JP3181886U - Precast pile and composite pile structure - Google Patents

Precast pile and composite pile structure Download PDF

Info

Publication number
JP3181886U
JP3181886U JP2012006732U JP2012006732U JP3181886U JP 3181886 U JP3181886 U JP 3181886U JP 2012006732 U JP2012006732 U JP 2012006732U JP 2012006732 U JP2012006732 U JP 2012006732U JP 3181886 U JP3181886 U JP 3181886U
Authority
JP
Japan
Prior art keywords
pile
driven
precast
mask
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2012006732U
Other languages
Japanese (ja)
Inventor
尹衍▲リョウ▼
Original Assignee
潤弘精密工程事業股▲分▼有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 潤弘精密工程事業股▲分▼有限公司 filed Critical 潤弘精密工程事業股▲分▼有限公司
Priority to JP2012006732U priority Critical patent/JP3181886U/en
Application granted granted Critical
Publication of JP3181886U publication Critical patent/JP3181886U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

【課題】打ち込み杭、延伸杭、及び連結杭部を備えるプレキャストパイルを提供する。
【解決手段】プレキャストパイルは打ち込み杭100を少なくとも備える。打ち込み杭は、複数本の主筋111及びこれら前記主筋を包囲させるあばら筋112で構成され、主筋とあばら筋との交叉する箇所は対向する位置で固定される鉄筋籠110と、コンクリートで鉄筋籠を被覆して形成され、その一端には尖端を形成させる打ち込み杭と、尖端を被覆させる円錐形マスク130を含む。
【選択図】図1A
A precast pile including a driven pile, an extended pile, and a connecting pile portion is provided.
The precast pile includes at least a driving pile. The driving pile is composed of a plurality of main bars 111 and ribs 112 that surround the main bars, and the crossing points of the main bars and the bar bars are fixed at opposing positions, and the reinforcing bar bar is made of concrete. One end includes a driving pile that forms a tip and a conical mask 130 that covers the tip.
[Selection] Figure 1A

Description

本考案は、プレキャスト建築物構造体のプレキャストパイルに関する。 The present invention relates to a precast pile of a precast building structure.

いわゆる「プレキャスト工法」はプレキャスト工場或いは工事現場周辺で標準化された作業工程及びモジュール化されたモジュールにより、精密な杭、梁、板体等の構造体の部材を高速に大量生産する。精確な運搬管理及び組立作業により、生産された杭、梁、板体等の部材を工事現場で組み立てて建設する。 The so-called “precast construction method” mass-produces high-precision structural members such as piles, beams, plates, etc. at high speeds by using standardized work processes and modularized modules around the precast factory or construction site. Through precise transportation management and assembly work, the produced piles, beams, plates, etc. are assembled and constructed at the construction site.

しかしながら、前述した従来の技術では、上述の杭、梁、板体は建築物の基礎のパイルの建設完了後、パイル上に組み立てて建設させ、パイルの建設には従来の建設工法が用いられる。 However, in the above-described conventional technology, the above-described piles, beams, and plates are assembled and built on the pile after the construction of the pile of the foundation of the building is completed, and a conventional construction method is used for the construction of the pile.

そこで、本発明者は上記の欠点が改善可能と考え、鋭意検討を重ねた結果、合理的設計で上記の課題を効果的に改善する本考案の提案に到った。 Therefore, the present inventor considered that the above-described drawbacks can be improved, and as a result of intensive studies, the present inventor has arrived at a proposal of the present invention that effectively improves the above-described problems by rational design.

本考案は、このような従来の問題に鑑みてなされたものである。上記課題解決のため、本考案は、打ち込み杭、延伸杭、及び連結杭部で構成されるプレキャストパイル、並びに主杭、複数本の副杭、及び橋台で構成される複合杭構造を提供することを主目的とする。 The present invention has been made in view of such conventional problems. In order to solve the above problems, the present invention provides a precast pile composed of driven piles, extended piles, and connected pile parts, and a composite pile structure composed of main piles, a plurality of sub piles, and an abutment. The main purpose.

上述した課題を解決し、目的を達成するために、本考案に係るプレキャストパイルは、
打ち込み杭と、延伸杭と、連結杭部を備え、前記打ち込み杭は、複数本の主筋及びこれら前記主筋を包囲させるあばら筋からなり、主筋とあばら筋との交叉する箇所は対向する位置で固定される鉄筋籠と、コンクリートにより前記鉄筋籠を被覆させて形成され、その一端には尖端を形成させる打ち込み杭と、前記尖端を被覆させる円錐形マスクを更に含み、
前記延伸杭は、複数本の主筋及びこれら前記主筋を包囲させるあばら筋からなり、主筋とあばら筋との交叉する箇所は対向する位置で固定される鉄筋籠と、コンクリートにより前記鉄筋籠を被覆させて形成される延伸杭体と、前記延伸杭体の一端を被覆させ、前記延伸杭は前記第一延伸杭マスクと前記打ち込み杭マスクとを接合させて連結させ、前記打ち込み杭の他端に接続させる第一延伸杭マスクを更に含み、前記連結杭部は、連結杭体と、前記連結杭体の一端に位置され、前記連結杭部は前記接合部を前記打ち込み杭マスクに接合させて連結させ、前記打ち込み杭の他端に接続させる接合部を更に含むことを特徴とする。
In order to solve the above-described problems and achieve the object, the precast pile according to the present invention is:
A driven pile, an extended pile, and a connecting pile portion are provided, and the driven pile is composed of a plurality of main bars and ribs surrounding the main bars, and the crossing points of the main bars and the bar bars are fixed at opposing positions. Further comprising a reinforcing bar to be formed, a concrete pile covering the reinforcing bar with concrete, a driving pile for forming a tip at one end thereof, and a conical mask for covering the tip.
The extending pile is composed of a plurality of main bars and ribs that surround the main bars, and the crossing points of the main bars and the bar bars are fixed at opposing positions, and the reinforcing bar is covered with concrete. The stretched pile body formed by coating one end of the stretched pile body, the stretched pile joining the first stretched pile mask and the driven pile mask, and connecting to the other end of the driven pile A first extending pile mask, wherein the connecting pile portion is positioned at one end of the connecting pile body and the connecting pile body, and the connecting pile portion is connected by joining the joining portion to the driving pile mask. Further, it is characterized by further including a joint portion connected to the other end of the driving pile.

本考案に係るプレキャストパイルの打ち込み杭の概略図である。It is the schematic of the driving pile of the precast pile concerning this invention. 本考案に係るプレキャストパイルの延伸杭の概略図である。It is the schematic of the extending | stretching pile of the precast pile which concerns on this invention. 本考案に係るプレキャストパイルの連結杭部の概略図である。It is the schematic of the connection pile part of the precast pile which concerns on this invention. 本考案に係るプレキャストパイルを地面に打ち込む際に用いる杭打槌の概略図である。It is the schematic of the pile driving rod used when driving the precast pile concerning this invention in the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 図2A乃至図2Cの打ち込まれたプレキャストパイルを用いてボトムアップ工法を施工させる順序の概略図である。It is the schematic of the order which constructs a bottom up construction method using the precast pile piled in FIG. 2A thru | or FIG. 2C. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 本考案に係るプレキャストパイルを地面に打ち込む施工順序の概略図である。It is the schematic of the construction order which drives a precast pile concerning the present invention into the ground. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure. 図4A乃至図4Hの打ち込まれたプレキャストパイルを用いてトップダウン工法を施工させ複合杭構造を形成させる順序の概略図である。It is the schematic of the order which constructs a top-down construction method using the precast pile which was driven in Drawing 4A thru / or 4H, and forms a composite pile structure.

以下に図面を参照して、本考案を実施するための形態について、詳細に説明する。なお、本考案は、以下に説明する実施形態に限定されるものではない。 Hereinafter, embodiments for carrying out the present invention will be described in detail with reference to the drawings. The present invention is not limited to the embodiments described below.

図1A及び図1Bによると、前記打ち込み杭100及び延伸杭200の鉄筋籠110及び鉄筋籠211は複数本の主筋111、複数本の主筋211、包囲させるあばら筋112、及び包囲させるあばら筋212を備え、交叉する箇所は対向する位置で固定される。完成した鉄筋籠110及び鉄筋籠211はモジュールに設置されコンクリートを流し込み一端に尖端を有する打ち込み杭120及び延伸杭体220を形成させる。前記打ち込み杭120の尖端は金属で形成される円錐形マスク130で被覆され、他端は面取り部141を有する金属で形成される打ち込み杭マスク140で被覆され、前記延伸杭体220の一端は面取り部231を有する金属で形成される第一延伸杭マスク230で被覆され、他端は面取り部241を有する金属で形成される第二延伸杭マスク240で被覆される。 According to FIGS. 1A and 1B, the reinforcing bar 110 and the reinforcing bar 211 of the driven pile 100 and the extended pile 200 include a plurality of main bars 111, a plurality of main bars 211, a surrounding stirrup 112, and a surrounding stirrup 212. Provided, the crossing location is fixed at the opposite position. The completed reinforcing bar rod 110 and the reinforcing bar rod 211 are installed in a module to pour concrete into one and form a driven pile 120 and a stretched pile body 220 having a tip at one end. The tip of the driven pile 120 is covered with a conical mask 130 formed of metal, the other end is covered with a driven pile mask 140 formed of metal having a chamfered portion 141, and one end of the elongated pile body 220 is chamfered. The other end is covered with a second stretched pile mask 240 formed of a metal having a chamfered portion 241.

図1Cによれば、前記連結杭部300は連結杭体310を備え、連結杭体310の柱面を梁の主筋に連結させ、連結杭体310の柱面は所定の位置に鉄筋連結部311を設置させる。鉄筋連結部311は連結バンプ312及び複数のスリーブ部313を備える。連結杭体310の一端には変化部320(変化部は杭体の形態に合わせて相異する円形の異なる形状で設置させる)及び面取り部331を有する接合部330を形成させ、連結杭体310の他端は打槌端340となる。 Referring to FIG. 1C, the connection pile part 300 includes a connection pile body 310, the column surface of the connection pile body 310 is connected to the main bar of the beam, and the column surface of the connection pile body 310 is in a predetermined position at the reinforcing bar connection part 311. To install. The reinforcing bar connecting portion 311 includes a connecting bump 312 and a plurality of sleeve portions 313. At one end of the connecting pile body 310, a connecting portion 330 having a changing portion 320 (the changing portion is installed in a different circular shape different according to the shape of the pile body) and a chamfered portion 331 is formed, and the connecting pile body 310 is formed. The other end is a striking end 340.

パイルドライバーにより打ち込み杭100を円錐形マスク130から地面へ打ち込み、地面の所定の深度まで打ち込まれると、連結杭部300の接合部330を打ち込み杭マスク140に接合させて連結させる。或いは、打ち込み杭100の深度がパイル全体の所定の深度に達しない場合、延伸杭200の第一延伸杭マスク230を打ち込み杭マスク140に接合させて連結させ、地面への打ち込みを継続させ、連結杭部300の接合部330を第二延伸杭マスク240に接合させて連結させ、延伸を続けさせる。 When the driving pile 100 is driven into the ground from the conical mask 130 by a pile driver and driven to a predetermined depth on the ground, the joint 330 of the connecting pile portion 300 is joined and connected to the driving pile mask 140. Alternatively, if the depth of the driven pile 100 does not reach the predetermined depth of the entire pile, the first extended pile mask 230 of the extended pile 200 is joined and connected to the driven pile mask 140, and the driving to the ground is continued and connected. The joint part 330 of the pile part 300 is joined and connected to the second stretched pile mask 240 to continue stretching.

もしプレキャストパイルをトップダウン工法に応用させるならば、打ち込み杭100の打ち込み杭マスク140或いは延伸杭200の第二延伸杭マスク240に接続部400を設置させ、杭打槌500を接続部400に接続させて打ち込み杭100、延伸杭200を地面に打ち込む。 If the precast pile is applied to the top-down method, the connecting portion 400 is installed on the driven pile mask 140 of the driven pile 100 or the second extended pile mask 240 of the extended pile 200, and the pile driving rod 500 is connected to the connected portion 400. The driven pile 100 and the extended pile 200 are driven into the ground.

図1Bによると、接続部400の第二延伸杭マスク240の中央部には開口部410を形成させ、パイプ部420を延伸杭200内まで延伸させ、パイプ部420の環囲側から延伸させて溝部430を形成させ、パイプ部420の管壁周縁の溝部430から外径の外側に向かい陥没される箇所に所定の高さを保留させて接合部440を形成させる。 According to FIG. 1B, an opening 410 is formed at the center of the second stretched pile mask 240 of the connecting portion 400, the pipe portion 420 is stretched into the stretched pile 200, and stretched from the surrounding side of the pipe portion 420. The groove portion 430 is formed, and the joint portion 440 is formed by retaining a predetermined height at a portion recessed from the groove portion 430 at the periphery of the pipe wall of the pipe portion 420 toward the outside of the outer diameter.

図1Dによれば、杭打槌500は杭体打槌510及び杭体打槌510の一端に連結される接続部520を備え、杭打槌500は接続部520を接続部400を設ける打ち込み杭100或いは延伸杭200に接合させて連結させ、杭体打槌510の他端の打槌端530は打ち込み時の衝撃力を受ける。接続部520は杭体打槌510の一端のバンプ522に連結される挿入柱521を備える。挿入柱521はパイプ部420に、バンプ522は溝部430及び接合部440に互いに対応させ、挿入柱521が開口部410に位置を合わせ、バンプ522が溝部430に位置を合わせると、接続部520は開口部410からパイプ部420へと挿入され、バンプ522が接合部440の深度に達すると、杭打槌500が回転しバンプ522を接合部440へ進入させ、杭打槌500を接続部400を設ける打ち込み杭100或いは延伸杭200に接合させて連結させる。図2A乃至図2C及び図3A乃至図3Fによると、プレキャストパイルを地下に打ち込みプレキャストパイルを用いてボトムアップ工法の建設ステップを進行させる。 According to FIG. 1D, the pile driving rod 500 includes a pile body driving rod 510 and a connection portion 520 connected to one end of the pile body driving rod 510, and the pile driving rod 500 includes the connection portion 520 and the driving pile provided with the connection portion 400. 100 or the stretched pile 200 is joined and connected, and the pile end 530 of the other end of the pile body striker 510 receives an impact force at the time of driving. The connecting portion 520 includes an insertion column 521 that is connected to the bump 522 at one end of the pile hitting rod 510. When the insertion column 521 corresponds to the pipe portion 420, the bump 522 corresponds to the groove portion 430 and the joint portion 440, the insertion column 521 aligns with the opening 410, and the bump 522 aligns with the groove portion 430, the connection portion 520 When the bump 410 is inserted into the pipe portion 420 from the opening 410 and reaches the depth of the joint portion 440, the pile driving rod 500 rotates to cause the bump 522 to enter the joint portion 440, and the pile driving rod 500 is connected to the connecting portion 400. The driven pile 100 or the extended pile 200 to be provided is joined and connected. According to FIGS. 2A to 2C and FIGS. 3A to 3F, the precast pile is driven into the basement and the construction step of the bottom-up method is advanced using the precast pile.

まず、図2Aによると、パイルの建設予定地にパイルドライバー900によりプレキャストが完了した打ち込み杭100を地下へ打ち込む。 First, according to FIG. 2A, the pile pile 100 that has been precast by the pile driver 900 is driven into the planned construction site of the pile.

図2Bによれば、延伸杭200の第一延伸杭マスク230を打ち込み杭100の打ち込み杭マスク140に立設させ、第一延伸杭マスク230と打ち込み杭マスク140とを溶接により接合させて連結させ、延伸杭200を打ち込み杭100に接続させる。打ち込み杭マスク140と第一延伸杭マスク230との内の何れか1つの端縁には面取り部231及び面取り部141を形成させ、溶接を行い延伸杭200を続けて接続させる。 2B, the first stretched pile mask 230 of the stretched pile 200 is erected on the driven pile mask 140 of the driven pile 100, and the first stretched pile mask 230 and the driven pile mask 140 are joined and connected by welding. The extension pile 200 is driven and connected to the pile 100. A chamfered portion 231 and a chamfered portion 141 are formed on one edge of the driven pile mask 140 and the first extended pile mask 230, and the extended pile 200 is continuously connected by welding.

図2Cによると、延伸杭200を地下へ打ち込む際に第二延伸杭マスク240がまだ地上に位置されるなら、連結杭部300は接合部330を延伸杭200の第二延伸杭マスク240に立設させ、溶接により接合させて連結させる。この際、第二延伸杭マスク240と連結杭部300との内の何れか1つの端縁には面取り部241及び面取り部331を形成させ、溶接箇所910を溶接させてパイルの打ち込み作業を完成させる。 According to FIG. 2C, if the second stretched pile mask 240 is still positioned on the ground when the stretched pile 200 is driven into the basement, the connection pile portion 300 stands the joint 330 on the second stretched pile mask 240 of the stretched pile 200. Installed and joined by welding. At this time, the chamfered portion 241 and the chamfered portion 331 are formed on any one of the edges of the second stretched pile mask 240 and the connecting pile portion 300, and the welding portion 910 is welded to complete the pile driving operation. Let

打ち込み作業完了後、図3Aのように、連結杭部300の柱面には複数の鉄筋連結部311を設置させ、連結杭部300の最下方の鉄筋連結部311には、連結杭部300を包囲させる橋あばら筋810を設置させ、相異する連結杭部300の鉄筋連結部311のスリーブ部313の間には梁主筋710を連結させ且つ梁主筋710には梁あばら筋720を固定させ、橋あばら筋810の角には補強筋820を設置させて鉄筋連結作業を行う。続いて鋳型定盤を架設させ、コンクリート流し込み作業を行う。コンクリートが固まった後、図3Bによれば、固まったコンクリートにより梁主筋710及び梁あばら筋720を被覆させて梁700を形成させ、固まったコンクリートは橋あばら筋810及び補強筋820を被覆させる橋体830となり、橋台800を形成させる。 After the driving operation is completed, as shown in FIG. 3A, a plurality of reinforcing bar connecting portions 311 are installed on the column surface of the connecting pile portion 300, and the connecting pile portion 300 is attached to the lowermost reinforcing bar connecting portion 311 of the connecting pile portion 300. The bridge rib 810 to be surrounded is installed, the beam main bar 710 is connected between the sleeve portions 313 of the reinforcing bar connecting portions 311 of the different connecting piles 300, and the beam bar 720 is fixed to the beam main bar 710, A reinforcing bar 820 is installed at a corner of the bridge rib bar 810 to perform a reinforcing bar connecting operation. Next, the mold surface plate is installed and the concrete pouring work is performed. After the concrete has solidified, according to FIG. 3B, the beam main bar 710 and the beam stirrup 720 are covered with the hardened concrete to form the beam 700, and the solidified concrete covers the bridge stirrup 810 and the reinforcing bar 820. A body 830 is formed and an abutment 800 is formed.

次に、図3C及び図3Eによると、相異するパイルの間の鉄筋連結作業及びコンクリート流し込み作業を反復して行い、各層の梁700及び橋台800を形成させる。 Next, according to FIG. 3C and FIG. 3E, the rebar connecting operation and the concrete pouring operation between different piles are repeated to form the beam 700 and the abutment 800 of each layer.

図3Dによれば、橋あばら筋810の角には延伸筋821を設置させる。続いて、図3Eのように、橋台800の形成時に延伸筋821は橋体830の上面から突出させる。これにより、橋体830の上面から突出させる延伸筋821は続けて上に向けて延伸されて建設され、図3Fのように、延伸筋821とプレキャストの柱600が連結され、続けて上に向けて延伸されて建設される。 According to FIG. 3D, the extension bar 821 is installed at the corner of the bridge rib bar 810. Subsequently, as shown in FIG. 3E, the extension bar 821 is protruded from the upper surface of the bridge body 830 when the abutment 800 is formed. As a result, the extension bar 821 protruding from the upper surface of the bridge body 830 is continuously extended upward and constructed, and the extension bar 821 and the precast pillar 600 are connected to each other as shown in FIG. 3F. It is stretched and built.

図4A乃至図4H、及び図5A乃至図5Nによると、プレキャストパイルをトップダウン工法に応用する場合、プレキャストパイルを地下に打ち込み、プレキャストパイルにより複合杭構造のステップを施行させる。 According to FIGS. 4A to 4H and FIGS. 5A to 5N, when the precast pile is applied to the top-down construction method, the precast pile is driven into the basement, and the step of the composite pile structure is performed by the precast pile.

図4A及び図4Bによれば、パイルドライバー900はプレキャストの完成した打ち込み杭100を所定の打ち込み杭位置P1で地下に打ち込む。図4Bのように、設計されたパイルの深度に応じ、延伸杭200を打ち込み杭100に接合させて連結させ、続けて地面へ打ち込む。 According to FIGS. 4A and 4B, the pile driver 900 drives the precast piled pile 100 that has been precast into the basement at a predetermined pile pile position P1. As shown in FIG. 4B, according to the designed pile depth, the stretched pile 200 is joined and connected to the driven pile 100 and then driven into the ground.

図4Cによると、延伸杭200の第二延伸杭マスク240の一端には接続部400が形成され、接続部520により接続部400に連結されて杭打槌500を延伸杭200に接合させてに連結させる。続けて延伸杭200を地面へ打ち込む。 According to FIG. 4C, a connection part 400 is formed at one end of the second extension pile mask 240 of the extension pile 200 and connected to the connection part 400 by the connection part 520 to join the pile driving rod 500 to the extension pile 200. Connect. Subsequently, the stretched pile 200 is driven into the ground.

打ち込み杭位置P1の位置にあるパイルを所定の深度まで打ち込んだ後、打ち込み杭位置P1の位置にあるパイルの打ち込みステップと同様に打ち込み杭位置P2乃至打ち込み杭位置P4の打ち込み作業を続け、図4Dのように、杭打槌500の上端は地面から突出させる。次に図4E乃至図4Gによれば、打ち込み杭位置P1乃至打ち込み杭位置P4の位置の杭打槌500の間には補助フレーム920を設置させ、パイルを補助させて精確に打ち込み杭位置P5の位置に打ち込む。前記補助フレームは井の字型を呈し、打ち込み杭位置P1乃至打ち込み杭位置P4の杭打槌500はそれぞれ位置決めロープ921により補助フレーム920に連結される。補助フレーム920の中央には打ち込み杭口922が形成され且つ周囲には仕切り物923が設けられる。続いて、打ち込み杭100、延伸杭200、及び連結杭部300を打ち込み杭口922から地面へ打ち込む。 After driving the pile at the driving pile position P1 to a predetermined depth, the driving operation from the driving pile position P2 to the driving pile position P4 is continued in the same manner as the driving step of the pile at the driving pile position P1, and FIG. As described above, the upper end of the pile driving rod 500 is projected from the ground. Next, according to FIGS. 4E to 4G, an auxiliary frame 920 is installed between the pile driving rods 500 at the driven pile position P1 to the driven pile position P4, and the pile is supported accurately by assisting the pile. Type in the position. The auxiliary frame is shaped like a well, and the pile driving rods 500 at the driving pile position P1 to the driving pile position P4 are connected to the auxiliary frame 920 by positioning ropes 921, respectively. A driving pile port 922 is formed at the center of the auxiliary frame 920 and a partition 923 is provided around the periphery. Subsequently, the driven pile 100, the extended pile 200, and the connection pile portion 300 are driven into the ground from the pile port 922.

図4Hによると、補助フレーム920を取り除き、打ち込み杭位置P1乃至打ち込み杭位置P4の杭打槌500と延伸杭200との連結を解除させ、打ち込み杭位置P1乃至打ち込み杭位置P4の位置の杭打槌500をそれぞれ地面から引き抜き延伸杭200及び打ち込み杭100を地中に保留させ、杭打槌500を抜き出したために出来た坑穴を埋める。複数、例えば2つの複合杭構造の杭の打ち込みステップが完了すると図5Aのような状態となる。 According to FIG. 4H, the auxiliary frame 920 is removed, the connection between the pile driving rod 500 at the driven pile position P1 to the driven pile position P4 and the extended pile 200 is released, and the pile driving at the position of the driven pile position P1 to the driven pile position P4 is performed. The pit 500 is pulled out from the ground, the extended pile 200 and the driven pile 100 are held in the ground, and the pit formed by extracting the pile lash 500 is filled. When a plurality of, for example, two composite pile structure pile driving steps are completed, the state shown in FIG. 5A is obtained.

図5Bによれば、連結杭部300の周囲及び近隣の地面を掘り、所定の高さ露出させる。図5Cのように、連結杭部300の連結杭体310に鉄筋連結部311をそれぞれ設置させ、溶接により固設させる。 According to FIG. 5B, the circumference | surroundings of the connection pile part 300 and the nearby ground are dug, and predetermined height is exposed. As shown in FIG. 5C, the reinforcing bar connecting portions 311 are respectively installed on the connecting pile bodies 310 of the connecting pile portions 300, and are fixed by welding.

図5Dによると、連結杭部300の所定の位置に鉄筋連結部311を設置させた後、連結杭部300を包囲させる橋あばら筋810を設置させて、相異する連結杭部300の鉄筋連結部311のスリーブ部313の間に梁主筋710を連結させて梁あばら筋720を固定させ、橋あばら筋810の角には補強筋820或いは延伸筋821を更に設置させて、相異するパイルの間の鉄筋の連結作業を行い、鋳型定盤を架設させてコンクリートの流し込み作業を行う。 According to FIG. 5D, after the reinforcing bar connecting part 311 is installed at a predetermined position of the connecting pile part 300, the bridging rib 810 that surrounds the connecting pile part 300 is installed, and the reinforcing bar connection of the different connecting pile parts 300 is performed. The main beam 710 is connected between the sleeve portions 313 of the portion 311 to fix the beam stirrup 720, and a reinforcing bar 820 or an extension bar 821 is further installed at the corner of the bridge stirrup 810, so that the different piles Reinforcing the reinforcing bars between them, and pouring the concrete by laying the mold surface plate.

図5Eによれば、固まったコンクリートにより梁主筋710及び梁あばら筋720を被覆させて梁700を形成させ、固まったコンクリートは橋あばら筋810及び補強筋820を被覆させる橋体830となり、橋台800を形成させる。 According to FIG. 5E, the beam main bar 710 and the beam stirrup 720 are covered with the solid concrete to form the beam 700, and the solid concrete becomes the bridge body 830 that covers the bridge stirrup 810 and the reinforcing bar 820. To form.

橋台800の形成時、延伸筋821は橋体830の上面から突出させる。また、図5Fのように、延伸筋821とプレキャストの柱600とを連結させ、続けて上に向けて延伸させて建設させる。 When the abutment 800 is formed, the extension bar 821 is protruded from the upper surface of the bridge body 830. Further, as shown in FIG. 5F, the extension bar 821 and the precast pillar 600 are connected, and the extension bar 821 is continuously extended upward to be constructed.

図5G乃至図5Iによると、パイルの間の鉄筋の連結作業及びコンクリートの流し込み作業を反復して行い、梁700及び橋台800を形成させる。図5Jのように、所定の深度まで土砂を掘り先に地下まで打ち込まれた打ち込み杭位置P1乃至打ち込み杭位置P4に位置される延伸杭200を露出させる。 Referring to FIGS. 5G to 5I, the rebar connecting operation between the piles and the concrete pouring operation are repeatedly performed to form the beam 700 and the abutment 800. As shown in FIG. 5J, the extended pile 200 positioned at the driven pile position P1 to the driven pile position P4 where the earth and sand are dug up to a predetermined depth to the basement is exposed.

図5Kによれば、連結杭部300の所定の位置には鉄筋連結部311を設置させ、図5Lによれば、外に露出される延伸杭体220を解体させ、固まったコンクリートを除去し、鉄筋籠210を外に露出させる。 According to FIG. 5K, the reinforcing bar connecting part 311 is installed at a predetermined position of the connecting pile part 300, and according to FIG. 5L, the stretched pile body 220 exposed to the outside is disassembled, and the solidified concrete is removed. The reinforcing bar 210 is exposed outside.

図5Mによると、外に露出される打ち込み杭位置P1乃至打ち込み杭位置P4の延伸杭200の上端の鉄筋籠210を包囲させる橋あばら筋810を設置させ、相異する連結杭部300の鉄筋連結部311のスリーブ部313の間には梁主筋710が連結され且つ梁主筋710は梁あばら筋720を固定させ、複合杭橋台の鉄筋の括り付け及び相異するパイルの間の鉄筋の連結作業を行う。 Referring to FIG. 5M, a bridge rib 810 that surrounds the reinforcing bar 210 at the upper end of the extended pile 200 at the driven pile position P1 to the exposed pile position P4 exposed to the outside is installed, and the reinforcing bar connection of the different connecting pile parts 300 is performed. The main beam 710 is connected between the sleeve portions 313 of the section 311 and the main beam 710 fixes the beam stirrup 720 to bind the reinforcing bars of the composite pile abutment and to connect the reinforcing bars between the different piles. Do.

鋳型定盤を架設させてコンクリート流し込み作業及びコンクリート固めを行い、図5Nのように、固まったコンクリートにより梁主筋710及び梁あばら筋720を被覆させて梁700を形成させ、固まったコンクリートは橋あばら筋810及び鉄筋籠210を被覆させる複合橋体840となり、橋台800を形成させる。梁主筋710は主杭の連結杭部300の柱面から突出させ橋台800へ進入させる連結筋となり、橋台800を更に突出させ他の主杭の連結杭部300の柱面へ連結させて、梁の梁主筋710とする。 As shown in FIG. 5N, the main plate 710 and the beam stirrup 720 are covered with the solid concrete to form the beam 700, and the solid concrete is loosened from the bridge. A composite bridge body 840 that covers the reinforcing bar 810 and the reinforcing bar 210 is formed, and the abutment 800 is formed. The beam main reinforcement 710 becomes a connection reinforcement that protrudes from the column surface of the connection pile portion 300 of the main pile and enters the abutment 800, further protrudes the abutment 800 and is connected to the column surface of the connection pile portion 300 of the other main pile, It is assumed that the beam main reinforcement 710.

以上、本考案はこのような実施形態に限定されるものではなく、考案の趣旨を逸脱しない範囲において、種々の形態で実施することができる。 As mentioned above, this invention is not limited to such embodiment, In the range which does not deviate from the meaning of invention, it can implement with a various form.

100 打ち込み杭
110 鉄筋籠
111 主筋
112 あばら筋
120 杭体
130 円錐形マスク
140 打ち込み杭マスク
141 面取り部
200 延伸杭
210 鉄筋籠
211 主筋
212 あばら筋
220 延伸杭体
230 第一延伸杭マスク
231 面取り部
240 第二延伸杭マスク
241 面取り部
250 接続部
251 開口部
252 パイプ部
253 溝部
254 接合部
300 連結杭部
310 連結杭体
311 鉄筋連結部
312 連結バンプ
313 スリーブ部
320 変化部
330 接合部
331 面取り部
340 打槌端
400 接続部
410 開口部
420 パイプ部
430 溝部
440 接合部
500 杭打槌
510 杭体打槌
520 接続部
521 挿入柱
522 バンプ
530 打槌端
600 柱
700 梁
710 梁主筋(連結筋)
720 梁あばら筋
800 橋台
810 橋あばら筋
820 補強筋
821 延伸筋
830 橋体
840 複合橋体
900 パイルドライバー
910 溶接箇所
920 補助フレーム
921 位置決めロープ
922 打ち込み杭口
923 仕切り物
P1 打ち込み杭位置
P2 打ち込み杭位置
P3 打ち込み杭位置
P4 打ち込み杭位置
P5 打ち込み杭位置
DESCRIPTION OF SYMBOLS 100 Driving pile 110 Reinforcement rod 111 Main reinforcement 112 Loose bar 120 Pile body 130 Conical mask 140 Driving pile mask 141 Chamfering part 200 Stretched pile 210 Reinforcing bar 211 Main bar 212 Stirring bar 220 Stretched pile body 230 1st extension pile mask 231 Second stretched pile mask 241 Chamfered portion 250 Connection portion 251 Opening portion 252 Pipe portion 253 Groove portion 254 Joint portion 300 Connection pile portion 310 Connection pile body 311 Reinforcing bar connection portion 312 Connection bump 313 Sleeve portion 320 Change portion 330 Connection portion 331 Chamfer portion 340 Striking end 400 Connection portion 410 Opening portion 420 Pipe portion 430 Groove portion 440 Joint portion 500 Pile driving rod 510 Pile body driving rod 520 Connection portion 521 Inserting pillar 522 Bumping end 600 Column 700 Beam 710 Beam main reinforcement (connecting reinforcement)
720 Beam stirrup 800 Abutment 810 Bridge stirrup 820 Reinforcement rebar 821 Stretched stirrup 830 Bridge body 840 Composite bridge body 900 Pile driver 910 Welding point 920 Auxiliary frame 921 Positioning rope 922 Driven pile port 923 Partition P1 Driven pile position P2 Driven pile position P3 Driving pile position P4 Driving pile position P5 Driving pile position

Claims (2)

打ち込み杭と、延伸杭と、連結杭部を備え、前記打ち込み杭は、複数本の主筋及びこれら前記主筋を包囲させるあばら筋からなり、主筋とあばら筋との交叉する箇所は対向する位置で固定される鉄筋籠と、コンクリートにより前記鉄筋籠を被覆させて形成され、その一端には尖端を形成させる打ち込み杭と、前記尖端を被覆させる円錐形マスクを更に含み、
前記延伸杭は、複数本の主筋及びこれら前記主筋を包囲させるあばら筋からなり、主筋とあばら筋との交叉する箇所は対向する位置で固定される鉄筋籠と、コンクリートにより前記鉄筋籠を被覆させて形成される延伸杭体と、前記延伸杭体の一端を被覆させ、前記延伸杭は前記第一延伸杭マスクと前記打ち込み杭マスクとを接合させて連結させ、前記打ち込み杭の他端に接続させる第一延伸杭マスクを更に含み、前記連結杭部は、連結杭体と、前記連結杭体の一端に位置され、前記連結杭部は前記接合部を前記打ち込み杭マスクに接合させて連結させ、前記打ち込み杭の他端に接続させる接合部を更に含む事を特徴とするプレキャストパイル。
A driven pile, an extended pile, and a connecting pile portion are provided, and the driven pile is composed of a plurality of main bars and ribs surrounding the main bars, and the crossing points of the main bars and the bar bars are fixed at opposing positions. Further comprising a reinforcing bar to be formed, a concrete pile covering the reinforcing bar with concrete, a driving pile for forming a tip at one end thereof, and a conical mask for covering the tip.
The extending pile is composed of a plurality of main bars and ribs that surround the main bars, and the crossing points of the main bars and the bar bars are fixed at opposing positions, and the reinforcing bar is covered with concrete. The stretched pile body formed by coating one end of the stretched pile body, the stretched pile joining the first stretched pile mask and the driven pile mask, and connecting to the other end of the driven pile A first extending pile mask, wherein the connecting pile portion is positioned at one end of the connecting pile body and the connecting pile body, and the connecting pile portion is connected by joining the joining portion to the driving pile mask. The precast pile further includes a joint portion connected to the other end of the driving pile.
少なくとも前記連結杭部は建築基準面上に立設される主杭と、互いに距離を空けながら前記建築基準面に立設され且つ前記主杭の周囲に立設され、これらの上端の主筋は外に露出される複数本の副杭と、橋台を備え、前記橋台は、これら前記副杭を包囲させ、これら前記副杭の主筋との交叉する箇所を固定させる少なくとも1つのあばら筋と、コンクリートを流し込みこれら前記副杭及び前記あばら筋を被覆させる複合橋体を更に含む事を特徴とする複合杭構造。   At least the connecting pile portion is erected on the building reference plane with the main pile erected on the building reference plane, and is erected on the building reference plane while being spaced apart from each other. A plurality of sub-stakes exposed to the abutment, and the abutment, the abutment surrounds the sub-pile, and at least one stirrup to fix the crossing point with the main reinforcement of the sub-pile, and concrete A composite pile structure characterized by further including a composite bridge body that covers the sub-pile and the stirrup.
JP2012006732U 2012-11-06 2012-11-06 Precast pile and composite pile structure Expired - Lifetime JP3181886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012006732U JP3181886U (en) 2012-11-06 2012-11-06 Precast pile and composite pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012006732U JP3181886U (en) 2012-11-06 2012-11-06 Precast pile and composite pile structure

Publications (1)

Publication Number Publication Date
JP3181886U true JP3181886U (en) 2013-02-28

Family

ID=50426044

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012006732U Expired - Lifetime JP3181886U (en) 2012-11-06 2012-11-06 Precast pile and composite pile structure

Country Status (1)

Country Link
JP (1) JP3181886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113172183A (en) * 2021-04-12 2021-07-27 建华建材(中国)有限公司 Manufacturing process of reinforcement cage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113172183A (en) * 2021-04-12 2021-07-27 建华建材(中国)有限公司 Manufacturing process of reinforcement cage

Similar Documents

Publication Publication Date Title
CN205530667U (en) Prefabricated assembled concrete member
CN101775844B (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
JP6792329B2 (en) Construction method of column beam frame using precast concrete columns
JP6702128B2 (en) Foundation structure, pile head structure of steel pipe pile, and construction method of foundation structure
JP2013256793A (en) Construction method for underground structure, and underground structure
CN103628571B (en) Beam-column joint for reverse construction method and construction method
KR20090069151A (en) Prefab apparatus for reinforcing head of pile
CN213741571U (en) Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation
TWM448509U (en) Precast foundation piles and composite pile structure
JP3181886U (en) Precast pile and composite pile structure
JP4536615B2 (en) Construction method of steel pillars to steel pipe piles, buried pipe body and pile construction method
JP5456627B2 (en) Connection structure and method of connection between pile and steel column
CN205857745U (en) Joint bar constructing structure
CN201598734U (en) Concrete filled steel tubular column ring beam joint for topdown construction method foundation pit engineering
KR101612637B1 (en) Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings
JP2013032682A (en) Construction pile and construction pile constructing method using the same
JP5686414B2 (en) True pillar
JP2002030672A (en) Structure of joining foundation pile to pier base and method of constructing the structure
JP6677564B2 (en) Reinforced basket and connection method of reinforced basket
JP6988047B2 (en) How to reconstruct the underground skeleton
JP5201719B2 (en) Column construction method and column structure
KR101137959B1 (en) Prefab apparatus for reinforcing head of pile
KR101657628B1 (en) Top-down method for building undergroud structure using steel pipe
CN114016536B (en) Method for building large-volume concrete bearing platform
JP6217102B2 (en) Joint structure and method of head and foundation of cast-in-place concrete pile

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121220

R150 Certificate of patent or registration of utility model

Ref document number: 3181886

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160206

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term