JP3081777B2 - Water leakage prevention wall for tunnel - Google Patents

Water leakage prevention wall for tunnel

Info

Publication number
JP3081777B2
JP3081777B2 JP07240977A JP24097795A JP3081777B2 JP 3081777 B2 JP3081777 B2 JP 3081777B2 JP 07240977 A JP07240977 A JP 07240977A JP 24097795 A JP24097795 A JP 24097795A JP 3081777 B2 JP3081777 B2 JP 3081777B2
Authority
JP
Japan
Prior art keywords
wall
plate
panel
tunnel
wall panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07240977A
Other languages
Japanese (ja)
Other versions
JPH0960494A (en
Inventor
貴司 柳井
Original Assignee
株式会社淀川製鋼所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社淀川製鋼所 filed Critical 株式会社淀川製鋼所
Priority to JP07240977A priority Critical patent/JP3081777B2/en
Publication of JPH0960494A publication Critical patent/JPH0960494A/en
Application granted granted Critical
Publication of JP3081777B2 publication Critical patent/JP3081777B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、トンネル内壁から
の漏水によってつららを生じたり、路面が凍結するのを
防ぐために、トンネル内を壁パネルで覆う漏水防止壁に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a water leakage prevention wall for covering an inside of a tunnel with a wall panel in order to prevent icicles from being generated by water leakage from a tunnel inner wall or freezing of a road surface.

【0002】[0002]

【従来の技術】トンネル用の漏水防止壁は、特公平4−
60199号公報および特公平4−60200号公報に
公知である。そこでは、上下に一対の締結座を有するハ
ット形断面の取付金具をトンネル内壁に先付け固定し、
上下の締結座に壁パネルを締結固定して、壁パネルをト
ンネル内壁から浮き離れた状態で横張り状に取り付けて
いる。上下に隣接する壁パネルの接合隙間、すなわち横
目地部からの漏水を防ぐために、隙間部分の裏面(トン
ネル内壁と対向する側)をポリエチレンフォームシート
からなる防水シートで覆っている。詳しくは、壁パネル
に裏打ちした防水シートをパネル下縁より下方へ垂れ幕
状に突出させ、この垂れ下がったシート裾部を下段の壁
パネルの裏面に重ねて防水している。さらに、左右の壁
パネルの接合隙間すなわち縦目地部を断面山形の止水材
で裏面側から塞ぎ、隙間の表面側を化粧板で覆ってい
る。止水材はポリエチレンフォームで形成した弾性条材
からなる。
2. Description of the Related Art Water leakage prevention walls for tunnels are disclosed in
No. 60199 and Japanese Patent Publication No. 4-60200. There, a hat-shaped cross-section mounting bracket with a pair of fastening seats on the top and bottom is fixed to the inner wall of the tunnel first,
The wall panels are fastened and fixed to the upper and lower fastening seats, and the wall panels are mounted in a horizontal state in a state of being separated from the inner wall of the tunnel. The back surface of the gap (the side facing the inner wall of the tunnel) is covered with a waterproof sheet made of a polyethylene foam sheet in order to prevent water from leaking from the joint gap between the vertically adjacent wall panels, that is, the horizontal joint. More specifically, a waterproof sheet lined with the wall panel is projected downward from the lower edge of the panel in a hanging manner, and the hanging sheet hem is overlapped on the back surface of the lower wall panel to provide waterproofing. Further, the joint gap between the left and right wall panels, that is, the vertical joint is closed from the back side with a waterproof material having a mountain-shaped cross section, and the front side of the gap is covered with a decorative board. The waterproof material is made of an elastic strip formed of polyethylene foam.

【0003】[0003]

【発明が解決しようとする課題】横目地部の防水に関し
て、シート裾部を下段側のパネル裏面に重ねる上記の防
水構造では、十分な防水機能が得難い。詳しくは、ポリ
エチレンフォームで形成してあるシート裾部が軟らかく
変形しやすいので、壁パネルの移送時や、施工現場での
取扱い時などに誤って傷付けやすく、傷付いた状態のま
まで壁パネルを組むと、その部分から漏水する。壁パネ
ルを接合する際に、シート裾部をパネル接合部にたくし
込んだり、折り込んでしまいやすい。こうした組み付け
不良を避ける必要上、施工に手間を要する不利もある。
シート裾部はパネル裏面に単に被さっているだけなの
で、施工後にも両者間に隙間を生じるおそれが多分にあ
る。両者を接着すると隙間の発生は阻止できるが、その
作業は困難を極める。
With respect to waterproofing of the horizontal joints, it is difficult to obtain a sufficient waterproofing function by the above waterproofing structure in which the sheet hem is overlapped with the back surface of the lower panel. In detail, the sheet hem made of polyethylene foam is soft and easily deformed, so it is easy to be accidentally scratched when transporting the wall panel or handling it at the construction site, etc. When assembled, water will leak from that area. When joining wall panels, it is easy to knock or fold the seat hem into the panel joint. There is also a disadvantage that the installation is troublesome in addition to the necessity of avoiding such a defective assembly.
Since the seat hem simply covers the rear surface of the panel, there is a possibility that a gap may be formed between the two even after construction. Adhesion of the two can prevent the formation of a gap, but the operation is extremely difficult.

【0004】縦目地部では、壁パネルの側端面を止水材
に密着して防水を行う。しかし、左右の壁パネルの隣接
間隔は、パネル面のレベルの違い等によってばらつくこ
とが多く、隣接間隔が拡がる場合にパネル側端面を止水
材に密着させることができず、その隙間から漏水するお
それがあった。換言すると、施工時のばらつきの許容幅
が小さく、施工に細心の注意を要する。壁パネルを取付
金具に固定するための一群のボルト頭部が、全てパネル
表面に露出するので、仕上がり状態における外観上の体
裁にも欠ける不利があった。
[0004] In the vertical joint portion, the side end surface of the wall panel is brought into close contact with a waterproof material to perform waterproofing. However, the adjacent distance between the left and right wall panels often fluctuates due to a difference in the level of the panel surface, etc., and when the adjacent distance increases, the panel side end face cannot be brought into close contact with the waterproof material, and water leaks from the gap. There was a fear. In other words, the permissible range of variation at the time of construction is small, and careful attention is required for construction. Since a group of bolt heads for fixing the wall panel to the mounting bracket are all exposed on the panel surface, there is a disadvantage that the appearance of the finished state is lacking.

【0005】本発明の目的は、横目地部および縦目地部
のそれぞれを確実に防水でき、長期にわたって施工時と
同等の防水機能を発揮できるトンネル用の漏水防止壁を
提供することにある。本発明の目的は、施工時に組み付
け不良を生じる余地がなく、しかも縦目地部の目地間隔
が大小にばらつく場合にも支障なく対応でき、均質に施
工できるトンネル用の漏水防止壁を提供することにあ
る。本発明の目的は、壁パネルを取付金具に固定するた
めのボルト本数を半分以下に減少でき、しかも締結状態
におけるボルト頭部をパネル接合部の目地底に位置させ
て隠し、漏水防止壁の外観をスッキリした印象に仕上げ
るにある。
An object of the present invention is to provide a water leakage prevention wall for a tunnel which can surely waterproof each of a horizontal joint portion and a vertical joint portion and can exhibit a waterproof function equivalent to that at the time of construction for a long time. SUMMARY OF THE INVENTION An object of the present invention is to provide a water leakage prevention wall for a tunnel, which has no room for assembling failure at the time of construction, can cope with a case where the joint spacing of vertical joints varies in size, and can be constructed uniformly. is there. SUMMARY OF THE INVENTION An object of the present invention is to reduce the number of bolts for fixing a wall panel to a mounting bracket to less than half, and furthermore, the bolt head in a fastened state is located at the joint bottom of a panel joint to hide the exterior of the water leakage prevention wall. There is to finish in a refreshing impression.

【0006】[0006]

【課題を解決するための手段】本発明の漏水防止壁は、
図3に示すごとく上下縁に沿って凹凸状の連結部2・2
を有する左右横長の壁パネル1が、塗装鋼板ないしはメ
ッキ−塗装鋼板等で形成した表裏の外被板1a・1b間
にプラスチック材を発泡充填して断熱層1cを設けたサ
ンドイッチパネルからなり、壁パネル1の一群をトンネ
ル内壁Wに固定される取付金具6に締結し、トンネル内
壁Wから浮き離れた状態の壁面を形成するものである。
その壁パネル1の裏外被板1bには、図5に示すごとく
パネル下縁から下方へ突出する金属板製の横水切板4
と、一方のパネル側端から外側方へ突出する金属板製の
縦水切板5とが、それぞれ固定されている。
The water leakage prevention wall of the present invention comprises:
As shown in FIG. 3, the connecting portions 2 and 2 are uneven along the upper and lower edges.
The left and right horizontally long wall panel 1 is composed of a sandwich panel in which a plastic material is foam-filled between front and back outer plates 1a and 1b formed of a coated steel plate or a plating-coated steel plate or the like and a heat insulating layer 1c is provided. One group of panels 1 is fastened to a mounting bracket 6 fixed to the tunnel inner wall W to form a wall surface that is separated from the tunnel inner wall W.
As shown in FIG. 5, a horizontal drain plate 4 made of a metal plate protruding downward from the lower edge of the panel is provided on the back cover plate 1 b of the wall panel 1.
And a vertical drainage plate 5 made of a metal plate protruding outward from one panel side end.

【0007】取付金具6は、トンネル内壁Wに締結固定
される締結座12と、締結座12に連続してトンネル内
壁Wとほぼ平行に立ち上げられた連結座10と、連結座
10の裏面に固定したボルト20用のシールブロック1
3とを備えており、取付金具6の締結座12が横水切板
4の下端縁から突出する状態で、壁パネル1の裏外被板
1bに連結座10を予め先付け固定する。そして、図1
に示すごとく取付金具6の締結座12をトンネル内壁W
に締結固定したのち、上段の壁パネル1の下端の連結部
2に対して下段の壁パネル1の上端の連結部2を連結座
10の外面側で差し込み接合し、この状態において下段
の壁パネル1の上端の連結部2と上段の壁パネル1の横
水切板4とをパネル外面側からねじ込んだボルト20で
連結座10に締結固定し、上下パネル1・1の接合部裏
面側を横水切板4で覆う。
The mounting bracket 6 includes a fastening seat 12 fastened and fixed to the inner wall W of the tunnel, a connecting seat 10 standing up substantially in parallel with the inner wall W of the tunnel continuing from the fastening seat 12, and a back surface of the connecting seat 10. Seal block 1 for fixed bolt 20
The connecting seat 10 is pre-fixed to the back cover plate 1b of the wall panel 1 in advance with the fastening seat 12 of the mounting bracket 6 protruding from the lower edge of the horizontal drainage plate 4. And FIG.
As shown in the figure, the fastening seat 12 of the mounting bracket 6 is connected to the inner wall W of the tunnel.
Then, the connecting portion 2 at the upper end of the lower wall panel 1 is inserted and joined to the connecting portion 2 at the lower end of the upper wall panel 1 on the outer surface side of the connecting seat 10 in this state. 1 and the horizontal drain plate 4 of the upper wall panel 1 are fastened and fixed to the connection seat 10 with bolts 20 screwed from the outer side of the panel, and the rear side of the joint of the upper and lower panels 1.1 is horizontally drained. Cover with plate 4.

【0008】左右に隣接する壁パネル1・1間の縦目地
部は、図4に示すごとく縦水切板5で裏面側から塞ぎ、
これら三者で形成される縦目地溝をバックアップ材23
と、可塑性シーリング材24とで封止し、該縦目地溝の
外面を化粧板25で覆う。
The vertical joint between the left and right adjacent wall panels 1 and 1 is closed with a vertical drain plate 5 from the back side as shown in FIG.
The vertical groove formed by these three members is used as a backup material 23.
And a plastic sealing material 24, and the outer surface of the vertical joint groove is covered with a decorative plate 25.

【0009】具体的には、横水切板4および縦水切板5
は、壁パネル1の裏外被板1bに対して防水性を備えた
粘着テープ7でそれぞれ固定する。壁パネル1の裏外被
板1bの左右両端に配置した取付金具6の一方を壁パネ
ル1の側端縁に沿って配置し、縦水切板5を間に挟んで
壁パネル1にブラインドリベット16で固定する。下段
の壁パネル1の上端の連結部2は、その表外被板1aを
凹み形成することによって、上下に隣接する壁パネル1
・1の連結部2・2間にパネル表面側が凹む横目地部を
形成し、この横目地部にボルト20の操作頭部が収まる
状態で下段の壁パネル1の上方の連結部2を該ボルト2
0で連結座10に締結固定したものである。
Specifically, the horizontal draining plate 4 and the vertical draining plate 5
Are fixed to the back cover plate 1b of the wall panel 1 with an adhesive tape 7 having waterproofness. One of the mounting brackets 6 arranged on the left and right ends of the back outer cover plate 1b of the wall panel 1 is arranged along the side edge of the wall panel 1, and the blind rivet 16 is attached to the wall panel 1 with the vertical drain plate 5 interposed therebetween. Fix with. The connecting portion 2 at the upper end of the lower wall panel 1 is formed by recessing the outer cover plate 1a so that the vertically adjacent wall panel 1 is formed.
A joint is formed between the joints 1 and 2 so that the panel surface side is recessed, and the joint 2 above the lower wall panel 1 is connected to the bolt 2 with the operation head of the bolt 20 set in the joint. 2
0 is fixed to the connection seat 10.

【0010】[0010]

【作用】縦横の水切板4・5は、それぞれ金属板で形成
して壁パネル1に予め固定するので、施工時に各水切板
4・5がパネル接合部にたくし込まれたり折り込まれる
ことはない。壁パネル1の取扱い時に傷付くこともな
い。取り付け状態において、横水切板4を取付金具6に
対して壁パネル1と共にボルト20で締結するので、横
水切板4を下段側の壁パネル1に密着させることができ
る。縦目地部は縦水切板5で塞いだうえで、バックアッ
プ材23と可塑性シーリング材24と化粧板25で封止
するから、左右の壁パネル1・1の隣接間隔がばらつく
場合にも支障なく対応でき、確実に防水を行える。
The vertical and horizontal draining plates 4 and 5 are each formed of a metal plate and fixed to the wall panel 1 in advance, so that the draining plates 4 and 5 are not knocked or folded into the panel joint during construction. . There is no damage when the wall panel 1 is handled. In the mounted state, the horizontal drainage plate 4 is fastened to the mounting bracket 6 together with the wall panel 1 with the bolts 20, so that the horizontal drainage plate 4 can be brought into close contact with the lower wall panel 1. The vertical joints are covered with the vertical drain board 5 and sealed with the backup material 23, the plastic sealing material 24, and the decorative board 25, so that even when the adjacent distance between the left and right wall panels 1 1 varies, there is no problem. Yes, it can be waterproof.

【0011】予め取付金具6を壁パネル1の裏外被板1
bに固定しておくので、施工現場で壁パネル1をトンネ
ル内壁Wに取り付けるために必要なボルト本数が、従来
の施工態様の半分以下に減る。パネル表面から凹む目地
部においてボルト20を締結し、その操作頭部が目地部
に収まっていると、少なくともボルト20の操作頭部が
目立たない。
The mounting bracket 6 is previously mounted on the back panel 1 of the wall panel 1.
b, the number of bolts required to attach the wall panel 1 to the tunnel inner wall W at the construction site is reduced to less than half of the conventional construction mode. When the bolt 20 is fastened at the joint recessed from the panel surface and the operation head is settled in the joint, at least the operation head of the bolt 20 is inconspicuous.

【0012】[0012]

【実施例】図2において、漏水防止壁を形成するための
壁パネル1は、上下縁に沿ってそれぞれ連結部2・2を
設けた左右横長のサンドイッチパネルからなり、塗装鋼
板ないしはメッキ−塗装鋼板等の金属板で形成した表裏
一対の外被板1a・1b間に、プラスチック材を発泡充
填した断熱層1cを設けてなる。上下の各連結部2に
は、それぞれ断面U字形状の接合壁部2aを設ける。こ
の接合壁部2aどうしを互い違い状に差し込み接合可能
とするために、上方の接合壁部2aは裏面側へ片寄せて
形成し、下方の接合壁部2aは表面側へ片寄せて形成す
る。下方の接合壁部2aの溝部底には、ゴム製のパッキ
ン3を埋設してある。
In FIG. 2, a wall panel 1 for forming a water leakage prevention wall is composed of a left-right horizontally long sandwich panel provided with connecting portions 2 along the upper and lower edges, respectively, and is a painted steel plate or a plated-painted steel plate. A heat insulating layer 1c formed by foaming and filling a plastic material is provided between a pair of front and back cover plates 1a and 1b formed of a metal plate such as the above. Each of the upper and lower connecting portions 2 is provided with a joining wall portion 2a having a U-shaped cross section. In order to enable the joining walls 2a to be inserted alternately and joined to each other, the upper joining wall 2a is formed so as to be offset toward the back surface, and the lower joining wall 2a is formed as being offset toward the front surface. A rubber packing 3 is embedded in the bottom of the groove of the lower joining wall 2a.

【0013】壁パネル1の裏外被板1bには、横水切板
4と縦水切板5とをそれぞれ固定し、さらに裏外被板1
bの左右両端に取付金具6を固定する。このうち、横水
切板4は、亜鉛メッキ鋼板や塗装鋼板等の防錆処理され
た鋼板、あるいはアルミニウム板、ステンレス鋼板など
の金属板を帯板状に形成したものであって、その左右長
さは壁パネル1の左右長さよりも僅かに大きく寸法設定
する。
A horizontal draining plate 4 and a vertical draining plate 5 are fixed to the back cover plate 1b of the wall panel 1, respectively.
The mounting brackets 6 are fixed to both left and right ends of b. Among them, the horizontal drainage plate 4 is formed by forming a rust-preventive steel plate such as a galvanized steel plate or a coated steel plate, or a metal plate such as an aluminum plate or a stainless steel plate into a strip shape. Is set slightly larger than the left and right length of the wall panel 1.

【0014】この横水切板4は壁パネル1の裏外被板1
bの下縁寄りに接合して、板面下縁がパネル下縁より下
方へ突出しており、さらに板面の一側端がパネル側端か
ら左外側方へ突出する状態で、板面の上縁を粘着テープ
7で裏外被板1bに固定してある。この例での横水切板
4は、上下幅寸法を125mm、パネル下縁からの下方へ
の突出寸法を50mm、パネル側端からの突出寸法を50
mmとした。
The horizontal drainage plate 4 is a back cover plate 1 of the wall panel 1.
b near the lower edge, the lower edge of the panel protrudes below the lower edge of the panel, and one edge of the panel protrudes leftward from the edge of the panel. The edge is fixed to the back cover plate 1b with an adhesive tape 7. The horizontal drain plate 4 in this example has a vertical width of 125 mm, a downward projecting dimension from the lower edge of the panel is 50 mm, and a projecting dimension from the panel side end is 50 mm.
mm.

【0015】縦水切板5は横水切板4と同じ素材で上下
縦長の長方形状に形成されており、その上下寸法は壁パ
ネル1の上下幅寸法に横水切板4の下方への突出寸法を
加えた長さに設定してある。この縦水切板5は横水切板
4の側方突端縁に沿わせて壁パネル1の裏外被板1bに
接合したうえで、縦水切板5の板面の右側縁を粘着テー
プ7で裏外被板1bおよび横水切板4に固定する。これ
により、壁パネル1の裏面側の左側縁および下縁に沿っ
て止水壁8が連結形成される。粘着テープ7は防水性を
備えている粘着テープ、例えばブチルゴムテープや、ベ
ースフィルムの表面にアルミニウム箔をライニングし、
あるいはアルミ蒸着した粘着テープを用いる。
The vertical drain board 5 is formed of the same material as the horizontal drain board 4 and is formed in a vertically long rectangular shape. The vertical dimension of the vertical drain board 5 corresponds to the vertical width dimension of the wall panel 1 and the downward projecting dimension of the horizontal drain board 4. It is set to the added length. The vertical draining plate 5 is joined to the back cover plate 1b of the wall panel 1 along the side edge of the horizontal draining plate 4, and the right edge of the vertical draining plate 5 is backed with an adhesive tape 7. It is fixed to the jacket plate 1b and the horizontal drain plate 4. Thereby, the water stop wall 8 is connected and formed along the left edge and the lower edge on the back surface side of the wall panel 1. The adhesive tape 7 is provided with a waterproof adhesive tape, for example, a butyl rubber tape or a lining of a base film with aluminum foil,
Alternatively, an aluminum-deposited adhesive tape is used.

【0016】取付金具6は、図1に示すごとく上下一対
の脚壁9と、両脚壁9の一端どうしを接続する連結座1
0とで側面視がコ字形の受枠部11を形成し、下方の脚
壁9に連続して締結座12を下向きに突設したプレス成
形品からなり、連結座10の裏面下端寄りに発泡プラス
チック材で形成した直方体状のシールブロック13を貼
り付けてある。締結座12の板面にボルト挿通孔14を
設け、さらに連結座10の上端寄りに2個のリベット孔
を設けておく。脚壁9の立ち上がり高さは約20mmであ
って、この寸法を対向隙間にして壁パネル1がトンネル
内壁Wと対向する。なお、取付金具6はステンレス鋼板
で形成した。
As shown in FIG. 1, the mounting bracket 6 includes a pair of upper and lower leg walls 9 and a connecting seat 1 for connecting one ends of both leg walls 9 to each other.
0, a receiving frame portion 11 is formed in a U-shape when viewed from the side, and is formed by a press-formed product in which a fastening seat 12 is projected downward from the lower leg wall 9 continuously. A rectangular parallelepiped seal block 13 made of a material is attached. A bolt insertion hole 14 is provided on the plate surface of the fastening seat 12, and two rivet holes are provided near the upper end of the connection seat 10. The rising height of the leg wall 9 is about 20 mm, and the wall panel 1 is opposed to the inner wall W of the tunnel with this dimension as an opposing gap. The mounting bracket 6 was formed from a stainless steel plate.

【0017】左右の各取付金具6は、それぞれの締結座
12が横水切板4の止水壁8の下端縁より下方に突出す
る状態で連結座10を壁パネル1の裏外被板1bに接合
し、リベット孔に挿通したブラインドリベット16で壁
パネル1に締結固定する。このとき、図4において左方
の取付金具6は、連結座10の側縁が壁パネル1の左側
端縁に沿うよう縦水切板5の裏面に配置して、縦水切板
5と横水切板4とを同時に締結する。右方の取付金具6
は壁パネル1の右側端縁の手前に配置して、横水切板4
を同時に締結する。
Each of the left and right mounting brackets 6 connects the connecting seat 10 to the back cover plate 1b of the wall panel 1 in a state where the respective fastening seats 12 project below the lower end edge of the water stop wall 8 of the horizontal drainage plate 4. It is joined and fastened and fixed to the wall panel 1 with a blind rivet 16 inserted through the rivet hole. At this time, the left mounting bracket 6 in FIG. 4 is arranged on the back surface of the vertical drainage plate 5 so that the side edge of the connection seat 10 is along the left edge of the wall panel 1, and the vertical drainage plate 5 and the horizontal drainage plate And 4 at the same time. Right mounting bracket 6
Is located just before the right edge of the wall panel 1 and
At the same time.

【0018】上記のように縦横の水切板4・5と取付金
具6とを一体に設けた壁パネルは、図3に示すようにト
ンネル内壁Wの上面中央に設けたスタータ22に連続し
て、両脇へ向かって取り付けて行く。詳しくは、図1に
示すようにトンネル内壁Wにアンカーボルト17を打ち
込み、その軸部に締結座12のボルト挿通孔14を挿通
した後、外側からナット18をアンカーボルト17の突
出軸部にねじ込んで締結座12をトンネル内壁Wに固定
する。このとき、前記ブラインドリベット16の頭部外
面は可塑性シーリング材で覆って防水しておく。
The wall panel in which the vertical and horizontal drainers 4 and 5 and the mounting bracket 6 are integrally provided as described above is connected to a starter 22 provided at the center of the upper surface of the tunnel inner wall W as shown in FIG. Attach to both sides. Specifically, as shown in FIG. 1, an anchor bolt 17 is driven into the inner wall W of the tunnel, and a bolt portion of the fastening seat 12 is inserted into a shaft portion of the anchor bolt 17, and then a nut 18 is screwed into a projecting shaft portion of the anchor bolt 17 from outside. Then, the fastening seat 12 is fixed to the inner wall W of the tunnel. At this time, the outer surface of the head of the blind rivet 16 is covered with a plastic sealing material to be waterproof.

【0019】次に、下段となる新たな壁パネル1を用意
し、図1に示すごとくその上方の連結部2の連結溝に可
塑性シーリング材19を充填した後、これを図5に示す
ごとく既に固定した上段の壁パネル1の下端の連結部2
に下方より案内して嵌め込み係合連結する。壁パネル1
の上端の連結部2には、その表外被板1aを凹み形成し
てあり、これにより連結部2・2間に凹字状の横目地部
31が形成されるので、この横目地部31の底壁からセ
ルフドリリングボルト(ボルト)20をねじ込んで、下
段の壁パネル1の接合壁部2aの基端を取付金具6の連
結座10に締結固定する。セルフドリリングボルト20
の先端は、連結座10の裏面に設けたシールブロック1
3に喰い込んでシールされる。
Next, a new lower wall panel 1 is prepared, and the connecting groove of the connecting portion 2 above the new wall panel 1 is filled with a plastic sealing material 19 as shown in FIG. Connection part 2 at the lower end of fixed upper wall panel 1
Are guided from below to be engaged and connected. Wall panel 1
The outer joint plate 1a is recessed in the connecting portion 2 at the upper end of the joint, and a concave joint portion 31 is formed between the connecting portions 2 and 2 so that the joint portion 31 has a concave shape. A self-drilling bolt (bolt) 20 is screwed in from the bottom wall of the lower wall panel 1 to fasten and fix the base end of the joint wall 2a of the lower wall panel 1 to the connection seat 10 of the mounting bracket 6. Self drilling bolt 20
Of the seal block 1 provided on the back surface of the connection seat 10
It is sealed by biting into 3.

【0020】この図1の締結状態において、壁パネル1
・1の上下の横目地部31の裏面は、横水切板4の止水
壁8で覆われる。従って、パネル裏面に沿って漏水が流
下する場合にも、漏水が接合部に浸入することはない。
止水壁8は連結座10に壁パネル1と共締め固定されて
いるので、施工後にも確実に防水作用を発揮する。前記
ボルト20の頭部は横目地部31の内部に位置するの
で、仕上がり状態における壁面の体裁を損なわない。以
後は取付金具6のトンネル内壁Wへの締結と、新たな壁
パネル1の接合および取付金具6への締結を上から下へ
と順に繰り返すことにより、トンネル周面に沿うパネル
列を形成でき、このパネル列をトンネル軸方向へ連続し
て形成することにより、漏水防止壁を構築できる。
In the fastening state shown in FIG.
The back surface of the upper and lower horizontal joints 31 is covered with the water blocking wall 8 of the horizontal drainage board 4. Therefore, even when water leaks down along the back surface of the panel, the water does not enter the joint.
Since the water stop wall 8 is fixedly fastened to the connection seat 10 together with the wall panel 1, the waterproof effect is reliably exhibited even after construction. Since the head of the bolt 20 is located inside the horizontal joint portion 31, the appearance of the wall surface in the finished state is not impaired. Thereafter, by repeating the fastening of the mounting bracket 6 to the inner wall W of the tunnel and the joining of the new wall panel 1 and the fastening to the mounting bracket 6 in order from top to bottom, it is possible to form a panel row along the tunnel peripheral surface, By forming the panel row continuously in the tunnel axial direction, a water leakage prevention wall can be constructed.

【0021】左右に隣接する壁パネル1・1は、図4に
示すように約20mmの隙間をあけて配置するが、この縦
目地部の目地隙間Eの裏面は縦水切板5の止水壁8によ
って塞ぐ。さらに、両壁パネル1・1の側端面と止水壁
8とで形成される縦目地溝は、バックアップ材23と、
これの外面側に重ねた可塑性シーリング材24とで封止
し、これらの最外面を左右の壁パネル1・1を跨ぐ状態
で取り付けた化粧板25で覆う。従って、漏水が縦目地
部から染み出すことはない。
As shown in FIG. 4, the right and left adjacent wall panels 1 and 1 are arranged with a gap of about 20 mm. Block by 8. Further, the vertical joint grooves formed by the side end surfaces of the two wall panels 1 and the water blocking wall 8 are provided with a backup material 23,
This is sealed with a plastic sealing material 24 superposed on the outer surface side, and the outermost surfaces thereof are covered with a decorative plate 25 attached so as to straddle the left and right wall panels 1. Therefore, water leakage does not seep out from the vertical joint.

【0022】上記の可塑性シーリング材24および19
としては、例えば変成シリコーンコーキング材やシリコ
ーンコーキング材等を適用できる。バックアップ材23
は発泡ポリエチレン製の条材からなり、縦目地部に押し
込み装着されて、自己の弾性力によって装着状態を維持
する。化粧板25は塗装鋼板やメッキ−塗装鋼板で形成
した帯状の板材からなり、その左右幅方向の両端を裏面
側へ折り返して水切壁26を設け、この水切壁26の裏
面側にシール材27を貼り付ける。化粧板25の左右端
は、水切壁26を同時に貫通するブラインドリベット3
2で左右に隣接する壁パネル1・1にそれぞれ締結固定
する。
The above-mentioned plastic sealing materials 24 and 19
For example, a modified silicone caulking material or a silicone caulking material can be used. Backup material 23
Is made of foamed polyethylene and is pressed into the vertical joint, and is kept attached by its own elastic force. The decorative plate 25 is made of a band-shaped plate material formed of a coated steel plate or a plating-coated steel plate, and both ends in the left-right width direction are turned back to the back side to provide a drain wall 26, and a sealing material 27 is provided on the back side of the drain wall 26. paste. The left and right ends of the decorative board 25 are blind rivets 3 penetrating the drain wall 26 at the same time.
2 fastens and fixes to the left and right adjacent wall panels 1.1 respectively.

【0023】上記のように縦目地部をバックアップ材2
3と可塑性シーリング材24とで封止すると、左右の壁
パネル1・1の隣接間隔がばらつく場合にも、これに対
応して縦目地溝を支障なく確実に封止できる。
As described above, the vertical joint is formed by the backup material 2
When sealing is performed with the plastic sealing material 3 and the plastic sealing material 24, the vertical joint groove can be reliably sealed without any trouble even when the adjacent space between the left and right wall panels 1 1 varies.

【0024】上記の実施例以外に、本発明は図6ないし
図8に示す形態で実施することができる。図6の例で
は、前記ボルト20が収まる接合目地に可塑性シーリン
グ材28を充填して、ボルト頭部を完全に覆い隠してい
る。図7の例では、上下の壁パネル1・1の横目地部3
1の裏面に可塑性シーリング材29を充填して、横目地
部31と横水切板4との間を更に封水する仕様とした。
In addition to the above embodiment, the present invention can be embodied in the forms shown in FIGS. In the example shown in FIG. 6, a plastic sealing material 28 is filled in a joint joint where the bolt 20 is accommodated, and the bolt head is completely covered and hidden. In the example of FIG. 7, the horizontal joint portions 3 of the upper and lower wall panels 1.1 are used.
1 was filled with a plastic sealing material 29 so that the space between the horizontal joint portion 31 and the horizontal drainage plate 4 was further sealed.

【0025】図8に示す壁パネル1は、上下の連結部2
・2の断面構造が上記の実施例のそれと異なる。すわな
ち、下方の連結部2に断面U字状の接合壁部2aを設
け、これに嵌まり込む接合リブ2bを上方の連結部2に
設けたものである。このように、連結部2の断面形状
は、壁パネル1の厚み寸法や形成材によって変更すべき
事項であって、互いに嵌係合して厚み方向への移動を規
制できる形状であればよい。なお、図6ないし図7にお
いては、先の実施例と同じ部材には同一符号を付して、
その説明を省略する。
The wall panel 1 shown in FIG.
The cross-sectional structure of 2 is different from that of the above embodiment. That is, a joining wall portion 2a having a U-shaped cross section is provided in the lower connecting portion 2, and a joining rib 2b fitted into the joining wall portion 2b is provided in the upper connecting portion 2. As described above, the cross-sectional shape of the connecting portion 2 is a matter to be changed depending on the thickness dimension and the forming material of the wall panel 1 and may be any shape that can be fitted and engaged with each other to restrict the movement in the thickness direction. 6 and 7, the same members as those in the previous embodiment are denoted by the same reference numerals, and
The description is omitted.

【0026】上記以外に、横水切板4は溶接や接着によ
って壁パネル1に固定できる。取付金具6は中空枠状に
形成でき、この場合はトンネル内壁Wと接当する壁面を
アンカーボルト17に締結固定する。ボルト20として
は、セルフドリリングボルト以外にタッピンボルトなど
を用いることもできる。
In addition to the above, the horizontal drain plate 4 can be fixed to the wall panel 1 by welding or bonding. The mounting bracket 6 can be formed in a hollow frame shape. In this case, a wall surface that comes into contact with the tunnel inner wall W is fastened and fixed to the anchor bolt 17. As the bolt 20, a self-drilling bolt or a tapping bolt can be used.

【0027】[0027]

【発明の効果】本発明では、横目地部を壁パネル1の裏
外被板1bに固定した金属板製の横水切板4で覆って止
水した。しかも横水切板4の止水壁8を下段側の壁パネ
ル1と共に取付金具6に締結固定した。また、縦目地部
は、その裏面側を金属板製の縦水切板5で覆い、縦目地
溝にバックアップ材23と可塑性シーリング材24とを
充填して封止し、さらにその外面を化粧板25で覆って
止水した。従って、横目地部および縦目地部のそれぞれ
を確実に防水できるのはもちろんのこと、長期使用時に
も施工時と同等の防水機能を維持して、各目地部からの
水の浸み出しを確実に阻止できる。
According to the present invention, the horizontal joint is covered with a horizontal drain plate 4 made of a metal plate fixed to the back cover plate 1b of the wall panel 1 to stop water. In addition, the water stop wall 8 of the horizontal drain board 4 was fastened and fixed to the mounting bracket 6 together with the lower wall panel 1. The vertical joint portion is covered with a vertical draining plate 5 made of a metal plate on the back surface, filled with a backup material 23 and a plastic sealing material 24 in the vertical joint groove, and sealed. And covered with water. Therefore, it is possible not only to ensure waterproofing of the horizontal joints and the vertical joints, but also to maintain the same waterproofing function as during construction even during long-term use, and to ensure that water seeps out of each joint. Can be stopped.

【0028】それぞれ金属板で形成した縦横の水切板4
・5で一次止水を行うので、施工時に止水壁8がパネル
接合部にたくし込まれるなどの組み付け不良を生じる余
地がなく、壁パネル1の接合を容易に行える。さらに縦
目地部の目地間隔が大小にばらつく場合にも、可塑性シ
ーリング材24の充填量を加減するだけで支障なく対応
でき、全体として壁パネル1のトンネル内壁Wへの取り
付けが容易にしかも均一な仕上がり品質を保証して行え
る。
Vertical and horizontal drainers 4 each formed of a metal plate
Since the primary water stop is performed in step 5, there is no room for assembly failure such as the water stop wall 8 being knocked into the panel joint during construction, and the wall panel 1 can be easily joined. Furthermore, even when the joint spacing of the vertical joints varies in size, it can be dealt with simply by adjusting the filling amount of the plastic sealing material 24, and as a whole, the wall panel 1 can be easily and uniformly attached to the tunnel inner wall W. Finished quality can be guaranteed.

【0029】取付金具6は壁パネル1の裏外被板1bに
予め固定しておくので、施工時には下段側の壁パネル1
を取付金具6にボルト20で締結するだけでよく、従来
の施工形態に比べて、壁パネル1の取り付け作業に要す
るボルト本数が半分以下にまで減少し、組み付けの手間
を減らしボルト20が目立つのを抑止できる。とくに、
接合目地を利用してボルト20の操作頭部を目地内に収
める締結形態を採るので、仕上がり状態における外観が
スッキリしたものとなり、その体裁を向上できる。
Since the mounting bracket 6 is fixed to the back cover plate 1b of the wall panel 1 in advance, the lower wall panel 1 is installed at the time of construction.
Only needs to be fastened to the mounting bracket 6 with the bolts 20, and the number of bolts required for the mounting work of the wall panel 1 is reduced to less than half compared with the conventional construction form, the labor for assembling is reduced, and the bolts 20 are conspicuous. Can be suppressed. In particular,
Since the fastening mode is adopted in which the operation head of the bolt 20 is accommodated in the joint using the joint, the appearance in the finished state is refreshed, and the appearance can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】壁パネルの上下の接合構造を示す縦断側面図で
ある。
FIG. 1 is a longitudinal sectional side view showing an upper and lower joining structure of a wall panel.

【図2】壁パネルを裏面側から見た斜視図である。FIG. 2 is a perspective view of the wall panel viewed from the back side.

【図3】施工状態の概略を示すトンネル断面の内部斜視
図である。
FIG. 3 is an internal perspective view of a tunnel section showing an outline of a construction state.

【図4】図3におけるA−A線断面図である。FIG. 4 is a sectional view taken along line AA in FIG.

【図5】壁パネルの組み付け手順を示す要部の正面図で
ある。
FIG. 5 is a front view of a main part showing a procedure of assembling the wall panel.

【図6】別の施工例を示す縦断側面図である。FIG. 6 is a longitudinal sectional side view showing another construction example.

【図7】更に別の施工例を示す縦断側面図である。FIG. 7 is a longitudinal sectional side view showing still another construction example.

【図8】壁パネルの別実施例を示す縦断側面図である。FIG. 8 is a vertical sectional side view showing another embodiment of the wall panel.

【符号の説明】[Explanation of symbols]

1 壁パネル 2 連結部 4 横水切板 5 縦水切板 6 取付金具 10 連結座 12 締結座 13 シールブロック 20 ボルト 23 バックアップ材 24 可塑性シーリング材 25 化粧板 W トンネル内壁 DESCRIPTION OF SYMBOLS 1 Wall panel 2 Connection part 4 Horizontal drain board 5 Vertical drain board 6 Mounting bracket 10 Connection seat 12 Fastening seat 13 Seal block 20 Bolt 23 Backup material 24 Plastic sealing material 25 Decorative board W Tunnel inner wall

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上下縁に沿って凹凸状の連結部2・2を
有する左右横長の壁パネル1が、塗装鋼板ないしはメッ
キ−塗装鋼板等で形成した表裏の外被板1a・1b間に
プラスチック材を発泡充填して断熱層1cを設けたサン
ドイッチパネルからなり、壁パネル1の一群が、トンネ
ル内壁Wに固定される取付金具6に締結されて、トンネ
ル内壁Wから浮き離れた状態の壁面を形成するトンネル
用の漏水防止壁であって、 壁パネル1の裏外被板1bには、パネル下縁から下方へ
突出する金属板製の横水切板4と、一方のパネル側端か
ら外側方へ突出する金属板製の縦水切板5とがそれぞれ
固定されており、 取付金具6は、トンネル内壁Wに締結固定される締結座
12と、締結座12に連続してトンネル内壁Wとほぼ平
行に立ち上げられた連結座10と、連結座10の裏面に
固定したボルト20用のシールブロック13とを備えて
おり、 取付金具6の締結座12が横水切板4の下端縁から突出
する状態で、壁パネル1の裏外被板1bに連結座10を
予め先付け固定してあり、 取付金具6の締結座12をトンネル内壁Wに締結固定し
たのち、上段の壁パネル1の下端の連結部2に対して下
段の壁パネル1の上端の連結部2を連結座10の外面側
で差し込み接合し、この状態において下段の壁パネル1
の上端の連結部2と上段の壁パネル1の横水切板4と
が、パネル外面側からねじ込んだボルト20で連結座1
0に締結固定されて、上下パネル1・1の接合部裏面側
が横水切板4で覆われており、 左右に隣接する壁パネル1・1間の縦目地部を縦水切板
5で裏面側から塞ぎ、これら三者で形成される縦目地溝
をバックアップ材23と、可塑性シーリング材24とで
封止し、該縦目地溝の外面が化粧板25で覆われている
トンネル用の漏水防止壁。
1. A left-right horizontally long wall panel 1 having uneven connecting portions 2 along upper and lower edges is formed of a coated steel plate or a plated-painted steel plate or the like. It consists of a sandwich panel provided with a heat insulating layer 1c by foaming and filling a material, and a group of wall panels 1 is fastened to a mounting bracket 6 fixed to the tunnel inner wall W to remove the wall surface floating from the tunnel inner wall W. A water leakage prevention wall for a tunnel to be formed, a lateral outer plate 1b made of a metal plate protruding downward from a lower edge of the panel, and a lateral drain plate 4 protruding downward from a lower edge of the panel. A vertical draining plate 5 made of a metal plate protruding from each other is fixed, and a mounting bracket 6 is fixed to the inner wall W of the tunnel, and is fixed to the inner wall W of the tunnel. Connection seat 1 launched in And a seal block 13 for bolts 20 fixed to the back surface of the connection seat 10. The fastening seat 12 of the mounting bracket 6 protrudes from the lower end edge of the horizontal drainage plate 4, and After the connecting seat 10 is previously fixed to the plate 1b and the fastening seat 12 of the mounting bracket 6 is fastened and fixed to the inner wall W of the tunnel, the lower wall panel is connected to the connecting portion 2 at the lower end of the upper wall panel 1. 1 is inserted and joined on the outer surface side of the connection seat 10 in this state, and in this state, the lower wall panel 1
Of the upper end of the panel and the horizontal drain plate 4 of the upper wall panel 1 are connected to the connecting seat 1 by bolts 20 screwed from the outer surface side of the panel.
0, the back side of the joint of the upper and lower panels 1.1 is covered with a horizontal drain board 4, and the vertical joint between the left and right adjacent wall panels 1.1 is cut by a vertical drain board 5 from the back side. A vertical joint groove formed by these three members is sealed with a backup material 23 and a plastic sealing material 24, and a water leakage prevention wall for a tunnel in which the outer surface of the joint groove is covered with a decorative plate 25.
【請求項2】 横水切板4および縦水切板5が、壁パネ
ル1の裏外被板1bに対して防水性を備えた粘着テープ
7でそれぞれ固定されており、 壁パネル1の裏外被板1bの左右両端に配置した取付金
具6の一方が、壁パネル1の側端縁に沿って配置され、
縦水切板5を間に挟んで壁パネル1にブラインドリベッ
ト16で固定してあり、 下段の壁パネル1の上端の連結部2は、その表外被板1
aを凹み形成することによって、上下に隣接する壁パネ
ル1・1の連結部2・2間にパネル表面側が凹む横目地
部が形成され、この横目地部にボルト20の操作頭部が
収まる状態で、下段の壁パネル1の上方の連結部2を該
ボルト20で連結座10に締結固定してある請求項1記
載のトンネル用の漏水防止壁。
2. The horizontal draining plate 4 and the vertical draining plate 5 are fixed to a back outer covering plate 1b of the wall panel 1 with an adhesive tape 7 having waterproof property, respectively. One of the mounting brackets 6 arranged on the left and right ends of the plate 1b is arranged along the side edge of the wall panel 1,
A vertical rivet plate 5 is interposed therebetween and fixed to the wall panel 1 with a blind rivet 16. The connecting portion 2 at the upper end of the lower wall panel 1 is connected to its front cover plate 1.
By recessing a, a horizontal joint is formed between the connecting portions 2.2 of the vertically adjacent wall panels 1.1 so that the panel surface side is concave, and the operation head of the bolt 20 is accommodated in the horizontal joint. The water leakage prevention wall for a tunnel according to claim 1, wherein the connection portion (2) above the lower wall panel (1) is fastened and fixed to the connection seat (10) with the bolt (20).
JP07240977A 1995-08-24 1995-08-24 Water leakage prevention wall for tunnel Expired - Fee Related JP3081777B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07240977A JP3081777B2 (en) 1995-08-24 1995-08-24 Water leakage prevention wall for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07240977A JP3081777B2 (en) 1995-08-24 1995-08-24 Water leakage prevention wall for tunnel

Publications (2)

Publication Number Publication Date
JPH0960494A JPH0960494A (en) 1997-03-04
JP3081777B2 true JP3081777B2 (en) 2000-08-28

Family

ID=17067484

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07240977A Expired - Fee Related JP3081777B2 (en) 1995-08-24 1995-08-24 Water leakage prevention wall for tunnel

Country Status (1)

Country Link
JP (1) JP3081777B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2451449A (en) * 2007-07-30 2009-02-04 Lameek Ltd Waterproof tunnel lining
CN103541740A (en) * 2013-10-31 2014-01-29 同济大学 Structure system for reducing tunnel lining frost heaving force in cold region

Also Published As

Publication number Publication date
JPH0960494A (en) 1997-03-04

Similar Documents

Publication Publication Date Title
US4700520A (en) Side joint of composite metal panel
US4924647A (en) Exterior wall panel drainage system
US4685263A (en) Aluminum plate curtain wall structure
JPH06322848A (en) Waterproof structure of vertical outer wall joint
JP3081777B2 (en) Water leakage prevention wall for tunnel
US5953867A (en) Seal arrangement for a swimming-pool lining structure
JP2930338B2 (en) Building panel
JPH11222965A (en) Watertight structure of curtain wall
JPH07269087A (en) End structure
JPH0312082Y2 (en)
JP2003003595A (en) Sealing structure at vertical and horizontal frames connecting portion of curtain wall
JP2843531B2 (en) Mounting structure of curtain wall unit and cubic and seamless joining structures supporting this curtain wall unit
JPH094328A (en) Heat insulating sash
JP2003328529A (en) Vertical joint structure of external facing material
JP3160498B2 (en) Joint structure
JP2527450Y2 (en) Watertight structure of wall panels
JP3245319B2 (en) Unit bathroom wall panel joint structure
JPH0532563Y2 (en)
JP3523402B2 (en) Wall panel mounting structure
JPH07259230A (en) Leak-prevention type curtain wall
JPH0238962Y2 (en)
AU2002309202B2 (en) An insulated panel
GB2520966A (en) A composite insulation panel
JP2001173191A (en) Joint material and its execution method
JP2007278019A (en) Seal structure for exterior-wall joint

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees