JP3190055U JP2014000501U JP2014000501U JP3190055U JP 3190055 U JP3190055 U JP 3190055U JP 2014000501 U JP2014000501 U JP 2014000501U JP 2014000501 U JP2014000501 U JP 2014000501U JP 3190055 U JP3190055 U JP 3190055U
Authority
JP
Japan
Prior art keywords
steel column
funnel
column base
cap
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2014000501U
Other languages
Japanese (ja)
Inventor
耕平 大沼
吉雄 竹沢
收二 村崎
Original Assignee
株式会社構造工学研究所
Filing date
Publication date
Application filed by 株式会社構造工学研究所 filed Critical 株式会社構造工学研究所
Application granted granted Critical
Publication of JP3190055U publication Critical patent/JP3190055U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

【課題】人がそばに近寄っても問題がなく、意匠性を損なうことがない鉄骨柱脚ラーメン構造における鉄骨柱脚固定構造を提供する。
【解決手段】複数のアンカーボルト2が突出した基礎1の中央にレベルモルタル3が形成され、レベルモルタル上に、アンカーボルト用のナット7が埋設した状態で締結可能なボルト孔5の形成されたラーメン構造の鉄骨柱脚のベースプレート4が配置され、アンカーボルトとベースプレートとがナットで締結され、基礎とベースプレートとの間に無収縮モルタルが充填された鉄柱脚ラーメン構造における鉄骨柱脚固定構造であって、ベースプレートのボルト孔に無収縮モルタルが充填され、かつボルト孔の無収縮モルタルがキャップ32で被覆されている。
【選択図】図5
There is provided a steel column base fixing structure in a steel column base ramen structure that does not cause a problem even when a person approaches the side and does not impair the design.
A level mortar 3 is formed at the center of a foundation 1 from which a plurality of anchor bolts 2 protrudes, and a bolt hole 5 that can be fastened with an anchor bolt nut 7 embedded on the level mortar. This is a steel column base fixing structure in a steel column base ramen structure in which a base plate 4 of a steel frame base with a rigid frame structure is arranged, an anchor bolt and a base plate are fastened with nuts, and a non-shrink mortar is filled between the foundation and the base plate. The bolt holes of the base plate are filled with non-shrink mortar, and the non-shrink mortar of the bolt holes is covered with the cap 32.
[Selection] Figure 5

Description

本考案は、鉄骨柱脚ラーメン構造におけるラーメン構造の柱脚を固定する鉄骨柱脚固定構造に関する。   The present invention relates to a steel column base fixing structure for fixing a column base of a rigid frame structure in a steel column base rigid frame structure.

鉄骨柱脚には主に鋼管ポールの柱脚(以下、ポール柱脚と表記。)と、ラーメン構造の柱脚(角形鋼管、H型鋼、円形鋼管等:以下、鉄骨柱脚と表記。)と、が挙げられる。
鋼管ポールの固定方法としては例えば、特許文献1に開示されている。
特許文献1に記載の発明は、ベースプレートに形成されるボルト孔に、固定ボルトの頭部を配位する頭部配位孔を設け、ベースプレートの上面側から固定ボルトを挿入して、ベースプレートを挟んで配位される埋設体に螺合することにより、ベースプレートの上面から、固定ボルトの頭部がほとんど突出しないようにできるものである。
Steel column bases are mainly steel pipe pole bases (hereinafter referred to as pole bases) and ramen-structured column bases (square steel pipes, H-shaped steels, round steel pipes, etc .: hereinafter referred to as steel bases). .
For example, Patent Document 1 discloses a method for fixing a steel pipe pole.
In the invention described in Patent Document 1, a head positioning hole for positioning the head of the fixing bolt is provided in the bolt hole formed in the base plate, and the fixing bolt is inserted from the upper surface side of the base plate to sandwich the base plate. The head of the fixing bolt hardly protrudes from the upper surface of the base plate by being screwed to the embedded body arranged at.

ところで、ポール柱脚の施工方法と鉄骨柱脚の施工方法とは異なっており、
I)建築基準法によれば、鉄骨を用いた建築物は、鉄骨柱脚を必要とし、鉄骨柱脚をアンカーボルトで基礎と締結しなければならないとされている。
II)また、ポール柱脚は引き抜き軸の耐性のみ考慮すれば良いのに対し、鉄骨柱脚は引き抜き軸方向だけでなく、曲げ力方向、剪断力方向、接合条件等を考慮しなければならない。
III)さらに、ポール柱脚の施工は、基部の水平度のみ測定し、アンカーボルト及びナットで基部を固定すれば良いのに対し、鉄骨柱脚の施工は、アンカーボルトに鉄骨柱脚のベースプレートをナットで仮止めし、鉄骨柱脚を揺らす等してナットを締めたり緩めたりすることにより鉄骨柱脚の傾きを調整した後、ナットを本締めする必要がある。ナットの本締め後、ベースプレートを型枠で囲み、液状の無収縮モルタルをベースプレートと基礎との間に充填し、所定時間乾燥させることにより硬化させて完了する。すなわち、ポール柱脚はZ軸方向の耐性のみ考慮すればよいのに対し、鉄骨柱脚はX軸、Y軸、及びZ軸方向の耐性について考慮しなければならない。
By the way, the pole column base construction method and the steel column base construction method are different.
I) According to the Building Standard Law, buildings using steel frames require steel column bases and the steel column bases must be fastened to the foundation with anchor bolts.
II) In addition, for pole column bases, it is only necessary to consider the resistance of the pulling shaft, whereas for steel column bases, not only the pulling shaft direction but also the bending force direction, shearing force direction, joining conditions, etc. must be considered.
III) Furthermore, pole column bases can be measured only by measuring the level of the base, and the base can be fixed with anchor bolts and nuts, while steel column bases can be constructed by attaching the base plate of the steel column base to the anchor bolts. After adjusting the inclination of the steel column base by tightening or loosening the nut by temporarily fixing with a nut and shaking the steel column base, etc., it is necessary to finally tighten the nut. After the nut is fully tightened, the base plate is surrounded by a mold, and a liquid non-shrink mortar is filled between the base plate and the foundation, and is dried for a predetermined time to be cured. In other words, the pole column base only needs to consider the resistance in the Z-axis direction, while the steel column base must consider the resistance in the X-axis, Y-axis, and Z-axis directions.

次に、鉄骨柱脚の施工についてさらに述べる。
図1は、従来技術による鉄骨柱脚の施工後の断面図の一例である。
以下、同様の部材には共通の符号を用いる。
基礎1の鉄骨柱脚の設置箇所に立ち上がり基礎1aが形成されている場合について述べる。
立ち上がり基礎1aに複数のアンカーボルト2が突出するように鉛直に設けられている。アンカーボルト2の下端のネジ部には定着板11がナット10で固定されている。立ち上がり基礎1aの上面中央には、レベルモルタル(中心塗部分モルタルとも言う。)3が形成され、レベルモルタル3の上にはボルト孔5が形成され、鉄骨柱8と一体化されたベースプレート4が配置されている。ベースプレート4のボルト孔5にはアンカーボルト2の上端が貫通し、アンカーボルト2のネジ部が座金6及びナット7で固定されている。立ち上がり基礎1aとベースプレート4との間には無収縮モルタル9が硬化状態で設けられている。
Next, the construction of steel column base will be further described.
FIG. 1 is an example of a cross-sectional view after construction of a steel column base according to the prior art.
Hereinafter, a common code | symbol is used for the same member.
The case where the standing foundation 1a is formed at the installation location of the steel column base of the foundation 1 will be described.
A plurality of anchor bolts 2 are vertically provided on the rising foundation 1a. A fixing plate 11 is fixed to a screw portion at the lower end of the anchor bolt 2 with a nut 10. A level mortar (also referred to as a central coating mortar) 3 is formed in the center of the upper surface of the rising foundation 1a, a bolt hole 5 is formed on the level mortar 3, and a base plate 4 integrated with the steel column 8 is formed. Has been placed. The upper end of the anchor bolt 2 passes through the bolt hole 5 of the base plate 4, and the screw portion of the anchor bolt 2 is fixed by a washer 6 and a nut 7. A non-shrink mortar 9 is provided between the rising foundation 1a and the base plate 4 in a cured state.

特開2004−137780号公報JP 2004-137780 A

しかしながら、図1に示した従来技術には、以下の問題点が挙げられる。
(1)ベースプレートを基礎上に取り付けるため、ベースプレートを含め、ベースプレートから突出する補強プレート、アンカーボルト、ナット等の部材は、人が鉄骨柱脚のそばに近寄った場合等、それらの部材が障害物となる。
(2)「柱頭」、「柱脚」を含む柱は、建築物の意匠性を左右する重要な要素である。その「柱脚」にリブ補強プレートやアンカーボルトの頭部が露出されると、建築物の外観の意匠性をはなはだしく低下させる。
(3)ベースプレートのボルト孔とアンカーボルトとの間に隙間が生じており、地震時の「剪断力」は、アンカーボルトに均等には働かないため、大きめの座金を使用し、ベースプレートに溶接する方法が採られる。
However, the conventional technique shown in FIG. 1 has the following problems.
(1) In order to mount the base plate on the foundation, members such as the reinforcing plate, anchor bolts, and nuts that protrude from the base plate, including the base plate, are obstructions when a person approaches the steel column base. It becomes.
(2) Pillars including “pillars” and “pillars” are important elements that influence the design of buildings. If the rib reinforcement plate and the head of the anchor bolt are exposed to the “column base”, the design of the exterior appearance of the building is drastically reduced.
(3) There is a gap between the bolt hole of the base plate and the anchor bolt, and the “shearing force” at the time of earthquake does not work evenly on the anchor bolt, so use a large washer and weld it to the base plate The method is taken.

そこで、本考案の目的は、人がそばに近寄っても問題がなく、意匠性を損なうことがない鉄骨柱脚ラーメン構造における鉄骨柱脚固定構造を提供することにある。   Therefore, an object of the present invention is to provide a steel column base fixing structure in a steel column base ramen structure that does not cause a problem even if a person approaches the side and does not impair the design.

上記課題を解決するため、請求項1に記載の考案は、複数のアンカーボルトが突出した基礎の中央にレベルモルタルが形成され、前記レベルモルタル上に、前記アンカーボルト用のナットが埋設した状態で締結可能なボルト孔の形成されたラーメン構造の鉄骨柱脚のベースプレートが配置され、前記アンカーボルトと前記ベースプレートとがナットで締結され、前記基礎と前記ベースプレートとの間に無収縮モルタルが充填された鉄柱脚ラーメン構造における鉄骨柱脚固定構造であって、前記ベースプレートのボルト孔に前記無収縮モルタルが充填され、かつ前記ボルト孔の前記無収縮モルタルがキャップで被覆されていることを特徴とする。   In order to solve the above-mentioned problem, in the invention according to claim 1, a level mortar is formed in the center of a foundation from which a plurality of anchor bolts protrudes, and a nut for the anchor bolt is embedded on the level mortar. A base plate of a steel frame base with a rigid frame structure in which a bolt hole that can be fastened is arranged, the anchor bolt and the base plate are fastened with nuts, and a non-shrink mortar is filled between the base and the base plate A steel column base fixing structure in a steel column base ramen structure, wherein the bolt hole of the base plate is filled with the non-shrink mortar, and the non-shrink mortar of the bolt hole is covered with a cap.

本考案によれば、人がそばに近寄っても問題がなく、意匠性を損なうことがない鉄骨柱脚ラーメン構造に鉄骨柱脚固定構造の提供を実現することができる。   According to the present invention, it is possible to provide a steel column base fixing structure to a steel column base ramen structure that has no problem even if a person approaches the side and does not impair the design.

従来技術による鉄骨柱脚の施工後の断面図の一例である。It is an example of sectional drawing after the construction of the steel column base by a prior art. 一実施形態に係る鉄骨柱脚固定構造の概念図である。It is a conceptual diagram of the steel column base fixing structure which concerns on one Embodiment. ベースプレート4のボルト孔5内に突起部のある場合の鉄骨柱脚固定構造の部分拡大断面図である。4 is a partially enlarged cross-sectional view of a steel column base fixing structure when there is a protrusion in a bolt hole 5 of a base plate 4. FIG. ベースプレート4のボルト孔5の外側にナット受け鋼製スリーブ20を接合した溶接部21を有する場合の鉄骨柱脚固定構造の部分拡大断面図である。FIG. 4 is a partially enlarged cross-sectional view of a steel column base fixing structure when a welded portion 21 in which a nut receiving steel sleeve 20 is joined to the outside of a bolt hole 5 of a base plate 4 is provided. 本考案に係る一実施例の説明図である。It is explanatory drawing of one Example which concerns on this invention. (a)は、本考案に係る他の実施例の説明図であり、(b)は、(a)に示した漏斗付きキャップの一例を示す平面図である。(A) is explanatory drawing of the other Example which concerns on this invention, (b) is a top view which shows an example of the cap with a funnel shown to (a). (a)は、本考案に係る他の実施例の説明図であり、(b)は、(a)に示した漏斗付きキャップの一例を示す平面図である。(A) is explanatory drawing of the other Example which concerns on this invention, (b) is a top view which shows an example of the cap with a funnel shown to (a). (a)〜(e)は、漏斗付きキャップの変形例の説明図である。(A)-(e) is explanatory drawing of the modification of a cap with a funnel. (a)〜(e)は、キャップに漏斗で無収縮モルタルを注入する場合の説明図である。(A)-(e) is explanatory drawing in the case of inject | pouring a non-shrink mortar with a funnel to a cap. (a)〜(e)は、キャップに漏斗で無収縮モルタルを注入する場合の説明図である。(A)-(e) is explanatory drawing in the case of inject | pouring a non-shrink mortar with a funnel to a cap. (a)、(b)は、漏斗に回転式の弁を設けたものである。(A), (b) is what provided the rotary valve in the funnel. (a)、(b)は、漏斗にスライド式の弁を設けたものである。(A), (b) is what provided the slide-type valve in the funnel.

次に実施の形態について図面を参照して説明する。
図2は、一実施形態に係る鉄骨柱脚固定構造の概念図である。
図2に示す基礎1に複数(2本以上)のアンカーボルト2が突出するように鉛直に設けられている。アンカーボルト2の下端のネジ部には定着板11がナット10で固定されている。基礎1の凹部1bの中央にはレベルモルタル3が形成され、レベルモルタル3の上には図には示されないボルト孔が形成され、鉄骨柱8と一体化されたベースプレート4が配置されている。ベースプレート4のボルト孔にはアンカーボルト2の上端が貫通し、アンカーボルト2のネジ部が座金及びナットで固定されている。基礎1とベースプレート4との間、及び図示しないボルト孔には無収縮モルタル9が設けられている。
ベースプレート4及び鉄骨柱8は鉄からなる。
このような鉄骨柱脚固定構造は、基礎1とベースプレート4とが面一となっており、アンカーボルトやナットが通行人等に接触することがなく、かつ外観の意匠性を損ねることがない。
Next, embodiments will be described with reference to the drawings.
FIG. 2 is a conceptual diagram of a steel column base fixing structure according to an embodiment.
A plurality (two or more) of anchor bolts 2 are provided vertically on the foundation 1 shown in FIG. A fixing plate 11 is fixed to a screw portion at the lower end of the anchor bolt 2 with a nut 10. A level mortar 3 is formed in the center of the recess 1b of the foundation 1, a bolt hole (not shown) is formed on the level mortar 3, and a base plate 4 integrated with the steel column 8 is disposed. The upper end of the anchor bolt 2 passes through the bolt hole of the base plate 4, and the threaded portion of the anchor bolt 2 is fixed with a washer and a nut. Non-shrink mortar 9 is provided between the base 1 and the base plate 4 and in bolt holes (not shown).
The base plate 4 and the steel column 8 are made of iron.
In such a steel column base fixing structure, the foundation 1 and the base plate 4 are flush with each other, the anchor bolts and nuts do not come into contact with passersby, and the appearance design is not impaired.

図3は、ベースプレート4のボルト孔5内に突起部のある場合の鉄骨柱脚固定構造の部分拡大断面図である。
アンカーボルト2の頭部がベースプレート4のボルト孔5に挿入された状態で座金6及びアンカーボルト2用のナット7でボルト孔5の突起部5aに締結されている。
ボルト孔5は、アンカーボルト2用のナットが埋設した状態で締結可能に形成されている。
FIG. 3 is a partially enlarged cross-sectional view of the steel column base fixing structure when there is a protrusion in the bolt hole 5 of the base plate 4.
With the head of the anchor bolt 2 inserted into the bolt hole 5 of the base plate 4, the anchor bolt 2 is fastened to the protrusion 5 a of the bolt hole 5 with a washer 6 and a nut 7 for the anchor bolt 2.
The bolt hole 5 is formed so as to be fastened in a state where a nut for the anchor bolt 2 is embedded.

図4は、ベースプレート4のボルト孔5の外側にナット受け鋼製スリーブ20を接合した溶接部21を有する場合の鉄骨柱脚固定構造の部分拡大断面図である。
以下、各図において、説明の都合上硬化後の無収縮モルタル9が示されているが、液状の無収縮モルタル22の充填前は空間である。
ボルト孔5の上方からピッチャー23で硬化前の液状の無収縮モルタル22をボルト孔5に充填する。充填された液状の無収縮モルタル22は例えばポタージュ程度の流動性を有するので、矢印P1、P2方向に流れ、座金6を通り抜けて基礎1とベースプレート4との間に充填される。尚、座金6は例えば、切り欠き等が形成されて流通性を有するものとする。また、無収縮モルタル22の充填時にはベースプレート4の周囲には枠型が形成されているものとする。
このような方法で無収縮モルタル22をボルト孔5内に充填すると、アンカーボルト2の雄ねじとナット7の雌ねじとの間の隙間にも充填されるので、剪断応力耐性が向上する。また、ベースプレート4と、ボルト孔5内の無収縮モルタル22とが面一となるので、アンカーボルト2のネジ部とナット7とが完全に無収縮モルタル22内に埋設される。アンカーボルト2やナット7が完全に埋設されるので意匠性を損なうことがない。
FIG. 4 is a partially enlarged cross-sectional view of the steel column base fixing structure in which the welded portion 21 is formed by joining the nut receiving steel sleeve 20 outside the bolt hole 5 of the base plate 4.
Hereinafter, in each figure, the non-shrinkable mortar 9 after curing is shown for convenience of explanation, but it is a space before filling with the liquid non-shrinkable mortar 22.
From the upper side of the bolt hole 5, the liquid non-shrink mortar 22 before curing is filled into the bolt hole 5 by the pitcher 23. The filled liquid non-shrinkable mortar 22 has a fluidity of, for example, a potage, and therefore flows in the directions of arrows P1 and P2, passes through the washer 6, and is filled between the foundation 1 and the base plate 4. The washer 6 has, for example, a notch or the like and is circulated. Further, it is assumed that a frame is formed around the base plate 4 when the non-shrink mortar 22 is filled.
When the non-shrink mortar 22 is filled in the bolt hole 5 by such a method, the gap between the male screw of the anchor bolt 2 and the female screw of the nut 7 is also filled, so that the shear stress resistance is improved. Further, since the base plate 4 and the non-shrink mortar 22 in the bolt hole 5 are flush with each other, the screw portion of the anchor bolt 2 and the nut 7 are completely embedded in the non-shrink mortar 22. Since the anchor bolt 2 and the nut 7 are completely embedded, the design is not impaired.

図5は、本考案に係る一実施例の説明図である。
ベースプレート4のボルト孔5を、供給孔32aが形成されたキャップ32で覆い、キャップ32の中央に形成された供給孔32aに漏斗31を用いて無収縮モルタル22を充填する。キャップ32を介して充填された無収縮モルタル22はナット7、座金6、及びナット受け鋼製スリーブ20を介して基礎1とベースプレート4との間に充填される。
ボルト孔5内に充填された無収縮モルタル22の硬化後は、キャップ32で拘束されている。このキャップ32による拘束により、耐剪断応力を向上させることができ、意匠性を得ることができる。
すなわち、本実施例によれば、人がそばに近寄っても問題がなく、意匠性を損なうことがない。
FIG. 5 is an explanatory diagram of an embodiment according to the present invention.
The bolt hole 5 of the base plate 4 is covered with a cap 32 in which a supply hole 32 a is formed, and the supply hole 32 a formed in the center of the cap 32 is filled with the non-shrink mortar 22 using the funnel 31. The non-shrink mortar 22 filled via the cap 32 is filled between the foundation 1 and the base plate 4 via the nut 7, the washer 6, and the nut receiving steel sleeve 20.
After the non-shrink mortar 22 filled in the bolt hole 5 is cured, it is restrained by the cap 32. The restraint by the cap 32 can improve the shear stress resistance and can provide a design.
That is, according to the present embodiment, there is no problem even if a person approaches the side, and the design property is not impaired.

図6(a)は、本考案に係る他の実施例の説明図であり、図6(b)は、図6(a)に示した漏斗付きキャップの一例を示す平面図である。
図6(a)、(b)に示した実施例の図5に示した実施例との相違点は、各ボルト孔に漏斗付きキャップ44で覆い、ベースプレート4に形成した貫通孔45から無収縮モルタル22を充填する点である。
図6(b)に示す漏斗付きキャップ44は、円形平面形状のキャップ部41と、漏斗部43と、が連結部42で連結されたものである。漏斗付きキャップ44の外径はボルト孔5の内径に等しい。漏斗付きキャップ44の材質は、紙、鉄もしくはエンジニアリングプラスチックが挙げられる。図6(a)に示すように漏斗付きキャップ44の側面断面形状は上下対象かつ左右対称となっている。このため、漏斗付きキャップ44をベースプレート4へ装着する時に上下いずれの方向から装着することができる。
図6(a)に示すベースプレート4のボルト孔5を、それぞれ漏斗付きキャップ44で覆う。
FIG. 6 (a) is an explanatory view of another embodiment according to the present invention, and FIG. 6 (b) is a plan view showing an example of the cap with a funnel shown in FIG. 6 (a).
The difference between the embodiment shown in FIGS. 6A and 6B and the embodiment shown in FIG. 5 is that each bolt hole is covered with a cap 44 with a funnel and is not contracted from the through hole 45 formed in the base plate 4. The point is that the mortar 22 is filled.
A cap 44 with a funnel shown in FIG. 6B is obtained by connecting a cap portion 41 having a circular plane shape and a funnel portion 43 with a connecting portion 42. The outer diameter of the funnel-equipped cap 44 is equal to the inner diameter of the bolt hole 5. Examples of the material of the funnel-equipped cap 44 include paper, iron, and engineering plastic. As shown in FIG. 6A, the side cross-sectional shape of the funnel-equipped cap 44 is vertically and symmetrical. For this reason, when the cap 44 with a funnel is attached to the base plate 4, it can be attached from either the upper or lower direction.
The bolt holes 5 of the base plate 4 shown in FIG. 6A are each covered with a cap 44 with a funnel.

ベースプレート4にはボルト孔5とは別に貫通孔45が形成されている。この貫通孔45に他の漏斗46の足部を挿入し、漏斗46にピッチャー23から所定量の無収縮モルタル22を矢印P11方向に注入する。漏斗46に注入された無収縮モルタル22は貫通孔45から基礎1、ベースプレート4、及び図示しない型枠で囲まれた空間内を広がり、空間が無収縮モルタル22で充填されると、ナット受け鋼製スリーブ20及び座金6を通過して、アンカーボルトの雄ねじとナット7の雌ねじとの間及びボルト孔5、漏斗付きキャップ44のキャップ部41を通って、連結部42から矢印P12、P13方向に露出する。このとき、漏斗46、ボルト孔5、ナット受け鋼製スリーブ20、基礎1とベースプレート4と型枠とで構成される空間、漏斗付きキャップ44とは、いわば連通管として機能する。この結果、漏斗46の無収縮モルタル22の液面と、漏斗付きキャップ44の液面とは等しくなる。これは、ボルト孔5、アンカーボルト2の雄ねじとナット7との間、ナット受け鋼製スリーブ20、基礎1とベースプレート4との間の空間に完全に無収縮モルタル22が充填されたことを意味する。無収縮モルタル22は、漏斗付きキャップ44の連結部42を超えて、漏斗部43まで上昇しても溢れなければよい。   A through hole 45 is formed in the base plate 4 in addition to the bolt hole 5. A foot portion of another funnel 46 is inserted into the through hole 45, and a predetermined amount of non-shrink mortar 22 is injected into the funnel 46 from the pitcher 23 in the direction of arrow P11. The non-shrinking mortar 22 injected into the funnel 46 spreads from the through hole 45 in the space surrounded by the base 1, the base plate 4, and a mold (not shown), and when the space is filled with the non-shrinking mortar 22, the nut receiving steel After passing through the sleeve 20 and the washer 6, between the male screw of the anchor bolt and the female screw of the nut 7, through the bolt hole 5, and the cap portion 41 of the funnel-equipped cap 44, from the connecting portion 42 in the directions of arrows P 12 and P 13. Exposed. At this time, the funnel 46, the bolt hole 5, the nut receiving steel sleeve 20, the space constituted by the foundation 1, the base plate 4 and the mold, and the funneled cap 44 function as a communication pipe. As a result, the liquid level of the non-shrink mortar 22 of the funnel 46 is equal to the liquid level of the cap 44 with the funnel. This means that the space between the bolt hole 5, the male screw of the anchor bolt 2 and the nut 7, the nut receiving steel sleeve 20, and the space between the foundation 1 and the base plate 4 is completely filled with the non-shrinkable mortar 22. To do. The non-shrinkable mortar 22 may not overflow even if it rises to the funnel portion 43 beyond the connecting portion 42 of the cap 44 with the funnel.

無収縮モルタル22の充填後、漏斗46を引き抜き、無収縮モルタル22を所定時間乾燥させる。所定時間乾燥させることにより無収縮モルタル22が硬化する。硬化した無収縮モルタルが漏斗付きキャップ44の連結部42もしくは漏斗部43に残留していても、漏斗付きキャップ44の連結部42を折ることにより、漏斗部43を除去することができる。漏斗部43の除去後は、連結部42をヤスリがけする等して仕上げることができる。仕上げ後のキャップ部41にはペンキ等で塗装してもよい。
これらの処理により、鉄骨柱脚固定構造が形成される。この鉄骨柱脚固定構造は、人がそばに近寄っても問題がなく、意匠性を損なうことがない。
After filling the non-shrink mortar 22, the funnel 46 is pulled out and the non-shrink mortar 22 is dried for a predetermined time. The non-shrink mortar 22 is cured by drying for a predetermined time. Even if the hardened non-shrink mortar remains in the connecting part 42 or the funnel part 43 of the cap 44 with funnel, the funnel part 43 can be removed by folding the connecting part 42 of the cap 44 with funnel. After the funnel portion 43 is removed, the connecting portion 42 can be finished by sanding or the like. The cap part 41 after finishing may be painted with paint or the like.
By these processes, a steel column base fixing structure is formed. This steel column base fixing structure has no problem even if a person approaches, and does not impair the design.

図7(a)は、本考案に係る他の実施例の説明図であり、図7(b)は、図7(a)に示した漏斗付きキャップの一例を示す平面図である。
図7(a)、(b)に示した実施例の図6(a)、(b)に示した実施例との相違点は、漏斗付きキャップが内側にナットを有すると共に漏斗部の位置がアンカーボルト2の中心に対して偏心している点である。
漏斗付きキャップ55は、アンカーボルト2と螺合可能な他のナットとしてのナット51と、ナット51を覆うように同軸、かつ円形状に形成されたキャップ部52と、漏斗部54と、キャップ部52と漏斗部54とを連結する連結部53と、を有する。
貫通孔45に他の漏斗46の足部を挿入し、漏斗46にピッチャー23から所定量の無収縮モルタル22を矢印P21方向に注入した後の無収縮モルタル22の動きは実施例2と同様に貫通孔45から基礎1、ベースプレート4、及び図示しない型枠で囲まれた空間内、ナット受け鋼製スリーブ20及び座金6を通過して、アンカーボルトの雄ねじとナット7の雌ねじとの間及びボルト孔5、漏斗付きキャップ55のキャップ部52を通って、連結部53から矢印P22、P23方向に露出する。この無収縮モルタル22の露出により、無収縮モルタル22が完全に充填されたことが分かる。
Fig.7 (a) is explanatory drawing of the other Example based on this invention, FIG.7 (b) is a top view which shows an example of the cap with a funnel shown to Fig.7 (a).
The difference between the embodiment shown in FIGS. 7A and 7B and the embodiment shown in FIGS. 6A and 6B is that the cap with a funnel has a nut on the inside and the position of the funnel portion is different. This is a point that is eccentric with respect to the center of the anchor bolt 2.
The funnel-equipped cap 55 includes a nut 51 as another nut that can be screwed to the anchor bolt 2, a cap portion 52 that is coaxially and circularly formed so as to cover the nut 51, a funnel portion 54, and a cap portion 52 and a connecting portion 53 that connects the funnel portion 54.
The movement of the non-shrinking mortar 22 after inserting a foot portion of another funnel 46 into the through hole 45 and injecting a predetermined amount of the non-shrinking mortar 22 from the pitcher 23 into the funnel 46 in the direction of arrow P21 is the same as in the second embodiment. Passing through the through hole 45 in the space surrounded by the base 1, the base plate 4, and the mold (not shown), passing through the nut receiving steel sleeve 20 and the washer 6, between the male screw of the anchor bolt and the female screw of the nut 7, and the bolt It passes through the hole 5 and the cap portion 52 of the funnel-equipped cap 55 and is exposed from the connecting portion 53 in the directions of arrows P22 and P23. It can be seen that the non-shrink mortar 22 is completely filled by the exposure of the non-shrink mortar 22.

所定時間乾燥させることにより無収縮モルタル22が硬化する。硬化した無収縮モルタルが漏斗付きキャップ55の連結部53もしくは漏斗部54に残留していても、漏斗付きキャップ55の連結部53を折ることにより、漏斗部54を除去することができる。
漏斗付きキャップ55は内側に設けられたナット51をアンカーボルト2の雄ねじに螺合させることにより、硬化後の無収縮モルタル9の拘束性が向上し、より強固な鉄骨柱脚固定構造が得られる。
The non-shrink mortar 22 is cured by drying for a predetermined time. Even if the hardened non-shrink mortar remains in the connecting portion 53 or the funnel portion 54 of the funnel-equipped cap 55, the funnel portion 54 can be removed by folding the connecting portion 53 of the funnel-equipped cap 55.
The cap 55 with the funnel is screwed into the male screw of the anchor bolt 2 with the nut 51 provided on the inner side, thereby improving the restraint property of the non-shrinkable mortar 9 after hardening and obtaining a stronger steel column base fixing structure. .

これらの処理により、鉄骨柱脚固定構造が形成される。この鉄骨柱脚固定構造は、人がそばに近寄っても問題がなく、意匠性を損なうことがない。   By these processes, a steel column base fixing structure is formed. This steel column base fixing structure has no problem even if a person approaches, and does not impair the design.

<変形例1>
図8(a)〜(e)は、漏斗付きキャップの変形例の説明図である。
図8(a)は、漏斗付きキャップ44の平面図であり、図8(b)は、図8(a)の側面図である。図8(c)〜(e)は、透視図である。
漏斗付きキャップ44は、漏斗状部材が一体化したキャップであり、キャップ部41、連結部42、及び漏斗部43からなる。漏斗付きキャップ44でベースプレート4のボルト孔5のアンカーボルト2及びナット7(いずれも図5参照)を覆い、ピッチャー23で無収縮モルタル22を漏斗部43に注入する(図8(c))。
無収縮モルタル22でボルト孔5とキャップ部が充填されると、充填を終了し、所定時間乾燥すると、硬化した無収縮モルタル9が得られる(図8(d))。
漏斗付きキャップ44の連結部42を無収縮モルタル9ごと折るか切断して漏斗部43を除去することにより、ボルト孔5が無収縮モルタル9で充填され、かつキャップ部41で被覆される。この結果ボルト孔5内の無収縮モルタル9の拘束性が向上する。
<Modification 1>
FIGS. 8A to 8E are explanatory views of a modification of the funnel-equipped cap.
Fig.8 (a) is a top view of the cap 44 with a funnel, FIG.8 (b) is a side view of Fig.8 (a). FIGS. 8C to 8E are perspective views.
The funnel-equipped cap 44 is a cap in which a funnel-shaped member is integrated, and includes a cap portion 41, a connecting portion 42, and a funnel portion 43. The cap 44 with a funnel covers the anchor bolt 2 and the nut 7 (see FIG. 5) of the bolt hole 5 of the base plate 4, and the pitcher 23 injects the non-shrink mortar 22 into the funnel portion 43 (FIG. 8C).
When the bolt hole 5 and the cap portion are filled with the non-shrinkable mortar 22, the filling is finished, and after drying for a predetermined time, a hardened non-shrinkable mortar 9 is obtained (FIG. 8 (d)).
By folding or cutting the connecting portion 42 of the cap 44 with the funnel together with the non-shrink mortar 9 to remove the funnel portion 43, the bolt hole 5 is filled with the non-shrink mortar 9 and covered with the cap portion 41. As a result, the restraint property of the non-shrink mortar 9 in the bolt hole 5 is improved.

<変形例2>
図9(a)〜(e)は、キャップに漏斗で無収縮モルタルを注入する場合の説明図である。
図9(a)は、キャップ上に漏斗を配置した場合の平面図であり、図9(b)は、図9(a)の側面図である。図9(c)〜図9(e)は、透視図である。
図9(b)に示したキャップ41aは、上端中央に貫通孔を有する突起が形成されている。
キャップ41aは、漏斗状部材が着脱自在に設けられるようになっている。この貫通孔に漏斗43aの足部を挿入し、液状の無収縮モルタル22を注入する(図9(c))。
ボルト孔5内及びキャップ41a内が無収縮モルタル22で充填されると、無収縮モルタル22の充填を終了し(図9(d))、液状の無収縮モルタル22を所定時間乾燥すると、硬化した無収縮モルタル9が得られる(図9(e))。
<Modification 2>
FIGS. 9A to 9E are explanatory diagrams in the case of injecting non-shrink mortar into the cap with a funnel.
Fig.9 (a) is a top view at the time of arrange | positioning a funnel on a cap, FIG.9 (b) is a side view of Fig.9 (a). FIG. 9C to FIG. 9E are perspective views.
The cap 41a shown in FIG. 9B has a protrusion having a through hole at the center of the upper end.
The cap 41a is provided with a funnel-shaped member so as to be detachable. The foot portion of the funnel 43a is inserted into the through hole, and the liquid non-shrink mortar 22 is injected (FIG. 9C).
When the inside of the bolt hole 5 and the inside of the cap 41a are filled with the non-shrink mortar 22, the filling of the non-shrink mortar 22 is finished (FIG. 9 (d)), and the liquid non-shrink mortar 22 is cured when dried for a predetermined time. Non-shrink mortar 9 is obtained (FIG. 9 (e)).

<変形例3>
図10(a)〜(e)は、キャップに漏斗で無収縮モルタルを注入する場合の説明図である。
変形例3の変形例2との相違点は、キャップ41bの中央部の形状が平坦である点であり、それ以外は変形例2と同様にキャップに漏斗状部材が着脱自在に設けられたものであるため、説明を省略する。
<Modification 3>
10 (a) to 10 (e) are explanatory diagrams when injecting non-shrink mortar into the cap with a funnel.
The difference between Modification 3 and Modification 2 is that the shape of the central portion of the cap 41b is flat. Otherwise, the funnel-like member is detachably provided on the cap as in Modification 2. Therefore, the description is omitted.

<変形例4>
図11(a)、(b)は、漏斗に回転式の弁を設けたものである。
漏斗部43bの足部に公知の回転式の弁61が設けられており、弁61のつまみ62を回すことにより弁61が開閉し、漏斗部43b内にピッチャー23で注入された液状の無収縮モルタル22をキャップ41a内に制御自在に充填できる。
<Modification 4>
11 (a) and 11 (b) show a funnel provided with a rotary valve.
A known rotary valve 61 is provided at the foot of the funnel portion 43b, and the valve 61 is opened and closed by turning the knob 62 of the valve 61, and the liquid non-constriction injected into the funnel portion 43b by the pitcher 23. The mortar 22 can be filled in the cap 41a in a controllable manner.

<変形例5>
図12(a)、(b)は、漏斗にスライド式の弁を設けたものである。
漏斗部43bの足部に公知のスライド式の弁71が設けられており、弁71のつまみ72を押し引きすることにより弁71が開閉し、漏斗部43b内にピッチャー23で注入された液状の無収縮モルタル22をキャップ41a内に制御自在に充填できる。
<Modification 5>
12 (a) and 12 (b) show a funnel provided with a slide type valve.
A known slide-type valve 71 is provided at the foot of the funnel portion 43b. The valve 71 is opened and closed by pushing and pulling the knob 72 of the valve 71, and the liquid liquid injected into the funnel portion 43b by the pitcher 23 is provided. The non-shrink mortar 22 can be filled in the cap 41a in a controllable manner.

尚、上述した実施の形態等は、本考案の好適な実施の形態の一例を示すものであり、本考案はそれに限定されることなく、その要旨を逸脱しない範囲内において、種々変形実施が可能である。例えば、図6に示した実施例では、無収縮モルタルを漏斗46から注入したが、漏斗付きキャップ44から充填してもよく、図示しない型枠側から充填してもよい。   The above-described embodiments and the like show examples of preferred embodiments of the present invention, and the present invention is not limited thereto, and various modifications can be made without departing from the scope of the invention. It is. For example, in the embodiment shown in FIG. 6, the non-shrink mortar is injected from the funnel 46, but it may be filled from the cap 44 with a funnel or from the mold side (not shown).

1 基礎
1b 凹部
2 アンカーボルト
3 レベルモルタル
4 ベースプレート
5 ボルト孔
6 座金
7、10 ナット
8 鉄骨柱
9 (硬化後の)無収縮モルタル
11 定着板
20 ナット受け鋼製スリーブ
21 溶接部
22 (液状の)無収縮モルタル
23 ピッチャー
31 漏斗
32 キャップ
41、51 キャップ部
42、52 連結部
43、53 漏斗部
44、55 漏斗付きキャップ
45 貫通孔
DESCRIPTION OF SYMBOLS 1 Base 1b Recess 2 Anchor bolt 3 Level mortar 4 Base plate 5 Bolt hole 6 Washer 7, 10 Nut 8 Steel column 9 (After hardening) Non-shrink mortar 11 Fixing plate 20 Nut receiving steel sleeve 21 Welded part 22 (Liquid) Non-shrink mortar 23 Pitcher 31 Funnel 32 Cap 41, 51 Cap part 42, 52 Connecting part 43, 53 Funnel part 44, 55 Cap with funnel 45 Through hole

Claims (2)

複数のアンカーボルトが突出した基礎の中央にレベルモルタルが形成され、前記レベルモルタル上に、前記アンカーボルト用のナットが埋設した状態で締結可能なボルト孔の形成されたラーメン構造の鉄骨柱脚のベースプレートが配置され、前記アンカーボルトと前記ベースプレートとがナットで締結され、前記基礎と前記ベースプレートとの間に無収縮モルタルが充填された鉄柱脚ラーメン構造における鉄骨柱脚固定構造であって、
前記ベースプレートのボルト孔に前記無収縮モルタルが充填され、かつ前記ボルト孔の前記無収縮モルタルがキャップで被覆されていることを特徴とする鉄骨柱脚ラーメン構造における鉄骨柱脚固定構造。
A level mortar is formed at the center of a foundation from which a plurality of anchor bolts protrudes, and a steel column base having a rigid frame structure in which a bolt hole is formed on the level mortar and can be fastened with a nut for the anchor bolt embedded therein. A steel column base fixing structure in a steel column base ramen structure in which a base plate is disposed, the anchor bolt and the base plate are fastened with nuts, and non-shrink mortar is filled between the foundation and the base plate,
A steel column base fixing structure in a steel column base ramen structure, wherein the bolt hole of the base plate is filled with the non-shrink mortar and the non-shrink mortar of the bolt hole is covered with a cap.
前記キャップの内側に設けられた他のナットが前記アンカーボルトに螺合していることを特徴とする請求項1記載の鉄骨柱脚ラーメン構造における鉄骨柱脚固定構造。   The steel column base fixing structure in the steel column base rigid frame structure according to claim 1, wherein another nut provided inside the cap is screwed into the anchor bolt.
JP2014000501U 2014-01-31 Steel column base fixation structure in steel column base rigid frame structure Expired - Lifetime JP3190055U (en)

Publications (1)

Publication Number Publication Date
JP3190055U true JP3190055U (en) 2014-04-10

Family

ID=

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021042617A (en) * 2019-09-13 2021-03-18 高田機工株式会社 Knock-off bolt and fitting structure for the same
KR102521219B1 (en) * 2021-11-29 2023-04-12 현대건설(주) Quantitative controller for grout,quantitative injector for grout having the same and quantitative injection method using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021042617A (en) * 2019-09-13 2021-03-18 高田機工株式会社 Knock-off bolt and fitting structure for the same
JP7128786B2 (en) 2019-09-13 2022-08-31 高田機工株式会社 Knock-off type bolt mounting structure
KR102521219B1 (en) * 2021-11-29 2023-04-12 현대건설(주) Quantitative controller for grout,quantitative injector for grout having the same and quantitative injection method using the same

Similar Documents

Publication Publication Date Title
JP6198576B2 (en) Junction structure
JP5592220B2 (en) Precast member joining method
KR101301030B1 (en) Structures and method for seismic strengthening of masonry walls using a pressure plate
JP2014109173A (en) Column-beam joint structure, column-beam joint method, and precast concrete column head member
JP2017160743A (en) Joining structure of steel member
JP6430271B2 (en) Footing-integrated foundation pile structure and construction method of footing-integrated foundation pile
JP3190055U (en) Steel column base fixation structure in steel column base rigid frame structure
JP2008081980A (en) Positioning tool for anchor bolt
TWI437159B (en) Framework fixing structure, method for fixing framework and window/door construction of building
JP2005200994A (en) Joining structure of closed cross-sectional member
JP6435218B2 (en) Fixing method of joint steel frame in composite structure, construction method and joint structure of joint, anchor bolt fixing jig
JP3165719U (en) Infrastructure for facilities
JP6802675B2 (en) Beam-column joining method and joint member
JP5603820B2 (en) Anchor box
JP2015113563A (en) Screw pile and burying method thereof
JP2014133986A (en) Connection method of precast member and connection structure of precast member
WO2017179194A1 (en) Apparatus fixing tool
JP6116997B2 (en) Method for joining bag body and precast member
JP6244191B2 (en) Column base fixing device and column base fixing method
JP2011127399A (en) Precast reinforced concrete column and construction method of the column
JP2010216196A (en) Anchor bolt installation method for continuous footing, and anchor bolt-tool set
JP5013565B2 (en) Anchor bolt anchoring method for column base using sheath tube
JP6220645B2 (en) Column base fixing structure and column base fixing method
JP6739265B2 (en) Joining structure of wood members
JP2020117923A (en) Securing jig for post-installation bar-shaped member and securing method