JP2678990B2 - High strength structure - Google Patents

High strength structure

Info

Publication number
JP2678990B2
JP2678990B2 JP26236995A JP26236995A JP2678990B2 JP 2678990 B2 JP2678990 B2 JP 2678990B2 JP 26236995 A JP26236995 A JP 26236995A JP 26236995 A JP26236995 A JP 26236995A JP 2678990 B2 JP2678990 B2 JP 2678990B2
Authority
JP
Japan
Prior art keywords
sheath
reinforcing bar
reinforcing
concrete
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP26236995A
Other languages
Japanese (ja)
Other versions
JPH0978576A (en
Inventor
泰弘 山田
邦光 山田
Original Assignee
建設基礎エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 建設基礎エンジニアリング株式会社 filed Critical 建設基礎エンジニアリング株式会社
Priority to JP26236995A priority Critical patent/JP2678990B2/en
Publication of JPH0978576A publication Critical patent/JPH0978576A/en
Application granted granted Critical
Publication of JP2678990B2 publication Critical patent/JP2678990B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Sewage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は杭、柱、地盤改良
用ウエル、などの内部に補強鋼材を配してコンクリート
などのセメント系硬化材を使用して形成する構造物に関
するものであり、主として地盤の中に埋設するための高
強度構造体に関するものである。また、柱としては海岸
近く又は海中に設置される柱類にも適用されるものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure formed by arranging a reinforcing steel material inside a pile, a pillar, a well for ground improvement, etc. and using a cement-based hardening material such as concrete. The present invention relates to a high-strength structure for embedding in the ground. Moreover, the pillars are also applied to pillars installed near the coast or in the sea.

【0002】[0002]

【従来の技術】地盤に埋設する杭として、主筋や肋筋を
内部に配したプレキャスト製のコンクリート杭や、現場
にて地盤に掘削した削孔の中に主筋や肋筋を組んだもの
を吊り降ろし、削孔内にコンクリートなどのセメント系
硬化材を充満して構築する現場打ち杭など様々な種類が
ある。また、地盤に埋設して内側の空間に周辺の水を集
め、地滑り防止などを目的とする筒形状のプレキャスト
製の集水ウエルが採用されている。
2. Description of the Related Art As a pile to be buried in the ground, a precast concrete pile with main bars and ribs arranged inside, or a pile with main bars and ribs drilled in the ground on site to assemble the main bars and ribs. There are various types such as cast-in-place piles that are constructed by filling cement-hardening materials such as concrete in the holes that have been taken down and drilled. In addition, a cylindrical precast water collecting well is used which is buried in the ground and collects surrounding water in an inner space to prevent landslides.

【0003】[0003]

【発明が解決しようとする課題】これら地盤の中に埋設
する杭やウエルにおいて課題となるのは、周辺地盤が含
む水が内側に浸透することによって内部に埋設した主筋
や肋筋(帯鉄筋)などを錆付かせることである。コンク
リートにクラックが入ったり、経年変化によりコンクリ
ートが中性化することによって、土壌に浸み込んだ酸性
雨が杭の中に浸透し易くなり、杭の中に配した主筋や肋
筋を錆び付かせることがあった。特に最も杭の外周近く
に位置する肋筋は水に触れる可能性が高く、小径の杭で
はかぶりも小さいため、これら肋筋が短期間で錆び付く
ことがあった。またウエルでは、外周から内側へ水を浸
透させるためコンクリートとしてポーラスコンクリート
を使用するが、この水が内部に配した鉄筋に触れて錆び
付かせることがあった。
The problem with piles and wells buried in these grounds is that the main bars and ribs (band reinforcements) buried inside due to the water contained in the surrounding ground penetrating inward. Is to rust. When concrete cracks or the concrete becomes neutral due to aging, acid rain that has infiltrated the soil easily penetrates into the pile, and the main bars and ribs placed inside the pile are rusted. There was something to do. In particular, the ribs located closest to the outer circumference of the piles are likely to come into contact with water, and small piles have a small fog, so these ribs may rust in a short period of time. In addition, in the well, porous concrete is used as concrete in order to allow water to permeate from the outer periphery to the inner side, but this water sometimes touches the reinforcing bar placed inside to cause rust.

【0004】また海岸近くの構造物では塩害の影響が強
く、特に鉄筋が錆ついて、鉄筋の体積が膨張することに
よって、クラックが拡大して錆が進行し、更にはコンク
リートが剥離することになり、構造物としての機能が無
くなることが多く見られている。実際、樹脂塗装や亜鉛
メッキ塗装の鉄筋でも、この塩害を十分に防ぐことがで
きないのが現状である。更に、海砂がコンクリートの細
骨材として使用されることによって、次第に鉄筋が錆付
く問題が近年大きくクローズアップされてきている。ま
た前述したような鉄筋に直接施したエポキシなどの樹脂
塗装などの被覆層は、30ミクロンほどの厚さしかな
く、現場への搬入、施工中に被覆層に傷がつく場合が多
く発生しており、この傷から水が鉄筋に触れて鉄筋を錆
び付かせているという報告がなされている。
Further, structures near the coast are strongly affected by salt damage, especially when the reinforcing bars are rusted and the volume of the reinforcing bars expands, cracks expand and rust progresses, and further concrete peels off. It is often seen that the function as a structure is lost. In fact, the fact is that even with resin-coated or galvanized steel bars, this salt damage cannot be sufficiently prevented. In addition, the problem of gradually rusting the reinforcing bars due to the use of sea sand as fine aggregate for concrete has recently been greatly highlighted. Moreover, the coating layer such as resin coating such as epoxy directly applied to the reinforcing bar as described above has a thickness of only about 30 microns, and the coating layer is often scratched during transportation to the site or construction. However, it has been reported that water from these scratches touches the reinforcing bar, causing it to rust.

【0005】また、この発明で解決すべき他の課題は、
コンクリートに曲げ荷重が作用した場合、硬化材と鉄筋
の付着が容易に切れてしまうことである。杭などの場
合、鋼管の中に鉄筋を通し、コンクリートを充満して鋼
管杭として、鋼管の拘束力によってコンクリートを拘束
することが考えられる。鉄筋とコンクリートの付着が切
れても、拘束されたコンクリートが鉄筋と密着して実質
的な付着効果を得ることがある。しかしながら、鋼管を
使用する場合は、鋼管を杭の長さに応じて溶接によって
繋げる必要があり、施工の面倒さの他、強度の問題など
が生じる。
Another problem to be solved by the present invention is
When a bending load is applied to the concrete, the adhesion between the hardening material and the reinforcing bar is easily broken. In the case of a pile or the like, it is conceivable that steel bars are passed through the steel pipe to fill the concrete to form a steel pipe pile, and the concrete is restrained by the restraining force of the steel pipe. Even if the bond between the reinforcing bar and the concrete is broken, the constrained concrete may adhere to the reinforcing bar to obtain a substantial bonding effect. However, when a steel pipe is used, it is necessary to connect the steel pipes by welding according to the length of the pile, which causes troubles such as construction and problems of strength.

【0006】この発明は以上のような課題を解決するた
めになされたもので、特に帯鉄筋の腐食が生ぜず、構造
体全体を周囲から拘束して高い曲げ耐力やせん断耐力を
得ることが可能であり、補強鋼材と硬化材との付着が良
好な高強度構造体を提供することを目的とする。
The present invention has been made in order to solve the above problems, and in particular, corrosion of band rebars does not occur and it is possible to obtain high bending strength and shear strength by restraining the entire structure from the surroundings. It is an object of the present invention to provide a high-strength structure having good adhesion between the reinforcing steel material and the hardened material.

【0007】[0007]

【発明の実施の形態】この発明にかかる高強度構造体と
しては、まず杭などがあり、工場で製造するプレキャス
ト製の杭にも現場打ちの杭にも実施可能である。複数本
の補強鋼材を適宜間隔離して平行に配する。補強鋼材と
しては通常の鉄筋でもよいし、鋼より線、より鉄筋、異
形PC鋼線や小径異形PC鋼線などを単数若しくは複数
本束ねたものでもよい。この複数本の鉄筋を囲むよう
に、シースの中に通した帯鉄筋を螺旋状に配する。帯鉄
筋としては通常の鉄筋でもよいが、鋼より線、より鉄
筋、異形PC鋼線や小径異形PC鋼線などを単数若しく
は複数本束ねたものでもよい。シースは外周に凹凸を備
えるもので、合成樹脂製や鋼製シースが使用可能であ
る。鋼製シースとしてはステンレスなどのワインディン
グシースが好適で、現場への運搬・搬入・施工などのハ
ンドリング(取扱い)時に容易に破損しない程の強度を
備え、また後に述べる曲げ加工の容易さを考慮すれば、
厚さ0.3mm程度のものが好適である。ポリエチレン
などの合成樹脂シースの場合は、取扱い易さと強度を考
慮して、厚さ1mm程度のものが好ましい。
BEST MODE FOR CARRYING OUT THE INVENTION The high-strength structure according to the present invention includes a pile, and can be applied to a precast pile manufactured at a factory or a cast-in-place pile. Plural reinforcing steel materials are appropriately separated and arranged in parallel. As the reinforcing steel material, a normal reinforcing bar may be used, or a single strand or a plurality of bundles of steel twisted wire, twisted bar, deformed PC steel wire, small-diameter deformed PC steel wire, and the like may be used. The strip reinforcing bars passed through the sheath are spirally arranged so as to surround the plurality of reinforcing bars. As the reinforcing bar, a normal reinforcing bar may be used, but a single or plural bundles of steel stranded wire, more reinforcing bar, deformed PC steel wire, small diameter deformed PC steel wire and the like may be used. The sheath has irregularities on the outer circumference, and a synthetic resin or steel sheath can be used. As a steel sheath, a winding sheath made of stainless steel or the like is suitable, and has a strength that does not easily break during handling (handling) such as transportation, loading, and construction at the site, and considering the ease of bending, which will be described later. If
A thickness of about 0.3 mm is suitable. In the case of a synthetic resin sheath such as polyethylene, a sheath having a thickness of about 1 mm is preferable in consideration of handling and strength.

【0008】シースの中には硬化材を注入する。このシ
ース内への注入硬化材としては、セメントペースト、樹
脂系硬化材、高分子系硬化材などが使用できる。これら
硬化材にはモルタルのように海砂などの細骨材を使用す
ることがない。従って海砂が混入しないということは、
これら硬化材を使用しても塩害が発生する恐れが一切無
いことになる。プレキャスト製の構造体の場合、このよ
うに組んだ補強鋼材と帯鉄筋を型枠に入れ、モルタルや
コンクリートなどの硬化材を充填して杭を形成すればよ
い。現場打ちの杭の場合、以上のように組んだ補強鋼材
や帯鉄筋を地盤に掘削した削孔に吊り降ろし、削孔の中
に硬化材を充填して構築すればよい。
A hardening material is injected into the sheath. A cement paste, a resin-based hardening material, a polymer-based hardening material, or the like can be used as the hardening material injected into the sheath. Fine aggregates such as sea sand are not used for these hardening materials unlike mortar. Therefore, the fact that sea sand does not mix means that
Even if these hardeners are used, there is no risk of salt damage. In the case of a precast structure, the reinforcing steel material and the strip reinforcing bar thus assembled may be put in a formwork and filled with a hardening material such as mortar or concrete to form a pile. In the case of a cast-in-place pile, the reinforcing steel material and the strip reinforcing bar assembled as described above may be suspended in a drilled hole drilled in the ground, and the hardened material may be filled into the drilled hole.

【0009】補強鋼材もシースの中に通すことが可能で
あり、特に補強鋼材として鋼より線、より鉄筋、異形P
C鋼線、小径異形PC鋼線などを使用した場合には、こ
れらを単数若しくは複数本を束ねてシースの中に通す。
シースとしては外周に凹凸を有する異形の合成樹脂シー
スや鋼製シースが使用可能である。このようにシース内
に複数本を入れることは、1本の鉄筋としては細くて、
曲げ加工配置が容易となるので、配筋がし易い。これは
帯鉄筋をシースの中に通して曲げ加工する場合に特に有
利である。また、シースの中に通すことにより、帯筋自
体よりも巾が広くなる。つまり螺旋の内側に打設した硬
化材を拘束する部分が多くなって拘束効果が高くなり、
螺旋のピッチ間でのコンクリートが破壊されて抜け出す
ことが起こり難い。
Reinforcing steel material can also be passed through the sheath. Particularly, as reinforcing steel material, stranded steel wire, more rebar, and deformed P
When a C steel wire, a small-diameter deformed PC steel wire, or the like is used, one or more of these are bundled and passed through the sheath.
As the sheath, a deformed synthetic resin sheath having irregularities on the outer periphery or a steel sheath can be used. Putting multiple pieces in the sheath like this is thin as one rebar,
Since the bending work arrangement becomes easy, the bar arrangement is easy. This is particularly advantageous when bending the rebar through the sheath. In addition, by passing it through the sheath, the width becomes wider than that of the stirrups themselves. In other words, there are more parts that restrain the hardened material placed inside the spiral, and the restraining effect is higher,
It is difficult for concrete to break between spiral pitches to escape.

【0010】集水ウエルや下水道管の場合、シースの中
に帯鉄筋を通し、硬化材を充満するとともに螺旋状に形
成したものを使用する。この帯鉄筋を内部に埋設してセ
メント系硬化材を硬化させて、内側が空間となった筒状
に形成する。シースも帯鉄筋も既述したものが採用可能
である。これら筒状構造体の場合も、工場にて製造する
こともできるし、現場打ちにて形成することも可能であ
る。ウエルの場合、硬化材としては連続気泡を有するポ
ーラスコンクリート(ギャップグレードコンクリート)
を使用する。
In the case of a water collecting well or a sewer pipe, a sheath reinforcing bar is used, which is filled with a hardening material and formed into a spiral shape. The strip-shaped reinforcing bar is embedded inside and the cement-based hardening material is hardened to form a tubular shape with a space inside. As the sheath and the reinforcing bar, the above-mentioned ones can be adopted. Also in the case of these cylindrical structures, it is possible to manufacture them in a factory or to form them in-situ. In the case of wells, the hardening material is porous concrete with open cells (gap grade concrete)
Use

【0011】以上のように帯鉄筋をシースの中に通して
硬化材を充満することにより、浸透した水が帯鉄筋に触
れることがない。補強鋼材もシースの中に通すことによ
り、補強鋼材も錆びる可能性が無くなる。螺旋状とした
帯鉄筋によって杭などの硬化材全体を外周から拘束する
ため、硬化材の圧縮耐力と曲げ耐力が向上する。
As described above, by passing the reinforcing bar through the sheath and filling it with the hardening material, the infiltrated water does not come into contact with the reinforcing bar. By passing the reinforcing steel material through the sheath, the possibility that the reinforcing steel material also rusts is eliminated. Since the entire stiffening material such as piles is constrained from the outer periphery by the spiral band reinforcing bar, the compression strength and bending strength of the stiffening material are improved.

【0012】[0012]

【実施例】以下、図に示す実施例に基づきこの発明を詳
細に説明する。図1及び図2に示すのはプレキャスト製
のコンクリート杭Aであって、1は鋼製シース2の中に
通した補強鋼材である。補強鋼材1としては鋼より線が
使用されており、図3に示すように複数本の鋼より線が
外周に螺旋状の凸部を有するステンレス製シース2の中
に挿入されている。図3において3は硬化材注入パイプ
であり、このパイプ3を使用してシース2内にセメント
ペースト4を注入してある。この補強鋼材1を通したシ
ース2複数本を、適宜間隔づつ離れて円環上に位置する
ように平行に起立させる。これら複数本のシース2の周
りを囲むように、螺旋状にした帯鉄筋5を配設してあ
る。螺旋のピッチは、直径が400〜500mmの小径
の杭で200mm程度である。帯鉄筋5としては、やは
り鋼より線が使用されており、複数本の鋼より線が、既
述したと同じように硬化材注入パイプ3とともに鋼製シ
ース6の中に配してある。シース6は径が30〜80m
m程度であり、帯てっきん5自体よりその巾がかなり広
くなる。鋼製シース6には周面に凹凸が形成されてお
り、この凹凸の伸縮によって容易に螺旋状に屈曲可能で
ある。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail based on an embodiment shown in the drawings. 1 and 2 show a precast concrete pile A, in which 1 is a reinforcing steel material that is passed through a steel sheath 2. A stranded steel wire is used as the reinforcing steel material 1, and as shown in FIG. 3, a plurality of steel stranded wires are inserted into a stainless steel sheath 2 having a spiral convex portion on the outer circumference. In FIG. 3, 3 is a hardening material injection pipe, and the cement paste 4 is injected into the sheath 2 using this pipe 3. A plurality of sheaths 2 passing through the reinforcing steel material 1 are erected in parallel so as to be positioned on the ring at appropriate intervals. A spiral reinforcing bar 5 is arranged so as to surround the plurality of sheaths 2. The pitch of the spiral is about 200 mm for a small diameter pile having a diameter of 400 to 500 mm. As the reinforcing bar 5, a steel twisted wire is also used, and a plurality of steel twisted wires are arranged in the steel sheath 6 together with the hardening material injection pipe 3 as described above. The sheath 6 has a diameter of 30 to 80 m
It is about m, and its width is considerably wider than that of the obi belt 5 itself. The steel sheath 6 has irregularities formed on its peripheral surface, and can be easily spirally bent by expansion and contraction of the irregularities.

【0013】これらシース2・6の中に通した補強鋼材
1と帯鉄筋5を型枠の中に入れ、コンクリート7を打設
してプレキャストコンクリート製の杭Aが形成されてい
る。螺旋状の帯鉄筋5は、コンクリート7を周囲から拘
束するように機能し、曲げ荷重が作用してコンクリート
7と補強鋼材1のシース2との付着が切れても、杭A全
体を拘束して実質的な付着効果を維持して曲げ耐力やせ
ん断耐力が低下しないよう機能する。帯鉄筋5の更に周
囲に、杭A全体を囲むように、亜鉛メッキや合成樹脂な
どで防錆処理したエキスパンドメタルなどの金網類を巻
き付けてから、コンクリート7を打設することもある。
杭Aにクラックが入っても、帯鉄筋5のピッチ間のコン
クリート7が容易に崩れず、拘束効果がより高くなる。
The reinforcing steel material 1 and the strip reinforcing bar 5 which have passed through the sheaths 2 and 6 are put in a formwork, and concrete 7 is cast to form piles A made of precast concrete. The spiral strip reinforcing bar 5 functions to restrain the concrete 7 from the surroundings, and restrains the entire pile A even if the concrete 7 and the sheath 2 of the reinforcing steel material 1 are disconnected from each other due to a bending load. It functions so as to maintain a substantial adhesive effect and prevent the bending and shear strengths from decreasing. In some cases, a wire mesh such as expanded metal, which is rust-proofed with zinc plating or synthetic resin, is wound around the reinforcing bar 5 so as to surround the entire pile A, and then the concrete 7 is placed.
Even if the pile A is cracked, the concrete 7 between the pitches of the strip reinforcing bars 5 does not easily collapse, and the restraining effect is further enhanced.

【0014】図4に示すのは現場打ちの杭Aの施工状態
を示すもので、既述したように一体に組んだシース2の
中に通した補強鋼材1と帯鉄筋5を、地盤に掘削した削
孔8に吊り降ろす。削孔8内には泥水9が充満してい
る。この時点ではシース2・6の中にはセメントペース
ト4が注入されておらず、各シース2・6の下端は封じ
られている。各シース2の下端は削孔7の底との間にク
リアランスが設けられており、シース2の下端は削孔8
の底に触れず、各シース2は削孔8内で垂直に維持され
る。この状態で硬化材注入パイプ3を使用して各シース
2・6の中にセメントペースト4を注入する。セメント
ペースト4はシース2によって拘束されるため、シース
2・6と補強鋼材1との隙間を埋めて、補強鋼材1、シ
ース2・2、硬化材4が一本の補強部材として有効に機
能する。
FIG. 4 shows the construction state of the pile A that is cast in-situ. As described above, the reinforcing steel material 1 and the band reinforcing bar 5 which are passed through the sheath 2 integrally assembled are excavated in the ground. It is hung on the drilled hole 8. The drill hole 8 is filled with muddy water 9. At this time, the cement paste 4 has not been injected into the sheaths 2 and 6, and the lower ends of the sheaths 2 and 6 are sealed. A clearance is provided between the lower end of each sheath 2 and the bottom of the drilled hole 7, and the lower end of each sheath 2 is drilled 8
Each sheath 2 is kept vertical in the drilled hole 8 without touching the bottom of the. In this state, the cement paste 4 is injected into each of the sheaths 2 and 6 using the hardening material injection pipe 3. Since the cement paste 4 is restrained by the sheath 2, the gap between the sheaths 2 and 6 and the reinforcing steel material 1 is filled, and the reinforcing steel material 1, the sheaths 2 and 2, and the hardening material 4 effectively function as one reinforcing member. .

【0015】削孔8の中にはインナーグラウトパイプ1
0を使用してコンクリート11を注入して、泥水9と置
換する。シース2・6の周面には凹凸が形成されている
ため、置換されたコンクリート11との付着は良好であ
る。シース2・6は鋼より線自体と比較して径が大き
く、また周面に凹凸が形成されているため泥水9の影響
が少なく、周面の凹凸と硬化したコンクリート11が噛
み合うように付着して、実質的に接着と同様に機能す
る。尚、螺旋状帯鉄筋5の周囲を更に亜鉛メッキや合成
樹脂などで防錆処理されたエキスパンドメタルなどの金
網類を巻き付けてから、補強鋼材1と帯鉄筋5を削孔8
内に降ろすこともある。帯鉄筋5のピッチ間のコンクリ
ート11の崩れを防ぐとともに、金網類の内側と外側の
硬化材が繋って、杭Aの周辺地盤との付着も良好であ
る。
Inside the drilled hole 8 is an inner grout pipe 1
0 is used to inject concrete 11 to replace muddy water 9. Since the peripheral surfaces of the sheaths 2 and 6 have irregularities, the adhesion to the replaced concrete 11 is good. The sheaths 2 and 6 have a diameter larger than that of the steel strand itself, and since irregularities are formed on the peripheral surface, the effect of mud water 9 is small, and the irregularities on the peripheral surface and the hardened concrete 11 are attached so as to mesh with each other. And substantially functions like bonding. In addition, after winding wire mesh such as expanded metal, which is rust-proofed with zinc plating or synthetic resin, around the periphery of the spiral strip reinforcing bar 5, the reinforcing steel material 1 and the strip reinforcing bar 5 are drilled 8
It may be dropped inside. In addition to preventing the concrete 11 from collapsing between the pitches of the reinforcing bars 5, the hardened material inside and outside the wire netting is connected, and the adhesion to the ground around the pile A is also good.

【0016】図5及び図6に示すのは、地滑り防止のた
めのウエルBに実施した例であり、シース6の中に通し
た帯鉄筋5を型枠の中に配置する。型枠内にポーラスコ
ンクリート12を打設して内部に帯鉄筋5を埋設した円
筒形状のウエルBを形成する。ウエルBの直径は300
0〜5000mmであり、肉厚は300〜700mmで
あり、シース6の径は35〜80mmである。このウエ
ルBを地盤に掘削した削孔13内に降ろして、複数個を
積み上げ、地盤に定着したアンカー14によって連続体
構造とする。ポーラスコンクリート12の気泡を通じて
周辺地盤が含む水が内側に浸入し、これを汲み上げて地
下水を下げ、地滑りの防止をする。ポーラスコンクリー
ト12の気泡を水が通過しても、内部に埋設された帯鉄
筋5はシース5の中に通してあり、水が触れることがな
く錆び付かない。また螺旋状の帯鉄筋5はリング状の肋
筋を複数使用するよりも全体としての一体性が強く、全
体の強度が高くなる。このようなシース6に通した帯鉄
筋5は、その他プレキャスト製、或いは現場打ちの下水
道管にも採用可能である。
FIG. 5 and FIG. 6 show an example in which the well B for preventing landslides is used, and the strip reinforcing bar 5 passed through the sheath 6 is arranged in the form. Porous concrete 12 is poured into the mold to form a cylindrical well B in which the reinforcing bar 5 is embedded. Well B has a diameter of 300
It is 0 to 5000 mm, the wall thickness is 300 to 700 mm, and the sheath 6 has a diameter of 35 to 80 mm. The well B is lowered into the drilled hole 13 drilled in the ground, a plurality of the wells B are stacked, and the anchor 14 fixed to the ground forms a continuous body structure. Water contained in the surrounding ground enters inside through the bubbles of the porous concrete 12 and is pumped up to lower the groundwater to prevent landslides. Even if water passes through the air bubbles of the porous concrete 12, the strip reinforcing bar 5 embedded inside is passed through the sheath 5 and does not come into contact with water and does not rust. Further, the spiral bar reinforcing bar 5 has a stronger integrity as a whole than the case where a plurality of ring-shaped ribs are used, and the strength of the whole becomes high. The strip reinforcing bar 5 passed through such a sheath 6 can also be used for other precast products or cast-in-place sewer pipes.

【0017】[0017]

【発明の効果】この発明は以上のような構成を有し、以
下の効果を得ることができる。 帯鉄筋をシースの中に通したため、コンクリートの中
へ浸入した水が帯鉄筋に触れず、錆び付くことがなく極
めて長い耐久性を維持できる。 帯鉄筋入りのシースは直径が30〜80mm程度とな
り、通常の鉄筋と比較して巾が広いので、螺旋の内側の
コンクリートに対して拘束する支圧巾が広いので、より
効果的に拘束効果を発揮する。 帯鉄筋がシースの中に通してあるため、かぶり厚さや
肉厚を大きくとる必要がなく、小径の杭なども耐久性を
高めることができる。 補強鋼材もシースの中に通すことにより、同じく錆び
付きが防止され、極めて長い耐久性を維持できる。 シースの中に硬化材を注入したため、補強鋼材或いは
帯鉄筋とシースが一体となって有効な補強部材として機
能する。 シースは内部に注入した硬化材を拘束するため、補強
鋼材或いは帯鉄筋との付着が切れ難く、また実質的に高
い付着効果を維持し、一体化された補強部材として極め
て有効に機能する。 シースは鉄筋や鋼より線などよりも大きな径を有して
おり、また周面に凹凸が形成されており、泥水が付着し
難く、また付着してもその影響はシース自体の凹凸が大
きいので、硬化材と噛み合うように付着して、高い曲げ
耐力を得ることが可能である。 螺旋状の帯鉄筋は硬化材を拘束して、硬化材の圧縮耐
力とせん断耐力を増大させ、また実質的に硬化材と補強
部材との付着効果を維持するため、構造体の曲げ耐力と
せん断耐力を低下させることがない。 螺旋状の帯鉄筋は、連続的に伸ばすように配設するた
め、構造体の多少の長さには関係なく、溶接などの手順
が不要で、製造や施工が著しく容易である。
The present invention has the above-described configuration, and can obtain the following effects. Since the strips are passed through the sheath, the water that has penetrated into the concrete does not touch the strips and does not get rusted, which makes it possible to maintain extremely long durability. The diameter of the sheath with the reinforcing bar is about 30 to 80 mm, and the width is wider than that of ordinary reinforcing bar. Therefore, the bearing width for constraining against the concrete inside the spiral is wider, so the constraint effect is more effective. Demonstrate. Since the reinforcing bar is passed through the sheath, it is not necessary to increase the cover thickness and wall thickness, and the durability of small diameter piles can be improved. By passing the reinforcing steel material through the sheath as well, rusting is similarly prevented, and extremely long durability can be maintained. Since the hardening material is injected into the sheath, the reinforcing steel material or the band reinforcing bar and the sheath integrally function as an effective reinforcing member. Since the sheath restrains the hardened material injected inside, it is difficult for the sheath to adhere to the reinforcing steel material or the band reinforcing bar, and the substantially high adhesive effect is maintained, and the sheath functions extremely effectively as an integrated reinforcing member. The sheath has a diameter larger than that of reinforcing bars and steel stranded wire, and irregularities are formed on the peripheral surface, so muddy water does not easily adhere, and even if it adheres, the effect of the irregularities on the sheath itself is large. It is possible to obtain a high bending resistance by being attached so as to mesh with the hardening material. The spiral rebar restrains the hardened material to increase the compressive strength and shear strength of the hardened material, and to substantially maintain the effect of adhesion between the hardened material and the reinforcing member, the bending strength and shear strength of the structure It does not reduce the yield strength. Since the spiral rebar is arranged so as to be continuously stretched, regardless of the length of the structure, a procedure such as welding is unnecessary, and the manufacturing and the construction are remarkably easy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明を杭に実施した一部切り欠き説明図で
ある。
FIG. 1 is a partially cutaway explanatory view in which the present invention is applied to a pile.

【図2】杭の横断面図である。FIG. 2 is a cross-sectional view of a pile.

【図3】シースの中に配した補強鋼材若しくは帯鉄筋の
断面図である。
FIG. 3 is a cross-sectional view of a reinforcing steel material or a band reinforcing bar arranged in a sheath.

【図4】現場打ちの杭を施工する断面図である。FIG. 4 is a cross-sectional view of constructing a cast-in-place pile.

【図5】ウエルの横断面図である。FIG. 5 is a cross-sectional view of a well.

【図6】ウエルを使用しての集水の説明図である。FIG. 6 is an illustration of water collection using wells.

【符号の説明】[Explanation of symbols]

A 杭 B ウエル 1 補強鋼材 2 シース 3 硬化材注入パイプ 4 セメントペースト 5 帯鉄筋 6 シース 7 コンクリート 8 削孔 9 泥水 10 インナーグラウトパイプ 11 コンクリート 12 ポーラスコンクリート 13 削孔 14 アンカー A pile B well 1 Reinforced steel material 2 Sheath 3 Hardened material injection pipe 4 Cement paste 5 Strip reinforcing bar 6 Sheath 7 Concrete 8 Drilling hole 9 Mud water 10 Inner grout pipe 11 Concrete 12 Porous concrete 13 Drilling hole 14 Anchor

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 補強鋼材複数本を適宜間隔空けて配し、
周面に凹凸を有するシースの中に帯鉄筋を通して螺旋状
として前記複数本の補強鋼材の周りを囲むように配して
硬化材を充填し、これら補強鋼材とシースの中に通した
帯鉄筋を内部に埋設して硬化材を硬化させて形成する高
強度構造体。
1. A plurality of reinforcing steel materials are arranged at appropriate intervals,
A reinforcing bar is inserted into a sheath having irregularities on the peripheral surface so as to surround the reinforcing steel materials in a spiral shape and filled with a hardening material. A high-strength structure that is embedded in the interior and cured by curing a curing material.
【請求項2】 周面に凹凸を有する鋼製シースの中に通
した補強鋼材複数本を適宜間隔空けて配し、これら複数
本の補強鋼材の周りを囲むようにシースの中に帯鉄筋を
通して螺旋状として硬化材を充満し、これらシースの中
に通した補強鋼材と帯鉄筋を内部に埋設して硬化材を硬
化させて形成する高強度構造体。
2. A plurality of reinforcing steel materials passed through a steel sheath having irregularities on the circumferential surface are arranged at appropriate intervals, and a reinforcing steel strip is passed through the sheath so as to surround the plurality of reinforcing steel materials. A high-strength structure formed by filling a hardening material in the form of a spiral, embedding a reinforcing steel material and a band reinforcing bar in these sheaths, and hardening the hardening material.
【請求項3】 周面に凹凸を有するシースの中に帯鉄筋
を通すとともに螺旋状として硬化材を充満し、この帯鉄
筋を内部に埋設して硬化材を硬化させて筒状に形成して
なる高強度構造体。
3. A reinforcing bar is passed through a sheath having irregularities on its peripheral surface and filled with a hardening material in a spiral shape. The reinforcing bar is embedded inside and the hardening material is hardened to form a tubular shape. High strength structure.
JP26236995A 1995-09-14 1995-09-14 High strength structure Expired - Fee Related JP2678990B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26236995A JP2678990B2 (en) 1995-09-14 1995-09-14 High strength structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26236995A JP2678990B2 (en) 1995-09-14 1995-09-14 High strength structure

Publications (2)

Publication Number Publication Date
JPH0978576A JPH0978576A (en) 1997-03-25
JP2678990B2 true JP2678990B2 (en) 1997-11-19

Family

ID=17374795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26236995A Expired - Fee Related JP2678990B2 (en) 1995-09-14 1995-09-14 High strength structure

Country Status (1)

Country Link
JP (1) JP2678990B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851916B (en) * 2010-06-01 2013-10-16 上海中技桩业股份有限公司 Concrete precast pile
CN102166788B (en) * 2011-01-26 2012-07-04 江苏建华管桩有限公司 Production method of pretensioning prestressed concrete dynamic load piles
CN102490266B (en) * 2011-12-14 2013-10-16 盐城市同力新型建材有限公司 Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
JP6633311B2 (en) * 2015-07-17 2020-01-22 株式会社フジタ Reinforcement method of concrete structure

Also Published As

Publication number Publication date
JPH0978576A (en) 1997-03-25

Similar Documents

Publication Publication Date Title
US20080019779A1 (en) Steel-Cased Concrete Piers
KR100553478B1 (en) The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
CN112323777A (en) Hollow precast pile for rock embedding and rock embedding construction method using precast pile
JP5388785B2 (en) Construction method for concrete structures
CN111997101A (en) Prestressed anti-corrosion anti-floating anchor rod and construction method
CN112176992A (en) Construction method of manual hole digging pile and manual hole digging pile
JP4171470B2 (en) Method for reinforcing concrete structures
JP2678990B2 (en) High strength structure
JP2618850B2 (en) Construction method of high strength pile
JP3756385B2 (en) Composite pile and its construction method
CN211257916U (en) Prestressed steel-concrete combined pile underpinning node
KR102319143B1 (en) Soil retaining wall for phc pile
CN112049158A (en) Bottom-expanding type prestress composite anchor cable uplift pile and preparation method thereof
CN214614049U (en) Prestressed anchor cable structure
JP2008150910A (en) Prefabricated concrete pile
JP3038298B2 (en) High strength structure
KR102171787B1 (en) Soil retaining wall using phc pile
CN113863291B (en) Construction method of unbonded prestressed poured uplift pile
KR102070912B1 (en) Phc pile for soil retaining wall, mold assembly and manufacturing method thereof
JPH05148835A (en) Crushing method of pile head of concrete pile
KR101020217B1 (en) rock construction structure of using anchor and method thereof
KR101195551B1 (en) PHC Pile for Support of Tensile Force and Construction Method of Foot Reinforcement Using the Same
CN111139856A (en) External prestressed tendon structure, prestressed concrete annular foundation and construction method thereof
KR20050043815A (en) Reinforcement bar for retaining wall and manufacturing method thereof
CN216379511U (en) Prestress and non-prestress heat-shrinkable sleeve anti-corrosion anchor rod

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20080801

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110801

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees