JP2679235B2 - Soft ground reclamation method - Google Patents

Soft ground reclamation method

Info

Publication number
JP2679235B2
JP2679235B2 JP8947089A JP8947089A JP2679235B2 JP 2679235 B2 JP2679235 B2 JP 2679235B2 JP 8947089 A JP8947089 A JP 8947089A JP 8947089 A JP8947089 A JP 8947089A JP 2679235 B2 JP2679235 B2 JP 2679235B2
Authority
JP
Japan
Prior art keywords
embankment
soft ground
resistor
geotextile
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8947089A
Other languages
Japanese (ja)
Other versions
JPH02269216A (en
Inventor
瑛一路 滝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyobo Co Ltd
Original Assignee
Toyobo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyobo Co Ltd filed Critical Toyobo Co Ltd
Priority to JP8947089A priority Critical patent/JP2679235B2/en
Publication of JPH02269216A publication Critical patent/JPH02269216A/en
Application granted granted Critical
Publication of JP2679235B2 publication Critical patent/JP2679235B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、軟弱地盤埋立工法に関し、特にジオテキス
タイルのポストテンション工法に関する。
TECHNICAL FIELD The present invention relates to a soft ground reclamation method, and more particularly to a geotextile post-tension method.

(従来の技術) 従来、軟弱地盤対策としては土を置き替える置換工
法、軟弱土を硬化させる地盤改良工法、地盤の支持力を
上げ、かつ排水を狙ったサンドパイル工法、古くはソダ
沈床を配置するなどの工法が知られている。いずれにし
ても軟弱地盤は水の中に土の粒子が浮いているような状
態でこの上に盛土をした場合盛土の形態が安定せず、軟
弱地盤の土の粒子が互に接触し余分な水を排除しながら
落ちつくまでに相当な時間がかかり最終沈下までに10年
から80年はかかると言われている。このため上記のよう
な軟弱地盤対策がとられたり最近はシート状のジオテキ
スタイルを敷設しシートの引張力で土層を分離し、また
上の盛土のすべり破壊を防止し早く盛土の形態を安定さ
せる方法がとられている。
(Prior art) Conventionally, as a countermeasure against soft ground, a replacement method that replaces soil, a ground improvement method that hardens soft soil, a sand pile method that raises the bearing capacity of the ground and aims for drainage, old soda floor The construction method such as doing is known. In any case, when soft soil is filled with soil particles in the water and the embankment is placed on top of this, the shape of the embankment is not stable and soil particles on the soft soil contact each other to cause excess soil. It takes a considerable amount of time to settle down while eliminating water, and it is said that it will take 10 to 80 years until the final settlement. For this reason, the above soft ground countermeasures have been taken, and recently, sheet-like geotextiles have been laid and the soil layer is separated by the tensile force of the sheet, and the slippage of the upper embankment is prevented and the shape of the embankment is stabilized quickly. The method is taken.

(発明が解決しようとする課題) 上記のようなシート状ジオテキスタイルを敷設した場
合、盛土と軟弱地盤の分離、また盛土のすべり破壊が防
止されるが盛土によりジオテキスタイル上にかかった荷
重で、軟弱地盤は圧密沈下し全体に盛土が沈下しつづ
け、いつまでたっても形状が決まらないという問題があ
った。
(Problems to be solved by the invention) When a sheet-like geotextile as described above is laid, separation of the embankment and soft ground and slip failure of the embankment are prevented, but the soft ground is affected by the load applied on the geotextile by the embankment. Had a problem that the shape of the soil could not be determined forever as the soil subsided and the embankment continued to subside.

本発明は、軟弱地盤対策でジオテキスタイルを敷設す
るに際し軟弱地盤の圧密沈下を防止しまたは遅らせ早く
盛土の利用ができるジオテキスタイルの敷設方法を提供
せんとするものである。
The present invention is to provide a method for laying a geotextile which can prevent or delay consolidation settlement of the soft ground when laying the geotextile as a countermeasure against the soft ground and can use the embankment quickly.

(課題を解決するための手段) 即ち、本発明は、ジオテキスタイル敷設の工法で、盛
土自身の受働土圧に変換し支持することを特徴とする軟
弱地盤埋立工法である。ここでいうジオテキスタイルと
は繊維糸、繊維テープ、スリットフイルムから作られる
織物、編物、組物はもちろんスパンボンド法、ニードル
パンチ法、樹脂加工法、メルトブロー法なによる不織布
のほかこれらを樹脂加工したジオネット類または樹脂を
成型したプラスチックグリッド、またはフイルムまたは
樹脂をコーティングしたジオメンブレンなど土木に使わ
れるシート状物はいずれであってもよい。これらは前述
のように軟弱地盤対策として軟弱地盤の上に敷設し、シ
ートの引張力で上層を分離または盛土の滑り破壊の防止
の目的で使われているものである。
(Means for Solving the Problem) That is, the present invention is a method for laying a geotextile, which is a soft ground reclamation method characterized by converting and supporting the passive earth pressure of the embankment itself. The geotextile here is not only woven fabrics, knitted fabrics and braids made from fiber yarns, fiber tapes and slit films, but also non-woven fabrics such as spunbond method, needle punching method, resin processing method and melt blow method, as well as geo-processed resin. Any of nets or plastic grids molded with resin, or sheet-like materials used for civil engineering such as films or resin-coated geomembranes may be used. As described above, these are laid on the soft ground as a measure against the soft ground, and are used for the purpose of separating the upper layer by the tensile force of the sheet or preventing slip failure of the embankment.

抵抗体とは、望ましくはコンクリート板であり、プラ
スチック板、金属板であってもよく形状も板状でなく内
側にわん曲したものであってもよいが、盛土荷重を盛土
自身の受働土圧を変換し支持できる形状と強度が必要で
大きさ、強度は計算された盛土の鉛直荷重の大きさに対
し必要な受働土圧の受けられるもので安全率としては2
倍あればよい。
The resistor is preferably a concrete plate, and may be a plastic plate or a metal plate, and the shape may not be plate-like but curved inward, but the embankment load is the passive earth pressure of the embankment itself. The size and strength that can convert and support the required strength and strength are those that can receive the required passive earth pressure against the calculated vertical load of the embankment, and the safety factor is 2
It should be doubled.

ジオテキスタイルとの固定方法は抵抗体にロープで結
びつけても、ボルトで締めつけてもよいが、望ましくは
シートを抵抗体に巻きつけてしまうのが施工上簡単であ
る。抵抗体の定着方法は例えば第1図で盛土5の鉛直荷
重がかかる両側に抵抗体2を配し抵抗体2にジオテキス
タイル3を巻きつけて抵抗体2を軟弱地盤中に沈めジオ
テキスタイル3を軟弱地盤表面に敷設、仮定着する。抵
抗体2の仮定着後抵抗体2を固定し後工程の盛土で抵抗
体が移動しないよう抵抗体2の内側にプレ盛土4を行な
い抵抗体を定着後、盛土5を行なう。
The method of fixing to the geotextile may be tied to the resistor with a rope or may be tightened with a bolt, but it is desirable to wind the sheet around the resistor for the purpose of construction. The method of fixing the resistor is, for example, in FIG. 1, placing the resistor 2 on both sides of the embankment 5 to which a vertical load is applied, winding the geotextile 3 around the resistor 2, submerging the resistor 2 in the soft ground, and softening the geotextile 3 in the soft ground. Lay it on the surface and put it on. After assuming that the resistor 2 has been attached, the resistor 2 is fixed, and the pre-embankment 4 is performed inside the resistor 2 so that the resistor does not move in the embankment in the subsequent step.

(作用) 本発明の構成によれば、盛土5の荷重がジオテキスタ
イル3にかかったとき、この鉛直荷重はジオテキスタイ
ル3に固定された抵抗体2で盛土5自身の受働土圧に変
換され盛土自身の荷重は軟弱地盤に直接かからず広く緩
和される。
(Operation) According to the configuration of the present invention, when the load of the embankment 5 is applied to the geotextile 3, the vertical load is converted into the passive earth pressure of the embankment 5 itself by the resistor 2 fixed to the geotextile 3, and The load is not directly applied to the soft ground and is widely relaxed.

(実施例) 実施例 1 人が立って沈む程度の軟弱地盤の地盤支持力はN値が
2であった。この上に4mの高さ盛土し上底6m、下底22m
の台形断面で6m幅の道路を施工することになった。
(Example) Example 1 N value was 2 for the ground bearing capacity of the soft ground to the extent that one person stands and sinks. A 4m high embankment on top of this, 6m on the top and 22m on the bottom
It was decided to construct a 6m wide road with a trapezoidal cross section.

他方、高さ2m、長さ8m、厚み20cmのコンクリート板を
抵抗体として準備した。施工現場では、道路予定地を中
心線に沿って18m幅の両側へ抵抗体を埋めるため深さ1m
の堀さくを行ないジオテキスタイルを巻きつけた抵抗体
を1m立て込んでジオテキスタイルを敷設、抵抗体を仮定
着した。
On the other hand, a concrete plate having a height of 2 m, a length of 8 m and a thickness of 20 cm was prepared as a resistor. At the construction site, a depth of 1m to fill the resistor with 18m width on both sides of the planned road along the center line.
I made a moat and built a geotextile with a resistor wrapped with geotextile for 1 m, and put on a hypothetical resistor.

この後抵抗体の内側へ抵抗体の上方50cmの高さまで上
底幅2m、傾斜1:2でプレ盛土を行なった。
After this, pre-filling was performed inside the resistor up to a height of 50 cm above the resistor with an upper base width of 2 m and a slope of 1: 2.

これにより抵抗体を定着後高さ4mの盛土を行ない幅6m
勾配1:2の道路を施工した。
As a result, after fixing the resistor, embankment with a height of 4m is performed and a width of 6m.
A road with a slope of 1: 2 was constructed.

施工後道路の沈下量を経時的に測量したが、通常ジオ
テキスタイルを敷設した同クラスの盛土では初年度の1
年で10mm程度の沈下がみられるが、本発明の工法では初
年度の1年で3mm程度でおさまった。
After the construction, the subsidence of the road was measured over time, but in the embankment of the same class where normal geotextile was laid, it was 1 in the first year.
Although a subsidence of about 10 mm is seen annually, the construction method of the present invention subsided at about 3 mm in the first year of the first year.

(発明の効果) 軟弱地盤に盛土載荷したとき、ジオテキスタイル本来
の上層分離、すべり破壊防止の効果はもとより軟弱地盤
の圧密沈下を防止し早く盛土を安定させ上部の利用を早
くすることができた。
(Effect of the invention) When embankment was loaded on soft ground, not only the original upper layer separation of geotextile and the prevention of slip fracture, but also consolidation settlement of soft ground was prevented, the embankment was stabilized quickly, and utilization of the upper part could be accelerated.

【図面の簡単な説明】[Brief description of the drawings]

第1図は軟弱地盤埋立部の断面図である。 1……軟弱地盤、2……抵抗体 3……ジオテキスタイル。 FIG. 1 is a sectional view of a soft ground reclamation part. 1 ... Soft ground, 2 ... Resistor 3 ... Geotextile.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】ジオテキスタイル敷設の工法で、盛土荷重
をあらかじめジオテキスタイルで固定した抵抗体で盛土
自身の受働土圧に変換し支持することを特徴とする軟弱
地盤埋立工法。
1. A method of laying geotextiles, which comprises converting a load of embankment into a passive earth pressure of the embankment itself by a resistor fixed in advance by geotextiles and supporting the soft ground reclamation method.
JP8947089A 1989-04-07 1989-04-07 Soft ground reclamation method Expired - Fee Related JP2679235B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8947089A JP2679235B2 (en) 1989-04-07 1989-04-07 Soft ground reclamation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8947089A JP2679235B2 (en) 1989-04-07 1989-04-07 Soft ground reclamation method

Publications (2)

Publication Number Publication Date
JPH02269216A JPH02269216A (en) 1990-11-02
JP2679235B2 true JP2679235B2 (en) 1997-11-19

Family

ID=13971605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8947089A Expired - Fee Related JP2679235B2 (en) 1989-04-07 1989-04-07 Soft ground reclamation method

Country Status (1)

Country Link
JP (1) JP2679235B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19848846A1 (en) * 1998-10-22 2000-04-27 Huesker Synthetic Gmbh & Co Foundation structure for constructions on soft ground has pillars at regular intervals through into the lower hard ground layer with pillar head caps covered by a geo-plastics reinforcement to take the loose ballast
JP4002428B2 (en) * 2001-12-03 2007-10-31 新日石プラスト株式会社 Geotextile used for block paving
DE102009011119B4 (en) * 2009-03-03 2013-12-19 Huesker Synthetic Gmbh Method for stabilizing a dam or dump on a soft ground and embankment or heap prepared by this method

Also Published As

Publication number Publication date
JPH02269216A (en) 1990-11-02

Similar Documents

Publication Publication Date Title
CA2244984C (en) Composite retaining wall
US4024719A (en) Reinforced road foundation and method for making said road foundation
JP2013002185A (en) Banking structure and method for constructing the same
JP2679235B2 (en) Soft ground reclamation method
CN111005278B (en) Rapid repairing and reinforcing method for locally-reinforced embankment
AU2018216633B2 (en) Method of constructing a foundation
JP2597116B2 (en) Embankment foundation and its construction method
Zornberg Ingenuity in geotechnical design using geosynthetics
JPH03180617A (en) Bank of sharp gradient
CN110219248B (en) Anti-overturning simple temporary bridge pier construction method and anti-overturning simple temporary bridge construction method
JPS6317969B2 (en)
RU143210U1 (en) DEVELOPMENT OF ROAD CLOTHING
JPH0765315B2 (en) Embankment structure
JP3712878B2 (en) Retaining wall structure
JPH0454011B2 (en)
KR20020056852A (en) Embankment construction method with poor quality fill material and insitu soils
CN110528538A (en) Refuse landfill and its method of construction
RU2270900C2 (en) Slope consolidation method
Makarchian et al. Experimental and numerical study of uplift behavior of anchors embedded in reinforced sand
CN214574015U (en) Anchor plate opposite-pulling structure assembly for backfill high slope
CN107700500A (en) Slope retaining structure and slope supporting draining integral system
Douglas Design and construction of fabric-reinforced retaining walls by New York State
RU2783072C1 (en) Method for preparing the base of a cylindrical tank on soft soils
DE19746052C2 (en) Dike remediation process
CN217679174U (en) Expansive soil slope flexible ecological supporting structure

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080801

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees