JP2506631Y2 - Pillar scaffolding - Google Patents

Pillar scaffolding

Info

Publication number
JP2506631Y2
JP2506631Y2 JP7624591U JP7624591U JP2506631Y2 JP 2506631 Y2 JP2506631 Y2 JP 2506631Y2 JP 7624591 U JP7624591 U JP 7624591U JP 7624591 U JP7624591 U JP 7624591U JP 2506631 Y2 JP2506631 Y2 JP 2506631Y2
Authority
JP
Japan
Prior art keywords
pin
stage
pillar
scaffolding
scaffolding device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7624591U
Other languages
Japanese (ja)
Other versions
JPH0519434U (en
Inventor
毅 後藤
勝志 東山
昭義 大久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Light Metal Co Ltd
Original Assignee
Nippon Light Metal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Light Metal Co Ltd filed Critical Nippon Light Metal Co Ltd
Priority to JP7624591U priority Critical patent/JP2506631Y2/en
Publication of JPH0519434U publication Critical patent/JPH0519434U/en
Application granted granted Critical
Publication of JP2506631Y2 publication Critical patent/JP2506631Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は建築工事等において柱用
鉄骨の垂直面に取付けられて使用される柱用足場装置に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column scaffolding device which is used by being attached to a vertical surface of a column steel frame in construction work and the like.

【0002】[0002]

【従来の技術】建築の鉄骨工事、道路の土木工事等、特
に地表より高い位置で鉄骨同士の継手締結、溶接作業な
どの各種作業を行なう場合、柱用鉄骨に吊り下げられて
使用されるこの種の柱用足場装置としては従来から種々
提案されているが、その一例として、実公平3−747
1号公報、実公平3−2599号公報等に開示されたも
のが知られている。図8は上記実公平3−7471号公
報に開示された柱用足場装置を示すもので、予め柱用鉄
骨Cの垂直な足場取付面にそれぞれ左右一対からなるピ
ン固定部材6および押しボルト13を上下に適宜間隔離
間させて取付けておき、作業用足場Aのステージ1の前
記柱用鉄骨Cと対向する縁部1aの幅方向中央部に、左
右一対のピン5をピン取付部材7を介して取付けると共
に、ステージ1の下面中央にそれぞれ補強部材9、垂直
部材10および方枝11とからなる左右一対のブラケッ
ト部材8を取付け、前記ピン5をピン固定部材6のスリ
ーブ内にそれぞれ上方から嵌挿し、垂直部材10を前記
押しボルト13の先端面に当接させるようにしたもので
ある。ブラケット部材8は、柱用足場Aを柱用鉄骨Cに
取付けた際、ステージ1を水平に保つと共に、その荷重
を支えることにより、ステージ1の安定性を確保する。
2. Description of the Related Art When performing various works such as steel construction work for construction, civil engineering work for roads, especially for fastening joints between steel frames at a position higher than the surface of the earth, welding work, etc. Various types of scaffolding devices for pillars have been proposed in the past.
Those disclosed in Japanese Patent Publication No. 1 and Japanese Utility Model Publication No. 3-2599 are known. FIG. 8 shows a scaffolding device for pillars disclosed in Japanese Utility Model Publication No. 3-7471, in which a pair of left and right pin fixing members 6 and push bolts 13 are preliminarily provided on vertical scaffolding mounting surfaces of a steel frame C for pillars. The pair of left and right pins 5 is attached to the upper and lower portions of the scaffold A for working in the widthwise central portion of the edge 1a of the stage 1 of the work scaffold A facing the pillar steel frame C via the pin attachment member 7. At the same time as mounting, a pair of left and right bracket members 8 each consisting of a reinforcing member 9, a vertical member 10 and a branch 11 are attached to the center of the lower surface of the stage 1, and the pins 5 are inserted into the sleeves of the pin fixing members 6 from above respectively. The vertical member 10 is brought into contact with the tip surface of the push bolt 13. The bracket member 8 secures the stability of the stage 1 by keeping the stage 1 horizontal and supporting the load when the column scaffold A is attached to the column steel frame C.

【0003】[0003]

【考案が解決しようとする課題】しかしながら、上記し
た従来の柱用足場装置においては、ブラケット部材8の
垂直部材10をステージ1の重量によって単に押しボル
ト13に当接させているだけであるため、下からの強風
等によるステージ1の浮き上がりを完全には防止するこ
とができず、安定性および作業性が悪く、また作業者に
心理的不安感を与えるという問題があった。
However, in the above-mentioned conventional pillar scaffolding device, since the vertical member 10 of the bracket member 8 is simply brought into contact with the push bolt 13 due to the weight of the stage 1, There is a problem in that it is impossible to completely prevent the stage 1 from being lifted up due to a strong wind from below, the stability and workability are poor, and the operator is psychologically uneasy.

【0004】したがって、本考案は上記したような従来
の問題点に鑑みてなされたもので、その目的とするとこ
ろは、ステージが浮き上がったりすることがなく安定性
および作業性に優れ、作業者が安心して作業を行えるよ
うにした柱用足場装置を提供することにある。
Therefore, the present invention has been made in view of the above-mentioned conventional problems, and its purpose is to provide excellent stability and workability without raising the stage, and An object of the present invention is to provide a scaffolding device for a pillar that enables work to be performed with peace of mind.

【0005】[0005]

【課題を解決するための手段】本考案は上記目的を達成
するため、建築工事における柱用鉄骨の一面に上下二段
に並設されたスリーブを有するピン支持部材を設け、ス
テージには前記スリーブに対応する位置にピン部材を設
け、各ピン部材を前記ピン支持部材のスリーブ内に上方
から嵌挿するようにしたものである。
In order to achieve the above object, the present invention provides a pin support member having sleeves arranged in parallel in two steps on one surface of a steel frame for a pillar in construction work, and the sleeve is provided on the stage. The pin members are provided at the positions corresponding to, and each pin member is inserted into the sleeve of the pin support member from above.

【0006】[0006]

【作用】本考案において、ステージに設けられたピンは
柱用鉄骨の垂直な足場取付面に取付けられたピン支持部
材のスリーブに上方から嵌挿されることで、ステージの
上下2個所を保持固定し、ステージの浮き上がりを防止
する。
In the present invention, the pin provided on the stage is inserted into the sleeve of the pin support member attached to the vertical scaffolding attachment surface of the column steel frame from above to hold and fix the upper and lower two places of the stage. , Prevent the stage from rising.

【0007】[0007]

【実施例】以下、本考案を図面に示す実施例に基づいて
詳細に説明する。図1は本考案に係る柱用足場装置の一
実施例を示す要部断面図、図2は同足場装置の側面図、
図3は同足場装置の正面図、図4は同足場装置の平面
図、図5はピン支持部材の正面図である。これらの図に
おいて、全体を符号20で示す柱用足場装置は、左右方
向に長く作業に必要な面積を有する長方形のステージ2
1を有している。ステージ21は、アルミニウム合金等
の軽金属製押し出し型材によって形成されて前後に並設
された一対の足場床22A、22Bと、断面形状がロ字
型の鋼材からなり足場床22A、22Bの下面中央部に
前後方向に延在するように設けられた左右一対の補強部
材23A、23B(図4)を有している。足場床22
A、22Bの中央部には左右一対のブラケット取付孔2
4が上下面に貫通して形成されており、このブラケット
取付孔24には筒状の連結ブラケット25が嵌合、溶接
されており、またこの連結ブラケット25の中央に設け
られたボルト取付け孔26には通しボルト27が挿通さ
れて前記補強部材23の下面に突出し、その突出端部に
ナット28が螺合されることにより、前記各足場床22
A、22Bと補強部材23A、23Bを強固に締結固定
している。前記ボルト27の頭部は作業の邪魔にならな
いよう連結ブラケット25の上面に設けられた凹陥部2
5a内に収納されている。前記ナット28は補強部材2
3A、23Bの下面に溶接固定されている。前記ステー
ジ21の上面周縁部にはアルミニウム合金等の軽金属か
らなる適宜高さの巾木31が全周に亙って立設され、ま
た柱用鉄骨30の垂直な足場取付面30aと対向する前
縁部を除く左右側縁部および後縁部には手摺32が前記
巾木31の内側面に沿って立設されている。手摺32
は、逆U字状に形成された上段手摺32aと、中段手摺
32bとで構成されており、上段手摺32aの下端部が
前記足場床22A、22Bに突設された挿入管33に上
方から抜き差し自在に嵌挿され、且つばね付きロックピ
ン34(図3)によって係止されている。ばね付きロッ
クピン34は、手摺32に設けられた挿入孔に挿入管3
3の外側より差し込まれ、挿入孔を選択することで手摺
32の高さを上下2段に調整することができる。なお、
ばね付きロックピン34は、挿入管33に固定されてい
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will now be described in detail with reference to the embodiments shown in the drawings. 1 is a cross-sectional view of a main part showing an embodiment of a scaffolding device for pillars according to the present invention, FIG. 2 is a side view of the scaffolding device,
3 is a front view of the scaffolding device, FIG. 4 is a plan view of the scaffolding device, and FIG. 5 is a front view of a pin support member. In these figures, a scaffolding device for pillars, which is generally designated by reference numeral 20, is a rectangular stage 2 having a long left-right direction and an area required for work.
One. The stage 21 includes a pair of scaffolding floors 22A and 22B formed of an extruded molding material made of a light metal such as an aluminum alloy and arranged side by side in front and back, and a bottom central portion of the scaffolding floors 22A and 22B made of steel material having a square cross section. It has a pair of left and right reinforcing members 23A and 23B (FIG. 4) provided so as to extend in the front-rear direction. Scaffolding floor 22
A pair of left and right bracket mounting holes 2 are provided in the central portions of A and 22B.
4 is formed so as to penetrate through the upper and lower surfaces, a tubular connecting bracket 25 is fitted and welded to the bracket attaching hole 24, and a bolt attaching hole 26 provided at the center of the connecting bracket 25. A through bolt 27 is inserted into the lower end of the reinforcing member 23 so as to protrude from the lower surface of the reinforcing member 23, and a nut 28 is screwed into the protruding end portion of the reinforcing member 23.
A and 22B and the reinforcing members 23A and 23B are firmly fastened and fixed. The head portion of the bolt 27 is a recessed portion 2 provided on the upper surface of the connecting bracket 25 so as not to interfere with the work.
It is stored in 5a. The nut 28 is the reinforcing member 2
It is welded and fixed to the lower surfaces of 3A and 23B. A skirting board 31 made of a light metal such as aluminum alloy and having an appropriate height is erected all over the circumference of the upper surface of the stage 21, and before facing the vertical scaffolding mounting surface 30a of the pillar steel frame 30. Handrails 32 are provided upright along the inner side surface of the skirting board 31 at the left and right side edge portions and the rear edge portion excluding the edge portion. Handrail 32
Is composed of an upper handrail 32a formed in an inverted U shape and an intermediate handrail 32b. It is freely inserted and locked by a spring-loaded lock pin 34 (FIG. 3). The lock pin 34 with spring is inserted into the insertion hole provided in the handrail 32 so that the insertion tube 3
It is possible to adjust the height of the handrail 32 between the upper and lower stages by inserting it from the outside of the handrail 3 and selecting the insertion hole. In addition,
The spring lock pin 34 is fixed to the insertion tube 33.

【0008】前記ステージ21の足場床22A、22B
の下面中央に固定された左右一対の補強部材23A、2
3Bは、前後一対の連結部材36A、36Bによって互
いに連結されており、また前方側の連結部材36Aには
下方に延在する左右一対の垂直部材37(図1)の上端
部が前記補強部材23A、23Bの端部に溶接されてい
る。ピン取付部材38はコ字状の鋼材からなり、凹陥部
が前記連結部材36Aに前方から嵌合され、該連結部材
36Aにボルト39およびナット40によって固定され
ている。そして、ピン取付部材38の前面には左右一対
のピン部材40A、40Bが突設されている。ピン部材
40A、40Bは、逆L字状に形成されて、基端部が前
記ピン取付部材38の前面に溶接固定されている。同じ
く前記左右一対の垂直部材37の下端にも連結部材42
が溶接によって横架されており、第2のピン取付部材4
5もコ字状の鋼材からなり、凹陥部が前記連結部材42
に前方から嵌合され、該連結部材42に、ボルト43お
よびナット44によって固定されている。前記第2のピ
ン取付部材45の前面には左右一対のピン部材46A、
46B(46Bは図示せず)が突設されている。これら
のピン部材46A、46Bは、前記部材ピン40A、4
0Bと略同一に形成され、基端部がピン取付部材45の
前面に溶接固定されている。上段のピン部材40A、4
0Bと下段のピン部材46A、46Bの下方を指向する
垂直なピン本体部は、後述するスリーブへの挿入を容易
にすると共に挿入間違いを防ぐため長さが異なり、上段
の部材ピン40A、40Bの方が下段のピン部材46
A、46Bより長く設定されており、さらにピン本体部
の下端部はテーパ状に小径化されている。前記連結部材
42と前記ステージ21の下面とは前下がりに傾斜した
左右一対のステー48A、48Bによって互いに連結さ
れている。
Scaffolding floors 22A, 22B of the stage 21
A pair of left and right reinforcing members 23A, 2 fixed to the center of the lower surface of the
3B are connected to each other by a pair of front and rear connecting members 36A and 36B, and the front end of the connecting member 36A has a pair of left and right vertical members 37 (FIG. 1) whose upper ends are the reinforcing members 23A. , 23B are welded to the ends. The pin mounting member 38 is made of a U-shaped steel material, and the recessed portion is fitted into the connecting member 36A from the front, and is fixed to the connecting member 36A by a bolt 39 and a nut 40. A pair of left and right pin members 40A and 40B are provided on the front surface of the pin mounting member 38 so as to project therefrom. The pin members 40A and 40B are formed in an inverted L shape, and their base ends are welded and fixed to the front surface of the pin mounting member 38. Similarly, connecting members 42 are also provided at the lower ends of the pair of left and right vertical members 37.
Are welded horizontally by welding, and the second pin mounting member 4
5 is also made of a U-shaped steel material, and the concave portion is the connecting member 42.
Is fitted to the connecting member 42 by a bolt 43 and a nut 44. On the front surface of the second pin attachment member 45, a pair of left and right pin members 46A,
46B (46B is not shown) is projected. These pin members 46A, 46B correspond to the member pins 40A, 4B.
The base end portion is fixed to the front surface of the pin mounting member 45 by welding. Upper pin members 40A, 4
0B and the lower pin members 46A and 46B, which are oriented vertically downward, have different lengths for facilitating insertion into a sleeve to be described later and to prevent insertion errors, and thus the upper pin members 40A and 40B have different lengths. The lower one is the pin member 46
The length is set longer than A and 46B, and the lower end of the pin body is tapered to have a smaller diameter. The connecting member 42 and the lower surface of the stage 21 are connected to each other by a pair of left and right stays 48A and 48B that are inclined forward and downward.

【0009】前記柱用鉄骨30の垂直な足場取付面30
aには左右一対のピン支持部材50が配設されている。
このピン支持部材50は、図5に示すように前記足場取
付面30aに溶接等によって固定された上下方向に長い
左右一対の座板51A、51Bと、前記各ピン部材40
A、40B、46A、46Bに対応して左右一対ずつ上
下二段に並設された合計4つのスリーブ52A、52
B、52C、52Dと、座板51A、51Bの上下端を
互いに連結する上下一対の間隔部材53A、53Bとを
備え、スリーブ52A、52B、52C、52Dは上下
端が開放して前記各座板51A、51Bの表面に溶接固
定されている。
A vertical scaffold mounting surface 30 of the pillar steel frame 30
A pair of left and right pin support members 50 is arranged at a.
As shown in FIG. 5, the pin support member 50 includes a pair of left and right seat plates 51A and 51B which are fixed to the scaffold mounting surface 30a by welding or the like and which are long in the vertical direction, and the pin members 40.
Corresponding to A, 40B, 46A, 46B, a total of four sleeves 52A, 52 arranged in parallel in a pair of upper and lower left and right.
B, 52C, 52D, and a pair of upper and lower spacing members 53A, 53B for connecting the upper and lower ends of the seat plates 51A, 51B to each other. The sleeves 52A, 52B, 52C, 52D are open at the upper and lower ends, and each of the seat plates is provided. It is welded and fixed to the surfaces of 51A and 51B.

【0010】このような構成からなる柱用足場装置20
を柱用鉄骨30の足場取付面30aに設置する場合に
は、ステージ21に手摺32を取付けた後、柱用足場装
置20をロープで吊り下げて足場取付面30aに沿って
下降させ、ピン支持部材50の部位まで下げたら各ピン
部材40A、40B、46A、46Bの下方に折曲され
たピン本体部をスリーブ52A、52B、52C、52
Dに上方からそれぞれ嵌挿し、且つ上段のピン部材40
A、40Bのピン本体部のスリーブ52A、52Bの下
方に突出する下端部に設けられた径方向の挿通孔に抜け
止めピン59(図1)を差し込むことで、柱用足場装置
20の設置を完了する。前記抜け止めピン59は、柱用
足場装置20を高い場所に設置する場合、下方からの強
風等によって柱用足場装置20が煽られ、万一浮き上が
ってピン部材40A、40B、46A、46Bが上方へ
移動したり、スリーブ52A、52B、52C、52D
から上方へ抜けるのを防止するものである。ここで、本
考案においては上下2段に設けた4つのピン部材40
A、40B、46A、46Bをスリーブ52A、52
B、52C、52Dによって保持しているので、ステー
ジの下面に垂設した垂直部材を足場取付面に突設した押
しボルトに当接させた図8の従来装置と比べて浮き上が
る心配がなく、柱用足場装置20の安定性に優れ、ステ
ージ21上での作業を安心して行なうことができる。ま
た、ピン部材40A、40B、46A、46Bをスリー
ブ52A、52B、52C、52Dに嵌挿するだけでよ
いため、柱用足場装置20の柱用鉄骨30への取付け作
業も簡単且つ容易である。また補強部材23A、23B
と手摺32はステージ21に対して分離可能に取付けら
れているので、これらをステージ21から取り外すと、
ステージ21をコンパクトに積み重ねることができ、し
かも柱用足場装置20の搬送も容易である。
A column scaffolding device 20 having such a structure
When installing the pillar scaffold 30 on the scaffolding mounting surface 30a of the pillar steel frame, after mounting the handrail 32 on the stage 21, suspend the pillar scaffolding device 20 with a rope and lower it along the scaffolding mounting surface 30a to support the pins. When lowered to the part of the member 50, the pin main body portion bent below each of the pin members 40A, 40B, 46A, 46B is provided with sleeves 52A, 52B, 52C, 52.
The upper pin member 40 is fitted into the D member from above, and
By installing the retaining pin 59 (FIG. 1) into the radial insertion hole provided at the lower end portion projecting downward of the sleeve bodies 52A and 52B of the pin body portions of A and 40B, the pillar scaffolding device 20 can be installed. Complete. When the pillar scaffolding device 20 is installed at a high place, the pillars scaffolding device 20 is agitated by strong wind from below, and the pin members 40A, 40B, 46A and 46B are lifted up. To the sleeves 52A, 52B, 52C, 52D
It is to prevent the slipping out from above. Here, in the present invention, the four pin members 40 provided in the upper and lower two stages.
A, 40B, 46A, 46B with sleeves 52A, 52
Since it is held by B, 52C, and 52D, there is no fear of floating compared to the conventional device of FIG. 8 in which the vertical member hung on the lower surface of the stage is brought into contact with the push bolt protruding on the scaffold mounting surface, The stability of the scaffolding device 20 is excellent, and the work on the stage 21 can be performed with confidence. Further, since it is only necessary to fit the pin members 40A, 40B, 46A, 46B into the sleeves 52A, 52B, 52C, 52D, the work of attaching the scaffolding device 20 for columns to the steel frame 30 for columns is simple and easy. Further, the reinforcing members 23A and 23B
Since the handrail 32 and the handrail 32 are detachably attached to the stage 21, when these are removed from the stage 21,
The stages 21 can be compactly stacked, and the pillar scaffolding device 20 can be easily transported.

【0011】図6はピン支持部材50の他の実施例を示
す正面図である。この実施例は上段側が2つ、下段側が
1つ、合計3つのスリーブ52A、52B、52Cによ
って柱用足場装置を保持するようにしたものである。上
段側のスリーブ52A、52Bはこれらスリーブと略同
一長さを有する左右一対の上側座板60A、60Bに溶
接固定されており、またこれらの上側座板60A、60
Bは間隔部材53によって互いに連結されている。一
方、下段側のスリーブ52Cは、垂直方向に長く延在す
る下側座板60Cの下端部に溶接固定されており、この
下側座板60Cの上端部は前記間隔部材53の中央に溶
接固定されている。なお、柱用足場装置には上段に2
つ、下段に1つ、合計3つのピン部材が、前記各スリー
ブ52A、52B、52Cに対応して設けられることは
云うまでもない。このような構成においても上記実施例
と同様な効果が得られるものである。
FIG. 6 is a front view showing another embodiment of the pin support member 50. In this embodiment, the pillar scaffolding device is held by two sleeves 52A, 52B, 52C, two on the upper side and one on the lower side. The upper sleeves 52A and 52B are welded and fixed to a pair of left and right upper seat plates 60A and 60B having substantially the same length as these sleeves, and the upper seat plates 60A and 60B are also fixed.
Bs are connected to each other by a spacing member 53. On the other hand, the lower sleeve 52C is welded and fixed to the lower end portion of a lower seat plate 60C that extends in the vertical direction, and the upper end portion of the lower seat plate 60C is welded and fixed to the center of the spacing member 53. Has been done. In addition, the scaffolding device for pillars has 2
It goes without saying that a total of three pin members, one at the lower stage, are provided corresponding to each of the sleeves 52A, 52B and 52C. Even with such a configuration, the same effect as that of the above embodiment can be obtained.

【0012】図7は本考案の他の実施例を示す平面図で
ある。この実施例は柱用足場装置20を平面視L字型に
形成し、ステージ21Aの互いに直交する内側面62
a、62bで内側隅角部に近い部位に、図1〜図5に示
した上記実施例と同様、逆L字状に形成された4つのピ
ン部材63をそれぞれ左右一対ずつ上下2段に配列し、
これらのピン部材63を、角鋼材からなる柱用鉄骨30
の互いに直交する外側2つの垂直な足場取付面30a、
30bにそれぞれ左右一対ずつ上下2段に設けた4つの
スリーブ64にそれぞれ上方から嵌合させるようにした
ものである。このような構成においては、8つのスリー
ブ64とピン部材63によってステージ21Aの上、下
それぞれ4個所を保持固定しているので、柱用足場装置
20をより安定に取付けることができる。
FIG. 7 is a plan view showing another embodiment of the present invention. In this embodiment, the scaffolding device 20 for pillars is formed in an L-shape in plan view, and the inner side surfaces 62 of the stage 21A which are orthogonal to each other are formed.
Similar to the above-described embodiment shown in FIGS. 1 to 5, four pin members 63 each formed in an inverted L shape are arranged in a pair of left and right upper and lower portions at positions close to the inner corners of a and 62b. Then
These pin members 63 are used for the column steel frame 30 made of square steel.
Two outer vertical scaffolding mounting surfaces 30a orthogonal to each other,
The four sleeves 64 are provided on the upper and lower sides of the pair of right and left 30b, respectively, and are fitted from above. In such a configuration, the upper and lower four positions of the stage 21A are held and fixed by the eight sleeves 64 and the pin members 63, so that the column scaffolding device 20 can be attached more stably.

【0013】[0013]

【考案の効果】以上説明したように本考案に係る柱用足
場装置は、柱用鉄骨の垂直な足場取付面に取付けられる
ピン支持部材にスリーブを上下2段に設け、これに対応
してステージにピン部材を上下2段に設け、各ピン部材
をスリーブに嵌挿させるように構成したので、柱用足場
装置が下方からの強風等によって浮き上がるのを確実に
防止することができ、また作業員のステージ上の移動に
よるステージの揺れを防止でき、作業の安全性を向上さ
せることができる。したがって、作業者は柱用足場装置
上で安心して作業を行なうことができる。また、ピン部
材を単にスリーブに上方から嵌挿するだけでよいため、
柱用足場装置の取付けも簡単且つ容易である。
As described above, in the scaffolding device for pillars according to the present invention, sleeves are provided in two stages, upper and lower, on the pin support member mounted on the vertical scaffolding mounting surface of the steel frame for pillars, and the stage is correspondingly provided. Since the pin members are provided in the upper and lower two stages and the respective pin members are fitted into the sleeves, it is possible to reliably prevent the scaffolding device for the pillar from being lifted up by a strong wind or the like from below, and also the worker. It is possible to prevent shaking of the stage due to movement on the stage, and improve work safety. Therefore, the worker can work on the pillar scaffolding device with peace of mind. Further, since it is only necessary to insert the pin member into the sleeve from above,
Installation of the pillar scaffolding device is also simple and easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係る柱用足場装置の一実施例を示す要
部断面図である。
FIG. 1 is a cross-sectional view of essential parts showing an embodiment of a scaffolding device for pillars according to the present invention.

【図2】同足場装置の側面図である。FIG. 2 is a side view of the scaffolding device.

【図3】同足場装置の正面図である。FIG. 3 is a front view of the scaffolding device.

【図4】同足場装置の平面図である。FIG. 4 is a plan view of the scaffolding device.

【図5】ピン支持部材の正面図である。FIG. 5 is a front view of a pin support member.

【図6】ピン支持部材の他の実施例を示す正面図であ
る。
FIG. 6 is a front view showing another embodiment of the pin support member.

【図7】本考案に係る柱用足場装置の他の実施例を示す
平面図である。
FIG. 7 is a plan view showing another embodiment of the scaffolding device for a pillar according to the present invention.

【図8】柱用足場装置の従来例を示す側面図である。FIG. 8 is a side view showing a conventional example of a pillar scaffolding device.

【符号の説明】[Explanation of symbols]

20 柱用足場装置 21 ステージ 23A、23B 補強部材 30 柱用鉄骨 30a 足場取付面 32 手摺 ピン部材 40A、40B、46A 50 ピン支持部材 52A〜52D スリーブ 20 Scaffolding device for pillar 21 Stage 23A, 23B Reinforcing member 30 Steel frame for pillar 30a Scaffold mounting surface 32 Handrail pin member 40A, 40B, 46A 50 Pin support member 52A to 52D Sleeve

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 建築工事における柱用鉄骨の一面に上下
二段に並設されたスリーブを有するピン支持部材を設
け、ステージには前記スリーブに対応する位置にピン部
材を設け、各ピン部材を前記ピン支持部材のスリーブ内
に上方から嵌挿するようにしたことを特徴とする柱用足
場装置。
1. A pin support member having sleeves arranged in parallel in two steps on one surface of a pillar steel frame in construction work is provided, and a pin member is provided on a stage at a position corresponding to the sleeve, and each pin member is provided. A scaffolding device for a pillar, wherein the scaffolding device for a pillar is fitted and inserted into a sleeve of the pin support member from above.
JP7624591U 1991-08-29 1991-08-29 Pillar scaffolding Expired - Lifetime JP2506631Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7624591U JP2506631Y2 (en) 1991-08-29 1991-08-29 Pillar scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7624591U JP2506631Y2 (en) 1991-08-29 1991-08-29 Pillar scaffolding

Publications (2)

Publication Number Publication Date
JPH0519434U JPH0519434U (en) 1993-03-12
JP2506631Y2 true JP2506631Y2 (en) 1996-08-14

Family

ID=13599802

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7624591U Expired - Lifetime JP2506631Y2 (en) 1991-08-29 1991-08-29 Pillar scaffolding

Country Status (1)

Country Link
JP (1) JP2506631Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154113A (en) * 2011-01-27 2012-08-16 Toda Constr Co Ltd Platform for high lift work
JP7232744B2 (en) * 2019-10-28 2023-03-03 鹿島建設株式会社 Structure to prevent overturning of shoring, Tunnel construction method, Shoring for tunnel construction, Sheath pipe assembly

Also Published As

Publication number Publication date
JPH0519434U (en) 1993-03-12

Similar Documents

Publication Publication Date Title
KR101654483B1 (en) The building is equipped with safety scaffold equipment
US8245816B2 (en) Integral safety system which can be used for construction
JP5160143B2 (en) Suspended scaffold structure
JP4683595B2 (en) Mounting method of handrail on frame scaffold
JP2506631Y2 (en) Pillar scaffolding
JP3027130B2 (en) Assembly structure of hanging scaffold
JP2909896B1 (en) Exterior body for slope moving device
JP4387568B2 (en) Temporary scaffold members such as overhang brackets
JP2807858B2 (en) Mountable work stage
JPH0829905B2 (en) Hoistway scaffolding equipment
JP3011939U (en) Push-pull support mounting jig and mounting structure
JPH07102788A (en) Temporary safety handrail
JP2545030Y2 (en) Hanging scaffolding frame
JPH0712541Y2 (en) Scaffolding equipment
JP2003314054A (en) Temporary scaffold for steel work
KR20190041976A (en) Coupling device for scaffolding pipes
JPH0532588Y2 (en)
EP1876315A1 (en) Integral safety system which can be used for construction
JP7426160B1 (en) Outrigger mounting structure on pillar
JPH06219669A (en) Elevator car assembling frame
JPH0443141B2 (en)
JP4321947B2 (en) Ladder equipment
JPH0447300Y2 (en)
JPH0541151Y2 (en)
JPH0738508Y2 (en) House structure