JP3595177B2 - Installation equipment for tunnel support - Google Patents
Installation equipment for tunnel support Download PDFInfo
- Publication number
- JP3595177B2 JP3595177B2 JP33913998A JP33913998A JP3595177B2 JP 3595177 B2 JP3595177 B2 JP 3595177B2 JP 33913998 A JP33913998 A JP 33913998A JP 33913998 A JP33913998 A JP 33913998A JP 3595177 B2 JP3595177 B2 JP 3595177B2
- Authority
- JP
- Japan
- Prior art keywords
- work vehicle
- support
- tunnel
- erector
- moving mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、トンネル支保工の設置装置に関するものである。
【0002】
【従来の技術】
NATM工法においてトンネルを構築する際に、アーチ状のトンネル支保工を設置する場合、従来は、以下に説明する手順により行われていた。まず、切羽の近傍に吹付け機をセットして、切羽にコンクリートを一次吹き付けし、これが完了すると、吹付け機を退出させる。
【0003】
次いで、切羽の近傍に支保工エレクター台車をセットして、エレクターによりアーチ状のトンネル支保工を切羽に建て込み、これが完了すると支保工エレクター台車を退出させる。
【0004】
次に、切羽に吹付け機を再びセットし、建て込まれたトンネル支保工を埋め込むようにして、コンクリートの二次吹付けを行い、吹付け機を退出させる。
【0005】
しかしながら、このような手順で行われるトンネル支保工の設置手順では、重機( 吹付け機および支保工エレクター台車)の移動,セット,退出動作を3回も行う必要があって、狭い切羽付近の作業現場で重機の移動が輻湊する。
【0006】
このため、移動や待機などのロスタイムが長く、施工能率に対する影響が大きく不経済となる。また、重機の移動が輻湊すると、作業員と重機および重機同士が接触する可能性が高く、安全上の問題もあった。
【0007】
そこで、例えば、特開平3−295999号公報には、1台の走行車両に支保工を建て込むためのエレクターブームと、コンクリート吹付けロボットと、削孔機とを搭載したトンネル支保工の設置装置が提案されている。
【0008】
この公報に提案されている装置によれば、狭隘な切羽付近での重機の移動が少なくなり、施工能率および安全性の向上が期待されるが、この公報に提案されている装置にも以下に説明する技術的な課題があった。
【0009】
【発明が解決しようとする課題】
すなわち、上記公報に開示されているトンネル支保工の設置装置では、エレクタブームは、円弧状の支保材の長手方向の軸が切羽と平行になるように受承して、これを上方に移動させることで、アーチ状に組立てるものである。
【0010】
ところが、受承した円弧状の支保材を、その長手軸が切羽と平行になるようエレクタブームに保持させて、この状態で走行車両により運搬するとすれば、走行車両の前後移動方向に対して、支保材の長手軸が直交するので、支保材の保持状態が不安定になるとともに、運転する際の視界の障害となる。
【0011】
また、走行車両の前後移動方向に対して、支保材の長手軸が直交していると、支保材の長手軸方向の長さに相当する移動範囲で、運搬中に他の作業を中断することになり、運搬中の作業能率が低下する。
【0012】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、支保材の運搬中において、安定した状態で保持することができるとともに、他の作業に影響を及ぼすことが少ないトンネル支保工の設置装置を提供することにある。
【0013】
【課題を解決するための手段】
上記目的を達成するために、本発明は、円弧状に分割された一対の支保材を、切羽の前面側に設置して、中央部で相互に連結してアーチ状のトンネル支保工を建て込むトンネル支保工の設置装置において、前記支保材を個別に受承する一対のエレクター装置と、前記エレクター装置が搭載された走行移動自在な作業車両と、前記作業車両に配置されたスライド移動機構とを備え、前記エレクター装置は、前記支保材を揺動移動自在かつ旋回自在に保持するハンド部と、前記ハンド部を前後移動自在に支持する伸縮ビームと、前記伸縮ビームを支持する取付ベースとを有し、前記スライド移動機構部は、前記作業車両の幅方向の両端に配置され、長手軸方向に沿って、そのほぼ全長に亘って延設され、前記取付ベースが搭載された走行レールを有し、前記支保材は、前記作業車両により運搬する際に、当該支保材の長手軸が、前記作業車両の長手方向に沿うように前記エレクター装置に保持させた状態で、前記スライド移動機構の駆動により、前記エレクター装置を前記作業車両の長手方向に沿って、当該作業車両側に引き寄せるように移動させて、前記作業車両の側方に位置させるようにした。
このように構成したトンネル支保工の設置装置によれば、支保材は、作業車両により運搬する際に、当該支保材の長手軸が、作業車両の長手方向に沿うようにエレクター装置に保持させるので、運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなる。
また、作業車両には、支保材の長手軸が、作業車両の長手方向に沿うようにしてエレクター装置に保持させた状態で、エレクター装置を作業車両の長手方向に沿って移動させるスライド移動機構部を設けており、支保材の長手軸が、作業車両の長手方向に沿うようにしてエレクター装置に保持させた状態でスライド移動機構を駆動すると、エレクター装置が作業車両の長手方向に移動し、支保材を作業車両側に引き寄せ、支保工を作業車両の側面に位置させる。
このため、支保材と作業車両の長さ関係によっても異なるが、支保材が作業車両よりも短いと、作業車両の長さ範囲内に支保材を収めることが可能になり、支保材が作業車両よりも長い場合にも、支保材が作業車両の前後に突出する量を少なくすることが可能になる。
前記スライド移動機構部は、前記走行レールと、前記伸縮ビームの支持ベースに回転自在に取付けられ、前記走行レールに嵌合される複数のガイド車輪と、前記支持ベース側に搭載され、前記走行レールに沿って延設されたチェンに嵌合するスプロケットホイールと、前記スプロケットホイールの回転駆動用モータとで構成することができる。
【0014】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図8は、本発明にかかるトンネル支保工の設置装置の一実施例を示している。
【0015】
同図に示したトンネル支保工10の設置装置は、円弧状に屈曲したH型鋼からなる一対の左,右支保材10a,10bを、中央部で相互に連結して切羽にアーチ状に建て込むものであって、エレクター装置12と吹付け装置14とを搭載した作業車両16を有している。
【0016】
作業車両16は、エンジン,操舵装置などを有していて、運転者が乗って操舵することにより、任意の方向に走行移動できるようになっている。
【0017】
エレクター装置12は、作業車両16の側方に同一構成のものが一対配置されており、各エレクター装置12により一対の左,右支保材10a,10bを個別に受承する。
【0018】
本実施例のエレクター装置12は、左,右支保材10a,10bを揺動移動自在に且つ旋回自在に保持するハンド部18と、各ハンド部18を前後移動自在に支持する伸縮ビーム20と、伸縮ビーム20を支持する取付ベース22とを有している。
【0019】
伸縮ビーム20は、多重管構造に構成されていて、その下端側が取付ベース22に揺動自在に取付けられていて、伸縮ビーム20と取付ベース22との間には、伸縮ビーム20を傾動移動させるための傾動シリンダ23が設けられている。
【0020】
取付ベース22は、作業車両16に搭載されたスライド移動機構24により、作業車両16の長手方向の軸に沿って前後方向に移動される。本実施例のスライド移動機構24は、その詳細を図2から図4に示すように、走行レール26と、ガイド車輪28と、チェーン29および走行用スプロケットホイール30と、駆動モータ32とを備えている。
【0021】
走行レール26は、一対のエレクター装置12に対応して設けられていて、作業車両16の幅方向の両側に配置されていて、作業車両16の長手方向の軸に沿って、そのほぼ全長にわたって延設されている。
【0022】
各走行レール26は、図4に示すように、凹形断面の部材から構成されていて、一対の部材の凹部が、内側を向いて相互に対向するように所定の間隔を置いて作業車両16上に固設されている。
【0023】
ガイド車輪28は、取付ベース22にピンを介して取付けられたイコライザフレーム34に回転可能に支持されていて、走行レール26の凹部内に嵌合している。
【0024】
本実施例の場合には、イコライザフレーム34が取付ベース22の前後方向に所定の間隔を隔てて一対配置されていて、且つ、各イコライザフレーム34は、取付ベース22の幅方向に対向するように設けられている。
【0025】
チェーン29は、図2に示すように、走行レール26の長手軸方向に沿って、その全長に亙って延設されていて、一端側が走行レール26の一端に固定されるとともに、他端側は、張力調整部材36を介在させて、走行レール26の他端に固定されている。
【0026】
走行用スプロケットホイール30は、取付ベース22に搭載されている駆動モータ32の回転軸に固設され、チェーン29に嵌合しており、このホイール30の前後には、一対のアイドラホイール38が設けられている。
【0027】
このように構成したスライド移動機構24では、走行用スプロケットホイール30が走行レール26の長手軸方向に延設されたチェーン29に嵌合しているので、駆動モータ32を回転駆動すると、取付ベース22が走行レール26の長手軸方向に沿って前後移動する。
【0028】
ハンド18は、その先端側に各左,右支保材10a,10bを挟持するチャック部40が設けられている。吹付け装置14は、作業車両16の後部側に搭載されたコンクリートポンプ41からコンクリートが供給される吹付けノズル42と、この吹付けノズル42が先端に取付けられたビーム44とを備えている。
【0029】
ビーム44は、作業車両16に搭載された支持ブロック48に支持されていて、相互にピン結合された4本の第1アーム44a〜第4アーム44dと、第1アーム44a〜第4アーム44dの揺動シリンダ44e〜44gとを有している。
【0030】
次に、上記構成の設置装置を使用してトンネル支保工10を設置する手順について、図5〜図8に基づいて説明する。切羽50にトンネル支保工10を設置する際には、各ハンド18のチャック部40に円弧状の左,右支保材10a,10bを受承させてそれぞれ保持させる。
【0031】
このときの各支保材10a,10bの保持状態は、図5に示すように、各左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿うように、チャック部40に挟持させる。
【0032】
そして、チャック部40に左,右支保材10a,10bを挟持させると、左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿った状態を維持しながら、スライド移動機構24の駆動モータ32を回転駆動させて、図5に点線で示すように、左,右支保材10a,10bを作業車両16の方向に引き寄せる。
【0033】
左,右支保材10a,10bを作業車両16の方向に引き寄せた状態においては、左,右支保材10a,10bは、作業車両16の幅方向および長手軸方向においてほぼ納まっていて、外方に飛び出していない。
【0034】
この引き寄せ操作が終了すると、作業車両16を運転して、左,右支保材10a,10bを切羽50の前方まで運搬する。左,右支保材10a,10bが切羽50の前方の所定の位置まで運搬されると、作業車両16をアウトリガーを伸長させて固定した後に、次に、図6に示すように、スライド移動機構24の駆動モータ32を回転駆動させて、左,右支保材10a,10bが前方に押出される。
【0035】
次いで、傾動シリンダ23の駆動と、伸縮ビーム20の伸長とにより、左,右支保材10a,10bを斜め上方に押上げた後に、ハンド部18の駆動により、チャック部26を徐々に旋回移動させて、支保材10a,10bが切羽面50と平行になるように移動させる。
【0036】
この旋回移動の終了状態においては、図7に示すように、左,右支保材10a,10bが前後方向に所定の間隔を隔てて離れるように一対のエレクター装置12を制御する。
【0037】
左,右支保材10a,10bの旋回移動が終了すると、図7に示すように、吹付け装置14のビーム44を駆動して、吹付けノズル42からコンクリートを噴射させて、トンネル掘削面に一次吹付けをする。
【0038】
この一次吹付けが終了すると、図8に示すように、伸縮ビーム20の伸長、傾動シリンダ23の駆動、ハンド部18の旋回および揺動などの各操作を組合せることにより、左,右支保材10a,10bを切羽50に位置決めして、左,右支保材10a,10bを中央部分で相互に連結することにより、アーチ状に組立てて支保工10の建込みが終了する。
【0039】
さて、以上のように構成したトンネル支保工の設置装置によれば、左,右支保材10a,10bは、作業車両16により運搬する際に、当該支保材10a,10bの長手軸が、作業車両16の長手方向に沿うようにエレクター装置12に保持させるので、運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなり、作業能率の低下を防ぐことができる。
【0040】
また、このような状態で左,右支保材10a,10bを運搬すると、作業車両16の運転車の視界を遮ることがなくなるので、運搬作業の安全性も向上する。
【0041】
また、本実施例の場合には、前記作業車両16には、左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿うようにしてハンド部18に保持させた状態で、エレクター装置12を作業車両16の長手軸方向に沿って移動させるスライド移動機構部24を設けている。
【0042】
このため、スライド移動機構部24を駆動すると、エレクター装置12が作業車両16の長手軸方向に移動し、左,右支保材10a,10bを作業車両16側に引き寄せることができる。
【0043】
従って、支保材10a,10bと作業車両16の長さ関係によっても異なるが、支保材10a,10bが作業車両16よりも短いと、作業車両16の長さ範囲内に支保材10a,10bを収めることが可能になり、支保材10a,10bが作業車両16よりも長い場合にも、支保材10a,10bが作業車両16の前後に突出する量を少なくすることが可能になる。
【0044】
しかして、本実施例のようなスライド移動機構部24を用いると、より一層運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなり、作業能率の低下を防ぐことができる。
【0045】
なお、上記実施例では、チェーン29とスプロケットホイール30で構成したスライド移動機構部24を例示したが、本発明の実施は、これに限定されることはなく、例えば、ボールスクリュー構造やラックピニオン構造のスライド移動機構部であってもよい。
【0046】
【発明の効果】
以上、実施例で詳細に説明したように、本発明にかかるトンネル支保工の設置装置によれば、支保材の運搬中において、安定した状態で保持することができるとともに、他の作業に影響を及ぼすことが少ないので、施工能率の低下も回避することができる。
【図面の簡単な説明】
【図1】本発明にかかるトンネル支保工の設置装置の一実施例を示す側面図である。
【図2】図1のスライド移動機構部の拡大図である。
【図3】図2のA部拡大図である。
【図4】図3のA−A線断面図である。
【図5】本発明にかかるトンネル支保工の設置装置で支保材を保持して運搬する際の側面図である。
【図6】図5の後に切羽前方まで運搬した支保材を旋回させる際の側面説明図である。
【図7】図6の後において、切羽に支保材を建て込む前にコンクリートを吹付ける際の側面説明図である。
【図8】図7の後に支保工を切羽に建て込んだ状態の側面説明図である。
【符号の説明】
10 トンネル支保工
10a,10b 支保材
12 エレクター装置
14 吹付け装置
16 作業車両
18 ハンド部
20 伸縮ビーム
22 取付ベース
24 スライド移動機構部
26 走行レール
28 ガイド車輪
30 スプロケットホイール
40 チャック部[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an installation device for a tunnel supporter.
[0002]
[Prior art]
When an arch-shaped tunnel support is installed when constructing a tunnel in the NATM method, conventionally, the procedure described below has been used. First, a spraying machine is set near the face, and concrete is primarily sprayed on the face, and when this is completed, the spraying machine is ejected.
[0003]
Next, a erection trolley is set near the face, and an arched tunnel support is erected on the face by the erector, and when this is completed, the erector trolley is withdrawn.
[0004]
Next, the spraying machine is set on the face again, and the secondary spraying of the concrete is performed by embedding the built tunnel support, and the spraying machine is moved out.
[0005]
However, in the installation procedure of the tunnel shoring performed by such a procedure, it is necessary to move, set, and retreat the heavy equipment (the spraying machine and the erection trolley) three times, and work near the narrow face is required. Movement of heavy equipment converges on site.
[0006]
For this reason, loss time such as movement and standby is long, and the effect on construction efficiency is large, which is uneconomical. In addition, when the movement of the heavy equipment is congested, there is a high possibility that the worker and the heavy equipment and the heavy equipment will come into contact with each other, and there is also a safety problem.
[0007]
Therefore, for example, Japanese Unexamined Patent Application Publication No. 3-295999 discloses a tunnel support installation device equipped with an erector boom for embedding a support in one traveling vehicle, a concrete spraying robot, and a drilling machine. Has been proposed.
[0008]
According to the device proposed in this publication, the movement of heavy machinery near a narrow face is reduced, and improvement in construction efficiency and safety is expected. However, the device proposed in this publication also has the following. There were technical issues to explain.
[0009]
[Problems to be solved by the invention]
That is, in the installation device of the tunnel supporter disclosed in the above publication, the elector boom receives the arc-shaped support material such that the longitudinal axis of the support material is parallel to the face and moves it upward. In this way, it can be assembled in an arch shape.
[0010]
However, if the received arc-shaped support material is held by the electrified boom so that its longitudinal axis is parallel to the face, and if it is transported by the traveling vehicle in this state, with respect to the forward and backward movement direction of the traveling vehicle, Since the longitudinal axes of the support members are orthogonal to each other, the holding state of the support members becomes unstable and hinders the visibility when driving.
[0011]
In addition, if the longitudinal axis of the supporting material is orthogonal to the longitudinal movement direction of the traveling vehicle, other work may be interrupted during transportation in a moving range corresponding to the length of the supporting material in the longitudinal axis direction. And the work efficiency during transportation decreases.
[0012]
The present invention has been made in view of such conventional problems, and an object of the present invention is to be able to hold the support material in a stable state during transportation of the support material and to perform other operations. It is an object of the present invention to provide an installation device for a tunnel support with less influence.
[0013]
[Means for Solving the Problems]
In order to achieve the above object, according to the present invention, a pair of support members divided in an arc shape are installed on the front side of a face, and are interconnected at a central portion to build an arch-shaped tunnel support. In the installation device of the tunnel support, a pair of erector devices that individually receive the support material, a movable work vehicle equipped with the erector device, and a slide moving mechanism disposed on the work vehicle. The erector device includes a hand unit for swingably moving and pivotally holding the support material, a telescopic beam for supporting the hand unit for back and forth movement, and a mounting base for supporting the telescopic beam. and, wherein the sliding mechanism is disposed in the width direction of both ends of the working vehicle, along a longitudinal axis, extending over its entire length, the running rail, wherein the mounting base is mounted And, wherein the pre-supports, when transporting by the work vehicle, the longitudinal axis of the pre-supports are, while being held by the erector device along the longitudinal direction of the work vehicle, drive of the sliding mechanism Accordingly, the erector device is moved along the longitudinal direction of the work vehicle so as to be drawn toward the work vehicle, and is positioned on the side of the work vehicle.
According to the installation device of the tunnel shoring constructed in this way, the shoring material is held by the erector device such that the longitudinal axis of the shoring material is along the longitudinal direction of the working vehicle when transported by the working vehicle. In addition, the holding state is stabilized during transportation, and the influence on other operations is reduced.
Further, the work vehicle has a slide moving mechanism for moving the erector device along the longitudinal direction of the work vehicle in a state where the support member is held by the erector device along the longitudinal direction of the work vehicle. When the slide moving mechanism is driven with the longitudinal axis of the supporting material held by the erector device along the longitudinal direction of the work vehicle, the erector device moves in the longitudinal direction of the work vehicle, and The material is drawn toward the work vehicle, and the support is positioned on the side of the work vehicle.
For this reason, although it depends on the length of the support material and the length of the work vehicle, if the support material is shorter than the work vehicle, it becomes possible to store the support material within the length range of the work vehicle, and the support material becomes Even in the case where the length is longer than that, it is possible to reduce the amount of the support material protruding forward and backward of the work vehicle.
The sliding mechanism includes: the running rail, rotatably mounted on the support base of the telescopic beam, and a plurality of guide wheels fitted to the running rail, mounted on the support base side, the running rail And a sprocket wheel fitted to a chain extending along the shaft, and a motor for rotationally driving the sprocket wheel.
[0014]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 to FIG. 8 show an embodiment of an installation device for a tunnel supporter according to the present invention.
[0015]
The installation device of the tunnel supporter 10 shown in the same figure connects a pair of left and
[0016]
The
[0017]
A pair of
[0018]
The
[0019]
The
[0020]
The mounting
[0021]
The running rails 26 are provided corresponding to the pair of
[0022]
As shown in FIG. 4, each of the running rails 26 is formed of a member having a concave cross section, and the
[0023]
The
[0024]
In the case of the present embodiment, a pair of equalizer frames 34 are arranged at predetermined intervals in the front-rear direction of the mounting
[0025]
As shown in FIG. 2, the
[0026]
The traveling
[0027]
In the
[0028]
The
[0029]
The
[0030]
Next, a procedure for installing the tunnel shoring 10 using the installation apparatus having the above configuration will be described with reference to FIGS. When the tunnel supporter 10 is installed on the face 50, the
[0031]
At this time, the holding state of the
[0032]
When the left and
[0033]
In a state where the left and
[0034]
When the pulling operation is completed, the
[0035]
Next, after the left and
[0036]
In the end state of the turning movement, as shown in FIG. 7, the pair of
[0037]
When the turning movements of the left and
[0038]
When the primary spraying is completed, as shown in FIG. 8, the left and right support members are combined by combining each operation such as extension of the
[0039]
Now, according to the installation device of the tunnel shoring constructed as described above, when the left and right shoring
[0040]
Further, when the left and
[0041]
Further, in the case of the present embodiment, the
[0042]
Therefore, when the
[0043]
Therefore, if the
[0044]
Thus, by using the
[0045]
In the above-described embodiment, the
[0046]
【The invention's effect】
As described above in detail in the embodiment, according to the installation device of the tunnel shoring according to the present invention, during transport of the shoring material, it can be held in a stable state while affecting other operations. Since it has little effect, a decrease in construction efficiency can be avoided.
[Brief description of the drawings]
FIG. 1 is a side view showing one embodiment of a tunnel shoring installation device according to the present invention.
FIG. 2 is an enlarged view of a slide moving mechanism of FIG. 1;
FIG. 3 is an enlarged view of a portion A in FIG. 2;
FIG. 4 is a sectional view taken along line AA of FIG. 3;
FIG. 5 is a side view when the supporting material is held and transported by the installation device of the tunnel support according to the present invention.
FIG. 6 is an explanatory side view when the support material transported to the front of the face after FIG. 5 is turned.
FIG. 7 is an explanatory side view of a case where concrete is sprayed after the support material is erected on the face after FIG. 6;
FIG. 8 is an explanatory side view of a state in which a shoring is erected on the face after FIG. 7;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10
Claims (2)
前記支保材を個別に受承する一対のエレクター装置と、前記エレクター装置が搭載された走行移動自在な作業車両と、前記作業車両に配置されたスライド移動機構とを備え、
前記エレクター装置は、前記支保材を揺動移動自在かつ旋回自在に保持するハンド部と、前記ハンド部を前後移動自在に支持する伸縮ビームと、前記伸縮ビームを支持する取付ベースとを有し、
前記スライド移動機構部は、前記作業車両の幅方向の両端に配置され、長手軸方向に沿って、そのほぼ全長に亘って延設され、前記取付ベースが搭載された走行レールを有し、
前記支保材は、前記作業車両により運搬する際に、当該支保材の長手軸が、前記作業車両の長手方向に沿うように前記エレクター装置に保持させた状態で、前記スライド移動機構の駆動により、前記エレクター装置を前記作業車両の長手方向に沿って、当該作業車両側に引き寄せるように移動させて、前記作業車両の側方に位置させることを特徴とするトンネル支保工の設置装置。In a tunnel support installation device that installs a pair of support materials divided in an arc shape on the front side of the face and interconnects at the center to build an arch-shaped tunnel support.
A pair of erector devices that individually receive the support material, a traveling movable work vehicle equipped with the erector device, and a slide moving mechanism disposed on the work vehicle,
The erector device has a hand unit that holds the support material swingably and pivotably, a telescopic beam that supports the hand unit movably back and forth, and a mounting base that supports the telescopic beam .
The slide moving mechanism portion is disposed at both ends in the width direction of the work vehicle, extends along substantially the entire length thereof along a longitudinal axis direction, and has a traveling rail on which the mounting base is mounted,
When the support material is transported by the work vehicle, in a state where the longitudinal axis of the support material is held by the erector device along the longitudinal direction of the work vehicle, by driving the slide moving mechanism, An installation device for a tunnel supporter, wherein the erector device is moved along the longitudinal direction of the work vehicle so as to be drawn toward the work vehicle, and is located at a side of the work vehicle.
前記走行レールと、
前記伸縮ビームの支持ベースに回転自在に取付けられ、前記走行レールに嵌合される複数のガイド車輪と、
前記支持ベース側に搭載され、前記走行レールに沿って延設されたチェンに嵌合するスプロケットホイールと、
前記スプロケットホイールの回転駆動用モータとを有することを特徴とする請求項1記載のトンネル支保工の設置装置。The slide moving mechanism section,
The traveling rail ;
A plurality of guide wheels that are rotatably mounted on the support base of the telescopic beam and are fitted to the traveling rail;
A sprocket wheel mounted on the support base side and fitted to a chain extending along the traveling rail;
The installation device for a tunnel supporter according to claim 1, further comprising a motor for rotating the sprocket wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33913998A JP3595177B2 (en) | 1998-11-30 | 1998-11-30 | Installation equipment for tunnel support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33913998A JP3595177B2 (en) | 1998-11-30 | 1998-11-30 | Installation equipment for tunnel support |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000160996A JP2000160996A (en) | 2000-06-13 |
JP3595177B2 true JP3595177B2 (en) | 2004-12-02 |
Family
ID=18324616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33913998A Expired - Fee Related JP3595177B2 (en) | 1998-11-30 | 1998-11-30 | Installation equipment for tunnel support |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3595177B2 (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014134025A (en) * | 2013-01-10 | 2014-07-24 | Fts Kk | Apparatus for constructing tunnel |
JP6845080B2 (en) * | 2017-05-15 | 2021-03-17 | 古河ロックドリル株式会社 | Support installation equipment for tunnels |
JP6867269B2 (en) * | 2017-10-13 | 2021-04-28 | 鹿島建設株式会社 | Tunnel construction equipment and tunnel construction method |
CN109026084A (en) * | 2018-08-06 | 2018-12-18 | 中国铁建重工集团有限公司 | Arch installs trolley and its sliding platform |
CN110645028B (en) * | 2019-10-21 | 2020-11-24 | 中铁五局集团第一工程有限责任公司 | Multidirectional operation type arch mounting machine |
CN110645027B (en) * | 2019-10-21 | 2020-11-24 | 中铁五局集团第一工程有限责任公司 | Construction method by arch installing machine |
CN110617089B (en) * | 2019-10-21 | 2020-10-09 | 中铁五局集团第一工程有限责任公司 | Stable clamping arch installing machine |
CN110685725B (en) * | 2019-10-21 | 2021-02-23 | 中铁五局集团第一工程有限责任公司 | Take bow member mounting plate of integrated valve piece |
CN112096421A (en) * | 2020-09-29 | 2020-12-18 | 湖南五新隧道智能装备股份有限公司 | Cantilever crane movable type arch center mounting vehicle |
CN112049668A (en) * | 2020-09-29 | 2020-12-08 | 湖南五新隧道智能装备股份有限公司 | Three-arm arch frame vehicle |
CN117489371B (en) * | 2024-01-02 | 2024-03-19 | 中铁五局集团电务工程有限责任公司 | TBM tunnel construction slip casting device |
-
1998
- 1998-11-30 JP JP33913998A patent/JP3595177B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2000160996A (en) | 2000-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3595177B2 (en) | Installation equipment for tunnel support | |
JPS6011199B2 (en) | Temporary reinforcement device for tunnels | |
JP4069528B2 (en) | Tunnel support material transport device | |
CN210177345U (en) | Movable support leg for inverted arch trestle | |
JPH0853006A (en) | Track travelling apparatus of service car on track land | |
JP2524537Y2 (en) | Multifunctional tunnel construction equipment | |
JP2007056585A (en) | Working device for construction | |
JP4496473B2 (en) | Concrete spraying equipment | |
JP4057362B2 (en) | Track work equipment | |
CN110668303A (en) | Tire type tunnel pipe rack conveying and erecting machine | |
JP3924099B2 (en) | Tube carrier | |
JP2729892B2 (en) | Backstay disassembly method of pile driver | |
JP2000248900A (en) | Tunnel construction equipment | |
JP2633423B2 (en) | Traveling equipment for work vehicles | |
CN211056510U (en) | Tire type tunnel pipe rack conveying and erecting machine | |
CN214215923U (en) | Multi-terrain traveling device and wheel type mobile equipment | |
JP4416253B2 (en) | Guide cell folding mechanism in excavator | |
JP2001049999A (en) | Reinforcing segment assembly device | |
JPH10266762A (en) | Driving mechanism of bolter head of rock bolt-driving machine | |
JP2001090494A (en) | Rock bolt supply apparatus | |
JP2007056586A (en) | Working device for construction | |
JPH06212897A (en) | Automobile erecting carrier | |
JPH11199177A (en) | Crane jib overhang and storage method and its device | |
JPS6321800B2 (en) | ||
JPH11276050A (en) | Onboard boom spraying pest controlling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20030805 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040902 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070910 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080910 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080910 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090910 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100910 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110910 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120910 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120910 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130910 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |