JP2972972B2 - How to fix anchor bolt - Google Patents

How to fix anchor bolt

Info

Publication number
JP2972972B2
JP2972972B2 JP4152663A JP15266392A JP2972972B2 JP 2972972 B2 JP2972972 B2 JP 2972972B2 JP 4152663 A JP4152663 A JP 4152663A JP 15266392 A JP15266392 A JP 15266392A JP 2972972 B2 JP2972972 B2 JP 2972972B2
Authority
JP
Japan
Prior art keywords
anchor bolt
concrete
state
nut
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4152663A
Other languages
Japanese (ja)
Other versions
JPH05321268A (en
Inventor
洋 高森
義則 住友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP4152663A priority Critical patent/JP2972972B2/en
Publication of JPH05321268A publication Critical patent/JPH05321268A/en
Application granted granted Critical
Publication of JP2972972B2 publication Critical patent/JP2972972B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、アンカーボルトを基
礎コンクリート内に埋設して固定するための固定方法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a fixing method for embedding and fixing an anchor bolt in a foundation concrete.

【0002】[0002]

【従来の技術】図5は、基礎コンクリートを打設する前
のアンカーボルトの設置状態を示している。図において
(1)(1)は型枠であり、この型枠(1)(1)の上
端間に固定された支持プレート(2)へ、アンカーボル
ト(3)(3)…を挿通して、その支持プレート(2)
の上方に突出するアンカーボルト(3)先端部にナット
(4)を螺合し、これによって、支持プレート(2)か
ら吊り下げ支持している。(5)は、型枠(1)(1)
内に配筋された基礎鉄筋である。
2. Description of the Related Art FIG. 5 shows an anchor bolt installation state before a foundation concrete is cast. In the figures, (1) and (1) are molds, and anchor bolts (3) (3) are inserted through support plates (2) fixed between upper ends of the molds (1) and (1). , Its support plate (2)
A nut (4) is screwed into a tip of an anchor bolt (3) protruding upward from the support bolt, thereby suspending and supporting the nut from a support plate (2). (5) Mold (1) (1)
It is the foundation rebar arranged inside.

【0003】[0003]

【発明が解決しようとする課題】上記のように、アンカ
ーボルト(3)は、支持プレート(2)より吊り下げた
状態で支持され、その下端部分はフリーな状態にある。
このため、この状態で基礎コンクリートを打設すると、
図6で示すように、その打設されたコンクリート(6)
により、アンカーボルト(3)下端部分が押し流されて
傾斜し、このまま硬化すると、そのアンカーボルト
(3)上端部で固定する柱或いは軸組の取付けが困難と
なる不具合を生ずる。
As described above, the anchor bolt (3) is supported by being suspended from the support plate (2), and its lower end is in a free state.
For this reason, when the foundation concrete is cast in this state,
As shown in FIG. 6, the cast concrete (6)
As a result, the lower end portion of the anchor bolt (3) is swept away and inclined, and if it hardens as it is, there is a problem that it becomes difficult to attach a column or a frame fixed at the upper end portion of the anchor bolt (3).

【0004】このため、このようにアンカーボルト
(3)が倒れると正しい位置に戻さなければならない
が、コンクリートの打設後に行なうと、支持プレート
(2)より突出する非常に短い部分を持って傾きを戻さ
なければならず、そのためには非常な力を要するから、
従来においては、コンクリート(6)を打設している間
に傾きを直している。即ち、倒れを直しながらコンクリ
ートの打設を行なっており、コンクリートの打設とアン
カーボルトの倒れの修正という2つの作業を行わなけれ
ばならず、非常に手間を要する欠点がある。
[0004] Therefore, when the anchor bolt (3) falls down as described above, it must be returned to a correct position. Must be returned, and that requires a lot of power,
Conventionally, the inclination is corrected while the concrete (6) is being poured. That is, concrete is cast while falling down, and two operations of concrete placement and correction of anchor bolt fall have to be performed, which has a drawback that requires much labor.

【0005】そこで、このような面倒を避けるため、従
来、図7で示すようにアンカーボルト(3)を、型枠
(1)(1)内に設置しないで、その下端フック部分
(7)のみを支持プレート(2)へ挿通しておき、コン
クリート(6)の打設後に、図7の右側で示すようにそ
のコンクリート(6)内に押し込んで設置するようにし
ている。しかし、この場合においても、アンカーボルト
(3)を非常に深い位置まで押し込まなければならず、
コンクリートの硬化の早い夏場では、やはり作業が困難
である。また、押し込む際に、先端のフック部分(7)
がコンクリート内の鉄筋(5)と干渉する等して、その
干渉のために傾く不都合があり、正確な設置は困難であ
るという欠点もある。
Therefore, in order to avoid such trouble, conventionally, as shown in FIG. 7, the anchor bolt (3) is not installed in the formwork (1) (1), but only the lower end hook portion (7) is provided. Is inserted into the support plate (2), and after the concrete (6) is cast, the concrete (6) is pushed into the concrete (6) as shown in the right side of FIG. However, even in this case, the anchor bolt (3) must be pushed to a very deep position,
In summer, when concrete hardens quickly, work is still difficult. Also, when pushing in, hook part at the tip (7)
However, there is a disadvantage that it interferes with the reinforcing steel (5) in the concrete and tilts due to the interference, so that accurate installation is difficult.

【0006】この発明は、これら従来の欠点を解消し
て、型枠内に設置したアンカーボルトが、コンクリート
の打設の際にそのコンクリートによって押し流されて倒
れることのない固定方法を提供することを目的とするも
のである。
The present invention has been made to solve the above-mentioned conventional disadvantages, and to provide a fixing method in which an anchor bolt installed in a formwork is not pushed down by concrete and falls down when the concrete is poured. It is the purpose.

【0007】[0007]

【課題を解決するための手段】上記の課題を解決するた
め、この発明では、支持部材より吊り下げ支持されるア
ンカーボルト下端のフック部を、型枠内に配筋された鉄
筋へ掛止した状態でそのアンカーボルト上端に螺合した
ナットにて締め付け固定し、この状態でコンクリートを
打設するとともに、そのコンクリート硬化前に前記ナッ
トを弛めてアンカーボルトを所定の深さへ位置決めする
ことを特徴とするものである。
In order to solve the above-mentioned problems, according to the present invention, a hook portion at a lower end of an anchor bolt suspended from and supported by a support member is hooked to a reinforcing bar arranged in a formwork. In this state, tighten and fix it with a nut screwed to the upper end of the anchor bolt, place concrete in this state, and loosen the nut before hardening the concrete to position the anchor bolt to a predetermined depth. It is a feature.

【0008】[0008]

【作用】型枠に設置されたアンカーボルトは、そのフッ
ク部が鉄筋に掛止した状態でナットによって締め付け固
定されているから、打設されるコンクリートによって押
し流されることがない。また、そのアンカーボルトの所
定の深さへの位置決めは、僅かな量だけ押し込めば良い
から、コンクリートの上面から深く押し込む場合に比較
して、僅かな力で容易に作業することができる。
The anchor bolts installed on the formwork are fastened and fixed by the nuts with the hooks hooked on the rebar, so that they are not washed away by the concrete to be cast. Further, since the anchor bolt is positioned at a predetermined depth by a small amount, it can be easily operated with a small force as compared with a case where the anchor bolt is deeply pressed from the upper surface of the concrete.

【0009】[0009]

【実施例】図1は、アンカーボルト(3)の設置の途中
の状態を示している。なお、実施例において型枠
(1)、支持プレート(2)及び鉄筋(5)の構造は従
来と同じであるので、その詳細な説明は省略する。な
お、型枠(1)は先に打設したベースコンクリート(1
4)上に設置されている。アンカーボルト(3)は、従
来と同じく、支持プレート(2)の取付け穴へ挿通し
て、型枠(1)(1)内に設置されるが、そのアンカー
ボルト(3)上端に形成される雄螺子(11)は、従来よ
りも、フック部(12)側に延長して長く形成されてい
る。
FIG. 1 shows a state in which an anchor bolt (3) is being installed. In the embodiment, since the structures of the mold (1), the support plate (2) and the reinforcing bar (5) are the same as those of the related art, detailed description thereof will be omitted. In addition, the formwork (1) is the base concrete (1
4) Installed on top. The anchor bolt (3) is inserted into the mounting hole of the support plate (2) and installed in the formwork (1) (1) as in the prior art, and is formed at the upper end of the anchor bolt (3). The male screw (11) extends longer toward the hook (12) side than in the related art.

【0010】そして、このフック部(12)を、前記鉄筋
(5)の、上下3本の横筋のうち中間部の横筋(13)下
方まで位置させるとともに、この状態から、上端に螺合
したナット(4)を締め付けて、図2で示すように、そ
のフック部(12)を横筋(13)へ掛止した状態で移動し
ないよう締め付け固定しておく。この状態では、アンカ
ーボルト(3)は、通常の所定の深さよりも浅い状態に
あり、そのため、その上端部が支持プレート(2)より
も大きく上方に突出し、これに伴って、ナット(4)の
螺合を可能にするために、その雄螺子部(11)の形成範
囲を長くしたものである。
The hook portion (12) is positioned below the middle horizontal line (13) of the upper and lower three horizontal bars of the reinforcing bar (5), and from this state, the nut screwed to the upper end is formed. As shown in FIG. 2, (4) is tightened so that the hook portion (12) is fastened and fixed so as not to move while being hooked on the horizontal streak (13). In this state, the anchor bolt (3) is in a state shallower than a normal predetermined depth, so that its upper end protrudes larger than the support plate (2), and accordingly, the nut (4). In order to enable screwing, the formation range of the male screw portion (11) is lengthened.

【0011】上記のようにして、アンカーボルト(3)
を固定しておいて、図3のように基礎コンクリート
(6)を打設する。
As described above, the anchor bolt (3)
Is fixed, and the foundation concrete (6) is poured as shown in FIG.

【0012】次いで、基礎コンクリート(6)が硬化す
る前に、前記ナット(4)を弛めて、図4で示すよう
に、アンカーボルト(3)を所定の深さまでそのまま垂
直に押し込んで、それ以上アンカーボルト(3)が落下
しないよう、ナット(4)をねじ込んで支持させ、この
ままの状態でコンクリート(6)を硬化させることによ
り、所定の位置に確実に支持されることになる。
Next, before the foundation concrete (6) is hardened, the nut (4) is loosened, and as shown in FIG. 4, the anchor bolt (3) is pushed vertically to a predetermined depth as it is. As described above, the nut (4) is screwed and supported so that the anchor bolt (3) does not drop, and the concrete (6) is hardened in this state, so that the concrete (6) is reliably supported at a predetermined position.

【0013】[0013]

【発明の効果】この発明によれば、上記のようにアンカ
ーボルト下端のフック部を鉄筋へ掛止した状態でナット
で締め付け固定し、この状態でコンクリートを打設する
から、その締め付けによって確実に支持され、コンクリ
ートによって押し流されて倒れることがない。また、コ
ンクリート打設後にアンカーボルトを所定の深さ位置ま
で押し込む必要があるが、その押し込み深さは僅かで良
く、前記図7のように基礎コンクリートの上面から深く
押し込む必要がないから、僅かな力で容易に押し込むこ
とができ、その作業も短時間で終えることができる。勿
論、コンクリート打設の際に倒れを防止する作業も不要
であるから、全体に作業が簡素化され、施工期間も短縮
することができる。
According to the present invention, the hook portion at the lower end of the anchor bolt is fastened and fixed with the nut while the hook portion at the lower end of the anchor bolt is hooked to the reinforcing bar as described above, and concrete is cast in this state. It is supported and will not be pushed down by concrete and fall down. Further, although it is necessary to push the anchor bolt to a predetermined depth position after placing the concrete, the pushing depth may be small, and it is not necessary to push the anchor bolt deeply from the upper surface of the foundation concrete as shown in FIG. It can be easily pushed by force, and the work can be completed in a short time. Needless to say, since the work for preventing the concrete from falling during casting is unnecessary, the work can be simplified as a whole and the construction period can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】アンカーボルトの設置の途中の状態を示す型枠
部分の横断面図である。
FIG. 1 is a cross-sectional view of a mold portion showing a state in the middle of installation of an anchor bolt.

【図2】アンカーボルトを固定した状態を示す型枠部分
の横断面図である。
FIG. 2 is a cross-sectional view of a mold portion showing a state where an anchor bolt is fixed.

【図3】コンクリート打設後の状態を示す型枠部分の横
断面図である。
FIG. 3 is a cross-sectional view of a mold portion showing a state after concrete is poured.

【図4】アンカーボルトを所定の深さまで押し込んだ状
態を示す型枠部分の横断面図である。
FIG. 4 is a cross-sectional view of a mold portion showing a state where an anchor bolt is pushed to a predetermined depth.

【図5】基礎コンクリート打設前の従来のアンカーボル
トの設置状態を示す要部の斜視図である。
FIG. 5 is a perspective view of a main part showing an installation state of a conventional anchor bolt before placing concrete on a foundation.

【図6】同じく従来において、基礎コンクリート打設の
際のアンカーボルトの状態を示す側面図である。
FIG. 6 is a side view showing a state of anchor bolts at the time of placing concrete in the related art.

【図7】アンカーボルトの従来の別の設置方法を示す要
部の斜視図である。
FIG. 7 is a perspective view of a main part showing another conventional method for installing an anchor bolt.

【符号の説明】[Explanation of symbols]

(1) 型枠 (2) 支持部材 (3) アンカーボルト (4) ナット (6) 基礎コンクリート (12) フック部 (13) 横筋 (1) Formwork (2) Support member (3) Anchor bolt (4) Nut (6) Foundation concrete (12) Hook (13) Lateral bar

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 支持部材より吊り下げ支持されるアンカ
ーボルト下端のフック部を、型枠内に配筋された鉄筋へ
掛止した状態でそのアンカーボルト上端に螺合したナッ
トにて締め付け固定し、この状態でコンクリートを打設
するとともに、そのコンクリート硬化前に前記ナットを
弛めてアンカーボルトを所定の深さへ位置決めすること
を特徴とするアンカーボルトの固定方法。
1. A hook portion at a lower end of an anchor bolt suspended and supported by a support member is fastened and fixed with a nut screwed to an upper end of the anchor bolt while being hooked on a reinforcing bar arranged in a formwork. And fixing the anchor bolt to a predetermined depth by placing concrete in this state and loosening the nut before hardening the concrete.
JP4152663A 1992-05-19 1992-05-19 How to fix anchor bolt Expired - Fee Related JP2972972B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4152663A JP2972972B2 (en) 1992-05-19 1992-05-19 How to fix anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4152663A JP2972972B2 (en) 1992-05-19 1992-05-19 How to fix anchor bolt

Publications (2)

Publication Number Publication Date
JPH05321268A JPH05321268A (en) 1993-12-07
JP2972972B2 true JP2972972B2 (en) 1999-11-08

Family

ID=15545370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4152663A Expired - Fee Related JP2972972B2 (en) 1992-05-19 1992-05-19 How to fix anchor bolt

Country Status (1)

Country Link
JP (1) JP2972972B2 (en)

Also Published As

Publication number Publication date
JPH05321268A (en) 1993-12-07

Similar Documents

Publication Publication Date Title
JP3131816B2 (en) How to build a steel column
JP2972972B2 (en) How to fix anchor bolt
JP2012067441A (en) Installation method for anchor bolt
JP3017084U (en) Jig for level adjustment of side form
JPH07119297A (en) Steel form installing device
JPH0138947B2 (en)
KR200234872Y1 (en) An iron reinforcing bar prop
JP2583707B2 (en) Metal fittings for formwork for concrete foundation construction
JP3612356B2 (en) Installation structure of concrete formwork
KR200246517Y1 (en) Spacer with inclined groove
JPH10140641A (en) Variable side ditch and laying method thereof
JP2001059226A (en) Concrete footing level setter and column installation method to concrete footing
KR200365824Y1 (en) Formwork for Concrete Buildings
JP2592742Y2 (en) Anchor bolt fixing device
JP3830245B2 (en) Arch rib construction method
JPH0544218A (en) Base-repairing tool for anchor bolt
JP2829626B2 (en) Structure of concrete block and method of stacking concrete block on slope
JP2561529Y2 (en) Foundation anchor bolt
JPH05321229A (en) Method for constructing top overhung part of concrete dam
JPS5825145B2 (en) How to bury a concrete anchor
JP3368360B2 (en) How to install a packer plate for equipment installation
JPH084514Y2 (en) Concrete formwork
JPS5914595Y2 (en) Anchor installation tool
JPH0410540B2 (en)
JPS5824969Y2 (en) Bearing leveling device

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990706

LAPS Cancellation because of no payment of annual fees