JP3179677B2 - Crane fixing structure, method of fixing the same, and method of removing the fixed structure - Google Patents

Crane fixing structure, method of fixing the same, and method of removing the fixed structure

Info

Publication number
JP3179677B2
JP3179677B2 JP14709895A JP14709895A JP3179677B2 JP 3179677 B2 JP3179677 B2 JP 3179677B2 JP 14709895 A JP14709895 A JP 14709895A JP 14709895 A JP14709895 A JP 14709895A JP 3179677 B2 JP3179677 B2 JP 3179677B2
Authority
JP
Japan
Prior art keywords
crane
ground
foundation
anchor
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14709895A
Other languages
Japanese (ja)
Other versions
JPH08338034A (en
Inventor
忠 松浦
孝一 後田
良平 宮原
辰雄 牧田
圭也 佐藤
好夫 石名部
忠彰 及川
高野  博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP14709895A priority Critical patent/JP3179677B2/en
Publication of JPH08338034A publication Critical patent/JPH08338034A/en
Application granted granted Critical
Publication of JP3179677B2 publication Critical patent/JP3179677B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、クレーンの固定構造に
係り、特に固定式クレーンの地盤への固定構造に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for fixing a crane, and more particularly to a structure for fixing a fixed crane to the ground.

【0002】[0002]

【従来の技術】図11aは従来から知られている固定式
クレーン(タワークレーン)の基礎の平面図を示し、図
11bはその断面図を示している。
2. Description of the Related Art FIG. 11a shows a plan view of a foundation of a conventionally known fixed crane (tower crane), and FIG. 11b shows a sectional view thereof.

【0003】従来から知られている固定式クレーンの基
礎では、クレーンを設置する地盤上に均しコンクリート
を打設しておき、この上に鉄筋コンクリート製の基礎2
が乗った構造であり、基礎2中に基礎ボルト61部分が
埋設固定された状態の固定式クレーンの鋼製脚支柱部材
11は、風,振動,クレーン稼働に伴う引張力を基礎2
の重量で抵抗している。従来からの鉄筋コンクリート重
量で全ての引張荷重を支持する方式の固定式クレーンの
基礎2では、十分な厚さ(重量)を有する強固な基礎2
を造成することが必要となる。
[0003] In a conventionally known fixed crane foundation, leveling concrete is cast on the ground on which the crane is installed, and a reinforced concrete foundation 2 is placed thereon.
The steel leg support member 11 of the fixed crane in a state in which the foundation bolt 61 is buried and fixed in the foundation 2 applies wind, vibration, and the pulling force accompanying the crane operation to the foundation 2.
The weight is resisting. In the conventional fixed crane foundation 2 of the type that supports all tensile loads with the weight of reinforced concrete, a solid foundation 2 having a sufficient thickness (weight) is used.
It is necessary to create.

【0004】このように建築物の建築現場において、資
材の搬入,搬出,製品の据付け等に用いる固定式クレー
ンを支える基礎部分には、クレーン稼働時、あるいは強
風時にクレーン脚部に加わる荷重に対して十分耐える強
固な構造が求められる。そのため、基礎部分のコンクリ
ート造成は、大きく,厚く施工する必要があった。
As described above, at the building site of a building, a base portion supporting a fixed type crane used for loading and unloading of materials, installation of products, and the like is provided with a load applied to the crane legs during operation of the crane or strong wind. It is required to have a strong structure that can withstand enough. Therefore, it was necessary to construct a large and thick concrete for the foundation.

【0005】高さの高い鉄骨構造物を固定設置する技術
としては、コンクリートを地盤に設置して、そのコンク
リート内にアースアンカーを固定設置して、前記アース
アンカーで前記コンクリートに前記鉄骨構造物を固定設
置する技術が特開平5− 179657号公報に開示されてい
る。この技術を採用しても、鉄骨構造物の転倒しようと
する力にコンクリートの重量で対抗してその転倒を阻止
しているから、そのコンクリートを大きく,厚く施工し
て重くする必要があった。
As a technique of fixing and installing a tall steel structure, concrete is installed on the ground, an earth anchor is fixedly installed in the concrete, and the steel structure is attached to the concrete by the earth anchor. A technique for fixed installation is disclosed in JP-A-5-179657. Even if this technique is employed, the concrete is required to be large, thick and heavy because the weight of the concrete opposes the force of the steel structure to overturn to prevent the overturn.

【0006】[0006]

【発明が解決しようとする課題】固定式クレーンの一般
的な基礎は、鉄筋コンクリートクリートを基礎設定範囲
全面にわたり厚く造成することによって、クレーン稼働
時の圧縮(重量)荷重、並びに引張荷重に耐える強度を
確保している。しかしながら、建設工事工程の関係で、
短期間で固定式クレーンの基礎造成が必要なケースや、
稼働中の固定式クレーンの基礎造成範囲に、建物等別の
計画物が存在していて、計画物建造のために、固定式ク
レーンの基礎撤去期間を短縮せざるを得ないようなケー
スにおいては、従来からの固定式クレーンの基礎では、
設定,解体方法が困難である。
A general foundation of a fixed crane is to form a thick reinforced concrete cleat over the entire range of the foundation, thereby increasing the strength to withstand a compressive (weight) load and a tensile load during crane operation. Is secured. However, due to the construction process,
In cases where the foundation of fixed cranes is required in a short time,
In the case where there is another project such as a building in the foundation building area of the fixed crane in operation, the removal period of the fixed crane foundation has to be shortened for the construction of the project. In the foundation of a conventional fixed crane,
Setting and dismantling methods are difficult.

【0007】本発明の目的は、クレーンを短時間に設置
できるクレーンの固定構造及びその固定方法を提供する
ことにある。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a crane fixing structure and a fixing method for the crane which can be installed in a short time.

【0008】本発明の他の目的は、短時間に撤去できる
クレーンの固定構造の撤去方法のことである。
Another object of the present invention is a method for removing a fixed structure of a crane which can be removed in a short time.

【0009】[0009]

【課題を解決するための手段】本発明の目的を達成する
ための第1手段は、地盤に設置されたクレーン基礎を貫
通して前記地盤内に埋設されたアースアンカーを備え、
前記アースアンカー周辺を形成するグラウト材が前記ア
ースアンカー設定用の孔の掘削径より拡径した部分を有
し、前記アースアンカーで前記クレーン基礎上に設置さ
れたクレーンの脚部を固定していることを特徴とするク
レーンの固定構造である。
According to a first aspect of the present invention, there is provided a ground anchor penetrating through a crane foundation installed on the ground and embedded in the ground .
The grout material forming the periphery of the earth anchor is
There is a part larger than the excavation diameter of the hole for setting the anchor.
A crane fixing structure, wherein a leg of the crane installed on the crane foundation is fixed by the ground anchor .

【0010】同じく第2手段は、地盤に設置されたクレ
ーン基礎を貫通して前記地盤内に埋設されたアースアン
カーを備え、前記アースアンカー周辺を形成するグラウ
ト材が前記アースアンカー設定用の孔の掘削径より拡径
した部分を有し、前記アースアンカーによって、前記ク
レーン基礎を固定しており、前記クレーン基礎に設けら
れたボルトによって前記クレーン基礎上に設置されたク
レーンの脚部を固定していることを特徴とするクレーン
の固定構造である。
The second means also includes a ground anchor penetrating a crane foundation installed on the ground and buried in the ground, and forming a ground around the ground anchor.
Material is larger than the diameter of the hole for setting the earth anchor
The crane foundation is fixed by the ground anchor , and a leg of the crane installed on the crane foundation is fixed by a bolt provided on the crane foundation. This is the fixed structure of the crane to be driven.

【0011】同じく第3手段は、第1手段または第2手
段において、前記地盤内の複数個所にそれぞれ注入され
たグラウト材を備え、前記クレーン基礎を貫通した前記
アースアンカーが、前記各グラウト材内にそれぞれ設置
され、隣接する前記アースアンカーを取り囲む前記グラ
ウト材は互いに接触していないクレーンの固定構造であ
る。
[0011] Similarly, the third means is the first means or the second means, further comprising grouting material injected into a plurality of locations in the ground, wherein the ground anchor penetrating the crane foundation is provided in each of the grouting materials. And the grout material surrounding the adjacent ground anchor is a fixed structure of the crane which is not in contact with each other.

【0012】同じく第4手段は、地盤内でグラウト材に
より取り囲まれ前記グラウト材に接する鋼製ワイヤーの
部分である定着部と、引っ張り力を前記定着部に伝達す
る鋼製ワイヤーの部分である自由長部と、クレーン基礎
を貫通して前記クレーン基礎より上方で前記鋼製ワイヤ
ーに取り付けられ、前記クレーン基礎上に設置されたク
レーンの脚部を固定する定着具とを有する複数のアース
アンカーを備え、少なくとも前記定着部は、前記地盤内
に注入された前記グラウト材により前記地盤に圧着して
埋設されており、前記定着部周辺を形成するグラウト材
がアースアンカー設定用の孔の掘削径より拡径した部分
を備え、隣接する前記アースアンカーを取り囲む前記グ
ラウト材は互いに接触していないことを特徴としたクレ
ーンの固定構造である。
Similarly, the fourth means is a fixing portion which is a portion of a steel wire which is surrounded by the grout material in the ground and is in contact with the grout material, and a portion of the steel wire which transmits a tensile force to the fixing portion. A plurality of earth anchors having a long portion and a fixing device that is attached to the steel wire above the crane foundation through the crane foundation and that fixes a leg of the crane installed on the crane foundation. At least the fixing portion is buried by being pressed against the ground by the grout material injected into the ground, and a grout material forming a periphery of the fixing portion
Is larger than the excavation diameter of the hole for setting the earth anchor
Wherein the grout members surrounding the adjacent ground anchors are not in contact with each other.

【0013】同じく第5手段は、地盤内でグラウト材に
より取り囲まれ前記グラウト材に接する鋼製ワイヤーの
部分である定着部と、引っ張り力を前記定着部に伝達す
る鋼製ワイヤーの部分である自由長部と、クレーン基礎
を貫通して前記クレーン基礎より上方で前記鋼製ワイヤ
ーに取り付けられ、前記クレーン基礎を固定する定着具
とを有する複数のアースアンカーを備え、少なくとも前
定着部は、前記地盤内に注入された前記グラウト材に
より前記地盤に圧着して埋設されており、前記定着部周
辺を形成するグラウト材がアースアンカー設定用の孔の
掘削径より拡径した部分を備え、隣接する前記アースア
ンカーを取り囲む前記グラウト材は互いに接触していな
く、前記クレーン基礎上に設置されたクレーンの脚部を
前記クレーン基礎に設けられたボルトによって固定する
ことを特徴としたクレーンの固定構造である。
Similarly, the fifth means is a fixing portion which is a portion of a steel wire which is surrounded by the grout material in the ground and is in contact with the grout material, and a portion of the steel wire which transmits a tensile force to the fixing portion. A plurality of earth anchors having a long portion , and a fixing tool that penetrates the crane foundation and is attached to the steel wire above the crane foundation and fixes the crane foundation, wherein at least the fixing part includes the ground. It is embedded and pressed into the ground by injected the grout within the fixing portion periphery
The grout material forming the side is the hole for the ground anchor setting
The grout material surrounding the earth anchor is not in contact with each other and has a portion that is larger than the excavation diameter, and the legs of the crane installed on the crane foundation are fixed by bolts provided on the crane foundation. And a crane fixing structure.

【0014】同じく第6手段は、第4手段または第5手
段において、クレーン基礎は鉄筋コンクリートで造成さ
れているクレーンの固定構造である。
A sixth means is the fixing structure of the crane according to the fourth means or the fifth means, wherein the crane foundation is made of reinforced concrete.

【0015】同じく第7手段は、第4手段または第5手
段において、前記クレーン基礎は上面の鉄板とその下方
コンクリートの組み合わせで構成されているクレーン
の固定構造である。
A seventh means is the fourth means or the fifth means, wherein the crane foundation is an iron plate on an upper surface and a lower part thereof.
It is a fixed structure of a crane that is composed of a combination of concrete.

【0016】同じく第8手段は、第4手段または第5手
段において、クレーン基礎は鉄板で構成されているクレ
ーンの固定構造である。
An eighth means is the crane fixing structure according to the fourth means or the fifth means, wherein the crane foundation is made of an iron plate.

【0017】同じく第9手段は、第4手段または第5手
段において、自由長部は、筒状体内に配置された前記鋼
製ワイヤーの部分であるクレーンの固定構造である。
A ninth means is the crane fixing structure according to the fourth means or the fifth means, wherein the free length portion is a portion of the steel wire disposed in the cylindrical body.

【0018】同じく第10手段は、地盤内にアースアン
カー設定用の孔を掘削してあけ、この孔内に1つのアー
スアンカーを挿入した状態で前記孔内に注入した前記グ
ラウト材を加圧して前記グラウト材の径を前記アースア
ンカー設定用の孔の掘削径よりも拡大させ、前記クレー
ン基礎上に設置した前記クレーン脚部を前記アースアン
カーに張力を与えた状態で固定することを特徴としたク
レーンの固定方法である。
Similarly, the tenth means excavates and drills a hole for setting an earth anchor in the ground, and presses the grout material injected into the hole with one earth anchor inserted into the hole. Adjust the diameter of the grout
A method for fixing a crane, characterized in that the diameter of the excavation hole is larger than the excavation diameter of the anchor setting hole, and the crane legs installed on the crane foundation are fixed with tension applied to the earth anchor.

【0019】本発明の他の目的を達成するための第11
手段は、クレーン基礎を貫通して地盤に埋設されたアー
スアンカーによって前記クレーン基礎上に固定されたク
レーン脚部を固定しているクレーンの固定構造を、クレ
ーン使用後に撤去する方法であって、前記地盤内から、
前記アースアンカー又は前記アースアンカー周りに注入
されたグラウト材の一部を露出させ、その後、前記地盤
から露出している部分で前記アースアンカーを切断し、
この切断位置より上方の部分を撤去し、その切断位置よ
り下方の部分を前記地盤内に残存させることを特徴とし
たクレーンの固定構造の撤去方法である。
An eleventh aspect for achieving another object of the present invention.
The method is a method of removing a crane fixing structure fixing a crane leg fixed on the crane foundation by an earth anchor buried in the ground through the crane foundation after using the crane, From within the ground,
Exposing a part of the earth anchor or grout material injected around the earth anchor, and thereafter cutting the earth anchor at a part exposed from the ground,
A method for removing a fixed structure of a crane, wherein a portion above the cutting position is removed and a portion below the cutting position is left in the ground.

【0020】[0020]

【作用】第1手段によれば、アースアンカーがクレーン
の転倒しようとする力を引張力として受け止めて地盤に
伝え、クレーンの転倒を防止するので、クレーン基礎に
よるアースアンカーの引張力支持の負担を軽減でき、ク
レーン基礎の容積を減少でき軽量化できる。しかも、ア
ースアンカー周りのグラウト材の径がアースアンカー設
定用の孔の掘削径より拡大されて地盤に対してアースア
ンカーが強固に定着され、クレーンの転倒に対する抵抗
力が増加する。このため、従来のようにその転倒防止に
強固で大重量の鉄筋コンクリートを採用せずに済み、ク
レーンの固定構造の建設時間が短縮できる。このため、
クレーンの設置に要する時間を著しく短縮できる。更
に、クレーン脚部を固定するボルトをアースアンカーと
は別にクレーン基礎に設ける必要がないので、クレーン
の固定構造を単純化できる。
According to the first means, the earth anchor receives the force of the crane to fall over as a tensile force and transmits it to the ground to prevent the crane from overturning. It is possible to reduce the volume of the crane foundation and reduce the weight. Moreover, a
The diameter of the grout material around the ground anchor is
It is enlarged from the drilling diameter of
Tanker is firmly established and the crane falls down
Power increases. For this reason, it is not necessary to employ a strong and heavy reinforced concrete for preventing the fall as in the related art, and the construction time of the crane fixing structure can be reduced. For this reason,
The time required for crane installation can be significantly reduced. Furthermore, since it is not necessary to provide a bolt for fixing the crane leg on the crane foundation separately from the ground anchor, the crane fixing structure can be simplified.

【0021】第2手段によれば、アースアンカーが、ボ
ルトを介してクレーン基礎に伝えられるクレーンの転倒
しようとする力を引張力として受け止めて地盤に伝え、
クレーンの転倒を防止するので、クレーン基礎によるア
ースアンカーの引張力支持の負担を軽減でき、クレーン
基礎の容積を減少でき軽量化できる。しかも、アースア
ンカー周りのグラウト材の径がアースアンカー設定用の
孔の掘削径より拡大されて地盤に対してアースアンカー
が強固に定着され、クレーンの転倒に対する抵抗力が増
加する。このため、従来のようにその転倒防止に強固で
大重量の鉄筋コンクリートを採用せずに済み、クレーン
の固定構造の建設時間が短縮できる。このため、クレー
ンの設置に要する時間を著しく短縮できる。
According to the second means, the earth anchor receives, as a tensile force, the crane overturning force transmitted to the crane foundation via the bolt, and transmits the force to the ground.
Since the crane is prevented from tipping over, the burden of supporting the earth anchor by the crane foundation can be reduced, and the volume of the crane foundation can be reduced and the weight can be reduced. Moreover, Earth
The diameter of the grout material around the anchor is for setting the earth anchor.
Enlarged from the drilling diameter of the hole and earth anchor to the ground
Is firmly established, increasing the resistance to crane falls
Add. For this reason, it is not necessary to employ a strong and heavy reinforced concrete for preventing the fall as in the related art, and the construction time of the crane fixing structure can be reduced. Therefore, the time required for installing the crane can be significantly reduced.

【0022】第3手段によれば、第1手段または第2手
段で生じる作用に加えて、グラウト材と地盤との摩擦力
が増加するので、アースアンカーの引き抜き抵抗力増大
し、より大きな転倒力を支持できる。すなわち、クレー
ン脚部と地盤またはクレーン基礎と地盤とのアースアン
カーによる一体化がより強固に達成される。
According to the third means, in addition to the action produced by the first means or the second means, the frictional force between the grout material and the ground increases, so that the pull-out resistance of the earth anchor increases, and the overturning force increases. Can be supported. That is, the integration of the crane leg and the ground or the crane foundation and the ground by the ground anchor is more firmly achieved.

【0023】第4手段によれば、アースアンカーの定着
部が地盤に対して摩擦力で固定され、アースアンカーの
自由長部が、クレーンの転倒しようとする力を引張力と
して受け止めて定着部を介して地盤に伝えるので、クレ
ーン脚部が地盤と一体化される。しかも、アースアンカ
ー周りのグラウト材の径がアースアンカー設定用の孔の
掘削径より拡大されて地盤に対してアースアンカーが強
固に定着され、クレーンの転倒に対する抵抗力が増加す
る。従って、クレーンの転倒は強固で大重量のコンクリ
ートブロックを基礎に採用することなく確実に阻止でき
る。クレーン基礎の容積は小さくて済み、クレーンの固
定構造の建設時間が短縮できる。このため、クレーンの
設置に要する時間を著しく短縮できる。更に、クレーン
脚部を固定するボルトをアースアンカーとは別にクレー
ン基礎に設ける必要がないので、クレーンの固定構造を
単純化できる。
According to the fourth means, the anchoring portion of the earth anchor is fixed to the ground by a frictional force, and the free length portion of the earth anchor receives the force of the crane to overturn as a tensile force, and fixes the anchoring portion. The crane legs are integrated with the ground because they are transmitted to the ground through the ground. And earth anchor
-The diameter of the surrounding grout material is
Earth anchor is strong against the ground because it is larger than the excavation diameter
Firmly anchored, increasing the crane's resistance to tipping over
You. Therefore, the overturn of the crane can be reliably prevented without using a strong and heavy concrete block as a foundation. The volume of the crane foundation can be small, and the construction time of the fixed structure of the crane can be reduced. Therefore, the time required for installing the crane can be significantly reduced. Further, since there is no need to provide a bolt for fixing the crane legs on the crane foundation separately from the ground anchor, the crane fixing structure can be simplified.

【0024】第5手段によれば、アースアンカーの定着
部が地盤に対して摩擦力で固定され、アースアンカーの
自由長部が、ボルトを介してクレーン基礎に伝えられる
クレーンの転倒しようとする力を引張力として受け止め
て定着部を介して地盤に伝えるので、クレーン基礎が地
盤と一体化される。しかも、アースアンカー周りのグラ
ウト材の径がアースアンカー設定用の孔の掘削径より拡
大されて地盤に対してアースアンカーが強固に定着さ
れ、クレーンの転倒に対する抵抗力が増加する。従っ
て、クレーンの転倒は強固で大重量のコンクリートブロ
ックを基礎に採用することなく確実に阻止できる。クレ
ーン基礎の容積は小さくて済み、クレーンの固定構造の
建設時間が短縮できる。このため、クレーンの設置に要
する時間を著しく短縮できる。
According to the fifth means, the anchoring portion of the earth anchor is fixed to the ground by a frictional force, and the free length of the earth anchor is transmitted to the crane foundation via bolts to force the crane to overturn. Is received as a tensile force and transmitted to the ground via the fixing portion, so that the crane foundation is integrated with the ground. Besides, the ground around the earth anchor
The diameter of the wood is larger than the diameter of the hole for setting the earth anchor.
The ground anchor is firmly fixed to the ground
This increases the crane's resistance to tipping over. Therefore, the overturn of the crane can be reliably prevented without using a strong and heavy concrete block as a foundation. The volume of the crane foundation can be small, and the construction time of the fixed structure of the crane can be reduced. Therefore, the time required for installing the crane can be significantly reduced.

【0025】第6手段によれば、第4手段又は第5手段
による作用に加えて、クレーン基礎として鉄筋コンクリ
ートを採用しても、クレーンが転倒しようとするときに
発生する引張力はアースアンカーで受けるので、クレー
ン基礎はその引張力を受けることなく小型軽量で薄いも
ので足りる。クレーン基礎の容積が減少した分、クレー
ンの固定構造の設置及び撤去が容易になりこれらに要す
る時間が短縮できる。第7手段によれば、第4手段又は
第5手段による作用に加えて、クレーン基礎として鉄板
とコンクリートの組み合わせ構造物を採用することで、
鉄板部分でクレーン脚部が支持されかつアースアンカー
の引張力を受けるので、クレーン基礎がコンクリートの
みで造成されている場合に比べてクレーン基礎に割れな
どが生じない。このため、クレーン脚部の確実な固定が
可能になる。
According to the sixth means, in addition to the action of the fourth means or the fifth means, even if reinforced concrete is used as the crane foundation, the tensile force generated when the crane tries to fall is received by the earth anchor. Therefore, the crane foundation need only be small, lightweight and thin without receiving the tensile force. Since the volume of the crane foundation is reduced, it is easy to install and remove the crane fixing structure, and the time required for these can be reduced. According to the seventh means, in addition to the operation of the fourth means or the fifth means, by employing a combined structure of iron plate and concrete as a crane foundation,
Since the crane leg is supported by the iron plate portion and receives the tensile force of the earth anchor, the crane foundation does not crack or the like as compared with the case where the crane foundation is made only of concrete. For this reason, the crane leg can be securely fixed.

【0026】第8手段によれば、第4手段又は第5手段
による作用に加えて、第7手段と同様な作用が生じる。
また、クレーン基礎を鉄板で構成することにより、コン
クリートを用いるものに較べてクレーン基礎の薄型化が
達成できる。
According to the eighth means, in addition to the action of the fourth means or the fifth means, an action similar to that of the seventh means is produced.
Further, by forming the crane foundation with an iron plate, the crane foundation can be made thinner as compared with the one using concrete.

【0027】第9手段によれば、筒状体内に配置された
鋼製ワイヤーの部分が地盤またはグラウト材と接触しな
いので、アースアンカーの機能、すなわち鋼製ワイヤー
に十分な引張力を生じせしめられ、しかも、アースアン
カー周りのグラウト材の径がアースアンカー設定用の孔
の掘削径より拡大されて地盤に対してアースアンカーが
強固に定着され、クレーンの転倒に対する抵抗力が増加
する。このため鋼製ワイヤーのこの引張力によるクレー
ンの転倒防止の機能を十分に発揮させることができる。
According to the ninth means, since the portion of the steel wire disposed in the cylindrical body does not come into contact with the ground or the grout material, the function of the earth anchor, that is, a sufficient tensile force is generated in the steel wire. And, Earth An
Hole of grout material around car is set for earth anchor
Earth excavation diameter is larger than ground
Firmly anchored, increasing crane resistance
I do. Therefore, the function of preventing the crane from overturning due to the tensile force of the steel wire can be sufficiently exhibited.

【0028】第10手段によれば、地盤にあけた孔にア
ースアンカーを入れてグラウト材を加圧することによ
り、アースアンカー周りのグラウト材の径がアースアン
カー設定用の孔の掘削径より拡大されてグラウト材は地
盤とアースアンカーとに圧着されアースアンカーの地盤
からの引き抜き抵抗力を増加できる。このため、アース
アンカーにゆるみなく張力を加えた上でそのアースアン
カーでクレーン脚部を地盤に強固に固定できる。クレー
ン基礎によるアースアンカーの引張力支持の負担を軽減
でき、クレーン基礎を軽量化できる。
According to the tenth means, the diameter of the grout material around the ground anchor is reduced by inserting the earth anchor into the hole formed in the ground and pressing the grout material.
The grout material is expanded from the excavation diameter of the hole for setting the car, and the grout material is pressed against the ground and the ground anchor, so that the pullout resistance of the ground anchor from the ground can be increased. Therefore, the crane leg can be firmly fixed to the ground with the earth anchor after tension is applied without loosening. The burden of supporting the earth anchor by the crane foundation by the crane foundation can be reduced, and the crane foundation can be reduced in weight.

【0029】第11手段によれば、アースアンカーを途
中で切断して基礎を撤去し、切断位置から下方のアース
アンカー部分は地盤に残留させることにより余分な撤去
作業を省略し、その地盤を次の作業のために早くあけわ
たせる作用が得られる。
According to the eleventh means, the earth anchor is cut in the middle and the foundation is removed, and the ground anchor portion below the cutting position is left on the ground, so that unnecessary removal work is omitted, and the ground is replaced with the next ground. The effect of quickly releasing the work is obtained.

【0030】[0030]

【実施例】以下、図を用いて本発明の実施例を説明す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0031】図1aは、第1実施例におけるアースアン
カー21を用いた固定式クレーンの基礎の平面図を示し
ている。また、図1bは、第1実施例におけるアースア
ンカー21を用いた固定式クレーンの基礎の断面図を示
したものである。
FIG. 1a shows a plan view of the foundation of a fixed type crane using the earth anchor 21 in the first embodiment. FIG. 1B is a cross-sectional view of a foundation of a fixed crane using the earth anchor 21 in the first embodiment.

【0032】第1実施例におけるアースアンカー21を
用いた固定式クレーンの固定構造においては、固定して
いる固定式クレーンの鉄筋コンクリート造の基礎2が、
基礎2を貫通して地盤1深くまで埋設されているアース
アンカー21によって地盤に固定されている。固定式ク
レーンの鋼製脚支柱部材11は、基礎2の上面に設置さ
れ、アースアンカー21とは別の、基礎2に埋設された
ボルトにナットにより固定されている。固定式クレーン
の鋼製脚支柱部材11は、風,振動,クレーン稼働に伴
う引張力を、固定式クレーンの基礎2の重量ではなく、
アースアンカー21の引き抜き抵抗力(引き抜き強度)
でもっている。ボルトを設置せず、図10に示すように
基礎2を貫通するアースアンカー21によって、鋼製脚
支柱部材11の下端に取り付けられた鋼材52を固定し
てもよい。ボルトを設けない分、固定式クレーンの固定
構造が単純化される。
In the fixing structure of the fixed crane using the earth anchor 21 in the first embodiment, the reinforced concrete foundation 2 of the fixed fixed crane is fixed.
It is fixed to the ground by an earth anchor 21 penetrating the foundation 2 and buried deep into the ground 1. The steel leg support member 11 of the fixed crane is installed on the upper surface of the foundation 2, and is fixed by a nut to a bolt embedded in the foundation 2, which is different from the ground anchor 21. The steel leg strut member 11 of the fixed crane generates wind, vibration, and tensile force caused by the operation of the crane, not the weight of the foundation 2 of the fixed crane.
Pull-out resistance of earth anchor 21 (pull-out strength)
I have. The steel material 52 attached to the lower end of the steel leg support member 11 may be fixed by an earth anchor 21 penetrating the foundation 2 as shown in FIG. Since the bolt is not provided, the fixing structure of the fixed crane is simplified.

【0033】従来からの鉄筋コンクリートの重量で全て
の引張荷重を支持する方式(例えば、特開平5−179657
号公報の図1の構造)の固定式クレーンの基礎コンクリ
ート2では、十分な厚さ(重量)を有する強固な鉄筋コ
ンクリート造の基礎2を造成することが必要となるが、
本実施例における基礎2が支持するのは圧縮荷重のみな
ので、基礎2の面積に対して厚さが薄くても良いことを
特徴とする。
A conventional method of supporting all tensile loads by the weight of reinforced concrete (for example, Japanese Patent Laid-Open No. 5-179657)
In the foundation concrete 2 of the fixed type crane of the structure shown in FIG. 1 of the publication, it is necessary to form a strong reinforced concrete foundation 2 having a sufficient thickness (weight).
Since only the compressive load is supported by the foundation 2 in the present embodiment, it is characterized in that the thickness may be smaller than the area of the foundation 2.

【0034】本実施例における固定式クレーンの基礎2
は、鉄筋コンクリートで造成するほか、代替方法とし
て、上表面を鉄板とした鉄板とコンクリートとの複合構
造とする方法、または、鉄板部材で構成する方法も考え
られる。
The foundation 2 of the fixed crane in this embodiment
In addition to the method of forming with reinforced concrete, as an alternative method, a method of forming a composite structure of iron plate and concrete having an upper surface as an iron plate, or a method of forming with a steel plate member can be considered.

【0035】図2に、第2実施例である、固定式クレー
ンの基礎に鉄筋コンクリートを使用した固定式クレーン
の固定構造を示す。
FIG. 2 shows a fixed structure of a fixed crane according to a second embodiment, in which reinforced concrete is used for the foundation of the fixed crane.

【0036】第2実施例においては、固定式クレーンの
鋼製脚支柱部材11は、鉄筋コンクリート造の基礎2に
設定される基礎ボルトにより固定される。基礎2は、基
礎2を貫通して地盤1深くまで埋設されているアースア
ンカー21によって地盤に固定されている。第1実施例
と同様に、図10のように基礎2を貫通するアースアン
カー21によって、鋼製脚支柱部材11の下端に取り付
けられた鋼材52を固定してもよい。
In the second embodiment, the steel leg support member 11 of the fixed crane is fixed by foundation bolts set on the reinforced concrete foundation 2. The foundation 2 is fixed to the ground by an earth anchor 21 penetrating the foundation 2 and buried deep into the ground 1. Similarly to the first embodiment, the steel material 52 attached to the lower end of the steel leg support member 11 may be fixed by an earth anchor 21 penetrating the foundation 2 as shown in FIG.

【0037】図3に、第3実施例である、固定式クレー
ンの基礎に鉄板とコンクリートとの複合構造を使用した
固定式クレーンの固定構造を示す。
FIG. 3 shows a fixed structure of a fixed type crane according to a third embodiment, in which a composite structure of an iron plate and concrete is used as the base of the fixed type crane.

【0038】第3実施例においては、固定式クレーンの
鋼製脚支柱部材11は、鉄板コンクリート造の基礎3に
埋設される基礎ボルトにより固定されている。図10の
ように基礎3を貫通するアースアンカー21によって、
鋼製脚支柱部材11の下端に取り付けられた鋼材52を
固定してもよい。また鉄板コンクリート造の基礎3を構
成する鉄板部材31は固定式クレーンの鋼製脚支柱部材
11に溶接して固定してもよい。固定式クレーンの基礎
3に用いる鉄板部材31の下面に、予めジベルスタッド
32を溶着しておき、そのジベルスタッド32を基礎3
のコンクリートの部分に埋設して鉄板部材31とコンク
リートとの一体化構造を成立させている。この複合構造
によれば、より強固な基礎構造を得ることができる上、
アースアンカー21のアンカー頭部43や固定クレーン
の脚部が設定される面がコンクリートに較べて割れにく
い鉄板で構成されるからその設定が確実且つ容易に成せ
る。
In the third embodiment, the steel leg support members 11 of the fixed crane are fixed by foundation bolts embedded in the iron plate concrete foundation 3. By the earth anchor 21 penetrating the foundation 3 as shown in FIG.
The steel material 52 attached to the lower end of the steel leg support member 11 may be fixed. The iron plate member 31 constituting the iron plate concrete foundation 3 may be fixed by welding to the steel leg support member 11 of the fixed crane. A dowel stud 32 is previously welded to the lower surface of the iron plate member 31 used for the foundation 3 of the fixed crane, and the dovetail stud 32 is attached to the foundation 3.
Of the iron plate member 31 and concrete. According to this composite structure, a stronger base structure can be obtained,
Since the surface on which the anchor head 43 of the earth anchor 21 and the leg of the fixed crane are set is made of an iron plate that is less likely to be cracked than concrete, the setting can be performed reliably and easily.

【0039】図4に、第4実施例である、固定式クレー
ンの基礎4として鉄板31を用いた固定式クレーンの固
定構造を示す。固定式クレーンの鋼製脚支柱部材11
は、鉄板部材31に基礎ボルトにより固定されている。
図10のように基礎4を貫通するアースアンカー21に
よって、鋼製脚支柱部材11の下端に取り付けられた鋼
材52を固定してもよい。
FIG. 4 shows a fixing structure of a fixed type crane according to a fourth embodiment using an iron plate 31 as a base 4 of the fixed type crane. Steel leg support member 11 for fixed crane
Are fixed to the iron plate member 31 with foundation bolts.
As shown in FIG. 10, a steel material 52 attached to the lower end of the steel leg support member 11 may be fixed by an earth anchor 21 penetrating the foundation 4 as shown in FIG.

【0040】鉄板部材31と固定式クレーンの鋼製脚支
柱部材11を溶接して固定すること、あるいは、固定式
クレーンの基礎として地盤1に接する平面部分に当たる
鉄板部材31を予め工場もしくは現場近くの加工場で固
定式クレーンの鋼製脚支柱部材11と組立、一体化した
上で現場に設置することも可能である。
The iron plate member 31 and the steel leg support member 11 of the fixed crane are welded and fixed, or the iron plate member 31 corresponding to a plane portion in contact with the ground 1 as a base of the fixed crane is previously prepared at a factory or near the site. It is also possible to assemble and integrate with the steel leg support member 11 of the fixed crane at the processing site and then install it on the site.

【0041】この鉄板による基礎4は、アースアンカー
21のアンカー頭部43や固定クレーンの脚部が設定さ
れる面がコンクリートに較べて割れにくい鉄板で構成さ
れるからその設定が確実且つ容易に成せ、軽量でもあ
る。
Since the surface on which the anchor head 43 of the earth anchor 21 and the legs of the fixed crane are set is made of an iron plate that is less likely to be cracked than concrete, the iron base 4 can be reliably and easily set. It is also lightweight.

【0042】図5は、前述の各実施例で用いるアースア
ンカー21の詳細構造を示している。
FIG. 5 shows the detailed structure of the earth anchor 21 used in each of the above-described embodiments.

【0043】アースアンカー21は、アースアンカー2
1自体とアースアンカー21を埋込む地盤1との間に発
生する圧縮力を利用してアースアンカーに生じる引張力
により、クレーンを転倒させる力に対抗するものであ
る。
The ground anchor 21 is the ground anchor 2
The compression force generated between the ground anchor 1 itself and the ground 1 in which the earth anchor 21 is embedded is used to oppose the crane falling force by the tensile force generated in the earth anchor.

【0044】アースアンカー21の構造は、大別して、
引張力をグラウト材22を介して地盤1に伝達する役目
を持つアースアンカーの定着部41、引張力をアースア
ンカーの定着部41に伝達する自由長部42,固定式ク
レーンの脚部分と定着することを役目とするアンカー頭
部43の3つの部分から成る。アースアンカー21の定
着部41は、引っ張り力をグラウト材22を介して地盤
1に伝える。アースアンカー定着部41の位置は、アー
スアンカー21本体のうち、最も地中深い部分、すなわ
ち、アースアンカー21の先端部分に相当する。アース
アンカーの定着部41を構成する部材は、グラウト材2
2との間に移動を発生しない構造とする必要がある。具
体的には、アースアンカー21の自由長部42から連続
している引張材23は、PC鋼より線とし、これにリブ
等の凸凹を設けておく構成等が考えられる。
The structure of the earth anchor 21 is roughly divided into
The anchoring portion 41 of the earth anchor which has a role of transmitting the tensile force to the ground 1 via the grout material 22, the free length portion 42 which transmits the tensile force to the anchoring portion 41 of the earth anchor, and the leg of the fixed type crane. It consists of three parts of the anchor head 43 serving to do this. The fixing portion 41 of the earth anchor 21 transmits the pulling force to the ground 1 via the grout material 22. The position of the earth anchor fixing portion 41 corresponds to the deepest part of the earth anchor 21, that is, the tip of the earth anchor 21. The member constituting the anchoring portion 41 of the earth anchor is a grout material 2
It is necessary to have a structure that does not generate a movement between itself and the second. Specifically, the tension member 23 continuous from the free length portion 42 of the earth anchor 21 may be made of a PC stranded wire, and may be provided with irregularities such as ribs.

【0045】アースアンカー21の自由長部42は、ア
ースアンカー21の頭部43にかかる引張力を、アース
アンカー21の定着部41に伝達する役目を持つ引張材
23と、引張材23とグラウト材22との接触を防止し
て摩擦減少させるとともに、地下水の進入を防ぎ、引張
材23の腐食を防止する役目を持つパイプ部材24から
成る。引張材23は、間隙を形成してパイプ部材24内
に設けられる。このため、パイプ部材24内の引張材2
3の部分に十分な引張力を生じさせることができ、クレ
ーンの転倒防止の機能を十分に発揮させることができ
る。引張材23としては、鋼製ワイヤー、または鋼製ワ
イヤーより線が、また、パイプ部材24としては、ポリ
エチレン管,鋼管等が採用される。また、パイプ部材2
4の端部は、防水処理が施され、パイプ部材24内部へ
の水の進入を防いでいる。
The free length portion 42 of the earth anchor 21 is composed of a tension member 23 having a function of transmitting a tensile force applied to the head 43 of the earth anchor 21 to the fixing portion 41 of the earth anchor 21, a tension member 23 and a grout material. The pipe member 24 has a function of preventing contact with the base member 22 and reducing friction, preventing entry of groundwater, and preventing corrosion of the tensile member 23. The tensile member 23 is provided in the pipe member 24 with a gap formed. Therefore, the tension member 2 in the pipe member 24
A sufficient tensile force can be generated in the portion 3 and the function of preventing the crane from tipping over can be sufficiently exerted. As the tensile member 23, a steel wire or a stranded steel wire is used, and as the pipe member 24, a polyethylene pipe, a steel pipe, or the like is used. In addition, pipe member 2
The end of 4 is waterproofed to prevent water from entering the inside of the pipe member 24.

【0046】アースアンカー21は、地盤1と、固定式
クレーンの鋼製脚支柱部材11を固定している基礎2と
の間を常に緊張した状態に保っておく必要がある。アー
スアンカーのアンカー頭部43は、固定式クレーンの基
礎2に対し強固に固定された構造とする。引張材23か
らの引張力は、アンカープレート25で受ける。
It is necessary to keep the ground anchor 21 always in tension between the ground 1 and the foundation 2 to which the steel leg support member 11 of the fixed crane is fixed. The anchor head 43 of the earth anchor has a structure firmly fixed to the foundation 2 of the fixed crane. The tensile force from the tensile member 23 is received by the anchor plate 25.

【0047】自由長部42に続く引張材23のアンカー
頭部43にはねじが形成されている。アンカー頭部43
にナット(定着具)26を係合させこのナット26を回
転することにより、引張材23の緊張を調整可能であ
る。アースアンカー21のアンカー頭部43には防水処
理が施され、雨等の水が上方よりアースアンカー21の
内部へ進入することを防いでいる。
A screw is formed in the anchor head 43 of the tension member 23 following the free length portion 42. Anchor head 43
The tension of the tension member 23 can be adjusted by engaging a nut (fixing device) 26 with the nut and rotating the nut 26. The anchor head 43 of the earth anchor 21 is waterproofed to prevent water such as rain from entering the inside of the earth anchor 21 from above.

【0048】次に、アースアンカー21を用いた固定式
クレーン基礎の施工手順について説明する。
Next, the procedure for installing the fixed crane foundation using the earth anchor 21 will be described.

【0049】はじめに、固定式クレーンの鋼製脚支柱1
1を設定する場所において、地盤1の上面を均し処理し
た後、基礎2を設定する。基礎2のコンクリートを均し
た地盤5上に設定した状態を図6に示す。先にも触れた
が、本実施例における鉄筋コンクリート製の基礎2は圧
縮荷重が支持できればよいので、基礎2の面積に対して
厚さを薄くすることが可能である。従って固定式クレー
ンの基礎2は、鉄筋コンクリートの基礎とするほか、
板コンクリート、あるいは鉄板部材31にて代替するこ
とも可能である。
First, the steel leg support 1 of the fixed crane
At the place where 1 is set, the upper surface of the ground 1 is leveled, and then the foundation 2 is set. FIG. 6 shows a state in which the concrete of the foundation 2 is set on the leveled ground 5. As mentioned above, since the reinforced concrete foundation 2 in this embodiment can support a compressive load, the thickness can be reduced with respect to the area of the foundation 2. Therefore foundation 2 of fixed crane, in addition to a foundation of reinforced concrete, iron
It is also possible to substitute a plate concrete or an iron plate member 31.

【0050】次に削孔機を用いて、アースアンカー21
を挿入する孔51を基礎2を貫通して地盤1に掘削す
る。この状態を図7に示す。その際、オールケーシング
二重管堀りとすれば、掘削と同時にパイプ部材24の設
定が可能である。
Next, the earth anchor 21 is
Is excavated in the ground 1 through the foundation 2. This state is shown in FIG. At this time, if all-casing double pipe is dug, the pipe member 24 can be set at the same time as excavation.

【0051】次に、掘削したアースアンカー21を設定
する孔51部分の隙間がなくなるように柔らかいモルタ
ル(グラウト材22)を注入する。グラウト材22の一
次注入後に、アースアンカー設定用の孔51部分にアー
スアンカー21を挿入する。アースアンカー21を孔5
1に挿入した後、更にグラウト材22を加圧注入する。
この状態を図8に示す。これにより、定着部41部分を
はじめとするアースアンカー周辺を形成するグラウト材
22が掘削径より拡大するため、アースアンカー21を
地盤1に対して、より強固に定着させることが可能であ
る。すなわち、グラウト材22が地盤1とアースアンカ
ー21とに圧着され、ナット(定着具)26締め付け後
におけるアースアンカー21のクレーンの転倒に対する
抵抗力がより増加する。グラウト材22が固化し、強度
が十分確保された後、アースアンカーのアンカー頭部4
3のナット26を締めることにより、アースアンカー2
1の引張力を調整する。
Next, soft mortar (grout material 22) is injected so as to eliminate the gap between the holes 51 where the excavated earth anchors 21 are set. After the primary injection of the grout material 22, the ground anchor 21 is inserted into the hole 51 for setting the ground anchor. Hole 5 for earth anchor 21
After the insertion, the grout material 22 is further injected under pressure.
This state is shown in FIG. As a result, the grout material 22 that forms the periphery of the earth anchor including the fixing portion 41 is larger than the excavation diameter, so that the earth anchor 21 can be more firmly fixed to the ground 1. That is, the grout material 22 is crimped to the ground 1 and the earth anchor 21, and the resistance of the earth anchor 21 to overturn of the crane after tightening the nut (fixing tool) 26 is further increased. After the grout material 22 is solidified and sufficient strength is secured, the anchor head 4 of the earth anchor
3 by tightening the nut 26 of the ground anchor 2
Adjust the tensile force of 1.

【0052】アンカー頭部43には、防錆処理を施すこ
とにより、アースアンカー21内部に水が進入すること
を防止することが可能である。アースアンカー21内部
への防水構造の例として、アースアンカー頭部43に防
水キャップ27を被せることが考えられる。アースアン
カーのアンカー頭部43に防水キャップ27を適用した
例を図9に示す。
It is possible to prevent water from entering the inside of the earth anchor 21 by subjecting the anchor head 43 to a rust preventive treatment. As an example of the waterproof structure inside the earth anchor 21, it is conceivable to cover the earth anchor head 43 with the waterproof cap 27. FIG. 9 shows an example in which the waterproof cap 27 is applied to the anchor head 43 of the earth anchor.

【0053】固定式クレーンの鋼製脚支柱部材11をア
ースアンカー式基礎地盤に固定する場合には、固定式ク
レーンの鋼脚支柱部材を貫通してアースアンカー21を
設定し、アースアンカーのアンカー頭部43が固定式ク
レーンの鋼製脚部を構成する鋼材52上に突き出すよう
に設置し、ナット26を締め付けることによりアースア
ンカー21の引張力が得られ、固定式クレーンを強固に
支持することが可能になる。この状態を図10に示す。
When the steel leg support member 11 of the fixed crane is fixed to the ground anchor type foundation ground, an earth anchor 21 is set through the steel leg support member of the fixed crane, and the anchor head of the earth anchor is fixed. The portion 43 is installed so as to protrude above the steel material 52 constituting the steel legs of the fixed crane, and the tensile force of the earth anchor 21 is obtained by tightening the nut 26, so that the fixed crane can be firmly supported. Will be possible. This state is shown in FIG.

【0054】本実施例におけるアースアンカー21を利
用した固定式クレーンの基礎を撤去する際には、固定式
クレーンの撤去後に同じ場所に設置される計画物の設置
に必要な掘削範囲より下の位置まで地盤を掘削してアー
スアンカー21やグラウト材を露出させ、その位置でア
ースアンカー21を切断し、それより上の部分を撤去す
る。
When removing the foundation of the fixed crane using the earth anchor 21 in the present embodiment, a position below the excavation area required for installation of a project to be installed in the same place after the removal of the fixed crane. The ground is excavated until the ground anchor 21 and the grout material are exposed, the ground anchor 21 is cut at that position, and the portion above it is removed.

【0055】この場合、前述の切断位置より地中深く埋
設されているアースアンカーの引張材23(グラウト材
22を含む)は埋め殺されて、余分の撤去作業を無く
す。
In this case, the tensile material 23 (including the grout material 22) of the earth anchor buried deep in the ground from the above-mentioned cutting position is buried and eliminated, and an extra removal operation is eliminated.

【0056】以上に述べた本発明の各実施例は、アース
アンカー21がクレーンの転倒しようとする力を引張力
として受け止めて地盤1に伝えてクレーンの転倒を防止
するので、クレーン基礎によるアースアンカー21の引
張力支持の負担を軽減でき、クレーン基礎の容積を減少
でき軽量化できる。このため、クレーンの固定構造及び
撤去に要する時間を著しく短縮できる。また、クレーン
基礎に多量のコンクリートを使用する必要がないので、
撤去後のコンクリート廃材の発生量が減少する。
In each of the embodiments of the present invention described above, the earth anchor 21 receives the force of the crane overturning as a tensile force and transmits it to the ground 1 to prevent the crane from overturning. The load of supporting the tensile force of the crane 21 can be reduced, the volume of the crane foundation can be reduced, and the weight can be reduced. For this reason, the crane fixing structure and the time required for removal can be significantly reduced. Also, since there is no need to use a large amount of concrete for the crane foundation,
The amount of concrete waste generated after removal is reduced.

【0057】[0057]

【発明の効果】請求項1及び請求項2の発明によれば、
アースアンカーがクレーンの転倒しようとする力を引張
力として受け止めて地盤に伝えてクレーンの転倒を防止
するので、クレーン基礎によるアースアンカーの引張力
支持の負担を軽減でき、クレーン基礎の容積を減少でき
軽量化できる。このため、クレーンの設置に要する時間
を著しく短縮できる。また、クレーン基礎に多量のコン
クリートを使用する必要がないので、撤去後のコンクリ
ート廃材の発生量が減少する。
According to the first and second aspects of the present invention,
Since the earth anchor receives the force that the crane tries to overturn as tensile force and transmits it to the ground to prevent the crane from overturning, the burden of supporting the earth anchor's tensile force by the crane foundation can be reduced, and the volume of the crane foundation can be reduced. Can be reduced in weight. Therefore, the time required for installing the crane can be significantly reduced. Moreover, since it is not necessary to use a large amount of concrete for the crane foundation, the amount of generated concrete waste after removal is reduced.

【0058】請求項3の発明によれば、請求項1(また
は請求項2)の発明で得られる効果を生じると共に、グ
ラウト材の使用によりアースアンカーの引き抜き抵抗力
増大し、より大きな転倒力を支持できる。すなわち、ク
レーン脚部と地盤またはクレーン基礎と地盤とのアース
アンカーによる一体化がより強固に達成される。
According to the invention of claim 3, the effect obtained by the invention of claim 1 (or claim 2) is produced, and the pull-out resistance of the earth anchor is increased by using the grout material, so that a larger overturning force is obtained. I can support it. That is, the integration of the crane leg and the ground or the crane foundation and the ground by the ground anchor is more firmly achieved.

【0059】請求項4及び請求項5の発明によれば、ア
ースアンカーの自由長部が、クレーンの転倒しようとす
る力を引張力として受け止めて定着部を介して地盤に伝
えるので、クレーン基礎の容積は小さくて済み、クレー
ンの設置に要する時間を著しく短縮できる。
According to the fourth and fifth aspects of the present invention, the free length portion of the earth anchor receives the force of the crane to overturn as a tensile force and transmits the force to the ground via the anchoring portion. The volume is small and the time required for crane installation can be significantly reduced.

【0060】請求項6の発明によれば、請求項4(また
は請求項5)の発明で得られる効果を生じると共に、ク
レーン基礎が受けるアースアンカーの引張力が軽減され
クレーン基礎は小型軽量で薄いもので足りる。クレーン
基礎の容積が減少した分、クレーンの固定構造の設置及
び撤去が容易になりこれらに要する時間が短縮できる。
請求項7の発明によれば、請求項4(または請求項5)の
発明で得られる効果を生じると共に、クレーン基礎がコ
ンクリートのみで造成されている場合に比べてクレーン
基礎に割れなどが生じない。このため、クレーン脚部の
確実な固定が可能になる。
According to the invention of claim 6, the effect obtained by the invention of claim 4 (or claim 5) is obtained, and the tensile force of the earth anchor received by the crane foundation is reduced, so that the crane foundation is small, lightweight and thin. Things are enough. Since the volume of the crane foundation is reduced, it is easy to install and remove the crane fixing structure, and the time required for these can be reduced.
According to the invention of claim 7, the effect obtained by the invention of claim 4 (or claim 5) is obtained, and cracks and the like do not occur on the crane foundation as compared with the case where the crane foundation is made only of concrete. . For this reason, the crane leg can be securely fixed.

【0061】請求項8の発明によれば、請求項7と同様
な効果を生じる。
According to the eighth aspect of the invention, the same effect as the seventh aspect is produced.

【0062】請求項9の発明によれば、請求項4(また
は請求項5)の発明で得られる効果を生じると共に、鋼
製ワイヤーに十分な引張力を生じせしめられ、この引張
力によるクレーンの転倒防止の機能を十分に発揮させる
ことができる。
According to the ninth aspect of the invention, the effect obtained by the fourth aspect (or the fifth aspect) is obtained, and a sufficient tensile force is generated in the steel wire. The function of preventing falling can be sufficiently exhibited.

【0063】請求項10の発明によれば、グラウト材は
地盤とアースアンカーとに圧着されアースアンカーの地
盤からの引き抜き抵抗力を増加できるので、クレーン基
礎を軽量化できる。このため、クレーンの設置に要する
時間を短縮できる。
According to the tenth aspect of the present invention, since the grout material is pressed against the ground and the ground anchor and the pull-out resistance of the ground anchor from the ground can be increased, the weight of the crane foundation can be reduced. For this reason, the time required for installing the crane can be reduced.

【0064】請求項11の発明によれば、切断位置から
下方のアースアンカー部分は地盤に残留させることによ
り固定構造の撤去に要する時間を短縮でき、その地盤を
次の作業のために早くあけわたせられる。
According to the eleventh aspect of the present invention, the time required for removing the fixing structure can be reduced by leaving the ground anchor portion below the cutting position on the ground, and the ground can be quickly opened for the next operation. Can be

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)図は本発明を適用した固定式クレーンの
基礎近辺の上面図であり(b)図は(a)図の固定式ク
レーンの基礎近辺の縦断面図。
FIG. 1A is a top view of the vicinity of a foundation of a fixed crane to which the present invention is applied, and FIG. 1B is a longitudinal sectional view of the vicinity of the foundation of the fixed crane of FIG.

【図2】図1bの拡大図。FIG. 2 is an enlarged view of FIG. 1b.

【図3】固定式クレーンの基礎が鉄板とコンクリートと
の複合構造である場合の本発明の適用例を示す固定式ク
レーンの基礎近辺の縦断面図。
FIG. 3 is a longitudinal sectional view of the vicinity of a fixed crane foundation showing an application example of the present invention when the foundation of the fixed crane has a composite structure of an iron plate and concrete.

【図4】固定式クレーンの基礎が鉄板構造である場合の
本発明の適用例を示す固定式クレーンの基礎近辺の縦断
面図。
FIG. 4 is a longitudinal sectional view of the vicinity of a fixed crane foundation showing an application example of the present invention when the foundation of the fixed crane has an iron plate structure.

【図5】本発明に用いるアースアンカーの全体立面図。FIG. 5 is an overall elevation view of a ground anchor used in the present invention.

【図6】本発明の一実施例による基礎造成地盤の縦断面
図。
FIG. 6 is a longitudinal sectional view of a foundation ground according to an embodiment of the present invention.

【図7】本発明の一実施例において、削孔機を用い、ア
ースアンカーを設定する孔を基礎コンクリートを貫通し
て地盤に掘削した状態を示す基礎造成地盤の縦断面図。
FIG. 7 is a vertical cross-sectional view of a foundation-constructed ground showing a state in which a hole for setting an earth anchor has been pierced into the ground by using a drilling machine in the embodiment of the present invention, through a foundation concrete.

【図8】本発明の一実施例において、グラウト材を加圧
注入することにより、アースアンカー定着部が掘削径よ
り拡大した状態を示す基礎造成地盤の縦断面図。
FIG. 8 is a vertical cross-sectional view of the foundation ground showing a state in which the ground anchor anchoring portion is larger than the excavation diameter by injecting grout material under pressure in one embodiment of the present invention.

【図9】本発明の一実施例において、アースアンカー頭
部に防水キャップを適用した例を示す基礎造成地盤の縦
断面図。
FIG. 9 is a vertical sectional view of a foundation ground showing an example in which a waterproof cap is applied to an earth anchor head in one embodiment of the present invention.

【図10】図2のアースアンカーとその周辺の縦断面
図。
FIG. 10 is a longitudinal sectional view of the earth anchor of FIG. 2 and its periphery.

【図11】(a)図は従来例による固定式クレーンの基
礎近辺の上面図であり(b)図は(a)図の固定式クレ
ーンの基礎近辺の縦断面図。
11A is a top view of the vicinity of the foundation of the conventional fixed crane according to the related art, and FIG. 11B is a longitudinal sectional view of the vicinity of the foundation of the fixed crane of FIG.

【符号の説明】[Explanation of symbols]

1…地盤、2,3,4…基礎、5…均し地盤、11…固
定式クレーンの脚、21…アースアンカー、22…グラ
ウト材、23…引張材、24…パイプ部材、25…アン
カープレート、26…頭部定着具(ナット)、27…防
水キャップ、31…鉄板部材、32…ジベルスタッド、
41…アースアンカーの定着部、51…孔。
DESCRIPTION OF SYMBOLS 1 ... Ground, 2, 3, 4 ... Foundation, 5 ... Leveling ground, 11 ... Leg of fixed crane, 21 ... Earth anchor, 22 ... Grout material, 23 ... Tension material, 24 ... Pipe member, 25 ... Anchor plate , 26: Head fixing device (nut), 27: Waterproof cap, 31: Iron plate member, 32: Dowel stud,
41: fixing part of earth anchor, 51: hole.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 宮原 良平 茨城県日立市幸町三丁目1番1号 株式 会社 日立製作所 日立工場内 (72)発明者 牧田 辰雄 東京都千代田区内神田一丁目1番14号 日立プラント建設株式会社内 (72)発明者 佐藤 圭也 東京都千代田区内神田一丁目1番14号 日立プラント建設株式会社内 (72)発明者 石名部 好夫 東京都千代田区内神田一丁目1番14号 日立プラント建設株式会社内 (72)発明者 及川 忠彰 茨城県日立市幸町三丁目1番1号 株式 会社 日立製作所 日立工場内 (72)発明者 高野 博 茨城県日立市幸町三丁目1番1号 株式 会社 日立製作所 日立工場内 (56)参考文献 特開 昭56−28942(JP,A) 特開 平6−346462(JP,A) 特開 平4−89927(JP,A) 特開 昭59−10623(JP,A) 特開 平5−214724(JP,A) 実開 昭57−105340(JP,U) 実開 平5−27147(JP,U) (58)調査した分野(Int.Cl.7,DB名) E02D 27/44 E02D 27/32 B66C 5/00 ──────────────────────────────────────────────────続 き Continuing from the front page (72) Ryohei Miyahara 3-1-1, Sakaimachi, Hitachi, Ibaraki Pref. Hitachi, Ltd. Inside the Hitachi Plant (72) Inventor Tatsuo Makita 1-1-1, Uchikanda, Chiyoda-ku, Tokyo 14 Hitachi Plant Construction Co., Ltd. (72) Inventor Keiya Sato 1-114 Uchikanda, Chiyoda-ku, Tokyo Hitachi Plant Construction Co., Ltd. (72) Yoshio Ishinabe Kazuto Uchikanda, Chiyoda-ku, Tokyo Hitachi Plant Construction Co., Ltd. (No. 1-114) Tadaaki Oikawa Inventor Hitachi 3-1-1, Sachicho, Ibaraki Pref. Hitachi, Ltd.Hitachi Plant (72) Inventor Hiroshi Takano, Sachimachi, Hitachi, Ibaraki No. 3-1-1, Hitachi, Ltd. In Hitachi factory (56) References JP-A-56-28942 (JP, A) JP-A-6-346462 (JP, A) JP-A-4-89927 (JP, A) JP-A-59-10623 (JP, A) JP-A-5-214724 (JP, A) JP-A-57-105340 (JP, U) JP-A-5-27147 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E02D 27/44 E02D 27/32 B66C 5/00

Claims (11)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地盤に設置されたクレーン基礎を貫通して
前記地盤内に埋設されたアースアンカーを備え、前記ア
ースアンカー周辺を形成するグラウト材が前記アースア
ンカー設定用の孔の掘削径より拡径した部分を有し、前
記アースアンカーで前記クレーン基礎上に設置されたク
レーンの脚部を固定していることを特徴とするクレーン
の固定構造。
1. A through the crane foundation installed in the ground with a buried ground anchor in said soil, said A
The grout material forming the periphery of the ground anchor is
It has a part larger than the excavation diameter of the
A crane fixing structure , wherein a leg of the crane installed on the crane foundation is fixed by the earth anchor .
【請求項2】地盤に設置されたクレーン基礎を貫通して
前記地盤内に埋設されたアースアンカーを備え、前記ア
ースアンカー周辺を形成するグラウト材が前記アースア
ンカー設定用の孔の掘削径より拡径した部分を有し、前
記アースアンカーによって、前記クレーン基礎を固定し
ており、前記クレーン基礎に設けられたボルトによって
前記クレーン基礎上に設置されたクレーンの脚部を固定
していることを特徴とするクレーンの固定構造。
2. A through the crane foundation installed in the ground with a buried ground anchor in said soil, said A
The grout material forming the periphery of the ground anchor is
It has a part larger than the excavation diameter of the
A crane fixing structure, wherein the crane base is fixed by an earth anchor , and a leg of the crane installed on the crane base is fixed by bolts provided on the crane base.
【請求項3】請求項1または請求項2において、前記地
盤内の複数個所にそれぞれ注入されたグラウト材を備
え、前記クレーン基礎を貫通した前記アースアンカー
が、前記各グラウト材内にそれぞれ設置され、隣接する
前記アースアンカーを取り囲む前記グラウト材は互いに
接触していないクレーンの固定構造。
3. The grout material according to claim 1, further comprising a grout material injected into a plurality of locations in the ground, wherein the ground anchors penetrating the crane foundation are respectively installed in the grout materials. A crane fixing structure in which the grout materials surrounding the adjacent earth anchors are not in contact with each other.
【請求項4】地盤内でグラウト材により取り囲まれ前記
グラウト材に接する鋼製ワイヤーの部分である定着部
と、引っ張り力を前記定着部に伝達する鋼製ワイヤーの
部分である自由長部と、クレーン基礎を貫通して前記ク
レーン基礎より上方で前記鋼製ワイヤーに取り付けら
れ、前記クレーン基礎上に設置されたクレーンの脚部を
固定する定着具とを有する複数のアースアンカーを備
え、少なくとも前記定着部は、前記地盤内に注入された
前記グラウト材により前記地盤に圧着して埋設されてお
り、前記定着部周辺を形成するグラウト材がアースアン
カー設定用の孔の掘削径より拡径した部分を備え、隣接
する前記アースアンカーを取り囲む前記グラウト材は互
いに接触していないことを特徴としたクレーンの固定構
造。
4. A ground surrounded by a grout material in the ground.
The part of the steel wire that contacts the groutFixing section
And the pulling forceFixing sectionOf steel wire transmitting to
Through the crane foundation and the free length
Attached to the steel wire above the lane foundation
The legs of the crane installed on the crane foundation
A plurality of earth anchors having fixing devices for fixing are provided.
Well, at leastFixing sectionWas injected into the ground
The grout is buried in the ground by crimping
AndThe grout material forming the periphery of the fixing section is
It has a part larger than the excavation diameter of the hole for car setting,adjacent
The grouting material surrounding the earth anchor
Fixed structure of a crane characterized by no contact
Build.
【請求項5】地盤内でグラウト材により取り囲まれ前記
グラウト材に接する鋼製ワイヤーの部分である定着部
と、引っ張り力を前記定着部に伝達する鋼製ワイヤーの
部分である自由長部と、クレーン基礎を貫通して前記ク
レーン基礎より上方で前記鋼製ワイヤーに取り付けら
れ、前記クレーン基礎を固定する定着具とを有する複数
のアースアンカーを備え、少なくとも前記定着部は、前
記地盤内に注入された前記グラウト材により前記地盤に
圧着して埋設されており、前記定着部周辺を形成するグ
ラウト材がアースアンカー設定用の孔の掘削径より拡径
した部分を備え、隣接する前記アースアンカーを取り囲
む前記グラウト材は互いに接触していなく、前記クレー
ン基礎上に設置されたクレーンの脚部を前記クレーン基
礎に設けられたボルトによって固定することを特徴とし
たクレーンの固定構造。
5. The method according to claim 5, wherein said material is surrounded by a grout material in the ground.
The part of the steel wire that contacts the groutFixing section
And the pulling forceFixing sectionOf steel wire transmitting to
Through the crane foundation and the free length
Attached to the steel wire above the lane foundation
And a fixing device for fixing the crane foundation.
A ground anchor, at leastFixing sectionIs before
Due to the grout material injected into the recording ground,
It is buried by crimping,Group forming around the fixing unit
The lout material is larger than the excavation diameter of the hole for setting the earth anchor
Equipped withSurrounds the adjacent earth anchor
The grout materials are not in contact with each other and
Connect the legs of the crane installed on the
It is characterized by being fixed by bolts provided on the foundation
Crane fixed structure.
【請求項6】請求項4または請求項5において、前記ク
レーン基礎は鉄筋コンクリートで造成されているクレー
ンの固定構造。
6. A crane fixing structure according to claim 4, wherein said crane foundation is made of reinforced concrete.
【請求項7】請求項4または請求項5において、前記ク
レーン基礎は上面の鉄板とその下方のコンクリートの組
み合わせで構成されているクレーンの固定構造。
7. A crane fixing structure according to claim 4, wherein said crane foundation is composed of a combination of an iron plate on an upper surface and concrete below the iron plate.
【請求項8】請求項4または請求項5において、前記ク
レーン基礎は鉄板で構成されているクレーンの固定構
造。
8. A crane fixing structure according to claim 4, wherein said crane foundation is made of an iron plate.
【請求項9】請求項4または請求項5において、前記自
由長部は、筒状体内に配置された前記鋼製ワイヤーの部
分であるクレーンの固定構造。
9. The crane fixing structure according to claim 4, wherein said free length portion is a portion of said steel wire disposed in a cylindrical body.
【請求項10】地盤内にアースアンカー設定用の孔を
削してあけ、この孔内に1つのアースアンカーを挿入し
た状態で前記孔内に注入した前記グラウト材を加圧して
前記グラウト材の径を前記アースアンカー設定用の孔の
掘削径よりも拡大させ、前記クレーン基礎上に設置した
前記クレーン脚部を前記アースアンカーに張力を与えた
状態で固定することを特徴としたクレーンの固定方法。
10. A within soil dug a hole for grounding the anchor setting
The grout material injected into the hole is pressurized while one ground anchor is inserted into the hole.
The diameter of the grout material is set to the hole for setting the earth anchor.
A method for fixing a crane, characterized in that the crane leg portion, which is larger than the excavation diameter, is fixed on the crane foundation while tension is applied to the earth anchor.
【請求項11】クレーン基礎を貫通して地盤に埋設され
たアースアンカーによって前記クレーン基礎上に固定さ
れたクレーン脚部を固定しているクレーンの固定構造
を、クレーン使用後に撤去する方法であって、前記地盤
内から、前記アースアンカー又は前記アースアンカー周
りに注入されたグラウト材の一部を露出させ、その後、
前記地盤から露出している部分で前記アースアンカーを
切断し、この切断位置より上方の部分を撤去し、その切
断位置より下方の部分を前記地盤内に残存させることを
特徴としたクレーンの固定構造の撤去方法。
11. A method for removing a crane fixing structure for fixing a crane leg fixed on said crane foundation by an earth anchor buried in the ground through the crane foundation after using the crane. Exposing a part of the earth anchor or the grout material injected around the earth anchor from within the ground,
A crane fixing structure, wherein the ground anchor is cut at a portion exposed from the ground, a portion above the cut position is removed, and a portion below the cut position is left in the ground. How to remove.
JP14709895A 1995-06-14 1995-06-14 Crane fixing structure, method of fixing the same, and method of removing the fixed structure Expired - Fee Related JP3179677B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14709895A JP3179677B2 (en) 1995-06-14 1995-06-14 Crane fixing structure, method of fixing the same, and method of removing the fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14709895A JP3179677B2 (en) 1995-06-14 1995-06-14 Crane fixing structure, method of fixing the same, and method of removing the fixed structure

Publications (2)

Publication Number Publication Date
JPH08338034A JPH08338034A (en) 1996-12-24
JP3179677B2 true JP3179677B2 (en) 2001-06-25

Family

ID=15422453

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14709895A Expired - Fee Related JP3179677B2 (en) 1995-06-14 1995-06-14 Crane fixing structure, method of fixing the same, and method of removing the fixed structure

Country Status (1)

Country Link
JP (1) JP3179677B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101019735B1 (en) 2009-12-29 2011-03-08 (주)한국에스코 The overthrow preventive construction of high pressure electricity steel tower

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7792297B1 (en) 1998-03-31 2010-09-07 Piccionelli Greg A System and process for limiting distribution of information on a communication network based on geographic location
US9924216B2 (en) 2000-03-21 2018-03-20 Ted R. Rittmaster System and process for distribution of information on a communication network
KR100503918B1 (en) * 2004-01-20 2005-08-17 (주) 뉴텍 Fixed type fishing boat salvage device
CN100406652C (en) * 2005-04-06 2008-07-30 天津一建机施钢结构工程有限公司 Tower crane foundation with stiffened steel structure
CN103015449A (en) * 2011-09-28 2013-04-03 中国建筑第七工程局有限公司 Joint soil nail-reinforcing construction method for foundation micropiles of slope top tower cranes for deep foundation pits
JP2015117466A (en) * 2013-12-16 2015-06-25 大成建設株式会社 Support structure
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
US9783950B2 (en) 2014-10-07 2017-10-10 Allan P. Henderson Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like
CN105002925A (en) * 2015-08-04 2015-10-28 上海建工五建集团有限公司 Tower crane assembling type steel structure transferring layer and construction method for same
CA170237S (en) 2016-08-29 2017-03-30 Spronken John Rene Crane tie-arm
CN106480899A (en) * 2016-09-12 2017-03-08 安徽华电工程咨询设计有限公司 A kind of full landform self-balancing column foot attachment structure
CN108222054B (en) * 2018-01-05 2019-11-15 广州市芳村建筑工程有限公司 Tower-crane foundation structure and its construction method
CN108313872A (en) * 2018-03-08 2018-07-24 中铁建设集团有限公司 One kind overhauling hoisting frame based on steel construction boiler plant
US11661718B2 (en) 2018-07-25 2023-05-30 Terracon Consultants, Inc. Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same
CN109281333A (en) * 2018-11-07 2019-01-29 厦门理工学院 The cast iron platform of horizontal adjustable and large-scale cast iron stage+module mode
US11365523B2 (en) 2018-11-13 2022-06-21 Terracon Consultants, Inc. Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11274412B2 (en) 2019-01-31 2022-03-15 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US11885092B2 (en) 2019-01-31 2024-01-30 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101019735B1 (en) 2009-12-29 2011-03-08 (주)한국에스코 The overthrow preventive construction of high pressure electricity steel tower

Also Published As

Publication number Publication date
JPH08338034A (en) 1996-12-24

Similar Documents

Publication Publication Date Title
JP3179677B2 (en) Crane fixing structure, method of fixing the same, and method of removing the fixed structure
JP4842350B2 (en) Ground improvement method
WO2014182074A1 (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
JP2006188940A (en) Earthquake resistant structure
JP4593577B2 (en) Pneumatic caisson and its construction method
CN110700275A (en) Assembled connection structure of steel purlin and vertical enclosure of foundation ditch
CN216515697U (en) Rock drilling anchor cable and bearing platform combined anti-seismic foundation
JP2000073349A (en) Jacket with rotary press-in steel pipe pile and its execution method
CN112647497B (en) In-hole prestress supporting member, prestress anchor rod and construction method
JP2006083642A (en) Foundation structure of steel tower
JP3440169B2 (en) Artificial island ground and its construction method
JP2011168975A (en) Seismic strengthening method and seismic strengthening structure for structure
JPH0724493Y2 (en) PC steel edge fixing device
JP4202548B2 (en) Pile foundation
JP4573124B2 (en) Foundation construction method in improved ground
JPH1082057A (en) Method of earthquake-resisting pile foundation construction
JP2559394Y2 (en) Rock anchored octopus foot anchor foundation
RU2068916C1 (en) Device for reinforcing foundations of buildings and structures and method for erecting the device for reinforcing foundations of buildings and structures
JP7341579B1 (en) Reinforcement method for retaining walls
JP2774661B2 (en) Precast concrete pile
JPH1082056A (en) Method of earthquake-resisting pile foundation construction
CN211872979U (en) Multi-row ultra-deep oblique composite anchor rod pile for narrow space
JP4313164B2 (en) Pile head joint structure
JP3142685B2 (en) Equipment for joining steel pipe piles and foundation beams
JPH10140583A (en) Aseismatic reinforcing method of existing structure foundation by micropile

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080413

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090413

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090413

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100413

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110413

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120413

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120413

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees