Building construction method using precast concrete members

Info

Publication number
JP2702365B2
JP2702365B2 JP4313177A JP31317792A JP2702365B2 JP 2702365 B2 JP2702365 B2 JP 2702365B2 JP 4313177 A JP4313177 A JP 4313177A JP 31317792 A JP31317792 A JP 31317792A JP 2702365 B2 JP2702365 B2 JP 2702365B2
Authority
JP
Japan
Prior art keywords
precast concrete
tension
concrete beam
column
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4313177A
Other languages
Japanese (ja)
Other versions
JPH06158716A (en
Inventor
恵三 田辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurosawa Construction Co Ltd
Original Assignee
Kurosawa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18038036&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2702365(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Kurosawa Construction Co Ltd filed Critical Kurosawa Construction Co Ltd
Priority to JP4313177A priority Critical patent/JP2702365B2/en
Publication of JPH06158716A publication Critical patent/JPH06158716A/en
Application granted granted Critical
Publication of JP2702365B2 publication Critical patent/JP2702365B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はプレキャストコンクリー
ト部材による建物の構築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building construction method using precast concrete members.

【0002】[0002]

【従来の技術】一般に、プレキャストコンクリート部材
による多スパンの建物の構築は、図15に示すように、
梁受け用顎20を備えたプレキャストコンクリート柱3
0を適宜間隔ごとに立設し、これらの柱30間に順次プ
レキャストコンクリート梁40を架設し、その接合部間
に目地モルタルを充填した後、これらの柱30と梁40
とを連続PC鋼線50により一体接合して構築してい
た。
2. Description of the Related Art Generally, the construction of a multi-span building using precast concrete members is as shown in FIG.
Precast concrete column 3 with beam receiving jaws 20
0 are erected at appropriate intervals, precast concrete beams 40 are sequentially erected between these columns 30, and joint mortar is filled between the joints thereof.
And were integrally joined by a continuous PC steel wire 50.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記のように
柱と梁とを連続PC鋼線で一体接合して建物を構築する
方法は、最初の柱から最後の柱まで一気にプレストレス
を導入するため、プレストレス導入の摩擦損失量及び軸
変形による不静定2次応力が大きくなって両側の柱の設
計が難しくなって、せいぜい3〜4スパンの建物が限度
となり、これ以上の多スパンの建物の構築は困難であっ
た。
However, as described above, the method of constructing a building by integrally joining columns and beams with a continuous PC steel wire introduces prestress from the first column to the last column at once. Therefore, the amount of friction loss due to the introduction of prestress and the unsteady secondary stress due to axial deformation increase, making it difficult to design the columns on both sides, and the maximum is 3 to 4 spans of buildings. Building the building was difficult.

【0004】さらに、この方法は最後のスパンにおける
梁の目地モルタルが硬化しなければ緊張できずにプレス
トレス導入までの長期間にわたって柱及び梁が片持ち梁
の単純支持状態となるため、風力や地震力に対して不安
定で安全性に欠けるという問題あった。
[0004] In addition, since this method is that pillars and beams is simply supported state of the cantilever over a long period of time of up to Zunipu Restless introduction can be tension if the joint mortar is cured of the beam at the end of the span, wind there has been a problem of a lack of unstable and safety against and seismic force.

【0005】本発明は上記のような問題に鑑みてなされ
たものであり、その目的は、プレストレス導入における
不静定2次応力を小さくすることにより多スパンの建物
の構築を可能とし、工期の短縮を図ると共に、施工中に
おける風力等の水平力に対しての安全性を高めることで
ある。
The present invention has been made in view of the above-mentioned problems, and an object of the present invention is to make it possible to construct a multispan building by reducing the statically indeterminate secondary stress in the introduction of prestress. And to increase the safety against horizontal force such as wind force during construction.

【0006】[0006]

【課題を解決するための手段】以上の課題を達成するた
めの本発明のプレキャストコンクリート部材による建物
の構築工法は、請求項1の発明が、梁受け用顎を突設し
たプレキャストコンクリート柱を適宜間隔をもって直線
状に多数立設し、これらのプレキャストコンクリート柱
間で且つ梁受け用顎に端部を載せて予めプレストレスが
付与されたプレキャストコンクリート梁をそれぞれ架設
し、各プレキャストコンクリート梁をその両端部寄りの
一つの側面で緊張鋼材により緊張定着する建物の構築工
法であって、1番目と2番目のコンクリート柱間に位置
する1番目のプレキャストコンクリート梁は、一方の接
合端部を1番目のプレキャストコンクリート柱と緊張鋼
材を介して緊張定着すると共に、他方の接合端部は2番
目のプレキャストコンクリート柱を介して隣接する2番
目のプレキャストコンクリート梁内を挿通し跨ぐように
して3番目のプレキャストコンクリート柱及び3番目の
プレキャストコンクリート梁の一方の接合端部と緊張鋼
材を介して緊張定着させ、更に1番目のプレキャストコ
ンクリート梁は、1番目のプレキャストコンクリート
柱、2番目のプレキャストコンクリート柱及び2番目の
プレキャストコンクリート梁の一方の接合端部と別の緊
張鋼材を介して緊張定着し、以下2番目以降の中間部に
位置するプレキャストコンクリート梁の両端部は、プレ
キャストコンクリート梁内を挿通し一つおきに跨ぐよう
にして配設緊張される緊張鋼材によってそれぞれ緊張定
着され、前記1番目と対称位置にある端部のプレキャス
トコンクリート梁は、前記1番目のプレキャストコンク
リート梁と対称構造で緊張定着されることを特徴とする
構成とし、請求項2の発明が、梁受け用顎を突設したプ
レキャストコンクリート柱を適宜間隔をもって直線状に
多数立設し、これらのプレキャストコンクリート柱間で
且つ梁受け用顎に端部を載せて予めプレストレスが付与
されたプレキャストコンクリート梁をそれぞれ架設し、
各プレキャストコンクリート梁をその両端部寄りの一つ
の側面で緊張鋼材により緊張定着する建物の構築工法で
あって、1番目のプレキャストコンクリート柱から複数
のプレキャストコンクリート梁を介してn個目のプレキ
ャストコンクリート梁の一方の接合端部にまで緊張鋼材
を貫通してこれらを緊張定着した後、2番目のプレキャ
ストコンクリート柱から複数のプレキャストコンクリー
ト梁を介してn個目のプレキャストコンクリート梁の一
方の接合端部にまで緊張鋼材を貫通してこれらを緊張定
着し、以下3番目以降も同様に緊張鋼材を貫通させて緊
張定着することを特徴とする構成とし、請求項3の発明
が、前記n個のnは、2以上の正の整数であることを特
徴とする構成とすることである。
According to the present invention, there is provided a method for constructing a building by using a precast concrete member according to the present invention. Straight line with intervals
A large number erected to Jo, these precast concrete column
Precast prestressed precast concrete beams are respectively erected with the ends placed between them and on the beam receiving jaws .
A method of constructing a building in which one side is tensioned by a tension steel material, wherein a first precast concrete beam located between a first and a second concrete column has one of its joint ends connected to a first precast concrete column. And the other joint end is inserted through the inside of the adjacent second precast concrete beam through the second precast concrete column and straddles it.
Then, the third precast concrete column and one of the joining ends of the third precast concrete beam are tensioned and fixed via the tension steel, and the first precast concrete beam is further connected to the first precast concrete column, the second precast concrete beam, and the second precast concrete beam. Tension is established between one joint end of the precast concrete column and the second precast concrete beam and another tension steel, and then to the middle part after the second.
Both ends of the precast concrete beam
Insert in the cast concrete beam and straddle every other one
The tension is set by the tension steel materials that are tensioned.
Precast at the end which is mounted and symmetrical with the first
Concrete beam is the first precast concrete
The present invention is characterized in that the pre-cast concrete columns having the beam receiving jaws are linearly arranged at appropriate intervals in a linear manner. And between these precast concrete columns
In addition , precast prestressed precast concrete beams are respectively erected by placing the ends on the beam receiving jaws,
Place each precast concrete beam near one of its ends
Of a building construction method of a building that tension fixed by tension steel material side, the tension steel up to one joint end portion of the n-th precast concrete beam via a plurality of precast concrete beam from the first precast concrete pillars After penetrating them and fixing them, the tension steel is penetrated from the second precast concrete column to one joint end of the n-th precast concrete beam through a plurality of precast concrete beams, and these are fixed. In the third and subsequent parts, the tension steel material is similarly penetrated and fixed in tension, and the invention of claim 3 is characterized in that the n pieces of n are positive integers of 2 or more. This is a characteristic configuration.

【0007】[0007]

【作用】而して、上記のように各プレキャストコンクリ
ート柱の梁受け用顎間に架設されたプレキャストコンク
リート梁を1スパン又は複数スパンごとに緊張材で順次
緊張接合することにより、プレストレス導入における不
静定2次応力を小さくすることができるので多スパンの
建物の構築を可能とする。また、1スパンまたは複数ス
パンごとに順次緊張接合してラーメン構造を構築してい
くことから施工中の風力や地震力等の水平力に対して安
全性を飛躍的に高めることができた。
The precast concrete beams installed between the beam receiving jaws of each precast concrete column as described above are successively tension-joined with a tension member for each span or a plurality of spans. Since the indeterminate secondary stress can be reduced, it is possible to construct a multispan building. In addition, since the rigid frame structure is constructed by sequentially tension-joining one or a plurality of spans, the safety against horizontal force such as wind force and seismic force during construction can be remarkably improved.

【0008】[0008]

【実施例】以下、本発明のプレキャストコンクリート部
材による建物の構築工法の一実施例を図面に基づいて詳
細に説明する。図1は第1発明における建物の構築工法
を示した概念図であり、基礎コンクリート6上に梁受け
用顎1aが突設されたプレキャストコンクリート柱1
(以下単に柱という)を多数立設し、これら柱1の間に
それぞれプレキャストコンクリート梁を架設する。即
ち、端部に位置する柱1と2番目に位置する柱との間に
1番目のプレキャストコンクリート梁2(以下第1プレ
キャストコンクリート梁という)を、2番目と3番目の
柱との間に2番目のプレキャストコンクリート梁3(以
下第2プレキャストコンクリート梁という、3番目以降
も同様にいう)を順次架設するようにする。そして、架
設する複数のプレキャストコンクリート梁において、端
部に位置する1番目の柱側に向いている端部を一方の接
合端部と称し、その反対側の端部を他方の接合端部と称
して説明する
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing a construction method of a building using precast concrete members according to the present invention. FIG. 1 is a conceptual view showing a construction method of a building according to the first invention, in which a precast concrete column 1 having a beam receiving jaw 1a protruding from a foundation concrete 6 is shown.
A number of columns (hereinafter simply referred to as columns) are erected, and precast concrete beams are erected between the columns 1. That is, a first precast concrete beam 2 (hereinafter, referred to as a first precast concrete beam) is provided between a column 1 located at an end and a second column, and a second precast concrete beam 2 is provided between a second column and a third column. The third precast concrete beam 3 (hereinafter referred to as a second precast concrete beam, the same applies to the third and subsequent beams) is sequentially installed. And the frame
At the end of multiple precast concrete beams to be installed
The end facing the first column side of the
The opposite end is called the mating end, and the other end is called the other joining end.
I will explain .

【0009】この柱1は基礎コンクリート6上の台座ブ
ロック7に鋼棒7aで一体的に固定され、かつ予め挿通
されたPC鋼棒6aでプレストレスが付与されて柱1、
台座ブロック7、基礎コンクリート6と一体化された構
成となっている。また、この柱1には緊張鋼材用の挿通
孔1bが貫通されている。
The column 1 is integrally fixed to a pedestal block 7 on a foundation concrete 6 with a steel bar 7a, and is prestressed by a PC steel bar 6a inserted in advance, and the column 1,
The base block 7 and the foundation concrete 6 are integrated. The column 1 has an insertion hole 1b for a tension steel material.

【0010】前記第1及び第2プレキャストコンクリー
ト梁2、3は、一次緊張鋼材2a、3aにより予めプレ
ストレスが付与され、接合端部の上下には上面に貫通す
る挿通孔2bを備えている。
The first and second precast concrete beams 2, 3 are prestressed in advance by primary tension steel members 2a, 3a, and have insertion holes 2b penetrating the upper surface above and below the joint ends.

【0011】次に、図2に示すように、第1プレキャス
トコンクリート梁2の一方の接合端部における挿通孔2
bと柱1の挿通孔1bとにわたって緊張鋼材8を貫入
し、これを端部で緊張定着することにより第1プレキャ
ストコンクリート梁2の一方の接合端部のみ接合する。
この状態で第1プレキャストコンクリート梁2の他端は
軸方向のみ移動できる自由状態となっている。
Next, as shown in FIG. 2, an insertion hole 2 at one joint end of the first precast concrete beam 2 is provided.
The tension steel material 8 penetrates between the first precast concrete beam 2 and the insertion hole 1b of the column 1 and is fixed at the end thereof, whereby only one of the joining ends of the first precast concrete beam 2 is joined.
In this state, the other end of the first precast concrete beam 2 is in a free state in which it can move only in the axial direction.

【0012】次に、図3に示すように、第1プレキャス
トコンクリート梁2の他方の接合端部における挿通孔2
bと柱1及び第2プレキャストコンクリート梁3の一方
の接合端部における挿通孔3bとにわたって緊張鋼材8
を貫入し、これを端部で緊張定着することにより第1プ
レキャストコンクリート梁2の他方の接合端部と第2プ
レキャストコンクリート梁3の一方の接合端部とを柱1
に緊張接合する。この状態で第1プレキャストコンクリ
ート梁2は両柱1に完全に接合されるが、第2プレキャ
ストコンクリート梁3の他端は上記と同様に軸方向のみ
移動できる自由状態となっている。
Next, as shown in FIG. 3, an insertion hole 2 at the other joint end of the first precast concrete beam 2 is provided.
tension steel material 8 extending between the hole 1b and the insertion hole 3b at one joint end of the column 1 and the second precast concrete beam 3.
And the other end of the first precast concrete beam 2 and one end of the second precast concrete beam 3 are connected to each other by the column 1.
Tension bonding. In this state, the first precast concrete beam 2 is completely joined to both columns 1, but the other end of the second precast concrete beam 3 is in a free state in which it can move only in the axial direction as described above.

【0013】図4及び図5は、第1プレキャストコンク
リート梁2を柱1間に接合し、かつ第2プレキャストコ
ンクリート梁3の一方の接合端部のみを接合した状態を
詳しく示した断面図である。
FIGS. 4 and 5 are cross-sectional views showing a state in which the first precast concrete beam 2 is joined between the columns 1 and only one of the joining ends of the second precast concrete beam 3 is joined. .

【0014】次に、図6に示すように、さらに2つのプ
レキャストコンクリート梁9を柱1間に架設して前記と
同様の方法によりこれらを順次接合するものである。な
お、図7に示すように、PC床板13はプレキャストコ
ンクリート梁2、3…上面の架設とともにその上に載置
するものとする。そして、この接合は梁間方向及び桁行
方向の接合に用いられるものであり、この接合が終了し
た後は、前記PC床板13上にトップコンクリート14
を打設して梁と一体な合成スラブ15を形成する。そし
て、前記柱1の上に他の柱を連結して上記と同様の方法
でプレキャストコンクリート梁を順次緊張接合すること
により多スパンでかつ多層階の建物が構築される。
Next, as shown in FIG. 6, two more precast concrete beams 9 are erected between the columns 1 and sequentially joined by the same method as described above. As shown in FIG. 7, it is assumed that the PC floorboard 13 is placed on the precast concrete beams 2, 3,. This joining is used for joining in the inter-beam direction and the girder direction. After the joining is completed, the top concrete 14 is placed on the PC floor plate 13.
To form a composite slab 15 integral with the beam. Then, the other columns are connected on the column 1 and the precast concrete beams are successively tension-joined in the same manner as described above, whereby a multi-span, multi-story building is constructed.

【0015】図8の(1)〜(3)は第1発明の他の実
施例を示すものであり、(1)の場合はプレキャストコ
ンクリート梁2、3が大きな場合の接合方法を示し、接
合端部を3本の緊張鋼材8で接合し、(2)の場合はプ
レキャストコンクリート梁2、3の側面で接合端部を接
合している。また(3)の場合は、2本の緊張鋼材8を
用い、第1プレキャストコンクリート梁2と第2プレキ
ャストコンクリート梁3の一方の接合端部とを同時に接
合する方法である。即ち、端部に位置する1番目のプレ
キャストコンクリート梁は、一方の接合端部を端部に位
置する柱1と緊張鋼材8を介して緊張定着すると共に、
他方の接合端部は2番目の柱1を介して隣接する2番目
のプレキャストコンクリート梁3内を挿通し跨ぐように
して3番目の柱1及び3番目のプレキャストコンクリー
ト梁の一方の接合端部と緊張鋼材8を介して緊張定着さ
せ、更に1番目のプレキャストコンクリート梁2の一方
の接合端部は、1番目及び2番目の柱と2番目のプレキ
ャストコンクリート梁3の一方の接合端部と緊張鋼材8
を介して緊張定着する。以下2番目以降の中間部に位置
するプレキャストコンクリート梁3……の一方及び他方
の接合端部は、プレキャストコンクリート梁内を挿通し
一つおきに跨ぐようにして配設緊張される各緊張鋼材8
によってそれぞれ緊張定着され、前記1番目と対称位置
にある端部のプレキャストコンクリート梁は、前記1番
目のプレキャストコンクリート梁2と対称構造で緊張定
着されるのである。そして、実質的に2番目以降の柱に
おいては、2本の緊張鋼材8が襷掛けの状態になる。
の場合に、緊張鋼材8の緊張定着位置は各プレキャスト
コンクリート梁の端部寄りにおける一つの側面であり、
作業性等を考慮したときに、好ましくは上側面である
FIGS. 8 (1) to 8 (3) show another embodiment of the first invention. In the case of FIG. 8, (1) shows a joining method when the precast concrete beams 2 and 3 are large. In the case of (2), the joining ends are joined by the side surfaces of the precast concrete beams 2 and 3 at the ends. In the case of (3), two tension steel members 8 are used to simultaneously join the first precast concrete beam 2 and one joining end of the second precast concrete beam 3. That is, the first precast concrete beam located at the end is tensioned and fixed at one of the joining ends via the column 1 located at the end and the tension steel 8.
The other joint end is inserted into the adjacent second precast concrete beam 3 through the second column 1 so as to straddle it.
Then , one of the joint ends of the third column 1 and the third precast concrete beam is tensioned and fixed via the tension steel member 8, and one of the joint ends of the first precast concrete beam 2 is the first and the first. One joint end of the second column and the second precast concrete beam 3 and a tension steel member 8
Established tension through. In the middle part after the second
One and the other of precast concrete beams 3
Of the joint is inserted through a precast concrete beam
Each tension steel material 8 that is placed and tensioned so as to straddle every other
Respectively, are tensed and anchored, and are symmetrical with the first
The precast concrete beam at the end at
Tension fixed by symmetrical structure with precast concrete beam 2
It is worn . Then, in the second and subsequent columns, the two tension steel members 8 are in a crossed state. This
In the case of, the tension anchoring position of the tension steel 8 is
One side near the end of the concrete beam,
In consideration of workability and the like, the upper surface is preferably used .

【0016】次に、図9により第2発明の実施例につい
て説明する。これは、上記第1発明と同様に基礎コンク
リート6上に、梁受け用顎1aが突設された柱1を多数
立設し、この柱1間に予めプレストレスが付与された第
1、第2及び第3のプレキャストコンクリート梁2、
3、4を架設する。
Next, an embodiment of the second invention will be described with reference to FIG. This is because, similarly to the first invention, a large number of columns 1 on which the beam receiving jaws 1a protrude are erected on the foundation concrete 6, and the first and second columns are prestressed in advance between the columns 1. 2nd and 3rd precast concrete beams 2,
3 and 4 are erected.

【0017】そして、図10に示すように、第1緊張鋼
材10を、第1及び第2プレキャストコンクリート梁
2、3を貫通して第3プレキャストコンクリート梁4の
一方の接合端部まで配線して緊張定着することにより、
第1及び第2プレキャストコンクリート梁2、3を仮接
合するとともに、第3プレキャストコンクリート梁4を
他端が軸方向のみ移動できる自由状態に仮接合する。
Then, as shown in FIG. 10, the first tensile steel material 10 is wired through the first and second precast concrete beams 2 and 3 to one joint end of the third precast concrete beam 4. By establishing tension,
The first and second precast concrete beams 2 and 3 are temporarily joined, and the third precast concrete beam 4 is temporarily joined so that the other end can move only in the axial direction.

【0018】この第1緊張鋼材10は、第1柱1cにお
ける梁受け用顎1aの上部から第2柱1dの梁受け用顎
1aを通って第3柱1eにおける梁受け用顎1aの上部
に配線されている。
The first tensile steel material 10 passes from the upper part of the beam receiving jaw 1a of the first column 1c to the upper part of the beam receiving jaw 1a of the third column 1e through the beam receiving jaw 1a of the second column 1d. Wired.

【0019】次に、図11に示すように、第2緊張鋼材
11を、第1プレキャストコンクリート梁2を貫通させ
て第2プレキャストコンクリート梁3の一方の接合端部
まで配線して緊張定着することにより、第1プレキャス
トコンクリート梁2を本接合する。
Next, as shown in FIG. 11, the second tensioned steel member 11 is laid through the first precast concrete beam 2 and wired to one joint end of the second precast concrete beam 3 to be tensioned and fixed. Thereby, the first precast concrete beam 2 is permanently joined.

【0020】そして、図12に示すように、2本目の第
1緊張鋼材10aを、前記と同様に第2及び第3プレキ
ャストコンクリート梁3、4を貫通させて第4プレキャ
ストコンクリート梁5の一方の接合端部まで配線して緊
張定着することにより、第1及び第2緊張鋼材10、1
0a、11が交差状に配線されて第2プレキャストコン
クリート梁2が本接合され、第3プレキャストコンクリ
ート梁4も仮接合されるとともに、第4プレキャストコ
ンクリート梁5が仮接合されて他端が軸方向のみ移動で
きる自由状態となる。
Then, as shown in FIG. 12, a second first tensioned steel member 10a is passed through the second and third precast concrete beams 3, 4 in the same manner as described above, and one of the fourth precast concrete beams 5 is formed. The first and second tensioned steel members 10 and 1 are wired to the joint end and fixed by tension.
The second precast concrete beam 2 is permanently joined, the third precast concrete beam 4 is also temporarily joined, and the fourth precast concrete beam 5 is temporarily joined, and the other end is in the axial direction. It becomes a free state where only the user can move.

【0021】このように2スパン単位でプレキャストコ
ンクリート梁2、3を接合すると共に、図13に示すよ
うに、さらに他のプレキャストコンクリート梁12を柱
1間に架設し、かつ2本目の第2緊張鋼材11aを配線
して緊張することによりこれらを順次接合するものであ
る。
In this way, the precast concrete beams 2 and 3 are joined in units of two spans, and as shown in FIG. 13, another precast concrete beam 12 is erected between the columns 1 and a second second tension is applied. The steel members 11a are sequentially connected by wiring and tensioning.

【0022】また、この接合方法も梁間方向及び桁行方
向の接合に用いられるものであり、上記と同様に接合完
了後はプレキャストコンクリート梁上面にPC床板13
を架設し、さらにその上にトップコンクリート14を打
設して梁と一体な合成スラブ15を形成する。そして、
前記柱1の上に他の柱を連結して上記と同様の方法でプ
レキャストコンクリート梁を順次緊張接合することによ
り多スパンでかつ多層階の建物が構築される。
This joining method is also used for joining in the inter-beam direction and the girder direction. Similar to the above, after the joining is completed, the PC floor plate 13 is placed on the upper surface of the precast concrete beam.
And a top concrete 14 is cast thereon to form a composite slab 15 integral with the beam. And
A multi-span, multi-story building is constructed by connecting other pillars on the pillar 1 and sequentially tension-joining the precast concrete beams in the same manner as described above.

【0023】図14は第2発明の他の実施例を示すもの
であり、第1及び第2緊張鋼材1010a、11、11
aの他に第3緊張鋼材16をプレキャストコンクリート
梁2、3…の接合端部に設けたものである。
FIG. 14 shows another embodiment of the second invention, in which first and second tensile steel materials 1010a, 11 and 11 are provided.
In addition to a, a third tension steel member 16 is provided at the joint end of the precast concrete beams 2, 3,....

【0024】[0024]

【発明の効果】予めプレストレスが付与されたプレキャ
ストコンクリート梁が1スパン又は複数スパンごとに緊
張定着されることにより、プレストレス導入における不
静定2次応力を小さくすることができるので多スパンの
建物を容易に構築することができる。
The prestressed precast concrete beam is pre-stressed and fixed for each span or spans, so that the indeterminate secondary stress in the prestress introduction can be reduced. Buildings can be easily constructed.

【0025】予めプレストレスが付与されたプレキャス
トコンクリート梁が1スパン又は複数スパンごとに緊張
定着されることにより、最端部の目字モルタルが硬化す
るまでプレストレスの導入を待たなくてよいので、工期
の短縮を図ることができると共に、施工中における風力
等の水平力に対する安全性を高めることができる。
Since the precast concrete beam to which the prestress has been applied in advance is tensioned and fixed for each span or a plurality of spans, it is not necessary to wait for introduction of the prestress until the outermost mortar is hardened. The construction period can be shortened, and the safety against horizontal force such as wind force during construction can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】プレキャストコンリート柱間に第1及び第2プ
レキャストコンリート梁を架設した概念図である。
FIG. 1 is a conceptual diagram in which first and second precast concrete beams are installed between precast concrete columns.

【図2】第1プレキャストコンクリート梁の一方の接合
端部を緊張定着した概念図である。
FIG. 2 is a conceptual diagram in which one joint end of a first precast concrete beam is tensioned and fixed.

【図3】第1プレキャストコンクリート梁の両接合端部
と第2プレキャストコンクリート梁の一方の接合端部を
緊張定着した概念図である。
FIG. 3 is a conceptual view in which both joint ends of a first precast concrete beam and one joint end of a second precast concrete beam are tensioned and fixed.

【図4】第2プレキャストコンクリート梁の両接合端部
と第3プレキャストコンクリート梁の一方の接合端部を
緊張定着した拡大断面図である。
FIG. 4 is an enlarged sectional view in which both joint ends of a second precast concrete beam and one joint end of a third precast concrete beam are tensioned and fixed.

【図5】図4の平面図である。FIG. 5 is a plan view of FIG. 4;

【図6】第2プレキャストコンクリート梁の両接合端部
と第3プレキャストコンクリート梁の一方の接合端部を
緊張定着した概念図である。
FIG. 6 is a conceptual view in which both joint ends of a second precast concrete beam and one joint end of a third precast concrete beam are tensioned and fixed.

【図7】(1)及び(2)は梁の上面にPC床板を載
せ、その上にトップコンクリートを打設した合成スラブ
の断面図である。
FIGS. 7 (1) and (2) are cross-sectional views of a composite slab in which a PC floorboard is placed on the upper surface of a beam and top concrete is cast thereon.

【図8】(1)〜(3)は第1発明の他の実施例を示す
概念図である。
FIGS. 8A to 8C are conceptual diagrams showing another embodiment of the first invention.

【図9】第2発明においてプレキャストコンクリート柱
間に第1及び第2プレキャストコンクリート梁を架設し
た概念図である。
FIG. 9 is a conceptual diagram in which first and second precast concrete beams are installed between precast concrete columns in the second invention.

【図10】第1緊張鋼材を緊張定着した概念図である。FIG. 10 is a conceptual diagram in which a first tension steel material is tension-fixed.

【図11】第2緊張鋼材を緊張定着した概念図である。FIG. 11 is a conceptual diagram in which a second tension steel material is tension-fixed.

【図12】2本目の第1緊張鋼材を緊張定着した概念図
である。
FIG. 12 is a conceptual diagram in which a second first tension steel is tensioned and fixed.

【図13】2本目の第2緊張鋼材を緊張定着した概念図
である。
FIG. 13 is a conceptual view in which a second second tension steel material is tensioned and fixed.

【図14】第2発明の他の実施例を示す概念図である。FIG. 14 is a conceptual diagram showing another embodiment of the second invention.

【図15】従来の建物の構築工法を示す概念図である。FIG. 15 is a conceptual diagram showing a conventional building construction method.

【符号の説明】[Explanation of symbols]

1 プレキャストコンクリート柱 1a 梁受け用顎 2 第1プレキャストコンクリート梁 3 第2プレキャストコンクリート梁 4 第3プレキャストコンクリート梁 5 第4プレキャストコンクリート梁 6 基礎コンクリート 7 台座ブロック 8 緊張鋼材 9 プレキャストコンクリート梁 10 第1緊張鋼材 11 第2緊張鋼材 Reference Signs List 1 precast concrete column 1a beam receiving jaw 2 first precast concrete beam 3 second precast concrete beam 4 third precast concrete beam 5 fourth precast concrete beam 6 foundation concrete 7 pedestal block 8 tension steel 9 precast concrete beam 10 first tension Steel 11 Second tension steel

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 梁受け用顎を突設したプレキャストコン
クリート柱を適宜間隔をもって直線状に多数立設し、こ
れらのプレキャストコンクリート柱間で且つ梁受け用顎
に端部を載せて予めプレストレスが付与されたプレキャ
ストコンクリート梁をそれぞれ架設し、各プレキャスト
コンクリート梁をその両端部寄りの一つの側面で緊張鋼
により緊張定着する建物の構築工法であって、1番目
と2番目のコンクリート柱間に位置する1番目のプレキ
ャストコンクリート梁は、一方の接合端部を1番目のプ
レキャストコンクリート柱と緊張鋼材を介して緊張定着
すると共に、他方の接合端部は2番目のプレキャストコ
ンクリート柱を介して隣接する2番目のプレキャストコ
ンクリート梁内を挿通し跨ぐようにして3番目のプレキ
ャストコンクリート柱及び3番目のプレキャストコンク
リート梁の一方の接合端部と緊張鋼材を介して緊張定着
させ、更に1番目のプレキャストコンクリート梁は、1
番目のプレキャストコンクリート柱、2番目のプレキャ
ストコンクリート柱及び2番目のプレキャストコンクリ
ート梁の一方の接合端部と別の緊張鋼材を介して緊張定
着し、以下2番目以降の中間部に位置するプレキャスト
コンクリート梁の両端部は、プレキャストコンクリート
梁内を挿通し一つおきに跨ぐようにして配設緊張される
緊張鋼材によってそれぞれ緊張定着され、前記1番目と
対称位置にある端部のプレキャストコンクリート梁は、
前記1番目のプレキャストコンクリート梁と対称構造で
緊張定着されることを特徴とするプレキャストコンクリ
ート部材による建物の構築工法。
1. A plurality of precast concrete columns having beam receiving jaws projecting therefrom are erected in a straight line at appropriate intervals , and between these precast concrete columns and beam receiving jaws.
The precast concrete beam in advance prestressing is applied by placing the end Erection respectively, each precast
The concrete beam a construction method of a building that tension fixed by tension steel in one aspect of its ends close, first
The first precast concrete beam located between the second precast concrete column and the second precast concrete column is connected to the first precast concrete column with the first precast concrete column through tension steel, and the other precast concrete beam is connected to the second precast concrete column. Inserting and straddling the inside of the adjacent second precast concrete beam via the precast concrete column, and tension-fixing the third precast concrete column and one of the joining ends of the third precast concrete beam via the tension steel material. And the first precast concrete beam is 1
The first precast concrete column, the second precast concrete column, and the second precast concrete beam are tensioned and set via one of the joining ends of the second precast concrete beam and another tension steel material, and are located at the second and subsequent intermediate portions.
Both ends of the concrete beam are precast concrete
Arranged so that it passes through every other beam and straddles every other
The tension is fixed by the tension steel, respectively,
Precast concrete beams at the ends in symmetrical positions
Symmetrical structure with the first precast concrete beam
A building construction method using precast concrete members that is settled in tension .
【請求項2】 梁受け用顎を突設したプレキャストコン
クリート柱を適宜間隔をもって直線状に多数立設し、こ
れらのプレキャストコンクリート柱間で且つ梁受け用顎
に端部を載せて予めプレストレスが付与されたプレキャ
ストコンクリート梁をそれぞれ架設し、各プレキャスト
コンクリート梁をその両端部寄りの一つの側面で緊張鋼
により緊張定着する建物の構築工法であって、各プレ
キャストコンクリート梁を緊張鋼材により緊張定着する
建物の構築工法であって、1番目プレキャストコンクリ
ート柱から複数のプレキャストコンクリート梁を介して
n個目のプレキャストコンクリート梁の一方の接合端部
にまで緊張鋼材を貫通してこれらを緊張定着した後、2
番目のプレキャストコンクリート柱から複数のプレキャ
ストコンクリート梁を介してn個目のプレキャストコン
クリート梁の一方の接合端部にまで緊張鋼材を貫通して
これらを緊張定着し、以下3番目以降も同様に緊張鋼材
を貫通させて緊張定着することを特徴とするプレキャス
トコンクリート部材による建物の構築工法。
2. A plurality of precast concrete columns having beam receiving jaws projecting therefrom are erected in a straight line at appropriate intervals , and between these precast concrete columns and beam receiving jaws.
The precast concrete beam in advance prestressing is applied by placing the end Erection respectively, each precast
The concrete beam a construction method of a building that tension fixed by tension steel in one aspect of its ends near to a building construction method of a building each precast concrete beam tense fixed by tension steel, the first precast concrete column Through a plurality of precast concrete beams to one joint end of the n-th precast concrete beam to penetrate the tension steel and fix them, and then 2
The tension steel is penetrated from the first precast concrete column to the one end of the n-th precast concrete beam through a plurality of precast concrete beams, and these are tensioned and fixed. A building construction method using precast concrete members, characterized in that tension is established by penetrating through.
【請求項3】 前記n個のnは、2以上の正の整数であ
る請求項2に記載のプレキャストコンクリート部材によ
る建物の構築工法。
3. The construction method according to claim 2, wherein the n pieces of n are positive integers of 2 or more.
JP4313177A 1992-11-24 1992-11-24 Building construction method using precast concrete members Expired - Lifetime JP2702365B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4313177A JP2702365B2 (en) 1992-11-24 1992-11-24 Building construction method using precast concrete members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4313177A JP2702365B2 (en) 1992-11-24 1992-11-24 Building construction method using precast concrete members

Publications (2)

Publication Number Publication Date
JPH06158716A JPH06158716A (en) 1994-06-07
JP2702365B2 true JP2702365B2 (en) 1998-01-21

Family

ID=18038036

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4313177A Expired - Lifetime JP2702365B2 (en) 1992-11-24 1992-11-24 Building construction method using precast concrete members

Country Status (1)

Country Link
JP (1) JP2702365B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3323458B2 (en) * 1999-07-05 2002-09-09 黒沢建設株式会社 Joint, joint structure between column and beam, and method for joining the joint
KR100356048B1 (en) * 2000-01-14 2002-10-12 삼성물산 주식회사 U-shape PS beam and method for constructing structure using the same
JP4995696B2 (en) * 2007-11-12 2012-08-08 大成建設株式会社 Construction method of structure
KR101033693B1 (en) * 2008-06-24 2011-05-12 코비코리아 주식회사 Pipe rack as constructed using precast concrete members
JP6271377B2 (en) * 2014-09-02 2018-01-31 三井住友建設株式会社 Ramen structure
JP7107484B2 (en) * 2018-12-12 2022-07-27 株式会社竹中工務店 Column-beam frame

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0334963U (en) * 1989-08-17 1991-04-05
JPH0414567A (en) * 1990-05-07 1992-01-20 Taisei Corp Lamination construction method of building
JPH0417260A (en) * 1990-05-11 1992-01-22 Toshiba Battery Co Ltd Cadmium negative electrode for alkaline storage battery

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0334963U (en) * 1989-08-17 1991-04-05
JPH0414567A (en) * 1990-05-07 1992-01-20 Taisei Corp Lamination construction method of building
JPH0417260A (en) * 1990-05-11 1992-01-22 Toshiba Battery Co Ltd Cadmium negative electrode for alkaline storage battery

Also Published As

Publication number Publication date
JPH06158716A (en) 1994-06-07

Similar Documents

Publication Publication Date Title
JP6647721B1 (en) Tensionless PC steel bar concrete beam-column structure
JP2702365B2 (en) Building construction method using precast concrete members
JP3384820B2 (en) Prefabricated bridge pier
KR200279918Y1 (en) beam-column connection detail of long-span pre-cast system
JP2001172913A (en) Elevated bridge and its construction method
KR20100089255A (en) Construction method of building with precast concrete member
JP2000064222A (en) Elevated bridge
JPH0634994Y2 (en) Pre-stress introduction Pre-cast steel reinforced concrete girder
JPH06185111A (en) Precast concrete beam and column and construction method of earthquake-proof wall using them
JPH11190068A (en) Building structure
JP2977367B2 (en) Precast concrete block foundation for modular buildings
JP2641836B2 (en) Precast prestressed concrete U-beam
JPH0673203U (en) Beam-column joint structure
JP2005042491A (en) Prestressed concrete structure
JPH0657879A (en) Precast concrete flat beam and erection thereof
JP3319709B2 (en) Construction method of prestressed concrete steel beam
JP2968952B2 (en) Column and beam joint structure and joining method
JP2000087313A (en) Composite floor slab bridge and its erection method
JP2659329B2 (en) Construction method of PC structure
JPH0375701B2 (en)
JPH10325212A (en) Precast column body for constituting steel encased reinforced concrete column
JP2023097877A (en) Floor slab structure and bonding method
JPH0742755B2 (en) Construction method of PC synthetic flat slab
JPH066823B2 (en) Precast structural members
KR20030075131A (en) beam-column connection detail of long-span pre-cast system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071003

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081003

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091003

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091003

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101003

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101003

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111003

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111003

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121003

Year of fee payment: 15