JP2543059B2 - Tracking data extraction method - Google Patents

Tracking data extraction method

Info

Publication number
JP2543059B2
JP2543059B2 JP61300110A JP30011086A JP2543059B2 JP 2543059 B2 JP2543059 B2 JP 2543059B2 JP 61300110 A JP61300110 A JP 61300110A JP 30011086 A JP30011086 A JP 30011086A JP 2543059 B2 JP2543059 B2 JP 2543059B2
Authority
JP
Japan
Prior art keywords
data
control
moving speed
line
delay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61300110A
Other languages
Japanese (ja)
Other versions
JPS63155202A (en
Inventor
文昭 大出
裕 関野
正 五百旗頭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
JFE Steel Corp
Original Assignee
Meidensha Corp
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Kawasaki Steel Corp filed Critical Meidensha Corp
Priority to JP61300110A priority Critical patent/JP2543059B2/en
Publication of JPS63155202A publication Critical patent/JPS63155202A/en
Application granted granted Critical
Publication of JP2543059B2 publication Critical patent/JP2543059B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Control Of Conveyors (AREA)
  • Controlling Sheets Or Webs (AREA)
  • Control Of Metal Rolling (AREA)
  • Feedback Control In General (AREA)

Description

【発明の詳細な説明】 A.産業上の利用分野 本発明は、圧延ラインや造管ライン等にて、移動速度
に応じてトラッキングしたデータを抽出する方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION A. Field of Industrial Application The present invention relates to a method for extracting data tracked according to a moving speed in a rolling line, a pipe making line or the like.

B.発明の概要 この発明は、ラインの上流のデータを下流の制御対象
の動作に反映させる場合のトラッキングデータ抽出方法
において、ラインの移動速度のみならず、変動するデー
タの平均保持時間や制御装置の制御遅れや制御対象の動
作遅れを勘案することにより、制御対象に常に最適なデ
ータを出力して高精度で製品の不良をなくすようにした
ものである。
B. SUMMARY OF THE INVENTION The present invention relates to a tracking data extraction method for reflecting the data upstream of a line in the operation of a downstream control target, and not only the moving speed of the line but also the average holding time of fluctuating data and the control device. By taking into consideration the control delay and the operation delay of the controlled object, the optimum data is always output to the controlled object to eliminate product defects with high accuracy.

C.従来の技術 例えば、造管ラインや圧延ラインにおいては、制御対
象(溶接装置や圧延装置)の動作点(溶接点や圧延点)
の上流にて計測したデータ(板厚や温度など)を、ライ
ンの移動速度に応じてトラッキングし、下流の動作点に
て上記計測データを反映して制御対象の制御が行なわれ
ている。第4図は、その一例であって、例えば鋼板1の
移動に際して上流の計測器2にて板厚や温度などのデー
タを計測し、速度検出器3にもとづく移動速度パルス発
生器4のパルスにてシフトレジスタ(図示省略)内のデ
ータをシフトさせてデータを鋼板1の移動にトラッキン
グさせ、データの動作点までの移動により制御演算器5
を動作させついで動作機器6を駆動させて鋼板1のたと
えば溶接制御を行ない、計測点のデータを動作点に反映
させている。この場合、計測点から動作点までのトラッ
キング距離lをデータの単位に相応する単位シフト量△
lにて割った値であるデータ個数(トラッキング個数)
は、単位移動距離当りの発生パルス数が同じであること
から、トラッキング距離lが一定であるため、移動速度
に応じて変化し、高速になるほどトラッキング個数が少
なくなる。
C. Conventional technology For example, in a pipe making line or rolling line, the operating point (welding point or rolling point) of the control target (welding device or rolling device)
The data (plate thickness, temperature, etc.) measured upstream is tracked according to the moving speed of the line, and the measurement target is reflected at the downstream operating point to control the controlled object. FIG. 4 is an example thereof, for example, when the steel plate 1 is moved, data such as the plate thickness and temperature is measured by the upstream measuring device 2, and the pulse of the moving speed pulse generator 4 based on the speed detector 3 is measured. The data in the shift register (not shown) is shifted to track the movement of the steel sheet 1, and the control calculator 5 is operated by the movement of the data to the operating point.
Is operated and then the operating device 6 is driven to perform, for example, welding control of the steel plate 1, and the data of the measurement point is reflected in the operation point. In this case, the tracking distance l from the measurement point to the operating point is the unit shift amount Δ corresponding to the data unit.
Number of data (tracking number) divided by l
Since the number of pulses generated per unit moving distance is the same, the tracking distance 1 is constant, and therefore changes according to the moving speed. The higher the speed, the smaller the number of tracking.

D.発明が解決しようとする問題点 上述の構成による場合、動作点にてデータを読み込ん
でから制御装置の一部である制御演算器5や制御対象で
ある動作機器6の演算遅れや動作遅れ、更にはあるデー
タによりその制御状態を保持する時間内でのデータ変動
分等があるため制御対象に対して最適な制御ができな
い。これは鋼板1の例えば板厚や温度の変動が緩やかで
ライン速度が遅い場合には、この遅れによる誤差は少な
いが、板厚等の変動が激しくあるいは更に加えて移動速
度が早い場合には、制御演算器5の演算時間がかかり、
また動作機器6の応答遅れも加わって制御遅れが生じて
最適制御ができないという問題点となって現われ、誤差
の増大に伴う製品の品質の低下につながる。
D. Problems to be Solved by the Invention In the case of the above-mentioned configuration, after the data is read at the operating point, the operation delay and the operation delay of the control arithmetic unit 5 which is a part of the control device and the operating device 6 which is the control target. Further, there is a data variation within a time period in which the control state is held depending on certain data, so that optimum control cannot be performed on the control target. This is because, for example, when the plate thickness or temperature of the steel plate 1 is gentle and the line speed is slow, the error due to this delay is small, but when the plate thickness or the like is violently changed or the moving speed is fast, The calculation time of the control calculator 5 is long,
Further, the response delay of the operating device 6 is added to cause a control delay, which causes a problem that the optimum control cannot be performed, which leads to a decrease in product quality due to an increase in error.

そこで、本発明は、上述の問題点に鑑み制御対象の遅
れ等を加味して高精度な最適制御によって製品品質をよ
り良好なものとするトラッキングデータ抽出方法を提供
する。
In view of the above-mentioned problems, the present invention provides a tracking data extraction method that improves the product quality by highly accurate optimal control in consideration of the delay of the controlled object.

E.問題を解決するための手段 上述の目的を達成する本発明は、ラインの上流のデー
タを下流の制御対象の動作に反映させる場合のトラッキ
ングデータ抽出方法において、ラインの移動速度のみな
らず、変動するデータの平均保持時間や制御対象に対す
る制御遅れや動作機器の動作遅れを勘案して最適制御を
可能としたことを基本思想とする。
E. Means for solving the problem The present invention to achieve the above-mentioned object, in the tracking data extraction method in the case of reflecting the upstream data of the line to the operation of the downstream control target, not only the moving speed of the line, The basic idea is to enable optimum control in consideration of the average holding time of fluctuating data, the control delay with respect to the control target, and the operation delay of the operating equipment.

F.作用 ライン及びその制御系の遅れをすべて考慮して制御対
象を制御させたものであり、精度の向上に多いに寄与す
る。
F. The controlled object is controlled in consideration of all the delays of the action line and its control system, which contributes greatly to the improvement of accuracy.

G.実施例 ここで、第4図をふまえて第1図ないし第3図にて本
発明方法の実施例を説明する。第1図は電縫管溶接機の
電力制御システムである。同図において、ラインの上流
には計測器であるたとえば板厚計2が配置される。この
板厚計2は、電縫管を形成する鋼板の板厚を計測するも
ので、常時又は周期的に測定を行なっている。
G. Example An example of the method of the present invention will now be described with reference to FIG. 4 and FIGS. FIG. 1 shows a power control system of an electric resistance welded pipe welding machine. In the figure, a measuring instrument such as a plate thickness gauge 2 is arranged upstream of the line. The plate thickness meter 2 measures the plate thickness of the steel plate forming the electric resistance welded pipe, and is measured constantly or periodically.

板厚計2は制御装置7内の平均化回路8に接続され、
この平均化回路8では予想される板厚の変動に対処する
ため、一定時間内における複数回の計測値の相加平均を
算出している。平均化回路8の平均値は板厚のデータで
あり、このデータは制御装置7内のシフトレジスタ9に
乗せられてシフトされる。シフトレジスタ9のシフトロ
ックは、速度検出器3及び移動速度パルス発生器4によ
り鋼板又は電縫管の移動速度に対応して発生される。
The plate thickness gauge 2 is connected to the averaging circuit 8 in the controller 7,
The averaging circuit 8 calculates an arithmetic average of a plurality of measured values within a certain time period in order to cope with the expected variation in the plate thickness. The average value of the averaging circuit 8 is plate thickness data, and this data is loaded into the shift register 9 in the control device 7 and shifted. The shift lock of the shift register 9 is generated by the speed detector 3 and the moving speed pulse generator 4 in accordance with the moving speed of the steel plate or the electric resistance welded pipe.

移動速度パルス発生器4のクロックは、制御装置7内
のポインタシフト部10にも入力され、ここでは動作点の
選択をシフトレジスタのシフト単位と同期して行なうよ
うにしている。
The clock of the moving speed pulse generator 4 is also input to the pointer shift unit 10 in the control device 7 so that the operating point is selected in synchronization with the shift unit of the shift register.

制御装置7内には、動作点のデータを取出して板厚平
均データ(t)から制御出力(p)を電力換算する制御
演算器5がある。そして、この制御演算器5は動作機器
である高周波発振器盤6に溶接機電力指令を出力し動作
させる。
In the control device 7, there is a control calculator 5 which takes out data at the operating point and converts the control output (p) from the plate thickness average data (t) into electric power. Then, the control calculator 5 outputs a welding machine power command to the high-frequency oscillator board 6 which is an operating device to operate it.

第2図は第1図のポインタシフト部10や制御演算器5
付近の回路構成を更に詳しく示している。ここで、ポイ
ンタシフト部10は前述の如く動作点を選択するものであ
るが、この選択は次のように行なわれる。すなわち、制
御装置7主に制御演算器5の制御遅れ時間t1、制御対象
である動作機器6の動作応答遅れt2、及び同一データに
よる制御を保持する時間t3とし、クロックに基づく鋼板
の移動速度vとした場合、(t1+t2+t3/2)vだけ前の
データを選択する。ここで、制御遅れ時間t1は演算時間
を主とする遅れである。また制御対象の応答遅れt2は、
偏差量により変化し第2図に示す方法で決定する。すな
わち、前回の制御出力値△E′と今回演算により得られ
た制御出力値△Eとを引算器11にかけて△E−△E′
(偏差量)を得て、演算器12にてこの偏差量△E−△
E′から応答遅れ時間t2を割り出し、この時間t2にてポ
インタシフト部10のt2をセットする。例えば、動作機器
6の動作応答PVを第5図に示すように制御出力偏差SVに
対して示す場合、必要な精度にまで応答PVが入るまでに
用いる時間t2は制御出力偏差SV=ΔE−ΔE′の制御周
期毎の変化量により変化する。つまり、ΔE−ΔE′が
大きければt2が長くなり小さければ短くなる。したがっ
て、例えば t2=k1e(ΔE−ΔE′)/k2 の様に求めるか、あるいは簡素化してt2=k1(ΔE−Δ
E′)の如き比例式によってt2を求めることができる。
ここで、k1,k2は係数である。
FIG. 2 shows the pointer shift unit 10 and the control calculator 5 of FIG.
The circuit configuration in the vicinity is shown in more detail. Here, the pointer shift unit 10 selects the operating point as described above, and this selection is performed as follows. That is, the control device 7 mainly has a control delay time t 1 of the control calculator 5, an operation response delay t 2 of the operating device 6 to be controlled, and a time t 3 for holding control by the same data, and If the moving velocity v, select the previous data by (t 1 + t 2 + t 3/2) v. Here, the control delay time t 1 is a delay mainly based on the calculation time. The response delay t 2 of the controlled object is
It depends on the amount of deviation and is determined by the method shown in FIG. That is, the previous control output value .DELTA.E 'and the control output value .DELTA.E obtained by the present calculation are multiplied by a subtractor 11 to obtain .DELTA.E-.DELTA.E'.
(Deviation amount) is obtained, and the deviation amount ΔE-Δ is calculated by the calculator 12.
E indexing the response delay time t 2 from ', sets t 2 of the pointer shift unit 10 at this time t 2. For example, when the operation response PV of the operating device 6 is shown with respect to the control output deviation SV as shown in FIG. 5, the time t 2 used until the response PV reaches the required accuracy is the control output deviation SV = ΔE− It changes depending on the amount of change of ΔE ′ in each control cycle. That is, if ΔE−ΔE ′ is large, t 2 is long, and if it is small, it is short. Therefore, for example, t 2 = k 1 e (ΔE−ΔE ′) / k 2 is obtained, or t 2 = k 1 (ΔE−Δ
T 2 can be obtained by a proportional equation such as E ′).
Here, k 1 and k 2 are coefficients.

このt2の演算によってメモリ13ではt2を記憶しておき
t2の変化を記録して確かめる。こうして、新たな演算結
果t2にてポインタシフト部10での計算が行なわれる。
Stores the in the memory 13 t 2 by the operation of this t 2
Record and verify the change in t 2 . Thus, the pointer shift unit 10 performs the calculation with the new calculation result t 2 .

更に、制御値の保持時間t3は平均化回路8による平均
化データから次の平均化データまでの変動分をみこし
て、平均化データをそのまま用いることなく次の平均化
データまでの時間の1/2を採ることによって平均化デー
タどおしの平均値を取込めば、平均化データの変動を少
なくすることができる。すなわち、t3/2だけ遅れを採れ
ば変動幅中央のデータを得ることができる。より詳細に
説明すれば、シフトレジスタ9におけるシフトデータの
シフト単位Δ1やクロックによるシフト速度は、制御値
の保持時間(制御周期)t3は無関係である。仮に制御周
期t3が大きく、シフト単位が少なくシフト速度が大きい
ときには、制御に使用されるデータは少なく数多くのデ
ータが未使用のまま棄てられる。
Further, the control value holding time t 3 is a time interval of 1 to the next averaged data without using the averaged data as it is because the fluctuation amount from the averaged data by the averaging circuit 8 to the next averaged data is found. By taking / 2, if you take in the average value of each averaged data, you can reduce the fluctuation of the averaged data. That is, it is possible to obtain data fluctuation range center Taking the t 3/2 delayed. More specifically, the shift unit Δ1 of the shift data in the shift register 9 and the shift speed by the clock are irrelevant to the holding time (control cycle) t 3 of the control value. If the control cycle t 3 is large, the number of shift units is small, and the shift speed is large, the amount of data used for control is small and a large amount of data is discarded without being used.

一般的に、制御対象のデータは、連絡する変化量をサ
ンプリングして使用されるので、増大か減少かの一方向
変化が多い。この場合、制御開始時点で取り込んだデー
タで制御周期t3間の制御を行なう場合、制御周期t3終了
後の制御量と制御出力PVとの差が大きくなる。すなわ
ち、第6図に示すように一方向変化となるサンプリング
データの制御周期(保持時間)の中間位置にあるデータ
にて制御をかけるようにすれば制御保持時間中の制御量
と制御出力PVとの差が平均化される。
In general, the data to be controlled is used by sampling the amount of change to be communicated, so that it often has a one-way change of increase or decrease. In this case, when the control is performed for the control cycle t 3 with the data acquired at the start of the control, the difference between the control amount and the control output PV after the control cycle t 3 is large. That is, as shown in FIG. 6, if the control is performed by the data in the middle position of the control cycle (holding time) of the sampling data that changes in one direction, the control amount and the control output PV during the control holding time Differences are averaged.

この結果、(t1+t2+t3/2)の遅れ時間とライン移動
速度とを掛算して距離を出し、シフト単位△lにて割算
すれば、その値のデータ個数だけ現在の動作点より手前
にさかのぼらせて動作点を選択することにより、遅れ等
を考慮した最適データを得ることができる。
As a result, (t 1 + t 2 + t 3/2) issues a delay time and distance by multiplying a line speed of movement of, if division by shift unit △ l, the data number only the current operating point of the value By selecting the operating point by going back further, it is possible to obtain optimum data in consideration of delay and the like.

第3図は、シフトレジスタのシフト単位をt1+t2+t3
/2に対応させた場合を例示している。ここで、保持時間
はシフト単位と一致するが、演算遅れt1や応答遅れt2
例示したものである。すなわち、保持時間t3をシフト単
位と一致させた場合、そして前述の制御遅れt1動作応答
遅れt2とでシフト単位に相応させると、t1+t2+t3/2に
よる動作点の選択(シフト)はn番目の中央からn−1
とn−2との境界までさかのぼることになる。図中△の
位置にて制御をかけるため▽のデータを取り出すもので
あり、t1〜t3の値が大きくなる程上流n−2側へさかの
ぼるデータを取り出すことになる。
FIG. 3 shows the shift unit of the shift register as t 1 + t 2 + t 3
The case where it corresponds to / 2 is illustrated. Here, the holding time matches the shift unit, but the calculation delay t 1 and the response delay t 2 are just examples. That is, if the holding time t 3 to match the shift unit, and when the correspondingly shift units and control delay t 1 operation response delay t 2 of the foregoing, the selection of the operating point due to t 1 + t 2 + t 3 /2 ( Shift) is n-1 from the nth center
And n-2 will be traced back. Since the control is applied at the position of Δ in the figure, the data of ▽ is taken out, and the data going back to the upstream n−2 side is taken out as the value of t 1 to t 3 increases.

H.発明の効果 以上説明の如く遅れ時間を補償するようにデータ抽出
ポイントをシフトさせ動作点を選択することにより、最
適制御ができ、従って誤差が少なく、製品品質の向上が
大幅に図れる。
H. Effects of the Invention As described above, by shifting the data extraction point and compensating for the delay time and selecting the operating point, optimum control can be performed, and therefore, there are few errors and the product quality can be greatly improved.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第3図は本発明方法の実施例説明に供して
おり、第1図は概略説明図、第2図はブロック図、第3
図はシフト単位と遅れの対応説明図、第4図は従来の概
略説明図、第5図はt2を求める場合の説明図、第6図は
t3/2を得る場合の説明図である。 図中、 1は鋼板、 2は計測器、 3は速度検出器、 5は制御演算器、 6は動作機器、 7は制御装置、 8は平均化回路、 9はシフトレジスタ、 10はポインタシフト部である。
1 to 3 are provided for explaining an embodiment of the method of the present invention. FIG. 1 is a schematic explanatory view, FIG. 2 is a block diagram, and FIG.
The figure shows the correspondence between shift units and delays, FIG. 4 is a conventional schematic illustration, FIG. 5 is an illustration when t 2 is calculated, and FIG.
It is an explanatory view of a case of obtaining a t 3/2. In the figure, 1 is a steel plate, 2 is a measuring instrument, 3 is a speed detector, 5 is a control calculator, 6 is an operating device, 7 is a control device, 8 is an averaging circuit, 9 is a shift register, 10 is a pointer shift unit. Is.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 五百旗頭 正 東京都品川区大崎2丁目1番17号 株式 会社明電舎内 (56)参考文献 特開 昭60−137517(JP,A) 特開 昭59−21420(JP,A) 実開 昭59−77506(JP,U) 特公 昭62−29353(JP,B2) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tadashi Ichigo Tadashi 2-1-1-17 Osaki, Shinagawa-ku, Tokyo Meidensha Co., Ltd. (56) References JP-A-60-137517 (JP, A) JP-A-59- 21420 (JP, A) Actual development Sho 59-77506 (JP, U) Japanese Patent Sho 62-29353 (JP, B2)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】ラインの上流にて取出したデータをライン
の移動速度に応じてトラッキングしてラインの下流にて
抽出し、そのデータに基づき上記移動速度に対応して制
御対象を動作させる場合において、上記データのシフト
単位を移動速度に対応して設定し、上記制御対象を制御
する制御装置の制御遅れ時間、前回の制御出力と今回の
制御出力との差分に基づき次回分が算出される上記制御
対象の動作応答遅れ時間、及び上記データの1単位周期
の変動を平均化するための制御保持時間を上記移動速度
に応じて加味することを特徴とするトラッキングデータ
抽出方法。
1. When the data taken out upstream of the line is tracked according to the moving speed of the line and extracted at the downstream of the line, and the controlled object is operated corresponding to the moving speed based on the data. , The shift unit of the data is set corresponding to the moving speed, the control delay time of the control device for controlling the controlled object, the next minute is calculated based on the difference between the previous control output and the current control output. A tracking data extraction method, characterized in that an operation response delay time of a controlled object and a control holding time for averaging a variation of one unit cycle of the data are added in accordance with the moving speed.
JP61300110A 1986-12-18 1986-12-18 Tracking data extraction method Expired - Lifetime JP2543059B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61300110A JP2543059B2 (en) 1986-12-18 1986-12-18 Tracking data extraction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61300110A JP2543059B2 (en) 1986-12-18 1986-12-18 Tracking data extraction method

Publications (2)

Publication Number Publication Date
JPS63155202A JPS63155202A (en) 1988-06-28
JP2543059B2 true JP2543059B2 (en) 1996-10-16

Family

ID=17880839

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61300110A Expired - Lifetime JP2543059B2 (en) 1986-12-18 1986-12-18 Tracking data extraction method

Country Status (1)

Country Link
JP (1) JP2543059B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4907311B2 (en) * 2006-11-24 2012-03-28 新日本製鐵株式会社 Thickness control device for tandem rolling mill
JP2009195925A (en) * 2008-02-20 2009-09-03 Jfe Steel Corp Hot rolling method, hot-rolled metal band and electric resistance welded tube

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60137517A (en) * 1983-12-24 1985-07-22 Nippon Steel Corp Set value controlling device
JPS6229353A (en) * 1985-07-31 1987-02-07 Toshiba Corp Switching controller for hook state detection circuit

Also Published As

Publication number Publication date
JPS63155202A (en) 1988-06-28

Similar Documents

Publication Publication Date Title
US4434470A (en) Speed measurement system with means for calculating the exact time period of a known quantity of speed pulses
US4162443A (en) Speed measuring systems
JPS5885104A (en) Method and device for evaluating and processing signal from ultrasonic range finder
JP3432210B2 (en) Flow measurement device
JP2543059B2 (en) Tracking data extraction method
EP0478785B1 (en) Apparatus for measuring wavelength of light by high precision detection of interference fringe
WO1981001257A1 (en) Method of controlling the thickness of rolled sheet in a strip mill
JP3171770B2 (en) NC machine tool moving position error correction method and moving position error correction confirmation method
EP0753804B1 (en) Laser measuring apparatus
JPS6233521B2 (en)
GB2166891A (en) Velocity control system
JPH05343306A (en) Electron beam pattern drawing apparatus
JPH09507601A (en) Control system, control means used in such control system, and correlation system
SU1233109A1 (en) Device for checking amplitude and phase frequency characteristics of mechanical systems
JPS602085A (en) Speed controller for motor
JPH0776890B2 (en) Tracking control method between two servo systems
SU1401371A1 (en) Ultrasonic flaw detector
SU605265A1 (en) Device for measuring moving magnetic tape deformation
SU645091A1 (en) Device for measuring non-uniformity of object motion velocity
JPH049767A (en) Method for detecting speed of electric motor
JPH0515184A (en) Speed detector
JP2002136165A (en) Speed detecting method for motor controller
SU1689904A1 (en) Device for simulation of non-stationary electromagnetic fields
SU1307339A1 (en) Digital speed meter for microprocessor systems
JPH05260777A (en) Speed detection method for electric motor