JP3554701B2 - Method of manufacturing stone structure for environmental protection - Google Patents

Method of manufacturing stone structure for environmental protection Download PDF

Info

Publication number
JP3554701B2
JP3554701B2 JP2000302625A JP2000302625A JP3554701B2 JP 3554701 B2 JP3554701 B2 JP 3554701B2 JP 2000302625 A JP2000302625 A JP 2000302625A JP 2000302625 A JP2000302625 A JP 2000302625A JP 3554701 B2 JP3554701 B2 JP 3554701B2
Authority
JP
Japan
Prior art keywords
stone
stones
unit
massive
subunit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000302625A
Other languages
Japanese (ja)
Other versions
JP2002105927A (en
Inventor
信政 的場
Original Assignee
有限会社的場造園石材センター
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社的場造園石材センター filed Critical 有限会社的場造園石材センター
Priority to JP2000302625A priority Critical patent/JP3554701B2/en
Publication of JP2002105927A publication Critical patent/JP2002105927A/en
Application granted granted Critical
Publication of JP3554701B2 publication Critical patent/JP3554701B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、護岸、護床施工等に用いる環境保全用の石材ユニット及びこれを用いた石材構造体、並びにこれらの製造方法に関する。
【0002】
【従来の技術】
環境の保全を配慮して護岸、護床等の構造体を施工する方法として、例えば特開平8−253919号公報に開示されたものが存在する。この方法では、4個の自然石を正方形状若しくは放射状に配置連結した複数の護岸護床材を2次元的に配列して各護岸護床材を相互に連結することにより、護岸、護床等のための連続的な構造体を構築することができる。
【0003】
【発明が解決しようとする課題】
しかし、上記護岸護床材は、これらを2次元的に配置施工することを前提として設計されており、立体的な護岸護床構造体を施工することは容易でない。
【0004】
立体的な護岸護床構造体は、その内部の隙間に、微小動物等が営巣、生息するために望ましい比較的閉じた空間を形成することができるので、環境保全型の河川整備等において必要性が高まっている。
【0005】
一方、これまでの河川整備では、概ね経済性と耐久性に優れるコンクリートがに用いられてきたが、コンクリート製の護岸護床は自然環境を配慮した工法から遊離する。ここで、コンクリート製の護岸護床を完全に除去して石材からなる護岸護床に置き換えることも考えられるが、かかる河川改修は大規模なものとなり、費用を膨大な額に増大させることになるとともに、護岸護床の造成に際して一旦環境を破壊することにもなる。
【0006】
そこで、本発明は、立体的に連続する、施工性に優れ安定した環境保全用の護岸護床構造体の製造方法を提供することを目的とする。
【0007】
また、本発明は、既存の護岸護床を壊すことなく、自然に近い河川環境を簡易に形成することができる環境保全用の石材ユニットからなる石材構造体の製造方法を提供することを目的とする。
【0008】
【課題を解決するための手段】
上記課題を解決するため、本発明の環境保全用の石材ユニットは、複数の塊状の石材と、当該複数の石材のうち第1及び第2の石材を互いに連結するとともに、当該第1及び第2の石材に対し第3の石材を離間しかつ遊びを持たせて連結する連結手段とを備える。
【0009】
上記石材ユニットでは、連結手段が当該第1及び第2の石材に対し第3の石材を離間しかつ遊びを持たせて連結するので、複数の石材ユニットから立体的な石材構造体を組み立てる際の施工性を高めることができる。すなわち、複数の石材ユニットのうちの第1及び第2の石材を下側層として近接して逐次配列しつつ、着目する石材ユニットの第1及び第2の石材に隣接する一対の石材ユニットの第1及び第2の石材(計4つの石材)によって形成される上部の窪みに、着目する石材ユニットの第3の石材を上側層として適宜はめ込むように配置することで、立体的で安定した石材構造体を簡易かつ迅速に施工することができる。
【0010】
ここで、第1及び第2の石材は、予め近接して連結しておくことができ、これによって施工後の安定性が高まる。また、塊状の石材としては、ほぼ同一寸法の玉石を使用することができ、これにより、石材ユニットをほぼ等間隔で規則的に配列することができ、施工後の安定性も高まる。また、特定の石材ユニットの第3の石材は、上側層として配置後、適当な連結手段によって例えば隣接する石材ユニットの第1及び第2の石材と連結することができる。これにより、施工後の安定性、安全性がさらに高まる。さらに、特定の石材ユニットの第1及び第2の石材は、下側層として配置後、例えばワイヤと適当な連結手段とによって隣接する石材ユニットの第1及び第2の石材と連結することができる。これによっても、施工後の安定性、安全性が高まる。
【0011】
また、本発明の環境保全用の石材構造体は、上記のような石材ユニットを複数準備して第1乃至第3石材ユニットとして順次配列したものであって、前記第1ユニットを構成する前記第1及び第2の石材と、第2ユニットを構成する前記第1及び第2の石材とを近接して床上に配置した際の上部の窪みに、前記第3ユニットの前記第3の石材を載置することによって組み立てられる。
【0012】
上記石材構造体では、第1ユニットの前記第1及び第2の石材と、第2ユニットの前記第1及び第2の石材とを近接して床上に配置した際の上部の窪みに、前記第3ユニットの前記第3の石材を載置しているので、立体的で連続した石材構造体を高い安定性で施工することができ、施工の際の作業性が極めて高い。この立体的な石材構造体は、前記第3の石材の下方に石材に囲まれた空間を有し、虫、魚、植物等の生態系を保全することができる。さらに、この石材構造体により、環境に優しい自然な景観を河川等に形成することができる。
【0013】
なお、近接して配置された前記第1ユニットの前記第1及び第2の石材と前記第2ユニットの前記第1及び第2の石材との上部の窪みに、前記第2ユニットの前記第3の石材を載置することも可能であるが、この場合、石材構造体の施工の際の安定性が多少減少する。
【0014】
また、本発明の別の環境保全用の石材構造体は、複数の塊状の石材を連結した石材ユニットを複数配列することによって形成されるとともに、塊状の石材を2列に並べた構造を有する下層と当該下層の上部の窪みに塊状の石材を配列した構造を有する上層とを備える環境保全用の石材構造体であって、前記石材ユニットは、前記下層を形成する一対の隣接する石材を第1端に有し、前記上層を形成する石材を第2端に有することを特徴とする。なお、このような石材構造体が河川の流れにほぼ沿って配置される場合、上記第1端が上流側となり、上記第2端が下流側となるようにすれば、増水等に対して十分な強度を有する石材構造体を提供することができる。
【0015】
上記石材構造体では、前記石材ユニットが前記下層を形成する一対の隣接する石材を第1端に有し、前記上層を形成する石材を第2端に有するので、立体的で連続した石材構造体を高い安定性を持たせて施工することができる。この立体的な石材構造体は、上層の石材の下方に下層の石材に囲まれた空間を有し、生態系を保全することができる。さらに、この石材構造体により、環境に優しい自然な景観を河川等に形成することができる。しかも、このような石材構造体は、既存の人工的な護岸護床を壊すことなくこれに簡易に組み込むことができるので、多自然型の護岸護床を低コストかつローインパクトで実現できる。
【0016】
また、本発明に係る環境保全用の石材構造体の製造方法は、塊状の第1及び第2の石材を互いに連結するとともに、当該第1及び第2の石材に対し塊状の第3の石材を離間しかつ遊びを持たせて連結することによって構成した石材ユニットを、第1乃至第3石材ユニットとして複数準備する工程と、前記第1ユニットを構成する前記第1及び第2の石材に近接して床上に配置された前記第2ユニットを構成する前記第1及び第2の石材に近接して、前記第1ユニットの前記第1及び第2の石材の反対側に、前記第3ユニットを構成する前記第1及び第2ユニットを床上に配置する工程と、近接して配置された前記第1ユニットの前記第1及び第2の石材と前記第2ユニットの前記第1及び第2の石材との上部の窪みに、前記第3ユニットの前記第3の石材を載置する工程とを備える。
【0017】
上記石材構造体の製造方法では、第1ユニットの前記第1及び第2の石材と、第2ユニットの前記第1及び第2の石材とを近接して床上に配置した際の上部の窪みに、前記第3ユニットの前記第3の石材を載置するので、立体的で連続した石材構造体を施工する際の施工性を高めることができる。この立体的な石材構造体により、生態系を保全することができ、自然な景観を河川等に形成することができる。
【0018】
また、本発明に係る別の環境保全用の石材構造体の製造方法は、塊状の石材を2列に並べた構造を有する下層と当該下層の上部の窪みに塊状の石材を配列した構造を有する上層とを備える環境保全用の石材構造体の製造方法であって、塊状の第1及び第2の石材を可撓性の連結部材を介して互いに連結することによって構成した石材ユニットを、第1乃至第3サブユニットとして複数準備する工程と、前記第1サブユニットの前記第1の石材を上層の所定位置に配置するとともに、前記第1サブユニットの前記第2の石材を前記所定位置に対して配列方向に近接する下層の第1位置に対し配列方向に関してさらに隣の下層の第2位置に配置する工程と、前記第2サブユニットの前記第1の石材を下層の前記第2位置に配置するとともに、前記第2サブユニットの前記第2の石材を前記第2位置に対して配列方向に関して隣の下層の第3位置に配置する工程と、前記第1サブユニットの前記連結部材と前記第2サブユニットの前記連結部材とを互いに連結する工程と、前記第3サブユニットの前記第1の石材を下層の前記第3位置に配置し、前記第3サブユニットの前記第2の石材を前記第1及び第2位置の石材の上部の窪みの配置する工程と、前記第2サブユニットの前記連結部材と前記第3サブユニットの前記連結部材とを互いに連結する工程とを備える。
【0019】
上記石材構造体の製造方法では、第1乃至第3サブユニットを連結して6つの石材を1組とする石材ユニットを組み立てつつ石材構造体を形成する。6つの石材からなるこの石材ユニットは、下層を形成する一対の隣接する石材を一端に有し、上層を形成する石材を他端に有するものである。これにより、立体的で連続した石材構造体を高い安定性を有するものとして施工することができる。この立体的な石材構造体は、上層の石材の下方に下層の石材に囲まれた空間を有し、生態系を保全することができる。さらに、この石材構造体により、環境に優しい自然な景観を河川等に形成することができる。
【0020】
【発明の実施の形態】
〔第1実施形態〕
図1は、本発明の第1実施形態に係る環境保全用の石材ユニットを説明する図である。
【0021】
この石材ユニットAは、複数の塊状の石材である3つの玉石A1、A2、A3と、各玉石A1、A2、A3に固定されているリング付アンカー11、12、13と、各リング付アンカー11、12、13を相互に連結する環状のワイヤ30とを備える。リング付アンカー11、12、13と、ワイヤ30とは、玉石A1、A2、A3を連結するするための連結手段を構成し、これにより、第1及び第2の石材である玉石A1、A2が互いに連結されるとともに、第1及び第2の玉石A1、A2に対して第3の石材である玉石A3が離間しかつ遊びを有する状態で連結される。
【0022】
各玉石A1、A2、A3は、それぞれランダムな形状を有するが、同程度の大きさとしている。具体的な実施例では、直径50cm程度の玉石を用いた。玉石は、各種材質の自然産のものとすることもできるが、自然石を加工した割石等とすることもできる。要は、生物の生息に適する自然石等の環境に優しい素材で形成されたものに置き換えることができる。
【0023】
各リング付アンカー11、12、13は、鉄製の本体に防食用の亜鉛合金メッキを施したもので、各玉石A1、A2、A3に形成した細径の孔に固定されるアンカー部11a、12a、13aと、ワイヤ30を通すためのリング部11b、12b、13bとを備える。各アンカー部11a、12a、13aは、各玉石A1、A2、A3の固定孔にねじ込まれて固定されたり、打ち込まれて固定されたり、接着剤を利用して固定される。なお、各リング付アンカー11、12、13は、各アンカーボルトにかかる応力として、せん断力、引き抜き力等を検討し、施工中や施工後における負荷に対して充分な強度を有するものを使用する。
【0024】
ワイヤ30は、鋼製若しくは亜鉛合金メッキした鉄製の細線を束ねて可撓性を持たせたもので、各リング付アンカー11、12、13の各リング部11b、12b、13bの穴に通された後、両端がワイヤクリップ等の締結金具30aによって接続されてループとなる。ワイヤ30は、玉石A1、A2、A3の重さを充分に支えることができる程度の強度を有し、且つ、ワイヤ30にかかる破壊的な応力として、せん断力、引っ張り力等を検討した上で充分な強度を有している。このワイヤ30は、チェーンに置き換えることもできる。なお、ワイヤ30両端を接続する締結金具30aは、鉄製の本体に防食用の亜鉛合金メッキを施したものである。この締結金具30aは、鉛等の材料で形成した環状かしめ部材とすることもできる。
【0025】
図2は、図1に示す石材ユニットAと同一構造の石材ユニットを複数準備しこれらを組み上げることによって得た環境保全用の石材構造体の構造を説明する平面図であり、図3は、図2の石材構造体の側面図である。
【0026】
各石材ユニットA〜Gは、それぞれ3つの玉石A1、A2、A3〜G1、G2、G3を備えており、符号の順に河床40上に川上に向けて順次配置・施工される。具体的には、河床40上に近接して配置された3つの玉石A1、A2、A3の上部の窪みに、次の石材ユニットBの第3玉石B3を載置しており、河床40上に近接して配置された4つの玉石A1、A2、B1、B2の上部の窪みに、次の石材ユニットCの第3玉石C3を載置している。これが順次繰返されており、最終的には、河床40上に近接して配置された4つの玉石E1、E2、F1、F2の上部の窪みに、最後の石材ユニットGの第3玉石G3を載置することになる。ここで、終端の部分に形成される4つの玉石F1、F2、G1、G2の上部の窪みには、単一の仕上げ用の玉石Hを載置することもできる。上層を形成するB3〜G3の下側には、石に囲まれた空間が形成される。この空間は、多孔質であると同時にある程度閉ざされた空間となり、小さな動植物等が生息するために最適な環境となる。なお、図示のような構造を有する環境保全用の石材構造体は、これを設置する場所に応じて玉石のサイズや石材ユニットの数を適宜調節することにより、任意の長さ及び幅に設定できることは言うまでもない。また、図示の石材構造体は、直線状に延ばす必要はなく、河の流れに沿って一定の曲率を持たせたり、蛇行させたりすることができる。
【0027】
図4及び図5は、図1に示す石材ユニットを用いて図2に示す石材構造体を施工する方法を概念的に説明する図である。
【0028】
説明を省略するこれまでの工程で、図4に示すように、第2の石材ユニットDの第1玉石D1及び第2玉石D2が第1の石材ユニットCの第1玉石C1及び第2玉石C2にそれぞれ隣接して配置された状態とする。ここで、石材ユニットA、Bについては図示を省略しており、上層側となる玉石C3、D3についても図示を省略している。なお、一対の玉石C1、C2は、石材構造体の配列方向αβに直交する方向にわずかに離間して配置されており、一対の玉石D1、D2も、配列方向αβに直交する方向にわずかに離間して配置されている。
【0029】
次に、第3の石材ユニットEを準備する。この第3の石材ユニットEは、現場で組み立ててもよいが、予め工場で組み立てておいて現場に搬送することもできる。
【0030】
次に、第3の石材ユニットEの玉石E3をクレーンに吊り下げられている玉石つかみ器50の把持部51で把持して第3の石材ユニットE全体を吊り上げる。つまり、ワイヤ30を介して玉石E3の下方に第1及び第2の玉石E1、E2が吊り下げられる。
【0031】
次に、第3の石材ユニットEを適当な位置に移動させて降下させる。これにより、第1玉石E1及び第2玉石E2を、第2の石材ユニットDの第1玉石D1及び第2玉石D2の近くであって、石材構造体の配列方向αβに玉石1個分程度離間させて配置する。
【0032】
次に、河床上に降下させた第1玉石E1及び第2玉石E2を、配列方向αβに直交する方向に関してわずかに離間させる。
【0033】
次に、両玉石E1、E2を石材構造体の長手方向αβに沿って転がして、各玉石E1、E2を第2の石材ユニットDの玉石D1、D2にそれぞれ隣接して配置した状態とする。この際、玉石E1、E2のリング付アンカー11、12は、玉石E1、E2の回転によって下側に配置される。これにより、リング付アンカー11、12が人目に触れることを避け、危険な突起となることを回避することができる。
【0034】
次に、図5に示すように、クレーン50を操作して、近接して配置された4つの玉石C1、C2、D1、D2上の凹部に玉石E3を載置する。この際、玉石E3のリング付アンカー13がそのまま下側に配置されるので、リング付アンカー13が人目に触れることを避け、危険な突起となることを簡易に防止することができる。
第3の石材ユニットEについて行なわれた以上のような作業工程は、その後の石材ユニットF、G、…(図2参照)についても繰り返される。なお、第3の石材ユニットEの前に施工される石材ユニットB〜Dについても同様の作業工程が行なわれる。最初の石材ユニットAだけは特別で、下層のみにおいて三角形の頂点位置に配置される。
【0035】
以上のような施工によって形成された石材構造体においては、第1の石材ユニットCの第1及び第2玉石C1、C2と、第2の石材ユニットDの第1及び第2玉石D1、D2とによって形成される下層の上部の窪みに、第3の石材ユニットEの第3玉石E3を上側層として適宜嵌め込むように配置することになるので、隣り合う第2の石材ユニットDと第3の石材ユニットEとが緩く連結された状態となり、安定した石材構造体を簡易かつ迅速に施工することができる。
【0036】
なお、玉石E1、E2間に延びているワイヤ30と、石材構造体の施工方向に延びる連結用のワイヤ39とをクロスクリップ39a等の金具で接続することにより、第3の石材ユニットEと第2の石材ユニットDとを連結することができ、これを各ユニット施工ごとに順次繰返すことで、石材構造体が全体として連結されることになり、石材構造体の強度をさらに高めることができる。なお、クロスクリップ39aも、鉄製の本体に防食用の亜鉛合金メッキを施したものである。
【0037】
図6は、図2及び図3に示す石材構造体を低水護岸として施工した例を示す図である。河床81は、自然の川底を削ったり埋めたりして平坦化したものである。この河床81は、従来工法によって施工された既存のコンクリート護床とすることもでき、自然石の石畳とすることもできる。両側の護岸は、従来工法によって施工された既存のコンクリート擁壁82Aと、既存のコンクリートブロック82Bとからなる。川の中央部の低水護岸83は、図2及び図3に示す石材構造体を河川上流に向けて二列に配列したものである。通常の護岸82A、82Bと低水護岸83と間には、現場発生土あるいは植栽用客土等で埋め立てられた河原84が形成されている。また、一対の低水護岸83の間には、水路85が形成される。これらの低水護岸83は、直線状に延びるものとすることもできるが、石材構造体を施工する際に適宜蛇行させることもできる。これによって、瀬や淵を備える自然に近い河道を形成することができる。また、川原84は、人工的に形成する必要は必ずしもない。すなわち、低水護岸83を蛇行させること等により、瀬や淵が形成され、自然の作用により土砂が堆積し、川原83が徐々に埋め立てられて植生が進むことになる。
【0038】
このようにして形成した低水護岸83を構成する立体的な配置の玉石の間には、蛍その他の水生昆虫、これらを育む水生植物、魚介類等が生息するための自然に近い空間Sが形成されるので、環境保全に役立つ。すなわち、この空間Sにより、動物等が安全に生息することができ、微生物が繁殖するための多面積の石材面を提供することができ、かつ、水流が不規則に変化してエアレーション等による自浄作用が増進される。さらに、この低水護岸83は、図4及び図5に示す方法によって施工した石材構造体であるので、増水に際しても十分な強度を有し、かつ、安全性の高いものとなっている。さらに、河床81が水流によって洗掘されても地盤に追随できるので、長期に亘って護岸構造の安定性が維持されることになる。
【0039】
また、河原84には、昆虫が羽化したり、微小動物や鳥が営巣するための草むら等の水辺環境が形成され、多様な生命を育む場所として環境保全に役立つことになる。
【0040】
以上のような施工法は、既存の人工的な護岸を比較的低コストで、多自然型で親水性の護岸に蘇らせるものである。これにより、環境に優しく景観的にも優れた河川を回復することができる。
【0041】
〔第2実施形態〕
図7は、第2実施形態に係る環境保全用の石材ユニットを説明する図である。この場合、図1に示す第1実施形態における連結手段を変更している。
【0042】
この石材ユニットAでは、3つの玉石A1、A2、A3に固定されているリング付アンカー11、12、13と、連結用の環状のワイヤ30とを、シャックル20を介して連結している。シャックル20は、U字部とねじ部とからなる連結金具であり、鉄製の本体に亜鉛合金メッキを施したものである。例えば玉石A1については、シャックル20のU字部の両端にねじ部をねじ込んで固定することによって形成される環にリング部11bとワイヤ30とを通すことによって両者が連結される。この場合、リング付アンカー11、12、13と、シャックル20と、ワイヤ30とは、連結手段を構成することになる。各リング付アンカー11、12、13とワイヤ30との連結は、シャックル20のねじ部をゆるめることによって簡単に外すことができる。シャックル20を用いることにより、各玉石A1、A2、A3を現場で簡易に連結することができ、ワイヤ30の長さの選択により、各玉石A1、A2、A3間の最大限に分離できる間隔を簡易に変更することができる。
【0043】
〔第3実施形態〕
図8は、第3実施形態に係る環境保全用の石材ユニットを説明する図である。この場合、図1のワイヤ30に代えてチェーン130を用いている。
【0044】
チェーン130のうち第1部分130aは、下層側となる一対の玉石A1、A2を互いに近接して連結する。また、第2部分130bは、上層側となる玉石A3と下層側となる玉石A1、A2とをある程度以上離間させて連結する。具体的に説明すると、第2部分130bの一端を玉石A3のリング付アンカー13に接続し、第2部分130bの他端を第1部分130aの中央と接続する。なお、チェーン130とリング付アンカー11、12、13との接続は、シャックル等の連結金具によるものとすることもできる。
【0045】
上記の石材ユニットを図4に示す施工によって複数連結することによっても、図2に示すと同様の環境保全用の石材構造体を得ることができる。
【0046】
〔第4実施形態〕
図9(a)は、第4実施形態に係る環境保全用の石材ユニットを概念的に説明する図である。この石材ユニットは、図1のワイヤ30を変形したものである。この場合、特殊な棒状のアンカー231によって玉石A1、A2を連結する。亜鉛合金メッキしたアンカー231の一端231aは、ねじ込み式ものになっており、他端231bは打ち込み式のものとなっている。これにより、まず玉石A2にアンカー231の一端231aをねじ込み、次に玉石A1にアンカー231の他端231bを挿入後に打ち込んで固定する。玉石A3には、リング付アンカー13が固定されている。このリング付アンカー13には、ワイヤ232の一端を通し折り返してワイヤクリップ等の適当な金具で固定することにより、ワイヤ232の一端が連結される。ワイヤ232の他端は、アンカー231に設けたU字状の金具部分231cに通されて、ここに適当な金具等を利用して連結される。
【0047】
上記の石材ユニットを図4に示す施工によって複数連結することによっても、図2に示すと同様の環境保全用の石材構造体を得ることができる。
【0048】
図9(b)は、第4実施形態を変形した環境保全用の石材ユニットを概念的に説明する図である。この場合、特殊なY字状の連結金具333を用いて玉石A1、A2、A3を連結する。亜鉛合金メッキしたY字体333aの3つの先端部にはリング部が形成されており、これら3つのリング部と、3つの玉石A1、A2、A3に固定されているリング付アンカー11、12、13とを、亜鉛合金メッキしたシャックル333bを介してそれぞれ連結している。
【0049】
〔第5実施形態〕
図10は、第5実施形態に係る環境保全用の石材構造体を説明する図である。この石材構造体は、図2に示す第1実施形態の石材構造体を変形したものであり、ほぼ直角に曲がる角部分COを形成している。
【0050】
この角部分COでも、石材構造体の施工方法は、図4及び図5に示すものと本質的に同じである。具体的には、石材ユニットHの第1玉石H1及び第2玉石H2を、石材ユニットGの玉石G1、G2の隣ではなく、玉石F1、G1の隣に下側層として配置し、その後に、第3玉石H3を玉石F1、F2、G1、G2によって形成される上部の窪みに上側層として適宜はめ込むように配置する。次に、石材ユニットIの第1玉石I1及び第2玉石I2を、石材ユニットHの玉石H1、H2の隣に下側層として配置し、その後に、第3玉石I3を玉石F1、G1、H1、H2によって形成される上部の窪みに上側層として適宜はめ込むように配置する。以下これを繰返して、石材ユニットJを配置・連結する。終端部分には、単一の仕上げ用の玉石Kを載置することもできる。
【0051】
〔第6実施形態〕
以下、本発明の第6実施形態に係る環境保全用の石材ユニットを説明する。図11は、実施形態に係る環境保全用の石材ユニットの一部を構成するサブユニットを説明する図である。
【0052】
このサブユニットWは、2つの玉石W1、W2と、各玉石W1、W2に固定されているリング付アンカー511、512と、各リング付アンカー511、512を相互に連結する環状のワイヤ530とを備える。ここで、リング付アンカー511、512とワイヤ530は、玉石W1、W2を連結するするための可撓性の連結部材となっている。
【0053】
図12及び図13は、図11のサブユニットを用いた護岸用の石材構造体の施工を説明する図である。
【0054】
説明を省略する工程を経て、図12(a)に示すように、サブユニットW0のの玉石W01、W02と単独の玉石Zとを三角形の頂点位置に配置し、リング付アンカー511、512に通されたワイヤ530と、玉石Zに設けたリング付アンカー513とを、シャックル等の連結金具520によって連結する。これにより、下層の端部を形成することができる。なお、玉石W01、W02の配列方向に関する位置は、説明の便宜のため第1位置と呼ぶものとする。
【0055】
次に、図11と同様の第1サブユニットW1を準備し、そのうち第1の玉石W11を上層の所定位置すなわち、上層である玉石W01、W02、Z上部の窪みに配置する。さらに、第2の玉石W12を下層の第1位置に隣接する第2位置の例えば左側に配置する(図12(b)参照)。この際、サブユニットW0のワイヤ530に予め通してあるワイヤ535を、サブユニットW1のワイヤ530にも通して両端をワイヤクリップ等でとめることにより、両サブユニットW0、W1が互いに連結される。
【0056】
次に、図11と同様の第2サブユニットW2を準備し、そのうち第1の玉石W21を下層の第2位置の右側に配置し、第2の玉石W22を下層の第2位置に隣接する第3位置の例えば左側に配置する(図12(c)参照)。
【0057】
次に、第1サブユニットW1のワイヤ530と、第2サブユニットW2の玉石W21に設けたリング付アンカー511とを、連結金具520を介して連結する。この際、シャックル等の複数の連結金具520を直列的に連結することにより、ワイヤ530の長さ調節に代えることができる。
【0058】
次に、図11と同様の第3サブユニットW3を準備し、そのうち第1の玉石W31を上層である玉石W01、W02、W12、W21上部の窪みに配置する。さらに、第2の玉石W32を下層の第3位置の右側に配置する(図13(a)参照)。
【0059】
次に、第2サブユニットW2のワイヤ530と、第3サブユニットW3の玉石W32に設けたリング付アンカー511とを、連結金具520を介して連結する。
【0060】
次に、図11と同様の第4サブユニットW4を準備し、そのうち第1の玉石W41を上層である玉石W12、W21、W22、W32上部の窪みに配置する。さらに、第2の玉石W42を下層の第4位置の例えば左側に配置する(図13(b)参照)。この際、サブユニットW2若しくはサブユニットW3のワイヤ530に予め通してあるワイヤ535を、サブユニットW4のワイヤ530にも通して両端をワイヤクリップでとめることにより、サブユニットW2若しくはサブユニットW3とサブユニットW4とが互いに連結される。
【0061】
以上を繰返すことにより、図2に示すような石材構造体を形成することができる。このような石材構造体は、第1実施形態と同様、図6に示すような護岸として施工される。この場合、3つのサブユニットW1〜W3によって1つの石材ユニットを形成していると見ることができ、この石材ユニットは、下層を形成する一対の隣接する玉石W22、W32を一端に有し、上層を形成する玉石W31を他端に有する。また別な見方をすれば、サブユニットW1の玉石W11、W12とサブユニットW2の玉石W21とは、結果的に互いに連結されており、図2の石材ユニットBに対応すると考えることができる。同様に、サブユニットW2の玉石W22とサブユニットW3の玉石W31、W32とは、結果的に互いに連結されており、図2の石材ユニットCに対応すると考えることができる。
【0062】
〔第7実施形態〕
図14は、第7実施形態を示しており、図2等の環境保全用の石材構造体を補助的護岸として施工した例を示す図である。河床181及び本体護岸182は、コンクリート等で形成されている。補助護岸183は、図2や図13に示す石材構造体を一列に配列したものであり、本体護岸182の下部(根入れ)の侵食を防止する根固め用の護岸としての役割を有する。補助護岸183を構成する立体的な配置の玉石の間には、空間Sが形成され、水流に浸かる。この空間Sは、魚類や水生昆虫、さらにこれらを育む動植物が生息するための揺りかごとなるので、環境保全にも役立つ。すなわち、この空間Sにより、動物等が安全に生息するための比較的閉ざされた環境が形成され、微生物の繁殖に適する広い表面積が形成される。しかも、この空間Sの周辺では、水流が不規則に変化してエアレーション等による自浄作用が増進される。
この場合、既設の護岸護床を取り壊して新たな護岸護床を施工する必要がなく、簡易かつ安価に環境に優しい河川を実現することができる。
【0063】
〔第8実施形態〕
図15は、第8実施形態を示しており、図2や図13の環境保全用の石材構造体を低水護岸及び護岸として施工した多自然型の河川を示す図である。
【0064】
河床81は、図6の場合と同様に、例えば自然の川底を削ったり埋めたりして平坦化したものである。川の中央部の低水護岸83は、図2や図13に示す石材構造体をニ列に配列したものであり、一対の低水護岸83の間には、水路85が形成されている。両側の護岸282は、図6の場合と異なり、図2等に示す石材構造体を複数平行に配列して壁体としたものである。護岸282を構成する石材構造体は、例えば45度の傾きの法面上に、図1等に示す石材ユニットを下方から上方に向けて順次配列しつつ組み合わせることによって施工される。この石材構造体は、下地が斜面である点を除き、図4、5、12、13の施工と同様に施工される。
【0065】
本実施形態において、低水護岸83を構成する玉石の間に形成されている多孔質で、かつ、ある程度閉ざされた空間S1は、動植物を保護するためのもので、環境保全に役立つ。護岸282を構成する玉石の間に形成された空間S2も、空間S1と同様に動植物を保護することができ環境保全に役立つ。さらに、この護岸282は、図4、5、12、13等に示す方法によって施工した石材構造体であるので、増水に際しても十分な強度を有し、かつ、安全性の高いものとなっている。
【0066】
〔第9実施形態〕
図16は、第9実施形態を示しており、図2、10、13の環境保全用の石材構造体を護床用の石材沈床として施工した例を示す図である。
【0067】
両側の護岸382の間には、水路385が形成されている。この水路385の川床上には、桝目状の石材沈床383が施工されている。この石材沈床383は、図2、10、13に示すと同様の石材構造体383a〜383iで構成されている。石材沈床383の造成は、石材構造体383a〜383iを符号の順に施工するとともに、桝目部分183zの内部に適当なサイズの自然石を充填することにより行なわれる。すなわち、L字状の石材構造体383a〜383dをまず施工し、次にI字状の石材構造体383eを施工し、次に鉤型の石材構造体383fとL字状の石材構造体383g〜383iとを順次施工する。最後に、石材構造体383a〜383iによって形成された矩形の桝目部分183zに大小の自然石(玉石や栗石)を埋め込み、石材構造体383a〜383iの上端とほぼ高さを一致させる。
【0068】
本実施形態において、石材沈床383を構成する玉石の間に形成された空間は、魚類、貝類、藻等の水生の動植物を保護するためのもので、環境保全に役立つ。この石材沈床383は、図4、5、12、13等に示す方法によって施工した石材構造体からなるので、増水に際しても十分な強度を有し、かつ、安全性の高いものとなっている。
【0069】
以上の石材沈床383は、水路385の中央に配置したが、補助的護岸若しくは根固めとしての役割を持たせたい場合、石材構造体383a〜383e等からなる一列の石材沈床を護岸382に沿って形成することもできる。
【0070】
以上、実施形態に即して本発明を説明したが、本発明は上記実施形態に限定されるものではない。例えば実施形態の石材構造体は、河川の護岸のみならず、河川の護床、海辺の護岸護床に用いることができることは言うまでもない。
【0071】
また、石材ユニットは、塊状の石材を例えば5つ以上連結したものとすることもでき、この場合直列した3つの石材を下側層とし残りの2つの石材を上側層として、複数の石材ユニットを順次配列しつつ組み立てることにより、立体的な石材構造体を簡易に施工することができる。
【0072】
また、リング付アンカー11、12、13、シャックル20、ワイヤ30、39、締結金具30a、チェーン130、連結金具333、クロスクリップ39aは、亜鉛合金メッキした鉄材に限らずステンレス鋼材等の各種耐蝕材料で形成することができる。
【図面の簡単な説明】
【図1】第1実施形態に係る環境保全用の石材ユニットの構造を説明する図である。
【図2】図1に示す石材ユニットを複数準備して連結した環境保全用の石材構造体を説明する平面図である。
【図3】図2の石材構造体の側面図である。
【図4】図2に示す石材構造体を施工する方法を概念的に説明する図である。
【図5】図2に示す石材構造体を施工する方法を概念的に説明する図である。
【図6】図2及び図3に示す石材構造体を低水護岸として施工した例を示す図である。
【図7】第2実施形態に係る環境保全用の石材ユニットを説明する図である。
【図8】第3実施形態に係る環境保全用の石材ユニットを説明する図である。
【図9】(a)は、第4実施形態に係る環境保全用の石材ユニットを説明する図であり、(b)はその変形例を説明する図である。
【図10】第5実施形態に係る環境保全用の石材構造体を説明する図である。
【図11】第6実施形態に係るサブユニットを説明する図である。
【図12】(a)、(b)、(c)は、図11のサブユニットを用いた護岸用の石材構造体の施工方法を説明する図である。
【図13】(a)、(b)は、図11のサブユニットを用いた護岸用の石材構造体の施工方法を説明する図である。
【図14】第7実施形態を説明する図である。
【図15】第8実施形態を説明する図である。
【図16】第9実施形態を説明する図である。
【符号の説明】
11,12,13 リング付アンカー
30 ワイヤ
81 河床
82 護岸
83 低水護岸
84 河原
A〜G 石材ユニット
A1,A2,A3 玉石
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a stone unit for environmental protection used for revetment, construction of a revetment, etc., a stone structure using the same, and a method of manufacturing these.
[0002]
[Prior art]
As a method of constructing structures such as seawalls and seawalls in consideration of environmental protection, there is a method disclosed in, for example, JP-A-8-253919. In this method, a plurality of revetment revetments in which four natural stones are arranged in a square or radial pattern are two-dimensionally arranged, and the revetment revetment materials are interconnected to each other so that revetment, revetment, etc. A continuous structure for can be constructed.
[0003]
[Problems to be solved by the invention]
However, the seawall protection materials are designed on the premise that they are two-dimensionally arranged and constructed, and it is not easy to construct a three-dimensional seawall protection structure.
[0004]
The three-dimensional seawall protection structure can form a relatively closed space in its internal space, which is desirable for nesting and inhabiting of small animals. Is growing.
[0005]
On the other hand, up to now, river improvement has generally used concrete that is economical and durable, but concrete revetments are free from natural environmentally friendly construction methods. Here, it is conceivable to completely remove the concrete revetment and replace it with a stone revetment, but such river renovation would be large-scale and would increase the cost to a huge amount. At the same time, the construction of the seawall will destroy the environment once.
[0006]
Accordingly, an object of the present invention is to provide a method for manufacturing a seawall protection structure that is three-dimensionally continuous, has excellent workability, and is stable for environmental protection.
[0007]
Another object of the present invention is to provide a method for manufacturing a stone structure including a stone unit for environmental protection, which can easily form a river environment close to nature without breaking existing revetments. I do.
[0008]
[Means for Solving the Problems]
In order to solve the above-mentioned problem, the stone unit for environmental conservation of the present invention connects a plurality of massive stones and first and second stones among the plurality of stones to each other, as well as the first and second stones. And a connecting means for connecting the third stone material to the third stone material with a clearance and play.
[0009]
In the above-mentioned stone unit, since the connecting means connects the third stone to the first and second stones with a gap and with play, the connecting means is used when assembling a three-dimensional stone structure from a plurality of stone units. Workability can be improved. That is, while the first and second stones of the plurality of stone units are sequentially arranged close to each other as a lower layer, the first and second stones of the pair of stone units adjacent to the first and second stones of the target stone unit are arranged. By arranging the third stone of the target stone unit as an upper layer as appropriate in the upper depression formed by the first and second stones (a total of four stones), a three-dimensional and stable stone structure The body can be constructed easily and quickly.
[0010]
Here, the first and second stone materials can be connected in close proximity in advance, thereby increasing the stability after construction. In addition, as the massive stone material, cobble stones having substantially the same dimensions can be used, whereby the stone units can be regularly arranged at substantially equal intervals, and the stability after construction is enhanced. Also, the third stone of a particular stone unit can be connected to, for example, the first and second stones of adjacent stone units by suitable connecting means after being arranged as an upper layer. This further enhances stability and safety after construction. Furthermore, the first and second stones of a particular stone unit can be connected to the first and second stones of the adjacent stone unit after being arranged as a lower layer, for example by means of wires and suitable connecting means. . This also increases stability and safety after construction.
[0011]
In addition, the stone structure for environmental conservation of the present invention is prepared by preparing a plurality of stone units as described above and sequentially arranging them as first to third stone units, and the first unit constituting the first unit. The third stone of the third unit is placed in an upper depression when the first and second stones and the first and second stones constituting the second unit are arranged close to each other on the floor. Assembled by placing.
[0012]
In the above-mentioned stone material structure, the first and second stone materials of the first unit and the first and second stone materials of the second unit are placed close to each other on the floor when the first and second stone materials are placed on the floor. Since three units of the third stone are placed, a three-dimensional and continuous stone structure can be constructed with high stability, and workability during construction is extremely high. This three-dimensional stone structure has a space surrounded by stones below the third stone, and can preserve ecosystems such as insects, fish, and plants. Furthermore, an environment-friendly natural landscape can be formed in a river or the like by using the stone structure.
[0013]
Note that the third unit of the second unit is placed in a recess above the first and second stones of the first unit and the first and second stones of the second unit, which are arranged close to each other. Can be placed, but in this case, the stability at the time of construction of the stone structure is slightly reduced.
[0014]
Further, another stone structure for environmental protection of the present invention is formed by arranging a plurality of stone units connecting a plurality of massive stones, and has a lower layer having a structure in which massive stones are arranged in two rows. And an upper layer having a structure in which massive stones are arranged in a depression in an upper part of the lower layer, wherein the stone unit includes a first pair of adjacent stones forming the lower layer. It has at the end, and has a stone material forming the upper layer at the second end. In addition, when such a stone structure is arranged substantially along the flow of a river, if the first end is on the upstream side and the second end is on the downstream side, it is sufficient for increasing water and the like. A stone structure having excellent strength can be provided.
[0015]
In the above-mentioned stone structure, since the stone unit has a pair of adjacent stones forming the lower layer at a first end and a stone forming the upper layer at a second end, a three-dimensional and continuous stone structure is formed. Can be constructed with high stability. This three-dimensional stone structure has a space surrounded by a lower layer of stone below the upper layer of stone, and can preserve the ecosystem. Furthermore, an environment-friendly natural landscape can be formed in a river or the like by using the stone structure. Moreover, since such a stone structure can be easily incorporated into an existing artificial revetment without breaking it, a multi-natural type revetment can be realized at low cost and with low impact.
[0016]
In addition, the method for manufacturing a stone structure for environmental conservation according to the present invention connects the massive first and second stone materials to each other, and attaches the massive third stone material to the first and second stone materials. A step of preparing a plurality of stone units constituted by being separated from each other and having a play and connecting them as first to third stone units; and providing a plurality of stone units in proximity to the first and second stone members constituting the first unit. The third unit is arranged on the opposite side of the first and second stones of the first unit, in close proximity to the first and second stones constituting the second unit arranged on the floor. Arranging the first and second units on a floor, and arranging the first and second stones of the first unit and the first and second stones of the second unit, which are arranged close to each other. In front of the third unit, And a step of placing the third stone.
[0017]
In the above-described method for manufacturing a stone structure, the first and second stones of the first unit and the first and second stones of the second unit are placed close to each other on the floor when they are arranged on the floor. Since the third stone of the third unit is placed, the workability in constructing a three-dimensional and continuous stone structure can be improved. With this three-dimensional stone structure, an ecosystem can be preserved, and a natural landscape can be formed on a river or the like.
[0018]
Further, another method of manufacturing a stone structure for environmental protection according to the present invention has a structure in which a block having a structure in which block stones are arranged in two rows and a block in which a block of stones are arranged in a depression above the lower layer. A method for manufacturing an environment-preserving stone structure including an upper layer, wherein a stone unit formed by connecting massive first and second stones to each other via a flexible connecting member is provided as a first stone unit. And preparing a plurality of third stones as third subunits, and arranging the first stone of the first subunit at a predetermined position in the upper layer, and positioning the second stone of the first subunit with respect to the predetermined position. Arranging the first stone material of the second subunit at the second position of the lower layer, the step of arranging the first stone material of the second subunit further adjacent to the first position of the lower layer adjacent to the arrangement direction in the arrangement direction. And said Arranging the second stone material of the two subunits at a third lower position adjacent to the second position in the arrangement direction; and connecting the connecting member of the first subunit and the second subunit. Connecting a connecting member to each other, disposing the first stone of the third subunit at the third position in the lower layer, and attaching the second stone of the third subunit to the first and second stones. A step of arranging an upper depression of a stone material at a position and a step of connecting the connecting member of the second subunit and the connecting member of the third subunit to each other.
[0019]
In the above-described method for manufacturing a stone structure, the stone structure is formed while assembling a stone unit in which the first to third subunits are connected to form a set of six stones. This stone unit composed of six stones has a pair of adjacent stones forming the lower layer at one end and a stone forming the upper layer at the other end. Thereby, a three-dimensional and continuous stone structure can be constructed as having high stability. This three-dimensional stone structure has a space surrounded by a lower layer of stone below the upper layer of stone, and can preserve the ecosystem. Furthermore, an environment-friendly natural landscape can be formed in a river or the like by using the stone structure.
[0020]
BEST MODE FOR CARRYING OUT THE INVENTION
[First Embodiment]
FIG. 1 is a diagram illustrating a stone unit for environmental protection according to a first embodiment of the present invention.
[0021]
The stone unit A includes three cobblestones A1, A2, and A3, which are a plurality of massive stones, anchors with rings 11, 12, and 13, which are fixed to the cobblestones A1, A2, and A3, and anchors with rings 11, respectively. , 12 and 13 to each other. The anchors with rings 11, 12, 13 and the wire 30 constitute connecting means for connecting the boulders A1, A2, A3, whereby the boulders A1, A2, which are the first and second stone materials, are formed. In addition to being connected to each other, the first and second cobblestones A1 and A2 are connected with a cobblestone A3, which is a third stone material, separated and having play.
[0022]
Each of the boulders A1, A2, and A3 has a random shape, but has approximately the same size. In a specific example, a boulder having a diameter of about 50 cm was used. Cobble stones can be made of natural materials of various materials, but can also be made of broken stones or the like obtained by processing natural stones. In essence, it can be replaced with one made of environmentally friendly materials such as natural stones suitable for the inhabitation of living things.
[0023]
Each of the anchors 11, 12, and 13 with a ring is made of an iron body coated with anti-corrosion zinc alloy, and is anchored to a small hole formed in each of the boulders A1, A2, and A3. , 13a and ring portions 11b, 12b, 13b for passing the wire 30 through. The anchor portions 11a, 12a, and 13a are screwed and fixed in the fixing holes of the boulders A1, A2, and A3, are fixed by being driven, or are fixed using an adhesive. In addition, as for the anchors 11, 12, and 13 with rings, a shear force, a pull-out force, etc. are examined as stress applied to each anchor bolt, and those having sufficient strength against a load during and after construction are used. .
[0024]
The wire 30 is made of a bundle of steel or zinc alloy-plated iron wires and is made flexible, and is passed through the holes of the ring portions 11b, 12b, 13b of the anchors 11, 12, 13 with rings. After that, both ends are connected by a fastener 30a such as a wire clip to form a loop. The wire 30 has a strength enough to sufficiently support the weight of the cobblestones A1, A2, and A3, and also considers a shear force, a tensile force, and the like as destructive stress applied to the wire 30. Has sufficient strength. This wire 30 can be replaced by a chain. The fastening fitting 30a for connecting both ends of the wire 30 is formed by plating an iron body with a zinc alloy plating for corrosion protection. The fastening fitting 30a may be an annular caulking member formed of a material such as lead.
[0025]
FIG. 2 is a plan view illustrating the structure of a stone structure for environmental conservation obtained by preparing a plurality of stone units having the same structure as the stone unit A shown in FIG. 1 and assembling them. It is a side view of the 2 stone structure.
[0026]
Each of the stone units A to G includes three boulders A1, A2, A3 to G1, G2, and G3, respectively, and is sequentially arranged and constructed on the riverbed 40 toward the river in the order of reference numerals. Specifically, the third boulder B3 of the next stone unit B is placed in the upper depression of the three boulders A1, A2, and A3 arranged close to each other on the riverbed 40. The third boulder C3 of the next stone unit C is placed in the upper recess of the four boulders A1, A2, B1, and B2 arranged in close proximity. This is repeated in sequence, and finally, the third boulder G3 of the last stone unit G is placed in the upper depression of the four boulders E1, E2, F1, and F2 arranged close to each other on the riverbed 40. Will be placed. Here, a single finishing cobble stone H can be placed in the upper depression of the four cobblestones F1, F2, G1, G2 formed at the end portion. A space surrounded by stones is formed below B3 to G3 forming the upper layer. This space is porous and at the same time a closed space to some extent, and is an optimal environment for small animals and plants to inhabit. It should be noted that the stone structure for environmental protection having the structure shown in the figure can be set to any length and width by appropriately adjusting the size of the boulder and the number of stone units according to the place where it is installed. Needless to say. The illustrated stone structure does not need to be extended in a straight line, but can have a constant curvature or meander along the river flow.
[0027]
4 and 5 are diagrams conceptually illustrating a method of constructing the stone structure shown in FIG. 2 using the stone unit shown in FIG.
[0028]
In the steps up to this point, the first boulder D1 and the second boulder D2 of the second stone unit D are replaced with the first boulder C1 and the second boulder C2 of the first stone unit C as shown in FIG. Are placed adjacent to each other. Here, the illustration of the stone units A and B is omitted, and the illustration of the boulders C3 and D3 on the upper layer side is also omitted. Note that the pair of boulders C1 and C2 are disposed slightly apart in the direction perpendicular to the arrangement direction αβ of the stone structure, and the pair of boulders D1 and D2 are also slightly spaced in the direction perpendicular to the arrangement direction αβ. They are spaced apart.
[0029]
Next, a third stone unit E is prepared. The third stone unit E may be assembled at the site, or may be assembled at a factory in advance and transported to the site.
[0030]
Next, the cobblestone E3 of the third stone unit E is gripped by the gripper 51 of the cobblestone grasper 50 suspended by the crane, and the entire third stone unit E is lifted. That is, the first and second boulders E1 and E2 are suspended below the boulder E3 via the wire 30.
[0031]
Next, the third stone unit E is moved to an appropriate position and lowered. Thereby, the first boulder E1 and the second boulder E2 are separated from each other by about one boulder in the arrangement direction αβ of the stone structure near the first boulder D1 and the second boulder D2 of the second stone unit D. And place it.
[0032]
Next, the first boulder E1 and the second boulder E2 dropped on the riverbed are slightly separated from each other in a direction orthogonal to the arrangement direction αβ.
[0033]
Next, both cobblestones E1 and E2 are rolled along the longitudinal direction αβ of the stone structure, and the cobblestones E1 and E2 are arranged adjacent to the cobblestones D1 and D2 of the second stone unit D, respectively. At this time, the anchors 11 and 12 with rings of the boulders E1 and E2 are arranged on the lower side by the rotation of the boulders E1 and E2. Thereby, the anchors with rings 11 and 12 can be prevented from being exposed to human eyes, and can be prevented from becoming dangerous projections.
[0034]
Next, as shown in FIG. 5, the crane 50 is operated to place the cobblestone E3 in the concave portions on the four cobblestones C1, C2, D1, and D2 arranged close to each other. At this time, since the ring-mounted anchor 13 of the cobble stone E3 is directly disposed on the lower side, the ring-mounted anchor 13 can be prevented from touching a human eye and can easily be prevented from becoming a dangerous projection.
The above-described working steps performed for the third stone unit E are repeated for the subsequent stone units F, G,... (See FIG. 2). The same work process is performed for the stone units B to D constructed before the third stone unit E. Only the first stone unit A is special and is located at the apex of the triangle only in the lower layer.
[0035]
In the stone structure formed by the above construction, the first and second boulders C1 and C2 of the first stone unit C, and the first and second boulders D1 and D2 of the second stone unit D are provided. The third cobblestone E3 of the third stone unit E is disposed as an upper layer as appropriate in the upper depression of the lower layer formed by the above, so that the adjacent second stone unit D and the third stone unit E The stone unit E is loosely connected to the stone unit E, and a stable stone structure can be easily and quickly constructed.
[0036]
In addition, the wire 30 extending between the cobblestones E1 and E2 and the connecting wire 39 extending in the construction direction of the stone structure are connected to each other with metal fittings such as cross clips 39a, so that the third stone unit E and the third stone unit E are connected to each other. The two stone units D can be connected, and this is sequentially repeated for each unit construction, whereby the stone structures are connected as a whole, and the strength of the stone structures can be further increased. The cross clip 39a is also formed by plating a zinc-alloy anticorrosion on the iron main body.
[0037]
FIG. 6 is a diagram showing an example in which the stone structure shown in FIGS. 2 and 3 is constructed as a low-water revetment. The riverbed 81 is made by shaving or burying a natural riverbed to make it flat. The riverbed 81 can be an existing concrete protection floor constructed by a conventional method, or can be a natural stone cobblestone. The revetment on both sides is made up of an existing concrete retaining wall 82A constructed by a conventional method and an existing concrete block 82B. The low-water revetment 83 at the center of the river has the stone structures shown in FIGS. 2 and 3 arranged in two rows toward the upstream of the river. Between the normal seawalls 82A and 82B and the low-water seawall 83, there is formed a riverbank 84 reclaimed with on-site soil or planting soil. In addition, a water channel 85 is formed between the pair of low water revetments 83. These low-water revetments 83 may extend linearly, but may meander appropriately when constructing the stone structure. In this way, it is possible to form a river close to nature with a stream and an edge. In addition, the Kawahara 84 does not necessarily need to be formed artificially. That is, a meandering or the like of the low-water revetment 83 is formed, and a sediment is formed by natural action, sediment is deposited by natural action, and the riverbed 83 is gradually reclaimed to advance vegetation.
[0038]
Between the cobblestones of the three-dimensional arrangement constituting the low water revetment 83 formed in this way, a space S close to nature for inhabiting fireflies and other aquatic insects, aquatic plants and fish and shellfish that breed these, and the like. Because it is formed, it helps the environment. In other words, the space S allows animals and the like to inhabit safely, provides a large-area stone surface for microorganisms to propagate, and changes the water flow irregularly, and causes self-cleaning by aeration or the like. Action is enhanced. Further, since the low-water revetment 83 is a stone structure constructed by the method shown in FIGS. 4 and 5, it has sufficient strength even when water is increased and has high safety. Furthermore, since the riverbed 81 can follow the ground even if it is scoured by the water current, the stability of the seawall structure is maintained for a long time.
[0039]
In the riverbank 84, a waterside environment such as grasses for insects to emerge and small animals and birds to nest is formed, which is useful for environmental conservation as a place for nurturing a variety of life.
[0040]
The above-mentioned construction method restores existing artificial revetments to relatively natural and hydrophilic revetments at relatively low cost. As a result, it is possible to restore a river that is environmentally friendly and has excellent landscape.
[0041]
[Second embodiment]
FIG. 7 is a diagram illustrating a stone unit for environmental protection according to the second embodiment. In this case, the connecting means in the first embodiment shown in FIG. 1 is changed.
[0042]
In the stone unit A, the anchors with rings 11, 12, and 13 fixed to the three boulders A1, A2, and A3 are connected to the annular wire 30 for connection via a shackle 20. The shackle 20 is a connection fitting composed of a U-shaped part and a screw part, and is obtained by plating an iron body with a zinc alloy. For example, with regard to the cobblestone A1, the ring portion 11b and the wire 30 are connected to each other by passing the ring portion 11b and the wire 30 through a ring formed by screwing and fixing a screw portion to both ends of the U-shaped portion of the shackle 20. In this case, the anchors 11, 12, and 13 with rings, the shackle 20, and the wire 30 constitute connection means. The connection between the anchors with rings 11, 12, 13 and the wire 30 can be easily removed by loosening the screw portion of the shackle 20. By using the shackle 20, the cobblestones A1, A2, and A3 can be easily connected on-site, and by selecting the length of the wire 30, the distance between the cobblestones A1, A2, and A3 can be maximized. It can be easily changed.
[0043]
[Third embodiment]
FIG. 8 is a diagram illustrating a stone unit for environmental protection according to the third embodiment. In this case, a chain 130 is used instead of the wire 30 in FIG.
[0044]
The first portion 130a of the chain 130 connects a pair of cobblestones A1 and A2 on the lower layer in close proximity to each other. In addition, the second portion 130b connects the cobblestone A3 on the upper layer side and the cobblestones A1 and A2 on the lower layer side by a certain distance or more. Specifically, one end of the second portion 130b is connected to the anchor 13 with the ring of the cobblestone A3, and the other end of the second portion 130b is connected to the center of the first portion 130a. In addition, the connection between the chain 130 and the anchors 11, 12, and 13 with a ring may be made by a connection fitting such as a shackle.
[0045]
By connecting a plurality of the above stone units by the construction shown in FIG. 4, a stone structure for environmental protection similar to that shown in FIG. 2 can be obtained.
[0046]
[Fourth embodiment]
FIG. 9A is a diagram conceptually illustrating a stone unit for environmental protection according to the fourth embodiment. This stone material unit is a modification of the wire 30 of FIG. In this case, the cobblestones A1 and A2 are connected by a special rod-shaped anchor 231. One end 231a of the zinc alloy-plated anchor 231 is a screw-in type, and the other end 231b is a drive-in type. Thus, first, the one end 231a of the anchor 231 is screwed into the cobblestone A2, and then the other end 231b of the anchor 231 is inserted into the cobblestone A1 and fixed. An anchor 13 with a ring is fixed to the cobblestone A3. One end of the wire 232 is connected to the ring-attached anchor 13 by passing through the one end of the wire 232 and fixing it with an appropriate metal fitting such as a wire clip. The other end of the wire 232 is passed through a U-shaped fitting portion 231c provided on the anchor 231 and is connected to the wire 232 using an appropriate fitting or the like.
[0047]
By connecting a plurality of the above stone units by the construction shown in FIG. 4, a stone structure for environmental protection similar to that shown in FIG. 2 can be obtained.
[0048]
FIG. 9B is a diagram conceptually illustrating a stone unit for environmental conservation that is a modification of the fourth embodiment. In this case, the boulders A1, A2, and A3 are connected using a special Y-shaped connection fitting 333. Ring portions are formed at the three tip portions of the zinc alloy-plated Y-shaped body 333a, and these three ring portions and the anchors 11, 12, 13 with rings fixed to the three boulders A1, A2, A3. Are connected via a shackle 333b plated with zinc alloy.
[0049]
[Fifth Embodiment]
FIG. 10 is a diagram illustrating a stone structure for environmental protection according to a fifth embodiment. This stone structure is a modification of the stone structure of the first embodiment shown in FIG. 2, and forms a corner portion CO that bends at a substantially right angle.
[0050]
At this corner portion CO, the construction method of the stone structure is essentially the same as that shown in FIGS. 4 and 5. Specifically, the first cobblestone H1 and the second cobblestone H2 of the stone unit H are arranged as the lower layer next to the cobblestones F1 and G1 instead of next to the cobblestones G1 and G2 of the stone unit G. The third cobblestone H3 is disposed so as to be properly fitted as an upper layer in an upper depression formed by the cobblestones F1, F2, G1, and G2. Next, the first cobblestone I1 and the second cobblestone I2 of the stone unit I are arranged as a lower layer next to the cobblestones H1 and H2 of the stone unit H, and then the third cobblestone I3 is set to the cobblestones F1, G1, and H1. , H2 so as to be appropriately fitted as an upper layer in an upper depression formed by the same. Hereinafter, this is repeated to arrange and connect the stone units J. A single finishing boulder K may be placed on the end portion.
[0051]
[Sixth embodiment]
Hereinafter, a stone unit for environmental protection according to a sixth embodiment of the present invention will be described. Drawing 11 is a figure explaining a subunit which constitutes a part of the stone unit for environmental conservation concerning an embodiment.
[0052]
The subunit W includes two boulders W1 and W2, anchors 511 and 512 with rings fixed to the boulders W1 and W2, and an annular wire 530 interconnecting the anchors 511 and 512 with rings. Prepare. Here, the anchors with rings 511 and 512 and the wire 530 are flexible connecting members for connecting the boulders W1 and W2.
[0053]
FIG. 12 and FIG. 13 are diagrams for explaining the construction of the revetment stone structure using the subunit of FIG. 11.
[0054]
After a step of omitting the description, as shown in FIG. 12A, the cobblestones W01 and W02 of the subunit W0 and the single cobblestone Z are arranged at the apexes of the triangle and passed through the anchors with rings 511 and 512. The connected wire 530 and the anchor 513 with a ring provided on the cobblestone Z are connected by a connection fitting 520 such as a shackle. Thereby, an end of the lower layer can be formed. The position in the arrangement direction of the boulders W01 and W02 is referred to as a first position for convenience of description.
[0055]
Next, a first subunit W1 similar to that shown in FIG. 11 is prepared, and the first cobblestone W11 is arranged at a predetermined position in the upper layer, that is, at the upper part of the cobblestones W01, W02, and Z. Further, the second cobblestone W12 is arranged, for example, on the left side of the second position adjacent to the lower first position (see FIG. 12B). At this time, the two subunits W0 and W1 are connected to each other by passing the wire 535 previously passed through the wire 530 of the subunit W0 through the wire 530 of the subunit W1 and fixing both ends with a wire clip or the like.
[0056]
Next, a second subunit W2 similar to that shown in FIG. 11 is prepared, of which the first cobblestone W21 is disposed on the right side of the lower second position, and the second cobblestone W22 is disposed adjacent to the lower second position. For example, they are arranged on the left side of the three positions (see FIG. 12C).
[0057]
Next, the wire 530 of the first subunit W1 and the anchor with ring 511 provided on the cobblestone W21 of the second subunit W2 are connected via the connection fitting 520. At this time, by connecting a plurality of connection fittings 520 such as a shackle in series, it is possible to replace the adjustment of the length of the wire 530.
[0058]
Next, a third subunit W3 similar to that shown in FIG. 11 is prepared, and the first cobblestone W31 is arranged in the upper recess of the cobblestones W01, W02, W12, and W21. Further, the second cobblestone W32 is disposed on the right side of the lower third position (see FIG. 13A).
[0059]
Next, the wire 530 of the second subunit W2 and the anchor with ring 511 provided on the cobblestone W32 of the third subunit W3 are connected via the connection fitting 520.
[0060]
Next, a fourth subunit W4 similar to that shown in FIG. 11 is prepared, and the first cobblestone W41 is arranged in the depression above the upper cobblestones W12, W21, W22, and W32. Further, the second cobblestone W42 is arranged, for example, on the left side of the lower fourth position (see FIG. 13B). At this time, the wire 535 previously passed through the wire 530 of the subunit W2 or the subunit W3 is also passed through the wire 530 of the subunit W4 and both ends thereof are clipped, so that the subunit W2 or the subunit W3 is connected to the subunit W2. The unit W4 is connected to each other.
[0061]
By repeating the above, a stone structure as shown in FIG. 2 can be formed. Such a stone structure is constructed as a revetment as shown in FIG. 6 similarly to the first embodiment. In this case, it can be seen that one stone unit is formed by the three subunits W1 to W3, and the stone unit has a pair of adjacent boulders W22 and W32 forming a lower layer at one end, and an upper layer. At the other end. From another viewpoint, the boulders W11 and W12 of the subunit W1 and the boulder W21 of the subunit W2 are consequently connected to each other, and can be considered to correspond to the stone unit B of FIG. Similarly, the boulders W22 of the subunit W2 and the boulders W31 and W32 of the subunit W3 are consequently connected to each other and can be considered to correspond to the stone unit C of FIG.
[0062]
[Seventh embodiment]
FIG. 14 shows the seventh embodiment, and is a diagram showing an example in which a stone structure for environmental protection such as that shown in FIG. 2 is constructed as an auxiliary seawall. The riverbed 181 and the main revetment 182 are formed of concrete or the like. The auxiliary revetment 183 is formed by arranging the stone structures shown in FIG. 2 and FIG. 13 in a row, and has a role as a revetment for solidifying the lower part (penetration) of the main revetment 182. A space S is formed between the cobblestones of the three-dimensional arrangement constituting the auxiliary revetment 183 and is immersed in the water flow. This space S is useful for environmental conservation, because it serves as a cradle for fish, aquatic insects, and animals and plants breeding them. That is, the space S forms a relatively closed environment for animals and the like to safely inhabit, and a large surface area suitable for propagation of microorganisms. Moreover, in the vicinity of the space S, the water flow changes irregularly, and the self-cleaning action by aeration or the like is enhanced.
In this case, there is no need to demolish the existing revetment revetment and construct a new revetment revetment, and an environment-friendly river can be realized simply and inexpensively.
[0063]
[Eighth Embodiment]
FIG. 15 shows the eighth embodiment, and is a diagram showing a multi-natural river in which the stone structure for environmental protection shown in FIGS. 2 and 13 is constructed as a low-water revetment and a revetment.
[0064]
As in the case of FIG. 6, the riverbed 81 is, for example, formed by flattening the natural riverbed by shaving or burying it. The low-water revetment 83 at the center of the river has the stone structures shown in FIGS. 2 and 13 arranged in two rows, and a water channel 85 is formed between the pair of low-water revetments 83. The revetment 282 on both sides differs from the case of FIG. 6 in that a plurality of stone structures shown in FIG. 2 and the like are arranged in parallel to form a wall. The stone structure constituting the revetment 282 is constructed by, for example, assembling the stone units shown in FIG. This stone structure is constructed in the same manner as in FIGS. 4, 5, 12, and 13, except that the base is a slope.
[0065]
In the present embodiment, the porous and somewhat closed space S1 formed between the boulders constituting the low water revetment 83 is for protecting animals and plants and is useful for environmental conservation. The space S2 formed between the boulders constituting the revetment 282 can protect animals and plants similarly to the space S1, and is useful for environmental conservation. Further, since the revetment 282 is a stone structure constructed by the method shown in FIGS. 4, 5, 12, 13, and the like, the revetment 282 has sufficient strength even when water is increased, and has high safety. .
[0066]
[Ninth embodiment]
FIG. 16 shows the ninth embodiment, and is a diagram showing an example in which the stone structure for environmental protection shown in FIGS. 2, 10, and 13 is constructed as a stone floor for protection.
[0067]
A water channel 385 is formed between the revetments 382 on both sides. On the riverbed of this waterway 385, a grid-shaped stone sink 383 is constructed. The stone sink 383 is composed of the same stone structures 383a to 383i as shown in FIGS. The formation of the stone sink 383 is performed by constructing the stone structures 383a to 383i in the order of the reference numerals and filling the inside of the mesh portion 183z with natural stone of an appropriate size. That is, the L-shaped stone structures 383a to 383d are constructed first, then the I-shaped stone structure 383e is constructed, and then the hook-shaped stone structures 383f and the L-shaped stone structures 383g to 383g are formed. 383i. Finally, large and small natural stones (cobble stones and chestnut stones) are buried in the rectangular mesh portions 183z formed by the stone structures 383a to 383i, and the heights thereof are made substantially equal to the upper ends of the stone structures 383a to 383i.
[0068]
In the present embodiment, the space formed between the cobblestones constituting the stone sink 383 is for protecting aquatic animals and plants such as fish, shellfish, and algae, and is useful for environmental conservation. Since the stone sink 383 is made of a stone structure constructed by the method shown in FIGS. 4, 5, 12, 13, etc., the stone sink 383 has sufficient strength even when water is increased, and has high safety.
[0069]
The above-mentioned stone sink 383 is arranged at the center of the water channel 385. However, when it is desired to have a role as an auxiliary seawall or a solidification, a row of stone sinks composed of the stone structures 383a to 383e and the like is formed along the seawall 382. It can also be formed.
[0070]
As described above, the present invention has been described with reference to the embodiments. However, the present invention is not limited to the above embodiments. For example, it is needless to say that the stone structure of the embodiment can be used not only for revetment of rivers but also for revetments of rivers and revetments at seaside.
[0071]
In addition, the stone unit may be formed by connecting, for example, five or more massive stones. In this case, three stones in series are used as a lower layer and the remaining two stones are used as an upper layer, and a plurality of stone units are used. By assembling while sequentially arranging, a three-dimensional stone structure can be easily constructed.
[0072]
Further, the anchors 11, 12, and 13 with rings, the shackle 20, the wires 30 and 39, the fastening fitting 30 a, the chain 130, the connecting fitting 333, and the cross clip 39 a are not limited to the zinc-plated iron material but various stainless steel materials. Can be formed.
[Brief description of the drawings]
FIG. 1 is a diagram illustrating a structure of a stone unit for environmental conservation according to a first embodiment.
FIG. 2 is a plan view illustrating an environment-protecting stone structure in which a plurality of stone units shown in FIG. 1 are prepared and connected.
FIG. 3 is a side view of the stone structure of FIG. 2;
FIG. 4 is a diagram conceptually illustrating a method of constructing the stone structure shown in FIG.
5 is a diagram conceptually illustrating a method of constructing the stone structure shown in FIG.
FIG. 6 is a diagram showing an example in which the stone structure shown in FIGS. 2 and 3 is constructed as a low-water revetment.
FIG. 7 is a diagram illustrating a stone unit for environmental protection according to a second embodiment.
FIG. 8 is a diagram illustrating a stone unit for environmental protection according to a third embodiment.
FIG. 9A is a diagram illustrating a stone unit for environmental protection according to a fourth embodiment, and FIG. 9B is a diagram illustrating a modification thereof.
FIG. 10 is a diagram illustrating a stone structure for environmental protection according to a fifth embodiment.
FIG. 11 is a diagram illustrating a subunit according to a sixth embodiment.
12 (a), (b) and (c) are views for explaining a method of constructing a revetment stone structure using the subunit of FIG. 11;
13 (a) and 13 (b) are views for explaining a method of constructing a revetment stone structure using the subunit of FIG. 11;
FIG. 14 is a diagram illustrating a seventh embodiment.
FIG. 15 is a diagram illustrating an eighth embodiment.
FIG. 16 is a diagram illustrating a ninth embodiment.
[Explanation of symbols]
11,12,13 Anchor with ring
30 wires
81 Riverbed
82 Seawall
83 Low water revetment
84 Kawara
A to G stone unit
A1, A2, A3 Cobblestone

Claims (3)

塊状の石材を2列に並べた構造を有する下層と、当該下層を構成する近接して配置された4つの塊状の石材上部の窪みに塊状の石材を配列した構造を有する上層とを備える環境保全用の石材構造体の製造方法であって、
塊状の第1及び第2の石材を互いに連結するとともに、当該第1及び第2の石材に対し塊状の第3の石材を離間しかつ遊びを持たせて連結することによって構成した石材ユニットを、第1乃至第3ユニットとして複数準備する工程と、
前記第1ユニットを構成するとともに前記石材構造体の配列方向に直交する方向に配置された前記第1及び第2の石材に近接して前記第2ユニットを構成する前記第1及び第2の石材を前記配列方向に直交する方向に配置することによって、前記第1ユニットの前記第1及び第2の石材と前記第2ユニットの前記第1及び第2の石材との上部に窪みを形成する工程と、
前記第2ユニットを構成する前記第1及び第2の石材に近接して、前記第1ユニットの前記第1及び第2の石材の反対側に、前記第3ユニットを構成する前記第1及び第2の石材を前記配列方向に直交する方向に配置する工程と、
近接して配置された前記第1ユニットの前記第1及び第2の石材と前記第2ユニットの前記第1及び第2の石材との上部の前記窪みに、前記第3ユニットの前記第3の石材を載置する工程と
を備える環境保全用の石材構造体の製造方法。
Environmental preservation comprising a lower layer having a structure in which massive stones are arranged in two rows and an upper layer having a structure in which massive stones are arranged in depressions above four massive stones which are adjacent to each other and constitute the lower layer. A method of manufacturing a stone structure for
A stone unit configured by connecting the massive first and second stone materials to each other, and connecting the massive third stone material to the first and second stone materials with a distance and with play, Preparing a plurality of first to third units;
The first and second stones forming the first unit and forming the second unit in the vicinity of the first and second stones arranged in a direction orthogonal to the arrangement direction of the stone structures. Forming recesses on the first and second stones of the first unit and the first and second stones of the second unit by arranging the stones in a direction orthogonal to the arrangement direction. When,
The first unit and the second unit constituting the third unit are arranged on the opposite side of the first unit and the second unit of the first unit in the vicinity of the first and second units constituting the second unit. Arranging the two stone materials in a direction orthogonal to the arrangement direction;
In the depression above the first and second stones of the first unit and the first and second stones of the second unit, the third unit of the third unit A method of manufacturing a stone structure for environmental protection, comprising the step of placing a stone.
塊状の石材を2列に並べた構造を有する下層と、当該下層を構成する近接して配置された4つの塊状の石材上部の窪みに塊状の石材を配列した構造を有する上層とを備える環境保全用の石材構造体の製造方法であって、一対の塊状の石材が配置方向に直交する方向に配置されている第1位置に対して当該配列方向に隣接する第2位置と、当該第2位置に対してさらに当該配列方向に隣接する第3位置とに前記下層を順次形成するとともに、当該下層の形成に対応して前記上層を順次形成する石材構造体の製造方法において、
単独の塊状の石材と一対の塊状の石材とを、前記下層として、三角形の頂点位置であって前記一対の塊状の石材が前記第1位置となるように配置することによって、前記単独の塊状の石材と前記一対の塊状の石材との上部に窪みを形成する工程と、
塊状の第1及び第2の石材を可撓性の連結部材を介して互いに連結することによって構成したサブユニットを、第1乃至第3サブユニットとして複数準備する工程と、
前記第1サブユニットの前記第1の石材を、前記単独の塊状の石材と前記一対の塊状の石材との上部に既に形成された窪みに配置するとともに、前記第1サブユニットの前記第2の石材を、前記下層における前記第2位置のうち一方の列側に配置する工程と、
前記第2サブユニットの前記第1の石材を前記下層における前記第2位置のうち他方の列側に配置するとともに、前記第2サブユニットの前記第2の石材を前記下層における前記第3位置のうち一方の列側に配置する工程と、
前記第1サブユニットの前記連結部材と前記第2サブユニットの前記連結部材とを互いに連結する工程と、
前記第3サブユニットの前記第1の石材を前記下層における前記第3位置の他方の列に配置するとともに、前記第3サブユニットの前記第2の石材を前記第1及び第2位置に既に配置された石材の上部の窪みに配置する工程と、
前記第2サブユニットの前記連結部材と前記第3サブユニットの前記連結部材とを互いに連結する工程と、
を備えることを特徴とする環境保全用の石材構造体の製造方法。
Environmental preservation comprising a lower layer having a structure in which massive stones are arranged in two rows and an upper layer having a structure in which massive stones are arranged in depressions above four massive stones which are adjacent to each other and constitute the lower layer. And a second position adjacent to the first position in which the pair of massive stone materials are arranged in a direction orthogonal to the arrangement direction in the arrangement direction, and the second position. The method for manufacturing a stone structure further comprising sequentially forming the lower layer at a third position adjacent to the arrangement direction and sequentially forming the upper layer corresponding to the formation of the lower layer,
By arranging a single massive stone and a pair of massive stones as the lower layer at the apex position of a triangle and the pair of massive stones at the first position, the single massive stone is provided. Forming a depression in the upper part of the stone and the pair of massive stones,
A step of preparing a plurality of subunits constituted by connecting the massive first and second stone materials to each other via a flexible connecting member as first to third subunits;
The first stone of the first subunit is arranged in a depression already formed above the single massive stone and the pair of massive stones, and the second stone of the first subunit is Disposing a stone material on one of the second positions in the lower layer,
The first stone material of the second subunit is arranged on the other row side of the second position in the lower layer, and the second stone material of the second subunit is arranged in the third position in the lower layer. Arranging it on one of the columns,
Connecting the connecting member of the first subunit and the connecting member of the second subunit to each other;
The first stone of the third sub-unit is arranged in the other row of the third position in the lower layer, and the second stone of the third sub-unit is already arranged in the first and second positions. Arranging the stone in the upper depression of the stone,
Connecting the connecting member of the second subunit and the connecting member of the third subunit to each other;
A method for producing a stone structure for environmental conservation, comprising:
塊状の石材を2列に並べた構造を有する下層と、当該下層を構成する近接して配置された4つの塊状の石材上部の窪みに塊状の石材を配列した構造を有する上層とを備える環境保全用の石材構造体の製造方法であって、一対の塊状の石材が配置方向に直交する方向に配置されている第1位置に対して当該配列方向に隣接する第2位置と、当該第2位置に対してさらに当該配列方向に隣接する第3位置とに前記下層を順次形成するとともに、当該下層の形成に対応して前記上層を順次形成する石材構造体の製造方法において、
塊状の第1及び第2の石材を可撓性の連結部材を介して互いに連結することによってそれぞれ構成した複数のサブユニットを所定位置に配置しつつ連結することによって、塊状の石材を2列に並べた構造を有する下層部分と、当該下層部分を構成する塊状の石材上部の窪みに塊状の石材を配列した構造を有する上層部分とを有するとともに、前記下層部分の端部において近接して配置された4つの塊状の石材の上部に窪みを残した石材構造体の部分を準備する工程と、
塊状の第1及び第2の石材を可撓性の連結部材を介して互いに連結することによって構成したサブユニットを、第1乃至第3サブユニットとして複数準備する工程と、
前記第1サブユニットの前記第1の石材を、前記近接して配置された4つの塊状の石材の上部に既に形成された窪みに配置するとともに、前記第1サブユニットの前記第2の石材を、前記下層における前記第2位置のうち一方の列側に配置する工程と、
前記第2サブユニットの前記第1の石材を前記下層における前記第2位置のうち他方の列側に配置するとともに、前記第2サブユニットの前記第2の石材を前記下層における前記第3位置のうち一方の列側に配置する工程と、
前記第1サブユニットの前記連結部材と前記第2サブユニットの前記連結部材とを互いに連結する工程と、
前記第3サブユニットの前記第1の石材を前記下層における前記第3位置の他方の列に配置するとともに、前記第3サブユニットの前記第2の石材を前記第1及び第2位置に既に配置された石材の上部の窪みに配置する工程と、
前記第2サブユニットの前記連結部材と前記第3サブユニットの前記連結部材とを互いに連結する工程と、
を備えることを特徴とする環境保全用の石材構造体の製造方法。
Environmental preservation comprising a lower layer having a structure in which massive stones are arranged in two rows and an upper layer having a structure in which massive stones are arranged in depressions above four massive stones which are adjacent to each other and constitute the lower layer. And a second position adjacent to the first position in which the pair of massive stone materials are arranged in a direction orthogonal to the arrangement direction in the arrangement direction, and the second position. The method for manufacturing a stone structure further comprising sequentially forming the lower layer at a third position adjacent to the arrangement direction and sequentially forming the upper layer corresponding to the formation of the lower layer,
The block-shaped first and second stones are connected to each other via a flexible connecting member, and the plurality of subunits are connected to each other while being arranged at predetermined positions. A lower part having a side-by-side structure, and an upper part having a structure in which massive stones are arranged in depressions above the massive stone constituting the lower part, and are arranged close to each other at an end of the lower part. A step of preparing a portion of the stone structure having a depression at the top of the four massive stones;
A step of preparing a plurality of subunits constituted by connecting the massive first and second stone materials to each other via a flexible connecting member as first to third subunits;
The first stone of the first subunit is placed in a depression already formed on the four massive stones arranged in close proximity to each other, and the second stone of the first subunit is placed in the depression. Arranging on the side of one of the second positions in the lower layer;
The first stone material of the second subunit is arranged on the other row side of the second position in the lower layer, and the second stone material of the second subunit is arranged in the third position in the lower layer. Arranging it on one of the columns,
Connecting the connecting member of the first subunit and the connecting member of the second subunit to each other;
The first stone of the third sub-unit is arranged in the other row of the third position in the lower layer, and the second stone of the third sub-unit is already arranged in the first and second positions. Arranging the stone in the upper depression of the stone,
Connecting the connecting member of the second subunit and the connecting member of the third subunit to each other;
A method for producing a stone structure for environmental conservation, comprising:
JP2000302625A 2000-10-02 2000-10-02 Method of manufacturing stone structure for environmental protection Expired - Fee Related JP3554701B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000302625A JP3554701B2 (en) 2000-10-02 2000-10-02 Method of manufacturing stone structure for environmental protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000302625A JP3554701B2 (en) 2000-10-02 2000-10-02 Method of manufacturing stone structure for environmental protection

Publications (2)

Publication Number Publication Date
JP2002105927A JP2002105927A (en) 2002-04-10
JP3554701B2 true JP3554701B2 (en) 2004-08-18

Family

ID=18783946

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000302625A Expired - Fee Related JP3554701B2 (en) 2000-10-02 2000-10-02 Method of manufacturing stone structure for environmental protection

Country Status (1)

Country Link
JP (1) JP3554701B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6656621B2 (en) * 2015-11-25 2020-03-04 株式会社ジョイント Connecting device for hollow block and supporting member used for the device

Also Published As

Publication number Publication date
JP2002105927A (en) 2002-04-10

Similar Documents

Publication Publication Date Title
KR100817471B1 (en) Stone net for river bulkhead and this construction technique
US20180238006A1 (en) Erosion control apparatus
KR20070078318A (en) Fixing structure of constructionthe stone and construction method using thereof
KR101001828B1 (en) Artificial reef for habitation of shellfish and forming sea forest
JP3554701B2 (en) Method of manufacturing stone structure for environmental protection
CN211312402U (en) Liftable ecological reconsitution interface restoration structure
CN107585866A (en) A kind of underwater littoral barrier constructed with celluar concrete and interception and the method for controlling algae
Halide et al. Designing bamboo wave attenuators for mangrove plantations
CN107938592B (en) Ecological transformation structure of linear type urban river
JP3304764B2 (en) Porous block and its construction
JP3566850B2 (en) Floor stop method using pile
KR102276932B1 (en) Revetment block for preventing scour and restoring ecological environment and Revetment structure comprising the same
JPH11303043A (en) Cage-shaped frame body and multi-natural type cage block
KR100762355B1 (en) Structure for constructing a spawning ground block
CN109338988B (en) Single-side wing wall type ecological type spur dike
JP2002330662A (en) Member to be submerged to water bottom and artificial fish shelter, mattress, fishway and bank protection member produced by using the same
KR200413124Y1 (en) Hexapod for prevention against wave abrasion of structure in water
KR100479439B1 (en) A embankment of a triangle barrier and a carrying out method for river
KR200338738Y1 (en) Mode of life block
KR100406812B1 (en) Lattice embankment block
JP2852879B2 (en) River covering block and concrete covering block revetment
JP3357641B2 (en) Revetment block
JP2004027696A (en) Waterside conservation block and its laying method
JP3124733B2 (en) Floor protection block and construction method of the same
CN214116480U (en) Hydraulic slope protection retaining wall duplex structure

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040413

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040510

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees