JP3250765B2 - Installation of exterior curtain wall - Google Patents

Installation of exterior curtain wall

Info

Publication number
JP3250765B2
JP3250765B2 JP20405693A JP20405693A JP3250765B2 JP 3250765 B2 JP3250765 B2 JP 3250765B2 JP 20405693 A JP20405693 A JP 20405693A JP 20405693 A JP20405693 A JP 20405693A JP 3250765 B2 JP3250765 B2 JP 3250765B2
Authority
JP
Japan
Prior art keywords
curtain wall
building
exterior
elevating
exterior curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP20405693A
Other languages
Japanese (ja)
Other versions
JPH0754487A (en
Inventor
明志 平尾
秀雄 谷尻
隆 後藤
義高 吉武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP20405693A priority Critical patent/JP3250765B2/en
Publication of JPH0754487A publication Critical patent/JPH0754487A/en
Application granted granted Critical
Publication of JP3250765B2 publication Critical patent/JP3250765B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は金属製パネル系,プレキ
ャストコンクリート系,アルミニウムカーテンウォール
系で構成された外装カーテンウォールの建物外壁面に対
する取付け施工法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for mounting an exterior curtain wall comprising a metal panel system, a precast concrete system, and an aluminum curtain wall system on an outer wall surface of a building.

【0002】[0002]

【従来の技術】従来、建物の外装壁は構造的には非耐力
壁で、金属製パネル系,プレキャストコンクリート系,
アルミカーテンウォール系で構成され、パネル化された
カーテンウォールが外装壁として用いられている。これ
らのカーテンウォールは、現場で築造するものではな
く、予め工場でカーテンウォールパネルユニットとして
製作され、現場施工の進捗状況に応じて現場に搬送し、
建物躯体の建ち上りに合わせて取付けられている。
2. Description of the Related Art Conventionally, exterior walls of buildings are structurally non-bearing walls, and are made of metal panels, precast concrete,
An aluminum curtain wall system and a panelized curtain wall are used as an exterior wall. These curtain walls are not built on site, but are manufactured in advance as curtain wall panel units at the factory, and transported to the site according to the progress of site construction,
It is installed according to the rise of the building frame.

【0003】前記カーテンウォールパネルユニットは、
屋上に設置されているクレーンなどを利用して、直接地
上、あるいはトラック上より吊り上げて、下方から順次
外壁面に取付けている。また、アルミニウムカーテンウ
ォールは、そのカーテンウォール枠材とガラスは一旦各
階に配置し、同各階で枠材にガラスを入れ、シール材を
装填し完全にパネル化して上階より揚重手段によって取
付けている。
[0003] The curtain wall panel unit comprises:
Using a crane or the like installed on the roof, it is lifted directly from the ground or from a truck and attached to the outer wall sequentially from below. In addition, the curtain wall frame material and glass of the aluminum curtain wall are temporarily arranged on each floor, glass is put into the frame material on each floor, a sealing material is loaded, a complete panel is formed, and the panel is mounted by lifting means from the upper floor. I have.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、建物の
外装壁に金属製パネル系,プレキャストコンクリート
系,アルミカーテンウォール系で構成されたカーテンウ
ォールは無足場工法を採用し、屋上に設置されているク
レーンなどを利用して、直接地上あるいはトラック上よ
り吊り上げて下方から順次外壁面に対する取付け作業を
行なうが前記工法には次のような問題がある。
However, a curtain wall composed of a metal panel system, a precast concrete system, or an aluminum curtain wall system on the exterior wall of a building adopts a scaffolding-free construction method and a crane installed on the roof. Using such methods, the work is directly lifted directly from the ground or on a truck, and the work of attaching to the outer wall surface is performed sequentially from below. However, the above method has the following problems.

【0005】即ちカーテンウォールは予め工場で製作さ
れ、施工現場の進捗状況に応じて現場に搬送するため、
搬送するための大きさが制限され、カーテンウォールパ
ネルユニットの単体として一枚一枚揚重して取り付ける
ため、パネルユニットの数だけ反復して取り付け作業を
行うこととなり、作業が煩雑で、その間、クレーンによ
る他の建て方作業が中断し工程が遅延する要因となる。
That is, the curtain wall is manufactured in a factory in advance, and is transported to the construction site in accordance with the progress of the construction site.
The size for transport is limited, and since the curtain wall panel units are lifted and mounted one by one as a single unit, the mounting operation will be repeated as many times as the number of panel units, making the work complicated, Other construction work by the crane is interrupted, causing a delay in the process.

【0006】また、前記のように屋上に設置されている
クレーン等により、直接地上あるいはトラック上より吊
り上げて所定の取付け位置まで搬送しカーテンウォール
部材を建物内から作業員が取り込むので、その姿勢が不
安定となり、高所での作業では危険性が多く、防護柵や
安全ロープ等による安全対策を講じるが、熟練した作業
員が必要になるため、作業要員の確保が困難である。
Further, as described above, the worker is lifted directly from the ground or a truck by a crane or the like installed on the roof and transported to a predetermined mounting position, and the worker takes in the curtain wall member from inside the building. It becomes unstable and there is a lot of danger when working at high altitudes, and safety measures such as protective fences and safety ropes are taken. However, since skilled workers are required, it is difficult to secure work personnel.

【0007】さらに、共通的には、カーテンウォール部
材を揚重機等で地上より上げて所定の取り付け位置に搬
送するため、天候に左右され易く、特に強風時にはカー
テンウォール部材の吊り上げが不安定となり、作業を中
断せざるを得なくなり、工程が遅延する原因となる。ま
たカーテンウォール部材取付け後の部材間の目地シーリ
ングの作業が多く残り、これは高所作業を伴うため作業
効率が低下し、更には環境によっては均一なシーリング
を施すことが困難で、品質管理が困難になる場合があ
る。
[0007] Further, since the curtain wall member is generally lifted from the ground by a hoist or the like and transported to a predetermined mounting position, the curtain wall member is easily affected by the weather, and the lifting of the curtain wall member becomes unstable, especially in a strong wind. The work must be interrupted, causing a delay in the process. In addition, a lot of joint sealing work between members after the curtain wall member is attached remains, and this involves work at high places, which lowers the work efficiency. Further, depending on the environment, it is difficult to perform uniform sealing, and quality control is difficult. It can be difficult.

【0008】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、その目的とする処は、施工性が
向上され、取付精度が改善され、省力化と作業の安全性
が図られる外装カーテンウォールの取付け施工法を提供
する点にある。
The present invention has been proposed in view of the above-mentioned problems of the prior art. The object of the present invention is to improve workability, improve mounting accuracy, save labor and improve work safety. The present invention is to provide a method for mounting an exterior curtain wall.

【0009】[0009]

【課題を解決するための手段】前記目的を達成するた
め、本発明に係る外装カーテンウォールの取付け施工法
は、外装カーテンウォールを取付ける建物外壁面の地上
部に外装カーテンウォール組立作業施設を前記外壁面の
左右に沿って延在させて設置し、前記外壁面の左右に沿
って延在する昇降架台を設け、昇降手段によって前記建
物の外壁面に沿って前記昇降架台を昇降自在に装架した
外装カーテンウォールの組立装置において、前記外壁面
の左右に間隔を置いた複数箇所で外装カーテンウォール
取付位置を通過し、建物側の頂部から下部に亘って延び
るPC鋼棒をそれぞれ緊張する工程と、前記外装カーテ
ンウォールの左右に間隔を置いた複数箇所で縦軸方向に
延びる方立の中空孔に前記各PC鋼棒をそれぞれ挿通さ
せつつ前記外装カーテンウォール組立作業施設における
前記昇降架台上に建物外壁面の1層階分の外装カーテン
ウォールを組立てる工程と、前記昇降架台及び同架台上
で組立てられた外装カーテンウォールを前記昇降手段に
よって建物の所定位置に上昇する工程と、同所定の位置
に上昇した外装カーテンウォールの方立の上端を、建物
本体に既に緊結された外装カーテンウォールの方立の下
端に差し込むと共に、同所定の位置に上昇した外装カー
テンウォールを建物本体に緊結する工程と、建物本体に
緊結された外装カーテンウォールと前記昇降架台との緊
結を解除して同架台を前記昇降手段を介して降下して元
の位置に復元する工程とによって、1層分のカーテンウ
ォールを建物外壁面に取付け、以下前記同様の工程を下
層階にも反復することを特徴とする。
In order to achieve the above object, an exterior curtain wall mounting method according to the present invention comprises the steps of: mounting an exterior curtain wall assembling work facility on a ground portion of an outer wall surface of a building where the exterior curtain wall is to be installed. It was installed extending along the left and right sides of the wall surface, provided with an elevating gantry extending along the left and right sides of the outer wall surface, and the elevating gantry was mounted to be able to move up and down along the outer wall surface of the building by elevating means. In the exterior curtain wall assembling apparatus, a step of passing through the exterior curtain wall mounting position at a plurality of locations spaced on the left and right of the outer wall surface, and tensioning each of the PC steel bars extending from the top to the lower part on the building side, While the PC steel rods are respectively inserted through cubic hollow holes extending in the longitudinal direction at a plurality of locations spaced apart on the left and right of the exterior curtain wall, the exterior car Assembling an exterior curtain wall for one floor of the outer wall of the building on the elevating gantry in the wall assembling work facility; and positioning the elevating gantry and the exterior curtain wall assembled on the gantry at a predetermined position in the building by the elevating means. And the upper end of the cubicle of the exterior curtain wall raised to the predetermined position is inserted into the lower end of the cubicle of the exterior curtain wall already fastened to the building body, and the exterior raised to the predetermined position. A step of tying the curtain wall to the building body and a step of releasing the ties between the exterior curtain wall tied to the building body and the elevating gantry and lowering the gantry via the elevating means to restore the original position. Thus, a curtain wall for one layer is attached to the outer wall surface of the building, and the same steps as described above are repeated for lower floors.

【0010】また、本発明は、前記昇降手段によって前
記建物の外壁面の左右に沿って前記昇降架台を任意の長
さに分割し、夫々の昇降架台を独立して昇降し、前記組
立て工程によってカーテンウォール取付けて施工するこ
とを特徴とする。
Further, according to the present invention, the elevating means divides the elevating platform into arbitrary lengths along the left and right sides of the outer wall surface of the building, and independently raises and lowers each of the elevating platforms. It is characterized by being installed with a curtain wall.

【0011】また、本発明は、前記昇降架台の左右に高
さ検出センサーと、同センサーのデータを入力して昇降
架台の姿勢、高さを制御する制御装置、及び同制御装置
が異常値を示したとき警報を発し、自動停止する操作装
置によって架台昇降手段を操作、制御することを特徴と
する。
Further, the present invention provides a height detection sensor on the left and right sides of the lift gantry, a control device for inputting data of the sensor to control the posture and height of the lift gantry, and the control device detects an abnormal value. A warning is issued when indicated, and the gantry elevating means is operated and controlled by an operating device that automatically stops.

【0012】[0012]

【作用】本発明によれば前記したように、建物外壁面の
地上部に設けた外装カーテンウォール組立て作業施設に
カーテンウォールを取り込んで、昇降手段によって建物
の外壁面に沿って昇降自在な昇降架台上に、一層階分の
カーテンウォールを組立て、PC鋼棒をカーテンウォー
ルの上下ガイドとして前記昇降手段により所定の位置ま
で上昇せしめて、同所定の位置に上昇した外装カーテン
ウォールの方立の上端を、建物本体に既に緊結された外
装カーテンウォールの方立の下端に差し込むと共に、同
カーテンウォールを建物本体に緊結固定した後、昇降架
台とカーテンウォールの緊結を解除し、昇降架台を再び
元の位置に降下し、復元して、一層階の外装カーテンウ
ォールを取付け、以下下層階にも前記の作業を繰り返す
ことによって外装カーテンウォールの取付けを効率よ
く、安全に遂行するものである。
According to the present invention, as described above, the curtain wall is taken into the exterior curtain wall assembling work facility provided on the ground portion of the outer wall surface of the building, and the elevating platform can be moved up and down along the outer wall surface of the building by the elevating means. On the upper part, a curtain wall of one floor is assembled, and a PC steel bar is raised to a predetermined position by the elevating means as a vertical guide of the curtain wall, and the upper end of the cubic of the exterior curtain wall raised to the predetermined position is raised. After inserting the curtain wall into the lower end of the curtain wall that has already been tied to the building body, tightening and fixing the curtain wall to the building body, release the tie between the elevator frame and the curtain wall, and move the elevator frame back to its original position. To the lower level, attach the exterior curtain wall of the first floor, and repeat the above operation on the lower floor. The attachment of over ten wall efficiently is to safely perform.

【0013】また、本発明によれば、複数のPC鋼棒を
カーテンウォールの上下ガイドとして用いることで、カ
ーテンウォールの組立が容易になり、かつ、既に取付け
られたカーテンウォールの方立とが同軸に位置すること
によって、精度の高い取付けが行なわれ、特に多少の風
圧でも揺れることがない。
Further, according to the present invention, the use of a plurality of PC steel bars as vertical guides for the curtain wall facilitates the assembly of the curtain wall and allows the already mounted curtain wall to be coaxial. , Accurate mounting is performed, and there is no swing even with a slight wind pressure.

【0014】また、本発明によれば、昇降架台を建物外
壁面の左右全長に亘って架装するか、または、任意の長
さに分割してそれぞれの架台が独立して昇降するように
したことにより、工区割がし易く、組立加工、カーテン
ウォール間のシーリング作業、同養生、吊り上げ取付作
業のサイクル工程により、工区別にタクト工程によって
労務が簡素化し、作業効率が向上する。また、昇降架台
を分割してそれぞれの架台を独立して昇降することによ
って、壁面に凹凸に対応して配設することができる。
Further, according to the present invention, the elevating platform is mounted over the entire left and right length of the outer wall of the building, or divided into arbitrary lengths so that each of the platforms can be independently raised and lowered. This makes it easy to divide the work area, and simplifies labor by the tact step for distinguishing works by the cycle process of assembling process, sealing work between curtain walls, same curing, and lifting installation work, thereby improving work efficiency. In addition, by dividing the elevating pedestal and independently elevating each pedestal, the pedestal can be disposed on the wall surface in accordance with the unevenness.

【0015】また、本発明によれば、昇降手段によって
昇降架台が昇降する際、その高さを監視する高さ検出セ
ンサーを昇降架台の左右に設置して常に昇降高さを検出
しそのデータを制御装置に入力して、制御装置により現
在高さ、姿勢を表示、監視し水平位置が異常値に達する
と警報を発し自動停止せしめるとともに、作業員が危険
を察知して無線機により非常停止する安全機能を有し、
作業の安全性を確保することができる。
Further, according to the present invention, when the elevating platform is moved up and down by the elevating means, height detecting sensors for monitoring the height are installed on the left and right sides of the elevating platform to constantly detect the ascending and descending heights and to store the data. Input to the control device, display and monitor the current height and posture by the control device, and when the horizontal position reaches an abnormal value, issue an alarm and stop automatically, and the worker senses danger and emergency stop by radio Has a safety function,
Work safety can be ensured.

【0016】また、操作員は常に制御装置のモニターを
目視して昇降架台の状況を把握し、操作装置によって昇
降手段を操作して所定の位置に確実に昇降架台を昇降操
作するので精度の高い取付けができる。
Also, the operator always looks at the monitor of the control device to grasp the condition of the elevating platform, and operates the elevating means by the operating device to reliably raise and lower the elevating platform at a predetermined position. Can be installed.

【0017】[0017]

【実施例】以下本発明を図示の実施例について説明す
る。先ずカーテンウォールの取付施工の概要を図1によ
って説明する。Aは建物で、外壁面の外装にアルミニウ
ムのカーテンウォールBが使用されている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. First, the outline of the installation work of the curtain wall will be described with reference to FIG. A is a building in which an aluminum curtain wall B is used for the exterior of the outer wall.

【0018】建物の外壁面の地上部に高床のカーテンウ
ォール組立作業施設Cが設けられ、同施設Cに昇降架台
Dが設置され、同昇降架台Dは夫々昇降手段Pを具えて
おり、外装を施す外壁面を分割したA工區,B工區及び
C工區の各工區に配設されている。昇降手段Pとしては
例えば電動チエンブロックが採用され、建物Aの上部階
に配置され、チエーンSを介して前記昇降架台Dを懸架
している。
A curtain wall assembling work facility C having a high floor is provided on a ground portion of the outer wall surface of the building, and an elevating platform D is installed in the facility C. The elevating platform D is provided with elevating means P, respectively. It is arranged in each of the A, B, and C sections where the outer wall surface to be applied is divided. As the elevating means P, for example, an electric chain block is adopted, which is arranged on the upper floor of the building A, and suspends the elevating gantry D via a chain S.

【0019】カーテンウォール組立作業施設Cは地上部
に設置された高床の構台aと、同構台a上に設置された
カーテンウォール組立足場bと、同足場上部のトロリー
ホイストcとより構成され、地上部と高床の構台aとの
間に荷揚装置dが設置されている。(図2参照) 図1中、A工區においては、カーテンウォール組立作業
施設Cの昇降架台DにおけるカーテンウォールBの組立
が完了し、C工區では昇降架台D1 で組立てられたカー
テンウォールBを昇降手段によって上昇中であり、B工
區ではA工區及びC工區より外壁面が後退しており、既
に上方のカーテンウォールBの建物Aに対する緊締、固
定が完了し、昇降架台D2 はカーテンウォールBと切り
離されて降下している状態を示す。
The curtain wall assembling work facility C is composed of a gantry a with a high floor installed on the ground, a scaffold b with a curtain wall installed on the gantry a, and a trolley hoist c above the scaffold. The unloading device d is installed between the section and the gantry a on the high floor. In (see FIG. 2) FIG. 1, A in Ko區, curtain wall assembly operation and assembly of the curtain wall B in elevating frame D facility C is completed, C curtain wall assembled with the elevating frame D 1 is Ko區B a rising by the lifting means, the B Ko區and retracts the outer wall surface than a Ko區and C Ko區already tightened against the building a of the upper curtain wall B, and fixed is finished, the elevating frame D 2 Indicates a state of being separated from the curtain wall B and descending.

【0020】図2はカーテンウォール組立作業施設Cの
断面図で、昇降手段Pは吊下げ架台P1に懸吊され、昇
降架台DをチェーンSで懸吊している。1は昇降架台D
の電動チェーンの吊フック2の係止部である。図1、図
6に示すように、カーテンウォール組立作業施設Cは、
建物Aの外壁面の左右に沿って延在し、昇降架台Dも建
物Aの外壁面の左右に沿って延在しており、図3、図6
に示すように、外壁面の左右に間隔を置いた複数箇所で
建物躯体に固定した係着部3,4間にPC鋼棒Eがそれ
ぞれ緊張され、PC鋼棒Eは建物Aの頂部から下部に亘
って上下に延在している。前記PC鋼棒Eは、図6、図
7、図8に示すように、カーテンウォールBの左右に間
隔を置いた複数箇所で縦軸方向に延びる中空縦枠状の方
立Fにそれぞれ挿通されるとともに、図4,図5に示す
ように、カーテンウォールBの裏面に取付けられた軸受
5にも遊貫されている。かくして前記とは他の実施例、
例えばPCパネル、金属パネル、石材パネル等のカーテ
ンウォールに本発明の適用を可能ならしめたものであ
る。
FIG. 2 is a sectional view of the curtain wall assembling work facility C. The lifting means P is suspended on a hanging stand P 1 , and the lifting stand D is suspended by a chain S. 1 is the lifting platform D
Of the hanging hook 2 of the electric chain. As shown in FIGS. 1 and 6, the curtain wall assembly work facility C
3 and 6, the elevating gantry D also extends along the left and right sides of the outer wall surface of the building A.
As shown in the figure, the PC steel bars E are tensioned between the engaging portions 3 and 4 fixed to the building frame at a plurality of places spaced apart on the left and right sides of the outer wall, respectively. Extending vertically. As shown in FIGS. 6, 7, and 8, the PC steel bars E are respectively inserted into hollow vertical frame-shaped cubicles F extending in the vertical axis direction at a plurality of locations spaced apart on the left and right of the curtain wall B. In addition, as shown in FIG. 4 and FIG. 5, the bearing is loosely mounted on the bearing 5 attached to the back surface of the curtain wall B. Thus other embodiments than the above,
For example, the present invention can be applied to curtain walls such as PC panels, metal panels, and stone panels.

【0021】図6は本方法の適用される建物外壁の立面
図で、Gは昇降架台Dのガイドレール、5′は同昇降架
台Dに設けたガイドローラで、左右の同昇降架台Dには
計測ワイヤー6を介して高さ検出センサーHが連結され
ている。同センサーHの検出信号による制御手段は後述
する。次にカーテンウォールBの組立について説明す
る。
FIG. 6 is an elevational view of an outer wall of a building to which the present method is applied. G is a guide rail of a lifting / lowering stand D, 5 'is a guide roller provided on the same. Is connected to a height detection sensor H via a measuring wire 6. Control means based on the detection signal of the sensor H will be described later. Next, the assembly of the curtain wall B will be described.

【0022】図7及び図8はアルミニウム製のカーテン
ウォールBの典型的なもので、方立Fにサッシ立枠7を
固定し、同立枠に横枠8が組立てられ、次いでガラス
8′とアルミパネル9が前記枠材に納まっている。10
はコーナー壁である。前記カーテンウォールの組立に際
しては、カーテンウォール組立作業施設Cの荷揚装置に
よって、地上部から資材を作業構台に供給し、そして昇
降架台Dは最下部に設置し、図9(イ)及び図5に示す
ように、緊張されているPC鋼棒Eを一部外して方立F
の中空孔にPC鋼棒Eを挿通して再び取り外したPC鋼
棒Eを取付け緊張状態に戻す。(図9(ロ)参照)その
後、通常のサッシの組立て要領で昇降架台上で組立てガ
ラス、アルミパネル取付けとガラス、アルミパネルまわ
りのコーキングを済まして硬化養生する。
FIGS. 7 and 8 show a typical aluminum curtain wall B, in which a sash upright frame 7 is fixed to a square F, and a horizontal frame 8 is assembled to the upright frame. An aluminum panel 9 is housed in the frame material. 10
Is a corner wall. At the time of assembling the curtain wall, materials are supplied from the ground to the work gantry by the unloading device of the curtain wall assembling work facility C, and the elevating gantry D is installed at the lowermost position. As shown in FIG.
The PC steel bar E is inserted into the hollow hole of the above, and the PC steel bar E removed again is attached to return to the tension state. (Refer to FIG. 9B.) Thereafter, assembling the sash in the usual manner, the assembling is performed on the ascending and descending stand, and the glass and the aluminum panel are attached, and the caulking around the glass and the aluminum panel is completed.

【0023】次に、昇降手段Pで昇降架台Dを所定の高
さに上昇させて上階のカーテンウォールBを建物Aの本
体に緊結する。(図9(ハ)(ニ)参照) 次に、カーテンウォールBと建物本体に緊結されたカー
テンウォールBと切り放し、昇降架台Dのみを下降して
もとの位置に戻す。図9(ホ)(ヘ)は取付けが完了し
たところである。
Next, the elevating platform D is raised to a predetermined height by the elevating means P, and the curtain wall B on the upper floor is tied to the main body of the building A. (See FIGS. 9 (c) and (d).) Next, the curtain wall B and the curtain wall B tied to the building body are cut off, and only the elevating gantry D is lowered and returned to the original position. FIGS. 9 (e) and (f) show that the mounting is completed.

【0024】カーテンウォールBと建物本体との緊結状
態は図10に示す如く、建物本体に予めファスナー11
と緩衝材12を取付け方立F側の取付金物13とをボル
ト14で緊結し、高さ調整アングル15のボルト16に
よって高さを調整して取付けが完了する。その際、既に
取り付けられている方立Fと上昇して取り付ける方立F
とは図11のように上部がテーパーが付き芯にPC鋼棒
Eを貫通した補助具17を方立F頂部に取付け、上昇す
る方立Fと既に取り付けられている方立Fとが狂い無く
案内されて点線部分まで精確に差し込まれる。18は上
端が三角錐に形成された上昇時のスライドパッキンでフ
ァスナー11の緩衝材12とには隙間の余裕がなくスラ
イド時に緩衝材12をスライドパッキンのテーパーによ
りかわしてスライドし、用が終れば取り外す。(図1
0,11参照)前記の工程によりカーテンウォールBが
取付けられ、さらに、図1に示す如く建物の横方向に工
区割をして、カーテンウォールBを組立て、ガラスの取
付け、シール、シールの養生、ファスナーの取付け、を
サイクル工程としこれを工区順に取付けることによって
作業の無駄が省くことができ、工期短縮、労務コストの
逓減が出来る。また、昇降架台の揺れもなく、さらに、
図6に示す如く複数の方立Fの中空孔にそれぞれPC鋼
棒Eを挿通して緊張状態に保持するので風によって揺れ
ることなく安全に、かつ、既に取付けられた方立Fに精
確に接合する。
The tightness between the curtain wall B and the building body is shown in FIG.
The buffer member 12 is attached to the mounting bracket 13 on the mounting F side with bolts 14 and the height is adjusted by the bolts 16 of the height adjusting angle 15 to complete the mounting. At this time, the already mounted cubic F and the raised cubic F
As shown in FIG. 11, an auxiliary tool 17 having a tapered core at the top and penetrating a PC steel bar E is attached to the top of the cubic F, and the rising cubic F and the already mounted cubic F are not disturbed. Guided and inserted precisely to the dotted line. Reference numeral 18 denotes a sliding packing at the time of ascending with an upper end formed in a triangular pyramid, which has no clearance with the cushioning material 12 of the fastener 11 and slides by sliding the cushioning material 12 by sliding by the taper of the sliding packing at the time of sliding. Remove. (Figure 1
0, 11) The curtain wall B is attached by the above-mentioned process, and further, as shown in FIG. 1, the construction section is divided in the lateral direction of the building, the curtain wall B is assembled, glass is attached, the seal, the curing of the seal, The installation of the fasteners is a cycle process, and the installation of the fasteners in the construction section order can reduce waste of work, shorten the construction period, and reduce labor costs. In addition, there is no shaking of the lifting platform,
As shown in FIG. 6, the PC steel bars E are inserted through the hollow holes of the plurality of cubic Fs, respectively, and are held in a tensioned state, so that they are safely joined without being shaken by the wind and accurately joined to the already mounted cubic Fs. I do.

【0025】図13は本方法のシステム図で、前記カー
テンウォールBの取付け施工にあたり昇降装置の操作
は、昇降架台Dの左右両端に設けた高さ検出センサーH
(デイスタンスセンサー)と変換器102とデジタルカ
ウンター103を経由してコンピューターとモニターと
に接続されて、さらに、操作装置と接続され分電盤より
電源を送電するように構成されている。図中101は計
測ワイヤーである。
FIG. 13 is a system diagram of the present method. In mounting the curtain wall B, the operation of the elevating device is performed by height detecting sensors H provided on both left and right ends of the elevating base D.
(Distance sensor), a converter 102, and a digital counter 103 are connected to a computer and a monitor via a digital counter 103, and are further connected to an operating device to transmit power from a distribution board. In the figure, reference numeral 101 denotes a measurement wire.

【0026】昇降架台Dの操作に際して、昇降架台Dの
高さ検出センサーH(デイスタンスセンサー)が昇降架
台Dの昇降によって計測ワイヤー6が伸び縮みし、セン
サーで昇降値を検出して変換器102でデジタル変換
し、その数値をデジタルカウンター103に表示し、ケ
ーブル104を介して制御装置105に送られ、制御装
置105で予め設定された水平の傾斜値の監視や制限高
さの監視をして、初期設定値の範囲を越えると警報を発
するとともに自動停止して安全を図っている。モニター
106には前記数値が表示されて、操作装置107は初
期設定値の範囲でスイッチ操作を手動で行ない、所定の
位置に操作する。無線器108は、カーテンウォール取
付け作業をしている作業員が非常停止リモコンスイッチ
109を携行し、カーテンウォールの取付け作業中に異
常が発生した場合に作業員が自ら非常停止リモコンスイ
ッチ109の停止ボタンを押して無線器108に直接信
号を送り、非常停止させて作業の安全を図っている。図
中110は分電盤である。
In operation of the elevating gantry D, the height detecting sensor H (distance sensor) of the elevating gantry D causes the measurement wire 6 to expand and contract as the elevating gantry D moves up and down. The digital value is displayed on the digital counter 103, and the numerical value is displayed on the digital counter 103. The digital value is sent to the control device 105 via the cable 104, and the control device 105 monitors a preset horizontal inclination value and monitors a limit height. When the value exceeds the range of the initial set value, an alarm is issued and the automatic stop is performed for safety. The above-mentioned numerical values are displayed on the monitor 106, and the operating device 107 manually performs the switch operation within the range of the initial set value, and operates the switch to a predetermined position. The radio device 108 allows the worker performing the curtain wall mounting operation to carry the emergency stop remote control switch 109, and when an abnormality occurs during the curtain wall mounting operation, the operator himself operates the stop button of the emergency stop remote control switch 109. Is pressed to directly send a signal to the wireless device 108, and an emergency stop is performed to ensure work safety. In the figure, reference numeral 110 denotes a distribution board.

【0027】[0027]

【発明の効果】本発明によれば、建物の外装のカーテン
ウォールの取り付け施工に当たり、組立装置によってカ
ーテンウォール組立て作業施設にカーテンウォール部材
が供給され、昇降架台上にカーテンウォールが組み立て
られ、各工区別に巻上機によって所定の位置にカーテン
ウォールを取り付け、取り付けが終了したら、昇降架台
を元の位置に戻し、次位の階も前記と同様の手順を繰り
返してカーテンウォールが順次取り付けられることによ
り都市の市街地の狭小の立地条件においても精度の高
く、施工性がよく、しかも従来のような危険性もなく、
安全、かつ省力化が図られるカーテンウォールの取り付
け施工が行われる。また、外装カーテンウォール取付位
置を通過して、建物側の頂部から下部に亘って延びる複
数のPC鋼棒を緊張し、外装カーテンウォール縦軸方向
の方立に挿通して組立てることによって精度の高い取付
けが行なわれ、多少の風圧にも揺れることなく昇降し、
作業の迅速化と安全性とが図られる。
According to the present invention, when installing a curtain wall on the exterior of a building, a curtain wall member is supplied to a curtain wall assembling work facility by an assembling apparatus, and the curtain wall is assembled on a lifting stand. Separately, a curtain wall is attached to a predetermined position by a hoist, and when the attachment is completed, the elevating pedestal is returned to the original position, and the next floor is repeatedly attached to the curtain wall by repeating the same procedure as described above. High accuracy, good workability, and no danger as in the past
The installation work of the curtain wall, which is safe and labor-saving, is performed. In addition, a plurality of PC steel bars extending from the top to the lower part of the building, passing through the exterior curtain wall mounting position, are tensioned, and are inserted into the vertical direction of the exterior curtain wall to assemble them to achieve high accuracy. The installation is performed and it goes up and down without swinging even with some wind pressure,
Work speed and safety are improved.

【0028】また、本発明によれば、前記昇降手段によ
って前記建物の外壁面の左右に沿って昇降架台を任意の
長さに分割し、夫々の昇降架台を独立してカーテンウォ
ールを組立てるようにしたことにより、建物の外壁施工
面の工区割が容易になり、カーテンウォールの組立加
工、同カーテンウォール間のシーリング作業、養生、吊
上げ取付作業のサイクル工程によって労務が簡略化し、
施工性が向上し、前記各架台を互いに独立して昇降させ
ることによって壁面の凹凸に対応した施工が可能とな
り、建物の外観に変化を持たせ、高級感のある建物を構
成しうるものである。
According to the present invention, the elevating platform is divided into arbitrary lengths along the left and right sides of the outer wall of the building by the elevating means, and each of the elevating platforms is independently assembled into a curtain wall. This makes it easier to divide the construction area of the outer wall construction surface of the building, and simplifies labor by the cycle process of curtain wall assembly processing, sealing work between the curtain walls, curing, and lifting installation work,
Improving workability, it is possible to perform construction corresponding to the unevenness of the wall surface by elevating and lowering each of the gantry independently from each other, making it possible to change the appearance of the building, and configure a high-class building. .

【0029】また、本発明によれば、前記昇降架台の左
右に高さ検出センサー、同センサーのデータを入力し昇
降架台の姿勢を制御する制御装置及び、同制御装置が異
常値を示したとき警報を発し自動停止する操作装置によ
って架台昇降手段を操作、制御するようにしたので作業
の安全性が確保され、精度の高い取付作業が行なわれ
る。
Further, according to the present invention, a height detection sensor is provided on the left and right sides of the lift gantry, a control device for inputting data of the sensors and controlling the attitude of the lift gantry, and a control device for detecting an abnormal value when the control device indicates an abnormal value. Since the gantry elevating means is operated and controlled by the operating device which issues an alarm and automatically stops, the safety of the operation is ensured, and the mounting operation with high accuracy is performed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る外装カーテンウォールの取付け施
工法の一実施例を示す斜視図である。
FIG. 1 is a perspective view showing an embodiment of a method for mounting an exterior curtain wall according to the present invention.

【図2】前記カーテンウォールの取付装置の縦断面図で
ある。
FIG. 2 is a longitudinal sectional view of the curtain wall mounting device.

【図3】昇降架台とPC鋼棒の設置を説明する縦断面図
である。
FIG. 3 is a vertical cross-sectional view illustrating installation of a lifting stand and a PC steel rod.

【図4】昇降架台とPC鋼棒との関係を示す拡大斜視図
である。
FIG. 4 is an enlarged perspective view showing a relationship between a lifting stand and a PC steel bar.

【図5】本発明のPCカーテンウォールへの適用例を示
す縦断面図である。
FIG. 5 is a longitudinal sectional view showing an application example of the present invention to a PC curtain wall.

【図6】図2の正面図である。FIG. 6 is a front view of FIG. 2;

【図7】外装カーテンウォールの一層分の立面図で一部
を欠截して示している。
FIG. 7 is a partially cutaway elevation view of an exterior curtain wall.

【図8】図7の平面図である。FIG. 8 is a plan view of FIG. 7;

【図9】(イ)(ロ)(ハ)(ニ)(ホ)(ヘ)は外装
カーテンウォール一層分の取付工程を説明する縦断面図
である。
9 (a), (b), (c), (d), (e), and (f) are longitudinal sectional views for explaining a mounting process for one exterior curtain wall.

【図10】外装カーテンウォール取付部の拡大縦断面図
である。
FIG. 10 is an enlarged vertical sectional view of an exterior curtain wall mounting portion.

【図11】外装カーテンウォールの取付部の詳細を示す
斜視図である。
FIG. 11 is a perspective view showing details of a mounting portion of the exterior curtain wall.

【図12】前記カーテンウォールの取付本体部の斜視図
である。
FIG. 12 is a perspective view of a mounting body of the curtain wall.

【図13】昇降架台の操作システム図である。FIG. 13 is an operation system diagram of the elevating gantry.

【符号の説明】[Explanation of symbols]

A 建物 B カーテンウォール C カーテンウォール組立作業施設 D,D1 ,D2 昇降架台 E PC鋼棒 F,F′ 方立 G ガイドレール H 高さ検出センサー J 制御装置 P 昇降手段 P1 吊下げ架台 S チェーン a 構台 b カーテンウォール組立足場 c トロリーホイスト d 荷揚装置 1 係止部 2 吊フック 3 係着部 4 係着部 5 軸受 5′ ガイドローラー 6 計測ワイヤー 7 サッシ立枠 8 横枠 8′ ガラス 9 アルミパネル 10 コーナー壁 11 ファスナー 12 緩衝材 13 取付金物 14 ボルト 15 高さ調整アングル 16 ボルト 17 補助具 18 スライドパッキン 101 計測ワイヤー 102 変換器 103 デジタルカウンター 104 ケーブル 105 制御装置 106 モニター 107 操作装置 108 無線器 109 非常停止リモコンスイッチ 110 分電盤A Building B Curtain wall C Curtain wall assembling work facility D, D 1 , D 2 Elevating gantry E PC steel bar F, F 'Orientation G Guide rail H Height detection sensor J Control device P Elevating means P 1 Hanging gantry S Chain a gantry b curtain wall assembling scaffold c trolley hoist d loading device 1 locking part 2 hanging hook 3 engaging part 4 engaging part 5 bearing 5 'guide roller 6 measuring wire 7 sash upright frame 8 side frame 8' glass 9 aluminum Panel 10 Corner wall 11 Fastener 12 Buffer material 13 Mounting hardware 14 Bolt 15 Height adjustment angle 16 Bolt 17 Auxiliary tool 18 Slide packing 101 Measurement wire 102 Converter 103 Digital counter 104 Cable 105 Control device 106 Monitor 107 Operating device 108 Radio 109 Emergency stop Limoko Switch 110 distribution board

フロントページの続き (72)発明者 吉武 義高 東京都渋谷区千駄ヶ谷四丁目6番15号 株式会社フジタ内 (56)参考文献 特開 平3−21748(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04B 2/96 E04G 21/16 (72) Inventor Yoshitaka Yoshitake 4-6-1-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd. (56) References JP-A-3-21748 (JP, A) (58) Fields investigated (Int) .Cl. 7 , DB name) E04B 2/96 E04G 21/16

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 外装カーテンウォールを取付ける建物外
壁面の地上部に外装カーテンウォール組立作業施設を前
記外壁面の左右に沿って延在させて設置し、前記外壁面
の左右に沿って延在する昇降架台を設け、昇降手段によ
って前記建物の外壁面に沿って前記昇降架台を昇降自在
に装架した外装カーテンウォールの組立装置において、 前記外壁面の左右に間隔を置いた複数箇所で外装カーテ
ンウォール取付位置を通過し、建物側の頂部から下部に
亘って延びるPC鋼棒をそれぞれ緊張する工程と、 前記外装カーテンウォールの左右に間隔を置いた複数箇
所で縦軸方向に延びる方立の中空孔に前記各PC鋼棒を
それぞれ挿通させつつ前記外装カーテンウォール組立作
業施設における前記昇降架台上に建物外壁面の1層階分
の外装カーテンウォールを組立てる工程と、 前記昇降架台及び同架台上で組立てられた外装カーテン
ウォールを前記昇降手段によって建物の所定位置に上昇
する工程と、同所定の位置に上昇した外装カーテンウォールの方立の
上端を、建物本体に既に緊結された外装カーテンウォー
ルの方立の下端に差し込むと共に、 同所定の位置に上昇
した外装カーテンウォールを建物本体に緊結する工程
と、 建物本体に緊結された外装カーテンウォールと前記昇降
架台との緊結を解除して同架台を前記昇降手段を介して
降下して元の位置に復元する工程と、 によって1層分のカーテンウォールを建物外壁面に取付
け、以下前記同様の工程を下層階にも反復する、 ことを特徴とする外装カーテンウォールの取付け施工
法。
1. An exterior curtain wall assembling work facility is installed on a ground portion of an exterior wall surface on which an exterior curtain wall is to be installed, extending along the left and right sides of the outer wall surface, and extending along the left and right sides of the outer wall surface. An apparatus for assembling an exterior curtain wall in which an elevating platform is provided and the elevating platform is mounted so as to be able to move up and down along the outer wall surface of the building by means of elevating means, A step of tensioning each of the PC steel rods extending from the top to the bottom of the building side, passing through the mounting position, and cubic hollow holes extending in the longitudinal direction at a plurality of locations spaced apart on the left and right of the exterior curtain wall. The first and second PC steel rods are inserted through the exterior curtain wall assembly work facility, and the exterior curtain wall of the first floor of the building outer wall surface is placed on the elevating gantry. A step of assembling and a step which rises to a predetermined position of the building by an exterior curtain wall assembled with the elevating frame and on the same platform said elevating means, mullions of exterior curtain wall which rises to the predetermined position
At the upper end, an exterior curtain walk already tied to the building body
And tightening the exterior curtain wall, which has been raised to the predetermined position, to the building body, and releasing the binding between the exterior curtain wall tightened to the building body and the lifting stand. Lowering the gantry via the elevating means and restoring the gantry to its original position; attaching a curtain wall for one layer to the outer wall of the building, and repeating the same steps as described above for the lower floors. Exterior curtain wall installation method.
【請求項2】 前記昇降手段によって前記建物の外壁面
の左右に沿って前記昇降架台を任意の長さに分割し、夫
々の昇降架台を独立して昇降し、前記組立て工程によっ
てカーテンウォール取付けて施工する請求項1記載の外
装カーテンウォールの取付け施工法。
2. The elevation platform is divided into arbitrary lengths along the left and right sides of the outer wall surface of the building by the elevation means, and each elevation platform is independently raised and lowered, and a curtain wall is attached by the assembling step. The method for mounting an exterior curtain wall according to claim 1, which is performed.
【請求項3】 前記昇降架台の左右に高さ検出センサー
と、同センサーのデータを入力して昇降架台の姿勢、高
さを制御する制御装置、及び同制御装置が異常値を示し
たとき警報を発し、自動停止する操作装置によって架台
昇降手段を操作、制御する請求項1または2記載の外装
カーテンウォールの取付け施工法。
3. A height detection sensor on the left and right sides of the lifting platform, a control device for inputting data of the sensor to control the attitude and height of the lifting platform, and an alarm when the control device indicates an abnormal value. The exterior curtain wall mounting method according to claim 1 or 2, wherein the gantry elevating means is operated and controlled by an operating device that automatically stops.
JP20405693A 1993-08-18 1993-08-18 Installation of exterior curtain wall Expired - Fee Related JP3250765B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20405693A JP3250765B2 (en) 1993-08-18 1993-08-18 Installation of exterior curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20405693A JP3250765B2 (en) 1993-08-18 1993-08-18 Installation of exterior curtain wall

Publications (2)

Publication Number Publication Date
JPH0754487A JPH0754487A (en) 1995-02-28
JP3250765B2 true JP3250765B2 (en) 2002-01-28

Family

ID=16484023

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20405693A Expired - Fee Related JP3250765B2 (en) 1993-08-18 1993-08-18 Installation of exterior curtain wall

Country Status (1)

Country Link
JP (1) JP3250765B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6143103B2 (en) * 2013-10-02 2017-06-07 清水建設株式会社 Curtain wall mounting method and curtain wall lifting box used therefor
CN114215235B (en) * 2021-12-06 2023-07-07 中建八局第二建设有限公司 Super high-rise inclined double-layer special-shaped curtain wall construction device and method

Also Published As

Publication number Publication date
JPH0754487A (en) 1995-02-28

Similar Documents

Publication Publication Date Title
JP3172719B2 (en) Building construction safety fence
CN102337782B (en) Lift system for constructing truss platform on top of tall and large space
JP2002349079A (en) Demolition method for building
CN111395184A (en) System and method for constructing high pier with gradually-changed section by using electric bridge type scaffold platform
US20060117678A1 (en) Concrete slab lifting system
JP3250765B2 (en) Installation of exterior curtain wall
JP3250764B2 (en) Building exterior curtain wall assembly equipment
CN113216587A (en) High-rise building outer wall construction operation platform fixing structure and construction method thereof
CN108584646B (en) Assembled type additional elevator shaft structure suitable for jacking construction
CN108675116B (en) Construction method of PC (polycarbonate) component
KR100583785B1 (en) Construction-material lift being installed at the outside of the construction-structure
JP3950800B2 (en) Suspension scaffold
WO2009093974A1 (en) Frame system for supporting facade elements and use of the frame system
CN210976551U (en) External hanging protective frame
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN108755419B (en) Construction platform for hoisting bridge shock-proof steel stop block and installation method
JPH0754492A (en) Measurement and control device for lift platform for installation of exterior curtain wall
JP3438046B2 (en) Exterior curtain wall assembly equipment
JPH07238682A (en) Method for installing armoring curtain wall
KR20210068283A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
JPH06185215A (en) Method for attaching exterior panel of building
CN221031587U (en) Aluminum mould operation floor elevator mouth edge protection device capable of being hoisted for multiple times
JP7444751B2 (en) Wall material unit and wall construction method
CN214570326U (en) Curtain wall unit plate rail hoisting and hard protection integrated device
JPH0810127Y2 (en) Scaffolding device for work in large diameter curved pipe

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees