also possible to adopt a configuration to be formed. In the case of FIG. 7, the upper half section of the foundation beam 5 is configured as an outer beam section 7B, and the foundation slab 4 is provided with a slope portion 12 that matches the height of the lower half section of the foundation beam 5. As a result, the separation portion S is configured to be the moving path 9. In the case of FIG. 9, the lower half section of the foundation beam 5 is configured as the outer beam portion 7B. When the beam back is high, the separation portion S and the separation portion S are separated by a height that allows the seismic isolation device B2 to pass. The moving path 9 can be ensured only by doing. According to the seismic isolation buildings of these two embodiments, the foundation beam 5 itself is connected in the longitudinal direction even while the moving beam 9 is secured by removing the detaching beam portion 7B, and external force is applied. Since it can be borne, the seismic isolation device can be replaced more safely.
<5> As described in the previous embodiment, the separating portion S is not limited to the configuration in which the detaching beam portion 7B configured to be detached is necessarily provided. For example, as illustrated in FIGS. Alternatively, the foundation beam 5 may be attached to the foundation 1 so as to be horizontally swingable, and a connection portion 13 corresponding to the separation portion S may be provided at an end portion or an intermediate portion of the foundation beam 5. In the case of these embodiments, the separation portion S can be reproduced without providing the removal tool 10 for moving the removal beam portion 7B as in the previous example.
<6> The seismic isolation device is not limited to the one made of the laminated rubber containing lead plugs described in the previous embodiment. For example, a high-damping rubber (a damper effect can be expected by adding a special blend of rubber to give it a stickiness. Or a natural rubber-based laminated rubber (an oil damper, a metal damper or the like must be installed as a separate device), or the like.
[Brief description of the drawings]
[Fig. 1] Side sectional view showing the main part of the seismic isolation building [Fig. 2] Partially cutaway perspective view showing the seismic isolation device [Fig. 3] Plan view showing the seismic isolation pit [Fig. 4] FIG. 5 is a side sectional view showing a seismic isolation pit. FIG. 6 is a plan view showing a foundation beam according to another embodiment. FIG. 7 is a sectional view showing a foundation beam according to another embodiment. FIG. 9 is a plan view showing a foundation beam in another embodiment. FIG. 10 is a plan view showing a foundation beam in another embodiment. FIG. 11 is a sectional view showing a conventional foundation beam. Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Foundation 4 Foundation slab 5 Foundation beam 7B Removal beam part 9 Moving path 10 Removal tool 11 Set space B1 Seismic isolation pit B2 Seismic isolation apparatus B3 Building body S Separation part

Claims (4)

基礎上に免震装置を設置して形成した免震ピットと、前記免震装置によって支持される建物本体とを設け、前記免震ピットの基礎梁を、逆梁で構成してある免震建物であって、
前記基礎梁は、その少なくとも一部を分離自在に形成してあると共に、基礎梁の分離部分に、前記免震装置の横移動可能な移動路を確保自在に形成してある免震建物。
A base-isolated building in which a base-isolated pit formed by installing a base-isolated device on the foundation and a building body supported by the base-isolated device are provided, and the base beam of the base-isolated pit is composed of reverse beams Because
The base beam is a seismically isolated building in which at least a part thereof is separably formed, and a separable moving path of the seismic isolation device is formed in a separated portion of the base beam.
前記基礎梁の内、少なくとも前記分離部分が属する部分は、鉄骨製である請求項1に記載の免震建物。  The seismic isolation building according to claim 1, wherein at least a portion to which the separation portion belongs is made of steel. 前記分離部分は、基礎梁における内梁の長手方向の中央部に設定してある請求項1〜2の何れか一項に記載の免震建物。The seismic isolation building according to any one of claims 1 to 2, wherein the separation portion is set at a central portion in the longitudinal direction of the inner beam in the foundation beam. 前記分離部分で基礎梁から取り外される取外梁部は、前記取外梁部を載置して移動する取り外し具をセット自在なセット空間を、基礎スラブとの間に確保した状態に取り付けてある請求項1〜3の何れか一項に記載の免震建物。  The removal beam part removed from the foundation beam at the separation part is attached in a state in which a set space in which the removal tool for placing and moving the removal beam part can be freely set is secured between the separation beam part and the foundation slab. The seismic isolation building as described in any one of Claims 1-3.
JP10624099A 1999-04-14 1999-04-14 Seismic isolation building Expired - Lifetime JP3781916B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10624099A JP3781916B2 (en) 1999-04-14 1999-04-14 Seismic isolation building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10624099A JP3781916B2 (en) 1999-04-14 1999-04-14 Seismic isolation building

Publications (2)

Publication Number Publication Date
JP2000297559A JP2000297559A (en) 2000-10-24
JP3781916B2 true JP3781916B2 (en) 2006-06-07

Family

ID=14428603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10624099A Expired - Lifetime JP3781916B2 (en) 1999-04-14 1999-04-14 Seismic isolation building

Country Status (1)

Country Link
JP (1) JP3781916B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4657759B2 (en) * 2005-02-25 2011-03-23 株式会社奥村組 Building pile foundation structure
JP4590300B2 (en) * 2005-05-02 2010-12-01 大成建設株式会社 Base structure of base-isolated building
JP4743412B2 (en) * 2005-10-31 2011-08-10 清水建設株式会社 Pile head seismic isolation structure
JP2012180699A (en) * 2011-03-02 2012-09-20 Shimizu Corp Base-isolated structure
JP5800570B2 (en) * 2011-05-18 2015-10-28 住友不動産株式会社 Intermediate seismic isolation structure using flat reverse beams
JP6030873B2 (en) * 2012-07-13 2016-11-24 株式会社熊谷組 Pile foundation structure
JP6708872B2 (en) * 2015-09-15 2020-06-10 株式会社安藤・間 Expanded pile Pile head seismic isolation structure
JP7061904B2 (en) * 2018-03-19 2022-05-02 株式会社免制震ディバイス Structure foundation

Also Published As

Publication number Publication date
JP2000297559A (en) 2000-10-24

Similar Documents

Publication Publication Date Title
CN111764379B (en) Construction method and structure applied to reverse construction steel pipe pile
JP3781916B2 (en) Seismic isolation building
JP2008115628A (en) Construction method for elevated structure
EP1028196A2 (en) Prefabrication type high level road structure
KR101310677B1 (en) Top down method using precast composite retaining wall and raker in slope
JP2011032684A (en) Lining structure and lining method
JP6441030B2 (en) How to add underground facilities
KR20070111435A (en) The bridge adjustable bearing for change off pc-beam puilling up system and the method
JP3240438B2 (en) Seismic isolation method for seismically isolated buildings and existing buildings
CN106835984B (en) The reverse construction method of installation of slug matching bridge Bridge Erector
JPH08296209A (en) Method for reinforcing foundation part of elevated bridge
JP2004068286A (en) Laying method for steel pc composite bridge
JP2001123672A (en) Method and mechanism for shifting existing building for base isolation
JP3639999B2 (en) Transmission line steel tower rebuilding method
JPH1136608A (en) Construction method for foundation base isolation of existing structure
JP3850575B2 (en) Seismic isolation device
JPH074049A (en) Construction method of building
KR100519718B1 (en) Strong form structure that ease exchange of support
CN111335670A (en) Method for constructing foundation pit and newly adding underground structure in situ under existing reserved building
JP3826356B2 (en) Building foundation structure
KR20060008453A (en) Bridge construction work method
KR100593203B1 (en) a deck supportframe and a construction methed
JP2857995B2 (en) Messel shield machine
CN104141310B (en) Method for constructing assembly type pre-stress fish-belly sill internal support system
JPH10292637A (en) Method of reforming existing building into base isolated structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051208

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060223

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060308

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100317

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100317

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110317

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120317

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130317

Year of fee payment: 7