JP3114024B2 - Frame joint structure - Google Patents

Frame joint structure

Info

Publication number
JP3114024B2
JP3114024B2 JP03198394A JP19839491A JP3114024B2 JP 3114024 B2 JP3114024 B2 JP 3114024B2 JP 03198394 A JP03198394 A JP 03198394A JP 19839491 A JP19839491 A JP 19839491A JP 3114024 B2 JP3114024 B2 JP 3114024B2
Authority
JP
Japan
Prior art keywords
steel
column
joint
concrete
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03198394A
Other languages
Japanese (ja)
Other versions
JPH0518004A (en
Inventor
宏治 山野辺
昇 坂口
武 河内
靖夫 神野
仁志 熊谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP03198394A priority Critical patent/JP3114024B2/en
Publication of JPH0518004A publication Critical patent/JPH0518004A/en
Application granted granted Critical
Publication of JP3114024B2 publication Critical patent/JP3114024B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建築工事等において使
用される躯体の接合部構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint structure of a skeleton used in construction work and the like.

【0002】[0002]

【従来の技術】従来、建築物の躯体を構成する柱と梁
は、現場での場所打ちにより構築していた。この場所打
ちによる方法では、鉄骨を組み立てる工程、鉄筋を組み
立てる工程、型枠を組み立てる工程、コンクリートを型
枠内に打設する工程、及び所定の強度が発現した後の型
枠の脱型工程からなっている。この鉄骨を組み立てる工
程では、鉄骨柱を建方し、鉄骨梁を鉄骨柱に溶接により
組み立てる。そして、鉄筋を組み立てる工程では、鉄骨
柱と鉄骨梁とに対し鉄筋を配設する。次に、型枠を組み
立てる工程では、鉄骨柱および鉄骨梁と鉄筋との周囲を
型枠で覆い、次のコンクリートを型枠内に打設する工程
で、この型枠の中にコンクリートを流し込む。最後に型
枠の脱型工程では、流し込まれたコンクリートの強度が
発現した後、型枠を取り外す。こうして、鉄骨鉄筋コン
クリート造の躯体が形成される。
2. Description of the Related Art Heretofore, columns and beams constituting a building body of a building have been constructed by local casting on site. In this cast-in-place method, the steps of assembling the steel frame, assembling the rebar, assembling the formwork, casting the concrete into the formwork, and removing the formwork after the predetermined strength is developed Has become. In the process of assembling the steel frame, a steel column is built, and a steel beam is assembled to the steel column by welding. Then, in the step of assembling the reinforcing bars, the reinforcing bars are provided for the steel columns and the steel beams. Next, in the step of assembling the formwork, the periphery of the steel column and the steel beam and the reinforcing steel are covered with the formwork, and concrete is poured into the formwork in the next step of casting concrete into the formwork. Finally, in the mold releasing step, the mold is removed after the strength of the poured concrete has developed. Thus, a steel reinforced concrete frame is formed.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、場所打
ちによれば、鉄骨鉄筋コンクリート造の躯体が形成され
るまでには、鉄骨を組み立てる工程、鉄筋を組み立てる
工程、型枠を組み立てる工程、コンクリートを型枠内に
打設する工程、及び所定の強度が発現した後の型枠の脱
型工程を経なければならないため、施工期間が長くなる
という問題があった。しかもそれぞれ現場で行うため、
作業が繁雑であった。特に、現場での鉄筋の配筋には非
常に手間がかかっていた。
However, according to the cast-in-place method, the steps of assembling the steel frame, assembling the rebar, assembling the formwork, and forming the concrete by the time the steel-framed reinforced concrete frame is formed. However, there is a problem that the construction period is prolonged because it is necessary to go through a step of casting into the mold and a step of releasing the mold after a predetermined strength is developed. In addition, because each is done on site,
The work was complicated. In particular, arranging the reinforcing bars on site was very troublesome.

【0004】本発明は前記課題を有効に解決するもの
で、工期を短縮し、作業性を向上させることのできる躯
体の接合部構造を提供することを目的とする。
An object of the present invention is to effectively solve the above-mentioned problems, and an object of the present invention is to provide a joint structure of a skeleton which can shorten a construction period and improve workability.

【0005】[0005]

【課題を解決するための手段】すなわち、請求項1記載
の躯体の接合部構造は、躯体を構成する鉄骨鉄筋コンク
リート製の柱および鉄骨鉄筋コンクリート製の梁の接合
をプレキャスト化することにより接合部ユニットを形
成し、該接合部ユニットを、前記柱の一部を構成する鉄
骨柱のフランジに、柱主筋の端部を定着するとともに、
前記梁の一部を構成する鉄骨梁のフランジに梁主筋の端
部を定着し、なおかつ、前記梁の上面に、前記梁主筋を
露出させて配置した構成とし、さらに、前記柱および梁
の各端部において、前記鉄骨柱および前記鉄骨梁の端部
を露出させた構成としたことを特徴としている。
In other words, the joint structure of the skeleton according to the first aspect of the present invention is a joint unit by precasting the joint of the steel reinforced concrete columns and the steel reinforced concrete beams constituting the skeleton. The shape
The joint unit is made of iron forming part of the pillar
While fixing the end of the pillar main bar to the flange of the pillar,
The end of the beam main reinforcement is attached to the flange of the steel beam that constitutes part of the beam.
Part and fix the beam main reinforcement on the upper surface of the beam.
A configuration in which the columns and beams are exposed, and
At each end of the steel column and the end of the steel beam
Is exposed.

【0006】[0006]

【0007】[0007]

【0008】[0008]

【作用】請求項1記載の躯体の接合部構造によれば、鉄
骨鉄筋コンクリート製の柱および鉄骨鉄筋コンクリート
製の梁の接合部が、接合部ユニットとしてプレキャスト
化されているために、これら柱および梁をそれぞれ接続
することにより建築躯体を構成することができる。そし
て、柱および梁の接合部がプレキャスト化されているた
め、現場で行う各種の工程を省略することができる。
らに、接合部ユニットにおいては、梁の上面に鉄骨梁に
定着された梁主筋が露出する構成となるために、梁の上
面に床スラブを打設して形成する際に、床スラブと梁と
を強固に一体化することができる。また、柱および梁の
各端部において、鉄骨柱および鉄骨梁の端部を露出させ
るとともに、梁主筋および柱主筋の端部を鉄骨柱および
鉄骨梁に定着した状態としたため、接合ユニットの柱ま
たは梁の端部同士を接合する際に、梁主筋または柱主筋
同士の接合が必要とならず、鉄骨柱同士または鉄骨梁同
士のみを接続すればよいので、施工性がよい。そして、
これら鉄骨柱および鉄骨梁同士の接合端部を、床スラブ
のコンクリートを打設する際に、同時にコンクリートで
被覆することができるため、より一層の施工の簡略化を
図ることができる。
According to the joint structure of the skeleton of the first aspect, since the joint between the steel reinforced concrete columns and the steel reinforced concrete beams is precast as a joint unit , these columns and beams are connected. By connecting each of them, a building frame can be formed. And since the joint part of a pillar and a beam is precast, various processes performed on site can be omitted. Sa
In addition, in the joint unit, a steel beam is
The beam main bar that has been fixed is exposed,
When the floor slab is cast by casting it on the surface,
Can be firmly integrated. Also, for columns and beams
At each end, expose the ends of the steel columns and beams.
At the same time, the ends of the beam and column
Since it is fixed to the steel beam,
When joining the ends of beams or beams, use beam or column
There is no need for joints between steel columns and steel columns or steel beams.
Since only the technician needs to be connected, the workability is good. And
The joint ends of these steel columns and beams are connected to floor slabs.
At the same time as placing concrete
Can be coated, further simplifying construction
Can be planned.

【0009】[0009]

【0010】[0010]

【0011】[0011]

【実施例】以下、本発明の躯体の接合部構造の一実施例
を図1ないし図2を参照して説明する。図中、符号1
は、躯体を構成する鉄骨鉄筋コンクリート製の柱2と、
鉄骨鉄筋コンクリート製の梁3とを有する接合部ユニッ
トである。この接合部ユニット1は、図1で示すよう
に、例えば、鉄骨鉄筋コンクリート製の柱2と、鉄骨鉄
筋コンクリート製の梁3とを中央部で互いに直角方向に
組み立てられてプレキャスト化したものである。この柱
2の両端からは鉄骨柱5の端部が剥き出しにされ、梁3
の両端からも鉄骨梁6の端部が剥き出しにされ、これら
剥き出しにされた鉄骨柱5および鉄骨梁6の各先端によ
り接合端部7、7が形成されている。そして、この剥き
出しされた鉄骨柱5および鉄骨梁6の各フランジ10の
両端部には、図2及び図3に示すように、柱主筋8及び
梁主筋9の両端部が例えば溶接により定着されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the joint structure of a skeleton according to the present invention will be described below with reference to FIGS. In the figure, reference numeral 1
Is a pillar 2 made of steel reinforced concrete that constitutes the skeleton,
This is a joint unit having a beam 3 made of steel reinforced concrete. As shown in FIG. 1, this joint unit 1 is, for example, a column 2 made of steel-framed reinforced concrete and a beam 3 made of steel-framed reinforced concrete, which are assembled at right angles to each other at the center and precast. The ends of the steel column 5 are exposed from both ends of the column 2 and the beam 3
The ends of the steel beam 6 are also exposed from both ends of the steel beam 6, and the exposed ends of the steel column 5 and the steel beam 6 form joining ends 7,7. As shown in FIGS. 2 and 3, both ends of the column main bar 8 and the beam main bar 9 are fixed to both ends of the exposed flange 10 of the steel column 5 and the steel beam 6 by, for example, welding. I have.

【0012】前記接合部ユニット1を詳述すると、鉄骨
鉄筋コンクリート製の柱2と、鉄骨鉄筋コンクリート製
の梁3とから主要構成され、これらが互いに垂直に突き
出して形成されている。この柱2には、図2に示すよう
に、中心部に例えばH型鋼からなる鉄骨柱5が鉛直方向
に配置され、この鉄骨柱5の両フランジ10の外側に
は、柱主筋8が鉄骨柱5のフランジ10に対向して平行
にそれぞれ配置されている。これら柱主筋8の両端部は
フランジ10寄りに屈曲されて形成され、これら両端部
が鉄骨柱5の両フランジ10に接続されている。また、
柱主筋8には、閉鎖型剪断補強筋11が巻回されてい
る。そして、これら鉄骨柱5、柱主筋8、閉鎖型剪断補
強筋11全体を覆うコンクリート12が打設されること
により、プレキャスト化された柱2が形成されている。
The joint unit 1 is mainly composed of a steel frame reinforced concrete column 2 and a steel frame reinforced concrete beam 3, which are formed so as to project perpendicularly to each other. As shown in FIG. 2, a steel column 5 made of, for example, H-shaped steel is disposed in the center of the column 2 in the vertical direction, and a column main bar 8 is provided outside the two flanges 10 of the steel column 5. 5 are arranged in parallel to face each other. Both ends of the column main bar 8 are formed by bending toward the flange 10, and these both ends are connected to both flanges 10 of the steel column 5. Also,
A closed-type shear reinforcing bar 11 is wound around the column main bar 8. Then, the concrete 2 covering the entirety of the steel column 5, the column main reinforcement 8, and the closed-type shear reinforcement 11 is cast to form the precast column 2.

【0013】一方、梁3は、柱2より全体として小さく
形成され、図3に示すように、中心部に例えばH型鋼か
らなる鉄骨梁6が水平方向に配置されている。この鉄骨
梁6は、上下にフランジ10がそれぞれ対向して形成さ
れ、これら上下のフランジ10は連結板13により接続
されている。この連結板13に表面には突状のシアコッ
ター14が複数形成されている。これらフランジ10の
外側には、梁主筋9がフランジ10に対向して平行にそ
れぞれ配置されている。これら梁主筋9の両端部は、フ
ランジ10寄りに屈曲され、それぞれ各フランジ10に
接続されている。また、これら梁主筋9の周囲には閉鎖
型剪断補強筋15が巻回されている。そして、鉄骨梁6
の上側フランジ10と、この上側フランジ10に対向し
て取り付けられた梁主筋9とを除く範囲で、これら鉄骨
梁6、梁主筋9、閉鎖型剪断補強筋15を覆うコンクリ
−ト16が打設されている。これにより、接合部ユニッ
ト1においては、上側の梁主筋9aが、梁3の上面に露
出した構成となっている。そして、図4に示すように、
これら剥き出しにされた鉄骨梁6のコンクリ−ト16の
上面には、床版17が取り付けられている。この床版1
7上には、床スラブ18が打設され、この打設された床
スラブ18により、剥き出しにされた鉄骨梁6が覆わ
れ、上側の梁主筋9aは、床スラブ18の内部に埋設さ
れている。
On the other hand, the beam 3 is formed so as to be smaller than the column 2 as a whole, and as shown in FIG. 3, a steel beam 6 made of, for example, H-section steel is horizontally arranged at the center. This steel frame
The beams 6 are formed with upper and lower flanges 10 facing each other, and these upper and lower flanges 10 are connected by a connecting plate 13. A plurality of projecting shea cotters 14 are formed on the surface of the connecting plate 13. Outside the flanges 10, main beam bars 9 are arranged in parallel to the flanges 10, respectively. Both ends of these beam main reinforcements 9 are bent toward the flanges 10 and are connected to the respective flanges 10. A closed-type shear reinforcement 15 is wound around the beam main reinforcement 9. And steel beam 6
A concrete 16 covering the steel beam 6, the beam main reinforcement 9, and the closed-type shear reinforcement 15 is cast in a range excluding the upper flange 10 and the main beam 9 attached opposite to the upper flange 10. Have been. As a result, the joint unit
In FIG. 1, the upper beam main reinforcement 9 a is exposed on the upper surface of the beam 3.
It has a configuration. And, as shown in FIG.
A floor slab 17 is mounted on the upper surface of the concrete 16 of the exposed steel beam 6 . This floor slab 1
On the floor 7, a floor slab 18 is cast, and the cast floor slab 18 covers the exposed steel beam 6 , and the upper beam main reinforcement 9a is embedded inside the floor slab 18.
Have been.

【0014】上記のように構成された接合部ユニット1
が、隣接する接合部に配置された状態において、前記柱
2の接合端部7では、上下両端の剥き出しにされた鉄骨
柱5がそれぞれ対向され、例えば金属板19を介してボ
ルトによりそれぞれ固定され、これら互いに接続される
接合端部7は例えばグラウト20により全体を覆われて
接続されている。同様に、梁3の接合端部7では、左右
両端の剥き出しにされた鉄骨梁6がそれぞれ対向され、
金属板19を介してボルトによりそれぞれ固定されてい
る。そして、これら梁3の接合端部7では、床スラブ1
8を打設する際に例えばコンクリートにより全体を覆わ
れて接続されている。
The joint unit 1 constructed as described above
However, in a state in which the steel columns 5 are exposed at the joint ends 7 of the columns 2 at the upper and lower ends thereof, and are fixed to each other by bolts via a metal plate 19, for example. The joint ends 7 connected to each other are entirely covered and connected by, for example, grout 20. Similarly, at the joint end 7 of the beam 3, the exposed steel beams 6 at the left and right ends are opposed to each other,
Each is fixed by a bolt via a metal plate 19. Then, at the joint ends 7 of these beams 3, the floor slab 1
For example, when the casting 8 is cast, the whole is covered with concrete and connected.

【0015】次に、接合部ユニット1の施工手順を説明
する。まず、接合部ユニット1を例えば工場等により構
築する。ここで、この接合部ユニット1では、鉄骨柱5
及び鉄骨梁6を、それぞれの中央部に接続固定し、これ
ら鉄骨柱5及び鉄骨梁6のフランジ10にそれぞれ平行
に柱主筋8及び梁主筋9を配置する。これら柱主筋8及
び梁主筋9の両端部を、それぞれ溶接によりフランジ1
0に定着する。これら定着された柱主筋8及び梁主筋9
の周囲に、それぞれ閉鎖型剪断補強筋11、15を複数
巻回する。そして、柱2では、鉄骨柱5の両端部を除
き、これら鉄骨柱5、柱主筋8、閉鎖型剪断補強筋11
全体を覆うコンクリート12を打設する。一方、梁3で
は、鉄骨梁6の両端部と、鉄骨梁6の上側フランジ10
と、この上側フランジ10に対向して取り付けらた梁主
筋9とを除く範囲で、これら鉄骨梁6、梁主筋9、閉鎖
型剪断補強筋15を覆うコンクリ−ト16を打設する。
こうして、プレキャスト化された接合部ユニット1を形
成する。
Next, the procedure for installing the joint unit 1 will be described. First, the joint unit 1 is constructed in, for example, a factory. Here, in the joint unit 1, the steel column 5
And the steel beam 6 are connected and fixed to their respective central portions, and the column main reinforcement 8 and the beam main reinforcement 9 are arranged in parallel to the flanges 10 of the steel column 5 and the steel beam 6, respectively. The two ends of the column main bar 8 and the beam main bar 9 are each welded to the flange 1 by welding.
Fixes to 0. These fixed column main bar 8 and beam main bar 9
, A plurality of closed-type shear reinforcing bars 11 and 15 are wound. In the column 2, except for both ends of the steel column 5, the steel column 5, the column main bar 8, and the closed-type shear reinforcing bar 11 are provided.
The concrete 12 covering the whole is cast. On the other hand, in the beam 3, both ends of the steel beam 6 and the upper flange 10
A concrete 16 covering the steel beam 6, the beam main reinforcement 9, and the closed-type shear reinforcement 15 is cast in a range except for the main reinforcement 9 attached to the upper flange 10 and the beam main reinforcement 9.
Thus, a precast joint unit 1 is formed.

【0016】現場で鉄骨柱を複数本施工し、この鉄骨柱
に上記接合部ユニット1をそれぞれの鉄骨柱5に取り付
ける。ここで、接合部ユニット1の鉄骨柱5鉛直方向に
向けた状態で、施工された鉄骨柱と、接合部ユニット1
の鉄骨柱5の接合端部7とをそれぞれ対向させ、それぞ
れの鉄骨柱5に金属板19を介してボルトにより固定す
る。そして、これら接合部ユニット1の鉄骨梁6の接合
端部7をそれぞれ対向させ、それぞれの鉄骨梁6に金属
板19を介してボルトにより固定する。
On the site, a plurality of steel columns are constructed, and the joint unit 1 is attached to each steel column 5 on the steel columns. Here, in the state where the steel column 5 of the joint unit 1 is oriented in the vertical direction, the steel column constructed and the joint unit 1
The joint ends 7 of the steel columns 5 are opposed to each other, and are fixed to the respective steel columns 5 via bolts via metal plates 19. Then, the joint ends 7 of the steel beams 6 of these joint units 1 are opposed to each other, and are fixed to the respective steel beams 6 via bolts via metal plates 19.

【0017】次に、これら接続された接合部ユニット1
の接合端部7の回りに型枠を取り付ける。柱2では、こ
れら接合端部7全体をグラウト20により覆い、施工さ
れた鉄骨柱と接合部ユニット1の鉄骨柱5とを一体にす
る。一方、梁3では、剥き出しにされた鉄骨梁6上に、
床版17を取り付ける。この床版17上に、図4に示す
ように、コンクリートを打設して床スラブ18を形成す
とともに、これら接続された接合部ユニット1の接合
端部7の回りにコンクリートを打設する。以下同様に、
固定された接合部ユニット1に、さらにプレキャスト化
された接合部ユニット1を載置し、これら柱2の接合端
部7を接続するとともに、これら梁3の接合端部7を接
続し、コンクリートを打設し、順次を躯体を構築してい
く。なお、床版17の取り付け及び床スラブ18打設
は、躯体が構築された後に行ってもよい。
Next, these connected joint units 1
A mold is attached around the joint end 7 of FIG. In the column 2, the entire joint end 7 is covered with the grout 20, and the constructed steel column and the steel column 5 of the joint unit 1 are integrated. On the other hand, in the beam 3, on the exposed steel beam 6 ,
Attach the floor slab 17. As shown in FIG. 4, concrete is cast on the floor slab 17 to form a floor slab 18.
That together, the concrete is around the joint end portion 7 of the joint unit 1 is these connections. Similarly,
On the fixed joint unit 1, the precast joint unit 1 is further placed, and the joint ends 7 of these columns 2 are connected, and the joint ends 7 of these beams 3 are connected, and concrete is removed. Casting and building the frame sequentially. The attachment of the floor slab 17 and the placement of the floor slab 18 may be performed after the skeleton is constructed.

【0018】このような躯体の接合部構造においては、
鉄骨鉄筋コンクリート製の柱2および鉄骨鉄筋コンクリ
ート製の梁3の接合部がプレキャスト化されているため
に、これら柱2および梁3をそれぞれ接続することによ
り建築躯体を構成することができるため、現場で行う鉄
骨を組み立てる工程、鉄筋を組み立てる工程、型枠を組
み立てる工程、コンクリートを型枠内に打設する工程、
及び所定の強度が発現した後の型枠の脱型工程がそれぞ
れ省略され、現場で接合部ユニット1を組み立てるだけ
で躯体が構築されるために、施工期間を短縮することが
できる。そして、柱2の鉄骨柱5のフランジ10には柱
主筋8がそれぞれ定着され、梁3の鉄骨梁6のフランジ
10には梁主筋9がそれぞれ定着されているため、柱主
筋8および梁主筋9の現場での配筋作業が省略され、そ
れぞれ柱主筋8及び梁主筋9の接続する作業が省略さ
れ、接続作業性を向上させることができ、高所での配筋
作業が省略されるため、安全性を高めることができると
ともに、さらに施工期間を短縮することができる。さら
に、柱2および梁3の各端部には、隣接する接合部の柱
2および梁3の対向する各端部を接合する構成とされて
いるため、柱および柱の接続作業を容易にし、接合部ユ
ニット1の取り扱い作業性を向上させることができる。
また、鉄骨柱5及び鉄骨梁6の周囲に閉鎖型剪断補強筋
11、15がそれぞれ巻回されているために、それぞれ
のコンクリート12、16の剪断方向に対する強度を高
め、鉄骨梁6にシアコッター14が設けられているた
め、梁3のコンクリ−ト16の剪断方向に対する強度を
さらに高め、安全性を高めることができる。さらに、接
合部ユニット1においては、梁3の上面に鉄骨梁6のフ
ランジ10に定着された梁主筋9が露出する構成となる
ために、梁3の上面に床スラブ18を打設して形成する
際に、床スラブ18と梁3とを強固に一体化することが
できる。さらに、柱2および梁3の各端部において、鉄
骨柱5および鉄骨梁6の端部を露出させるとともに、柱
主筋8および梁主筋9の端部を鉄骨柱5および鉄骨梁6
に定着した状態としたため、接合ユニット1の柱2また
は梁3の端部同士を接合する際に、柱主筋8または梁主
筋9同士を接続する必要が無く、鉄骨柱5同士 または鉄
骨梁6同士のみを接続すればよいので、施工性がよい。
そして、これら鉄骨柱5および鉄骨梁6同士の接合端部
7を、床スラブ18のコンクリートを打設する際に、同
時にコンクリートで被覆することができるため、より一
層の施工の簡略化を図ることができる。これにより、建
築物を構築する際において、工期を短縮化するとともに
作業性を向上させることができる。
In such a joint structure of a skeleton,
Since the joints between the steel reinforced concrete columns 2 and the steel reinforced concrete beams 3 are precast, a building frame can be formed by connecting the columns 2 and the beams 3 respectively. The process of assembling steel frames, assembling rebar, assembling formwork, casting concrete into formwork,
In addition, the step of removing the mold after the predetermined strength is developed is omitted, and the frame is constructed only by assembling the joint unit 1 on site, so that the construction period can be shortened. The column main reinforcement 8 is fixed to the flange 10 of the steel column 5 of the column 2, and the beam main reinforcement 9 is fixed to the flange 10 of the steel beam 6 of the beam 3, respectively. The work of connecting the main bar 8 and the main beam 9 to each other can be omitted, the connection workability can be improved, and the reinforcing work at high places can be omitted. Safety can be improved and the construction period can be further reduced. Furthermore, since each end of the column 2 and the beam 3 is configured to join the opposing ends of the column 2 and the beam 3 of the adjacent joint, the connection work of the column and the column is facilitated, The handling workability of the joint unit 1 can be improved.
Further, since the closed-type shear reinforcing bars 11 and 15 are wound around the steel column 5 and the steel beam 6, respectively, the strength of the concrete 12 and 16 in the shearing direction is increased, and the shear cotter 14 is attached to the steel beam 6. Is provided, the strength of the beam 3 in the shear direction of the concrete 16 can be further increased, and safety can be enhanced. In addition,
In the joint unit 1, the steel beams 6
The main beam 9 fixed to the flange 10 is exposed.
For this purpose, a floor slab 18 is formed by casting on the upper surface of the beam 3.
At this time, the floor slab 18 and the beam 3 may be firmly integrated.
it can. Further, at each end of the column 2 and the beam 3, iron
While exposing the end of the trabecular column 5 and the steel beam 6,
The ends of the main bars 8 and the beam main bars 9 are connected to the steel columns 5 and the steel beams 6.
To the column 2 of the joining unit 1
When the ends of the beam 3 are joined together,
There is no need to connect the streaks 9 and the steel columns 5 or iron
Since only the trabecular bones 6 need to be connected, the workability is good.
And the joint end of these steel column 5 and steel beam 6
7 when placing concrete on the floor slab 18
Sometimes it can be covered with concrete,
The construction of the layer can be simplified. As a result,
When constructing a building, shorten the construction period and
Workability can be improved.

【0019】[0019]

【発明の効果】以上の説明から明らかなように、本発明
の躯体の接合部構造によれば、以下の効果を奏すること
ができる。請求項1記載の躯体の接合部構造によれば、
鉄骨鉄筋コンクリート製の柱および鉄骨鉄筋コンクリー
ト製の梁の接合部がプレキャスト化されているために、
現場で行う鉄骨を組み立てる工程、鉄筋を組み立てる工
程、型枠を組み立てる工程、コンクリートを型枠内に打
設する工程及び所定の強度が発現した後の型枠の脱型工
程がそれぞれ省略され、現場で接合部ユニットを組み立
てるだけで躯体が構築されるために、施工期間を短縮す
ることができる。また、鉄骨柱のフランジには柱主筋が
それぞれ定着され、梁の鉄骨梁のフランジには梁主筋が
それぞれ定着されているため、現場での配筋作業が省略
され、それぞれ柱主筋及び梁主筋の接続する作業が省略
され、接続作業性を向上させることができ、高所での配
筋作業が省略されるため、安全性を高めることができる
とともに、さらに施工期間を短縮することができる。
らに、柱および梁の各端部には、隣接する接合部の柱お
よび梁の対向する各端部を接合する構成とされているた
め、柱および柱の接続作業を容易にし、接合部ユニット
の取り扱い作業性を向上させることができる。そして、
接合部ユニットにおいては、梁の上面に鉄骨梁のフラン
ジに定着された梁主筋が露出する構成となるために、梁
の上面に床スラブを打設して形成する際に、床スラブと
梁とを強固に一体化することができる。さらに、柱およ
び梁の各端部において、鉄骨柱および鉄骨梁の端部を露
出させるとともに、柱主筋および梁主筋の端部を鉄骨柱
および鉄骨梁に定着した状態としたため、接合ユニット
の柱または梁の端部同士を接合する際に、柱主筋または
梁主筋同士を接続する必要が無く、鉄骨柱同士または鉄
骨梁同士のみを接続すればよいので、施工性がよい。そ
して、これら鉄骨柱および鉄骨梁同士の接合端部を、床
スラブのコンクリートを打設する際に、同時にコンクリ
ートで被覆することができるため、より一層の施工の簡
略化を図ることができる。これにより、建築物を構築す
る際において、工期を短縮化するとともに作業性を向上
させることができる。
As is clear from the above description, according to the joint structure of the skeleton of the present invention, the following effects can be obtained. According to the joint structure of the frame according to claim 1,
Because the joints of steel reinforced concrete columns and steel reinforced concrete beams are precast,
The steps of assembling the steel frame, assembling the rebar, assembling the formwork, casting the concrete into the formwork, and removing the formwork after the predetermined strength has been developed, which are performed on site, are omitted. Since the skeleton is constructed only by assembling the joint unit, the construction period can be shortened. In addition, the main bar of the column is fixed to the flange of the steel column, and the main bar of the beam is fixed to the flange of the steel beam of the beam. The connection work is omitted, the connection workability can be improved, and the reinforcing work at a high place is omitted, so that the safety can be improved and the construction period can be further shortened. Sa
Further, since each end of the column and the beam is configured to join the opposite end of the column and the beam of the adjacent joint, the connecting operation of the column and the column is facilitated, and the joint unit Operability can be improved. And
For the joint unit, the steel beam flange
The beam main bar fixed to the beam is exposed,
When forming a floor slab by casting it on the upper surface of
The beam and the beam can be firmly integrated. In addition, pillars and
At each end of the beam, expose the ends of the steel columns and beams.
And the ends of the column and beam bars are
And the unit is fixed to the steel beam.
When joining the ends of a column or beam,
There is no need to connect beam reinforcements, and steel columns or iron
Since only trabecular bones need to be connected, workability is good. So
Then, the joint ends of these steel columns and steel beams are
When placing slab concrete,
Can be coated with the
Abbreviation can be achieved. This allows building
Shortening the construction period and improving workability
Can be done.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の躯体の接合部構造の側面図である。FIG. 1 is a side view of a joint structure of a skeleton according to the present invention.

【図2】図1の柱の断面図である。FIG. 2 is a cross-sectional view of the column of FIG.

【図3】図1の梁の断面図である。FIG. 3 is a sectional view of the beam of FIG. 1;

【図4】図1の床版及びコンクリート打設後の梁の断面
図である。
FIG. 4 is a cross-sectional view of the floor slab of FIG. 1 and a beam after placing concrete.

【符号の説明】[Explanation of symbols]

1 接合部ユニット 2 柱 3 梁 5 鉄骨柱 6 鉄骨梁 7 接合端部 8 柱主筋 9 梁主筋 10 フランジ REFERENCE SIGNS LIST 1 joint unit 2 pillar 3 beam 5 steel column 6 steel beam 7 joint end 8 pillar main bar 9 beam main bar 10 flange

───────────────────────────────────────────────────── フロントページの続き (72)発明者 神野 靖夫 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 熊谷 仁志 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (56)参考文献 特開 昭49−2315(JP,A) 特開 昭58−207440(JP,A) 特開 平2−236328(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04B 1/30 E04B 1/16 E04C 3/00 - 3/46 ──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Yasuo Jinno 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Hitoshi Kumagai 1-2-3 Shibaura, Minato-ku, Tokyo Shimizu (56) References JP-A-49-2315 (JP, A) JP-A-58-207440 (JP, A) JP-A-2-236328 (JP, A) (58) Fields surveyed ( Int.Cl. 7 , DB name) E04B 1/30 E04B 1/16 E04C 3/00-3/46

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 躯体を構成する鉄骨鉄筋コンクリート製
の柱および鉄骨鉄筋コンクリート製の梁の接合部をプレ
キャスト化することにより接合部ユニットを形成し、 該接合部ユニットを、前記柱の一部を構成する鉄骨柱の
フランジに、柱主筋の端部を定着するとともに、前記梁
の一部を構成する鉄骨梁のフランジに梁主筋の端部を定
着し、なおかつ、前記梁の上面に、前記梁主筋を露出さ
せて配置した構成とし、さらに、前記柱および梁の各端
部において、前記鉄骨柱および前記鉄骨梁の端部を露出
させた構成としたことを特徴とする躯体の接合部構造
1. The joint between a steel reinforced concrete column and a steel reinforced concrete beam constituting a frame is preformed.
A joint unit is formed by casting, and the joint unit is formed of a steel column constituting a part of the column.
At the flange, fix the end of the main bar, and
The end of the beam main reinforcement to the flange of the steel beam that forms part of the
On the upper surface of the beam, and exposing the main beam of the beam.
And each end of the column and the beam
In the part, the ends of the steel column and the steel beam are exposed
The structure of the joint of the skeleton, characterized in that it is made to have a configuration .
JP03198394A 1991-07-12 1991-07-12 Frame joint structure Expired - Fee Related JP3114024B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03198394A JP3114024B2 (en) 1991-07-12 1991-07-12 Frame joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03198394A JP3114024B2 (en) 1991-07-12 1991-07-12 Frame joint structure

Publications (2)

Publication Number Publication Date
JPH0518004A JPH0518004A (en) 1993-01-26
JP3114024B2 true JP3114024B2 (en) 2000-12-04

Family

ID=16390402

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03198394A Expired - Fee Related JP3114024B2 (en) 1991-07-12 1991-07-12 Frame joint structure

Country Status (1)

Country Link
JP (1) JP3114024B2 (en)

Also Published As

Publication number Publication date
JPH0518004A (en) 1993-01-26

Similar Documents

Publication Publication Date Title
JP4490532B2 (en) Precast composite beam structure
JP3306632B2 (en) Construction method of building
JP3114024B2 (en) Frame joint structure
JPH10227010A (en) Steel form with main reinforcement for bridge floor panel and bridge floor panel construction method using it
JPH1150538A (en) Building and method for constructing the same
JPH06104993B2 (en) Construction method of steel pipe precast concrete columns
JP2797023B2 (en) Construction method of beam
JPH0732706Y2 (en) Reinforcement structure of precast reinforced concrete columns and crossed steel frames for joining steel beams
JP2645329B2 (en) Pillar construction method
JP3052102B2 (en) Construction method of building drive using joint structure
JP2782111B2 (en) Steel framing construction method
JPH0588331B2 (en)
JPH0746152B2 (en) Structure of containment vessel wall
JPH0830360B2 (en) Connection method for columns and beams
JP2629496B2 (en) Construction method of structure
JP3312945B2 (en) Construction method of concrete structure
JPH03151429A (en) Reinforcement preassembled beam with formwork and working method thereof
JPH02282538A (en) Construction method of reinforced concrete-made building frame
JPH06306935A (en) Connection structure of column and beam of rc structure and its construction
JPS6370733A (en) Construction of connection part of pillar and beam in concrete structure
JPH0213694B2 (en)
JPH0711171B2 (en) Reinforced steel composite column
JPH0460183B2 (en)
JPH04309630A (en) Skeleton construction method using pc member
JPH0366852A (en) Construction method for complex structure of precast reinforced concrete column and steel beam

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000801

LAPS Cancellation because of no payment of annual fees