JP3125155B2 - Curtain wall using prestress - Google Patents

Curtain wall using prestress

Info

Publication number
JP3125155B2
JP3125155B2 JP04073563A JP7356392A JP3125155B2 JP 3125155 B2 JP3125155 B2 JP 3125155B2 JP 04073563 A JP04073563 A JP 04073563A JP 7356392 A JP7356392 A JP 7356392A JP 3125155 B2 JP3125155 B2 JP 3125155B2
Authority
JP
Japan
Prior art keywords
panel
floor
curtain wall
fastener
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04073563A
Other languages
Japanese (ja)
Other versions
JPH05230916A (en
Inventor
正武 中村
哲郎 五十嵐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP04073563A priority Critical patent/JP3125155B2/en
Publication of JPH05230916A publication Critical patent/JPH05230916A/en
Application granted granted Critical
Publication of JP3125155B2 publication Critical patent/JP3125155B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は一般に、鉄筋コンクリー
ト造の建築物の軸組の構面または外壁面にプレキャスト
・コンクリート(以下PCという)造のパネルを取付け
るようにしたカーテンウォールに係り、とくに、カーテ
ンウォールにプレキャストのパネルを使用するときのプ
レストレスを利用する支持構造の改善に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention generally relates to a curtain wall in which a panel made of precast concrete (hereinafter, referred to as PC) is attached to a framing or outer wall of a reinforced concrete building. The present invention relates to an improvement of a support structure utilizing prestress when using a precast panel for a curtain wall.

【0002】[0002]

【従来の技術】まず図5において、鉄筋コンクリート造
の建築物1は、柱2と梁3との架構体であり、梁3が柱
2の外方に突出してスラブ4の先端に外壁5を支持して
いる。このような構造では、外壁5にカーテンウォール
構造を採用することが多く、各階の外壁5は、PC造の
単位体のパネル50を張設して構成する。従来技術のパ
ネル50は、建築物1への外力による架構体の変形に追
随できるように、建築物1の外壁5の面で各階ごとに上
下の梁3またはスラブ4にファスナー6で支持し、ファ
スナー6は、例えば、図6に示すように、梁3の上下位
置に一次ファスナー61、62を固定し、上下に位置す
るパネル50側では下部と上部とに二次ファスナー6
3、64を固定し、一次、二次のファスナーの間を、相
対移動が可能にするために、各ファスナーに上下方向、
パネル50に平行な左右方向、直角な前後方向の長孔6
5を設け、ボルト66を滑動可能に締め付けて結合する
ようにしている。
2. Description of the Related Art Referring first to FIG. 5, a reinforced concrete building 1 is a frame composed of a column 2 and a beam 3, and the beam 3 projects outward of the column 2 and supports an outer wall 5 at the tip of a slab 4. are doing. In such a structure, a curtain wall structure is often adopted as the outer wall 5, and the outer wall 5 of each floor is formed by extending a panel 50 of a unit body made of PC. The prior art panel 50 is supported by the fasteners 6 on the upper and lower beams 3 or the slabs 4 for each floor on the surface of the outer wall 5 of the building 1 so that the panel 50 can follow the deformation of the frame due to external force on the building 1, For example, as shown in FIG. 6, the fasteners 6 fix the primary fasteners 61 and 62 at the upper and lower positions of the beam 3, and the secondary fasteners 6 are provided at the lower and upper portions on the panel 50 located at the upper and lower sides.
In order to make the relative movement between the primary and secondary fasteners possible by fixing 3, 64, each fastener has a vertical direction,
A long hole 6 in the left-right direction parallel to the panel 50 and the right-left front-back direction
5 are provided so that the bolts 66 are slidably fastened and connected.

【0003】[0003]

【発明が解決しようとする課題】上記のようなカーテン
ウォールを有する建築物では、柱間隔S、階高Hに対す
るPCパネルの竪横比に従って、ロッキング、スウェ
イ、固定と変位を想定して、一次、二次のファスナー間
を摺動可能に緊結するが、大きな変位の吸収が予定され
るときほど、固定との間の摺動構造の設計が困難であ
り、パネル相互間の目地幅がひろくなる。また、設計に
従ってファスナーを構成すると、ファスナーが建築物の
変形に追随することができず、長孔内でのボルトの滑動
には限度があることから、理想的な変形による外力の吸
収の実現が極めて困難な場合が多い。そこで、カーテン
ウォールの支持構造において、別個の角度からの技術が
要求される。また、一般に、建築工事では、安全、確実
が第一であり、作業員は、安心のために過剰の固定作業
を行う傾向があり、上記のようなファスナーに対しても
しばしば可動部分まで溶接をして固定しまう惧れがある
ので、鋼材が直接対向するような構造を避ける必要が生
じ、さらに、カーテンウォールの支持構造には、できる
だけ溶接工事を避けて、省力、高品質化ならびに低コス
ト等が望まれている。
In a building having a curtain wall as described above, the locking, sway, fixation and displacement are assumed in accordance with the aspect ratio of the PC panel to the column spacing S and the floor height H, and the primary , The secondary fasteners are slidably tied, but as the large displacement is expected to be absorbed, the design of the sliding structure between the fixed and the fixed is more difficult, and the joint width between the panels becomes wider. . In addition, if the fastener is configured according to the design, the fastener cannot follow the deformation of the building, and the sliding of the bolt in the long hole is limited, so the absorption of external force by ideal deformation can be realized. Often very difficult. Therefore, a technique from a different angle is required in the curtain wall support structure. In general, safety and reliability are the first priority in construction work, and workers tend to perform excessive fixing work for security. Therefore, it is necessary to avoid a structure in which steel materials directly face each other. In addition, the supporting structure of the curtain wall should avoid welding work as much as possible to save labor, improve quality, and reduce costs. Is desired.

【0004】[0004]

【課題を解決するための手段】本発明は、上記のような
問題に鑑み、カーテンウォールの支持構造に改善を試
み、しかも、合理性を高めた施工方法を提供することを
目的として創案されたものであって、軸組の構面にプレ
キャストコンクリート造のパネルを取付けるようにした
カーテンウォールにおいて、建築物の下層部から上層部
にかけて、柱位置と柱の中間位置において緊張鋼材を張
設し、この緊張鋼材を上下端で固定したうえで各階の床
面位置で固定すると共に、各階の階高の中央高さの位置
においてパネルの緊結金具の本体部を構面内の両側に羽
根状に振り分けて取付け、一方、各床面位置には荷重受
装置を装備してパネルを支持し、パネルの側縁には前記
緊結金具の本体部に係着する固定ボルトを固着してあ
り、緊結金具の本体部と固定ボルトとを結合することに
よって、パネルがその側縁の中間高さの位置を緊張鋼材
によって支持されて構成したことを特徴としている。
SUMMARY OF THE INVENTION In view of the above-mentioned problems, the present invention has been conceived to provide a construction method that attempts to improve a curtain wall support structure and that is more rational. In a curtain wall in which a precast concrete panel is attached to a frame of a frame, a tension steel member is stretched at a column position and an intermediate position between columns, from a lower layer to an upper layer of a building, This tension steel material is fixed at the upper and lower ends and fixed at the floor position of each floor, and at the center height of the floor height of each floor, the main body of the panel fastener is distributed to both sides in the construction plane in a blade shape On the other hand, a load receiving device is provided at each floor position to support the panel, and a fixing bolt for fixing to the main body of the tie is fixed to a side edge of the panel. Main unit By combining the fixing bolt, the panel is characterized by being configured is supported by tension steel the position of the mid-height of its side edges.

【0005】従って、本発明によれば、現場におけるカ
ーテンウォールの取付工事において、まずプレストレス
ケーブルに緊結金具を取付けておき、例えば、2階、8
階等の所定の階の上下端で柱位置と柱の中間位置におい
て緊張して固定し、ついで、各階のスラブ位置で固定す
ると、各階の階高の中央高さの位置において、緊結金具
を構面内の両側に羽根状に振り分けて取付けることがで
きる。一方、各床面位置には荷重受装置を装備してパネ
ルを仮支持して位置を正し、パネルの側縁に固着した固
定ボルトを、緊結金具に結合することによって、パネル
をその側縁の中間高さの位置で緊張鋼材によって支持す
ることができる。従って、パネルは架構体の層間変位に
対して、中間の高さで従来の半分の幅で外力による変位
が吸収できて目地幅の設定が容易になるばかりでなく、
パネルの支持自体には一切溶接を使用せず、安全な施工
ができると共に、ファスナー金物としても数量が減少し
て、低コストが実現する。
[0005] Therefore, according to the present invention, in the installation work of the curtain wall at the site, first, a tie is attached to the prestressed cable, for example, the second floor, 8
At the upper and lower ends of a given floor, such as a floor, are tightened and fixed at the column position and the middle position between the columns, and then fixed at the slab position of each floor, the tie-down bracket is constructed at the center height of the floor height of each floor. It can be attached to both sides in the plane in the form of a blade. On the other hand, each floor position is equipped with a load receiving device to temporarily support the panel to correct the position, and to fix the panel to the side edge by connecting the fixing bolt fixed to the side edge of the panel to the tie. At a mid-height position. Therefore, the panel can absorb the displacement due to the external force with half the width of the conventional one at the intermediate height with respect to the interlayer displacement of the frame, and not only can the joint width be easily set,
No welding is used for the panel itself, and safe construction can be performed. In addition, the number of fasteners can be reduced and the cost can be reduced.

【0006】[0006]

【作 用】次に、本発明の作用を施工方法に基づいて、
図1によって説明する。図1は、本発明を採用する鉄筋
コンクリート造の建築物におけるカーテンウォールの取
付構造を示し、(a)は主要部の立面図、(b)は外壁
部の垂直断面図であり、従来のカーテンウォールの概略
を説明した図5に対応するものであって、図5の参照番
号は対応する部材について共通にしてある。
[Operation] Next, the operation of the present invention will be described based on the construction method.
This will be described with reference to FIG. 1A and 1B show a mounting structure of a curtain wall in a reinforced concrete building employing the present invention. FIG. 1A is an elevation view of a main part, FIG. 1B is a vertical sectional view of an outer wall part, and FIG. This corresponds to FIG. 5 illustrating the outline of the wall, and reference numbers in FIG. 5 are common to corresponding members.

【0007】図1において、鉄筋コンクリート造の建築
物1では、まず柱2と梁3とによって架構躯体を建方
し、例えば、第2階から最上階(8階)までを標準階4
0として、外周にパネル50を取付ける。その構築工法
は、建築物1の外部側の柱位置と柱の中間位置におい
て、緊張鋼材のケーブル10を垂直に張設し、これを緊
張してプレストレスを導入し、固定金具20を使用して
固定し、さらに、各階の床面位置のスラブの端縁または
梁において固定金具20によって固定する。一方、ケー
ブル10には予め緊結金具30を挿通しておき、各階の
中央高さの位置において緊結金具30を構面内の両側に
羽根状に振り分けて固定しておく。一方、パネル50を
揚重し、各床面位置に装備した荷重受装置60によって
パネル50を支持すると共に、パネル50の側縁に固着
した固定ボルト51と、前記の緊結金具30とを係着し
て、パネル50をその側縁の中間高さの位置において、
ケーブル10によって支持することによってプレストレ
スを利用したカーテンウォールを構成するものである。
In FIG. 1, in a reinforced concrete building 1, a frame structure is first constructed by columns 2 and beams 3, and, for example, a standard floor 4 is constructed from the second floor to the top floor (eighth floor).
As 0, the panel 50 is mounted on the outer periphery. In the construction method, a tension steel cable 10 is vertically stretched at a column position on the outer side of the building 1 and an intermediate position between the columns, a prestress is introduced by tensioning the cable 10, and a fixing bracket 20 is used. Then, the slab is fixed at the edge or beam of the slab at the floor position of each floor by the fixing bracket 20. On the other hand, the binding metal 30 is inserted into the cable 10 in advance, and the binding metal 30 is distributed and fixed in a vane shape on both sides of the construction surface at the center height of each floor. On the other hand, the panel 50 is lifted, the panel 50 is supported by the load receiving devices 60 provided at the respective floor positions, and the fixing bolts 51 fixed to the side edges of the panel 50 are engaged with the tying fittings 30. Then, the panel 50 is positioned at an intermediate height between its side edges,
A curtain wall utilizing prestress is constituted by being supported by the cable 10.

【0008】[0008]

【実施例】本発明のカーテンウォールを、一実施例を示
す図面に基づいてさらに詳細に説明する。図2はパネル
を支持する緊張鋼材のケーブルの固定構造を示し、
(a)は固定金物の正面図、(b)は垂直断面図、
(c)は平面図であり、図3はパネルの側縁における支
持部の詳細を示し、(a)は緊結金物の正面図、(b)
は垂直断面図、(c)は平面図、(d)は緊結金物の作
用を説明する正面図であり、図4はパネルの底辺におけ
る支持構造を示し、(a)は荷重受装置の垂直断面図、
(b)は正面図である。前記の固定金具20は、図2の
(a)、(b)、(c)に示すように、各階のスラブ4
の先端に、アンカー21を使用して固着される本体部2
2と、本体部22との間にケーブル10を挾む屈曲した
位置決め部24を形成した押さえ金物23と、本体部2
2側に裏側から植設して金物23を緊結するようにした
2本の締結ボルトナット25と、位置決め部24の外部
からケーブル10を固定するための締め付けボルト26
とからなっている。固定金具20は、まず2階と8階と
においてケーブル10を緊張してのち、両端を固定し、
さらに、各標準階40においてスラブ4の先端に設置さ
れてケーブル10を固定する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS A curtain wall according to the present invention will be described in more detail with reference to the drawings showing one embodiment. FIG. 2 shows a fixing structure of a tension steel cable supporting the panel,
(A) is a front view of the fixing hardware, (b) is a vertical sectional view,
FIG. 3C is a plan view, FIG. 3 shows details of a support portion at a side edge of the panel, FIG. 3A is a front view of a tie, and FIG.
FIG. 4C is a vertical sectional view, FIG. 4C is a plan view, FIG. 4D is a front view illustrating the operation of the binding metal, FIG. 4 shows a support structure at the bottom of the panel, and FIG. Figure,
(B) is a front view. As shown in FIGS. 2 (a), 2 (b) and 2 (c), the fixing bracket 20 has a slab 4 on each floor.
Body 2 secured to the end of the body using an anchor 21
A holding member 23 having a bent positioning portion 24 for holding the cable 10 between the main body portion 22 and the main body portion 2;
Two fastening bolts and nuts 25, which are planted from the back side on the two sides to tighten the hardware 23, and fastening bolts 26 for fixing the cable 10 from outside the positioning portion 24
It consists of The fixing bracket 20 first tensions the cable 10 on the second and eighth floors, and then fixes both ends.
Further, the cable 10 is fixed to the end of the slab 4 at each standard floor 40.

【0009】前記の緊結金具30は、図3の(a)、
(b)、(c)に示すように、各階にわたって上下方向
に張設されたケーブル10の中間部に係着してパネル5
0を支持するためのものであり、本体部31はその中央
部でケーブル10を挿通して跨ぐ曲折部32を形成し、
パネル50の端縁に植設された固定用のアンカーボルト
ナット51に対応する位置に、一対の縦方向の長孔33
を穿設してある。緊結金具30には、ボルトナット51
の締め付けに使用される滑動板34と、前記曲折部32
の背面側に使用され、ケーブル10とパネル50との間
に挾まれてケーブル10を固定する裏当て部材35とを
含んでいる。滑動板34は商品名「テフロン」として知
られるふっ素系材料によって加工した座金である。図中
の52はパネル50の端面であり、公知の技術手段によ
って目地を形成している。緊結金具30は、各階の階高
の中間部においてプレストレスケーブル10にパネル5
0の中間部を支持させ、その両側の長孔33とアンカー
ボルト51との相対移動によって、躯体に生ずる層間変
位を半分の寸法で吸収することになり、本発明において
独特の中間ファスナーを構成する。
The above-mentioned tying member 30 is shown in FIG.
As shown in (b) and (c), the panel 5 is engaged with an intermediate portion of the cable 10 stretched vertically in each floor.
The main body 31 forms a bent portion 32 that extends through the cable 10 at the center thereof.
At a position corresponding to the anchor bolt / nut 51 for fixing planted at the edge of the panel 50, a pair of longitudinal holes 33 is provided.
Has been drilled. Bolts and nuts 51
Sliding plate 34 used for tightening the bent portion 32
And a backing member 35 for fixing the cable 10 sandwiched between the cable 10 and the panel 50. The sliding plate 34 is a washer made of a fluorine-based material known as “Teflon” (trade name). Reference numeral 52 in the figure denotes an end face of the panel 50, which forms joints by a known technique. The tie 30 is attached to the prestressed cable 10 in the middle of the floor height of each floor by the panel 5.
The intermediate displacement of the frame is supported, and the relative displacement between the long hole 33 and the anchor bolt 51 on both sides absorbs the interlayer displacement generated in the frame in half the size, thereby constituting a unique intermediate fastener in the present invention. .

【0010】次に、荷重受装置60はケーブル10にパ
ネル50を取付ける作業の間に、パネル50を一時支持
するための装置であって、例えば、図6に示すファスナ
ー6の別種を使用することができる。図示のものは、梁
3の上面でパネル50の下部を支持するものだけを利用
するものであるから、具体的な説明には前記の参照番号
を使用するものとし、61は躯体側に固定した一次ファ
スナー、63は正面と下面に跨ってパネル50にアンカ
ーされた二次ファスナーである。67は荷重受のボルト
であって、一次ファスナー61に螺合して昇降可能であ
ると共に、二次ファスナー63の下面で相対移動が可能
である。53はパネル50の下部に形成したプレキャス
トのブロック体である。
Next, the load receiving device 60 is a device for temporarily supporting the panel 50 during the operation of attaching the panel 50 to the cable 10. For example, a different type of the fastener 6 shown in FIG. 6 is used. Can be. In the drawing, only the one supporting the lower part of the panel 50 on the upper surface of the beam 3 is used. Therefore, the above-mentioned reference numbers are used for specific description, and 61 is fixed to the skeleton side. The primary fastener 63 is a secondary fastener anchored to the panel 50 across the front and lower surfaces. Reference numeral 67 denotes a load receiving bolt which can be screwed onto the primary fastener 61 and can be moved up and down, and can be relatively moved on the lower surface of the secondary fastener 63. 53 is a precast block formed at the lower part of the panel 50.

【0011】上記のような構成において、図3の(d)
の矢印のように水平外力が加わった場合に、緊結金物3
0は図3の括弧( )付きと一点鎖線とで示した正規の
原位置から、実線のように作用する。ケーブル10が上
下階で層間変位を生じ、図のように左に傾いたとき、左
右のパネルに相互のずれが発生する。緊結金物30は回
転中心Cの回りでケーブル10を軸心としてパネルの変
位を吸収するような形で左右に回転する。長孔33は変
位量の最大値で長径が定めてある。
In the above configuration, FIG.
When a horizontal external force is applied as shown by the arrow in FIG.
0 acts as a solid line from the normal original position shown in parentheses () and the dashed line in FIG. When the cable 10 is displaced between layers on the upper and lower floors and tilts to the left as shown in the figure, mutual displacement occurs between the left and right panels. The binding hardware 30 rotates right and left around the rotation center C in such a manner as to absorb the displacement of the panel around the cable 10 as an axis. The long hole 33 has a long diameter determined by the maximum value of the displacement amount.

【0012】本発明のプレストレスを利用したカーテン
ウォールは、上記の実施例に限定されないことはもちろ
んであり、とくに、鉄筋コンクリート造の建築物のカー
テンウォールとして、構面の形状(縦横比)に従って、
外力による挙動が異なるときに、ファスナーはロッキン
グ、スウェイに対応するが、本発明では、緊結金具30
の本体部31に形成される長孔33の方向を縦、横に選
定して変更することができる。また、ケーブル10の緊
張、固定にはプレストレスの各種手段、機器を使用する
ことができる。さらに、固定金具20に準じて緊結金具
30にも本体部と押さえ金物の組合せを適用することが
できる。
The curtain wall utilizing prestress of the present invention is not limited to the above-described embodiment, and is particularly suitable as a curtain wall of a reinforced concrete building according to the shape (aspect ratio) of the structural surface.
When the behavior due to the external force is different, the fastener corresponds to locking and sway, but in the present invention, the fastener 30
The direction of the long hole 33 formed in the main body portion 31 can be changed vertically and horizontally. Various kinds of prestressing means and devices can be used for tensioning and fixing the cable 10. Further, a combination of the main body and the holding member can be applied to the binding member 30 in accordance with the fixing member 20.

【0013】[0013]

【発明の効果】本発明のプレストレスを利用したカーテ
ンウォールは、軸組の構面にプレキャストコンクリート
造のパネルを取付けるようにしたカーテンウォールにお
いて、建築物の下層部から上層部にかけて、柱位置と柱
の中間位置において緊張鋼材を張設し、この緊張鋼材を
上下端で固定したうえで各階の床面位置で固定すると共
に、各階の階高の中央高さの位置においてパネルの緊結
金具の本体部を構面内の両側に羽根状に振り分けて取付
け、一方、各床面位置には荷重受装置を装備してパネル
を支持し、パネルの側縁には前記緊結金具の本体部に係
着する固定ボルトを固着してあり、緊結金具の本体部と
固定ボルトとを結合することによって、パネルがその側
縁の中間高さの位置を緊張鋼材によって支持されて構成
したものであるから、パネルは架構体の層間変位に対し
て、中間の高さで従来の半分の幅で外力による変位が吸
収できて目地幅の設定が容易になるばかりでなく、パネ
ルの支持自体には一切溶接を使用しないから、各部の施
工の安全性に用心するあまり、可動部までも溶接してし
まうような惧れがなく、安全な施工ができると共に、フ
ァスナー金物としても数量が減少して、低コストが実現
し、施工精度も従来技術と同等程度で良い利益があっ
て、溶接無しの工法を提供することによって、将来の建
築業界に貢献するところが極めて大きい発明である。
The curtain wall utilizing prestress of the present invention is a curtain wall in which a precast concrete panel is mounted on a frame of a frame. Tensile steel material is stretched at the middle position of the pillar, and this tensile steel material is fixed at the upper and lower ends and then fixed at the floor position of each floor, and the main body of the panel fastener at the center height of the floor height of each floor Wings are attached to both sides of the structure in the form of wings, while each floor surface is equipped with a load receiving device to support the panel, and the side edges of the panel are attached to the main body of the tie. The fixing panel is fixed, and the panel is supported at the intermediate height position of the side edge by the tension steel material by connecting the fixing bolt with the main body of the fastening fitting. In addition, the panel can absorb the displacement due to external force with half the width of the conventional one at the intermediate height against the interlayer displacement of the frame, making it easy to set the joint width and also welding all to the panel support itself Because it is not used, there is no concern that the moving parts will be welded because there is no concern about the safety of the construction of each part, and safe construction is possible, and the number of fasteners is reduced, and the cost is low. This is an invention that has a great advantage that the construction accuracy is equivalent to that of the conventional technology and that it provides a construction method without welding, thereby contributing to the future construction industry.

【0014】[0014]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を採用する鉄筋コンクリート造の建築物
におけるカーテンウォールの取付構造を示し、(a)は
主要部の立面図、(b)は外壁部の垂直断面図である。
FIG. 1 shows a mounting structure of a curtain wall in a reinforced concrete building employing the present invention, wherein (a) is an elevational view of a main part, and (b) is a vertical sectional view of an outer wall part.

【図2】パネルを支持するケーブル緊張鋼材のケーブル
の固定構造を示し、(a)は固定金物の正面図、(b)
は垂直断面図、(c)は平面図である。
FIGS. 2A and 2B show a fixing structure of a cable made of a cable tension steel material for supporting a panel, wherein FIG. 2A is a front view of a fixing hardware, and FIG.
Is a vertical sectional view, and (c) is a plan view.

【図3】パネルの側縁における支持部の詳細を示し、
(a)は緊結金物の正面図、(b)は垂直断面図、
(c)は平面図、(d)は作用の説明図である。
FIG. 3 shows details of a support portion at a side edge of the panel;
(A) is a front view of the binding hardware, (b) is a vertical sectional view,
(C) is a plan view, and (d) is an explanatory diagram of an operation.

【図4】パネルの底辺における支持構造を示し、(a)
は荷重受装置の垂直断面図、(b)は正面図である。
FIG. 4 shows a support structure at the bottom of the panel, wherein (a)
Is a vertical sectional view of the load receiving device, and (b) is a front view.

【図5】従来の鉄筋コンクリート造の建築物におけるカ
ーテンウォールの取付構造を示す図1に対応する図であ
り、(a)は主要部の立面図、(b)は外壁部の垂直断
面図である。
FIG. 5 is a view corresponding to FIG. 1 showing a mounting structure of a curtain wall in a conventional reinforced concrete building, (a) is an elevation view of a main part, and (b) is a vertical sectional view of an outer wall part. is there.

【図6】従来のカーテンウォールに使用されるファスナ
ーの一例を示す図であり、(a)は壁体の断面方向の側
面図、(b)は正面図である。
6A and 6B are diagrams showing an example of a fastener used for a conventional curtain wall, wherein FIG. 6A is a side view of a wall in a sectional direction, and FIG. 6B is a front view.

【0015】[0015]

【符号の説明】[Explanation of symbols]

1 建築物 2 柱 3 梁 4 スラブ 5 カーテンウォール 6 ファスナー 10 緊張鋼材、ケーブル 20 固定金具 21 アンカー 22 本体部 23 押さえ金物 24 位置決め部 25 締結ボルトナット 26 締め付けボルト 30 緊結金具、中間ファスナー 31 本体部 32 曲折部 33 長孔 34 滑動板 35 裏当て部材 40 標準階 50 パネル 51 固定用ボルトナット 52 端面 53 荷受ブロック 60 荷重受装置 61 一次ファスナー 63 二次ファスナー 67 荷受ボルト H 階高 S 柱間隔 DESCRIPTION OF SYMBOLS 1 Building 2 Column 3 Beam 4 Slab 5 Curtain wall 6 Fastener 10 Tensile steel material, cable 20 Fixing metal 21 Anchor 22 Main body 23 Holder 24 Positioning part 25 Fastening bolt nut 26 Tightening bolt 30 Fastening metal, Intermediate fastener 31 Main body 32 Bent part 33 Slot 34 Sliding plate 35 Backing member 40 Standard floor 50 Panel 51 Fixing bolt and nut 52 End face 53 Load receiving block 60 Load receiving device 61 Primary fastener 63 Secondary fastener 67 Load receiving bolt H Floor height S Column spacing

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭51−20432(JP,A) 特開 昭61−75148(JP,A) 特開 昭48−7533(JP,A) 実開 昭61−41712(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04B 2/88 - 2/96 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-51-20432 (JP, A) JP-A-61-75148 (JP, A) JP-A-48-7533 (JP, A) 41712 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) E04B 2/88-2/96

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軸組の構面にプレキャストコンクリート
造のパネルを取付けるようにしたカーテンウォールにお
いて、建築物の下層部から上層部にかけて、柱位置と柱
の中間位置において緊張鋼材を張設し、この緊張鋼材を
上下端で固定したうえで各階の床面位置で固定すると共
に、各階の階高の中央高さの位置においてパネルの緊結
金具の本体部を構面内の両側に羽根状に振り分けて取付
け、一方、各床面位置には荷重受装置を装備してパネル
を支持し、パネルの側縁には前記緊結金具の本体部に係
着する固定ボルトを固着してあり、緊結金具の本体部と
固定ボルトとを結合することによって、パネルがその側
縁の中間高さの位置を緊張鋼材によって支持されて構成
したことを特徴とするプレストレスを利用したカーテン
ウォール。
1. A curtain wall in which a precast concrete panel is mounted on a frame of a frame, tension steel is stretched from a lower part to an upper part of a building at a position between pillars and between the pillars, This tension steel material is fixed at the upper and lower ends and fixed at the floor position of each floor, and at the center height of the floor height of each floor, the main body of the panel fastener is distributed to both sides in the construction plane in a blade shape On the other hand, a load receiving device is provided at each floor position to support the panel, and a fixing bolt for fixing to the main body of the tie is fixed to a side edge of the panel. A curtain wall using pre-stress, wherein a panel is supported at an intermediate height of a side edge thereof by a tension steel material by connecting a main body and a fixing bolt.
【請求項2】 緊張鋼材は、鋼棒、鋼線またはより鋼線
であることを特徴とする請求項1に記載のプレストレス
を利用したカーテンウォール。
2. The curtain wall using prestress according to claim 1, wherein the tensioned steel material is a steel rod, a steel wire, or a stranded steel wire.
【請求項3】 床面位置に装備する荷重受装置は、床面
に設置される一次ファスナーと、その上方に臨んでパネ
ルの内面に突出する二次ファスナーとからなり、二次フ
ァスナーの下面において一次ファスナーに対して昇降す
るボルトによって上下調節されることを特徴とする請求
項1または2に記載のプレストレスを利用したカーテン
ウォール。
3. A load receiving device mounted on a floor surface comprises a primary fastener installed on the floor surface and a secondary fastener projecting above and protruding from the inner surface of the panel. The curtain wall using prestress according to claim 1, wherein the curtain wall is adjusted up and down by a bolt that moves up and down with respect to the primary fastener.
JP04073563A 1992-02-25 1992-02-25 Curtain wall using prestress Expired - Fee Related JP3125155B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04073563A JP3125155B2 (en) 1992-02-25 1992-02-25 Curtain wall using prestress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04073563A JP3125155B2 (en) 1992-02-25 1992-02-25 Curtain wall using prestress

Publications (2)

Publication Number Publication Date
JPH05230916A JPH05230916A (en) 1993-09-07
JP3125155B2 true JP3125155B2 (en) 2001-01-15

Family

ID=13521862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04073563A Expired - Fee Related JP3125155B2 (en) 1992-02-25 1992-02-25 Curtain wall using prestress

Country Status (1)

Country Link
JP (1) JP3125155B2 (en)

Also Published As

Publication number Publication date
JPH05230916A (en) 1993-09-07

Similar Documents

Publication Publication Date Title
JP2000120023A (en) Earthquake-resisting reinforcing method for reinforced concrete pole
JP3125155B2 (en) Curtain wall using prestress
JPH10331436A (en) Earthquake-resisting reinforcing structure for beam-column in existing structure
JPH10325193A (en) Ground sill of external wall panel and external wall ground sill part construction
JPH11210079A (en) Earthquake-resistant reinforcing structure for leg portion of steel column of building and earthquake-resistant reinforcing method for leg portion of steel column of building
JPH1129979A (en) Anchored structure of beam main reinforcement at column-to-beam junction
JPH1181737A (en) Vibration control construction for reinforced concrete building and constructing method therefor
JP4660810B2 (en) Boundary beam damper
JPH07259228A (en) Wall panel fitting structure
JP3032197U (en) Wooden strong lattice beam structure of building
JPH07259227A (en) Wall panel fitting structure
JP2929268B2 (en) Bracing structure in wooden buildings
JPH0638970Y2 (en) Wall panel mounting structure
JPH0715923Y2 (en) Strut fastening device for wooden buildings
JP2586474Y2 (en) Wall panel mounting structure
JP3122340B2 (en) Panel mounting device
JPH10331258A (en) Binding device for joint and bracing, and device and method for binding joint for wooden frame structure
JP2004300715A (en) Building structure
JP2001146802A (en) Wall panel installation structure by vertical wall slide construction method
JPH1025838A (en) Brace reinforcing fitting
JP2023537218A (en) Pinned base connection for structural members
JPH0325138A (en) Mounting structure for wall panel
JPS6214241Y2 (en)
JP3579813B2 (en) Reinforcement structure of existing building and its construction method
JPH01192936A (en) Housing unit

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees