JP2915655B2 - Bathroom unit construction method - Google Patents

Bathroom unit construction method

Info

Publication number
JP2915655B2
JP2915655B2 JP3310622A JP31062291A JP2915655B2 JP 2915655 B2 JP2915655 B2 JP 2915655B2 JP 3310622 A JP3310622 A JP 3310622A JP 31062291 A JP31062291 A JP 31062291A JP 2915655 B2 JP2915655 B2 JP 2915655B2
Authority
JP
Japan
Prior art keywords
bathroom unit
construction
floor
construction method
bathroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3310622A
Other languages
Japanese (ja)
Other versions
JPH05149009A (en
Inventor
武 小森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aoki Construction Co Ltd
Original Assignee
Aoki Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aoki Construction Co Ltd filed Critical Aoki Construction Co Ltd
Priority to JP3310622A priority Critical patent/JP2915655B2/en
Publication of JPH05149009A publication Critical patent/JPH05149009A/en
Application granted granted Critical
Publication of JP2915655B2 publication Critical patent/JP2915655B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)
  • Residential Or Office Buildings (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、バスルームユニット
施工法に関するものである。さらに詳しくは、この発明
は、高層ビル建築からなるホテル等の省力化施工として
有用な、新しいバスルームユニット施工法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bathroom unit construction method. More specifically, the present invention relates to a new bathroom unit construction method useful as a labor-saving construction for a hotel or the like composed of a high-rise building.

【0002】[0002]

【従来の技術とその課題】高層ビル建築等においては、
高所作業の省力化とその安全対策の向上が建設工事にか
かわる技能者の不足とあいまってさらに肝要な課題とな
っている。このため、すでに様々な改善や改良がなされ
てきている。しかしながら、いわゆる水まわり施工と呼
ばれるバスルームの施工については必ずしもこの高所作
業の省力化は進展していないのが実情である。
2. Description of the Related Art In high-rise building construction, etc.,
Labor saving at high places and improvement of safety measures have become more important issues in combination with the shortage of technicians involved in construction work. For this reason, various improvements and improvements have already been made. However, in the construction of bathrooms, which is a so-called water plumbing construction, the fact is that the labor saving of this work at height has not necessarily progressed.

【0003】すなわち、このバスルーム施工について
は、従来より、スラブコンクリートの打設終了後、ユニ
ット型の浴槽やトイレ設備等の衛生器具を取付けること
が行われてきているが、このような従来の施工法の場合
には、スラブコンクリートの打設が完了しない限り、施
工に取りかかることができず、大規模なホテル等の建設
においては、工事進行の管理面上大きな制約があり、ま
た、コンクリート打設終了後に、バスルーム内の設備取
付けや配管の個々の作業を所定の場所で行うことが必要
であって、この作業はいわゆる高所作業となるため、そ
の省力化、安全性の確保の点において、問題となってい
た。
[0003] That is, in this bathroom construction, conventionally, after the slab concrete has been poured, a sanitary fixture such as a unit-type bathtub or toilet facilities has been installed. In the case of the construction method, construction cannot be started unless the slab concrete has been cast.Therefore, in the construction of large-scale hotels, etc., there are great restrictions on the management of the construction progress, and concrete After the installation is completed, it is necessary to perform the installation work of the equipment in the bathroom and individual work of piping at a predetermined place, and this work is a so-called high-place work, so that it is necessary to save labor and secure safety. Was a problem.

【0004】また、ホテル等の建設においては、最も慎
重な施工が必要とされるバスルームの防水施工、給水、
排水のための設備施工、さらには化粧施工等は、高所で
の個々のバスルームについての多大な作業となるため、
どうしてもその品質は不均一になりやすく、信頼性の点
で必ずしも充分とは言えないのが実情であった。そこ
で、この発明は、以上の通りの従来法の欠点を改善し、
高所作業の省力化を図ることができ、大規模ホテルの建
設等においても、多数のバスルームを均一に、信頼性の
高い施工を可能とすることのできる新しいバスルームユ
ニット施工法を提供することを目的としている。
[0004] In the construction of hotels and the like, bathroom construction, water supply,
Since the construction of equipment for drainage, and also the construction of makeup, is a great deal of work on individual bathrooms at high places,
The fact is that the quality tends to be uneven and the reliability is not always sufficient. Therefore, the present invention improves the disadvantages of the conventional method as described above,
To provide a new bathroom unit construction method that can save labor in high places and can evenly and reliably construct a large number of bathrooms even in the construction of large-scale hotels. It is intended to be.

【0005】[0005]

【課題を解決するための手段】この発明は、上記の通り
の課題を解決するものとして、PC板構造床に壁面板お
よび天井板を建込み、浴槽他の衛生器具を取付けてコー
キング打ちおよび表面化粧してなるバスルームユニット
を所定の部位に吊込み、躯体鉄骨の施工時に据付けする
ことを特徴とするバスルームユニット施工法を提供す
る。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems by constructing a wall board and a ceiling board on a PC board structure floor, attaching a bathtub and other sanitary fixtures, and performing coking and surface treatment. A bathroom unit construction method is characterized in that a bathroom unit with makeup is hung at a predetermined site and installed at the time of construction of a steel frame.

【0006】すなわち、この発明は、従来のバスユニッ
ト施工法とは本質的に相違して、PC板構造床一体型の
バスルームユニットをあらかじめ製作し、これをクレー
ン等により吊込んで高層ビル建築の所定の部位に据付け
ることを特徴としている。しかもこの発明においては、
従来のようにスラブコンクリートの打設終了を待つこと
なく、ビル建物の躯体鉄骨の施工時にこのバスルームユ
ニットを順次吊込み、かつ据付けることを特徴としてい
る。
That is, the present invention essentially differs from the conventional bus unit construction method in that a bathroom unit integrated with a PC board structure floor is manufactured in advance, and this is suspended by a crane or the like to build a high-rise building. It is characterized in that it is installed at a predetermined site. Moreover, in the present invention,
The present invention is characterized in that the bathroom units are sequentially hung and installed at the time of constructing the frame steel of the building without waiting for the completion of the slab concrete placement as in the related art.

【0007】[0007]

【実施例】添付した図面の図1は、この発明の工法の作
業フローを示したブロック図である。この図1に沿って
さらに詳しくこの発明のバスルームユニット施工法につ
いて説明する。工程は大概次のように区分される。 (A) PC床板製作 この発明のバスユニット施工の基礎となるバスルームの
PC床板を製作する。すなわち、 1) バスユニットPC床板型枠にスリーブ等の配管を
取付ける。
1 is a block diagram showing a work flow of the method of the present invention. The bathroom unit construction method of the present invention will be described in more detail with reference to FIG. The process is roughly divided as follows. (A) PC floorboard production A PC floorboard for a bathroom, which is the basis of the bath unit construction of the present invention, is produced. That is, 1) A pipe such as a sleeve is attached to the bus unit PC floor panel formwork.

【0008】2) バスユニットPC床板に配筋する。 3) バスユニットPC床板にコンクリート打設する。
この時、打設コンクリートの強度チェックを行う。 4) コンクリート均し、コテ押しを行う。 5) 蒸気養生する。
2) Bus bars are arranged on the PC floorboard. 3) Pour concrete into the floor plate of the bus unit PC.
At this time, the strength of the cast concrete is checked. 4) Level concrete and push iron. 5) Steam cure.

【0009】この時、再度打設コンクリートの強度をチ
ェックする。 6) 脱型および清掃を行う。 (B) 防水施工 防水材塗布(塗膜防水)する。
At this time, the strength of the cast concrete is checked again. 6) Remove the mold and clean. (B) Waterproofing Apply a waterproofing material (coating film waterproofing).

【0010】防水面のチェックを行う。 (C) バスルームユニット組立 PC床板の製作および防水施工の終了後、バスユニット
の組立を行う。 1) 壁面パネルの建込みを行う。 2) 天井パネルの建込みを行う。
[0010] The waterproof surface is checked. (C) Assembling the bathroom unit After completing the production of the PC floorboard and the waterproofing work, assemble the bathroom unit. 1) Install wall panels. 2) Install ceiling panels.

【0011】3) 浴槽他の衛生器具の取付を行う。 4) コーキング打ちを行う。 5) 床面石貼等の化粧施工する。 また、このバスルームユニット組立においては、天井面
の外面に防水パンを配置し、排水機能を付与する。これ
は、バスルームユニットの吊込み据付けが躯体鉄骨の施
工時に行われるため、雨仕舞を良くすることと、施工後
の上部階からの漏水に対する耐水性を向上させるためで
ある。 (D) バスユニット取付・据付 (A)(B)(C)の工程により製作したバスルームユ
ニットをクレーン等によってビル建築物の所定階の所定
部位まで吊上げ、据付を行う。
3) Attach a bathtub or other sanitary fixture. 4) Perform caulking. 5) Apply makeup such as sticking stones on the floor. Also, in this bathroom unit assembly, a waterproof pan is arranged on the outer surface of the ceiling surface to provide a drainage function. This is because the hanging installation of the bathroom unit is performed at the time of the construction of the skeleton steel frame, so that the rain break is improved and the water resistance against water leakage from the upper floor after the construction is improved. (D) Mounting and installation of the bus unit The bathroom unit manufactured in the steps (A), (B) and (C) is lifted up to a predetermined site on a predetermined floor of a building by a crane or the like, and is installed.

【0012】この時、位置、レベルのチェックを行う。
据付に際しては、PC板構造床の側端部にインサート鉄
筋を配設し、周囲の配筋床面にコンクリート打設する。
これによって、バスルームユニットのPC板構造床と周
囲床面とが連続一体化されることになる。
At this time, the position and level are checked.
At the time of installation, insert rebar is arranged at the side end of the PC board structure floor, and concrete is cast on the surrounding reinforcement floor.
Thereby, the PC board structure floor of the bathroom unit and the surrounding floor are continuously integrated.

【0013】以上の工程によって、バスルームユニット
の床板コンクリート、壁面および天井はもちろんのこ
と、防水、内部仕上げ、衛生器具の取付等のすべての作
業を、ビル建築現場の地上部、もしくは地下の所定の製
作ヤードにおいて行うことができるため、唯一残るの
は、ビル構造体の所定階の所定部位での設備配管のつな
ぎこみのみとなる。このため、高所での作業は従来に比
べてはるかに省力化される。
Through the above steps, not only floor concrete, walls and ceilings of the bathroom unit, but also all operations such as waterproofing, internal finishing, installation of sanitary fixtures, etc., can be performed in predetermined locations above or below the building construction site. The only thing that remains is the connection of the equipment piping at a given location on a given floor of the building structure. For this reason, work at a high place is much more labor-saving than before.

【0014】またバスルームユニットの天井外面には、
前記の通りの排水機能を付与して全天候型とすることに
より優れた性能を保つことができる。そして、従来の工
法であれば、スラブコンクリートの打設後に、所定のフ
ロアのバスルームの工事を行うため、コンクリート打設
が完了しなければこの工事に取りかかることができなか
ったが、この発明によって、コンクリート工事の進行と
は別に、バスルームユニットの製造を先行することがで
き、しかも躯体鉄筋の施工時に吊込み、据付ができると
いう大きな特徴が実現される。
[0014] Also, on the ceiling outer surface of the bathroom unit,
By providing the all-weather type by providing the drainage function as described above, excellent performance can be maintained. According to the conventional construction method, since the construction of the bathroom on the predetermined floor is performed after the slab concrete is placed, the construction cannot be started unless the concrete placement is completed. In addition to the progress of concrete work, it is possible to precede the production of the bathroom unit, and it is possible to realize a great feature that it can be suspended and installed at the time of the construction of the building rebar.

【0015】たとえば以上の施工法の具体例としては、
次の表1に示した通りの部材構成からなるバスルームユ
ニットを製作し、これをクレーンによって吊込んで据付
する。
For example, as a specific example of the above construction method,
A bathroom unit having a member configuration as shown in the following Table 1 is manufactured and suspended by a crane for installation.

【0016】[0016]

【表1】 [Table 1]

【0017】図2は、この発明によるバスルームユニッ
トを例示した外観斜視図である。たとえばこの図2に示
したように、この発明のバスルームユニットでは、PC
板構造床(1)に取付金物(2)を介して壁面板(3)
および天井板(4)を建込み、ルーム内の床面(5)に
は防水施工が施してある。また所要の化粧もバスルーム
内の床面(5)、壁面および天井面に施してある。
FIG. 2 is an external perspective view illustrating a bathroom unit according to the present invention. For example, as shown in FIG. 2, in the bathroom unit of the present invention, the PC
Wall plate (3) via mounting hardware (2) to plate structure floor (1)
And a ceiling board (4) is built, and the floor (5) in the room is waterproofed. The required makeup is also applied to the floor (5), walls and ceiling in the bathroom.

【0018】また、この例では、PC板構造床(1)の
大きさをバスルームそのものの大きさよりも大きくして
ある。天井板(4)の上部には防水パン(6)を配設
し、集水ホースによって排水機能を付与している。全天
候型のバスルームユニットとなる。この時、点検口およ
び換気口には、各々、キャップ(7)(8)を備えてお
く。バスルームユニットの据付後にこれは取りはずすこ
とになる。
In this embodiment, the size of the PC board floor (1) is larger than the size of the bathroom itself. A waterproof pan (6) is provided above the ceiling plate (4), and a drainage hose is provided with a drainage function. All-weather bathroom unit. At this time, the inspection port and the ventilation port are provided with caps (7) and (8), respectively. This will be removed after installation of the bathroom unit.

【0019】またさらに、PC板構造床(1)の側端面
にはインサート鉄筋の配筋用のインサート孔(9)を設
けてもいる。このバスルームユニットのA−A断面を例
示したものが図3である。バスルーム内には、浴槽(1
0)とともに、シャワールーム用のシャワー設備(1
1)およびドア(12)を設けている。また、水洗便器
等をその内部に設けている。この図3からも明らかなよ
うに、この発明のバスルームユニットのPC板構造床
(1)には、適宜な部位に排水管路(13)があらかじ
め設けられている。床面(5)および内壁面(14)に
は化粧が施されてもいる。
Further, an insert hole (9) for arranging an insert reinforcing bar is provided on the side end surface of the PC board structural floor (1). FIG. 3 illustrates an AA cross section of this bathroom unit. The bathroom has a bathtub (1
0) and shower facilities (1
1) and a door (12). In addition, a flush toilet and the like are provided inside. As is apparent from FIG. 3, a drain pipe (13) is provided in advance at an appropriate location on the PC board floor (1) of the bathroom unit of the present invention. The floor (5) and the inner wall surface (14) are also provided with makeup.

【0020】以上のようなバスルームユニットは、たと
えば総重量5 〜5.5ton程度のものとする。これを吊込ん
で据付けるには、鉄骨施工中のクレーンによって、その
躯体鉄骨の施工時に所定階フロアー部にまで吊込み、P
C板構造床(1)の下面の一部を鉄骨梁に乗せて支持す
る。この時、たとえば、図2において鉄骨梁として示し
たX,Yのうちの少なくとも一方、たとえば梁(X)は
その位置調整ができるようにしておく。これは吊込時
に、バスルームユニットがクレーンに支持されて所定階
にまで移動降下させる時に梁の存在がじゃまにならない
ようにするためである。
The above bathroom unit has a total weight of, for example, about 5 to 5.5 tons. In order to suspend and install this, the crane during the construction of the steel frame is used to suspend the steel frame to the floor of the specified floor when the steel frame is constructed.
A part of the lower surface of the C-plate structure floor (1) is supported on a steel beam. At this time, for example, at least one of X and Y shown as the steel beams in FIG. 2, for example, the beam (X) is adjusted so that its position can be adjusted. This is to prevent the presence of the beams when the bathroom unit is supported by the crane and moved down to the predetermined floor during the hanging.

【0021】また、バスルームユニットには、この吊込
時に、パイプ収納部を構成するためのコンクリート壁板
をあらかじめ取付けておいてもよい。これにより、たと
えばその総重量は約7ton となる。クレーンによって、
たとえば25階、30階、あるいはそれ以上の高層ビル
のホテル等において、このようなバスルームユニットの
吊込み据付けが可能となる。
In addition, a concrete wall plate for forming a pipe storage portion may be attached to the bathroom unit in advance when suspending. This results, for example, in a total weight of about 7 tons. By crane,
For example, in a hotel or the like of a high-rise building on the 25th floor, the 30th floor or higher, such a bathroom unit can be suspended and installed.

【0022】図4は、階下のフロアーに据付けられたバ
スルームユニットを示した斜視図である。梁(14)の
階下のものと、もう一方の階下の梁(15)とによって
バスルームユニットが支持される。パイプ収納部を形成
するコンクリート壁板(16)がこのバスルームユニッ
トに取付けられていることがわかる。
FIG. 4 is a perspective view showing a bathroom unit installed on a lower floor. The bathroom unit is supported by one below the beam (14) and the other below the beam (15). It can be seen that the concrete wall plate (16) forming the pipe storage is attached to this bathroom unit.

【0023】[0023]

【発明の効果】この発明により、以上詳しく説明した通
り、高所作業の省力化が図られ、かつ、スラブコンクリ
ートの打設に先行してバスルームユニットを製作し、か
つ、躯体鉄骨の施工時に吊込み据付けができるため、建
設スケジュール管理も極めて容易となる。品質の均一化
も図られる。
According to the present invention, as described in detail above, labor saving at high places can be achieved, and a bathroom unit can be manufactured prior to placing slab concrete, and at the time of building a steel frame. Because of the hanging installation, construction schedule management becomes extremely easy. The quality is also made uniform.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の施工法を示した工程フローブロック
図である。
FIG. 1 is a process flow block diagram showing a construction method of the present invention.

【図2】この発明のバスルームユニットを示した斜視図
である。
FIG. 2 is a perspective view showing a bathroom unit of the present invention.

【図3】図2の例の断面図である。FIG. 3 is a sectional view of the example of FIG. 2;

【図4】バスルームユニットの据付けを示した斜視図で
ある。
FIG. 4 is a perspective view showing installation of a bathroom unit.

【符号の説明】[Explanation of symbols]

1 PC板構造床 2 取付金物 3 壁面板 4 天井板 5 バスルーム内床面 6 防水パン 7 キャップ 8 キャップ 9 インサート孔 10 浴槽 11 シャワー設備 12 ドア 13 排水管路 14、15 梁 16 コンクリート壁板 DESCRIPTION OF SYMBOLS 1 PC board structure floor 2 Mounting hardware 3 Wall board 4 Ceiling board 5 Floor in bathroom 6 Waterproof pan 7 Cap 8 Cap 9 Insert hole 10 Bathtub 11 Shower equipment 12 Door 13 Drain pipe 14, 15 Beam 16 Concrete wall board

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 高層ビル建築におけるバスルームユニッ
トの搬入施工法であって、 建築構造体の一部としての PC板構造床に壁面板および
天井板を建込み、浴槽他の衛生器具を取付けてコーキン
グ打ちおよび表面化粧してなるバスルームユニットを所
定の部位に吊込み、躯体鉄骨施工時に据付けすることを
特徴とするバスルームユニット施工法。
1. A bathroom unit in a high-rise building construction.
A bathroom unit that is a method of carrying in construction work, where a wall plate and a ceiling plate are built on a PC plate structure floor as a part of a building structure , a bathtub and other sanitary fixtures are attached, and a caulking and surface decoration is performed. A bathroom unit construction method, wherein a bathroom unit is suspended at a predetermined site and installed at the time of construction of a steel frame.
【請求項2】 型枠にスリーブ等の配管を取付けて配筋
し、コンクリート打設、蒸気養生および脱型し、塗膜防
水したPC板構造床に壁面板および天井板を建込む請求
項1のバスルームユニット施工法。
2. A wall board and a ceiling board are built on a PC board structure floor which is provided with a pipe such as a sleeve attached to a formwork, is laid with concrete, is steam-cured, is demolded, and is waterproof. Bathroom unit construction method.
【請求項3】 天井板外面に防水パンを配置し、排水機
能を付与して全天候型ユニットとしてなる請求項1また
は2のバスルームユニット施工法。
3. The bathroom unit construction method according to claim 1, wherein a waterproof pan is arranged on an outer surface of the ceiling plate to provide a drainage function to form an all-weather unit.
【請求項4】 PC板構造床の側端部にインサート鉄筋
を配設し、周囲の配筋床面にコンクリート打設する請求
項1、2または3のバスルームユニット施工法。
4. The bathroom unit construction method according to claim 1, wherein an insert reinforcing bar is provided at a side end of the PC board structure floor, and concrete is cast on the surrounding reinforcing bar floor.
JP3310622A 1991-11-26 1991-11-26 Bathroom unit construction method Expired - Fee Related JP2915655B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3310622A JP2915655B2 (en) 1991-11-26 1991-11-26 Bathroom unit construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3310622A JP2915655B2 (en) 1991-11-26 1991-11-26 Bathroom unit construction method

Publications (2)

Publication Number Publication Date
JPH05149009A JPH05149009A (en) 1993-06-15
JP2915655B2 true JP2915655B2 (en) 1999-07-05

Family

ID=18007479

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3310622A Expired - Fee Related JP2915655B2 (en) 1991-11-26 1991-11-26 Bathroom unit construction method

Country Status (1)

Country Link
JP (1) JP2915655B2 (en)

Also Published As

Publication number Publication date
JPH05149009A (en) 1993-06-15

Similar Documents

Publication Publication Date Title
EP3670774B1 (en) Prefabricated bathroom and methods for constructing and installing the same
JP2002004610A (en) Prefabricated bathroom
CN107268841A (en) Partition wall system
JPH07122340B2 (en) Building equipment for multi-storey buildings
CN205134993U (en) Prefabricated whole bathroom
CN110644814A (en) Integrated bathroom and assembling method thereof
CN102230338A (en) Prefabricated toilet and construction method and installation method thereof
CN102230339A (en) Prefabricated kitchen and construction and installation method thereof
CN106223460B (en) The prefabricated construction method of large scale wallboard
JP2915655B2 (en) Bathroom unit construction method
CN102777032B (en) Installation method of prefabricated toilet
CN211313514U (en) Integral prefabricated toilet
JP2990434B1 (en) How to assemble the plumbing unit of the building to the frame by the frame wall method
CN102777033B (en) Method for mounting prefabricated kitchen
CN220167223U (en) Prefabricated bare concrete non-structural filling wall
JP4302616B2 (en) Construction method for multi-story buildings
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
KR20240057747A (en) Method for constructing precast bathroom
JP3177386B2 (en) Construction method of floor slab having concave portion on top surface
JP2733507B2 (en) Industrialization of racks for piping and wiring
JP2001123681A (en) Unit type kitchen and sanitary space facility
JPH0336981B2 (en)
JPH1037500A (en) Bathroom construction body and its working method
RU1818439C (en) Building section
JPH0211509Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees