JP3128555B2 - Concrete placing machine at the bottom of gutter - Google Patents

Concrete placing machine at the bottom of gutter

Info

Publication number
JP3128555B2
JP3128555B2 JP05289720A JP28972093A JP3128555B2 JP 3128555 B2 JP3128555 B2 JP 3128555B2 JP 05289720 A JP05289720 A JP 05289720A JP 28972093 A JP28972093 A JP 28972093A JP 3128555 B2 JP3128555 B2 JP 3128555B2
Authority
JP
Japan
Prior art keywords
frame
concrete
gutter
suspension
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP05289720A
Other languages
Japanese (ja)
Other versions
JPH07109764A (en
Inventor
健三 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokuetsu Corp
Original Assignee
Hokuetsu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokuetsu Corp filed Critical Hokuetsu Corp
Priority to JP05289720A priority Critical patent/JP3128555B2/en
Publication of JPH07109764A publication Critical patent/JPH07109764A/en
Application granted granted Critical
Publication of JP3128555B2 publication Critical patent/JP3128555B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、上面に蓋取付け用の開
口部を有し、底部の全面又は一部が開放型となっている
自由勾配型側溝ブロックによって構設された側溝の底部
に、ベースコンクリート及び排水勾配に合わせながらコ
ンクリートを打設するコンクリート打設機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bottom of a gutter formed by a free-slope gutter block having an opening for lid attachment on the upper surface and having an open bottom or a part of the bottom. The present invention relates to a concrete placing machine for placing concrete while adjusting to a base concrete and a drainage gradient.

【0002】[0002]

【従来の技術】従来この種の側溝の施工は、側溝ブロッ
ク底面の全面又は一部が開放型であるため、側溝ブロッ
クを据付けるためのベースコンクリートと、排水勾配の
確保及び開放部の強度を保持させるためのインバートコ
ンクリートの2度打設する必要があり、この2度のコン
クリートの打設作業が繁雑であった。
2. Description of the Related Art Conventionally, in the construction of this type of gutter, since the whole or a part of the bottom surface of the gutter block is an open type, a base concrete for installing the gutter block, a drainage gradient securing and a strength of the opening portion are required. Invert concrete needs to be cast twice to hold the concrete, and the work of casting concrete twice is complicated.

【0003】[0003]

【発明が解決しようとする課題】特にインバートの打設
については幅の狭い、しかも深い側溝ブロック内での仕
上げ面高さ合わせのための墨引き、及びコンクリートの
均し締固め、水路勾配に合わせた仕上げ等の作業であ
り、施工業者から苦しく困難で面倒がられていて、この
コンクリートの打設および仕上げを正確に、かつ容易に
行える方法が要望されている。
In particular, in the case of inverting, inking for adjusting the height of the finished surface in a narrow and deep gutter block, equalizing compaction of concrete, and adjusting to the inclination of the water channel. This is a work such as finishing, which is difficult and troublesome by a contractor, and there is a demand for a method capable of accurately and easily performing the concrete placing and finishing.

【0004】この問題を解決するために、出願人は先に
特願平4−343093号の自動コンクリート打設機を
開発した。これによって従来の施工に比較して側溝水路
の構築が容易に施工できる事となった。しかし、予め側
溝内に多量のコンクリートを投入する必要があり、掻き
均し後打設機によって荒仕上、コンクリート充填、仕上
げ均しする必要があった。または打設機に掻き板を取り
付け多量のコンクリートを均す必要があった。
[0004] In order to solve this problem, the applicant has previously developed an automatic concrete placing machine disclosed in Japanese Patent Application No. 4-343093. As a result, the construction of the gutter canal can be easily performed as compared with the conventional construction. However, it was necessary to put a large amount of concrete in the gutter in advance, and it was necessary to perform rough finishing, concrete filling, and finish leveling by a casting machine after leveling. Alternatively, it was necessary to attach a scraper to the casting machine to level a large amount of concrete.

【0005】[0005]

【課題を解決するための手段】本発明は、フレームAの
下部に斜平板(2)を有する大型のコンクリートホッパ
ー(1)を設けることでこれらの課題を解決するもの
で、予め側溝内に多量のコンクリートを投入することな
く、打設機の走行移動によって水路勾配に合せた側溝底
面へのコンクリートの打設が可能となるものである。
The present invention solves these problems by providing a large concrete hopper (1) having a swash plate (2) at the lower portion of a frame A. Without pouring the concrete, the concrete can be poured into the bottom of the gutter according to the inclination of the waterway by the traveling movement of the placing machine.

【0006】[0006]

【作用】本発明のコンクリート打設機は、フレームAの
走行に合せて打設部Bのコンクリートホッパー(1)に
順次コンクリートを供給し、振動機(3)によって上下
左右に搖し、斜平板(2)によってコンクリートを均平
に均しながら側溝底部へ適量のコンクリートを投入し、
下面にある枕ブロック(30−C)や側溝底の間隙の隅
々まで廻り込ませることができる。仕上げ部Cの均し板
(5)、仕上げブレード(6)と振動機(4)によって
底部コンクリートを平滑均一に仕上げることができ、ま
たこうすることによりコンクリートをベースコンクリー
トとインバートコンクリートとを一度に打設し排水勾配
に仕上げるもので、施工に当たっての作業時間、労力を
大幅に短縮することができる。
The concrete casting machine according to the present invention sequentially supplies concrete to the concrete hopper (1) of the casting section B in accordance with the traveling of the frame A, and swings up and down and right and left by the vibrator (3). (2) Put the appropriate amount of concrete into the gutter bottom while leveling the concrete evenly,
The pillow block (30-C) on the lower surface and the corners of the gap at the bottom of the gutter can be wrapped around. The leveling plate (5), the finishing blade (6) and the vibrator (4) of the finishing part C can finish the bottom concrete smoothly and uniformly, and in this way, the concrete can be simultaneously converted into the base concrete and the inverted concrete. It is cast and finished to a drainage gradient, so that the working time and labor required for construction can be greatly reduced.

【0007】[0007]

【実施例】添付図面により本発明の側溝底部へのコンク
リート打設機を説明すると、図1はコンクリート打設機
の請求項1の牽引式の実施例を示す側面図であり、図2
は平面図を示すものである。図3はフレームAをワイヤ
ーやロープ又はチェーン等(7−A)によって牽引する
牽引装置Dを示す。図4は図1のX−X線断面図であ
り、図5は図1のY−Y線断面図を示している。また図
6は図1のZ−Z線断面図を示す。図7は図1のフレー
ムAのワイヤー等による牽引移動を走行装置Fに代え自
走式とした打設機の実施例を示す側面図である。したが
って図中の符号(15)は牽引のためのワイヤーでなく
振動機や走行装置を駆動する電源コードを示す。図8は
請求項2の案内ローラーに代えて高さ調節用の懸架具の
下端に水路排水勾配に合せた連続したレール(40)を
装着した実施例の断面図を示すもので、符号(41)は
このレール(40)に係合するフレームAに設けた車輪
を示している。また図9は図8のX−X線断面図を示
す。
FIG. 1 is a side view showing a concrete driving machine according to the first embodiment of the present invention.
Shows a plan view. FIG. 3 shows a traction device D that pulls the frame A by a wire, a rope, a chain, or the like (7-A). 4 is a sectional view taken along line XX of FIG. 1, and FIG. 5 is a sectional view taken along line YY of FIG. FIG. 6 is a sectional view taken along line ZZ of FIG. FIG. 7 is a side view showing an embodiment of a self-propelled driving machine in which the towing movement of the frame A of FIG. Therefore, reference numeral (15) in the drawing indicates a power cord for driving the vibrator or the traveling device, not a wire for towing. FIG. 8 is a cross-sectional view of an embodiment in which a continuous rail (40) adapted to the drainage gradient of the waterway is attached to the lower end of the suspension for height adjustment in place of the guide roller of the second embodiment. ) Indicate wheels provided on the frame A to be engaged with the rail (40). FIG. 9 is a sectional view taken along line XX of FIG.

【0008】図10および図11,図12さらに図13
は水路排水勾配を得る底面コンクリートの打設をフレー
ムAに設けた昇降装置(50)で高さ勾配を自動調整し
ながらフレームAの下面に配置されたフレームGに設け
たコンクリート打設機で行う請求項3および4の実施例
図であり、また図14は側溝ブロックの側壁内側面の任
意高さに水平に長手方向に対して凹形等の切溝(52)
を形成する実施例図を示している。
FIG. 10, FIG. 11, FIG. 12 and FIG.
Is carried out by a concrete placing machine provided on a frame G disposed on the lower surface of the frame A while automatically adjusting the height gradient by an elevating device (50) provided on the frame A to obtain a channel drainage gradient. FIG. 14 is a view showing an embodiment according to claims 3 and 4, and FIG. 14 is a cut groove (52) having a concave shape or the like with respect to a longitudinal direction at an arbitrary height of an inner side surface of a side wall of a side groove block.
FIG.

【0009】図15は別の実施例図であって、U字形側
溝(30−E)の側壁上面にフレームAの車輪(40)
が載ってフレームAを移動走行させるもので、このフレ
ームAの下面には図10以下と同様にコンクリート打設
機を装備したフレームGが昇降自在に設けてあり、U字
形ブロックの底面に複数個の開口部又は凹部を有するブ
ロックや一般のU字形側溝ブロックの底部にコンクリー
トを打設することで自在に水路勾配を形成することも可
能となる。
FIG. 15 is a view showing another embodiment, in which the wheel (40) of the frame A is provided on the upper surface of the side wall of the U-shaped side groove (30-E).
A frame G equipped with a concrete placement machine is provided on the lower surface of the frame A so as to be able to move up and down similarly to FIG. 10 and below, and a plurality of frames are provided on the bottom surface of the U-shaped block. It is also possible to freely form a water channel gradient by placing concrete on the bottom of a block having an opening or a concave portion or a general U-shaped side groove block.

【0010】図において(30)は側溝ブロックであ
り、図1および図2を参照して側溝ブロック(30)の
上面には側溝蓋を配置するための開口部(30−B)が
中央に設けられてあって、この開口部(30−B)の両
側には補強用の梁(30−A)が設けられている。
Referring to FIGS. 1 and 2, reference numeral 30 denotes a side groove block. Referring to FIGS. 1 and 2, an opening (30-B) for arranging a side groove cover is provided at the center on the upper surface of the side groove block (30). Reinforcing beams (30-A) are provided on both sides of the opening (30-B).

【0011】一般にこの側溝ブロック(30)は長さが
2mに成形されているため開口部(30−B)の長さは
1mであり、したがって両側の補強梁(30−A)の長
さはそれぞれ50cmで設計されている。また側溝ブロ
ック(30)の幅および高さについては側溝水路構築の
条件によって種々成形される。
In general, since the side groove block (30) is formed to have a length of 2 m, the length of the opening (30-B) is 1 m, and therefore, the length of the reinforcing beams (30-A) on both sides is reduced. Each is designed at 50 cm. Further, the width and height of the gutter block (30) are variously formed depending on the conditions of the gutter channel construction.

【0012】高さ調整具(22)のついた懸架具(2
0)にフレームAの案内具(21)が装着してあり排水
勾配は懸架具の高さ調整具(22)および懸架具の長さ
調整によって行う。図示にあっては側溝ブロックの開口
部(30−B)の四隅に取付けられてあって、この懸架
具(20)の取付けおよび配置についてはこれに限定す
ることなく、開口部(30−B)の幅に対して中央に設
けるもの、あるいは別体となっていて補強梁(30−
A)の開口部側の端部にピンのようなもので簡単に取付
けるものでもよい。図中の符号(30−D)は側溝ブロ
ック(30)の接続部を示し、(30−C)は枕ブロッ
クを示している。
A suspension (2) with a height adjuster (22)
The guide (21) of the frame A is attached to 0), and the drainage gradient is performed by adjusting the height of the suspension (22) and adjusting the length of the suspension. In the drawing, it is attached to the four corners of the opening (30-B) of the side groove block, and the mounting and arrangement of the suspension (20) is not limited to this, and the opening (30-B) At the center with respect to the width of
It may be simply attached to the end on the opening side in A) with a pin or the like. Reference numeral (30-D) in the figure indicates a connecting portion of the side groove block (30), and (30-C) indicates a pillow block.

【0013】また案内ローラー(21)は図4に示され
ているような逆L字形に形成したフレームAを横方向か
ら係合する形式でもよいがこれに限ることなく、フレー
ムAはコ字状に形成して案内ローラー(21)と係合す
ることもできる。
The guide roller (21) may be of a type in which a frame A formed in an inverted L-shape as shown in FIG. 4 is engaged from the lateral direction, but the present invention is not limited to this. To engage with the guide roller (21).

【0014】フレームAは懸架具(20)の案内ローラ
ー(21)に対して3個程度に亘る長さとすることが移
動に際して安定している。このフレームAの中央下面に
は矢印の移動方向に対して順にコンクリートホッパー
(1)振動機(3)からなる打設部B、および振動機
(4)を有する均し板(5)、仕上げブレード(6)か
らなる仕上げ部Cを設けるものである。
The length of the frame A is about three with respect to the guide roller (21) of the suspension tool (20), so that it is stable during movement. On the lower surface at the center of the frame A, a concrete hopper (1) a placing portion B composed of a vibrator (3), a leveling plate (5) having a vibrator (4), and a finishing blade in the moving direction of the arrow in order. The finishing part C composed of (6) is provided.

【0015】そして打設部Bはコンクリートホッパー
(1)に斜平板(2)が設けてありフレームAの矢印方
向の移動により先頭のコンクリートホッパー(1)から
投入されたコンクリートEを振動機(3)で側溝底部へ
供給しながら側溝側壁の底部および枕ブロック(30−
C)の周囲の隅々にまで十分に侵入させる。
In the placing section B, the concrete hopper (1) is provided with a slanted plate (2), and the concrete E introduced from the leading concrete hopper (1) by the movement of the frame A in the direction of the arrow is vibrated by the vibrator (3). ) And the pillow block (30-)
C) Full penetration into all corners around.

【0016】この打設部Bの後方に設けてある仕上げ部
Cは、均し板(5)、仕上げブレード(6)を配置した
振動機(4)を有していて、仕上げブレード(6)で平
滑に均して仕上げ面を形成する。また振動機(3),
(4)はその振動を可変にすることができ、コンクリー
トの状態に合せることができる。
The finishing section C provided behind the casting section B has a vibrator (4) on which a leveling plate (5) and a finishing blade (6) are arranged, and the finishing blade (6). To form a finished surface. Vibrator (3),
In (4), the vibration can be made variable and can be adjusted to the state of concrete.

【0017】このように打設部B、仕上げ部Cを具備し
ているフレームAは図3に示される牽引機Dによってワ
イヤーやロープまたはチェーン(7−A)等によって牽
引されながら矢印方向に移動する。(7−B)はフレー
ムAとワイヤー(7−A)との接続具を示し、牽引装置
Dは車輪(9)を有する台車(8)によって側溝上の外
側を走行する。図中の符号(12)は電線捲取機、(1
5)は電線、(14)は操作動力盤である。(13)は
ウインチを示し、台車(8)の下面には折り畳み自在の
アーム(11)があってこのアーム(11)の先端には
ワイヤー(7−A)および電線(15)を誘導する滑車
(10)が設けてある。
The frame A having the casting portion B and the finishing portion C moves in the direction of the arrow while being pulled by a wire, a rope or a chain (7-A) by the pulling machine D shown in FIG. I do. (7-B) shows a connection tool between the frame A and the wire (7-A), and the traction device D travels outside on the gutter by a bogie (8) having wheels (9). Reference numeral (12) in the figure is an electric wire winder, (1)
5) is an electric wire, and (14) is an operation power panel. (13) denotes a winch, and a foldable arm (11) is provided on the lower surface of the cart (8), and a pulley for guiding the wire (7-A) and the electric wire (15) is provided at the tip of the arm (11). (10) is provided.

【0018】この牽引装置は下面のアーム(11)を折
り畳んで側溝上を一定距離移動して側溝開口部(30−
B)からアーム(11)を下しワイヤー(7−A)およ
び電線(15)をフレームAに接続してウインチ(1
3)を駆動させてワイヤー(7−A)および電線(1
5)を捲取りながらフレームAを引き寄せてコンクリー
ト面を形成し、また一定距離移動してフレームAを引き
寄せながらコンクリート面を形成してこの繰返しによっ
て排水勾配を有する側溝底面を完成させるものである。
This traction device folds the lower arm (11) and moves a predetermined distance on the gutter to open the gutter opening (30-).
The arm (11) is lowered from B), the wire (7-A) and the electric wire (15) are connected to the frame A, and the winch (1) is connected.
3) to drive the wire (7-A) and the electric wire (1).
5) While pulling up the frame A, the concrete surface is formed by drawing the frame A, and the concrete surface is formed by moving the fixed distance to draw the frame A. By repeating this process, the bottom surface of the gutter having the drainage gradient is completed.

【0019】本発明においては、牽引装置Dによってワ
イヤーやロープ(7−A)を使用してフレームAを引き
寄せているが、図示していないがフレームAを後方から
押出機を使用して移動させながらコンクリート面を形成
することも十分考えられて同様な施工ができる。
In the present invention, the frame A is pulled by the traction device D using a wire or a rope (7-A), but although not shown, the frame A is moved from behind by using an extruder. While the concrete surface can be formed, a similar construction can be performed.

【0020】図7は請求項1に示される自走式コンクリ
ート打設機の実施例図であってフレームAの移動走行を
走行装置Fによって行うもので、この走行装置はエンジ
ン又はモーターによって駆動する車輪で側溝側壁内面を
摩擦回動する車輪(32)を設けることでフレームAは
移動走行して側溝底部へコンクリートの打設を行う。
FIG. 7 shows an embodiment of the self-propelled concrete placing machine according to the present invention, in which the traveling of the frame A is carried out by a traveling device F, which is driven by an engine or a motor. By providing a wheel (32) that frictionally rotates the inner surface of the gutter side wall with the wheel, the frame A moves and runs, and concrete is poured into the bottom of the gutter.

【0021】図8は請求項2に示されるコンクリート打
設機の実施例図であって、高さ調節用の懸架具(20)
の下端に排水勾配に合せて連続したレール(40)を装
着したもので、フレームAにこのレール(40)に係合
する車輪(41)を設け、フレームAは、図3に示され
る牽引装置Dによってワイヤー又はロープ(7−A)等
によって牽引移動されるか、あるいは図7に示されるよ
うな走行装置Fによって自走移動しながらレール(4
0)の勾配、即ち側溝底部の排水勾配に合わせてコンク
リートを打設する。なお図9は図8のX−X線断面図を
示している。
FIG. 8 is a view showing an embodiment of the concrete casting machine according to the second aspect of the present invention.
A rail (40) that is continuous with the drainage gradient is attached to the lower end of the frame A, and a frame A is provided with wheels (41) that engage with the rail (40). The frame A is a traction device shown in FIG. D tow by a wire or a rope (7-A) or the like, or move by a traveling device F as shown in FIG.
Concrete is poured according to the gradient of 0), that is, the drainage gradient at the bottom of the gutter. FIG. 9 is a sectional view taken along line XX of FIG.

【0022】図10は測溝上面の開口部縁(30−B)
に一定の高さに設定した懸架具(20)を設け、この懸
架具の下端に案内ローラー(21)を装着し、この案内
ローラーに対して案内ローラー(21)を複数個に亘る
長さのフレームAを設け、フレームAに昇降装置(5
0)を設け、この昇降装置によって昇降するフレームG
をフレームAの下面に配置して2段とし、このフレーム
Gに移動方向から順にコンクリートホッパー(1)、斜
平板(2)、振動機(3)からなるコンクリート打設部
Bおよび振動機(4)、均し板(5)、仕上げブレード
(6)からなる仕上げ部Cを設けた請求項3に記載した
コンクリート打設機の実施例図であって、図示のように
牽引機D(図3参照)かまたは走行装置F(図7参照)
により自走式として移動走行するものである。
FIG. 10 shows an opening edge (30-B) on the upper surface of the groove.
Is provided with a suspension (20) set at a fixed height, and a guide roller (21) is attached to the lower end of the suspension, and a plurality of guide rollers (21) are provided with respect to the guide roller. A frame A is provided, and a lifting device (5
0), and the frame G which is raised and lowered by the lifting device
Are arranged on the lower surface of the frame A to form two steps. In this frame G, a concrete placing section B including a concrete hopper (1), a swash plate (2), and a vibrator (3) and a vibrator (4) are arranged in this order from the moving direction. ), A leveling plate (5), and a finishing part C comprising a finishing blade (6). FIG. Or traveling device F (see FIG. 7).
It travels and travels as a self-propelled type.

【0023】図11は請求項4に示されるコンクリート
打設機の実施例図であって、側溝側壁内面の任意高さに
側溝天端と平行にレール(40)を架設し、このレール
上を係合する車輪(41)を設け、この昇降装置によっ
て昇降するフレームGをフレームAの下面に配置して2
段としたフレームAを架装し、このフレームAに昇降装
置(50)を設けてコンクリート仕上げ面高さを排水勾
配に合わせて自動調整しながら、図3に示されている牽
引装置Dによって移動しながら底部コンクリートを打設
するか、あるいは図7に示されるような走行装置Fによ
って自走移動しながら底部コンクリートを打設するもの
である。また図12は図11のY−Y線断面図であっ
て、この図11にあってはレール(40)を懸架具(2
0)によって側溝天端と平行に懸架架設している。さら
に図13のようにレール(40)を側壁内面に側溝天端
と平行に固定することも考えられる。なおレール(4
0)の形状については溝型鋼材や角型鋼材等であっても
よい。
FIG. 11 is a view showing an embodiment of the concrete placing machine according to claim 4, wherein a rail (40) is erected at an arbitrary height on the inner surface of the side wall of the gutter in parallel with the top end of the gutter. An engaging wheel (41) is provided.
A stepped frame A is mounted, and a lifting device (50) is provided on the frame A, and the concrete finished surface height is automatically adjusted according to a drainage gradient, and is moved by a traction device D shown in FIG. The bottom concrete is poured while the bottom concrete is placed, or the bottom concrete is driven while moving by the traveling device F as shown in FIG. FIG. 12 is a cross-sectional view taken along the line YY of FIG. 11, in which the rail (40) is connected to the suspension (2).
According to 0), it is suspended in parallel with the top end of the gutter. Further, it is conceivable to fix the rail (40) to the inner surface of the side wall in parallel with the top end of the side groove as shown in FIG. The rail (4
The shape 0) may be a grooved steel material, a square steel material, or the like.

【0024】さらに図14は請求項5に示されるコンク
リート打設機の実施例図であってその断面図を示す。こ
れは側溝ブロック側壁内面の任意高さに側溝天端と平行
に長手方向に対して凹状の切溝(52)を予め成形した
ブロックで側溝を構築し、この連続した切溝(52)内
を走行する車輪(41)を設けたフレームAを架装し、
このフレームAに昇降装置(50)を設け、この昇降装
置によって昇降するフレームGをフレームAの下面に配
置して2段とし、コンクリート仕上げ面高さを排水勾配
に合わせて自動調整しながら図3に示されている牽引機
Dによって移動しながら底部コンクリートを打設する
か、あるいは図7に示されるような走行装置Fによって
自走移動しながら底部コンクリートを打設するものであ
る。なおこの切溝(52)の形状については凹条に限る
ことなく、V字状であっても凸条であっても同様の作用
効果を奏する。
FIG. 14 is a sectional view of an embodiment of the concrete placing machine according to the fifth aspect. This is to construct a side groove in a block in which a concave groove (52) is formed in advance in the longitudinal direction in parallel with the top of the side groove at an arbitrary height of the inner surface of the side wall of the side groove block, and the inside of the continuous groove (52) is formed. A frame A provided with running wheels (41) is mounted,
An elevating device (50) is provided on the frame A, and a frame G to be raised and lowered by the elevating device is arranged on the lower surface of the frame A to have two steps, and the height of the concrete finishing surface is automatically adjusted according to the drainage gradient. The bottom concrete is poured while moving by the towing machine D shown in FIG. 7, or the bottom concrete is driven while moving by the traveling device F as shown in FIG. Note that the shape of the cut groove (52) is not limited to a concave streak, and a similar effect can be obtained regardless of whether it is a V-shape or a convex streak.

【0025】さらに図15は請求項6に示す別の実施例
図であって、U字形側溝(30−E)の側壁上面にフレ
ームAの車輪(40)が載って、このフレームAに昇降
装置(50)を設け、この昇降装置によって昇降するフ
レームGをフレームAの下面に配置して2段とし、コン
クリート仕上げ面高さを排水勾配に合せて自動調整しな
がら図3に示されている牽引装置Dによって移動しなが
ら底部コンクリートを打設するか、あるいは図7に示さ
れているような走行装置Fによって自走移動しながら底
部コンクリートを打設するものである。したがってU字
形側溝ブロックの底面に複数個の開放部又は凹部を有す
るブロックや一般のU字形側溝ブロックに水路勾配に従
った底面を形成することが可能である。
FIG. 15 is a view showing another embodiment of the present invention, wherein the wheel (40) of the frame A is mounted on the upper surface of the side wall of the U-shaped groove (30-E). (50), the frame G which is raised and lowered by the lifting device is arranged on the lower surface of the frame A to have two steps, and the height of the concrete finishing surface is automatically adjusted according to the drainage gradient, and the traction shown in FIG. The bottom concrete is poured while moving by the device D, or the bottom concrete is driven while moving by the traveling device F as shown in FIG. Therefore, it is possible to form a block having a plurality of open portions or concave portions on the bottom surface of the U-shaped side groove block or a general U-shaped side groove block to have a bottom surface according to a water channel gradient.

【0026】[0026]

【発明の効果】本発明による側溝底部へのコンクリート
打設機は、フレームAの走行移動に合せて打設部Bのホ
ッパー(1)に順次コンクリートを供給し、振動機
(3)によって側溝底部へ適量のコンクリートを投入し
て仕上部Cにおいて底部コンクリートを平滑および均一
に仕上げるもので、ホッパー(1)、斜平板(2)、振
動機(3)によって適量に出来るため底面コンクリート
の仕上げ作業が迅速に行える。
According to the present invention, the concrete placing machine for the bottom of the gutter is supplied with the concrete to the hopper (1) of the placing part B in accordance with the traveling movement of the frame A, and the bottom of the gutter is vibrated by the vibrator (3). The bottom concrete is finished smoothly and uniformly in the finish C by putting an appropriate amount of concrete in the finish C. Since the hopper (1), the inclined plate (2), and the vibrator (3) can make an appropriate amount, the bottom concrete finishing work can be performed. Can be done quickly.

【0027】本発明においては、予め側溝底部へのコン
クリートを投入することなく、またこれを掻き均すこと
もなくコンクリートホッパー(1)にコンクリートを供
給しながら移動を繰返すことによってコンクリートの打
設が容易となり、工期を短縮することができるという従
来の施工に比較して卓越した作用効果を奏する。
In the present invention, the concrete is poured into the concrete hopper (1) by repeatedly moving the concrete hopper (1) without supplying concrete to the bottom of the gutter and without leveling the concrete. As a result, the present invention has an excellent function and effect as compared with the conventional construction in which the construction period can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 コンクリート打設機の側面を示す実施例図。FIG. 1 is an embodiment view showing a side surface of a concrete placing machine.

【図2】 平面図。FIG. 2 is a plan view.

【図3】 牽引装置。FIG. 3 is a traction device.

【図4】 図1のX−X線断面図。FIG. 4 is a sectional view taken along line XX of FIG. 1;

【図5】 図1のY−Y線断面図。FIG. 5 is a sectional view taken along line YY of FIG. 1;

【図6】 図1のZ−Z線断面図。FIG. 6 is a sectional view taken along the line ZZ of FIG. 1;

【図7】 コンクリート打設機の別な実施例を示す側面
図。
FIG. 7 is a side view showing another embodiment of the concrete placing machine.

【図8】 別な実施例を示す断面図。FIG. 8 is a sectional view showing another embodiment.

【図9】 図8のX−X線断面図。FIG. 9 is a sectional view taken along line XX of FIG. 8;

【図10】昇降するフレームGを設けたコンクリート打
設機の実施例図。
FIG. 10 is a view showing an embodiment of a concrete placing machine provided with a frame G that moves up and down.

【図11】図10の別な実施例図。FIG. 11 is a view showing another embodiment of FIG. 10;

【図12】図11のY−Y線断面図。FIG. 12 is a sectional view taken along line YY of FIG. 11;

【図13】図12の別な実施例図。FIG. 13 is a view showing another embodiment of FIG. 12;

【図14】請求項5の実施例図。FIG. 14 is a diagram showing an embodiment according to claim 5;

【図15】U字形側溝に使用する実施例図。FIG. 15 is an embodiment view for use in a U-shaped gutter.

【符号の説明】[Explanation of symbols]

(1)…コンクリートホッパー (2)…斜平板 (3)…振動機 (4)…振動機 (5)…均し板 (6)…仕上げブレード (7−A)…ワイヤー (7−B)…接続具 (8)…捲取機台車 (9)…車輪 (10)…滑車 (11)…滑車アーム (12)…電線捲取機 (13)…ウィンチ (14)…操作動力盤 (15)…電線 (20)…懸架具 (21)…案内ローラ (22)…高さ調整具 (30)…側溝ブロック (30−A)…側溝ブロックの補強梁 (30−B)…上面開口部 (30−C)…枕ブロック (30−D)…側溝ブロックの接続部 (30−E)…U字形側溝 (32)…自走装置Fの車輪 (40)…レール (41)…車輪 (50)…昇降装置 (52)…切溝 A…フレーム B…打設部 C…仕上げ部 D…牽引機 E…コンクリート F…走行装置 G…昇降するフレーム (1) Concrete hopper (2) Swash plate (3) Vibrator (4) Vibrator (5) Leveling plate (6) Finishing blade (7-A) Wire (7-B) Connection device (8) ... winder bogie (9) ... wheel (10) ... pulley (11) ... pulley arm (12) ... electric wire winder (13) ... winch (14) ... operation power board (15) ... Electric wire (20) Suspension tool (21) Guide roller (22) Height adjustment tool (30) Gutter block (30-A) Reinforcement beam for gutter block (30-B) Top opening (30- C) Pillow block (30-D) Connection part of gutter block (30-E) U-shaped gutter (32) Wheel of self-propelled device F (40) Rail (41) Wheel (50) Elevating Apparatus (52) ... Groove A ... Frame B ... Casting part C ... Finishing part D ... Towing machine E ... Concrete G: Traveling device G: Frame that moves up and down

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E03F 3/06 E03F 5/04 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E03F 3/06 E03F 5/04

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】側溝(30)上面の開口部縁(30−B)
に高さを自在に調節できる調節具(22)を設けた懸架
具(20)を設け、該懸架具の下端に案内ローラー(2
1)を装着し、該案内ローラーに対して案内ローラー
(21)を複数個に亘る長さのフレームAを設け、移動
方向より順にコンクリートホッパー(1)、斜平板
(2)、振動機(3)からなる打設部Bおよび振動機
(4)、均し板(5)、仕上げブレード(6)からなる
仕上げ部Cを設けたフレームAを牽引装置Dにより牽引
移動させるか、又はフレームAに走行装置Fを設け自走
式としたことを特徴とした側溝底部へのコンクリート打
設機。
1. An opening edge (30-B) on an upper surface of a side groove (30).
A suspension (20) provided with an adjusting tool (22) capable of freely adjusting the height is provided, and a guide roller (2) is provided at a lower end of the suspension.
1), a frame A having a plurality of guide rollers (21) is provided for the guide rollers, and a concrete hopper (1), a swash plate (2), and a vibrator (3) are sequentially arranged in the moving direction. ), And a frame A provided with a finishing portion C comprising a vibrating machine (4), a leveling plate (5), and a finishing blade (6). A concrete placement machine to the bottom of a gutter, which is provided with a traveling device F and is self-propelled.
【請求項2】案内ローラー(21)に代えて高さ調節具
(22)に設けた懸架具(20)の下端に排水勾配に合
せた連続したレール(40)を装着し、前記フレームA
に該レール(40)に係合する車輪(41)を装着した
ことを特徴とした請求項1に記載の側溝底部へのコンク
リート打設機。
2. A continuous rail (40) adapted to a drainage gradient is attached to the lower end of a suspension (20) provided on a height adjuster (22) instead of the guide roller (21).
The concrete casting machine according to claim 1, characterized in that wheels (41) engaging with the rails (40) are mounted on the bottom.
【請求項3】側溝(30)上面の開口部(30−B)に
一定高さに設定した懸架具(20)を設け、該懸架具の
下端に案内ローラー(21)を装着し、該案内ローラー
に対して案内ローラー(21)を複数個に亘る長さのフ
レームAを設け、該フレームAに昇降装置(50)を設
け、該昇降装置(50)によって昇降するフレームGを
前記フレームAの下面に配置して2段とし、該フレーム
Gに移動方向より順にコンクリートホッパー(1)、斜
平板(2)、振動機(3)からなる打設部Bおよび振動
機(4)、均し板(5)、仕上げブレード(6)からな
る仕上げ部Cを設け、前記フレームAを牽引機Dにより
牽引移動させるか、又は走行装置Fにより自走式とした
ことを特徴とした側溝底部へのコンクリート打設機。
3. A suspension (20) set at a constant height is provided in an opening (30-B) on the upper surface of the side groove (30), and a guide roller (21) is mounted on a lower end of the suspension, and the guide is provided. A frame A having a length extending over a plurality of guide rollers (21) is provided for the rollers, a lifting device (50) is provided on the frame A, and a frame G that is raised and lowered by the lifting device (50) is attached to the frame A. It is arranged on the lower surface to form two steps, and a concrete hopper (1), a swash plate (2), a driving part B composed of a vibrator (3) and a vibrator (4), and a leveling plate are arranged on the frame G in this order from the moving direction. (5) A finishing part C comprising a finishing blade (6) is provided, and the frame A is towed by a towing machine D or self-propelled by a traveling device F. Casting machine.
【請求項4】側溝側壁内面の任意高さに水平にレール
(40)を架設し、該レール上を走行する車輪(41)
を設けたフレームAを架装し、該フレームAに昇降装置
(50)を設け、該昇降装置(50)によって昇降する
フレームGを前記フレームAの下面に配置して2段とし
たことを特徴とした請求項3に記載の側溝底部へのコン
クリート打設機。
4. A rail (40) which is horizontally installed at an arbitrary height on the inner surface of the side wall of the gutter and which runs on the rail.
A frame A provided with a frame is mounted thereon, a lifting device (50) is provided on the frame A, and a frame G that is raised and lowered by the lifting device (50) is arranged on the lower surface of the frame A to form two stages. 4. The concrete casting machine according to claim 3, wherein:
【請求項5】側溝ブロック側壁内面の任意高さに水平に
長さ方向に対して凹状の切溝(52)を予め成形して側
溝を構築し、該切溝(52)上を走行する車輪(40)
を設けたフレームAを架設し、該フレームAに昇降装置
(50)を設け、フレームAの下面に該昇降装置によっ
て昇降するフレームGを設けて2段としたことを特徴と
した請求項4に記載の側溝底部へのコンクリート打設
機。
5. A wheel running on the cut groove (52) by forming in advance a cut groove (52) that is concave in the length direction horizontally at an arbitrary height of the inner surface of the side groove block side wall. (40)
5. A frame A provided with a frame A, a lifting device (50) is provided on the frame A, and a frame G which is raised and lowered by the lifting device is provided on the lower surface of the frame A to form two stages. A concrete casting machine to the bottom of the gutter described.
【請求項6】U字形側溝(30−E)の側壁上面に該上
面を移動する車輪を設けたフレームAを載置し、該フレ
ームAに昇降装置(50)を設け、該昇降装置によって
昇降するフレームGを前記フレームAの下面に配置して
2段としたことを特徴とした請求項4に記載の側溝底部
へのコンクリート打設機。
6. A frame A provided with wheels for moving on the upper surface is placed on the upper surface of the side wall of the U-shaped side groove (30-E), and an elevating device (50) is provided on the frame A, and the elevating device is used to move the frame A up and down. 5. The concrete casting machine according to claim 4, wherein a frame G to be formed is arranged on the lower surface of the frame A to form two steps.
JP05289720A 1993-10-13 1993-10-13 Concrete placing machine at the bottom of gutter Expired - Fee Related JP3128555B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05289720A JP3128555B2 (en) 1993-10-13 1993-10-13 Concrete placing machine at the bottom of gutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05289720A JP3128555B2 (en) 1993-10-13 1993-10-13 Concrete placing machine at the bottom of gutter

Publications (2)

Publication Number Publication Date
JPH07109764A JPH07109764A (en) 1995-04-25
JP3128555B2 true JP3128555B2 (en) 2001-01-29

Family

ID=17746885

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05289720A Expired - Fee Related JP3128555B2 (en) 1993-10-13 1993-10-13 Concrete placing machine at the bottom of gutter

Country Status (1)

Country Link
JP (1) JP3128555B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060044B (en) * 2017-06-14 2022-12-20 四川省环茂工程机械设备有限公司 One-step forming die for pouring groove and using method thereof

Also Published As

Publication number Publication date
JPH07109764A (en) 1995-04-25

Similar Documents

Publication Publication Date Title
CN212331346U (en) Prefabricated component production facility and vibration trowelling mechanism thereof
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
JPH0960103A (en) Automatic concrete placement machine to bottom of side drain
JP3128555B2 (en) Concrete placing machine at the bottom of gutter
KR20140065774A (en) Railway track for placing the concrete finisher equipment
CN210561618U (en) Concrete pavement pouring formwork system
JP2655762B2 (en) How to install concrete blocks
CN115628087A (en) Lining trolley and method suitable for corbel lining section of loading and unloading zone of underground cave depot
JP2978957B2 (en) Concrete placing machine at the bottom of gutter
JP3174929B2 (en) Concrete placing machine at the bottom of gutter
JP2769489B2 (en) Concrete placing machine at the bottom of gutter
CN218493606U (en) Combined lining trolley of integrally-formed bracket
JPH08254098A (en) Stamping device of lining concrete for tunneling method
US3218944A (en) Curb and gutter molding machine
CN205999729U (en) The non-fragment orbit base cast running gear that vibrates
CN218596835U (en) Bridge floor leveling device
CN210886850U (en) Traction type synovial membrane machine
CN213144483U (en) Support is pour to ditch cable duct
JP2574717B2 (en) Concrete placing machine on the bottom of gutter and method of concrete placing by means of a placing machine
CN216893539U (en) Vibrating plate compactor draw-groove tool structure
JPH0274757A (en) Concrete flattening device
CN217150096U (en) Slip form device for construction of side wall of ditch
KR100284823B1 (en) Concrete finisher
JPH07139297A (en) Method for lining with invert concrete, and corner form and lining device used therefor
JPH0745799B2 (en) Method and apparatus for installing precast plate for tunnel

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees