JP3203637U - Stretching guide for stretched suspended wire - Google Patents

Stretching guide for stretched suspended wire Download PDF

Info

Publication number
JP3203637U
JP3203637U JP2016000388U JP2016000388U JP3203637U JP 3203637 U JP3203637 U JP 3203637U JP 2016000388 U JP2016000388 U JP 2016000388U JP 2016000388 U JP2016000388 U JP 2016000388U JP 3203637 U JP3203637 U JP 3203637U
Authority
JP
Japan
Prior art keywords
wire
boom
stretched
suspended
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016000388U
Other languages
Japanese (ja)
Inventor
由門 板坂
由門 板坂
光一 奈良迫
光一 奈良迫
哲 上垣内
哲 上垣内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tadano Ltd
Original Assignee
Tadano Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tadano Ltd filed Critical Tadano Ltd
Priority to JP2016000388U priority Critical patent/JP3203637U/en
Application granted granted Critical
Publication of JP3203637U publication Critical patent/JP3203637U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

【課題】ブーム上面に沿って張設しようとする吊荷ワイヤの索端を、ブーム上面に対して無接触で且つ確実にブーム先端部まで移動させ得る被張設吊荷ワイヤの張設案内具を提供する。【解決手段】ブーム基端側からブーム先端部まで張設される第1吊荷ワイヤと第2吊荷ワイヤが装備されるクレーンにおいて、張設すべき吊荷ワイヤ52をブーム上面に沿って張設する際に使用する被張設吊荷ワイヤの張設案内具であって、上記被張設吊荷ワイヤ52の索端52aに、ブーム上面に沿って張設している既張設吊荷ワイヤ51に対して上記索端52aをスライド自在に吊下させ得る引っ掛け具65を設けていることにより、該引っ掛け具65を既張設吊荷ワイヤ51に引っ掛けることで被張設吊荷ワイヤ52の索端52aを既張設吊荷ワイヤ51から宙吊り状態で移動させ得るようにしている。【選択図】図1A tension guide for a stretched load wire that can move a rope end of a load wire to be tensioned along a boom upper surface to the boom tip without contact with the boom upper surface. I will provide a. In a crane equipped with a first load wire and a second load wire that are stretched from a boom base end side to a boom tip end, a load wire 52 to be stretched is stretched along the upper surface of the boom. A tension guide for a stretched suspended wire used for installation, wherein the stretched suspended load is stretched along the top surface of the boom on the rope end 52a of the stretched suspended wire 52. By providing a hook 65 capable of slidably hanging the rope end 52a with respect to the wire 51, the hooked hanging wire 52 can be hooked by hooking the hook 65 on the existing hanging wire 51. The cable end 52a can be moved from the existing suspended load wire 51 in a suspended state. [Selection] Figure 1

Description

本考案は、ブーム基端側からブーム先端部まで張設される第1吊荷ワイヤと第2吊荷ワイヤが装備されるクレーンにおいて、張設すべき吊荷ワイヤをブーム上面に沿って張設する際に使用する被張設吊荷ワイヤの張設案内具に関するものである。   The present invention relates to a crane equipped with a first hanging wire and a second hanging wire that are stretched from the boom proximal end side to the boom distal end, and the suspension load wire to be stretched is stretched along the upper surface of the boom. The present invention relates to a tension guide for a stretched suspended load wire used in the process.

移動式クレーンの中には、旋回台上に第1ウインチ(メインウインチ)と第2ウインチ(サブウインチ)の2つのウインチを装備し、クレーン作業の内容に応じて第1ウインチに巻回している第1吊荷ワイヤ(索端にメインフックが取付けられる)と第2ウインチに巻回している第2吊荷ワイヤ(索端にサブフックが取付けられる)とを使い分けるようにしたものがある。尚、本願の説明では、上記第1ウインチ(メインウインチ)に巻回している第1吊荷ワイヤをメイン吊荷ワイヤと称し、上記第2ウインチ(サブウインチ)に巻回している第2吊荷ワイヤをサブ吊荷ワイヤと称することがある。   Some mobile cranes are equipped with two winches, a first winch (main winch) and a second winch (sub winch), on the swivel, and are wound around the first winch according to the contents of the crane work. There is a type in which a first hanging wire (a main hook is attached to a rope end) and a second hanging wire wound around a second winch (a sub hook is attached to a rope end) are selectively used. In the description of the present application, the first suspended load wire wound around the first winch (main winch) is referred to as a main suspended load wire, and the second suspended load wound around the second winch (sub winch). The wire may be referred to as a sub-hanging wire.

ところで、移動式クレーンにおいて、ウインチに巻回している吊荷ワイヤをブーム上面に沿ってブーム先端部まで張設するのに、当社では例えば特開2015−227236号公報(特許文献1)に示されるロープ連結サポート(発明の名称は、クレーン車における吊荷ロープ張設時に使用するロープ連結サポート)を使用している。   By the way, in a mobile crane, in order to stretch a suspended wire wound around a winch to the tip of the boom along the boom upper surface, in our company, for example, JP-A-2015-227236 (Patent Document 1) shows. The rope connection support (the name of the invention is a rope connection support used when suspending a suspended load rope in a crane truck) is used.

この公知(特許文献1)のロープ連結サポートは、ブーム上面を引き摺り得るソリ状の基台を有している。そして、このロープ連結サポートは、ブーム基端側において、上記基台に、張設すべき吊荷ワイヤの索端(この索端には一般に索端固定具が取付けられる)と牽引ロープ(細紐)の一端とをそれぞれ連結した状態で、牽引ロープの他端側をブーム先端部のシーブを介して地上から引き下げることによって、ウインチから巻解かれた吊荷ワイヤの先端側を上記基台とともにブーム上面に沿ってブーム先端部まで引出し得る機能を有するものである。   This known (patent document 1) rope connection support has a warped base that can drag the upper surface of the boom. And this rope connection support has a rope end (a rope end fixing tool is generally attached to this rope end) and a tow rope (narrow string) on the base of the boom on the base. ), The other end of the tow rope is pulled down from the ground via the sheave of the boom tip, and the tip of the suspended wire unwound from the winch is boomed together with the base. It has a function that can be pulled out to the tip of the boom along the upper surface.

ところで、吊荷ワイヤをブーム上面に沿って張設するのに、上記公知例(特許文献1)のようにロープ連結サポートをブーム上面上で引き摺る場合は、ブーム上面の幅が狭いと該ロープ連結サポートがブーム側方に脱落することがある。   By the way, when the rope connection support is dragged on the boom upper surface as in the above-described known example (Patent Document 1) to stretch the suspended load wire along the boom upper surface, the rope connection is performed when the width of the boom upper surface is narrow. The support may fall off to the side of the boom.

そこで、この種の移動式クレーンには、ブーム上面部分におけるブーム長さ方向に間隔をもった複数箇所にワイヤがブーム側方に脱落するのを防止するためのガード部材が設けられている。このガード部材は、左右の立上げ棒をブーム上面部分において連結棒で連結したものであって、ブーム上面部分にはガード部材の連結棒部分が横たわっている。   Therefore, this type of mobile crane is provided with guard members for preventing the wires from dropping off to the side of the boom at a plurality of locations spaced in the boom length direction on the upper surface portion of the boom. In this guard member, right and left rising bars are connected by a connecting rod at the boom upper surface portion, and the connecting rod portion of the guard member lies on the boom upper surface portion.

特開2015−227236号公報Japanese Patent Laying-Open No. 2015-227236

そして、上記公知例(特許文献1)のロープ連結サポートを用いて吊荷ワイヤをブーム上面に沿って張設する際には、上記ガード部材(特にブーム上面に横たわる連結棒部分)がブーム上面を引き摺られるロープ連結サポート(ソリ状の基台)の障害物となり、該ロープ連結サポートが上記障害物に衝合することでロープ連結サポート(基台部分)が引っ掛かったり姿勢変更したりして、スムーズな移動ができにくくなるという問題があった。   When the hanging wire is stretched along the boom upper surface using the rope connection support of the known example (Patent Document 1), the guard member (particularly the connecting rod portion lying on the boom upper surface) It becomes an obstacle of the dragging support (sledge-shaped base) to be dragged, and the rope connection support (base part) is hooked or changes its posture as the rope connection support collides with the obstacle, so that it is smooth There was a problem that it was difficult to move easily.

又、吊荷ワイヤの張設時に、上記ロープ連結サポートがブーム上面を引き摺られると、ブーム上面の塗装が剥げ易くなるという問題もあった。   In addition, when the hanging wire is stretched, if the rope connection support is dragged on the upper surface of the boom, there is a problem that the coating on the upper surface of the boom is easily peeled off.

そこで、本考案は、ブーム上面に沿って張設すべき吊荷ワイヤの索端をブーム上面に対して無接触で且つ確実に移動させ得るようにした被張設吊荷ワイヤの張設案内具を提供することを目的としている。   Therefore, the present invention provides a tensioning guide for a stretched suspended load wire that can move the rope end of the suspended load wire to be stretched along the boom upper surface without contact with the boom upper surface. The purpose is to provide.

本考案は、上記課題を解決するための手段として次の構成を有している。尚、本願の考案の名称は「被張設吊荷ワイヤの張設案内具」であるが、以下の説明では、本願の考案の名称を簡略して「ワイヤ張設案内具」と称することがある。   The present invention has the following configuration as means for solving the above problems. In addition, although the name of the device of the present application is “a stretched guide for a stretched suspended wire”, in the following description, the name of the device of the present application may be simply referred to as a “wire stretcher guide”. is there.

本考案のワイヤ張設案内具は、ブーム基端側からブーム先端部まで張設される第1吊荷ワイヤと第2吊荷ワイヤが装備されるクレーンにおいて、張設すべき吊荷ワイヤをブーム上面に沿って張設する際に使用するものである。   The wire tensioning guide of the present invention is a crane equipped with a first suspended load wire and a second suspended wire that are stretched from the boom proximal end side to the boom distal end, and the suspended load wire to be stretched is attached to the boom. It is used when stretching along the upper surface.

上記第1吊荷ワイヤはメインの吊荷作業を行うメイン吊荷ワイヤとなるものであり、上記第2吊荷ワイヤはサブの吊荷作業を行うサブ吊荷ワイヤとなるものである。これらの吊荷ワイヤ(第1吊荷ワイヤと第2吊荷ワイヤ)は、ブーム基端側(旋回台上)に設置した第1ウインチ(メインウインチ)と第2ウインチ(サブウインチ)にそれぞれ巻回されている。   The first suspended wire serves as a main suspended wire that performs a main suspended work, and the second suspended wire serves as a subsidiary suspended wire that performs a subsidiary suspended work. These load wires (first load wire and second load wire) are wound around a first winch (main winch) and a second winch (sub winch) installed on the boom base end side (on the swivel base), respectively. It has been turned.

そして、本考案のワイヤ張設案内具は、張設すべき吊荷ワイヤの索端に、ブーム上面に沿って張設している既張設吊荷ワイヤに対して上記索端をスライド自在に吊下させ得る引っ掛け具を設けていることを特徴としている。   Then, the wire tensioning guide of the present invention is slidable with respect to the existing suspended load wire that is stretched along the upper surface of the boom at the rope end of the suspended load wire to be stretched. It is characterized by providing a hooking tool that can be suspended.

吊荷ワイヤの索端には、一般に索端固定具(索端止めともいう)が取付けられているが、本願では、この索端固定具を含めたものを索端と表現している。そして、上記引っ掛け具は、上記索端固定具に設けたものでもよい。   A cable end fixing tool (also called a cable end stopper) is generally attached to the cable end of the suspended load wire. In the present application, the cable end including the cable end fixing tool is expressed as a cable end. The hooking tool may be provided on the rope end fixing tool.

本願で使用している上記引っ掛け具は、例えば細線材や薄板材の上部をフック状に屈曲させたものを採用できる。   As the hook used in the present application, for example, an upper part of a thin wire material or a thin plate material bent in a hook shape can be adopted.

又、本考案では、上記引っ掛け具は、索端(索端固定具)に固定したままのもの(引っ掛け具に格納し得るものも含む)でもよいが、該引っ掛け具を上記索端(索端固定具)に対して着脱自在に取付けることができる。   In the present invention, the hooking tool may be one that is fixed to the end of the rope (the rope end fixing tool) (including one that can be stored in the hooking tool). It can be detachably attached to the fixture.

本願のワイヤ張設案内具は、第1吊荷ワイヤと第2吊荷ワイヤの少なくとも何れか一方がブーム基端側からブーム先端部まで張設された状態で使用される。尚、以下の説明では、ブーム基端側からブーム先端部まで既に張設されている吊荷ワイヤを既張設吊荷ワイヤといい、これから張設しようとしている未張設の吊荷ワイヤを被張設吊荷ワイヤということがある。   The wire tensioning guide of the present application is used in a state in which at least one of the first suspended load wire and the second suspended load wire is stretched from the boom proximal end side to the boom distal end portion. In the following description, the suspended wire that has already been stretched from the boom base end side to the boom distal end is referred to as an existing suspended load wire, and the unsuspended suspended wire to be stretched from now on is covered. Sometimes called a tension wire.

そして、本願のワイヤ張設案内具を使用して、被張設吊荷ワイヤをブーム上面に沿って張設するには、ブームを略水平姿勢まで倒伏させた姿勢で、次のように行われる。   Then, using the wire tensioning guide of the present application to stretch the stretched suspended load wire along the upper surface of the boom, it is performed in the following manner with the boom lying down to a substantially horizontal position. .

まず、ブーム基端側において被張設吊荷ワイヤの索端(索端固定具を含む)に設けている引っ掛け具を上記既張設吊荷ワイヤに引っ掛けて、被張設吊荷ワイヤの索端を既張設吊荷ワイヤから吊下させる。続いて、この状態で、索端(索端固定具)に牽引ロープの一端を連結した後、該牽引ロープの他端側をブーム先端部のシーブを介してブーム先端部から下方に垂れ下げておく。   First, a hook provided on the rope end (including the rope end fixing tool) of the tension suspension load wire on the boom base end side is hooked on the tension extension load wire, and the tension suspension load wire Suspend the end from the existing suspended wire. Subsequently, in this state, after connecting one end of the tow rope to the rope end (the rope end fixing tool), the other end side of the tow rope is hung downward from the boom tip through the sheave of the boom tip. deep.

ところで、ブームを略水平姿勢まで倒伏している状態では、上記既張設吊荷ワイヤとブーム上面との間に、既張設吊荷ワイヤから吊下させた被張設吊荷ワイヤの索端(索端固定具)をブーム上面に無接触でスライドさせるための隙間がない場合があり、その場合には、ブームを若干角度(例えば角度10°程度)起仰させることで、上記隙間を索端(索端固定具)がブーム上面に接触しない程度まで大きくできる。尚、上記隙間を大きくするための他の方法としては、ブームを略水平にした状態で、既張設吊荷ワイヤの基端部側を所定高さのマストで持ち上げることでも達成することができる。   By the way, in the state where the boom is lying down to a substantially horizontal posture, the end of the stretched suspended load wire suspended from the stretched suspended load wire between the stretched suspended load wire and the upper surface of the boom. In some cases, there is no gap for sliding the (hook end fixing tool) on the top surface of the boom without contact. In such a case, the boom is raised by raising the boom at a slight angle (for example, an angle of about 10 °). It can be enlarged to the extent that the end (the rope end fixing tool) does not contact the upper surface of the boom. In addition, as another method for enlarging the said clearance gap, it can also achieve by raising the base end part side of the existing suspended load wire with a mast having a predetermined height in a state where the boom is substantially horizontal. .

次に、被張設吊荷ワイヤのウインチを巻解きながらブーム先端部前方の地上から垂れ下げた牽引ロープの他端側を下方に引き下ろすと、該牽引ロープを介してワイヤ張設案内具(被張設吊荷ワイヤの索端)が既張設吊荷ワイヤに宙吊りにガイドされた状態で順次ブーム先端部まで移動していき、ブーム上面のほぼ全長に亘って被張設吊荷ワイヤが張設される。そして、被張設吊荷ワイヤの索端(ワイヤ張設案内具)がブーム先端部の近傍まで達すると、地上に立設した脚立に登って引っ掛け具を既張設吊荷ワイヤから外し、続いて被張設吊荷ワイヤの先端部付近のワイヤをブーム先端部のシーブに掛けて下方に垂下させ、その被張設吊荷ワイヤの索端から牽引ロープを外して該索端に所定の吊荷フックを付け替えれば、一連の吊荷ワイヤ張設作業が完了する。   Next, when the other end side of the tow rope suspended from the ground in front of the boom tip is unwound while unwinding the winch of the stretched suspended wire, the wire tension guide ( The cable end of the tension suspension load wire) is sequentially moved to the tip of the boom in a state of being suspended in suspension by the tension tension load wire. It is stretched. Then, when the rope end (wire tensioning guide) of the stretched suspended wire reaches the vicinity of the tip of the boom, it climbs on a stepladder standing on the ground to remove the hook from the existing suspended load wire. Then, hang the wire near the tip of the suspended load wire on the sheave at the tip of the boom and hang downward, remove the tow rope from the end of the stretched load wire, If the load hook is replaced, a series of hanging load wire extending operations are completed.

又、引っ掛け具が索端(索端固定具)に対して着脱自在なものでは、該引っ掛け具を索端(索端固定具)から取外すことによって、索端(索端固定具)の外表面から突出部分を無くすことができる。   In addition, when the hook is detachable from the rope end (the rope end fixing tool), the outer surface of the rope end (the rope end fixing tool) can be obtained by removing the hook from the rope end (the rope end fixing tool). The protruding portion can be eliminated from

本考案のワイヤ張設案内具は、上記被張設吊荷ワイヤの索端(索端固定具を含む)に、該索端を上記既張設吊荷ワイヤから吊下させ得る引っ掛け具を設けているので、被張設吊荷ワイヤをブーム基端側からブーム先端部まで張設する際に、上記引っ掛け具を既張設吊荷ワイヤに引っ掛けることで、被張設吊荷ワイヤの索端を既張設吊荷ワイヤから宙吊りにした状態でブーム上面に沿って移動させることができる。   The wire tensioning guide of the present invention is provided with a hooking tool capable of suspending the cable end from the existing suspended load wire at the cable end (including the cable end fixing tool) of the stretched suspended load wire. Therefore, when the stretched suspension wire is stretched from the boom base end side to the boom tip, the hook of the stretched suspension wire is hooked on the already installed suspension load wire. Can be moved along the upper surface of the boom in a state of being suspended from the existing suspended load wire.

従って、本考案のワイヤ張設案内具を使用すると、既張設吊荷ワイヤを被張設吊荷ワイヤの索端の引出しのためのガイドとして利用できるので、該索端(索端固定具)を安定姿勢で且つ確実に引出し側に移動させることができるという効果がある。   Accordingly, when the wire tensioning guide of the present invention is used, the existing suspended load wire can be used as a guide for pulling out the cable end of the stretched suspended load wire. Can be reliably moved to the drawer side in a stable posture.

又、上記索端(索端固定具を含む)の移動時には、該索端が既張設吊荷ワイヤから吊下されていることにより、該索端をブーム上面に対して無接触状態で移動させることができるので、該索端(硬質の索端固定具)の摺れによってブーム上面の塗装が剥げるのを未然に防止できるという効果がある。   Further, when the above-mentioned rope end (including the rope end fixing tool) is moved, the rope end is suspended from the existing suspended load wire so that the rope end is moved in a non-contact state with respect to the upper surface of the boom. Therefore, there is an effect that it is possible to prevent the paint on the upper surface of the boom from being peeled off due to the sliding of the cable end (hard cable end fixing tool).

さらに、引っ掛け具を上記索端に着脱させ得るようにしたものでは、該索端を既張設吊荷ワイヤから吊下させる必要がないときには、該引っ掛け具を索端から取外しておくことで索端から不要な突出部分を無くすことができる(引っ掛け具が邪魔にならない)という効果もある。   Further, in the case where the hooking tool can be attached to and detached from the cable end, when it is not necessary to hang the cable end from the existing suspended load wire, the hooking tool is removed from the cable end. There is also an effect that an unnecessary protruding portion can be eliminated from the end (the hook does not get in the way).

本願第1実施例のワイヤ張設案内具の斜視図である。It is a perspective view of the wire tension guide of the 1st example of this application. 図1のワイヤ張設案内具の使用方法説明図である。It is an explanatory view of the usage method of the wire tension guide of FIG. 図2のIII部拡大図である。It is the III section enlarged view of FIG. 図1のワイヤ張設案内具を既張設吊荷ワイヤに引っ掛けた状態でブーム上面に沿って移動させる際の第1の形態図である。It is a 1st form figure at the time of moving along the boom upper surface in the state which hooked the wire tensioning guide tool of FIG. 図1のワイヤ張設案内具を既張設吊荷ワイヤに引っ掛けた状態でブーム上面に沿って移動させる際の第2の形態図である。It is the 2nd form figure at the time of moving along the boom upper surface in the state which hooked the wire tensioning guide tool of FIG. 本願第2実施例のワイヤ張設案内具の分解斜視図である。It is a disassembled perspective view of the wire tension guide of 2nd Example of this application. 図6(第2実施例)のワイヤ張設案内具の組付け状態図である。FIG. 7 is an assembly state diagram of the wire tension guide of FIG. 6 (second embodiment).

以下、図1〜図7を参照して本願のいくつか(2つ)の実施例を説明する。尚、以下に説明する本願の各実施例においても、本願の考案の名称である「被張設吊荷ワイヤの張設案内具」を単に「ワイヤ張設案内具」と表現する。   Hereinafter, some (two) embodiments of the present application will be described with reference to FIGS. In each of the embodiments of the present application described below, the “stretching guide for stretched suspended wire”, which is the name of the present invention, is simply expressed as “wire tensioning guide”.

図1には本願第1実施例のワイヤ張設案内具を示し、図2〜図5には図1(第1実施例)のワイヤ張設案内具の使用形態を示し、図6〜図7には本願第2実施例のワイヤ張設案内具を示している。   FIG. 1 shows the wire tensioning guide of the first embodiment of the present application, FIGS. 2 to 5 show the usage mode of the wire tensioning guide of FIG. 1 (first embodiment), and FIGS. Shows the wire tensioning guide of the second embodiment of the present application.

本願各実施例のワイヤ張設案内具の使用対象となるクレーンとして、例えば図2に示すような移動式クレーンがあるが、この図2の移動式クレーンは、車両1上に旋回台2を設け、該旋回台2に起伏及び伸縮自在なブーム3を取付けている。又、旋回台2上には、第1吊荷ワイヤ51と第2吊荷ワイヤ52をそれぞれ巻回している第1ウインチ41と第2ウインチ42が設けられていて、クレーン作業の内容に応じて第1ウインチ41に巻回している第1吊荷ワイヤ51と第2ウインチ42に巻回している第2吊荷ワイヤ52とを使い分けるようにしている。   For example, a mobile crane as shown in FIG. 2 is used as a crane to be used for the wire tension guide of each embodiment of the present application. The mobile crane shown in FIG. A boom 3 that can be raised and lowered and attached to the swivel base 2 is attached. Further, on the swivel base 2, there are provided a first winch 41 and a second winch 42 around which the first hanging wire 51 and the second hanging wire 52 are wound, respectively, depending on the contents of the crane work. The first suspended wire 51 wound around the first winch 41 and the second suspended wire 52 wound around the second winch 42 are selectively used.

図2の実施例の移動式クレーンでは、上記第1ウインチ41がメインウインチであって該メインウインチ41に巻回している第1吊荷ワイヤ51がメイン吊荷ワイヤとなり、上記第2ウインチ42がサブウインチであって該サブウインチ42に巻回している第2吊荷ワイヤ52がサブ吊荷ワイヤとなるものである。又、第1吊荷ワイヤ51及び第2吊荷ワイヤ52の各先端部(索端)には、それぞれ図1に示すような索端固定具60が設けられているが、本願でいう索端には該索端固定具60を含むものである。   In the mobile crane of the embodiment of FIG. 2, the first winch 41 is the main winch, the first load wire 51 wound around the main winch 41 is the main load wire, and the second winch 42 is The second load wire 52 that is a sub-winch and is wound around the sub-winch 42 is a sub-load wire. Further, the tip end (the end of the rope) of the first hanging wire 51 and the second hanging wire 52 is provided with a rope end fixing tool 60 as shown in FIG. Includes the rope end fixing tool 60.

図示例(図1)の索端固定具60は、丸棒体61の一端側に索端52aを埋め込み固定しているとともに、該丸棒体61の他端側に係止ピン63を挿通させるピン穴62を設けている。このピン穴62及び係止ピン63は、後述する牽引ロープ7の一端部(輪状部)71を索端固定具60に連結する機能を有する一方、索端固定具60にサブフックを連結したり索端固定具60をブーム先端部32に固定したりするのに用いられる。   The rope end fixing tool 60 of the illustrated example (FIG. 1) has the rope end 52 a embedded and fixed to one end side of the round bar body 61, and the locking pin 63 is inserted into the other end side of the round bar body 61. A pin hole 62 is provided. The pin hole 62 and the locking pin 63 have a function of connecting one end portion (ring-shaped portion) 71 of the pulling rope 7 to be described later to the rope end fixing tool 60, while connecting a sub hook to the rope end fixing tool 60 or a cable. It is used to fix the end fixture 60 to the boom tip 32.

そして、図2に示すワイヤ張設案内具の使用形態では、第1吊荷ワイヤ(メイン吊荷ワイヤ)51がブーム基端側(メインウインチ41)からブーム先端部32まで張設されていて、既張設吊荷ワイヤとなるものであり、第2吊荷ワイヤ(サブ吊荷ワイヤ)52がサブウインチ42に巻回されたままの被張設吊荷ワイヤとなるものである。尚、この実施例の説明では、符号51の吊荷ワイヤについて第1吊荷ワイヤやメイン吊荷ワイヤや既張設吊荷ワイヤと表現を変えているが何れも同じものであり、符号52の吊荷ワイヤについも第2吊荷ワイヤやサブ吊荷ワイヤや被張設吊荷ワイヤと表現を変えているが何れも同じものである。   And in the usage form of the wire tensioning guide shown in FIG. 2, the first suspended load wire (main suspended load wire) 51 is stretched from the boom proximal end side (main winch 41) to the boom distal end 32, The second suspended load wire (sub-suspended wire) 52 is a stretched suspended wire that is wound around the sub winch 42. In the description of this embodiment, the expression of the suspended load wire 51 is changed to the first suspended wire, the main suspended load wire, and the existing suspended load wire. Although the expression of the suspended load wire is changed to the second suspended load wire, the sub-suspended load wire, and the stretched suspended load wire, they are all the same.

図1に示す第1実施例のワイヤ張設案内具Aは、被張設吊荷ワイヤ(第2吊荷ワイヤ)52の索端固定具60(本願の索端に含まれる)の外面に、既張設吊荷ワイヤ(第1吊荷ワイヤ)51に対して索端固定具60をスライド自在に吊下させ得る引っ掛け具65を設けて構成されたものである。尚、図1に示す第1実施例のワイヤ張設案内具Aでは、上記引っ掛け具65を索端固定具60に設けているので、本願において引っ掛け具65を設けいてる索端のことを索端固定具60で説明する。   The wire tensioning guide A of the first embodiment shown in FIG. 1 is provided on the outer surface of the rope end fixing tool 60 (included in the rope end of the present application) of the stretched hanging load wire (second hanging load wire) 52. A hooking tool 65 capable of slidably hanging the rope end fixing tool 60 with respect to the existing suspended load wire (first load wire) 51 is provided. In the wire tensioning guide A of the first embodiment shown in FIG. 1, since the hook 65 is provided on the rope end fixing tool 60, the rope end where the hook 65 is provided in the present application is referred to as the rope end. The fixing device 60 will be described.

この第1実施例のワイヤ張設案内具Aでは、引っ掛け具65として細線材の上部をフック状に屈曲させたものを2つ使用し、該2つの引っ掛け具65,65を索端固定具60(丸棒体61)の長さ方向に離間した2箇所に着脱自在に取付けている。この第1実施例の各引っ掛け具65,65の着脱は、細線材の下部に設けた雄ネジを丸棒体61の外面に設けた雌ネジに螺合及び螺解することによって行うものである。尚、図1において、鎖線図示する各引っ掛け具65′,65′は、索端固定具60から取り外した状態を示すものである。   In the wire tensioning guide A of the first embodiment, two hooks 65 in which the upper portion of the thin wire material is bent into a hook shape are used, and the two hooks 65, 65 are connected to the cable end fixing tool 60. It is detachably attached to two places separated in the length direction of the (round bar body 61). The hooks 65, 65 of the first embodiment are attached and detached by screwing and unscrewing the male screw provided at the lower part of the thin wire material to the female screw provided on the outer surface of the round bar 61. . In FIG. 1, the hooking tools 65 ′ and 65 ′ shown by chain lines indicate a state where they are detached from the cable end fixing tool 60.

このように、引っ掛け具65,65を索端固定具60に着脱し得るようにしたものでは、索端固定具60を既張設吊荷ワイヤ51から吊下させる必要がないときには、該引っ掛け具65,65を図1に鎖線図示(符号65′)するように索端固定具60から取外しておくことで、索端固定具60の外表面から突出する部分を無くすことができる(引っ掛け具65が邪魔にならない)。   As described above, when the hooking devices 65, 65 can be attached to and detached from the rope end fixing device 60, when the rope end fixing device 60 does not need to be suspended from the existing suspended load wire 51, the hooking device is provided. By removing 65 and 65 from the rope end fixing tool 60 as shown by a chain line in FIG. 1 (reference numeral 65 '), a portion protruding from the outer surface of the rope end fixing tool 60 can be eliminated (the hooking tool 65). Does not get in the way).

尚、本願の他の実施例では、引っ掛け具65を索端固定具60に固定したままのものも採用できるが、その場合は、引っ掛け具65を索端固定具60の外表面に沿って倒伏(格納)させ得るようにすると、引っ掛け具不使用時に突出部分を無くす(又は小さくする)ことができる。又、該引っ掛け具65は、索端固定具60に対して1箇所でもよいが、前後に小間隔をもった2箇所に設けると、索端固定具60を安定姿勢で吊下させることができる。尚、引っ掛け具65を薄板材で形成したものでは、索端固定具60の長さ方向に適宜の幅をもたせることで1つの引っ掛け具65でも索端固定具60を安定姿勢で吊下させることができる。   In another embodiment of the present application, a hook with the hook 65 being fixed to the rope end fixing tool 60 can be used. In this case, the hook 65 is lying down along the outer surface of the rope end fixing tool 60. If it can be (stored), the protruding portion can be eliminated (or made smaller) when the hook is not used. Further, the hooking device 65 may be provided at one location with respect to the rope end fixing device 60. However, if the hooking device 65 is provided at two locations with a small interval in the front and rear direction, the rope end fixing device 60 can be suspended in a stable posture. . In the case where the hooking tool 65 is formed of a thin plate material, the rope end fixing tool 60 can be suspended in a stable posture even with one hooking tool 65 by providing an appropriate width in the length direction of the rope end fixing tool 60. Can do.

図1に示す第1実施例のワイヤ張設案内具Aは、図2に示すように、一方の吊荷ワイヤをブーム基端側(旋回台2上のウインチ)からブーム先端部32まで張設した状態(既張設吊荷ワイヤ51となる)で、且つブーム3を略水平姿勢まで倒伏させた姿勢で次のように使用される。尚、2本の吊荷ワイヤのうち既張設吊荷ワイヤとなるのは、通常はメイン吊荷ワイヤ51の方であって、新たに張設しようとする被張設吊荷ワイヤはサブ吊荷ワイヤ52の場合が多いが、既張設吊荷ワイヤをサブ吊荷ワイヤ52とする一方、被張設吊荷ワイヤをメイン吊荷ワイヤ51とすることもできる。   As shown in FIG. 2, the wire tensioning guide A of the first embodiment shown in FIG. 1 stretches one suspended wire from the boom proximal end (winch on the swivel 2) to the boom distal end 32. The boom 3 is used in the following manner in a state where the boom 3 is laid down to a substantially horizontal posture. Of the two suspended load wires, the existing suspended load wire is normally the main suspended load wire 51, and the suspended suspended wire to be newly stretched is the sub-suspended wire. In many cases, the load wire 52 is used as the sub-suspended load wire 52, while the stretched load wire can be used as the main suspended wire 51.

まず、図2に示すように、作業員M1が旋回台2上に上がって、これから張設しようとしている被張設吊荷ワイヤ(サブ吊荷ワイヤ)52の索端固定具60に設けている引っ掛け具65,65(図1参照)を、ブーム基端側において既張設吊荷ワイヤ51に引っ掛けて、被張設吊荷ワイヤ52の索端(索端固定具60)を既張設吊荷ワイヤ51から吊下させる。続いて、この状態で、索端固定具60に牽引ロープ(細紐)7の一端部71を連結した後(図3参照)、該牽引ロープ7の他端側72を地上に垂れ下げておく(図2参照)。   First, as shown in FIG. 2, the worker M <b> 1 goes up on the turntable 2 and is provided on the rope end fixing tool 60 of the stretched suspended load wire (sub-suspended load wire) 52 to be stretched from now on. The hooks 65, 65 (see FIG. 1) are hooked on the existing suspended load wire 51 on the base end side of the boom, and the rope end of the stretched suspended load wire 52 (the rope end fixing tool 60) is suspended. It is suspended from the load wire 51. Subsequently, in this state, after connecting one end portion 71 of the traction rope (thin string) 7 to the rope end fixing tool 60 (see FIG. 3), the other end side 72 of the traction rope 7 is suspended from the ground. (See FIG. 2).

そして、牽引ロープ7の他端側72を握って該牽引ロープ7をブーム先端部32まで引き延ばすが、その際、図2に示すように、ブーム先端部32近傍に立てた脚立10に作業員M2が登って、牽引ロープ7′の中間部を振り上げてブーム上面31に載せた後、該牽引ロープ7′の他端側72′をブーム先端部32のシーブ33,34を介して符号72″で示すようにブーム先端部32の前方に垂れ下げておく。   Then, the other end side 72 of the tow rope 7 is gripped and the tow rope 7 is extended to the boom tip 32. At that time, as shown in FIG. After climbing up and swinging up the middle part of the traction rope 7 ′ and placing it on the boom upper surface 31, the other end side 72 ′ of the traction rope 7 ′ is denoted by reference numeral 72 ″ via the sheaves 33, 34 of the boom tip end part 32. As shown, it hangs down in front of the boom tip 32.

ところで、ブーム3を略水平姿勢まで倒伏している状態(図2参照)では、図3に拡大図示するように既張設吊荷ワイヤ51とブーム上面31との間の間隔S0が、既張設吊荷ワイヤ51から吊下させている索端固定具60をブーム上面31に無接触でスライドさせるための隙間より小さくなっている。即ち、図2及び図3の状態(上記間隔S0の状態)では、第1吊荷ワイヤ51から吊下されている索端固定具60がブーム上面31より下方にあって、該索端固定具60を既張設吊荷ワイヤ51に対してこのままスライドさせると、該索端固定具60がブーム上面31に接触することになる。   By the way, in a state where the boom 3 is lying down to a substantially horizontal posture (see FIG. 2), as shown in an enlarged view in FIG. 3, the distance S0 between the existing suspended load wire 51 and the boom upper surface 31 is an existing tension. The cable end fixing tool 60 suspended from the suspended load wire 51 is smaller than the gap for sliding the boom upper surface 31 without contact. That is, in the state of FIG. 2 and FIG. 3 (the state of the interval S0), the rope end fixture 60 suspended from the first hanging wire 51 is located below the boom upper surface 31, and the rope end fixture is When the 60 is slid as it is with respect to the existing suspended load wire 51, the rope end fixture 60 comes into contact with the boom upper surface 31.

そこで、この場合は、図4に示すように、ブーム3を若干角度(例えば角度10°程度)起仰させることで、上記間隔S0を間隔S1で示すように索端固定具6がブーム上面31に接触しない程度まで大きくできる。   Therefore, in this case, as shown in FIG. 4, by raising the boom 3 at a slight angle (for example, an angle of about 10 °), the rope end fixing tool 6 is attached to the boom upper surface 31 so that the interval S0 is indicated by the interval S1. It can be enlarged to the extent that it does not touch.

そして、図4の状態で、サブウインチ42のサブ吊荷ワイヤ52を巻解きながらブーム先端部32の前方側に垂れ下げている牽引ロープ7の他端側72を作業員M3が下方に引き下ろすことで、該牽引ロープ7を介してサブ吊荷ワイヤ52の索端固定具60(ワイヤ張設案内具A)がメイン吊荷ワイヤ51に宙吊りにガイドされた状態でブーム基端側位置(符号60及びAの位置)からブーム先端部近傍位置(符号60′及びA′の位置)まで移動していき、サブ吊荷ワイヤ52が鎖線図示(符号52′)するようにブーム上面31のほぼ全長に亘って張設される。そして、ワイヤ張設案内具A′(索端固定具60′)がブーム先端部32の近傍まで達すると、上記脚立10(図2)に登って引っ掛け具65,65をメイン吊荷ワイヤ51から外し、続いてサブ吊荷ワイヤ52の先端部付近のワイヤをブーム先端部32のシーブ33,34に掛けて下方に垂下させ、そのサブ吊荷ワイヤの索端固定具から牽引ロープを外して該索端固定具にサブ吊荷フック(図示省略)を付け替える。   Then, in the state of FIG. 4, the worker M3 pulls down the other end side 72 of the traction rope 7 that hangs down to the front side of the boom tip 32 while unwinding the sub-loading wire 52 of the sub-winch 42. Thus, in the state where the rope end fixing tool 60 (wire tensioning guide tool A) of the sub-loading wire 52 is guided suspended from the main hanging load wire 51 via the tow rope 7, The position of the boom upper surface 31 is almost the entire length so that the sub-loading wire 52 is shown by a chain line (reference numeral 52 '). It is stretched over. Then, when the wire tensioning guide A ′ (the rope end fixing tool 60 ′) reaches the vicinity of the boom tip end portion 32, it climbs onto the stepladder 10 (FIG. 2) and the hooks 65, 65 are pulled from the main hanging load wire 51. Next, the wire near the tip of the sub-loading wire 52 is hung downward by hanging on the sheaves 33, 34 of the boom tip 32, and the tow rope is removed from the rope end fixing tool of the sub-loading wire. Replace the sub-hanging hook (not shown) to the rope end fixing tool.

又、引っ掛け具65が索端固定具60に対して着脱自在なものでは、該引っ掛け具65を索端固定具60から取外すことによって、索端固定具60の外表面から突出部分を無くすことができる(引っ掛け具65が邪魔にならない)。   Further, when the hook 65 is detachable from the rope end fixing device 60, the protruding portion can be eliminated from the outer surface of the rope end fixing device 60 by removing the hook 65 from the rope end fixing device 60. Yes (the hook 65 does not get in the way).

図5は、図2に示すように既張設吊荷ワイヤ51とブーム上面31との間の隙間S0を大きくするための他の使用例であるが、この図5の使用例は、ブーム3を略水平姿勢から起仰できない場所において上記隙間を大きくするためのものである。   FIG. 5 shows another example of use for increasing the clearance S0 between the existing suspended load wire 51 and the boom upper surface 31, as shown in FIG. In order to increase the gap in a place where it cannot be raised from a substantially horizontal posture.

そして、この図5の使用例では、ブーム3を略水平にした状態で、既張設吊荷ワイヤ51の基端部側を所定高さのマスト8で持ち上げることで、既張設吊荷ワイヤ(メイン吊荷ワイヤ)51とブーム上面31との間に、ブーム3の全長に亘って既張設吊荷ワイヤ51に引っ掛けたワイヤ張設案内具A(索端固定具60)がブーム上面31に接触しない隙間を確保できるようにしたものである。   In the usage example of FIG. 5, in the state in which the boom 3 is substantially horizontal, the base end portion side of the already-extended suspended load wire 51 is lifted by the mast 8 having a predetermined height. Between the (main suspension load wire) 51 and the boom upper surface 31, the wire extension guide A (the rope end fixing tool 60) hooked on the existing extension load wire 51 over the entire length of the boom 3 is the boom upper surface 31. It is possible to ensure a gap that does not contact the surface.

上記マスト8は、旋回台2の上面(ブーム3の基端部上面でもよい)に対して着脱自在に取付けるか、あるいは起伏自在な構造にして、不使用時に邪魔にならない場所に格納し得るようにするとよい。   The mast 8 can be detachably attached to the upper surface of the swivel base 2 (or the upper surface of the base end portion of the boom 3), or can be raised and lowered so that it can be stored in a place where it does not get in the way when not in use. It is good to.

図6及び図7に示す第2実施例のワイヤ張設案内具Bは、上記図1(第1実施例)と同じ索端固定具60に、既張設吊荷ワイヤ(メイン吊荷ワイヤ)51に引っ掛け得る2つの引っ掛け具65,65を固定した横長のサポート66を係止ピン63で着脱自在に取付け得るようにしたものである。   The wire extension guide tool B of the second embodiment shown in FIG. 6 and FIG. 7 is attached to the same cable end fixing tool 60 as that of FIG. 1 (first embodiment), with the already installed extension load wire (main extension load wire). A horizontally long support 66 to which two hooks 65 and 65 that can be hooked on 51 are fixed can be detachably attached by a locking pin 63.

このサポート66は、係止ピン63で枢支される基部66aから横向きに長い細片66bを一体に設けたものである。そして、このサポート66は、その基部66aが索端固定具60に対して1本の係止ピン63のみで取付けられるので、該サポート66と索端固定具60とは係止ピン63部分を中心にして相対的に揺動するようになっている。   The support 66 is integrally provided with a strip 66b that is long in the lateral direction from a base portion 66a that is pivotally supported by a locking pin 63. Since the base 66a of the support 66 is attached to the rope end fixing tool 60 with only one locking pin 63, the support 66 and the rope end fixing tool 60 are centered on the locking pin 63 portion. Thus, it is relatively oscillated.

上記サポート66の細片66bの先端部には、被張設吊荷ワイヤ(サブ吊荷ワイヤ)52の先端部付近52bを載せ掛けて保持するフック状の保持部65aが設けられている。   A hook-like holding portion 65a is provided at the tip end of the strip 66b of the support 66 so as to place and hold the vicinity 52b of the stretched hanging load wire (sub-hanging wire) 52.

この第2実施例のワイヤ張設案内具Bは、サポート66の上記保持部65aに被張設吊荷ワイヤ(サブ吊荷ワイヤ)52の先端部付近52bを載せ掛けた状態で、該サポート66の基部66aを係止ピン63で索端固定具60の先端部に組付けることで、サポート66が索端固定具60に対して、係止ピン63と保持部65aとで2点支持される(サポート66と索端固定具60とが相対揺動しなくなる)。   The wire tensioning guide B of the second embodiment has the support 66 in a state in which the vicinity of the distal end portion 52b of the stretched suspended wire (sub-suspended wire) 52 is placed on the holding portion 65a of the support 66. The support 66 is supported at two points by the locking pin 63 and the holding portion 65a with respect to the rope end fixing device 60 by assembling the base portion 66a of the cable to the distal end portion of the rope end fixing device 60 with the locking pin 63. (The support 66 and the rope end fixing tool 60 do not swing relative to each other).

そして、各引っ掛け具65,65付きのサポート66を索端固定具60に装着した状態で、図7に示すように両引っ掛け具65,65を既張設吊荷ワイヤ(メイン吊荷ワイヤ)51に引っ掛けることで、索端固定具60を既張設吊荷ワイヤ51から吊下させ得るようになっている。   Then, in a state where the support 66 with the hooks 65 and 65 is mounted on the rope end fixing tool 60, the both hooks 65 and 65 are already attached to the suspended load wire (main load wire) 51 as shown in FIG. The cable end fixing tool 60 can be suspended from the existing suspended load wire 51 by being hooked on the cable.

この第2実施例のワイヤ張設案内具Bでも、上記第1実施例のワイヤ張設案内具Aと同様に、図2〜図5の工程で被張設吊荷ワイヤをブーム先端部32まで張設することができる。   Also in the wire tensioning guide B of the second embodiment, as in the case of the wire tensioning guide A of the first embodiment, the stretched suspended wire is moved to the boom tip 32 in the steps of FIGS. Can be tensioned.

尚、この第2実施例のワイヤ張設案内具Bでも、被張設吊荷ワイヤの引出し作業を行わないときには、上記サポート66を索端固定具60から取外しておけばよい(サポート66が邪魔にならない)。   In the wire tensioning guide B of the second embodiment, the support 66 may be removed from the cable end fixing tool 60 when the stretched suspended wire is not pulled out (the support 66 is an obstacle). do not become).

本願各実施例のワイヤ張設案内具A,Bは、次のような機能を有している。即ち、被張設吊荷ワイヤ(例えばサブ吊荷ワイヤ52)をブーム基端側からブーム先端部32まで張設する際に、索端(索端固定具60)に設けた引っ掛け具65を既張設吊荷ワイヤ(例えばメイン吊荷ワイヤ51)に引っ掛けることで、被張設吊荷ワイヤ52の索端(索端固定具60)を既張設吊荷ワイヤに宙吊り状態でブーム上面31に沿って移動させることができる。   The wire tension guides A and B of the embodiments of the present application have the following functions. That is, when the stretched suspended load wire (for example, the sub-suspended load wire 52) is stretched from the boom proximal end side to the boom distal end portion 32, the hook 65 provided on the rope end (the rope end fixing tool 60) is already attached. By hooking on the tension load wire (for example, the main load wire 51), the rope end (the rope end fixing tool 60) of the tension load wire 52 is suspended on the existing tension load wire on the boom upper surface 31. Can be moved along.

従って、既張設側吊荷ワイヤ51を被張設吊荷ワイヤ52の索端(索端固定具60)の移動のためのガイドとして利用できるので、該索端(索端固定具60)を安定姿勢で且つ確実に引出し側に移動させることができる。   Therefore, since the existing suspended load wire 51 can be used as a guide for moving the rope end (the rope end fixing tool 60) of the stretched hanging load wire 52, the rope end (the rope end fixing tool 60) is used. It can be moved to the drawer side in a stable posture.

又、上記索端(索端固定具60)の移動時には、該索端(索端固定具60)をブーム上面31に対して無接触状態で移動させることができるので、摺れによってブーム上面31の塗装が剥げるのを未然に防止できる。   Further, when the rope end (the rope end fixing tool 60) is moved, the rope end (the rope end fixing tool 60) can be moved in a non-contact state with respect to the boom upper face 31. It is possible to prevent the paint from peeling off.

さらに、引っ掛け具65を索端(索端固定具60)に着脱させ得るようにしたものでは、該引っ掛け具65を索端(索端固定具)から取外しておくことで索端(索端固定具60)の外表面から突出する部分を無くすことができる(引っ掛け具65が邪魔にならない)。   Further, in the case where the hooking device 65 can be attached to and detached from the cable end (the cable end fixing tool 60), the cable end (the cable end fixing) is removed by removing the hooking tool 65 from the cable end (the cable end fixing tool). The portion protruding from the outer surface of the tool 60) can be eliminated (the hook 65 does not get in the way).

ところで、上記図2〜図5におけるワイヤ張設案内具の使用例では、被張設吊荷ワイヤ52をブーム上面31に沿って張設する場合を説明しているが、このワイヤ張設案内具は、張設状態の吊荷ワイヤをウインチに巻取る(格納する)場合にも使用できる。即ち、この場合は、2本の吊荷ワイヤともにブーム全長に亘って張設している状態から、何れか一方の吊荷ワイヤをウインチに巻取る場合(巻取り側吊荷ワイヤとしてサブ吊荷ワイヤ52で説明する)であって、まずサブ吊荷ワイヤ(巻取り側吊荷ワイヤ)52の索端固定具60から吊荷フックを外して、該索端固定具60に引っ掛け具65,65(又は図6に示す引っ掛け具65,65付きのサポート66)を取付ける。そして、該索端固定具60の引っ掛け具65,65をブーム先端部32の近傍において張設したままの吊荷ワイヤ51に引っ掛け、その後、図4に示すようにブーム3を所定小角度だけ起仰させたり図5に示すように張設したままの吊荷ワイヤ51の基端側をマスト8で持ち上げたりして、張設したままの吊荷ワイヤ51とブーム上面31との間に所定間隔の隙間(例えば図4の隙間S1)を確保した状態で、巻取り側ウインチ(サブウインチ42)を巻取り作動させる。すると、巻取り側吊荷ワイヤ52の索端固定具60が張設したままの吊荷ワイヤ51から吊下された状態(ブーム上面31に非接触状態)で張設したままの吊荷ワイヤ51にガイドされながらブーム基端部まで移動するようになる。そして、旋回台2上で索端固定具60の引っ掛け具65,65を張設したままの吊荷ワイヤ51から外すと、巻取り側吊荷ワイヤ52の索端(索端固定具60)を巻取り側ウインチ42に巻取ることができる。   By the way, in the usage examples of the wire tension guides in FIGS. 2 to 5 described above, the case where the stretched suspended wire 52 is stretched along the boom upper surface 31 is described. Can also be used when a suspended wire in a tension state is wound (stored) on a winch. That is, in this case, when one of the two suspended wires is stretched over the entire length of the boom and one of the suspended wires is wound on the winch (the sub-suspended load is taken up as the winding-side suspended load wire). First, the hanging hook is removed from the rope end fixing tool 60 of the sub hanging load wire (winding side hanging load wire) 52, and the hooks 65, 65 are hooked on the rope end fixing tool 60. (Or support 66 with hooks 65, 65 shown in FIG. 6) is attached. Then, the hooks 65, 65 of the rope end fixing tool 60 are hooked on the hanging wire 51 stretched in the vicinity of the boom tip 32, and then the boom 3 is raised by a predetermined small angle as shown in FIG. As shown in FIG. 5, the base end side of the suspended load wire 51 that is stretched is lifted by the mast 8, and a predetermined distance is provided between the suspended load wire 51 and the boom upper surface 31. The winding-side winch (sub-winch 42) is wound up in a state in which the gap (for example, the gap S1 in FIG. 4) is secured. Then, the suspended load wire 51 that is stretched while being suspended from the suspended load wire 51 in which the rope end fixing tool 60 of the winding-side suspended load wire 52 is stretched (not in contact with the boom upper surface 31). It moves to the boom base end while being guided by the guide. And if it removes from the hanging wire 51 with the hooks 65 and 65 of the rope end fixing tool 60 stretched on the swivel base 2, the rope end (the rope end fixing tool 60) of the winding side hanging load wire 52 is removed. It can be wound on the winding side winch 42.

このように、本願のワイヤ張設案内具は、張設状態の吊荷ワイヤを巻取る際にも、該巻取り側吊荷ワイヤの索端(索端固定具)を張設したままの吊荷ワイヤをガイドとしてブーム基端側まで移動させることができる。   As described above, the wire tensioning guide of the present application is also capable of hanging with the rope end (the rope end fixing tool) of the winding side hanging load wire stretched even when winding the suspended tension wire. The load wire can be moved as a guide to the boom base end side.

1は車両、2は旋回台、3はブーム、7は牽引ロープ、31はブーム上面、32はブーム先端部、41は第1ウインチ(メインウインチ)、42は第2ウインチ(サブウインチ)、51は第1吊荷ワイヤ(メイン吊荷ワイヤ)、52は第2吊荷ワイヤ(サブ吊荷ワイヤ)、60はワイヤ索端となる索端固定具、65は引っ掛け具、Aは第1実施例のワイヤ張設案内具、Bは第2実施例のワイヤ張設案内具である。   1 is a vehicle, 2 is a swivel, 3 is a boom, 7 is a tow rope, 31 is a boom upper surface, 32 is a boom tip, 41 is a first winch (main winch), 42 is a second winch (sub winch), 51 Is a first suspended wire (main suspended wire), 52 is a second suspended wire (sub-suspended wire), 60 is a cable end fixing tool serving as a wire cable end, 65 is a hook, and A is a first embodiment. The wire tensioning guide, B, is the wire tensioning guide of the second embodiment.

Claims (2)

ブーム基端側からブーム先端部まで張設される第1吊荷ワイヤと第2吊荷ワイヤが装備されるクレーンにおいて、張設すべき吊荷ワイヤをブーム上面に沿って張設する際に使用する被張設吊荷ワイヤの張設案内具であって、
上記被張設吊荷ワイヤの索端に、上記ブーム上面に沿って張設している既張設吊荷ワイヤに対して上記索端をスライド自在に吊下させ得る引っ掛け具を設けている、
ことを特徴とする被張設吊荷ワイヤの張設案内具。
Used when a suspension wire to be stretched is stretched along the top surface of a boom in a crane equipped with a first suspension wire and a second suspension wire that are stretched from the boom base end to the boom tip. A tensioning guide for a stretched suspended load wire,
A hooking tool capable of slidably suspending the rope end with respect to the existing tension load wire that is stretched along the boom upper surface is provided at the rope end of the stretched suspension load wire.
A stretched guide for a stretched suspended load wire.
請求項1において、
上記引っ掛け具は上記索端に対して着脱自在に取付けている、
ことを特徴とする被張設吊荷ワイヤの張設案内具。
In claim 1,
The hook is detachably attached to the rope end,
A stretched guide for a stretched suspended load wire.
JP2016000388U 2016-01-29 2016-01-29 Stretching guide for stretched suspended wire Active JP3203637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016000388U JP3203637U (en) 2016-01-29 2016-01-29 Stretching guide for stretched suspended wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016000388U JP3203637U (en) 2016-01-29 2016-01-29 Stretching guide for stretched suspended wire

Publications (1)

Publication Number Publication Date
JP3203637U true JP3203637U (en) 2016-04-07

Family

ID=55647762

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016000388U Active JP3203637U (en) 2016-01-29 2016-01-29 Stretching guide for stretched suspended wire

Country Status (1)

Country Link
JP (1) JP3203637U (en)

Similar Documents

Publication Publication Date Title
JP2010241604A5 (en)
US9453556B2 (en) Rope connecting support for use in crane vehicle when hoist rope is stretched
ATE443024T1 (en) CRANE
JP3203637U (en) Stretching guide for stretched suspended wire
JP5466783B1 (en) Support member for safety belt
JP6396256B2 (en) Jib crane
US20150001330A1 (en) Device for positioning or stabilising a load attached to a crane
JP2009298488A (en) Mobile crane
JP6969281B2 (en) Crane and crane disassembly method
JP6686781B2 (en) Top spreader mounting method and crane
JP2011006199A (en) Leaving device, crane, and rope wiring method
JP5948542B1 (en) Simple crane
KR20140003551U (en) Winching apparatus for frame transportation
JP6787223B2 (en) Wiring method and crane
JP2021164237A (en) Guide device of wire rope for hanging insulator
JP5822521B2 (en) Suspended load rope tensioning method for boom detachable crane vehicles
JP4116360B2 (en) Crane hook storage device
JP2020104998A (en) Disassembling structure and method of crane
JP2014213994A (en) Lifting method using crane and auxiliary lifting device
JP4342255B2 (en) Hoisting and pulling device
JP2019052000A (en) Mooring method of jib and mooring device of jib
JP5060867B2 (en) Fixing method of pile driver and hoisting rope
JP2018162125A (en) Tower crane
JP7275702B2 (en) front strut backstop
JP4922714B2 (en) Crane overwinding detection device

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Ref document number: 3203637

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250