JP2817618B2 - Belt conveyor device - Google Patents

Belt conveyor device

Info

Publication number
JP2817618B2
JP2817618B2 JP3980494A JP3980494A JP2817618B2 JP 2817618 B2 JP2817618 B2 JP 2817618B2 JP 3980494 A JP3980494 A JP 3980494A JP 3980494 A JP3980494 A JP 3980494A JP 2817618 B2 JP2817618 B2 JP 2817618B2
Authority
JP
Japan
Prior art keywords
belt
main belt
pulley
main
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3980494A
Other languages
Japanese (ja)
Other versions
JPH07253000A (en
Inventor
正信 高木
慶三 風間
繁樹 磯村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP3980494A priority Critical patent/JP2817618B2/en
Publication of JPH07253000A publication Critical patent/JPH07253000A/en
Application granted granted Critical
Publication of JP2817618B2 publication Critical patent/JP2817618B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、立坑もしくは斜坑を
介して地下掘削現場から掘削土砂を搬出する際に用いる
ベルトコンベア装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a belt conveyor device used to carry out excavated earth and sand from an underground excavation site via a shaft or a shaft.

【0002】[0002]

【従来の技術】例えば、シールド工法においては、所定
深度の発進立坑を構築した後、この発進立坑を通じてシ
ールド掘削機を導入し、該掘削機により地下地盤の掘削
を行ないつつその後方にセグメントを組立てるようにし
ている。この種の地下工事では、掘削によって生じた掘
削土砂をトンネル内から前記発進立坑を通じて地上部に
揚土し、地上部の土砂排出位置に配置されたホッパから
運搬用のダンプトラック等に移し換えて掘削土砂の排出
を行なうのが一般的である。また、例えばトンネルボー
リングマシーンを用いたトンネル掘削工法では、トンネ
ル導坑の途中に設けた斜坑を介して地下掘削現場から生
じた掘削土砂を排出する場合がある。
2. Description of the Related Art In the shield method, for example, after a starting shaft having a predetermined depth is constructed, a shield excavator is introduced through the starting shaft, and a segment is assembled behind the excavator while excavating the underground ground. Like that. In this kind of underground construction, excavated earth and sand generated by excavation is excavated from the inside of the tunnel to the ground through the start shaft, and transferred from a hopper arranged at the earth and sand discharge position on the ground to a dump truck for transportation or the like. It is common to discharge excavated earth and sand. Further, in a tunnel excavation method using a tunnel boring machine, for example, excavated earth and sand generated from an underground excavation site may be discharged through an inclined shaft provided in the middle of a tunnel tunnel.

【0003】[0003]

【発明が解決しようとする課題】そして、かかる地下工
事では、掘削土砂の搬送手段としてベルトコンベアを用
いるのが一般的であるが、かかるベルトコンベアを用い
る場合にはベルトコンベアを掘削現場から立坑もしくは
斜坑までの全長に亘って配置しなければならない。そし
て、特にトンネル掘削工事の場合には、狭隘なトンネル
空間内においてベルトコンベアを掘進の進捗につれて継
ぎ足す作業に手間がかかるとともに、掘削土砂をベルト
コンベアからベルトコンベアへと受け渡すためにはコン
ベア同士を重ね合わす必要があるため、トンネル内の作
業空間が狭められて作業に不都合が生じる惧れがあると
いう課題があった。
In such underground works, a belt conveyor is generally used as a means for transporting excavated earth and sand. In the case of using such a belt conveyor, the belt conveyor is moved from an excavation site to a shaft or It must be located along the entire length up to the shaft. In particular, in the case of tunnel excavation work, it takes time and effort to add belt conveyors as the excavation progresses in a narrow tunnel space, and the conveyors are required to transfer excavated earth and sand from the belt conveyor to the belt conveyor. However, there is a problem that the work space in the tunnel is narrowed, which may cause inconvenience in the work.

【0004】また、かかるベルトコンベアを用いた掘削
土砂の搬送方法によれば、ベルトコンベアによって土砂
を搬送し得る傾斜角度に限界があるため、立坑もしくは
斜坑を介して掘削土砂を搬送する場合には、各種の揚重
機器を別途に用いる必要があるという課題があった。
Further, according to the method of conveying excavated earth and sand using such a belt conveyor, there is a limit to an inclination angle at which the earth and sand can be conveyed by the belt conveyor. However, there is a problem that it is necessary to separately use various lifting equipment.

【0005】そこで、この発明はかかる課題を解消する
ためになされたもので、掘削作業が進捗した場合でもそ
の搬送距離を容易に延長することができるとともに、立
坑や斜坑等の傾斜角度の大きい領域を通過する場合で
も、掘削土砂を容易に搬送することのできるベルトコン
ベア装置を提供することを目的とするものである。
Accordingly, the present invention has been made to solve the above-mentioned problem, and it is possible to easily extend the transport distance even when the excavation work has progressed, and at the same time, in a region having a large inclination angle such as a shaft or a shaft. It is an object of the present invention to provide a belt conveyor device that can easily transport excavated earth and sand even when the vehicle passes through.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するた
め、この発明のベルトコンベア装置は、一端を地下掘削
現場の掘削土砂受取位置に配置した状態で立坑もしくは
斜坑まで延長される第一の水平部と、該第一の水平部に
連続するとともに前記立坑もしくは斜坑に沿って姿勢変
更される昇降部と、該昇降部に連続するとともに地上部
で略水平に姿勢変更され、かつ他端を掘削土砂排出位置
に配置した第二の水平部とを備え、前記土砂受取位置及
び排出位置に設けられた主リターンプーリに巻装されて
無端状に移動する主ベルトと、前記昇降部における前記
主ベルトの搬送面に平行に対向配置される揚土用の補助
コンベアと、前記第二の水平部の下方に離接可能に対向
配置され、前記主ベルトをこれの無端状の軌跡内におい
て交互にじぐざぐ状に張架する複数のリターンプーリを
設けたベルトストック用の一対のプーリ台とを備えたこ
とを特徴とするものである。
In order to achieve the above object, a belt conveyor device according to the present invention comprises a first horizontal shaft extending to a shaft or an inclined shaft with one end disposed at an excavated sediment receiving position at an underground excavation site. Part, an elevating part which is continuous with the first horizontal part and whose attitude is changed along the vertical shaft or the inclined shaft, and which is continuous with the elevating part and whose attitude is changed substantially horizontally on the ground part, and excavates the other end. A main belt that has a second horizontal portion disposed at a sediment discharging position, is wound around a main return pulley provided at the sediment receiving position and the discharging position, and moves endlessly, and the main belt in the elevating portion. And an auxiliary conveyor for unloading, which is disposed in parallel with the transfer surface of the main belt, and is disposed opposite to and detachably below the second horizontal portion, and alternately holds the main belt in an endless locus thereof. Jagged It is characterized in that a pair of pulleys for belt stock having a plurality of return pulleys stand for stretching.

【0007】また、この発明のベルトコンベア装置は、
前記揚土用補助コンベアを、前記昇降部における前記主
ベルトの搬送面と所定の隙間をおいて対向配置されると
ともに前記昇降部に沿ってスライド移動する補助ベルト
と、該補助ベルトの両側に前記搬送面との隙間を覆って
突設された一対のベローズと、このベローズ間において
前記補助ベルトにこれの移動方向と交差して配置された
多数の仕切り板とを有するよう構成することができる。
[0007] Further, the belt conveyor device of the present invention comprises:
The lifting auxiliary conveyor, an auxiliary belt slid along the elevating unit and disposed opposite to the main belt conveying surface in the elevating unit with a predetermined gap, and the auxiliary belt on both sides of the auxiliary belt It can be configured to have a pair of bellows protrudingly provided so as to cover a gap with the conveying surface, and a large number of partition plates disposed between the bellows on the auxiliary belt so as to intersect the moving direction of the auxiliary belt.

【0008】さらに、この発明のベルトコンベア装置
は、前記プーリ台を、複数のリターンプーリを多段に軸
受した固定プーリ台と、前記各リターンプーリと対をな
す複数のリターンプーリを多段に軸受するとともに、前
記固定プーリ台に向けて移動可能にガイドされる移動プ
ーリ台と、該移動プーリ台の後端に連結して前記主ベル
トを前記各プーリ台間に所定のテンションで張設する繰
出用の巻取装置とを備えたものとすることができる。
Further, in the belt conveyor device according to the present invention, the pulley base is provided with a fixed pulley base in which a plurality of return pulleys are multi-tiered, and a plurality of return pulleys paired with the respective return pulleys are multi-tiered. A moving pulley table that is movably guided toward the fixed pulley table, and a feeding belt that is connected to a rear end of the moving pulley table to stretch the main belt between the respective pulley tables with a predetermined tension. And a winding device.

【0009】[0009]

【作用】以上の構成を有するこの発明のベルトコンベア
装置によれば、ベルトストック用の一対のプーリ台の間
隔を狭めることで、ストックされている主ベルトが繰り
出され、これによって無端状に移動する主ベルトによる
搬送距離が延長する。
According to the belt conveyor device of the present invention having the above-described structure, by narrowing the interval between the pair of pulley stands for belt stock, the stocked main belt is fed out, thereby moving endlessly. The transport distance by the main belt is extended.

【0010】また、姿勢変更された昇降部には、主ベル
トの搬送面と平行に対向配置されて揚土用の補助コンベ
アが設けられ、掘削土砂はこれらの間に保持されて搬送
移動することにより、昇降部の傾斜が大きい場合でも、
掘削土砂はかかる昇降部を容易に通過する。
[0010] Further, an auxiliary conveyor for excavation is provided in the elevating section whose posture has been changed so as to be opposed to and parallel to the conveying surface of the main belt, and excavated earth and sand is conveyed while being held therebetween. Therefore, even when the inclination of the elevating
The excavated earth and sand easily passes through the lifting section.

【0011】さらに、請求項2の構成とした場合には、
掘削土砂は主ベルトと補助ベルトとの間に挟まれ、各仕
切り板による区画毎に収容されて昇降搬送されるので、
各区画内のズリの荷重を各仕切り板が分担して受けるこ
とにより、過度な垂直荷重を生ずることなく掘削土砂が
昇降搬送される。
Further, in the case of the configuration of claim 2,
The excavated earth and sand is sandwiched between the main belt and the auxiliary belt, is stored in each section by each partition plate, and is transported up and down.
The excavated earth and sand is transported up and down without generating an excessive vertical load by each partition plate sharing and receiving the load of the shear in each section.

【0012】さらにまた、請求項3の構成とした場合に
は、巻取装置の繰出しによる移動プーリ台の移動作業の
みで主ベルトのテンションを保持しつつ主ベルトの繰り
出し長さの調整を行なうことができる。
Further, in the case of the third aspect, the main belt feeding length is adjusted while maintaining the tension of the main belt only by the operation of moving the movable pulley table by feeding the winding device. Can be.

【0013】[0013]

【実施例】以下、この発明の一実施例を図面を用いて詳
細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings.

【0014】図1はこの発明に係るベルトコンベア装置
をシールド掘進工法に適用した場合の全体図を示し、発
進立坑1の下部にから横方向に掘削形成されるトンネル
2の先端にはシールド掘削機3とこれに後続する各種設
備を載荷する複数の作業台車4が配置されている。シー
ルド掘削機3はその後部に組み立てられたセグメント5
に反力をとって前進しつつトンネル2の先端切羽面を掘
削するものである。
FIG. 1 shows an overall view of a case where a belt conveyor device according to the present invention is applied to a shield excavation method. A shield excavator is provided at a tip of a tunnel 2 excavated and formed laterally from a lower portion of a starting shaft 1. 3 and a plurality of work carts 4 on which various facilities subsequent thereto are loaded. The shield excavator 3 has a segment 5
And excavates the tip face of the tunnel 2 while moving forward with a reaction force.

【0015】そして、掘削機3から排出される掘削土砂
すなわち掘削ズリは、掘削機3に備えられたコンベア3
aを通じて後方に排出されるとともに、コンベア3aの
後端すなわち排出端直下にはこの発明によるベルトコン
ベア装置6の最先端部が位置し、掘削ズリはこのベルト
コンベア装置6の主ベルト7に移し替えられ、トンネル
2内から発進立坑1を経由して地上部側に搬送される。
The excavated earth and sand, that is, excavated waste, discharged from the excavator 3 is transferred to the conveyor 3 provided in the excavator 3.
a, the leading end of the belt conveyor device 6 according to the present invention is located at the rear end of the conveyor 3a, that is, immediately below the discharge end, and the excavation slip is transferred to the main belt 7 of the belt conveyor device 6. And is transported from the inside of the tunnel 2 to the above-ground portion via the starting shaft 1.

【0016】主ベルト7は、トンネル2の側壁や天井等
に沿って水平方向に搬送ガイドされる第一の水平部7a
と、発進立坑1内で垂直方向に姿勢変更されて垂直搬送
ガイドされる昇降部7bと、地上部で再び水平方向に姿
勢変更されて搬送ガイドされる第2の水平部7cとが連
続して無端状に移動する構成となっており、掘削現場か
ら地上部まで一本の主ベルト7によって掘削ズリを搬送
する。
The main belt 7 is provided with a first horizontal portion 7a which is guided in a horizontal direction along a side wall or a ceiling of the tunnel 2.
The vertically moving portion 7b vertically changed and guided vertically in the starting shaft 1 and the second horizontal portion 7c guided and changed horizontally in the ground portion again. It is configured to move endlessly, and the excavation waste is transported by a single main belt 7 from the excavation site to the ground portion.

【0017】第一の水平部7aにおける主ベルト7の先
端部、すなわちズリ受取位置[イ]において、主ベルト
7は、作業台車4やトンネル7の側面等に接続された主
リターンプーリ12に巻装され、シールド掘進機3の前
進に伴って延伸されるとともに、図2に示すように、ト
ンネル2の側壁に適宣間隔をおいて取付けられた搬送路
を構成するコンベアフレーム8内に設けた複数のコンベ
アガイド9によって発進立坑1まで水平にガイドされ
る。
At the tip of the main belt 7 in the first horizontal portion 7a, that is, at the slip receiving position [A], the main belt 7 is wound around the main return pulley 12 connected to the side surface of the work vehicle 4 or the tunnel 7 or the like. The shield machine 3 is extended along with the advance of the shield machine 3, and is provided in a conveyor frame 8 constituting a transport path attached to the side wall of the tunnel 2 at appropriate intervals as shown in FIG. 2. It is guided horizontally to the starting shaft 1 by a plurality of conveyor guides 9.

【0018】前記コンベアガイド9は、主ベルト7のズ
リ搬送方向(上部側)においては三つのガイドローラ9
aを例えば逆台形状やV型形状に配置することによって
前記主ベルト7を断面凹状に変形させ、得られたズリA
をその凹部内に収容する。また、ズリ受取位置[イ]側
に向けて移動する主ベルト7は各コンベアガイド9の下
部に配置されたガイドローラ9bにより平ベルト状に移
送される。
The conveyor guide 9 is provided with three guide rollers 9 in the direction (upper side) in which the main belt 7 is shifted.
a is arranged in an inverted trapezoidal shape or a V-shape, for example, so that the main belt 7 is deformed to have a concave cross section.
Is accommodated in the recess. The main belt 7 moving toward the slip receiving position [a] is transported in a flat belt shape by guide rollers 9b arranged below each conveyor guide 9.

【0019】また、発進立坑1内の昇降部7bにおい
て、主ベルト7は図示しない適宜な垂直支持フレームに
支持されて移動ガイドされるとともに、主ベルト7の搬
送面には揚土用の補助コンベア10が対向配置されてい
る。
In the elevating section 7b in the starting shaft 1, the main belt 7 is supported by a suitable vertical support frame (not shown) and guided to move, and the conveying surface of the main belt 7 has an auxiliary conveyor for unloading. 10 are arranged facing each other.

【0020】この補助コンベア10は、図3,4に示す
ように、前記主ベルト7が水平から垂直に姿勢変更する
部位、昇降部7b、及び垂直から水平に姿勢変更する部
位に沿って、主ベルト7と平行に対向配置されるととも
に、上下2台の主リターンプーリ13に巻装されて無端
状に回転移動する補助ベルト11と(図1参照)、補助
ベルト11の内側にあって前記主ベルト7との対向面に
適宜間隔をおいて配置される複数のガイドローラ52
を備えたもので、補助ベルト11は主リターンプーリ1
3の駆動により前記主ベルト7との対向面側を上昇方向
として垂直移動する。
As shown in FIGS. 3 and 4, the auxiliary conveyor 10 includes a main belt 7 along a part where the posture is changed from horizontal to vertical, an elevating unit 7b, and a part where the posture is changed from vertical to horizontal. An auxiliary belt 11 which is disposed in parallel with the belt 7 and is wound around two upper and lower main return pulleys 13 to rotate endlessly (see FIG. 1); The auxiliary belt 11 includes a plurality of guide rollers 52 arranged at appropriate intervals on a surface facing the belt 7.
By the drive of No. 3, it moves vertically with the side facing the main belt 7 as the ascending direction.

【0021】また、補助ベルト11の外側、すなわち前
記主ベルト7との対向面側には、長手方向両側から突設
されて主ベルト7と補助ベルト11との隙間を覆うとと
もに、端縁を前記主ベルト7の搬送面の両側に圧接接続
された一対のベローズ14と、両ベローズ14間に、主
ベルト7及び補助ベルト11の移動方向と垂直に交差し
て一定の間隔で配置された多数の仕切り板15とを備え
ている。
Further, on the outer side of the auxiliary belt 11, that is, on the side facing the main belt 7, a projection is provided from both sides in the longitudinal direction to cover the gap between the main belt 7 and the auxiliary belt 11, and to make the edge be the same as the above. A pair of bellows 14 connected by pressure to both sides of the conveying surface of the main belt 7, and a large number of bellows 14 disposed at regular intervals between the bellows 14 so as to intersect perpendicularly with the moving direction of the main belt 7 and the auxiliary belt 11. And a partition plate 15.

【0022】一方、昇降部7bにおける主ベルト7の内
側には、前記ガイドローラ52の取り付け位置に対応し
て複数のガイドローラ16が配置され、これらのガイド
ローラ52、16の間に主ベルト7、補助ベルト11、
ベローズ14、及び仕切り板15を一体として挟み込む
ようにしている。
On the other hand, on the inner side of the main belt 7 in the lifting unit 7b, the guide roller 52 corresponding to the mounting position of the arranged plurality of guide rollers 16, the main belt 7 between the guide rollers 52, 16 , Auxiliary belt 11,
The bellows 14 and the partition plate 15 are integrally sandwiched.

【0023】したがって、主ベルト7によってトンネル
2内を水平搬送されたズリAは、垂直に姿勢変更する直
前で主ベルト7と補助ベルト11との間に送り込まれ、
ベローズ14によって搬送面両側を閉鎖されるととも
に、仕切板15によって上下方向に仕切られた個々の空
間内に切り離し収容された状態で上昇移動する。
Therefore, the slip A which has been horizontally conveyed in the tunnel 2 by the main belt 7 is sent between the main belt 7 and the auxiliary belt 11 immediately before the posture is changed vertically.
Both sides of the transport surface are closed by the bellows 14, and the ascending movement is performed in a state of being separated and housed in individual spaces vertically separated by the partition plate 15.

【0024】つまり、ズリAは各仕切り板15毎に区画
されて垂直搬送されるので、その仕切られた内部のズリ
Aの垂直荷重を各仕切り板15が個々に分担して受ける
ことになり、したがって搬送中のズリの落下等を生ずる
ことなく効率良く掘削ズリを垂直搬送することができ
る。
That is, since the shears A are partitioned and transported vertically for each of the partition plates 15, each of the partition plates 15 receives the vertical load of the separated shears A in a divided manner. Therefore, it is possible to efficiently transport the excavation waste vertically without causing a drop of the waste during transportation.

【0025】そして、発進立坑の地表面側で前記主ベル
ト7が水平に姿勢変更した時点で補助ベルト11は、主
ベルト7の搬送面から離間し、仕切板15によって区画
されたズリAを主ベルト7の上面に受け渡した後、再び
発進立坑1内に向けて無端状に移動する動作を繰返す。
When the main belt 7 has changed its attitude horizontally on the ground surface side of the starting shaft, the auxiliary belt 11 separates from the conveying surface of the main belt 7 and mainly removes the slip A partitioned by the partition plate 15. After being transferred to the upper surface of the belt 7, the operation of endlessly moving again into the starting shaft 1 is repeated.

【0026】また、地上部側の第二の水平部7aにおい
て、ズリ排出位置[ロ]の近傍では、図5に示すよう
に、主ベルト7は断面門形をしたガイドフレーム20上
に前記と同様のコンベアガイド9を介して凹状にガイド
されつつ、このガイドフレーム20の終端部に設けられ
た前記と同様の主リターンプーリ12(図1参照)によ
って折り返すことにより、主ベルト7上を搬送されたズ
リAはこの部分で落下し、その下部に固定配置されたホ
ッパ21に投入され、ホッパ21の下部に待機するダン
プトラックやズリ鋼車などの移送手段22に受け渡され
る。
Further, in the second horizontal portion 7a on the ground side, in the vicinity of the slip discharge position [b], as shown in FIG. 5, the main belt 7 is placed on a guide frame 20 having a gate-shaped cross section. While being guided in a concave shape via the same conveyor guide 9, it is conveyed on the main belt 7 by being folded back by the same main return pulley 12 (see FIG. 1) provided at the end of the guide frame 20. The scrap A falls at this portion, is thrown into a hopper 21 fixedly arranged at the lower portion thereof, and is transferred to a transfer means 22 such as a dump truck or a scrap steel wheel waiting at a lower portion of the hopper 21.

【0027】そして、ガイドフレーム20下部には、前
記主リターンプーリ12によって折り返された主ベルト
7の部分を交互にじぐざぐ状に懸架するベルトストック
用の一対のプーリ台23,24が搬送方向に平行に配置
されている。
At the lower part of the guide frame 20, a pair of pulley stands 23 and 24 for belt stock are provided in the conveying direction for alternately suspending the part of the main belt 7 folded back by the main return pulley 12 in a zigzag manner. They are arranged in parallel.

【0028】すなわち、立坑1の坑口側に近い前部側プ
ーリ台23は、複数のリターンプーリ26を多段に軸受
した固定プーリ台であり、後部側プーリ台24は固定プ
ーリ台23と対をなす複数のリターンプーリ26を多段
に軸受した移動プーリ台であって、それぞれに設けられ
たリターンプーリ26間に主ベルト7をその上部側から
順に交互にじぐざぐ状に掛け渡すことにより、主ベルト
7の余長をこの部分にストックするとともに、ストック
部分の終端部、すなわち移動プーリ台24に設けた最下
段のリターンプーリ26から坑口側に向けて折り返され
る主ベルト7を再び立坑1側に向けて移動ガイドしてい
る。
That is, the front pulley table 23 near the pit side of the shaft 1 is a fixed pulley table in which a plurality of return pulleys 26 are supported in multiple stages, and the rear pulley table 24 forms a pair with the fixed pulley table 23. This is a moving pulley table in which a plurality of return pulleys 26 are multi-tiered, and the main belt 7 is alternately wobbled between return pulleys 26 provided on the respective stages in order from the upper side. And the main belt 7 folded back from the return pulley 26 at the lowermost stage provided on the movable pulley table 24 toward the wellhead side again toward the shaft 1 side. They are moving guides.

【0029】移動プーリ台24は固定プーリ台22側に
向けて敷設されたレール30に沿って走行可能に設けら
れた台車24a上に一体に配置されたものであり、この
台車24aの後部はワイヤwを介して巻取装置32に接
続されている。
The movable pulley stand 24 is integrally disposed on a carriage 24a provided so as to be able to travel along a rail 30 laid toward the fixed pulley stand 22. The rear part of the carriage 24a is a wire. It is connected to the winding device 32 via w.

【0030】そして、巻取装置32は常時移動プーリ台
24を後方に引くことにより各リターンプーリ26間に
多段に懸架される主ベルト7のテンションを調節すると
ともに、前記掘削機本体2の掘削に応じた前進動作に伴
いワイヤwを順次繰出して移動プーリ台24を前進さ
せ、これにより、移動プーリ台24と固定プーリ台22
との間隔を短縮する分ストックされていた主ベルトを繰
り出して、主ベルト7による搬送長さを延長させる機能
を有するものである。なお、前記巻取装置32にテンシ
ョン計などを設けておき、常時テンションが一定となる
ようにワイヤwを繰出すこともできる。
The take-up device 32 constantly adjusts the tension of the main belt 7 suspended in multiple stages between the return pulleys 26 by pulling the movable pulley table 24 backward, and excavates the excavator body 2. With the corresponding forward movement, the wire w is sequentially drawn out to move the movable pulley table 24 forward, whereby the movable pulley table 24 and the fixed pulley table 22
And has a function of extending the conveyed main belt by the main belt 7 by extending the stocked main belt by an amount corresponding to shortening the distance between the main belt 7 and the main belt 7. In addition, a tension meter or the like may be provided in the winding device 32, and the wire w may be fed out so that the tension is always constant.

【0031】以上の構成において、掘削作業の所期段階
では移動プーリ台24は固定プーリ台23から十分な離
間距離を保っており、両者間に十分な長さの主ベルト7
をじぐざぐ状にストックしている。そして、シールド掘
削機2により掘削されたズリAは、コンベア3aを通じ
て主ベルト7の受取位置[イ]に受け渡され、受け渡さ
れたズリAはコンベアガイド9を通じて後方に搬送さ
れ、立坑1で垂直に姿勢変更されつつ揚土用補助コンベ
ア10と協働して上昇搬送され、さらに地上部で再び水
平に姿勢変更されつつ搬送され、排出位置[ロ]から主
リターンプーリ12の下部側に順次排出され、ホッパー
21にストックされる。
In the above configuration, at the expected stage of the excavation operation, the movable pulley table 24 is kept at a sufficient distance from the fixed pulley table 23, and the main belt 7 having a sufficient length is provided therebetween.
Is stocked in a jagged shape. Then, the waste A excavated by the shield excavator 2 is delivered to the receiving position [A] of the main belt 7 through the conveyor 3a, and the delivered waste A is conveyed backward through the conveyor guide 9, and While being vertically changed in posture, it is conveyed upward in cooperation with the lifting conveyer 10 and further conveyed while being horizontally changed in posture again above the ground, and sequentially from the discharge position [b] to the lower side of the main return pulley 12. It is discharged and stored in the hopper 21.

【0032】掘削作業が進捗し、シールド掘削機本体3
が前進すると主ベルト7の先端を保持している作業台車
4も前進し、これに応じて主ベルト7にはテンションが
加わるが、これに応じて巻取装置32からワイヤwを繰
出し移動プーリ台24を前進させてストックされた主ベ
ルト7の余長部分を繰出し、主ベルト7の搬送長さを増
加し、トンネル延長の増加に対応する。なお、主ベルト
7の伸長に伴い、トンネル2内に新たなコンベアフレー
ム8を増設する必要があるが、この作業は適宣の作業台
車4によって行われる。
As the excavation work progresses, the shield excavator body 3
The work carriage 4 holding the tip of the main belt 7 also moves forward, and tension is applied to the main belt 7 in response to this. The main belt 7 is fed out by moving the main belt 24 forward to increase the transport length of the main belt 7 to cope with an increase in the tunnel extension. In addition, with the extension of the main belt 7, it is necessary to add a new conveyor frame 8 in the tunnel 2, but this work is performed by the work truck 4 appropriately.

【0033】このようにして移動プーリ台24が固定プ
ーリ台22の最接近位置まで移動するまで両者間にスト
ックされた主ベルト7の余長部分をトンネル1内に順次
繰出すことができる。なお、実用上はシールド掘削機の
進行長さの主ベルト7をストックすべくプーリ台23,
24の離間距離およびリターンプーリ26の数を設定す
れば良い。また、主ベルト7を全て繰り出した状態から
更に主ベルトの長さを長くしたい場合には、掘削作業時
間の合間に一旦主ベルト7を切断し、移動プーリ台24
を後退させ、両プーリ台22,24間に新たな主ベルト
7をじぐざぐ状に懸架し、その両端を既存の主ベルト7
の切断端部に継ぎ足せば良い。
In this way, the extra length of the main belt 7 stored between the movable pulley table 24 and the fixed pulley table 22 can be sequentially fed into the tunnel 1 until the movable pulley table 24 moves to the closest position. In practice, the pulley stand 23, to stock the main belt 7 of the traveling length of the shield excavator,
24 and the number of return pulleys 26 may be set. When it is desired to further lengthen the main belt 7 from the state in which the entire main belt 7 has been extended, the main belt 7 is cut once during the excavation work time, and
Is retracted, a new main belt 7 is suspended between both pulley stands 22 and 24, and both ends of the main belt 7
It is only necessary to add to the cut end.

【0034】なお、上記実施例では、この発明に係るベ
ルトコンベア装置を、シールド掘進工法において掘削土
砂を立坑を介して搬送する際に用いる場合について記載
したが、この発明のかかる実施例に限定されるものでは
なく、その他のトンネル工法において斜坑を介して掘削
土砂を搬送する場合や、一般の地下掘削工事において、
水平方向にベルトコンベアを設置することができない場
合にも適用することができる。
In the above embodiment, the case where the belt conveyor device according to the present invention is used for transporting excavated earth and sand through a shaft in a shield excavation method has been described. However, the present invention is not limited to such an embodiment of the present invention. In other tunnel construction methods, when transporting excavated earth and sand through an inclined shaft, or in general underground excavation work,
The present invention can be applied to a case where the belt conveyor cannot be installed in the horizontal direction.

【0035】[0035]

【発明の効果】以上詳述したこの発明に係るベルトコン
ベア装置にあっては、ベルトストック用の一対のプーリ
台の間隔を狭め、ストックされている主ベルトを繰り出
すことによって主ベルトによる搬送距離を延長するとと
もに、昇降部には、主ベルトの搬送面と平行に対向配置
される揚土用の補助コンベアを設け、掘削土砂をこれら
の間に保持して搬送移動するので、掘削作業が進捗した
場合でもその搬送距離を容易に延長することができると
ともに、立坑や斜坑等の傾斜角度の大きい領域を通過す
る場合でも、掘削土砂を容易に搬送することができる。
In the belt conveyor apparatus according to the present invention described in detail above, the distance between the pair of pulley stands for belt stock is reduced, and the stocked main belt is fed out to reduce the conveying distance by the main belt. In addition to the extension, the lifting unit is provided with an auxiliary conveyor for unloading that is arranged in parallel with the transfer surface of the main belt, and holds the excavated earth and sand between them, and conveys it. In this case, the transport distance can be easily extended, and the excavated earth and sand can be easily transported even when passing through a region with a large inclination angle such as a shaft or a shaft.

【0036】また、請求項2に記載の発明によれば、掘
削土砂は主ベルトと補助ベルトとの間に挟まれ、各仕切
り板による区画毎に収容されて昇降搬送されるので、各
区画内のズリの荷重を各仕切り板が分担して受けること
により、過度な垂直荷重を生ずることなく掘削土砂を容
易に昇降搬送することができる。
According to the second aspect of the present invention, the excavated earth and sand is sandwiched between the main belt and the auxiliary belt, is stored in each partition by each partition plate, and is transported up and down. Since each partition plate bears the load of the shear, the excavated earth and sand can be easily transported up and down without generating an excessive vertical load.

【0037】さらに、請求項3に記載の発明によれば、
巻取装置の繰出しによる移動プーリ台の移動作業のみよ
って、主ベルトのテンションを保持しつつ主ベルトの繰
り出し長さの調整を容易に行なうことができる。
Further, according to the third aspect of the present invention,
Only by the operation of moving the movable pulley table by the feeding of the winding device, it is possible to easily adjust the feeding length of the main belt while maintaining the tension of the main belt.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明のベルトコンベア装置をシールド工法
に適用した場合を示す側断面説明図である。
FIG. 1 is an explanatory side sectional view showing a case where a belt conveyor device of the present invention is applied to a shield method.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】昇降部における主ベルトと補助ベルトコンベア
との関係を示す断面説明図である。
FIG. 3 is an explanatory cross-sectional view showing a relationship between a main belt and an auxiliary belt conveyor in a lifting unit.

【図4】同部分斜視図である。FIG. 4 is a partial perspective view of the same.

【図5】図1のB−B線断面図である。FIG. 5 is a sectional view taken along line BB of FIG. 1;

【符号の説明】[Explanation of symbols]

1 発進立坑 2 トンネル 3 シールド掘削機 4 作業台車 6 ベルトコンベア装置 7 主ベルト 7a 第一の水平部 7b 昇降部 7c 第二の水平部 10 補助ベルトコンベア 11 補助ベルト12 主リターンプーリ 14 ベローズ 15 仕切り板 23 固定プーリ台 24 移動プーリ台 24a 台車 26 リターンプーリ 32 巻取装置 A ズリ W ワイヤ [イ] ズリ受取位置 [ロ] 排出位置DESCRIPTION OF SYMBOLS 1 Starting shaft 2 Tunnel 3 Shield excavator 4 Work cart 6 Belt conveyor device 7 Main belt 7a First horizontal portion 7b Elevating portion 7c Second horizontal portion 10 Auxiliary belt conveyor 11 Auxiliary belt 12 Main return pulley 14 Bellows 15 Partition plate 23 Fixed pulley stand 24 Moving pulley stand 24a Truck 26 Return pulley 32 Winding device A Slip W wire [A] Slip receiving position [B] Discharge position

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 一端を地下掘削現場の掘削土砂受取位置
に配置した状態で立坑もしくは斜坑まで延長される第一
の水平部と、該第一の水平部に連続するとともに前記立
坑もしくは斜坑に沿って姿勢変更される昇降部と、該昇
降部に連続するとともに地上部で略水平に姿勢変更さ
れ、かつ他端を掘削土砂排出位置に配置した第二の水平
部とを備え、前記土砂受取位置及び排出位置に設けられ
た主リターンプーリに巻装されて無端状に移動する主ベ
ルトと、前記昇降部における前記主ベルトの搬送面に平
行に対向配置される揚土用の補助コンベアと、前記第二
の水平部の下方に離接可能に対向配置され、前記主ベル
トをこれの無端状の軌跡内において交互にじぐざぐ状に
張架する複数のリターンプーリを設けたベルトストック
用の一対のプーリ台とを備えたことを特徴とするベルト
コンベア装置。
1. A first horizontal portion extending to a shaft or an inclined shaft with one end disposed at an excavated sediment receiving position at an underground excavation site, and a first horizontal portion continuous with the first horizontal portion and along the vertical shaft or the inclined shaft. A lifting / lowering portion whose posture is changed, and a second horizontal portion which is continuous with the lifting / lowering portion and has a substantially horizontal posture changed at the ground portion, and the other end of which is arranged at a digging and discharging position. And a main belt that is wound around a main return pulley provided at a discharge position and moves endlessly, and an auxiliary conveyer for earth lift that is arranged in parallel with a conveying surface of the main belt in the elevating unit, and A pair of belt stocks provided with a plurality of return pulleys which are arranged below the second horizontal portion so as to be able to be separated from and separated from each other, and alternately crook the main belt in an endless trajectory thereof. With pulley stand A belt conveyor device comprising:
【請求項2】 前記揚土用補助コンベアは、前記昇降部
における前記主ベルトの搬送面と所定の隙間をおいて対
向配置されるとともに前記昇降部に沿ってスライド移動
する補助ベルトと、該補助ベルトの両側に前記搬送面と
の隙間を覆って突設された一対のベローズと、このベロ
ーズ間において前記補助ベルトにこれの移動方向と交差
して配置された多数の仕切り板とを有することを特徴と
する請求項1に記載のベルトコンベア装置。
2. The auxiliary conveyor for earthing is disposed opposite to a main belt conveying surface in the elevating unit with a predetermined gap therebetween, and is slid along the elevating unit. A pair of bellows protrudingly provided on both sides of the belt so as to cover the gap with the conveyance surface, and a number of partition plates arranged between the bellows and the auxiliary belt intersecting the moving direction of the auxiliary belt. The belt conveyor device according to claim 1, wherein:
【請求項3】 前記プーリ台は、複数のリターンプーリ
を多段に軸受した固定プーリ台と、前記各リターンプー
リと対をなす複数のリターンプーリを多段に軸受すると
ともに、前記固定プーリ台に向けて移動可能にガイドさ
れる移動プーリ台と、該移動プーリ台の後端に連結して
前記ベルトを前記各プーリ台間に所定のテンションで張
設する繰出用の巻取装置とを備えたものであることを特
徴とする請求項1または2に記載のベルトコンベア装
置。
3. The pulley base includes a fixed pulley base having a plurality of return pulleys bearing in multiple stages, and a plurality of return pulleys paired with the respective return pulleys in a multistage bearing, and is directed toward the fixed pulley base. A movable pulley table that is movably guided, and a take-up winding device that is connected to a rear end of the movable pulley table and extends the belt with a predetermined tension between the respective pulley tables. 3. The belt conveyor device according to claim 1, wherein:
JP3980494A 1994-03-10 1994-03-10 Belt conveyor device Expired - Fee Related JP2817618B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3980494A JP2817618B2 (en) 1994-03-10 1994-03-10 Belt conveyor device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3980494A JP2817618B2 (en) 1994-03-10 1994-03-10 Belt conveyor device

Publications (2)

Publication Number Publication Date
JPH07253000A JPH07253000A (en) 1995-10-03
JP2817618B2 true JP2817618B2 (en) 1998-10-30

Family

ID=12563153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3980494A Expired - Fee Related JP2817618B2 (en) 1994-03-10 1994-03-10 Belt conveyor device

Country Status (1)

Country Link
JP (1) JP2817618B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911544A (en) * 2019-02-28 2019-06-21 北京住总集团有限责任公司 A kind of vertical method for improving of quarrel soil and device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4590420B2 (en) * 2007-03-02 2010-12-01 飛島建設株式会社 Continuous belt conveyor system
DE102015218266A1 (en) * 2015-09-23 2017-03-23 Contitech Transportbandsysteme Gmbh Double conveyor belt or double belt conveyor
CN105626143B (en) * 2015-11-18 2019-02-26 铜陵有色设计研究院 It is a kind of it is simple filling, the efficient fluffing of moulding sand horizontal sand warehouse
CN113548415B (en) * 2021-08-10 2023-04-07 中煤科工集团上海有限公司 Telescopic and liftable corrugated flange conveyor belt type conveyor and adjusting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911544A (en) * 2019-02-28 2019-06-21 北京住总集团有限责任公司 A kind of vertical method for improving of quarrel soil and device

Also Published As

Publication number Publication date
JPH07253000A (en) 1995-10-03

Similar Documents

Publication Publication Date Title
AU2021202434B2 (en) Take-up mechanism for conveyor system
US4896764A (en) Monorail advanced system for conveyors in a mining apparatus
JP2817618B2 (en) Belt conveyor device
JP5350863B2 (en) Telescopic belt conveyor and excavation slip conveying method using the same
CN113632333B (en) System for placing a cable in a trough
JP2984924B1 (en) Telescopic belt conveyor device
JPH09273393A (en) Belt conveyor device
US3289816A (en) Extendible conveyor
JP2011163051A (en) Belt conveyor apparatus
JP2018096044A (en) Conveyance device
JP2003013467A (en) Equipment for vertical conveyance of earth
JP2018096045A (en) Conveyance device
US2685375A (en) Blending and reclaiming apparatus
JPH0220319Y2 (en)
JP3992440B2 (en) Belt conveyor system
US2992725A (en) Endless belt conveyor
AU2019303339A1 (en) Apparatus and method for conveying into and out of a hollow
JPH09151695A (en) Muck conveyance device in shield tunnel construction work
JP7469165B2 (en) Extension belt conveyor
JP3831495B2 (en) Conveyor equipment
JPH11210400A (en) Backup deck
JPH06329226A (en) Belt conveyor device
JP3933957B2 (en) Segment supply apparatus and segment supply method
JP3073170B2 (en) Belt conveyor and transport method
JP2008214928A (en) Continuous belt conveyer system

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080821

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090821

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100821

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20100821

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20110821

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20110821

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20110821

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20120821

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20120821

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130821

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees