JP3724984B2 - Backhoe - Google Patents

Backhoe Download PDF

Info

Publication number
JP3724984B2
JP3724984B2 JP16411399A JP16411399A JP3724984B2 JP 3724984 B2 JP3724984 B2 JP 3724984B2 JP 16411399 A JP16411399 A JP 16411399A JP 16411399 A JP16411399 A JP 16411399A JP 3724984 B2 JP3724984 B2 JP 3724984B2
Authority
JP
Japan
Prior art keywords
boom
arm
bucket
angle
operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16411399A
Other languages
Japanese (ja)
Other versions
JP2000352068A (en
Inventor
栄治 西
敬典 三浦
厚 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP16411399A priority Critical patent/JP3724984B2/en
Publication of JP2000352068A publication Critical patent/JP2000352068A/en
Application granted granted Critical
Publication of JP3724984B2 publication Critical patent/JP3724984B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)
  • Component Parts Of Construction Machinery (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はバックホウにおいて、運転部とバックホウ装置のバケットとの接触を避ける為の構造に関する。
【0002】
【従来の技術】
バックホウでは例えば特開平6−17452号公報に開示されているように、旋回台に運転部とバックホウ装置とを並べて配置し、旋回台における運転部の横側に上下揺動自在に支持された第1ブーム、第1ブームの先端に左右揺動自在に支持された第2ブーム、第2ブームの先端に前後揺動自在に支持されたアーム、アームの先端に支持されたバケットを備えて、バックホウ装置を構成したものがある。このようなバックホウでは第1ブームを上昇側に操作しアームを掻き込み側に操作すると、バケットが運転部の横側に位置することになるので(前記公報の図4の実線参照)、この状態で第2ブームを運転部側に操作すると、バケットが運転部に接触するおそれがある。
【0003】
前記公報では、運転部と第1ブームとの間の空間に牽制面(前記公報の図4中のA2)を設定し、旋回台に対するバケットの位置センサーを備えて、バケットが牽制面に達した際に第2ブームが運転部側に操作されようとしても、第2ブームの運転部側への操作が阻止されるように構成されている。これにより、バケットが運転部の横側に位置している状態で、誤って第2ブームを運転部側に操作しても、運転部とバケットとの接触が避けられる。
【0004】
【発明が解決しようとする課題】
前述のように構成されたバックホウにおいて、例えばバケットが運転部の横側に位置している状態で、運転部の前方下方の地面をバケットで掘削するような場合、バケットが運転部の横側に位置している状態から、第1ブームを下降側に操作したり、アームを排土側に操作しながら、第2ブームを運転部側に操作したとする。
【0005】
このような操作を行うと、バケットは運転部の横側から運転部の前方下方に直線的に移動しようとして、運転部の前方を斜めに横切ろうとする状態となるのであるが、この移動の途中でバケットが牽制面に達すると、第2ブームの運転部側への操作が阻止され、この後の第1ブームの下降側への操作やアームの排土側への操作により、バケットが牽制面の前端に達する言う状態が生じる。このような状態になってバケットが牽制面から前方に外れると、第2ブームの運転部側への操作が阻止された状態が急に解除されて、急速に第2ブームが運転部側に移動する状態となり、ショックの生じることがある。
本発明は、バックホウにおいて第2ブームが運転部側に操作される際、第2ブームの運転部側への移動が阻止された状態が解除された途端に、急速に第2ブームが運転部側に移動するような状態を防止することを目的としている。
【0006】
【課題を解決するための手段】
[I]
例えばバケットが運転部の横側に位置している状態で、第1ブームを下降側に操作又はアームを排土側に操作しながら、第2ブームを運転部側に操作したり、第1ブームを下降側に操作し且つアームを排土側に操作しながら、第2ブームを運転部側に操作したとする。このような操作を行うと、バケットは運転部の横側から運転部の前方(又は前方下方)に直線的に移動しようとして、運転部の前方を斜めに横切ろうとする状態となる。
【0007】
請求項1の特徴によると、前述のように第2ブームを運転部側に操作した場合に、ブーム上下角度センサーのある検出値及びアーム前後角度センサーのある検出値において、ブーム左右角度センサーの検出値が設定値に達すると、第2ブームの運転部側への操作が阻止されてバケットの運転部への接触が回避される。
請求項2の特徴によると、前述のように第2ブームを運転部側に操作した場合に、運転部と第1ブームとの間の空間に設定された牽制面に、バケットが達すると、第2ブームの運転部側への操作が阻止されてバケットの運転部への接触が回避される。
【0008】
[II]
前項[I]に記載の状態の後、請求項1の特徴によると、第1ブームの下降側への操作やアームの排土側への操作により、バケットが前方に移動して運転部の横側前方に達すると(第2ブームの運転部側のへの操作は阻止されている)、第2ブームを運転部側に操作してもバケットが運転部に接触する可能性が小さくなり前述の設定値が変化して、ブーム左右角度センサーの検出値が前述の設定値から外れて、第2ブームを運転部側に操作可能な状態になる。
前項[I]に記載の状態の後、請求項2の特徴によると、第1ブームの下降側への操作やアームの排土側への操作により、バケットが牽制面に沿って前方に移動して牽制面から前方に外れると(第2ブームの運転部側のへの操作は阻止されている)、第2ブームを運転部側に操作してもバケットが運転部に接触する可能性が小さくなり、第2ブームを運転部側に操作可能な状態になる。
【0009】
前述のように第2ブームを運転部側に操作可能な状態になった場合、請求項1及び2の特徴によると、第2ブームの運転部側への操作が許され、第2ブームの運転部側への操作が阻止された状態から、第2ブームが漸次的に加速して運転部側に移動する状態となるのであり、第2ブームがショック少なく運転部側に移動する。
【0010】
[III]
請求項2の特徴や「従来の技術」に記載の特開平6−17452号公報の構成では、運転部と第1ブームとの間の空間に牽制面を設定しており、バケットの位置を検出する位置センサーの検出に基づいて、バケットが牽制面に達すると第2ブームの運転部側への操作を阻止するように構成している。
この場合、牽制面は運転部(旋回台)を基準とした3次元空間にXYZ座標によって設定されており、バケットの位置は位置センサーの検出値や事前に求められている第1及び第2ブームの長さ、アームの長さに基づいて演算され、運転部(旋回台)を基準とした3次元空間にXYZ座標によって表される。このように牽制面をXYZ座標で設定し、バケットの位置をXYZ座標で表すことにより、牽制面とバケットとの位置関係をXYZ座標で認識している。
【0011】
請求項2の特徴や「従来の技術」に記載の特開平6−17452号公報の構成のように、バケットの位置をXYZ座標で表す場合、位置センサーの検出値や第1及び第2ブームの長さ、アームの長さにより、三角関数を使用してバケットの位置のXYZ座標を演算することになるので、演算処理が複雑なものになっている。これにより、演算処理を行う演算装置にとって負荷が大きなものとなり、演算装置への負荷の軽減と言う面で改善の余地がある。
【0012】
[IV]
請求項1の特徴によるバックホウでは、旋回台に上下揺動自在に第1ブームが支持され、第1ブームの先端に左右揺動自在に第2ブームが支持されて、第2ブームの先端に前後揺動自在にアームが支持されており、アームの先端にバケットが支持されている。これにより請求項1の特徴によると、第1及び第2ブーム、アームの長さが決まっている状態で、旋回台に対する第1ブームの上下角度、第1ブームに対する第2ブームの左右角度及び第2ブームに対するアームの前後角度が決まれば、アームの先端に支持されたバケットの位置は一義的に決まる。
従って請求項1の特徴によると、三角関数を使用してバケットの位置のXYZ座標を演算しなくても、ブーム上下角度センサーの検出値、ブーム左右角度センサーの検出値及びアーム前後角度センサーの検出値を、そのままバケットの位置を示す値としたり、バケットの位置を示すパラメータとして使用したりすることができる。
【0013】
これにより請求項1の特徴によると、ブーム上下角度センサーのある検出値及びアーム前後角度センサーのある検出値において、第2ブームが運転部側に操作されてブーム左右角度センサーの検出値が設定値に達すると、第2ブームの運転部側への操作が阻止されるのであり、これによってバケットの運転部への接触が回避される。
この場合、ブーム上下角度センサーの検出値及びアーム前後角度センサーの検出値が変化すれば、前述の設定値(ブーム左右角度センサーの検出値)もこれに応じて変化する。
【0014】
【発明の実施の形態】
[1]
図1はバックホウの全体側面を示しており、ゴムクローラ型式の走行装置1に旋回台2が支持され、旋回台2の前部にバックホウ装置3が備えられている。バックホウ装置3は、油圧シリンダ11により上下に揺動操作されるブーム4、油圧シリンダ12により前後に揺動操作されるアーム5、及び油圧シリンダ13により揺動操作されるバケット6を備えて構成されている。
【0015】
バックホウ装置3のブーム4は、上下に揺動操作される第1ブーム4a、第1ブーム4aの前端の軸芯P1周りに揺動自在に連結された第2ブーム4b、第2ブーム4bの前端の軸芯P2周りに揺動自在に連結された支持ブラケット4cで構成されており、支持ブラケット4cにアーム5が連結されている。第1ブーム4aと支持ブラケット4cとに亘り、連係リンク8が架設されて平行四連リンクが構成されており、油圧シリンダ7により第2ブーム4bを第1ブーム4aに対して揺動操作することにより、アーム5及びバケット6を左右に移動させる。
【0016】
図1及び図5に示すように旋回台2において、右側にバックホウ装置3が配置され、左側に運転席14や右及び左操作レバー9,10等で構成された運転部15が配置されている。旋回台2の左右中央に、バックホウ装置3と運転部15とを仕切る窓付きの縦仕切り板16が設けられており、縦仕切り板16の上端に旋回台2の外側に沿った上仕切り板17が固定されている。
【0017】
[2]
次に、油圧回路構造、バックホウ装置3及び旋回台2等の操作構造について説明する。
図2に示すように、第1ブーム4a(ブーム4)の油圧シリンダ11の制御弁21、アーム5の油圧シリンダ12の制御弁22、バケット6の油圧シリンダ13の制御弁23、旋回台2の旋回モータ18の制御弁24、第2ブーム4bの油圧シリンダ7の制御弁25、右の走行装置1の制御弁26、左の走行装置1の制御弁27、サービスポート(図示せず)の制御弁28、並びに図1に示すドーザ19を昇降操作する油圧シリンダ51の制御弁29が備えられており、ポンプ20からの作動油が制御弁21〜29に供給されている。
【0018】
第1ブーム4aの制御弁21、アーム5の制御弁22、バケット6の制御弁23、旋回台2の制御弁24及び第2ブーム4bの制御弁25が、パイロット圧によるパイロット操作式で中立復帰型に構成されている。右及び左の走行装置1の制御弁26,27、サービスポートの制御弁28、ドーザ19の制御弁29が、操作レバー(図示せず)により操作される機械操作式で中立復帰型に構成されている。
【0019】
図3に示すように右操作レバー9は前後左右に操作自在に構成されており、右操作レバー9の後操作によりパイロット圧を発生するパイロット弁31a、及び右操作レバー9の前操作によりパイロット圧を発生するパイロット弁31b、右操作レバー9の右操作によりパイロット圧を発生するパイロット弁33a、及び右操作レバー9の左操作によりパイロット圧を発生するパイロット弁33bが備えられている。
【0020】
左操作レバー10も同様に前後左右に操作自在に構成されており、左操作レバー10の後操作によりパイロット圧を発生するパイロット弁32a、及び左操作レバー10の前操作によりパイロット圧を発生するパイロット弁32b、左操作レバー10の右操作によりパイロット圧を発生するパイロット弁34a、及び左操作レバー10の左操作によりパイロット圧を発生するパイロット弁34bが備えられている。
【0021】
図3及び図5に示すように左右に踏み操作自在な操作ペダル39が備えられており、操作ペダル39の左踏み操作によりパイロット圧を発生するパイロット弁35a、及び操作ペダル39の右踏み操作によりパイロット圧を発生するパイロット弁35bが備えられている。パイロット弁31a〜35bにパイロット圧を供給するパイロットポンプ30が備えられている。
【0022】
図2及び図3に示すように、右操作レバー9のパイロット弁31a,31bと第1ブーム4aの制御弁21、及び右操作レバー9のパイロット弁33a,33bとバケット6の制御弁23とが、パイロット油路を介して接続されており、左操作レバー10のパイロット弁32a,32bとアーム5の制御弁22、及び左操作レバー10のパイロット弁34a,34bと旋回台2の制御弁24とが、パイロット油路を介して接続されている。操作ペダル39のパイロット弁35a,35bと第2ブーム部分4bの制御弁25とが、パイロット油路を介して接続されている。
【0023】
以上の構造により右操作レバー9を後操作するとパイロット弁31aからのパイロット圧により、第1ブーム4aの制御弁21が上昇側(油圧シリンダ11の伸長側)に操作され、右操作レバー9を前操作するとパイロット弁31bからのパイロット圧により、第1ブーム4aの制御弁21が下降側(油圧シリンダ11の収縮側)に操作される。右操作レバー9を右操作するとパイロット弁33aからのパイロット圧により、バケット6の制御弁23が排土側(油圧シリンダ13の収縮側)に操作され、右操作レバー9を左操作するとパイロット弁33bからのパイロット圧により、バケット6の制御弁23が掻き込み側(油圧シリンダ13の伸長側)に操作される。
【0024】
左操作レバー10を後操作するとパイロット弁32aからのパイロット圧により、アーム5の制御弁22が掻き込み側(油圧シリンダ12の伸長側)に操作され、左操作レバー10を前操作するとパイロット弁32bからのパイロット圧により、アーム5の制御弁22が排土側(油圧シリンダ12の収縮側)に操作される。左操作レバー10を右操作するとパイロット弁34aからのパイロット圧により、旋回台2の制御弁24が右旋回側に操作され、左操作レバー10を左操作するとパイロット弁34bからのパイロット圧により、旋回台2の制御弁24が左旋回側に操作される。
【0025】
操作ペダル39を左踏み操作するとパイロット弁35aからのパイロット圧により、第2ブーム4bの制御弁25が左揺動側(油圧シリンダ7の伸長側)に操作され、操作ペダル39を右踏み操作するとパイロット弁35bからのパイロット圧により、第2ブーム4bの制御弁25が右揺動側(油圧シリンダ7の収縮側)に操作される。
【0026】
右及び左操作レバー9,10、操作ペダル39を中立位置から大きく操作する程、パイロット弁31a〜35bのパイロット圧が大きくなるように構成されている。これにより、右及び左操作レバー9,10、操作ペダル39を中立位置から大きく操作する程、右及び左操作レバー9,10、操作ペダル39の操作位置に対応してパイロット弁31a〜35bのパイロット圧が大きくなり、制御弁21〜25が流量大側に操作されるのであり、右及び左操作レバー9,10、操作ペダル39を大きく操作する程、油圧シリンダ7,11,12,13及び旋回モータ18が高速で作動する。
【0027】
[3]
図4及び図5に示すように、旋回台2及び第1ブーム4aの連結部に、旋回台2に対する第1ブーム4aの上下角度a1を検出するブーム上下角度センサー36が備えられ、第1及び第2ブーム4a,4bの連結部に、第1ブーム4aに対する第2ブーム4bの左右角度a2を検出するブーム左右角度センサー37が備えられている(第2ブーム4bを左揺動側の限度に揺動させた位置(図5の二点鎖線参照)を基準とした左右角度a2)。支持ブラケット4c及びアーム5の連結部に、第2ブーム4bに対するアーム5の前後角度a3を検出するアーム前後角度センサー38が備えられており、図3に示すようにブーム上下角度センサー36、ブーム左右角度センサー37及びアーム前後角度センサー38の検出値が制御装置40に入力されている。
【0028】
図3に示すように、右操作レバー9のパイロット弁31aと第1ブーム4aの制御弁21とを接続するパイロット油路(第1ブーム4aの制御弁21を上昇側に操作するパイロット油路)、左操作レバー10のパイロット弁32aとアーム5の制御弁22とを接続するパイロット油路(アーム5の制御弁22を掻き込み側に操作するパイロット油路)、並びに操作ペダル39のパイロット弁35aと第2ブーム4bの制御弁25とを接続するパイロット油路(第2ブーム4bの制御弁25を左揺動側に操作するパイロット油路)の各々に、電磁操作式の圧力制御弁41,42,43が備えられている。
【0029】
従って、圧力制御弁41,42,43によりパイロット圧を減圧操作して(最高圧は右及び左操作レバー9,10、操作ペダル39で設定されている値)、右及び左操作レバー9,10、操作ペダル39の操作位置に関係なく、第1ブーム4aの制御弁21の上昇側の開度、アーム5の制御弁22の掻き込み側の開度、第2ブーム4bの制御弁25の左揺動側の開度を任意に変更できる。圧力制御弁41,42,43によりパイロット圧を零に設定することによって、右及び左操作レバー9,10、操作ペダル39の操作位置に関係なく、第1ブーム4aの油圧シリンダ11、アーム5の油圧シリンダ12、第2ブーム4bの油圧シリンダ7を停止させることができる。
【0030】
[4]
次に、第1ブーム4aを上昇側及び下降側に操作した場合の制御について、図6に基づいて説明する。
ブーム上下角度センサー36の検出値(第1ブーム4aの上下角度a1)、ブーム左右角度センサー37(第2ブーム4bの左右角度a2)、及びアーム前後角度センサー38の検出値(アーム5の前後角度a3)が、制御装置40に常時入力されている(ステップS1)。
【0031】
右操作レバー9を後操作して第1ブーム4aを上昇側に操作する場合、バケット6は運転部15に接近する状態となる。これにより、右操作レバー9が後操作されて、第1ブーム4aの上下角度a1が上昇側に変化する場合(第1ブーム4aの上下角度a1が増大する場合)(ステップS2)、このときの第2ブーム4bの左右角度a2及びアーム5の前後角度a3に基づいて、関係式fb1,fb2により第1設定角度BO1及び第2設定角度BO2が算出される(ステップS3)。
【0032】
この場合、第1ブーム4aの上下角度a1が第1設定角度BO1に達していなければ(ステップS6,S7)、バケット6は運転部15からまだ充分に遠い位置にあると判断されて、右操作レバー9の操作位置に対応したパイロット圧が発生し、右操作レバー9の操作位置に対応した速度で第1ブーム4aが上昇側に操作される(ステップS8)。
【0033】
次に第1ブーム4aの上下角度a1が第1設定角度BO1を越えると(ステップS7,S9)、バケット6が運転部15から第1所定距離だけ離れた位置を越えて運転部15に接近したと判断されて、第1ブーム4aの上下角度a1と第1設定角度BO1との差Δa1が算出される(ステップS10)。
これにより、差Δa1に基づいて図3に示す圧力制御弁41によりパイロット弁31aのパイロット圧が減圧操作されて、右操作レバー9の後操作の操作位置に関係なく、第1ブーム4aの上昇側への操作(油圧シリンダ11の伸長速度)が減速操作されるのであり、差Δa1が大きくなる程(バケット6が運転部15に接近する程)、第1ブーム4aの上昇側への操作(油圧シリンダ11の伸長速度)が大きく減速操作される(ステップS11)。
【0034】
次に第1ブーム4aの上下角度a1が第2設定角度BO2に達すると(ステップS9)、バケット6が運転部15から第2所定距離だけ離れた位置に達したと判断されて、図3に示す圧力制御弁41によりパイロット弁31aのパイロット圧がアンロードされて、右操作レバー9の後操作の操作位置に関係なく、第1ブーム4aの上昇側への操作(油圧シリンダ11の伸長操作)が阻止される(ステップS12)。
【0035】
逆に右操作レバー9が前操作されて、第1ブーム4aの上下角度a1が下降側に変化する場合(第1ブーム4aの上下角度a1が減少する場合)(ステップS2)、バケット6が運転部15から離間する状態となるので、右操作レバー9の前操作の操作位置に対応したパイロット圧が発生し、右操作レバー9の前操作の操作位置に対応した速度で第1ブーム4aが下降側に操作される(ステップS13)(図3に示すように右操作レバー9のパイロット弁31bのパイロット油路には、圧力制御弁41が設けられていない点による)。
【0036】
[5]
前項[4]に記載のように、ステップS3の関係式fb1,fb2で算出される第1及び第2設定角度BO1,BO2は、第2ブーム4bの左右角度a2及びアーム5の前後角度a3が変化すると、これに伴って変化するものであり、例えば第2ブーム4bの左右角度a2が小さくなる程、アーム5の前後角度a3が小さくなる程、第1及び第2設定角度BO1,BO2は小さくなる。
【0037】
これにより、第2ブーム4bの左右角度a2及びアーム5の前後角度a3に対応して、第1ブーム4aの上下角度a1が第1設定角度BO1に達したときのバケットピン6a(アーム5の先端にバケット6を揺動自在に支持するもの)の位置をつないでいくと、図4及び図5に示すように、運転部15(縦及び上仕切り板16,17)から前方に第1所定距離だけ離れた面状の軌跡B1となる。
第2ブーム4bの左右角度a2及びアーム5の前後角度a3に対応して、第1ブーム4aの上下角度a1が第2設定角度BO2に達したときのバケットピン6aの位置をつないでいくと、運転部15(縦及び上仕切り板16,17)から前方に第2所定距離だけ離れた面状の軌跡A1となる。
【0038】
この場合、第1ブーム4aの上下角度a1が第2設定角度BO2に達した状態(バケットピン6aが軌跡A1に位置した状態)において、バケット6を最も運転部15に近づくように揺動操作しても、縦仕切り板16の前縁部及び上仕切り板17の前縁部から所定距離だけ離れた軌跡C1にバケット6の先端が位置するように、第2設定角度BO2(軌跡A1)が設定されている。
【0039】
図5に示すように、第2ブーム4bの左右角度a2が所定角度(図5に示す構成では第1及び第2ブーム4a,4bが直線状になる状態から、第2ブーム4bが右揺動側に位置した状態)を越えると、バケット6が運転部15から右横側に離れるので、この状態で第1ブーム4aを上昇側及び下降側に操作しても、バケット6が運転部15(縦及び上仕切り板16,17)に接触することはない。
これにより、第2ブーム4bの左右角度a2が前述の所定角度よりも大きくなると、ステップS3の関係式fb1,fb2で算出される第1及び第2設定角度BO1,BO2が、充分に大きな値(第1ブーム4aの上昇限度を越えるような大きな値)に設定されて、第1ブーム4aを上昇限度まで操作することが可能になる。
【0040】
第2ブーム4bの左右角度a2が前述の所定角度に達した状態で、第1ブーム4aを上昇側及び下降側に操作した際に、バケットピン6aの位置をつないでいくと、図5に示すように運転部15(縦及び上仕切り板16,17)から右横方に第1所定距離だけ離れた面状の軌跡A2となる。この場合、第2ブーム4bの左右角度a2が前述の所定角度に達した状態(バケットピン6aが軌跡A2に位置した状態)において、縦仕切り板16から所定距離だけ離れた軌跡C2にバケット6の左横側面が位置するように、前述の所定角度(軌跡A2)が設定されている。
【0041】
第1ブーム4aが上昇限度まで操作されようとした場合、第1ブーム4aの上下角度a1が上昇限度の少し手前の第3設定角度BO3に達すると(ステップS4)、図3に示す圧力制御弁41によりパイロット弁31aのパイロット圧が減圧操作されて、右操作レバー9の後操作の操作位置に関係なく、第1ブーム4aの上昇側への操作(油圧シリンダ11の伸長速度)が減速操作されるのであり(ステップS5)、第1ブーム4aが上昇限度に達すると図2に示すリリーフ弁45が開いて、第1ブーム4a(油圧シリンダ11)が停止する。
【0042】
[6]
次に、第1ブーム4aを上昇側に操作しながらアーム5を掻き込み側に操作した場合の制御について、図6に基づいて説明する。
右操作レバー9を後操作して第1ブーム4aを上昇側に操作しながら、左操作レバー10を後操作してアーム5を掻き込み側に操作する場合、バケット6は運転部15に急速に接近する状態となる。図3に示すように、左操作レバー10のパイロット弁32bとアーム5の制御弁22とを接続するパイロット油路に、パイロットポンプ30からのパイロット圧を分岐させるパイロット油路45を接続する圧力制御弁44が設けられており、通常は圧力制御弁44は閉位置に保持されている。
【0043】
右操作レバー9が後操作されて第1ブーム4aの上下角度a1が上昇側に変化する場合(第1ブーム4aの上下角度a1が増大する場合)(ステップS2)、このときの第1ブーム4aの上下角度a1及び第2ブーム4bの左右角度a2に基づいて、関係式fa3により第3設定角度AR3が算出される(ステップS3)。
【0044】
右操作レバー9が後操作されて第1ブーム4aの上下角度a1が上昇側に変化する状態で(ステップS2)、左操作レバー10が後操作されてアーム5が掻き込み側に操作された場合(ステップS6)、アーム5の前後角度a3が第3設定角度AR3に達していなければ、バケット6は運転部15からまだ充分に遠い位置にあると判断されて、右及び左操作レバー9,10の操作位置に対応したパイロット圧が発生し、右及び左操作レバー9,10の操作位置に対応した速度で第1ブーム4aが上昇側に操作され、アーム5が掻き込み側に操作される。
【0045】
次にアーム5の前後角度a3が第3設定角度AR3を越えると(ステップS14)、バケット6が運転部15から第3所定距離(前項[4]に記載の第1設定距離よりも運転部15から遠い位置)だけ離れた位置を越えて運転部15に接近したと判断されて、図3に示す圧力制御弁42によりパイロット弁32aのパイロット圧がアンロードされ、圧力制御弁44によりアーム5の制御弁22(排土側)にパイロット圧が供給されて、第1ブーム4aが上昇側に操作されるのと同時に、左操作レバー10の後操作の操作位置に関係なく、アーム5が低速で排土側に操作される(油圧シリンダ12の収縮操作)(ステップS15)。
【0046】
前述のように第1ブーム4aが上昇側に操作されるのと同時に、左操作レバー10の後操作の操作位置に関係なく、アーム5が低速で排土側に操作される際、右操作レバー9の後操作の操作位置に関係なく、図3に示す圧力制御弁41によりパイロット弁31aのパイロット圧が減圧操作されて、第1ブーム4aの上昇側への操作が減速操作される(ステップS16)。
【0047】
第1ブーム4aが上昇側に操作される場合、第1ブーム4aの上下角度a1が小さい程(第1ブーム4aが旋回台2と平行に寝た状態になる程)、第1ブーム4aの上昇側への操作に対して、第1ブーム4aの先端(アーム5及びバケット6)の運転部15への移動の水平成分は小さいものになるので、第1ブーム4aの上下角度a1が小さい状態では、ステップS16において第1ブーム4aの上昇側への操作はあまり減速操作されない。
【0048】
逆に第1ブーム4aの上下角度a1が大きい程(第1ブーム4aが旋回台2に対して直立した状態になる程)、第1ブーム4aの上昇側への操作に対して、第1ブーム4aの先端(アーム5及びバケット6)の運転部15への移動の水平成分は大きなものになるので、第1ブーム4aの上下角度a1が大きい状態では、ステップS16において第1ブーム4aの上昇側への操作が大きく減速操作される。
【0049】
このように右及び左操作レバー9,10を後操作して、第1ブーム4aを上昇側に操作しながらアーム5を掻き込み側に操作した場合、第1ブーム4aの上昇側への操作が減速操作されながら(第1ブーム4aの上下角度a1が大きくなる程、第1ブーム4aの上昇側への操作が大きく減速操作される)、アーム5が低速で排土側に操作されるように構成することによって、ステップS12に示すように第1ブーム4aの上昇側への操作が阻止されることなく、第1ブーム4aが上昇側に操作されて、バケット6が運転部15の前側を上方に移動していく。
【0050】
[7]
次に、アーム5を掻き込み側及び排土側に操作した場合の制御について、図7に基づいて説明する。
前項[4]に記載のように、ブーム上下角度センサー36の検出値(第1ブーム4aの上下角度a1)、ブーム左右角度センサー37(第2ブーム4bの左右角度a2)、及びアーム前後角度センサー38の検出値(アーム5の前後角度a3)が、制御装置40に常時入力されている(ステップS1)。
【0051】
左操作レバー10を後操作してアーム5を掻き込み側に操作すると、バケット6は運転部15に接近する状態となる。これにより、左操作レバー10が後操作されて、アーム5の前後角度a3が掻き込み側に変化する場合(アーム5の前後角度a3が減少する場合)(ステップS17)、このときの第1ブーム4aの上下角度a1及び第2ブーム4bの左右角度a2に基づいて、関係式fa1,fa2により第1設定角度AR1及び第2設定角度AR2が算出される(ステップS18)。
【0052】
この場合、アーム5の前後角度a3が第1設定角度AR1に達していなければ(ステップS21)、バケット6は運転部15からまだ充分に遠い位置にあると判断されて、左操作レバー10の操作位置に対応したパイロット圧が発生し、左操作レバー10の操作位置に対応した速度でアーム5が掻き込み側に操作される(ステップS22)。
【0053】
次にアーム5の前後角度a3が第1設定角度AR1を越えると(ステップS21,S23)、バケット6が運転部15から第1所定距離だけ離れた位置を越えて運転部15に接近したと判断されて、アーム5の前後角度a3と第1設定角度AR1との差Δa3が算出される(ステップS24)。
これにより、差Δa3に基づいて図3に示す圧力制御弁42によりパイロット弁32aのパイロット圧が減圧操作されて、左操作レバー10の後操作の操作位置に関係なく、アーム5の掻き込み側への操作(油圧シリンダ12の伸長速度)が減速操作されるのであり、差Δa3が大きくなる程(バケット6が運転部15に接近する程)、アーム5の掻き込み側への操作(油圧シリンダ12の伸長速度)が大きく減速操作される(ステップS25)。
【0054】
次にアーム5の前後角度a3が第2設定角度AR2に達すると(ステップS23)、バケット6が運転部15から第2所定距離だけ離れた位置に達したと判断されて、図3に示す圧力制御弁42によりパイロット弁32aのパイロット圧がアンロードされて、左操作レバー10の後操作の操作位置に関係なく、アーム5の掻き込み側への操作(油圧シリンダ12の伸長操作)が阻止される(ステップS26)。
【0055】
逆に左操作レバー10が前操作されて、アーム5の前後角度a3が排土側に変化する場合(アーム5の前後角度a3が増大する場合)(ステップS17)、バケット6が運転部15から離間する状態となるので、左操作レバー10の前操作の操作位置に対応したパイロット圧が発生し、左操作レバー10の前操作の操作位置に対応した速度でアーム5が排土側に操作される(ステップS27)。
【0056】
[8]
前項[7]に記載のように、ステップS18の関係式fa1,fa2で算出される第1及び第2設定角度AR1,AR2は、第1ブーム4aの上下角度a1及び第2ブーム4bの左右角度a2が変化すると、これに伴って変化するものであり、例えば、第1ブーム4aの上下角度a1が小さくなる程、第2ブーム4bの左右角度a2が大きくなる程、第1及び第2設定角度AR1,AR2は小さくなる。
【0057】
これにより、第1ブーム4aの上下角度a1及び第2ブーム4bの左右角度a2に対応して、アーム5の前後角度a3が第1設定角度AR1に達したときのバケットピン6aの位置をつないでいくと、図4,5及び前項[5]に記載のような軌跡B1となる。第1ブーム4aの上下角度a1及び第2ブーム4bの左右角度a2に対応して、アーム5の前後角度a3が第2設定角度AR2に達したときのバケットピン6aの位置をつないでいくと、図4,5及び前項[5]に記載ような軌跡A1となる。
【0058】
図5及び前項[5]に記載のように、第2ブーム4bの左右角度a2が所定角度(図5に示す構成では第1及び第2ブーム4a,4bが直線状になる状態から第2ブーム4bが右揺動側に位置した状態)を越えると、バケット6が運転部15から右横側に離れるので、この状態でアーム5を掻き込み側及び排土側に操作しても、バケット6が運転部15(縦及び上仕切り板16,17)に接触することはない。
これにより、第2ブーム4bの左右角度a2が前述の所定角度よりも大きくなると、ステップS18の関係式fa1,fa2で算出される第1及び第2設定角度AR1,AR2が、充分に小さな値(アーム5の掻き込み限度を越えるような小さな値)に設定されて、アーム5を掻き込み限度まで操作することが可能になる。第2ブーム4bの左右角度a2が前述の所定角度に達した状態で、アーム5を掻き込み側及び排土側に操作した際に、バケットピン6aの位置をつないでいくと、図5及び前項[5]に記載のような軌跡A2となる。
【0059】
アーム5が掻き込み限度まで操作されようとした場合、アーム5の前後角度a3が掻き込み限度の少し手前の第4設定角度AR4に達すると(ステップS19)、図3に示す圧力制御弁42によりパイロット弁32aのパイロット圧が減圧操作されて、左操作レバー10の後操作の操作位置に関係なく、アーム5の掻き込み側への操作(油圧シリンダ12の伸長速度)が減速操作されるのであり(ステップS20)、アーム5が掻き込み限度に達すると図2に示すリリーフ弁45が開いて、アーム5(油圧シリンダ12)が停止する。
【0060】
[9]
次に、第2ブーム4bを左揺動側及び右揺動側に操作した場合の制御について図8に基づいて説明する。
前項[4]に記載のように、ブーム上下角度センサー36の検出値(第1ブーム4aの上下角度a1)、ブーム左右角度センサー37(第2ブーム4bの左右角度a2)、及びアーム前後角度センサー38の検出値(アーム5の前後角度a3)が、制御装置40に常時入力されている(ステップS1)。
【0061】
操作ペダル39を左踏み操作して第2ブーム4bを左揺動側に操作すると、バケット6は運転部15に接近する状態となる。これにより、操作ペダル39が左踏み操作されて、第2ブーム4bの左右角度a2が左揺動側に変化する場合(第2ブーム4bの左右角度a2が減少する場合)(ステップS28)、このときの第1ブーム4aの上下角度a1及びアーム5の前後角度a3に基づいて、関係式fo1,fo2により第1設定角度OF1及び第2設定角度OF2が算出される(ステップS29)。
【0062】
この場合、第2ブーム4bの左右角度a2が第1設定角度OF1に達していなければ(ステップS32)、バケット6は運転部15からまだ充分に遠い位置にあると判断されて、操作ペダル39の操作位置に対応したパイロット圧が発生して、操作ペダル39の操作位置に対応した速度で第2ブーム4bが左揺動側に操作される(ステップS33)。
【0063】
次に第2ブーム4bの左右角度a2が第1設定角度OF1を越えると(ステップS32,S34)、バケット6が運転部15から第1所定距離だけ離れた位置を越えて運転部15に接近したと判断されて、第2ブーム4bの左右角度a2と第1設定角度OF1との差Δa2が算出される(ステップS35)。
これにより、差Δa2に基づいて図3に示す圧力制御弁43によりパイロット弁35aのパイロット圧が減圧操作されて、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長速度)が減速操作されるのであり、差Δa2が大きくなる程(バケット6が運転部15に接近する程)、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長速度)が大きく減速操作される(ステップS36)。
【0064】
次に第2ブーム4bの左右角度a2が第2設定角度OF2に達すると(ステップS34)、バケット6が運転部15から第2所定距離だけ離れた位置に達したと判断されて、図3に示す圧力制御弁43によりパイロット弁35aのパイロット圧がアンロードされて、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長操作)が阻止される(ステップS37)。
【0065】
逆に操作ペダル39が右踏み操作されて、第2ブーム4bの左右角度a2が右揺動側に変化する場合(第2ブーム4bの左右角度a2が増大する場合)(ステップS28)、バケット6が運転部15から離間する状態となるので、操作ペダル39の右踏み操作の操作位置に対応したパイロット圧が発生し、操作ペダル39の右踏み操作の操作位置に対応した速度で第2ブーム4bが右揺動側に操作される(ステップS38)(図3に示すように操作ペダル39のパイロット弁35bのパイロット油路には、圧力制御弁43が設けられていない点による)。
【0066】
[10]
前項[9]に記載のように、ステップS29の関係式fo1,fo2で算出される第1及び第2設定角度OF1,OF2は、第1ブーム4aの上下角度a1及びアーム5の前後角度a3が変化すると、これに伴って変化するものである。運転部15の前方にバケット15が位置する場合には、第1ブーム4aの上下角度a1が小さくなる程、アーム5の前後角度a3が大きくなる程、第1及び第2設定角度OF1,OF2は小さくなる。運転部15の右横側にバケット15が位置するような第1ブーム4aの上下角度a1及びアーム5の前後角度a3の場合、第1及び第2設定角度OF1,OF2は一定値となる。
【0067】
これにより、運転部15の前方にバケット15が位置する場合、第1ブーム4aの上下角度a1及びアーム5の前後角度a3に対応して、第2ブーム4bの左右角度a2が第1設定角度OF1に達したときのバケットピン6aの位置をつないでいくと、図4,5及び前項[5]に記載のような軌跡B1となる。第1ブーム4aの上下角度a1及びアーム5の前後角度a3に対応して、第2ブーム4bの左右角度a2が第2設定角度OF2に達したときのバケットピン6aの位置をつないでいくと、図4,5及び前項[5]に記載ような軌跡A1となる。
【0068】
運転部15の右横側にバケット15が位置する場合、第2ブーム4bの左右角度a2が第1設定角度OF1に達したときのバケットピン6aの位置をつないでいくと、図5及び前項[5]に記載のような軌跡B2となる。第1ブーム4aの上下角度a1及びアーム5の前後角度a3に対応して、第2ブーム4bの左右角度a2が第2設定角度OF2に達したときのバケットピン6aの位置をつないでいくと、図5及び前項[5]に記載ような軌跡A2となる。
【0069】
バケット6を運転部15から前方に充分に離れた位置に位置させていると(第1ブーム4aを下降側に操作し、アーム5を排土側に操作した状態)、この状態で第2ブーム4aを左揺動限度まで操作しても、バケット6が運転部15(縦及び上仕切り板16,17)に接触することはない。
これにより、バケット6を運転部15から前方に充分に離れた位置に位置させていると、ステップS29の関係式fo1,fo2で算出される第1及び第2設定角度OF1,OF2が充分に小さな値(第2ブーム4bの左揺動限度を越えるような小さな値)に設定されて、第2ブーム4bを左揺動限度まで操作することが可能になる。
【0070】
第2ブーム4bが左揺動限度まで操作されようとした場合、第2ブーム4bの左揺動限度の少し手前の第3設定角度OF3に達すると(ステップS30)、図3に示す圧力制御弁43によりパイロット弁35aのパイロット圧が減圧操作されて、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長速度)が減速操作されるのであり(ステップS31)、第2ブーム4bが左揺動限度に達すると図2に示すリリーフ弁45が開いて、第2ブーム4b(油圧シリンダ7)が停止する。
【0071】
[11]
次に、第1ブーム4aを上昇側に操作してアーム5を掻き込み側に操作し、第2ブーム4bを右揺動側に操作して、運転部15(縦仕切り板16)の右横側にバケット15を位置させている状態において(図10の実線参照)、第1ブーム4aを下降側に操作してアーム5を排土側に操作し、第2ブーム4bを左揺動側に操作して、バケット6を運転部15の前方下方(図10の二点鎖線参照)に移動させる場合について、図9及び図10に基づいて説明する。
【0072】
前項[4]に記載のように、ブーム上下角度センサー36の検出値(第1ブーム4aの上下角度a1)、ブーム左右角度センサー37(第2ブーム4bの左右角度a2)、及びアーム前後角度センサー38の検出値(アーム5の前後角度a3)が、制御装置40に常時入力されている(図6のステップS1)。
【0073】
図10の実線に示すようにバケット6が運転部15の右横側に位置している状態で、操作ペダル39が左踏み操作されて第2ブーム4bが左揺動側に操作された際(第2ブーム4bの左右角度a2が減少、ステップS41)、右操作レバー9又は左操作レバー10が前操作されるか、右及び左操作レバー9,10の両方が前操作されると(第1ブーム4aの上下角度a1が減少、ステップS42)、(アーム5の前後角度a2が増大、ステップS43)、バケット6は運転部15の右横側の位置(図10の実線の位置参照)から、運転部15の前方下方の位置(図10の二点鎖線の位置参照)に向かって、運転部15の前方を斜めに横切ろうとする。
【0074】
この場合、第1ブーム4aの上下角度a1及びアーム5の前後角度a3に基づいて、関係式fo1,fo2により第1設定角度OF1及び第2設定角度OF2が算出される(ステップS44)。
これにより、第2ブーム4bの左右角度a2が第1設定角度OF1に達していなければ(ステップS45)、バケット6は運転部15からまだ充分に遠い位置にあると判断されて、操作ペダル39の操作位置に対応したパイロット圧が発生して、操作ペダル39の操作位置に対応した速度で第2ブーム4bが左揺動側に操作される(ステップS40,S46,S47)(図10の矢印Y1の状態参照)。
【0075】
次に第2ブーム4bの左右角度a2が第1設定角度OF1を越えると(ステップS45,S48)、バケット6が運転部15から第1所定距離だけ離れた位置を越えて運転部15に接近したと判断されて、第2ブーム4bの左右角度a2と第1設定角度OF1との差Δa2が算出される(ステップS49)。
これにより、差Δa2に基づいて図3に示す圧力制御弁43によりパイロット弁35aのパイロット圧が減圧操作されて、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長速度)が減速操作されるのであり、差Δa2が大きくなる程(バケット6が運転部15に接近する程)、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長速度)が大きく減速操作される(ステップS50)(図10の矢印Y2の状態参照)。
【0076】
次に第2ブーム4bの左右角度a2が第2設定角度OF2に達すると(ステップS48)、バケット6が運転部15から第2所定距離だけ離れた位置に達したと判断されて、図3に示す圧力制御弁43によりパイロット弁35aのパイロット圧がアンロードされて、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長操作)が阻止される(ステップS51)。
【0077】
この場合、右操作レバー9又は左操作レバー10が前操作されるか、右及び左操作レバー9,10の両方が前操作されており、第1ブーム4aが下降側に操作され、アーム5が排土側に操作されているので、平面的に見ると第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長操作)が阻止された状態で、バケット5が前項[10]に記載の軌跡A2に沿って前方に移動する状態となる(図10の矢印Y3の状態参照)。前項[4][7]に記載のように、右操作レバー9の前操作の操作位置に対応した速度で第1ブーム4aが下降側に操作され、左操作レバー10の前操作の操作位置に対応した速度でアーム5が排土側に操作される。
以上のステップS45〜S51での第1及び第2設定角度OF1,OF2は、前項[10]に記載のように一定値である。
【0078】
次に図10に示すようにバケット6が軌跡A2の前端に達すると、第2ブーム4bを左揺動側に操作することが可能になるので、バケット6が軌跡A2の前端に達する値に、第1アーム4aの上下角度a1及びアーム5の前後角度a2がなると、ステップS44の関係式fo1,fo2により、第1ブーム4aの上下角度a1及びアーム5の前後角度a3に基づいて算出される第1及び第2設定角度OF1,OF2が変化する(第1及び第2設定角度OF1,OF2が小さくなる)。
【0079】
これにより前述のようにしてバケット6が軌跡A2の前端に達すると、第1及び第2設定角度OF1,OF2が小さくなるので、ステップS51,S52からステップS44,S45,S46,S53に移行して、第2ブーム4bの左揺動側への操作(油圧シリンダ7の伸長操作)が阻止される状態が解除されて、第2ブーム4bを左揺動側に操作することが可能な状態になる。
【0080】
この場合、操作ペダル39の左踏み操作の操作位置に関係なく、第2ブーム4bが停止状態から漸次的に加速されて左揺動側に操作され始めるのであり(ステップS53)、この後はステップS53,S54からステップS45,S46,S47に移行して、操作ペダル39の操作位置に対応した速度で第2ブーム4bが左揺動側に操作される。これと同時に第1ブーム4aが下降側に操作され、アーム5が排土側に操作されているので、バケット6は図10の矢印Y4の状態に示すように、軌跡A2の前端から斜め前方下方に移動する。
【0081】
[発明の実施の第1別形態]
前述の[発明の実施の形態]において、バケットピン6aの位置にバケット前後角度センサー(図示せず)を設け、バケット6の前後角度も、図6及び図7に示す関係式fb1,fb2,fa1,fa2,fa3にパラメメータとして入れて、第1,2,3設定角度BO1,BO2,AR1,AR2,AR3が算出されるように構成してもよい。
【0082】
[発明の実施の第2別形態]
前述の[発明の実施の形態]及び[発明の実施の第1別形態]を、次のように構成してもよい。
図4及び図5に示す軌跡A1,A2を、「従来の技術」に記載の特開平6−17452号公報の構成と同様に、空間に設定された牽制面として、XYZ座標によって制御装置(図示せず)に設定し、牽制面と軌跡B1,B2との間を減速領域として、XYZ座標によって制御装置(図示せず)に設定する。ブーム上下角度センサー36、ブーム左右角度センサー37及びアーム前後角度センサー38の検出値、第1ブーム4aの長さ、第2ブーム4bの長さ及びアーム5の長さにより、バケットピン6aの位置を演算しXYZ座標として表す。牽制面及び及び減速領域とバケットピン6aとの位置関係を、XYZ座標によって認識する。
【0083】
これにより、バケットピン6aが減速領域に入ると、図6のステップS11、図7のステップS25、図8のステップS36及び図9のステップS50と同様に、第1ブーム4aの上昇側への操作、第2ブームの運転部15側への操作及びアーム5の掻き込み側への操作が減速操作されるように構成し、バケットピン6aが牽制面に達すると、図6のステップS12、図7のステップS26、図8のステップS37及び図9のステップS51と同様に、第1ブーム4aの上昇側への操作、第2ブーム4bの運転部15側への操作及びアーム5の掻き込み側への操作が阻止されるように構成する。
【0084】
[発明の実施の第3別形態]
右及び左操作レバー9,10、操作ペダル39の操作位置をポテンショメータ(図示せず)で電気的に検出し、電磁比例減圧弁型式のパイロット弁(図示せず)を操作して、パイロット式の制御弁21〜25を操作する型式や、右及び左操作レバー9,10、操作ペダル39の操作位置をポテンショメータ(図示せず)で電気的に検出し、この検出値に基づいて電磁比例減圧弁型式の制御弁(図示せず)を操作する型式にも、本発明は適用できる。さらに、本発明は旋回台2の右側に運転部15を配置し、旋回台2の左側にバックホウ装置3のブーム4(第1ブーム4a)を配置したバックホウにも適用できる。
【0085】
【発明の効果】
請求項1及び2の特徴によると、第1及び第2ブーム、アーム、バケットによりバックホウ装置を構成し、旋回台に運転部とバックホウ装置とを並べて配置したバックホウにおいて、例えばバケットを運転部の横側に位置させた状態で、第1ブームを下降側に操作したり、アームを排土側に操作しながら、第2ブームを運転部側に操作した場合、第2ブームの運転部側への操作が阻止された状態が解除された際、第2ブームが漸次的に運転部側に移動するように構成することにより、急速に第2ブームが運転部側に移動することによるショックを抑えることができて、作業者にとっての快適性を向上させることができた。
【0086】
請求項1の特徴によると、三角関数を使用してバケットの位置のXYZ座標を演算しなくても、第1ブームの上下角度及びアームの前後角度に基づき、第2ブームの運転部側への操作を阻止することができるようになった。このように請求項1の特徴によると、三角関数を使用してバケットの位置のXYZ座標を演算しなくても、第2ブームの運転部側への操作によるバケットの運転部への接触を回避することができるようになって、演算装置への負荷を軽減することができるようになった。
【図面の簡単な説明】
【図1】バックホウの全体側面図
【図2】バックホウ装置の油圧シリンダ及び制御弁等を示す油圧回路図
【図3】右及び左操作レバー、操作ペダル、パイロット弁及びパイロット油路等を示す油圧回路図
【図4】図6のステップS11,S12及び図7のステップS25,S26でのバケットピンの位置をつないだ軌跡を示す側面図
【図5】図6のステップS11,S12及び図7のステップS25,S26、図8のステップS36,S37でのバケットピンの位置をつないだ軌跡を示す平面図
【図6】第1ブームを上昇側及び下降側に操作した際の制御の流れを示す図
【図7】アームを掻き込み側及び排土側に操作した際の制御の流れを示す図
【図8】第2ブームを左揺動側及び右揺動側に操作した際の制御の流れを示す図
【図9】バケットを運転部の右横側の位置から運転部の前方下方に移動させる際の制御の流れを示す図
【図10】バケットを運転部の右横側の位置から運転部の前方下方に移動させる際の状態を示す平面図
【符号の説明】
2 旋回台
4 ブーム
4a 第1ブーム
4b 第2ブーム
5 アーム
6 バケット
15 運転部
36 ブーム上下角度センサー、位置センサー
37 ブーム左右角度センサー、位置センサー
38 アーム前後角度センサー、位置センサー
A2 牽制面
OF2 設定値
a1 上下角度
a2 左右角度
a3 前後角度
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a structure for avoiding contact between an operation unit and a bucket of a backhoe device in a backhoe.
[0002]
[Prior art]
In the backhoe, as disclosed in, for example, Japanese Patent Laid-Open No. 6-17452, a driving unit and a backhoe device are arranged side by side on a swivel, and are supported on a side of the driving unit on the swivel so as to be swingable up and down. A first boom, a second boom supported at the front end of the first boom so as to swing left and right; an arm supported at the front end of the second boom so as to swing back and forth; a bucket supported at the front end of the arm; There is what constitutes the device. In such a backhoe, when the first boom is operated to the ascending side and the arm is operated to the scraping side, the bucket is positioned on the lateral side of the operating unit (see the solid line in FIG. 4 of the publication). If the second boom is operated to the operating unit side, the bucket may come into contact with the operating unit.
[0003]
In the above publication, a restraint surface (A2 in FIG. 4 of the above publication) is set in the space between the operating unit and the first boom, and a bucket position sensor for the swivel is provided, and the bucket reaches the restraint surface. Even if the second boom is about to be operated to the driving unit side, the operation of the second boom to the driving unit side is blocked. Thereby, even if the second boom is erroneously operated to the driving unit side with the bucket positioned on the side of the driving unit, contact between the driving unit and the bucket can be avoided.
[0004]
[Problems to be solved by the invention]
In the backhoe configured as described above, for example, when the bucket is located on the side of the driving unit and the ground below the driving unit is excavated with the bucket, the bucket is on the side of the driving unit. It is assumed that the second boom is operated to the driving unit side while the first boom is operated to the lowering side or the arm is operated to the earth discharging side from the position.
[0005]
When such an operation is performed, the bucket tries to move linearly from the side of the driving unit to the front lower part of the driving unit, and is in a state of trying to cross the front of the driving unit diagonally. When the bucket reaches the check surface in the middle, the operation to the operating part side of the second boom is blocked, and the bucket is checked by the subsequent operation to the lowering side of the first boom or the operation to the soil discharge side of the arm. A situation occurs that reaches the front edge of the surface. When the bucket moves forward from the check surface in such a state, the state where the operation of the second boom to the operation unit side is suddenly released, and the second boom rapidly moves to the operation unit side. May cause a shock.
According to the present invention, when the second boom is operated to the driving unit side on the backhoe, the second boom is rapidly moved to the driving unit as soon as the movement of the second boom to the driving unit side is released. The purpose is to prevent the situation of moving to the side.
[0006]
[Means for Solving the Problems]
[I]
For example, in a state where the bucket is located on the side of the driving unit, the second boom is operated on the driving unit side while the first boom is operated on the lowering side or the arm is operated on the earth discharging side, or the first boom is operated. Suppose that the second boom is operated to the driving unit side while operating the lower side and operating the arm to the soil removal side. When such an operation is performed, the bucket tries to move linearly from the side of the driving unit to the front of the driving unit (or to the front lower side), and is in a state of attempting to cross the front of the driving unit diagonally.
[0007]
According to the first aspect of the present invention, when the second boom is operated to the operating unit side as described above, the detection of the boom left / right angle sensor is performed in the detection value with the boom up / down angle sensor and the detection value with the arm front / rear angle sensor. When the value reaches the set value, the operation of the second boom toward the driving unit is prevented, and contact of the bucket with the driving unit is avoided.
According to the second aspect of the present invention, when the second boom is operated toward the driving unit as described above, when the bucket reaches the check surface set in the space between the driving unit and the first boom, The operation to the operation part side of 2 boom is blocked | prevented and the contact to the operation part of a bucket is avoided.
[0008]
[II]
After the state described in the preceding item [I], according to the feature of claim 1, the bucket is moved forward by the operation to the lowering side of the first boom or the operation to the earth discharging side of the arm, and the side of the driving unit. When it reaches the front side (the operation of the second boom toward the operation unit side is blocked), even if the second boom is operated toward the operation unit side, the possibility that the bucket contacts the operation unit is reduced. The set value changes, and the detected value of the boom left / right angle sensor deviates from the set value described above, and the second boom can be operated to the driving unit side.
After the state described in the preceding item [I], according to the feature of claim 2, the bucket moves forward along the check surface by the operation of the first boom to the lowering side or the operation of the arm to the earth discharging side. When the second boom is moved forward (the operation of the second boom to the driving unit side is blocked), the bucket is less likely to contact the driving unit even if the second boom is operated to the driving unit side. It will be in the state which can operate the 2nd boom to the operation part side.
[0009]
As described above, when the second boom is ready to be operated to the operating unit side, according to the features of claims 1 and 2, the operation of the second boom to the operating unit side is permitted and the second boom is operated. The second boom is gradually accelerated from the state in which the operation to the part side is prevented to move to the driving part side, and the second boom moves to the driving part side with little shock.
[0010]
[III]
In the configuration of Japanese Patent Application Laid-Open No. 6-17452 described in the features of claim 2 and “Prior Art”, a check surface is set in the space between the operating unit and the first boom, and the position of the bucket is detected. Based on the detection of the position sensor, the operation of the second boom toward the driving unit side is prevented when the bucket reaches the check surface.
In this case, the check surface is set in a three-dimensional space based on the driving unit (swivel base) by XYZ coordinates, and the position of the bucket is the first and second booms obtained in advance by the detection value of the position sensor and Is calculated based on the length of the arm and the length of the arm, and is represented by XYZ coordinates in a three-dimensional space based on the operating unit (swivel platform). Thus, by setting the check surface with XYZ coordinates and representing the position of the bucket with XYZ coordinates, the positional relationship between the check surface and the bucket is recognized with the XYZ coordinates.
[0011]
When the position of the bucket is represented by XYZ coordinates, as in the feature of claim 2 and the configuration of Japanese Patent Laid-Open No. 6-17452 described in “Prior Art”, the detection value of the position sensor and the first and second booms Since the XYZ coordinates of the bucket position are calculated using a trigonometric function depending on the length and the arm length, the calculation processing is complicated. This increases the load on the arithmetic device that performs arithmetic processing, and there is room for improvement in terms of reducing the load on the arithmetic device.
[0012]
[IV]
In the backhoe according to the first aspect of the present invention, the first boom is supported on the swivel base so as to be swingable up and down, the second boom is supported on the tip end of the first boom so as to be swingable left and right, and is supported on the tip end of the second boom. An arm is swingably supported, and a bucket is supported at the tip of the arm. Thus, according to the feature of claim 1, with the first and second booms and arm lengths determined, the vertical angle of the first boom relative to the swivel, the horizontal angle of the second boom relative to the first boom, and the second If the longitudinal angle of the arm with respect to the two booms is determined, the position of the bucket supported at the tip of the arm is uniquely determined.
Therefore, according to the first aspect of the present invention, the detected value of the boom up / down angle sensor, the detected value of the boom left / right angle sensor, and the detected value of the arm front / rear angle sensor can be detected without calculating the XYZ coordinates of the bucket position using a trigonometric function. The value can be used as a value indicating the position of the bucket as it is, or can be used as a parameter indicating the position of the bucket.
[0013]
Thus, according to the first aspect of the present invention, the detected value of the boom left / right angle sensor is set to the set value when the second boom is operated to the operating unit side in the detected value of the boom vertical angle sensor and the detected value of the arm longitudinal angle sensor. Therefore, the operation of the second boom toward the driving unit side is blocked, thereby avoiding contact of the bucket with the driving unit.
In this case, if the detection value of the boom up / down angle sensor and the detection value of the arm front / rear angle sensor change, the set value (the detection value of the boom left / right angle sensor) also changes accordingly.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
[1]
FIG. 1 shows the entire side surface of the backhoe. A swivel base 2 is supported by a rubber crawler type traveling device 1, and a backhoe device 3 is provided at the front of the swivel base 2. The backhoe device 3 includes a boom 4 that is swung up and down by a hydraulic cylinder 11, an arm 5 that is swung back and forth by a hydraulic cylinder 12, and a bucket 6 that is swung by a hydraulic cylinder 13. ing.
[0015]
The boom 4 of the backhoe device 3 includes a first boom 4a that is swung up and down, a second boom 4b that is pivotably connected around an axis P1 at the front end of the first boom 4a, and a front end of the second boom 4b. The support bracket 4c is swingably connected around the shaft core P2, and the arm 5 is connected to the support bracket 4c. The linkage link 8 is constructed over the first boom 4a and the support bracket 4c to form a parallel four-link, and the second boom 4b is swung with respect to the first boom 4a by the hydraulic cylinder 7. Thus, the arm 5 and the bucket 6 are moved left and right.
[0016]
As shown in FIGS. 1 and 5, in the swivel base 2, the backhoe device 3 is disposed on the right side, and the driving unit 15 including the driver's seat 14 and the right and left operation levers 9 and 10 is disposed on the left side. . A vertical partition plate 16 with a window for partitioning the backhoe device 3 and the operating unit 15 is provided at the left and right center of the swivel base 2, and an upper partition plate 17 along the outside of the swivel base 2 at the upper end of the vertical partition plate 16. Is fixed.
[0017]
[2]
Next, the operation structure of the hydraulic circuit structure, the backhoe device 3 and the swivel base 2 will be described.
As shown in FIG. 2, the control valve 21 of the hydraulic cylinder 11 of the first boom 4 a (boom 4), the control valve 22 of the hydraulic cylinder 12 of the arm 5, the control valve 23 of the hydraulic cylinder 13 of the bucket 6, and the swivel 2 Control of the control valve 24 of the swing motor 18, the control valve 25 of the hydraulic cylinder 7 of the second boom 4b, the control valve 26 of the right traveling device 1, the control valve 27 of the left traveling device 1, and the control of the service port (not shown). The control valve 29 of the hydraulic cylinder 51 which raises / lowers the valve 28 and the dozer 19 shown in FIG. 1 is provided, and the hydraulic oil from the pump 20 is supplied to the control valves 21-29.
[0018]
The control valve 21 of the first boom 4a, the control valve 22 of the arm 5, the control valve 23 of the bucket 6, the control valve 24 of the swivel 2 and the control valve 25 of the second boom 4b are neutrally returned by pilot operation using pilot pressure. It is structured into a mold. The control valves 26 and 27 of the right and left traveling devices 1, the control valve 28 of the service port, and the control valve 29 of the dozer 19 are constructed by a mechanically operated type that is operated by an operation lever (not shown) and is of a neutral return type. ing.
[0019]
As shown in FIG. 3, the right operation lever 9 is configured to be freely movable in the front / rear and left / right directions. The pilot valve 31 a generates pilot pressure by the rear operation of the right operation lever 9 and the pilot pressure by the front operation of the right operation lever 9. The pilot valve 31b that generates the pilot pressure, the pilot valve 33a that generates the pilot pressure by the right operation of the right operation lever 9, and the pilot valve 33b that generates the pilot pressure by the left operation of the right operation lever 9 are provided.
[0020]
Similarly, the left operation lever 10 is configured to be freely movable in the front / rear and left / right directions. The pilot valve 32a generates pilot pressure by the rear operation of the left operation lever 10 and the pilot generates pilot pressure by the front operation of the left operation lever 10. A valve 32b, a pilot valve 34a that generates a pilot pressure by a right operation of the left operation lever 10, and a pilot valve 34b that generates a pilot pressure by a left operation of the left operation lever 10 are provided.
[0021]
As shown in FIGS. 3 and 5, an operation pedal 39 that can be stepped left and right is provided. A pilot valve 35 a that generates a pilot pressure by a left step operation of the operation pedal 39 and a right step operation of the operation pedal 39 are provided. A pilot valve 35b that generates pilot pressure is provided. A pilot pump 30 for supplying pilot pressure to the pilot valves 31a to 35b is provided.
[0022]
2 and 3, the pilot valves 31a and 31b of the right operating lever 9, the control valve 21 of the first boom 4a, the pilot valves 33a and 33b of the right operating lever 9, and the control valve 23 of the bucket 6 are provided. The pilot valves 32a and 32b of the left operating lever 10 and the control valve 22 of the arm 5, the pilot valves 34a and 34b of the left operating lever 10 and the control valve 24 of the swivel base 2 are connected to each other through a pilot oil passage. Are connected via a pilot oil passage. The pilot valves 35a and 35b of the operation pedal 39 and the control valve 25 of the second boom part 4b are connected via a pilot oil passage.
[0023]
When the right operating lever 9 is operated afterward by the above structure, the control valve 21 of the first boom 4a is operated to the ascending side (the extending side of the hydraulic cylinder 11) by the pilot pressure from the pilot valve 31a, and the right operating lever 9 is moved forward. When operated, the control valve 21 of the first boom 4a is operated to the lower side (the contraction side of the hydraulic cylinder 11) by the pilot pressure from the pilot valve 31b. When the right operating lever 9 is operated to the right, the control valve 23 of the bucket 6 is operated to the soil discharging side (the contraction side of the hydraulic cylinder 13) by the pilot pressure from the pilot valve 33a, and when the right operating lever 9 is operated to the left, the pilot valve 33b is operated. The control valve 23 of the bucket 6 is operated to the scraping side (extension side of the hydraulic cylinder 13) by the pilot pressure from
[0024]
When the left operating lever 10 is operated backward, the control valve 22 of the arm 5 is operated to the scraping side (the extending side of the hydraulic cylinder 12) by the pilot pressure from the pilot valve 32a, and when the left operating lever 10 is operated in advance, the pilot valve 32b is operated. The control valve 22 of the arm 5 is operated to the soil discharge side (the contraction side of the hydraulic cylinder 12) by the pilot pressure from. When the left operating lever 10 is operated to the right, the control valve 24 of the swivel base 2 is operated to the right turning side by the pilot pressure from the pilot valve 34a, and when the left operating lever 10 is operated to the left by the pilot pressure from the pilot valve 34b, The control valve 24 of the turntable 2 is operated to the left turn side.
[0025]
When the operation pedal 39 is operated to the left, the control valve 25 of the second boom 4b is operated to the left swing side (the extension side of the hydraulic cylinder 7) by the pilot pressure from the pilot valve 35a, and when the operation pedal 39 is operated to the right. The control valve 25 of the second boom 4b is operated to the right swing side (the contraction side of the hydraulic cylinder 7) by the pilot pressure from the pilot valve 35b.
[0026]
The pilot pressures of the pilot valves 31a to 35b are increased as the right and left operation levers 9 and 10 and the operation pedal 39 are largely operated from the neutral position. Accordingly, the pilot valves 31a to 35b correspond to the operation positions of the right and left operation levers 9 and 10 and the operation pedal 39 as the right and left operation levers 9 and 10 and the operation pedal 39 are largely operated from the neutral position. The pressure is increased and the control valves 21 to 25 are operated to the larger flow rate side. The larger the right and left operation levers 9 and 10 and the operation pedal 39 are operated, the more the hydraulic cylinders 7, 11, 12, and 13 are turned. The motor 18 operates at high speed.
[0027]
[3]
4 and 5, a boom up / down angle sensor 36 for detecting an up / down angle a1 of the first boom 4a with respect to the swivel base 2 is provided at a connecting portion of the swivel base 2 and the first boom 4a. A boom left / right angle sensor 37 for detecting the left / right angle a2 of the second boom 4b with respect to the first boom 4a is provided at the connecting portion of the second booms 4a, 4b (the second boom 4b is limited to the left swing side). Left and right angle a2) based on the position of rocking (see the two-dot chain line in FIG. 5). An arm front / rear angle sensor 38 for detecting a front / rear angle a3 of the arm 5 with respect to the second boom 4b is provided at the connecting portion of the support bracket 4c and the arm 5, as shown in FIG. Detection values of the angle sensor 37 and the arm front-rear angle sensor 38 are input to the control device 40.
[0028]
As shown in FIG. 3, a pilot oil passage that connects the pilot valve 31 a of the right operation lever 9 and the control valve 21 of the first boom 4 a (a pilot oil passage that operates the control valve 21 of the first boom 4 a upward). , A pilot oil passage connecting the pilot valve 32a of the left operating lever 10 and the control valve 22 of the arm 5 (a pilot oil passage for operating the control valve 22 of the arm 5 to the scraping side), and a pilot valve 35a of the operation pedal 39 And a pilot oil passage connecting the control valve 25 of the second boom 4b (a pilot oil passage for operating the control valve 25 of the second boom 4b to the left swinging side) with an electromagnetically operated pressure control valve 41, 42 and 43 are provided.
[0029]
Therefore, the pilot pressure is reduced by the pressure control valves 41, 42, 43 (the maximum pressure is a value set by the right and left operation levers 9, 10, and the operation pedal 39), and the right and left operation levers 9, 10 are operated. Regardless of the operation position of the operation pedal 39, the opening degree of the control valve 21 of the first boom 4a, the opening degree of the control valve 22 of the arm 5 and the left side of the control valve 25 of the second boom 4b. The opening on the swing side can be arbitrarily changed. By setting the pilot pressure to zero with the pressure control valves 41, 42, 43, the hydraulic cylinder 11, the arm 5 of the first boom 4 a, regardless of the operation positions of the right and left operation levers 9, 10 and the operation pedal 39. The hydraulic cylinder 12 and the hydraulic cylinder 7 of the second boom 4b can be stopped.
[0030]
[4]
Next, control when the first boom 4a is operated to the ascending side and the descending side will be described with reference to FIG.
The detection value of the boom up / down angle sensor 36 (up / down angle a1 of the first boom 4a), the boom left / right angle sensor 37 (left / right angle a2 of the second boom 4b), and the detection value of the arm front / back angle sensor 38 (front / back angle of the arm 5). a3) is always input to the control device 40 (step S1).
[0031]
When the right operation lever 9 is operated afterward to operate the first boom 4 a to the ascending side, the bucket 6 is in a state of approaching the operating unit 15. As a result, when the right operating lever 9 is operated rearward and the vertical angle a1 of the first boom 4a changes to the upward side (when the vertical angle a1 of the first boom 4a increases) (step S2), Based on the left-right angle a2 of the second boom 4b and the front-rear angle a3 of the arm 5, the first set angle BO1 and the second set angle BO2 are calculated by the relational expressions fb1, fb2 (step S3).
[0032]
In this case, if the vertical angle a1 of the first boom 4a has not reached the first set angle BO1 (steps S6 and S7), it is determined that the bucket 6 is still far from the operating unit 15, and the right operation is performed. A pilot pressure corresponding to the operating position of the lever 9 is generated, and the first boom 4a is operated to the ascending side at a speed corresponding to the operating position of the right operating lever 9 (step S8).
[0033]
Next, when the vertical angle a1 of the first boom 4a exceeds the first set angle BO1 (steps S7, S9), the bucket 6 approaches the operating unit 15 beyond the position separated from the operating unit 15 by the first predetermined distance. Thus, the difference Δa1 between the vertical angle a1 of the first boom 4a and the first set angle BO1 is calculated (step S10).
Accordingly, the pilot pressure of the pilot valve 31a is reduced by the pressure control valve 41 shown in FIG. 3 based on the difference Δa1, and the first boom 4a is lifted regardless of the operation position of the rear operation of the right operation lever 9. (The extension speed of the hydraulic cylinder 11) is decelerated, and the greater the difference Δa1 is (the closer the bucket 6 is to the operating unit 15), the more the operation (hydraulic pressure is increased) of the first boom 4a. The cylinder 11 is decelerated to a large extent (step S11).
[0034]
Next, when the vertical angle a1 of the first boom 4a reaches the second set angle BO2 (step S9), it is determined that the bucket 6 has reached a position away from the operating unit 15 by a second predetermined distance, and FIG. The pilot pressure of the pilot valve 31a is unloaded by the pressure control valve 41 shown, and the first boom 4a is moved upward (the operation of extending the hydraulic cylinder 11) regardless of the operation position of the rear operation of the right operation lever 9. Is blocked (step S12).
[0035]
Conversely, when the right operation lever 9 is pre-operated and the vertical angle a1 of the first boom 4a changes to the lower side (when the vertical angle a1 of the first boom 4a decreases) (step S2), the bucket 6 operates. As a result, the pilot pressure corresponding to the previous operation position of the right operation lever 9 is generated, and the first boom 4a is lowered at a speed corresponding to the previous operation position of the right operation lever 9. (Step S13) (as shown in FIG. 3 because the pressure control valve 41 is not provided in the pilot oil passage of the pilot valve 31b of the right operation lever 9).
[0036]
[5]
As described in [4], the first and second set angles BO1 and BO2 calculated by the relational expressions fb1 and fb2 in step S3 are the left-right angle a2 of the second boom 4b and the front-rear angle a3 of the arm 5. If it changes, it will change with this, for example, the 1st and 2nd setting angles BO1 and BO2 will become small, so that the back-and-forth angle a3 of the arm 5 becomes small, so that the left-right angle a2 of the 2nd boom 4b becomes small. Become.
[0037]
Accordingly, the bucket pin 6a (the tip of the arm 5) when the vertical angle a1 of the first boom 4a reaches the first set angle BO1 corresponding to the left-right angle a2 of the second boom 4b and the front-rear angle a3 of the arm 5 is obtained. When the position of the bucket 6 is swingably supported, the first predetermined distance forward from the operating portion 15 (vertical and upper partition plates 16 and 17) as shown in FIGS. It becomes a planar trajectory B1 separated by a distance.
Corresponding to the right and left angle a2 of the second boom 4b and the front and rear angle a3 of the arm 5, when the position of the bucket pin 6a when the vertical angle a1 of the first boom 4a reaches the second set angle BO2, It becomes a planar locus A1 that is separated from the operation unit 15 (vertical and upper partition plates 16 and 17) by a second predetermined distance forward.
[0038]
In this case, in a state where the vertical angle a1 of the first boom 4a has reached the second set angle BO2 (the state where the bucket pin 6a is located on the locus A1), the bucket 6 is swung so as to be closest to the operating unit 15. Even so, the second set angle BO2 (trajectory A1) is set so that the tip of the bucket 6 is located at a trajectory C1 that is a predetermined distance away from the front edge of the vertical partition plate 16 and the front edge of the upper partition plate 17. Has been.
[0039]
As shown in FIG. 5, the left and right angle a2 of the second boom 4b is a predetermined angle (in the configuration shown in FIG. 5, the first and second booms 4a and 4b are linear, and the second boom 4b swings to the right. When the first boom 4a is operated to the up side and the down side in this state, the bucket 6 remains in the driving unit 15 ( There is no contact with the vertical and upper dividers 16, 17).
Thereby, when the left-right angle a2 of the second boom 4b becomes larger than the predetermined angle, the first and second set angles BO1, BO2 calculated by the relational expressions fb1, fb2 in step S3 are sufficiently large values ( It is possible to operate the first boom 4a to the upper limit by setting it to a large value that exceeds the upper limit of the first boom 4a.
[0040]
When the position of the bucket pin 6a is connected when the first boom 4a is operated to the ascending side and the descending side with the left-right angle a2 of the second boom 4b reaching the above-mentioned predetermined angle, it is shown in FIG. As described above, a planar trajectory A2 that is separated from the operation unit 15 (vertical and upper partition plates 16 and 17) by a first predetermined distance to the right side is obtained. In this case, in a state where the left and right angle a2 of the second boom 4b has reached the above-described predetermined angle (a state where the bucket pin 6a is positioned on the locus A2), the bucket 6 is moved to the locus C2 that is separated from the vertical partition plate 16 by a predetermined distance. The aforementioned predetermined angle (trajectory A2) is set so that the left lateral surface is positioned.
[0041]
When the first boom 4a is to be operated to the upper limit, when the vertical angle a1 of the first boom 4a reaches the third set angle BO3 slightly before the upper limit (step S4), the pressure control valve shown in FIG. 41, the pilot pressure of the pilot valve 31a is reduced, and the operation toward the rising side of the first boom 4a (the extension speed of the hydraulic cylinder 11) is decelerated regardless of the operation position of the rear operation of the right operation lever 9. Therefore (step S5), when the first boom 4a reaches the upper limit, the relief valve 45 shown in FIG. 2 is opened and the first boom 4a (hydraulic cylinder 11) is stopped.
[0042]
[6]
Next, control when the arm 5 is operated to the scraping side while operating the first boom 4a to the upward side will be described with reference to FIG.
When the right operating lever 9 is operated backward to operate the first boom 4a to the upward side, the left operating lever 10 is operated backward to operate the arm 5 to the scraping side, the bucket 6 is rapidly moved to the operating unit 15. It becomes a state to approach. As shown in FIG. 3, pressure control for connecting a pilot oil passage 45 for branching the pilot pressure from the pilot pump 30 to a pilot oil passage for connecting the pilot valve 32 b of the left operation lever 10 and the control valve 22 of the arm 5. A valve 44 is provided, and normally the pressure control valve 44 is held in the closed position.
[0043]
When the right operation lever 9 is operated rearward and the vertical angle a1 of the first boom 4a changes to the upward side (when the vertical angle a1 of the first boom 4a increases) (step S2), the first boom 4a at this time The third set angle AR3 is calculated by the relational expression fa3 based on the vertical angle a1 and the left-right angle a2 of the second boom 4b (step S3).
[0044]
When the right operating lever 9 is operated rearward and the vertical angle a1 of the first boom 4a changes to the ascending side (step S2), the left operating lever 10 is operated rearward and the arm 5 is operated to the scraping side. (Step S6) If the front-rear angle a3 of the arm 5 has not reached the third set angle AR3, it is determined that the bucket 6 is still sufficiently far from the operating unit 15, and the right and left operation levers 9, 10 The pilot pressure corresponding to the operating position is generated, the first boom 4a is operated upward at the speed corresponding to the operating position of the right and left operating levers 9 and 10, and the arm 5 is operated to the scraping side.
[0045]
Next, when the front-rear angle a3 of the arm 5 exceeds the third set angle AR3 (step S14), the bucket 6 moves from the operating unit 15 to a third predetermined distance (the operating unit 15 is more than the first set distance described in [4] above). 3, the pilot pressure of the pilot valve 32 a is unloaded by the pressure control valve 42 shown in FIG. 3, and the arm 5 of the arm 5 is unloaded by the pressure control valve 44. At the same time that the pilot pressure is supplied to the control valve 22 (discharging side) and the first boom 4a is operated to the ascending side, the arm 5 is at a low speed regardless of the operation position of the rear operation of the left operation lever 10. It is operated to the soil removal side (contraction operation of the hydraulic cylinder 12) (step S15).
[0046]
As described above, when the first boom 4a is operated to the ascending side and the arm 5 is operated to the soil discharging side at a low speed regardless of the operation position of the rear operation of the left operation lever 10, the right operation lever The pilot pressure of the pilot valve 31a is reduced by the pressure control valve 41 shown in FIG. 3 regardless of the operation position of the rear operation of 9, and the operation to the ascending side of the first boom 4a is reduced (step S16). ).
[0047]
When the first boom 4a is operated to the ascending side, the lower the vertical angle a1 of the first boom 4a is (the more the first boom 4a is lying in parallel with the swivel 2), the higher the first boom 4a is. Since the horizontal component of the movement of the tip (arm 5 and bucket 6) of the first boom 4a to the operating unit 15 is small with respect to the operation to the side, the vertical angle a1 of the first boom 4a is small. In step S16, the operation to raise the first boom 4a is not decelerated much.
[0048]
Conversely, the greater the up-and-down angle a1 of the first boom 4a is (the more the first boom 4a is standing upright with respect to the swivel 2), the more the first boom 4a is operated with respect to the ascending side. Since the horizontal component of the movement of the tip (arm 5 and bucket 6) of 4a to the operating unit 15 is large, in the state where the vertical angle a1 of the first boom 4a is large, the rising side of the first boom 4a in step S16 The operation to is greatly decelerated.
[0049]
As described above, when the right and left operation levers 9 and 10 are operated backward and the arm 5 is operated to the scraping side while operating the first boom 4a to the upward side, the operation to the upward side of the first boom 4a is performed. While being decelerated (the larger the vertical angle a1 of the first boom 4a is, the greater the decelerating operation to the ascending side of the first boom 4a is), the arm 5 is operated to the soil discharging side at a low speed. By configuring, as shown in step S12, the first boom 4a is operated to the upward side without preventing the first boom 4a from operating upward, and the bucket 6 moves upward on the front side of the operating unit 15. Go to.
[0050]
[7]
Next, control when the arm 5 is operated to the scraping side and the soil discharging side will be described with reference to FIG.
As described in [4] above, the detected value of the boom vertical angle sensor 36 (vertical angle a1 of the first boom 4a), the boom horizontal angle sensor 37 (horizontal angle a2 of the second boom 4b), and the arm longitudinal angle sensor The detected value 38 (front-rear angle a3 of the arm 5) is always input to the control device 40 (step S1).
[0051]
When the left operation lever 10 is operated backward to operate the arm 5 to the scraping side, the bucket 6 approaches the operating unit 15. Thereby, when the left operating lever 10 is operated rearward and the front-rear angle a3 of the arm 5 changes to the scraping side (when the front-rear angle a3 of the arm 5 decreases) (step S17), the first boom at this time Based on the vertical angle a1 of 4a and the horizontal angle a2 of the second boom 4b, the first set angle AR1 and the second set angle AR2 are calculated by the relational expressions fa1 and fa2 (step S18).
[0052]
In this case, if the front-rear angle a3 of the arm 5 has not reached the first set angle AR1 (step S21), it is determined that the bucket 6 is still sufficiently far from the operating unit 15, and the operation of the left operation lever 10 is performed. A pilot pressure corresponding to the position is generated, and the arm 5 is operated to the scraping side at a speed corresponding to the operation position of the left operation lever 10 (step S22).
[0053]
Next, when the front-rear angle a3 of the arm 5 exceeds the first set angle AR1 (steps S21 and S23), it is determined that the bucket 6 has approached the operating unit 15 beyond a position separated from the operating unit 15 by a first predetermined distance. Then, a difference Δa3 between the front-rear angle a3 of the arm 5 and the first set angle AR1 is calculated (step S24).
Accordingly, the pilot pressure of the pilot valve 32a is reduced by the pressure control valve 42 shown in FIG. 3 based on the difference Δa3, and the arm 5 is moved to the scraping side regardless of the operation position of the rear operation of the left operation lever 10. (The extension speed of the hydraulic cylinder 12) is decelerated, and the greater the difference Δa3 (the closer the bucket 6 approaches the operating unit 15), the more the operation toward the scraping side of the arm 5 (the hydraulic cylinder 12). (Elongation speed) is greatly decelerated (step S25).
[0054]
Next, when the front-rear angle a3 of the arm 5 reaches the second set angle AR2 (step S23), it is determined that the bucket 6 has reached a position separated by a second predetermined distance from the operating unit 15, and the pressure shown in FIG. The pilot pressure of the pilot valve 32a is unloaded by the control valve 42, and the operation to the scraping side of the arm 5 (extension operation of the hydraulic cylinder 12) is prevented regardless of the operation position of the rear operation of the left operation lever 10. (Step S26).
[0055]
Conversely, when the left operating lever 10 is operated forward and the front-rear angle a3 of the arm 5 changes to the soil removal side (when the front-rear angle a3 of the arm 5 increases) (step S17), the bucket 6 is removed from the operating unit 15. Since they are separated from each other, a pilot pressure corresponding to the previous operation position of the left operation lever 10 is generated, and the arm 5 is operated to the earth discharging side at a speed corresponding to the previous operation position of the left operation lever 10. (Step S27).
[0056]
[8]
As described in [7], the first and second set angles AR1 and AR2 calculated by the relational expressions fa1 and fa2 in step S18 are the vertical angle a1 of the first boom 4a and the horizontal angle of the second boom 4b. When a2 changes, it changes accordingly. For example, the lower the vertical angle a1 of the first boom 4a, the larger the left and right angle a2 of the second boom 4b, the first and second set angles. AR1 and AR2 become smaller.
[0057]
Accordingly, the position of the bucket pin 6a when the front-rear angle a3 of the arm 5 reaches the first set angle AR1 corresponding to the up-down angle a1 of the first boom 4a and the left-right angle a2 of the second boom 4b is connected. As a result, the locus B1 as described in FIGS. Corresponding to the vertical angle a1 of the first boom 4a and the horizontal angle a2 of the second boom 4b, when the position of the bucket pin 6a when the longitudinal angle a3 of the arm 5 reaches the second set angle AR2, The locus A1 is as described in FIGS. 4 and 5 and the previous item [5].
[0058]
As shown in FIG. 5 and the previous item [5], the right and left angle a2 of the second boom 4b is a predetermined angle (in the configuration shown in FIG. 5, the first and second booms 4a and 4b are in a linear shape from the second boom. 4b is positioned on the right swinging side), the bucket 6 is moved to the right side from the operating unit 15, and even if the arm 5 is operated in the scraping side and the soil discharging side in this state, the bucket 6 Does not come into contact with the operation unit 15 (vertical and upper partition plates 16 and 17).
Thereby, when the left-right angle a2 of the second boom 4b is larger than the predetermined angle, the first and second set angles AR1, AR2 calculated by the relational expressions fa1, fa2 in step S18 are sufficiently small values ( It is possible to operate the arm 5 up to the scratching limit by setting it to a small value that exceeds the scratching limit of the arm 5. When the position of the bucket pin 6a is connected when the arm 5 is operated to the scraping side and the soil discharging side in a state where the left and right angle a2 of the second boom 4b has reached the predetermined angle, FIG. The locus A2 is as described in [5].
[0059]
When the arm 5 is about to be operated up to the scratch limit, when the longitudinal angle a3 of the arm 5 reaches the fourth set angle AR4 slightly before the scrap limit (step S19), the pressure control valve 42 shown in FIG. The pilot pressure of the pilot valve 32a is reduced, and the operation to the scraping side of the arm 5 (extension speed of the hydraulic cylinder 12) is reduced regardless of the operation position of the rear operation of the left operation lever 10. (Step S20), when the arm 5 reaches the scratching limit, the relief valve 45 shown in FIG. 2 is opened and the arm 5 (hydraulic cylinder 12) is stopped.
[0060]
[9]
Next, control when the second boom 4b is operated to the left swing side and the right swing side will be described with reference to FIG.
As described in [4] above, the detected value of the boom vertical angle sensor 36 (vertical angle a1 of the first boom 4a), the boom horizontal angle sensor 37 (horizontal angle a2 of the second boom 4b), and the arm longitudinal angle sensor The detected value 38 (front-rear angle a3 of the arm 5) is always input to the control device 40 (step S1).
[0061]
When the second pedal 4b is operated to the left swing side by depressing the operation pedal 39 to the left, the bucket 6 comes into a state of approaching the operating unit 15. Accordingly, when the operation pedal 39 is operated to the left and the left / right angle a2 of the second boom 4b changes to the left swing side (when the left / right angle a2 of the second boom 4b decreases) (step S28), Based on the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5, the first set angle OF1 and the second set angle OF2 are calculated by the relational expressions fo1 and fo2 (step S29).
[0062]
In this case, if the left-right angle a2 of the second boom 4b has not reached the first set angle OF1 (step S32), it is determined that the bucket 6 is still sufficiently far from the operating unit 15, and the operation pedal 39 is A pilot pressure corresponding to the operation position is generated, and the second boom 4b is operated to the left swing side at a speed corresponding to the operation position of the operation pedal 39 (step S33).
[0063]
Next, when the left-right angle a2 of the second boom 4b exceeds the first set angle OF1 (steps S32 and S34), the bucket 6 approaches the operating unit 15 beyond the position separated from the operating unit 15 by the first predetermined distance. And the difference Δa2 between the left and right angle a2 of the second boom 4b and the first set angle OF1 is calculated (step S35).
Thereby, the pilot pressure of the pilot valve 35a is reduced by the pressure control valve 43 shown in FIG. 3 based on the difference Δa2, and the left boom of the second boom 4b is irrelevant regardless of the operation position of the left step operation of the operation pedal 39. The operation toward the moving side (the extension speed of the hydraulic cylinder 7) is decelerated, and the greater the difference Δa2 (the closer the bucket 6 approaches the operating unit 15), the more the second boom 4b moves toward the left swinging side. (The extension speed of the hydraulic cylinder 7) is greatly decelerated (step S36).
[0064]
Next, when the left-right angle a2 of the second boom 4b reaches the second set angle OF2 (step S34), it is determined that the bucket 6 has reached a position away from the operating unit 15 by a second predetermined distance, and FIG. The pilot pressure of the pilot valve 35a is unloaded by the pressure control valve 43 shown, and the operation to the left swing side of the second boom 4b (extension of the hydraulic cylinder 7) is performed regardless of the operation position of the left pedal operation of the operation pedal 39. Operation) is blocked (step S37).
[0065]
Conversely, when the operation pedal 39 is depressed to the right and the left / right angle a2 of the second boom 4b changes to the right swing side (when the left / right angle a2 of the second boom 4b increases) (step S28), the bucket 6 Is in a state of being separated from the driving unit 15, the pilot pressure corresponding to the operation position of the right pedal operation of the operation pedal 39 is generated, and the second boom 4 b at a speed corresponding to the operation position of the right pedal operation of the operation pedal 39. Is operated to the right swing side (step S38) (because the pressure control valve 43 is not provided in the pilot oil passage of the pilot valve 35b of the operation pedal 39 as shown in FIG. 3).
[0066]
[10]
As described in [9] above, the first and second set angles OF1 and OF2 calculated by the relational expressions fo1 and fo2 in step S29 are the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5, respectively. If it changes, it will change accordingly. When the bucket 15 is positioned in front of the operating unit 15, the first and second set angles OF1 and OF2 are increased as the vertical angle a1 of the first boom 4a decreases and the longitudinal angle a3 of the arm 5 increases. Get smaller. In the case of the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5 such that the bucket 15 is positioned on the right side of the operating unit 15, the first and second set angles OF1, OF2 are constant values.
[0067]
Accordingly, when the bucket 15 is positioned in front of the operating unit 15, the left-right angle a2 of the second boom 4b is set to the first set angle OF1 corresponding to the vertical angle a1 of the first boom 4a and the front-back angle a3 of the arm 5. When the position of the bucket pin 6a is reached, the locus B1 as shown in FIGS. 4 and 5 and the previous item [5] is obtained. Corresponding to the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5, the position of the bucket pin 6a when the horizontal angle a2 of the second boom 4b reaches the second set angle OF2, The locus A1 is as described in FIGS. 4 and 5 and the previous item [5].
[0068]
When the bucket 15 is located on the right side of the operation unit 15, when the position of the bucket pin 6a when the left-right angle a2 of the second boom 4b reaches the first set angle OF1 is connected, FIG. 5]. Corresponding to the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5, the position of the bucket pin 6a when the horizontal angle a2 of the second boom 4b reaches the second set angle OF2, The locus A2 is as described in FIG. 5 and the previous item [5].
[0069]
When the bucket 6 is positioned at a position sufficiently away from the operation unit 15 (a state in which the first boom 4a is operated to the lowering side and the arm 5 is operated to the earth discharging side), the second boom is maintained in this state. Even if 4a is operated to the left swing limit, the bucket 6 does not come into contact with the operating unit 15 (vertical and upper partition plates 16, 17).
Thereby, when the bucket 6 is positioned at a position sufficiently away from the operation unit 15 in front, the first and second set angles OF1, OF2 calculated by the relational expressions fo1, fo2 in step S29 are sufficiently small. The value (small value exceeding the left swing limit of the second boom 4b) is set, and the second boom 4b can be operated to the left swing limit.
[0070]
When the second boom 4b is about to be operated to the left swing limit, when the third set angle OF3 slightly before the left swing limit of the second boom 4b is reached (step S30), the pressure control valve shown in FIG. 43, the pilot pressure of the pilot valve 35a is reduced, and the operation to the left swing side of the second boom 4b (the extension speed of the hydraulic cylinder 7) is decelerated regardless of the operation position of the left pedal operation of the operation pedal 39. When the second boom 4b reaches the left swing limit, the relief valve 45 shown in FIG. 2 is opened and the second boom 4b (hydraulic cylinder 7) is stopped.
[0071]
[11]
Next, the first boom 4a is operated to the ascending side, the arm 5 is operated to the scraping side, the second boom 4b is operated to the right swinging side, and the right side of the operating unit 15 (vertical partition plate 16) is operated. In a state where the bucket 15 is positioned on the side (see the solid line in FIG. 10), the first boom 4a is operated to the lowering side, the arm 5 is operated to the earth discharging side, and the second boom 4b is moved to the left swinging side. The case where the bucket 6 is operated and moved to the front lower side of the operation unit 15 (see the two-dot chain line in FIG. 10) will be described with reference to FIGS. 9 and 10.
[0072]
As described in [4] above, the detected value of the boom vertical angle sensor 36 (vertical angle a1 of the first boom 4a), the boom horizontal angle sensor 37 (horizontal angle a2 of the second boom 4b), and the arm longitudinal angle sensor The detected value 38 (front-rear angle a3 of the arm 5) is always input to the control device 40 (step S1 in FIG. 6).
[0073]
When the operation pedal 39 is operated to the left and the second boom 4b is operated to the left swing side in a state where the bucket 6 is positioned on the right side of the operation unit 15 as indicated by a solid line in FIG. When the left and right angle a2 of the second boom 4b is decreased, step S41), when the right operation lever 9 or the left operation lever 10 is operated in advance, or both the right and left operation levers 9 and 10 are operated in advance (first operation). The vertical angle a1 of the boom 4a is decreased, step S42) (the front-rear angle a2 of the arm 5 is increased, step S43), and the bucket 6 is from the position on the right side of the operating unit 15 (see the position of the solid line in FIG. 10), An attempt is made to cross the front of the driving unit 15 diagonally toward the position below the driving unit 15 (see the position of the two-dot chain line in FIG. 10).
[0074]
In this case, the first set angle OF1 and the second set angle OF2 are calculated by the relational expressions fo1 and fo2 based on the vertical angle a1 of the first boom 4a and the longitudinal angle a3 of the arm 5 (step S44).
As a result, if the left-right angle a2 of the second boom 4b has not reached the first set angle OF1 (step S45), it is determined that the bucket 6 is still sufficiently far from the operating portion 15, and the operation pedal 39 is A pilot pressure corresponding to the operation position is generated, and the second boom 4b is operated to the left swing side at a speed corresponding to the operation position of the operation pedal 39 (steps S40, S46, S47) (arrow Y1 in FIG. 10). See state).
[0075]
Next, when the left-right angle a2 of the second boom 4b exceeds the first set angle OF1 (steps S45 and S48), the bucket 6 approaches the operating unit 15 beyond the position separated from the operating unit 15 by the first predetermined distance. And the difference Δa2 between the left and right angle a2 of the second boom 4b and the first set angle OF1 is calculated (step S49).
Thereby, the pilot pressure of the pilot valve 35a is reduced by the pressure control valve 43 shown in FIG. 3 based on the difference Δa2, and the left boom of the second boom 4b is irrelevant regardless of the operation position of the left step operation of the operation pedal 39. The operation toward the moving side (the extension speed of the hydraulic cylinder 7) is decelerated, and the greater the difference Δa2 (the closer the bucket 6 approaches the operating unit 15), the more the second boom 4b moves toward the left swinging side. (The extension speed of the hydraulic cylinder 7) is greatly decelerated (step S50) (see the state of the arrow Y2 in FIG. 10).
[0076]
Next, when the left-right angle a2 of the second boom 4b reaches the second set angle OF2 (step S48), it is determined that the bucket 6 has reached a position away from the operating unit 15 by a second predetermined distance, and FIG. The pilot pressure of the pilot valve 35a is unloaded by the pressure control valve 43 shown, and the operation to the left swing side of the second boom 4b (extension of the hydraulic cylinder 7) is performed regardless of the operation position of the left pedal operation of the operation pedal 39. Operation) is blocked (step S51).
[0077]
In this case, either the right operation lever 9 or the left operation lever 10 is operated in advance, or both the right and left operation levers 9 and 10 are operated in advance, the first boom 4a is operated downward, and the arm 5 is operated. Since the operation is performed on the earth discharging side, the bucket 5 is moved to the previous item [10] in a state where the operation to the left swinging side of the second boom 4b (extension operation of the hydraulic cylinder 7) is blocked when viewed in plan. It will be in the state which moves ahead along description locus A2 (refer the state of arrow Y3 of Drawing 10). As described in the preceding paragraphs [4] and [7], the first boom 4a is operated to the lower side at a speed corresponding to the operation position of the right operation lever 9 and the operation position of the left operation lever 10 is changed to the operation position of the previous operation. The arm 5 is operated to the earth discharging side at a corresponding speed.
The first and second set angles OF1 and OF2 in the above steps S45 to S51 are constant values as described in the previous item [10].
[0078]
Next, as shown in FIG. 10, when the bucket 6 reaches the front end of the trajectory A2, the second boom 4b can be operated to the left swing side, so that the bucket 6 reaches the front end of the trajectory A2. When the vertical angle a1 of the first arm 4a and the front-rear angle a2 of the arm 5 are obtained, a first calculation is performed based on the vertical angle a1 of the first boom 4a and the front-rear angle a3 of the arm 5 according to the relational expressions fo1 and fo2 in step S44. The first and second set angles OF1, OF2 change (the first and second set angles OF1, OF2 become smaller).
[0079]
As a result, when the bucket 6 reaches the front end of the trajectory A2 as described above, the first and second set angles OF1 and OF2 become smaller, so that the process proceeds from step S51, S52 to steps S44, S45, S46, S53. The state where the operation to the left swing side of the second boom 4b (the extension operation of the hydraulic cylinder 7) is released is released, and the second boom 4b can be operated to the left swing side. .
[0080]
In this case, the second boom 4b is gradually accelerated from the stopped state and begins to be operated to the left swing side regardless of the operation position of the left pedal operation of the operation pedal 39 (step S53). Shifting from S53, S54 to steps S45, S46, S47, the second boom 4b is operated to the left swing side at a speed corresponding to the operation position of the operation pedal 39. At the same time, the first boom 4a is operated to the lowering side and the arm 5 is operated to the earth discharging side, so that the bucket 6 is obliquely forward and downward from the front end of the locus A2, as shown by the state of the arrow Y4 in FIG. Move to.
[0081]
[First Alternative Embodiment of the Invention]
In the above-described [Embodiment of the invention], a bucket front-rear angle sensor (not shown) is provided at the position of the bucket pin 6a, and the front-rear angle of the bucket 6 is also expressed by the relational expressions fb1, fb2, fa1 shown in FIGS. , Fa2 and fa3 as parameters, and the first, second and third set angles BO1, BO2, AR1, AR2 and AR3 may be calculated.
[0082]
[Second Embodiment of the Invention]
The above-mentioned [Embodiment of the Invention] and [First Alternative Embodiment of the Invention] may be configured as follows.
Similar to the configuration of Japanese Patent Laid-Open No. 6-17452 described in “Prior Art”, the trajectories A1 and A2 shown in FIG. 4 and FIG. 5 are controlled by XYZ coordinates as control surfaces (see FIG. (Not shown), and between the check surface and the trajectories B1 and B2 is set as a deceleration region in the control device (not shown) by XYZ coordinates. The position of the bucket pin 6a is determined by the detected values of the boom up / down angle sensor 36, the boom left / right angle sensor 37, and the arm front / rear angle sensor 38, the length of the first boom 4a, the length of the second boom 4b, and the length of the arm 5. Calculated and expressed as XYZ coordinates. The positional relationship between the check surface and the deceleration region and the bucket pin 6a is recognized by the XYZ coordinates.
[0083]
As a result, when the bucket pin 6a enters the deceleration region, as with step S11 in FIG. 6, step S25 in FIG. 7, step S36 in FIG. 8, and step S50 in FIG. When the operation of the second boom toward the operation unit 15 and the operation toward the scraping side of the arm 5 are decelerated, when the bucket pin 6a reaches the check surface, steps S12 and 7 in FIG. Step S26 of FIG. 8, Step S37 of FIG. 8, and Step S51 of FIG. 9, the operation of the first boom 4a to the ascending side, the operation of the second boom 4b to the operating unit 15 side, and the arm 5 to the scraping side It is configured so that the operation of is prevented.
[0084]
[Third Another Embodiment of the Invention]
The operation positions of the right and left operation levers 9 and 10 and the operation pedal 39 are electrically detected by a potentiometer (not shown), and an electromagnetic proportional pressure reducing valve type pilot valve (not shown) is operated, The type for operating the control valves 21 to 25, the operation positions of the right and left operation levers 9 and 10, and the operation pedal 39 are electrically detected by a potentiometer (not shown), and the electromagnetic proportional pressure reducing valve is based on the detected value. The present invention can also be applied to a type that operates a type of control valve (not shown). Furthermore, the present invention can also be applied to a backhoe in which the operating unit 15 is disposed on the right side of the swivel base 2 and the boom 4 (first boom 4a) of the backhoe device 3 is disposed on the left side of the swivel base 2.
[0085]
【The invention's effect】
According to the features of claims 1 and 2, in the backhoe in which the backhoe device is constituted by the first and second booms, arms, and buckets, and the operation unit and the backhoe device are arranged side by side on the swivel, for example, the bucket is placed beside the operation unit. When the second boom is operated to the operating unit side while the first boom is operated to the lowering side or the arm is operated to the earth discharging side while being positioned on the side, the second boom is moved to the operating unit side. When the state in which the operation is blocked is released, the second boom is configured to gradually move to the driving unit side, thereby suppressing the shock caused by the rapid movement of the second boom to the driving unit side. It was possible to improve the comfort for the workers.
[0086]
According to the feature of claim 1, without calculating the XYZ coordinates of the bucket position using a trigonometric function, the second boom is moved to the driving unit side based on the vertical angle of the first boom and the longitudinal angle of the arm. It became possible to prevent the operation. As described above, according to the first aspect of the present invention, it is possible to avoid contact of the bucket with the driving unit due to the operation to the driving unit side of the second boom without using the trigonometric function to calculate the XYZ coordinates of the bucket position. As a result, the load on the arithmetic unit can be reduced.
[Brief description of the drawings]
FIG. 1 is an overall side view of a backhoe. FIG. 2 is a hydraulic circuit diagram showing a hydraulic cylinder and a control valve of the backhoe device. FIG. 3 is a hydraulic pressure showing a right and left operation lever, an operation pedal, a pilot valve, a pilot oil passage, and the like. FIG. 4 is a side view showing a locus connecting positions of bucket pins in steps S11 and S12 of FIG. 6 and steps S25 and S26 of FIG. 7. FIG. 5 is a side view of steps S11 and S12 of FIG. FIG. 6 is a plan view showing the trajectory connecting the bucket pin positions in steps S25 and S26 and steps S36 and S37 in FIG. 8. FIG. 6 is a diagram showing the flow of control when the first boom is operated to the up side and down side. FIG. 7 is a diagram showing the flow of control when the arm is operated to the scraping side and the soil removal side. FIG. 8 is a flow of control when the second boom is operated to the left swing side and the right swing side. Figure [Figure 9] Bucket FIG. 10 is a diagram showing the flow of control when moving the bucket from the position on the right side of the driving section to the front lower side of the driving section. Plan view showing the state of the [signs]
2 Pivot 4 Boom 4a 1st boom 4b 2nd boom 5 Arm 6 Bucket 15 Operating part 36 Boom up / down angle sensor, position sensor 37 Boom left / right angle sensor, position sensor 38 Arm front / rear angle sensor, position sensor A2 Check surface OF2 Setting value a1 Vertical angle a2 Left / right angle a3 Front / back angle

Claims (2)

旋回台における運転部の横側に上下揺動自在に支持された第1ブームと、前記第1ブームの先端に左右揺動自在に支持された第2ブームと、前記第2ブームの先端に前後揺動自在に支持されたアームと、前記アームの先端に支持されたバケットとを備え、これらの第1ブーム、第2ブーム、アーム、及びバケットのそれぞれを操作する操作具を備え、
前記旋回台に対する第1ブームの上下角度を検出するブーム上下角度センサーと、前記第1ブームに対する第2ブームの左右角度を検出するブーム左右角度センサーと、前記第2ブームに対するアームの前後角度を検出するアーム前後角度センサーとを備えると共に、
前記ブーム上下角度センサー及びアーム前後角度センサーの検出値に対して前記ブーム左右角度センサーの検出値が設定値に達すると、前記第2ブームに対する操作具の運転部側への移動操作指令に拘わらず、第2ブームの運転部側への移動を阻止する第2ブーム牽制手段と、
前記第2ブーム牽制手段の作動状態において、前記ブーム上下角度センサー及びアーム前後角度センサーの検出値の変化に応じて前記設定値が変化し、前記ブーム左右角度センサーの検出値が前記設定値から外れると、前記第2ブームの運転部側への操作を許して、第2ブームの移動方向と移動速度を指令する操作具の操作に拘わらず第2ブームを漸次的に運転部側に移動させる第2ブーム制御手段を備えてあるバックホウ。
A first boom supported on the lateral side of the operating unit in the swivel base so as to be swingable up and down, a second boom supported on the tip of the first boom so as to swing left and right, and front and rear on the tip of the second boom An arm that is swingably supported, and a bucket that is supported at the tip of the arm, and an operating tool that operates each of the first boom, the second boom, the arm, and the bucket,
A boom up / down angle sensor for detecting the up / down angle of the first boom relative to the swivel, a boom left / right angle sensor for detecting the left / right angle of the second boom relative to the first boom, and a front / back angle of the arm relative to the second boom. An arm longitudinal angle sensor that
When the detected value of the boom left / right angle sensor reaches a set value with respect to the detected values of the boom up / down angle sensor and the arm front / rear angle sensor , regardless of a movement operation command to the operating unit side of the operating tool for the second boom . , Second boom check means for preventing movement of the second boom to the operating part side ;
In the operating state of the second boom check means, the set value changes in accordance with changes in the detected values of the boom up / down angle sensor and the arm longitudinal angle sensor, and the detected value of the boom left / right angle sensor deviates from the set value. And allowing the second boom to be operated toward the operating unit side, and gradually moving the second boom to the operating unit side regardless of the operation of the operating tool that commands the moving direction and moving speed of the second boom . 2 Backhoe provided with boom control means.
旋回台における運転部の横側に上下揺動自在に支持された第1ブームと、前記第1ブームの先端に左右揺動自在に支持された第2ブームと、前記第2ブームの先端に前後揺動自在に支持されたアームと、前記アームの先端に支持されたバケットとを備え、これらの第1ブーム、第2ブーム、アーム、及びバケットのそれぞれを操作する操作具を備え、
前記運転部と第1ブームとの間の空間に牽制面を設定する設定手段と、前記旋回台に対するバケットの位置を検出する位置センサーとを備えると共に、
前記位置センサーの検出値に基づいて前記バケットが前記牽制面に達すると、前記第2ブームに対する操作具の運転部側への移動操作指令に拘わらず、第2ブームの運転部側への移動を阻止する第2ブーム牽制手段と、
前記第2ブーム牽制手段の作動状態において、前記第1ブームの操作又は前記アームの操作により前記バケットが前記牽制面から外れると、前記第2ブームの運転部側への操作を許して、第2ブームの移動方向と移動速度を指令する操作具の操作に拘わらず第2ブームを漸次的に運転部側に移動させる第2ブーム制御手段を備えてあるバックホウ。
A first boom supported on the lateral side of the operating unit in the swivel base so as to be swingable up and down, a second boom supported on the tip of the first boom so as to swing left and right, and front and rear on the tip of the second boom An arm that is swingably supported, and a bucket that is supported at the tip of the arm, and an operating tool that operates each of the first boom, the second boom, the arm, and the bucket,
A setting unit that sets a check surface in a space between the operating unit and the first boom, and a position sensor that detects a position of the bucket with respect to the swivel,
When the bucket reaches the check surface based on the detection value of the position sensor , the movement of the second boom to the operation unit side is performed regardless of the movement operation command to the operation unit side of the operation tool for the second boom. A second boom check means for blocking ;
In the operating state of the second boom check means, when the bucket is detached from the check surface by the operation of the first boom or the arm, the operation to the operation part side of the second boom is allowed, and the second A backhoe provided with second boom control means for gradually moving the second boom to the operating section side regardless of the operation of the operation tool for instructing the moving direction and moving speed of the boom.
JP16411399A 1999-06-10 1999-06-10 Backhoe Expired - Lifetime JP3724984B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16411399A JP3724984B2 (en) 1999-06-10 1999-06-10 Backhoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16411399A JP3724984B2 (en) 1999-06-10 1999-06-10 Backhoe

Publications (2)

Publication Number Publication Date
JP2000352068A JP2000352068A (en) 2000-12-19
JP3724984B2 true JP3724984B2 (en) 2005-12-07

Family

ID=15787008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16411399A Expired - Lifetime JP3724984B2 (en) 1999-06-10 1999-06-10 Backhoe

Country Status (1)

Country Link
JP (1) JP3724984B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6788990B2 (en) * 2016-04-12 2020-11-25 大成建設株式会社 Scraping management device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3307987B2 (en) * 1992-07-02 2002-07-29 株式会社クボタ Backhoe
JP2945589B2 (en) * 1994-09-08 1999-09-06 株式会社クボタ Backhoe
JPH0881980A (en) * 1994-09-09 1996-03-26 Kubota Corp Backhoe
JPH08158413A (en) * 1994-12-02 1996-06-18 Kubota Corp Backhoe

Also Published As

Publication number Publication date
JP2000352068A (en) 2000-12-19

Similar Documents

Publication Publication Date Title
JP2000282513A (en) Method and device for controlling devices of working machine
JP3724981B2 (en) Backhoe
JP3724982B2 (en) Backhoe
JP3724984B2 (en) Backhoe
JP3724983B2 (en) Backhoe
JPH0771057A (en) Back-hoe
JP3998479B2 (en) Work vehicle abnormality detection structure
JP2000160588A (en) Backhoe
JP3464111B2 (en) Backhoe
JP2002146826A (en) Back hoe
JP3457853B2 (en) Backhoe
JP3378472B2 (en) Backhoe
JP3173895B2 (en) Backhoe hydraulic cylinder stop structure
JP3488110B2 (en) Backhoe
JP3693829B2 (en) Backhoe
JPH06146331A (en) Back hoe
JP3541116B2 (en) Hydraulic control device for work equipment
JP2002138507A (en) Backhoe
JP2688131B2 (en) Backhoe
JP3418094B2 (en) Backhoe
JP3608914B2 (en) Backhoe interference prevention device
JP3313602B2 (en) Backhoe
JPH04333730A (en) Back-hoe
JP2003129524A (en) Malfunction detecting structure of working vehicle
JPH06146326A (en) Back hoe

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041202

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050131

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050908

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050920

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090930

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090930

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100930

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110930

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120930

Year of fee payment: 7