JP3005741B2 - Ground improvement method - Google Patents

Ground improvement method

Info

Publication number
JP3005741B2
JP3005741B2 JP6310041A JP31004194A JP3005741B2 JP 3005741 B2 JP3005741 B2 JP 3005741B2 JP 6310041 A JP6310041 A JP 6310041A JP 31004194 A JP31004194 A JP 31004194A JP 3005741 B2 JP3005741 B2 JP 3005741B2
Authority
JP
Japan
Prior art keywords
column
excavation
material slurry
solidified material
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6310041A
Other languages
Japanese (ja)
Other versions
JPH08134890A (en
Inventor
安弘 猪股
Original Assignee
株式会社三東工業社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社三東工業社 filed Critical 株式会社三東工業社
Priority to JP6310041A priority Critical patent/JP3005741B2/en
Publication of JPH08134890A publication Critical patent/JPH08134890A/en
Application granted granted Critical
Publication of JP3005741B2 publication Critical patent/JP3005741B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は地盤改良工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a ground improvement method.

【0002】[0002]

【従来の技術】軟弱な地盤の上に構造物を構築する場
合、その地盤を強化するためにセメント製のコラムを地
中に施工するようにしている。このコラムの施工には、
アースオーガなどの掘削軸の先端に設けた掘削ヘッドに
よって地中を掘削し、その掘削の過程で掘削軸の先端か
ら固化材スラリー(たとえばセメントミルク)を供給
し、土砂と固化材スラリーとを掘削軸に設けてある撹拌
翼により混合しながら土壌を凝結して、コラムを作り出
すのを普通としている。
2. Description of the Related Art When constructing a structure on a soft ground, a column made of cement is installed in the ground to strengthen the ground. For the construction of this column,
Underground is excavated by the excavating head provided at the tip of the excavating shaft such as an earth auger. During the excavation, solidified material slurry (for example, cement milk) is supplied from the excavated shaft end to excavate earth and sand and solidified material slurry. It is customary to condense the soil while mixing with a stirring blade provided on the shaft to create a column.

【0003】一方このように固化材スラリーと土砂との
混合撹拌によるコラムの施工にあたり、この固化材スラ
リーを短時間のうちに凝固させるための凝固液(たとえ
ば固化材スラリーがセメントミルクである場合は、けい
酸ソーダ液)を併用する工法(以下単に2液混合撹拌工
法という。)が採用されている。これによれば固化材ス
ラリーを、短時間のうちに凝固させてコラムを作り出す
ことができるので、軟弱な地盤でも施工でき、また施工
効果が確実となるなど、幾多の利点を備えている。
On the other hand, when the column is formed by mixing and stirring the solidified material slurry and the earth and sand, a coagulating liquid for solidifying the solidified material slurry in a short time (for example, when the solidified material slurry is cement milk, , Sodium silicate solution) (hereinafter, simply referred to as a two-liquid mixing and stirring method). According to this, the solidified material slurry can be solidified in a short time to produce a column, so that it can be constructed even on soft ground, and the construction effect is ensured, and has many advantages.

【0004】ところで平面地盤においてこれを全面改良
する場合、2液混合撹拌工法によるコラムを縦横に施工
すればよいが、この種のコラムは断面を円形とする円柱
状とされているので、互いに隣合う4本のコラムの間
に、コラムが存在しない地盤が残存するようになる。こ
の残存地盤の存在は、その地盤の強度を損ねる原因とな
る。
In order to improve the entire surface of a flat ground, columns with a two-liquid mixing and stirring method may be installed vertically and horizontally. However, since columns of this type are formed in a columnar shape having a circular cross section, they are adjacent to each other. Between the four matching columns, the ground without columns will remain. The presence of the remaining ground causes the strength of the ground to be impaired.

【0005】このような地盤の残存を解消する方法とし
て、2液混合撹拌工法によるコラムを互いにラップさせ
て施工することが考えられるが、これによるとコラムの
施工本数が多くなり、工費が高くなるといった欠点があ
る。
[0005] As a method of eliminating such residual ground, it is conceivable to perform construction by wrapping columns by the two-liquid mixing and stirring method, but this increases the number of columns to be constructed and increases construction costs. There are drawbacks.

【0006】[0006]

【発明が解決しようとする課題】本発明は、平面地盤に
2液混合撹拌工法によりコラムを縦横に施工することに
よって、地盤の強化を図るにあたり、各コラム間に未処
理部分が残らないようにすることを目的とする。
SUMMARY OF THE INVENTION The present invention aims at strengthening the ground by installing columns vertically and horizontally on a flat ground by a two-liquid mixing and stirring method so that an unprocessed portion does not remain between the columns. The purpose is to do.

【0007】[0007]

【課題を解決するための手段】本発明は、2液混合撹拌
工法により複数の列の第1のコラムを、未処理部分を残
して施工し、そのあと前記第1のコラムの列の間の未処
理部分を、回転する掘削軸の先端に設けた掘削ヘッドに
よって掘削し、その掘削の過程で掘削軸の先端から固化
材スラリーを吐出するとともに、前記撹拌翼の先端から
固化材スラリーを噴射させることにより、この固化材ス
ラリーを掘削による壁面より外側に向けて浸透させ、掘
削ヘッドにより掘削された部分よりも大きな径の第2の
コラムを列状に施工し、この第2のコラムにより前記第
1のコラムの列の間を満たすようにしたことを特徴とす
る。
SUMMARY OF THE INVENTION According to the present invention, a plurality of rows of first columns are constructed by a two-liquid mixing and stirring method while leaving unprocessed portions. The unprocessed portion is excavated by the excavation head provided at the tip of the rotating excavation shaft, and during the excavation, the solidified material slurry is discharged from the tip of the excavation shaft and the solidified material slurry is jetted from the tip of the stirring blade. This allows the solidified material slurry to penetrate outward from the wall surface by excavation, constructs a second column having a diameter larger than the portion excavated by the excavation head in a row, and uses the second column to form the second column. It is characterized in that the space between the columns of one column is filled.

【0008】[0008]

【作用】第1のコラムの列の間に第2のコラムの列が施
工されるが、この第2のコラムは、掘削ヘッドによって
掘削された部分よりも撹拌翼から噴射された固化材スラ
リーの浸透領域の分だけ周囲に拡大された大きな径のも
のとなる。このように形成された第2のコラムにより第
1のコラムの列の間を満たすようになり、したがって各
コラムの列の間には未処理部分が残存しないようにな
る。
A second column row is installed between the first column rows, and the second column is provided with a solidified material slurry injected from a stirring blade rather than a portion excavated by the excavation head. It has a large diameter that is enlarged around the permeation area. The second column thus formed fills the space between the columns of the first column, so that no unprocessed portion remains between the columns of each column.

【0009】[0009]

【実施例】本発明の実施例を図によって説明する。図6
〜8は本発明で使用する掘削装置の一例を示すもので、
リーダー1に駆動機構2が昇降自在に設置されてあり、
この駆動機構2によって掘削軸3が回転される。掘削軸
3には二つの流体通路4、5が同心状に設けられてあっ
て、一方の流体通路4は掘削軸3の中心位置にあり、ま
た他方の流体通路5は流体通路4を囲むように設けられ
ている。流体通路4、5にはグラウトポンプ6、7より
コラム施工に必要なグラウト材料が供給されるようにな
っている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. FIG.
8 show an example of a drilling device used in the present invention,
A drive mechanism 2 is installed on the reader 1 so as to be able to move up and down.
The excavating shaft 3 is rotated by the driving mechanism 2. The drilling shaft 3 is provided with two fluid passages 4 and 5 concentrically, one of the fluid passages 4 is located at the center position of the drilling shaft 3, and the other fluid passage 5 surrounds the fluid passage 4. It is provided in. Grout pumps 6 and 7 supply grout material necessary for column construction to the fluid passages 4 and 5.

【0010】掘削軸3の先端には掘削ヘッド8が設置さ
れてあり、掘削軸3の回転及び昇降によって地盤がこの
掘削ヘッド8によって掘削される。一方の流体通路4の
先端は掘削ヘッド8の中央に開口している。掘削の当初
では掘削軸3が回転および下降し、ここから掘削された
地盤に向けてグラウト材料である固化材スラリーがグラ
ウトポンプ6より流体通路4を介して吐出される。また
掘削軸3の引上げの際には、グラウトポンプ7より流体
通路5を介して凝固液が吐出される。
An excavating head 8 is provided at the tip of the excavating shaft 3, and the ground is excavated by the excavating head 8 as the excavating shaft 3 rotates and moves up and down. The tip of one fluid passage 4 is open at the center of the drilling head 8. At the beginning of excavation, the excavation shaft 3 rotates and descends, and a solidified material slurry, which is a grout material, is discharged from the grout pump 6 through the fluid passage 4 toward the ground excavated therefrom. When the excavating shaft 3 is pulled up, the coagulating liquid is discharged from the grout pump 7 through the fluid passage 5.

【0011】掘削軸3の周側には複数の撹拌翼9が掘削
軸3に対して放射状に延びるように設置されてあり、そ
の先端にはノズル10が設けてある。このノズル10に
他方の流体通路5の先端が開口している。掘削ヘッド8
によって掘削された土壌と掘削ヘッド8の先端から吐出
された固化材スラリーは、掘削ヘッド8と撹拌翼9とに
よって混合撹拌されるようになっている。。
A plurality of agitating blades 9 are provided on the peripheral side of the excavating shaft 3 so as to extend radially with respect to the excavating shaft 3, and a nozzle 10 is provided at the tip thereof. The other end of the fluid passage 5 is open to the nozzle 10. Drilling head 8
The excavated soil and the solidified material slurry discharged from the tip of the excavation head 8 are mixed and stirred by the excavation head 8 and the stirring blade 9. .

【0012】最初に2液混合撹拌工法によって複数のコ
ラム11を図4に示すように並列に施工する。この工法
を図3によって説明すると、グラウトポンプ6からの固
化材スラリーは流体通路4より掘削ヘッド8の先端から
矢印Pに示すように吐出させながら、図3の(a)に示
すように掘削軸3を回転および下降させる。掘削された
土壌は撹拌翼9によって固化材スラリーとともに撹拌さ
れる。
First, a plurality of columns 11 are installed in parallel by a two-liquid mixing and stirring method as shown in FIG. This method will be described with reference to FIG. 3. The solidified material slurry from the grout pump 6 is discharged from the tip of the drilling head 8 through the fluid passage 4 as shown by an arrow P, and the drilling shaft is made as shown in FIG. 3 is rotated and lowered. The excavated soil is stirred by the stirring blade 9 together with the solidified material slurry.

【0013】この掘削が所定の深度に達したあと、図3
の(b)に示すように、掘削軸3を逆回転しつつ引き上
げる。この上昇の過程でグラウトポンプ7より撹拌翼9
のノズル10から凝固液が矢印Mに示すように吐出され
る。この吐出と撹拌翼9による撹拌によって、さきに吐
出された固化材スラリーは短時間(たとえば50秒〜9
0秒程度)のうちに凝固する。これによって先に撹拌さ
れた土壌と固化材スラリーとによって、第1のコラム1
1が施工される。
After the excavation reaches a predetermined depth, FIG.
(B), the excavating shaft 3 is pulled up while rotating in the reverse direction. In the course of this ascent, the stirring blade 9 is supplied from the grout pump 7.
The coagulating liquid is discharged from the nozzle 10 as shown by the arrow M. Due to this discharge and stirring by the stirring blade 9, the solidified material slurry discharged earlier is short-time (for example, 50 seconds to 9 seconds).
(About 0 seconds). Thus, the first column 1 is formed by the previously stirred soil and solidified material slurry.
1 is constructed.

【0014】なお前記した2液混合撹拌工法は、掘削時
には固化材スラリーを、引上げ時に凝固液をてん充する
方法であるが、これに代えて掘削時にはいずれもてん充
せず、引上げ時に固化材スラリーと凝固液を同時にてん
充するようにしてもよいし、又は掘削時に固化材スラリ
ーと凝固液を同時にてん充し、引上げ時にはいずれもて
ん充しないようにしてもよいし、又は掘削、引上げ時と
も固化材スラリー、凝固液を同時にてん充してもよい。
更には掘削時に固化材スラリーを、引上げ時に固化材ス
ラリーと凝固液とを同時にてん充するようにしてもよ
い。これらの工法は掘削地盤の状況に応じて適当に選択
する。
The two-liquid mixing and stirring method described above is a method in which the solidified material slurry is filled at the time of excavation and the solidified liquid is filled at the time of pulling up. The slurry and the coagulating liquid may be filled at the same time, or the solidified material slurry and the coagulating liquid may be filled at the same time during excavation, and neither may be filled at the time of pulling up, or at the time of excavation or pulling up Alternatively, the solidifying material slurry and the coagulating liquid may be simultaneously filled.
Further, the solidified material slurry may be filled at the time of excavation, and the solidified material slurry and the coagulating liquid may be simultaneously filled at the time of pulling. These methods are appropriately selected according to the conditions of the excavated ground.

【0015】図4の(a)に示すようにコラム11は互
いに接した状態で列状に一体的に形成される。そしてこ
のコラム11の列を未処理部分12を残して複数並列に
形成する。その各列の間隔すなわち並列間隔はコラム1
1の直径に相当する間隔とする。コラム11の固化材ス
ラリーが凝固したあと、未処理部分12に第2のコラム
13を施工する。このコラム13の形成位置は、コラム
11の半径に相当する距離だけ列方向に移動した位置と
する。
As shown in FIG. 4A, the columns 11 are integrally formed in a row in contact with each other. A plurality of the columns 11 are formed in parallel with the unprocessed portion 12 remaining. The interval of each row, that is, the parallel interval is column 1
An interval corresponding to a diameter of 1. After the solidified material slurry in the column 11 has solidified, the second column 13 is applied to the untreated portion 12. The formation position of the column 13 is a position moved in the column direction by a distance corresponding to the radius of the column 11.

【0016】このコラム13の施工を図1により説明す
る。掘削軸3を同じく回転および下降させて掘削ヘッド
8により未処理部分12を掘削することによって行な
う。そして図1の(a)に示すように、この掘削の過程
で、流体通路4から供給される固化材スラリーを掘削ヘ
ッド8から矢印Nに示すように吐出する。掘削された土
壌と固化材スラリーは撹拌翼9によって撹拌される。ま
た同時に流体通路5を介して固化材スラリーを撹拌翼9
のノズル10より、たとえば10Kg/m程度の圧力
で、掘削壁面14より外周に向けて矢印Lに示すように
噴射させる。
The construction of the column 13 will be described with reference to FIG. This is performed by excavating the unprocessed portion 12 with the excavating head 8 while also rotating and lowering the excavating shaft 3. Then, as shown in FIG. 1A, during this excavation, the solidified material slurry supplied from the fluid passage 4 is discharged from the excavation head 8 as shown by an arrow N. The excavated soil and the solidified material slurry are stirred by the stirring blade 9. At the same time, the solidified material slurry is stirred via the fluid passage 5 with the stirring blades 9.
From the excavation wall surface 14 as shown by an arrow L at a pressure of, for example, about 10 kg / m 2 .

【0017】この掘削が所定の深度に達したあと、図1
の(b)に示すように、掘削軸3を逆回転しつつ引き上
げる。この上昇の過程で固化材スラリーを掘削時と同じ
ように掘削ヘッド8から吐出すると同時に、掘削時と同
じように流体通路5を介して固化材スラリーを撹拌翼9
のノズル10より、掘削壁面14より外周に向けて噴射
させる。
After the excavation reaches a predetermined depth, FIG.
(B), the excavating shaft 3 is pulled up while rotating in the reverse direction. In the course of this ascent, the solidified material slurry is discharged from the excavation head 8 in the same manner as during excavation, and at the same time, the solidified material slurry is discharged through the fluid passage 5 as in excavation.
From the excavation wall surface 14 toward the outer periphery.

【0018】この掘削時および引上げ時の撹拌翼9のノ
ズル10からの固化材スラリーの噴射によって、掘削ヘ
ッド8による掘削壁面14よりその外側に向かって固化
材スラリーが浸透していく。浸透していった固化材スラ
リーおよび掘削ヘッド8からの固化材スラリーが凝固す
れば、ここに第2のコラム13が形成されるようにな
る。このように形成されたコラム13は掘削ヘッド8に
よって掘削された部分より大きな径となる。15は固化
材スラリーの噴射によって大きな径とされたコラムの拡
大部分を示す。
By the injection of the solidified material slurry from the nozzle 10 of the stirring blade 9 at the time of excavation and pulling, the solidified material slurry permeates outward from the excavation wall surface 14 by the excavation head 8. When the solidified material slurry that has penetrated and the solidified material slurry from the excavation head 8 solidify, the second column 13 is formed here. The column 13 thus formed has a larger diameter than the portion excavated by the excavation head 8. Reference numeral 15 denotes an enlarged portion of the column whose diameter is increased by the injection of the solidifying material slurry.

【0019】このように大きな径とされるコラム13
は、コラム11の列の間を満たすように施工される。こ
のように施工された状態を示したのが図4の(b)であ
る。これによりコラム11、13の各列の間には未処理
部分はほとんどなくなり、コラム11,13の各列同士
は一体化さる。かくしてここに強固な改良地盤が形成さ
れることになる。
The column 13 having such a large diameter
Is constructed so as to fill the space between the columns of the column 11. FIG. 4B shows a state in which the work is performed in this manner. Thereby, there is almost no unprocessed portion between the columns 11 and 13, and the columns 11 and 13 are integrated. Thus, a solid improved ground is formed here.

【0020】なお図2の(a)に示すように掘削時には
掘削ノズル8からのみ固化材スラリーを吐出し、同
(b)に示すように引上げ時に掘削ノズル8と撹拌翼9
の両方から固化材スラリーを吐出、噴射するようにして
もよい。また図4ではコラム11の列間にコラム13を
施工するようにしているが、図5に示すように鋼矢板1
6とコラム11の列との間にコラム13を施工するよう
にしてもよい。この場合でもコラム11の列と鋼矢板1
6との間は大きな径とされたコラム13により満たされ
るようになる。
As shown in FIG. 2A, the solidified material slurry is discharged only from the excavating nozzle 8 during excavation, and as shown in FIG.
The solidified material slurry may be ejected and ejected from both of them. Further, in FIG. 4, the columns 13 are constructed between the columns of the columns 11, but as shown in FIG.
The column 13 may be constructed between the column 6 and the column 11. Even in this case, the row of columns 11 and the sheet pile 1
6 is filled with the column 13 having a large diameter.

【0021】[0021]

【発明の効果】以上説明したように本発明によれば、最
初に施工した第1のコラムの列の間またはその列と鋼矢
板との間に、第2のコラムの列を、そのコラムを形成す
るときの掘削ヘッドによる掘削部分よりも大きな径のコ
ラムによって形成することができ、これにより各コラム
の列の間、またはコラムの列と鋼矢板との間は、この大
きな径とされた第2のコラムにより満たされるため、コ
ラムが存在しない未処理部分はなくなり、したがって強
化な地盤を簡便に、かつ低コストで施工することができ
る効果を奏する。
As described above, according to the present invention, the second column is inserted between the rows of the first column or the column and the steel sheet pile, which were initially constructed. It can be formed by a column of a larger diameter than the excavated part by the excavating head when forming, so that between the columns of columns or between the columns of columns and the sheet pile is this large diameter Since it is filled with the second column, there is no unprocessed portion where the column does not exist. Therefore, there is an effect that the reinforced ground can be simply and inexpensively constructed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例工法を説明するための断面図で
ある。
FIG. 1 is a cross-sectional view for explaining a working method according to an embodiment of the present invention.

【図2】本発明の別の実施例工法を説明するための断面
図である。
FIG. 2 is a cross-sectional view for explaining another embodiment method of the present invention.

【図3】2液混合撹拌工法を説明するための断面図であ
る。
FIG. 3 is a sectional view for explaining a two-liquid mixing and stirring method.

【図4】本発明の実施例工法を説明するための平面図で
ある。
FIG. 4 is a plan view for explaining a working method according to an embodiment of the present invention.

【図5】本発明の他の実施例工法を説明するための平面
図である。
FIG. 5 is a plan view for explaining a method of another embodiment of the present invention.

【図6】本発明による工法の実施過程を説明するための
側面図である。
FIG. 6 is a side view for explaining an implementation process of the construction method according to the present invention.

【図7】掘削軸の部分断面図である。FIG. 7 is a partial sectional view of a digging shaft.

【図8】撹拌翼の一部の拡大断面図である。FIG. 8 is an enlarged sectional view of a part of the stirring blade.

【符号の説明】[Explanation of symbols]

3 掘削軸 8 掘削ヘッド 9 撹拌翼 11 第1のコラム 12 未処理部分 13 第2のコラム 14 掘削壁面 15 第2のコラムの拡大部分 16 鋼矢板 Reference Signs List 3 excavation axis 8 excavation head 9 stirring blade 11 first column 12 untreated portion 13 second column 14 excavated wall surface 15 enlarged portion of second column 16 steel sheet pile

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 回転及び昇降する掘削軸の先端に設けた
掘削ヘッドによって地盤を掘削し、この掘削の過程で前
記掘削軸の周囲に放射状に延びるように設けた複数の
拌翼により撹拌された土壌に、前記掘削ヘッドから固化
材スラリーを、また前記撹拌翼の先端に設けたノズルよ
り前記固化材スラリーを凝固させる凝固液を吐出して撹
拌することによって、第1のコラムを互いに接した状態
列状に施工するとともに、前記列の複数を各列の間を
残して並列するように施工する工程と、前記工程のあ
と、前記第1のコラムの列の間または前記第1のコラ
ムと鋼矢板との間残された未処理部分を、前記掘削ヘ
ッドによって掘削し、この掘削の過程で前記撹拌翼によ
り撹拌された土壌に、前記掘削ヘッドから固化材スラリ
ーを吐出するとともに、前記撹拌翼のノズルから固化材
スラリーを、前記掘削ヘッドによる掘削壁面より外側に
噴射して浸透させ、この浸透させた固化材スラリーの凝
固および前記掘削ヘッドからの固化材スラリーの凝固に
よって、前記掘削ヘッドにより掘削された部分よりも大
きな径の第2のコラムを列状に施工し、前記第2のコラ
ムにより、前記第1のコラムの列の間または前記第1の
コラムの列と前記鋼矢板との間を満たす工程とからなる
地盤改良工法。
An excavating head provided at the tip of a rotating and ascending and descending excavation shaft excavates the ground, and a plurality of agitators provided so as to extend radially around the excavation shaft during the excavation. The solidified material slurry from the excavating head was applied to the soil stirred by the blades, and a nozzle provided at the tip of the stirring blade.
The coagulating liquid for coagulating the solidified material slurry is discharged and stirred.
The first column is in contact with each other by stirring
At the same time as constructing in a row, a plurality of said rows between each row
A step of performing the work in parallel with leaving the
And the remaining unprocessed portion between each row of the first column or between the first column and the steel sheet pile is excavated by the excavating head, and is agitated by the agitating blades during the excavation. The solidified material slurry is discharged from the excavation head to the soil that has been solidified, and the solidified material slurry is discharged from the nozzle of the stirring blade to the outside of the excavation wall surface of the excavation head.
Inject and infiltrate and set the infiltrated solidified material slurry
Solidification and solidification of solidified slurry from the drilling head
Therefore, it is larger than the portion excavated by the excavation head.
The second column of Kina径 and construction in columns, said second Kola
Between the rows of the first column or the first column.
A ground improvement method comprising: a step of filling a gap between a row of columns and the steel sheet pile .
JP6310041A 1994-11-07 1994-11-07 Ground improvement method Expired - Fee Related JP3005741B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6310041A JP3005741B2 (en) 1994-11-07 1994-11-07 Ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6310041A JP3005741B2 (en) 1994-11-07 1994-11-07 Ground improvement method

Publications (2)

Publication Number Publication Date
JPH08134890A JPH08134890A (en) 1996-05-28
JP3005741B2 true JP3005741B2 (en) 2000-02-07

Family

ID=18000455

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6310041A Expired - Fee Related JP3005741B2 (en) 1994-11-07 1994-11-07 Ground improvement method

Country Status (1)

Country Link
JP (1) JP3005741B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032662A (en) * 1999-07-21 2001-02-06 Asahi Kiso Kk Earth auger
JP2013108299A (en) * 2011-11-22 2013-06-06 San & Shii Consultant Kk Soil improvement method for preventing liquefaction upon earthquake

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS618212A (en) * 1984-06-21 1986-01-14 Mitsubishi Heavy Ind Ltd Boring machine
JPH04237713A (en) * 1991-01-14 1992-08-26 Santou Kogyosha:Kk Bearing ground injecting method
JP3036295B2 (en) * 1993-04-20 2000-04-24 株式会社大林組 Construction method of retaining wall

Also Published As

Publication number Publication date
JPH08134890A (en) 1996-05-28

Similar Documents

Publication Publication Date Title
JPH05141168A (en) Auger for soil cement composite pile
JP2002275907A (en) Stabilization construction method for slope
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JP2004270157A (en) Steel pile and construction method for it
JPS5985028A (en) Steel pipe pile and laying work thereof
JP4811176B2 (en) Construction method of ready-made piles
JP3005741B2 (en) Ground improvement method
JP4550792B2 (en) Construction method of underground wall
JP4872561B2 (en) Construction method of ready-made piles
JPH09317373A (en) Method of shaft construction
JP4360745B2 (en) Construction method of ready-made piles
JP2819025B2 (en) Soft ground improvement method
JP4615841B2 (en) Synthetic pile construction method and synthetic pile
JP2010281084A (en) Constructive method of bracing wall, constructive method of pile, bracing wall, pile
JPH09268554A (en) Construction method of basic pile and device thereof
JPH07189241A (en) Ground improving machine and method of ground improving construction
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP2011202429A (en) Construction device of columnar ground improving pile, and construction method of columnar ground improving pile
JPH07197469A (en) Structure of earth retaining wall and earth retaining method
JPH06100080B2 (en) Large-section tunnel construction method and ground solidification column construction device
JPS60192022A (en) Method of installing foundation pile by means of inside excavation
JP3890427B2 (en) Improved column construction method for ground improvement
JPH018587Y2 (en)
JP2000345546A (en) Improvement method for soft ground containing hard stratum

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees