JP3486134B2 - Competition net - Google Patents

Competition net

Info

Publication number
JP3486134B2
JP3486134B2 JP15834099A JP15834099A JP3486134B2 JP 3486134 B2 JP3486134 B2 JP 3486134B2 JP 15834099 A JP15834099 A JP 15834099A JP 15834099 A JP15834099 A JP 15834099A JP 3486134 B2 JP3486134 B2 JP 3486134B2
Authority
JP
Japan
Prior art keywords
rope
net
insertion hole
stretchable
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP15834099A
Other languages
Japanese (ja)
Other versions
JP2000342734A (en
Inventor
幸則 永尾
政行 田中
雅昭 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Molten Corp
Original Assignee
Molten Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Molten Corp filed Critical Molten Corp
Priority to JP15834099A priority Critical patent/JP3486134B2/en
Publication of JP2000342734A publication Critical patent/JP2000342734A/en
Application granted granted Critical
Publication of JP3486134B2 publication Critical patent/JP3486134B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、ソフトバレーボー
ル競技等のネットとして好適な競技用ネットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a game net suitable as a net for soft volleyball games and the like.

【0002】[0002]

【従来の技術】ソフトバレーボール或いはミニソフトバ
レーボール競技は、バドミントンのコートと同一の大き
さのコートが使用され、ネットもまたバドミントン競技
用ネットと同等のものが使用される。ネットはコートを
挟んで設置された2本の支柱間に、所定の高さ(2m)
に張り渡されて支持される。ネットを支持するロープと
して、通常ナイロン製ロープが使用されることが多く、
支柱への取付けに際してはロープの両端を支柱の引っ掛
け部に引っ掛け結びつけられる。ロープの素材を開示し
た公報として例えば実開昭61−111468号公報が
ある。この公報には、通常ワイヤーロープは金属線が使
用されていること、及びこの考案では、特殊なワイヤー
ロープ(超延伸ポリオキシメチレンで形成されたロー
プ)を使用することにより、引張強度及び耐久性が向上
する旨記載されている。なおバレーボール競技用ネット
においては、金属製ワイヤーロープが使用されることが
多い。
2. Description of the Related Art In a soft volleyball or mini soft volleyball game, a court having the same size as a badminton court is used, and a net equivalent to a badminton net is used. The net is a certain height (2m) between two stanchions installed across the coat.
Is stretched over and supported. Nylon rope is often used as the rope that supports the net,
Both ends of the rope are hooked and tied to the hooks of the column when it is attached to the column. For example, Japanese Utility Model Laid-Open No. 61-111468 discloses a rope material. In this publication, a metal wire is usually used as the wire rope, and in this invention, by using a special wire rope (rope made of ultra-stretched polyoxymethylene), tensile strength and durability are improved. Will be improved. Note that metal wire ropes are often used in nets for volleyball competitions.

【0003】[0003]

【発明が解決しようとする課題】従来金属線ワイヤーロ
ープ或いはナイロン製ロープ等を使用したネットでは、
これを支柱間に張り渡す際、かなり強く引っ張った状態
で、ロープ端部を支柱に引っ掛け或いは支柱に結びつけ
るという作業が必要であり、緩みなく張り渡すには大人
の強い力でなければ難しいという問題がある。
DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention In the conventional net using a metal wire wire rope or a nylon rope,
When this is stretched between the columns, it is necessary to hook the rope end part to the column or tie it to the column while pulling it fairly strongly, and it is difficult to stretch it without looseness unless it is a strong adult force. There is.

【0004】また競技中、緩みなく張ったネットに選手
の手がかかり、ネットを張ったロープに強い引張力が加
わった場合、この力がそのまま支柱に加わり、特に床面
に載置されただけの可動式支柱の場合、これが倒れるお
それがある。
Also, during the competition, when the player's hand is caught on the stretched net and a strong tensile force is applied to the rope stretched on the net, this force is directly applied to the support pillars, in particular, it is placed on the floor surface. In the case of the movable support column, it may fall down.

【0005】本発明は、かかる事情に鑑みてなされたも
ので、ネットを常にピンと張った状態を維持でき、かつ
ネットに力が加わっても、これを吸収することができる
競技用ネットを提供するものである。また本発明は、ネ
ット張設作業を簡単に行うことができる競技用ネットを
提供するものである。
The present invention has been made in view of the above circumstances, and provides a competition net which can maintain the net in a taut state at all times and can absorb the net even when a force is applied to the net. It is a thing. Further, the present invention provides a net for competitions, which enables the net laying work to be performed easily.

【0006】[0006]

【課題を解決するための手段】本発明(請求項1)は、
上辺にロープ挿通孔を有するネット本体と、上記挿通孔
に挿通され、上記ネット本体を2本の支柱間に支持する
ためのロープとを有する競技用ネットにおいて、上記ロ
ープが弾性伸縮する伸縮部と非伸縮部よりなり、上記伸
縮部が上記挿通孔適所に位置せしめられるとともに、上
記伸縮部が位置する上記挿孔に、該挿通孔を開く開閉部
が形成されてなるものである。かかる構成において、ネ
ットに選手の手が引っ掛かり或いは体の一部が接触した
場合、その力はロープの伸縮部に加わり、これを弾性伸
長させて吸収、緩和する。またかかる構成により、ボー
ル或いは選手の手がネット上辺に当たったとき、上辺挿
通孔内のロープが伸び、ネット本体はこれに応じて変形
する。さらにかかる構成において、伸縮部の交換時、或
いは非伸縮部の長さを調節すべく、伸縮部と非伸縮部の
結び目を解き、これを結び直す際、開閉部が開かれ、か
かる作業がなされる。
The present invention (Claim 1) includes:
In a competition net having a net main body having a rope insertion hole on the upper side and a rope inserted into the insertion hole and supporting the net main body between two struts, an elastic portion in which the rope elastically expands and contracts, Consisting of non-stretchable parts ,
The crimped part is positioned at the appropriate place of the insertion hole, and
An opening / closing part that opens the insertion hole in the insertion hole where the expansion / contraction part is located
Are formed. In such a configuration, when the player's hand is caught in the net or a part of the body comes into contact with the net, the force is applied to the stretchable portion of the rope and elastically stretched to absorb and relax it. With this configuration, the bow
When the hand of the player or player hits the top of the net, insert the top
The rope in the through hole stretches and the net body deforms accordingly.
To do. Further, in such a structure, when the expansion / contraction part is replaced, or
In order to adjust the length of the non-stretchable part,
When you untie and retie the knot, the opening and closing
Light work is done.

【0007】[0007]

【0008】[0008]

【0009】本発明(請求項)にあっては、上記伸縮
部が位置する上記挿通孔に、上記伸縮部の上記開閉部か
らの移動を阻止する第1阻止手段を設けてなるものであ
る。かかる構成において、伸縮部は、開閉部から離れて
移動することができず、常に開閉部に位置することとな
る。
According to the present invention (claim 2 ), the insertion hole in which the expansion / contraction part is located is provided with a first prevention means for preventing the expansion / contraction part from moving from the opening / closing part. . In such a configuration, the expansion / contraction part cannot move away from the opening / closing part, and is always located in the opening / closing part.

【0010】本発明(請求項)にあっては、上記ロー
プが、上記挿通孔に挿通され、上記伸縮部を有するロー
プと、該ロープの両端に連結手段を介して連結されると
ともに上記支柱に取りつけられる2本の支柱ロープとか
らなるものである。かかる構成において、ネット本体の
挿通孔に通されたロープは、伸縮部が伸長された状態
で、その両端がネット本体の両サイドに位置し、支柱に
掛けられた支柱ロープの上端に、連結手段にて連結され
る。支柱ロープの下端は、支柱に固定される。
In the present invention (Claim 3 ), the rope is inserted into the insertion hole, is connected to the rope having the expansion and contraction portion, and is connected to both ends of the rope through connecting means, and the strut is also provided. It consists of two support ropes attached to the. In such a structure, the rope passed through the insertion hole of the net body has both ends thereof located on both sides of the net body in a state where the expansion and contraction portion is extended, and the connecting means is connected to the upper end of the pillar rope hung on the pillar. Will be connected at. The lower end of the column rope is fixed to the column.

【0011】本発明(請求項)にあっては、上記ロー
プの両端に、該ロープの端部が上記挿通孔内に入ること
を阻止する第2阻止手段を設けてなるものである。かか
る構成において、ロープは、伸縮部が非伸長状態にある
とき或いはロープ自体の移動により、ロープの端部がネ
ット本体の挿通孔内にはいるおそれが生じたとき、第2
阻止手段はかかるロープ端部の挿通孔内へ入ることを阻
止する。
According to the present invention (claim 4 ), the second blocking means for blocking the ends of the rope from entering the insertion hole is provided at both ends of the rope. In such a structure, the rope can be moved to the second position when the stretchable portion is in the non-stretched state or when the movement of the rope itself causes the end portion of the rope to enter the insertion hole of the net body.
The blocking means blocks entry into the insertion hole at the end of the rope.

【0012】[0012]

【0013】[0013]

【0014】[0014]

【0015】[0015]

【0016】[0016]

【発明の実施の形態】図1において、1は、ソフトバレ
ーボール用ネットで、ネット本体2とロープ3よりな
る。4は、ネット本体2の上辺5に形成された挿通孔
で、白色布の上端を折り返し下端を縫い合わせて構成さ
れる。6,7は、同様の白色布よりなる下辺及び側辺で
ある。8は、上下辺5,6及び側辺7にて囲まれた矩形
領域に張り渡された網目部分である。ロープ3は、非伸
縮部9と伸縮部10よりなり、非伸縮部9としてナイロ
ン製ロープが、伸縮部10としてゴムバンド又はコイル
スプリングが使用できる。図では、伸縮部10としてリ
ング状ゴムバンドを使用した場合を示す。ゴムバンド
は、リング状のほか、紐状のものも使用できる。非伸縮
部9としては、上記ロープのほか金属製ワイヤーロー
プ、天然繊維或いは化学繊維よりなる紐が使用できる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIG. 1, reference numeral 1 is a net for soft volleyball, which comprises a net body 2 and a rope 3. Reference numeral 4 is an insertion hole formed in the upper side 5 of the net body 2, which is formed by folding the upper end of white cloth and sewing the lower end together. Reference numerals 6 and 7 are lower and side edges made of the same white cloth. Reference numeral 8 is a mesh portion stretched over a rectangular area surrounded by the upper and lower sides 5, 6 and the side edge 7. The rope 3 includes a non-expandable portion 9 and an extendable portion 10. A nylon rope can be used as the non-expandable portion 9 and a rubber band or a coil spring can be used as the extendable portion 10. In the figure, a case where a ring-shaped rubber band is used as the elastic portion 10 is shown. The rubber band may be a ring-shaped one or a string-shaped one. As the non-stretchable portion 9, in addition to the above rope, a metal wire rope, a string made of natural fiber or chemical fiber can be used.

【0017】 伸縮部10は、ネット本体2の一端側(図
示例では左側)近傍に位置せしめられている。すなわ
ち、ロープ3は、挿通孔4内において、図中左から、短
い非伸縮部9、伸縮部10、長い非伸縮部9の順で連結
されている。伸縮部10と右側の長い非伸縮部9とは、
手で結び或いは解くことができる構造とされ、結び目1
1が形成される。その他の部分は金属管により固く結合
されている。一部を手で解く構造としたのは、ロープ3
全体の長さをネット本体2の幅に応じて変更できるよう
にするためである。12,12は、ロープ3の両端に取
りつけられた金属製自在継手である。
The elastic portion 10 is located near one end side (left side in the illustrated example) of the net body 2. That is, the rope 3 is connected in the insertion hole 4 in the order of the short non-stretchable portion 9, the stretchable portion 10, and the long non-stretchable portion 9 from the left in the figure. The stretchable portion 10 and the long non-stretchable portion 9 on the right side are
It has a structure that can be tied or untied by hand, and the knot 1
1 is formed. The other parts are firmly connected by a metal tube. Rope 3 has a structure in which a part of it is unwound.
This is because the entire length can be changed according to the width of the net body 2. Reference numerals 12 and 12 denote metal universal joints attached to both ends of the rope 3.

【0018】 13は、伸縮部10が位置するネット本体
2の挿通孔4部分に形成された開閉部で、この部分は上
辺5の下端が縫い合わされていず、内面に面状ファスナ
ー14が取りつけられている。したがって、この部分は
開くことができる。図1は、開いた状態を示す。15
は、この開閉部13の図中右端に形成された第1阻止手
段で、上辺5を矩形状に縫い合わせて挿通孔4を狭くし
ている。この挿通孔4の狭い部分を、伸縮部10と非伸
縮部9の結び目11は通り抜けることができないのであ
る。
Reference numeral 13 denotes an opening / closing portion formed in the insertion hole 4 portion of the net body 2 in which the expansion / contraction portion 10 is located. In this portion, the lower end of the upper side 5 is not sewn together, and the planar fastener 14 is attached to the inner surface. ing. Therefore, this part can be opened. FIG. 1 shows the opened state. 15
Is a first blocking means formed at the right end of the opening / closing part 13 in the figure, and the upper side 5 is sewn into a rectangular shape to narrow the insertion hole 4. The knot 11 between the stretchable portion 10 and the non-stretchable portion 9 cannot pass through the narrow portion of the insertion hole 4.

【0019】 第1阻止手段15を設け、かつ伸縮部10
が位置する部分の挿通孔4に開閉部13を設けたのは、
伸縮部10が切断したとき、これを交換しやすくし、或
いは結び目11を結び直すためである。すなわち、伸縮
部10が切断した場合、結び目11が第1阻止手段15
にて止められ、これ以上挿通孔4内(図中右側)に入り
込むことはないから、開閉部13を開くことによって、
これを容易に取り出すことができるのである。
[0019] provided with the first blocking means 15, and stretchable portion 10
The opening / closing part 13 is provided in the insertion hole 4 at the position where
This is because when the elastic portion 10 is cut, it can be easily replaced or the knot 11 can be rewound. That is, when the stretchable portion 10 is cut, the knot 11 becomes the first blocking means 15.
Since it does not enter the inside of the insertion hole 4 (right side in the drawing) any more, by opening the opening / closing part 13,
This can be taken out easily.

【0020】 16,16は、継手12,12が、挿通孔
4内に入ることを阻止する第2阻止手段で、短い紐(長
さ約5cm)よりなり、その一端が継手12,12に、
他端が上辺5端部に鳩目にて形成された開口17,17
に繋がれている。18は、ネット本体2を支柱に固定す
るための接続部材で、ゴムバンド19及びその先端と側
辺に形成された面状ファスナー部分20よりなり、ネッ
ト本体2の側辺7に各3本、ほぼ等間隔で設けられてい
る。このファスナー部分20は、後述する支柱を巻い
て、ネット側辺7に閉じられる。
Reference numerals 16 and 16 denote second blocking means for blocking the joints 12 and 12 from entering the insertion hole 4, and are made of a short string (about 5 cm in length), one end of which is connected to the joints 12 and 12.
The other end has openings 17, 17 formed by eyelets at the end of the upper side 5.
Connected to. Reference numeral 18 denotes a connecting member for fixing the net body 2 to the support column, which is composed of a rubber band 19 and a planar fastener portion 20 formed on the tip and side edges thereof, and three side edges 7 of the net body 2 each. They are provided at approximately equal intervals. The fastener portion 20 is wound around a post described later and is closed to the net side edge 7.

【0021】 ここで寸法の一例をあげると、ネット本体
2の幅は、600cm,高さ80cm,伸縮部10は、
ロープ3の一方の端(図示の例では左端)から20cm
内側に接続されている(すなわち非伸縮部の長さが20
cm)。伸縮部10の長さは、40cm(非伸長時)、
図中右側の長い方の非伸縮部9の長さは、525cmで
あり、ロープの全体の長さは585cmとなる。この長
さは、ネット本体2の幅よりも短い。すなわち伸縮部1
0が引っ張られて伸び、適度な引張力が与えられた状態
で、ネット本体2の幅に等しくなるよう設定される。第
1阻止手段15の位置は、ネット1の端からlm,この
部分の挿通孔4の幅は、lcmとすることができる。上
辺5の幅、すなわち挿通孔の幅は、7cm、下辺6及び
側辺7のの幅も同様に7cmである。
[0021] As an example of where the size, the width of the net body 2, 600 cm, height 80 cm, telescoping portion 10,
20 cm from one end of the rope 3 (left end in the illustrated example)
It is connected to the inside (that is, the length of the non-stretchable part is 20
cm). The length of the stretchable portion 10 is 40 cm (when not stretched),
The length of the longer non-stretchable portion 9 on the right side in the figure is 525 cm, and the total length of the rope is 585 cm. This length is shorter than the width of the net body 2. That is, the expandable part 1
It is set to be equal to the width of the net main body 2 in a state where 0 is stretched and stretched and an appropriate tensile force is applied. The position of the first blocking means 15 may be lm from the end of the net 1, and the width of the insertion hole 4 in this portion may be 1 cm. The width of the upper side 5, that is, the width of the insertion hole is 7 cm, and the widths of the lower side 6 and the side side 7 are also 7 cm.

【0022】 図2,3は、可動構造を有する支柱21,
21にネット1を張った場合を示す。支柱21は、金属
パイプよりなる上部支柱22及び下部支柱23にて構成
され、上部支柱22が下部支柱23に嵌装され、高さ調
整ピン24を介して、上部支柱22の高さが調整され
る。通常、ソフトバレーボール競技では、ネット1の上
辺5の高さは、一般成人用が2m、小学生では、2m,
1.8m,1.5m,1.2m等異なる高さに設定され
る。25は、上部支柱22の上端に形成された金属製リ
ングで、ロープ3両端の継手12が連結される。
[0022] FIGS. 2 and 3, strut 21 having a movable structure,
21 shows the case where the net 1 is set up. The support column 21 is composed of an upper support column 22 and a lower support column 23 made of a metal pipe, the upper support column 22 is fitted to the lower support column 23, and the height of the upper support column 22 is adjusted via a height adjusting pin 24. It Normally, in soft volleyball competitions, the height of the upper side 5 of the net 1 is 2 m for general adults and 2 m for elementary school students.
Different heights such as 1.8m, 1.5m, 1.2m are set. Reference numeral 25 denotes a metal ring formed on the upper end of the upper support column 22, to which the joints 12 at both ends of the rope 3 are connected.

【0023】 26は、下部支柱23の下端付近におい
て、下部支柱23に水平方向に固定されたベース、27
は、このべース26上に載置されたウェイト、28,2
9は、べース26下方に取りつけられたキャスター、3
0は支柱下端に取りつけられたゴムストッパーである。
ゴムストッパー30側のキャスター28は2個、外側の
キャスター29は1個で構成され、ベース26の安定な
状態とされている。ウェイト27の重心Gは、キャスタ
ー28の上方にあり、支柱21に何ら荷重が加わらない
ときは、軽く手で押すことにより、2種のキャスター2
8,29は、ともに床面31に接地させることができ、
かつこのとき支柱21のゴムストッパー30は床面31
から離れており、したがって、キャスター28,29の
転動により支柱21は床面31上を容易に移動できる。
Reference numeral 26 is a base fixed horizontally to the lower support column 23 near the lower end of the lower support column 23.
Is a weight placed on the base 26, 28, 2
9 is a caster mounted below the base 26, 3
Reference numeral 0 is a rubber stopper attached to the lower end of the column.
Two casters 28 on the rubber stopper 30 side and one caster 29 on the outer side are formed, so that the base 26 is in a stable state. The center of gravity G of the weight 27 is located above the casters 28, and when no load is applied to the support columns 21, the weight 27 is lightly pushed by the two casters 2.
Both 8 and 29 can be grounded to the floor surface 31,
And at this time, the rubber stopper 30 of the column 21 is on the floor 31.
Therefore, the columns 21 can easily move on the floor surface 31 by the rolling of the casters 28 and 29.

【0024】 他方、支柱21にネット1を張り、その重
量及び引張力により、例えば右側(図中)の支柱21
に、左方へ引っ張る力が加わったときは、ベース26及
びウェイト27はキャスター28を中心に左方向へ回動
し、支柱21のゴムストッパー30が床面31にあた
り、外側のキャスター29は宙に浮く。かくして支柱2
1は床面31に固定される。32は、ベース26及びウ
ェイト27を被覆する保護カバーである。
[0024] On the other hand, post tension the net 1 to the column 21 by its weight and tensile strength, for example, the right side (in the drawing) 21
When a pulling force is applied to the left, the base 26 and the weight 27 rotate leftward around the casters 28, the rubber stoppers 30 of the support columns 21 come into contact with the floor surface 31, and the outer casters 29 are suspended in the air. float. Thus supporting column 2
1 is fixed to the floor 31. Reference numeral 32 is a protective cover that covers the base 26 and the weight 27.

【0025】 かかる支柱21を使用してこれにネット1
を張る際には、上部支柱22を低くし、かつ2本の支柱
21を近寄らせた状態で、上辺5の挿通孔4に通したロ
ープ3の両端の継手12を各上部支柱22上端のリング
25に連結し、上方の接続部材18を上部支柱22に巻
く。次いで、上部支柱22を上方へ伸ばし、所定の高さ
として高さ調整ピン24で固定する。他の接続部材18
を上部支柱22に巻く。2本の支柱21,21間を拡
げ、コートサイドの所定位置にて停止させる。このと
き、ロープ3は引っ張られ、伸縮部10が弾性的に伸長
し、かつ接続部材18もゴムバンド部分19が弾性的に
伸び、ネット1は支柱21,21間にピンと張られる。
かかる作業は、背の低い小学生児童でも簡単に行うこと
ができる。
A net 1 is attached to this using the support column 21.
At the time of stretching, the upper strut 22 is lowered and the two strut 21 are brought close to each other, and the joints 12 at both ends of the rope 3 which are passed through the insertion holes 4 of the upper side 5 are connected to the ring at the upper end of each upper strut 22. 25, and the upper connecting member 18 is wound around the upper strut 22. Next, the upper support column 22 is extended upward and fixed with a height adjusting pin 24 to a predetermined height. Other connection member 18
Is wound on the upper column 22. The space between the two columns 21 and 21 is expanded and stopped at a predetermined position on the court side. At this time, the rope 3 is pulled, the expansion / contraction portion 10 elastically extends, and the rubber band portion 19 of the connecting member 18 also elastically extends, so that the net 1 is tensioned between the columns 21 and 21.
Such work can be easily performed even by short elementary school children.

【0026】 ネット張設状態にあっては、伸縮部10に
はロープ3が垂れ下がらない程度の張力を生じ、実際に
は伸縮部が40cmから50〜60cmに伸びたとき、
十分な張力が得られるよう伸縮部10の弾性が設定さ
れ、上記寸法のゴムバンドを使用したとき、バネ定数K
は、約30kg/mであった。伸縮部10のバネ定数
を、約25ないし50kg/mの範囲で設定すると、ネ
ット本体2の重量に抗して、ネット本体2をピンと張
り、かつ選手の体がぶつかったとき、適度な緩衝作用を
得ることができる。また、支柱21には、ネット1自体
の重量及び上記弾性力により内側方向への引張力がはた
らくから、支柱21のゴムストッバー30が床面31に
あたり、支柱21は固定される。
In the state where the net is stretched, a tension is generated in the expansion / contraction part 10 to such an extent that the rope 3 does not hang down, and when the expansion / contraction part is stretched from 40 cm to 50-60 cm in practice,
When the elasticity of the expansion / contraction part 10 is set so that sufficient tension can be obtained and a rubber band having the above dimensions is used, the spring constant K
Was about 30 kg / m. By setting the spring constant of the expansion / contraction part 10 within a range of about 25 to 50 kg / m, the net body 2 is taut against the weight of the net body 2 and when the player's body hits, a proper cushioning action is provided. Can be obtained. Further, since the weight of the net 1 itself and the above-described elastic force exert a tensile force inward on the support column 21, the rubber stubber 30 of the support column 21 contacts the floor surface 31, and the support column 21 is fixed.

【0027】 かかる構造にあっては、ネット上辺5に選
手の手が当たっても、ロープ3が弾性的に伸長し、この
衝撃を吸収、緩和するから、選手が感じる痛みは軽減さ
れる。同時に、この衝撃は、ロープ3にて吸収されるか
ら、支柱21に加わる衝撃が減殺され、支柱21の位置
がずれたり或いは支柱21が倒れたりする可能性は小さ
い。
In such a structure, even if the player's hand hits the net upper side 5, the rope 3 elastically expands and absorbs and absorbs this impact, so that the pain felt by the player is reduced. At the same time, since this impact is absorbed by the rope 3, the impact applied to the support column 21 is diminished, and there is little possibility that the position of the support column 21 will shift or the support column 21 will fall.

【0028】 接続部材18により、ネット本体2の側辺
7及び下辺6もまたピンと張られた状態にある。特にネ
ット下辺6が常にピンと張られた状態にあることが重要
である。バレーボール競技においては、ネット1に当た
って跳ね返ったポールをうまく処理しなければならず、
ネットプレーは選手にとって重要な技術である。ネット
下辺6が緩んでいると、網目部分8に当たったボールが
跳ね返らず、そのまま床面31に落ちてしまい、高度な
ネットプレーが発揮できず、ゲームの感興を削いでしま
うのである。それ故、ネット1は上辺5のみならず、下
辺6もまた常時ピンと張った状態になければならないの
である。
[0028] The connecting member 18, the sides 7 and the lower side of the net body 2 6 is also in a state of being taut. In particular, it is important that the net lower side 6 is always taut. In the volleyball competition, you have to handle the pole that hit the net 1 and bounce well,
Net play is an important technique for players. If the net lower side 6 is loose, the ball hitting the mesh portion 8 does not bounce and falls on the floor surface 31 as it is, so that high-level net play cannot be exerted, and the game is exaggerated. Therefore, the net 1 must always be taut not only on the upper side 5 but also on the lower side 6.

【0029】 すなわち、編目部分8に当たったボール
は、コート側にはね返らなければならず、そのために
は、下辺6がピンと張っていなければならないのであ
る。選手は下辺6にあたってコート側へはねかえるボー
ルの速度、方向等をを予測してボールを床面に落とすこ
となく処理する。
[0029] In other words, the ball hitting the stitch part 8, must rebound on the court side, for that is the lower edge 6 must be taut. The player predicts the speed, direction, etc. of the ball that rebounds toward the court on the lower side 6 and processes the ball without dropping it on the floor.

【0030】 図4〜6は、異なる構造の支柱32、すな
わち床面31に埋め込む構造の支柱32にネット1を張
設した場合を示す。支柱32は、上記同様上部支柱33
及び下部支柱34よりなり、上部支柱33が下部支柱3
4に嵌装され、高さ調整ピン24を介して、上部支柱3
3の高さが調整される。上部支柱33の上端には、水平
方向の孔35が形成されており、これに支柱ロープ36
が通される。37は、下部支柱34に形成された「く」
字型の係止部で、支柱ロープ36の下端を引っ掛けて固
定するものである。
[0030] Figures 4-6 shows the case of stretched net 1 to the structure of the strut 32 to embed the posts 32, i.e. floor 31 of different structures. The pillar 32 is the upper pillar 33 as described above.
And the lower column 34, the upper column 33 is the lower column 3
4 is mounted on the upper support column 3 via the height adjusting pin 24.
The height of 3 is adjusted. A horizontal hole 35 is formed in the upper end of the upper support column 33, and a support rope 36 is formed in the horizontal hole 35.
Is passed through. 37 is a "ku" formed on the lower column 34
The character-shaped locking portion hooks and fixes the lower end of the column rope 36.

【0031】 支柱32は、コートの両サイドに埋め込み
或いは嵌め込み等にて立設される。支柱ロープ36は、
その上端側にリング状部分38を有し、これにロープ3
の継手12が連結される。支柱ロープ36の下端は、係
止部37に巻き付けられて係止される。孔35の大きさ
は、支柱ロープ36の上端のリング状部分38が通り抜
けない大きさに形成されている。
The pillars 32 are erected on both sides of the coat by embedding or fitting. The support rope 36 is
It has a ring-shaped portion 38 on its upper end side, on which the rope 3
The joints 12 are connected. The lower end of the column rope 36 is wound around the locking portion 37 and locked. The size of the hole 35 is formed so that the ring-shaped portion 38 at the upper end of the support rope 36 cannot pass through.

【0032】 上記構成のネット1において、その取付け
方法を説明すると、上下支柱32を床面31に立設し、
上部支柱33を下げた状態で、支柱ロープ36を孔35
に通し、その下端を係止部37に仮止めしておく。次い
でネット1のロープ3の継手12を支柱ロープ36のリ
ング状部分38に連結してネット本体2を2本の支柱3
2,32間に張る。次に、両支柱32,32の上部支柱
33,33を上げ、所定高さに固定する。このとき、ネ
ット本体2の接続部材18を上部支柱33に回してネッ
ト側辺7を支柱32に固定する。両支柱32,32の支
柱ロープ36を引っ張り、ロープ3の継手12が上部支
柱33に接する位置まで伸縮部10を伸ばし、支柱ロー
プ36を係止部37に引っかけて固定する。なお、この
係止部37には、選手等が係止部37に直接当たらない
よう、支柱33ごと保護カバーを巻くことができる。か
くして、ネット1は支柱32,32間に張り渡される。
かかる方法においても、前述の実施形態同様、児童でも
その作業をすることができる。
In the net 1 having the above structure, a method of mounting the net 1 will be described. The upper and lower columns 32 are erected on the floor surface 31,
With the upper column 33 lowered, the column rope 36 is inserted into the hole 35.
And the lower end is temporarily fixed to the locking portion 37. Next, the joint 12 of the rope 3 of the net 1 is connected to the ring-shaped portion 38 of the strut rope 36 to connect the net body 2 to the two strut 3
Place between 2 and 32. Next, the upper columns 33, 33 of both columns 32, 32 are raised and fixed at a predetermined height. At this time, the connecting member 18 of the net body 2 is turned around the upper support 33 to fix the net side 7 to the support 32. The prop ropes 36 of both the props 32 and 32 are pulled, the expansion part 10 is extended to the position where the joint 12 of the rope 3 contacts the upper prop 33, and the prop rope 36 is hooked to the locking part 37 to be fixed. A protective cover can be wound around the locking portion 37 together with the support column 33 so that a player or the like does not directly hit the locking portion 37. Thus, the net 1 is stretched between the columns 32.
Even in this method, even a child can perform the work, as in the above-described embodiment.

【0033】 ロープ3における伸縮部10の位置及び数
は、変更することができる。図7は、伸縮部10を、ロ
ープ3の左右端部近傍にそれぞれ配置した場合を示す。
この構造では、ネット上辺5(図1)に選手の手がぶつ
かったとき、ロープ3の左右部分の伸縮部10が均等に
伸びるから、ロープ3の伸縮をより自然なバランスのと
れたものとすることができる。この場合、伸縮部10を
構成する例えばゴムバンドは、前述の実施形態における
ゴムバンドより短いものが使用できる。図8は、伸縮部
10をロープ3の中央に配置した場合を示す。上記いず
れの構造においても、伸縮部10が配置される挿通孔4
(図1)の部分には、開閉部13及び伸縮部10の移動
を阻止する第1阻止手段15が設けられる。
The location and number of stretch unit 10 in the rope 3 can be changed. FIG. 7 shows a case where the stretchable portions 10 are arranged near the left and right ends of the rope 3, respectively.
In this structure, when the player's hand hits the upper side 5 of the net (FIG. 1), the stretchable portions 10 on the left and right sides of the rope 3 extend evenly, so that the rope 3 can be stretched and balanced more naturally. be able to. In this case, for example, the rubber band forming the elastic portion 10 may be shorter than the rubber band in the above-described embodiment. FIG. 8 shows a case where the stretchable portion 10 is arranged at the center of the rope 3. In any of the above structures, the insertion hole 4 in which the expansion / contraction part 10 is arranged.
First blocking means 15 for blocking the movement of the opening / closing part 13 and the expansion / contraction part 10 is provided in the portion (FIG. 1).

【0034】 図9は、ロープ3を伸縮部10のみ、例え
ばゴムバンドのみにて構成したものである。かかる構成
においても、ネット1に弾性的な引張力を付与すること
ができる。さらに、非伸縮性のロープの両端にゴムバン
ド等伸縮部を設け、非伸縮部をネットの挿通孔に通し、
伸縮部を引っ張って支柱の係止部に係止する構造も可能
である。
In FIG . 9, the rope 3 is constructed by only the elastic portion 10, for example, only a rubber band. Even in such a configuration, elastic tensile force can be applied to the net 1. Furthermore, elastic parts such as rubber bands are provided at both ends of the non-stretchable rope, and the non-stretchable part is passed through the insertion hole of the net.
It is also possible to have a structure in which the expansion / contraction portion is pulled and locked to the locking portion of the column.

【0035】図10は、別の実施形態を示し、ネット本
体2の上辺5及び下辺6の中央に伸縮部39,40を形
成したものである。この伸縮部39,40以外の上辺
5、下辺6部分及び側辺7は、非伸縮性の布にて構成さ
れている。ネット側辺7には、前述の実施形態同様、ゴ
ムバンド及び面状ファスナー部よりなる接続部材18が
取りつけられている。伸縮部39,40は、ゴムにて構
成することができ、上辺5の伸縮部39は、左右の上辺
5と同様、挿通孔4が形成されている。ネット本体2に
は、その挿通孔4にロープ3(図1)が通される。上記
のほか、伸縮部7は、上辺5のみ又は下辺6のみに形成
することもでき、その位置も任意に設定できる。
FIG. 10 shows another embodiment, in which elastic portions 39 and 40 are formed at the centers of the upper side 5 and the lower side 6 of the net body 2. The upper side 5, lower side 6 and side 7 other than the stretchable portions 39 and 40 are made of non-stretchable cloth. A connecting member 18 including a rubber band and a planar fastener portion is attached to the net side 7 as in the above-described embodiment. The stretchable portions 39 and 40 can be made of rubber, and the stretchable portion 39 of the upper side 5 is formed with the insertion hole 4 like the left and right upper sides 5. The rope 3 (FIG. 1) is passed through the insertion hole 4 of the net body 2. In addition to the above, the stretchable portion 7 can be formed only on the upper side 5 or only on the lower side 6, and the position thereof can be set arbitrarily.

【0036】通常この種ネット1にあっては、特に児童
が使用する場合、競技中或いは練習中ネットの網目部分
8に手をかけて左右に引っ張ったり、或いはネット1に
寄りかかったりすることがある。従来のネットの場合、
この力が直接支柱に加わり、特に可動式支柱21(図
2)のとき、支柱21がずれたり或いは支柱21が倒れ
るおそれがあるが、上記構造にすれば、ネット本体2の
伸縮部39,40が弾性的に伸長してこれを吸収緩和
し、支柱21に加わる荷重を軽減する。
Usually, in this kind of net 1, especially when used by a child, it is possible that the net portion 8 of the net is held and pulled left or right or leaning on the net 1 during competition or practice. is there. For traditional nets,
It applied this force is directly strut, especially when the movable support 21 (FIG. 2), there is a fear that the strut 21 is displaced or or strut 21 falls down, if the above structure, the net body 2 stretchable portion 39, 40 Elastically expands and absorbs and relaxes this, reducing the load applied to the column 21.

【0037】 上記実施の形態では、ネット1としてソフ
トバレーボール、ミニソフトバレーボール用のネットに
つき説明したが、上記ネットの構造は、バトミントン、
バレーボール競技、テニス競技等他の競技のネットに使
用することができる。
In the above-described embodiment, the net 1 for soft volleyball and mini soft volleyball has been described, but the structure of the net is badminton,
It can be used for other sports such as volleyball and tennis.

【0038】本発明(請求項)によれば、ネットを支
柱間に張設した際、伸縮部が弾性伸長して、ロープに引
張力が加わるから、ネットを常時ピンと張った状態に維
持することができる。すなわちネットに選手の手等があ
たった場合、その衝撃は伸縮部にて吸収、緩和され、選
手に与える痛みは軽減される。またこの衝突或いはボー
ルがあたることによってネットに力が加わっても、支柱
に加わる力は減殺されるから、支柱がずれたり或いは倒
れたりするという事故の発生は抑制される。また、伸縮
部が切れたとき或いは伸縮部と非伸縮部材の結び目を調
整するとき、開閉部を開いてこれを挿通部から引き出す
ことが容易にでき、伸縮部分の交換作業、結び直し作業
が容易となる。
According to the present invention (Claim 1 ), when the net is stretched between the columns, the expansion and contraction portion elastically expands and a tensile force is applied to the rope, so that the net is always kept taut. be able to. That is, when the player's hand or the like hits the net, the impact is absorbed and relieved by the elastic portion, and the pain given to the player is reduced. Further, even if a force is applied to the net due to the collision or the ball hitting, the force applied to the support pillar is diminished, so that the occurrence of an accident in which the support pillar shifts or falls is suppressed. Also stretch
Adjust the knot between the stretchable part and the non-stretchable member when the part breaks.
When adjusting, open the opening / closing part and pull it out from the insertion part.
It is easy to do, and the work of exchanging the stretchable part and reconnecting it
Will be easier.

【0039】[0039]

【0040】また本発明(請求項)によれば、伸縮部
分が切れた場合、第1阻止手段にて止まり、これが開放
できない挿通孔の内部へ移動することはないから、伸縮
部分を挿通孔から容易に引き出すことができる。
Further, according to the present invention (Claim 2 ), when the stretchable portion is cut, it stops at the first blocking means and does not move to the inside of the insertion hole which cannot be opened. Therefore, the stretchable portion is inserted into the insertion hole. Can be easily pulled out from.

【0041】さらに本発明(請求項)によれば、支柱
ロープを引っ張ることにより、ロープの伸縮部が伸び、
ロープはピンと張られるから、支柱ロープの下端を支柱
に固定するのみでネットを張ることができる。
Further, according to the present invention (Claim 3 ), the stretchable portion of the rope is extended by pulling the support rope,
Since the rope is tensioned, the net can be stretched only by fixing the lower end of the column rope to the column.

【0042】さらに本発明(請求項)によれば、ロー
プがネット上辺の挿通孔に通されているにもかかわら
ず、その端部が挿通孔内に入り、これが取り出せないと
いう問題は生じず、いつでもロープ両端を支柱に或いは
支柱ロープに連結することができる。
Further, according to the present invention (claim 4 ), even though the rope is passed through the insertion hole on the upper side of the net, the problem that the end portion of the rope enters the insertion hole and cannot be taken out does not occur. , You can always connect both ends of the rope to the stanchion or to the stanchion rope.

【0043】[0043]

【0044】[0044]

【0045】[0045]

【0046】[0046]

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明実施の形態に係る競技用ネットを示す正
面図である。
FIG. 1 is a front view showing a competition net according to an embodiment of the present invention.

【図2】ネットを支柱に張設した状態を示す正面図であ
る。
FIG. 2 is a front view showing a state in which a net is stretched over a column.

【図3】図2の支柱上端部分を拡大して示す正面図であ
る。
FIG. 3 is an enlarged front view showing the upper end portion of the column of FIG.

【図4】ネットを別の構造を有する支柱に張設した状態
を示す正面図である。
FIG. 4 is a front view showing a state in which a net is stretched over a column having another structure.

【図5】図4の支柱上端部分を拡大して示す正面図であ
る。
5 is an enlarged front view showing the upper end portion of the column of FIG. 4. FIG.

【図6】図4の支柱の係止部を示す正面図である。FIG. 6 is a front view showing a locking portion of the column of FIG.

【図7】ロープの変形例を示す正面図である。FIG. 7 is a front view showing a modified example of the rope.

【図8】ロープの変形例を示す正面図である。FIG. 8 is a front view showing a modified example of the rope.

【図9】ロープの変形例を示す正面図である。FIG. 9 is a front view showing a modified example of the rope.

【図10】ネットの別の実施の形態を示す正面図であ
る。
FIG. 10 is a front view showing another embodiment of the net.

【符号の説明】[Explanation of symbols]

1 ネット 2 ネット本体 3 ロープ 4 挿通孔 5 上辺 6 下辺 7 側辺 8 網目部分 9 非伸縮部 10,39,40 伸縮部 11 結び目 12 継手 13 開閉部 14,20 ファスナー部 15 第1阻止手段 16 第2阻止手段 17 開口 18 接続部材 19 ゴムバンド 21,32 支柱 22,33 上部支柱 23,34 下部支柱 24 高さ調整ピン 25 リング 26 べース 27 ウエイト 28,29 キャスター 30 ゴムストッパー 36 支柱ロープ 37 係止部1 Net 2 Net Main Body 3 Rope 4 Insertion Hole 5 Upper Side 6 Lower Side 7 Side Side 8 Mesh Part 9 Non-Expandable Part 10, 39 , 40 Expandable Part 11 Knot 12 Joint 13 Opening / Closing Part 14, 20 Fastening Part 15 First Blocking 16th 2 Blocking means 17 Opening 18 Connection member 19 Rubber bands 21, 32 Supports 22, 33 Upper support 23, 34 Lower support 24 Height adjustment pin 25 Ring 26 Base 27 Weight 28, 29 Caster 30 Rubber stopper 36 Support rope 37 Engagement Stop

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平8−318105(JP,A) 実開 平7−27639(JP,U) 特表 平10−501158(JP,A) (58)調査した分野(Int.Cl.7,DB名) A63B 61/00 - 61/04 A63B 69/00 504 A63B 69/00 506 A63B 69/00 510 ─────────────────────────────────────────────────── ───Continued from the front page (56) References JP-A-8-318105 (JP, A) Actual Kaihei 7-27639 (JP, U) Special Table H10-501158 (JP, A) (58) Field (Int.Cl. 7 , DB name) A63B 61/00-61/04 A63B 69/00 504 A63B 69/00 506 A63B 69/00 510

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上辺にロープ挿通孔を有するネット本体
と、上記挿通孔に挿通され、上記ネット本体を2本の支
柱間に支持するためのロープとを有する競技用ネットに
おいて、上記ロープが弾性伸縮する伸縮部と非伸縮部よ
なり、上記伸縮部が上記挿通孔適所に位置せしめられ
るとともに、上記伸縮部が位置する上記挿孔に、該挿通
孔を開く開閉部が形成されてなる競技用ネット。
1. A competition net having a net main body having a rope insertion hole on an upper side thereof and a rope inserted into the insertion hole for supporting the net main body between two struts, wherein the rope is elastic. It consists of a stretchable part that stretches and a non-stretchable part, and the stretchable part is positioned at the appropriate place of the insertion hole.
In addition, insert the insertion hole into the insertion hole where the expansion and contraction section is located.
A competition net with an opening and closing part that opens a hole .
【請求項2】 上記伸縮部が位置する上記挿通孔に、上
記伸縮部の上記開閉部からの移動を阻止する第1阻止手
段を設けてなる請求項に記載の競技用ネット。
2. The game net according to claim 1 , wherein the insertion hole in which the expandable portion is located is provided with a first blocking means for blocking the movement of the expandable portion from the opening / closing portion.
【請求項3】 上記ロープが、上記挿通孔に挿通され、
上記伸縮部を有するロープと、該ロープの両端に連結手
段を介して連結されるとともに上記支柱に取りつけられ
る2本の支柱ロープとからなる請求項1または2に記載
の競技用ネット。
3. The rope is inserted through the insertion hole,
The competition net according to claim 1 or 2, comprising a rope having the stretchable portion, and two support ropes connected to both ends of the rope via connecting means and attached to the support pillar.
【請求項4】 上記ロープの両端に、該ロープの端部が
上記挿通孔内に入ることを阻止する第2阻止手段を設け
てなる請求項に記載の競技用ネット。
4. The competition net according to claim 3 , wherein the rope is provided with second blocking means for blocking both ends of the rope from entering the insertion hole.
JP15834099A 1999-06-04 1999-06-04 Competition net Expired - Fee Related JP3486134B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15834099A JP3486134B2 (en) 1999-06-04 1999-06-04 Competition net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15834099A JP3486134B2 (en) 1999-06-04 1999-06-04 Competition net

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2003200159A Division JP3892830B2 (en) 2003-07-22 2003-07-22 Competition net

Publications (2)

Publication Number Publication Date
JP2000342734A JP2000342734A (en) 2000-12-12
JP3486134B2 true JP3486134B2 (en) 2004-01-13

Family

ID=15669510

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15834099A Expired - Fee Related JP3486134B2 (en) 1999-06-04 1999-06-04 Competition net

Country Status (1)

Country Link
JP (1) JP3486134B2 (en)

Also Published As

Publication number Publication date
JP2000342734A (en) 2000-12-12

Similar Documents

Publication Publication Date Title
US6261207B1 (en) Trampoline or the like with enclosure
US9339676B2 (en) Trampoline or the like with enclosure
CA2500606C (en) Inflatable sport ball arresting structure
EP2552557B1 (en) Soccer training apparatus and method
CA2553767C (en) A trampoline and enclosure system
EP3085421B1 (en) Golf practice tent
US6287220B1 (en) Soccer practice return net
US20140054527A1 (en) Multipurpose seasonal sport safety fence
US5615889A (en) Soccer goal practice net
US4717157A (en) Self-tensioning game net
US5692978A (en) Volleyball block back device
US6264570B1 (en) Practice sports net
JP3486134B2 (en) Competition net
JP3892830B2 (en) Competition net
CN210644965U (en) Trampoline
EP3746189B1 (en) Safety net for a trampoline and a trampoline having a safety net
KR960006670Y1 (en) A post for net
US20160089587A1 (en) Football Goal
KR102357503B1 (en) Net device for mobile exercise
WO2012065208A1 (en) Sports training device
US20240198201A1 (en) Snag-free eyelet anchor
KR200171948Y1 (en) Badminton net
KR200256509Y1 (en) Simple Net Set

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071024

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081024

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081024

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091024

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101024

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111024

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees