JP2537410B2 - Concrete sheet pile - Google Patents

Concrete sheet pile

Info

Publication number
JP2537410B2
JP2537410B2 JP1180231A JP18023189A JP2537410B2 JP 2537410 B2 JP2537410 B2 JP 2537410B2 JP 1180231 A JP1180231 A JP 1180231A JP 18023189 A JP18023189 A JP 18023189A JP 2537410 B2 JP2537410 B2 JP 2537410B2
Authority
JP
Japan
Prior art keywords
sheet pile
steel material
concrete
concrete sheet
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1180231A
Other languages
Japanese (ja)
Other versions
JPH0347312A (en
Inventor
勗 川北
康元 糸島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PII ESU KK
Koshuha Netsuren KK
Original Assignee
PII ESU KK
Koshuha Netsuren KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PII ESU KK, Koshuha Netsuren KK filed Critical PII ESU KK
Priority to JP1180231A priority Critical patent/JP2537410B2/en
Publication of JPH0347312A publication Critical patent/JPH0347312A/en
Application granted granted Critical
Publication of JP2537410B2 publication Critical patent/JP2537410B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は港湾構造物,河川護岸,下水道土留擁壁等に
使用され、ウオタージエツトを使用して打込まれるコン
クリート矢板に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a concrete sheet pile used for port structures, river revetments, sewer retaining walls, etc. and driven using a water jet.

(従来の技術) コンクリート矢板は現場の土質条件がシルト,粘土,
砂質土壌,あるいは砂礫等の場合に使用され、ウオター
ジエツトを使用して打込まれる場合が多い。
(Prior Art) Concrete sheet piles have silt, clay,
It is used for sandy soil, gravel, etc., and is often driven using a water jet.

この種従来コンクリート矢板の一例の断面構造を第2
図(a)に、また従来の打込み時状態を第2図(b)に
示す。
The cross-sectional structure of an example of this type of conventional concrete sheet pile is
FIG. 2A shows a conventional driving state and FIG. 2B.

同図(a)における100は断面が波形を呈し,主鋼材
としてPC鋼線を用いた従来コンクリート矢板であり、11
はコンクリート,12は主鋼材,13は副鋼材,14は組立鋼材
である。上記主鋼材12および副鋼材13は要求される強度
に対応した矢板の種別,寸法によつて埋設本数や鋼材径
が異なる。
In the figure (a), 100 is a conventional concrete sheet pile having a corrugated cross section and using PC steel wire as the main steel material.
Is concrete, 12 is main steel, 13 is secondary steel, and 14 is assembled steel. The main steel material 12 and the sub steel material 13 differ in the number of buried sheets and the steel material diameter depending on the type and size of the sheet pile corresponding to the required strength.

同図(b)は打込み時にバイブロハンマーを使用する
場合であり、VHはバイブロハンマー,CHは上記バイブロ
ハンマーVHの下部に固定されたコンクリート矢板100把
持用のチヤツク,GおよびRは打ち込み時にコンクリート
矢板100を位置決め案内する導枠および引き寄せロール,
WJはウオタージエツト・ユニツトである。
The same figure (b) shows the case where a vibro hammer is used at the time of driving, VH is a vibro hammer, CH is a concrete sheet pile 100 fixed to the bottom of the above vibro hammer VH, a chuck for gripping 100, G and R are concrete sheet piles at the time of driving. Guide frame and pulling roll for positioning and guiding 100,
WJ is a water jet unit.

而して、ウオタージエツト・ユニツトWJはコンクリー
ト矢板100の全長とほぼ同じ長さの高圧パイプPを,例
えば第1図(a)に示す如く,コンクリート矢板100の
所定複数位置それぞれの表面添いに頂端面から下垂さ
せ、図示しないウオタージエツト・ポンプから送給され
る高圧水をホース2,ニツプル2,雌エルボからなるジヨイ
ント4を介して上記高圧パイプPへ導入し、当該高圧パ
イプPの先端に装着したジエツトノズル5からウオター
ジエツトJを噴射させる構成である。
Thus, the water jet unit WJ is a high-pressure pipe P having a length substantially the same as the entire length of the concrete sheet pile 100, for example, as shown in FIG. The high pressure water supplied from a water jet pump (not shown) is introduced into the high pressure pipe P through a hose 2, a nipple 2, and a female joint elbow 4, and the jet nozzle attached to the tip of the high pressure pipe P. The water jet J is ejected from No. 5.

通例の施工法は、まずコンクリート矢板打ち込み位置
に、パイロツト鋼矢板を建て込み,かつこれを引き抜い
て導孔を形成する。次ぎに図示の如くウオタージエツト
・ユニツトWJを装着したコンクリート矢板100を相隣る
コンクリート矢板100どうしの側面凹部と凸部とがそれ
ぞれ嵌合しあう状態として、先端を上記導孔の開口上に
位置決めする。この状態でウオタージエツト・ポンプを
駆動して高圧水を高圧パイプPへ送給してジエツトノズ
ル5からウオタージエツトJを噴射させ、打込み先であ
る導孔周囲の土砂を軟弱化・排除しつつ、コンクリート
矢板100自体の自重および駆動開始したバイブロハンマ
ーVHの振動による前進駆動力を介して順次導孔に従つて
打込むようにしている。
In the usual construction method, first, a pilot steel sheet pile is built in a concrete sheet pile driving position, and this is pulled out to form a guide hole. Next, as shown in the figure, the concrete sheet pile 100 equipped with the water jet unit WJ is placed in a state where the side surface concave portions and the convex portions of the adjacent concrete sheet piles 100 are fitted to each other, and the tip is positioned above the opening of the guide hole. . In this state, the water jet pump is driven to feed the high-pressure water to the high-pressure pipe P to inject the water jet J from the jet nozzle 5 to soften / eliminate the earth and sand around the guide hole, which is the driving destination, and the concrete sheet pile 100. The driving force of the vibro hammer VH that has started to drive and the vibration of the vibro hammer VH that has started to drive is used to sequentially drive along the guide hole.

(発明が解決しようとする問題点) 従来工法では、コンクリート矢板打込み前のパイロツ
ト鋼矢板の建て込みと引き抜きにより導孔を形成する前
工程を必要とし、これがために要する設備が工事費を高
騰させるとともに、工程が複雑で極めて煩雑であつた。
(Problems to be solved by the invention) The conventional method requires a pre-process of forming a guide hole by assembling and drawing out the pilot steel sheet pile before the concrete sheet pile is driven, and the equipment required therefor increases the construction cost. At the same time, the process was complicated and extremely complicated.

それのみならず、従来ウオタージエツト・ユニツトWJ
では、複数本の高圧パイプPをコンクリート矢板100の
表面添いに下垂させ、ウオタージエツトJを導孔周囲の
土砂に向けて噴射する構成であるので、打込み中のジエ
ツトノズル5の前面に,例えば礫あるいは硬質土塊があ
り、これ等が沈入中のコンクリート矢板100と下垂され
た高圧パイプPとの間に介入した場合など、高圧パイプ
Pがコンクリート矢板100の表面から遊離して高圧水の
噴射方向が偏向し、偏向方向の土砂を軟弱化・排除する
ので、たとえ導孔が孔設されていてもコンクリート矢板
100が抵抗の少ない方向へ沈入しがちとなり、垂直に打
ち込まれないという事態が時々発生する。この場合に
は、コンクリート矢板100を一度吊り上げ後退させ、コ
ンクリート矢板100の表面から離間した高圧パイプPを
再び表面に添わせ直しするなどの措置をとらねばならな
かつた。
Not only that, but the conventional water jet unit WJ
In the structure, a plurality of high-pressure pipes P are hung along the surface of the concrete sheet pile 100 and the water jet J is jetted toward the earth and sand around the guide hole. Therefore, for example, gravel or hard gravel can be placed on the front surface of the jet nozzle 5 during driving. When there is a clod of sand and these intervene between the submerged concrete sheet pile 100 and the drooping high pressure pipe P, the high pressure pipe P separates from the surface of the concrete sheet pile 100 and the high pressure water jet direction is deflected. However, since the soil in the deflecting direction is weakened and eliminated, even if the guide hole is provided, the concrete sheet pile
The 100 tends to sink in the direction with less resistance, and sometimes the situation where it is not driven vertically occurs. In this case, the concrete sheet pile 100 must be temporarily lifted up and retracted, and the high-pressure pipe P separated from the surface of the concrete sheet pile 100 must be put back on the surface again.

また、上記第2図(b)では高圧パイプPを3本使用
した例を示しているが、実際上はさらに多数本を使用す
る場合が多く、打込み前の段取りとして多数本の高圧パ
イプPをコンクリート矢板100表面添いにうまく取りつ
けたり,打込み後には後工程として土中から高圧パイプ
Pを引抜かねばならず、現場作業は煩雑であり、作業性
に欠けるとして改善策が望まれていた。
Further, although FIG. 2 (b) shows an example in which three high pressure pipes P are used, in actuality, a large number of high pressure pipes P are often used, and a large number of high pressure pipes P are used as a setup before the driving. The high-pressure pipe P had to be properly attached to the surface of the concrete sheet pile 100, or the high-pressure pipe P had to be pulled out from the soil as a post-process after the driving, and the on-site work was complicated, and workability was lacking, and an improvement measure was desired.

一方、上記要望に応えるものとして、高圧パイプをコ
ンクリート内に埋設したコンクリート矢板も提案されて
いるが、コンクリート内に径大のパイプを配置するため
に、かぶりの減少やひび割れの発生など強度上の悪影響
等の問題があり、未だ満足するものが得られていない。
On the other hand, in order to meet the above-mentioned demand, a concrete sheet pile in which a high-pressure pipe is embedded in concrete has been proposed, but since a large-diameter pipe is arranged in the concrete, a reduction in fogging and occurrence of cracks and the like in terms of strength. There are problems such as adverse effects, and satisfactory ones have not yet been obtained.

そこで本発明は、ウォタージェットを使用して打込ま
れる従来のコンクリート矢板に存する上記の問題点を解
消しようとするもので、直進的な打込みの確実性と容易
性を確保でき、現場作業の単純化を可能とすると共に、
コンクリート内にパイプを配置しても強度的な悪影響が
なく、強固で且つ製造が容易なコンクリート矢板を提供
することを目的とする。
Therefore, the present invention is intended to solve the above problems existing in a conventional concrete sheet pile driven by using a water jet, and can ensure the straightness of driving and the ease of driving, thereby simplifying on-site work. While enabling
An object of the present invention is to provide a strong and easy-to-manufacture concrete sheet pile without adversely affecting strength even if a pipe is placed in concrete.

(問題点を解決するための手段) 本発明のコンクリート矢板は、高圧水導通用パイプ
材、プレストレス導入用の主鋼材、及び副鋼材がコンク
リート内軸線方向に埋設・貫通し、且つ前記高圧水導通
用パイプ材はコンクリートを貫通して頂頭端面及び先端
端面が開口してなる、ウォータージェットを用いて打込
まれるPC構造のコンクリート矢板において、前記高圧水
導通用パイプ材が、前記副鋼材とほぼ同じ断面積を有
し、且つ該高圧水導通用パイプ材と前記副鋼材との本数
比率がほぼ1:1となるように、前記副鋼材群中の所定位
置の副鋼材に替えて該位置に埋設・貫通され、前記高圧
水導通用パイプ材が副鋼材の機能も兼ねさせるようにし
てなることを特徴とする技術的手段を採用することによ
って、上記問題点を解決したものである。
(Means for Solving Problems) The concrete sheet pile of the present invention has a pipe material for high-pressure water conduction, a main steel material for introducing prestress, and a sub-steel material that are embedded / penetrated in the axial direction of the concrete, and the high-pressure water is used. The pipe material for conduction is formed by penetrating concrete and opening the top end face and the tip end face, in the concrete sheet pile of PC structure driven by using a water jet, the high pressure water conduction pipe material is almost the same as the sub steel material. With the same cross-sectional area, and so that the number ratio of the pipe material for high-pressure water conduction and the sub steel material is approximately 1: 1, in place of the sub steel material at a predetermined position in the sub steel material group, The above problem is solved by adopting a technical means characterized in that it is buried and penetrated, and the high pressure water conducting pipe material also functions as a sub steel material.

(作用) 本発明によるコンクリート矢板において、高圧水導通
用パイプ材は、前記副鋼材とほぼ同じ断面積を有し、且
つ該高圧水導通用パイプ材と前記副鋼材との本数比率が
ほぼ1:1となるように、前記副鋼材群中の所定位置の副
鋼材に替えて該位置に埋設・貫通されているので、単に
高圧水導通機能ばかりでなく、副鋼材としての機能、即
ち鉄筋の機能も兼ねることができる。それにより、所定
の強度確保のためコンクリート内に埋設される鉄筋の数
を減らすことができると共に、管内に流通させる高圧水
に対しても十分な耐力を備えることができ、通水時に管
径が膨張することは殆どない。また、コンクリートのか
ぶりも十分に確保できるので、高圧水導通用パイプ材の
配置による強度上の悪影響がなく、均一な強度を維持す
ることができる。
(Operation) In the concrete sheet pile according to the present invention, the high-pressure water conducting pipe material has substantially the same cross-sectional area as the sub-steel material, and the number ratio of the high-pressure water conducting pipe material to the sub-steel material is approximately 1: As 1 is replaced with a sub steel material at a predetermined position in the sub steel material group and is embedded / penetrated at that position, not only the high-pressure water conduction function, but also the function as a sub steel material, that is, the function of the reinforcing bar It can also double as. As a result, the number of reinforcing bars embedded in concrete can be reduced to ensure a predetermined strength, and sufficient resistance to high-pressure water flowing in the pipe can be provided, and the pipe diameter during water passage can be reduced. It rarely expands. Further, since it is possible to sufficiently secure the covering of concrete, there is no adverse effect on the strength due to the arrangement of the high-pressure water conducting pipe material, and it is possible to maintain uniform strength.

特に、本発明では、高圧水導通用パイプ材と前記副鋼
材との本数比率がほぼ1:1となっているので、コンクリ
ート矢板に高圧水導通用パイプ材を力学的にバランスが
とれた断面配置が可能となり、強度的にもバランスして
鉄筋による副鋼材の場合と全く同様な機能を果たすこと
ができると共に、コンクリート矢板の打ち込み時にも、
ウォタージェットによる噴射力が矢板全体にバランスし
て、コンクリート矢板を直進的に安定して打ち込むこと
ができる。
In particular, in the present invention, since the number ratio of the high pressure water conducting pipe material and the auxiliary steel material is approximately 1: 1, the cross section arrangement in which the high pressure water conducting pipe material is mechanically balanced on the concrete sheet pile. It is possible to achieve the same function as in the case of the secondary steel material by reinforcing bars while balancing the strength, and at the time of driving concrete sheet pile,
The jet force of the water jet is balanced on the entire sheet pile, and the concrete sheet pile can be driven straight and stably.

そして、本発明のコンクリート矢板の打込みは、高圧
水を打込み直前方向の土砂に向けて噴射して土砂を軟弱
化・排除するので、従来のようにコンクリート矢板打込
み位置に予めパイロット鋼矢板を建て込み、引き抜いて
導孔を形成する前工程が不要である。また、コンクリー
ト矢板の打込みに対する抵抗力が減少するので、直進的
かつ容易な打込みが可能である。さらに、従来のように
コンクリート矢板打込み前に多数本の高圧パイプをコン
クリート矢板表面添いに取り付ける段取り作業や、打込
み後に高圧パイプを土中から引き抜く後工程が不要とな
り、作業が単純化できる。
And, in the driving of the concrete sheet pile of the present invention, high-pressure water is jetted toward the earth and sand in the immediately preceding direction to soften / eliminate the earth and sand, so that a pilot steel sheet pile is preliminarily built in the concrete sheet pile driving position as in the conventional case. , A pre-process of extracting and forming the guide hole is unnecessary. Further, since the resistance against driving of the concrete sheet pile is reduced, straight and easy driving is possible. Further, unlike the prior art, the setup work of mounting a large number of high-pressure pipes on the surface of the concrete sheet pile prior to the driving of the concrete sheet pile and the post-process of withdrawing the high-pressure pipes from the soil after the driving are unnecessary, and the work can be simplified.

一方、打込み後にパイプ材の管内に充填材を圧入する
が、該充填材はパイプ材自体を防錆するとともに、矢板
先端側の土砂中に浸透してコンクリート矢板の根を形成
し、構築物の強靭性を向上させる。
On the other hand, after the driving, the filler is press-fitted into the pipe material, and the filler prevents the pipe material itself from rusting and penetrates into the sand on the tip side of the sheet pile to form the root of the concrete sheet pile. Improve sex.

(実施例) 本発明の実施例を図面に基づき詳細に説明する。第1
図(a)〜(c)は、請求項1の発明の実施例であるPC
構造のコンクリート矢板を示している。
(Example) The Example of this invention is described in detail based on drawing. First
Figures (a) to (c) show a PC which is an embodiment of the invention of claim 1.
The concrete sheet pile of a structure is shown.

第1図(a)は波形を呈し,主鋼材にPC鋼線を用いた
本発明実施例コンクリート矢板10の断面を示し、11はコ
ンクリート,12は主鋼材,13は副鋼材,14は組立鋼材であ
り、これらの要素は従来同様であるが、本発明では副鋼
材13の本数が従来コンクリート矢板100の断面を示す第
2図の(a)と対比すれば即座に判明する如く少なくな
つており、副鋼材群中の所定位置の副鋼材が15a〜15fと
して示す中空のパイプ材に置き替わっており、第1図
(a)に示すように副鋼材13(ハッチングして示してい
る)とパイプ材15a〜15fが共に6本づつとなって、副鋼
材とパイプ材の本数比率1:1となっている。この場合、
これらの中空のパイプ材は第2図(a)の副鋼材13すな
わち鉄筋がパイプ材に置き替ったもので、これらの中空
パイプ材15a〜15fは鉄筋の作用をも果たしている。な
お、主鋼材12によるコンクリートへのプレストレス導入
は勿論従来どおりである。
Fig. 1 (a) shows a cross section of a concrete sheet pile 10 of the present invention example having a corrugated shape and using PC steel wire as a main steel material, 11 is concrete, 12 is a main steel material, 13 is a secondary steel material, and 14 is an assembled steel material. Although these elements are the same as the conventional ones, in the present invention, the number of the sub steel materials 13 is reduced as will be immediately understood when compared with (a) of FIG. 2 showing the cross section of the conventional concrete sheet pile 100. , The sub-steel materials at predetermined positions in the sub-steel material group are replaced by hollow pipe materials shown as 15a to 15f. As shown in FIG. 1 (a), the sub-steel material 13 (hatched) and the pipe Each of the materials 15a to 15f has 6 pieces, and the number ratio of the sub steel material and the pipe material is 1: 1. in this case,
These hollow pipe materials are obtained by replacing the sub steel material 13 in FIG. 2 (a), that is, the reinforcing bars with the pipe materials, and these hollow pipe materials 15a to 15f also function as reinforcing bars. The introduction of prestress into the concrete by the main steel material 12 is of course the same as before.

当該パイプ材15a〜15fそれぞれは,第1図(b)に示
す如く,コンクリート矢板10の頂頭端面コンクリートA
より所定長さ裸出しており、当該裸出部それぞれには端
部から所定長さ範囲,例えば20〜30mmにわたり雄ねじ部
16が形成されていて、ウオタージエツト・ポンプと導通
する管路の先端に位置する接続金具の雌ねじと螺合可能
である。従つて、現場では接続金具をパイプ材15a〜15f
それぞれに螺着させるだけで打込み段取りは終了する。
As shown in FIG. 1 (b), each of the pipe materials 15a to 15f is made of concrete top sheet A of concrete sheet pile 10.
It is exposed to a specified length for a bare length, and each of the exposed parts has a male threaded portion over a predetermined length range from the end, for example, 20 to 30 mm.
16 is formed and can be screwed with the female thread of the connecting fitting located at the tip of the conduit communicating with the water jet pump. Therefore, at the site, connect the fittings to the pipe materials 15a to 15f.
The driving setup is completed simply by screwing them on each other.

また、パイプ材15a〜15fそれぞれは,第1図(c)に
示す如く,コンクリート矢板10の先端端面コンクリート
Bより所定長さ裸出しており、当該裸出部それぞれには
端部から所定長さ範囲,例えば20〜30mmにわたり雄ねじ
部17が形成されていて、ウオタージエツトノズルの雌ね
じと螺合可能である。従つて,当該コンクリート矢板10
製造時に使い捨てウオタージエツトノズルを装着して出
荷すれば、現場での作業はなくなる。
Further, as shown in FIG. 1 (c), each of the pipe members 15a to 15f is bare from the tip end surface concrete B of the concrete sheet pile 10 by a predetermined length, and each bare portion has a predetermined length from the end. A male screw portion 17 is formed over a range, for example, 20 to 30 mm, and can be screwed with a female screw of the water jet nozzle. Therefore, the concrete sheet pile 10
If a disposable water jet nozzle is attached at the time of manufacture and shipped, the work at the site is eliminated.

さらに、この裸出部に上記の如き雄ねじ部17を形成せ
ず、第1図(d)に示すように,例えばスエージング加
工等でその先端の管内径を先細のテーパー状に形成して
開口を小さくし、当該部分をノズル部18としてもよい。
Furthermore, as shown in FIG. 1 (d), the male thread portion 17 as described above is not formed on the bare exposed portion, and as shown in FIG. 1 (d), for example, by swaging, the inner diameter of the tube is tapered to form an opening. May be reduced and the portion may be used as the nozzle portion 18.

而して、パイプ材15としては中実の副鋼材13と断面積
がほぼ同一のものが使用されることによって、副鋼材で
ある鉄筋の同程度の強度を有し、強度材としての鉄筋の
役目をも果たしている。
Thus, the pipe material 15 having substantially the same cross-sectional area as the solid secondary steel material 13 is used, so that the secondary steel material has the same strength as that of the reinforcing steel, and the strength of the reinforcing steel It also plays a role.

具体的数値例を挙げて説明すれば、例えば副鋼材13の
直径がφ13mmであれば,外径φ17mm,肉厚3mmのパイプ材
15が使用される。パイプ材15の肉厚が3mm程度あれば、
コンクリート矢板製造過程のコンクリートの膨脹力に拮
抗し得、かつ管内に流通させる高圧水(150Kg/cm2)に
対しても充分な耐力を備え、かつ通水時に管径が殆ど膨
脹することはない。従つて、コンクリートに有害とされ
るひび割れを生起させる虞はない。
Explaining with specific numerical examples, for example, if the diameter of the sub steel material 13 is φ13 mm, a pipe material with an outer diameter of φ17 mm and a wall thickness of 3 mm is used.
15 are used. If the wall thickness of the pipe material 15 is about 3 mm,
It can antagonize the expansive force of concrete in the manufacturing process of concrete sheet pile, and has sufficient resistance to high-pressure water (150 kg / cm 2 ) flowing in the pipe, and the pipe diameter hardly expands when passing water. . Therefore, there is no possibility of causing cracks that are harmful to concrete.

また、コンクリートの“かぶり”についていえば、パ
イプ材15の外径は副鋼材13の外径よりも4mm大である
が、JIS規格でコンクリート厚さは100mmとされており、
4mm程度の径差ならば、主鋼材12および組立鋼材14の径
と合算しても、副鋼材について必要な“かぶり"12mmは
充分確保されている。
Regarding the “fog” of concrete, the outer diameter of the pipe material 15 is 4 mm larger than the outer diameter of the sub steel material 13, but the concrete thickness is 100 mm according to the JIS standard.
If the diameter difference is about 4 mm, even if the diameters of the main steel material 12 and the assembled steel material 14 are summed up, the necessary "fog" 12 mm for the secondary steel material is sufficiently secured.

尚、コンクリート中に埋設される副鋼材13およびパイ
プ材15の本数は種別,寸法のコンクリート矢板10ごとに
異なるが、両者間の本数比率はほぼ1:1程度が好まし
い。
The number of the sub steel material 13 and the pipe material 15 embedded in the concrete varies depending on the type and size of the concrete sheet pile 10, but the ratio between the two is preferably about 1: 1.

(他の実施例) 上記説明では、断面が波形を呈し,主鋼材にPC鋼線を
使用したコンクリート矢板の副鋼材群中の一部所定位置
の副鋼材をパイプ材に置き替え配置した場合としたが、
本発明は断面が他の形状,例えば長方形等のコンクリー
ト矢板にも同様な配置構成を採り、かつ上記本発明打込
み工法に従つて施工されることは言うまでもない。
(Other Examples) In the above description, a case where a sub steel material at a predetermined position in a sub steel material group of a concrete sheet pile using a PC steel wire as a main steel material is replaced with a pipe material in the above description However,
It goes without saying that the present invention adopts the same arrangement configuration to concrete sheet piles having other cross-sections, such as rectangles, and is constructed according to the above-described driving method of the present invention.

(発明の効果) 本発明は従来工法で必要としたパイロツト鋼矢板の建
て込みと引き抜きにより導孔を形成する前工程を不要と
するので、設備費の低減,工程の簡易化に伴う工期の短
縮が可能となり、ウオタージエツトの指向先を打ち込み
先直前方向とするので、コンクリート矢板の直進的打込
みが確実かつ容易となり、さらには従来の如きコンクリ
ート矢板打込み前の多数本の高圧パイプを取りつける段
取り,打込み後の高圧パイプを土中からの引き抜く後工
程を不要とするので、現場作業性が大幅に向上する。そ
のうえ、打込まれたコンクリート矢板には根が形成され
るので、構築物の強靭性向上に資するなど、多岐にわた
る顕著な効果を奏するとして斯界に賞用される。
(Effect of the invention) Since the present invention does not require a pre-process of forming a guide hole by assembling and drawing out a pilot steel sheet pile, which is required in the conventional method, the facility cost is reduced and the construction period is shortened due to the simplification of the process. Since it is possible to direct the point of the water jet to the direction immediately before the driving destination, straight concrete driving of concrete sheet pile is sure and easy.Furthermore, it is possible to install many high pressure pipes before driving concrete sheet pile as in the past, and after setting up. Since the post-process of pulling out the high-pressure pipe from is not required, the workability on site is greatly improved. In addition, since roots are formed in the driven concrete sheet pile, it is awarded to the field as having various remarkable effects such as contributing to the improvement of the toughness of the structure.

特に、本発明のコンクリート矢板において高圧水導通
用パイプ材は、単に高圧水導通機能ばかりでなく、強度
材としてPC構造の場合は副鋼材、RC構造の場合は主鋼材
すなわち鉄筋の機能も兼ねることができるので、所定の
強度確保のためコンクリート内に埋設される鉄筋の数を
減らすことができる。また、管内に流通させる高圧水に
対しても十分な耐力を備えることができ、通水時に管径
が膨脹することは殆どなく、さらにコンクリートのかぶ
りも十分に確保できるので、導通用パイプ配置による強
度上の悪影響がなく、均一な強度を維持することができ
る。
In particular, in the concrete sheet pile of the present invention, the pipe material for high-pressure water conduction not only has a high-pressure water conduction function, but also has the function of a secondary steel material in the case of a PC structure as a strength material, and a main steel material, that is, a reinforcing bar in the case of an RC structure. Therefore, it is possible to reduce the number of reinforcing bars embedded in the concrete to secure a predetermined strength. In addition, it is possible to have sufficient proof strength against high-pressure water flowing in the pipe, the pipe diameter hardly expands when passing water, and concrete covering can be sufficiently secured. There is no adverse effect on strength and uniform strength can be maintained.

特に、本発明では、高圧水導通用パイプ材と前記副鋼
材との本数比率がほぼ1:1となっているので、コンクリ
ート矢板に高圧水導通用パイプ材を力学的にバランスが
とれた断面配置することが可能となり、強度的にもバラ
ンスして鉄筋による副鋼材と同様強度材として機能を効
果的に果たすことができる。また、コンクリート矢板の
打ち込み時にも、ウォタージェットによる噴射力が矢板
全体にバランスして、コンクリート矢板を直進的に安定
して打ち込むことができる。
In particular, in the present invention, since the number ratio of the high pressure water conducting pipe material and the auxiliary steel material is approximately 1: 1, the cross section arrangement in which the high pressure water conducting pipe material is mechanically balanced on the concrete sheet pile. Therefore, the strength can be balanced and the function as a strength material can be effectively fulfilled similarly to the secondary steel material by the reinforcing bar. Also, when the concrete sheet pile is driven, the jet force of the water jet is balanced over the entire sheet pile, and the concrete sheet pile can be driven straight and stably.

【図面の簡単な説明】[Brief description of drawings]

第1図(a)は本発明コンクリート矢板の一実施例の断
面図、第1図(b)および(c)それぞれは(a)に示
す実施例の頂頭部分斜視図および先端部分斜視図、第1
図(d)は他の実施例の先端部分断面図、第2図(a)
および(b)は従来コンクリート矢板の断面図および従
来コンクリート矢板打込み状態を示す斜視図である。 10……コンクリート矢板 11……コンクリート 13……副鋼材 15,15a〜15f……パイプ材 18……ノズル部 A……頂頭端面 B……先端端面
FIG. 1 (a) is a cross-sectional view of an embodiment of the concrete sheet pile of the present invention, and FIGS. 1 (b) and (c) are perspective views of the top portion and the tip portion of the embodiment shown in FIG. 1 (a), respectively. 1
FIG. 2D is a partial sectional view of the tip of another embodiment, and FIG. 2A.
And (b) are a cross-sectional view of a conventional concrete sheet pile and a perspective view showing a state of driving a conventional concrete sheet pile. 10 …… Concrete sheet pile 11 …… Concrete 13 …… Secondary steel material 15,15a to 15f …… Pipe material 18 …… Nozzle part A …… Top end face B …… Tip end face

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】高圧水導通用パイプ材、プレストレス導入
用の主鋼材、及び副鋼材がコンクリート内軸線方向に埋
設・貫通し、且つ前記高圧水導通用パイプ材はコンクリ
ートを貫通して頂頭端面及び先端端面が開口してなる、
ウォータージェットを用いて打込まれるPC構造のコンク
リート矢板において、前記高圧水導通用パイプ材が、前
記副鋼材とほぼ同じ断面積を有し、且つ該高圧水導通用
パイプと前記副鋼材との本数比率がほぼ1:1となるよう
に、前記副鋼材群中の所定位置の副鋼材に替えて該位置
に埋設・貫通され、前記高圧水導通用パイプ材が副鋼材
の機能も兼ねさせるようにしてなることを特徴とするコ
ンクリート矢板。
1. A pipe material for high-pressure water conduction, a main steel material for introducing prestress, and a sub-steel material are embedded / penetrated in the axial direction of concrete, and the pipe material for high-pressure water conduction penetrates concrete to obtain a top end surface. And the tip end face is open,
In a concrete sheet pile having a PC structure driven by using a water jet, the high-pressure water conducting pipe material has substantially the same cross-sectional area as the sub steel material, and the number of the high pressure water conducting pipe and the sub steel material. In order to have a ratio of about 1: 1, instead of the sub-steel material at a predetermined position in the sub-steel material group, it is embedded / penetrated in that position so that the high-pressure water conducting pipe material also has the function of the sub-steel material. A concrete sheet pile that is characterized by
JP1180231A 1989-07-14 1989-07-14 Concrete sheet pile Expired - Fee Related JP2537410B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1180231A JP2537410B2 (en) 1989-07-14 1989-07-14 Concrete sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1180231A JP2537410B2 (en) 1989-07-14 1989-07-14 Concrete sheet pile

Publications (2)

Publication Number Publication Date
JPH0347312A JPH0347312A (en) 1991-02-28
JP2537410B2 true JP2537410B2 (en) 1996-09-25

Family

ID=16079671

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1180231A Expired - Fee Related JP2537410B2 (en) 1989-07-14 1989-07-14 Concrete sheet pile

Country Status (1)

Country Link
JP (1) JP2537410B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812840A (en) * 2010-04-23 2010-08-25 上海中技桩业股份有限公司 U-shaped concrete slab pile
CN101913202A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Mould for U-shaped concrete sheet-pile

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726488A (en) * 2012-10-11 2014-04-16 上海中技桩业股份有限公司 Pi-shaped concrete pile
CN105672249A (en) * 2016-03-28 2016-06-15 福建省闽工新型建材有限公司 Concrete channel plate pile and manufacturing method thereof
CN105862724B (en) * 2016-05-27 2019-11-05 江苏金源管业有限公司 The reinforced prestressed concrete waveform sheet pile of rotary shaft

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5228285A (en) * 1975-08-28 1977-03-03 Toshiba Corp Surface acoustic device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812840A (en) * 2010-04-23 2010-08-25 上海中技桩业股份有限公司 U-shaped concrete slab pile
CN101913202A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Mould for U-shaped concrete sheet-pile

Also Published As

Publication number Publication date
JPH0347312A (en) 1991-02-28

Similar Documents

Publication Publication Date Title
EP1959057A2 (en) Equipment and method for constructing micropiles in soil, in particular for the anchorage of active anchors
CN210194636U (en) Be used for water conservancy to synthesize gate opening underground structure
WO2005005752A1 (en) Foundations for constructions
JP2537410B2 (en) Concrete sheet pile
CN110984180B (en) Supporting system for excavating pipe gallery foundation trench and construction method thereof
CN208950162U (en) It is easily installed the concrete column of supporting beam and the connection structure of itself and supporting beam
JP2014037714A (en) Long mirror bolt construction method
JP7280602B2 (en) Concrete wall forming method for earth retaining
CN116220004A (en) Combined concrete pipe pile for building construction
JPH0768698B2 (en) PC concrete sheet pile driving method and PC concrete sheet pile
JPH09111758A (en) Cast-in-place concrete pile and construction method thereof
JP5887193B2 (en) How to install underground diagonal materials
DE69938438T2 (en) A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE
JP3596687B2 (en) Seismic retrofitting method for existing foundation
CN210032192U (en) Use reliable prefabricated steel pipe shear force wall connection structure
EP1010815B1 (en) Splice for a drilled pile
JP2987141B1 (en) Preceding machine for water injection in steel sheet pile joint
DE19527608C2 (en) Underwater composite piles
CN219218959U (en) Square fore shaft pipe structure of wall even
KR102556547B1 (en) Construction method of earth retaining wall
CN218437006U (en) Self-drilling high-pressure jet grouting pile
JP7158010B2 (en) High-pressure injection method rod
JP7191327B2 (en) How to remove steel pipe piles
WO2004053285A1 (en) Method and device for drilling a channel
JPS62291317A (en) Quick construction of wide-width underground wall

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees