JP2023004676A - Method for producing titanium tetrachloride - Google Patents

Method for producing titanium tetrachloride Download PDF

Info

Publication number
JP2023004676A
JP2023004676A JP2021106524A JP2021106524A JP2023004676A JP 2023004676 A JP2023004676 A JP 2023004676A JP 2021106524 A JP2021106524 A JP 2021106524A JP 2021106524 A JP2021106524 A JP 2021106524A JP 2023004676 A JP2023004676 A JP 2023004676A
Authority
JP
Japan
Prior art keywords
fluidized bed
height
titanium tetrachloride
chlorination furnace
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021106524A
Other languages
Japanese (ja)
Inventor
雄市 丸山
Yuichi Maruyama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toho Titanium Co Ltd
Original Assignee
Toho Titanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toho Titanium Co Ltd filed Critical Toho Titanium Co Ltd
Priority to JP2021106524A priority Critical patent/JP2023004676A/en
Publication of JP2023004676A publication Critical patent/JP2023004676A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Crucibles And Fluidized-Bed Furnaces (AREA)

Abstract

To provide a method for producing titanium tetrachloride that can improve the yield in the production of titanium tetrachloride.SOLUTION: A method for producing titanium tetrachloride involves forming a fluidized bed including titanium ore containing titanium oxide, coke, and chlorine gas on a dispersion board by using a chlorination furnace equipped with the dispersion board. The method includes an estimation step of estimating a height of the fluidized bed, and in the estimation step, the height of the fluidized bed is estimated based on fluidized bed information obtained by measuring internal pressure in two or more fluidized bed formation regions differing in positions in the height direction.SELECTED DRAWING: None

Description

本発明は、四塩化チタンの製造方法に関する。 The present invention relates to a method for producing titanium tetrachloride.

四塩化チタンは、スポンジ状の固体金属チタン(以下、「スポンジチタン」と称する。)の製造原料のみならず、触媒或いは医薬の分野に幅広く利用されている。四塩化チタンは、炭素源であるコークスと、チタン鉱石に含まれる酸化チタンと、塩素ガスとを高温にて反応させることにより製造されている。 Titanium tetrachloride is widely used not only as a raw material for producing sponge-like solid metal titanium (hereinafter referred to as "sponge titanium"), but also in the fields of catalysts and medicines. Titanium tetrachloride is produced by reacting coke, which is a carbon source, titanium oxide contained in titanium ore, and chlorine gas at high temperatures.

四塩化チタンの生成は、耐火物構造の塩化炉内に形成された鉱石とコークスを塩素ガスで流動化した流動層内で行われている。塩化炉を用いた四塩化チタンの製造では、流動層から未反応のチタン鉱石やコークスが塩素ガスとともに塩化炉の上部の四塩化チタン回収管を介して製造工程下流側の四塩化チタン回収設備に移送されることがある。このような場合、四塩化チタンの製造歩留まりが低下することになる。当該製造歩留まりの低下を抑制するため、例えば特許文献1に記載の技術が報告されている。 Titanium tetrachloride is produced in a fluidized bed in which the ore and coke formed in a refractory structure chlorination furnace are fluidized with chlorine gas. In the production of titanium tetrachloride using a chlorination furnace, unreacted titanium ore and coke are discharged from the fluidized bed together with chlorine gas to the titanium tetrachloride recovery equipment downstream of the production process through the titanium tetrachloride recovery pipe at the top of the chlorination furnace. may be transferred. In such a case, the production yield of titanium tetrachloride will be lowered. In order to suppress the decrease in the manufacturing yield, for example, a technique described in Patent Document 1 has been reported.

上記特許文献1には、「流動塩化炉を用いた四塩化チタンの製造方法において、前記流動塩化炉に第一の還元剤を投入して流動層を形成後、流動層内の温度を所定の温度範囲に制御するために、前記第一の還元剤のカルシウム濃度より高いカルシウム濃度を有する第二の還元剤を前記流動塩化炉に投入することを特徴とする四塩化チタンの製造方法」が記載されている。 In the above-mentioned Patent Document 1, ``In the method for producing titanium tetrachloride using a fluidized chlorination furnace, after a first reducing agent is charged into the fluidized chlorination furnace to form a fluidized bed, the temperature in the fluidized bed is set to a predetermined value. A method for producing titanium tetrachloride, characterized in that a second reducing agent having a calcium concentration higher than the calcium concentration of the first reducing agent is charged into the fluidized chlorination furnace in order to control the temperature within the range. It is

特開2019-081673号公報JP 2019-081673 A

ところで、塩化炉で所要量の四塩化チタンを製造するにあたり、流動層の形成領域(以下、「流動層」とも称する。)における四塩化チタンの生成反応を適切に制御するために、流動層の高さを精度よく把握することが重要である。流動層の高さは、典型的には、塩化炉内に投入した原料のかさ密度や原料の投入量等に従って決まることが知られている。 By the way, in producing a required amount of titanium tetrachloride in a chlorination furnace, in order to appropriately control the production reaction of titanium tetrachloride in the fluidized bed formation region (hereinafter also referred to as "fluidized bed"), the fluidized bed It is important to accurately grasp the height. It is known that the height of the fluidized bed is typically determined according to the bulk density of the raw material charged into the chlorination furnace, the amount of raw material charged, and the like.

しかしながら、塩化炉の側壁が四塩化チタンの生成で発生する高温の生成熱にも耐えうる耐火レンガ等の内壁を備えているので、作業者は、流動層の高さを塩化炉の外部から目視することができず、該流動層の高さを知ることが非常に困難である。流動層の高さを把握できず、単位時間あたりの塩素ガス供給量に対して流動層の高さを十分に確保できなかった場合、流動層での酸化チタンや塩素ガスの反応が不十分になるおそれがある。このような場合、四塩化チタンの製造歩留まりの低下にもつながる。 However, since the side wall of the chlorination furnace is equipped with an inner wall made of refractory bricks that can withstand the high-temperature heat generated by the production of titanium tetrachloride, the operator can visually check the height of the fluidized bed from the outside of the chlorination furnace. It is very difficult to know the height of the fluidized bed. If the height of the fluidized bed cannot be grasped and the height of the fluidized bed cannot be sufficiently secured for the amount of chlorine gas supplied per unit time, the reaction of titanium oxide and chlorine gas in the fluidized bed will be insufficient. may become In such a case, it also leads to a decrease in the production yield of titanium tetrachloride.

そこで、本発明の一実施形態において、四塩化チタンの製造歩留まりを向上させることが可能な四塩化チタンの製造方法を提供することを目的とする。 Accordingly, an object of one embodiment of the present invention is to provide a method for producing titanium tetrachloride that can improve the production yield of titanium tetrachloride.

先述したように、塩化炉の流動層の高さを塩化炉の外部から目視することができない。そこで、本発明者は流動層の高さを知る方法を鋭意検討した。 As mentioned above, the height of the fluidized bed in the chlorination furnace cannot be visually observed from the outside of the chlorination furnace. Therefore, the present inventors diligently studied a method for determining the height of the fluidized bed.

流動層の高さを把握するには、塩化炉の内部圧力を測定することが考えられる。ここで、塩化炉において流動層の高さ位置よりも上側の領域(フリーボード部)は、流動層から離れているだけでなく流動層との内部圧力の圧力差が非常に大きく、その内部圧力を流動層の高さの把握に用いることは適切ではない。流動層の高さを知るためには、フリーボード部の内部圧力ではなく流動層の形成領域の内部圧力を測定することが適切であると考えられる。 In order to grasp the height of the fluidized bed, it is conceivable to measure the internal pressure of the chlorination furnace. Here, in the chlorination furnace, the area above the height position of the fluidized bed (freeboard part) is not only far from the fluidized bed but also has a very large internal pressure difference with the fluidized bed. is not appropriate for grasping the height of the fluidized bed. In order to know the height of the fluidized bed, it is considered appropriate to measure the internal pressure of the formation region of the fluidized bed instead of the internal pressure of the freeboard portion.

一方、塩化炉において流動層の形成領域の内部圧力の測定を1か所でしか行わない場合、一の流動層の形成領域の内部圧力の測定結果に対して何等かの係数を用いて流動層の高さに換算する必要がある。この場合、チタン鉱石のかさ密度に依存した係数等を使用して流動層高さを算出することになる。しかしながら、流動層への原料投入のタイミングや原料自体のかさ密度の変動等次第で流動層の状態が変動するため、上記係数を用いた算出では、精度の高い結果が得られるとはいえない。 On the other hand, when the internal pressure of the fluidized bed formation region is measured only at one place in the chlorination furnace, the fluidized bed must be converted to the height of In this case, the fluidized bed height is calculated using a coefficient dependent on the bulk density of titanium ore. However, the state of the fluidized bed fluctuates depending on the timing of charging the raw material into the fluidized bed and changes in the bulk density of the raw material itself.

これらの観点を考慮の上、鋭意検討した結果、本発明者は、高さ方向の位置が異なる2か所以上の流動層の形成領域の内部圧力を測定することで得られる流動層情報に基づき該流動層の高さを推測することで、四塩化チタンの製造歩留まりを向上させることを見出した。 Taking these points into consideration, as a result of intensive studies, the present inventors have found that, based on fluidized bed information obtained by measuring the internal pressure of two or more fluidized bed forming regions at different height positions, We have found that the production yield of titanium tetrachloride can be improved by estimating the height of the fluidized bed.

すなわち、本発明は一側面において、分散盤を備える塩化炉を用いて、前記分散盤上に、酸化チタンを含有するチタン鉱石、コークス及び塩素ガスを含む流動層を形成し、四塩化チタンを製造する方法であって、前記流動層の高さを推測する推測ステップを有し、前記推測ステップでは、高さ方向の位置が異なる2か所以上の前記流動層の形成領域の内部圧力を測定することで得られる流動層情報に基づき該流動層の高さを推測する、四塩化チタンの製造方法である。 That is, in one aspect of the present invention, titanium tetrachloride is produced by forming a fluidized bed containing titanium oxide-containing titanium ore, coke, and chlorine gas on the dispersing disk using a chlorination furnace equipped with a dispersing disk. The method has an estimating step of estimating the height of the fluidized bed, wherein the estimating step measures the internal pressures of two or more fluidized bed forming regions at different positions in the height direction. It is a method for producing titanium tetrachloride, in which the height of the fluidized bed is estimated based on the information on the fluidized bed obtained by the above.

本発明に係る四塩化チタンの製造方法の一実施形態において、前記流動層情報は、前記2か所以上の前記流動層の形成領域の内部圧力の高さ方向における差圧を含む。 In one embodiment of the method for producing titanium tetrachloride according to the present invention, the fluidized bed information includes the differential pressure in the height direction of the internal pressure of the two or more fluidized bed forming regions.

本発明に係る四塩化チタンの製造方法の一実施形態において、前記流動層情報は、高さ方向における前記2か所以上の前記流動層の形成領域の内部圧力の測定点間距離を更に含む。 In one embodiment of the method for producing titanium tetrachloride according to the present invention, the fluidized bed information further includes the distance between measurement points of the internal pressure of the two or more fluidized bed forming regions in the height direction.

本発明に係る四塩化チタンの製造方法の一実施形態において、前記流動層を取り囲む前記塩化炉の側壁には、高さ方向の位置が異なる2か所以上の開口部が設けられ、前記推測ステップにおいて、前記開口部を介して前記2か所以上の前記流動層の形成領域の内部圧力を測定する。 In one embodiment of the method for producing titanium tetrachloride according to the present invention, the side wall of the chlorination furnace surrounding the fluidized bed is provided with two or more openings at different positions in the height direction, and the estimation step , internal pressures of the two or more fluidized bed forming regions are measured through the openings.

本発明に係る四塩化チタンの製造方法の一実施形態において、前記推測ステップは、前記開口部から前記流動層に向けてガスを供給することを含む。 In one embodiment of the method for producing titanium tetrachloride according to the present invention, the estimating step includes supplying gas from the opening toward the fluidized bed.

本発明の一実施形態によれば、四塩化チタンの製造における歩留まりを向上させることが可能な四塩化チタンの製造方法を提供できる。 According to one embodiment of the present invention, it is possible to provide a method for producing titanium tetrachloride that can improve the yield in the production of titanium tetrachloride.

本発明に係る四塩化チタンの製造方法の一実施形態に用いられる塩化炉の内部構造を示す概略図である。1 is a schematic diagram showing the internal structure of a chlorination furnace used in one embodiment of the method for producing titanium tetrachloride according to the present invention; FIG. 図1Aの塩化炉内の分散盤及び流動層を示す部分拡大断面図である。1B is a partially enlarged cross-sectional view showing a dispersing disc and a fluidized bed in the chlorination furnace of FIG. 1A; FIG. 図1Aの切断線X-Xにおける概略端面図である。1B is a schematic end view at section line XX of FIG. 1A; FIG. 図1Aに示す塩化炉の開口部について、別の配置例を示す概略端面図である。1B is a schematic end view showing another arrangement example of the opening of the chlorination furnace shown in FIG. 1A. FIG. 本発明に係る四塩化チタンの製造方法の別の実施形態に用いられる塩化炉の内部構造を示す概略図である。FIG. 4 is a schematic diagram showing the internal structure of a chlorination furnace used in another embodiment of the method for producing titanium tetrachloride according to the present invention; 図2Aの塩化炉内の分散盤及び流動層を示す部分拡大断面図である。2B is a partially enlarged cross-sectional view showing a dispersing disc and a fluidized bed in the chlorination furnace of FIG. 2A; FIG. 本発明に係る四塩化チタンの製造方法の一実施形態に用いられる開口装置の内部構造を示す概略図である。1 is a schematic view showing the internal structure of an opening device used in one embodiment of the method for producing titanium tetrachloride according to the present invention; FIG.

本発明は以下に説明する各実施形態に限定されるものではなく、その要旨を逸脱しない範囲で構成要素を変形して具体化できる。また、各実施形態に開示されている複数の構成要素の適宜な組み合わせにより、種々の発明を形成できる。例えば、実施形態に示される全構成要素からいくつかの構成要素を削除して発明を形成してもよい。なお、図面では、発明に含まれる実施形態等の理解を助けるため概略として示す部材もあり、図示された大きさや位置関係等については必ずしも正確でない場合がある。
また、本明細書において、「高さ方向」とは、塩化炉の上下方向(図示の場合では図1A及び図2Aに示す塩化炉100、200の上下方向)に平行な方向を意味する。また、本明細書において、「開口部の高さ位置」は、図1B及び図2Bに示すように、高さ方向で正面視した場合における各開口部の中心点(図示の場合では開口部112、114、212、214、216の中心点C1~C5)の高さ位置を意味する。また、本明細書において、「内部圧力」は、大気圧を基準に表した圧力(ゲージ圧)を意味する。
The present invention is not limited to the embodiments described below, and can be embodied by modifying the constituent elements without departing from the spirit of the present invention. Moreover, various inventions can be formed by appropriately combining a plurality of constituent elements disclosed in each embodiment. For example, the invention may be formed by omitting some components from all the components shown in the embodiments. In addition, in the drawings, some members are shown schematically in order to facilitate understanding of the embodiments included in the invention, and the illustrated sizes, positional relationships, etc. may not necessarily be accurate.
Further, in this specification, the "height direction" means a direction parallel to the vertical direction of the chlorination furnace (in the illustrated case, the vertical direction of the chlorination furnaces 100 and 200 shown in FIGS. 1A and 2A). In addition, in this specification, as shown in FIGS. 1B and 2B, the “height position of the opening” means the center point of each opening when viewed from the front in the height direction (the opening 112 in the illustrated case). , 114, 212, 214, and 216). Further, in this specification, "internal pressure" means pressure (gauge pressure) expressed on the basis of atmospheric pressure.

[四塩化チタンの製造方法]
本発明に係る四塩化チタンの製造方法の一実施形態は、図1Aに示す分散盤120を備える塩化炉100を用いて、四塩化チタンを製造する方法であって、流動層情報に基づき、分散盤120上の流動層140の高さを推測する推測ステップを有する。流動層情報は、塩化炉100の高さ方向の位置が異なる2か所以上の流動層140の形成領域の内部圧力を測定することで得られる。流動層情報は、少なくとも、当該2か所以上の内部圧力を含み、さらに他の情報を含むことがある。塩化炉100では、通常、流動層140の下側と上側で内部圧力が異なっている。当該流動層情報は、流動層140の高さを精度良く求める観点から、上記2か所以上で測定して得られた内部圧力の高さ方向における差圧を含むことが好ましく、流動層140の高さを更に精度良く求める観点から、2か所以上の流動層140の形成領域の内部圧力の測定点間の高さ方向に沿う距離である測定点間距離L(図1B参照)を更に含むことがより好ましい。このとき、流動層140の高さを所望の高さに常時維持する観点から、流動層140の内部圧力を連続的に測定することが更に好ましい。流動層140の内部圧力を連続的に測定すれば、圧力の変化を迅速に把握でき、流動層140の高さを維持するための対策、例えばチタン鉱石やコークスの追加投入等の要否を迅速に判断できる。なお、測定される圧力の急激な低下により「流動層が形成されていない」という判断がなされることがありえるが、流動層がないという情報のみでは塩化炉に供給すべき塩素ガス供給量を決定できない場合があるので、本発明において「流動層の高さ」を求めることが重要となる。
以下、塩化炉100を説明しながら推測ステップの好適な態様について説明する。
[Method for producing titanium tetrachloride]
One embodiment of the method for producing titanium tetrachloride according to the present invention is a method for producing titanium tetrachloride using a chlorination furnace 100 equipped with a dispersion plate 120 shown in FIG. There is an estimation step of estimating the height of the fluidized bed 140 above the platen 120 . The fluidized bed information is obtained by measuring the internal pressure of two or more fluidized bed 140 forming regions at different positions in the height direction of the chlorination furnace 100 . The fluidized bed information includes at least the internal pressures of the two or more locations, and may include other information. In the chlorination furnace 100, the internal pressure is usually different between the lower side and the upper side of the fluidized bed 140. From the viewpoint of accurately determining the height of the fluidized bed 140, the fluidized bed information preferably includes the differential pressure in the height direction of the internal pressure obtained by measuring at the above two or more locations. From the standpoint of determining the height with higher accuracy, it further includes a distance L between measurement points (see FIG. 1B), which is a distance along the height direction between two or more measurement points of the internal pressure in the formation region of the fluidized bed 140. is more preferable. At this time, from the viewpoint of always maintaining the desired height of the fluidized bed 140, it is more preferable to measure the internal pressure of the fluidized bed 140 continuously. If the internal pressure of the fluidized bed 140 is continuously measured, changes in the pressure can be quickly grasped, and measures to maintain the height of the fluidized bed 140, such as the necessity of adding titanium ore or coke, can be quickly determined. can be judged. A sudden drop in the measured pressure may lead to the conclusion that the fluidized bed is not formed, but the information that there is no fluidized bed alone determines the amount of chlorine gas to be supplied to the chlorination furnace. Therefore, it is important to determine the "height of the fluidized bed" in the present invention.
A preferred embodiment of the estimation step will be described below while describing the chlorination furnace 100 .

(塩化炉)
当該塩化炉100は、塩化炉本体110と、分散盤120と、ウインドボックス130と、塩素含有ガス配管150と、原料供給管160と、四塩化チタン回収管170とを備える。塩化炉本体110、分散盤120、ウインドボックス130、塩素含有ガス配管150、原料供給管160、四塩化チタン回収管170の形状又は材質は公知のものを適宜採用可能である。なお、流動層140は、四塩化チタンの製造が開始されてから塩化炉本体110内で分散盤120上に形成される。流動層140は、操業時に形成される塩化炉100の構成である。
(chlorination furnace)
The chlorination furnace 100 includes a chlorination furnace main body 110 , a distribution plate 120 , a wind box 130 , a chlorine-containing gas pipe 150 , a raw material supply pipe 160 and a titanium tetrachloride recovery pipe 170 . The shape or material of the chlorination furnace body 110, the dispersing plate 120, the wind box 130, the chlorine-containing gas pipe 150, the raw material supply pipe 160, and the titanium tetrachloride recovery pipe 170 can be appropriately adopted. The fluidized bed 140 is formed on the distribution board 120 within the chlorination furnace main body 110 after the production of titanium tetrachloride is started. Fluidized bed 140 is a configuration of chlorination furnace 100 that is formed during operation.

(開口部)
開口部112、114は、流動層140の形成領域の内部圧力の測定容易性の観点から、流動層140を取り囲む側壁111に設けられている。開口部112、114は、流動層140の形成領域の内部圧力を高さ方向の異なる2か所以上について測定することに用いるため、流動層140の形成領域の側壁111であって高さ方向の異なる位置に設けられている。開口部112、114の断面形状は特に限定されるものではなく、円状や多角形状等が挙げられる。開口部112、114の断面形状が円状である場合、開口部112、114の径は、例えば50~100mmである。このとき、測定され得る内部圧力に影響することを考慮し開口部112、114の径が略同一であることが好ましい。
流動層140の下端、即ち分散盤120の上面にチタン鉱石及び/又はコークス由来の不純物を含む堆積物が生じることがあり、該流動層140の下端側が該堆積物の影響により内部圧力の測定に適さない場合がある。この理由から、開口部112は流動層140の下端に設けることが好ましくないことがある。流動層140の想定される上面から高さ方向における分散盤120の上面までの離間距離(H)に対する、高さ位置が低い方の開口部112の中心点C2から分散盤120の上面までの離間距離(H1)の割合(H1/H)は、例えば0.1~0.4である。より具体的には、上記離間距離(H)が1500~2500mmの範囲内である場合、上記離間距離H1は、例えば300mm以上、また例えば500mm以上である。これにより、上記堆積物の影響をほぼ受けずに、開口部112で流動層140の内部圧力を長期間安定して測定することができる。
また、高さ方向で位置が高い方の開口部114の位置について、流動層140の想定される上面から高さ方向における分散盤120の上面までの離間距離(H)に対する、高さ位置が低い方の開口部112の中心点C2から高さ位置が高い方の開口部114の中心点C1までの測定点間距離(L)と、高さ位置が低い方の開口部112の中心点C2から分散盤120の上面までの離間距離(H1)の割合((L+H1)/H)は、高さ位置が低い方の開口部112の内部圧力との差異を明確にする観点から、例えば0.2~0.7である。より具体的には、上記離間距離(H)が1500~2500mmの範囲内である場合、上記測定点間距離Lは、例えば300mm以上、500mm以上である。これにより、流動層140の高さをより精確に把握することができる。
開口部112、114で内部圧力を測定する際には、該開口部112、114の付近においてチタン鉱石及び/又はコークス由来の付着物を抑制する観点から、開口部112、114から流動層140に向けてガスを供給してもよい。たとえば、図1Bに示すように、開口部112、114にそれぞれ詰まり防止エアー配管113、115の一方の端部が接続され、詰まり防止エアー配管113、115の他方の端部にエアー供給源(不図示)が接続される。また、詰まり防止エアー配管113、115には、流動層140の内部圧力を測定するために、圧力測定用管(不図示)が設けられる。圧力検知手段により当該圧力測定用管内の内部圧力を測定することで、流動層140の形成領域の内部圧力とし、流動層情報を得ることができる。詰まり防止エアー配管113、115の具体的な構成の一例については後述する。
(Aperture)
The openings 112 and 114 are provided in the side wall 111 surrounding the fluidized bed 140 from the viewpoint of easy measurement of the internal pressure in the region where the fluidized bed 140 is formed. Since the openings 112 and 114 are used to measure the internal pressure of the formation region of the fluidized bed 140 at two or more points different in the height direction, the openings 112 and 114 are formed in the side walls 111 of the formation region of the fluidized bed 140 in the height direction. located in different positions. The cross-sectional shape of the openings 112 and 114 is not particularly limited, and examples thereof include a circular shape and a polygonal shape. When the cross-sectional shape of the openings 112 and 114 is circular, the diameter of the openings 112 and 114 is, for example, 50 to 100 mm. At this time, it is preferable that the diameters of the openings 112 and 114 are substantially the same in consideration of the influence on the internal pressure that can be measured.
Deposits containing titanium ore and/or coke-derived impurities may be formed on the lower end of the fluidized bed 140, that is, on the upper surface of the dispersing disk 120, and the lower end of the fluidized bed 140 may not be able to measure the internal pressure due to the influence of the deposits. May not be suitable. For this reason, it may not be desirable to provide opening 112 at the lower end of fluidized bed 140 . The distance from the center point C2 of the lower opening 112 to the upper surface of the distribution board 120 with respect to the separation distance (H) from the assumed upper surface of the fluidized bed 140 to the upper surface of the distribution board 120 in the height direction. A ratio (H1/H) of the distance (H1) is, for example, 0.1 to 0.4. More specifically, when the separation distance (H) is in the range of 1500 to 2500 mm, the separation distance H1 is, for example, 300 mm or more, or, for example, 500 mm or more. As a result, the internal pressure of the fluidized bed 140 can be stably measured at the opening 112 for a long period of time without being affected by the deposits.
In addition, regarding the position of the opening 114 that is higher in the height direction, the height position is lower than the separation distance (H) from the assumed upper surface of the fluidized bed 140 to the upper surface of the dispersion plate 120 in the height direction. The distance (L) between the measurement points from the center point C2 of the opening 112 on the one side to the center point C1 of the opening 114 on the higher side and from the center point C2 of the opening 112 on the lower side The ratio ((L+H1)/H) of the separation distance (H1) to the upper surface of the dispersion plate 120 is, for example, 0.2 from the viewpoint of clarifying the difference from the internal pressure of the opening 112 at the lower height position. ~0.7. More specifically, when the separation distance (H) is in the range of 1500 to 2500 mm, the distance L between measurement points is, for example, 300 mm or more, 500 mm or more. Thereby, the height of the fluidized bed 140 can be grasped more accurately.
When measuring the internal pressure at the openings 112 and 114, from the viewpoint of suppressing deposits derived from titanium ore and/or coke in the vicinity of the openings 112 and 114, from the openings 112 and 114 to the fluidized bed 140 Gas may be supplied to the For example, as shown in FIG. 1B, openings 112 and 114 are connected to one ends of anti-clogging air pipes 113 and 115, respectively, and the other ends of anti-clogging air pipes 113 and 115 are connected to an air supply source (non-removable). shown) are connected. Further, the clogging prevention air pipes 113 and 115 are provided with pressure measuring pipes (not shown) for measuring the internal pressure of the fluidized bed 140 . By measuring the internal pressure in the pressure-measuring pipe with the pressure detection means, the internal pressure of the formation region of the fluidized bed 140 can be obtained, and the fluidized bed information can be obtained. A specific configuration example of the clogging prevention air pipes 113 and 115 will be described later.

(流動層の高さを求める方法の例示)
上記流動層140の高さを求める方法の一例を以下に説明する。
図1A及び図1Bに示すように、高さ方向において異なる位置に2か所の開口部112、114(下側の開口部112及び上側の開口部114)がある場合、下記式(1)に基づき流動層高さHを求めることができる。なお、開口部112、114からは、同じ流量のエアーが供給されているものとする。
H={PL1/(PL1-PL2)}×L・・・式(1)
H:流動層高さ(mm)
L1:下側の開口部112に接続された詰まり防止エアー配管113の圧力測定用管の圧力検知手段で測定された流動層の形成領域の内部圧力(kPa)
L2:上側の開口部114に接続された詰まり防止エアー配管115の圧力測定用管の圧力検知手段で測定された流動層の形成領域の内部圧力(kPa)
L:下側の開口部112の中心点C2から上側の開口部114の中心点C1までの距離である測定点間距離(mm)
塩化炉100の操業において、流動層140内の測定点の高さ位置が低くなるにつれ測定される内部圧力が大きくなる傾向にある。また、上記PL1/(PL1-PL2)によって、ある測定点間距離における流動層140の形成領域の内部圧力の傾向を知ることができる。上記PL1/(PL1-PL2)に上記測定点間距離Lを乗じることで、理論上の流動層高さHを求めることができる。
(Example of how to find the height of the fluidized bed)
An example of a method for obtaining the height of the fluidized bed 140 will be described below.
As shown in FIGS. 1A and 1B, when there are two openings 112 and 114 (lower opening 112 and upper opening 114) at different positions in the height direction, the following formula (1) Based on this, the fluidized bed height H can be obtained. It is assumed that the same flow rate of air is supplied from the openings 112 and 114 .
H={P L1 /(P L1 −P L2 )}×L Expression (1)
H: fluidized bed height (mm)
P L1 : Internal pressure (kPa) of the fluidized bed forming region measured by the pressure detecting means of the pressure measuring pipe of the clogging prevention air pipe 113 connected to the lower opening 112
P L2 : Internal pressure (kPa) of the fluidized bed forming region measured by the pressure detecting means of the pressure measuring pipe of the clogging prevention air pipe 115 connected to the upper opening 114
L: Distance between measurement points (mm), which is the distance from the center point C2 of the lower opening 112 to the center point C1 of the upper opening 114
In the operation of the chlorination furnace 100, the measured internal pressure tends to increase as the height position of the measurement point in the fluidized bed 140 decreases. Also, from the above P L1 /(P L1 −P L2 ), it is possible to know the tendency of the internal pressure in the formation region of the fluidized bed 140 at a certain distance between measurement points. The theoretical fluidized bed height H can be obtained by multiplying the above P L1 /(P L1 -P L2 ) by the above distance L between the measurement points.

また、図1Dに示すように、同じ高さ位置に開口部114a~114dを複数個設けてもよい。具体的に、開口部114a~114dから測定値を得て、開口部112との差圧及び測定点間距離をそれぞれ上記式(1)に代入して、それぞれの流動層140の高さを求める。得られた流動層140の高さの平均値が、流動層140の高さとなりうる。図1Dに示す実施形態において、同じ高さ位置の開口部114a~114dに連結されたそれぞれの詰まり防止エアー配管の圧力測定用管から得られた内部圧力の数値に1つでも明らかな異常が確認された場合、その異常な内部圧力の数値を使用せずに、上記式(1)に基づき流動層140の高さを求めればよい。なお、各開口部には、詰まり防止エアー配管115a~dが接続される。
さらに、図1Dの例では、流動層140の上側の開口部114a~dを複数個設けているが、流動層140の下側の開口部を複数個設けてもよい。例えば、流動層140の上側の開口部114a~dの数と、流動層140の下側の開口部の数とが同じであって、上側の開口部114a~dと、流動層140の下側の開口部とが円周方向において同じ位置に配置されている場合、流動層140の上側の各開口部114a~dから、当該開口部114a~dと円周方向において同じ位置に配置された流動層140の下側の各開口部の差圧及び測定点間距離をそれぞれ上記式(1)に代入して、それぞれの流動層140の高さを求める。得られた流動層140の高さの平均値が、流動層140の高さとなりうる。
Also, as shown in FIG. 1D, a plurality of openings 114a to 114d may be provided at the same height position. Specifically, the measured values are obtained from the openings 114a to 114d, and the pressure difference with the openings 112 and the distance between the measurement points are respectively substituted into the above equation (1) to obtain the height of each fluidized bed 140. . The average value of the obtained heights of the fluidized bed 140 can be the height of the fluidized bed 140 . In the embodiment shown in FIG. 1D, even one obvious abnormality was confirmed in the numerical value of the internal pressure obtained from the pressure measurement pipe of each of the clogging prevention air pipes connected to the openings 114a to 114d at the same height position. If so, the height of the fluidized bed 140 can be obtained based on the above equation (1) without using the abnormal internal pressure value. In addition, clogging prevention air pipes 115a to 115d are connected to the respective openings.
Furthermore, in the example of FIG. 1D, a plurality of openings 114a to 114d are provided above the fluidized bed 140, but a plurality of openings below the fluidized bed 140 may be provided. For example, if the number of openings 114a-d on the upper side of the fluidized bed 140 is the same as the number of openings on the lower side of the fluidized bed 140, the upper openings 114a-d and the lower side of the fluidized bed 140 are arranged at the same positions in the circumferential direction, from the upper openings 114a to 114d of the fluidized bed 140, the flow arranged at the same positions in the circumferential direction as the openings 114a to 114d The height of each fluidized bed 140 is obtained by substituting the differential pressure at each opening on the lower side of the bed 140 and the distance between measurement points into the above equation (1). The average value of the obtained heights of the fluidized bed 140 can be the height of the fluidized bed 140 .

次に、別の実施形態を図2A及びBを使用しながら以下に説明する。なお、先述した実施形態の各構成については適宜適用可能であり、重複記載を割愛する。 Another embodiment will now be described below using FIGS. 2A and B. FIG. It should be noted that each configuration of the above-described embodiment can be appropriately applied, and redundant description will be omitted.

別の実施形態において、図2A及びBに示す塩化炉200には、高さ位置がそれぞれ異なる3つの開口部212、214、216が側壁111に設けられている。開口部212、214、216には、詰まり防止エアー配管213、215、217の一方の端部が接続され、他方の端部には、エアー供給源(不図示)が接続される。詰まり防止エアー配管213、215、217には、先述したように、圧力測定用管(不図示)を設け、該圧力測定用管には圧力検知手段を設ければよい。
開口部212と高さ方向において隣り合う開口部214から流動層140の形成領域の内部圧力の差圧及び測定点間距離L1(開口部212の中心点C3から開口部214の中心点C4までの距離)を上記式(1)に代入し、開口部214と隣り合う開口部216から流動層140の形成領域の内部圧力の差圧及び測定点間距離L2(開口部214の中心点C4から開口部216の中心点C5までの距離)を上記式(1)に代入して、それぞれの流動層140の高さを求める。得られた流動層140の高さの平均値が、流動層140の高さとなりうる。
また、開口部212と開口部216から流動層140の形成領域の内部圧力の差圧及び測定点間距離L3(開口部212の中心点C3から開口部216の中心点C5までの距離)を上記式(1)に代入して、流動層140の高さを求めてもよい。
In another embodiment, the chlorination furnace 200 shown in FIGS. 2A and B has three openings 212, 214, 216 in the side wall 111 at different heights. One ends of clogging prevention air pipes 213, 215 and 217 are connected to the openings 212, 214 and 216, and an air supply source (not shown) is connected to the other ends. As described above, the clogging prevention air pipes 213, 215, and 217 may be provided with pressure measuring pipes (not shown), and the pressure measuring pipes may be provided with pressure detecting means.
The differential pressure of the internal pressure in the formation region of the fluidized bed 140 from the opening 214 adjacent to the opening 212 in the height direction and the distance L1 between the measurement points (from the center point C3 of the opening 212 to the center point C4 of the opening 214 distance) is substituted into the above formula (1), and the differential pressure of the internal pressure in the formation region of the fluidized bed 140 from the opening 216 adjacent to the opening 214 and the distance L2 between the measurement points (from the center point C4 of the opening 214 to the opening The height of each fluidized bed 140 is obtained by substituting the distance to the center point C5 of the portion 216 into the above equation (1). The average value of the obtained heights of the fluidized bed 140 can be the height of the fluidized bed 140 .
Further, the differential pressure of the internal pressure in the formation region of the fluidized bed 140 from the openings 212 and 216 and the distance L3 between the measurement points (the distance from the center point C3 of the opening 212 to the center point C5 of the opening 216) The height of the fluidized bed 140 may be obtained by substituting into equation (1).

(分散盤)
分散盤120は、塩素含有ガス配管150から供給された塩素含有ガスを分散させて流動層140へ流す。該分散盤120は、例えば図1Bに示すように、底板122と、該底板122上に充填物で形成された断熱層124と、複数のガス流路125とを備えてよい。なお、上記塩素含有ガスの塩素濃度は塩化炉100の操業状態に鑑み適宜決定すればよく、塩素の他には酸素、窒素等他のガスが適宜含まれてよい。なお、塩素含有ガス配管150の形状又は材質は公知のものを適宜採用可能である。
(distributor)
The dispersing board 120 disperses the chlorine-containing gas supplied from the chlorine-containing gas pipe 150 and flows it to the fluidized bed 140 . The distribution plate 120 may comprise a bottom plate 122, a heat insulating layer 124 formed of a filler on the bottom plate 122, and a plurality of gas channels 125, for example, as shown in FIG. 1B. The chlorine concentration of the chlorine-containing gas may be appropriately determined in consideration of the operating state of the chlorination furnace 100, and other gases such as oxygen and nitrogen may be appropriately contained in addition to chlorine. As for the shape or material of the chlorine-containing gas pipe 150, known ones can be appropriately adopted.

(底板)
底板122は、塩化炉本体110においてウインドボックス130の上方に位置し、塩素含有ガスが通過するように複数のガス流路125が形成されている。分散盤120にはノズル(不図示)が通常設けられ、このノズルの先端から流動層140に塩素含有ガスが供給されてよい。
また、底板122の材質は、耐熱性という観点から、例えば、炭素鋼、ステンレス鋼、及びNiよりなる群から選択される1種以上であればよい。なお、底板122の厚さは適宜設計可能であるが、例えば40~100mmである。炭素鋼は炭素含有量が2質量%以下の鋼であって、いわゆる極低炭素鋼、低炭素鋼、中炭素鋼、高炭素鋼等を含むものである。炭素鋼の具体例として、SS400等が挙げられる。ステンレス鋼は、耐熱性及び強度という観点から、クロム(Cr)、ニッケル(Ni)等が添加された鋼である。ステンレス鋼の具体例として、フェライト系ステンレス鋼、オーステナイト系ステンレス鋼、マルテンサイト系ステンレス鋼、二相ステンレス鋼等が挙げられる。
(Bottom plate)
The bottom plate 122 is positioned above the wind box 130 in the chlorination furnace main body 110, and is formed with a plurality of gas flow paths 125 for passage of the chlorine-containing gas. A nozzle (not shown) is usually provided in the dispersing disk 120, and the chlorine-containing gas may be supplied to the fluidized bed 140 from the tip of this nozzle.
Moreover, from the viewpoint of heat resistance, the material of the bottom plate 122 may be, for example, one or more selected from the group consisting of carbon steel, stainless steel, and Ni. The thickness of the bottom plate 122 can be appropriately designed, and is, for example, 40 to 100 mm. Carbon steel is steel having a carbon content of 2% by mass or less, and includes so-called ultra-low carbon steel, low carbon steel, medium carbon steel, high carbon steel, and the like. Specific examples of carbon steel include SS400. Stainless steel is steel to which chromium (Cr), nickel (Ni), or the like is added from the viewpoint of heat resistance and strength. Specific examples of stainless steel include ferritic stainless steel, austenitic stainless steel, martensitic stainless steel, and duplex stainless steel.

(断熱層)
断熱層124は、通常、底板122の上面に形成される。断熱層124は、単層構造であってもよいし、多層構造であってもよい。断熱層124は、例えば、耐熱セラミックスの充填層としてよい。断熱層124の厚さは適宜設計可能であるが、例えば300~600mmである。
(Heat insulation layer)
A heat insulating layer 124 is typically formed on the top surface of the bottom plate 122 . The heat insulating layer 124 may have a single-layer structure or a multi-layer structure. The heat insulating layer 124 may be, for example, a filled layer of heat-resistant ceramics. The thickness of the heat insulating layer 124 can be appropriately designed, and is, for example, 300 to 600 mm.

(ウインドボックス)
ウインドボックス130は、塩化炉本体110の下側に設けられる。該ウインドボックス130は、その上方の開口を閉塞するように分散盤120が配置されている。なお、ウインドボックス130の形状又はウインドボックス130を区画する周囲壁の材質は公知のものを適宜採用可能である。
(wind box)
The window box 130 is provided below the chlorination furnace main body 110 . The wind box 130 has a dispersing board 120 arranged so as to close the upper opening thereof. As for the shape of the wind box 130 or the material of the surrounding wall that partitions the wind box 130, known materials can be appropriately adopted.

(流動層)
流動層140は塩化炉100の操業時に分散盤120上に形成される。該流動層140は、酸化チタンを含むチタン鉱石と、炭素源であるコークスと、塩素含有ガスとを含んで形成され、流動状態を維持している。高温条件下でチタン鉱石と、コークスと、塩素含有ガスとが接触して反応することで、四塩化チタンガスを生成する。
(fluidized bed)
A fluidized bed 140 is formed on the distribution plate 120 during operation of the chlorination furnace 100 . The fluidized bed 140 is formed containing titanium ore containing titanium oxide, coke as a carbon source, and chlorine-containing gas, and maintains a fluidized state. Titanium tetrachloride gas is generated by the contact and reaction of titanium ore, coke, and chlorine-containing gas under high temperature conditions.

(原料供給管)
原料供給管160は、流動層140にチタン鉱石及びコークスを供給するため、流動層140よりも高い位置で塩化炉本体110の側壁111に接続され、設けられている。原料供給管160の形状又は材質は公知のものを適宜採用可能である。
(Raw material supply pipe)
The raw material supply pipe 160 is connected to the side wall 111 of the chlorination furnace main body 110 at a position higher than the fluidized bed 140 to supply titanium ore and coke to the fluidized bed 140 . As for the shape or material of the raw material supply pipe 160, known ones can be appropriately adopted.

(四塩化チタン回収管)
四塩化チタン回収管170は、塩化炉本体110内で生成された四塩化チタンガスを回収するために、塩化炉本体110の頂部近傍に設けられている。このとき、回収された四塩化チタンガスは四塩化チタン回収管170から四塩化チタン回収設備のコンデンサー(不図示)に送られ、該コンデンサーにおいて該四塩化チタンガスを四塩化チタンの沸点136℃以下に冷却することで、液体四塩化チタンとして回収すればよい。また、四塩化チタン回収管170の形状又は材質は公知のものを適宜採用可能である。
(Titanium tetrachloride recovery tube)
A titanium tetrachloride recovery pipe 170 is provided near the top of the chlorination furnace body 110 to recover the titanium tetrachloride gas produced in the chlorination furnace body 110 . At this time, the recovered titanium tetrachloride gas is sent from the titanium tetrachloride recovery pipe 170 to the condenser (not shown) of the titanium tetrachloride recovery equipment, and in the condenser the titanium tetrachloride gas is converted to the boiling point of titanium tetrachloride of 136° C. or less. It can be recovered as liquid titanium tetrachloride by cooling to . In addition, the shape or material of the titanium tetrachloride recovery pipe 170 can appropriately adopt known ones.

(開口装置)
先述した詰まり防止エアー配管の構成は適宜選択可能であり、例えば詰まり防止エアー配管として三方管を用いても良い。すなわち、開口部114には、図3に示す開口装置500に含まれる詰まり防止エアー配管515が接続されてもよい。当該開口装置500は、先述した詰まり防止エアー配管の機能、すなわち開口部114にチタン鉱石及び/又はコークス由来の付着物を形成することを抑制する機能だけでなく、開口部114に形成された付着物を除去する機能をも有する。図3に示す開口装置500は、粉砕機構510と、詰まり防止エアー配管515と、バルブ520と、保管室530とを備える。なお、開口部114以外の他の開口部も開口装置を備えてよい。
(Opening device)
The configuration of the clogging prevention air pipe described above can be selected as appropriate, and for example, a three-way pipe may be used as the clogging prevention air pipe. That is, the clogging prevention air pipe 515 included in the opening device 500 shown in FIG. 3 may be connected to the opening 114 . The opening device 500 not only has the function of the clogging prevention air pipe described above, that is, the function of suppressing the formation of deposits derived from titanium ore and/or coke in the opening 114, but also the attachment formed in the opening 114. It also has the function of removing kimono. The opening device 500 shown in FIG. It should be noted that other openings besides opening 114 may also be provided with opening devices.

(粉砕機構)
粉砕機構510は、回転軸512を有し、回転軸512の基端に小型モータ(不図示)が設けられ、回転軸512の先端にビット514が設けられる。ビット514は、塩化炉100の操業において平常運転時、保管室530に保管される。
ビット514の材質は耐熱性及び耐摩耗性の観点から、鋼であることが好ましい。
(Pulverization mechanism)
The crushing mechanism 510 has a rotary shaft 512 , a small motor (not shown) is provided at the proximal end of the rotary shaft 512 , and a bit 514 is provided at the distal end of the rotary shaft 512 . Bits 514 are stored in storage room 530 during normal operation of chlorination furnace 100 .
The material of the bit 514 is preferably steel from the viewpoint of heat resistance and wear resistance.

(詰まり防止エアー配管)
詰まり防止エアー配管515はいわゆる三方管を使用しており、その端部の一つは、塩化炉100の開口部114に接続されている。詰まり防止エアー配管515の他の端部は、バルブ520に接続されている。また、詰まり防止エアー配管515の更に他の端部には、エアー供給源(不図示)が接続されている。詰まり防止エアー配管515には、先述したように、圧力測定用管(不図示)を設け、該圧力測定用管には圧力検知手段を設ければよい。
なお、図3に示す詰まり防止エアー配管515は、塩化炉の開口部114に接続されているが、図1A及びBに示す開口部112にも接続してよい。
(clogging prevention air piping)
The clogging prevention air pipe 515 uses a so-called three-way pipe, one end of which is connected to the opening 114 of the chlorination furnace 100 . The other end of the anti-clogging air line 515 is connected to the valve 520 . Further, an air supply source (not shown) is connected to the other end of the clogging prevention air pipe 515 . As described above, the clogging prevention air pipe 515 may be provided with a pressure measuring pipe (not shown), and the pressure measuring pipe may be provided with pressure detecting means.
3 is connected to the opening 114 of the chlorination furnace, it may also be connected to the opening 112 shown in FIGS. 1A and 1B.

(バルブ)
塩化炉100の操業においては、開口部114にチタン鉱石及び/又はコークス由来の付着物の形成を抑制する観点から、詰まり防止エアー配管515からエアーを供給する場合、通常バルブ520を閉状態にする。一方で、当該塩化炉100の操業において、開口部114の良好な通気を確保するため、また、開口部114にチタン鉱石及び/又はコークスの不純物由来等の付着物が形成されてしまった場合、すなわち圧力測定用管で測定された圧力が異常に高い場合に対応するため、まずバルブ520を開状態にする。バルブ520を開状態にした後、小型モータで回転軸512を水平方向に移動させて、回転軸512の先端のビット514がバルブ520を通過し、小型モータで回転軸512の周方向に回転させることで該ビット514が塩化炉100の開口部114の付着物を粉砕する。その後、小型モータで回転軸512を移動させてビット514を保管室530に戻し、バルブ520を閉状態とすればよい。
(valve)
In the operation of the chlorination furnace 100, from the viewpoint of suppressing the formation of deposits derived from titanium ore and/or coke in the opening 114, when supplying air from the clogging prevention air pipe 515, the valve 520 is normally closed. . On the other hand, in the operation of the chlorination furnace 100, in order to ensure good ventilation of the opening 114, and when deposits such as titanium ore and / or coke impurities are formed in the opening 114, That is, first, the valve 520 is opened in order to cope with the case where the pressure measured in the pressure measuring pipe is abnormally high. After the valve 520 is opened, the rotating shaft 512 is horizontally moved by the small motor, the bit 514 at the tip of the rotating shaft 512 passes through the valve 520, and the rotating shaft 512 is rotated in the circumferential direction by the small motor. The bit 514 thereby crushes deposits in the opening 114 of the chlorination furnace 100 . After that, the rotary shaft 512 is moved by the small motor to return the bit 514 to the storage chamber 530, and the valve 520 is closed.

(保管室)
保管室530は、バルブ520に接続されている。当該保管室530には、冷却エアー配管535が接続されている。ビット514が塩化炉100の開口部114の付着物を粉砕する場合、流動層140が1000~1100℃の高温であるため、ビット514が流動層140内に曝されて加熱され、軟化しうる。そこで、該ビット514が塩化炉100の開口部114の付着物を粉砕した後、保管室530に戻されたビット514を冷却エアーによって冷却する。保管室530には冷却エアー排気管(不図示)が備えられてよい。
(Storage room)
Storage chamber 530 is connected to valve 520 . A cooling air pipe 535 is connected to the storage room 530 . When the bits 514 pulverize deposits in the opening 114 of the chlorination furnace 100, the fluidized bed 140 is heated to a high temperature of 1000 to 1100° C., so the bits 514 are exposed to the inside of the fluidized bed 140 and can be heated and softened. Therefore, after the bits 514 have crushed the deposits on the opening 114 of the chlorination furnace 100, the bits 514 returned to the storage chamber 530 are cooled by cooling air. Storage chamber 530 may be equipped with a cooling air exhaust (not shown).

(流動層の高さの変更)
一実施形態において、該推測ステップで得られた流動層の高さが、管理している流動層の高さと異なる場合、チタン鉱石やコークスの投入や、塩素含有ガス量等を適宜変更し、所望の流動層高さとすればよい。
(Change in height of fluidized bed)
In one embodiment, if the height of the fluidized bed obtained in the estimation step is different from the height of the fluidized bed being managed, the input of titanium ore or coke, the amount of chlorine-containing gas, etc. are changed as appropriate, and the desired is the fluidized bed height.

本発明を実施例及び比較例に基づいて具体的に説明する。以下の実施例及び比較例の記載は、あくまで本発明の技術的内容の理解を容易とするための試験的な具体例であり、本発明の技術的範囲はこれらの具体例によって制限されるものではない。 The present invention will be specifically described based on examples and comparative examples. The descriptions of the following examples and comparative examples are merely experimental specific examples for facilitating the understanding of the technical content of the present invention, and the technical scope of the present invention is limited by these specific examples. is not.

[実施例1]
まず、図1Aに示す構成を備える塩化炉100を使用した。さらに、図3に示す構成を備える開口装置500を2組使用した。塩化炉100の開口部112は、高さ位置が低い方の開口部112の中心点C2から分散盤120の上面までの離間距離(H1)が500mmとなるように塩化炉100の側壁111に配置され、開口部114は、高さ位置が低い方の開口部112の中心点C2から高さ位置が高い方の開口部114の中心点C1までの測定点間距離(L)が500mmとなるように塩化炉100の側壁111に配置された。また、各開口部112、114の直径の大きさを50mmにした。各開口部112、114に開口装置500の詰まり防止エアー配管515を接続した。なお、塩化炉100の四塩化チタン回収管170には公知の四塩化チタン回収設備を接続した。
[Example 1]
First, a chlorination furnace 100 having the configuration shown in FIG. 1A was used. Further, two sets of opening devices 500 having the configuration shown in FIG. 3 were used. The opening 112 of the chlorination furnace 100 is arranged on the side wall 111 of the chlorination furnace 100 so that the distance (H1) from the center point C2 of the lower opening 112 to the upper surface of the distribution board 120 is 500 mm. The opening 114 is measured so that the distance (L) between measurement points from the center point C2 of the lower opening 112 to the center point C1 of the higher opening 114 is 500 mm. placed on the side wall 111 of the chlorination furnace 100. Also, the diameter of each opening 112, 114 is set to 50 mm. A clogging prevention air pipe 515 of the opening device 500 is connected to each of the openings 112 and 114 . A known titanium tetrachloride recovery facility was connected to the titanium tetrachloride recovery pipe 170 of the chlorination furnace 100 .

塩化炉100の原料供給管160からチタン鉱石及びコークスを投入し、塩素含有ガス配管150から塩素ガスを供給し、開口部112、114から同じ流量のエアーを供給しながら、塩化炉100の操業試験を開始した。このとき、流動層140の目標高さを2000mmに設定し、チタン鉱石及びコークスの投入量を調整した。塩化炉100の操業試験中、当該流動層140の目標高さを制御するため、高さ方向の位置が異なる開口部112、114を介して流動層140の形成領域の内部圧力の差圧を連続的に測定し、流動層140の高さを上記式(1)に基づき算出した。塩化炉100の操業試験中、上記式(1)で得られた流動層140の高さが流動層140の目標高さよりも低かった場合、チタン鉱石及びコークスの投入量を増やす一方で、当該得られた流動層140の高さが流動層140の目標高さよりも高かった場合、チタン鉱石及びコークスの投入量を減らした。すなわち、塩化炉100の操業試験中、前述した流動層140の目標高さとなるようにチタン鉱石及びコークスの投入量を適宜調整した。また、開口部112、114にチタン鉱石及び/又はコークスの不純物由来等の付着物を形成させないために、塩化炉100の操業試験の開始時から4時間ごとに開口装置500の粉砕機構510のビット514で処理した。 An operation test of the chlorination furnace 100 was performed while supplying titanium ore and coke from the raw material supply pipe 160 of the chlorination furnace 100, supplying chlorine gas from the chlorine-containing gas pipe 150, and supplying air at the same flow rate from the openings 112 and 114. started. At this time, the target height of the fluidized bed 140 was set to 2000 mm, and the input amounts of titanium ore and coke were adjusted. During the operation test of the chlorination furnace 100, in order to control the target height of the fluidized bed 140, the differential pressure inside the formation area of the fluidized bed 140 is continuously applied through the openings 112 and 114 at different positions in the height direction. The height of the fluidized bed 140 was calculated based on the above formula (1). During the operation test of the chlorination furnace 100, if the height of the fluidized bed 140 obtained by the above formula (1) is lower than the target height of the fluidized bed 140, while increasing the input amounts of titanium ore and coke, When the height of the fluidized bed 140 obtained was higher than the target height of the fluidized bed 140, the amounts of titanium ore and coke charged were reduced. That is, during the operation test of the chlorination furnace 100, the amounts of titanium ore and coke charged were appropriately adjusted so that the above-mentioned target height of the fluidized bed 140 was obtained. In addition, in order not to form deposits derived from titanium ore and/or coke impurities in the openings 112 and 114, the bit of the crushing mechanism 510 of the opening device 500 is removed every four hours from the start of the operation test of the chlorination furnace 100. 514.

塩化炉100の操業試験において、当該操業試験の開始時から24時間経過までで得られた上記式(1)のPL1(下側の開口部112に接続された詰まり防止エアー配管515の圧力測定用管の圧力検知手段で測定された流動層140の形成領域の内部圧力)の平均値は、26.5kPaであり、PL2(上側の開口部114に接続された詰まり防止エアー配管515の圧力測定用管の圧力検知手段で測定された流動層140の形成領域の内部圧力)の平均値は、19.9kPaであった。すなわち、下側の開口部112から測定した流動層140の形成領域の内部圧力と上側の開口部114から測定した流動層140の形成領域の内部圧力との差圧は、6.6kPaであった。上記式(1)のL(下側の開口部112の中心点C2から上側の開口部114の中心点C1までの距離である測定点間距離)が500mmであることを踏まえ、当該操業試験の開始時から24時間経過までの流動層140の高さの平均値は、2010mmであることが確認された。
なお、当該操業試験の開始時から24時間経過までで得られた上記式(1)のPL1は26.5±1.0kPaの範囲内であり、当該操業試験の開始時から24時間経過までで得られた上記式(1)のPL2は19.9±1.0kPaの範囲内であった。
なお、塩化炉100の操業試験中、四塩化チタン回収設備に回収された四塩化チタン中の塩素濃度を測定したが、塩素濃度の許容範囲を超える増加は確認されなかった。
これにより、四塩化チタン製造の歩留まりが良好であると判断した。
In the operation test of the chlorination furnace 100, P L1 of the above formula (1) obtained from the start of the operation test to the elapse of 24 hours (pressure measurement of the clogging prevention air pipe 515 connected to the lower opening 112 The average value of P L2 (the pressure in the clogging prevention air pipe 515 connected to the upper opening 114) is 26.5 kPa, The average value of the internal pressure in the formation region of the fluidized bed 140 measured by the pressure detection means of the measurement pipe was 19.9 kPa. That is, the pressure difference between the internal pressure of the fluidized bed 140 forming region measured from the lower opening 112 and the internal pressure of the fluidized bed 140 forming region measured from the upper opening 114 was 6.6 kPa. . Based on the fact that L in the above formula (1) (distance between measurement points, which is the distance from the center point C2 of the lower opening 112 to the center point C1 of the upper opening 114) is 500 mm, the operation test It was confirmed that the average value of the height of the fluidized bed 140 from the start to the passage of 24 hours was 2010 mm.
In addition, P L1 of the above formula (1) obtained from the start of the operation test until 24 hours has passed is within the range of 26.5 ± 1.0 kPa, and from the start of the operation test until 24 hours have passed P L2 of the above formula (1) obtained in 1 was within the range of 19.9±1.0 kPa.
During the operation test of the chlorination furnace 100, the chlorine concentration in the titanium tetrachloride recovered by the titanium tetrachloride recovery equipment was measured, but no increase in the chlorine concentration exceeding the permissible range was confirmed.
From this, it was judged that the yield of titanium tetrachloride production was good.

次に、塩化炉100の操業試験開始時から26時間経過後、当該操業試験の開始時から投入していたチタン鉱石よりかさ密度が高いチタン鉱石を原料供給管160から投入することで、流動層140の高さを意図的に変更した。流動層140の高さを連続的に上記式(1)に基づき算出していた結果、かさ密度が高いチタン鉱石の投入を開始してから上記式(1)より得られた流動層140の高さは、かさ密度が高いチタン鉱石を投入する前に上記式(1)より得られた流動層140の高さより低くなったことを確認した。
そこで、チタン鉱石を追加投入したことにより流動層140の高さを流動層140の目標高さに回復させた。塩化炉100の操業試験の開始時から30時間経過したが、四塩化チタン回収設備に回収された四塩化チタン中の塩素濃度は許容範囲を超える増加が確認されなかった。これは、流動層140の高さを適切に保った結果、チタン鉱石、コークス、塩素ガス量が適切に制御されたことで未反応塩素がほとんど回収されなかったためと推察される。
これにより、四塩化チタン製造の歩留まりが良好であると判断した。
Next, after 26 hours have passed since the start of the operation test of the chlorination furnace 100, titanium ore having a higher bulk density than the titanium ore that has been put in since the start of the operation test is fed from the raw material supply pipe 160, so that the fluidized bed I intentionally changed the height of 140. As a result of continuously calculating the height of the fluidized bed 140 based on the above formula (1), the height of the fluidized bed 140 obtained from the above formula (1) after the start of charging titanium ore with a high bulk density It was confirmed that the height became lower than the height of the fluidized bed 140 obtained from the above formula (1) before the titanium ore having a high bulk density was added.
Therefore, the height of the fluidized bed 140 was recovered to the target height of the fluidized bed 140 by additionally charging titanium ore. Thirty hours have passed since the start of the operation test of the chlorination furnace 100, but the chlorine concentration in the titanium tetrachloride recovered by the titanium tetrachloride recovery equipment did not increase beyond the permissible range. It is presumed that this is because the amount of titanium ore, coke, and chlorine gas was appropriately controlled as a result of keeping the fluidized bed 140 at an appropriate height, so that almost no unreacted chlorine was recovered.
From this, it was judged that the yield of titanium tetrachloride production was good.

[比較例1]
比較例1では、開口部114と開口部114に接続した開口装置500を使用しなかったこと以外、即ち、開口部112からのみ圧力を得るとしたこと以外、実施例1と同様に、塩化炉100の操業試験を開始した。流動層140の形成領域の圧力測定が開口部112でのみ行われるため、先述した式(1)を利用した推測は実施できない。そこで、塩化炉100の操業試験の開始時から24時間経過まで開口部112を介して流動層140の形成領域の内部圧力を連続的に測定し、流動層140の高さを下記式(2)に基づき算出した。
H=P1×α・・・式(2)
H:流動層140の高さ(cm)
P1:開口部112に接続された圧力測定用管の圧力検知手段で測定された流動層140の内部圧力(kPa)
α:鉱石のかさ密度に基づいて設定する係数(cm/kPa)
[Comparative Example 1]
In Comparative Example 1, the chlorination furnace was operated in the same manner as in Example 1, except that the opening 114 and the opening device 500 connected to the opening 114 were not used, that is, the pressure was obtained only from the opening 112. 100 operational trials were initiated. Since the pressure measurement in the region where the fluidized bed 140 is formed is performed only at the opening 112, it is not possible to make an estimation using the above equation (1). Therefore, the internal pressure of the formation region of the fluidized bed 140 is continuously measured through the opening 112 for 24 hours from the start of the operation test of the chlorination furnace 100, and the height of the fluidized bed 140 is calculated by the following formula (2). calculated based on
H=P1×α Expression (2)
H: Height of fluidized bed 140 (cm)
P1: Internal pressure (kPa) of the fluidized bed 140 measured by the pressure detecting means of the pressure measuring pipe connected to the opening 112
α: Coefficient set based on ore bulk density (cm/kPa)

塩化炉100の操業試験の開始時から26時間経過後、当該操業試験の開始時から投入していたチタン鉱石よりかさ密度が高いチタン鉱石を意図的に原料供給管160から投入することで、流動層140の高さを変更した。流動層140の高さを連続的に上記式(2)に基づき算出していた結果、上記式(2)のHは、かさ密度が高いチタン鉱石を投入しても所望する流動層高さと同じ値になった。しかしながら、操業試験の開始時から28時間の時点で塩化炉100の下流である四塩化チタン回収設備からは、未反応の塩素ガスが通常時よりも多く回収された。すなわち、未反応の塩素ガスが流動層140を通過し、四塩化チタンの製造に利用できなかったので、四塩化チタンの製造歩留りは低下した。 After 26 hours from the start of the operation test of the chlorination furnace 100, titanium ore having a higher bulk density than the titanium ore that had been put in from the start of the operation test was intentionally introduced from the raw material supply pipe 160, thereby The height of layer 140 was changed. As a result of continuously calculating the height of the fluidized bed 140 based on the above formula (2), H in the above formula (2) is the same as the desired fluidized bed height even if titanium ore with a high bulk density is charged. became a value. However, at 28 hours after the start of the operation test, more unreacted chlorine gas was recovered than usual from the titanium tetrachloride recovery facility downstream of the chlorination furnace 100 . That is, the unreacted chlorine gas passed through the fluidized bed 140 and could not be used for the production of titanium tetrachloride, so the production yield of titanium tetrachloride decreased.

[実施例による考察]
流動層の高さを直接測定することはできないが、実施例1においては、塩化炉の操業試験中、推測ステップでは、高さ方向の位置が異なる2か所の流動層の形成領域の内部圧力を測定することで得られる流動層情報に基づき該流動層の高さを推測したことで、流動層の高さを精度良く求めることができ、その結果、四塩化チタン製造の歩留まりが良好であったことを確認した。塩化炉内の原料組成(TiO2、C、SiO2)や鉱石種、原料のかさ密度等次第で流動層の高さが変わったとしても、流動層の高さを随時、上記式(1)より算出可能である。したがって、四塩化チタン製造の歩留まりを良好にすることができると推察される。また、使用する原料の変更に対しても迅速かつ精度よく対応でき、所望する流動層の高さを実現できる。この観点からも四塩化チタン製造の歩留まりを良好にすることができると推察される。
一方、比較例1においては、鉱石のかさ密度の変化により流動層の高さが想定を超えて低くなったと思われた。この理由としては、流動層の形成領域の内部圧力を1か所しか測定していないために、流動層の高さを適切に判断できなかったと考えられる。また、式(2)は鉱石のかさ密度を考慮した式としたが、式(1)と比べて流動層の高さの測定精度は低い結果となった。
塩化炉の寿命は数年にも及ぶことが多い。例えば実施例1のように、高さ方向の位置が異なる2か所以上の流動層の形成領域の内部圧力を測定することで得られる流動層情報に基づき該流動層の高さを推測するとその精度は高いと思われ、四塩化チタン製造の歩留まりの向上効果は大きい。
[Consideration by Example]
Although the height of the fluidized bed cannot be directly measured, in Example 1, during the operation test of the chlorination furnace, the estimation step was to determine the internal pressure By estimating the height of the fluidized bed based on the information on the fluidized bed obtained by measuring I confirmed that. Even if the height of the fluidized bed changes depending on the raw material composition (TiO 2 , C, SiO 2 ) in the chlorination furnace, the type of ore, the bulk density of the raw material, etc., the height of the fluidized bed can be adjusted at any time according to the above formula (1). It is possible to calculate more. Therefore, it is presumed that the yield of titanium tetrachloride production can be improved. In addition, it is possible to quickly and accurately respond to changes in raw materials used, and to achieve a desired height of the fluidized bed. From this point of view as well, it is presumed that the yield of titanium tetrachloride production can be improved.
On the other hand, in Comparative Example 1, it was thought that the height of the fluidized bed was lower than expected due to changes in the bulk density of the ore. The reason for this is thought to be that the height of the fluidized bed could not be properly determined because the internal pressure of the fluidized bed formation region was measured only at one point. In addition, the formula (2) is a formula that considers the bulk density of the ore, but the measurement accuracy of the height of the fluidized bed is lower than that of the formula (1).
Chlorination furnaces often have a service life of several years. For example, as in Example 1, if the height of the fluidized bed is estimated based on the fluidized bed information obtained by measuring the internal pressure of two or more fluidized bed forming regions at different height directions, The accuracy is thought to be high, and the effect of improving the yield of titanium tetrachloride production is great.

100、200 塩化炉
110 塩化炉本体
111 側壁
112、114、114a~d、212、214、216 開口部
113、115、115a~d、213、215、217、515 詰まり防止エアー配管
120 分散盤
122 底板
124 断熱層
125 ガス流路
130 ウインドボックス
140 流動層
150 塩素含有ガス配管
160 原料供給管
170 四塩化チタン回収管
500 開口装置
510 粉砕機構
512 回転軸
514 ビット
520 バルブ
530 保管室
535 冷却エアー配管
C1~5 中心点
100, 200 chlorination furnace 110 chlorination furnace main body 111 side walls 112, 114, 114a-d, 212, 214, 216 openings 113, 115, 115a-d, 213, 215, 217, 515 clogging prevention air pipe 120 dispersion board 122 bottom plate 124 Heat-insulating layer 125 Gas channel 130 Wind box 140 Fluidized bed 150 Chlorine-containing gas pipe 160 Raw material supply pipe 170 Titanium tetrachloride recovery pipe 500 Opening device 510 Crushing mechanism 512 Rotary shaft 514 Bit 520 Valve 530 Storage room 535 Cooling air pipe C1- 5 center point

Claims (5)

分散盤を備える塩化炉を用いて、前記分散盤上に、酸化チタンを含有するチタン鉱石、コークス及び塩素ガスを含む流動層を形成し、四塩化チタンを製造する方法であって、
前記流動層の高さを推測する推測ステップを有し、
前記推測ステップでは、高さ方向の位置が異なる2か所以上の前記流動層の形成領域の内部圧力を測定することで得られる流動層情報に基づき該流動層の高さを推測する、四塩化チタンの製造方法。
A method for producing titanium tetrachloride by forming a fluidized bed containing titanium oxide-containing titanium ore, coke, and chlorine gas on the dispersing disk using a chlorination furnace equipped with a dispersing disk,
an estimating step of estimating the height of the fluidized bed;
In the estimating step, the height of the fluidized bed is estimated based on fluidized bed information obtained by measuring internal pressures in two or more fluidized bed forming regions at different positions in the height direction. A method of manufacturing titanium.
前記流動層情報は、前記2か所以上の前記流動層の形成領域の内部圧力の高さ方向における差圧を含む、請求項1に記載の四塩化チタンの製造方法。 2. The method for producing titanium tetrachloride according to claim 1, wherein the fluidized bed information includes a differential pressure in the height direction of the internal pressures of the two or more fluidized bed forming regions. 前記流動層情報は、高さ方向における前記2か所以上の前記流動層の形成領域の内部圧力の測定点間距離を更に含む、請求項2に記載の四塩化チタンの製造方法。 3. The method for producing titanium tetrachloride according to claim 2, wherein said fluidized bed information further includes a distance between measurement points of internal pressure of said two or more fluidized bed forming regions in the height direction. 前記流動層を取り囲む前記塩化炉の側壁には、高さ方向の位置が異なる2か所以上の開口部が設けられ、
前記推測ステップにおいて、前記開口部を介して前記2か所以上の前記流動層の形成領域の内部圧力を測定する、請求項1~3のいずれか一項に記載の四塩化チタンの製造方法。
A side wall of the chlorination furnace surrounding the fluidized bed is provided with two or more openings at different positions in the height direction,
4. The method for producing titanium tetrachloride according to any one of claims 1 to 3, wherein in said estimating step, internal pressures of said two or more fluidized bed forming regions are measured through said openings.
前記推測ステップは、前記開口部から前記流動層に向けてガスを供給することを含む、請求項4に記載の四塩化チタンの製造方法。 5. The method for producing titanium tetrachloride according to claim 4, wherein said estimating step includes supplying gas from said opening toward said fluidized bed.
JP2021106524A 2021-06-28 2021-06-28 Method for producing titanium tetrachloride Pending JP2023004676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021106524A JP2023004676A (en) 2021-06-28 2021-06-28 Method for producing titanium tetrachloride

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021106524A JP2023004676A (en) 2021-06-28 2021-06-28 Method for producing titanium tetrachloride

Publications (1)

Publication Number Publication Date
JP2023004676A true JP2023004676A (en) 2023-01-17

Family

ID=85100710

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021106524A Pending JP2023004676A (en) 2021-06-28 2021-06-28 Method for producing titanium tetrachloride

Country Status (1)

Country Link
JP (1) JP2023004676A (en)

Similar Documents

Publication Publication Date Title
KR101606510B1 (en) Production process
EP3190194B1 (en) Method for detecting air flow distribution in blast furnace
TWI477936B (en) Reactor temperature control using probability distribution and reactor
JP2023004676A (en) Method for producing titanium tetrachloride
JP4352489B2 (en) Adhered dust thickness detection device and method for removing adhering dust in a metal smelting furnace
WO2006098129A1 (en) Gas blower of coke dry fire extinguishing facility and its operating method
JP7200041B2 (en) Distributor, chlorination furnace, and method for producing metal chloride
TWI820056B (en) Reaction device and method for producing trichlorosilane
CN111076694B (en) Method for judging air gap of blast furnace packing layer
JP2015139736A (en) Fluid bed reactor and production method of nitrile compound using the same
JP7428592B2 (en) Titanium tetrachloride manufacturing method and chlorination furnace
JP4371098B2 (en) Waste acid treatment method
JP2020501895A (en) Pressure drop control system and method for a feed distributor in a fluidized bed reactor
KR20180078333A (en) Fluid bed reactor and method of producing nitrile compound using same
JP4497004B2 (en) Monitoring and pressure control method for converter bottom blowing tuyere
JP2012087375A (en) Method for operating blast furnace
JP4770316B2 (en) Blast furnace tuyere and blast furnace bottom situation evaluation method
JP4829403B2 (en) High temperature melt discharge pipe
KR100776036B1 (en) The Method For Decision Of Upper Core Change using Central Gas Distribution Ratio
CN212931558U (en) Non-contact liquid level measuring device for molten salt furnace
JP2014025641A (en) Operation method of heat exchange system
JP2009068099A (en) Structure for gas-blowing tuyere in refining vessel
JP3788158B2 (en) Double pipe tuyere for hydrocarbon injection
JP2023049770A (en) Method for producing titanium tetrachloride and method for producing titanium sponge
JP2007046145A (en) Method for operating blast furnace with little variation of furnace heat

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240130