JP2023087961A - Anti-scouring structure and its construction method - Google Patents

Anti-scouring structure and its construction method Download PDF

Info

Publication number
JP2023087961A
JP2023087961A JP2021202544A JP2021202544A JP2023087961A JP 2023087961 A JP2023087961 A JP 2023087961A JP 2021202544 A JP2021202544 A JP 2021202544A JP 2021202544 A JP2021202544 A JP 2021202544A JP 2023087961 A JP2023087961 A JP 2023087961A
Authority
JP
Japan
Prior art keywords
scouring
adjacent
bed
blocks
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021202544A
Other languages
Japanese (ja)
Inventor
勇太 関谷
Yuta Sekiya
祐介 石川
Yusuke Ishikawa
洋一 田代
Yoichi Tashiro
直人 常住
Naoto Tsunesumi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Agriculture and Food Research Organization
Nakada Industrial Co Ltd
Original Assignee
National Agriculture and Food Research Organization
Nakada Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Agriculture and Food Research Organization, Nakada Industrial Co Ltd filed Critical National Agriculture and Food Research Organization
Priority to JP2021202544A priority Critical patent/JP2023087961A/en
Publication of JP2023087961A publication Critical patent/JP2023087961A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

To provide an anti-scouring structure and its construction method capable of suppressing suction and leakage of gravel from the bottom and surroundings of a protective block and stabilizing the installation state of multiple protective blocks.SOLUTION: An anti-scouring structure (10) includes multiple bed protection blocks (16) as multiple protective blocks that are laid on the river bed (SB) to protect the river bed (SB), and adjacent bed protection blocks (16) are flexibly connected to each other. The anti-scouring structure (10) includes a suction prevention member (22) that is provided to some of the bed protection blocks (16) to prevent drainage and seepage of gravel in the river bed (SB) from a gap between the adjacent bed protection blocks (16).SELECTED DRAWING: Figure 3

Description

本発明は、河床、水路底、静水池又は海底の洗掘を防止するための洗掘防止構造、及びその施工方法に関する。 TECHNICAL FIELD The present invention relates to an anti-scouring structure for preventing scouring of riverbeds, channel bottoms, still water ponds or seabeds, and a construction method thereof.

多くの農業用取水堰等の堰は、例えば圃場送水の便から河川の中上流域に設置されている。また、堰の下流側においては、治水や骨材採取の目的で河床掘削されることが多く、その河床低下が上流側に波及する。河床低下が堰直下流に至ると、パイピングや堰直下流の洗掘が生じ、堰底部の砂礫が吸い出されて、堰下流部のコンクリート床(エプロン)の陥没等から堰の損壊を引き起こす。 Weirs such as many agricultural water intake weirs are installed, for example, in the middle and upstream areas of rivers from the facilities of agricultural water supply. In addition, the riverbed is often excavated downstream of the weir for the purpose of flood control and collection of aggregates, and the deterioration of the riverbed spreads to the upstream side. When the river bed declines directly downstream of the weir, piping and scouring occur immediately downstream of the weir, and gravel at the bottom of the weir is sucked out.

一般に、堰等の構造物の下流側には、河床を保護するための複数の保護ブロックとして複数の護床ブロックが敷設されている。複数の護床ブロックは、河幅方向に沿って複数列になっている。隣接する各護床ブロック同士は、流水等で散逸しないようにシャックル等の連結部材によって屈撓可能に連結されている場合がある。或いは、隣接する各護床ブロック同士が屈撓可能に連結されるように、隣接する各護床ブロック同士は、噛み合う形状に構成されている場合もある。また、護床ブロックの散逸を防ぐため、護床ブロックを大型化もしくは重量化する場合もある。 In general, a plurality of bed protection blocks are laid as a plurality of protection blocks for protecting a riverbed downstream of a structure such as a weir. A plurality of bed protection blocks are arranged in a plurality of rows along the river width direction. Adjacent floor protection blocks may be connected to each other in a flexible manner by a connecting member such as a shackle so as not to be scattered by running water or the like. Alternatively, the adjacent floor protection blocks may be configured in a shape that meshes with each other so that the adjacent floor protection blocks are connected to each other in a flexible manner. Further, in order to prevent the floor protection block from dissipating, the floor protection block may be increased in size or weight.

なお、本発明に関連する先行文献として特許文献1に示すものがある。 Incidentally, there is one shown in Patent Document 1 as a prior document related to the present invention.

特許第6871583号公報Japanese Patent No. 6871583

隣接する各護床ブロック同士の間には、例えば5cm程度の隙間が存在している。堰からの放流流速が大きければ、その隙間から護床ブロック底面の砂礫が吸い出され、護床ブロックの沈下が進む。沈下により流れが護床ブロック上へ落下してくるようになると更に吸い出しが進み、堰直下流に大きな洗掘孔を発生させることになる。 A gap of about 5 cm, for example, exists between adjacent bed protection blocks. If the velocity of the discharge from the weir is high, gravel on the bottom of the bed protection block will be sucked out through the gaps, and the bed protection block will subside. If the flow falls on the protection block due to subsidence, the suction progresses further and a large scouring hole is generated immediately downstream of the weir.

同様の現象は、堰下流の河床低下により水位が低下した場合、護床ブロック群(護床工)の直下流でも起きる。この場合は、護床工下流の水位の低下により流速が増大するので、護床工直下流の洗掘が拡大し、護床工底部の砂礫が洗掘孔に漏出して、そこから護床工の屈撓(凹凸化)や護床工の傾斜化(傾動)が起きる。洗掘孔の拡大により屈撓や傾斜化は更に著しくなる。護床ブロック間の隙間は、屈撓角度等に応じて広がり、これにより護床ブロック底部及び周囲の砂礫は更に吸い出されやすくなるうえ、傾斜化により護床ブロック上の流速も増すので、この点からも吸い出しが著しくなる。このようにして傾斜化が護床工の上流部に波及し堰直下流に達すると堰直下流の流速も速くなる。これにより堰直下流にも洗掘孔が発生し拡大する。洗掘孔の拡大により堰直下流が落下流となると、洗掘孔は更に拡大し、護床工直下流の洗掘拡大による護床ブロック沈下と相まって、遂には堰下流の河床低下が堰直下流まで波及することになる。 A similar phenomenon occurs immediately downstream of the bed protection block group (bed protection work) when the water level drops due to the lowering of the riverbed downstream of the weir. In this case, since the flow speed increases due to the lowering of the water level downstream of the bed protection, the scouring just downstream of the bed protection is expanded, and the gravel at the bottom of the bed protection leaks into the scouring hole, and the bed protection from there. Flexure (unevenness) and tilting (tilting) of the bed protection work occur. As the scouring hole widens, bending and tilting become more pronounced. The gaps between the bed protection blocks widen according to the bending angle, etc., which makes it easier for the gravel and gravel at the bottom of the bed protection blocks to be sucked out. The suction becomes remarkable even from the point. In this way, when the slope spreads to the upstream part of the bed protection work and reaches directly downstream of the weir, the flow velocity immediately downstream of the weir also increases. As a result, scouring holes also occur and expand immediately downstream of the weir. When the scouring hole expands and the flow directly downstream of the weir becomes a falling flow, the scouring hole expands further, and the bed protection block subsides due to the expansion of scouring just downstream of the bed protection work. It will spread downstream.

以上のような堰直下流の洗掘孔の拡大や堰直下流の河床低下(護床ブロック沈下)によって、堰底面にパイピングが発生したり、エプロン底部の砂礫が漏出し、遂には堰の損壊を来すことになる。 As described above, due to the expansion of scouring holes directly downstream of the weir and the lowering of the riverbed (protection block settlement) immediately downstream of the weir, piping occurs on the bottom of the weir, and gravel at the bottom of the apron leaks, and finally the weir is damaged. will come.

護床ブロックの連結化では、下流河床が低下する等、流速が速くなる場合には、護床ブロック隙間からの砂礫の吸い出しを防げないので、堰直下流の洗掘や堰の損壊も防げない。一方、護床ブロックの大型化もしくは重量化でも、下流河床低下に伴う護床工直下流の洗掘拡大は防げず、ゆえに護床工直下流の洗掘孔への護床ブロックの転動や流失も防げず、最終的には護床ブロックが散逸し、堰直下流の洗掘を招くこととなる。すなわち、護床ブロックの連結化や大型化、重量化は堰直下流の洗掘や河床低下を幾分遅らせる効果しかない。また、護床ブロックの流失に対し護床ブロックを補填しても更に流失するだけでほとんど効果がない。 Connecting the bed protection blocks does not prevent the suction of gravel from the gaps in the bed protection blocks when the flow speed increases, such as when the downstream river bed is lowered, so it is not possible to prevent scouring or damage to the weir immediately downstream. . On the other hand, increasing the size or weight of the bed protection block does not prevent the expansion of scouring just downstream of the bed protection work due to the lowering of the downstream river bed. It cannot be prevented from being washed away, and eventually the bed protection blocks will disperse, leading to scouring immediately downstream of the weir. In other words, connecting, enlarging, and increasing the weight of bed protection blocks has only the effect of somewhat delaying scouring and river bed deterioration immediately downstream of the weir. In addition, even if the bed protection block is washed away, the bed protection block will be washed away further, and there is almost no effect.

堰等構造物の損壊を回避するための対策として、堰等の下流に床止め等の河川横断構造物を付設して傾斜した護床ブロックを元の姿勢に修復する手法と、隣接する各護床ブロック同士の間に間詰コンクリートを注入する手法が考えられる。前者の手法は、堰と同様の河川横断構造物を新たに築造することになるので費用が嵩むうえ、床止め直下流でも洗掘や河床低下の問題が起きるので、床止めの増設を繰り返すことになる。後者の手法は、隣接する各護床ブロック同士の屈撓性が無くなり、護床ブロックが河床地形の変化に追従することができず、護床工直下流の洗掘によって、護床工の下流端から護床工の損壊と護床ブロックの流失が生じ、結局は堰直下流の洗掘を引き起こすことになる。もしくは堰直下流の洗掘を防ぐために、頻繁に護床工直下流の洗掘孔の埋め戻し、護床工の修復を行うことになり、やはり費用が嵩む。 As a measure to avoid damage to structures such as weirs, there is a method to restore the tilted bed protection block to its original posture by attaching a river crossing structure such as a floor sill downstream of the weir, etc. A method of injecting filling concrete between floor blocks is conceivable. The former method involves constructing a new river crossing structure similar to the weir, which is expensive, and also causes problems such as scouring and lowering of the riverbed immediately downstream of the floor sills, so it is necessary to repeatedly increase the number of sills. become. In the latter method, the flexibility of adjacent bed protection blocks is lost, and the bed protection blocks cannot follow changes in the topography of the river bed. Damage to the bed protection work and loss of bed protection blocks will occur from the edge, eventually causing scouring immediately downstream of the weir. Alternatively, in order to prevent scouring immediately downstream of the weir, it is necessary to frequently backfill the scouring holes immediately downstream of the bed protection work and repair the bed protection work, which also increases the cost.

つまり、堰下流の河床低下に伴う下流水位の低下と護床ブロック上の流速増大に対して、エプロン直下流の洗掘や河床低下を抑えるのは容易ではない、もしくは費用が嵩むという問題がある。 In other words, there is a problem that it is not easy to suppress scouring and river bed deterioration directly downstream of the apron, or the cost increases, in response to the lowering of the downstream water level and the increase in flow velocity on the protection block due to the lowering of the riverbed downstream of the weir. .

前述の洗掘に係る問題は、堰等の構造物の下流側に設置された洗掘防止構造だけでなく、構造物の上流側に設置された洗掘防止構造においても流速が速ければ生じる。また、下流河床が低下していなくても護床工の設計想定以上に流速が速くなれば生じる。河川に関わらず、水路底、静水池又は海底に設置された洗掘防止構造においても生じる。 The above-mentioned problems related to scouring occur not only in anti-scouring structures installed downstream of structures such as weirs, but also in anti-scouring structures installed upstream of structures if the flow velocity is high. Also, even if the downstream riverbed is not lowered, it will occur if the flow velocity becomes faster than the design assumption of the bed protection work. It also occurs in anti-scouring structures installed on the bottom of channels, still water ponds or seabeds, regardless of the river.

そこで、本発明の一態様は、保護ブロック等の底部及び周囲の砂礫の吸出しや漏出を抑え、複数の保護ブロック等の設置状態を安定させることで、構造物の上下流等周囲の洗掘や河床等の低下を抑えることを目的とする。 Therefore, one aspect of the present invention is to suppress the suction and leakage of sand and gravel at the bottom and surroundings of the protective blocks, etc., and stabilize the installation state of the plurality of protective blocks, etc., so that scouring and The purpose is to suppress the deterioration of the riverbed, etc.

前述の課題を解決するため、本発明の一態様に係る洗掘防止構造は、河床、水路底、静水池又は海底の洗掘を防止するための洗掘防止構造であって、河床、水路底、静水池又は海底に敷設され、河床、水路底、静水池又は海底を保護するための複数の保護ブロックを備え、隣接する保護ブロック同士は、屈撓可能に連結され、更に、各保護ブロックの一部に設けられ、隣接する各保護ブロック同士の間の隙間からの河床、水路底、静水池又は海底の砂礫の吸出しを防止するための吸出防止部材を備える。 In order to solve the aforementioned problems, a scour-preventing structure according to one aspect of the present invention is a scour-preventing structure for preventing scour of a riverbed, a channel bottom, a still water pond, or a seabed, comprising: , laid in a still water pond or seabed, provided with a plurality of protection blocks for protecting the riverbed, channel bottom, still water pond or seabed, adjacent protection blocks are connected flexibly, and furthermore, each protection block A suck-out prevention member is provided in a part of the protection block to prevent the suck-out of gravel on the riverbed, channel bottom, still water pond or seabed from the gaps between the adjacent protection blocks.

前述の課題を解決するため、本発明の一態様に係る洗掘防止構造の施工方法は、本発明の一態様に係る洗掘防止構造を施工するための方法であって、複数の保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、隣接する各保護ブロック同士の側面又は上面に取付けた吸出防止部材を連結する第1連結工程と、敷設済みの隣接する各保護ブロック同士を屈撓可能に連結する第2連結工程と、を含む。 In order to solve the above-described problems, a method for constructing an anti-scouring structure according to an aspect of the present invention is a method for constructing an anti-scouring structure according to an aspect of the present invention, comprising a plurality of protective blocks. A laying step of laying on a riverbed, channel bottom, still water pond or seabed, a first connecting step of connecting the suction prevention members attached to the side surfaces or top surfaces of adjacent protection blocks, and adjacent protection blocks that have already been laid. and a second connecting step of flexibly connecting the .

また、本発明の一態様に係る洗掘防止構造の施工方法は、本発明の一態様に係る洗掘防止構造を施工するための方法であって、各保護ブロックの底面又は側面に取付けた吸出防止部材が各保護ブロックに隣接する前記保護ブロックの下側に位置するように、複数の前記保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、敷設済みの隣接する各保護ブロック同士を屈撓可能に連結する連結工程と、を含む。 Further, a method for constructing an anti-scouring structure according to an aspect of the present invention is a method for constructing an anti-scouring structure according to an aspect of the present invention, comprising a suction pipe attached to the bottom surface or side surface of each protection block. A laying step of laying a plurality of said protective blocks on a river bed, a channel bottom, a still water pond or a seabed such that a preventive member is positioned below said protective block adjacent to each protective block, and each laid adjacent protection block. a connecting step of flexibly connecting the blocks together.

本発明の一態様によれば、保護ブロック底部及び周囲の砂礫の吸出しを抑えて、もしくは保護ブロック底部の砂礫の洗掘孔への漏出を抑えて、複数の保護ブロックの設置状態を安定させることができる。 According to one aspect of the present invention, it is possible to stabilize the installation state of a plurality of protection blocks by suppressing the suction of gravel at the bottom of the protection block and its surroundings, or suppressing the leakage of gravel at the bottom of the protection block into the scouring hole. can be done.

第1実施形態に係る洗掘防止構造の模式的な側断面図である。1 is a schematic side cross-sectional view of a scouring prevention structure according to a first embodiment; FIG. 図1に示す洗掘防止構造の模式的な平面図である。FIG. 2 is a schematic plan view of the scour prevention structure shown in FIG. 1; 図1におけるIII部の拡大図である。2 is an enlarged view of part III in FIG. 1; FIG. 図2におけるIV部の拡大図である。FIG. 3 is an enlarged view of part IV in FIG. 2; 吸出防止部材が護床ブロックの側面にその周方向に沿って取付けられた様子を示す模式的な斜視図である。FIG. 4 is a schematic perspective view showing how the suction prevention member is attached to the side surface of the floor protection block along its circumferential direction. 第1実施形態に係る洗掘防止構造の施工方法を説明する模式図である。It is a schematic diagram explaining the construction method of the scouring prevention structure which concerns on 1st Embodiment. 第2実施形態に係る洗掘防止構造の模式的な側断面図である。It is a typical sectional side view of the scouring prevention structure which concerns on 2nd Embodiment. 図7におけるVIII部の拡大図である。8 is an enlarged view of the VIII section in FIG. 7; FIG. 吸出防止部材が護床ブロックの底面に取付けられた様子を示す模式的な斜視図である。FIG. 4 is a schematic perspective view showing how the suction prevention member is attached to the bottom surface of the floor protection block. 第2実施形態に係る洗掘防止構造の施工方法を説明する模式図である。It is a schematic diagram explaining the construction method of the scouring prevention structure which concerns on 2nd Embodiment. 第3実施形態に係る洗掘防止構造の模式的な側断面図である。It is a typical sectional side view of the scouring prevention structure which concerns on 3rd Embodiment. 図11に示す洗掘防止構造の模式的な平面図である。FIG. 12 is a schematic plan view of the scour prevention structure shown in FIG. 11; 図11におけるXIII部の拡大図である。12 is an enlarged view of section XIII in FIG. 11; FIG.

以下、本発明の実施形態について図面を参照して説明する。なお、本願の明細書及び特許請求範囲において、河床とは、河底の他に、河の法面を含む意である。水路底とは、農業用排水路、ダム放水路等の種々の水路の底の他に、水路の法面を含む意である。海底とは、海岸の近傍の海底の他に、海岸の法面を含む意である。砂礫とは、土砂を含む意である。図面中、「WD」は河幅方向、「FD」は流れ方向をそれぞれ指している。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, in the specification and claims of the present application, the term "river bed" includes not only the river bottom but also the slope of the river. The term "channel bottom" means the bottom of various channels such as agricultural drainage channels and dam discharge channels, as well as slopes of channels. The seabed is meant to include not only the seabed in the vicinity of the coast, but also the slope of the coast. Gravel is meant to include earth and sand. In the drawings, "WD" indicates the river width direction, and "FD" indicates the flow direction.

〔第1実施形態〕
図1から図5を参照して、第1実施形態に係る洗掘防止構造10の構成について説明する。図1は、第1実施形態に係る洗掘防止構造10の模式的な側断面図である。図2は、図1に示す洗掘防止構造10の模式的な平面図である。図3は、図1におけるIII部の拡大図である。図4は、図2におけるIV部の拡大図である。図5は、吸出防止部材22が護床ブロック16の側面にその周方向に沿って取付けられた様子を示す模式的な斜視図である。
[First embodiment]
The configuration of the anti-scouring structure 10 according to the first embodiment will be described with reference to FIGS. 1 to 5. FIG. FIG. 1 is a schematic side cross-sectional view of a scouring prevention structure 10 according to the first embodiment. FIG. 2 is a schematic plan view of the scour prevention structure 10 shown in FIG. FIG. 3 is an enlarged view of section III in FIG. FIG. 4 is an enlarged view of part IV in FIG. FIG. 5 is a schematic perspective view showing how the suction prevention member 22 is attached to the side surface of the bed protection block 16 along its circumferential direction.

図1及び図2に示すように、第1実施形態に係る洗掘防止構造10は、河床SBの洗掘を防止するための構造であり、堰のエプロン12の直下流側に設置されている。洗掘防止構造10は、河床SBの両側にそれぞれ設置された護岸14の間に位置している。 As shown in FIGS. 1 and 2, the scouring prevention structure 10 according to the first embodiment is a structure for preventing scouring of the riverbed SB, and is installed immediately downstream of the apron 12 of the weir. . The scouring prevention structure 10 is located between the bank protection 14 respectively installed on both sides of the riverbed SB.

図1から図4に示すように、洗掘防止構造10は、河床SBを保護するための複数の保護ブロックとしての複数の護床ブロック16を備えており、複数の護床ブロック16は、河床SBにおけるエプロン12の直下流側に敷設されている。各護床ブロック16は、例えばコンクリートからなり、複数の護床ブロック16は、河幅方向に沿って複数列になっている。河幅方向に隣接する護床ブロック16の間隔は、例えば5cm程度の隙間に設定されている。流れ方向に隣接する護床ブロック16の間隔は、例えば5cm程度の隙間に設定されている。 As shown in FIGS. 1 to 4, the scouring prevention structure 10 includes a plurality of bed protection blocks 16 as a plurality of protection blocks for protecting the riverbed SB. It is laid on the immediate downstream side of the apron 12 on the SB. Each bed protection block 16 is made of concrete, for example, and the plurality of bed protection blocks 16 are arranged in multiple rows along the river width direction. The interval between the bed protection blocks 16 adjacent in the river width direction is set to, for example, a gap of about 5 cm. The interval between the bed protection blocks 16 adjacent to each other in the flow direction is set to, for example, a gap of about 5 cm.

各護床ブロック16の形状は、説明を簡単とするために略直方体形状にしているが、既存の護床ブロックと同様に、種々の形状に変更可能である。 The shape of each bed protection block 16 is a substantially rectangular parallelepiped shape for the sake of simplicity of explanation, but it can be changed into various shapes like the existing bed protection blocks.

図3から図5に示すように、各護床ブロック16の上部の各角部には、連結配筋(連結環)18が埋設されている。流れ方向及び/又は河幅方向に隣接する各護床ブロック16の各連結配筋18同士は、例えばシャックル等の連結部材20によって屈撓可能に連結されている。換言すれば、洗掘防止構造10は、流れ方向及び/又は河幅方向に隣接する各護床ブロック16同士を屈撓可能に連結する連結部材20を備えている。 As shown in FIGS. 3 to 5 , connecting reinforcing bars (connecting rings) 18 are embedded in each corner of the upper portion of each bed protection block 16 . The connecting reinforcing bars 18 of the bed protection blocks 16 adjacent in the flow direction and/or the river width direction are flexibly connected by connecting members 20 such as shackles. In other words, the scouring prevention structure 10 includes connecting members 20 that flexibly connect the bed protection blocks 16 adjacent to each other in the flow direction and/or the river width direction.

図3から図5に示すように、洗掘防止構造10は、流れ方向及び/又は河幅方向に隣接する各護床ブロック16同士の間の隙間からか河床SBの砂礫の吸出しを防止するための吸出防止部材22を備えている。各吸出防止部材22は、各護床ブロック16の一部である側面にその周囲方向に沿って設けられている。各吸出防止部材22は、網状もしくは膜状に構成されている。 As shown in FIGS. 3 to 5, the anti-scouring structure 10 is designed to prevent the suction of sand and gravel from the riverbed SB through gaps between the bed protection blocks 16 adjacent in the flow direction and/or the river width direction. of suction prevention member 22 is provided. Each suction prevention member 22 is provided along the peripheral direction on the side surface which is a part of each floor protection block 16 . Each suction prevention member 22 is configured in a net shape or a film shape.

各吸出防止部材22の耐摩耗性及び耐久性を確保するために、各吸出防止部材22の素材として、ポリエステル繊維、ナイロン繊維、ポリエチレン繊維、ビニロン繊維のような汎用繊維や超高分子量ポリエチレン繊維、ポリアリレート繊維、アラミド繊維、炭素繊維、ガラス繊維のような高強度繊維が用いられる。各吸出防止部材22の素材は、単一の素材でもよいが、複合化した素材であってもよい。繊維の形状は強度に優れるフィラメント糸が望ましいが、スパン糸やスリットヤーン等でもよい。各吸出防止部材22の材料には主に編物ネットが使われ、編網手法として、通常はラッセル網を用いるが、無結節網又は有結節網を用いてもよい。各吸出防止部材22として、織物ネット、合成樹脂ネット、又は金網等を用いてもよい。また、不織布のような膜状の部材でもよい。 In order to ensure wear resistance and durability of each suction prevention member 22, the material of each suction prevention member 22 is general-purpose fibers such as polyester fiber, nylon fiber, polyethylene fiber, vinylon fiber, ultra-high molecular weight polyethylene fiber, High strength fibers such as polyarylate fibers, aramid fibers, carbon fibers and glass fibers are used. The material of each suction preventing member 22 may be a single material, or may be a composite material. As for the shape of the fiber, a filament yarn having excellent strength is desirable, but a spun yarn, a slit yarn, or the like may also be used. A knitted net is mainly used as the material of each suction prevention member 22, and as a knitted net method, a raschel net is usually used, but a knotless net or a knotted net may be used. A fabric net, a synthetic resin net, a wire net, or the like may be used as each suction prevention member 22 . Alternatively, a film-like member such as a non-woven fabric may be used.

各吸出防止部材22の網脚の直径(太さ)は、例えば1.0mm~8.0mmに設定されている。各吸出防止部材22の網目の大きさは、河床SBの砂礫の平均粒径以下に設定されている。砂礫の平均粒径とは、ふるい分け法によって求めた粒度分布の積算値60%における粒径のことをいう。具体的には、各吸出防止部材22の網目の大きさは、例えば5mm~25mm以下に設定されている。アーマリング等により平均粒径よりも大きな網目でも吸出し防止が図れるならば平均粒径よりも大きな網目とすることも有り得る。また、各吸出防止部材22は、1枚の部材からなるのであってもよく、複数枚の部材を重ね合わせてなるものであってよい。 The diameter (thickness) of the net leg of each suction prevention member 22 is set to, for example, 1.0 mm to 8.0 mm. The mesh size of each suction prevention member 22 is set to be equal to or less than the average grain size of gravel on the riverbed SB. The average particle size of sand and gravel means the particle size at 60% of the integrated value of the particle size distribution determined by the sieving method. Specifically, the mesh size of each suction prevention member 22 is set to, for example, 5 mm to 25 mm or less. If a mesh larger than the average particle size can be prevented from being sucked out by armoring or the like, it is possible to make the mesh larger than the average particle size. Moreover, each suction prevention member 22 may consist of one member, and may be formed by stacking a plurality of members.

各吸出防止部材22の端部には、例えば幅1cm~5cm程度の帯状部が形成されてもよい。各吸出防止部材22の帯状部は、各吸出防止部材22の端部の網目を閉じたり、帆布等の布材を縫製したりすることによって形成できる。また、各吸出防止部材22は、網状の部材ではなく、網目の無い膜状の部材であってもよい。 At the end of each suction prevention member 22, for example, a belt-like portion having a width of about 1 cm to 5 cm may be formed. The belt-shaped portion of each suction prevention member 22 can be formed by closing the mesh of the end of each suction prevention member 22 or by sewing a cloth material such as canvas. Further, each suction preventing member 22 may be a meshless film-like member instead of a mesh-like member.

各護床ブロック16の側面に対する各吸出防止部材22の取付手法は、コンクリートボンドを用いた接着、ステンレスボルトによる点止め取付、ステンレス製の押え板による取付、その他、公知の取付手法を用いてもよい。ただし、護床ブロック16が乾湿を繰り返す箇所に設置されるため、各吸出防止部材22の取付手法は、錆等より劣化しにくい素材を使用した手法であることが望ましい。 Attachment method of each suction prevention member 22 to the side surface of each bed protection block 16 may be adhesion using concrete bond, point stop attachment using stainless steel bolts, attachment using a stainless steel pressure plate, or other known attachment methods. good. However, since the bed protection block 16 is installed in a location where it is repeatedly dried and wet, it is desirable that the mounting method of each suction prevention member 22 is a method using a material that is less likely to deteriorate than rust or the like.

図2及び図4に示すように、流れ方向及び/又は河幅方向に隣接する各吸出防止部材22の端部同士は、隣接する各吸出防止部材22同士をロープで編み込み連結、ファスナによる噛み合わせ連結、ジョイントベルト、その他、公知の連結部材24によって連結されている。換言すれば、洗掘防止構造10は、流れ方向及び/又は河幅方向に隣接する各吸出防止部材22の端部同士を連結する連結部材24を備えている。連結部材24として、隣接する各吸出防止部材22の端部同士を接着する速乾接着剤、又は隣接する各吸出防止部材22の端部の網目同士を挿通して連結する連結ロープを用いてもよい。 As shown in FIGS. 2 and 4, the ends of the respective suction preventing members 22 adjacent in the flow direction and/or the river width direction are connected by braiding the adjacent suction preventing members 22 with a rope and meshed with a fastener. It is connected by a connection, joint belt, or other known connection member 24 . In other words, the anti-scouring structure 10 includes connecting members 24 that connect the ends of the respective anti-scouring members 22 adjacent in the flow direction and/or river width direction. As the connecting member 24, a quick-drying adhesive for adhering the ends of the adjacent suction preventing members 22 together, or a connecting rope for connecting by inserting the meshes of the ends of the adjacent suction preventing members 22 may be used. good.

続いて、図3から図6を参照して、第1実施形態に係る洗掘防止構造の施工方法について説明する。図6は、第1実施形態に係る洗掘防止構造の施工方法を説明する模式図である。 Next, a method for constructing the anti-scouring structure according to the first embodiment will be described with reference to FIGS. 3 to 6. FIG. FIG. 6 is a schematic diagram illustrating a construction method of the scour prevention structure according to the first embodiment.

図3及び図6に示すように、第1実施形態に係る洗掘防止構造の施工方法は、洗掘防止構造10を河床SBに施工するための方法であり、仮敷設工程と、取付工程と、第1連結工程と、敷設工程と、第2連結工程とを含んでいる。第1実施形態に係る洗掘防止構造の施工方法の具体的な内容は、次の通りである。 As shown in FIGS. 3 and 6, the construction method of the anti-scouring structure according to the first embodiment is a method for constructing the anti-scouring structure 10 on the riverbed SB, and includes a temporary laying process and an installation process. , a first connecting step, a laying step, and a second connecting step. Specific contents of the construction method of the anti-scouring structure according to the first embodiment are as follows.

図6のVIAに示すように、バックホウ又はクレーン等の建設機械によって複数の護床ブロック16を河床SBに仮敷設する(仮敷設工程)。そして、図5及び図6VIAに示すように、作業者は、各護床ブロック16の側面にその周方向に沿って吸出防止部材22を取付ける(取付工程)。 As shown in VIA of FIG. 6, a plurality of bed protection blocks 16 are temporarily laid on the riverbed SB by a construction machine such as a backhoe or a crane (temporary laying step). Then, as shown in FIGS. 5 and 6VIA, the worker attaches the suction prevention member 22 to the side surface of each bed protection block 16 along the circumferential direction (attachment step).

図6のVIBに示すように、隣接する護床ブロック16同士の間隔が例えば30cm程度の隙間になるように、建設機械によって河床SBにおける護床ブロック16の位置を調整する(仮敷設工程)。そして、図6のVICに示すように、作業者は、隣接する各吸出防止部材22の端部同士を連結部材24によって連結する(第1連結工程)。 As shown in VIB of FIG. 6, the positions of the bed protection blocks 16 on the riverbed SB are adjusted by the construction machine so that the gap between adjacent bed protection blocks 16 is, for example, about 30 cm (temporary laying step). Then, as shown in VIC of FIG. 6, the operator connects the ends of the adjacent suction preventing members 22 with the connecting members 24 (first connecting step).

図6のVIDに示すように、隣接する護床ブロック16同士の間隔が例えば5cm程度の隙間になるように、建設機械によって河床SBにおける護床ブロック16の位置を調整する。これにより、建設機械によって複数の護床ブロック16を河床SBに敷設することができる(敷設工程)。 As shown in VID of FIG. 6, the positions of the bed protection blocks 16 on the riverbed SB are adjusted by the construction machine so that the gap between adjacent bed protection blocks 16 is, for example, about 5 cm. As a result, a plurality of bed protection blocks 16 can be laid on the riverbed SB by construction machinery (laying step).

その後、図3及び図4に示すように、作業者は、隣接する各護床ブロック16の連結配筋18同士を連結部材20によって屈撓可能に連結する(第2連結工程)。これにより、洗掘防止構造10の施工が終了する。 After that, as shown in FIGS. 3 and 4, the operator connects the connecting reinforcements 18 of the adjacent floor protection blocks 16 with the connecting members 20 so as to be flexible (second connecting step). This completes the construction of the scour prevention structure 10 .

なお、工場等において、各護床ブロック16の側面に吸出防止部材22を予め取付けることにより、洗掘防止構造の施工方法から取付工程を省略してもよい。また、隣接する護床ブロック16同士の間隔が例えば30cm程度の隙間になるように河床SBにおける護床ブロック16の位置を調整しなくてもよい。この場合には、複数の護床ブロック16を河床SBに敷設した後に、作業者は、隣接する吸出防止部材22の端部同士を連結部材24によって連結する。 In a factory or the like, the mounting step may be omitted from the construction method of the scouring prevention structure by previously mounting the suction prevention member 22 on the side surface of each floor protection block 16 . Further, it is not necessary to adjust the positions of the bed protection blocks 16 on the riverbed SB so that the gap between the adjacent bed protection blocks 16 is, for example, about 30 cm. In this case, after laying the plurality of bed protection blocks 16 on the riverbed SB, the operator connects the ends of the adjacent suction preventing members 22 with the connecting member 24 .

続いて、第1実施形態の作用効果について説明する。 Next, the effects of the first embodiment will be described.

各吸出防止部材22が各護床ブロック16の一部である側面にその周囲方向に沿って設けられている。そのため、隣接する護床ブロック16同士が屈撓して、隣接する護床ブロック16同士の間の隙間が広がっても、その隙間からの河床SBの砂礫の吸出しを防止することができる。特に、各吸出防止部材22の網目の大きさが河床SBの砂礫の平均粒径以下に設定されているため、隣接する護床ブロック16同士の間の隙間からの河床SBの砂礫の吸出しを十分に防止することができる。これにより、護床ブロック16底部及び周囲の砂礫の吸出しによる護床ブロック16の傾斜化(傾動)やエプロン12直下流の洗掘を抑えて、複数の護床ブロック16の設置状態を安定させることができる。よって、河床SBに設置された堰直下流の洗掘を防止して、エプロン12の陥没等、堰の損壊を回避することができる。 Each suction prevention member 22 is provided on a side surface of each floor protection block 16 along its peripheral direction. Therefore, even if the adjacent bed protection blocks 16 are bent and the gaps between the adjacent bed protection blocks 16 widen, the gravel of the riverbed SB can be prevented from being sucked out from the gaps. In particular, since the mesh size of each suction prevention member 22 is set to be equal to or less than the average grain size of gravel on the riverbed SB, the gravel on the riverbed SB can be sufficiently sucked out from the gaps between the adjacent bed protection blocks 16. can be prevented. As a result, tilting (tilting) of the bed protection block 16 and scouring immediately downstream of the apron 12 due to suction of gravel from the bottom and surroundings of the bed protection block 16 are suppressed, and the installation state of the plurality of bed protection blocks 16 is stabilized. can be done. Therefore, scouring immediately downstream of the weir installed on the riverbed SB can be prevented, and damage to the weir, such as subsidence of the apron 12, can be avoided.

各吸出防止部材22が各護床ブロック16の側面に設けられ、隣接する各吸出防止部材22同士が連結されているため、吸出防止部材22と護床ブロック16との摩擦を低減して、吸出防止部材22の劣化を防止することができる。また、隣接する各護床ブロック16の連結配筋18同士が屈撓可能に連結されているため、隣接する護床ブロック16同士が屈撓しても、吸出防止部材22が引張力によって破断することはない。これにより、吸出防止部材22の耐久性を向上させることができる。 Each suction prevention member 22 is provided on the side surface of each floor protection block 16, and the adjacent suction prevention members 22 are connected to each other, so that the friction between the suction prevention member 22 and the floor protection block 16 is reduced and the suction is prevented. Deterioration of the prevention member 22 can be prevented. In addition, since the connecting reinforcements 18 of the adjacent floor protection blocks 16 are connected to each other in a flexible manner, even if the adjacent floor protection blocks 16 are flexed, the suction prevention member 22 is broken by the tensile force. never. Thereby, the durability of the suction prevention member 22 can be improved.

〔第2実施形態〕
図7から図9を参照して、第2実施形態に係る洗掘防止構造26の構成について説明する。図7は、第2実施形態に係る洗掘防止構造26の模式的な側断面図である。図8は、図7におけるVIII部の拡大図である。図9は、護床ブロック16の底面に吸出防止部材が取付けられた様子を示す模式的な斜視図である。
[Second embodiment]
The configuration of the anti-scouring structure 26 according to the second embodiment will be described with reference to FIGS. 7 to 9. FIG. FIG. 7 is a schematic side cross-sectional view of a scour prevention structure 26 according to the second embodiment. FIG. 8 is an enlarged view of the VIII section in FIG. FIG. 9 is a schematic perspective view showing a state in which a suction prevention member is attached to the bottom surface of the bed protection block 16. As shown in FIG.

図7及び図8に示すように、第2実施形態に係る洗掘防止構造26は、河床SBの洗掘を防止するための構造であり、堰のエプロン12の直下流側に設置されている。洗掘防止構造26は、河床SBの両側にそれぞれ設置された護岸14の間に位置している。また、洗掘防止構造26は、前述の洗掘防止構造10(図1及び図2参照)と同様の構成を有しており、洗掘防止構造26の構成のうち、洗掘防止構造10の構成と異なる点についてのみ説明する。なお、説明の便宜上、第1実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。 As shown in FIGS. 7 and 8, the scouring prevention structure 26 according to the second embodiment is a structure for preventing scouring of the riverbed SB, and is installed immediately downstream of the apron 12 of the weir. . The anti-scouring structures 26 are positioned between the bank protections 14 respectively installed on both sides of the riverbed SB. The anti-scouring structure 26 has the same configuration as the anti-scouring structure 10 (see FIGS. 1 and 2). Only points different from the configuration will be described. For convenience of explanation, members having the same functions as the members explained in the first embodiment are denoted by the same reference numerals, and the explanation thereof will not be repeated.

図8及び図9に示すように、各吸出防止部材22は、各護床ブロック16の一部である底面に設けられている。また、各吸出防止部材22の一部は、各護床ブロック16の底面のうち少なくとも2辺から外側にはみ出している。各吸出防止部材22の一部は、各護床ブロック16に流れ方向及び/又は河幅方向に隣接する護床ブロック16の下側に位置する。 As shown in FIGS. 8 and 9, each suction prevention member 22 is provided on the bottom surface that is a part of each bed protection block 16 . Part of each suction prevention member 22 protrudes outward from at least two sides of the bottom surface of each floor protection block 16 . A part of each suction prevention member 22 is located under the bed protection block 16 adjacent to each bed protection block 16 in the flow direction and/or river width direction.

各護床ブロック16の底面に対する各吸出防止部材22の取付手法は、コンクリートボンド等を用いた接着である。各吸出防止部材22は、各護床ブロック16の底面全体に接着されている。吸出防止部材22の材料費を削減するため、各吸出防止部材22が各護床ブロック16の底面の一部にのみ接着されるようにしてもよい。また、各護床ブロック16と各吸出防止部材22の取付手法は接着以外の方法でもよく、取付位置も各護床ブロック16の側面でも構わない。要は各護床ブロック16と各吸出防止部材22の間に河床砂礫が疎通するような隙間が生じなければよい。 A method of attaching each suction prevention member 22 to the bottom surface of each bed protection block 16 is adhesion using a concrete bond or the like. Each suction prevention member 22 is adhered to the entire bottom surface of each floor protection block 16 . In order to reduce the material cost of the anti-suction members 22 , each anti-suction member 22 may be adhered only to a portion of the bottom surface of each bed protection block 16 . In addition, the method of attaching the floor protection blocks 16 and the suction prevention members 22 may be a method other than adhesion, and the attachment position may be the side surface of each floor protection block 16 . In short, it is sufficient that there is no gap between each bed protection block 16 and each suction prevention member 22 through which the river bed gravel can communicate.

続いて、図8から図10を参照して、第2実施形態に係る洗掘防止構造の施工方法について説明する。図10は、第2実施形態に係る洗掘防止構造の施工方法を説明する模式図である。 Next, a construction method for a scour prevention structure according to the second embodiment will be described with reference to FIGS. 8 to 10. FIG. 10A and 10B are schematic diagrams for explaining a construction method of the scour prevention structure according to the second embodiment.

図8及び図10に示すように、第2実施形態に係る洗掘防止構造の施工方法は、洗掘防止構造26を河床SBに施工するための方法であり、取付工程と、敷設工程と、連結工程とを含んでいる。第2実施形態に係る洗掘防止構造の施工方法の具体的な内容は、次の通りである。 As shown in FIGS. 8 and 10, the construction method of the anti-scouring structure according to the second embodiment is a method for constructing the anti-scouring structure 26 on the riverbed SB, and includes a mounting process, a laying process, and a connecting step. The specific contents of the method for constructing the anti-scouring structure according to the second embodiment are as follows.

図10のXAに示すように、作業者は、河床SB等の載置領域に吸出防止部材22を載置し、吸出防止部材22における護床ブロック16の底面に対応する部位にコンクリートボンドを塗布する。次に、バックホウ又はクレーン等の建設機械によって護床ブロック16を吸出防止部材22における前記対応する部位に載置する。そして、コンクリートボンドを養生することによって、護床ブロック16の底面に吸出防止部材22を取付けることができる(取付工程)。 As shown in XA of FIG. 10, the operator places the suction prevention member 22 on the placement area of the riverbed SB or the like, and applies concrete bond to the portion of the suction prevention member 22 corresponding to the bottom surface of the bed protection block 16. do. Next, the bed protection block 16 is placed on the corresponding portion of the suction preventing member 22 by a construction machine such as a backhoe or a crane. Then, by curing the concrete bond, the suction prevention member 22 can be attached to the bottom surface of the bed protection block 16 (attachment step).

その後、図10のXBに示すように、各吸出防止部材22が各護床ブロック16に隣接する護床ブロック16の下側に位置するように、建設機械によって複数の護床ブロック16を河床SBに敷設する(敷設工程)。更に、図8及び図9に示すように、作業者は、隣接する各護床ブロック16の連結配筋18同士を連結部材20によって屈撓可能に連結する(連結工程)。これにより、洗掘防止構造26の施工が終了する。 After that, as shown in XB of FIG. 10 , a plurality of bed protection blocks 16 are placed on the river bed SB by construction machinery so that each of the suction preventing members 22 is positioned below each bed protection block 16 adjacent to each bed protection block 16 . (Laying process). Furthermore, as shown in FIGS. 8 and 9, the operator connects the connecting reinforcing bars 18 of the adjacent floor protection blocks 16 with the connecting members 20 so as to be flexible (connecting step). This completes the construction of the scouring prevention structure 26 .

なお、工場等において、各護床ブロック16の底面に吸出防止部材22を予め取付けることにより、洗掘防止構造の施工方法から取付工程を省略してもよい。 In a factory or the like, the mounting process may be omitted from the method of constructing the anti-scouring structure by previously mounting the anti-scouring member 22 on the bottom surface of each floor protection block 16 .

続いて、第2実施形態の作用効果について説明する。 Next, the effects of the second embodiment will be described.

各吸出防止部材22が各護床ブロック16の一部である底面に設けられている。そのため、隣接する護床ブロック16同士が屈撓して、隣接する護床ブロック16同士の間の隙間が広がっても、その隙間からの河床SBの砂礫の吸出しを防止することができる。特に、各吸出防止部材22の網目の大きさが河床SBの砂礫の平均粒径以下に設定されているため、隣接する護床ブロック16同士の間の隙間からの河床SBの砂礫の吸出しを十分に防止することができる。これにより、護床ブロック16直下の砂礫の吸出しによる護床ブロック16の傾斜化(傾動)やエプロン12直下流の洗掘を抑えて、複数の護床ブロック16の設置状態を安定させることができる。よって、河床SBに設置された堰直下流の洗掘を防止して、エプロン12の陥没等、堰の損壊を回避することができる。 Each suction prevention member 22 is provided on the bottom surface which is a part of each floor protection block 16 . Therefore, even if the adjacent bed protection blocks 16 are bent and the gaps between the adjacent bed protection blocks 16 widen, the gravel of the riverbed SB can be prevented from being sucked out from the gaps. In particular, since the mesh size of each suction prevention member 22 is set to be equal to or less than the average grain size of gravel on the riverbed SB, the gravel on the riverbed SB can be sufficiently sucked out from the gaps between the adjacent bed protection blocks 16. can be prevented. As a result, tilting (tilting) of the bed protection block 16 due to suction of gravel directly below the bed protection block 16 and scouring immediately downstream of the apron 12 can be suppressed, and the installation state of the plurality of bed protection blocks 16 can be stabilized. . Therefore, scouring immediately downstream of the weir installed on the riverbed SB can be prevented, and damage to the weir, such as subsidence of the apron 12, can be avoided.

各吸出防止部材22の一部が各護床ブロック16に隣接する護床ブロック16の下側に位置している。そのため、隣接する各吸出防止部材22同士を連結しなくても、河床SBにおける隣接する各護床ブロック16同士の間を吸出防止部材22によって覆うことができる。これにより、隣接する各吸出防止部材22同士を連結する手間が省けて、洗掘防止構造26の施工性を向上させることができる。 A portion of each suction prevention member 22 is positioned below the floor protection block 16 adjacent to each floor protection block 16 . Therefore, the suction prevention members 22 can cover the spaces between the adjacent bed protection blocks 16 on the riverbed SB without connecting the adjacent suction prevention members 22 . As a result, it is possible to save the trouble of connecting the adjacent suction prevention members 22 and improve the workability of the scouring prevention structure 26 .

〔第3実施形態〕
図11から図13を参照して、第3実施形態に係る洗掘防止構造28の構成について説明する。図11は、第3実施形態に係る洗掘防止構造28の模式的な側断面図である。図12は、図11に示す洗掘防止構造の模式的な平面図である。図13は、図11におけるXIII部の拡大図である。
[Third Embodiment]
The configuration of the scour prevention structure 28 according to the third embodiment will be described with reference to FIGS. 11 to 13. FIG. FIG. 11 is a schematic side sectional view of a scour prevention structure 28 according to the third embodiment. 12 is a schematic plan view of the anti-scouring structure shown in FIG. 11. FIG. 13 is an enlarged view of section XIII in FIG. 11. FIG.

図11及び図12に示すように、第3実施形態に係る洗掘防止構造28は、河床SBの洗掘を防止するための構造であり、堰のエプロン12の直下流側に設置されている。洗掘防止構造28は、河床SBの両側にそれぞれ設置された護岸14の間に位置している。また、洗掘防止構造28は、前述の洗掘防止構造10(図1及び図2参照)と同様の構成を有しており、洗掘防止構造28の構成のうち、洗掘防止構造10の構成と異なる点についてのみ説明する。なお、説明の便宜上、第1実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。 As shown in FIGS. 11 and 12, the scouring prevention structure 28 according to the third embodiment is a structure for preventing scouring of the riverbed SB, and is installed immediately downstream of the apron 12 of the weir. . The anti-scouring structures 28 are positioned between the bank protection 14 respectively installed on both sides of the riverbed SB. The anti-scouring structure 28 has the same configuration as the anti-scouring structure 10 (see FIGS. 1 and 2). Only points different from the configuration will be described. For convenience of explanation, members having the same functions as the members explained in the first embodiment are denoted by the same reference numerals, and the explanation thereof will not be repeated.

図13に示すように、流れ方向及び/又は河幅方向に隣接する各護床ブロック16同士のうちの一方の護床ブロック16の上部には、凸部30が他方の護床ブロック16側に突出して形成されている。流れ方向及び/又は河幅方向に隣接する各護床ブロック16同士のうちの他方の護床ブロック16の上部に、一方の護床ブロック16の凸部30と嵌合可能な凹部32が一方の護床ブロック16側の反対側に窪んで形成されている。また、各連結部材20及び各吸出防止部材22は、それぞれ、隣接する各護床ブロック16同士のうちの一方の護床ブロック16の凸部30の下側に位置している。 As shown in FIG. 13, on the top of one of the bed protection blocks 16 adjacent in the stream direction and/or the river width direction, a convex portion 30 is formed on the other bed protection block 16 side. formed to protrude. On the upper part of the other bed protection block 16 among the bed protection blocks 16 adjacent in the flow direction and/or river width direction, a concave portion 32 that can be fitted with the convex portion 30 of the one bed protection block 16 is provided on the one side. It is recessed on the side opposite to the bed protection block 16 side. Each connecting member 20 and each suction preventing member 22 is positioned below the convex portion 30 of one of the adjacent floor protection blocks 16 .

洗掘防止構造28は、第1実施形態に係る洗掘防止構造の施工方法と同様の方法によって河床SBに施工することができる。 The anti-scouring structure 28 can be constructed on the riverbed SB by the same method as the method for constructing the anti-scouring structure according to the first embodiment.

続いて、第3実施形態の作用効果について説明する。 Next, the effects of the third embodiment will be described.

第3実施形態においては、前述の第1実施形態と同様の作用効果を奏する。また、第3実施形態においては、その他、次のような作用効果を奏する。 In the third embodiment, the same effects as those of the first embodiment are obtained. In addition, the third embodiment has the following effects.

各吸出防止部材22が隣接する護床ブロック16同士のうちの一方の護床ブロック16の凸部30の下側に位置しているため、護床ブロック16の上側から流下する砂礫による吸出防止部材の摩耗を抑えることができる。これにより、吸出防止部材22の耐久性を向上させることができる。 Since each suction prevention member 22 is positioned below the convex portion 30 of one of the adjacent floor protection blocks 16, the suction prevention member for sand and gravel flowing down from the upper side of the floor protection block 16. wear can be suppressed. Thereby, the durability of the suction prevention member 22 can be improved.

各連結部材20が隣接する護床ブロック16同士のうちの一方の護床ブロック16の凸部30の下側に位置しているため、護床ブロック16の上側から流下する砂礫による連結部材20の摩耗を抑えることができる。これにより、連結部材20の耐久性を向上させることができる。 Since each connecting member 20 is positioned below the convex portion 30 of one of the adjacent bed protection blocks 16, the connection member 20 is not affected by gravel flowing down from the upper side of the bed protection block 16. Wear can be suppressed. Thereby, the durability of the connecting member 20 can be improved.

〔他の実施形態〕
堰のエプロン12の直下流側に設置した洗掘防止構造10(26,28)に適用した技術的思想を、堰以外の構造物の下流側、堰を含む構造物の上流側に設置した洗掘防止構造に適用してもよい。また、洗掘防止構造10(26,28)に適用した技術的思想を、水路底、静水池又は海底に設置された洗掘防止構造に適用してもよい。
[Other embodiments]
The technical idea applied to the scouring prevention structure 10 (26, 28) installed immediately downstream of the apron 12 of the weir is applied to the scouring prevention structure 10 (26, 28) installed downstream of structures other than the weir and upstream of the structure including the weir. It may be applied to anti-digging structures. Also, the technical concept applied to the anti-scouring structure 10 (26, 28) may be applied to an anti-scouring structure installed on the bottom of a channel, a still water pond, or the seabed.

〔まとめ〕
本発明の態様1に係る洗掘防止構造は、河床、水路底、静水池又は海底の洗掘を防止するための洗掘防止構造であって、河床、水路底、静水池又は海底に敷設され、河床、水路底、静水池又は海底を保護するための複数の保護ブロックを備え、隣接する保護ブロック同士は、屈撓可能に連結され、更に、各保護ブロックの一部に設けられ、隣接する各保護ブロック同士の間の隙間からの河床、水路底、静水池又は海底の砂礫の吸出しを防止するための吸出防止部材を備える。
〔summary〕
A scouring prevention structure according to aspect 1 of the present invention is a scouring prevention structure for preventing scouring of a riverbed, waterway bottom, still water pond or seabed, and is laid on a riverbed, waterway bottom, still water pond or seabed. , a plurality of protection blocks for protecting a river bed, a channel bottom, a still water pond, or a seabed, the adjacent protection blocks being flexibly connected to each other, further provided in a part of each protection block, and adjacent to each other. A suck-out prevention member is provided for preventing suck-out of gravel on the river bed, channel bottom, still water pond or seabed from the gaps between the protection blocks.

前記の構成によれば、各保護ブロックの一部に前記吸出防止部材が設けられている。そのため、隣接する前記保護ブロック同士が屈撓して、隣接する前記保護ブロック同士の間の隙間が広がっても、その隙間からの河床、水路底、静水池又は海底の砂礫の吸出しを防止することができる。これにより、前記保護ブロック底部及び周囲の砂礫の吸出しによる前記保護ブロックの傾斜化(傾動)を抑えて、複数の前記保護ブロックの設置状態を安定させることができる。よって、河床等に設置された堰等の構造物直下流の洗掘を防止して、前記構造物の損壊を回避することができる。 According to the above configuration, the suction prevention member is provided on a part of each protection block. Therefore, even if the adjacent protection blocks bend and the gap between the adjacent protection blocks widens, the gravel of the riverbed, channel bottom, still water pond or seabed can be prevented from being sucked out from the gap. can be done. As a result, tilting (tilting) of the protective blocks due to sucking out of the bottom portion of the protective blocks and surrounding gravel can be suppressed, and the installation state of the plurality of protective blocks can be stabilized. Therefore, it is possible to prevent scouring immediately downstream of a structure such as a weir installed on a riverbed or the like, thereby avoiding damage to the structure.

本発明の態様2に係る洗掘防止構造は、前記態様1において、各吸出防止部材は、各保護ブロックの側面又は上面にその周囲方向に沿って設けられ、隣接する各吸出防止部材同士は、連結されてもよい。 In the scour prevention structure according to aspect 2 of the present invention, in aspect 1, each suction prevention member is provided on the side surface or the upper surface of each protection block along the peripheral direction, and the adjacent suction prevention members are: may be concatenated.

前記の構成によれば、各吸出防止部材が各保護ブロックの側面又は上面に設けられ、隣接する各吸出防止部材同士が連結されているため、前記吸出防止部材と前記保護ブロックとの摩擦を低減して、前記吸出防止部材の劣化を防止することができる。また、隣接する保護ブロック同士が屈撓可能に連結されているため、隣接する前記保護ブロック同士が屈撓しても、前記吸出防止部材が引張力によって破断することはない。これにより、前記吸出防止部材の耐久性を向上させることができる。 According to the above configuration, each suction prevention member is provided on the side surface or top surface of each protection block, and the adjacent suction prevention members are connected to each other, thereby reducing friction between the suction prevention member and the protection block. As a result, deterioration of the suction prevention member can be prevented. Further, since the adjacent protection blocks are connected to each other in a flexible manner, even if the adjacent protection blocks are flexed, the pull-out prevention member will not break due to tensile force. As a result, the durability of the suction prevention member can be improved.

本発明の態様3に係る洗掘防止構造は、前記態様1において、各吸出防止部材は、各保護ブロックの底面又は側面に設けられ、各吸出防止部材の一部は、各保護ブロックに隣接する前記保護ブロックの下側に位置してもよい。 In the scour prevention structure according to aspect 3 of the present invention, in aspect 1, each suction prevention member is provided on the bottom surface or side surface of each protection block, and a part of each suction prevention member is adjacent to each protection block. It may be located below the protection block.

前記の構成によれば、各吸出防止部材の一部が各保護ブロックに隣接する前記保護ブロックの下側に位置している。そのため、隣接する各吸出防止部材同士を連結しなくても、河床等における隣接する各保護ブロック同士の間を前記吸出防止部材によって覆うことができる。これにより、隣接する各吸出防止部材同士を連結する手間が省けて、前記洗掘防止構造の施工性を向上させることができる。 According to the above configuration, a portion of each suction prevention member is positioned below the protection block adjacent to each protection block. Therefore, the suction prevention member can cover adjacent protection blocks on a riverbed or the like without connecting the adjacent suction prevention members. As a result, it is possible to save the trouble of connecting the adjacent suction prevention members, and improve the workability of the scouring prevention structure.

本発明の態様4に係る洗掘防止構造は、前記態様1から3のいずれかにおいて、隣接する各保護ブロック同士のうちの一方の保護ブロックの上部に、凸部が他方の保護ブロック側に突出して形成され、前記他方の保護ブロックの上部に、前記一方の保護ブロックの前記凸部と嵌合可能な凹部が前記一方の保護ブロック側の反対側に窪んで形成されており、各吸出防止部材は、前記一方の保護ブロックの前記凸部の下側に位置してもよい。 A scouring prevention structure according to aspect 4 of the present invention is the scouring prevention structure according to any one of aspects 1 to 3, wherein a convex portion protrudes from the top of one of the adjacent protection blocks toward the other protection block. and a concave portion that can be fitted with the convex portion of the one protective block is formed on the upper portion of the other protective block so as to be recessed on the opposite side of the one protective block side, and each suction prevention member may be positioned below the convex portion of the one protection block.

前記の構成によれば、各吸出防止部材が前記一方の保護ブロックの前記凸部の下側に位置しているため、前記保護ブロックの上側から流下する砂礫による前記吸出防止部材の摩耗を抑えることができる。これにより、前記吸出防止部材の耐久性を向上させることができる。 According to the above configuration, since each suction prevention member is positioned below the convex portion of the one protection block, abrasion of the suction prevention member due to gravel flowing down from the upper side of the protection block can be suppressed. can be done. As a result, the durability of the suction prevention member can be improved.

本発明の態様5に係る洗掘防止構造は、前記態様4において、隣接する各保護ブロック同士を屈撓可能に連結する連結部材を備え、各連結部材は、前記一方の保護ブロックの前記凸部の下側に位置してもよい。 A scouring prevention structure according to aspect 5 of the present invention is, in aspect 4, provided with a connecting member that flexibly connects the adjacent protection blocks, and each connecting member includes the convex portion of the one protection block. may be located below the

前記の構成によれば、各連結部材が前記一方の保護ブロックの前記凸部の下側に位置しているため、前記保護ブロックの上側から流下する砂礫による前記連結部材の摩耗を抑えることができる。これにより、前記連結部材の耐久性を向上させることができる。 According to the above configuration, since each connecting member is positioned below the convex portion of the one protection block, it is possible to suppress abrasion of the connecting member due to sand and gravel flowing down from the upper side of the protection block. . Thereby, the durability of the connecting member can be improved.

本発明の態様6に係る洗掘防止構造は、前記態様1から4のいずれかにおいて、各吸出防止部材は、網状又は膜状に構成され、各吸出防止部材の網目は、河床、水路底、静水池又は海底の砂礫の平均粒径以下になっていてもよい。 A scouring prevention structure according to aspect 6 of the present invention is the scouring prevention structure according to any one of aspects 1 to 4, wherein each suction prevention member is configured in a mesh shape or a film shape, and the mesh of each suction prevention member is a river bed, a channel bottom, It may be less than or equal to the average grain size of gravel in still water ponds or seabeds.

前記の構成によれば、各吸出防止部材の網目が河床等の砂礫の平均粒径以下になっているため、隣接する各保護ブロック同士の間の隙間からの河床等の砂礫の吸出しを十分に防止することができる。 According to the above configuration, since the mesh of each suction prevention member is equal to or smaller than the average grain size of sand and gravel on the river bed, the sand and gravel on the river bed can be sufficiently sucked out from the gaps between the adjacent protection blocks. can be prevented.

本発明の態様7に係る洗掘防止構造の施工方法は、前記態様2に係る洗掘防止構造を施工するための方法であって、複数の保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、隣接する前記保護ブロックの側面又は上面に取付けた吸出防止部材を連結する第1連結工程と、敷設済みの隣接する前記保護ブロック同士を屈撓可能に連結する第2連結工程と、を含む。 A method for constructing an anti-scouring structure according to aspect 7 of the present invention is a method for constructing an anti-scouring structure according to aspect 2, wherein a plurality of protective blocks are placed on a riverbed, channel bottom, still water pond or seabed. A laying step of laying, a first connecting step of connecting the suction prevention member attached to the side surface or the top surface of the adjacent protection blocks, and a second connecting step of connecting the laid adjacent protection blocks so as to be flexible. and including.

前記の構成によれば、隣接する前記保護ブロックの側面又は上面に取付けた吸出防止部材を連結しているため、前記吸出防止部材と前記保護ブロックとの摩擦を低減して、前記吸出防止部材の劣化を防止することができる。また、隣接する前記保護ブロック同士を屈撓可能に連結しているため、隣接する前記保護ブロック同士が屈撓しても、前記吸出防止部材が引張力によって破断することはない。これにより、前記吸出防止部材の耐久性を向上させることができる。 According to the above configuration, since the suction prevention member attached to the side surface or the upper surface of the adjacent protection block is connected, the friction between the suction prevention member and the protection block is reduced, and the suction prevention member Deterioration can be prevented. In addition, since the adjacent protection blocks are connected to each other in a flexible manner, even if the adjacent protection blocks are flexed, the suction prevention member will not break due to the tensile force. As a result, the durability of the suction prevention member can be improved.

本発明の態様8に係る洗掘防止構造の施工方法は、前記態様3に係る洗掘防止構造を施工するための方法であって、各保護ブロックの底面又は側面に取付けた吸出防止部材が各保護ブロックに隣接する前記保護ブロックの下側に位置するように、複数の前記保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、敷設済みの隣接する各保護ブロック同士を屈撓可能に連結する連結工程と、を含む。 A construction method for a scouring prevention structure according to aspect 8 of the present invention is a method for constructing a scouring prevention structure according to aspect 3, wherein a suction prevention member attached to the bottom surface or side surface of each protection block is A laying step of laying a plurality of the protection blocks on a riverbed, a channel bottom, a still water pond, or the seabed so as to be positioned below the protection blocks adjacent to the protection blocks, and bending the laid adjacent protection blocks against each other. a connecting step of flexible connecting.

前記の構成によれば、各保護ブロックの底面又は側面に取付けた前記吸出防止部材が各保護ブロックに隣接する前記保護ブロックの下側に位置するように、河床等に複数の前記保護ブロックを敷設している。そのため、隣接する各吸出防止部材同士を連結しなくても、河床等における隣接する各保護ブロック同士の間を前記吸出防止部材によって覆うことができる。これにより、隣接する各吸出防止部材同士を連結する手間が省けて、前記洗掘防止構造の施工性を向上させることができる。 According to the above configuration, a plurality of protection blocks are laid on a river bed or the like so that the suction prevention member attached to the bottom surface or the side surface of each protection block is positioned below the protection block adjacent to each protection block. are doing. Therefore, the suction prevention member can cover adjacent protection blocks on a riverbed or the like without connecting the adjacent suction prevention members. As a result, it is possible to save the trouble of connecting the adjacent suction prevention members, and improve the workability of the scouring prevention structure.

〔付記事項〕
本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。
[Additional notes]
The present invention is not limited to the above-described embodiments, but can be modified in various ways within the scope of the claims, and can be obtained by appropriately combining technical means disclosed in different embodiments. is also included in the technical scope of the present invention.

10:洗掘防止構造(第1実施形態に係る洗掘防止構造)、12:エプロン、14:護岸、16:護床ブロック(保護ブロック)、18:連結配筋、20:連結部材、22:吸出防止部材、24:連結部材、26:洗掘防止構造(第2実施形態に係る洗掘防止構造)、28:洗掘防止構造(第3実施形態に係る洗掘防止構造)、30:凸部、32:凹部 10: Anti-scouring structure (anti-scouring structure according to the first embodiment), 12: Apron, 14: Revetment, 16: Protection block (protection block), 18: Connecting reinforcement, 20: Connecting member, 22: Suction prevention member 24: Connecting member 26: Scouring prevention structure (scouring prevention structure according to the second embodiment) 28: Scouring prevention structure (scouring prevention structure according to the third embodiment) 30: Convex part, 32: concave part

Claims (8)

河床、水路底、静水池又は海底の洗掘を防止するための洗掘防止構造であって、
河床、水路底、静水池又は海底に敷設され、河床、水路底、静水池又は海底を保護するための複数の保護ブロックを備え、
隣接する各保護ブロック同士は、屈撓可能に連結され、
更に、各保護ブロックの一部に設けられ、隣接する各保護ブロック同士の間の隙間からの河床、水路底、静水池又は海底の砂礫の吸出しを防止するための吸出防止部材を備える、洗掘防止構造。
An anti-scouring structure for preventing scouring of riverbeds, channel bottoms, still water ponds or seabeds,
laying on the river bed, channel bed, still water pond or sea bed and comprising a plurality of protective blocks for protecting the river bed, channel bed, still water pond or sea bed,
Adjacent protection blocks are flexibly connected to each other,
Furthermore, a scour prevention member provided in a part of each protection block for preventing suction of sand and gravel from the riverbed, channel bottom, still water pond or seabed from the gap between adjacent protection blocks. prevention structure.
各吸出防止部材は、各保護ブロックの側面又は上面にその周囲方向に沿って設けられ、
隣接する各吸出防止部材同士は、連結されている、請求項1に記載の洗掘防止構造。
Each suction prevention member is provided on the side surface or top surface of each protection block along its peripheral direction,
The anti-scouring structure according to claim 1, wherein each adjacent anti-scouring member is connected.
各吸出防止部材は、各保護ブロックの底面又は側面に設けられ、
各吸出防止部材の一部は、各保護ブロックに隣接する前記保護ブロックの下側に位置する、請求項1に記載の洗掘防止構造。
Each suction prevention member is provided on the bottom surface or side surface of each protection block,
2. An anti-scouring structure according to claim 1, wherein a portion of each anti-scouring member is located on the underside of said protective block adjacent to each protective block.
隣接する各保護ブロック同士のうちの一方の保護ブロックの上部に、凸部が他方の保護ブロック側に突出して形成され、前記他方の保護ブロックの上部に、前記一方の保護ブロックの前記凸部と嵌合可能な凹部が前記一方の保護ブロック側の反対側に窪んで形成されており、
各吸出防止部材は、前記一方の保護ブロックの前記凸部の下側に位置している、請求項1から3のいずれか1項に記載の洗掘防止構造。
A convex portion is formed on an upper portion of one of the adjacent protective blocks so as to protrude toward the other protective block, and the convex portion of the one protective block is formed on an upper portion of the other protective block. A recess that can be fitted is recessed and formed on the opposite side of the one protection block,
The scouring prevention structure according to any one of claims 1 to 3, wherein each suction prevention member is positioned below the convex portion of the one protection block.
隣接する各保護ブロック同士を屈撓可能に連結する連結部材を備え、
各連結部材は、前記一方の保護ブロックの前記凸部の下側に位置している、請求項4に記載の洗掘防止構造。
A connecting member that connects adjacent protection blocks to each other in a flexible manner,
5. The anti-scouring structure according to claim 4, wherein each connecting member is positioned below the convex portion of the one protection block.
各吸出防止部材は、網状又は膜状に構成され、各吸出防止部材の網目は、河床、水路底、静水池又は海底の砂礫の平均粒径以下になっている、請求項1から5のいずれか1項に記載の洗掘防止構造。 Each suction prevention member is configured in a mesh or film shape, and the mesh of each suction prevention member is equal to or less than the average grain size of gravel on a river bed, channel bottom, still water pond, or seabed. or the scour prevention structure according to item 1. 請求項2に記載の洗掘防止構造を施工するための方法であって、
複数の保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、
隣接する各保護ブロックの側面に取付けた吸出防止部材同士を連結する第1連結工程と、
敷設済みの隣接する各保護ブロック同士を屈撓可能に連結する第2連結工程と、を含む、洗掘防止構造の施工方法。
A method for constructing an anti-scouring structure according to claim 2, comprising:
a laying step of laying a plurality of protective blocks in a river bed, channel bed, still water pond or seabed;
a first connecting step of connecting the suction prevention members attached to the side surfaces of adjacent protection blocks;
and a second connecting step of connecting adjacent protection blocks that have been laid to each other in a flexible manner.
請求項3に記載の洗掘防止構造を施工するための方法であって、
各保護ブロックの底面に取付けた吸出防止部材が各保護ブロックに隣接する前記保護ブロックの下側に位置するように、複数の前記保護ブロックを河床、水路底、静水池又は海底に敷設する敷設工程と、
敷設済みの隣接する各保護ブロック同士を屈撓可能に連結する連結工程と、を含む、洗掘防止構造の施工方法。
A method for constructing an anti-scouring structure according to claim 3, comprising:
A laying step of laying a plurality of said protection blocks on a river bed, a waterway bottom, a still water pond or a seabed such that a suction prevention member attached to the bottom face of each protection block is positioned below said protection block adjacent to each protection block. and,
A method for constructing an anti-scouring structure, comprising: a connecting step of connecting adjacent protection blocks that have been laid so that they can bend.
JP2021202544A 2021-12-14 2021-12-14 Anti-scouring structure and its construction method Pending JP2023087961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021202544A JP2023087961A (en) 2021-12-14 2021-12-14 Anti-scouring structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021202544A JP2023087961A (en) 2021-12-14 2021-12-14 Anti-scouring structure and its construction method

Publications (1)

Publication Number Publication Date
JP2023087961A true JP2023087961A (en) 2023-06-26

Family

ID=86899550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021202544A Pending JP2023087961A (en) 2021-12-14 2021-12-14 Anti-scouring structure and its construction method

Country Status (1)

Country Link
JP (1) JP2023087961A (en)

Similar Documents

Publication Publication Date Title
EP1809815B1 (en) Scour protection system for water-courses using artificial blocks with an appearance similar to the surrounding area
JP2012167496A (en) Wall body provided with liquefaction countermeasure and steel sheet pile with liquefaction prevention function
JP2023087961A (en) Anti-scouring structure and its construction method
JP2023087962A (en) Anti-scouring structure and construction method thereof
JP6283765B1 (en) Sand protection structure of caisson dam structure
JP6309148B1 (en) Sand proof sheet laying structure
JP2022075302A (en) Scouring prevention structure
JP2018179056A (en) Protective sheet of underground pipe conduit
CN112942242A (en) Bank dyke scour protection floating dam structure and bank dyke scour protection system
JP6656686B1 (en) Surface material for civil engineering structure and revetment landfill sediment prevention structure using the surface material
JP6676463B2 (en) Embankment reinforcement method
JP6872419B2 (en) Resin net for civil engineering
JP4282115B2 (en) Offshore structure construction method
JP2007105618A (en) Water barrier structure of waste landfill site
JP7239934B2 (en) Plane material for civil engineering structures and structure for preventing soil outflow from revetment landfill using the plane material
US20230035252A1 (en) Prefabricated vertical geotexile ditch check system
KR20110099553A (en) Water pressure dissipating filter mat
CN112942243A (en) Bank dyke geotechnical cloth protective structure and bank dyke geotechnical cloth protective system
JPS60340Y2 (en) Sand control material
JP6871583B1 (en) Washing prevention unit and washing prevention structure
JP6007017B2 (en) Underwater foundation and construction method of underwater foundation
KR102139811B1 (en) Scour Protection Form and construction method using the same
RU88767U1 (en) ROCK SHEET
JP2018184722A (en) Reinforcement construction of dike rear slope toe, reinforcement method of dike rear slope toe and block mat for reinforcing dike rear slope toe
JP2002361196A (en) Composite water barrier sheet unit and method for manufacturing the same