JP3504411B2 - Bogie holding device for crane with weight bogie - Google Patents

Bogie holding device for crane with weight bogie

Info

Publication number
JP3504411B2
JP3504411B2 JP33074795A JP33074795A JP3504411B2 JP 3504411 B2 JP3504411 B2 JP 3504411B2 JP 33074795 A JP33074795 A JP 33074795A JP 33074795 A JP33074795 A JP 33074795A JP 3504411 B2 JP3504411 B2 JP 3504411B2
Authority
JP
Japan
Prior art keywords
boom
mast
weight
bogie
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP33074795A
Other languages
Japanese (ja)
Other versions
JPH09165191A (en
Inventor
寛 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Construction Crane Co Ltd
Original Assignee
Sumitomo Heavy Industries Construction Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Construction Crane Co Ltd filed Critical Sumitomo Heavy Industries Construction Crane Co Ltd
Priority to JP33074795A priority Critical patent/JP3504411B2/en
Publication of JPH09165191A publication Critical patent/JPH09165191A/en
Application granted granted Critical
Publication of JP3504411B2 publication Critical patent/JP3504411B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明はウエイト台車付クレ
ーンに関するものであり、特に、ブームに吊り下げたフ
ックの荷重に対する本体への負荷とウエイト台車への負
荷のバランスを考慮したウエイト台車付クレーンの台車
保持装置に関するものである。 【0002】 【従来の技術】図3は従来のウエイト台車付クレーン1
を示し、ブーム2及びウインチユニット3を装着した本
体4と、該本体4の後部にウエイト台車5が牽引されて
いる。本体4の前部にはブーム2を前後回動自在に装着
し、ブーム2の後方位置にマストブーム6及びハイマス
ト7が夫々前後回動自在に装着されている。 【0003】前記ブーム3の先端にトップシーブ8及び
ガイドシーブ9を枢着し、各シーブにフックロープ10
を巻回してフック11を吊り下げる。該フックロープ1
0はマストブーム6に設けたガイドシーブ12,13を
経てウインチユニット3へ接続される。 【0004】一方、前記ブーム2の先端後部にブームペ
ンダントロープ14の一端を係止し、該ブームペンダン
トロープ14の他端にブライドル15を連結するととも
にマストブーム6の先端にトップシーブ16を枢着す
る。そして、ブライドル15とベイル17との間にブー
ム起伏ロープ18を巻回し、このブーム起伏ロープ18
を前記トップシーブ16を経てウインチユニット3へ接
続する。 【0005】また、前記マストブーム6の先端にマスト
ペンダントロープ19の一端を係止し、該マストペンダ
ントロープ19の他端にブライドル20を連結するとと
もにハイマスト7の先端にトップシーブ21を枢着す
る。そして、ブライドル20とベイル22との間にマス
ト起伏ロープ23を巻回し、このマスト起伏ロープ23
を前記トップシーブ21を経てウインチユニット3へ接
続する。 【0006】ここで、前記ハイマスト7は前後回動自在
に枢着した門形のストラット24と、このストラット2
4の先端を後方から支承する左右一対のステー25とか
らなり、ステー25は油圧にて伸縮可能となっている。 【0007】更に、前記マストブーム6の先端とウエイ
ト台車5とを懸垂ペンダントロープ26にて接続し、マ
ストブーム6に対する後方への反力をとる。尚、符号2
7はブームバックストップであり、ブーム2が最大角度
を超えないようにブーム2の後面下部を支承している。
また、符号28はマストブームバックストップであり、
マストブーム6の後面下部を支承する。 【0008】図4はフック11に荷重W0 を吊り下げた
ときの作用力を示し、この荷重W0によりブームペンダ
ントロープ14に張力T1 が掛かり、マストブーム6の
回動支点O1 から張力T1 の作用線までの距離をL1
すれば、該回動支点O1 を中心に図中反時計方向へT1
×L1 の回転モーメントが生じる。 【0009】この回転モーメントに釣り合うべく、回動
支点O1 から距離L2 のマスト起伏ロープ23を介して
本体4にP2 ×L2 の負荷が掛かるとともに、回動支点
1から距離L3 の懸垂ペンダントロープ26を介して
ウエイト台車5にP3 ×L3の負荷が掛かる。 【0010】 【発明が解決しようとする課題】従来のウエイト台車付
クレーンは、ブームに吊り下げたフックの荷重を本体と
ウエイト台車とで負担している。クレーン作業時に旋回
する場合や前後進する場合に、地盤が完全に水平であれ
ばウエイト台車は安定して牽引されるが、通常は地盤の
凹凸によりウエイト台車が上下動する。 【0011】該ウエイト台車の上下動によって本体とウ
エイト台車との荷重負担の割合が変動し、例えば、本体
側の負荷が極端に大きくなったときには本体の後部が浮
き上がるなど、安全率が低下して事故発生の虞がある。 【0012】そこで、ウエイト台車付クレーンの本体へ
の負荷とウエイト台車への負荷とのバランスを考慮し、
本体への負荷を少なくして吊り上げ性能並びに安全性を
向上させるために解決すべき技術的課題が生じてくるの
であり、本発明はこの課題を解決することを目的とす
る。 【0013】 【課題を解決するための手段】本発明は上記目的を達成
するために提案されたものであり、ブーム及びウインチ
ユニットを装着した本体と、該本体の後部に牽引される
ウエイト台車とからなり、該本体のブーム後方位置にマ
ストブームを前後回動自在に装着し、ブームの先端とマ
ストブームの先端との間にブーム起伏ロープを巻装して
ウインチユニットへ接続したクレーンに於いて、前記本
体のマストブーム後方位置にハイマストを前後回動自在
に枢着し、該ハイマストの先端をウエイト台車の上方に
位置させるとともに、マストブームの先端とハイマスト
の先端との間にマスト起伏ロープを巻装してウインチユ
ニットへ接続し、更に、ハイマストの先端とウエイト台
車との間にウエイト台車負荷ロープを巻装してウインチ
ユニットへ接続し、前記ブームに吊り下げたフックの荷
重をウエイト台車へ優先的に負荷させるウエイト台車付
クレーンの台車保持装置を提供するものである。 【0014】 【発明の実施の形態】以下、本発明の実施の形態を図面
に従って詳述する。尚、説明の都合上、従来と同一構成
部分には同一符号を付してその説明を省略する。 【0015】図1はウエイト台車付クレーン31を示
し、本体4にはブーム2及びマストブーム6とともにハ
イマスト32を前後回動自在に枢着する。該ハイマスト
32は前後回動自在に枢着した門形のストラット33
と、このストラット33の先端を下方から支承する左右
一対のステー34とからなり、ステー34は油圧にて伸
縮可能となっている。また、従来のハイマストとは異な
り、前記ストラット33は本体4の後方へ延設され、ハ
イマスト32の先端がウエイト台車5の上方に位置して
いる。 【0016】そして、従来と同様に、該ハイマスト32
の先端にトップシーブ21を枢着し、マストブーム6の
先端に係止したマストペンダントロープ19にブライド
ル20を連結するとともに、ブライドル20とベイル2
2との間にマスト起伏ロープ23を巻回し、このマスト
起伏ロープ23を前記トップシーブ21を経てウインチ
ユニット3へ接続する。 【0017】更に、ハイマスト32の先端にウエイト台
車吊り用のシーブ35及び36を吊り下げ、このシーブ
35,36間にウエイト台車負荷ロープ37を巻回して
ウインチユニット3へ接続し、ウエイト台車5に取り付
けられたブラケット38の頂部と前記シーブ36とをリ
ンク39にて連結する。 【0018】このウエイト台車負荷ロープ37の繰り出
し量を調整することにより、ウエイト台車5が地盤から
浮き上がることなく本体4と水平になるように初期セッ
トする。尚、作業中にはウエイト台車負荷ロープ37を
巻上げ下げしない。 【0019】また、前記ハイマスト32のステー34は
油圧にて全長が伸縮するが、油圧によるストロークとは
別にステー34は伸び側へ若干の遊びを有している。通
常はステー34に内蔵されたバネ(図示せず)により、
ステー34が伸び側への遊びを保持したまま圧縮方向へ
付勢されている。 【0020】図2はフック11に荷重W0 を吊り下げた
ときの作用力を示し、この荷重W0によりブームペンダ
ントロープ14に張力T1 が掛かり、マストブーム6の
回動支点O1 から張力T1 の作用線までの距離をL1
すれば、該回動支点O1 を中心に図中反時計方向へT1
×L1 の回転モーメントが生じる。 【0021】この回転モーメントに釣り合うべく、回動
支点O1 から距離L3 のマスト起伏ロープ23にP4 ×
3 の負荷が掛かる。いま、ウエイト台車5の重量をW
1 として、P4 がW1 以下であるときは前記ハイマスト
32のステー34は伸び側への遊びを保持し、前記P4
×L3 の負荷はすべてウエイト台車5に掛かる。 【0022】ここで、P4 がW1 を超えたときはウエイ
ト台車5が地盤から浮き上がろうとするが、前記ハイマ
スト32のステー34が遊び分だけ伸びることによって
ウエイト台車5の荷重負担の不足分を本体4側で受け、
ウエイト台車5の浮き上がりを防止するとともに浮き上
がり量を可及的に低減する。 【0023】即ち、フック11の荷重W0 をウエイト台
車5へ優先的に負荷させ、本体4への負荷を小さくする
ことにより、本体4への荷重負担の割合が極力軽減され
て安全率が高くなる。従って、ウエイト台車付クレーン
31の本体4を大型にすることなく、ウエイト台車5の
重量W1 を増加することにより吊り上げ性能の向上を図
ることができる。 【0024】尚、本発明は、本発明の精神を逸脱しない
限り種々の改変を為すことができ、そして、本発明が該
改変されたものに及ぶことは当然である。 【0025】 【発明の効果】以上説明したように、本発明ではハイマ
ストの先端をウエイト台車の上方に位置させ、ハイマス
トの先端とウエイト台車との間にウエイト台車負荷ロー
プを巻装して双方を連結し、ブームに吊り下げたフック
の荷重をウエイト台車へ優先的に負荷させることによ
り、本体への荷重負担の割合が極力軽減されて安全率が
高くなる。 【0026】斯くして、ウエイト台車付クレーンの本体
を大型にすることなく、吊り上げ性能を向上できるとと
もに安全性の確保にも寄与できる。
Description: BACKGROUND OF THE INVENTION [0001] 1. Field of the Invention [0002] The present invention relates to a crane with a weight bogie, and more particularly to a load on a main body and a load on a weight bogie with respect to a load of a hook suspended from a boom. The present invention relates to a bogie holding device for a crane with a weight bogie taking into account the balance of the bogies. FIG. 3 shows a conventional crane 1 with a weight cart.
The main body 4 on which the boom 2 and the winch unit 3 are mounted, and a weight carriage 5 is pulled by a rear portion of the main body 4. A boom 2 is mounted on the front part of the main body 4 so as to be able to rotate back and forth, and a mast boom 6 and a high mast 7 are mounted at a rear position of the boom 2 so as to be able to rotate back and forth. A top sheave 8 and a guide sheave 9 are pivotally connected to the end of the boom 3 and a hook rope 10 is attached to each sheave.
And the hook 11 is hung. The hook rope 1
Reference numeral 0 is connected to the winch unit 3 via guide sheaves 12 and 13 provided on the mast boom 6. On the other hand, one end of a boom pendant rope 14 is locked at the rear end of the boom 2, a bridle 15 is connected to the other end of the boom pendant rope 14, and a top sheave 16 is pivotally connected to the end of a mast boom 6. I do. Then, a boom hoisting rope 18 is wound between the bridle 15 and the bail 17, and the boom hoisting rope 18 is wound.
Is connected to the winch unit 3 via the top sheave 16. Further, one end of a mast pendant rope 19 is locked at the tip of the mast boom 6, a bridle 20 is connected to the other end of the mast pendant rope 19, and a top sheave 21 is pivotally attached to the tip of the high mast 7. . Then, a mast hoisting rope 23 is wound between the bridle 20 and the bail 22, and the mast hoisting rope 23 is wound.
Is connected to the winch unit 3 via the top sheave 21. Here, the high mast 7 is composed of a gate-shaped strut 24 pivotally attached to the front and rear rotatable, and the strut 2
4 comprises a pair of left and right stays 25 for supporting the tip of the back from the rear, and the stays 25 can be expanded and contracted by hydraulic pressure. Further, the tip of the mast boom 6 and the weight carriage 5 are connected by a suspension pendant rope 26, and a rearward reaction force to the mast boom 6 is taken. Note that reference numeral 2
Reference numeral 7 denotes a boom backstop, which supports a lower rear portion of the boom 2 so that the boom 2 does not exceed the maximum angle.
Reference numeral 28 is a mast boom backstop,
The lower rear part of the mast boom 6 is supported. FIG. 4 shows the acting force when a load W 0 is hung on the hook 11. The load W 0 causes a tension T 1 to be applied to the boom pendant rope 14, and the tension T 1 is applied from the rotation fulcrum O 1 of the mast boom 6. Assuming that the distance to the line of action of T 1 is L 1 , T 1 moves counterclockwise around the rotation fulcrum O 1 in the figure.
Rotation moment × L 1 occurs. [0009] To balance the rotation moment, with load of P 2 × L 2 is applied to the main body 4 through the mast hoist cable 23 a distance L 2 from the pivot point O 1, the distance L 3 from the rotation fulcrum O 1 A load of P 3 × L 3 is applied to the weight cart 5 via the suspension pendant rope 26 of FIG. [0010] In the conventional crane with a weight cart, the load of the hook suspended from the boom is borne by the main body and the weight cart. When turning or moving forward and backward during a crane operation, the weight bogie is pulled stably if the ground is completely horizontal, but usually the weight bogie moves up and down due to unevenness of the ground. The ratio of the load burden between the main body and the weight carriage fluctuates due to the vertical movement of the weight carriage. For example, when the load on the main body side becomes extremely large, the safety factor decreases, for example, the rear portion of the main body rises. There is a risk of an accident. Therefore, taking into account the balance between the load on the body of the crane with the weight trolley and the load on the weight trolley,
A technical problem to be solved arises in order to improve the lifting performance and safety by reducing the load on the main body, and an object of the present invention is to solve this problem. [0013] The present invention has been proposed to achieve the above object, and has a main body on which a boom and a winch unit are mounted, and a weight cart pulled by a rear portion of the main body. A crane in which a mast boom is attached to the boom rear position of the main body so as to be rotatable back and forth, and a boom hoisting rope is wound between a tip of the boom and a tip of the mast boom and connected to a winch unit. A high mast is pivotally attached to the mast boom rear position of the main body so that the high mast can be pivoted back and forth, and a tip of the high mast is located above the weight cart, and a mast hoisting rope is provided between the tip of the mast boom and the tip of the high mast. Wind and connect it to the winch unit.Furthermore, wind the weight bogie load rope between the tip of the high mast and the weight bogie to winch unit. The present invention is to provide a bogie holding device for a crane with a weight bogie, which is connected to a wagon and which preferentially loads the weight of the hook suspended from the boom to the weight bogie. Embodiments of the present invention will be described below in detail with reference to the drawings. For convenience of explanation, the same components as those of the related art are denoted by the same reference numerals, and description thereof will be omitted. FIG. 1 shows a crane 31 with a weight trolley. A high mast 32 is pivotally attached to a main body 4 together with a boom 2 and a mast boom 6 so as to be rotatable back and forth. The high mast 32 has a gate-shaped strut 33 pivotally attached to the front and rear.
And a pair of left and right stays 34 for supporting the tip of the strut 33 from below, and the stay 34 is hydraulically extendable. Also, unlike the conventional high mast, the strut 33 extends rearward of the main body 4, and the tip of the high mast 32 is located above the weight carriage 5. Then, as in the prior art, the high mast 32
A top sheave 21 is pivotally attached to the tip of the mast boom 6 and a bridle 20 is connected to a mast pendant rope 19 locked at the tip of the mast boom 6.
The mast hoisting rope 23 is wound between the top sheave 21 and the winch unit 3 via the top sheave 21. Furthermore, sheaves 35 and 36 for suspending a weight cart are suspended from the end of the high mast 32, and a weight cart load rope 37 is wound between the sheaves 35 and 36 and connected to the winch unit 3. The top of the attached bracket 38 and the sheave 36 are connected by a link 39. By adjusting the extension of the weight bogie load rope 37, the weight bogie 5 is initially set so as to be horizontal with the main body 4 without being lifted from the ground. During the operation, the weight bogie load rope 37 is not hoisted down. The length of the stay 34 of the high mast 32 expands and contracts by hydraulic pressure, but the stay 34 has a slight play on the extension side apart from the stroke by hydraulic pressure. Normally, a spring (not shown) built in the stay 34
The stay 34 is urged in the compression direction while maintaining play on the extension side. FIG. 2 shows the acting force when a load W 0 is hung on the hook 11. The load W 0 applies a tension T 1 to the boom pendant rope 14, and the tension T 1 is applied from the pivot O 1 of the mast boom 6. Assuming that the distance to the line of action of T 1 is L 1 , T 1 moves counterclockwise around the rotation fulcrum O 1 in the figure.
Rotation moment × L 1 occurs. In order to balance this rotational moment, the mast hoisting rope 23 at a distance L 3 from the pivot O 1 is P 4 ×
Load of L 3 is applied. Now, the weight of the weight cart 5 is W
As 1, the stay 34 of the Haimasuto 32 when P 4 is W 1 or less holds the play to the extension side, the P 4
All × load of L 3 is applied to the weight carriage 5. Here, when P 4 exceeds W 1 , the weight cart 5 tends to rise from the ground, but the stay 34 of the high mast 32 is extended by a play, so that the weight load of the weight cart 5 is insufficient. Minutes are received on the body 4 side,
The lifting of the weight cart 5 is prevented, and the lifting amount is reduced as much as possible. That is, the load W 0 of the hook 11 is preferentially applied to the weight carriage 5 and the load applied to the main body 4 is reduced, so that the ratio of the load applied to the main body 4 is reduced as much as possible and the safety factor is increased. Become. Therefore, it is possible to improve without the body 4 of the weight truck with crane 31 large, lifting by increasing the weight W 1 of the weight carriage 5 performance. The present invention can be variously modified without departing from the spirit of the present invention, and it goes without saying that the present invention extends to the modified ones. As described above, in the present invention, the tip of the high mast is located above the weight bogie, and the weight bogie load rope is wrapped between the tip of the high mast and the weight bogie to connect both ends. By preferentially applying the load of the hooks connected and suspended on the boom to the weight cart, the ratio of the load burden on the main body is reduced as much as possible, and the safety factor is increased. Thus, the lifting performance can be improved and the safety can be ensured without increasing the size of the body of the crane with the weight cart.

【図面の簡単な説明】 【図1】本発明の実施の形態を示し、ウエイト台車付ク
レーンの側面図。 【図2】荷重を吊り下げたときの作用力を示す解説図。 【図3】従来のウエイト台車付クレーンの側面図。 【図4】従来のウエイト台車付クレーンに荷重を吊り下
げたときの作用力を示す解説図。 【符号の説明】 2 ブーム 3 ウインチユニット 4 本体 5 ウエイト台車 6 マストブーム 11 フック 18 ブーム起伏ロープ 23 マスト起伏ロープ 31 ウエイト台車付クレーン 32 ハイマスト 33 ストラット 34 ステー 37 ウエイト台車負荷ロープ
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an embodiment of the present invention and is a side view of a crane with a weight cart. FIG. 2 is an explanatory diagram showing an acting force when a load is suspended. FIG. 3 is a side view of a conventional crane with a weight cart. FIG. 4 is an explanatory diagram showing an acting force when a load is suspended on a conventional crane with a weight cart. [Description of Signs] 2 Boom 3 Winch unit 4 Main body 5 Weight bogie 6 Mast boom 11 Hook 18 Boom hoisting rope 23 Mast hoisting rope 31 Crane with weight bogie 32 High mast 33 Strut 34 Stay 37 Weight bogie load rope

フロントページの続き (56)参考文献 特開 昭51−132567(JP,A) 特開 昭60−262792(JP,A) 特開 昭61−203095(JP,A) 特開 昭56−65794(JP,A) 特開 平7−149498(JP,A) 実開 昭48−66264(JP,U) 実開 昭59−26494(JP,U) 特公 昭60−39639(JP,B2) 実公 昭55−44870(JP,Y2) (58)調査した分野(Int.Cl.7,DB名) B66C 23/00 - 23/94 Continuation of the front page (56) References JP-A-51-132567 (JP, A) JP-A-60-262792 (JP, A) JP-A-61-203095 (JP, A) JP-A-56-65794 (JP) JP-A-7-149498 (JP, A) JP-A-48-66264 (JP, U) JP-A-59-26494 (JP, U) JP-B-60-39639 (JP, B2) 55-44870 (JP, Y2) (58) Field surveyed (Int. Cl. 7 , DB name) B66C 23/00-23/94

Claims (1)

(57)【特許請求の範囲】 【請求項1】 ブーム及びウインチユニットを装着した
本体と、該本体の後部に牽引されるウエイト台車とから
なり、該本体のブーム後方位置にマストブームを前後回
動自在に装着し、ブームの先端とマストブームの先端と
の間にブーム起伏ロープを巻装してウインチユニットへ
接続したクレーンに於いて、前記本体のマストブーム後
方位置にハイマストを前後回動自在に枢着し、該ハイマ
ストの先端をウエイト台車の上方に位置させるととも
に、マストブームの先端とハイマストの先端との間にマ
スト起伏ロープを巻装してウインチユニットへ接続し、
更に、ハイマストの先端とウエイト台車との間にウエイ
ト台車負荷ロープを巻装してウインチユニットへ接続
し、前記ブームに吊り下げたフックの荷重をウエイト台
車へ優先的に負荷させることを特徴とするウエイト台車
付クレーンの台車保持装置。
(57) [Claims 1] A main body on which a boom and a winch unit are mounted, and a weight cart pulled by a rear portion of the main body, and a mast boom is moved back and forth at a position behind the boom of the main body. In a crane that is movably mounted and has a boom hoisting rope wrapped between the end of the boom and the end of the mast boom and is connected to the winch unit, the high mast can be rotated back and forth at the mast boom rear position of the main body. Pivotally attached to the mast boom, and the mast hoisting rope is wound between the mast boom tip and the high mast tip and connected to the winch unit.
Furthermore, a weight bogie load rope is wound between the tip of the high mast and the weight bogie, connected to the winch unit, and the load of the hook suspended from the boom is preferentially applied to the weight bogie. Bogie holding device for crane with weight bogie.
JP33074795A 1995-12-19 1995-12-19 Bogie holding device for crane with weight bogie Expired - Fee Related JP3504411B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33074795A JP3504411B2 (en) 1995-12-19 1995-12-19 Bogie holding device for crane with weight bogie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33074795A JP3504411B2 (en) 1995-12-19 1995-12-19 Bogie holding device for crane with weight bogie

Publications (2)

Publication Number Publication Date
JPH09165191A JPH09165191A (en) 1997-06-24
JP3504411B2 true JP3504411B2 (en) 2004-03-08

Family

ID=18236107

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33074795A Expired - Fee Related JP3504411B2 (en) 1995-12-19 1995-12-19 Bogie holding device for crane with weight bogie

Country Status (1)

Country Link
JP (1) JP3504411B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8783477B2 (en) * 2009-10-08 2014-07-22 Caterpillar Inc. Lightweight high-performance pipelayer
KR101662893B1 (en) * 2014-08-07 2016-10-06 두산중공업 주식회사 Plant products moving apparatus
JP7031315B2 (en) 2018-01-12 2022-03-08 コベルコ建機株式会社 Height adjustment assist device, crane equipped with this and height adjustment method

Also Published As

Publication number Publication date
JPH09165191A (en) 1997-06-24

Similar Documents

Publication Publication Date Title
EP2492235B1 (en) Method of assembling a mobile lift crane
US7762412B2 (en) Mast raising structure and process for high-capacity mobile lift crane
JP4455828B2 (en) Crane with self-lifting mast
JPS61203095A (en) Counterbalance type crane
JP3504411B2 (en) Bogie holding device for crane with weight bogie
JP5649870B2 (en) Mobile crane
JPS6241192A (en) Counterbalance crane
JPS59133195A (en) Hoist
JP2820912B2 (en) Crane boom hoist
JP2726239B2 (en) Assembling method of rear post supporting cable in jib crane
JP4422845B2 (en) Counterweight mounting method and frame support means
JP2823825B2 (en) Crane boom hoist
JP3399356B2 (en) crane
JPH09136789A (en) Boom pulling-up device for traveling crane with weight truck
JP4940619B2 (en) Self-propelled crane
JP2000118952A (en) Crane device
JPH09165192A (en) Boom derricking device of crane provided with weight truck
JP4625163B2 (en) Mobile crane hoisting cylinder load reduction device
JP4674938B2 (en) Jib crane
JP2872959B2 (en) Balance control device for crane with weight bogie
JP7111130B2 (en) Jib mooring device and jib mooring method
CN220223341U (en) Sling structure with anti-shaking function
JP2000118957A (en) Crane jib flap preventive device
JPH09136790A (en) Boom hoisting device for crane
JPS6127907Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20031209

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031210

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees