JP3588154B2 - Signal pressure delay device - Google Patents

Signal pressure delay device Download PDF

Info

Publication number
JP3588154B2
JP3588154B2 JP33647894A JP33647894A JP3588154B2 JP 3588154 B2 JP3588154 B2 JP 3588154B2 JP 33647894 A JP33647894 A JP 33647894A JP 33647894 A JP33647894 A JP 33647894A JP 3588154 B2 JP3588154 B2 JP 3588154B2
Authority
JP
Japan
Prior art keywords
spool
internal oil
oil passage
notch
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP33647894A
Other languages
Japanese (ja)
Other versions
JPH08177812A (en
Inventor
久人 内藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KYB Corp
Original Assignee
KYB Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KYB Corp filed Critical KYB Corp
Priority to JP33647894A priority Critical patent/JP3588154B2/en
Publication of JPH08177812A publication Critical patent/JPH08177812A/en
Application granted granted Critical
Publication of JP3588154B2 publication Critical patent/JP3588154B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、建設機械、生産機械等の正逆両方の流れが生じる油圧回路における、信号圧遅延回路に関するものである。
【0002】
【従来の技術】
信号圧遅延機構として、図3に示す従来例があった。
ポートAとポートBとの間の油路14、を並列に分岐させ油路14a、油路14bとし、それぞれにポペット11a、11bを互いに逆向きに接続する。また、各ポペット11a、11bの下流には絞り13a、13bを設置する。
ポートA→ポートBへ圧油が流れる場合には、ポペット11aが移動し、油路14aが連通し、ポートB→ポートAへ圧油が流れる場合には、ポペット11bが移動し、油路14bが連通する。
この際、スプリング12a、12bがそれぞれクラッキング圧を決定し、A→Bでは、絞り13a、B→Aでは、絞り13bが信号圧伝達の遅延を決定する。
【0003】
【発明が解決しようとする課題】
上記の従来例では、2個のポペット11a、11bを並列に接続するために、2本の油路14a、14bと2ヶ所の分岐を設ける必要がある。このため、油路の加工が複雑になるうえ、スペースをとるので、方向切換弁のハウジング等に内蔵する構造をとる場合、ハウジングが大きくなるという問題があった。
そこで、本発明の目的は、いずれか一方への流れが生じる油圧信号回路において、信号圧応答に、クラッキング圧設定によるタイムラグと、立ち上がり遅延を与える機構を、簡素な油路構成で実現することである。
【0004】
【課題を解決するための手段】
本発明の信号圧遅延装置は、ハウジング内に設置したスリーブと、このスリーブの内壁に設けたランド部と、ランド部の両側に形成した一対の第1、第2環状溝と、スリーブの内側に摺動自在に設置したスプールと、スプールを中立位置に保持するためのスプールの両側の一対の第1、第2スプリングと、スプールの中央部に形成した一対の第1、第2ノッチと、第1または第2ノッチを介して連通するノッチ両側のスプール内部に形成した一対の第1、第2スプール内部油路とからなり、スプールが中立位置にあるときには、両ノッチがスリーブのランド部とラップして両スプール内部油路を遮断し、上記スプールが第1スプリングに抗して移動したときには、第1ノッチと第1環状溝とが連通して絞りを形成し、この絞りを介して両スプール内部油路が連通して、第1スプール内部油路から第2スプール内部油路への流れが生じる一方、上記スプールが第2スプリングに抗して移動したときには、第2ノッチと第2環状溝とが連通して絞りを形成し、この絞りを介して両スプール内部油路が連通して、第2スプール内部油路から第1スプール内部油路への流れが生じる構成にしたことを特徴とする。
【0005】
【作用】
スプールが中立状態の時には、スプールの中央部に形成した一対の第1、第2ノッチが、スリーブのランド部とラップして油路は遮断されている。
スプールが第1または第2スプリングに抗して移動したときには、第1ノッチと第1環状溝、または、第2ノッチと第2環状溝とで形成する絞りを介して両スプール内部油路が連通し、スプールの移動方向に対応した正逆どちらかの方向の流れが生じる。
この際、第1または第2スプリングの抗力が、クラッキング圧を設定し、ノッチと環状溝とで形成する絞りが、信号圧伝達の遅延が決定する。
【0006】
【実施例】
図1、2に示す本実施例は、ハウジング10内に設置したスリーブ3と、このスリーブ3の内壁に設けたランド部6と、ランド部6の両側に形成した一対の第1環状溝8a、第2環状溝8bと、スリーブ3の内側に摺動自在に設置したスプール1と、スプールを中立位置に保持するためのスプール1の両側に設置したスプリング受け9a、9bで受けた一対の第1スプリング2a、第2スプリング2bと、スプール1の中央部に形成した一対の第1ノッチ4a、第2ノッチ4bと、第1または第2ノッチ4a、4bを介して連通するノッチ両側のスプール1内部に形成した一対の第1、第2スプール内部油路5a、5bとからなる。第1、第2スプール内部油路5a、5bは、一方をスプール1の一端で開口し、他端に通孔7a、7bを形成している。
そして、スプール1が図1に示す中立位置にあるときには、両ノッチ4a、4bが、スリーブ3のランド部6とラップして両スプール内部油路5a、5bが連通せず、圧油の流れは生じない。
【0007】
図2に示すのは、A→Bへ圧油が流れる場合である。スプール1が第1スプリング2aに抗して移動し、第1ノッチ4aと第1環状溝8aとで形成する絞りが開口する。この絞りを介して第1、第2スプール内部油路、5aと5bが連通する。
つまり、圧油は、A→第1スプール内部油路5a→通孔7a→第1ノッチ4a→第1環状溝8a→通孔7b→第2スプール内部油路5b→Bへと流れる。そして、第1スプリング2aのスプリング抗力が、クラッキング圧力を決定し、第1ノッチ4a→第1環状溝8aで形成される絞りで、信号圧の遅延が決定される。なお、B→Aへ圧油が流れる場合は、スプール1の移動方向が逆になり、第2スプリング2bでクラッキング圧が決定され、第2ノッチ4b、第2環状溝8bで信号圧遅延が決定する。
このように、A→B間とB→A間の流れを、共通の油路で実現できるので、従来例のようなスペースを必要としない。
【0008】
【発明の効果】
本発明の信号圧遅延装置は、圧油の流れの向きに応じて、1個のスプールが移動し、いずれか一方の油路を連通し、スプリングによるクラッキング圧の設定と、立ち上がりの遅延を与える機構としたので、油路の構成や加工が簡単であり、全体が小型になった。
【図面の簡単な説明】
【図1】本実施例の中立位置を示す図である。
【図2】本実施例の油路連通状態を示す図である。
【図3】従来例の回路図である。
【符号の説明】
1 スプール
2a 第1スプリング
2b 第2スプリング
3 スリーブ
4a 第1ノッチ
4b 第2ノッチ
5a 第1スプール内部油路
5b 第2スプール内部油路
6 ランド部
8a 第1環状溝
8b 第2環状溝
10 ハウジング
[0001]
[Industrial applications]
The present invention relates to a signal pressure delay circuit in a hydraulic circuit of a construction machine, a production machine, or the like in which both forward and reverse flows occur.
[0002]
[Prior art]
As a signal pressure delay mechanism, there is a conventional example shown in FIG.
The oil passage 14 between the port A and the port B is branched in parallel into an oil passage 14a and an oil passage 14b, and the poppets 11a and 11b are respectively connected to the respective opposite directions. In addition, throttles 13a and 13b are provided downstream of the poppets 11a and 11b.
When pressure oil flows from port A to port B, poppet 11a moves and oil path 14a communicates. When pressure oil flows from port B to port A, poppet 11b moves and oil path 14b Communicate.
At this time, the springs 12a and 12b each determine the cracking pressure, and when A → B, the throttle 13a, and when B → A, the throttle 13b determines the delay of signal pressure transmission.
[0003]
[Problems to be solved by the invention]
In the above-mentioned conventional example, in order to connect the two poppets 11a and 11b in parallel, it is necessary to provide two oil passages 14a and 14b and two branches. For this reason, the processing of the oil passage becomes complicated and a space is taken up. Therefore, when the structure is incorporated in the housing of the directional control valve or the like, there is a problem that the housing becomes large.
Therefore, an object of the present invention is to realize, in a hydraulic signal circuit in which a flow to either one of them occurs, a mechanism for giving a time lag by setting a cracking pressure to a signal pressure response and a mechanism for giving rise to a delay with a simple oil passage configuration. is there.
[0004]
[Means for Solving the Problems]
A signal pressure delay device according to the present invention includes a sleeve installed in a housing, a land provided on an inner wall of the sleeve, a pair of first and second annular grooves formed on both sides of the land, A spool slidably installed, a pair of first and second springs on both sides of the spool for holding the spool at a neutral position, a pair of first and second notches formed at the center of the spool, A pair of first and second spool internal oil passages formed inside the spool on both sides of the notch communicating with each other via the first or second notch. When the spool is at the neutral position, both notches wrap around the land portion of the sleeve. to cut off both spools internal oil passage, when said spool is moved against the first spring, the first notch and the first annular groove forms a stop communicating, both through the diaphragm spray While the internal oil passages communicate with each other and a flow from the first spool internal oil passage to the second spool internal oil passage occurs, when the spool moves against the second spring, the second notch and the second annular The throttle communicates with the groove to form a throttle, and the two spool internal oil passages communicate with each other through the throttle to generate a flow from the second spool internal oil passage to the first spool internal oil passage. And
[0005]
[Action]
When the spool is in the neutral state, the pair of first and second notches formed at the center of the spool wrap with the land of the sleeve to block the oil passage.
When the spool moves against the first or second spring, the oil passages inside the spool communicate with each other via a throttle formed by the first notch and the first annular groove or the second notch and the second annular groove. Then, a flow occurs in either the forward or reverse direction corresponding to the moving direction of the spool.
At this time, the resistance of the first or second spring sets the cracking pressure, and the throttle formed by the notch and the annular groove determines the delay of signal pressure transmission.
[0006]
【Example】
The present embodiment shown in FIGS. 1 and 2 includes a sleeve 3 installed in a housing 10, a land 6 provided on the inner wall of the sleeve 3, and a pair of first annular grooves 8 a formed on both sides of the land 6. A second annular groove 8b, a spool 1 slidably installed inside the sleeve 3, and a pair of first springs 9a and 9b received on spring receivers 9a and 9b installed on both sides of the spool 1 for holding the spool in a neutral position. Spring 2a, second spring 2b, a pair of first notch 4a, second notch 4b formed at the center of spool 1, and inside spool 1 on both sides of notch communicating with first or second notch 4a, 4b And a pair of first and second spool internal oil passages 5a and 5b. One of the first and second spool internal oil passages 5a, 5b is opened at one end of the spool 1, and the other end is formed with through holes 7a, 7b.
When the spool 1 is at the neutral position shown in FIG. 1, the notches 4a and 4b wrap with the land portion 6 of the sleeve 3 and the two spool internal oil passages 5a and 5b do not communicate with each other, so that the flow of pressure oil is Does not occur.
[0007]
FIG. 2 shows a case where pressure oil flows from A to B. The spool 1 moves against the first spring 2a, and an aperture formed by the first notch 4a and the first annular groove 8a is opened. The first and second spool internal oil passages 5a and 5b communicate with each other through the throttle.
That is, the pressure oil flows from A → first spool internal oil passage 5a → through hole 7a → first notch 4a → first annular groove 8a → through hole 7b → second spool internal oil passage 5b → B. The spring resistance of the first spring 2a determines the cracking pressure, and the delay of the signal pressure is determined by the throttle formed by the first notch 4a → the first annular groove 8a. When pressure oil flows from B to A, the moving direction of the spool 1 is reversed, the cracking pressure is determined by the second spring 2b, and the signal pressure delay is determined by the second notch 4b and the second annular groove 8b. I do.
As described above, the flow between A → B and the flow between B → A can be realized by the common oil passage, so that the space unlike the conventional example is not required.
[0008]
【The invention's effect】
According to the signal pressure delay device of the present invention, one spool moves in accordance with the direction of the flow of the pressure oil, and communicates with one of the oil passages to set a cracking pressure by a spring and delay the rise. Because of the mechanism, the structure and processing of the oil passage were simple, and the whole was compact.
[Brief description of the drawings]
FIG. 1 is a diagram showing a neutral position of the present embodiment.
FIG. 2 is a diagram illustrating an oil passage communication state according to the present embodiment.
FIG. 3 is a circuit diagram of a conventional example.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Spool 2a 1st spring 2b 2nd spring 3 Sleeve 4a 1st notch 4b 2nd notch 5a 1st spool internal oil passage 5b 2nd spool internal oil passage 6 Land part 8a 1st annular groove 8b 2nd annular groove 10 Housing

Claims (1)

ハウジング内に設置したスリーブと、このスリーブの内壁に設けたランド部と、ランド部の両側に形成した一対の第1、第2環状溝と、スリーブの内側に摺動自在に設置したスプールと、スプールを中立位置に保持するためのスプールの両側の一対の第1、第2スプリングと、スプールの中央部に形成した一対の第1、第2ノッチと、第1または第2ノッチを介して連通するノッチ両側のスプール内部に形成した一対の第1、第2スプール内部油路とからなり、スプールが中立位置にあるときには、両ノッチがスリーブのランド部とラップして両スプール内部油路を遮断し、上記スプールが第1スプリングに抗して移動したときには、第1ノッチと第1環状溝とが連通して絞りを形成し、この絞りを介して両スプール内部油路が連通して、第1スプール内部油路から第2スプール内部油路への流れが生じる一方、上記スプールが第2スプリングに抗して移動したときには、第2ノッチと第2環状溝とが連通して絞りを形成し、この絞りを介して両スプール内部油路が連通して、第2スプール内部油路から第1スプール内部油路への流れが生じる構成にした信号圧遅延装置。A sleeve installed in the housing, a land provided on the inner wall of the sleeve, a pair of first and second annular grooves formed on both sides of the land, and a spool slidably installed inside the sleeve. A pair of first and second springs on both sides of the spool for holding the spool in the neutral position, a pair of first and second notches formed in the center of the spool, and communication via the first or second notch. And a pair of first and second spool internal oil passages formed inside the spool on both sides of the notch. When the spool is at the neutral position, both notches wrap around the land portions of the sleeve and shut off both spool internal oil passages. and, said spool when moved against the first spring, the first notch and the first annular groove forms a stop communicating, both spools internal oil passage through the diaphragm communicates, the While the flow from the spool internal oil passage to the second spool internal oil passage occurs, when the spool moves against the second spring, the second notch communicates with the second annular groove to form a throttle, A signal pressure delay device having a configuration in which both spool internal oil passages communicate with each other via the throttle to generate a flow from the second spool internal oil passage to the first spool internal oil passage .
JP33647894A 1994-12-22 1994-12-22 Signal pressure delay device Expired - Fee Related JP3588154B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33647894A JP3588154B2 (en) 1994-12-22 1994-12-22 Signal pressure delay device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33647894A JP3588154B2 (en) 1994-12-22 1994-12-22 Signal pressure delay device

Publications (2)

Publication Number Publication Date
JPH08177812A JPH08177812A (en) 1996-07-12
JP3588154B2 true JP3588154B2 (en) 2004-11-10

Family

ID=18299555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33647894A Expired - Fee Related JP3588154B2 (en) 1994-12-22 1994-12-22 Signal pressure delay device

Country Status (1)

Country Link
JP (1) JP3588154B2 (en)

Also Published As

Publication number Publication date
JPH08177812A (en) 1996-07-12

Similar Documents

Publication Publication Date Title
JPH0356345B2 (en)
JP3588154B2 (en) Signal pressure delay device
JP4859786B2 (en) Control device
JP2022080073A (en) Multi-control valve
JPH0235162B2 (en) SAISEIOYOBYUSENKENYOYUATSUSEIGYOSOCHI
JPH11257303A (en) Switching valve
JPH0752402Y2 (en) Fluid control valve
JPH0359304B2 (en)
JP2649045B2 (en) Pressure control valve
JPH0442563Y2 (en)
WO1993013319A1 (en) Fluid control for two independent actuators
JP4610116B2 (en) Valve device
JP2022091424A (en) Spool and spool valve
JPH0612121B2 (en) Direction switching valve
JP4020878B2 (en) Hydraulic control device
JPS6139551B2 (en)
JP2942570B2 (en) Counter balance valve
JP2821008B2 (en) Hydraulic switching valve
JPH0512512Y2 (en)
JPH08184301A (en) Hydraulic control device
JP4009402B2 (en) Hydraulic control device
CN111734709A (en) Multi-way valve and engineering machinery
JPH08128405A (en) Unload valve
JPH084923A (en) Neutral dead zone switching valve in hydraulic closed circuit
JPH0425522Y2 (en)

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040316

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040713

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040812

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080820

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090820

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100820

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100820

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110820

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees