Prior art keywords
concrete
vibrator
holding plate
tunnel lining
compaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000160645A
Other languages
Japanese (ja)
Other versions
JP2001336397A (en
Inventor
光雅 小笠原
正彦 三浦
美夫 佐賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2000160645A priority Critical patent/JP3758468B2/en
Publication of JP2001336397A publication Critical patent/JP2001336397A/en
Application granted granted Critical
Publication of JP3758468B2 publication Critical patent/JP3758468B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、トンネル覆工コンクリートの締固め充填装置に関する。
【0002】
【従来の技術】
トンネル履工コンクリートのアーチ、クラウン部への完全充填は、場合によっては困難となることがある。充填不足となる箇所は特にコンクリートとの打継ぎ部であり、充填不足の原因としては、既打設側へのコンクリートの流動性が悪く、エアーポケットとなっているものと考えられている。この対策としては、従来ではエアー抜き金具を装備したり、型枠面バイブレータにより振動を与える方法が採用されている。
【0003】
【発明が解決しようとする課題】
しかしながら、以上の方法では、コンクリート内部を直接振動させるものでないため、十分な締固めが出来ず、充填が不足したり、仕上り面にあばたが生ずる欠点があった。
【0004】
ところで、本来、コンクリートの締固めは、コンクリート内部に棒バイブレータを挿入する方法が最適であると考えられている。ところが、トンネルにあっては巻厚が30cmと厚みが薄く、実用的には作業員が中に入ってバイブレータをかけたり、妻側からバイブレータを長く伸ばして使うことは困難であり、また、天端付近ではコンクリートが漏洩するなど、その作業性の面から実施されていないのが実情である。
【0005】
本発明は、以上の課題を解決するものであって、その目的は、覆工コンクリートの締固めに際し、天端付近でのバイブレータの使用を可能としたトンネル覆工コンクリートの締固め充填装置を提供するものである。
【0006】
【課題を解決するための手段】
前記目的を達成するため、本発明は、型枠の一部に形成された開口部と、この開口部の一端をヒンジされて開口部を蓋するとともに、ヒンジにより打設内側に向けて揺動可能であって、周囲にフランジを立ち下げたバイブレータ保持板と、この保持板の揺動端側フランジに開口され、保持板を上部に持上げた状態で打設内側に連通する挿入孔と、この挿入孔を通じて打設内側に向けて挿通されるバイブレータとからなることを特徴とする。
【0007】
従って、本発明では、保持板をヒンジを支点として上部に引上げてコンクリート内に先端を位置させた上で、挿入孔よりバイブレータを差込んで振動を与えることで、コンクリートは締め固められる。
【0008】
また、前記バイブレータは、型枠における吹込み口と、既設コンクリートとの間に配置されることで、特に空洞が発生しやすい既打設コンクリート付近での締固め性の改善を図ることができる。
【0009】
【発明の実施の形態】
以下、本発明の好ましい実施の形態につき、添付図面を参照して詳細に説明する。図1は本発明の装置を配備したスキンプレートの天端付近を示す底面図、図2,3は図1のそれぞれA−A線及びB−B線断面図である。
【0010】
図において、型枠としてのスキンプレート1は、既打設コンクリート2の内側面に後端を接した状態で、一次覆工としての吹付けコンクリート3との間に所定の間隙を設けて配置される。そして、スキンプレート1の天端中心CLにおいて、既打設コンクリート2の近傍にはコンクリート打設入口である吹込み口4が設けられ、ここからコンクリートが注入打設される。なお、図1においては、吹込み口4を蓋した状態が示されている。
【0011】
天端中心CLの左右には、長手方向に沿って所定間隔をおいてエア抜き用のパイプ5が内部に向けて突設され、特に図2に示すように打設されたフレッシュコンクリートCが天端付近まで打設された状態でここから空気を抜くとともに、ホースジョイントなどを介して接続されたホース6を通じて、コンクリートが流下することで、打設完了を確認できるようになっている。
【0012】
そして、吹込み口4の左右に打設締固め装置7が配置されている。この装置7は、特に図3に示すように、吹込み口4の左右にあって、スキンプレート1に形成された開口部8を蓋するとともに、上部すなわちコンクリート打設側に向けて揺動可能に支持されたバイブレータ保持板9と、開口部8の周囲にあって、スキンプレート1の下面に一体に固定し、かつ周囲を補強材などによって補強された揺動ガイド用のプレート10とを備え、保持板9をガイドプレート10によって包囲している。保持板9は、その一端、すなわち既打設コンクリート2から遠い位置の両側にヒンジピン11が設けられ、ガイドプレート10に揺動可能に軸受している。
【0013】
また、保持板9の周囲にはフランジ12が立ち下げ状態に一体化され、上部側へ移動した状態での隙間の発生を防止し、ここからのコンクリートの漏れを防止している。フランジ12の両側部には切欠14が形成され、この切欠14がガイドプレート10の両側部内側に突設された係止ピン15に係止することで保持板9を下ろした状態で、保持板9の上面がスキンプレート1と面一となるように位置決めされる。
【0014】
フランジ12の前部中心、すなわち既打設コンクリートに近い位置には、所定の角度でバイブレータ挿入孔を構成するガイドパイプ16が突設され、その左右には開閉操作用のハンドル17が一体に設けられている。そして、ガイドパイプ16にはコンクリート打設時に棒状のバイブレータ18が挿入され、振動による締固め作業がなされる。
【0015】
図4は、以上の締固め充填装置17における保持板9とバイブレータとの関係を示す半断面斜視図である。なお、本図では、保持板9はヒンジピン11の揺動端側に向けて扇形に広がる形状としてあるが、図1のごとく長方形であっても良い。
【0016】
次に、以上の充填装置17を用いた作業手順を図5を用いて説明する。先ず(a)に示すように、打設に先立ち、ハンドル17を手で持って保持板9を上方に引上げることで、保持板9の板面がスキンプレート1と面一の状態からガイドパイプ16の先端開口が打設内部に向くように持上げられる。その後(b)に示すように、バイブレータ18をガイドパイプ16に挿通し、その先端が既打設コンクリート2の近傍においてフレッシュコンクリート内部に位置するようにセットする。
【0017】
次いで、フレッシュコンクリートCを打設し、コンクリート天端が覆工天端に至る段階でバイブレータ18を駆動し、振動による締固め充填作業を並行して行う。これによって、特に、既打設コンクリート2に対する打継ぎ位置では、十分な脱泡と締固めがなされることになり、空洞の発生を未然に防止できることになる。
【0018】
次に、十分に締固めがなされた段階で、バイブレータ18を引き抜けば、(c)に示すように 、コンクリートの打設圧力により保持板9は元位置に下降し、板面が再びスキンプレート1と面一の状態に保持され、この状態でコンクリートCの養生が行われる。
【0019】
なお、以上の実施の形態では、天端部分における既打設コンクリートとの打継ぎ面近傍に本装置17を配置したが、その他の打継ぎ欠陥の発生しやすい箇所にも配備することが可能であることは勿論である。
【0020】
【発明の効果】
以上の説明により明らかなように、本発明によるトンネル覆工コンクリートの締固め充填装置にあっては、フレッシュコンクリートに直接バイブレータを挿入して締固め充填作業が出来るため、コンクリート打継ぎ部における充填性を改善できる。
【図面の簡単な説明】
【図1】本発明装置を適用したスキンプレートの天端付近を示す底面図である。
【図2】図1のA−A線における断面図である。
【図3】図1のB−B線における断面図である。
【図4】保持板とバイブレータとの関係を示す半断面斜視図である。
【図5】(a),(b),(c)は同装置による作業手順を示す断面説明図である。
【符号の説明】
1 スキンプレート(型枠)
2 既打設コンクリート
4 吹込み口
7 締固め充填装置
8 開口部
9 バイブレータ保持板
11 ヒンジピン
12 フランジ
16 ガイドパイプ(バイブレータ挿入孔)
18 バイブレータ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a compacting and filling apparatus for tunnel lining concrete.
[0002]
[Prior art]
In some cases, it is difficult to completely fill the arch and crown of the tunnel construction concrete. The part where the filling is insufficient is a joint portion with concrete in particular, and the cause of the insufficient filling is considered to be the air pocket due to the poor fluidity of the concrete to the already placed side. As countermeasures, conventionally, a method of providing air vents or applying vibration by a formwork vibrator has been adopted.
[0003]
[Problems to be solved by the invention]
However, the above method does not directly vibrate the inside of the concrete, so that there is a drawback that sufficient compacting cannot be performed, filling is insufficient, and flapping occurs on the finished surface.
[0004]
By the way, it is considered that the most suitable method for compacting concrete is to insert a rod vibrator inside the concrete. However, in a tunnel, the winding thickness is as thin as 30 cm, and it is practically difficult for an operator to enter inside and put a vibrator on, or to extend the vibrator from the wife side for a long time. The fact is that it is not implemented from the viewpoint of workability, such as concrete leaking near the edges.
[0005]
The present invention solves the above-mentioned problems, and its purpose is to provide a compacting and filling apparatus for tunnel lining concrete that enables the use of a vibrator near the top when lining concrete is compacted. To do.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides an opening formed in a part of a mold, and one end of the opening is hinged to cover the opening, and swings inwardly by the hinge. A vibrator holding plate with a flange lowered at the periphery, an insertion hole that is open to the swing end side flange of the holding plate and communicates with the inside of the placement with the holding plate lifted upward, The vibrator is inserted through the insertion hole toward the inside of the placement.
[0007]
Therefore, in the present invention, the concrete is compacted by pulling the holding plate upward with the hinge as a fulcrum and positioning the tip in the concrete, and inserting a vibrator through the insertion hole to give vibration.
[0008]
Further, the Baibure data includes a blowing port in the mold, that is disposed between the existing concrete, in particular improve the compaction properties at the cavity is likely already hitting set near concrete occurs .
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 is a bottom view showing the vicinity of the top end of a skin plate provided with the apparatus of the present invention, and FIGS. 2 and 3 are sectional views taken along lines AA and BB in FIG. 1, respectively.
[0010]
In the figure, a skin plate 1 as a formwork is arranged with a predetermined gap between the inner surface of an already-placed concrete 2 and a shotcrete 3 as a primary lining in a state where the rear end is in contact therewith. The Then, at the top end center CL of the skin plate 1, a blowing port 4 that is a concrete placing entrance is provided in the vicinity of the already placed concrete 2, and concrete is poured therefrom. In addition, in the FIG. 1, the state which covered the blowing inlet 4 is shown.
[0011]
On the left and right of the top center CL, air venting pipes 5 project inward at a predetermined interval along the longitudinal direction, and the fresh concrete C placed especially as shown in FIG. In the state of being driven to the vicinity of the end, air is extracted from here, and concrete flows down through the hose 6 connected through a hose joint or the like, so that the completion of the driving can be confirmed.
[0012]
And the placement compaction device 7 is arrange | positioned at the right and left of the blowing inlet 4. FIG. As shown particularly in FIG. 3, this device 7 is located on the left and right of the air inlet 4, covers the opening 8 formed in the skin plate 1, and can swing toward the upper portion, that is, the concrete placing side. And a vibrating guide plate 10 which is fixed to the lower surface of the skin plate 1 and is reinforced by a reinforcing material around the opening 8. The holding plate 9 is surrounded by the guide plate 10. The holding plate 9 is provided with hinge pins 11 on one end thereof, that is, on both sides far from the already-placed concrete 2, and is supported by the guide plate 10 so as to be swingable.
[0013]
In addition, the flange 12 is integrated in a lowered state around the holding plate 9 to prevent generation of a gap in a state where the flange 12 is moved to the upper side, thereby preventing leakage of concrete from here. Cutouts 14 are formed on both sides of the flange 12, and the cutouts 14 are engaged with locking pins 15 projecting from the inner sides of the guide plate 10 to lower the holding plate 9. 9 is positioned so that the upper surface of 9 is flush with the skin plate 1.
[0014]
A guide pipe 16 constituting a vibrator insertion hole is projected at a predetermined angle at the front center of the flange 12, that is, at a position close to the already-placed concrete, and a handle 17 for opening / closing operation is integrally provided on the left and right sides thereof. It has been. Then, a rod-like vibrator 18 is inserted into the guide pipe 16 at the time of placing the concrete, and compaction work by vibration is performed.
[0015]
FIG. 4 is a half cross-sectional perspective view showing the relationship between the holding plate 9 and the vibrator in the compaction filling device 17 described above. In this figure, the holding plate 9 has a fan-shaped shape extending toward the swing end side of the hinge pin 11, but it may be rectangular as shown in FIG.
[0016]
Next, the work procedure using the above filling apparatus 17 is demonstrated using FIG. First, as shown in (a), prior to placing, the holding plate 9 is pulled up by holding the handle 17 by hand so that the plate surface of the holding plate 9 is flush with the skin plate 1 from the guide pipe. The 16 tip openings are lifted so as to face the inside of the placement. Thereafter, as shown in (b), the vibrator 18 is inserted into the guide pipe 16 and set so that the tip thereof is located in the fresh concrete in the vicinity of the already-placed concrete 2.
[0017]
Next, fresh concrete C is placed, and the vibrator 18 is driven at a stage where the concrete top end reaches the lining top end, and compaction filling work by vibration is performed in parallel. As a result, sufficient defoaming and compaction are performed particularly at the joining position with respect to the already-placed concrete 2, and the generation of cavities can be prevented in advance.
[0018]
Next, when the vibrator 18 is pulled out in a stage where the compaction is sufficiently performed, the holding plate 9 is lowered to the original position by the concrete placing pressure as shown in FIG. In this state, the concrete C is cured.
[0019]
In the above embodiment, the present apparatus 17 is arranged in the vicinity of the joining surface with the already-cast concrete at the top end portion, but it can also be deployed in other places where joining defects are likely to occur. Of course there is.
[0020]
【The invention's effect】
As is apparent from the above description, the compacting and filling apparatus for tunnel lining concrete according to the present invention can perform compaction filling work by inserting a vibrator directly into fresh concrete. Can be improved.
[Brief description of the drawings]
FIG. 1 is a bottom view showing the vicinity of a top end of a skin plate to which an apparatus of the present invention is applied.
FIG. 2 is a cross-sectional view taken along line AA in FIG.
3 is a cross-sectional view taken along line BB in FIG.
FIG. 4 is a half sectional perspective view showing a relationship between a holding plate and a vibrator.
FIGS. 5A, 5B, and 5C are cross-sectional explanatory views showing a work procedure by the apparatus.
[Explanation of symbols]
1 Skin plate (formwork)
2 Existing concrete 4 Blowing port 7 Compaction filling device 8 Opening 9 Vibrator holding plate 11 Hinge pin 12 Flange 16 Guide pipe (vibrator insertion hole)
18 Vibrator

Claims (2)

型枠の一部に形成された開口部と、この開口部の一端をヒンジされて開口部を蓋するとともに、ヒンジにより打設内側に向けて揺動可能であって、周囲にフランジを立ち下げたバイブレータ保持板と、この保持板の揺動端側フランジに開口され、保持板を上部に持上げた状態で打設内側に連通する挿入孔と、この挿入孔を通じて打設内側に向けて挿通されるバイブレータとからなることを特徴とするトンネル覆工コンクリートの締固め充填装置。An opening formed in a part of the mold and one end of this opening are hinged to cover the opening, and can be swung inward by the hinge, and the flange is lowered around A vibrator holding plate, an insertion hole that opens to the swinging end side flange of the holding plate and communicates with the inside of the placement with the holding plate lifted upward, and is inserted through the insertion hole toward the inside of the placement. A compacting and filling device for tunnel lining concrete characterized by comprising a vibrator. 前記バイブレータは、型枠における吹込み口と、既設コンクリートとの間に配置されることを特徴とする請求項1に記載のトンネル覆工コンクリートの締固め充填装置。The Baibure data includes a blowing port in the mold, compaction the filling device of a tunnel lining concrete according to claim 1, characterized in that disposed between the existing concrete.
JP2000160645A 2000-05-30 2000-05-30 Compaction filling equipment for tunnel lining concrete Expired - Fee Related JP3758468B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000160645A JP3758468B2 (en) 2000-05-30 2000-05-30 Compaction filling equipment for tunnel lining concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000160645A JP3758468B2 (en) 2000-05-30 2000-05-30 Compaction filling equipment for tunnel lining concrete

Publications (2)

Publication Number Publication Date
JP2001336397A JP2001336397A (en) 2001-12-07
JP3758468B2 true JP3758468B2 (en) 2006-03-22

Family

ID=18664808

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000160645A Expired - Fee Related JP3758468B2 (en) 2000-05-30 2000-05-30 Compaction filling equipment for tunnel lining concrete

Country Status (1)

Country Link
JP (1) JP3758468B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4815262B2 (en) * 2006-04-27 2011-11-16 株式会社熊谷組 Tunnel lining method and formwork apparatus
JP2007291792A (en) * 2006-04-27 2007-11-08 Kumagai Gumi Co Ltd Pipe for bleeding air used for forming lining on wall surface of structure
JP2008088691A (en) * 2006-10-02 2008-04-17 Maeda Corp Tunnel lining form and tunnel lining construction method
JP6240478B2 (en) * 2013-11-13 2017-11-29 鹿島建設株式会社 Concrete placement method
JP6778493B2 (en) * 2016-03-10 2020-11-04 鹿島建設株式会社 Concrete continuous forming device and concrete continuous forming method
JP6942025B2 (en) * 2017-10-12 2021-09-29 前田建設工業株式会社 How to compact construction seams in tunnel lining
CN108506024A (en) * 2018-04-17 2018-09-07 蓝传雯 A kind of construction method and supporting mold of Tunnel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748994A (en) * 1993-08-09 1995-02-21 Saga Kogyo Kk Concrete compaction in case of placement of tunnel lining concrete and concrete placing center used therefor
JP3047758B2 (en) * 1994-12-22 2000-06-05 株式会社大林組 Compaction equipment for lining concrete in tunnel method
JP3962472B2 (en) * 1998-01-26 2007-08-22 岐阜工業株式会社 Method and apparatus for placing concrete for tunnel

Also Published As

Publication number Publication date
JP2001336397A (en) 2001-12-07

Similar Documents

Publication Publication Date Title
JP3758468B2 (en) Compaction filling equipment for tunnel lining concrete
CN107035141A (en) A kind of mold method of floor slab back casting band
CN210164233U (en) Constructional column pouring tool
JP6942025B2 (en) How to compact construction seams in tunnel lining
JPH108898A (en) Method of vibrating placed concrete for tunnel and device therefor
JP6257571B2 (en) Precast circular waterway connection installation method
JP6371556B2 (en) Placing trace pattern elimination apparatus and casting trace pattern elimination method in tunnel lining
JP2020094458A (en) Placement method of tunnel lining concrete
JP5358393B2 (en) Formwork for producing a segment and method for producing a segment using the formwork
JP3793442B2 (en) Method and apparatus for vibration of cast concrete
JP3093020U (en) Form with inspection window
JP4566891B2 (en) Tunnel lining concrete placement method
CN219118392U (en) I-steel embedded waterproof sleeve
JP4451969B2 (en) Secondary lining concrete placing method and formwork
JPS58196145A (en) Mold forming method
CN216690370U (en) I-steel entrance to a cave of encorbelmenting exempts from to tear open mould built-in fitting
JP3076897U (en) Concrete casting equipment for tunnels
JPH05287902A (en) Remover for remaining concrete in concrete-placing tube
JPH02112593A (en) Method of construction of lining concrete placing in tunnel and device thereof
JP2003311727A (en) Method and apparatus for manufacturing synthetic segment
JPH0718173B2 (en) Molding equipment and molding method for L-shaped concrete block for earth retaining
JPS637407Y2 (en)
JPH0657833A (en) Method for filling heat insulating material to wall
JP3144618B2 (en) Filling method of mold sand
JP3197504B2 (en) Tunnel lining method and concrete casting device used for it

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20040419

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040419

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040714

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040714

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040924

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050902

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050913

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051108

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20051108

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051226

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100113

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100113

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110113

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110113

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120113

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees