JP2905613B2 - Foundation bolt fixing device - Google Patents

Foundation bolt fixing device

Info

Publication number
JP2905613B2
JP2905613B2 JP8180891A JP8180891A JP2905613B2 JP 2905613 B2 JP2905613 B2 JP 2905613B2 JP 8180891 A JP8180891 A JP 8180891A JP 8180891 A JP8180891 A JP 8180891A JP 2905613 B2 JP2905613 B2 JP 2905613B2
Authority
JP
Japan
Prior art keywords
anchor
plate
fixed
fixing
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8180891A
Other languages
Japanese (ja)
Other versions
JPH0649850A (en
Inventor
修一 前川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON DORAIBUITSUTO KK
Original Assignee
NIPPON DORAIBUITSUTO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON DORAIBUITSUTO KK filed Critical NIPPON DORAIBUITSUTO KK
Priority to JP8180891A priority Critical patent/JP2905613B2/en
Publication of JPH0649850A publication Critical patent/JPH0649850A/en
Application granted granted Critical
Publication of JP2905613B2 publication Critical patent/JP2905613B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】 【0001】 【産業上の利用分野】本発明は、建造物の鉄骨柱脚等を
支持するための基礎ボルトの固定装置に関するものであ
る。 【0002】 【従来の技術】建造物の鉄骨柱脚等を基礎構造物に支
持、固定する方法としては、従来一般に、図6に示すよ
うに、J形等によるアンカ−ボルト14,14を、基礎ボル
トとして地中梁のための鉄筋の配筋と同時にセットして
基礎コンクリート6中に埋設し、そのコンクリート6よ
り突出させた部分に柱脚11等のべースプレート部12を係
合してナット13で締付け固定するようにしている。 【0003】しかし、この方法では、基礎ボルト14,14
は各々独立してコンクリートに埋設されるため、位置決
めが難かしく、柱脚等との位置合わせのため、図6の
(イ)に示すように、基礎ボルト14を曲げてやることが
多く、作業が非常に面倒になるばかりでなく、基礎ボル
トに余分な応力を作用させることになる、という問題が
あった。 【0004】そこで、上記の問題を解決するために、例
えば実開昭60ー8305 号公報に記載されているようなアン
カーボルト定着装置、或は特公昭50ー13575号公報に記載
されているようなアンカーボルト礎着方法が実施化され
るようになってきた。上記前者の装置は、基礎ボルトと
なる4本のボルトの上下にプレ−トをナットで固定し、
下側プレートには固定用の定着板を設けた構成のもの
で、すてコンクリートに定着板をアンカーで固定して基
礎コンクリ−トに埋設し、ボルトに柱脚のベースプレー
ト部を固定するようにしている。また、上記後者の方法
は、プレートの一方の面にコンクリートへ埋込まれる食
込み足(異形棒鋼)を溶接した金物を、プレートの他の
面が表面に露出するように設置して基礎コンクリートに
埋設した後、プレートの露出側表面に基礎ボルトを溶接
して、これに柱脚等のベースプレート部を固定するもの
である。 【0005】 【発明が解決しようとする課題】しかし、上記前者のも
のは、コンクリートの打設時に装置が傾いたり動いてし
まうことが多いため、装置の固定手段を施す必要がある
とともに、柱脚の固定位置の微妙な修正が不可能である
等の欠点がある。また、上記後者のものは、食込み足の
異形棒鋼は工場でプレートに溶接されるが、最も重要な
基礎ボルトは一本づつ現場で溶接しなければならず、各
基礎ボルトの溶接位置を決めるのが面倒であるとともに
品質管理にも問題がある。更に、異形棒鋼及び基礎ボル
トは特別な溶接装置を使用し、高い技能が必要とされ、
鉄筋の配筋から柱脚の固定までの作業計画を綿密に決定
しなければならない等の問題がある。 【0006】本発明は、上記従来技術における問題を解
決するためになされたもので、異形棒鋼及び柱脚等を固
定するための重要な基礎ボルトの溶接を、自動制御の溶
接装置が使用でき品質管理が容易である工場で行なえる
ようにし、現場においては、特殊な溶接装置及び特別な
技能を必要としないで、柱脚等の支持位置への基礎ボル
トの固定が容易に行なえるようにし、基礎構造物の鉄筋
の配筋から柱脚の支持までの作業計画が容易に行ない得
るようにした基礎ボルト固定装置を提供しようとするも
のである。 【0007】 【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図1〜図
5を参照して説明すると、本発明は、アンカープレート
3の一面側にアンカー材5,5 を溶接4したアンカー部1
と、補助プレート7の一面側に基礎ボルト8,8を溶接9
した固定部2とを各別体で形成し、アンカ−プレート3
の他面側に補助プレート7の他面側を添接し、それら両
プレート3,7 を溶接10して、アンカー部1と固定部2と
を固着したことを特徴とするものである。 【0008】 【実施例】図1は本発明装置の1実施例の斜視図、図2
は側面図、図3は分離状態の側面図であって、1はアン
カー部、2は固定部である。 【0009】アンカー部1は、平板状に形成されたアン
カープレート3の一方の面に、基礎コンクリート6中に
埋設される異形棒鋼等により形成された複数本のアンカ
ー材5 ,5 の一端が溶接4により固着された構造となっ
ており、アンカープレート3へのアンカー材の溶接は工
場において行なわれ、施工現場に運ばれる。なお、実施
例図においては、アンカー材5は2本固着したものとな
っているが、それ以上の多数本を固着することができ
る。 【0010】固定部2は、アンカープレート3より平面
形状を小さく形成した平板状の補助プレート7の一方の
面に、柱脚等のベースプレート部を固定するための短尺
な基礎ボルト8の複数本が所要の間隔をおいて溶接9に
より立設された構造となっており、これも工場において
補助プレート7への基礎ボルト8 ,8 の溶接がなされ、
施工現場に運ばれる。なお、実施例図では、基礎ボルト
8を4本固着したものとなっているが、その数は必要に
応じ増減することができる。また、補助プレート7は単
なる平板でもよいが、図1に示すような中抜き状とした
り環状に形成すれば好適である。 【0011】上記のアンカー部1と固定部2とは、施工
現場において溶接により結合され、本発明の装置として
形成される。すなわち、まず地中梁等の基礎構造物の配
筋を利用して、アンカー部1を、そのアンカー材5 ,5
が基礎構造物中に埋設されるとともに、その反対側のア
ンカープレート3の面が基礎構造物の表面に露出するよ
うにして固定し、基礎コンクリート6を打設する。そし
て、そのコンクリート6の硬化後、基礎構造物上に柱脚
設置のためのけがき線a−a、b−b(図1参照)をけ
がき、固定部2の補助プレート7をけがき線a,bに合
せてアンカープレート3上に載置し、補助プレート7の
周囲及び必要個所を溶接10することにより、固定部2を
アンカー部1に固着するのである。柱脚11は、図2に示
すように、その下端のベースプレート12を基礎ボルト8
,8 に係合してナット13,13を締付けて固定されるこ
とになる。なお、けがき線は、a,bに合せるための印
を、図4に示すように、アンカープレート3及び補助プ
レート7に設けることもできる。 【0012】上記の実施例では、アンカープレート3と
補助プレート7とはほぼ同軸となるように固着している
が、例えば図4に示すように、配筋との取り合い等によ
りアンカー部1が定位置よりづれて埋設された場合は補
助プレート7がアンカープレート3の中心よりはずれた
位置に固着することができ、また、図5に示すように、
固定する柱脚の係合部分の位置に対応して、基礎ボルト
8 ,8 の位置決めをするため、補助プレート7を自在に
転回して固着することもできる。更に、上記各実施例で
は、アンカープレート3及び補助プレート7は平面四角
状となっているが、その形状は多角形、円形等各種の形
状とすることができる。 【0013】 【発明の効果】以上説明したように、本発明の基礎ボル
ト固定装置は、アンカープレートにアンカー材を溶接し
たアンカー部と、補助プレートに基礎ボルトを溶接した
固定部とを別体に形成して、それら両者を施工現場で固
着できる構成としたので、アンカー部と固定部とはそれ
ぞれ工場において必要な溶接装置を用いて確実、強固に
でき、品質管理も十分行ない得られるとともに、寸法精
度の向上が図れる。 【0014】そして、現場では、埋設したアンカー部に
対し、補助プレートをけがき線に合せて固定部を固着す
ればよく、その固着は特殊な溶接装置や熟練を要さない
ステイック溶接によって行なうことができ、現場作業が
簡易、確実に能率よく行なえることになるとともに、溶
接状態の検査も容易にすることができる。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for fixing a foundation bolt for supporting a steel column base or the like of a building. 2. Description of the Related Art As a method of supporting and fixing a steel column base and the like of a building to a substructure, conventionally, as shown in FIG. 6, anchor bolts 14 and 14 of a J shape or the like are generally used. It is set at the same time as the reinforcing bars for the underground beams as foundation bolts, buried in the foundation concrete 6, and the base plate portion 12 such as the column base 11 is engaged with the portion protruding from the concrete 6 and the nut is engaged. Tighten and fix at 13. However, in this method, the foundation bolts 14, 14
Since each of them is buried in concrete independently, it is difficult to position them, and in many cases, the foundation bolts 14 are bent as shown in FIG. However, there is a problem that not only is it very troublesome, but also extra stress acts on the foundation bolt. Therefore, in order to solve the above-mentioned problem, for example, an anchor bolt fixing device as described in Japanese Utility Model Laid-Open No. 60-8305 or as described in Japanese Patent Publication No. 50-13575. An anchor bolt foundation method has come into practice. In the former device, plates are fixed above and below four bolts serving as foundation bolts with nuts,
The lower plate is provided with a fixing plate for fixing.The fixing plate is fixed to all concrete with an anchor, embedded in the foundation concrete, and the base plate portion of the column base is fixed to the bolt. ing. Also, in the latter method, a metal piece with a bite foot (deformed steel bar) embedded in concrete on one side of the plate is installed so that the other side of the plate is exposed on the surface and embedded in the foundation concrete. Then, a base bolt is welded to the exposed surface of the plate, and a base plate portion such as a column base is fixed thereto. [0005] However, in the case of the former, since the device is often tilted or moved at the time of placing concrete, it is necessary to provide a fixing means for the device, and the column pedestal is required. There is a drawback that it is impossible to delicately fix the fixed position of the camera. In the latter case, the deformed steel bars of the bite feet are welded to the plate at the factory, but the most important foundation bolts must be welded one by one at the site, and the welding position of each foundation bolt is determined. Is troublesome, and there is a problem in quality control. In addition, deformed steel bars and foundation bolts use special welding equipment and require high skills,
There is a problem that the work plan from the arrangement of the reinforcing bars to the fixing of the column pedestals must be carefully determined. SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems in the prior art, and an important feature is that the welding of an important foundation bolt for fixing a deformed steel bar and a column base can be performed by using an automatically controlled welding device. To be able to be performed in a factory that is easy to manage, and to be able to easily fix the foundation bolts to the support positions such as column bases without requiring special welding equipment and special skills at the site, It is an object of the present invention to provide a foundation bolt fixing device that facilitates a work plan from the arrangement of reinforcing bars of a foundation structure to the support of a column base. [0007] The configuration of the present invention for achieving the above object will be described with reference to FIGS. 1 to 5 corresponding to the embodiment. Anchor part 1 with four anchor members 5,5 welded to one side
And the base bolts 8, 8 are welded to one side of the auxiliary plate 7
The fixed part 2 is formed separately from each other, and the anchor plate 3
The other side of the auxiliary plate 7 is in contact with the other side of the auxiliary plate 7, and the two plates 3, 7 are welded 10 to fix the anchor portion 1 and the fixed portion 2 together. FIG. 1 is a perspective view of one embodiment of the apparatus of the present invention, and FIG.
Is a side view, and FIG. 3 is a side view in a separated state, where 1 is an anchor portion and 2 is a fixing portion. The anchor portion 1 is formed by welding one end of a plurality of anchor members 5 formed of deformed steel bars or the like buried in a foundation concrete 6 to one surface of an anchor plate 3 formed in a flat shape. The structure is fixed by the fixing member 4, and the welding of the anchor material to the anchor plate 3 is performed in a factory and transported to a construction site. In the embodiment, two anchor members 5 are fixed, but more than two anchor members 5 can be fixed. The fixing part 2 has a plurality of short base bolts 8 for fixing a base plate part such as a column base on one surface of a flat auxiliary plate 7 having a smaller planar shape than the anchor plate 3. It is a structure that is erected by welding 9 at required intervals, and this is also the case where the base bolts 8 and 8 are welded to the auxiliary plate 7 at the factory,
Transported to the construction site. In the embodiment, four foundation bolts 8 are fixed, but the number can be increased or decreased as needed. Further, the auxiliary plate 7 may be a simple flat plate, but it is preferable that the auxiliary plate 7 is formed in a hollow shape as shown in FIG. The above-mentioned anchor portion 1 and fixing portion 2 are joined by welding at a construction site, and formed as an apparatus of the present invention. That is, first, the anchor part 1 is connected to the anchor members 5 and 5 by using the reinforcement of the foundation structure such as the underground beam.
Is embedded in the substructure, and the anchor plate 3 on the opposite side is fixed so that the surface of the anchor plate 3 is exposed to the surface of the substructure. Then, after the concrete 6 has hardened, scribe lines aa and bb (see FIG. 1) for installing column bases are scribed on the substructure, and the auxiliary plate 7 of the fixing part 2 is scribed. The fixing portion 2 is fixed to the anchor portion 1 by placing the device on the anchor plate 3 in accordance with a and b, and welding 10 around the auxiliary plate 7 and necessary portions. As shown in FIG. 2, the column base 11 is attached to the base plate 12 at the lower end thereof by the foundation bolt 8.
, 8 are fixed by tightening the nuts 13, 13. In addition, as for the scribe line, marks for adjusting to a and b can be provided on the anchor plate 3 and the auxiliary plate 7 as shown in FIG. In the above embodiment, the anchor plate 3 and the auxiliary plate 7 are fixed so as to be substantially coaxial. However, for example, as shown in FIG. When buried out of position, the auxiliary plate 7 can be fixed at a position off the center of the anchor plate 3, and as shown in FIG.
Depending on the position of the engaging part of the column base to be fixed,
The auxiliary plate 7 can be freely rotated and fixed in order to position 8, 8. Further, in each of the above-described embodiments, the anchor plate 3 and the auxiliary plate 7 have a plane square shape, but their shapes may be various shapes such as a polygon and a circle. As described above, the foundation bolt fixing device of the present invention separates an anchor portion obtained by welding an anchor member to an anchor plate and a fixing portion obtained by welding a base bolt to an auxiliary plate. Since it is formed and fixed so that both can be fixed at the construction site, the anchor part and the fixed part can be firmly and firmly using the necessary welding equipment at the factory, and quality control can be sufficiently performed. The accuracy can be improved. At the site, the fixing portion may be fixed to the buried anchor portion by aligning the auxiliary plate with the scribe line, and the fixing is performed by a special welding device or stick welding which does not require skill. Thus, the on-site work can be performed simply and reliably and efficiently, and the inspection of the welding state can be facilitated.

【図面の簡単な説明】 【図1】本発明装置の一実施例を示す斜面図である。 【図2】同側面図である。 【図3】アンカー部と固定部とを別体として示す側面図
である。 【図4】他の実施例を示す平面図である。 【図5】更に他の実施例を示す平面図である。 【図6】従来装置を示す側断面図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of the apparatus of the present invention. FIG. 2 is a side view of the same. FIG. 3 is a side view showing an anchor portion and a fixing portion as separate bodies. FIG. 4 is a plan view showing another embodiment. FIG. 5 is a plan view showing still another embodiment. FIG. 6 is a side sectional view showing a conventional device.

Claims (1)

(57)【特許請求の範囲】 アンカープレートの一面側にアンカー材を溶接したアン
カ−部と、補助プレートの一面側に基礎ボルトを溶接し
た固定部とを各別体で形成し、アンカープレートの他面
側に補助プレートの他面側を添接し、それら両プレ−ト
を溶接して、アンカー部と固定部とを固着したことを特
徴とする、基礎ボルト固定装置。
(57) [Claims] An anchor portion in which an anchor material is welded to one surface side of an anchor plate and a fixing portion in which a base bolt is welded to one surface side of an auxiliary plate are formed separately from each other. A base bolt fixing device, wherein the other surface of the auxiliary plate is attached to the other surface, and the plates are welded to fix the anchor portion and the fixing portion.
JP8180891A 1991-03-20 1991-03-20 Foundation bolt fixing device Expired - Fee Related JP2905613B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8180891A JP2905613B2 (en) 1991-03-20 1991-03-20 Foundation bolt fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8180891A JP2905613B2 (en) 1991-03-20 1991-03-20 Foundation bolt fixing device

Publications (2)

Publication Number Publication Date
JPH0649850A JPH0649850A (en) 1994-02-22
JP2905613B2 true JP2905613B2 (en) 1999-06-14

Family

ID=13756794

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8180891A Expired - Fee Related JP2905613B2 (en) 1991-03-20 1991-03-20 Foundation bolt fixing device

Country Status (1)

Country Link
JP (1) JP2905613B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3678695B2 (en) * 2001-11-16 2005-08-03 株式会社三喜工務店 Fixing method of column to concrete foundation
JP2012097458A (en) * 2010-11-02 2012-05-24 Miwa Tokita Foundation construction method for structure on ground, and component of foundation construction
JP5691420B2 (en) * 2010-11-11 2015-04-01 株式会社Ihi Object installation method
JP5159942B1 (en) * 2011-12-06 2013-03-13 健一 山本 Column base of building

Also Published As

Publication number Publication date
JPH0649850A (en) 1994-02-22

Similar Documents

Publication Publication Date Title
JPH05280202A (en) Anchor frame locating tool
JP2905613B2 (en) Foundation bolt fixing device
JP2008031650A (en) Apparatus and method for positioning column and steel pipe pile
JP4416141B2 (en) How to install seismic isolation devices
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JPH0536042Y2 (en)
JPH0533351A (en) Steel column base of steel frame structure and execution thereof
JP2670968B2 (en) Jig for temporary assembly of frame structure and method of temporary assembly of frame structure
JP2566470Y2 (en) Anchor bolt fixing device for construction
JPH10311045A (en) Surface table construction method and device for erecting post
JPH04106267A (en) Form device of column
JPH086374B2 (en) Foundation bolt fixing structure
JP2838922B2 (en) Pillar standing method
JP2001065175A (en) Finely adjusting support base for structure
JP2004027647A (en) Steel structure of house, and its construction method
JPH06228973A (en) Structure of base of structural steel-made column, using screwed bolt
JPH0544317A (en) Supporting anchor of outdoor staircase and the like
JPH0416628A (en) Base construction method and building construction method and base and anchor bolts for base
JP2611917B2 (en) Pillar formwork equipment
JPH0431409Y2 (en)
JPH0849306A (en) Anchorage device of anchor bolt
JPH0521012U (en) Corner panel positioning tool
JPH06116968A (en) Temporary building-sustaining trestle, and structure therefor
JP2000096884A (en) Fixing structure, connect-fixing structure and fixing method for structure
JPH09328815A (en) Construction method of precast concrete column/beam

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees