JP3324012B2 - How to build an artificial water-impermeable layer - Google Patents

How to build an artificial water-impermeable layer

Info

Publication number
JP3324012B2
JP3324012B2 JP24378093A JP24378093A JP3324012B2 JP 3324012 B2 JP3324012 B2 JP 3324012B2 JP 24378093 A JP24378093 A JP 24378093A JP 24378093 A JP24378093 A JP 24378093A JP 3324012 B2 JP3324012 B2 JP 3324012B2
Authority
JP
Japan
Prior art keywords
permeable layer
layer
pipe
water
injection pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24378093A
Other languages
Japanese (ja)
Other versions
JPH0771029A (en
Inventor
勝利 津田
謙 中野
秀則 小寺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP24378093A priority Critical patent/JP3324012B2/en
Publication of JPH0771029A publication Critical patent/JPH0771029A/en
Application granted granted Critical
Publication of JP3324012B2 publication Critical patent/JP3324012B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、透水層を利用した人工
難透水層の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an artificial water-impermeable layer using a water-permeable layer.

【0002】[0002]

【従来の技術】従来の山留工事等においては、地中の難
透水層まで山留壁を貫入させ、地下水の浸透を少なくし
て掘削を行っていた。しかし、軟透水層が適切な深さに
存在しない場合、山留壁の内側に地上より多数のボ−リ
ングを行い、そこから薬液を注入して人工難透水層を構
築していた。
2. Description of the Related Art In a conventional digging work or the like, digging is performed by making a digging wall penetrate into a hardly permeable layer underground to reduce the infiltration of groundwater. However, when the soft permeable layer does not exist at an appropriate depth, a number of borings are carried out from the ground inside the retaining wall, and a chemical solution is injected therefrom to construct an artificially permeable layer.

【0003】[0003]

【発明が解決しようとする問題点】前記した従来の人工
難透水層の構築方法には次のような問題点がある。
Problems to be Solved by the Invention The above-mentioned conventional method for constructing an artificial water-impermeable layer has the following problems.

【0004】<イ> 掘削面が広くなる程、薬剤注入用
のボ−リング数が増し、作業に多大な時間とコストがか
かる。
<A> As the excavated surface becomes wider, the number of drilling holes for chemical injection increases, and much time and cost are required for the operation.

【0005】<ロ> 難透水層を大深度に形成する場合
は、1本当たりのボ−リング長が長いものとなり、難透
水層の構築に多大な時間とコストがかかる。
<B> When the water-impermeable layer is formed at a large depth, the boring length per one becomes long, and it takes a lot of time and cost to construct the water-impermeable layer.

【0006】[0006]

【本発明の目的】本発明は以上の問題点を解決するため
になされたもので、その目的とするところは、迅速かつ
経済的に難透水層を構築できる、人工難透水層の構築方
法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to provide a method for constructing an artificial water-impermeable layer which can quickly and economically construct a water-impermeable layer. To provide.

【0007】[0007]

【問題点を解決するための手段】本発明は、透水層に到
達する深さに山留壁を構築し、前記山留壁に沿って、透
水層に到達する長さの注入管を貫入すると共に、前記注
入管から離れた位置に、透水層に到達する長さの回収管
を貫入し、前記注入管より透水層へ薬液を吐出しつつ、
回収管で吸引して薬液を浸透させ、前記注入管と回収管
の位置する透水層を難透水層に形成することを特徴とす
る、人工難透水層の構築方法である。
According to the present invention, a retaining wall is constructed at a depth reaching a permeable layer, and an injection pipe having a length reaching the permeable layer penetrates along the retaining wall. At the same time, at a position distant from the injection pipe, penetrate a recovery pipe of a length reaching the permeable layer, while discharging the chemical solution from the injection pipe to the permeable layer,
A method for constructing an artificial water-impermeable layer, characterized in that a suction is performed by a recovery pipe to penetrate a chemical solution, and a water-permeable layer in which the injection pipe and the recovery pipe are located is formed as a poor water-permeable layer.

【0008】[0008]

【実施例1】以下図面を参照しながら本発明の実施例に
ついて説明する。
Embodiment 1 An embodiment of the present invention will be described below with reference to the drawings.

【0009】<イ>山留壁の構築(図1) 掘削予定範囲を囲って公知の工法により山留壁1を構築
する。この場合、山留壁1の下部は、砂礫層等の透水性
に優れた透水層4に貫入させる。
<A> Construction of the retaining wall (FIG. 1) The retaining wall 1 is constructed by a known method surrounding the area to be excavated. In this case, the lower part of the retaining wall 1 is made to penetrate into a permeable layer 4 having excellent water permeability such as a gravel layer.

【0010】<ロ>薬液注入管の設置(図1) 山留壁1近傍の掘削予定地盤5に薬液注入管2を貫入す
る。薬液注入管2は、透水層4に達する長さを有する管
体で、その下部に薬液吐出用の吐出孔21を有し、上部
が吐出ポンプP1と接続していて、タンク内の薬液6を
透水層4内で吐出できるようになっている。
<B> Installation of Chemical Injection Pipe (FIG. 1) The chemical injection pipe 2 penetrates the ground 5 to be excavated near the retaining wall 1. The chemical injection pipe 2 is a tube having a length reaching the permeable layer 4 and having a discharge hole 21 for discharging a chemical liquid at a lower part thereof, and an upper part connected to the discharge pump P1 to supply the chemical liquid 6 in the tank. The liquid can be discharged in the permeable layer 4.

【0011】<ハ>薬液回収管の設置(図1) 薬液回収管3を、山留壁1から離れた掘削予定地盤5に
貫入する。回収管3は、前記注入管2と同様に透水層4
に達する長さを有する管体で、その上部が吸引ポンプP
2と接続している。尚、前記注入管2と回収管3の貫入
作業は、並行して行っても良い。
<C> Installation of chemical recovery pipe (FIG. 1) The chemical recovery pipe 3 penetrates into the ground 5 to be excavated away from the retaining wall 1. The collection pipe 3 is provided with a water permeable layer 4 like the injection pipe 2.
, And the upper part thereof is a suction pump P
2 is connected. The operation of penetrating the injection pipe 2 and the recovery pipe 3 may be performed in parallel.

【0012】<ニ>人工難透水層の構築(図1、2、
3) 両ポンプP1,P2の運転を開始し、注入管2の先端よ
り透水層4内に薬液6を吐出させる。単に注入管2から
薬液6を吐出させるだけでは薬液6の浸透範囲に限界が
ある。 本実施例では、薬液6の吐出位置から離れた位
置に設置した回収管3で負圧吸引するので、注入管2か
ら吐出された薬液6が回収管3へ向けて透水層4内を移
動し、地下水と共に薬液6の一部を回収管3で回収す
る。その結果、注入管2と回収管3の間に位置する透水
層4が連続した人工難透水層7として形成される。尚、
透水層4までの深度が大きい場合は、ポンプを回収管3
の下端部に設けて吸引する場合もある。
<D> Construction of an artificially impervious water-permeable layer (FIGS. 1, 2,
3) The operation of both pumps P1 and P2 is started, and the chemical solution 6 is discharged from the tip of the injection pipe 2 into the permeable layer 4. Simply discharging the chemical solution 6 from the injection pipe 2 limits the permeation range of the chemical solution 6. In the present embodiment, since the negative pressure is suctioned by the recovery pipe 3 provided at a position distant from the discharge position of the chemical liquid 6, the chemical liquid 6 discharged from the injection pipe 2 moves in the water-permeable layer 4 toward the recovery pipe 3. Then, a part of the chemical solution 6 is collected by the collection pipe 3 together with the groundwater. As a result, the water-permeable layer 4 located between the injection pipe 2 and the recovery pipe 3 is formed as a continuous artificial water-impermeable layer 7. still,
When the depth to the permeable layer 4 is large, the pump is
In some cases, suction may be provided at the lower end of the head.

【0013】<ホ>掘削(図3) 人工難透水層7は、山留壁1の底部間を閉塞して山留壁
1の外方の地下水が山留壁1の内側に浸入するのを阻止
する。そのため地下水の浸水を防止した状態で山留壁1
内の掘削を実施できる。
<E> Excavation (FIG. 3) The artificially impervious layer 7 closes the bottom of the retaining wall 1 to prevent groundwater outside the retaining wall 1 from entering the inside of the retaining wall 1. Block. As a result, the retaining wall 1
Excavation can be carried out.

【0014】[0014]

【実施例2】山留壁を構築する際に、山留壁の構成部材
の1つである連続地中壁の鉄筋籠や鋼管矢板等に予め薬
液注入管を付設してもよい。本実施例にあっては、独立
した注入管の貫入作業が不要となるから作業の簡略化を
図ることができる。
[Embodiment 2] When constructing a retaining wall, a chemical injection pipe may be attached in advance to a reinforcing steel cage, a steel pipe sheet pile or the like of a continuous underground wall, which is one of the constituent members of the retaining wall. In this embodiment, it is not necessary to penetrate an independent injection tube, so that the operation can be simplified.

【0015】[0015]

【実施例3】薬液注入管2と薬液回収管3との設置距離
が大きい場合は、注入管2と回収管3との間に透水層4
に達する長さの補助管(図示せず)を配置し、注入管2
より吐出させた薬液6を補助管で吸引して、先ず注入管
2と補助管の間の透水層4に薬液6を浸透させる。次
に、補助管を通じて吐出させたら薬液6を回収管3で吸
引して、補助管と回収管3との間の透水層4に薬液6を
浸透させる。上記の作業を実施することにより、薬液注
入管2と薬液回収管3との設置距離が広い場合にも難透
水層が容易に構築できる。
[Embodiment 3] When the installation distance between the chemical injection pipe 2 and the chemical recovery pipe 3 is large, the permeable layer 4 is placed between the injection pipe 2 and the recovery pipe 3.
An auxiliary pipe (not shown) having a length to reach
The discharged chemical solution 6 is sucked by the auxiliary pipe, and firstly the chemical liquid 6 penetrates into the permeable layer 4 between the injection pipe 2 and the auxiliary pipe. Next, when the chemical solution 6 is discharged through the auxiliary pipe, the chemical liquid 6 is sucked by the recovery pipe 3, and the chemical liquid 6 penetrates into the permeable layer 4 between the auxiliary pipe and the recovery pipe 3. By performing the above operation, a poorly permeable layer can be easily constructed even when the installation distance between the chemical injection pipe 2 and the chemical recovery pipe 3 is large.

【0016】[0016]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。
As described above, the present invention has the following effects.

【0017】<イ> 本発明の人工難透水層構築方法
は、人工難透水層を構築する際に使用されるボ−リング
が少なくなるため、難透水層の構築作業が迅速化されコ
ストも大幅に削減できる。
<A> In the method for constructing an artificial water-impermeable layer according to the present invention, since the amount of boring used when constructing the artificial water-impermeable layer is reduced, the work of constructing the water-impermeable layer is quickened and the cost is greatly increased. Can be reduced.

【0018】<ロ> 本発明の人工難透水層構築方法
は、深く、広い掘削部を持つ現場での作業に於いても、
使用されるボ−リングが少ないことから、難透水層の構
築作業が迅速化されコストも大幅に削減できる。
<B> The method for constructing an artificially impervious layer according to the present invention can be applied to work on site having a deep and wide excavation part.
Since less boring is used, the construction work of the impervious layer can be accelerated and the cost can be greatly reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る人工難透水層の構築前の断面図FIG. 1 is a cross-sectional view of an artificial water-impermeable layer according to the present invention before construction.

【図2】 人工難透水層の構築時の断面図FIG. 2 is a cross-sectional view of the construction of the artificially impervious layer.

【図3】 掘削時の説明図FIG. 3 is an explanatory view at the time of excavation.

フロントページの続き (56)参考文献 特開 昭61−60919(JP,A) 特開 昭49−111411(JP,A) 特公 昭35−7425(JP,B1) (58)調査した分野(Int.Cl.7,DB名) E02D 3/12 101 E02D 19/12 E02D 31/02 Continuation of the front page (56) References JP-A-61-60919 (JP, A) JP-A-49-111411 (JP, A) JP-B-35-7425 (JP, B1) (58) Fields investigated (Int .Cl. 7 , DB name) E02D 3/12 101 E02D 19/12 E02D 31/02

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】透水層に到達する深さに山留壁を構築し、 前記山留壁に沿って、透水層に到達する長さの注入管を
貫入すると共に、 前記注入管から離れた位置に、透水層に到達する長さの
回収管を貫入し、 前記注入管より透水層へ薬液を吐出しつつ、 回収管で吸引して薬液を浸透させ、 前記注入管と回収管の位置する透水層を難透水層に形成
することを特徴とする、 人工難透水層の構築方法
1. A ridge wall is constructed at a depth reaching a permeable layer, and an injection pipe having a length reaching the permeable layer penetrates along the ridge wall and at a position away from the injection pipe. Into the permeable layer through the collecting pipe, and while discharging the chemical solution from the injection pipe to the permeable layer, sucking the recovery pipe to penetrate the chemical solution, Forming an artificial water-impermeable layer, wherein the layer is formed as a water-impermeable layer.
JP24378093A 1993-09-03 1993-09-03 How to build an artificial water-impermeable layer Expired - Fee Related JP3324012B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24378093A JP3324012B2 (en) 1993-09-03 1993-09-03 How to build an artificial water-impermeable layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24378093A JP3324012B2 (en) 1993-09-03 1993-09-03 How to build an artificial water-impermeable layer

Publications (2)

Publication Number Publication Date
JPH0771029A JPH0771029A (en) 1995-03-14
JP3324012B2 true JP3324012B2 (en) 2002-09-17

Family

ID=17108866

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24378093A Expired - Fee Related JP3324012B2 (en) 1993-09-03 1993-09-03 How to build an artificial water-impermeable layer

Country Status (1)

Country Link
JP (1) JP3324012B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4749800B2 (en) * 2004-08-23 2011-08-17 三菱マテリアル株式会社 Formation method of underground impermeable layer
JP4678018B2 (en) * 2006-10-10 2011-04-27 株式会社大北耕商事 Ground survey device, ground survey method, and ground improvement method

Also Published As

Publication number Publication date
JPH0771029A (en) 1995-03-14

Similar Documents

Publication Publication Date Title
US4538386A (en) Drainage system and method
CN108612111B (en) Steel pipe pile, foundation pit support structure and construction method of foundation pit support structure
JP2009179945A (en) Well conduit for road and its construction method
JP5016517B2 (en) Groundwater level lowering method
CN109853604A (en) A kind of static pressure waterpower suction open caisson construction method
CN111411639B (en) Shallow foundation pit dewatering construction method for water-rich pebble layer
JP3324012B2 (en) How to build an artificial water-impermeable layer
KR100719444B1 (en) Level of underground water lowering method and deep well point system thereof
JPS5847823A (en) Construction of in-place concrete pile
JPS61211414A (en) Reduction well construction method
JP3224008B2 (en) Underwater ground improvement method
JP3200781B2 (en) How to reduce groundwater
KR100588185B1 (en) A construction method of concrete retaining wall
JP4346078B2 (en) Ground improvement method
JP2005090015A (en) Ground excavating method
JPS61237717A (en) Natural permeation work of chemical grout and plant therefor
CN112695767B (en) Water lowering structure and water lowering method for micro-expansive soil foundation pit soaked by underground water
CN108547320A (en) A kind of deep piping lane foundation pit method for digging of Collapsible Loess District
CN218880920U (en) High-efficient foundation ditch tubular well precipitation structure
JP2857907B2 (en) Infiltration type simple recharge drainage method
JPH1037202A (en) Cutting excavation method and device removing underground spring water
JP3552925B2 (en) Opening method of groundwater holes in steel pipe column retaining wall
JP3445923B2 (en) Continuous underground wall and its construction method
JP2004197473A (en) Bottom expanded well and excavation method thereof
JP2873809B2 (en) Construction method of house with basement in soft ground

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees