JP3340981B2 - Groove formation method for rock and rock excavation method using the groove formation method - Google Patents

Groove formation method for rock and rock excavation method using the groove formation method

Info

Publication number
JP3340981B2
JP3340981B2 JP31557999A JP31557999A JP3340981B2 JP 3340981 B2 JP3340981 B2 JP 3340981B2 JP 31557999 A JP31557999 A JP 31557999A JP 31557999 A JP31557999 A JP 31557999A JP 3340981 B2 JP3340981 B2 JP 3340981B2
Authority
JP
Japan
Prior art keywords
rock
hole
drilling
groove
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP31557999A
Other languages
Japanese (ja)
Other versions
JP2001132376A (en
Inventor
昭男 神島
Original Assignee
株式会社神島組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社神島組 filed Critical 株式会社神島組
Priority to JP31557999A priority Critical patent/JP3340981B2/en
Publication of JP2001132376A publication Critical patent/JP2001132376A/en
Application granted granted Critical
Publication of JP3340981B2 publication Critical patent/JP3340981B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、岩盤表面から鉛
直方向または鉛直方向に対して傾斜して複数の削孔を相
互に隣接させながら連続して設け、これら連続削孔によ
って溝を形成する溝形成工法、ならびに当該溝形成工法
を用いた岩盤掘削工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a groove in which a plurality of drilled holes are formed continuously from a rock surface in a vertical direction or inclined with respect to the vertical direction while adjoining each other, and grooves are formed by the continuous drilling. The present invention relates to a forming method and a rock excavation method using the groove forming method.

【0002】[0002]

【従来の技術】従来より、市街地近辺での岩盤掘削作業
では、基本的に発破を使用することが極めて困難である
ことから、油圧シャベルなどの建設用重機車両に大型油
圧ブレーカ(例えば、甲南電機株式会社製の油圧ブレー
カMKB1200Nなど)を取付け、この大型油圧ブレ
ーカによって岩盤掘削を行っている。
2. Description of the Related Art Conventionally, it has been extremely difficult to use blasting in rock excavation work in the vicinity of an urban area. Therefore, large hydraulic breakers (for example, Konan Electric Co., Ltd.) are used for heavy construction vehicles such as hydraulic shovels. A hydraulic breaker MKB1200N manufactured by Co., Ltd.) is installed, and rock excavation is performed by this large hydraulic breaker.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、中硬岩
や硬岩などの岩盤を掘削する場合、このような油圧ブレ
ーカでは作業効率が悪く、所望の掘削形状を得るために
長時間を要してしまうという問題を有している。また、
油圧ブレーカでは作業中に金属音に近い騒音が発生し、
それが断続的に続くため、近隣住民に対する騒音問題が
深刻なものとなっている。
However, when excavating rock such as medium hard rock or hard rock, such a hydraulic breaker is inefficient and requires a long time to obtain a desired excavation shape. There is a problem that it is. Also,
When working with a hydraulic breaker, noise similar to metal noise is generated,
Since it continues intermittently, the problem of noise to nearby residents has become serious.

【0004】そこで、騒音問題を考慮すれば、静的破砕
剤の使用も考えられるが、これは岩盤に穿孔を行い、そ
の孔に水とよく混練した静的破砕剤を充填し、それを固
化させることで岩盤にクラックを与えるものである。こ
のように静的破砕剤は単に岩盤にクラックを生じさせる
ための機能しか有していないため、クラックを与えた後
においては、小割りが必要となり、実質的に騒音問題は
解消されない。また、静的破砕剤は高価であり、これを
用いた場合、岩盤掘削コストが著しく増大するという経
済的デメリットもある。さらに、静的破砕剤が固化する
までに長時間を要して作業効率が低下するという問題も
ある。
In view of the noise problem, it is conceivable to use a static crushing agent. However, in this case, a rock is perforated, and the hole is filled with a static crushing agent well mixed with water and solidified. By doing so, it gives cracks to the bedrock. As described above, since the static crushing agent only has a function of simply causing cracks in the rock, it is necessary to divide the cracks after cracking, and the noise problem is not substantially solved. In addition, the static crushing agent is expensive, and when used, there is an economic disadvantage that the rock excavation cost is significantly increased. Further, there is also a problem that it takes a long time for the static crushing agent to solidify and the working efficiency is reduced.

【0005】この発明は上記課題に鑑みなされたもので
あり、低コストで、低騒音で、しかも高い作業効率で岩
盤に溝を形成することができる溝形成工法を提供するこ
とを第1の目的とする。
The present invention has been made in view of the above problems, and has as its first object to provide a groove forming method capable of forming grooves in rock at low cost, with low noise, and with high working efficiency. And

【0006】また、この発明は、上記溝形成工法を用い
て低コストで、低騒音で、しかも高い作業効率で岩盤掘
削を行うことができる岩盤掘削工法を提供することを第
2の目的とする。
It is a second object of the present invention to provide a rock excavation method capable of performing rock excavation at low cost, with low noise and with high working efficiency by using the groove forming method. .

【0007】[0007]

【課題を解決するための手段】この発明は、岩盤表面か
ら鉛直方向または鉛直方向に対して傾斜して複数の削孔
を相互に隣接させながら連続して設け、これら連続削孔
によって溝を形成する溝形成工法であって、上記第1の
目的を達成するため、岩盤に形成された第1削孔に、第
1削孔の内径よりも小さな外径を有する中空鋼管を挿入
する第1工程と、前記中空鋼管の内部に空気を圧送して
前記第1削孔の底部から岩盤表面側に向かう気流を形成
しながら、前記第1削孔と隣接する位置に第2削孔を形
成して溝を形成拡張する第2工程とを備えている。
SUMMARY OF THE INVENTION According to the present invention, a plurality of drilled holes are provided continuously while being adjacent to each other in a vertical direction or inclined with respect to the vertical direction from a rock surface, and a groove is formed by these continuous drilled holes. A first step of inserting a hollow steel pipe having an outer diameter smaller than the inner diameter of the first drilling into a first drilling formed in the rock to achieve the first object. Forming a second drilling hole at a position adjacent to the first drilling hole while forming airflow from the bottom of the first drilling hole toward the rock surface side by pumping air into the hollow steel pipe. A second step of forming and expanding the groove.

【0008】この発明では、岩盤に複数の削孔が相互に
隣接しながら連続して設けられ、これら連続削孔によっ
て溝が形成される。ここで、すでに形成されている削孔
に隣接して削孔を設けて連続削孔を形成しようとすれ
ば、次のような問題が生じてしまう。すなわち、岩盤に
削孔を形成しようとする際、隣接する位置にすでに削孔
が形成されている場合には、岩盤を穿孔している途中で
削孔機のビット先端部が隣接する削孔に逃げてしまい、
所望の削孔を形成することができない。そこで、この発
明では、隣接する既成削孔、つまり第1削孔に鋼管を挿
入しておくことで、ビット先端部が隣接する第1削孔に
逃げるのを防止し、第1削孔と隣接して新たな削孔を形
成し、溝の拡張が行われる。
According to the present invention, a plurality of holes are continuously provided in the rock while adjoining each other, and a groove is formed by these continuous holes. Here, if a continuous hole is formed by providing a hole adjacent to a hole already formed, the following problem occurs. In other words, when drilling a hole in the rock, if a hole has already been formed in the adjacent position, the bit end of the drilling machine will be inserted into the adjacent hole while drilling the rock. Escaped,
A desired hole cannot be formed. Therefore, in the present invention, by inserting a steel pipe into an adjacent pre-drilled hole, that is, the first drill hole, it is possible to prevent the tip end of the bit from escaping to the adjacent first drill hole, and to adjoin the first drill hole. Then, a new hole is formed and the groove is expanded.

【0009】また、穿孔作業を行う際には、粉塵や被削
物など(以下、単に「粉塵」という)が発生し、これを
如何にして除去するのかが問題となる。特に岩盤表面か
ら鉛直方向または鉛直方向に対して傾斜して削孔を設け
る場合には、削孔形成時に発生する粉塵が第1削孔に飛
散すると、第1削孔の内底部に溜り易いという問題があ
る。しかしながら、この発明では、第1削孔に中空鋼管
を挿入し、しかも、その中空鋼管の内部に空気が圧送さ
れて第1削孔の底部から岩盤表面側に向かう気流が形成
されており、この気流に乗って第1削孔内に飛散してき
た粉塵が第1削孔の外部に排出される。こうして、第1
削孔内に粉塵が溜まるのを防止する。
Further, when performing a drilling operation, dust and work pieces (hereinafter simply referred to as "dust") are generated, and there is a problem how to remove the dust and work. In particular, in the case where a drilling hole is provided in a vertical direction or inclined with respect to the vertical direction from the rock surface, if dust generated at the time of forming the drilling hole scatters into the first drilling hole, it easily accumulates at the inner bottom of the first drilling hole. There's a problem. However, in the present invention, a hollow steel pipe is inserted into the first drilled hole, and air is forced into the hollow steel pipe to form an airflow from the bottom of the first drilled hole toward the rock surface. Dust scattered in the first drilling hole along with the airflow is discharged to the outside of the first drilling hole. Thus, the first
Prevents dust from accumulating in the borehole.

【0010】ここで、第2削孔から離れた位置で、かつ
第1削孔と隣接して既に第3削孔が岩盤に形成されてい
ることがあるが、この場合、当該第3削孔にガイド手段
を挿入し、当該ガイド手段によって第3削孔に流れ込む
気流を岩盤表面側に導くように構成するのが望ましい。
というのも、第1削孔内で発生される気流が第3削孔に
流入し、その流入気流に乗って粉塵が第3削孔に飛散す
るおそれがあるが、ガイド手段を設けることで流入気流
を岩盤表面側に導き、粉塵を第3削孔の外部に排出する
ことができるからである。
In some cases, a third hole is already formed in the rock at a position away from the second hole and adjacent to the first hole. In this case, the third hole is formed. It is preferable that a guide means is inserted into the hole and the guide means guides the airflow flowing into the third hole to the surface of the rock.
This is because the airflow generated in the first drilling hole flows into the third drilling hole, and there is a possibility that dust may be scattered on the third drilling hole on the inflowing airflow. This is because the air current can be guided to the rock surface side, and the dust can be discharged to the outside of the third hole.

【0011】また、第1および第2削孔から離れた位置
で、かつ第3削孔と隣接して第4削孔が岩盤に形成され
ていることがあるが、この場合、第4削孔の表面開口を
キャップ手段で塞ぐことで、第4削孔への粉塵の飛散を
防止することができる。もちろん、第1〜第3削孔から
離れた位置において既に形成されている削孔の表面開口
をキャップ手段で塞ぐことで、各削孔への粉塵の飛散を
防止するようにしてもよい。
A fourth drill hole may be formed in the rock at a position away from the first and second drill holes and adjacent to the third drill hole. In this case, the fourth drill hole is formed. By closing the surface opening with the cap means, scattering of dust to the fourth drilling hole can be prevented. Of course, dust may be prevented from being scattered to each of the holes by closing the surface openings of the holes already formed at positions away from the first to third holes with cap means.

【0012】さらに、この発明にかかる岩盤掘削工法
は、岩盤のうち所定の掘削領域を部分的に掘削する岩盤
掘削工法であって、上記第2の目的を達成するため、前
記掘削領域を掘削するのに先立って、予め前記掘削領域
を取り囲むように前記請求項1ないし3のいずれかに記
載の溝形成工法によって前記岩盤に閉ループ状に周回溝
を形成している。
Further, a rock excavation method according to the present invention is a rock excavation method for partially excavating a predetermined excavation area in a rock mass, and excavates the excavation area in order to achieve the second object. Prior to this, a circular groove is formed in the rock as a closed loop by the groove forming method according to any one of claims 1 to 3 so as to surround the excavation area in advance.

【0013】このようにして周回溝を形成する前におい
ては、岩盤のうち露出している面、つまり自由面は表面
のみであり、岩盤の掘削作業性は比較的低くなってい
る。これに対し、岩盤の掘削領域を取り囲むように閉ル
ープ状に周回溝が形成されると、岩盤の掘削領域の側面
も自由面となり、掘削作業性が向上する。
Before forming the orbital groove in this way, the exposed surface of the rock, that is, the free surface is only the surface, and the workability of excavating the rock is relatively low. On the other hand, when the circular groove is formed in a closed loop shape so as to surround the excavation region of the rock, the side surface of the excavation region of the rock also becomes a free surface, and the excavation workability is improved.

【0014】[0014]

【発明の実施の形態】A.岩盤への溝形成工法 図1および図2は、この発明にかかる溝形成工法の一の
実施形態を示す断面図である。この溝形成工法では、ま
ず重機車両(図示省略)のブームの先端に削孔機2(図
1(c))を取付ける。この削孔機2は、ブームに装着
固定されたリーダに沿ってロッド21を回転・スライド
させ、そのロッド先端に取付けられたビット22によっ
て岩盤に対して削孔を形成可能となっている。
DETAILED DESCRIPTION OF THE INVENTION FIG. 1 and FIG. 2 are cross-sectional views showing one embodiment of a groove forming method according to the present invention. In this groove forming method, first, a drilling machine 2 (FIG. 1C) is attached to the tip of a boom of a heavy equipment vehicle (not shown). The drilling machine 2 rotates and slides a rod 21 along a leader attached to and fixed to a boom, and a drilling hole can be formed in a bedrock by a bit 22 attached to the tip of the rod.

【0015】重機車両への削孔機2のセットが完了する
と、重機車両を操作してビット先端部を最初の削孔形成
位置に移動させた後、削孔機2によって岩盤3の表面か
ら鉛直方向(図1のZ方向)に穿孔し、最初の削孔41
を形成する(図1(a))。そして、この削孔41内に
削孔41の内径よりも小さな外径を有する中空鋼管51
を挿入する(同図(b))。なお、この実施形態では、
鉛直方向に削孔を形成しているが、鉛直方向に対して傾
斜させて削孔を連続的に形成することで溝を形成する場
合にも、本実施形態を適用することができる。
When the setting of the drilling machine 2 on the heavy equipment vehicle is completed, the tip of the bit is moved to the first drilling position by operating the heavy equipment vehicle, and then the drilling machine 2 vertically moves the bit from the surface of the rock 3. Direction (Z direction in FIG. 1), the first drilling 41
Is formed (FIG. 1A). A hollow steel pipe 51 having an outer diameter smaller than the inner diameter of the hole 41 is formed in the hole 41.
Is inserted (FIG. 2B). In this embodiment,
Although the hole is formed in the vertical direction, the present embodiment can be applied to a case where the groove is formed by continuously forming the hole by being inclined with respect to the vertical direction.

【0016】この中空鋼管51は、後述するように必要
に応じてビット22の回転方向に対して逆の回転方向に
回転駆動されるように構成されるとともに、回転駆動中
に送気管511を介して中空部に圧縮空気を圧送可能に
構成されている。また、中空鋼管51の先端部512は
絞り込まれて嘴状に形成され、その中央開口513から
削孔の内底部に向けて送気管511からの空気を吹き付
けるように構成されている。
The hollow steel pipe 51 is configured to be driven to rotate in a direction opposite to the direction of rotation of the bit 22 as necessary, as will be described later, and via the air supply pipe 511 during the rotation. The compressed air can be sent to the hollow part by pressure. The distal end portion 512 of the hollow steel pipe 51 is narrowed and formed into a beak shape, and is configured to blow air from an air supply pipe 511 from a central opening 513 toward an inner bottom portion of a drilled hole.

【0017】また、図3に示すように、中空鋼管51の
管壁部には複数の空気噴出用孔部514がらせん状に穿
設されている。これらの空気噴出用孔部514はいずれ
も中空管内から管表面に行くにしたがって上昇するよう
に傾斜形成されている。このため、送気管511を介し
て中空鋼管51に圧縮空気を圧送すると、削孔内に底面
から岩盤表面に向け渦巻き状の上昇気流が形成され、削
孔の内底部に溜まっている、あるいは他の穿孔処理中に
発生する粉塵がこの上昇気流に乗って削孔内から排出可
能となっている。
As shown in FIG. 3, a plurality of air ejection holes 514 are helically drilled in the tube wall of the hollow steel tube 51. Each of the air ejection holes 514 is formed to be inclined so as to rise from the inside of the hollow tube toward the tube surface. For this reason, when compressed air is pumped into the hollow steel pipe 51 through the air supply pipe 511, a spiral upward airflow is formed from the bottom surface to the rock surface in the borehole, and the airflow accumulates at the inner bottom part of the borehole, or Dust generated during the perforation process can be discharged from inside the borehole by riding the rising airflow.

【0018】なお、この実施形態では、中空鋼管51の
回転方向に応じて空気噴出用孔部514の配列態様が異
なる2種類の中空鋼管51を用意している。すなわち、
軸心515を中心に時計回りに回転させる場合に用いる
第1中空鋼管51A(図3a)と、軸心515を中心に
反時計回りに回転させる場合に用いる第2中空鋼管51
B(図3b)とが用意されている。このように、回転方
向に応じて中空鋼管51を使い分けることで、削孔内に
形成される上昇気流の流速を高めて、より確実に粉塵を
削孔内から排出することができる。ただし、空気噴出用
孔部514の形成位置、形状や数などはこの実施形態に
限定されるものではなく任意である。また、空気噴出用
孔部514をらせん状に配列することは必須構成要件で
はなく、ランダムに配列したり、円環状や周期的に配列
したりしてもよい。
In this embodiment, two types of hollow steel pipes 51 are provided in which the arrangement of the air ejection holes 514 differs depending on the rotation direction of the hollow steel pipe 51. That is,
A first hollow steel pipe 51A (FIG. 3a) used for rotating clockwise about the axis 515 and a second hollow steel pipe 51 used for rotating counterclockwise about the axis 515.
B (FIG. 3b). As described above, by properly using the hollow steel pipe 51 according to the rotation direction, the flow velocity of the upward airflow formed in the drill hole can be increased, and the dust can be more reliably discharged from the drill hole. However, the formation position, shape, number, and the like of the air ejection holes 514 are not limited to this embodiment, and are arbitrary. It is not essential to arrange the air ejection holes 514 in a spiral shape, and the air ejection holes 514 may be arranged randomly, annularly or periodically.

【0019】次に、図1(c)に戻って説明を続ける。
中空鋼管51の削孔41への挿入が完了すると、削孔の
内径と同じあるいは若干短い間隔だけ溝長手方向Xに離
れた位置、つまり第3番目の削孔の形成予定位置にビッ
ト22を位置させて穿孔を開始する。こうして、第3番
目の削孔43が、既に岩盤3に形成された既成削孔41
から溝長手方向Xに、しかも約削孔1個分だけ離れた位
置に形成され、これらの削孔41,43によって、後述
するように次に削孔される削孔予定位置31が挟み込ま
れている。ここで、この穿孔処理を行う際には、穿孔領
域を覆うように岩盤3上に飛散防止用カバー6を設け、
図示を省略する吸引回収機構によって穿孔処理に際して
発生する粉塵を吸引排出している。なお、この実施形態
では、同図(c)に示すように、削孔43の形成時には
中空鋼管51の回転および中空鋼管51への空気圧送を
停止しているが、これら回転・空気圧送処理を同時に実
行してもよいことはいうまでもない。
Next, returning to FIG. 1C, the description will be continued.
When the insertion of the hollow steel pipe 51 into the hole 41 is completed, the bit 22 is positioned at a position in the groove longitudinal direction X that is the same as or slightly shorter than the inner diameter of the hole, that is, a position where the third hole is to be formed. Then start drilling. Thus, the third drilling 43 is formed by the existing drilling 41 already formed in the rock 3.
Are formed in the longitudinal direction X of the groove and at a position separated by about one hole, and these hole 41, 43 sandwich a hole position 31 to be next drilled as described later. I have. Here, when performing this perforation process, a scattering prevention cover 6 is provided on the rock 3 so as to cover the perforated area,
Dust generated at the time of perforation processing is suctioned and discharged by a suction recovery mechanism (not shown). In this embodiment, the rotation of the hollow steel pipe 51 and the air supply to the hollow steel pipe 51 are stopped when the drilled hole 43 is formed, as shown in FIG. It goes without saying that they may be executed simultaneously.

【0020】上記のようにして第3番目の削孔43が形
成されると、その削孔43に中空鋼管51を挿入する
(同図(d))。そして、ビット22を削孔41,43
にサンドイッチされている削孔予定位置31に移動させ
た後、削孔機2によって岩盤3の表面から鉛直方向Z
(図1のZ方向)に穿孔し、第2番目の削孔42を形成
していく(同図(e))。この穿孔処理が完了すると、
第1ないし第3番目の削孔41〜43が相互に連通して
岩盤3中にX方向に延びる溝1(図4)が形成される。
When the third hole 43 is formed as described above, the hollow steel pipe 51 is inserted into the hole 43 (FIG. 4D). Then, the bit 22 is bored 41, 43
Is moved from the surface of the rock 3 to the vertical direction Z by the drilling machine 2.
(Z direction in FIG. 1) to form a second hole 42 (FIG. 1E). When this perforation process is completed,
The first to third holes 41 to 43 communicate with each other to form a groove 1 (FIG. 4) extending in the X direction in the rock 3.

【0021】ここで、この実施形態では、すでに形成さ
れている削孔41,43に中空鋼管51,51を挿入し
ているが、その理由は以下の通りである。すなわち、鋼
管挿入を行わないまま既に形成されている既成削孔4
1,43に隣接して岩盤3に削孔を設けようとした場
合、岩盤3を穿孔している途中で削孔機2のビット22
が隣接する削孔41あるいは43に逃げてしまい、削孔
43を削孔予定位置31から鉛直方向Zに真っ直ぐ形成
することができず、削孔41,43を連通させることが
できなくなり、その結果、溝が形成されない。これに対
して、本実施形態のように、隣接する既成削孔41,4
3に中空鋼管51,51をそれぞれ挿入しておくこと
で、ビット22が隣接する既成削孔41あるいは43に
逃げるのを防止し、既成削孔41,43と隣接して新た
な削孔42を形成し、溝1を形成し、X方向に拡張する
ことができる。
Here, in this embodiment, the hollow steel pipes 51, 51 are inserted into the drilled holes 41, 43 already formed, for the following reason. That is, the existing drilled hole 4 already formed without inserting the steel pipe.
When drilling a hole in the rock 3 adjacent to the rocks 1 and 43, the bit 22 of the drill 2
Escapes to the adjacent hole 41 or 43, the hole 43 cannot be formed straight from the planned hole 31 in the vertical direction Z, and the holes 41 and 43 cannot communicate with each other. As a result, No groove is formed. On the other hand, as in the present embodiment, adjacent existing drill holes 41 and 4
By inserting the hollow steel pipes 51 into the holes 3, respectively, it is possible to prevent the bit 22 from escaping into the adjacent pre-drilled holes 41 or 43, and to form new holes 42 adjacent to the pre-drilled holes 41 and 43. Formed, forming a groove 1 and expanding in the X direction.

【0022】また、この実施形態では、ビット22を挟
み込むように中空鋼管51,51が配置されることとな
り、中空鋼管51,51がビット22のガイドとして機
能し、真っ直ぐに穿孔することができ、削孔予定位置3
1からの削孔42のズレを防止することができる。そし
て、この実施形態では、同図(e)に示すように、回転
するビット22に対して中空鋼管51,51を強制的に
従動方向に回転させており、ベアリングとしても機能し
て良好な穿孔処理を行うことができる。
Further, in this embodiment, the hollow steel pipes 51, 51 are arranged so as to sandwich the bit 22, and the hollow steel pipes 51, 51 function as guides for the bit 22, and can be bored straight. Expected drilling position 3
The displacement of the hole 42 from the position 1 can be prevented. In this embodiment, the hollow steel pipes 51, 51 are forcibly rotated in the driven direction with respect to the rotating bit 22, as shown in FIG. Processing can be performed.

【0023】さらに、穿孔処理中に送気管511を介し
て中空鋼管51に空気を圧送しており、削孔41,43
内に底面から岩盤表面に向けの上昇気流が形成され、削
孔の内底部に溜まっている、あるいは削孔42を形成す
るための穿孔処理中に発生する粉塵がこの上昇気流に乗
って削孔41,43内から岩盤表面側に排出され、さら
に吸引回収機構によって回収される。したがって、新た
に削孔を形成する場合、その削孔に隣接する既成削孔内
に穿孔処理によって発生する粉塵が飛散し、既成削孔に
入り込んでしまうが、この実施形態によれば、それらの
粉塵を確実に排出することができる。
Further, air is pressure-fed to the hollow steel pipe 51 through the air supply pipe 511 during the drilling process, and
A rising air current is formed from the bottom surface toward the rock surface in the inside, and dust accumulated on the inner bottom portion of the drilling hole or dust generated during the drilling process for forming the drilling hole 42 is drilled by this rising air flow. It is discharged to the rock surface side from inside 41 and 43, and further collected by a suction collection mechanism. Therefore, when a new hole is formed, dust generated by the drilling process is scattered in the existing hole adjacent to the hole and enters the existing hole, but according to this embodiment, Dust can be reliably discharged.

【0024】上記のようにして削孔42の形成が完了す
ると、中空鋼管51を削孔41から引き抜き、その削孔
41の表面開口411を金属、ゴムあるいは樹脂製のキ
ャップ71で塞ぐことで、削孔41への粉塵の飛散を防
止するとともに、削孔42には、ガイド部材72を挿入
する(図2(a))。
When the formation of the hole 42 is completed as described above, the hollow steel pipe 51 is pulled out from the hole 41 and the surface opening 411 of the hole 41 is closed with a cap 71 made of metal, rubber or resin. The dust is prevented from being scattered into the hole 41, and a guide member 72 is inserted into the hole 42 (FIG. 2A).

【0025】図5はガイド部材の一例を示す図であり、
同図(a)が斜視図であり、同図(b)が平面図であ
る。このガイド部材72は、開口角を約150゜とし、
その断面形状が略C字状を呈したC型鋼721の外周部
にゴムや樹脂などの弾性部材722を設けてなるもので
ある。この実施形態では、図5のガイド部材72を、図
2(a)に示すように、その開口部723を削孔43内
に挿入されている中空鋼管51に向けて削孔42に挿入
している。したがって、中空鋼管51に対して圧縮空気
を送り込むと、上昇気流の一部がガイド部材72の中央
部に流れ込むが、その流入気流をガイド部材72の内周
面に沿って岩盤表面側に導くことができる。なお、ガイ
ド部材の構造に関しては任意であり、隣接する中空鋼管
51から流入してきた流入気流を岩盤表面側に導くこと
ができる構成であれば、材質や形状などは任意である
が、本実施形態の如く構成した場合には、ガイド部材7
2の座屈抵抗を高めることができる。また、ガイド部材
72を削孔内に挿入した際、弾性部材722が削孔41
に隣接する孔壁に密着して削孔41へ粉塵が流入するの
を効果的に防止することができる。したがって、この点
から図5に示すガイド部材72は、好適な実施形態の一
つといえる。
FIG. 5 shows an example of the guide member.
FIG. 1A is a perspective view, and FIG. 1B is a plan view. The guide member 72 has an opening angle of about 150 °,
An elastic member 722 such as rubber or resin is provided on the outer periphery of a C-shaped steel 721 having a substantially C-shaped cross section. In this embodiment, as shown in FIG. 2A, the guide member 72 of FIG. 5 is inserted into the hole 42 with its opening 723 facing the hollow steel pipe 51 inserted into the hole 43. I have. Therefore, when the compressed air is sent into the hollow steel pipe 51, a part of the rising air flows into the central portion of the guide member 72, but the inflow air flow is guided to the rock surface along the inner peripheral surface of the guide member 72. Can be. Note that the structure of the guide member is arbitrary, and any material and shape may be used as long as the structure can guide the inflow airflow flowing from the adjacent hollow steel pipe 51 to the rock surface side. In the case of such a configuration, the guide member 7
2 can increase the buckling resistance. When the guide member 72 is inserted into the hole 41, the elastic member 722 is
It is possible to effectively prevent dust from flowing into the hole 41 in close contact with the hole wall adjacent to the hole. Therefore, from this point, the guide member 72 shown in FIG. 5 can be said to be one of the preferred embodiments.

【0026】削孔41へのキャップ71の装着、および
削孔42へのガイド部材72の挿入に続いて、図2
(a)に示すように、第5番目の削孔45を既成削孔4
3から溝長手方向Xに、しかも約削孔1個分だけ離れた
位置に形成する。この時、ビット22と隣接していない
にもかかわらず、削孔43内の中空鋼管51を回転させ
るとともに、圧縮空気を中空鋼管51に対して圧送して
いるが、これは渦巻き状の上昇気流を安定的に形成し、
粉塵を効果的に排出して粉塵によるビット22の回転阻
害を準備しておくためである。
Following the installation of the cap 71 into the hole 41 and the insertion of the guide member 72 into the hole 42, FIG.
As shown in (a), the fifth drill hole 45 is
3 in the longitudinal direction X of the groove, and at a position separated by about one hole. At this time, the hollow steel pipe 51 in the drilled hole 43 is rotated and the compressed air is fed to the hollow steel pipe 51 under pressure, although the hollow steel pipe 51 is not adjacent to the bit 22. Stably form,
This is because the dust is effectively discharged to prepare for preventing the rotation of the bit 22 by the dust.

【0027】次に、新たに形成された削孔45に中空鋼
管51を挿入し、上記と同様に、削孔43,45にサン
ドイッチされている削孔予定位置を削孔機2によって岩
盤3の表面から鉛直方向Zに穿孔して第4番目の削孔4
4を形成すると、さらに第4および第5削孔44,45
が既成削孔41〜43からなる溝に連通して溝1がX方
向に拡張される。そして、このような処理を繰り返すこ
とで、溝1をX方向にさらに延設することが可能であ
る。
Next, the hollow steel pipe 51 is inserted into the newly formed drill hole 45, and the drilling position sandwiched between the drill holes 43 and 45 is determined by the drilling machine 2 in the rock 3 as described above. 4th drilling 4 from the surface in the vertical direction Z
4, the fourth and fifth holes 44 and 45 are further formed.
Communicates with the groove formed by the existing holes 41 to 43, and the groove 1 is expanded in the X direction. By repeating such a process, the groove 1 can be further extended in the X direction.

【0028】以上のように、この実施形態によれば、複
数の削孔41〜45を相互に連通させることで岩盤3に
溝1を形成するようにしているので、従来のように油圧
ブレーカを用いる場合に比べて作業に伴う騒音を大幅に
低減することができる。また、比較的硬い岩盤であって
も効率良く溝を形成することができ、油圧ブレーカを用
いる場合や静的破砕剤を使用する場合に比べて作業時間
を大幅に短縮することができる。
As described above, according to this embodiment, the groove 1 is formed in the rock 3 by mutually communicating the plurality of drilled holes 41 to 45, so that the hydraulic breaker is conventionally used. The noise associated with the work can be significantly reduced as compared with the case of using. Also, grooves can be efficiently formed even on relatively hard rock, and the working time can be greatly reduced as compared with the case where a hydraulic breaker is used or the case where a static crushing agent is used.

【0029】また、穿孔作業を行う際には、粉塵が発生
し、これが既成削孔に飛散すると、既成削孔の内底部に
溜ってしまうが、上記したように既成削孔に中空鋼管5
1を挿入し、しかも、その中空鋼管51の内部に圧縮空
気を圧送することで既成削孔の底部から岩盤表面側に向
かって渦巻き状の上昇気流を形成しているため、この上
昇気流に乗って既成削孔内に飛散してきた粉塵を当該既
成削孔の外部に排出することができ、既成削孔内に粉塵
が溜まるのを効果的に防止することができる。
Further, when the drilling operation is performed, dust is generated, and when the dust is scattered into the existing drilling hole, the dust accumulates at the inner bottom of the existing drilling hole.
1 is inserted, and compressed air is pumped into the hollow steel pipe 51 to form a spiral updraft from the bottom of the pre-drilled hole toward the rock surface side. Thus, the dust scattered in the formed hole can be discharged to the outside of the formed hole, and the accumulation of dust in the formed hole can be effectively prevented.

【0030】ところで、上記実施形態においては、溝長
手方向Xに削孔を順次形成して行くことで溝1をX方向
に拡張しているが、予め約削孔1個分の間隔で奇数番目
の削孔41,43,45,…を形成しておき、各削孔4
1,43,45,…に鋼管を挿入した後、偶数番目の削
孔42,44,…を形成することで溝1を設けるように
してもよい。
In the above embodiment, the grooves 1 are expanded in the X direction by sequentially forming the holes in the longitudinal direction X of the groove, but the odd-numbered grooves are previously formed at intervals of about one hole. Are formed in advance, and each of the drilled holes 4, 43, 45,.
After the steel pipes are inserted into 1, 43, 45,..., Grooves 1 may be provided by forming even-numbered holes 42, 44,.

【0031】また、上記実施形態では、溝1を長手方向
Xに拡張する場合について説明しているが、次のように
幅方向Yにも上記のようにして連続削孔を形成すること
で溝1を拡張することができる。例えば図4の削孔4
1,43に鋼管を挿入した後、これらの削孔41,43
に隣接する削孔予定位置32(同図中の1点鎖線)を穿
孔して新たな削孔を設けるような幅拡張作業を繰り返し
て行うことで、溝1の幅を幅W1から幅W2(>W1)に
拡張することができる。
In the above embodiment, the case where the groove 1 is extended in the longitudinal direction X has been described. However, by forming the continuous hole in the width direction Y as described above, One can be extended. For example, drilling 4 in FIG.
After inserting the steel pipes into the holes 1, 43, these holes 41, 43
The width of the groove 1 is changed from the width W1 to the width W2 (by repeatedly performing the width expansion operation of drilling the drilling expected position 32 (indicated by the one-dot chain line in FIG. > W1).

【0032】さらに、上記実施形態では、削孔予定位置
を2つの既成削孔によりサンドイッチした状態で削孔予
定位置に削孔を形成するようにしているが、図6に示す
手順で複数の削孔を形成し、岩盤3に溝1を形成するよ
うにしてもよい。
Further, in the above-described embodiment, the drilling hole is formed at the planned drilling position while the planned drilling position is sandwiched by the two existing drilled holes. A hole may be formed and the groove 1 may be formed in the rock 3.

【0033】図6は、この発明にかかる溝形成工法の他
の実施形態を示す断面図である。この溝形成工法が先の
実施形態(図1、図2)と大きく相違する点は、岩盤3
に削孔46を形成し(図6(a))、中空鋼管51を挿
入した(同図(b))後、直ちに、その削孔46に隣接
する削孔予定位置33を穿孔して新たな削孔47を形成
し(同図(c))、既成削孔46に連通させることで溝
1をX方向に拡張している点であり、その他の基本的手
順は先の実施形態と同様であるため、ここでは、それら
の説明を省略する。
FIG. 6 is a sectional view showing another embodiment of the groove forming method according to the present invention. The major difference between this groove forming method and the previous embodiment (FIGS. 1 and 2) is that the rock mass 3
6 (a), and after inserting the hollow steel pipe 51 ((b) in FIG. 6), immediately, drilling is performed at the scheduled drilling position 33 adjacent to the drilled hole 46 and a new hole is formed. A hole 47 is formed (FIG. 3 (c)), and the groove 1 is expanded in the X direction by communicating with the existing hole 46. Other basic procedures are the same as in the previous embodiment. Therefore, the description thereof is omitted here.

【0034】また、削孔47の形成後についても、先の
実施形態と同様に、ガイド部材72やキャップ71も用
いながら、削孔48、49を順次形成していく。
After the formation of the holes 47, the holes 48 and 49 are sequentially formed using the guide member 72 and the cap 71, as in the previous embodiment.

【0035】このように、この実施形態では、先に説明
したように中空鋼管51によってサンドイッチされた状
態で新たな削孔を形成する先の実施形態に比べて削孔形
成精度の点で若干劣るものの、中空鋼管51によってビ
ット22が隣接する既成削孔46に逃げるのを防止する
とともに、穿孔処理によって発生し、隣接する既成削孔
46に飛散した粉塵を渦巻き状の上昇気流によって岩盤
表面側に排出することができる。そして、このような溝
形成工程を採用することで、先の実施形態と同様に、作
業に伴う騒音を大幅に低減するとともに、比較的硬い岩
盤であっても効率良く溝を形成することができ、油圧ブ
レーカを用いる場合や静的破砕剤を使用する場合に比べ
て作業時間を大幅に短縮することができる。また、既成
削孔内に粉塵が溜まるのを効果的に防止することができ
る。
As described above, this embodiment is slightly inferior in precision of drilling as compared with the previous embodiment in which a new drilling is formed in a state sandwiched by the hollow steel pipes 51 as described above. However, the hollow steel pipe 51 prevents the bit 22 from escaping to the adjacent pre-drilled hole 46, and the dust generated by the drilling process and scattered in the adjacent pre-drilled hole 46 is swirled upward by the upward flow of air to the rock surface. Can be discharged. And by adopting such a groove forming step, similarly to the previous embodiment, it is possible to significantly reduce the noise caused by the work and efficiently form the groove even in a relatively hard rock. The working time can be greatly reduced as compared with the case where a hydraulic breaker is used or the case where a static crushing agent is used. In addition, it is possible to effectively prevent dust from accumulating in the existing drilled hole.

【0036】B.上記溝形成工法を用いた岩盤掘削工法 図7はこの発明にかかる岩盤掘削工法の一の実施形態を
示す図である。また、図8は図7の岩盤掘削工法におけ
る作業手順を示す断面図である。この岩盤掘削工法は、
上記「A.岩盤への溝形成工法」の項で説明した溝形成
工法を利用したものであり、その詳細は以下の通りであ
る。
B. Rock excavation method using the above groove forming method Fig. 7 is a view showing one embodiment of a rock excavation method according to the present invention. FIG. 8 is a sectional view showing an operation procedure in the rock excavation method shown in FIG. This rock excavation method
The groove forming method described in the section "A. Groove forming method for rock" is used, and details thereof are as follows.

【0037】まず、図7に示すように、岩盤8のうち掘
削する領域(以下「掘削領域」という。)81を取り囲
むように閉ループ状に周回溝82を所定深さH(図8)
で形成する。このとき、上記した溝形成工法を用いるこ
とで、従来のように油圧ブレーカを用いる場合に比べて
作業に伴う騒音を大幅に低減することができ、岩盤8が
比較的硬い場合であっても効率良く溝82を形成するこ
とができ、油圧ブレーカを用いる場合や静的破砕剤を使
用する場合に比べて作業時間を大幅に短縮することがで
きる。
First, as shown in FIG. 7, a circular groove 82 having a predetermined depth H (FIG. 8) is formed in a closed loop shape so as to surround an area 81 to be excavated (hereinafter referred to as "excavation area") in the rock 8.
Formed. At this time, by using the above-described groove forming method, the noise caused by the work can be significantly reduced as compared with the case of using the hydraulic breaker as in the related art, and the efficiency can be improved even when the rock 8 is relatively hard. The groove 82 can be formed well, and the working time can be greatly reduced as compared with the case where a hydraulic breaker is used or the case where a static crushing agent is used.

【0038】周回溝82の形成が完了すると、図8
(a)に示すように、掘削領域81内で、しかも周回溝
82の近傍位置に斜孔83を形成する。この斜孔83は
周回溝82の内底部に向けて形成されており、この斜孔
83内に油圧式石割機(例えば、平戸金属工業株式会社
製のK−25W40A400)9のウェッジ部91を挿
入セットした後、油圧式石割機9を作動させる。これに
よって、同図(b)に示すように、周回溝82の内底部
に向けて加圧クラック84が発生する。
When the formation of the circumferential groove 82 is completed, FIG.
As shown in (a), an oblique hole 83 is formed in the excavation area 81 and at a position near the orbital groove 82. The oblique hole 83 is formed toward the inner bottom of the orbital groove 82, and the wedge portion 91 of a hydraulic stone splitter (for example, K-25W40A400 manufactured by Hirado Metal Industry Co., Ltd.) 9 is inserted into the oblique hole 83. After setting, the hydraulic stone splitter 9 is operated. As a result, a pressure crack 84 is generated toward the inner bottom of the orbital groove 82 as shown in FIG.

【0039】これに続いて、掘削領域81内に削孔85
を形成し、上記と同様に油圧式石割機9を用いて岩盤8
に加圧クラック84を発生させるとともに、掘削部の底
面に相当する位置にクラックを伝播させる。このような
作業を複数回繰り返すことで、図7に示すように、掘削
領域81を破砕して複数の岩石に分割する。その後、こ
れらの岩石を搬出することで、深さHの掘削部を形成す
ることができる。
Subsequently, a hole 85 is formed in the excavation area 81.
Is formed, and the rock mass 8 is formed using the hydraulic stone splitter 9 as described above.
A pressure crack 84 is generated at the same time, and the crack is propagated to a position corresponding to the bottom surface of the excavated portion. By repeating such operations a plurality of times, the excavation area 81 is crushed and divided into a plurality of rocks, as shown in FIG. Then, by excavating these rocks, an excavated portion having a depth H can be formed.

【0040】以上のように、この実施形態では、予め周
回溝82を形成しておくことで、次のような効果が得ら
れる。すなわち、周回溝82を形成しないで岩盤掘削を
行う場合、岩盤のうち露出している面、つまり自由面は
表面のみであり、岩盤を掘削するために油圧ブレーカを
用いる必要があり、掘削に多大な時間を要し、深刻な騒
音問題を引き起こしてしまうという問題があるのに対し
て、岩盤8の掘削領域81を取り囲むように閉ループ状
に周回溝82を形成し、岩盤8の掘削領域81の側面を
露出させて自由面を増大させることで、上記したような
作業によって掘削作業を行うことができ、掘削時間を大
幅に短縮するとともに、騒音を大幅に低減することがで
きる。
As described above, in this embodiment, the following effects can be obtained by forming the circumferential groove 82 in advance. That is, when the rock excavation is performed without forming the orbital groove 82, the exposed surface of the rock, that is, the free surface is only the surface, and it is necessary to use a hydraulic breaker to excavate the rock, which is very difficult for the excavation. In contrast to the problem that it takes a long time to cause a serious noise problem, a circular groove 82 is formed in a closed loop shape so as to surround the excavation area 81 of the rock 8, and the excavation area 81 of the rock 8 is formed. By exposing the side surface to increase the free surface, the excavation work can be performed by the above-described operation, and the excavation time can be significantly reduced, and the noise can be significantly reduced.

【0041】また、掘削領域81を予め閉ループ状の周
回溝82で取り囲んでおり、掘削部を限定的に、かつ効
率良く掘削することができる。
Further, the excavation area 81 is previously surrounded by a closed loop-shaped circumferential groove 82, so that the excavation part can be excavated in a limited and efficient manner.

【0042】なお、上記実施形態では、周回溝82を形
成し、岩盤8の自由面を増大させた後、油圧式石割機9
によって掘削領域81の破砕作業を行っているが、これ
以外の手法によって掘削領域81の破砕作業を行うよう
にしてもよいは言うまでもない。
In the above-described embodiment, after the circumferential groove 82 is formed and the free surface of the rock 8 is increased, the hydraulic stone splitter 9
Although the crushing operation of the excavation area 81 is performed by the method, it goes without saying that the crushing operation of the excavation area 81 may be performed by other methods.

【0043】[0043]

【発明の効果】以上のように、この発明にかかる岩盤へ
の溝形成工法では、岩盤に複数の削孔を相互に隣接させ
ながら連続して設け、これら連続削孔によって溝を形成
している。特に、連続削孔を形成するに際して、隣接す
る既成削孔に鋼管または鋼棒を挿入しておくことで、ビ
ット22が隣接する既成削孔に逃げるのを防止し、既成
削孔と隣接して新たな削孔を確実に形成し、溝の形成拡
張を行っている。このため、従来のように油圧ブレーカ
を用いる場合に比べて作業に伴う騒音を大幅に低減する
ことができる。また、比較的硬い岩盤であっても効率良
く溝を形成することができ、油圧ブレーカを用いる場合
や静的破砕剤を使用する場合に比べて作業時間を大幅に
短縮することができる。
As described above, in the method of forming grooves in a rock according to the present invention, a plurality of holes are continuously provided in a rock while adjoining each other, and grooves are formed by these continuous holes. . In particular, when forming a continuous drilling hole, by inserting a steel pipe or a steel rod into an adjacent existing drilling hole, it is possible to prevent the bit 22 from escaping to the adjacent existing drilling hole, and to adjoin the existing drilling hole. New holes are surely formed, and the formation of grooves is expanded. For this reason, it is possible to greatly reduce the noise caused by the work as compared with the case where the hydraulic breaker is used as in the related art. Also, grooves can be efficiently formed even on relatively hard rock, and the working time can be greatly reduced as compared with the case where a hydraulic breaker is used or the case where a static crushing agent is used.

【0044】また、第1削孔に中空鋼管を挿入し、しか
も、その中空鋼管の内部に空気を圧送して第1削孔の底
部から岩盤表面側に向かう気流を形成しているので、第
1削孔内に飛散してきた粉塵を当該上昇気流に乗って第
1削孔の外部に排出することができるので、第1削孔内
に粉塵が溜まるのを防止することができる。
Further, since a hollow steel pipe is inserted into the first drilled hole, and air is forced into the hollow steel pipe to form an airflow from the bottom of the first drilled hole toward the rock surface. The dust scattered in the first drilling can be discharged to the outside of the first drilling by riding the rising air current, so that it is possible to prevent the dust from being accumulated in the first drilling.

【0045】また、第3削孔にガイド手段を挿入し、当
該ガイド手段によって第3削孔に流れ込む気流を岩盤表
面側に導くように構成すると、第1削孔内で発生される
気流に乗って第3削孔に飛散した粉塵を、ガイド手段に
よって岩盤表面に導かれる気流に乗って第3削孔の外部
に排出することができる。
Further, when a guide means is inserted into the third drilling, and the airflow flowing into the third drilling is guided by the guide means to the surface of the rock, the airflow generated in the first drilling is taken. Thus, the dust scattered in the third hole can be discharged to the outside of the third hole by riding on an airflow guided to the rock surface by the guide means.

【0046】また、第4削孔の表面開口をキャップ手段
で塞ぐことで、第4削孔への粉塵の飛散を防止すること
ができる。
Further, by closing the surface opening of the fourth hole with the cap means, it is possible to prevent the scattering of dust to the fourth hole.

【0047】さらに、この発明にかかる岩盤掘削工法で
は、岩盤の掘削領域を掘削するのに先立って、予め掘削
領域を取り囲むように上記溝形成工法によって岩盤に閉
ループ状に周回溝を形成しているため、閉ループ状に周
回溝の形成によって岩盤の掘削領域の側面も自由面とな
り、掘削作業性を向上させることができる。
Further, in the rock excavation method according to the present invention, prior to excavating the excavated area of the rock, a circular groove is formed in the rock as a closed loop by the groove forming method so as to surround the excavated area in advance. Therefore, the side surface of the excavation region of the bedrock becomes free by the formation of the circular groove in a closed loop, and the excavation workability can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明にかかる溝形成工法の一の実施形態を
示す断面図である。
FIG. 1 is a sectional view showing one embodiment of a groove forming method according to the present invention.

【図2】この発明にかかる溝形成工法の一の実施形態を
示す断面図である。
FIG. 2 is a sectional view showing one embodiment of a groove forming method according to the present invention.

【図3】この発明にかかる溝形成工法において使用する
中空鋼管を示す断面図である。
FIG. 3 is a sectional view showing a hollow steel pipe used in the groove forming method according to the present invention.

【図4】図1および図2の溝形成工程によって岩盤に形
成された溝を示す図である。
FIG. 4 is a view showing grooves formed in the rock by the groove forming steps of FIGS. 1 and 2;

【図5】この発明にかかる溝形成工法において使用する
ガイド部材を示す断面図である。
FIG. 5 is a sectional view showing a guide member used in the groove forming method according to the present invention.

【図6】この発明にかかる溝形成工法の他の実施形態を
示す断面図である。
FIG. 6 is a sectional view showing another embodiment of the groove forming method according to the present invention.

【図7】この発明にかかる岩盤掘削工法の一の実施形態
を示す図である。
FIG. 7 is a view showing one embodiment of a rock excavation method according to the present invention.

【図8】図7の岩盤掘削工法における作業手順を示す断
面図である。
FIG. 8 is a sectional view showing an operation procedure in the rock excavation method of FIG.

【符号の説明】[Explanation of symbols]

1,82…(周回)溝 3,8…岩盤 31〜33…削孔予定位置 81…(岩盤の)掘削領域 41〜49…削孔 51…鋼管 X…溝長手方向 Z…深さ方向 1,82 ... (circumferential) groove 3,8 ... rock 31-33 ... scheduled drilling position 81 ... digging area (of rock) 41-49 ... drilling 51 ... steel pipe X ... groove longitudinal direction Z ... depth direction

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E21C 25/00 - 37/10 E02D 5/00 - 5/18 E21B 3/00 - 6/08 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 7 , DB name) E21C 25/00-37/10 E02D 5/00-5/18 E21B 3/00-6/08

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 岩盤表面から鉛直方向または鉛直方向に
対して傾斜して複数の削孔を相互に隣接させながら連続
して設け、これら連続削孔によって溝を形成する溝形成
工法であって、 岩盤に形成された第1削孔に、第1削孔の内径よりも小
さな外径を有する中空鋼管を挿入する第1工程と、 前記中空鋼管の内部に空気を圧送して前記第1削孔の底
部から岩盤表面側に向かう気流を形成しながら、前記第
1削孔と隣接する位置に第2削孔を形成して溝を形成拡
張する第2工程とを備えたことを特徴とする岩盤への溝
形成工法。
1. A groove forming method in which a plurality of holes are continuously provided while being adjacent to each other in a vertical direction or inclined with respect to the vertical direction from a rock surface, and a groove is formed by these continuous holes. A first step of inserting a hollow steel pipe having an outer diameter smaller than the inner diameter of the first drilling into a first drilling formed in the rock, and the first drilling by pumping air into the hollow steel pipe. A second step of forming a second drilling hole at a position adjacent to the first drilling hole to form and expand a groove while forming an airflow from the bottom of the rocker toward the rock surface side. Groove formation method.
【請求項2】 前記第2工程に先立って、前記第2削孔
を形成する削孔形成位置から離れた位置で、かつ前記第
1削孔と隣接して既に前記岩盤に形成されている第3削
孔内にガイド手段を挿入し、当該ガイド手段によって前
記第3削孔に流れ込む気流を岩盤表面側に導く第3工程
をさらに備える請求項1記載の岩盤への溝形成工法。
2. Prior to the second step, a first hole formed in the bedrock at a position away from a hole forming position for forming the second hole and adjacent to the first hole. The method of forming a groove in a rock according to claim 1, further comprising a third step of inserting a guide means into the three holes and guiding the airflow flowing into the third hole to the rock surface side by the guide means.
【請求項3】 前記第2工程に先立って、前記第1およ
び第2削孔から離れた位置で、かつ前記第3削孔と隣接
して既に前記岩盤に形成されている第4削孔の表面開口
をキャップ手段で塞ぐ第4工程をさらに備える請求項2
記載の岩盤への溝形成工法。
3. Prior to the second step, a fourth drilling hole formed in the rock at a position away from the first and second drilling holes and adjacent to the third drilling hole. 3. The method according to claim 2, further comprising a fourth step of closing the surface opening with cap means.
The method of forming grooves in the bedrock described.
【請求項4】 岩盤のうち所定の掘削領域を部分的に掘
削する岩盤掘削工法において、 前記掘削領域を掘削するのに先立って、予め前記掘削領
域を取り囲むように前記請求項1ないし3のいずれかに
記載の溝形成工法によって前記岩盤に閉ループ状に周回
溝を形成しておくことを特徴とする岩盤掘削工法。
4. A rock excavation method for partially excavating a predetermined excavation area of a rock mass, wherein the excavation area is surrounded beforehand before excavating the excavation area. A rock excavation method, wherein a circular groove is formed in the rock in a closed loop by the groove forming method described in the above (1).
JP31557999A 1999-11-05 1999-11-05 Groove formation method for rock and rock excavation method using the groove formation method Expired - Lifetime JP3340981B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31557999A JP3340981B2 (en) 1999-11-05 1999-11-05 Groove formation method for rock and rock excavation method using the groove formation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31557999A JP3340981B2 (en) 1999-11-05 1999-11-05 Groove formation method for rock and rock excavation method using the groove formation method

Publications (2)

Publication Number Publication Date
JP2001132376A JP2001132376A (en) 2001-05-15
JP3340981B2 true JP3340981B2 (en) 2002-11-05

Family

ID=18067059

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31557999A Expired - Lifetime JP3340981B2 (en) 1999-11-05 1999-11-05 Groove formation method for rock and rock excavation method using the groove formation method

Country Status (1)

Country Link
JP (1) JP3340981B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6982553B2 (en) * 2018-06-25 2021-12-17 日本製鉄株式会社 How to cut pig iron in a blast furnace
KR102376612B1 (en) * 2021-08-05 2022-03-21 주식회사 기술나라 drill guide unit for formation of free Surface and method for performing the free Surface in rock Splitting

Also Published As

Publication number Publication date
JP2001132376A (en) 2001-05-15

Similar Documents

Publication Publication Date Title
JP5062442B2 (en) Sand pile generator
JP3340981B2 (en) Groove formation method for rock and rock excavation method using the groove formation method
JPH1162453A (en) System for effective use of down-the-hole drill
JP4253801B2 (en) Tunnel construction method
JP4516494B2 (en) Obstacle removal method and excavation device in propulsion method
JPS62228591A (en) Method of pit excavation construction and casing pipe used for said method
JPH04302693A (en) Excavating engineering method
JPH06264434A (en) Cement milk injection type down-hole hammer
JP4781195B2 (en) Driving method for driving material and driving material for preceding excavation
KR20050089656A (en) Boring system and method therefor
JP3465789B2 (en) Drilling rig
JPH06264435A (en) Cement milk injection type down-hole hammer
JP4372661B2 (en) Construction method of expansion head pile
JP6982598B2 (en) Deep-deep excavation equipment and deep-deep excavation method
JP2006348478A (en) Peripheral bit of steel pipe
KR102468621B1 (en) A construction method of a pithead to minimize for cutting slopes of the mountain
KR101571123B1 (en) Tunnel construction method using tunnel boring machine of ring type (ring tbm) and horizontal boring machine
JP3879105B2 (en) Shield connection method to existing tunnel
KR102566443B1 (en) Vibration-Free Rock Crushing with 3 Free-face Excavation Method
JPH094351A (en) Excavating device
JP3568844B2 (en) Excavator and buried pipe
JP5166727B2 (en) Excavator
JPH04309685A (en) Well boring
JP2000328864A (en) Expandable-diameter bit for drilling, for constructing concrete pile for use in reinforcing concrete bedrock
JP2002371785A (en) Method for draining pressurized water in ground on planned tunneling line

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020806

R150 Certificate of patent or registration of utility model

Ref document number: 3340981

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080816

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090816

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090816

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100816

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110816

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110816

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120816

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130816

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term