JP3337138B2 - Bridge construction method - Google Patents

Bridge construction method

Info

Publication number
JP3337138B2
JP3337138B2 JP35617899A JP35617899A JP3337138B2 JP 3337138 B2 JP3337138 B2 JP 3337138B2 JP 35617899 A JP35617899 A JP 35617899A JP 35617899 A JP35617899 A JP 35617899A JP 3337138 B2 JP3337138 B2 JP 3337138B2
Authority
JP
Japan
Prior art keywords
bridge
wire
hand
pier
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35617899A
Other languages
Japanese (ja)
Other versions
JP2001172918A (en
Inventor
良一 滝井
Original Assignee
株式会社大滝油圧
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社大滝油圧 filed Critical 株式会社大滝油圧
Priority to JP35617899A priority Critical patent/JP3337138B2/en
Publication of JP2001172918A publication Critical patent/JP2001172918A/en
Application granted granted Critical
Publication of JP3337138B2 publication Critical patent/JP3337138B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁(主桁)の架
設工法に関し、詳しくは連続的に送出す橋梁の先端に手
延べ機を取り付けて送出す手延べ式送出し工法の改良に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of erection of a bridge (main girder), and more particularly, to an improvement of a hand-rolling type delivery method in which a hand-held device is attached to a tip of a continuously-transmitted bridge and then delivered.

【0002】[0002]

【従来の技術】鋼製の橋梁をピア(橋脚)上に架設する
工法として、送出す橋梁の先端に手延べ機を連結取り付
けて送出す手延べ式送出し工法がある。この工法は、鋼
製の橋梁の先端に、トラス型或いはガーダー型の軽量な
手延べ機を連結取付け、軌道又は軌条上に送出し装置又
はローラで支持した橋梁を橋軸方向に送出して、ピア上
に橋梁を据え付ける工法である。
2. Description of the Related Art As a method of erection of a steel bridge on a pier (pier), there is a hand-rolling delivery method in which a hand-held device is connected and attached to a tip of a bridge to be delivered and delivered. In this method, a truss-type or girder-type lightweight hand-held device is connected and attached to the tip of a steel bridge, and a bridge supported by a delivery device or roller on a track or rail is delivered in the bridge axis direction. This is a method of installing a bridge on a pier.

【0003】この手延べ式送出し工法における橋梁先端
の手延べ機は、送出される橋梁の先端を送出し方向前方
に位置するピアへスムーズに受け渡す為に取り付けられ
ている。その為、この手延べ機はアングル材等を用いて
トラス型、ガーダー型に構成され、且つ先端側に行くに
従い上下方向の厚みが薄く形成されている。
[0003] The hand-held machine at the tip of the bridge in this hand-operated delivery method is mounted to smoothly deliver the tip of the delivered bridge to a pier located forward in the delivery direction. Therefore, this hand-rolling machine is formed into a truss type or a girder type by using an angle material or the like, and is formed to be thinner in the vertical direction toward the tip end.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、受け渡
しを早くするために長く形成されているため、送出され
た手延べ機はそれが支持されているピア上の送り装置
(支点)から遠ざかる(次のピアに近づく)に従ってそ
の先端が自重で下方に撓み、手延べ機の先端がスムーズ
に次のピア上に設置されている送り装置に受け亘らない
といった問題が生じる。
However, because of the long length of the hand-rolling machine, the hand-held machine is moved away from the feeding device (fulcrum) on the pier on which it is supported. (Close to the pier), the tip of the hand deflects downward due to its own weight, which causes a problem that the tip of the hand-roller does not smoothly reach the feeder installed on the next pier.

【0005】上記の問題を解決する手段として、橋梁を
送出す時、該橋梁を水平より上向きに向けて送出し、手
延べ機の先端が下方に撓んでも次のピア上に到達するよ
うな方法が考えられる。この方法を実施する場合は、橋
梁を水平より上向きに送出すため、送り装置には高さ調
整が必要で、従って、送り装置としては仮受けジャッキ
と、水平ジャッキで水平移動される鉛直ジャッキで橋梁
を持ち替え、鉛直ジャッキで支持した場合に該鉛直ジャ
ッキを水平ジャッキで送出すようになっている。従っ
て、この場合、橋梁の送出しは該橋梁の持ち替えと、水
平ジャッキの往復動により断続的な送出しとなり、連続
的に送出すことは出来ない。
[0005] As a means for solving the above problem, when a bridge is sent out, the bridge is sent out upward from the horizontal so that even if the tip of the hand-rolling machine is bent downward, it reaches the next pier. A method is conceivable. When carrying out this method, the height of the feeder must be adjusted in order to send the bridge upward from the horizontal.Therefore, as the feeder, a temporary receiving jack and a vertical jack horizontally moved by the horizontal jack are used. When the bridge is switched and supported by a vertical jack, the vertical jack is sent out by a horizontal jack. Therefore, in this case, the delivery of the bridge is intermittent due to the change of the bridge and the reciprocation of the horizontal jack, and cannot be delivered continuously.

【0006】本発明は上記した従来の技術が有する問題
点に鑑みてなされたもので、その目的とするところは、
橋梁を水平線より上向きに送出すことなく、手延べ機の
撓みを解消して確実に次のピア上に到達させることが出
来る送出し架設工法を提供することにある。
[0006] The present invention has been made in view of the above-mentioned problems of the prior art.
An object of the present invention is to provide a delivery erection method capable of eliminating deflection of a hand-held device and reliably reaching a next pier without sending a bridge upward from a horizontal line.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
に本発明が講じた技術的手段は、手延べ機を連結取り付
けた橋梁、又は橋梁の送出し方向前方に位置するピアに
ワイヤーの一端を固定し、そのワイヤーの端部(開放端
側)を手延べ機の下面に沿って案内し、橋梁に連結した
ワイヤーの端部を引張って手延べ機の先端を前方のピア
上の送り台に到達させるか、又はピアに固定したワイヤ
ーの端部を引込んで橋梁を前進させ、手延べ機の先端を
ピア上の送り台に到達させることを特徴とする。即ち、
ワイヤーを引込む場合(請求項1)は、先端に手延べ機
を連結取り付けた橋梁にワイヤー引込み装置を取り付
け、このワイヤー引込み装置に引込むワイヤーはその一
端を橋梁の送出し方向前方に位置するピアに固定し、そ
のワイヤーの開放端部は、橋梁前方のピア上に設置され
た送り台と略同じ高さにあるガイド部材及び手延べ機の
下側を経由して橋梁に取り付けてあるワイヤー引込み装
置に案内導入し、そのワイヤー引込み装置を作動して手
延べ機及び橋梁を前進させ、手延べ機の先端を送出し方
向前方のピア上の送り台に到達させる。ピア上に設置す
る送り台としては、クローラ式送り台、ローラ式送り台
等が効果的である。
The technical means taken by the present invention to solve the above-mentioned problems is that a bridge to which a hand-held device is connected and attached, or a pier located in front of the bridge in the delivery direction of the bridge has one end of a wire. Is fixed, and the end of the wire (open end side) is guided along the lower surface of the hand-roller, and the end of the wire connected to the bridge is pulled to connect the tip of the hand-roller to the feeder on the front pier. Or the end of the wire fixed to the pier is pulled in to advance the bridge, and the tip of the hand-roller reaches the feeder on the pier. That is,
When pulling the wire (Claim 1), a hand- rolling machine at the tip
A wire pull-in device is attached to a bridge with a connection
The wire drawn into this wire pulling device is one of them.
Fix the end to a pier located in front of the bridge in the
The open end of the wire is installed on the pier in front of the bridge
Of the guide member and hand-roller at approximately the same height
Wire drop-in device attached to the bridge via the lower side
Guide, and activate the wire pull-in device to
How to advance the beam and bridge and send out the tip of the hand
To the feeder on the peer in front of you. A crawler-type feeder, a roller-type feeder, or the like is effective as a feeder installed on the pier.

【0008】に、ピア上に取り付けるガイド部材は、
滑車、ローラ等、ワイヤーをスムーズに案内することが
出来るものであればよい。
[0008] Further, the attachment to the peer guide member,
Any material that can smoothly guide the wire, such as a pulley or a roller, may be used.

【0009】記工法において、ワイヤーを引込むのに
使用する引込み装置としては、ワイヤークランプとジャ
ッキを組み合わせたもの、センターホールジャッキ等が
挙げられる。
[0009] In the above SL method, the retraction device used to retract the wire, a combination of wire clamp and the jack, and a center hole jack or the like.

【0010】上記請求項1の手段によれば、橋梁の送出
し方向の前方に位置するピアに固定したワイヤーを、橋
梁に固定した引込み装置で引込むことで、手延べ機を連
結した橋梁はワイヤーをガイドとして前進し、手延べ機
の先端がピアに近づくに従ってワイヤーも直線状に緊張
され、それにより手延べ機先端の撓みも解消され、手延
べ機はピア上の送り台にスムーズに乗り移る。
[0010] According to the measure of the first aspect, a wire fixed to peers located in front of the direction dispatches the bridges, by pulling in a fixed retraction device bridges, bridges linked hands total machine The wire advances as a guide, and the wire is straightened as the tip of the hand tool approaches the peer, thereby eliminating the bending of the tip of the hand tool and allowing the hand tool to smoothly move to the feeder on the peer. .

【0011】[0011]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づき説明する。図1は本発明請求項1に係る手延式
送出し工法を示し、図中、1は鋼製の橋梁、2は橋梁1
の送出し方向先端に連結取り付けたアングル材でトラス
型に構成した手延べ機、3は前記橋梁1の先端側下部に
連結したワイヤー、4は前記手延べ機2の送出し方向先
端部に取り付けたワイヤー3のガイド部材、5はピア6
の上面に設置したクローラ式送り台7の載承面(クロー
面)と略同じ高さ位置に取り付けたワイヤー3のガイ
ド部材である。上記手延べ機2の先端に取り付けるガイ
ド部材4、及びピア6の上面に取り付けるガイド部材5
としては、ワイヤー3をスムーズに案内することができ
る滑車を使用し、それらのガイド部材4、5はワイヤー
3を引張って手延べ機2を送り台7の上面に乗せる時、
邪魔にならない位置、即ち、送り台7の内側、又は外側
とし、そのガイド部材4、5の位置に対応してワイヤー
3を橋梁1に固定する。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a hand-rolling type delivery method according to claim 1 of the present invention. In the figure, 1 is a steel bridge, 2 is a bridge 1
3 is a wire connected to the lower end of the bridge 1 at the tip side of the bridge 1 and 4 is attached to the tip of the hand-rolling machine 2 in the delivery direction. Guide member of wire 3
Mounting Uketamawamen (claw crawler type feed table 7 installed in the upper surface of the
La surface) to be substantially a guide member wire 3 attached at the same height. A guide member 4 attached to the tip of the hand-rolling machine 2 and a guide member 5 attached to the upper surface of the pier 6
A pulley that can smoothly guide the wire 3 is used. When the guide members 4 and 5 pull the wire 3 and put the hand-held device 2 on the upper surface of the feed base 7,
The wire 3 is fixed to the bridge 1 in a position that does not get in the way, that is, inside or outside the feed stand 7, corresponding to the position of the guide members 4, 5.

【0012】ピア6の上面に設置するクローラ式送り台
7は、図2に示すように台板7aに機体7bがジャッキ
7cで起立支持され、その機体7bの外周に無端状の
ローラ7dが回動可能に巻装された構成のものである。
そして、上記クローラ式送り台7は、台板7aをピア6
上面に載置させて設置することで、その台板7aピア
6上面との接触抵抗より、橋梁1を載承するクローラ
dと機体7bとの接触抵抗が小さいため、水平ジャッキ
(図示省略)による押動または前記ワイヤー3の牽引
(引張り)の力が橋梁1に作用することで、該橋梁1を
載承支持するクローラ7dは機体7bの周囲を回動し、
橋梁1は順次送出し移送される。尚、ピア6上面に設置
するクローラ式送り台7の台数は、架設する橋梁1の横
幅に応じて決定する。
As shown in FIG. 2, a crawler- type feed stand 7 installed on the upper surface of the pier 6 has a body 7b standing upright supported by a jack 7c on a base plate 7a, and an endless claw is provided on the outer periphery of the body 7b .
The roller 7d is configured to be rotatably wound.
Then, the crawler- type feed table 7 connects the base plate 7a to the pier 6
The crawler 7 on which the bridge 1 is mounted is placed on the upper surface, and the contact resistance between the base plate 7a and the upper surface of the pier 6 is set.
Since the contact resistance between the d and the body 7b is small, a pushing force by a horizontal jack (not shown) or a pulling (pulling) force of the wire 3 acts on the bridge 1, so that the crawler for mounting and supporting the bridge 1 is provided. 7d rotates around the body 7b,
The bridges 1 are sequentially sent out and transferred. The number of crawler- type feed stands 7 installed on the upper surface of the pier 6 is determined according to the width of the bridge 1 to be erected.

【0013】次に、橋梁の送出し架設方法について説明
する。先ず、橋梁1の送出し方向先端に手延べ機2を連
結取付け、且つ橋梁1の先部下面にワイヤー3を連結す
ると共に、そのワイヤー3は前記手延べ機2の下面に沿
って先端側に案内し、手延べ機2の先部に取り付けたガ
イド部材4の滑車を経由して送出し方向前方に位置する
ピア6上のガイド部材5の滑車を経由して前方に延長さ
せる。そして、橋梁1の後部を水平ジャッキで押動する
と同時にワイヤー3を送出し方向に引張るか、又はワイ
ヤー3のみを引張ることで、橋梁1をクローラ式送り台
7の作用で送出し移送される。
Next, a method of erection and erection of a bridge will be described. First, a hand-rolling machine 2 is connected and attached to the leading end of the bridge 1 in the delivery direction, and a wire 3 is connected to the lower surface of the leading end of the bridge 1. It is guided and extended forward through the pulley of the guide member 4 on the pier 6 located forward in the sending direction via the pulley of the guide member 4 attached to the tip of the handwheel 2. Then, by pushing the rear part of the bridge 1 with the horizontal jack and pulling the wire 3 in the sending direction at the same time as pulling the wire 3 or pulling only the wire 3, the bridge 1 is sent and transferred by the action of the crawler type feeder 7.

【0014】ところで、橋梁1の送出しが、現に送出し
が行なわれている送り台7が設置されたピア6から送出
し方向前方に位置するピア6に向けて送出し量が増加す
るに伴い、橋梁1の先端に連結された手延べ機2の先部
は支点(送出しが行なわれている送り台7)から遠ざか
るため、手延べ機2の先部は下方に撓み、手延べ機2の
先部下面はピア6上の送り台7の上面(クローラ面)よ
り下方に位置し、このまま送出しを続行しても手延べ機
2の先部は前方の送り台7上面に到達せず、送出しは不
可能となる。
By the way, the delivery of the bridge 1 is accompanied by an increase in the delivery amount from the pier 6 on which the feed base 7 where the delivery is currently being performed is installed to the pier 6 located in the forward direction in the delivery direction. Since the tip of the hand-rolling machine 2 connected to the tip of the bridge 1 moves away from the fulcrum (the feed bar 7 where the feeding is performed), the tip of the hand-rolling machine 2 bends downward and the hand-rolling machine 2 Is located below the upper surface ( crawler surface) of the feed bar 7 on the pier 6. Even if the feeding is continued as it is, the front portion of the hand-rolling machine 2 does not reach the upper surface of the front feed bar 7. , The transmission becomes impossible.

【0015】しかし、本発明の架設方法は、橋梁1に連
結したワイヤー3を手延べ機2の下面に沿って前方に案
内し、そのワイヤー3を手延べ機2先端のガイド部材
4、及び前方のピア6上面に設置のガイド部材5を経由
して引張られているため、下方に撓む手延べ機2はその
先端が次のピア6が近づくに従ってワイヤー3で下側を
支えられて上方に引き上げられ、手延べ機2の下面が送
り台7の上面と面一、若しくは送り台7の上面より上方
に位置し、手延べ機2の先部はスムーズに送り台7上に
移乗され、連続した送出しが可能となる。(図2、図3
参照)
However, according to the erection method of the present invention, the wire 3 connected to the bridge 1 is guided forward along the lower surface of the hand tool 2, and the wire 3 is guided to the guide member 4 at the tip of the hand tool 2 and to the front. Is pulled through the guide member 5 installed on the upper surface of the pier 6, and the hand tool 2, which bends downward, has its tip supported on the lower side by the wire 3 as the next pier 6 approaches, and moves upward. The lower surface of the hand-rolling machine 2 is positioned flush with the upper surface of the feed bar 7 or higher than the upper surface of the feed bar 7, and the leading end of the hand-rolling machine 2 is smoothly transferred onto the feed bar 7. It becomes possible to send out. (FIGS. 2 and 3
reference)

【0016】即ち、橋梁1に連結したワイヤー3を送出
し方向に引張ることで、緊張状態のワイヤー3で手延べ
機2が下方へ撓むのを防止すると共に、ワイヤー3がピ
ア6上のガイド部材5を経由するため、手延べ機2の先
部は該ワイヤー3が案内されるガイド部材5の位置へ引
き上げられる。これにより、橋梁1の送出しが進み、手
延べ機2の先部が次のピア6に近づくに従い前方に送出
されながら上方へ引き上げられ、ピア上の送り台7にス
ムーズに乗り移る。
That is, by pulling the wire 3 connected to the bridge 1 in the sending direction, the hand 3 is prevented from bending downward by the tensioned wire 3 and the wire 3 is guided by the guide on the pier 6. Since the wire 3 passes through the member 5, the leading end of the hand-rolling machine 2 is lifted to the position of the guide member 5 where the wire 3 is guided. As a result, the bridge 1 is sent out, and as the tip of the hand-rolling machine 2 approaches the next pier 6, it is lifted upward while being sent out forward, and smoothly moves to the feed stand 7 on the pier.

【0017】図4は請求項3に記載の送出し工法を示す
説明図で、前記した実施例で示した部材と同じ部材は同
一の符号を付し、説明を省略する。前記した工法は、ワ
イヤー3を送り出し方向に向けて引張り、それにより橋
梁1を前進させながら該ワイヤー3で手延べ機2の先端
が下方に撓むのを防止するものであるが、本工法はワイ
ヤー3を引込むことで橋梁を前進させ、且つワイヤー3
で手延べ機の先端が下方に撓むのを防止し、手延べ機を
送り台に乗り移らせる方法である。その為に、先端に手
延べ機2を連結した橋梁1の下面にワイヤー引込み装置
8を取り付け、このワイヤー引込み装置8で引込むワイ
ヤー3の基端は、橋梁1の送り出し方向前方に位置する
ピア6上に固定し、他端(開放端側)は同ピア6上に設
置した送り台7と略同じ高さのガイド部材9、手延べ機
2の先端に取り付けたガイド部材4、及び手延べ機2の
下面を経由して橋梁1側に案内し、橋梁1の下面に取り
付けたワイヤー引込み装置8に導入する。尚、ワイヤー
3の基端をピア6に固定する場合、橋梁の送り出しの進
行に合わせてワイヤー3の固定を順次移す必要があるた
め、着脱し得るようにすると便利である。
FIG. 4 is an explanatory view showing a delivery method according to a third embodiment. The same members as those described in the above-mentioned embodiment are denoted by the same reference numerals, and description thereof will be omitted. The above-described method is to pull the wire 3 in the feeding direction, thereby preventing the tip of the hand-rolling machine 2 from being bent downward by the wire 3 while moving the bridge 1 forward. The bridge is advanced by pulling in the wire 3 and the wire 3
In this method, the tip of the hand-rolling machine is prevented from bending downward, and the hand-rolling machine is transferred to the feed stand. For this purpose, a wire pull-in device 8 is attached to the lower surface of the bridge 1 to which the hand-drawing machine 2 is connected at the tip, and the base end of the wire 3 pulled in by the wire pull-in device 8 is a pier 6 located in front of the bridge 1 in the feeding direction. The guide member 9 is fixed on the upper end and the other end (open end side) is substantially the same height as the feed stand 7 installed on the pier 6, the guide member 4 attached to the tip of the hand-rolling machine 2, and the hand-rolling machine It is guided to the bridge 1 side via the lower surface of the bridge 2 and is introduced into the wire drawing device 8 attached to the lower surface of the bridge 1. When the base end of the wire 3 is fixed to the pier 6, it is necessary to sequentially move the fixation of the wire 3 in accordance with the progress of the delivery of the bridge.

【0018】以上の如く準備してワイヤー引込み装置8
を作動させると、ワイヤー3の基端が固定されているた
め、該ワイヤー引込み装置8を取り付けた橋梁1はワイ
ヤー3をガイドにしながら前進し、手延べ機2の先端は
前方のピア6に近づく。そして、ワイヤー3の引込みを
順次進めることでワイヤー3の固定部とワイヤー引込み
装置8との間隔が狭まり、ワイヤー3も直線状に緊張さ
れ、それにより手延べ機2の先端の撓みも徐々に少なく
なってピア6上の送り台7に到達し、スムーズに乗り移
りが行なわれる。
The wire pull-in device 8 prepared as described above
When the is operated, since the base end of the wire 3 is fixed, the bridge 1 to which the wire drawing-in device 8 is attached advances while using the wire 3 as a guide, and the tip of the hand-rolling machine 2 approaches the front pier 6. . Then, the wire 3 is sequentially pulled in, the distance between the fixed portion of the wire 3 and the wire drawing device 8 is reduced, and the wire 3 is also tensioned linearly, so that the bending of the tip of the hand-rolling machine 2 is gradually reduced. As a result, the vehicle reaches the feed stand 7 on the pier 6, and the transfer is performed smoothly.

【0019】[0019]

【発明の効果】本発明の橋梁の架設方法は、請求項1に
記載の方法により、橋梁の送出しが進にしたがって生じ
る手延べ機先端側が下方に撓むのを防止すると共に、ワ
イヤーの引張り、又は引込みで手延べ機の先部を確実に
送り台の上面に乗り移らせることができる。因って、送
り台を使用して連続して送出し架設することができる架
設方法を提供できる。
According to the method for erection of a bridge of the present invention, the method of claim 1 prevents the tip end of a hand-rolling machine, which occurs when the bridge is sent out as it advances, from bending downward. By pulling or pulling the wire, the tip of the hand-roller can be reliably transferred to the upper surface of the feeder. Therefore, it is possible to provide an erection method capable of continuously sending and erection using the feeder.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明請求項1の架設方法を説明する説明図
で、(a)はピア上の送り台に乗り移る前の状態、
(b)は手延べ機がピア上の送り台に乗り移った状態を
示す。
FIG. 1 is an explanatory view for explaining a method of erection according to claim 1 of the present invention, wherein FIG.
(B) shows a state in which the hand-rolling machine has moved onto the feed bar on the peer.

【図2】 手延べ機の先部がピアに到達する手前の状態
を示す拡大斜視図である。
FIG. 2 is an enlarged perspective view showing a state before a leading end of the hand-rolling machine reaches a pier.

【図3】 手延べ機の先部がピア上の送り台に乗り移る
直前の状態を示す同拡大斜視図である。
FIG. 3 is an enlarged perspective view showing a state immediately before the leading end of the hand-rolling machine moves onto a feed bar on a pier.

【図4】 本発明請求項の架設方法を説明する説明図
である。
FIG. 4 is an explanatory view illustrating a method of erection according to claim 1 of the present invention.

【符号の説明】[Explanation of symbols]

1…橋梁 2…手延べ機 3…ワイヤー 4…手延べ機に取り付けた
ガイド部材 5…ピア上のガイド部材 6…ピア 7…送り台 8…ワイヤー引込み装置
DESCRIPTION OF SYMBOLS 1 ... Bridge 2 ... Hand-rolling machine 3 ... Wire 4 ... Guide member attached to the hand-rolling machine 5 ... Guide member on a pier 6 ... Peer 7 ... Feeding stand 8 ... Wire drawing-in device

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平3−90703(JP,A) 特開 昭58−131209(JP,A) 特開 昭51−15539(JP,A) 特開 昭57−137507(JP,A) 特開 昭56−16709(JP,A) 特開 平9−3830(JP,A) 実開 昭55−40022(JP,U) (58)調査した分野(Int.Cl.7,DB名) E01D 21/00 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-3-90703 (JP, A) JP-A-58-131209 (JP, A) JP-A-51-15539 (JP, A) JP-A-57-131 137507 (JP, A) JP-A-56-16709 (JP, A) JP-A-9-3830 (JP, A) JP-A-55-40022 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E01D 21/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ピア上に橋梁を架設する工法であって、
先端に手延べ機を連結取り付けた橋梁にワイヤー引込み
装置を取り付け、このワイヤー引込み装置に引込むワイ
ヤーはその一端を橋梁の送出し方向前方に位置するピア
に固定し、そのワイヤーの開放端部は、橋梁前方のピア
上に設置された送り台と略同じ高さにあるガイド部材及
び手延べ機の下側を径由して橋梁に取り付けてあるワイ
ヤー引込み装置に案内導入し、そのワイヤー引込み装置
を作動して手延べ機及び橋梁を前進させ、手延べ機の先
端を送出し方向前方のピア上の送り台に到達させること
を特徴とする橋梁の架設工法。
1. A method of erection of a bridge on a pier,
Wires are pulled into a bridge with a hand-held device connected to the tip
Attach the device and pull the wire
One end of the pier is located in front of the bridge in the delivery direction of the bridge.
And the open end of the wire is
The guide member and the
Of the hand attached to the bridge
Guide to the wire retraction device, and the wire retraction device
The bridge construction method is characterized in that the bridge and the bridge are advanced by operating the bridge and the tip of the bridge is sent out to reach the feeder on the pier in the forward direction .
JP35617899A 1999-12-15 1999-12-15 Bridge construction method Expired - Fee Related JP3337138B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35617899A JP3337138B2 (en) 1999-12-15 1999-12-15 Bridge construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35617899A JP3337138B2 (en) 1999-12-15 1999-12-15 Bridge construction method

Publications (2)

Publication Number Publication Date
JP2001172918A JP2001172918A (en) 2001-06-26
JP3337138B2 true JP3337138B2 (en) 2002-10-21

Family

ID=18447730

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35617899A Expired - Fee Related JP3337138B2 (en) 1999-12-15 1999-12-15 Bridge construction method

Country Status (1)

Country Link
JP (1) JP3337138B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100468500B1 (en) * 2001-12-28 2005-01-27 대우조선해양 주식회사 Method for construction of curvature steel bridge
KR100472390B1 (en) * 2001-12-29 2005-03-08 대우조선해양 주식회사 Method for construction of linear steel bridge
JP3641617B2 (en) * 2002-03-28 2005-04-27 株式会社大滝油圧 Bridge girder delivery method
JP4558609B2 (en) * 2005-08-30 2010-10-06 オリエンタル白石株式会社 Extrusion construction method of bridge
CN102747691B (en) * 2012-08-02 2014-08-27 中铁二十三局集团有限公司 Integral pushing erection method for truss girders
CN102828471B (en) * 2012-09-07 2015-06-10 中铁二十三局集团第三工程有限公司 Butt-jointing method for truss girder
JP5649637B2 (en) * 2012-11-27 2015-01-07 三菱重工鉄構エンジニアリング株式会社 Bridge erection device and bridge erection method
KR101492914B1 (en) * 2013-05-30 2015-02-12 김태희 Pulling-out method of concrete bridge using trolley and winch
KR101630312B1 (en) * 2015-11-17 2016-06-24 한국도로공사 Rapid bridge replacement construction method using through bridge girder segment
JP6907443B2 (en) * 2017-12-09 2021-07-21 株式会社横河ブリッジ Protective film delivery device, long object delivery system, and long object delivery method
CN110273367B (en) * 2018-03-17 2021-06-25 中铁第五勘察设计院集团有限公司 Method for erecting beam at low station

Also Published As

Publication number Publication date
JP2001172918A (en) 2001-06-26

Similar Documents

Publication Publication Date Title
JP3337138B2 (en) Bridge construction method
EP0755475A1 (en) Method and device for installing light-weight panel units
KR100652530B1 (en) Earth anchor bracket
US6769223B2 (en) Roof insulation applicator with purlin connectors
US6007050A (en) Machine for laying an overhead line of a track
JP4041716B2 (en) Girder feeding construction method
PL211054B1 (en) Machine for and method of lying a traction cable
US6672024B2 (en) System for applying heat insulation to a roof structure
JPH10145921A (en) Jig for cable laying
JP4759120B2 (en) Jib crane
KR20100096386A (en) Angle adjustment bracket
JPS63144707A (en) Method and apparatus for paying off messemger rope for laying cable in cable rack
JP2684167B2 (en) Ground anchor Ground fixing structure
JP2001012079A (en) Concrete pump car
WO2002012110A1 (en) Jib crane
JP4349995B2 (en) How to build a bridge
JP3494432B2 (en) Guide device used for erection of bridge girder
JPH1182809A (en) Piping tractional installation construction method and device
JP3219972B2 (en) Automatic cable feeding device
JP3924099B2 (en) Tube carrier
EP1711671A1 (en) Apparatus for dispensing and tensioning wire
JPH10131445A (en) Execution supporting device for curved building plate and executing method therefor
JP3124736B2 (en) Guide frame for building sheet piles
JPH0545909Y2 (en)
JPH08260883A (en) Receiving device of underground jacking body

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3337138

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090809

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100809

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100809

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110809

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110809

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120809

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120809

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130809

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees