JP3220663B2 - Framed equipment for wooden buildings - Google Patents

Framed equipment for wooden buildings

Info

Publication number
JP3220663B2
JP3220663B2 JP17219997A JP17219997A JP3220663B2 JP 3220663 B2 JP3220663 B2 JP 3220663B2 JP 17219997 A JP17219997 A JP 17219997A JP 17219997 A JP17219997 A JP 17219997A JP 3220663 B2 JP3220663 B2 JP 3220663B2
Authority
JP
Japan
Prior art keywords
hole
pillar
piece
connecting rod
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP17219997A
Other languages
Japanese (ja)
Other versions
JPH1113137A (en
Inventor
藤原恭史
Original Assignee
株式会社家づくり工房
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社家づくり工房 filed Critical 株式会社家づくり工房
Priority to JP17219997A priority Critical patent/JP3220663B2/en
Publication of JPH1113137A publication Critical patent/JPH1113137A/en
Application granted granted Critical
Publication of JP3220663B2 publication Critical patent/JP3220663B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、木造建物の軸組装置に
関するもので、上側柱と下側柱を組合せて階層間に用い
る軸組装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a framing apparatus for a wooden building, and more particularly to a framing apparatus used between layers by combining upper and lower columns.

【0002】[0002]

【従来の技術】木造建物において、所謂通し柱に代え
て、上下の柱(木製)を連結して用いる場合、下側柱上
に梁などの横架材を載置し、該横架材に形成したほぞ穴
に、上側柱の下端に突設したほぞを係合し、必要に応じ
て補強金物を用いて上下の柱を連結するようにしている
のが一般である。
2. Description of the Related Art In a wooden building, when connecting upper and lower columns (wooden) instead of so-called through columns, a horizontal member such as a beam is placed on a lower column and formed on the horizontal member. Generally, a tenon protruding from the lower end of the upper pillar is engaged with the mortise hole, and the upper and lower pillars are connected by using a reinforcing metal as necessary.

【0003】[0003]

【発明が解決しようとする課題】前記従来例は、補強金
物を用いるとしても、上側柱と下側柱の直接的な結合関
係がないばかりでなく、上下の柱は横架材とのほぞとほ
ぞ穴を用いた接合関係であるので、上側柱に負荷される
外力は下側柱に伝わりにく、上側柱だけで水平荷重を受
けなければならず、耐力的に万全とはいえない。
In the prior art, even if reinforcing metal is used, not only is there no direct connection between the upper column and the lower column, but also the upper and lower columns are in tenon with the horizontal member. Because of the joining relationship using mortise holes, the external force applied to the upper column is not easily transmitted to the lower column, and a horizontal load must be received only by the upper column, and it cannot be said that the proof stress is perfect.

【0004】本発明は、従来の横架材を介する上下の柱
の接合手段に代る、耐力的にも優れた軸組装置を提供す
ることを目的として創案したものである。
An object of the present invention is to provide a framing device which is superior in terms of strength and replaces the conventional means for joining upper and lower columns via a horizontal member.

【0005】[0005]

【課題を解決するための手段】下側柱に載置して固着し
た接合金物と前記下側柱を取り囲む梁などの横架材の端
部に固着した取付け金物を互いに接続して前記下側柱の
直上に前記横架材の端面で構成する係合部を設け、該係
合部に係合した上側柱の下端部に突設した連結杆と、前
記接合金物を通じて前記連結杆を埋入した前記下側柱を
互いに固着した構成にすることにより各軸組材を強固に
固定できるようにし、また、柱と連結杆を固定ピンで互
いに固着することにより固着作業を簡単に行えるように
したものである。
The connecting metal fixed on the lower column and the mounting metal fixed to the end of a horizontal member such as a beam surrounding the lower column are connected to each other to connect the lower metal. An engaging portion composed of an end surface of the horizontal member is provided directly above the column, and a connecting rod protruding from a lower end of the upper column engaged with the engaging portion and the connecting rod is embedded through the joint hardware. The lower pillars are fixed to each other so that the respective frame members can be firmly fixed, and the fixing work can be easily performed by fixing the pillars and the connecting rod to each other with fixing pins. Things.

【0006】[0006]

【実施例】図面は本発明に係る木造建物の軸組装置の一
実施例を示し、図1は縦断面図、図2は横断面図、図3
は図1のX−X線断面図、図4は接合金物の斜視図、図
5は連結材の斜視図、図6は第一取付け金物の斜視図、
図7は第二取付け金物の斜視図、図8は横架材端部の斜
視図、図9は他の横架材端部の斜視図である。
1 is a longitudinal sectional view, FIG. 2 is a transverse sectional view, and FIG.
FIG. 4 is a cross-sectional view taken along the line XX of FIG. 1, FIG. 4 is a perspective view of a metal joint, FIG. 5 is a perspective view of a connecting member, FIG.
7 is a perspective view of the second mounting hardware, FIG. 8 is a perspective view of an end of the transverse member, and FIG. 9 is a perspective view of another end of the transverse member.

【0007】実施例のものは、接合金物Aと連結材Bお
よび第一、第二の取付け金物C1、C2を用いて、下側
柱(木製)1Bの直上に、該下側柱1Bの上端部四方に
接続した梁などの横架材(木製)2A、2A、2B、2
Bの端面で取り囲まれる係合部3を設け、該係合部3に
係合した上側柱(木製)1Aの下端部に前記連結材Bを
構成する連結杆4の上端を、前記下側柱1Bの上端部に
前記連結杆4の下端をそれぞれ埋入して固着して、上下
の柱1A、1Bと該柱1A、1Bを中心として四方に配
した横架材2A、2A、2B、2Bを接合した場合の装
置例である。
In the embodiment, the upper end of the lower pillar 1B is placed directly above the lower pillar (wooden) 1B using the joint hardware A, the connecting member B, and the first and second mounting hardware C1, C2. Horizontal members (wooden) 2A, 2A, 2B, 2 such as beams connected on all sides
B is provided with an engaging portion 3 surrounded by the end surface, and the lower end of the connecting rod 4 constituting the connecting member B is attached to the lower end of the upper pillar (wooden) 1A engaged with the engaging portion 3 with the lower pillar. The lower ends of the connecting rods 4 are respectively embedded and fixed to the upper ends of the upper and lower columns 1A and 1B, and the horizontal members 2A, 2A, 2B and 2B arranged in four directions around the upper and lower columns 1A and 1B. It is an example of a device in the case of bonding.

【0008】なお、接合金物A、連結材Bおよび第一、
第二の取付け金物C1、C2は鋼板でできており、横架
材2A、2Bは柱と組付けて軸組材となる梁や桁をい
う。
[0008] The joining hardware A, the connecting material B and the first,
The second mounting hardware C1 and C2 are made of a steel plate, and the horizontal members 2A and 2B are beams or girders that are assembled with columns to form a shaft assembly.

【0009】前記接合金物Aは、前記柱1A、1Bの方
形断面形(端面形)と一致する方形状の接合基板5の中
央に立設した方形筒状の補強筒6を備え、該補強筒6の
各外側面中央には補強筒6の周側方向に等間隔を存する
ように配し、しかも、補強筒6の外側面と前記接合基板
5の上面に熔接した接続板7を配し、補強筒6より高さ
幅の有るこの接続板7、7間の中央すなわち前記接合基
板5の4隅部に螺子杆8を立設し、前記接続板7に組付
けピン9A又は9B嵌挿用の上下一対の透孔10、10
を、また、接合基板5に止着螺子11A貫通用の透孔1
2Aを設けて構成したものである。
The metal joint A is provided with a rectangular cylindrical reinforcing cylinder 6 erected at the center of a rectangular bonding substrate 5 corresponding to the rectangular cross-sectional shape (end face shape) of the columns 1A and 1B. In the center of each outer side surface of the reinforcing tube 6, a connection plate 7 welded to the outer side surface of the reinforcing tube 6 and the upper surface of the bonding substrate 5 is arranged at equal intervals in the circumferential direction of the reinforcing tube 6, Screw rods 8 are erected at the center between the connection plates 7, 7 having a width higher than the reinforcing cylinder 6, that is, at the four corners of the joint board 5, and fitted to the connection plate 7 for fitting pins 9 </ b> A or 9 </ b> B. A pair of upper and lower through holes 10, 10
And a through hole 1 for penetrating the fixing screw 11A to the bonding substrate 5.
2A.

【0010】前記連結材Bは、接合金物Aの前記接合基
板5と一致する方形状の連結基板13の下面側に、接合
金物Aの前記補強筒6の断面形と一致する方形状の係合
枠14を突設し、この係合枠14と前記連結基板13に
貫通させてこれらに溶接した円筒状の前記連結杆4の上
側と下側には固定ピン15の貫通孔16を設けて構成し
たものである。
The connecting member B is formed on the lower surface of the rectangular connecting board 13 of the joining hardware A, which coincides with the joining board 5, in the form of a square engagement with the cross-sectional shape of the reinforcing cylinder 6 of the joining hardware A. A frame 14 is provided so as to protrude, and a through-hole 16 for a fixing pin 15 is provided on the upper and lower sides of the cylindrical connecting rod 4 which penetrates through the engaging frame 14 and the connecting board 13 and is welded thereto. It was done.

【0011】なお、前記接合金物Aの接続板7の上端部
は、図4で示すように補強筒6より突出しているが、そ
の突出量と高さ幅(突出幅)が一致するように前記係合
枠14は連結基板13より突出し、この関係で、係合枠
14は、接合金物Aの接続板7、7、7、7間に係合さ
れ、接続板7、7、7、7上に連結基板13が載置でき
るようになっている(連結基板13で受ける上側柱1A
の荷重を接続板7が、すなわち接合金物Aが直接受ける
ことになる)。
The upper end of the connecting plate 7 of the metal joint A protrudes from the reinforcing cylinder 6 as shown in FIG. 4, but the projecting amount and the height (projecting width) coincide with each other. The engagement frame 14 protrudes from the connection board 13, and in this relation, the engagement frame 14 is engaged between the connection plates 7, 7, 7, 7 of the joint metal A, and is on the connection plates 7, 7, 7, 7. (The upper pillar 1A received by the connecting substrate 13)
Is directly received by the connection plate 7, that is, the joint metal A).

【0012】前記第一取付け金物C1は、鋼板を屈曲し
て成り、前記一方の横架材2Aの端部に係合する主体片
17の下端を互いに反対方向に直角に折り曲げて支持片
18、18(横架材2Aの荷重を部分的に受ける)を連
設し、前記主体片17の前端側の上部を部分的に前方へ
突出させて下面開口の挾入間隙19を備えた組付け片2
0と成し、該組付け片20の下端を前記支持片18、1
8と同様に互いに反対方向に折り曲げて受支片21、2
1を設けて構成したもので、主体片17には組付け管2
2貫通用の透孔23を、支持片18には止着螺子11B
貫通用の透孔12Bを、組付け片20には前記組付けピ
ン9A貫通用の透孔26を、また、受支片21には前記
螺子杆8貫通用の透孔27をそれぞれ設けてある。
The first metal fitting C1 is formed by bending a steel plate, and the lower ends of the main pieces 17 engaged with the ends of the one lateral member 2A are bent at right angles in opposite directions to each other, and the supporting pieces 18 are bent. 18 (partially receiving the load of the transverse member 2A), the upper part of the main body piece 17 at the front end side is partially projected forward to provide an insertion gap 19 having a lower surface opening. 2
0, and the lower end of the mounting piece 20 is
8, the supporting pieces 21, 2 are bent in the opposite directions.
The main piece 17 has an assembly pipe 2
2. A through hole 23 for penetrating and a fixing screw 11B
A through hole 12B for penetrating, an assembling piece 20 is provided with a through hole 26 for penetrating the assembling pin 9A, and a receiving piece 21 is provided with a through hole 27 for penetrating the screw rod 8. .

【0013】前記第二取付け金物C2は第一取付け金物
C1と同様に鋼板を屈曲して構成して該第一取付け金物
C1と近似した形状にしたもので(受支片32に螺子杆
8と組付けるための透孔を備えていない点で第一取付け
金物C1と異なる)、前記一方の横架材2Aに隣接する
他の一方の前記横架材2Bの端部に係合する主体片28
の下端を互いに反対方向に直角に折り曲げて支持片2
9、29(横架材2Bの荷重を部分的に受け、前記支持
片18と同様補強材を成す)を連設し、前記主体片28
の前端側の上部を部分的に前方へ突出させて下面開口の
挾入間隙30を備えた組付け片31と成し、該組付け片
31の下端を前記支持片29と同様に互いに反対方向に
折り曲げて受支片32、32を設けて構成したもので、
主体片28には組付け管22貫通用の透孔33を、支持
片29には止着螺子11C貫通用の透孔12Cを、組付
け片31には前記組付けピン9B貫通用の透孔34をそ
れぞれ設けたものである。
The second mounting hardware C2 is formed by bending a steel plate in the same manner as the first mounting hardware C1 to have a shape similar to that of the first mounting hardware C1. It differs from the first mounting hardware C1 in that it does not have a through hole for assembling), and the main piece 28 that engages with the end of the other lateral member 2B adjacent to the one lateral member 2A.
The lower ends of the support pieces 2 at right angles in opposite directions to each other.
9, 29 (partially receiving the load of the horizontal member 2B and forming a reinforcing material in the same manner as the support piece 18),
The upper part of the front end side of the mounting piece 31 is partially projected forward to form an assembling piece 31 having an insertion gap 30 with a lower surface opening, and the lower end of the assembling piece 31 is in the opposite direction to the supporting piece 29 as in the case of the support piece 29. And provided with receiving pieces 32, 32,
The main piece 28 has a through hole 33 for penetrating the mounting tube 22, the support piece 29 has a through hole 12C for penetrating the fastening screw 11C, and the mounting piece 31 has a through hole for penetrating the mounting pin 9B. 34 are provided.

【0014】しかして、前記接合金物Aは、上面中央に
受入穴36を予め形成した下側柱1B上に、接合基板5
を載置し、該接合基板5に設けた透孔12Aに止着螺子
11Aを貫通させて螺子先端を下側柱1Bにねじ込むこ
とにより下側柱1Bに固定されている。
Thus, the metal joint A is placed on the lower column 1B in which the receiving hole 36 is formed in the center of the upper surface in advance.
Is fixed to the lower column 1B by screwing a fixing screw 11A into a through hole 12A provided in the bonding substrate 5 and screwing a screw tip into the lower column 1B.

【0015】前記第一取付け金物C1は、端面にスリッ
ト37を設けた横架材2Aに、前記スリット37に主体
片17を挾入して組合わせ、主体片17に設けた前記透
孔23と横架材2Aに前記スリット37に交差するよう
にして設けた貫通孔38に前記組付け管22を嵌挿し、
該組付け管22に固定ボルト39を挿通させて、その先
端にナット40を螺合して締め付ける一方、支持片18
に設けた透孔12Bを通じて前記止着螺子11Bを横架
材2Aに埋入させることにより、一方の横架材2A部側
に止着させてあり、横架材2A端面より組付け片20お
よび該組付け片20の下端に連なる受支片20を突出し
ている。
The first mounting hardware C1 is combined with a horizontal member 2A having a slit 37 on an end face by inserting the main body piece 17 into the slit 37 to form the first mounting hardware C1 with the through hole 23 provided in the main body piece 17. The assembling tube 22 is inserted into a through hole 38 provided in the transverse member 2A so as to cross the slit 37,
A fixing bolt 39 is inserted through the assembling tube 22, and a nut 40 is screwed to the tip of the fixing bolt 39 to tighten the supporting bolt 18.
The fixing screws 11B are embedded in the horizontal member 2A through the through holes 12B provided in the horizontal member 2A, thereby being fixed to one of the horizontal members 2A. A support piece 20 connected to the lower end of the assembly piece 20 protrudes.

【0016】第二取付け金物C2は、端面に前記一方の
横架材2Aと同様にスリット37を備え、該スリット3
7を介して前記端面より突出する突部片41、41を備
えた他の一方の横架材2Bに固着したもので、前記スリ
ット37に主体片28を挿入し、かつ、前記突部片4
1、41が受支片32、32上に重合されるように組合
わせ、主体片28に設けた前記透孔33と横架材2B
に、前記スリット37に交差するようにして設けた貫通
孔38に前記組付け管22を嵌挿し、該組付け管22に
固定ボルト39を貫通させ、組付け管22より突出する
ボルト先端にナット40を螺合して締付ける一方、支持
片29に設けた透孔12Cを通じて前記止着螺子11C
を横架材2Bに埋入させることにより、該横架材2Bの
端部に止着したものである。
The second mounting hardware C2 has a slit 37 on the end surface, like the one horizontal member 2A, and the slit 37
7, the main body 28 is inserted into the slit 37 and the projecting piece 41 is fixed to the other transverse member 2B provided with the projecting pieces 41, 41 protruding from the end face.
1, 41 are combined so as to be superimposed on the support pieces 32, 32, and the through hole 33 provided in the main piece 28 and the horizontal member 2B are provided.
The mounting pipe 22 is inserted into a through hole 38 provided so as to intersect with the slit 37, a fixing bolt 39 is passed through the mounting pipe 22, and a nut is attached to a tip of a bolt protruding from the mounting pipe 22. 40 is screwed and tightened, while the fastening screw 11C is
Is fixed to an end portion of the horizontal member 2B by being embedded in the horizontal member 2B.

【0017】また、前記上側柱1Aの下端面に、下側柱
1Bの上端面に設けた受入穴36と同様の受入穴36を
設け、該受入穴36に前記連結材Bの連結杆4の上部側
を挿入して該連結杆4に設けた貫通孔16と上側柱1A
側に設けた貫通孔24を互いに一致させ、これらに前記
固定ピン15を嵌挿して、上側柱1Aの下端面に連結基
板13を介して係合枠14と前記連結杆4の下部を突設
してある。
A receiving hole 36 similar to the receiving hole 36 provided on the upper end surface of the lower pillar 1B is provided at the lower end surface of the upper pillar 1A, and the connecting rod 4 of the connecting member B is provided in the receiving hole 36. A through hole 16 provided in the connecting rod 4 by inserting an upper side thereof and an upper column 1A
The fixing pins 15 are fitted into the through holes 24 provided on the sides of the upper column 1A, and the engaging frame 14 and the lower portion of the connecting rod 4 project from the lower end surface of the upper column 1A via the connecting substrate 13. I have.

【0018】以上のように、接合金物Aは下側柱1B
に、第一取付け金物C1は一方側の横架材2Aに、第二
取付け金物C2は前記横架材2Aに対して交差方向に配
する他の一方側の横架材2Bに、また、連結材Bは上側
柱1Aにそれぞれ固着し、これらを互いに組付けるので
ある。
As described above, the metal joint A is connected to the lower pillar 1B.
In addition, the first mounting hardware C1 is connected to the one horizontal member 2A, and the second mounting hardware C2 is connected to the other one horizontal member 2B arranged in a direction crossing the horizontal material 2A. The material B is fixed to the upper column 1A, respectively, and these are assembled together.

【0019】なお、下側柱1Bに接合金物Aを、横架材
2Aに第一取付け金物C1と、他の横架材2Bに第二取
付け金物C2を、また、上側柱1Aに連結材Bを予め固
着して工場出荷するようにすると、現場での作業の煩雑
さ(金物を柱等に組付けるという)を回避できる。
It is to be noted that the joining hardware A is attached to the lower pillar 1B, the first attaching hardware C1 is attached to the lateral member 2A, the second attaching hardware C2 is attached to the other lateral member 2B, and the connecting member B is attached to the upper pillar 1A. Is fixed in advance and shipped from the factory, it is possible to avoid troublesome work on site (that is, assembling hardware to a pillar or the like).

【0020】そして、接合金物Aの接合基板5に立設し
た接続板7を横架材2Aに第一取付け金物C1を取付け
て突設した組付け片20の挾入間隙19に挾入させるよ
うにし、かつ、組付け片20と同様に横架材2Aの端面
より突設した受支片21の透孔27に螺子杆8を貫通さ
せるようにして、下側柱1B上に載置した接合金物Aの
接合基板5上に前記受支片21を載置し、受支片21よ
り突出する前記螺子杆8の先端にナット25を螺合して
締付ける一方、互いに一致させた組付け片20に設けた
透孔26と接続板7に設けた透孔10に組付けピン9A
を嵌入して、下側柱1Bの上端部の相対する両側に、接
続金物Aと第一取付け金物C1を介して一対の横架材2
A、2Aを組付けてある。
Then, the connecting plate 7 erected on the joining board 5 of the joining metal A is inserted into the insertion gap 19 of the mounting piece 20 protruding by attaching the first attaching metal C1 to the horizontal member 2A. And the screw rod 8 is passed through the through hole 27 of the support piece 21 protruding from the end face of the horizontal member 2A in the same manner as the mounting piece 20 so that the screw rod 8 is mounted on the lower pillar 1B. The support piece 21 is placed on the joint substrate 5 of the metal A, and the nut 25 is screwed and fastened to the tip of the screw rod 8 protruding from the support piece 21, while the assembly pieces 20 aligned with each other are screwed. Mounting pin 9A in the through hole 26 provided in the through hole 10 and the through hole 10 provided in the
And a pair of horizontal members 2 are provided on opposite sides of the upper end of the lower pillar 1B via the connection hardware A and the first mounting hardware C1.
A and 2A are assembled.

【0021】また、横架材2Aに対して直交方向に配す
る横架材2Bは、その端面に突部片21、21に挾持さ
れるようにして突出する組付け片31の挾入間隙30
に、接合金物Aの接続板7を挾入し、互いに一致する、
突部片41に設けた透孔43、組付け片31に設けた透
孔34および接続板7に設けた透孔10に組付けピン9
Bを嵌挿することにより、一方の横架材2Aと直交する
方向にして、接合金物Aおよび第二取付け金物C2を介
して下側柱1Bに組付けられ、下側柱1Bの接合金物A
を介する直上には、互いに直線上に配した一対の横架材
2A、2Aと、該横架材2A、2Aに対して直交方向に
配されて互いに直線上に配した一対の横架材2B、2B
のそれぞれの端面で取り囲まれる前記係合部3が形成さ
れる。
The transverse member 2B, which is arranged in a direction perpendicular to the transverse member 2A, has an insertion gap 30 for an assembling piece 31 protruding at its end face so as to be sandwiched by the protruding pieces 21, 21.
, The connecting plate 7 of the joint metal A is sandwiched and coincides with each other.
The assembling pin 9 is inserted into the through hole 43 provided in the projecting piece 41, the through hole 34 provided in the mounting piece 31, and the through hole 10 provided in the connecting plate 7.
B is inserted into the lower pillar 1B via the joint hardware A and the second mounting hardware C2 in a direction perpendicular to one of the horizontal members 2A by fitting the lower metal 1A.
A pair of horizontal members 2A, 2A arranged on a straight line and a pair of horizontal members 2B arranged in a direction orthogonal to the horizontal members 2A, 2A and arranged on a straight line directly above each other. , 2B
The engaging portion 3 is formed so as to be surrounded by the respective end surfaces.

【0022】この係合部3を通じて、上側柱1Aに突設
した前記連結杆4の下部を接合金物Aの補強筒6を介し
て下側柱1Bに設けた受入穴36に挿入し、これに伴っ
て、上側柱1Aの下端部を連結基板13を介して組付け
片20、31上に載置して前記係合部3内に係合し、下
側柱1Bに設けた貫通孔24と連結杆4の下部に設けた
貫通孔16を互いに一致させ、これらに上側柱1Aと同
様に固定ピン15を嵌挿して上側柱1Aと下側柱1B
は、接合金物A連結材Bおよび第一、第二の取付け金物
C1、C2を介して互いに連結して実施例装置としてあ
る。
Through the engaging portion 3, the lower part of the connecting rod 4 protruding from the upper column 1A is inserted into the receiving hole 36 provided in the lower column 1B via the reinforcing cylinder 6 of the metal joint A, and into this, Accordingly, the lower end of the upper pillar 1A is placed on the mounting pieces 20 and 31 via the connecting board 13 to engage with the engaging portion 3, and the lower hole 1B is provided with the through hole 24 provided in the lower pillar 1B. The through-holes 16 provided in the lower portion of the connecting rod 4 are aligned with each other, and the fixing pins 15 are inserted into these through-holes 16 in the same manner as the upper column 1A, and the upper column 1A and the lower column 1B are inserted.
Are connected to each other via a joining hardware A connecting member B and first and second mounting hardware C1 and C2, thereby forming an embodiment apparatus.

【0023】[0023]

【発明の効果】本発明は前記の通り端部を埋入して固着
した連結杆を介して上下の柱は互いに接続されるから引
張り荷重に対して従来みることの出来ない強固な装置を
提供でき、また、上側柱は横架材で構成される係合部に
係合してあるから、該上側柱に対する負荷が下側柱に伝
わり易くなって接合部に負荷が集中することのなく、い
わゆる通し柱と変ることのない柱装置を提供できる。
As described above, the present invention provides a strong device which cannot be seen with respect to a tensile load since the upper and lower columns are connected to each other via the connecting rod having the ends embedded and fixed. Also, since the upper column is engaged with the engaging portion formed of the horizontal member, the load on the upper column is easily transmitted to the lower column, so that the load is not concentrated on the joint portion, A pillar device that is not different from a so-called through pillar can be provided.

【0024】また、連結杆と柱を固定ピンで固着する構
成を採るから軸組作業の省力化を図れる。
In addition, since the connecting rod and the column are fixed to each other with the fixing pin, labor for the frame assembly can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】縦断面図。FIG. 1 is a longitudinal sectional view.

【図2】横断面図。FIG. 2 is a cross-sectional view.

【図3】図1のX−X線断面図。FIG. 3 is a sectional view taken along line XX of FIG. 1;

【図4】接合金物の斜視図。FIG. 4 is a perspective view of a metal joint.

【図5】連結材の斜視図。FIG. 5 is a perspective view of a connecting member.

【図6】第一取付け金物の斜視図。FIG. 6 is a perspective view of a first mounting hardware.

【図7】第二取付け金物の斜視図。FIG. 7 is a perspective view of a second mounting hardware.

【図8】横架材端部の斜視図。FIG. 8 is a perspective view of an end of a transverse member.

【図9】他の横架材端部の斜視図。FIG. 9 is a perspective view of another cross member end.

【符号の説明】[Explanation of symbols]

1A 上側柱 1B 下側柱 2A 横架材 2B 横架材 3 係合部 4 連結杆 Reference Signs List 1A Upper column 1B Lower column 2A Horizontal member 2B Horizontal member 3 Engagement part 4 Connecting rod

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04B 1/26 E04B 1/58 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E04B 1/26 E04B 1/58

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 下側柱に載置して固着した接合金物と前
記下側柱を取り囲む梁などの横架材の端部に固着した取
付け金物を互いに接続して前記下側柱の直上に前記横架
材の端面で取り囲まれる係合部を設け、該係合部に係合
した上側柱の下端部に突設した連結杆と、前記接合金物
を通じて前記連結杆を埋入した前記下側柱を互いに固着
した、木造建物の軸組装置。
1. A metal fitting placed on and fixed to a lower pillar and a metal fitting fixed to an end of a transverse member such as a beam surrounding the lower pillar are connected to each other to be directly above the lower pillar. An engaging portion surrounded by the end surface of the horizontal member is provided, a connecting rod protruding from a lower end of the upper pillar engaged with the engaging portion, and the lower side embedded with the connecting rod through the joint hardware. A framed device for wooden buildings with columns fixed to each other.
【請求項2】 上側柱に設けた貫通孔と連結杆に設けた
貫通孔を互いに一致させ、これらに固定ピンを嵌挿し
た、請求項1記載の木造建物の軸組装置。
2. A timbering device for a wooden building according to claim 1, wherein the through-hole provided in the upper pillar and the through-hole provided in the connecting rod are aligned with each other, and a fixing pin is inserted into these.
JP17219997A 1997-06-27 1997-06-27 Framed equipment for wooden buildings Expired - Fee Related JP3220663B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17219997A JP3220663B2 (en) 1997-06-27 1997-06-27 Framed equipment for wooden buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17219997A JP3220663B2 (en) 1997-06-27 1997-06-27 Framed equipment for wooden buildings

Publications (2)

Publication Number Publication Date
JPH1113137A JPH1113137A (en) 1999-01-19
JP3220663B2 true JP3220663B2 (en) 2001-10-22

Family

ID=15937429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17219997A Expired - Fee Related JP3220663B2 (en) 1997-06-27 1997-06-27 Framed equipment for wooden buildings

Country Status (1)

Country Link
JP (1) JP3220663B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3749997B2 (en) * 2001-01-31 2006-03-01 株式会社タナカ創研 Beam receiving hardware and manufacturing method thereof
JP6895267B2 (en) * 2017-02-13 2021-06-30 株式会社竹中工務店 Pillar support structure

Also Published As

Publication number Publication date
JPH1113137A (en) 1999-01-19

Similar Documents

Publication Publication Date Title
JP2004324270A (en) Joint structure of structure using gusset plate and the building
JP5002308B2 (en) Joint structure in wood ramen structure
JPH10280542A (en) Joint construction between reinforced concrete column and steel framed beam
JP3714902B2 (en) Column and cross member joining device
JP3220663B2 (en) Framed equipment for wooden buildings
JP2954548B2 (en) Column-beam joint structure of steel structure
JP2886488B2 (en) Reinforced metal fittings for buildings
JP2007284919A (en) Mounting hardware
JP2010106626A (en) Joint structure of column and beam
JP3631700B2 (en) Column and horizontal joining device
JP3051878B2 (en) Equipment for joining columns and beams to horizontal members
JP3787140B2 (en) Wall structure
JP3287807B2 (en) Beam assembly equipment
JP2863141B2 (en) Beam frame
JP2004084353A (en) Roof truss beam installing structure and roof truss beam installing method
JP3107749B2 (en) Steel House Frame Structure
JP2609143B2 (en) Frame structure
JP2006104774A (en) Building member connection structure
JP2001241106A (en) Corner part fastening hardware and fastening structure
JP2877864B2 (en) Building method
JPH0333846Y2 (en)
JP2891415B1 (en) Equipment for joining horizontal members in wooden buildings
JPH1018425A (en) Framework device of wooden structure
JP2514769B2 (en) Beam receiving method and beam receiving bracket
JP2019196656A (en) Junction structure of structural skeleton of wooden building and wooden building

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees