JP3057979B2 - Catenary control device - Google Patents

Catenary control device

Info

Publication number
JP3057979B2
JP3057979B2 JP5259031A JP25903193A JP3057979B2 JP 3057979 B2 JP3057979 B2 JP 3057979B2 JP 5259031 A JP5259031 A JP 5259031A JP 25903193 A JP25903193 A JP 25903193A JP 3057979 B2 JP3057979 B2 JP 3057979B2
Authority
JP
Japan
Prior art keywords
catenary
height
welding point
tension
calculating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5259031A
Other languages
Japanese (ja)
Other versions
JPH0788527A (en
Inventor
孝一 小田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Priority to JP5259031A priority Critical patent/JP3057979B2/en
Publication of JPH0788527A publication Critical patent/JPH0788527A/en
Application granted granted Critical
Publication of JP3057979B2 publication Critical patent/JP3057979B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Control Of Metal Rolling (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄鋼プロセスライン等
におけるカテナリー制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a catenary control device in a steel process line or the like.

【0002】[0002]

【従来の技術】従来、鉄鋼プロセスライン等におけるカ
テナリー制御は、カテナリーループの入側と出側に、そ
れぞれブライドルロールを備え、このブライドルロール
に速度指令、トルク指令を与えることによりカテナリー
ループを一定に保っている。具体的な制御としては、カ
テナリーゾーンに張力検出器を設置して張力を一定に保
持する張力制御方式と、カテナリーセンサを設置して高
さを一定に保持する高さ制御方式がある。
2. Description of the Related Art Conventionally, in catenary control in a steel process line or the like, a bridle roll is provided on each of an entrance side and an exit side of a catenary loop, and a speed command and a torque command are given to the bridle roll to keep the catenary loop constant. I keep it. Specific control includes a tension control method in which a tension detector is installed in a catenary zone to maintain a constant tension, and a height control method in which a catenary sensor is installed to maintain a constant height.

【0003】これらの制御において、カテナリーを構成
する鋼板等の材料の厚みが変わり断面積が変動するよう
な場合は、先行材と後行材が接続される溶接点がカテナ
リーゾーンを通過するにつれてカテナリーの形状が変化
する。その変化を模式的に示したのが図4である。図中
で実線で示したカテナリー形状はカテナリーを形成す
る材料の断面積が一定の場合を示し、破線で示したの
が先行材の断面積が後行材の断面積より大きい場合を示
し、一点鎖線で示したのが先行材の断面積が後行材の
断面積より小さい場合を示す。
In these controls, when the thickness of a material such as a steel plate constituting the catenary changes and the cross-sectional area fluctuates, as the welding point connecting the preceding material and the following material passes through the catenary zone, Changes. FIG. 4 schematically shows the change. The catenary shape shown by a solid line in the figure indicates a case where the cross-sectional area of the material forming the catenary is constant, and the broken line indicates that the cross-sectional area of the preceding material is larger than that of the following material. The chain line shows the case where the cross-sectional area of the preceding material is smaller than the cross-sectional area of the following material.

【0004】このように溶接点の通過とともにカテナリ
ー形状が変動するため、そのままでは変動した部分で材
料が構造障害物に接触してしまう。そこで、張力制御の
場合は張力を制御し、高さ制御の場合は高さを制御する
ことにより、カテナリー形状を制御する必要がある。例
えば、張力制御の場合は、シミュレーションにより張力
設定値を補正し、カテナリーと構造障害物との距離を一
定に保ったり、全カテナリーゾーンでの変動分Δhを最
小にしたり、あるいは、最下点(下死点)の位置を一定
に保ったりすることができる。具体的には、図5に示す
補正カーブを用い、先行材の張力設定値をT1、後行材
の張力設定値をT2、溶接点の位置をxとすると、最適
張力設定値T*は次式により求められる。
[0004] Since the catenary shape changes as the welding point passes, the material comes into contact with the structural obstacle at the changed portion as it is. Therefore, it is necessary to control the catenary shape by controlling the tension in the case of the tension control and controlling the height in the case of the height control. For example, in the case of the tension control, the tension set value is corrected by a simulation to keep the distance between the catenary and the structural obstacle constant, the variation Δh in all the catenary zones is minimized, or the lowest point ( The position of the bottom dead center can be kept constant. Specifically, assuming that the tension set value of the preceding material is T 1 , the tension set value of the following material is T 2 , and the position of the welding point is x using the correction curve shown in FIG. 5, the optimal tension set value T * Is determined by the following equation.

【0005】[0005]

【数1】T*=T1+d(x)・(T2−T1## EQU1 ## T * = T 1 + d (x) · (T 2 −T 1 )

【0006】また、この数式によると、始点では、最適
張力設定値T*がT1に、終点では、最適張力設定値T*
がT2となる。
According to this formula, at the start point, the optimum tension set value T * becomes T 1 , and at the end point, the optimum tension set value T * becomes T *.
But the T 2.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、高さ制
御によりカテナリー形状を制御しようとする場合は、補
正カーブが図6のようになり、補正カーブが断面積の比
によって変化してしまう。しかも、この変化は単純に断
面積比に比例しているわけでもない。そのため、従来は
多数の補正カーブを作成しておく必要があり、しかも最
適な補正値を得ることが困難であるという問題があっ
た。本発明は上記問題点を解決するためになされたもの
で、その目的とするところは、高さ制御における高さ設
定値の最適補正値を簡単に求めることができるカテナリ
ー制御装置を提供することにある。
However, when the catenary shape is to be controlled by height control, the correction curve becomes as shown in FIG. 6, and the correction curve changes depending on the ratio of the cross-sectional areas. Moreover, this change is not simply proportional to the cross-sectional area ratio. Therefore, conventionally, there has been a problem that it is necessary to prepare a large number of correction curves, and it is difficult to obtain an optimum correction value. The present invention has been made in order to solve the above-described problems, and an object of the present invention is to provide a catenary control device that can easily obtain an optimum correction value of a height set value in height control. is there.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、カテナリーゾーンの定点におけるカテナ
リー高さを検出するカテナリーセンサと、カテナリーゾ
ーンの定点におけるカテナリー高さの最適値が外部入力
により設定される高さ設定器と、カテナリーを形成する
際の特性が互いに異なる異種材を接続した溶接点がカテ
ナリーゾーンへ進入した際の溶接点位置を検出する手段
と、予め用意されている溶接点位置とそれに対する最適
張力設定値との関係を示す張力補正カーブを参照して、
検出された溶接点位置における最適張力設定値を算出す
る手段と、カテナリーゾーン内の溶接点の前方カテナリ
ーを形成する先行材および後方カテナリーを形成する後
行材ごとのカテナリー曲線式を、溶接点位置、最適張力
設定値および既知の先行材単位長重量、後行材単位長重
量、カテナリースパンとから算出する手段と、定点に対
する溶接点の位置に応じ該当するカテナリー曲線式を用
いて定点におけるカテナリー高さを算出する手段と、算
出されたカテナリー高さから設定されたカテナリー高さ
最適値を減算して高さ補正量を算出する減算手段と、高
さ補正量とカテナリーセンサにより検出されたカテナリ
ー高さとから前方側ブライダルロールにおける張力の補
正量を算出する手段とを備えたことを特徴とする。
In order to achieve the above object, the present invention provides a catenary sensor for detecting a catenary height at a fixed point in a catenary zone, and an optimal value of the catenary height at a fixed point in the catenary zone is input to an external input. And a means for detecting a welding point position when a welding point connecting different materials having different characteristics when forming a catenary enters the catenary zone, and a welding prepared in advance. With reference to the tension correction curve showing the relationship between the point position and the optimal tension set value for it,
Means for calculating the optimum tension set value at the detected welding point position, and a catenary curve formula for each of the preceding material forming the front catenary and the following material forming the rear catenary of the welding point in the catenary zone, the welding point position A means for calculating from the optimum tension set value and the known preceding material unit weight, the succeeding material unit weight, and the catenary span, and the catenary height at the fixed point using the corresponding catenary curve equation according to the position of the welding point with respect to the fixed point. Means for calculating a height, a subtraction means for calculating a height correction amount by subtracting the set catenary height optimum value from the calculated catenary height, and a catenary height detected by the height correction amount and the catenary sensor. Means for calculating a correction amount of the tension in the front bridal roll from the above.

【0009】[0009]

【作用】本発明においては、カテナリーゾーンの定点に
おけるカテナリー高さがカテナリーセンサにより検出さ
れるとともに、定点におけるカテナリー高さの最適値が
高さ設定器により設定される。カテナリーを形成する際
の特性が互いに異なる異種材を接続して形成される溶接
点がカテナリーゾーンへ進入するとその溶接点位置が検
出される。すると、予め用意されている溶接点位置とそ
れに対する最適張力設定値との関係を示す張力補正カー
ブを参照して、検出された溶接点位置における最適張力
設定値が算出される。
In the present invention, the catenary height at the fixed point of the catenary zone is detected by the catenary sensor, and the optimum value of the catenary height at the fixed point is set by the height setting device. When a welding point formed by connecting dissimilar materials having different properties when forming a catenary enters the catenary zone, the position of the welding point is detected. Then, the optimum tension setting value at the detected welding point position is calculated with reference to a tension correction curve indicating the relationship between the welding point position prepared in advance and the optimum tension setting value corresponding thereto.

【0010】同時に、カテナリーゾーン内の溶接点の前
方カテナリーを形成する先行材および後方カテナリーを
形成する後行材ごとのカテナリー曲線式が、検出された
溶接点位置、算出された最適張力設定値および既知の先
行材単位長重量、後行材単位長重量、カテナリースパン
とから算出される。次に、定点に対する溶接点の位置に
応じ該当するカテナリー曲線式を用いることにより、定
点におけるカテナリー高さが算出される。
At the same time, a catenary curve formula for each of the preceding material forming the front catenary of the welding point in the catenary zone and the following material forming the rear catenary is calculated based on the detected welding point position, the calculated optimum tension set value and It is calculated from the known preceding material unit length weight, the following material unit length weight, and the catenary span. Next, the catenary height at the fixed point is calculated by using the catenary curve equation corresponding to the position of the welding point with respect to the fixed point.

【0011】さらに、算出されたカテナリー高さから設
定されたカテナリー高さ最適値が減算されて高さ補正量
が算出され、得られた高さ補正量とカテナリーセンサに
より検出されたカテナリー高さとから前方に位置するブ
ライダルロールにおける張力の補正量が算出される。そ
れにより、1回のシミュレーションのみで定点のカテナ
リーの最適高さを求めてカテナリー高さを制御すること
が可能になる。
Further, the set catenary height optimum value is subtracted from the calculated catenary height to calculate a height correction amount, and the height correction amount is calculated from the obtained height correction amount and the catenary height detected by the catenary sensor. The correction amount of the tension in the bridal roll located ahead is calculated. As a result, the catenary height can be controlled by obtaining the optimum height of the fixed-point catenary with only one simulation.

【0012】[0012]

【実施例】以下、図に沿って本発明の実施例を説明す
る。図1は本発明の実施例の構成を示す説明図である。
図において、制御対象となるカテナリーCは、主ブライ
ドルロール1の直後に配設されたガイドローラ2と、従
ブライドルロール4の直前に配設されたガイドローラ3
との間に形成される。このガイドローラ2,3の間がカ
テナリーゾーンとなり、カテナリーゾーン内の特定位置
(以下、定点と言う)におけるカテナリーCの高さがカ
テナリーセンサ5により検出される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is an explanatory diagram showing the configuration of the embodiment of the present invention.
In the figure, a catenary C to be controlled includes a guide roller 2 disposed immediately after a main bridle roll 1 and a guide roller 3 disposed immediately before a sub bridle roll 4.
Is formed between The space between the guide rollers 2 and 3 is a catenary zone, and the height of the catenary C at a specific position (hereinafter, referred to as a fixed point) in the catenary zone is detected by the catenary sensor 5.

【0013】カテナリーCは、ブライドルロール1,4
により制御される。すなわち、速度指令値Nmrefが
速度制御部6に入力されると、速度制御部6は速度指令
値Nmrefに基づきモータ7の回転を制御することに
より、ブライドルロール1が所定の張力および速度で駆
動される。一方、ブライドルロール4については、同一
材が連続して送られてカテナリーCが形成されている通
常の場合、高さ設定器8により設定されたカテナリー高
さの設定値Hrefから、カテナリーセンサ5が検出し
たカテナリー高さの実測値Histを減算器9において
減算し、得られた差を高さ制御調節器11へ送る。
Catenary C is composed of bridle rolls 1, 4
Is controlled by That is, when the speed command value Nmref is input to the speed control unit 6, the speed control unit 6 controls the rotation of the motor 7 based on the speed command value Nmref, so that the bridle roll 1 is driven at a predetermined tension and speed. You. On the other hand, as for the bridle roll 4, in a normal case where the same material is continuously fed to form the catenary C, the catenary sensor 5 is set based on the set value Href of the catenary height set by the height setting device 8. The actual measured value Hist of the detected catenary height is subtracted by the subtractor 9, and the obtained difference is sent to the height control controller 11.

【0014】高さ制御調節器11は入力された差を速度
指令値Nhrefに変換して速度制御部12へ送る。速
度制御部12は入力された速度指令値Nhrefに基づ
きモータ13の回転を制御する。それにより、ブライド
ルロール4の張力および速度が制御されて、最適なカテ
ナリーCが形成される。なお、速度制御部12にはドル
ープ抵抗14が並列に接続されることにより、垂下特性
が付加されている。
The height control adjuster 11 converts the input difference into a speed command value Nhref and sends it to the speed controller 12. The speed control unit 12 controls the rotation of the motor 13 based on the input speed command value Nhref. Thereby, the tension and speed of the bridle roll 4 are controlled, and the optimal catenary C is formed. The droop resistance 14 is added to the speed control unit 12 in parallel, so that a drooping characteristic is added.

【0015】また、異なる材料が通過する場合は、異な
る材料の端部を接続した溶接点のカテナリーゾーンへの
進入位置が、図示しない検出手段により検出されて高さ
補正回路15内の最適張力設定値演算部16へ入力され
る。演算部16には、図5に示されたものと同様な張力
補正カーブがあらかじめ格納されており、この補正カー
ブを参照することにより、最適張力設定値T*が算出さ
れて高さ補正演算部17へ送られる。高さ補正演算部1
7では、溶接点の位置に応じて後述するカテナリー式の
いずれかが選択されてから、最適張力設定値T*に基づ
き、カテナリーセンサ5が設置されている定点における
カテナリー高さHref′が算出される。
When different materials pass through, the position of the welding point connecting the ends of the different materials into the catenary zone is detected by a detecting means (not shown), and the optimum tension setting in the height correction circuit 15 is performed. The value is input to the value calculator 16. The tension correction curve similar to that shown in FIG. 5 is stored in advance in the calculation unit 16, and by referring to this correction curve, the optimum tension set value T * is calculated, and the height correction calculation unit It is sent to 17. Height correction calculation unit 1
At 7, the catenary height Href 'at the fixed point where the catenary sensor 5 is installed is calculated based on the optimum tension set value T * after one of the catenary formulas described later is selected according to the position of the welding point. You.

【0016】次に、減算器18において、カテナリー高
さHref′から、高さ設定器8により設定されたカテ
ナリー高さの設定値Hrefを減算し、得られた差ΔH
refを加算器19へ送る。加算器19は送られた差Δ
Hrefにさらに設定値Hrefを加算し、得られた和
を減算器9へ送る。以後は前述したようにブライドルロ
ール4の速度が制御されて、カテナリーCの定点におけ
るカテナリー高さが設定値Hrefに保持される。
Next, the subtractor 18 subtracts the catenary height set value Href set by the height setter 8 from the catenary height Href ', and obtains the difference ΔH
ref is sent to the adder 19. The adder 19 calculates the difference Δ
The set value Href is further added to Href, and the obtained sum is sent to the subtractor 9. Thereafter, as described above, the speed of the bridle roll 4 is controlled, and the catenary height at the fixed point of the catenary C is maintained at the set value Href.

【0017】次に、高さ補正演算部17において使用さ
れるカテナリーの曲線を表す式について、図2の説明図
に基づいて説明する。図2において、ガイドローラ2,
3の間に形成されるカテナリーCの曲線式は、走行する
材料が同一である場合、次式のようになる。
Next, an expression representing a catenary curve used in the height correction calculating section 17 will be described with reference to the explanatory diagram of FIG. In FIG. 2, guide rollers 2,
The curve formula of the catenary C formed between 3 is as follows when the running materials are the same.

【0018】[0018]

【数2】 (Equation 2)

【0019】式中のSA,DAはそれぞれ次式により表さ
れる。
S A and D A in the equations are represented by the following equations, respectively.

【0020】[0020]

【数3】 (Equation 3)

【0021】[0021]

【数4】 (Equation 4)

【0022】ここで数式2〜4中のTは張力設定値(k
g)、Wは材料重量(kg/m)、Sはカテナリースパ
ン(m)、xはカテナリーの始点からの高さ(m)、y
はカテナリーの始点からの水平距離(m)、Hはガイド
ローラ2,3間の垂直距離(m)である。また、溶接点
がカテナリゾーンに進入した場合の後行材のカテナリー
式は数式5のように、先行材のカテナリー式は数式6の
ようになる。なお、式中のxzは溶接点の位置(水平距
離m)、W1は先行材重量(kg/m)、W2は後行材重量
(kg/m)である。
Here, T in Equations 2 to 4 is a tension set value (k
g), W is the material weight (kg / m), S is the catenary span (m), x is the height from the start of the catenary (m), y
Is the horizontal distance (m) from the starting point of the catenary, and H is the vertical distance (m) between the guide rollers 2 and 3. Further, when the welding point enters the catenary zone, the catenary formula of the following material is as shown in Expression 5, and the catenary expression of the preceding material is as shown in Expression 6. In the equation, x z is the position of the welding point (horizontal distance m), W 1 is the weight of the preceding material (kg / m), and W 2 is the weight of the following material (kg / m).

【0023】[0023]

【数5】 (Equation 5)

【0024】[0024]

【数6】 (Equation 6)

【0025】ここで数式5,6中のSB,DB,SA,DA
はそれぞれ次式により表される。
Here, S B , D B , S A , and D A in Expressions 5 and 6 are used.
Are represented by the following equations.

【0026】[0026]

【数7】 SB=a1・(S−xz2+xz+a2・xz 2+a3・TS B = a 1 · (S−x z ) 2 + x z + a 2 · x z 2 + a 3 · T

【0027】[0027]

【数8】DB=a4・SB 2・1/T## EQU8 ## D B = a 4 · S B 2 · 1 / T

【0028】[0028]

【数9】SA=xz+a5・(xz−SBS A = x z + a 5 · (x z -S B )

【0029】[0029]

【数10】DA=−a4・xz 2・1/T+2・a4・SB
z・1/T+a6・(xz−SB2・1/T
Equation 10] D A = -a 4 · x z 2 · 1 / T + 2 · a 4 · S B ·
x z · 1 / T + a 6 · (x z −S B ) 2 · 1 / T

【0030】ここで数式7〜10中のa1〜a6は全て定
数であり、それぞれ次式のようになる。
Here, a 1 to a 6 in Equations 7 to 10 are all constants, and are as follows.

【0031】[0031]

【数11】a1=W2/2・W2・S[Number 11] a 1 = W 2/2 · W 2 · S

【0032】[0032]

【数12】a2=−1/2・S## EQU12 ## a 2 = − / · S

【0033】[0033]

【数13】a3=−H/W2・S## EQU13 ## a 3 = −H / W 2 · S

【0034】[0034]

【数14】a4=−W2/2[Number 14] a 4 = -W 2/2

【0035】[0035]

【数15】a5=−W2/W1 ## EQU15 ## a 5 = −W 2 / W 1

【0036】[0036]

【数16】a6=−W2 2/2・W1 [Number 16] a 6 = -W 2 2/2 · W 1

【0037】次に、カテナリーゾーンへ溶接点が進入し
た場合の高さ補正演算部17の演算を図3のフローチャ
ートに基づいて説明する。まず、演算部17では、上述
した数式7〜10および数式11〜16により、SB
B,SA,DAが算出される(S1)。次に、溶接点の
位置xzと、カテナリセンサ5の水平方向の位置xsを比
較し、カテナリセンサ5の手前に溶接点が位置している
場合は(S2Yes)、数式6に表されている先行材に
ついてのカテナリー式を用いて、センサ位置xsにおけ
る最適高さを求める(S3)。
Next, the calculation of the height correction calculator 17 when the welding point enters the catenary zone will be described with reference to the flowchart of FIG. First, the arithmetic unit 17 calculates S B ,
D B, S A, D A is calculated (S1). Next, the position x z of the welding point is compared with the position x s of the catenary sensor 5 in the horizontal direction. If the welding point is located before the catenary sensor 5 (S2 Yes), it is expressed by Expression 6. using catenary equation for the preceding material which are, determining the optimal height at the sensor position x s (S3).

【0038】溶接点がカテナリセンサ5を越えた場合は
(S2No)、数式5に表されている後行材についての
カテナリー式を用いて、センサ位置xsにおける最適高
さを求める(S4)。
[0038] If the welding point exceeds Katenarisensa 5 (S2No), using a catenary equation in the row material after represented in Equation 5 to determine the optimum height at the sensor position x s (S4).

【0039】この実施例によると、従来の高さ制御では
溶接点通過時の補正を最適にすることができなかったも
のを、張力制御の補正を利用して演算することにより簡
単に実現することができる。また、最適に近い値を求め
る場合でも、従来は先行材と後行材の断面積の比率によ
り、複数のシミュレーションを行う必要があったもの
が、実施例では1回のシミュレーションで実現すること
ができる。
According to this embodiment, it is possible to easily realize, by using the correction of the tension control, what could not be optimized at the time of passing the welding point by the conventional height control. Can be. Further, even when a value close to the optimal value is obtained, a plurality of simulations have conventionally been required to be performed depending on the ratio of the cross-sectional area of the preceding material and the succeeding material. However, in the embodiment, the simulation can be realized by one simulation. it can.

【0040】[0040]

【発明の効果】以上述べたように本発明によれば、張力
補正カーブを参照して溶接点の位置ごとに最適張力設定
値を求めてから定点のカテナリー高さを演算により算出
し、得られた値と、センサにより実測された値、設定さ
れた値とを比較することにより、張力の補正値を算出す
る。その結果、従来の高さ制御では溶接点通過時の補正
を最適にすることができなかったものを、張力制御の補
正を利用した1回のシミュレーションにより簡単に実現
することができるようになる。
As described above, according to the present invention, the catenary height at the fixed point is obtained by calculating the optimum tension set value for each welding point position with reference to the tension correction curve, and then calculating. Then, the tension correction value is calculated by comparing the measured value with the value actually measured by the sensor and the set value. As a result, what could not be optimally corrected at the time of passing the welding point by the conventional height control can be easily realized by one simulation using the correction of the tension control.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例の構成を示す説明図である。FIG. 1 is an explanatory diagram showing a configuration of an embodiment of the present invention.

【図2】実施例で用いられるカテナリー曲線式の説明図
である。
FIG. 2 is an explanatory diagram of a catenary curve equation used in the embodiment.

【図3】図1の高さ補正演算部の処理動作を示すフロー
チャートである。
FIG. 3 is a flowchart illustrating a processing operation of a height correction calculation unit in FIG. 1;

【図4】溶接点の通過に伴うカテナリーの変化を模式的
に示した説明図である。
FIG. 4 is an explanatory diagram schematically showing a change in catenary accompanying passage of a welding point.

【図5】従来の張力制御に用いられている張力補正カー
ブを示すグラフである。
FIG. 5 is a graph showing a tension correction curve used for conventional tension control.

【図6】従来の高さ制御に用いられている高さ補正カー
ブを示すグラフである。
FIG. 6 is a graph showing a height correction curve used for conventional height control.

【符号の説明】[Explanation of symbols]

1 主ブライドルロール 2 ガイドローラ 3 ガイドローラ 4 従ブライドルロール 5 カテナリーセンサ 6 速度制御部 7 モータ 8 高さ設定器 9 減算器 11 高さ制御調節器 12 速度制御部 13 モータ 14 ドループ抵抗 15 高さ補正回路 16 最適張力設定値演算部 17 高さ補正演算部 18 減算器 19 加算器 C カテナリー REFERENCE SIGNS LIST 1 main bridle roll 2 guide roller 3 guide roller 4 slave bridle roll 5 catenary sensor 6 speed control unit 7 motor 8 height setting unit 9 subtractor 11 height control controller 12 speed control unit 13 motor 14 droop resistance 15 height correction Circuit 16 Optimum tension setting value calculation unit 17 Height correction calculation unit 18 Subtractor 19 Adder C Catenary

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 カテナリーゾーンの定点におけるカテナ
リー高さを検出するカテナリーセンサと、 カテナリーゾーンの定点におけるカテナリー高さの最適
値が外部入力により設定される高さ設定器と、 カテナリーを形成する際の特性が互いに異なる異種材を
接続した溶接点がカテナリーゾーンへ進入した際の溶接
点位置を検出する手段と、 予め用意されている溶接点位置とそれに対する最適張力
設定値との関係を示す張力補正カーブを参照して、検出
された溶接点位置における最適張力設定値を算出する手
段と、 カテナリーゾーン内の溶接点の前方カテナリーを形成す
る先行材および後方カテナリーを形成する後行材ごとの
カテナリー曲線式を、溶接点位置、最適張力設定値およ
び既知の先行材単位長重量、後行材単位長重量、カテナ
リースパンとから算出する手段と、 定点に対する溶接点の位置に応じ該当するカテナリー曲
線式を用いて定点におけるカテナリー高さを算出する手
段と、 算出されたカテナリー高さから設定されたカテナリー高
さ最適値を減算して高さ補正量を算出する減算手段と、 高さ補正量とカテナリーセンサにより検出されたカテナ
リー高さとから前方側ブライダルロールにおける張力の
補正量を算出する手段と、 を備えたことを特徴とするカテナリー制御装置。
1. A catenary sensor for detecting a catenary height at a fixed point of a catenary zone, a height setting device for setting an optimum value of the catenary height at a fixed point of the catenary zone by an external input, and A means for detecting a welding point position when a welding point connecting different materials having different properties enters the catenary zone, and a tension correction indicating a relationship between a welding point position prepared in advance and an optimum tension setting value for the welding point position. Means for calculating an optimum tension set value at the detected welding point position with reference to the curve; and a catenary curve for each of the preceding material forming the front catenary and the following material forming the rear catenary of the welding point in the catenary zone. Formulas include welding point location, optimal tension setting and known preceding and following material unit weight, succeeding material unit weight, catenary Means for calculating from the pan, means for calculating the catenary height at the fixed point using a corresponding catenary curve equation according to the position of the welding point with respect to the fixed point, and a catenary height optimum value set from the calculated catenary height Subtraction means for calculating a height correction amount by subtracting, and means for calculating a correction amount of tension in the front bridal roll from the height correction amount and the catenary height detected by the catenary sensor. Characteristic catenary control device.
JP5259031A 1993-09-22 1993-09-22 Catenary control device Expired - Lifetime JP3057979B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5259031A JP3057979B2 (en) 1993-09-22 1993-09-22 Catenary control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5259031A JP3057979B2 (en) 1993-09-22 1993-09-22 Catenary control device

Publications (2)

Publication Number Publication Date
JPH0788527A JPH0788527A (en) 1995-04-04
JP3057979B2 true JP3057979B2 (en) 2000-07-04

Family

ID=17328381

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5259031A Expired - Lifetime JP3057979B2 (en) 1993-09-22 1993-09-22 Catenary control device

Country Status (1)

Country Link
JP (1) JP3057979B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5231660B1 (en) * 2012-01-16 2013-07-10 三菱電機エンジニアリング株式会社 Steel process line controller

Also Published As

Publication number Publication date
JPH0788527A (en) 1995-04-04

Similar Documents

Publication Publication Date Title
EP0391658B1 (en) Wet skin-pass rolling method
JP3057979B2 (en) Catenary control device
US4386511A (en) Method and system for controlling a plate width
EP0075960B1 (en) Control device for a continuous rolling machine
JPH0569021A (en) Method and device for controlling rolling mill
JP3501982B2 (en) Sheet width control device
JP2547850B2 (en) Plate thickness controller for cold tandem rolling mill
JPH06142730A (en) Method for controlling shape in reverse rolling
JP3281682B2 (en) Slip prediction control system in hot rough rolling using laser speedometer
JP2588233B2 (en) Rolled material flatness control device
JPH06154823A (en) Method for deciding shift amount of work roll
JP3120007B2 (en) Thickness control device for tandem cold rolling mill
JP3767832B2 (en) Thickness control method in hot rolling
JPH048122B2 (en)
JP3446398B2 (en) Control method and device for die rolling mill
US20040034442A1 (en) Furnace pacing for multistrand mill
JP3467559B2 (en) Strip width control method in hot continuous rolling
JP3541596B2 (en) Thickness control method of sheet material in continuous tandem rolling mill
JPH082457B2 (en) Tandem mill control method and apparatus
JPH0636929B2 (en) Method for controlling strip width of rolled material
JPH10225701A (en) Method for automatically controlling dimension in universal rolling of shape
JPH08187504A (en) Manufacture of tapered steel sheet
JP3504154B2 (en) Automatic thickness control method and apparatus for rolling mill
JPS6219922B2 (en)
JPH069702B2 (en) Plate thickness control method for hot continuous rolling mill

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000321

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080421

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090421

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100421

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110421

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120421

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140421

Year of fee payment: 14