JP2023127211A - Transport facility - Google Patents

Transport facility Download PDF

Info

Publication number
JP2023127211A
JP2023127211A JP2022030849A JP2022030849A JP2023127211A JP 2023127211 A JP2023127211 A JP 2023127211A JP 2022030849 A JP2022030849 A JP 2022030849A JP 2022030849 A JP2022030849 A JP 2022030849A JP 2023127211 A JP2023127211 A JP 2023127211A
Authority
JP
Japan
Prior art keywords
section
target
temporary storage
article
holding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022030849A
Other languages
Japanese (ja)
Inventor
昌重 岩田
Masashige Iwata
和誠 木村
Kazumasa Kimura
浩章 中村
Hiroaki Nakamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daifuku Co Ltd
Original Assignee
Daifuku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daifuku Co Ltd filed Critical Daifuku Co Ltd
Priority to JP2022030849A priority Critical patent/JP2023127211A/en
Priority to PCT/JP2023/007191 priority patent/WO2023167159A1/en
Publication of JP2023127211A publication Critical patent/JP2023127211A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

To improve conveyance efficiency as the whole facility, in a transport facility which includes a circulation path in which a conveyance truck circulates in one direction.SOLUTION: A control system executes a relay unloading process in the case where an inter-section temporary placement part 6m in a vacant state exists on a downstream side of an object holding part 50 in a first section 21, in the case where an object article 9 is transported to an unloading part 7 by a transport truck 1. In the relay unloading process, the inter-section temporary placement part 6m in a vacant state is set as a first object temporary placement part 61t, and the object article 9 is received from the object holding part 50 and is delivered to the first object temporary placement part 61t in the first section 21. After that, the object article 9 is received from the first object temporary placement part 61t in a second section 22 and is delivered to the unloading part 7.SELECTED DRAWING: Figure 4B

Description

本発明は、物品を搬送する搬送台車と、前記搬送台車が一方向に移動する搬送経路と、前記物品を外部へ搬出する搬出部と、前記搬送台車を制御する制御システムと、を備えた搬送設備に関する。 The present invention provides a transport system that includes a transport vehicle that transports an article, a transport path along which the transport vehicle moves in one direction, an unloading section that transports the article to the outside, and a control system that controls the transport vehicle. Regarding equipment.

このような搬送設備の一例が、特許第6461359号公報(特許文献1)に開示されている。以下、背景技術の説明の欄において括弧内に示される符号は、特許文献1のものである。 An example of such a transport facility is disclosed in Japanese Patent No. 6461359 (Patent Document 1). Hereinafter, the symbols shown in parentheses in the column of explanation of the background art are those of Patent Document 1.

特許文献1に開示された搬送設備は、物品(30)を搬送する複数の搬送台車(110)と、複数の搬送台車(110)が循環移動するループ状の搬送経路(100)と、搬送経路(100)に物品(30)を搬入する搬入部(201)と、搬送経路(100)から物品(30)を搬出する搬出部(401)と、搬送経路(100)に隣接する位置において物品(30)を一時的に保管するバッファ(600)と、を備えている。 The conveyance equipment disclosed in Patent Document 1 includes a plurality of conveyance carts (110) for conveying articles (30), a loop-shaped conveyance path (100) along which the plurality of conveyance carts (110) circulate, and a conveyance path. (100); an unloading section (401) that unloads the article (30) from the transport route (100); 30) and a buffer (600) for temporarily storing the data.

特許文献1に開示された搬送設備では、複数の物品(30)が、搬入部(201)への到着順に、搬送経路(100)へと搬入される。そして、上記到着順が予め意図された正規の順番とは異なる場合には、搬送経路(100)内において、複数の物品(30)の順番を正規の順番に入れ替えるための処理が行われる。具体的には、搬送経路(100)上で水平方向に対向して配置される2つの搬送台車(110)間で物品(30)を受け渡すバイパス搬送を行うことで、搬送経路(100)に先に進入していた先行物品(30)を追い越すモード(a)を実行する。これにより、搬送経路(100)に後に進入した物品(30)の順番が繰り上げられる。また、先に搬送経路(100)に進入した先行物品(30)をバッファ(600)に一時的に保管し、それよりも後に搬送経路(100)に進入した物品(30)が上記先行物品(30)を追い越すまで待機するモード(b)を実行する。これにより、搬送経路(100)に先に進入していた先行物品(30)の順番が繰り下げられる。 In the conveyance equipment disclosed in Patent Document 1, a plurality of articles (30) are carried into the conveyance path (100) in the order of arrival at the carry-in section (201). If the arrival order is different from the pre-intended regular order, processing is performed to change the order of the plurality of articles (30) to the regular order within the transport route (100). Specifically, by performing bypass transport in which the article (30) is transferred between two transport carts (110) arranged horizontally opposite each other on the transport route (100), Mode (a) is executed to overtake the preceding article (30) that had entered earlier. As a result, the order of the article (30) that entered the conveyance path (100) later is moved up. Further, the preceding article (30) that entered the conveying route (100) first is temporarily stored in the buffer (600), and the article (30) that entered the conveying route (100) later 30) and executes mode (b) of waiting until the vehicle overtakes the vehicle. As a result, the order of the preceding article (30) that entered the conveyance path (100) first is moved down.

特許第6461359号公報Patent No. 6461359

上述のように、特許文献1に開示された搬送設備では、搬送経路(100)内において、複数の物品(30)の順番を正規の順番に入れ替えるための処理を行っている。しかし、特許文献1には、設備全体として搬送効率を向上させる点について詳細な開示は無い。 As described above, the conveyance equipment disclosed in Patent Document 1 performs a process for changing the order of the plurality of articles (30) into the regular order within the conveyance path (100). However, Patent Document 1 does not disclose in detail how to improve the transport efficiency of the entire equipment.

上記実状に鑑みて、搬送台車が一方向に循環する循環経路を備えた搬送設備において、設備全体として搬送効率を向上させることが望まれている。 In view of the above-mentioned circumstances, it is desired to improve the conveyance efficiency of the entire facility in a conveyance facility equipped with a circulation path in which the conveyance vehicle circulates in one direction.

物品を搬送する搬送台車と、
前記搬送台車が一方向に移動する搬送経路と、
前記物品が順次搬送されてきて保持される保持部を複数備えた保持装置と、
前記物品を外部へ搬出する搬出部と、
前記搬送台車を制御する制御システムと、を備えた搬送設備であって、
前記搬送経路は、前記搬出部に対応する搬出位置を通って前記搬送台車が一方向に循環する循環経路を形成しており、前記搬出位置に対して下流側に設定された第1区間と、前記第1区間よりも下流側かつ前記搬出位置よりも上流側に設定されていると共に前記第1区間に対して特定方向に離間して平行状に配置された第2区間と、を備え、
複数の前記保持部は、前記第1区間に沿って並ぶように配置され、
前記物品を一時的に保管可能な仮置き部が、前記搬送経路に沿って複数配置され、
複数の前記仮置き部には、前記第1区間と前記第2区間との前記特定方向の間において前記第1区間及び前記第2区間の双方に沿って並ぶように配置された両区間仮置き部が複数含まれ、
前記搬送台車は、前記搬送経路における、複数の前記保持部、複数の前記仮置き部、及び、前記搬出部のそれぞれに対応する位置において、それらと前記物品の受け渡しを行うことができるように構成され、
複数の前記保持部に保持された前記物品のうち1つを対象物品とし、複数の前記保持部に保持された前記物品のうちの前記対象物品以外の前記物品を非対象物品とし、前記対象物品が保持されている前記保持部を対象保持部として、
前記制御システムは、
前記搬送台車により前記対象物品を前記搬出部へ搬送する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が存在する場合には、当該空き状態の前記両区間仮置き部を第1対象仮置き部として、前記対象物品を前記対象保持部から受け取って前記第1区間内で前記第1対象仮置き部に引き渡し、その後、前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取って前記搬出部に引き渡す、中継搬出処理を前記搬送台車により実行し、
更に、前記中継搬出処理を実行する場合において、前記第1区間内で前記第1対象仮置き部に前記対象物品を引き渡した位置の下流側に前記非対象物品が保持された前記保持部である非対象保持部があり、かつ、前記非対象保持部の下流側であって前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取る位置の上流側に空き状態の前記仮置き部が存在する場合には、当該空き状態の前記仮置き部を第2対象仮置き部として、前記中継搬出処理の途中で、前記非対象物品を前記非対象保持部から受け取って前記第2対象仮置き部に引き渡す、中間搬送処理を前記搬送台車により実行する。
A transport vehicle for transporting goods;
a transport path along which the transport vehicle moves in one direction;
a holding device including a plurality of holding parts in which the articles are sequentially conveyed and held;
an unloading section that unloads the article to the outside;
A transport facility comprising: a control system for controlling the transport vehicle;
The conveyance path forms a circulation path in which the conveyance vehicle circulates in one direction through a carry-out position corresponding to the carry-out section, and includes a first section set on the downstream side with respect to the carry-out position; a second section that is set downstream of the first section and upstream of the carry-out position, and is spaced apart from and parallel to the first section in a specific direction;
The plurality of holding parts are arranged so as to line up along the first section,
A plurality of temporary storage parts capable of temporarily storing the articles are arranged along the conveyance route,
The plurality of temporary storage sections include temporary storage sections arranged along both the first section and the second section between the first section and the second section in the specific direction. Contains multiple parts,
The transport vehicle is configured to be able to transfer the article to and from the plurality of holding sections, the plurality of temporary storage sections, and the carrying-out section at positions corresponding to each of the holding sections, the plurality of temporary storage sections, and the carrying-out section on the transport route. is,
One of the articles held by the plurality of holding sections is a target article, the articles other than the target article among the articles held by the plurality of holding sections are set as non-target articles, and the target article is The holding part in which is held is the target holding part,
The control system includes:
When the target article is transported to the unloading section by the transport vehicle, if there is a temporary storage section in both sections in an empty state on the downstream side of the object holding section in the first section, the empty state The two section temporary storage sections of are used as first target temporary storage sections to receive the target article from the target holding section and deliver it to the first target temporary storage section within the first section, and then to the first target temporary storage section within the second section. performing a relay carry-out process using the transport trolley, in which the target article is received from the first target temporary storage unit and delivered to the carry-out unit;
Furthermore, when performing the relay carry-out process, the holding section holds the non-target article on the downstream side of the position where the target article is delivered to the first target temporary storage section within the first section. The temporary storage has a non-target holding section and is vacant on the downstream side of the non-target holding section and upstream of the position for receiving the target article from the first temporary storage section within the second section. If there is a temporary holding section, the vacant temporary storage section is set as a second target temporary storage section, and during the relay carrying out process, the non-target article is received from the non-target holding section and the second target storage section is set as the second target temporary storage section. An intermediate conveyance process for handing over to the temporary storage section is executed by the conveyance truck.

本構成によれば、搬出部との距離が保持部よりも近い仮置き部に、対象物品を一時的に配置することができる。そして、搬送台車は、対象物品を仮置き部に配置した後、対象物品を搬送していない移動中に、非対象物品を保持部から受け取って別の仮置き部に配置することができる。その後、搬送台車は、自らが仮置き部に配置した対象物品を第2区間において受け取り、適切に搬出部へ搬送することができる。上記において別の仮置き部に配置された非対象物品は、他の搬送台車にとっての対象物品となり得るため、他の搬送台車が当該非対象物品を搬出部へ搬送する際の搬送距離を短くできる。このように、本構成によれば、対象保持部から搬出部への対象物品の搬送を適切に行うことができると共に、その対象保持部から搬出部までの経路の移動中に、非対象物品を搬出部に近い位置に移動させることができる。従って、物品を搬出部へ搬送する場合の搬送効率を、設備全体として向上させることができる。 According to this configuration, the target article can be temporarily placed in the temporary storage section that is closer to the carrying-out section than the holding section. Then, after placing the target article in the temporary storage section, the transport vehicle can receive the non-target article from the holding section and place it in another temporary storage section while the transportation vehicle is not transporting the target article. Thereafter, the transport vehicle can receive the target article that it has placed in the temporary storage section in the second section, and can appropriately transport it to the unloading section. In the above, a non-target item placed in another temporary storage section can become a target article for another transport vehicle, so the transport distance when the other transport vehicle transports the non-target item to the unloading section can be shortened. . As described above, according to the present configuration, it is possible to appropriately transport the target article from the target holding part to the carrying out part, and also to transport non-target articles while moving along the path from the target holding part to the carrying out part. It can be moved to a position close to the unloading section. Therefore, it is possible to improve the transport efficiency of the entire equipment when transporting articles to the unloading section.

本開示に係る技術のさらなる特徴と利点は、図面を参照して記述する以下の例示的かつ非限定的な実施形態の説明によってより明確になるであろう。 Further features and advantages of the technology according to the present disclosure will become clearer from the following description of illustrative and non-limiting embodiments, written with reference to the drawings.

搬送設備の側面図Side view of conveyance equipment 搬送台車の側面図Side view of the transport vehicle 制御ブロック図Control block diagram ケース1において実行される処理の説明図Explanatory diagram of the process executed in case 1 ケース1において実行される処理の説明図Explanatory diagram of the process executed in case 1 ケース2において実行される処理の説明図Explanatory diagram of the process executed in case 2 ケース3において実行される処理の説明図Explanatory diagram of the process executed in case 3 ケース3において実行される処理の説明図Explanatory diagram of the process executed in case 3 仮置き部予約処理が実行される場合の説明図Explanatory diagram when temporary storage section reservation processing is executed グループ出庫処理が実行される場合の説明図Explanatory diagram when group issue processing is executed グループ出庫処理が実行される場合の説明図Explanatory diagram when group issue processing is executed 制御システムが実行する処理の手順を示すフローチャートFlowchart showing the steps of processing performed by the control system

搬送設備は、物品を搬送するための設備である。搬送対象とされる物品は、商品を収容する容器(折り畳みコンテナや段ボール箱等)や商品を載置するパレット、或いは、商品そのものであっても良い。なお、商品には、完成品や仕掛品が含まれる。以下、搬送設備の実施形態について図面を参照して説明する。 The transportation equipment is equipment for transporting articles. The object to be transported may be a container (such as a folding container or a cardboard box) that stores the product, a pallet on which the product is placed, or the product itself. Note that products include finished products and work in progress. Hereinafter, embodiments of the transport facility will be described with reference to the drawings.

図1に示すように、搬送設備100は、物品9を搬送する搬送台車1と、搬送台車1が一方向に移動する搬送経路2と、物品9が順次搬送されてきて保持される保持部50を複数備えた保持装置5と、物品9を外部へ搬出する搬出部7と、搬送台車1を制御する制御システム8(図3参照)と、を備えている。本実施形態では、搬送設備100は、搬送台車1を複数備えている。 As shown in FIG. 1, the transportation equipment 100 includes a transportation vehicle 1 for transporting articles 9, a transportation path 2 for the transportation vehicle 1 to move in one direction, and a holding section 50 for sequentially conveying and holding the articles 9. The holding device 5 includes a plurality of holding devices 5, a carry-out section 7 for carrying out articles 9 to the outside, and a control system 8 (see FIG. 3) for controlling the transport vehicle 1. In this embodiment, the transport facility 100 includes a plurality of transport vehicles 1.

搬送経路2は、搬出部7に対応する搬出位置70を通って搬送台車1が一方向に循環する循環経路を形成しており、搬出位置70に対して下流側(搬送方向の下流側。以下同じ。)に設定された第1区間21と、第1区間21よりも下流側かつ搬出位置70よりも上流側(搬送方向の上流側。以下同じ。)に設定されていると共に第1区間21に対して特定方向Xに離間して平行状に配置された第2区間22と、を備えている。 The conveyance path 2 forms a circulation path in which the conveyance vehicle 1 circulates in one direction through a carry-out position 70 corresponding to the carry-out section 7, and is on the downstream side (downstream side in the conveyance direction; hereinafter referred to as the downstream side in the conveyance direction) with respect to the carry-out position 70. ), and the first section 21 is set downstream from the first section 21 and upstream from the carry-out position 70 (upstream side in the transport direction; the same applies hereinafter). A second section 22 is spaced apart from and parallel to the specific direction X.

本実施形態では、搬送経路2は、搬送台車1が鉛直面内に沿って循環する循環経路を形成している。搬送経路2の第1区間21及び第2区間22は、上下方向に沿って延在している。本例では、搬送経路2は、特定方向Xに沿って延在する第1接続区間21c及び第2接続区間22cを備えている。第1接続区間21c及び第2接続区間22cのそれぞれは、第1区間21と第2区間22とを接続している。本例では、第1接続区間21cと第2接続区間22cとは、互いに上下方向に離間して配置されている。第1接続区間21cは、第1区間21の上端部と第2区間22の上端部とを接続している。第2接続区間22cは、第1区間21の下端部と第2区間22の下端部とを接続している。 In this embodiment, the transport path 2 forms a circulation path along which the transport vehicle 1 circulates in a vertical plane. The first section 21 and the second section 22 of the conveyance path 2 extend in the vertical direction. In this example, the conveyance path 2 includes a first connection section 21c and a second connection section 22c that extend along the specific direction X. Each of the first connection section 21c and the second connection section 22c connects the first section 21 and the second section 22. In this example, the first connection section 21c and the second connection section 22c are arranged vertically apart from each other. The first connection section 21c connects the upper end of the first section 21 and the upper end of the second section 22. The second connection section 22c connects the lower end of the first section 21 and the lower end of the second section 22.

以下の説明では、水平面に沿う特定の方向を上記の「特定方向X」とし、特定方向Xに対して平面視で直交する方向を「直交方向Y」とする。本例では、特定方向Xに直交する水平方向を直交方向Yとしている。 In the following description, a specific direction along the horizontal plane will be referred to as the above-mentioned "specific direction X", and a direction orthogonal to the specific direction X in a plan view will be referred to as an "orthogonal direction Y". In this example, the horizontal direction orthogonal to the specific direction X is defined as the orthogonal direction Y.

本実施形態では、搬送経路2は、直交方向Yに離間して配置された一対の駆動レール3と、直交方向Yに離間して配置された一対の補助レール4と、を備えている。本例では、駆動レール3及び補助レール4は、第1区間21、第1接続区間21c、第2区間22、及び第2接続区間22cに沿って配置されており、直交方向Y視でループ状を成すように形成されている。駆動レール3と補助レール4とは、直交方向Y視において、一部(図示の例では4箇所)が重複しつつ互いにずれて配置されている。 In this embodiment, the transport path 2 includes a pair of drive rails 3 spaced apart from each other in the orthogonal direction Y, and a pair of auxiliary rails 4 spaced apart from each other in the orthogonal direction Y. In this example, the drive rail 3 and the auxiliary rail 4 are arranged along the first section 21, the first connection section 21c, the second section 22, and the second connection section 22c, and are arranged in a loop shape when viewed in the orthogonal direction Y. It is formed to form a When viewed in the orthogonal direction Y, the drive rail 3 and the auxiliary rail 4 are arranged offset from each other while partially overlapping (four locations in the illustrated example).

図2に示すように、駆動レール3は、搬送台車1の後述する駆動輪12を案内するように構成されている。本実施形態では、駆動レール3は、搬送経路2に沿って設けられたレール側ギヤ部30を有している。レール側ギヤ部30は、搬送台車1の駆動輪12に噛み合うように構成されている。図示の例では、駆動レール3は、搬送台車1の駆動輪12が配置される内部空間を有している。そして、レール側ギヤ部30は、駆動レール3の内面に設けられている。 As shown in FIG. 2, the drive rail 3 is configured to guide drive wheels 12, which will be described later, of the transport vehicle 1. In this embodiment, the drive rail 3 has a rail-side gear section 30 provided along the conveyance path 2. The rail-side gear section 30 is configured to mesh with the drive wheels 12 of the transport vehicle 1. In the illustrated example, the drive rail 3 has an internal space in which the drive wheels 12 of the transport vehicle 1 are arranged. The rail-side gear portion 30 is provided on the inner surface of the drive rail 3.

本実施形態では、補助レール4は、搬送台車1の後述する第1補助輪13及び第2補助輪14を案内するように構成されている。補助レール4は、搬送経路2に沿って設けられた一対の案内面40を有している。図示の例では、補助レール4は、搬送台車1の第1補助輪13及び第2補助輪14が配置される内部空間を有している。一対の案内面40は、補助レール4の内部空間において、レール延在方向に直交する方向に対向している。一対の案内面40のレール延在方向に直交する方向の間隔は、第1補助輪13や第2補助輪14が一対の案内面40の双方に同時に接触しない間隔に設定されている。一対の案内面40は、補助レール4の内部空間において、搬送台車1の第1補助輪13及び第2補助輪14を両側から挟むように構成されている。 In this embodiment, the auxiliary rail 4 is configured to guide a first auxiliary wheel 13 and a second auxiliary wheel 14, which will be described later, of the transport vehicle 1. The auxiliary rail 4 has a pair of guide surfaces 40 provided along the conveyance path 2. In the illustrated example, the auxiliary rail 4 has an internal space in which the first auxiliary wheels 13 and the second auxiliary wheels 14 of the transport vehicle 1 are arranged. The pair of guide surfaces 40 face each other in a direction perpendicular to the rail extending direction in the internal space of the auxiliary rail 4. The interval between the pair of guide surfaces 40 in the direction perpendicular to the rail extending direction is set to such a distance that the first auxiliary wheel 13 and the second auxiliary wheel 14 do not contact both of the pair of guide surfaces 40 at the same time. The pair of guide surfaces 40 are configured to sandwich the first auxiliary wheel 13 and the second auxiliary wheel 14 of the transport vehicle 1 from both sides in the internal space of the auxiliary rail 4.

図1に示すように、保持装置5は、搬送経路2に対して特定方向Xの一方側に隣接して配置されている。複数の保持部50は、第1区間21に沿って並ぶように配置されている。本実施形態では、複数の保持部50は、上下方向に沿って並ぶように配置されている。複数の保持部50のそれぞれは、搬送経路2を移動している搬送台車1との間で物品9が移載され得る移載対象箇所の1つである。保持装置5は、例えば、自動倉庫に保管されている物品9を出庫するための装置とされる。この場合、各保持部50には、自動倉庫から出庫される物品9が順次搬送されてくる。 As shown in FIG. 1, the holding device 5 is disposed adjacent to the transport path 2 on one side in the specific direction X. As shown in FIG. The plurality of holding parts 50 are arranged so as to be lined up along the first section 21. In this embodiment, the plurality of holding parts 50 are arranged so as to be lined up along the vertical direction. Each of the plurality of holding parts 50 is one of the transfer target locations where the article 9 can be transferred to and from the transport vehicle 1 moving on the transport route 2 . The holding device 5 is, for example, a device for taking out articles 9 stored in an automated warehouse. In this case, the articles 9 taken out from the automated warehouse are sequentially conveyed to each holding section 50.

複数の保持部50のそれぞれは、物品9を特定方向Xに沿って搬送するように構成されている。これにより、複数の保持部50のそれぞれは、物品9を搬送経路2に隣接する位置に順次搬送可能であると共に、搬送台車1に対して物品9を引き渡すことが可能となっている。例えば、複数の保持部50のそれぞれは、特定方向Xに沿って物品9を搬送するコンベヤを備えている。 Each of the plurality of holding sections 50 is configured to transport the article 9 along the specific direction X. Thereby, each of the plurality of holding sections 50 can sequentially transport the article 9 to a position adjacent to the transport path 2, and can also deliver the article 9 to the transport vehicle 1. For example, each of the plurality of holding units 50 includes a conveyor that conveys the article 9 along the specific direction X.

本実施形態では、複数の保持部50のそれぞれには、物品9の有無を検出する在荷センサ50D(図3参照)が設けられている。後述するように、在荷センサ50Dによって検出された、保持部50における物品9の有無の情報は、制御システム8に送信される。 In this embodiment, each of the plurality of holding parts 50 is provided with an inventory sensor 50D (see FIG. 3) that detects the presence or absence of the article 9. As will be described later, information about the presence or absence of the article 9 in the holding section 50, which is detected by the inventory sensor 50D, is transmitted to the control system 8.

搬出部7は、搬送経路2を移動している搬送台車1との間で物品9が移載され得る移載対象箇所の1つである。搬出部7は、搬送経路2のいずれかの箇所に配置されている。本例では、搬出部7は、特定方向Xにおいて、搬送経路2を挟んで保持装置5とは反対側に配置されている。換言すれば、上述のように、保持装置5は、搬送経路2に対して特定方向Xの一方側に隣接して配置されている。そして、搬出部7は、搬送経路2に対して特定方向Xの他方側に隣接して配置されている。 The unloading section 7 is one of the locations where the article 9 can be transferred to and from the transport vehicle 1 moving on the transport route 2 . The carry-out section 7 is arranged somewhere on the conveyance path 2. In this example, the unloading section 7 is disposed on the opposite side of the holding device 5 across the conveyance path 2 in the specific direction X. In other words, as described above, the holding device 5 is disposed adjacent to the transport path 2 on one side in the specific direction X. The unloading unit 7 is disposed adjacent to the other side of the specific direction X with respect to the transport route 2 .

搬出部7は、物品9を特定方向Xに沿って搬送するように構成されている。これにより、搬出部7は、搬送台車1から適切に物品9を受け取ることが可能であると共に、受け取った物品9を次の工程が行われる場所(例えば、物品9から商品を取り出すピッキング作業が行われる場所)等に搬送可能となっている。例えば、搬出部7は、特定方向Xに沿って物品9を搬送するコンベヤを備えている。 The unloading section 7 is configured to transport the article 9 along a specific direction X. As a result, the carry-out section 7 can appropriately receive the articles 9 from the transport vehicle 1, and also transfer the received articles 9 to a place where the next process will be performed (for example, a picking operation to take out the articles from the articles 9). It can be transported to other places such as For example, the carry-out section 7 includes a conveyor that conveys the article 9 along the specific direction X.

物品9を一時的に保管可能な仮置き部6が、搬送経路2に沿って複数配置されている。仮置き部6は、搬送経路2を移動している搬送台車1との間で物品9が移載され得る移載対象箇所の1つである。搬送台車1が保持部50から受け取った物品9を仮置き部6に一時的に保管することで、保持部50に搬送されてきた物品9が保持部50に長く留まることを抑制しつつ、保持部50からの物品9の搬出順序とは異なる順序で、複数の物品9を搬出部7に搬送することができる。 A plurality of temporary storage units 6 in which articles 9 can be temporarily stored are arranged along the conveyance path 2. The temporary storage section 6 is one of the transfer target locations where the article 9 can be transferred to and from the transport vehicle 1 moving on the transport route 2. By temporarily storing the article 9 that the transport vehicle 1 receives from the holding section 50 in the temporary storage section 6, the article 9 that has been conveyed to the holding section 50 can be held while suppressing it from remaining in the holding section 50 for a long time. A plurality of articles 9 can be transported to the discharge section 7 in a different order from the order in which the articles 9 are discharged from the section 50.

本実施形態では、複数の仮置き部6のそれぞれには、物品9の有無を検出する在荷センサ60D(図3参照)が設けられている。後述するように、在荷センサ60Dによって検出された、仮置き部6における物品9の有無の情報は、制御システム8に送信される。 In this embodiment, each of the plurality of temporary storage sections 6 is provided with an inventory sensor 60D (see FIG. 3) that detects the presence or absence of the article 9. As will be described later, information about the presence or absence of the article 9 in the temporary storage section 6, which is detected by the inventory sensor 60D, is transmitted to the control system 8.

複数の仮置き部6には、第1区間21と第2区間22との特定方向Xの間において第1区間21及び第2区間22の双方に沿って並ぶように配置された両区間仮置き部6mが複数含まれる。本実施形態では、複数の両区間仮置き部6mは、第1区間21と第2区間22との特定方向Xの間において、上下方向に沿って並ぶように配置されている。 The plurality of temporary storage sections 6 include both section temporary storages arranged along both the first section 21 and the second section 22 between the first section 21 and the second section 22 in the specific direction X. A plurality of portions 6m are included. In this embodiment, the plurality of both section temporary storage parts 6m are arranged so as to line up in the vertical direction between the first section 21 and the second section 22 in the specific direction X.

複数の両区間仮置き部6mのそれぞれは、物品9を特定方向Xに沿って搬送するように構成されている。これにより、複数の両区間仮置き部6mのそれぞれは、第1区間21にある搬送台車1から物品9を受け取ることが可能であると共に、第2区間22にある搬送台車1へ物品9を引き渡すことが可能となっている。例えば、複数の両区間仮置き部6mのそれぞれは、特定方向Xに沿って物品9を搬送するコンベヤを備えている。 Each of the plurality of both section temporary storage sections 6m is configured to transport the article 9 along the specific direction X. As a result, each of the plurality of temporary storage sections 6m in both sections can receive the article 9 from the carrier 1 in the first section 21 and deliver the article 9 to the carrier 1 in the second section 22. It is now possible. For example, each of the plurality of both section temporary storage sections 6m is equipped with a conveyor that conveys the article 9 along the specific direction X.

本実施形態では、複数の仮置き部6には、第2区間22に沿って並ぶように配置され、第2区間22内に位置する搬送台車1とのみ物品9の受け渡しが行われる片側仮置き部6sが更に含まれる。本実施形態では、片側仮置き部6sは、特定方向Xにおいて、第2区間22を挟んで両区間仮置き部6mとは反対側に配置されている。換言すれば、両区間仮置き部6mは、第2区間22に対して特定方向Xの一方側に隣接して配置されている。そして、片側仮置き部6sは、第2区間22に対して特定方向Xの他方側に隣接して配置されている。 In the present embodiment, the plurality of temporary storage units 6 include one-sided temporary storage where articles 9 are arranged in line along the second section 22 and the articles 9 are transferred only to the transport cart 1 located within the second section 22. A section 6s is further included. In the present embodiment, the one-side temporary storage section 6s is disposed in the specific direction X on the opposite side of the two-section temporary storage section 6m with the second section 22 in between. In other words, both section temporary storage parts 6m are arranged adjacent to one side of the specific direction X with respect to the second section 22. The one-sided temporary storage section 6s is arranged adjacent to the second section 22 on the other side in the specific direction X.

本実施形態では、複数の片側仮置き部6sが搬送経路2に沿って配置されている。本例では、複数の片側仮置き部6sは、上下方向に沿って並ぶように配置されている。 In this embodiment, a plurality of one-sided temporary storage parts 6s are arranged along the conveyance path 2. In this example, the plurality of one-sided temporary storage parts 6s are arranged so as to be lined up along the vertical direction.

複数の片側仮置き部6sのそれぞれは、物品9を特定方向Xに沿って搬送するように構成されている。これにより、複数の片側仮置き部6sのそれぞれは、第2区間22にある搬送台車1との間で物品9の受け渡しが可能となっている。例えば、複数の片側仮置き部6sのそれぞれは、特定方向Xに沿って物品9を搬送するコンベヤを備えている。 Each of the plurality of one-sided temporary storage sections 6s is configured to transport the article 9 along the specific direction X. Thereby, each of the plurality of one-sided temporary storage parts 6s can receive and deliver the article 9 to and from the transport vehicle 1 in the second section 22. For example, each of the plurality of one-sided temporary storage sections 6s includes a conveyor that conveys the article 9 along the specific direction X.

搬送台車1は、搬送経路2における、複数の保持部50、複数の仮置き部6、及び、搬出部7のそれぞれに対応する位置において、それらと物品9の受け渡しを行うことができるように構成されている。すなわち、複数の保持部50、複数の仮置き部6、及び、搬出部7が、搬送台車1との間で物品9を移載可能な移載対象箇所である。 The transport vehicle 1 is configured to be able to transfer the article 9 to the plurality of holding sections 50, the plurality of temporary storage sections 6, and the carrying-out section 7 at positions corresponding to each of them on the transport path 2. has been done. That is, the plurality of holding sections 50, the plurality of temporary storage sections 6, and the unloading section 7 are transfer target locations to which the article 9 can be transferred to and from the transport vehicle 1.

この搬送設備100では、搬送台車1は、複数の保持部50のうちいずれかの保持部50に保持されている物品9を、搬出部7へ搬送するように構成されている。例えば、搬送台車1は、保持部50から搬出部7へ移動する間に、複数の仮置き部6(両区間仮置き部6m又は片側仮置き部6s)のいずれかに物品9を搬送する。 In this transport facility 100 , the transport vehicle 1 is configured to transport the article 9 held in any one of the plurality of holding parts 50 to the unloading part 7 . For example, while moving from the holding section 50 to the unloading section 7, the transport vehicle 1 transports the article 9 to one of the plurality of temporary storage sections 6 (both section temporary storage sections 6m or one side temporary storage section 6s).

図2に示すように、本実施形態では、搬送台車1は、本体部10と、上記の各移載対象箇所との間で物品9を移載する移載部11と、一対の駆動レール3のそれぞれのレール側ギヤ部30に噛み合う車輪側ギヤ部12gを備えた駆動輪12と、一対の補助レール4のそれぞれに案内される第1補助輪13と、一対の補助レール4のそれぞれに案内される第2補助輪14と、を備えている。 As shown in FIG. 2, in the present embodiment, the carrier 1 includes a main body 10, a transfer unit 11 that transfers articles 9 between the above-mentioned respective transfer target locations, and a pair of drive rails 3. A drive wheel 12 equipped with a wheel-side gear part 12g that meshes with each rail-side gear part 30, a first auxiliary wheel 13 guided by each of a pair of auxiliary rails 4, and a first auxiliary wheel 13 guided by each of a pair of auxiliary rails 4. A second auxiliary wheel 14 is provided.

移載部11は、特定方向Xに沿って物品9を移動させるように構成されている。これにより、移載部11は、搬送台車1に対して特定方向Xに隣接して配置された各移載対象箇所との間で、物品9を移載可能となっている。本例では、移載部11は、コンベヤを用いて構成されている。但し、移載部11は、フォーク機構やチャック機構等を備えた周知の移載手段を用いて構成されていても良い。 The transfer unit 11 is configured to move the article 9 along a specific direction X. Thereby, the transfer unit 11 can transfer the article 9 to and from each transfer target location arranged adjacent to the specific direction X with respect to the transport vehicle 1. In this example, the transfer section 11 is configured using a conveyor. However, the transfer section 11 may be configured using a known transfer means including a fork mechanism, a chuck mechanism, or the like.

一対の駆動輪12は、本体部10から直交方向Yの外側に突出する駆動軸12aに連結されている。駆動輪12は、直交方向Yに沿う軸心まわりに回転するように構成されている。駆動軸12aは、モータ等の駆動源(不図示)によって回転駆動される。 The pair of drive wheels 12 are connected to a drive shaft 12a that protrudes outward from the main body 10 in the orthogonal direction Y. The drive wheel 12 is configured to rotate around an axis along the orthogonal direction Y. The drive shaft 12a is rotationally driven by a drive source (not shown) such as a motor.

本実施形態では、一対の第1補助輪13及び一対の第2補助輪14は、本体部10に対して回転自在に支持された非駆動輪である。第1補助輪13及び第2補助輪14は、直交方向Yに沿う軸心まわりに回転するように構成されている。第1補助輪13及び第2補助輪14は、補助レール4に備えられた一対の案内面40の間に配置され、案内面40との接触によって回転するように構成されている。上記のように、一対の第1補助輪13及び一対の第2補助輪14が非駆動輪であるため、搬送台車1に搭載される駆動源の数を少なく抑えることができる。従って、搬送台車1の低コスト化を図ることが可能となっている。 In this embodiment, the pair of first auxiliary wheels 13 and the pair of second auxiliary wheels 14 are non-driven wheels rotatably supported with respect to the main body 10. The first auxiliary wheel 13 and the second auxiliary wheel 14 are configured to rotate around an axis along the orthogonal direction Y. The first auxiliary wheel 13 and the second auxiliary wheel 14 are arranged between a pair of guide surfaces 40 provided on the auxiliary rail 4, and are configured to rotate upon contact with the guide surface 40. As described above, since the pair of first auxiliary wheels 13 and the pair of second auxiliary wheels 14 are non-driven wheels, the number of drive sources mounted on the transport vehicle 1 can be kept small. Therefore, it is possible to reduce the cost of the transport vehicle 1.

本実施形態では、駆動輪12と第1補助輪13と第2補助輪14とが、上下方向の異なる位置に配置されている。すなわち、搬送台車1における直交方向Yの両側のそれぞれにおいて、3つの車輪が、上下方向の異なる位置で駆動レール3又は補助レール4によって支持されている。これにより、搬送台車1が上下方向に対して傾くことを抑制し易くなっている。 In this embodiment, the drive wheel 12, the first auxiliary wheel 13, and the second auxiliary wheel 14 are arranged at different positions in the vertical direction. That is, on each of both sides of the transport vehicle 1 in the orthogonal direction Y, three wheels are supported by the drive rail 3 or the auxiliary rail 4 at different positions in the vertical direction. Thereby, it is easy to suppress tilting of the transport vehicle 1 in the vertical direction.

本実施形態では、駆動輪12に対して特定方向Xに離間した位置において、第1補助輪13と第2補助輪14とが上下方向に離間して配置されている。そして、第1補助輪13と第2補助輪14との上下方向の間に、駆動輪12が配置されている。これにより、搬送台車1が上下方向に対して傾こうとした場合に生じるモーメントを、第1補助輪13と第2補助輪14とが案内面40に接触することによって受け止めることができる。そのため、搬送台車1の傾きに起因して駆動輪12に負荷が掛かることを回避することができる。従って、搬送台車1の傾きを抑制しつつ、搬送台車1が搬送経路2に沿って移動するための推進力を適切に付与し易い。 In the present embodiment, the first auxiliary wheel 13 and the second auxiliary wheel 14 are arranged apart from each other in the vertical direction at a position spaced apart from the drive wheel 12 in the specific direction X. The drive wheel 12 is arranged between the first auxiliary wheel 13 and the second auxiliary wheel 14 in the vertical direction. As a result, the first auxiliary wheel 13 and the second auxiliary wheel 14 contact the guide surface 40 to absorb the moment that occurs when the transport vehicle 1 tries to tilt in the vertical direction. Therefore, it is possible to avoid applying a load to the drive wheels 12 due to the inclination of the transport vehicle 1. Therefore, while suppressing the inclination of the transport vehicle 1, it is easy to appropriately apply the propulsion force for the transport vehicle 1 to move along the transport route 2.

図3に示すように、搬送設備100は、設備全体を統括して管理する統括制御装置80と、複数の搬送台車1のそれぞれに搭載される搬送制御装置81と、を備えている。本実施形態では、統括制御装置80と複数の搬送制御装置81とが、制御システム8の少なくとも一部を構成している。制御システム8(本例では、統括制御装置80及び搬送制御装置81)は、例えば、マイクロコンピュータ等のプロセッサ、メモリ等の周辺回路等を備えている。そして、これらのハードウェアとコンピュータ等のプロセッサ上で実行されるプログラムとの協働により、各機能が実現される。 As shown in FIG. 3, the transport equipment 100 includes a general control device 80 that centrally manages the entire equipment, and a transport control device 81 mounted on each of the plurality of transport vehicles 1. In this embodiment, the overall control device 80 and the plurality of transport control devices 81 constitute at least a part of the control system 8. The control system 8 (in this example, the overall control device 80 and the transport control device 81) includes, for example, a processor such as a microcomputer, peripheral circuits such as a memory, and the like. Each function is realized through cooperation between these hardware and a program executed on a processor such as a computer.

本実施形態では、複数の搬送台車1のそれぞれは、自らの現在位置を検出する位置検出部15を備えている。また本例では、図1に示すように、保持部50、仮置き部6、及び搬出部7などの移載対象箇所に対応した位置に被検出部25が設けられている。被検出部25は、当該被検出部25が配置された位置のアドレス情報を保持している。搬送台車1は、被検出部25に保持されたアドレス情報を位置検出部15により読み取ることで、自らの現在位置を検出することができる。例えば、被検出部25として、1次元コード又は2次元コードを用い、位置検出部15として、1次元コードリーダ又は2次元コードリーダを用いることができる。 In this embodiment, each of the plurality of transport vehicles 1 includes a position detection section 15 that detects its own current position. Further, in this example, as shown in FIG. 1, the detected portion 25 is provided at a position corresponding to a transfer target location such as the holding portion 50, the temporary storage portion 6, and the unloading portion 7. The detected part 25 holds address information of the position where the detected part 25 is placed. The transport vehicle 1 can detect its own current position by having the position detection unit 15 read the address information held in the detected unit 25 . For example, a one-dimensional code or a two-dimensional code can be used as the detected part 25, and a one-dimensional code reader or a two-dimensional code reader can be used as the position detection part 15.

本実施形態では、被検出部25は、搬送経路2に設けられている。具体的には、被検出部25は、搬送経路2における、保持部50、仮置き部6、及び搬出部7などの移載対象箇所に対して上流側に隣接する位置に設けられている。これにより、搬送台車1は、目的の移載対象箇所に到着する前に自らの現在位置を把握できる。従って、搬送台車1は、目的の移載対象箇所に到着する前に、減速などの到着準備を行うことができる。 In this embodiment, the detected portion 25 is provided on the transport path 2 . Specifically, the detected portion 25 is provided at a position adjacent to the upstream side of transfer target locations such as the holding portion 50 , the temporary storage portion 6 , and the unloading portion 7 on the conveyance path 2 . Thereby, the transport vehicle 1 can grasp its current position before arriving at the target transfer target location. Therefore, the transport vehicle 1 can prepare for arrival, such as decelerating, before arriving at the intended transfer target location.

搬送台車1が位置検出部15により取得した自らの現在位置の情報は、搬送制御装置81を介して統括制御装置80に送信される。そのため、統括制御装置80は、搬送経路2における各搬送台車1の現在位置を把握可能となっている。 Information about the current position of the transport vehicle 1 acquired by the position detection unit 15 is transmitted to the overall control device 80 via the transport control device 81 . Therefore, the overall control device 80 can grasp the current position of each transport vehicle 1 on the transport route 2.

図3に示すように、本実施形態では、複数の保持部50のそれぞれに、物品9の有無を検出する在荷センサ50Dが設けられている。在荷センサ50Dによって検出された、保持部50における物品9の有無の情報は、統括制御装置80に送信される。そのため、統括制御装置80は、複数の保持部50における物品9の有無を把握可能となっている。 As shown in FIG. 3, in this embodiment, each of the plurality of holding parts 50 is provided with an inventory sensor 50D that detects the presence or absence of the article 9. Information on the presence or absence of the article 9 in the holding section 50 detected by the inventory sensor 50D is transmitted to the overall control device 80. Therefore, the overall control device 80 is able to grasp the presence or absence of the articles 9 in the plurality of holding sections 50.

本実施形態では、複数の仮置き部6のそれぞれに、物品9の有無を検出する在荷センサ60Dが設けられている。在荷センサ60Dによって検出された、仮置き部6における物品9の有無の情報は、統括制御装置80に送信される。そのため、統括制御装置80は、複数の仮置き部6における物品9の有無を把握可能となっている。 In this embodiment, each of the plurality of temporary storage sections 6 is provided with an inventory sensor 60D that detects the presence or absence of the article 9. Information about the presence or absence of the article 9 in the temporary storage section 6, which is detected by the inventory sensor 60D, is transmitted to the overall control device 80. Therefore, the overall control device 80 is able to grasp the presence or absence of the articles 9 in the plurality of temporary storage sections 6.

制御システム8は、複数の保持部50のそれぞれに設けられた在荷センサ50Dから取得した情報に基づいて、複数の保持部50のうちいずれかの保持部50に保持されている物品9を搬出部7へ搬送するように、搬送台車1を制御する。 The control system 8 carries out the article 9 held in any one of the plurality of holding parts 50 based on the information acquired from the inventory sensor 50D provided in each of the plurality of holding parts 50. The transport vehicle 1 is controlled to transport the material to the section 7.

また、制御システム8は、複数の仮置き部6(両区間仮置き部6m又は片側仮置き部6s)のそれぞれに設けられた在荷センサ60Dから取得した情報に基づいて、搬送台車1が保持部50から搬出部7へ移動する間に複数の仮置き部6のいずれかに物品9を搬送するように、搬送台車1を制御する。 In addition, the control system 8 controls the transport vehicle 1 based on the information acquired from the inventory sensors 60D provided in each of the plurality of temporary storage sections 6 (both section temporary storage sections 6m or one side temporary storage section 6s). The carriage 1 is controlled so that the article 9 is conveyed to any one of the plurality of temporary storage sections 6 while being moved from the section 50 to the unloading section 7 .

図1に示すように、制御システム8は、搬出部7へ搬送すべき物品9を、各搬送台車1に割り当てる。図1に示す例において、物品9に付された文字(A,B,C…)と搬送台車1に付された文字(A,B,C…)とが対応している。例えば、物品9(D)は、搬送台車1(D)に対応している。すなわち、搬送台車1(D)には、制御システム8によって物品9(D)が割り当てられている。この場合、搬送台車1(D)は、物品9(D)を保持部50から搬出部7まで搬送する。なお、図1において物品9や搬送台車1に付されている文字(A,B,C…)は、実際には存在しないものである。ここでは、説明の便宜上そのような文字を図示している。 As shown in FIG. 1, the control system 8 assigns articles 9 to be transported to the unloading section 7 to each transport vehicle 1. In the example shown in FIG. 1, the letters (A, B, C...) attached to the article 9 correspond to the letters (A, B, C...) attached to the transport vehicle 1. For example, article 9 (D) corresponds to transport vehicle 1 (D). That is, the article 9 (D) is assigned to the transport vehicle 1 (D) by the control system 8 . In this case, the transport vehicle 1 (D) transports the article 9 (D) from the holding section 50 to the unloading section 7 . Note that the letters (A, B, C, . . . ) attached to the articles 9 and the transport vehicle 1 in FIG. 1 do not actually exist. Here, such characters are illustrated for convenience of explanation.

本明細書では、複数の保持部50に保持された物品9のうち1つを対象物品9とし、複数の保持部50に保持された物品9のうちの対象物品9以外の物品9を非対象物品9とし、対象物品9が保持されている保持部50を対象保持部50とする。複数の搬送台車1のそれぞれを対象搬送台車1として、制御システム8は、対象搬送台車1に対象物品9を割り当てる。図1に示す例では、搬送台車1(D)に着目した場合に、当該搬送台車1(D)に割り当てられた物品9(D)が、対象物品9である。そして、物品9(D)が保持されている保持部50が、対象保持部50である。すなわち、対象物品9、非対象物品9、及び対象保持部50は、複数の搬送台車1のうちいずれが対象搬送台車1とされるかによって変わる概念である。 In this specification, one of the articles 9 held by the plurality of holding parts 50 is referred to as a target article 9, and articles 9 other than the target article 9 among the articles 9 held by the plurality of holding parts 50 are referred to as non-target articles. It is assumed that the article 9 is the object 9, and the holding section 50 in which the target object 9 is held is the object holding section 50. The control system 8 assigns the target article 9 to each of the plurality of transport vehicles 1 as the target transport vehicle 1 . In the example shown in FIG. 1, when focusing on the transport vehicle 1 (D), the target article 9 is the article 9 (D) assigned to the transport vehicle 1 (D). The holding section 50 holding the article 9(D) is the object holding section 50. That is, the target article 9, the non-target article 9, and the target holding part 50 are concepts that change depending on which of the plurality of transport vehicles 1 is designated as the target transport vehicle 1.

本実施形態では、制御システム8は、対象搬送台車1が搬送中であった物品9を搬出部7に引き渡した後、最も上流側に配置された保持部50に到達するまでの間に、対象搬送台車1に搬送させる対象物品9を指定する。図1に示す例では、物品9(V)を搬出部7に引き渡した後の対象搬送台車1に、次に搬送すべき対象物品9(H)が制御システム8によって指定されている。その後、当該対象搬送台車1(H)は、対象保持部50から物品9(H)を受け取って搬出部7に搬送するために、搬送経路2を周回する。 In this embodiment, the control system 8 controls the object transport vehicle 1 to transfer the object 9 to the unloading unit 7 after the object transport vehicle 1 reaches the holding unit 50 disposed at the most upstream side. The target article 9 to be transported by the transport vehicle 1 is specified. In the example shown in FIG. 1 , the control system 8 designates the target article 9 (H) to be transported next to the target transport vehicle 1 after delivering the article 9 (V) to the carry-out section 7 . Thereafter, the target transport vehicle 1 (H) circulates around the transport route 2 in order to receive the article 9 (H) from the target holding section 50 and transport it to the unloading section 7 .

制御システム8は、対象物品9を対象保持部50から搬出部7へ搬送するための処理として、中継搬出処理又は直接搬出処理を実行するように構成されている。 The control system 8 is configured to execute a relay carry-out process or a direct carry-out process as a process for conveying the target article 9 from the target holding unit 50 to the carry-out unit 7 .

〔中継搬出処理〕
制御システム8は、中継搬出条件を満たす場合に、中継搬出処理を搬送台車1により実行する。中継搬出条件は、搬送台車1により対象物品9を搬出部7へ搬送する場合において、第1区間21における対象保持部50の下流側に、空き状態の両区間仮置き部6mが存在することである。なお、対象物又は対象位置の下流側とは、対象物の配置位置又は対象位置を基準位置として、基準位置と、基準位置に対して下流側に離間した位置との双方を含む概念である。ここでは、対象保持部50が対象物であり、対象保持部50の配置位置が基準位置となる。制御システム8は、この中継搬出条件を満たす場合に、空き状態の両区間仮置き部6mを第1対象仮置き部61tとして(図4A等参照)、対象物品9を対象保持部50から受け取って第1区間21内で第1対象仮置き部61tに引き渡し、その後、第2区間22内で第1対象仮置き部61tから対象物品9を受け取って搬出部7に引き渡す。
[Relay export processing]
The control system 8 executes the relay carry-out process using the carrier vehicle 1 when the relay carry-out conditions are satisfied. The relay carry-out condition is such that when the target article 9 is conveyed to the carry-out section 7 by the transport vehicle 1, there is an empty temporary storage section 6m in both sections on the downstream side of the object holding section 50 in the first section 21. be. Note that the downstream side of the target object or target position is a concept that includes both the reference position and a position spaced downstream from the reference position, with the arrangement position of the target object or the target position as the reference position. Here, the object holding section 50 is the object, and the arrangement position of the object holding section 50 is the reference position. When this relay carryout condition is satisfied, the control system 8 receives the target article 9 from the target holding unit 50 by setting the empty two-section temporary storage unit 6m as the first target temporary storage unit 61t (see FIG. 4A, etc.). The target article 9 is delivered to the first target temporary storage section 61t within the first section 21, and then the target article 9 is received from the first target temporary storage section 61t within the second section 22 and delivered to the carry-out section 7.

〔直接搬出処理〕
制御システム8は、直接搬出条件を満たす場合に、直接搬出処理を搬送台車1により実行する。直接搬出条件は、搬送台車1により対象物品9を対象保持部50から搬出部7へ搬送する場合において、第1区間21における対象保持部50の下流側に、空き状態の両区間仮置き部6mが存在しないことである。制御システム8は、この直接搬出条件を満たす場合に、対象物品9を対象保持部50から受け取って、そのまま対象物品9を搬出位置70まで搬送し、対象物品9を搬出部7に引き渡す。
[Direct unloading process]
The control system 8 causes the transport vehicle 1 to perform a direct carry-out process when the direct carry-out conditions are satisfied. The direct unloading condition is that when the target article 9 is transported from the target holding part 50 to the unloading part 7 by the transport vehicle 1, an empty temporary storage part 6m in both the sections is placed on the downstream side of the target holding part 50 in the first section 21. does not exist. When this direct carry-out condition is satisfied, the control system 8 receives the target article 9 from the target holding unit 50, transports the target article 9 as it is to the carry-out position 70, and delivers the target article 9 to the carry-out unit 7.

制御システム8は、非対象物品9を保持部50から仮置き部6へ搬送するための処理として、中間搬送処理又は事前搬送処理を実行するように構成されている。 The control system 8 is configured to execute an intermediate conveyance process or a preliminary conveyance process as a process for conveying the non-target article 9 from the holding part 50 to the temporary storage part 6.

〔中間搬送処理〕
制御システム8は、中間搬送条件を満たす場合に、中間搬送処理を搬送台車1により実行する。中間搬送条件は、上記の中継搬出処理を実行する場合において、第1区間21内で第1対象仮置き部61tに対象物品9を引き渡した位置の下流側に非対象物品9が保持された保持部50である非対象保持部50があり、かつ、非対象保持部50の下流側であって第2区間22内で第1対象仮置き部61tから対象物品9を受け取る位置の上流側に空き状態の仮置き部6が存在することである。なお、対象物又は対象位置の上流側とは、対象物の配置位置又は対象位置を基準位置として、基準位置と、基準位置に対して上流側に離間した位置との双方を含む概念である。制御システム8は、この中間搬送条件を満たす場合に、空き状態の仮置き部6を第2対象仮置き部62tとして(図4A等参照)、中継搬出処理の途中で、非対象物品9を非対象保持部50から受け取って第2対象仮置き部62tに引き渡す。なお、中間搬送処理では、両区間仮置き部6m又は片側仮置き部6sを第2対象仮置き部62tとして、当該第2対象仮置き部62tに非対象物品9を引き渡すようにして良い。
[Intermediate conveyance processing]
The control system 8 causes the transport vehicle 1 to perform intermediate transport processing when the intermediate transport conditions are satisfied. The intermediate conveyance condition is a holding condition in which the non-target article 9 is held downstream of the position where the target article 9 is delivered to the first target temporary storage section 61t within the first section 21 when performing the above-mentioned relay carry-out process. There is a non-target holding section 50 which is a section 50, and there is an empty space downstream of the non-target holding section 50 and upstream of the position for receiving the target article 9 from the first temporary storage section 61t within the second section 22. This means that there is a temporary storage section 6 in the state. Note that the upstream side of the target object or target position is a concept that includes both the reference position and a position spaced upstream from the reference position, with the arrangement position of the target object or the target position as the reference position. When this intermediate conveyance condition is satisfied, the control system 8 sets the vacant temporary storage section 6 as the second target temporary storage section 62t (see FIG. 4A, etc.), and transfers the non-target articles 9 to the non-target storage section 62t during the relay carry-out process. It is received from the object holding section 50 and delivered to the second object temporary storage section 62t. In the intermediate conveyance process, the both section temporary storage section 6m or the one-side temporary storage section 6s may be used as the second target temporary storage section 62t, and the non-target article 9 may be delivered to the second target temporary storage section 62t.

〔事前搬送処理〕
制御システム8は、事前搬送条件を満たす場合に、事前搬送処理を搬送台車1により実行する。事前搬送条件は、第1区間21における対象保持部50の上流側に非対象保持部50があり、かつ、非対象保持部50の下流側であって対象保持部50の上流側に空き状態の仮置き部6が存在することである。制御システム8は、この事前搬送条件を満たす場合に、空き状態の仮置き部6を第3対象仮置き部63tとして(図6A参照)、対象物品9を対象保持部50から受け取る前に、非対象物品9を非対象保持部50から受け取って第3対象仮置き部63tに引き渡す。なお、事前搬送処理では、仮置き部6のうち両区間仮置き部6mを第3対象仮置き部63tとして、当該第3対象仮置き部63tに非対象物品9を引き渡す。上述のように、事前搬送処理では、搬送台車1が対象物品9を対象保持部50から受け取る前に非対象物品9を仮置き部6に引き渡さなければならないため、保持装置5(全ての保持部50)よりも下流側に配置されている片側仮置き部6sを第3対象仮置き部63tとすることはできない。
[Pre-conveyance processing]
The control system 8 executes a pre-transport process using the transport vehicle 1 when the pre-transport conditions are satisfied. The pre-conveyance condition is that there is a non-target holding section 50 upstream of the target holding section 50 in the first section 21, and that there is an empty state downstream of the non-target holding section 50 and upstream of the target holding section 50. The temporary storage section 6 is present. When this pre-conveyance condition is satisfied, the control system 8 sets the empty temporary storage section 6 as the third target temporary storage section 63t (see FIG. 6A), and sets the target article 9 as a non-transfer part 63t before receiving the target article 9 from the object holding section 50. The target article 9 is received from the non-target holding section 50 and delivered to the third temporary storage section 63t. In the preliminary conveyance process, the both section temporary storage sections 6m of the temporary storage section 6 are set as the third target temporary storage section 63t, and the non-target article 9 is delivered to the third target temporary storage section 63t. As described above, in the pre-conveyance process, the non-target articles 9 must be delivered to the temporary storage section 6 before the conveyance vehicle 1 receives the target articles 9 from the target holding section 50. 50) cannot be used as the third target temporary storage section 63t.

本実施形態では、制御システム8は、非対象保持部50が複数存在する場合、それぞれの非対象保持部50から非対象物品9を受け取った場合に当該非対象物品9を引き渡すことができる空き状態の仮置き部6が存在するか否かを、搬送台車1が複数の非対象保持部のそれぞれに到達する毎に判定する。これにより、搬送台車1が非対象保持部50から非対象物品9を受け取ることが可能な時点における仮置き部6の状況に応じて、非対象物品9を搬送するか否かの判断を行うことができる。 In the present embodiment, when a plurality of non-target holding units 50 exist, the control system 8 is set to an empty state in which the non-target item 9 can be delivered when the non-target item 9 is received from each non-target holding unit 50. It is determined whether the temporary storage section 6 exists or not each time the transport vehicle 1 reaches each of the plurality of non-target holding sections. Thereby, it is possible to determine whether or not to transport the non-target article 9 according to the status of the temporary storage section 6 at the time when the transport vehicle 1 can receive the non-target article 9 from the non-target holding section 50. I can do it.

次に、図4~図6を参照して、異なる複数のケースにおける制御システム8の処理について説明する。なお、図4~図6では、実際に存在している物品9を実線で示し、物品9を移載可能な空き状態の仮置き部6上に、物品9の形状を模した破線を示している。 Next, processing of the control system 8 in a plurality of different cases will be described with reference to FIGS. 4 to 6. In addition, in FIGS. 4 to 6, the actually existing articles 9 are shown with solid lines, and the broken lines imitating the shape of the articles 9 are shown on the empty temporary storage section 6 where the articles 9 can be transferred. There is.

〔ケース1〕
図4A及び図4Bは、ケース1において制御システム8が実行する処理を示している。ケース1は、制御システム8が中継搬出処理及び中間搬送処理を実行するケースである。
[Case 1]
4A and 4B show processing executed by the control system 8 in case 1. Case 1 is a case in which the control system 8 executes relay export processing and intermediate conveyance processing.

図4Aに示すように、時刻T11では、第1区間21における、対象物品9(A)が保持された対象保持部50の下流側に、空き状態の両区間仮置き部6mが存在している。そのため、中継搬出条件を満たす。制御システム8は、中継搬出処理を開始し、空き状態の両区間仮置き部6mを第1対象仮置き部61tとして、対象物品9(A)を対象保持部50から受け取って第1区間21内で第1対象仮置き部61tに引き渡す。図4Aに示すように、本実施形態では、制御システム8は、中継搬出処理を実行する場合において、第1区間21における対象保持部50の下流側に、空き状態の両区間仮置き部6mが複数存在する場合には、それらのうち最も上流側の両区間仮置き部6mを第1対象仮置き部61tとする。これにより、搬送台車1(A)が対象物品9(A)を仮置き部6に引き渡す位置を、より上流側にすることができる。そのため、その後も継続して搬送経路2を移動する搬送台車1(A)が非対象物品9を搬送可能な搬送経路2の範囲を、広く確保することができる。 As shown in FIG. 4A, at time T11, in the first section 21, there is an empty temporary storage section 6m in both sections on the downstream side of the object holding section 50 holding the object article 9(A). . Therefore, the relay export conditions are satisfied. The control system 8 starts the relay carry-out process, uses the empty two-section temporary storage section 6m as the first target temporary storage section 61t, receives the target article 9(A) from the target holding section 50, and stores it in the first section 21. Then, the object is transferred to the first object temporary storage section 61t. As shown in FIG. 4A, in the present embodiment, the control system 8 stores the empty two-section temporary storage section 6m on the downstream side of the object holding section 50 in the first section 21 when executing the relay unloading process. If there are multiple temporary storage sections, the most upstream temporary storage section 6m for both sections is set as the first temporary storage section 61t. Thereby, the position at which the transport vehicle 1 (A) delivers the target article 9 (A) to the temporary storage section 6 can be made more upstream. Therefore, it is possible to secure a wide range of the transport route 2 in which the transport vehicle 1 (A), which continues to move on the transport route 2 thereafter, can transport the non-target article 9.

時刻T12(時刻T11よりも後の時刻)では、第1区間21内で第1対象仮置き部61tに対象物品9(A)を引き渡した位置の下流側に、例えば非対象物品9(B)が保持された非対象保持部50(最上段から4段目の保持部50)があり、かつ、非対象保持部50の下流側であって第2区間22内で第1対象仮置き部61tから対象物品9(A)を受け取る位置の上流側に空き状態の仮置き部6(例えば両区間仮置き部6m)が存在している。そのため、中間搬送条件を満たす。制御システム8は、中間搬送処理を実行し、上記空き状態の仮置き部6(両区間仮置き部6m)を第2対象仮置き部62tとして、中継搬出処理の途中で、非対象物品9(B)を非対象保持部50から受け取って第2対象仮置き部62tに引き渡す。なお、制御システム8は、両区間仮置き部6mと片側仮置き部6sとの双方から、中間搬送処理における第2対象仮置き部62tを選択する。従って、制御システム8は、中間搬送条件を満たし得る空き状態の片側仮置き部6sが存在している場合には、空き状態の両区間仮置き部6mに代えて、当該片側仮置き部6sを第2対象仮置き部62tとして選択しても良い。 At time T12 (time after time T11), for example, a non-target article 9 (B) is placed downstream of the position where the target article 9 (A) is delivered to the first target temporary storage section 61t within the first section 21. There is a non-target holding section 50 (fourth stage holding section 50 from the top) in which the non-target holding section 50 is held, and a first temporary holding section 61t is located downstream of the non-target holding section 50 and within the second section 22. There is an empty temporary storage section 6 (for example, both section temporary storage section 6m) upstream of the position where the target article 9(A) is received from. Therefore, the intermediate conveyance conditions are satisfied. The control system 8 executes the intermediate conveyance process, sets the vacant temporary storage section 6 (both section temporary storage section 6m) as the second target temporary storage section 62t, and transfers the non-target article 9 ( B) is received from the non-target holding unit 50 and delivered to the second target temporary storage unit 62t. Note that the control system 8 selects the second target temporary storage section 62t in the intermediate conveyance process from both the two-section temporary storage section 6m and the one-side temporary storage section 6s. Therefore, when there is an empty one-sided temporary storage section 6s that can satisfy the intermediate conveyance condition, the control system 8 uses the one-side temporary storage section 6s instead of the empty two-section temporary storage section 6m. It may be selected as the second target temporary storage section 62t.

図4Bに示すように、時刻T13(時刻T12よりも後の時刻)において、制御システム8は、中継搬出処理を再開し、第2区間22内で第1対象仮置き部61tから対象物品9(A)を受け取る。そして、時刻T14(時刻T13よりも後の時刻)において、制御システム8は、第2区間22内で第1対象仮置き部61tから受け取った対象物品9(A)を搬出部7に引き渡す。 As shown in FIG. 4B, at time T13 (time after time T12), the control system 8 restarts the relay unloading process, and moves the target article 9 ( Receive A). Then, at time T14 (time after time T13), the control system 8 delivers the target article 9(A) received from the first target temporary storage section 61t within the second section 22 to the unloading section 7.

このように、制御システム8は、中継搬出処理を実行することにより、搬出部7との距離が対象保持部50よりも近い仮置き部6に、対象物品9(A)を一時的に配置することができる。そして、搬送台車1(A)は、対象物品9(A)を仮置き部6に引き渡した後、対象物品9(A)を搬送していない移動中に、非対象物品9(B)を非対象保持部50から受け取って別の仮置き部6に引き渡すことができる。その後、搬送台車1(A)は、自らが仮置き部6に引き渡した対象物品9(A)を第2区間22において受け取り、適切に搬出部7に引き渡すことができる。上記において別の仮置き部6に配置された非対象物品9(B)は、他の搬送台車1にとっての対象物品9となり得るため、他の搬送台車1が当該非対象物品9(B)を搬出部7へ搬送する際の搬送距離を短くできる。 In this way, the control system 8 temporarily places the target article 9(A) in the temporary storage unit 6, which is closer to the unloading unit 7 than the target holding unit 50, by executing the relay unloading process. be able to. Then, after delivering the target article 9 (A) to the temporary storage section 6, the transport vehicle 1 (A) transfers the non-target article 9 (B) to the non-target article 9 (B) while it is not transporting the target article 9 (A). It can be received from the object holding section 50 and delivered to another temporary storage section 6. Thereafter, the transport vehicle 1 (A) can receive the target article 9 (A) that it has delivered to the temporary storage section 6 in the second section 22 and appropriately deliver it to the unloading section 7 . In the above, the non-target article 9(B) placed in another temporary storage section 6 can become the target article 9 for another transport vehicle 1, so the other transport vehicle 1 may pick up the non-target article 9(B) The conveyance distance when conveying to the unloading section 7 can be shortened.

〔ケース2〕
図5は、ケース2において制御システム8が実行する処理を示している。ケース2は、制御システム8が直接搬出処理を実行するケースである。
[Case 2]
FIG. 5 shows the processing executed by the control system 8 in case 2. Case 2 is a case where the control system 8 directly executes the unloading process.

図5に示すように、時刻T21では、第1区間21における、対象物品(A)が保持された対象保持部50の下流側に、空き状態の両区間仮置き部6mが存在していない。そのため、直接搬出条件を満たす。制御システム8は、直接搬出処理を実行し、対象物品9(A)を対象保持部50から受け取って(時刻T21)、そのまま対象物品9(A)を搬出位置70まで搬送し、搬出部7に引き渡す(時刻T22)。 As shown in FIG. 5, at time T21, there is no vacant temporary storage section 6m in both sections downstream of the object holding section 50 in which the object article (A) is held in the first section 21. Therefore, the conditions for direct export are met. The control system 8 directly executes the unloading process, receives the target article 9(A) from the target holding unit 50 (time T21), transports the target article 9(A) as it is to the unloading position 70, and transfers the target article 9(A) to the unloading unit 7. Handover (time T22).

このように、第1区間21における対象保持部50の下流側に空き状態の両区間仮置き部6mが存在しない状況において、制御システム8は、直接搬出処理を実行することにより、非対象物品9の搬送を行うことなく、対象物品9(A)を対象保持部50から搬出部7へ適切に搬送することができる。 In this way, in a situation where there is no empty temporary storage section 6m for both sections on the downstream side of the object holding section 50 in the first section 21, the control system 8 directly carries out the unloading process to remove the non-target articles 9. The target article 9(A) can be appropriately transported from the object holding section 50 to the unloading section 7 without transporting the target article 9(A).

〔ケース3〕
図6A及び図6Bは、ケース3において制御システム8が実行する処理を示している。ケース3は、制御システム8が事前搬送処理及び中継搬出処理を実行するケースである。
[Case 3]
6A and 6B show the processing executed by the control system 8 in case 3. Case 3 is a case in which the control system 8 executes preliminary transport processing and relay unloading processing.

図6Aに示すように、時刻T31では、第1区間21における対象物品9(A)が保持された対象保持部50の上流側に、非対象物品9(B)が保持された非対象保持部50があり、かつ、非対象保持部50の下流側であって対象保持部50の上流側に、空き状態の両区間仮置き部6m(最上段から4段目の両区間仮置き部6m)が存在している。そのため、事前搬送条件を満たす。制御システム8は、事前搬送処理を実行し、上記空き状態の両区間仮置き部6mを第3対象仮置き部63tとして、対象物品9(A)を対象保持部50から受け取る前に、非対象物品9(B)を非対象保持部50から受け取って第3対象仮置き部63tに引き渡す。 As shown in FIG. 6A, at time T31, the non-target holding section in which the non-target article 9(B) is held is located on the upstream side of the target holding section 50 in which the target article 9(A) in the first section 21 is held. 50, and an empty two-section temporary storage section 6m on the downstream side of the non-target holding section 50 and upstream of the target holding section 50 (the fourth two-section temporary storage section 6m from the top) exists. Therefore, the pre-conveyance condition is satisfied. The control system 8 executes a preliminary conveyance process, sets the empty two-section temporary storage section 6m as a third target temporary storage section 63t, and transfers the target article 9(A) to a non-target object before receiving it from the object holding section 50. The article 9(B) is received from the non-target holding section 50 and delivered to the third temporary storage section 63t.

時刻T32(時刻T31よりも後の時刻)では、第1区間21における、対象物品9(A)が保持された対象保持部50の下流側に、空き状態の両区間仮置き部6m(最上段から2段目の両区間仮置き部6m)が存在している。そのため、中継搬出条件を満たす。制御システム8は、中継搬出処理を開始し、上記空き状態の両区間仮置き部6mを第1対象仮置き部61tとして、対象物品9(A)を対象保持部50から受け取って第1区間21内で第1対象仮置き部61tに引き渡す。 At time T32 (a time later than time T31), in the first section 21, an empty temporary storage section 6m in both sections (the uppermost stage) is placed on the downstream side of the object holding section 50 holding the object article 9(A). There is a temporary storage section (6m) for both sections in the second stage. Therefore, the relay export conditions are met. The control system 8 starts the relay carry-out process, sets the empty two-section temporary storage section 6m as the first target temporary storage section 61t, receives the target article 9(A) from the target holding section 50, and transfers the target article 9(A) to the first section 21. The object is then delivered to the first object temporary storage section 61t.

図6Bに示すように、時刻T33(時刻T32よりも後の時刻)では、第1区間21内で第1対象仮置き部61tに対象物品9(A)を引き渡した位置の下流側に、非対象物品9(K)が保持された非対象保持部50(最上段の保持部50)があるが、当該非対象保持部50の下流側であって第2区間22内で第1対象仮置き部61t(最上段から2段目の両区間仮置き部6m)から対象物品9(A)を受け取る位置の上流側に空き状態の仮置き部6が存在していない。そのため、中間搬送条件を満たさず、制御システム8は中間搬送処理を実行しない。従って、制御システム8は、第1区間21内で第1対象仮置き部61tに対象物品9(A)を引き渡した位置の下流側では非対象物品9を受け取ることなく、第2区間22内で第1対象仮置き部61tから対象物品9(A)を受け取る。そして、時刻T34(時刻T33よりも後の時刻)において、制御システム8は、第2区間22内で第1対象仮置き部61tから受け取った対象物品9(A)を搬出部7に引き渡す。なお、上記において中間搬送条件を満たす場合には、制御システム8は、第2区間22内で第1対象仮置き部61tから対象物品9(A)を受け取る前に、中間搬送処理を実行しても良い。 As shown in FIG. 6B, at time T33 (time after time T32), a non-standard item is placed on the downstream side of the position where the target article 9(A) is delivered to the first target temporary storage section 61t within the first section 21. There is a non-target holding section 50 (the uppermost holding section 50) in which the target article 9 (K) is held, but the first target temporary storage is on the downstream side of the non-target holding section 50 and within the second section 22. There is no vacant temporary storage section 6 upstream of the position where the target article 9(A) is received from the section 61t (temporary storage section 6m in both sections at the second stage from the top). Therefore, the intermediate conveyance condition is not satisfied, and the control system 8 does not execute the intermediate conveyance process. Therefore, the control system 8 does not receive the non-target article 9 downstream of the position where the target article 9 (A) is handed over to the first target temporary storage section 61t within the first section 21, and in the second section 22. The target article 9(A) is received from the first target temporary storage section 61t. Then, at time T34 (time after time T33), the control system 8 delivers the target article 9(A) received from the first target temporary storage section 61t within the second section 22 to the unloading section 7. In addition, when the intermediate conveyance conditions are satisfied in the above, the control system 8 executes the intermediate conveyance process before receiving the target article 9(A) from the first target temporary storage section 61t within the second section 22. Also good.

このように、制御システム8は、事前搬送処理を実行することにより、搬送台車1(A)が対象保持部50に到達するまでの移動中に、非対象物品9(B)を搬出部7に近い位置に移動させることができる。 In this way, the control system 8 executes the preliminary conveyance process so that the non-target article 9 (B) is transferred to the unloading unit 7 while the conveyance vehicle 1 (A) is moving until it reaches the target holding unit 50. It can be moved to a nearby location.

〔仮置き部予約処理〕
本実施形態では、制御システム8は、仮置き部予約処理を実行するように構成されている。仮置き部予約処理は、搬送台車1が空き状態の特定の仮置き部6の上流側にある状態で、物品9を配置するために当該仮置き部6を予約する処理である。予約された仮置き部6は、実際には空き状態であっても、他の搬送台車1にとっては物品9が配置された状態として取り扱われる。
[Temporary storage reservation process]
In this embodiment, the control system 8 is configured to execute temporary storage section reservation processing. The temporary storage section reservation process is a process of reserving a temporary storage section 6 for placing the article 9 in a state where the transport vehicle 1 is located upstream of a specific temporary storage section 6 in an empty state. Even if the reserved temporary storage section 6 is actually vacant, other transport vehicles 1 treat it as having the article 9 placed therein.

図7は、制御システム8が仮置き部予約処理を実行するケースを示している。図7に示例では、2台の搬送台車1が搬送経路2を移動している。2台のうち先(下流側)を移動する搬送台車1(A)には、対象物品9(A)が割り当てられている。2台のうち後(上流側)を移動する搬送台車1(B)には、対象物品9(B)が割り当てられている。以下では、搬送台車1(A)を先行搬送台車1(A)とし、搬送台車1(B)を後続搬送台車1(B)とする。 FIG. 7 shows a case where the control system 8 executes the temporary storage section reservation process. In the example shown in FIG. 7, two transport vehicles 1 are moving along the transport route 2. In the example shown in FIG. The target article 9 (A) is assigned to the transport vehicle 1 (A) that moves first (downstream side) of the two vehicles. The target article 9 (B) is assigned to the transport vehicle 1 (B) that moves later (on the upstream side) of the two vehicles. In the following, the transport vehicle 1 (A) will be referred to as the preceding transport vehicle 1 (A), and the transport vehicle 1 (B) will be referred to as the following transport vehicle 1 (B).

図7に示すように、時刻T41において、先行搬送台車1(A)が、対象保持部50から対象物品9(A)を受け取る時点では、2つの空き状態の両区間仮置き部6m(最上段から2段目と3段目の両区間仮置き部6m)が存在している。制御システム8は、仮置き部予約処理を実行することにより、2つの空き状態の両区間仮置き部6mのうち1つ(最上段から3段目の両区間仮置き部6m)を、先行搬送台車1(A)が対象物品9(A)を配置するための仮置き部6として予約する。 As shown in FIG. 7, at time T41, when the preceding transport vehicle 1(A) receives the target article 9(A) from the target holding unit 50, there are two vacant temporary storage units 6m in both sections (the uppermost stage). There are temporary storage sections (6m) in both the second and third sections. By executing the temporary storage unit reservation process, the control system 8 assigns one of the two vacant double-section temporary storage units 6m (the third tier from the top, the double-section temporary storage unit 6m) to advance transportation. The trolley 1(A) is reserved as the temporary storage section 6 for placing the target article 9(A).

時刻T42(時刻T41よりも後の時刻)において、後続搬送台車1(B)が、対象保持部50から対象物品9(B)を受け取る時点では、先刻予約された両区間仮置き部6m(最上段から3段目の両区間仮置き部6m)に先行搬送台車1(A)が未だ対象物品(A)を配置していないため、実際には、2つの空き状態の両区間仮置き部6m(最上段から2段目と3段目の両区間仮置き部6m)が存在している。しかし、先刻、先行搬送台車1(A)が対象物品9(A)を配置するための仮置き部6として予約された両区間仮置き部6m(最上段から3段目の両区間仮置き部6m)は、後続搬送台車1(B)にとっては、対象物品9(A)が配置されているものとして取り扱われる。そのため、制御システム8は、別の仮置き部予約処理を実行することにより、先行搬送台車1(A)が対象物品9(A)を配置するための仮置き部6として予約された両区間仮置き部6m以外の空き状態の両区間仮置き部6m(最上段から2段目の両区間仮置き部6m)を、後続搬送台車1(B)が対象物品9(B)を配置するための仮置き部6として予約する。 At time T42 (a time later than time T41), when the subsequent conveyance vehicle 1 (B) receives the target article 9 (B) from the target holding section 50, the temporary storage section 6m (the most Since the preceding transport vehicle 1 (A) has not yet placed the target article (A) in the temporary storage section 6m of both sections in the third tier from the top, there are actually two vacant temporary storage sections 6m of both sections. (Temporary storage section 6m exists in both the second and third sections from the top). However, the preceding transport vehicle 1(A) previously reserved the temporary storage area 6m for both sections as the temporary storage area 6 for placing the target article 9(A) (the temporary storage area for both sections at the third stage from the top). 6m) is treated by the subsequent transport vehicle 1(B) as being where the target article 9(A) is placed. Therefore, the control system 8 executes another temporary storage section reservation process so that the preceding transport vehicle 1 (A) can temporarily reserve both sections as the temporary storage section 6 for placing the target article 9 (A). The vacant both section temporary storage sections 6m other than the storage section 6m (both section temporary storage sections 6m on the second stage from the top) are used for the subsequent conveyance cart 1 (B) to place the target article 9 (B). Reserve as temporary storage section 6.

このように、制御システム8は、仮置き部予約処理を実行することにより、搬送経路2を移動する複数の搬送台車1が保持部50から物品9を受け取ったにもかかわらず当該物品9を仮置き部6に搬送できない事態を回避することができる。 In this way, by executing the temporary storage section reservation process, the control system 8 can temporarily hold the article 9 even though the plurality of transport vehicles 1 moving on the transport route 2 have received the object 9 from the holding section 50. It is possible to avoid a situation where the product cannot be transported to the storage section 6.

〔グループ出庫処理〕
本実施形態では、制御システム8は、グループ出庫処理を実行するように構成されている。グループ出庫処理は、複数の仮置き部6のそれぞれに保管された一部の物品9を対象物品9とみなし、対象物品9とみなした複数の物品9のうちから搬出部7へ搬送する対象を選択する処理を含む。制御システム8は、グループ出庫処理と共に、中継搬出処理及び中間搬送処理を実行する。すなわち、制御システム8は、仮置き部6に保管された物品9であって対象物品9と同等であるとみなす1つ以上の物品9を同等物品9として設定し、同等物品9を対象物品9とみなすと共に当該同等物品9が保管された仮置き部6を第1対象仮置き部61tとみなした場合に中間搬送処理を実行できる場合には、同等物品9を対象物品9とみなすと共に当該同等物品9が保管された仮置き部6を第1対象仮置き部61tとみなして、中継搬出処理及び中間搬送処理を実行する。例えば、対象物品9と同じ商品を収容する物品9が、同等物品9として設定される構成とすることができる。また、複数の物品9(例えば、1つのオーダー情報により指定される複数の物品9)を1つのグループとして搬出部7に搬送する場合に、対象物品9と同じグループに含まれる物品9が、同等物品9として設定される構成とすることもできる。
[Group issue processing]
In this embodiment, the control system 8 is configured to execute group shipping processing. In the group unloading process, some of the articles 9 stored in each of the plurality of temporary storage sections 6 are regarded as target articles 9, and from among the plurality of articles 9 regarded as the target articles 9, an object to be transported to the unloading section 7 is selected. Contains processing to select. The control system 8 executes a group unloading process, a relay unloading process, and an intermediate conveyance process. That is, the control system 8 sets one or more articles 9 stored in the temporary storage section 6 that are considered to be equivalent to the target article 9 as equivalent articles 9, and sets the equivalent articles 9 as the target article 9. If the intermediate conveyance process can be executed when the temporary storage section 6 in which the equivalent article 9 is stored is regarded as the first target temporary storage section 61t, the equivalent article 9 is regarded as the target article 9 and the corresponding equivalent article 9 is regarded as the target article 9. The temporary storage section 6 in which the article 9 is stored is regarded as the first target temporary storage section 61t, and the relay carry-out process and the intermediate conveyance process are executed. For example, an article 9 containing the same product as the target article 9 may be set as the equivalent article 9. Furthermore, when a plurality of articles 9 (for example, a plurality of articles 9 specified by one order information) are transported to the unloading section 7 as one group, the articles 9 included in the same group as the target article 9 are It can also be configured to be set as the article 9.

図8A及び図8Bは、制御システム8が、グループ出庫処理と共に、中継搬出処理及び中間搬送処理を実行するケースを示している。図8A及び図8Bに示す例では、両区間仮置き部6m(最上段の両区間仮置き部6m)に配置された物品9(A)、及び、片側仮置き部6s(最上段から5段目の片側仮置き部6s)に配置された物品9(A)が、搬送台車1(A)が搬送すべき対象物品(A)と同等であるとみなされている。 FIGS. 8A and 8B show a case in which the control system 8 executes a group unloading process, a relay unloading process, and an intermediate conveyance process. In the example shown in FIGS. 8A and 8B, the article 9(A) placed in the both section temporary storage section 6m (both section temporary storage section 6m at the top) and the one side temporary storage section 6s (5 steps from the top) The article 9(A) placed in the temporary storage section 6s on one side of the eye is considered to be equivalent to the target article (A) to be transported by the transport vehicle 1(A).

図8Aに示すように、時刻T51では、第1区間21における、対象物品9(A)が保持された対象保持部50の下流側に、空き状態の両区間仮置き部6m(最上段から3段目の両区間仮置き部6m)が存在している。そのため、中継搬出条件を満たす。制御システム8は、中継搬出処理を開始し、上記空き状態の両区間仮置き部6mを第1対象仮置き部61tとして、対象物品9(A)を対象保持部50から受け取って第1区間21内で第1対象仮置き部61tに引き渡す。 As shown in FIG. 8A, at time T51, in the first section 21, the temporary storage section 6m for both sections (3 m from the top) is located downstream of the object holding section 50 holding the object article 9(A). There is a temporary storage section (6m) in both sections of the tier. Therefore, the relay export conditions are satisfied. The control system 8 starts the relay carry-out process, sets the empty two-section temporary storage section 6m as the first target temporary storage section 61t, receives the target article 9(A) from the target holding section 50, and transfers the target article 9(A) to the first section 21. The object is then delivered to the first object temporary storage section 61t.

時刻T52(時刻T51よりも後の時刻)では、第1区間21内で第1対象仮置き部61tに対象物品9(A)を引き渡した位置の下流側に、例えば非対象物品9(B)が保持された非対象保持部50(最上段から2段目の保持部50)があるが、当該非対象保持部50の下流側であって、第2区間22内で先刻対象物品9(A)を引き渡した第1対象仮置き部61t(最上段から3段目の両区間仮置き部6m)の上流側には、空き状態の仮置き部6が存在しない。しかし、本ケースにおいては、空き状態の片側仮置き部6s(最上段から4段目の片側仮置き部6s)の下流側にある片側仮置き部6s(最上段から5段目の片側仮置き部6s)に既に配置されている物品9(A)が、搬送台車1(A)が搬送すべき対象物品9(A)と同等であるとみなされ、当該物品9(A)が配置されている片側仮置き部6sが第1対象仮置き部61tとみなされている。そのため、非対象物品9(B)が保持された非対象保持部50(最上段から2段目の保持部50)の下流側であって第2区間22内で第1対象仮置き部61tから対象物品9(A)を受け取る位置(最上段から5段目の片側仮置き部6s)の上流側に、空き状態の片側仮置き部6s(最上段から4段目の片側仮置き部6s)が存在している。従って、中間搬送条件を満たす。制御システム8は、中間搬送処理を実行し、上記空き状態の片側仮置き部6sを第2対象仮置き部62tとして、中継搬出処理の途中で、非対象物品9(B)を非対象保持部50から受け取って第2対象仮置き部62tに引き渡す。 At time T52 (a time later than time T51), for example, a non-target article 9 (B) is placed downstream of the position where the target article 9 (A) is delivered to the first target temporary storage section 61t within the first section 21. There is a non-target holding section 50 (the second holding section 50 from the top) in which the target article 9 (A There is no empty temporary storage section 6 on the upstream side of the first target temporary storage section 61t (both section temporary storage sections 6m in the third stage from the top) to which the object was delivered. However, in this case, the one-sided temporary storage section 6s (the fifth one-sided temporary storage section from the topmost layer) located downstream of the empty one-sided temporary storage section 6s (the fourth one-sided temporary storage section 6s from the topmost step) is The article 9(A) already placed in the section 6s) is considered to be equivalent to the target article 9(A) to be transported by the transport vehicle 1(A), and the article 9(A) is The temporary storage section 6s on one side is regarded as the first target temporary storage section 61t. Therefore, from the first target temporary storage part 61t within the second section 22 on the downstream side of the non-target holding part 50 (second stage holding part 50 from the top) holding the non-target article 9(B). Upstream of the position for receiving the target article 9(A) (the one-sided temporary storage section 6s on the fifth tier from the top), there is an empty one-sided temporary storage section 6s (one-sided temporary storage section 6s on the fourth tier from the top). exists. Therefore, the intermediate conveyance conditions are satisfied. The control system 8 executes the intermediate conveyance process, sets the vacant one-sided temporary storage section 6s as the second target temporary storage section 62t, and transfers the non-target article 9(B) to the non-target holding section during the relay carry-out process. 50 and delivers it to the second temporary storage section 62t.

図8Bに示すように、時刻T53(時刻T52よりも後の時刻)において、制御システム8は、中継搬出処理を再開し、第2区間22内で、第1対象仮置き部61tとみなした片側仮置き部6s(最上段から5段目の片側仮置き部6s)から、対象物品9(A)とみなした同等物品9(A)を受け取る。そして、時刻T54(時刻T53よりも後の時刻)において、制御システム8は、対象物品9(A)とみなして受け取った同等物品9(A)を、搬出部7に引き渡す。 As shown in FIG. 8B, at time T53 (time later than time T52), the control system 8 restarts the relay unloading process, and in the second section 22, the one side that is considered to be the first target temporary storage section 61t. An equivalent article 9(A), which is regarded as the target article 9(A), is received from the temporary storage section 6s (the one-sided temporary storage section 6s on the fifth tier from the top). Then, at time T54 (time after time T53), the control system 8 delivers the received equivalent article 9(A), which is regarded as the target article 9(A), to the carry-out unit 7.

このように、制御システム8は、グループ出庫処理を実行することにより、物品9を搬出部7または仮置き部6に搬送する場合にとり得る選択肢を増やすことができ、中継搬出処理及び中間搬送処理を実行できる可能性を高めることができる。 In this way, by executing the group unloading process, the control system 8 can increase the options available when transporting the articles 9 to the unloading section 7 or the temporary storage section 6, and can perform the relay unloading process and the intermediate transport process. It can increase the possibility of implementation.

次に、図9のフローチャートを参照して、制御システム8が実行する処理の手順について説明する。なお、図9のフローチャートに示される処理は、1台の搬送台車1に関して実行されるものである。制御システム8は、このような処理を、搬送経路2を移動する複数の搬送台車1のそれぞれに対して実行する。 Next, the procedure of processing executed by the control system 8 will be described with reference to the flowchart in FIG. Note that the process shown in the flowchart of FIG. 9 is executed for one transport vehicle 1. The control system 8 performs such processing for each of the plurality of transport vehicles 1 moving on the transport route 2.

図9に示すように、制御システム8は、まず、事前搬送条件を満たすか否かを判定する(ステップ#1)。制御システム8は、事前搬送条件を満たすと判定した場合には(ステップ#1:Yes)、事前搬送処理を実行する(ステップ#2)。次に、制御システム8は、中継搬出条件を満たすか否かを判定する(ステップ#3)。なお、制御システム8は、上記ステップ#1の処理において、事前搬送条件を満たさないと判定した場合には(ステップ#1:No)、事前搬送処理を実行せずに、ステップ#3の処理に移行する。 As shown in FIG. 9, the control system 8 first determines whether the pre-conveyance conditions are satisfied (step #1). If the control system 8 determines that the pre-conveyance conditions are met (step #1: Yes), it executes the pre-conveyance process (step #2). Next, the control system 8 determines whether the relay export conditions are satisfied (step #3). Note that if the control system 8 determines in the process of step #1 that the pre-conveyance conditions are not satisfied (step #1: No), the control system 8 proceeds to the process of step #3 without executing the pre-conveyance process. Transition.

制御システム8は、中継搬出条件を満たすと判定した場合には(ステップ#3:Yes)、中継搬出処理を開始する(ステップ#4)。制御システム8は、中継搬出処理を開始することにより、対象物品9を対象保持部50から受け取って第1対象仮置き部61tに引き渡す。なお、制御システム8は、中継搬出条件を満たさないと判定した場合には(ステップ#3:No)、直接搬出処理を実行し(ステップ#9)、ルーチンを終了する。 If the control system 8 determines that the relay export conditions are satisfied (step #3: Yes), it starts the relay export process (step #4). By starting the relay carry-out process, the control system 8 receives the target article 9 from the target holding unit 50 and delivers it to the first target temporary storage unit 61t. In addition, when the control system 8 determines that the relay carry-out condition is not satisfied (step #3: No), the control system 8 executes the direct carry-out process (step #9), and ends the routine.

制御システム8は、中継搬出処理を開始した後は(ステップ#4)、中間搬送条件を満たすか否かを判定する(ステップ#5)。制御システム8は、中間搬送条件を満たすと判定した場合には(ステップ#5:Yes)、中間搬送処理を実行する(ステップ#6)。制御システム8は、中間搬送条件を満たさないと判定するまで、ステップ#5の処理とステップ#6の処理とを繰り返し実行する。 After starting the relay carry-out process (step #4), the control system 8 determines whether intermediate conveyance conditions are satisfied (step #5). If the control system 8 determines that the intermediate conveyance conditions are satisfied (step #5: Yes), it executes intermediate conveyance processing (step #6). The control system 8 repeatedly executes the process of step #5 and the process of step #6 until it determines that the intermediate conveyance condition is not satisfied.

制御システム8は、中間搬送条件を満たさないと判定した場合には(ステップ#5:No)、中継搬出処理を再開して第1対象仮置き部61tの対象物品9を搬出部7まで搬送し(ステップ#7)、その後、中継搬出処理を終了する(ステップ#8)。 If the control system 8 determines that the intermediate conveyance conditions are not satisfied (step #5: No), the control system 8 restarts the relay unloading process and conveys the target article 9 in the first target temporary storage section 61t to the unloading section 7. (Step #7), and then the relay export process ends (Step #8).

以上説明した搬送設備100によれば、物品9を搬出部7へ搬送する場合の搬送効率を、設備全体として向上させることができる。 According to the transport equipment 100 described above, the transport efficiency when transporting the articles 9 to the unloading section 7 can be improved as a whole of the equipment.

〔その他の実施形態〕
次に、搬送設備のその他の実施形態について説明する。
[Other embodiments]
Next, other embodiments of the transport facility will be described.

(1)上記の実施形態では、制御システム8は、中継搬出処理を実行する場合において、第1区間21における対象保持部50の下流側に、空き状態の両区間仮置き部6mが複数存在する場合には、それらのうち最も上流側の両区間仮置き部6mを第1対象仮置き部61tとする例について説明した。しかし、このような例に限定されることなく、制御システム8は、中継搬出処理を実行する場合において、複数の空き状態の両区間仮置き部6mのうちいずれを第1対象仮置き部61tとしても良い。 (1) In the above-described embodiment, when executing the relay unloading process, the control system 8 determines that there are a plurality of vacant two-section temporary storage sections 6m on the downstream side of the object holding section 50 in the first section 21. In this case, an example has been described in which the most upstream temporary storage section 6m of both sections is the first target temporary storage section 61t. However, without being limited to such an example, the control system 8 determines which one of the plurality of empty two-section temporary storage sections 6m is the first target temporary storage section 61t when performing the relay unloading process. Also good.

(2)上記の実施形態では、制御システム8は、対象搬送台車1が搬送中であった物品9を搬出部7に引き渡した後、最も上流側に配置された保持部50に到達するまでの間に、対象搬送台車1に搬送させる対象物品9を指定する例について説明した。しかし、このような例に限定されることなく、制御システム8は、例えば、対象搬送台車1が搬送中であった物品9を搬出部7に引き渡す前に、当該対象搬送台車1に対して次に搬送すべき対象物品9を指定しても良い。 (2) In the above-described embodiment, the control system 8 controls the process after the target transport vehicle 1 delivers the article 9 being transported to the unloading section 7 until it reaches the holding section 50 disposed on the most upstream side. In the meantime, an example of specifying the target article 9 to be transported by the target transport vehicle 1 has been described. However, the control system 8 is not limited to such an example, and for example, before the target transport vehicle 1 delivers the article 9 being transported to the unloading section 7, the control system 8 may perform the following operations on the target transport vehicle 1: The target article 9 to be transported may be specified.

(3)上記の実施形態では、複数の仮置き部6には、第2区間22に沿って並ぶように配置され、第2区間22内に位置する搬送台車1とのみ物品9の受け渡しが行われる片側仮置き部6sが含まれる例について説明した。しかし、このような例に限定されることなく、複数の仮置き部6には、両区間仮置き部6mが含まれていれば良く、片側仮置き部6sは含まれていなくても良い。 (3) In the above embodiment, the plurality of temporary storage units 6 are arranged so as to be lined up along the second section 22, and the articles 9 can only be delivered to and from the transport cart 1 located within the second section 22. An example in which the one side temporary storage section 6s is included has been described. However, the present invention is not limited to such an example, and the plurality of temporary storage sections 6 only need to include both section temporary storage sections 6m, and may not include the one-side temporary storage section 6s.

(4)上記の実施形態では、搬送経路2が、搬送台車1が鉛直面内に沿って循環する循環経路を形成している例について説明した。しかし、このような例に限定されることなく、搬送経路2は、例えば、水平面内に沿って循環する循環経路を形成していても良い。この場合、搬送経路2の第1区間21及び第2区間22は、上下方向ではなく、水平方向に沿って延在するように構成される。 (4) In the above embodiment, an example has been described in which the transport route 2 forms a circulation route in which the transport vehicle 1 circulates along a vertical plane. However, without being limited to such an example, the conveyance path 2 may form, for example, a circulation path that circulates along a horizontal plane. In this case, the first section 21 and the second section 22 of the conveyance path 2 are configured to extend not in the vertical direction but in the horizontal direction.

(5)上記の実施形態では、図2を参照して搬送台車1の具体的構成について説明した。すなわち、搬送台車1が、駆動輪12と第1補助輪13と第2補助輪14とを備え、これらの車輪が上下方向の異なる位置に配置されている点について説明した。しかし、搬送台車1は、上記のような構成に限定されることなく、搬送経路2を移動可能で、かつ、複数の移載対象箇所との間で物品9を移載可能に構成されていれば良い。周知の構成を用いて搬送台車1を実現しても良い。 (5) In the above embodiment, the specific configuration of the transport vehicle 1 has been described with reference to FIG. That is, it has been explained that the transport vehicle 1 includes the drive wheel 12, the first auxiliary wheel 13, and the second auxiliary wheel 14, and that these wheels are arranged at different positions in the vertical direction. However, the transport vehicle 1 is not limited to the above configuration, and may be configured to be able to move along the transport route 2 and to be able to transfer the articles 9 to and from a plurality of transfer target locations. Good. The transport vehicle 1 may be realized using a well-known configuration.

(6)なお、上述した実施形態で開示された構成は、矛盾が生じない限り、他の実施形態で開示された構成と組み合わせて適用することも可能である。その他の構成に関しても、本明細書において開示された実施形態は全ての点で単なる例示に過ぎない。従って、本開示の趣旨を逸脱しない範囲内で、適宜、種々の改変を行うことが可能である。 (6) Note that the configuration disclosed in the embodiment described above can also be applied in combination with the configuration disclosed in other embodiments, as long as there is no contradiction. Regarding other configurations, the embodiments disclosed herein are merely illustrative in all respects. Therefore, various modifications can be made as appropriate without departing from the spirit of the present disclosure.

〔上記実施形態の概要〕
以下、上記において説明した搬送設備について説明する。
[Summary of the above embodiment]
The conveyance equipment described above will be explained below.

物品を搬送する搬送台車と、
前記搬送台車が一方向に移動する搬送経路と、
前記物品が順次搬送されてきて保持される保持部を複数備えた保持装置と、
前記物品を外部へ搬出する搬出部と、
前記搬送台車を制御する制御システムと、を備えた搬送設備であって、
前記搬送経路は、前記搬出部に対応する搬出位置を通って前記搬送台車が一方向に循環する循環経路を形成しており、前記搬出位置に対して下流側に設定された第1区間と、前記第1区間よりも下流側かつ前記搬出位置よりも上流側に設定されていると共に前記第1区間に対して特定方向に離間して平行状に配置された第2区間と、を備え、
複数の前記保持部は、前記第1区間に沿って並ぶように配置され、
前記物品を一時的に保管可能な仮置き部が、前記搬送経路に沿って複数配置され、
複数の前記仮置き部には、前記第1区間と前記第2区間との前記特定方向の間において前記第1区間及び前記第2区間の双方に沿って並ぶように配置された両区間仮置き部が複数含まれ、
前記搬送台車は、前記搬送経路における、複数の前記保持部、複数の前記仮置き部、及び、前記搬出部のそれぞれに対応する位置において、それらと前記物品の受け渡しを行うことができるように構成され、
複数の前記保持部に保持された前記物品のうち1つを対象物品とし、複数の前記保持部に保持された前記物品のうちの前記対象物品以外の前記物品を非対象物品とし、前記対象物品が保持されている前記保持部を対象保持部として、
前記制御システムは、
前記搬送台車により前記対象物品を前記搬出部へ搬送する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が存在する場合には、当該空き状態の前記両区間仮置き部を第1対象仮置き部として、前記対象物品を前記対象保持部から受け取って前記第1区間内で前記第1対象仮置き部に引き渡し、その後、前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取って前記搬出部に引き渡す、中継搬出処理を前記搬送台車により実行し、
更に、前記中継搬出処理を実行する場合において、前記第1区間内で前記第1対象仮置き部に前記対象物品を引き渡した位置の下流側に前記非対象物品が保持された前記保持部である非対象保持部があり、かつ、前記非対象保持部の下流側であって前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取る位置の上流側に空き状態の前記仮置き部が存在する場合には、当該空き状態の前記仮置き部を第2対象仮置き部として、前記中継搬出処理の途中で、前記非対象物品を前記非対象保持部から受け取って前記第2対象仮置き部に引き渡す、中間搬送処理を前記搬送台車により実行する。
A transport vehicle for transporting goods;
a transport path along which the transport vehicle moves in one direction;
a holding device including a plurality of holding parts in which the articles are sequentially conveyed and held;
an unloading section that unloads the article to the outside;
A transport facility comprising: a control system for controlling the transport vehicle;
The conveyance path forms a circulation path in which the conveyance vehicle circulates in one direction through a carry-out position corresponding to the carry-out section, and includes a first section set on the downstream side with respect to the carry-out position; a second section that is set downstream of the first section and upstream of the carry-out position, and is spaced apart from and parallel to the first section in a specific direction;
The plurality of holding parts are arranged so as to line up along the first section,
A plurality of temporary storage sections capable of temporarily storing the articles are arranged along the conveyance route,
The plurality of temporary storage sections include temporary storage sections arranged along both the first section and the second section between the first section and the second section in the specific direction. Contains multiple parts,
The transport vehicle is configured to be able to transfer the article to and from the plurality of holding sections, the plurality of temporary storage sections, and the carrying-out section at positions corresponding to each of the holding sections, the plurality of temporary storage sections, and the carrying-out section on the transport route. is,
One of the articles held by the plurality of holding sections is a target article, the articles other than the target article among the articles held by the plurality of holding sections are set as non-target articles, and the target article is The holding part in which is held is the target holding part,
The control system includes:
When the target article is transported to the unloading section by the transport vehicle, if there is a temporary storage section in both sections in an empty state on the downstream side of the object holding section in the first section, the empty state The two section temporary storage sections of are used as first target temporary storage sections to receive the target article from the target holding section and deliver it to the first target temporary storage section within the first section, and then to the first target temporary storage section within the second section. performing a relay carry-out process using the transport trolley, in which the target article is received from the first target temporary storage unit and delivered to the carry-out unit;
Furthermore, when performing the relay carry-out process, the holding section holds the non-target article on the downstream side of the position where the target article is delivered to the first target temporary storage section within the first section. The temporary storage has a non-target holding section and is vacant on the downstream side of the non-target holding section and upstream of the position for receiving the target article from the first temporary storage section within the second section. If there is a temporary holding section, the empty temporary storage section is set as a second target temporary storage section, and during the relay carrying out process, the non-target article is received from the non-target holding section and is stored in the second target storage section. An intermediate conveyance process for handing over to the temporary storage section is executed by the conveyance truck.

本構成によれば、搬出部との距離が保持部よりも近い仮置き部に、対象物品を一時的に配置することができる。そして、搬送台車は、対象物品を仮置き部に配置した後、対象物品を搬送していない移動中に、非対象物品を保持部から受け取って別の仮置き部に配置することができる。その後、搬送台車は、自らが仮置き部に配置した対象物品を第2区間において受け取り、適切に搬出部へ搬送することができる。上記において別の仮置き部に配置された非対象物品は、他の搬送台車にとっての対象物品となり得るため、他の搬送台車が当該非対象物品を搬出部へ搬送する際の搬送距離を短くできる。このように、本構成によれば、対象保持部から搬出部への対象物品の搬送を適切に行うことができると共に、その対象保持部から搬出部までの経路の移動中に、非対象物品を搬出部に近い位置に移動させることができる。従って、物品を搬出部へ搬送する場合の搬送効率を、設備全体として向上させることができる。 According to this configuration, the target article can be temporarily placed in the temporary storage section that is closer to the carrying-out section than the holding section. Then, after placing the target article in the temporary storage section, the transport vehicle can receive the non-target article from the holding section and place it in another temporary storage section while the transportation vehicle is not transporting the target article. Thereafter, the transport vehicle can receive the target article that it has placed in the temporary storage section in the second section, and can appropriately transport it to the unloading section. In the above, a non-target item placed in another temporary storage section can become a target article for another transport vehicle, so the transport distance when the other transport vehicle transports the non-target item to the unloading section can be shortened. . As described above, according to the present configuration, it is possible to appropriately transport the target article from the target holding part to the carrying out part, and also to transport non-target articles while moving along the path from the target holding part to the carrying out part. It can be moved to a position close to the unloading section. Therefore, it is possible to improve the transport efficiency of the entire equipment when transporting articles to the unloading section.

前記制御システムは、前記中継搬出処理を実行する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が複数存在する場合には、それらのうち最も上流側の前記両区間仮置き部を前記第1対象仮置き部とする、と好適である。 When executing the relay unloading process, if there are a plurality of empty temporary storage units for both sections downstream of the object holding section in the first section, the control system selects the most temporary storage section among them. Preferably, the upstream temporary storage sections for both sections are the first target temporary storage section.

本構成によれば、搬送台車が対象物品を第1対象仮置き部に配置する位置を、より上流側にすることができる。そのため、その後も継続して搬送経路を移動する搬送台車が非対象物品を搬送可能な搬送経路の範囲を、広く確保することができる。 According to this configuration, the position at which the transport vehicle places the target article in the first target temporary storage section can be made more upstream. Therefore, it is possible to secure a wide range of the transport route in which the transport carriage, which continues to move on the transport route thereafter, can transport non-target articles.

前記制御システムは、前記搬送台車により前記対象物品を前記対象保持部から前記搬出部へ搬送する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が存在しない場合には、前記対象物品を前記対象保持部から受け取って、そのまま前記対象物品を前記搬出位置まで搬送し、前記対象物品を前記搬出部に引き渡す、直接搬出処理を前記搬送台車により実行する、と好適である。 When the target article is transported from the target holding section to the carrying out section by the transport vehicle, the control system includes a temporary storage section in both sections in an empty state on the downstream side of the object holding section in the first section. If the target article does not exist, the conveyance truck executes a direct unloading process in which the target article is received from the target holding section, the target article is directly transported to the unloading position, and the target article is delivered to the unloading section. It is preferable to do so.

状況によっては、第1区間における対象保持部の下流側に、空き状態の両区間仮置き部が存在しない場合がある。本構成によれば、このような状況では、直接搬出処理を実行することによって、非対象物品の搬送を行うことなく、対象物品を対象保持部から搬出部へ適切に搬送することができる。 Depending on the situation, there may not be an empty temporary storage section for both sections downstream of the object holding section in the first section. According to this configuration, in such a situation, by directly executing the carry-out process, the target article can be appropriately transported from the target holding section to the carrying-out section without transporting the non-target article.

前記制御システムは、前記第1区間における前記対象保持部の上流側に前記非対象保持部があり、かつ、前記非対象保持部の下流側であって前記対象保持部の上流側に空き状態の前記仮置き部が存在する場合には、当該空き状態の前記仮置き部を第3対象仮置き部として、前記対象物品を前記対象保持部から受け取る前に、前記非対象物品を前記非対象保持部から受け取って前記第3対象仮置き部に引き渡す、事前搬送処理を前記搬送台車により実行する、と好適である。 The control system includes the non-target holding unit upstream of the target holding unit in the first section, and an empty state downstream of the non-target holding unit and upstream of the target holding unit. If the temporary storage section exists, the empty temporary storage section is set as a third target temporary storage section, and the non-target article is placed in the non-target storage section before the target article is received from the target holding section. Preferably, the transport vehicle performs a preliminary transport process of receiving the object from the third target temporary storage unit and delivering it to the third target temporary storage unit.

本構成によれば、事前搬送処理を実行することにより、搬送台車が対象保持部に到達するまでの移動中に、非対象物品を搬出部に近い位置に移動させることができる。 According to this configuration, by performing the preliminary conveyance process, the non-target article can be moved to a position close to the carry-out section while the conveyance vehicle is moving until it reaches the target holding section.

前記制御システムは、前記非対象保持部が複数存在する場合、それぞれの前記非対象保持部から前記非対象物品を受け取った場合に当該非対象物品を引き渡すことができる空き状態の前記仮置き部が存在するか否かを、前記搬送台車が複数の前記非対象保持部のそれぞれに到達する毎に判定する、と好適である。 In the case where there are a plurality of non-target holding units, the control system controls the temporary storage unit in an empty state to which the non-target article can be delivered when the non-target article is received from each of the non-target holding units. Preferably, whether or not the target object exists is determined each time the transport vehicle reaches each of the plurality of non-target holding parts.

本構成によれば、搬送台車が非対象保持部から非対象物品を受け取ることが可能な時点における仮置き部の状況に応じて、非対象物品を搬送するか否かの判断を行うことができる。 According to this configuration, it is possible to determine whether or not to transport the non-target article according to the status of the temporary storage section at the time when the transport vehicle can receive the non-target article from the non-target holding section. .

前記制御システムは、前記仮置き部に保管された前記物品であって前記対象物品と同等であるとみなす1つ以上の前記物品を同等物品として設定し、前記同等物品を前記対象物品とみなすと共に当該同等物品が保管された前記仮置き部を前記第1対象仮置き部とみなした場合に前記中間搬送処理を実行できる場合には、前記同等物品を前記対象物品とみなすと共に当該同等物品が保管された前記仮置き部を前記第1対象仮置き部とみなして、前記中継搬出処理及び前記中間搬送処理を実行する、と好適である。 The control system sets one or more of the articles stored in the temporary storage section that are considered to be equivalent to the target article as equivalent articles, and considers the equivalent article as the target article. If the intermediate conveyance process can be executed when the temporary storage section where the equivalent article is stored is regarded as the first target temporary storage section, the equivalent article is regarded as the target article and the equivalent article is stored. It is preferable that the relay carry-out process and the intermediate conveyance process be performed by regarding the temporarily placed part as the first target temporary holding part.

本構成によれば、物品を搬出部または仮置き部に搬送する場合にとり得る選択肢を増やすことができ、中継搬出処理及び中間搬送処理を実行できる可能性を高めることができる。 According to this configuration, it is possible to increase the options that can be taken when transporting the article to the carry-out section or the temporary storage section, and it is possible to increase the possibility that the relay carry-out process and the intermediate conveyance process can be executed.

複数の前記仮置き部には、前記第2区間に沿って並ぶように配置され、前記第2区間内に位置する前記搬送台車とのみ前記物品の受け渡しが行われる片側仮置き部が更に含まれ、
前記制御システムは、前記両区間仮置き部と前記片側仮置き部との双方から、前記中間搬送処理における前記第2対象仮置き部を選択する、と好適である。
The plurality of temporary storage units further include a one-sided temporary storage unit that is arranged in line along the second section and receives and receives the articles only with the transport vehicle located within the second section. ,
Preferably, the control system selects the second target temporary storage section in the intermediate conveyance process from both the two-section temporary storage section and the one-side temporary storage section.

本構成によれば、非対象物品を仮置き部に搬送する場合にとり得る選択肢を増やすことができ、中間搬送処理を実行できる可能性を高めることができる。 According to this configuration, it is possible to increase the options that can be taken when transporting non-target articles to the temporary storage section, and it is possible to increase the possibility that intermediate transport processing can be executed.

前記搬送台車を複数備え、
前記制御システムは、複数の前記搬送台車のそれぞれを対象搬送台車として、前記対象搬送台車が搬送中であった前記物品を前記搬出部に引き渡した後、最も上流側に配置された前記保持部に到達するまでの間に、前記対象搬送台車に搬送させる前記対象物品を指定する、と好適である。
comprising a plurality of the transport vehicles,
The control system uses each of the plurality of transport vehicles as a target transport vehicle, and after the target transport vehicle delivers the article being transported to the unloading unit, transfers the article to the holding unit disposed at the most upstream side. It is preferable that the target article to be transported by the target transport vehicle is specified before reaching the target article.

本構成によれば、搬送経路を循環する複数の搬送台車のそれぞれに、適切に対象物品を搬送させることができる。 According to this configuration, the target article can be appropriately transported by each of the plurality of transport vehicles circulating on the transport route.

本開示に係る技術は、物品を搬送する搬送台車と、前記搬送台車が一方向に移動する搬送経路と、前記物品を外部へ搬出する搬出部と、前記搬送台車を制御する制御システムと、を備えた搬送設備に利用することができる。 The technology according to the present disclosure includes a transport vehicle that transports an article, a transport path along which the transport vehicle moves in one direction, an unloading section that transports the article to the outside, and a control system that controls the transport vehicle. It can be used for conveyance equipment equipped with

100 :搬送設備
1 :搬送台車
2 :搬送経路
21 :第1区間
22 :第2区間
5 :保持装置
50 :保持部
6 :仮置き部
6m :両区間仮置き部
6s :片側仮置き部
61t :第1対象仮置き部
62t :第2対象仮置き部
63t :第3対象仮置き部
7 :搬出部
70 :搬出位置
8 :制御システム
9 :物品
X :特定方向
100: Transport equipment 1: Transport vehicle 2: Transport route 21: First section 22: Second section 5: Holding device 50: Holding section 6: Temporary storage section 6m: Both section temporary storage section 6s: One side temporary storage section 61t: First object temporary storage section 62t: Second object temporary storage section 63t: Third object temporary storage section 7: Unloading section 70: Unloading position 8: Control system 9: Article X: Specific direction

Claims (8)

物品を搬送する搬送台車と、
前記搬送台車が一方向に移動する搬送経路と、
前記物品が順次搬送されてきて保持される保持部を複数備えた保持装置と、
前記物品を外部へ搬出する搬出部と、
前記搬送台車を制御する制御システムと、を備えた搬送設備であって、
前記搬送経路は、前記搬出部に対応する搬出位置を通って前記搬送台車が一方向に循環する循環経路を形成しており、前記搬出位置に対して下流側に設定された第1区間と、前記第1区間よりも下流側かつ前記搬出位置よりも上流側に設定されていると共に前記第1区間に対して特定方向に離間して平行状に配置された第2区間と、を備え、
複数の前記保持部は、前記第1区間に沿って並ぶように配置され、
前記物品を一時的に保管可能な仮置き部が、前記搬送経路に沿って複数配置され、
複数の前記仮置き部には、前記第1区間と前記第2区間との前記特定方向の間において前記第1区間及び前記第2区間の双方に沿って並ぶように配置された両区間仮置き部が複数含まれ、
前記搬送台車は、前記搬送経路における、複数の前記保持部、複数の前記仮置き部、及び、前記搬出部のそれぞれに対応する位置において、それらと前記物品の受け渡しを行うことができるように構成され、
複数の前記保持部に保持された前記物品のうち1つを対象物品とし、複数の前記保持部に保持された前記物品のうちの前記対象物品以外の前記物品を非対象物品とし、前記対象物品が保持されている前記保持部を対象保持部として、
前記制御システムは、
前記搬送台車により前記対象物品を前記搬出部へ搬送する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が存在する場合には、当該空き状態の前記両区間仮置き部を第1対象仮置き部として、前記対象物品を前記対象保持部から受け取って前記第1区間内で前記第1対象仮置き部に引き渡し、その後、前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取って前記搬出部に引き渡す、中継搬出処理を前記搬送台車により実行し、
更に、前記中継搬出処理を実行する場合において、前記第1区間内で前記第1対象仮置き部に前記対象物品を引き渡した位置の下流側に前記非対象物品が保持された前記保持部である非対象保持部があり、かつ、前記非対象保持部の下流側であって前記第2区間内で前記第1対象仮置き部から前記対象物品を受け取る位置の上流側に空き状態の前記仮置き部が存在する場合には、当該空き状態の前記仮置き部を第2対象仮置き部として、前記中継搬出処理の途中で、前記非対象物品を前記非対象保持部から受け取って前記第2対象仮置き部に引き渡す、中間搬送処理を前記搬送台車により実行する、搬送設備。
A transport vehicle for transporting goods;
a transport path along which the transport vehicle moves in one direction;
a holding device including a plurality of holding parts in which the articles are sequentially conveyed and held;
an unloading section that unloads the article to the outside;
A transport facility comprising: a control system for controlling the transport vehicle;
The conveyance path forms a circulation path in which the conveyance vehicle circulates in one direction through a carry-out position corresponding to the carry-out section, and includes a first section set on the downstream side with respect to the carry-out position; a second section that is set downstream of the first section and upstream of the carry-out position, and is spaced apart from and parallel to the first section in a specific direction;
The plurality of holding parts are arranged so as to line up along the first section,
A plurality of temporary storage parts capable of temporarily storing the articles are arranged along the conveyance route,
The plurality of temporary storage sections include temporary storage sections arranged along both the first section and the second section between the first section and the second section in the specific direction. Contains multiple parts,
The transport vehicle is configured to be able to transfer the article to and from the plurality of holding sections, the plurality of temporary storage sections, and the carrying-out section at positions corresponding to each of the holding sections, the plurality of temporary storage sections, and the carrying-out section on the transport route. is,
One of the articles held by the plurality of holding sections is a target article, the articles other than the target article among the articles held by the plurality of holding sections are set as non-target articles, and the target article is The holding part in which is held is the target holding part,
The control system includes:
When the target article is transported to the unloading section by the transport vehicle, if there is a temporary storage section in both sections in an empty state on the downstream side of the object holding section in the first section, the empty state The two section temporary storage sections of are used as first target temporary storage sections to receive the target article from the target holding section and deliver it to the first target temporary storage section within the first section, and then to the first target temporary storage section within the second section. performing a relay carry-out process using the transport trolley, in which the target article is received from the first target temporary storage unit and delivered to the carry-out unit;
Furthermore, when performing the relay carry-out process, the holding section holds the non-target article on the downstream side of the position where the target article is delivered to the first target temporary storage section within the first section. The temporary storage has a non-target holding section and is vacant on the downstream side of the non-target holding section and upstream of the position for receiving the target article from the first temporary storage section within the second section. If there is a temporary holding section, the vacant temporary storage section is set as a second target temporary storage section, and during the relay carrying out process, the non-target article is received from the non-target holding section and the second target storage section is set as the second target temporary storage section. A conveyance facility in which intermediate conveyance processing for handing over to a temporary storage section is executed by the conveyance cart.
前記制御システムは、前記中継搬出処理を実行する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が複数存在する場合には、それらのうち最も上流側の前記両区間仮置き部を前記第1対象仮置き部とする、請求項1に記載の搬送設備。 When executing the relay unloading process, if there are a plurality of empty temporary storage units for both sections downstream of the object holding section in the first section, the control system selects the most temporary storage section among them. The conveyance equipment according to claim 1, wherein the upstream temporary storage section for both sections is the first target temporary storage section. 前記制御システムは、前記搬送台車により前記対象物品を前記対象保持部から前記搬出部へ搬送する場合において、前記第1区間における前記対象保持部の下流側に、空き状態の前記両区間仮置き部が存在しない場合には、前記対象物品を前記対象保持部から受け取って、そのまま前記対象物品を前記搬出位置まで搬送し、前記対象物品を前記搬出部に引き渡す、直接搬出処理を前記搬送台車により実行する、請求項1又は2に記載の搬送設備。 When the target article is transported from the target holding section to the carrying out section by the transport vehicle, the control system includes a temporary storage section in both sections in an empty state on the downstream side of the object holding section in the first section. If the target article does not exist, the conveyance truck executes a direct unloading process in which the target article is received from the target holding section, the target article is directly transported to the unloading position, and the target article is delivered to the unloading section. The conveying equipment according to claim 1 or 2. 前記制御システムは、前記第1区間における前記対象保持部の上流側に前記非対象保持部があり、かつ、前記非対象保持部の下流側であって前記対象保持部の上流側に空き状態の前記仮置き部が存在する場合には、当該空き状態の前記仮置き部を第3対象仮置き部として、前記対象物品を前記対象保持部から受け取る前に、前記非対象物品を前記非対象保持部から受け取って前記第3対象仮置き部に引き渡す、事前搬送処理を前記搬送台車により実行する、請求項1から3のいずれか一項に記載の搬送設備。 The control system includes the non-target holding unit upstream of the target holding unit in the first section, and an empty state downstream of the non-target holding unit and upstream of the target holding unit. If the temporary storage section exists, the empty temporary storage section is set as a third target temporary storage section, and the non-target article is placed in the non-target storage section before the target article is received from the target holding section. The conveyance equipment according to any one of claims 1 to 3, wherein the conveyance cart performs a preliminary conveyance process of receiving the object from the third target temporary storage section and delivering it to the third target temporary storage section. 前記制御システムは、前記非対象保持部が複数存在する場合、それぞれの前記非対象保持部から前記非対象物品を受け取った場合に当該非対象物品を引き渡すことができる空き状態の前記仮置き部が存在するか否かを、前記搬送台車が複数の前記非対象保持部のそれぞれに到達する毎に判定する、請求項1から4のいずれか一項に記載の搬送設備。 In the case where there are a plurality of non-target holding units, the control system controls the temporary storage unit in an empty state to which the non-target article can be delivered when the non-target article is received from each of the non-target holding units. The conveyance equipment according to any one of claims 1 to 4, wherein whether or not the non-target holding portion exists is determined each time the conveyance vehicle reaches each of the plurality of non-target holding parts. 前記制御システムは、前記仮置き部に保管された前記物品であって前記対象物品と同等であるとみなす1つ以上の前記物品を同等物品として設定し、前記同等物品を前記対象物品とみなすと共に当該同等物品が保管された前記仮置き部を前記第1対象仮置き部とみなした場合に前記中間搬送処理を実行できる場合には、前記同等物品を前記対象物品とみなすと共に当該同等物品が保管された前記仮置き部を前記第1対象仮置き部とみなして、前記中継搬出処理及び前記中間搬送処理を実行する、請求項1から5のいずれか一項に記載の搬送設備。 The control system sets one or more of the articles stored in the temporary storage section that are considered to be equivalent to the target article as equivalent articles, and considers the equivalent article as the target article. If the intermediate conveyance process can be executed when the temporary storage section where the equivalent article is stored is regarded as the first target temporary storage section, the equivalent article is regarded as the target article and the equivalent article is stored. The conveyance equipment according to any one of claims 1 to 5, wherein the relay carry-out process and the intermediate conveyance process are executed by regarding the temporarily placed part as the first target temporary place part. 複数の前記仮置き部には、前記第2区間に沿って並ぶように配置され、前記第2区間内に位置する前記搬送台車とのみ前記物品の受け渡しが行われる片側仮置き部が更に含まれ、
前記制御システムは、前記両区間仮置き部と前記片側仮置き部との双方から、前記中間搬送処理における前記第2対象仮置き部を選択する、請求項1から6のいずれか一項に記載の搬送設備。
The plurality of temporary storage units further include a one-sided temporary storage unit that is arranged in line along the second section and receives and receives the articles only with the transport vehicle located within the second section. ,
The control system according to any one of claims 1 to 6, wherein the control system selects the second target temporary storage section in the intermediate conveyance process from both the two-section temporary storage section and the one-side temporary storage section. transportation equipment.
前記搬送台車を複数備え、
前記制御システムは、複数の前記搬送台車のそれぞれを対象搬送台車として、前記対象搬送台車が搬送中であった前記物品を前記搬出部に引き渡した後、最も上流側に配置された前記保持部に到達するまでの間に、前記対象搬送台車に搬送させる前記対象物品を指定する、請求項1から7のいずれか一項に記載の搬送設備。
comprising a plurality of the transport vehicles,
The control system uses each of the plurality of transport vehicles as a target transport vehicle, and after the target transport vehicle delivers the article being transported to the unloading unit, transfers the article to the holding unit disposed at the most upstream side. The conveyance equipment according to any one of claims 1 to 7, wherein the target article to be conveyed to the target conveyance vehicle is specified before reaching the target article.
JP2022030849A 2022-03-01 2022-03-01 Transport facility Pending JP2023127211A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022030849A JP2023127211A (en) 2022-03-01 2022-03-01 Transport facility
PCT/JP2023/007191 WO2023167159A1 (en) 2022-03-01 2023-02-28 Transport facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022030849A JP2023127211A (en) 2022-03-01 2022-03-01 Transport facility

Publications (1)

Publication Number Publication Date
JP2023127211A true JP2023127211A (en) 2023-09-13

Family

ID=87883700

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022030849A Pending JP2023127211A (en) 2022-03-01 2022-03-01 Transport facility

Country Status (2)

Country Link
JP (1) JP2023127211A (en)
WO (1) WO2023167159A1 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05178404A (en) * 1991-12-27 1993-07-20 Mitsubishi Heavy Ind Ltd Delivery control device for automatic warehouse
FR3031510B1 (en) * 2015-01-13 2019-04-19 Savoye SEQUENCING SYSTEM AND METHOD FOR AT LEAST ONE PREPARATION STATION

Also Published As

Publication number Publication date
WO2023167159A1 (en) 2023-09-07

Similar Documents

Publication Publication Date Title
JP7507210B2 (en) CARGO CONVEYING METHOD, CARGO CONVEYING DEVICE, SERVER, AND STORAGE MEDIUM
KR100855594B1 (en) Transportation system
JPH09315521A (en) Conveying system to stocker
JP2005243729A (en) Conveyer system
JP7338708B2 (en) Automated warehouse, automated warehouse control method, program, and automated warehouse system
JP2023127211A (en) Transport facility
JP2006290542A (en) Conveying system and conveyance control method
JP5796300B2 (en) Automatic warehouse
JP7392635B2 (en) Goods storage equipment
JP2002087539A (en) Carrying system
JP7444138B2 (en) Goods storage equipment
JP7200810B2 (en) Goods storage facility
JP7183732B2 (en) Transfer robot system and automated warehouse system
JP3353973B2 (en) Work transfer device for plate processing machine
JP3735895B2 (en) Transport control system
JP2018141292A (en) Mechanical parking facility
WO2023038046A1 (en) Article storage facility, article storage method and article storage program
WO2022024507A1 (en) Article storage facility
JPH0812008A (en) Load disposal in automatic warehouse and device therefor
JP2018115064A (en) Automatic warehouse system
JP2005082284A (en) Carrying control device for carrying vehicle
JPH11165809A (en) Automatic carrier
KR20240096112A (en) Container transfer system and container transfer method
JP2023139860A (en) Carrier system
JPH07267307A (en) Article receiving/delivering method in plane type automatic warehouse

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240227

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20240522

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240611