JP3595177B2 - Installation equipment for tunnel support - Google Patents

Installation equipment for tunnel support Download PDF

Info

Publication number
JP3595177B2
JP3595177B2 JP33913998A JP33913998A JP3595177B2 JP 3595177 B2 JP3595177 B2 JP 3595177B2 JP 33913998 A JP33913998 A JP 33913998A JP 33913998 A JP33913998 A JP 33913998A JP 3595177 B2 JP3595177 B2 JP 3595177B2
Authority
JP
Japan
Prior art keywords
work vehicle
support
tunnel
erector
moving mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP33913998A
Other languages
Japanese (ja)
Other versions
JP2000160996A (en
Inventor
長谷川  功
有佐 斎藤
哲治 保岡
茂 石橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Furukawa Co Ltd
Original Assignee
Obayashi Corp
Furukawa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Furukawa Co Ltd filed Critical Obayashi Corp
Priority to JP33913998A priority Critical patent/JP3595177B2/en
Publication of JP2000160996A publication Critical patent/JP2000160996A/en
Application granted granted Critical
Publication of JP3595177B2 publication Critical patent/JP3595177B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、トンネル支保工の設置装置に関するものである。
【0002】
【従来の技術】
NATM工法においてトンネルを構築する際に、アーチ状のトンネル支保工を設置する場合、従来は、以下に説明する手順により行われていた。まず、切羽の近傍に吹付け機をセットして、切羽にコンクリートを一次吹き付けし、これが完了すると、吹付け機を退出させる。
【0003】
次いで、切羽の近傍に支保工エレクター台車をセットして、エレクターによりアーチ状のトンネル支保工を切羽に建て込み、これが完了すると支保工エレクター台車を退出させる。
【0004】
次に、切羽に吹付け機を再びセットし、建て込まれたトンネル支保工を埋め込むようにして、コンクリートの二次吹付けを行い、吹付け機を退出させる。
【0005】
しかしながら、このような手順で行われるトンネル支保工の設置手順では、重機( 吹付け機および支保工エレクター台車)の移動,セット,退出動作を3回も行う必要があって、狭い切羽付近の作業現場で重機の移動が輻湊する。
【0006】
このため、移動や待機などのロスタイムが長く、施工能率に対する影響が大きく不経済となる。また、重機の移動が輻湊すると、作業員と重機および重機同士が接触する可能性が高く、安全上の問題もあった。
【0007】
そこで、例えば、特開平3−295999号公報には、1台の走行車両に支保工を建て込むためのエレクターブームと、コンクリート吹付けロボットと、削孔機とを搭載したトンネル支保工の設置装置が提案されている。
【0008】
この公報に提案されている装置によれば、狭隘な切羽付近での重機の移動が少なくなり、施工能率および安全性の向上が期待されるが、この公報に提案されている装置にも以下に説明する技術的な課題があった。
【0009】
【発明が解決しようとする課題】
すなわち、上記公報に開示されているトンネル支保工の設置装置では、エレクタブームは、円弧状の支保材の長手方向の軸が切羽と平行になるように受承して、これを上方に移動させることで、アーチ状に組立てるものである。
【0010】
ところが、受承した円弧状の支保材を、その長手軸が切羽と平行になるようエレクタブームに保持させて、この状態で走行車両により運搬するとすれば、走行車両の前後移動方向に対して、支保材の長手軸が直交するので、支保材の保持状態が不安定になるとともに、運転する際の視界の障害となる。
【0011】
また、走行車両の前後移動方向に対して、支保材の長手軸が直交していると、支保材の長手軸方向の長さに相当する移動範囲で、運搬中に他の作業を中断することになり、運搬中の作業能率が低下する。
【0012】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、支保材の運搬中において、安定した状態で保持することができるとともに、他の作業に影響を及ぼすことが少ないトンネル支保工の設置装置を提供することにある。
【0013】
【課題を解決するための手段】
上記目的を達成するために、本発明は、円弧状に分割された一対の支保材を、切羽の前面側に設置して、中央部で相互に連結してアーチ状のトンネル支保工を建て込むトンネル支保工の設置装置において、前記支保材を個別に受承する一対のエレクター装置と、前記エレクター装置が搭載された走行移動自在な作業車両と、前記作業車両に配置されたスライド移動機構とを備え、前記エレクター装置は、前記支保材を揺動移動自在かつ旋回自在に保持するハンド部と、前記ハンド部を前後移動自在に支持する伸縮ビームと、前記伸縮ビームを支持する取付ベースとを有し、前記スライド移動機構部は、前記作業車両の幅方向の両端に配置され、長手軸方向に沿って、そのほぼ全長に亘って延設され、前記取付ベースが搭載された走行レールを有し、前記支保材は、前記作業車両により運搬する際に、当該支保材の長手軸が、前記作業車両の長手方向に沿うように前記エレクター装置に保持させた状態で、前記スライド移動機構の駆動により、前記エレクター装置を前記作業車両の長手方向に沿って、当該作業車両側に引き寄せるように移動させて、前記作業車両の側方に位置させるようにした。
このように構成したトンネル支保工の設置装置によれば、支保材は、作業車両により運搬する際に、当該支保材の長手軸が、作業車両の長手方向に沿うようにエレクター装置に保持させるので、運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなる。
また、作業車両には、支保材の長手軸が、作業車両の長手方向に沿うようにしてエレクター装置に保持させた状態で、エレクター装置を作業車両の長手方向に沿って移動させるスライド移動機構部を設けており、支保材の長手軸が、作業車両の長手方向に沿うようにしてエレクター装置に保持させた状態でスライド移動機構を駆動すると、エレクター装置が作業車両の長手方向に移動し、支保材を作業車両側に引き寄せ、支保工を作業車両の側面に位置させる。
このため、支保材と作業車両の長さ関係によっても異なるが、支保材が作業車両よりも短いと、作業車両の長さ範囲内に支保材を収めることが可能になり、支保材が作業車両よりも長い場合にも、支保材が作業車両の前後に突出する量を少なくすることが可能になる。
前記スライド移動機構部は、前記走行レールと、前記伸縮ビームの支持ベースに回転自在に取付けられ、前記走行レールに嵌合される複数のガイド車輪と、前記支持ベース側に搭載され、前記走行レールに沿って延設されたチェンに嵌合するスプロケットホイールと、前記スプロケットホイールの回転駆動用モータとで構成することができる。
【0014】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図8は、本発明にかかるトンネル支保工の設置装置の一実施例を示している。
【0015】
同図に示したトンネル支保工10の設置装置は、円弧状に屈曲したH型鋼からなる一対の左,右支保材10a,10bを、中央部で相互に連結して切羽にアーチ状に建て込むものであって、エレクター装置12と吹付け装置14とを搭載した作業車両16を有している。
【0016】
作業車両16は、エンジン,操舵装置などを有していて、運転者が乗って操舵することにより、任意の方向に走行移動できるようになっている。
【0017】
エレクター装置12は、作業車両16の側方に同一構成のものが一対配置されており、各エレクター装置12により一対の左,右支保材10a,10bを個別に受承する。
【0018】
本実施例のエレクター装置12は、左,右支保材10a,10bを揺動移動自在に且つ旋回自在に保持するハンド部18と、各ハンド部18を前後移動自在に支持する伸縮ビーム20と、伸縮ビーム20を支持する取付ベース22とを有している。
【0019】
伸縮ビーム20は、多重管構造に構成されていて、その下端側が取付ベース22に揺動自在に取付けられていて、伸縮ビーム20と取付ベース22との間には、伸縮ビーム20を傾動移動させるための傾動シリンダ23が設けられている。
【0020】
取付ベース22は、作業車両16に搭載されたスライド移動機構24により、作業車両16の長手方向の軸に沿って前後方向に移動される。本実施例のスライド移動機構24は、その詳細を図2から図4に示すように、走行レール26と、ガイド車輪28と、チェーン29および走行用スプロケットホイール30と、駆動モータ32とを備えている。
【0021】
走行レール26は、一対のエレクター装置12に対応して設けられていて、作業車両16の幅方向の両側に配置されていて、作業車両16の長手方向の軸に沿って、そのほぼ全長にわたって延設されている。
【0022】
各走行レール26は、図4に示すように、凹形断面の部材から構成されていて、一対の部材の凹部が、内側を向いて相互に対向するように所定の間隔を置いて作業車両16上に固設されている。
【0023】
ガイド車輪28は、取付ベース22にピンを介して取付けられたイコライザフレーム34に回転可能に支持されていて、走行レール26の凹部内に嵌合している。
【0024】
本実施例の場合には、イコライザフレーム34が取付ベース22の前後方向に所定の間隔を隔てて一対配置されていて、且つ、各イコライザフレーム34は、取付ベース22の幅方向に対向するように設けられている。
【0025】
チェーン29は、図2に示すように、走行レール26の長手軸方向に沿って、その全長に亙って延設されていて、一端側が走行レール26の一端に固定されるとともに、他端側は、張力調整部材36を介在させて、走行レール26の他端に固定されている。
【0026】
走行用スプロケットホイール30は、取付ベース22に搭載されている駆動モータ32の回転軸に固設され、チェーン29に嵌合しており、このホイール30の前後には、一対のアイドラホイール38が設けられている。
【0027】
このように構成したスライド移動機構24では、走行用スプロケットホイール30が走行レール26の長手軸方向に延設されたチェーン29に嵌合しているので、駆動モータ32を回転駆動すると、取付ベース22が走行レール26の長手軸方向に沿って前後移動する。
【0028】
ハンド18は、その先端側に各左,右支保材10a,10bを挟持するチャック部40が設けられている。吹付け装置14は、作業車両16の後部側に搭載されたコンクリートポンプ41からコンクリートが供給される吹付けノズル42と、この吹付けノズル42が先端に取付けられたビーム44とを備えている。
【0029】
ビーム44は、作業車両16に搭載された支持ブロック48に支持されていて、相互にピン結合された4本の第1アーム44a〜第4アーム44dと、第1アーム44a〜第4アーム44dの揺動シリンダ44e〜44gとを有している。
【0030】
次に、上記構成の設置装置を使用してトンネル支保工10を設置する手順について、図5〜図8に基づいて説明する。切羽50にトンネル支保工10を設置する際には、各ハンド18のチャック部40に円弧状の左,右支保材10a,10bを受承させてそれぞれ保持させる。
【0031】
このときの各支保材10a,10bの保持状態は、図5に示すように、各左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿うように、チャック部40に挟持させる。
【0032】
そして、チャック部40に左,右支保材10a,10bを挟持させると、左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿った状態を維持しながら、スライド移動機構24の駆動モータ32を回転駆動させて、図5に点線で示すように、左,右支保材10a,10bを作業車両16の方向に引き寄せる。
【0033】
左,右支保材10a,10bを作業車両16の方向に引き寄せた状態においては、左,右支保材10a,10bは、作業車両16の幅方向および長手軸方向においてほぼ納まっていて、外方に飛び出していない。
【0034】
この引き寄せ操作が終了すると、作業車両16を運転して、左,右支保材10a,10bを切羽50の前方まで運搬する。左,右支保材10a,10bが切羽50の前方の所定の位置まで運搬されると、作業車両16をアウトリガーを伸長させて固定した後に、次に、図6に示すように、スライド移動機構24の駆動モータ32を回転駆動させて、左,右支保材10a,10bが前方に押出される。
【0035】
次いで、傾動シリンダ23の駆動と、伸縮ビーム20の伸長とにより、左,右支保材10a,10bを斜め上方に押上げた後に、ハンド部18の駆動により、チャック部26を徐々に旋回移動させて、支保材10a,10bが切羽面50と平行になるように移動させる。
【0036】
この旋回移動の終了状態においては、図7に示すように、左,右支保材10a,10bが前後方向に所定の間隔を隔てて離れるように一対のエレクター装置12を制御する。
【0037】
左,右支保材10a,10bの旋回移動が終了すると、図7に示すように、吹付け装置14のビーム44を駆動して、吹付けノズル42からコンクリートを噴射させて、トンネル掘削面に一次吹付けをする。
【0038】
この一次吹付けが終了すると、図8に示すように、伸縮ビーム20の伸長、傾動シリンダ23の駆動、ハンド部18の旋回および揺動などの各操作を組合せることにより、左,右支保材10a,10bを切羽50に位置決めして、左,右支保材10a,10bを中央部分で相互に連結することにより、アーチ状に組立てて支保工10の建込みが終了する。
【0039】
さて、以上のように構成したトンネル支保工の設置装置によれば、左,右支保材10a,10bは、作業車両16により運搬する際に、当該支保材10a,10bの長手軸が、作業車両16の長手方向に沿うようにエレクター装置12に保持させるので、運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなり、作業能率の低下を防ぐことができる。
【0040】
また、このような状態で左,右支保材10a,10bを運搬すると、作業車両16の運転車の視界を遮ることがなくなるので、運搬作業の安全性も向上する。
【0041】
また、本実施例の場合には、前記作業車両16には、左,右支保材10a,10bの長手軸が、作業車両16の長手方向に沿うようにしてハンド部18に保持させた状態で、エレクター装置12を作業車両16の長手軸方向に沿って移動させるスライド移動機構部24を設けている。
【0042】
このため、スライド移動機構部24を駆動すると、エレクター装置12が作業車両16の長手軸方向に移動し、左,右支保材10a,10bを作業車両16側に引き寄せることができる。
【0043】
従って、支保材10a,10bと作業車両16の長さ関係によっても異なるが、支保材10a,10bが作業車両16よりも短いと、作業車両16の長さ範囲内に支保材10a,10bを収めることが可能になり、支保材10a,10bが作業車両16よりも長い場合にも、支保材10a,10bが作業車両16の前後に突出する量を少なくすることが可能になる。
【0044】
しかして、本実施例のようなスライド移動機構部24を用いると、より一層運搬中において保持状態が安定するとともに、他の作業に与える影響が少なくなり、作業能率の低下を防ぐことができる。
【0045】
なお、上記実施例では、チェーン29とスプロケットホイール30で構成したスライド移動機構部24を例示したが、本発明の実施は、これに限定されることはなく、例えば、ボールスクリュー構造やラックピニオン構造のスライド移動機構部であってもよい。
【0046】
【発明の効果】
以上、実施例で詳細に説明したように、本発明にかかるトンネル支保工の設置装置によれば、支保材の運搬中において、安定した状態で保持することができるとともに、他の作業に影響を及ぼすことが少ないので、施工能率の低下も回避することができる。
【図面の簡単な説明】
【図1】本発明にかかるトンネル支保工の設置装置の一実施例を示す側面図である。
【図2】図1のスライド移動機構部の拡大図である。
【図3】図2のA部拡大図である。
【図4】図3のA−A線断面図である。
【図5】本発明にかかるトンネル支保工の設置装置で支保材を保持して運搬する際の側面図である。
【図6】図5の後に切羽前方まで運搬した支保材を旋回させる際の側面説明図である。
【図7】図6の後において、切羽に支保材を建て込む前にコンクリートを吹付ける際の側面説明図である。
【図8】図7の後に支保工を切羽に建て込んだ状態の側面説明図である。
【符号の説明】
10 トンネル支保工
10a,10b 支保材
12 エレクター装置
14 吹付け装置
16 作業車両
18 ハンド部
20 伸縮ビーム
22 取付ベース
24 スライド移動機構部
26 走行レール
28 ガイド車輪
30 スプロケットホイール
40 チャック部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an installation device for a tunnel supporter.
[0002]
[Prior art]
When an arch-shaped tunnel support is installed when constructing a tunnel in the NATM method, conventionally, the procedure described below has been used. First, a spraying machine is set near the face, and concrete is primarily sprayed on the face, and when this is completed, the spraying machine is ejected.
[0003]
Next, a erection trolley is set near the face, and an arched tunnel support is erected on the face by the erector, and when this is completed, the erector trolley is withdrawn.
[0004]
Next, the spraying machine is set on the face again, and the secondary spraying of the concrete is performed by embedding the built tunnel support, and the spraying machine is moved out.
[0005]
However, in the installation procedure of the tunnel shoring performed by such a procedure, it is necessary to move, set, and retreat the heavy equipment (the spraying machine and the erection trolley) three times, and work near the narrow face is required. Movement of heavy equipment converges on site.
[0006]
For this reason, loss time such as movement and standby is long, and the effect on construction efficiency is large, which is uneconomical. In addition, when the movement of the heavy equipment is congested, there is a high possibility that the worker and the heavy equipment and the heavy equipment will come into contact with each other, and there is also a safety problem.
[0007]
Therefore, for example, Japanese Unexamined Patent Application Publication No. 3-295999 discloses a tunnel support installation device equipped with an erector boom for embedding a support in one traveling vehicle, a concrete spraying robot, and a drilling machine. Has been proposed.
[0008]
According to the device proposed in this publication, the movement of heavy machinery near a narrow face is reduced, and improvement in construction efficiency and safety is expected. However, the device proposed in this publication also has the following. There were technical issues to explain.
[0009]
[Problems to be solved by the invention]
That is, in the installation device of the tunnel supporter disclosed in the above publication, the elector boom receives the arc-shaped support material such that the longitudinal axis of the support material is parallel to the face and moves it upward. In this way, it can be assembled in an arch shape.
[0010]
However, if the received arc-shaped support material is held by the electrified boom so that its longitudinal axis is parallel to the face, and if it is transported by the traveling vehicle in this state, with respect to the forward and backward movement direction of the traveling vehicle, Since the longitudinal axes of the support members are orthogonal to each other, the holding state of the support members becomes unstable and hinders the visibility when driving.
[0011]
In addition, if the longitudinal axis of the supporting material is orthogonal to the longitudinal movement direction of the traveling vehicle, other work may be interrupted during transportation in a moving range corresponding to the length of the supporting material in the longitudinal axis direction. And the work efficiency during transportation decreases.
[0012]
The present invention has been made in view of such conventional problems, and an object of the present invention is to be able to hold the support material in a stable state during transportation of the support material and to perform other operations. It is an object of the present invention to provide an installation device for a tunnel support with less influence.
[0013]
[Means for Solving the Problems]
In order to achieve the above object, according to the present invention, a pair of support members divided in an arc shape are installed on the front side of a face, and are interconnected at a central portion to build an arch-shaped tunnel support. In the installation device of the tunnel support, a pair of erector devices that individually receive the support material, a movable work vehicle equipped with the erector device, and a slide moving mechanism disposed on the work vehicle. The erector device includes a hand unit for swingably moving and pivotally holding the support material, a telescopic beam for supporting the hand unit for back and forth movement, and a mounting base for supporting the telescopic beam. and, wherein the sliding mechanism is disposed in the width direction of both ends of the working vehicle, along a longitudinal axis, extending over its entire length, the running rail, wherein the mounting base is mounted And, wherein the pre-supports, when transporting by the work vehicle, the longitudinal axis of the pre-supports are, while being held by the erector device along the longitudinal direction of the work vehicle, drive of the sliding mechanism Accordingly, the erector device is moved along the longitudinal direction of the work vehicle so as to be drawn toward the work vehicle, and is positioned on the side of the work vehicle.
According to the installation device of the tunnel shoring constructed in this way, the shoring material is held by the erector device such that the longitudinal axis of the shoring material is along the longitudinal direction of the working vehicle when transported by the working vehicle. In addition, the holding state is stabilized during transportation, and the influence on other operations is reduced.
Further, the work vehicle has a slide moving mechanism for moving the erector device along the longitudinal direction of the work vehicle in a state where the support member is held by the erector device along the longitudinal direction of the work vehicle. When the slide moving mechanism is driven with the longitudinal axis of the supporting material held by the erector device along the longitudinal direction of the work vehicle, the erector device moves in the longitudinal direction of the work vehicle, and The material is drawn toward the work vehicle, and the support is positioned on the side of the work vehicle.
For this reason, although it depends on the length of the support material and the length of the work vehicle, if the support material is shorter than the work vehicle, it becomes possible to store the support material within the length range of the work vehicle, and the support material becomes Even in the case where the length is longer than that, it is possible to reduce the amount of the support material protruding forward and backward of the work vehicle.
The sliding mechanism includes: the running rail, rotatably mounted on the support base of the telescopic beam, and a plurality of guide wheels fitted to the running rail, mounted on the support base side, the running rail And a sprocket wheel fitted to a chain extending along the shaft, and a motor for rotationally driving the sprocket wheel.
[0014]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 to FIG. 8 show an embodiment of an installation device for a tunnel supporter according to the present invention.
[0015]
The installation device of the tunnel supporter 10 shown in the same figure connects a pair of left and right support members 10a and 10b made of an H-shaped steel bent in an arc shape to each other at a central portion and erected in an arch shape on a face. And a work vehicle 16 having an erector device 12 and a spray device 14 mounted thereon.
[0016]
The work vehicle 16 has an engine, a steering device, and the like, and can travel and move in an arbitrary direction when the driver gets on and steers.
[0017]
A pair of erector devices 12 having the same configuration is arranged on the side of the work vehicle 16, and each erector device 12 individually receives a pair of left and right support members 10 a and 10 b.
[0018]
The erector device 12 of the present embodiment includes a hand unit 18 that holds the left and right support members 10a and 10b so as to swing and swing freely, a telescopic beam 20 that supports each hand unit 18 so as to be able to move back and forth, And a mounting base 22 for supporting the telescopic beam 20.
[0019]
The telescopic beam 20 has a multi-tube structure, and the lower end thereof is swingably attached to the mounting base 22. The telescopic beam 20 is tilted between the telescopic beam 20 and the mounting base 22. Tilting cylinder 23 is provided.
[0020]
The mounting base 22 is moved in the front-rear direction along a longitudinal axis of the work vehicle 16 by a slide moving mechanism 24 mounted on the work vehicle 16. As shown in detail in FIGS. 2 to 4, the slide moving mechanism 24 of the present embodiment includes a traveling rail 26, a guide wheel 28, a chain 29, a traveling sprocket wheel 30, and a drive motor 32. I have.
[0021]
The running rails 26 are provided corresponding to the pair of erector devices 12, are disposed on both sides in the width direction of the work vehicle 16, and extend over substantially the entire length thereof along the longitudinal axis of the work vehicle 16. Is established.
[0022]
As shown in FIG. 4, each of the running rails 26 is formed of a member having a concave cross section, and the work vehicles 16 are arranged at predetermined intervals so that the recesses of the pair of members face inward and face each other. It is fixed on top.
[0023]
The guide wheel 28 is rotatably supported by an equalizer frame 34 attached to the attachment base 22 via a pin, and is fitted in a recess of the traveling rail 26.
[0024]
In the case of the present embodiment, a pair of equalizer frames 34 are arranged at predetermined intervals in the front-rear direction of the mounting base 22, and each equalizer frame 34 faces the width direction of the mounting base 22. Is provided.
[0025]
As shown in FIG. 2, the chain 29 extends along the longitudinal axis of the traveling rail 26 over its entire length, and one end is fixed to one end of the traveling rail 26 and the other end is Is fixed to the other end of the traveling rail 26 with a tension adjusting member 36 interposed therebetween.
[0026]
The traveling sprocket wheel 30 is fixed to a rotating shaft of a drive motor 32 mounted on the mounting base 22 and is fitted to a chain 29. A pair of idler wheels 38 is provided before and after the wheel 30. Have been.
[0027]
In the slide moving mechanism 24 configured as described above, since the traveling sprocket wheel 30 is fitted to the chain 29 extending in the longitudinal direction of the traveling rail 26, when the driving motor 32 is rotationally driven, the mounting base 22 is rotated. Moves back and forth along the longitudinal axis of the traveling rail 26.
[0028]
The hand 18 is provided at its distal end with a chuck portion 40 for holding the left and right support members 10a and 10b. The spray device 14 includes a spray nozzle 42 to which concrete is supplied from a concrete pump 41 mounted on the rear side of the work vehicle 16, and a beam 44 to which the spray nozzle 42 is attached at the tip.
[0029]
The beam 44 is supported by a support block 48 mounted on the work vehicle 16, and includes four first arms 44 a to 44 d and a first arm 44 a to a fourth arm 44 d which are pin-connected to each other. It has swing cylinders 44e to 44g.
[0030]
Next, a procedure for installing the tunnel shoring 10 using the installation apparatus having the above configuration will be described with reference to FIGS. When the tunnel supporter 10 is installed on the face 50, the chuck portions 40 of the hands 18 receive the arc-shaped left and right support members 10a and 10b and hold them.
[0031]
At this time, the holding state of the support members 10a and 10b is set to the chuck portion 40 such that the longitudinal axes of the left and right support members 10a and 10b are along the longitudinal direction of the work vehicle 16 as shown in FIG. Let it be pinched.
[0032]
When the left and right support members 10a and 10b are held by the chuck portion 40, the slide moving mechanism is maintained while maintaining the longitudinal axes of the left and right support members 10a and 10b along the longitudinal direction of the work vehicle 16. 24, the left and right support members 10a and 10b are drawn in the direction of the work vehicle 16 as indicated by the dotted lines in FIG.
[0033]
In a state where the left and right support members 10a and 10b are pulled toward the work vehicle 16, the left and right support members 10a and 10b are substantially accommodated in the width direction and the longitudinal axis direction of the work vehicle 16, and are outward. Not jumping out.
[0034]
When the pulling operation is completed, the work vehicle 16 is driven to transport the left and right support members 10a and 10b to the front of the face 50. When the left and right support members 10a and 10b are transported to predetermined positions in front of the face 50, the work vehicle 16 is fixed by extending the outriggers, and then, as shown in FIG. , The left and right support members 10a, 10b are pushed forward.
[0035]
Next, after the left and right support members 10a and 10b are pushed up obliquely upward by the driving of the tilting cylinder 23 and the extension of the telescopic beam 20, the chuck portion 26 is gradually turned by the driving of the hand portion 18. Then, the supporting members 10a and 10b are moved so as to be parallel to the face 50.
[0036]
In the end state of the turning movement, as shown in FIG. 7, the pair of erector devices 12 is controlled so that the left and right support members 10a and 10b are separated at a predetermined interval in the front-rear direction.
[0037]
When the turning movements of the left and right support members 10a and 10b are completed, as shown in FIG. 7, the beam 44 of the spraying device 14 is driven so that the concrete is sprayed from the spraying nozzle 42, so that the concrete is primarily sprayed on the tunnel excavation surface. Spray.
[0038]
When the primary spraying is completed, as shown in FIG. 8, the left and right support members are combined by combining each operation such as extension of the telescopic beam 20, driving of the tilting cylinder 23, turning and swinging of the hand unit 18, and the like. By positioning the 10a and 10b on the face 50 and connecting the left and right support members 10a and 10b to each other at the central portion, the arching of the support 10 is completed by assembling in an arch shape.
[0039]
Now, according to the installation device of the tunnel shoring constructed as described above, when the left and right shoring members 10a, 10b are transported by the working vehicle 16, the longitudinal axes of the supporting members 10a, 10b are set to the length of the working vehicle. Since the holder 16 is held by the erector device 12 along the longitudinal direction, the holding state is stabilized during transportation, the influence on other work is reduced, and a decrease in work efficiency can be prevented.
[0040]
Further, when the left and right support members 10a, 10b are transported in such a state, the visibility of the driving vehicle of the work vehicle 16 is not obstructed, so that the safety of the transport operation is also improved.
[0041]
Further, in the case of the present embodiment, the work vehicle 16 is held in the hand portion 18 such that the longitudinal axes of the left and right support members 10a and 10b are along the longitudinal direction of the work vehicle 16. And a slide moving mechanism 24 for moving the erector device 12 along the longitudinal axis of the work vehicle 16.
[0042]
Therefore, when the slide moving mechanism 24 is driven, the erector device 12 moves in the longitudinal axis direction of the work vehicle 16, and can pull the left and right support members 10 a and 10 b toward the work vehicle 16.
[0043]
Therefore, if the support materials 10a and 10b are shorter than the work vehicle 16, the support materials 10a and 10b are accommodated within the length range of the work vehicle 16, although it depends on the length relationship between the support materials 10a and 10b and the work vehicle 16. Therefore, even when the support members 10a and 10b are longer than the work vehicle 16, the amount by which the support members 10a and 10b protrude forward and backward of the work vehicle 16 can be reduced.
[0044]
Thus, by using the slide moving mechanism 24 as in this embodiment, the holding state is further stabilized during transportation, and the influence on other work is reduced, so that a decrease in work efficiency can be prevented.
[0045]
In the above-described embodiment, the slide moving mechanism 24 constituted by the chain 29 and the sprocket wheel 30 is exemplified. However, the embodiment of the present invention is not limited to this. For example, a ball screw structure or a rack and pinion structure may be used. May be the slide moving mechanism section.
[0046]
【The invention's effect】
As described above in detail in the embodiment, according to the installation device of the tunnel shoring according to the present invention, during transport of the shoring material, it can be held in a stable state while affecting other operations. Since it has little effect, a decrease in construction efficiency can be avoided.
[Brief description of the drawings]
FIG. 1 is a side view showing one embodiment of a tunnel shoring installation device according to the present invention.
FIG. 2 is an enlarged view of a slide moving mechanism of FIG. 1;
FIG. 3 is an enlarged view of a portion A in FIG. 2;
FIG. 4 is a sectional view taken along line AA of FIG. 3;
FIG. 5 is a side view when the supporting material is held and transported by the installation device of the tunnel support according to the present invention.
FIG. 6 is an explanatory side view when the support material transported to the front of the face after FIG. 5 is turned.
FIG. 7 is an explanatory side view of a case where concrete is sprayed after the support material is erected on the face after FIG. 6;
FIG. 8 is an explanatory side view of a state in which a shoring is erected on the face after FIG. 7;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Tunnel support 10a, 10b Support material 12 Erector device 14 Spray device 16 Work vehicle 18 Hand part 20 Telescopic beam 22 Mounting base 24 Slide moving mechanism part 26 Running rail 28 Guide wheel 30 Sprocket wheel 40 Chuck part

Claims (2)

円弧状に分割された一対の支保材を、切羽の前面側に設置して、中央部で相互に連結してアーチ状のトンネル支保工を建て込むトンネル支保工の設置装置において、
前記支保材を個別に受承する一対のエレクター装置と、前記エレクター装置が搭載された走行移動自在な作業車両と、前記作業車両に配置されたスライド移動機構とを備え、
前記エレクター装置は、前記支保材を揺動移動自在かつ旋回自在に保持するハンド部と、前記ハンド部を前後移動自在に支持する伸縮ビームと、前記伸縮ビームを支持する取付ベースとを有し、
前記スライド移動機構部は、前記作業車両の幅方向の両端に配置され、長手軸方向に沿って、そのほぼ全長に亘って延設され、前記取付ベースが搭載された走行レールを有し、
前記支保材は、前記作業車両により運搬する際に、当該支保材の長手軸が、前記作業車両の長手方向に沿うように前記エレクター装置に保持させた状態で、前記スライド移動機構の駆動により、前記エレクター装置を前記作業車両の長手方向に沿って、当該作業車両側に引き寄せるように移動させて、前記作業車両の側方に位置させることを特徴とするトンネル支保工の設置装置。
In a tunnel support installation device that installs a pair of support materials divided in an arc shape on the front side of the face and interconnects at the center to build an arch-shaped tunnel support.
A pair of erector devices that individually receive the support material, a traveling movable work vehicle equipped with the erector device, and a slide moving mechanism disposed on the work vehicle,
The erector device has a hand unit that holds the support material swingably and pivotably, a telescopic beam that supports the hand unit movably back and forth, and a mounting base that supports the telescopic beam .
The slide moving mechanism portion is disposed at both ends in the width direction of the work vehicle, extends along substantially the entire length thereof along a longitudinal axis direction, and has a traveling rail on which the mounting base is mounted,
When the support material is transported by the work vehicle, in a state where the longitudinal axis of the support material is held by the erector device along the longitudinal direction of the work vehicle, by driving the slide moving mechanism, An installation device for a tunnel supporter, wherein the erector device is moved along the longitudinal direction of the work vehicle so as to be drawn toward the work vehicle, and is located at a side of the work vehicle.
前記スライド移動機構部は、
前記走行レールと、
前記伸縮ビームの支持ベースに回転自在に取付けられ、前記走行レールに嵌合される複数のガイド車輪と、
前記支持ベース側に搭載され、前記走行レールに沿って延設されたチェンに嵌合するスプロケットホイールと、
前記スプロケットホイールの回転駆動用モータとを有することを特徴とする請求項1記載のトンネル支保工の設置装置。
The slide moving mechanism section,
The traveling rail ;
A plurality of guide wheels that are rotatably mounted on the support base of the telescopic beam and are fitted to the traveling rail;
A sprocket wheel mounted on the support base side and fitted to a chain extending along the traveling rail;
The installation device for a tunnel supporter according to claim 1, further comprising a motor for rotating the sprocket wheel.
JP33913998A 1998-11-30 1998-11-30 Installation equipment for tunnel support Expired - Fee Related JP3595177B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33913998A JP3595177B2 (en) 1998-11-30 1998-11-30 Installation equipment for tunnel support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33913998A JP3595177B2 (en) 1998-11-30 1998-11-30 Installation equipment for tunnel support

Publications (2)

Publication Number Publication Date
JP2000160996A JP2000160996A (en) 2000-06-13
JP3595177B2 true JP3595177B2 (en) 2004-12-02

Family

ID=18324616

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33913998A Expired - Fee Related JP3595177B2 (en) 1998-11-30 1998-11-30 Installation equipment for tunnel support

Country Status (1)

Country Link
JP (1) JP3595177B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014134025A (en) * 2013-01-10 2014-07-24 Fts Kk Apparatus for constructing tunnel
JP6845080B2 (en) * 2017-05-15 2021-03-17 古河ロックドリル株式会社 Support installation equipment for tunnels
JP6867269B2 (en) * 2017-10-13 2021-04-28 鹿島建設株式会社 Tunnel construction equipment and tunnel construction method
CN109026084A (en) * 2018-08-06 2018-12-18 中国铁建重工集团有限公司 Arch installs trolley and its sliding platform
CN110645028B (en) * 2019-10-21 2020-11-24 中铁五局集团第一工程有限责任公司 Multidirectional operation type arch mounting machine
CN110645027B (en) * 2019-10-21 2020-11-24 中铁五局集团第一工程有限责任公司 Construction method by arch installing machine
CN110617089B (en) * 2019-10-21 2020-10-09 中铁五局集团第一工程有限责任公司 Stable clamping arch installing machine
CN110685725B (en) * 2019-10-21 2021-02-23 中铁五局集团第一工程有限责任公司 Take bow member mounting plate of integrated valve piece
CN112096421A (en) * 2020-09-29 2020-12-18 湖南五新隧道智能装备股份有限公司 Cantilever crane movable type arch center mounting vehicle
CN112049668A (en) * 2020-09-29 2020-12-08 湖南五新隧道智能装备股份有限公司 Three-arm arch frame vehicle
CN117489371B (en) * 2024-01-02 2024-03-19 中铁五局集团电务工程有限责任公司 TBM tunnel construction slip casting device

Also Published As

Publication number Publication date
JP2000160996A (en) 2000-06-13

Similar Documents

Publication Publication Date Title
JP3595177B2 (en) Installation equipment for tunnel support
JPS6011199B2 (en) Temporary reinforcement device for tunnels
JP4069528B2 (en) Tunnel support material transport device
CN210177345U (en) Movable support leg for inverted arch trestle
JPH0853006A (en) Track travelling apparatus of service car on track land
JP2524537Y2 (en) Multifunctional tunnel construction equipment
JP2007056585A (en) Working device for construction
JP4496473B2 (en) Concrete spraying equipment
JP4057362B2 (en) Track work equipment
CN110668303A (en) Tire type tunnel pipe rack conveying and erecting machine
JP3924099B2 (en) Tube carrier
JP2729892B2 (en) Backstay disassembly method of pile driver
JP2000248900A (en) Tunnel construction equipment
JP2633423B2 (en) Traveling equipment for work vehicles
CN211056510U (en) Tire type tunnel pipe rack conveying and erecting machine
CN214215923U (en) Multi-terrain traveling device and wheel type mobile equipment
JP4416253B2 (en) Guide cell folding mechanism in excavator
JP2001049999A (en) Reinforcing segment assembly device
JPH10266762A (en) Driving mechanism of bolter head of rock bolt-driving machine
JP2001090494A (en) Rock bolt supply apparatus
JP2007056586A (en) Working device for construction
JPH06212897A (en) Automobile erecting carrier
JPH11199177A (en) Crane jib overhang and storage method and its device
JPS6321800B2 (en)
JPH11276050A (en) Onboard boom spraying pest controlling machine

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20030805

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040902

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070910

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090910

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100910

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110910

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees