JP3075152B2 - Hanging jig for piping material and method of installing piping material using the same - Google Patents

Hanging jig for piping material and method of installing piping material using the same

Info

Publication number
JP3075152B2
JP3075152B2 JP07232824A JP23282495A JP3075152B2 JP 3075152 B2 JP3075152 B2 JP 3075152B2 JP 07232824 A JP07232824 A JP 07232824A JP 23282495 A JP23282495 A JP 23282495A JP 3075152 B2 JP3075152 B2 JP 3075152B2
Authority
JP
Japan
Prior art keywords
pipe
hanging
holding
members
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07232824A
Other languages
Japanese (ja)
Other versions
JPH0977458A (en
Inventor
達也 脇坂
恭司 吉野
幸次 渡辺
泰邦 上村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP07232824A priority Critical patent/JP3075152B2/en
Publication of JPH0977458A publication Critical patent/JPH0977458A/en
Application granted granted Critical
Publication of JP3075152B2 publication Critical patent/JP3075152B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建物の構築作業と
併行して建て込まれる、例えば上下水用の配管材を搬送
するための吊り治具及びこれを用いた配管材の建て込み
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging jig for transporting, for example, plumbing materials for water and sewage, which is built in parallel with the construction work of a building, and a method of installing a plumbing material using the same. .

【0002】[0002]

【従来の技術】従来、建物を構築する際、この構築作業
と併行して上下水用の配管材を建て込む場合があり、こ
の場合において、配管材をクレーン等の吊り下げ手段に
よって一本一本吊り下げて搬送するという方法が採られ
ていた。すなわち、例えば地上のストックヤードに積み
あげられた配管材の一本にワイヤーを緊結し、これをク
レーンで水平状態或いは垂下状態で建築中の建物上部の
建て込み予定箇所まで搬送し、ここにおいて建て込み、
その後前記緊結を解除するとともにクレーンを地上のス
トックヤードまで移動させるという作業を繰り返すこと
により複数の配管材を搬送していた。
2. Description of the Related Art Conventionally, when constructing a building, there is a case where piping materials for water supply and sewage are built in parallel with this construction work. In this case, the piping materials are individually suspended by a hanging means such as a crane. The method of carrying the book by hanging it has been adopted. That is, for example, a wire is tied to one of the plumbing materials piled up in the stockyard on the ground, and the crane is transported horizontally or vertically to a place where it is to be built at the top of the building under construction by a crane. Including
Thereafter, the work of releasing the binding and moving the crane to the stock yard on the ground is repeated, thereby transporting a plurality of pipe members.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記方
法では、クレーンを地上と建物上部の建て込み予定箇所
との間を逐次往復させて配管材を一本一本搬送するう
え、かかる建て込み予定箇所は構築中の建物全体に点在
していることとも相俟って、搬送作業に時間がかかると
いう問題があった。また、配管材の建て込み予定箇所の
周囲では、他の建築作業、例えば床配筋等の作業が行わ
れており、これら他の作業の進行を妨げないようにかか
る搬送作業を短時間で行う必要があった。
However, according to the above-mentioned method, the crane is reciprocated between the ground and the place to be built at the top of the building one by one to convey each pipe material one by one, and the place to be built is required. There is a problem that it takes a long time for the transport work, in combination with being scattered throughout the building under construction. In addition, other construction work, for example, work such as floor arrangement, is performed around the planned place where the pipe material is to be built, and the transfer work is performed in a short time so as not to hinder the progress of these other works. Needed.

【0004】また、上記方法では、配管材の一本一本を
ワイヤーで緊結するとともに、建て込み後にはこの緊結
を一本一本解除するものであったため、その作業が煩雑
でありこれが配管材の建て込み作業が遅延する原因の一
つにもなっていた。
[0004] In addition, in the above-described method, each pipe member is tied with a wire, and after erection, this tie is released one by one. Was one of the causes of the delay in the construction work.

【0005】この発明は、かかる課題を解決すべくなさ
れたもので、複数の配管材を一括して搬送することを可
能とし、搬送作業に要する時間を削減するとともに、ワ
イヤーの緊結等の作業を省略できる配管材の吊り治具及
びこれを用いた配管材の建て込み方法を提供することを
目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problem, and enables a plurality of pipes to be conveyed collectively, thereby reducing the time required for the conveyance work and reducing the work such as wire binding. It is an object of the present invention to provide a piping material suspending jig which can be omitted and a method of installing a piping material using the same.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
本発明の配管材の吊り治具は、クレーン等の吊下手段に
よって複数の配管材を搬送するための吊り治具であっ
て、前記吊下手段によって吊り下げられ前記複数の配管
材の各一端部を下向きに回動自在に且つ係脱自在にそれ
ぞれ保持する保持手段と、前記吊り下げ手段によって吊
り下げられ前記複数の配管材の各他端部を下方から係脱
自在にそれぞれ保持する係合手段とからなるものである
(請求項1)。
In order to achieve the above object, the present invention provides a pipe material suspending jig for transporting a plurality of pipe materials by a suspending means such as a crane. Holding means suspended by suspending means to hold each end of each of the plurality of pipe members rotatably downward and detachably, respectively; and each of the plurality of pipe materials suspended by the suspending means An engaging means for holding the other end portion detachably from below from below (claim 1).

【0007】また、上記吊り治具を用いた本発明の配管
材の建て込み方法は、請求項1記載の配管材の吊り治具
を用いて複数の配管材を順次建て込み予定箇所に建込む
方法であって、予め、前記複数の配管材の各一端部を保
持手段により保持させるとともにこれら複数の配管材の
各他端部を係合手段により保持させ、この状態において
前記吊下手段でこれら複数の配管材をほぼ水平に前記建
て込み予定箇所上方まで搬送し、これら複数の配管材の
うちの一つの係合手段を解除するとともに保持手段を下
向きに回動させて前記配管材を垂下させて前記建て込み
予定箇所にこれを建て込み、その後前記保持手段を解除
するとともに前記吊り下げ治具を次の建て込み予定箇所
上方に移動させ前記建て込み作業を繰り返すものである
(請求項2)。
Further, in the method of installing a piping material according to the present invention using the hanging jig, a plurality of piping materials are sequentially installed at a planned place using the hanging jig of the piping material according to the first aspect. A method in which one end of each of the plurality of pipe members is held in advance by holding means, and the other end of each of the plurality of pipe members is held by engagement means. A plurality of pipes are conveyed substantially horizontally to above the planned place to be built, one of the plurality of pipes is disengaged from the engaging means, and the holding means is rotated downward to drop the pipes. This is erected at the planned erection location, and then the holding means is released, and the hanging jig is moved above the next erection planned location to repeat the embedding work (claim 2). .

【0008】上記構成を有する請求項1記載の発明に係
る配管材の吊り治具によれば、保持手段及び係合手段に
より複数の配管材を一括して吊り下げることができるの
で、必要量の配管材を短時間に搬送することができる。
このとき、係合手段の保持を解除するとともに、保持手
段によって配管材を下向きに回動させることにより、配
管材を垂下状態とすることができるため、配管材を建て
込み作業が容易となる態勢にすることができ、その作業
を簡易なものとすることができる。
According to the pipe member suspending jig according to the first aspect of the present invention, a plurality of pipe members can be suspended at once by the holding means and the engaging means. The piping material can be transported in a short time.
At this time, since the holding of the engaging means is released, and the pipe member is rotated downward by the holding means, the pipe member can be made to be in a hanging state. And the operation can be simplified.

【0009】また、請求項2記載の発明に係る配管材の
建て込み方法によれば、一括して複数本の配管材を搬送
することができるので、クレーン等の往復回数を減少さ
せて、搬送時間を短縮することができる。殊に、搬送時
おいてはこれらの配管材はほぼ水平状態となるため安定
して搬送することができ、建て込み時においては配管材
を垂下した状態とするため建て込み作業が容易となる。
Further, according to the pipe material embedding method according to the second aspect of the present invention, since a plurality of pipe materials can be conveyed at once, the number of reciprocations of a crane or the like can be reduced to convey the pipe materials. Time can be reduced. In particular, these pipes can be stably transported during transportation because they are substantially in a horizontal state, and the pipes are hung down at the time of installation, which facilitates the installation work.

【0010】[0010]

【発明の実施の形態】以下、この発明の実施の形態を添
付図面を参照して詳細に説明する。図1はこの実施形態
にかかる配管材12の吊り治具10を示すものである。
配管材12は、建築物の構築作業と併行して、建築物の
高さ方向に延設すべく建て込まれるもので、例えば、上
下水用の配管として建築物内に配管されるものである。
Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 shows a hanging jig 10 for a pipe member 12 according to this embodiment.
The piping material 12 is built so as to extend in the height direction of the building in parallel with the construction work of the building. For example, the piping material 12 is piped into the building as water and water pipes. .

【0011】そして、前記吊り治具10は、吊下手段と
してのクレーン11によって複数の配管材12,12を
搬送するためのものであって、クレーン11によって吊
り下げられ複数の配管材12,12の各一端部を下向き
に回動自在に且つ係脱自在にそれぞれ保持する保持手段
13と、クレーン11によって吊り下げられ複数の配管
材12,12の各他端部を下方より係脱自在にそれぞれ
保持する係合手段14とからなるものである。
The hanging jig 10 is for transporting a plurality of pipes 12, 12 by a crane 11 as a suspending means. The hanging jig 10 is suspended by the crane 11 and has a plurality of pipes 12, 12. And holding means 13 for holding one end of each of the pipe members downward and rotatably and detachably, respectively, and the other end of each of a plurality of pipe members 12, 12 suspended by a crane 11 so as to be freely detachable from below. And holding means 14 for holding.

【0012】吊下手段であるクレーン11は、建築物の
最上階に設けられるタワークレーン等の揚重設備であ
り、地上に設けられた配管材12のストックヤードと、
建築中の建築物の最上部の施工現場との間を往復するも
のである。
The crane 11, which is a suspending means, is a lifting equipment such as a tower crane provided on the top floor of a building, and has a stockyard for piping materials 12 provided on the ground.
It reciprocates with the top construction site of the building under construction.

【0013】前記保持手段13は、本実施形態では、ワ
イヤロープ15で水平になるように吊下される断面が略
三角形状をなす保持手段本体16と、この保持手段本体
16の側面に複数配設されるヒンジ部17,17と、こ
のヒンジ部17により上下に回動自在に取付けられ、左
右に開閉して配管材1の端部を把持又は解放するアーム
部18とから構成される。
In the present embodiment, the holding means 13 is suspended by a wire rope 15 so as to be horizontal, and has a substantially triangular cross section. A hinge portion 17 is provided, and an arm portion 18 is attached rotatably up and down by the hinge portion 17 and opens and closes left and right to grip or release the end of the pipe material 1.

【0014】一方、係合手段14は、本実施形態では、
ワイヤロープ15で、前記保持手段本体15と平行とな
るように水平に、且つ前記保持手段本体15よりも配管
材1の直径分高く位置するように吊下される断面が略三
角形状をなす係合手段本体19と、この係合手段本体1
9の下面に複数配設され、開閉して配管材12の他端を
下方から係脱自在に保持する係合部20,20とから構
成されている。なお、係合部20は、ワイヤー等によっ
て緊張して、配管材12の他端を保持する構成とするこ
とができる。
On the other hand, in this embodiment, the engaging means 14 is
The wire rope 15 is hung horizontally so as to be parallel to the holding means main body 15 and higher than the holding means main body 15 by the diameter of the pipe material 1, and has a substantially triangular cross section. The engaging means main body 19 and the engaging means main body 1
A plurality of engaging portions 20 are provided on the lower surface of the pipe 9 and open and close to hold the other end of the pipe member 12 from below in a detachable manner. The engagement portion 20 may be configured to be tensioned by a wire or the like to hold the other end of the pipe member 12.

【0015】そして、このような構成の配管材の吊り治
具10を用いて配管材12を建込むには、図2中(a)
に示すように、先ず地上作業において、予め複数の配管
材12,12の各一端部を吊り治具10の保持手段13
のアーム部18により把持させて保持するとともに、こ
れら配管材12,12の各他端部を係合手段14により
下方から保持させる。
In order to set up the pipe member 12 using the pipe member suspending jig 10 having such a configuration, the pipe member 12 shown in FIG.
As shown in FIG. 1, first, in the ground work, one end of each of the plurality of pipe members 12 is previously held by the holding means 13 of the jig 10.
The other end portions of the pipe members 12 are held from below by the engaging means 14.

【0016】次いで、吊り治具10によって保持して、
吊下手段11で配管材12,12をほぼ水平とした状態
で建築物2の最上部の建て込み予定箇所3a上方まで搬
送する。そして、ここにおいて、同図中(b)に示すよ
うに、複数の配管材12,12のうちの一つの係合手段
14を解除するとともに保持手段13を下向きに回動さ
せて配管材12を垂下させる。
Next, holding by the hanging jig 10,
The pipes 12, 12 are transported by the suspending means 11 to the uppermost part 3a at the top of the building 2 in a state where the pipe members 12, 12 are substantially horizontal. Then, as shown in (b) of the figure, one of the plurality of piping members 12, 12 is released from the engaging means 14, and the holding means 13 is rotated downward, so that the piping member 12 is moved. Let it hang down.

【0017】その後、この状態でクレーン11を降下さ
せて、建込み予定箇所3aの下層階配管4a上に配管材
12を建て込む。その後、保持手段13を解除するとと
もに、この建て込まれた配管材12を下層階配管4aに
接続する。このように、搬送時には、配管材12を水平
状態で搬送し、建て込み時には、配管材12を垂下状態
とすることにより、配管材の搬送を安定させるととも
に、建て込み作業を簡易なものとすることができる。
Thereafter, the crane 11 is lowered in this state, and the pipe material 12 is laid on the lower floor pipe 4a of the erected site 3a. Thereafter, the holding means 13 is released, and the laid pipe material 12 is connected to the lower floor pipe 4a. Thus, at the time of conveyance, the pipe 12 is conveyed in a horizontal state, and at the time of erection, the pipe 12 is suspended, thereby stabilizing the conveyance of the pipe and simplifying the erection work. be able to.

【0018】この配管材12の建て込み作業が終了した
ら、同図中(c)に示すように、クレーン11を次の建
て込み予定箇所3bの上方に移動させ、ここにおいて前
記建て込み作業と同様の作業を繰り返す。すなわち、同
図中(d)に示すように、複数の配管材12,12のう
ちの一つの係合手段14を解除するとともに保持手段1
3を下向きに回動させて配管材12を垂下させ、建込み
予定箇所3bの下層階配管4b上に配管材12を建て込
む。その後、保持手段13を解除するとともに、この建
て込まれた配管材12を下層階配管4bに接続する。
When the work of installing the pipe member 12 is completed, the crane 11 is moved above the next scheduled place 3b, as shown in FIG. Repeat the above steps. That is, as shown in (d) of the figure, the engaging means 14 of one of the plurality of pipe members 12 is released and the holding means 1 is released.
3 is rotated downward so that the pipe material 12 hangs down, and the pipe material 12 is erected on the lower-floor pipe 4b of the planned installation location 3b. After that, the holding means 13 is released, and the laid pipe material 12 is connected to the lower floor pipe 4b.

【0019】上記構成を有する吊り治具10によれば、
保持手段13及び係合手段14により複数の配管材1
2,12を一括して吊り下げることができるので、必要
量の配管材12を短時間に搬送することができる。この
とき、係合手段14の保持を解除するとともに、保持手
段13によって配管材12を下向きに回動させることに
より、配管材12を垂下することができるため、その後
の建て込み作業時において、配管材12を建て込み作業
が容易となる態勢とすることができる。
According to the hanging jig 10 having the above configuration,
The plurality of pipe members 1 are held by the holding means 13 and the engaging means 14.
Since the pipes 2 and 12 can be suspended together, a required amount of the pipe material 12 can be transported in a short time. At this time, since the holding of the engaging means 14 is released, and the pipe member 12 is rotated downward by the holding means 13, the pipe member 12 can be hung down. The material 12 can be set in a state that facilitates the work.

【0020】次いで、本発明の吊り治具の他の実施形態
を図2を用いて説明する。同図(a)及び(b)におい
て、吊り治具20は、上述した実施形態と同様に、クレ
ーン11によって複数の配管材12,12を搬送するも
ので、配管材12,12の各一端部を下向きに回動自在
に且つ係脱自在にそれぞれ保持する保持手段21と、こ
の保持手段21と平行になるように配設され複数の配管
材12,12の各他端部を下方よりそれぞれ係脱自在に
保持する係合手段22とからなるものである。
Next, another embodiment of the hanging jig of the present invention will be described with reference to FIG. 5A and 5B, the hanging jig 20 transports a plurality of piping members 12, 12 by a crane 11, similarly to the above-described embodiment, and one end of each of the piping members 12, 12. Means 21 for holding each of the pipe members rotatably and detachably downward, and the other end portions of the plurality of piping members 12, 12 arranged in parallel with the holding means 21, respectively. And an engaging means 22 for detachably holding.

【0021】そして、本実施形態では、前記保持手段2
1は、ワイヤロープ15で水平になるように吊下される
断面が角型をなす保持手段本体23と、この保持手段本
体23の下面に取付けられ、配管材12の一端部に緊結
される麻ロープ等からなる保持部24とから構成されて
いる。
In this embodiment, the holding means 2
1 is a holding means main body 23 suspended in a horizontal shape by a wire rope 15 and having a rectangular cross section, and a hemp attached to the lower surface of the holding means main body 23 and fastened to one end of the pipe member 12. And a holding portion 24 made of a rope or the like.

【0022】一方、係合手段22は、本実施形態では、
ワイヤロープ15で、前記保持手段本体23と平行とな
るように水平に吊下される横架部材25と、この横架部
材25と前記保持手段本体23との間に複数懸架される
梁部材26,26と、これら梁部材26、26の端部か
ら麻ロープ27a等によって吊下された一対のフック状
部材27bからなる係合部27とから構成されている。
On the other hand, in this embodiment, the engaging means 22 is
A horizontal member 25 suspended horizontally by the wire rope 15 so as to be parallel to the holding unit main body 23, and a plurality of beam members 26 suspended between the horizontal member 25 and the holding unit main body 23. , 26 and an engaging portion 27 composed of a pair of hook-like members 27b suspended from the ends of the beam members 26, 26 by a hemp rope 27a or the like.

【0023】このような構成の吊り治具20を用いて配
管材12を搬送するには、上述した実施形態と同様に、
複数の配管材12,12の各一端部を吊り治具10の保
持手段21によって緊結して保持するとともに、これら
配管材12,12の各他端部を係合手段22のフック状
部材27b上に載置することにより、これを下方から保
持させ、この状態において、配管材12の建て込み予定
箇所3a上方まで搬送する。
In order to transport the pipe member 12 using the hanging jig 20 having such a configuration, as in the above-described embodiment,
One end of each of the plurality of pipe members 12 is tightly held by the holding means 21 of the hanging jig 10, and the other end of each of the pipe members 12 is held on the hook-like member 27 b of the engagement means 22. The pipe 12 is conveyed to above the planned place 3a of the pipe material 12 in this state.

【0024】そして、配管材12を建込む際には、配管
材12,12のうちの一つの配管材の一端部を係合手段
22のフック状部材27bから外して配管材12を垂下
させる。このとき、保持手段21の保持部24は麻ロー
プ等から構成されているので、容易に配管材12を下向
きに回動させることができる。
When the pipe 12 is to be built, one end of one of the pipes 12, 12 is detached from the hook-like member 27b of the engaging means 22, and the pipe 12 is hung down. At this time, since the holding portion 24 of the holding means 21 is formed of a hemp rope or the like, the pipe member 12 can be easily turned downward.

【0025】このような構成の吊り治具20によれば、
簡単な構成によって、複数の配管材を一括して搬送する
ことができるので、搬送するための設備費を低減するこ
とができる。特に、保持手段21を構成する保持部24
は麻ロープ等から形成されるため、配管材12を容易に
回動させることができる。また係合手段22を構成する
係合部27は、フック状部材27bを備え、これに配管
材12の他端部を載置することによってこれを保持させ
るので、これを係脱する作業が容易である。
According to the hanging jig 20 having such a configuration,
With a simple configuration, a plurality of pipe members can be transported collectively, so that equipment costs for transport can be reduced. In particular, the holding unit 24 constituting the holding unit 21
Since the pipe member 12 is formed of a hemp rope or the like, the pipe member 12 can be easily rotated. The engaging portion 27 of the engaging means 22 includes a hook-like member 27b, and the other end of the pipe member 12 is placed on the hook-like member 27b to hold it. It is.

【0026】なお、上記各実施形態において、吊り治具
10,20を用いて複数の配管材12を建込む際、これ
ら配管材12のうち、吊り治具10,20の両外側に装
着されたものから順次建込むことが好ましい。これによ
り、吊り治具10,20の水平が保たれ、バランスのよ
い作業が可能となり、建込み作業をより安全なものとす
ることができる。
In the above embodiments, when a plurality of piping members 12 are built using the hanging jigs 10, 20, the pipe members 12 are mounted on both outer sides of the hanging jigs 10, 20. It is preferable to build them one by one. Thereby, the leveling of the hanging jigs 10 and 20 is maintained, and a well-balanced operation can be performed, so that the installation operation can be performed more safely.

【0027】[0027]

【発明の効果】以上、詳細に説明したように、請求項1
記載の発明に係る配管材の吊り治具によれば、保持手段
及び係合手段により複数の配管材を一括して吊り下げる
ことができるので、必要量の配管材を短時間に搬送する
ことができる。このとき、係合手段の保持を解除すると
ともに、保持手段によって配管材を下向きに回動させる
ことにより、配管材を垂下することができるため、その
後の建て込み作業時において、配管材を建て込み作業が
容易となる態勢とすることができ、その作業を簡易なも
のとすることができる。
As described in detail above, claim 1 is as follows.
According to the pipe material suspending jig according to the described invention, a plurality of pipe members can be suspended at a time by the holding means and the engagement means, so that a required amount of pipe materials can be transported in a short time. it can. At this time, since the holding of the engagement means is released and the pipe is rotated downward by the holding means, the pipe can be hung down. Work can be facilitated, and the work can be simplified.

【0028】また、請求項2記載の発明に係る配管材の
建て込み方法によれば、一括して複数本の配管材を搬送
することができるので、クレーン等の往復回数を減少さ
せて、搬送時間を短縮することができる。殊に、搬送時
おいてはこれらの配管材は水平状態となるため、安定し
て搬送することができ、建て込み時においては配管材を
垂下した状態とするため建て込み作業が容易となる。
According to the pipe material embedding method according to the second aspect of the present invention, a plurality of pipe materials can be conveyed in a lump, so that the number of reciprocations of a crane or the like is reduced, and Time can be reduced. In particular, these pipes are in a horizontal state during transport, so that they can be transported stably. At the time of installation, the pipes are suspended so that the installation work becomes easy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る配管材の吊り治具の実施形態を示
す斜視図である。
FIG. 1 is a perspective view showing an embodiment of a pipe member suspending jig according to the present invention.

【図2】本発明に係る配管材の吊り治具を用いた柱の建
て込み方法の作業手順を示す説明図である。
FIG. 2 is an explanatory view showing an operation procedure of a method for erection of a column using a hanging jig for piping material according to the present invention.

【図3】本発明に係る配管材の吊り治具の変更実施形態
を示す説明図であり、(a)はその斜視図であり、
(b)はその側面図である。
FIG. 3 is an explanatory view showing a modified embodiment of a pipe material suspending jig according to the present invention, wherein (a) is a perspective view thereof,
(B) is a side view thereof.

【符号の説明】[Explanation of symbols]

10 吊り治具 11 吊下手段 12 配管材 13 保持手段 14 係合手段 13 補強用シート DESCRIPTION OF SYMBOLS 10 Hanging jig 11 Hanging means 12 Piping material 13 Holding means 14 Engaging means 13 Reinforcement sheet

───────────────────────────────────────────────────── フロントページの続き (72)発明者 上村 泰邦 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (56)参考文献 特開 平2−225291(JP,A) 実開 昭53−78039(JP,U) (58)調査した分野(Int.Cl.7,DB名) B66C 1/62 ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yasunori Uemura 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Head Office (56) References JP-A-2-225291 (JP, A) 53-78039 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) B66C 1/62

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 クレーン等の吊下手段によって複数の配
管材を搬送するための吊り治具であって、前記吊下手段
によって吊り下げられ前記複数の配管材の各一端部を下
向きに回動自在に且つ係脱自在にそれぞれ保持する保持
手段と、前記吊り下げ手段によって吊り下げられ前記複
数の配管材の各他端部を下方から係脱自在にそれぞれ保
持する係合手段とからなることを特徴とする配管材の吊
り治具。
1. A hanging jig for transporting a plurality of piping members by a hanging means such as a crane, wherein the jig is suspended by the hanging means and rotates one end of each of the plurality of piping members downward. Holding means for freely and detachably holding, and engagement means for hanging each other end of the plurality of pipe members suspended by the hanging means and holding the other end of each of the plurality of pipe members from below in a detachable manner. A special jig for hanging piping materials.
【請求項2】 請求項1記載の配管材の吊り治具を用い
て複数の配管材を順次建て込み予定箇所に建込む方法で
あって、予め、前記複数の配管材の各一端部を保持手段
により保持させるとともに該複数の配管材の各他端部を
係合手段により保持させ、この状態において前記吊下手
段でこれら複数の配管材をほぼ水平に前記建て込み予定
箇所上方まで搬送し、次いで該複数の配管材のうちの一
つの係合手段を解除するとともに保持手段を下向きに回
動させて該配管材を垂下させ前記建て込み予定箇所に建
て込み、その後前記保持手段を解除するとともに前記吊
り下げ治具を次の建て込み予定箇所上方に移動させ前記
建て込み作業を繰り返すことを特徴とする配管材の建て
込み方法。
2. A method for sequentially laying a plurality of pipes at a planned place using the pipe material suspending jig according to claim 1, wherein one end of each of the plurality of pipes is held in advance. While holding by means, the other end of each of the plurality of pipe members is held by engagement means, and in this state, the plurality of pipe members are conveyed substantially horizontally by the suspending means to a position above the planned installation location, Next, releasing the engaging means of one of the plurality of pipe members and rotating the holding means downward, dropping the pipe members, and building the pipe at the planned installation location, and then releasing the holding means A method of erection of a piping material, wherein the hanging jig is moved above a next scheduled erection site and the erection operation is repeated.
JP07232824A 1995-09-11 1995-09-11 Hanging jig for piping material and method of installing piping material using the same Expired - Fee Related JP3075152B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07232824A JP3075152B2 (en) 1995-09-11 1995-09-11 Hanging jig for piping material and method of installing piping material using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07232824A JP3075152B2 (en) 1995-09-11 1995-09-11 Hanging jig for piping material and method of installing piping material using the same

Publications (2)

Publication Number Publication Date
JPH0977458A JPH0977458A (en) 1997-03-25
JP3075152B2 true JP3075152B2 (en) 2000-08-07

Family

ID=16945362

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07232824A Expired - Fee Related JP3075152B2 (en) 1995-09-11 1995-09-11 Hanging jig for piping material and method of installing piping material using the same

Country Status (1)

Country Link
JP (1) JP3075152B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863937A (en) * 2014-03-06 2014-06-18 福建省南平铝业有限公司 Lifting appliance for large aluminum alloy round bars while leaving out of well

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5934987B2 (en) * 2012-04-17 2016-06-15 鹿島建設株式会社 Linear member holding support device and linear member laying method
JP5951745B2 (en) * 2014-12-12 2016-07-13 中国電力株式会社 Vertical member suspension
GB2562742B (en) * 2017-05-23 2022-05-04 Gaydon Henderson Specialist Lifting Equipment Ltd Lifting-apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863937A (en) * 2014-03-06 2014-06-18 福建省南平铝业有限公司 Lifting appliance for large aluminum alloy round bars while leaving out of well
CN103863937B (en) * 2014-03-06 2016-08-24 福建省南平铝业股份有限公司 Large aluminum alloy pole go out well suspender

Also Published As

Publication number Publication date
JPH0977458A (en) 1997-03-25

Similar Documents

Publication Publication Date Title
JP6042021B1 (en) Floor construction method, lifting jig for floor slab unit, and lifting device for floor slab unit
JP3075152B2 (en) Hanging jig for piping material and method of installing piping material using the same
JP6017084B1 (en) Floor construction method
CN108277993A (en) A kind of steel bar truss floor support plate hanging brace device and its assembling production method
CN218815294U (en) Steel construction platform of unloading
JP3158383U (en) Body reinforcement assembly jig
JP6053981B1 (en) Floor slab unit
JP2000072379A (en) Piping module technique and article pull-up method
JP2004308155A (en) Method and implement for hanging pc slab
JP6826887B2 (en) Prefabricated structure erection method, prefabricated structure
JP2827856B2 (en) Hanging jig for ALC plate
JPH05214813A (en) Suspension jig for reinforcing cage
JPS61162679A (en) Construction of nuclear reactor plant
JPH05113026A (en) Temporary scaffold structure
JPH05163839A (en) Method and device for conveying provisionally equipped material of building under construction to upper floor
JPH07248394A (en) Small material carrying-in device
JPH0546425B2 (en)
KR20080100002A (en) Construction apparatus and installation method using it
CA2068449A1 (en) Process for concrete building construction
JPS62244941A (en) Push-up system construction method
JP3183992B2 (en) Jig for loading riser unit
JP3226547B2 (en) Hanging balance for product group setting, components of the hanging balance, and method of constructing a plant using the hanging balance
JPH04360960A (en) Removing method for suspended scaffolding, and suspension jig
JPH035547A (en) Outer wall half pc plate and mounting method thereof
JP2005180123A (en) Assembling stand of reinforcement cage

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees