JP2022186105A - Building unit connection structure - Google Patents

Building unit connection structure Download PDF

Info

Publication number
JP2022186105A
JP2022186105A JP2021094167A JP2021094167A JP2022186105A JP 2022186105 A JP2022186105 A JP 2022186105A JP 2021094167 A JP2021094167 A JP 2021094167A JP 2021094167 A JP2021094167 A JP 2021094167A JP 2022186105 A JP2022186105 A JP 2022186105A
Authority
JP
Japan
Prior art keywords
steel pipe
column
steel
pipe column
building unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021094167A
Other languages
Japanese (ja)
Inventor
比呂人 高津
Hiroto Takatsu
全 高尾
Takeshi Takao
祐介 新谷
Yusuke Shintani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2021094167A priority Critical patent/JP2022186105A/en
Publication of JP2022186105A publication Critical patent/JP2022186105A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

To connect steel pipe poles of a building unit which are adjacent to each other vertically while improving a degree of fixation of a steel beam to the steel pipe pole.SOLUTION: Building unit connection structure comprises a first building unit 20A including a first steel pipe pole 30A and an upper steel beam 40U with a beam end 40E connected to a pole head 30U of the first steel pipe pole 30A, a second building unit 20B including a second steel pipe pole 30B arranged on the first steel pipe pole 30A and a lower steel beam 40L with the beam end 40E connected to the pole leg of the second steel pipe pole 30B and a connection steel pipe 50 in which cement type filling material 52 is filled, and which has a lower part fitted in the pole head 30U of the first steel pipe pole 30A and an upper part fitted in the pole leg 30L of the second steel pipe pole 30B, for connecting the first steel pipe pole 30A and the second steel pipe pole 30B.SELECTED DRAWING: Figure 2

Description

本発明は、建物ユニット連結構造に関する。 The present invention relates to a building unit connecting structure.

上下の鋼管柱の内部に、コンクリートを充填して接合する鋼管柱の接合構造が知られている(例えば、特許文献1,2参照)。 There is known a joint structure of steel pipe columns in which the insides of upper and lower steel pipe columns are filled with concrete and joined (see, for example, Patent Literatures 1 and 2).

特開昭62-264235号公報JP-A-62-264235 特開平5-295800号公報JP-A-5-295800

ところで、現場において、箱状の複数の建物ユニットを積み上げることにより、建物を構築するユニット工法(ユニット建築)が知られている。 By the way, there is known a unit construction method (unit construction) in which a building is constructed by piling up a plurality of box-shaped building units on site.

建物ユニットは、例えば、四隅に立てられた複数の鋼管柱と、隣り合う鋼管柱にそれぞれ架設された複数の鉄骨梁とを備え、現場において積み上げられる。そして、上下に隣接する箱状ユニットの鋼管柱同士が接合される。 A building unit includes, for example, a plurality of steel pipe columns erected at four corners and a plurality of steel beams respectively erected on the adjacent steel pipe columns, which are piled up on site. Then, the steel pipe columns of the vertically adjacent box-shaped units are joined together.

この種のユニット工法では、現場において、上下に隣接する箱状ユニットの鋼管柱同士を接合しつつ、鋼管柱に対する鉄骨梁の固定度を高めたいとの要望がある。 In this type of unit construction method, there is a demand to increase the degree of fixation of the steel beams to the steel pipe columns while joining the steel pipe columns of vertically adjacent box-shaped units at the site.

本発明は、上記の事実を考慮し、上下に隣接する建物ユニットの鋼管柱同士を接合しつつ、鋼管柱に対する鉄骨梁の固定度を高めることを目的とする。 SUMMARY OF THE INVENTION In view of the above facts, an object of the present invention is to increase the degree of fixation of steel beams to steel pipe columns while joining steel pipe columns of vertically adjacent building units.

請求項1に記載の建物ユニット連結構造は、第一鋼管柱と、前記第一鋼管柱の柱頭部に梁端部が接合される第一鉄骨梁と、を有する第一建物ユニットと、前記第一鋼管柱の上に配置される第二鋼管柱と、前記第二鋼管柱の柱脚部に梁端部が接合される第二鉄骨梁と、を有する第二建物ユニットと、内部にセメント系充填材が充填され、下部が前記第一鋼管柱の前記柱頭部内に嵌め込まれるとともに、上部が前記第二鋼管柱の前記柱脚部内に嵌め込まれ、前記第一鋼管柱と前記第二鋼管柱とを連結する連結鋼管と、を備える。 The building unit connection structure according to claim 1 is a first building unit having a first steel pipe column and a first steel frame beam having a beam end joined to a column head of the first steel pipe column; A second building unit having a second steel pipe column placed on top of one steel pipe column, a second steel frame beam whose beam end is joined to the column base of the second steel pipe column, Filling material is filled, the lower part is fitted into the column head of the first steel pipe column, the upper part is fitted into the column base of the second steel pipe column, and the first steel pipe column and the second steel pipe column and a connecting steel pipe that connects the

請求項1に係る建物ユニット連結構造によれば、第一建物ユニットは、第一鋼管柱と、第一鋼管柱の柱頭部に梁端部が接合される第一鉄骨梁とを有する。また、第二建物ユニットは、第一鋼管柱の上に配置される第二鋼管柱と、第二鋼管柱の柱脚部に梁端部が接合される第二鉄骨梁とを有する。 According to the building unit connection structure according to claim 1, the first building unit has the first steel pipe column and the first steel beam whose beam end is joined to the column head of the first steel pipe column. Also, the second building unit has a second steel pipe column arranged on top of the first steel pipe column, and a second steel beam whose beam end is joined to the column base of the second steel pipe column.

連結鋼管は、内部にセメント系充填材が充填される。この連結鋼管の下部は、第一鋼管柱の柱頭部内に嵌め込まれる。また、連結鋼管の上部は、第二鋼管柱の柱脚部内に嵌め込まれる。この連結鋼管によって、第一鋼管柱と第二鋼管柱とが連結される。 The connecting steel pipes are internally filled with a cement-based filler. The lower part of this connecting steel pipe is fitted into the column head of the first steel pipe column. Also, the upper portion of the connecting steel pipe is fitted into the column base portion of the second steel pipe column. The connecting steel pipe connects the first steel pipe column and the second steel pipe column.

ここで、前述したように、連結鋼管の下部は、第一鋼管柱の柱頭部内に嵌め込まれる。この第一鋼管柱の柱頭部には、第一鉄骨梁の梁端部が接合される。これにより、水平力作用時に、第一鉄骨梁の梁端部から第一鋼管柱の柱頭部に圧縮力が作用した場合に、当該柱頭部の変形が抑制される。つまり、第一鋼管柱の柱頭部に対する第一鉄骨梁の梁端部の固定度が高められる。 Here, as described above, the lower portion of the connecting steel pipe is fitted into the column head of the first steel pipe column. The beam end of the first steel beam is joined to the column head of the first steel pipe column. This suppresses deformation of the column head when a compressive force acts on the column head of the first steel pipe column from the beam end of the first steel beam when a horizontal force acts. That is, the degree of fixation of the beam end portion of the first steel beam to the column head of the first steel pipe column is enhanced.

これと同様に、連結鋼管の上部は、第二鋼管柱の柱脚部内に嵌め込まれる。この第二鋼管柱の柱脚部には、第二鉄骨梁の梁端部が接合される。これにより、水平力作用時に、第二鉄骨梁の梁端部から第二鋼管柱の柱脚部に圧縮力が作用した場合に、当該柱脚部の変形が抑制される。つまり、第二鋼管柱の柱脚部に対する第二鉄骨梁の梁端部の固定度が高められる。 Similarly, the upper part of the connecting steel pipe is fitted into the column base of the second steel pipe column. The beam end of the second steel beam is joined to the column base of the second steel pipe column. This suppresses deformation of the column base when a compressive force acts on the column base of the second steel pipe column from the beam end of the second steel beam when the horizontal force acts. That is, the fixation degree of the beam end portion of the second steel beam to the column base portion of the second steel pipe column is enhanced.

このように本発明では、上下に隣接する第一建物ユニットの第一鋼管柱と第二建物ユニットの第二鋼管柱を接合することができる。また、本発明では、第一鋼管柱の柱頭部に対する第一鉄骨梁の梁端部の固定度を高めることができるとともに、第二鋼管柱の柱脚部に対する第二鉄骨梁の梁端部の固定度を高めることができる。 Thus, in the present invention, the first steel pipe column of the first building unit and the second steel pipe column of the second building unit that are vertically adjacent to each other can be joined. Further, in the present invention, it is possible to increase the degree of fixation of the beam end of the first steel beam to the column head of the first steel pipe column, and to secure the beam end of the second steel beam to the column base of the second steel pipe column. You can increase the degree of fixation.

請求項2に記載の建物ユニット連結構造は、請求項1に記載の建物ユニット連結構造において、前記第一鉄骨梁の前記梁端部に設けられ、前記第一鋼管柱の前記柱頭部と接触する第一セメント系硬化体と、前記第二鉄骨梁の前記梁端部に設けられ、前記第二鋼管柱の前記柱脚部と接触する第二セメント系硬化体と、を備える。 The building unit connection structure according to claim 2 is the building unit connection structure according to claim 1, which is provided at the beam end of the first steel beam and contacts the column head of the first steel pipe column. A first cementitious hardening body and a second cementitious hardening body provided at the beam end of the second steel beam and in contact with the column base of the second steel pipe column are provided.

請求項2に係る建物ユニット連結構造によれば、第一鉄骨梁の梁端部には、第一セメント系硬化体が設けられる。第一セメント系硬化体は、第一鋼管柱の柱頭部と接触する。これにより、水平力作用時に、第一鉄骨梁の梁端部から第一セメント系硬化体を介して、第一鋼管柱の柱頭部に圧縮力が分散して作用する。 According to the building unit connection structure according to claim 2, the beam end portion of the first steel frame beam is provided with the first cement-based hardening body. The first cementitious hardening body contacts the stigma of the first steel pipe column. As a result, when a horizontal force acts, a compressive force is dispersedly applied to the column head of the first steel pipe column from the beam end of the first steel beam through the first cementitious hardened body.

したがって、第一鋼管柱の柱頭部の変形がさらに抑制される。つまり、第一鋼管柱の柱頭部に対する第一鉄骨梁の梁端部の固定度がさらに高められる。 Therefore, the deformation of the column head of the first steel pipe column is further suppressed. That is, the degree of fixation of the beam end portion of the first steel beam to the column head of the first steel pipe column is further enhanced.

これと同様に、第二鉄骨梁の梁端部には、第二セメント系硬化体が設けられる。第二セメント系硬化体は、第二鋼管柱の柱脚部と接触する。これにより、水平力作用時に、第二鉄骨梁の梁端部から第二セメント系硬化体を介して、第二鋼管柱の柱脚部に圧縮力が分散して作用する。 Similarly, the beam ends of the second steel beams are provided with a second cementitious hardening body. The second cementitious hardening body contacts with the column base of the second steel pipe column. As a result, when a horizontal force acts, a compressive force is dispersedly applied to the column base of the second steel pipe column from the beam end of the second steel beam through the second cement-based hardened body.

したがって、第一鋼管柱の柱頭部の変形がさらに抑制される。つまり、第一鋼管柱の柱頭部に対する第一鉄骨梁の梁端部の固定度がさらに高められる。 Therefore, the deformation of the column head of the first steel pipe column is further suppressed. That is, the degree of fixation of the beam end portion of the first steel beam to the column head of the first steel pipe column is further enhanced.

請求項3に記載の建物ユニット連結構造は、請求項1又は請求項2に記載の建物ユニット連結構造において、前記連結鋼管の下端は、前記第二鉄骨梁の下端よりも下側に位置し、前記連結鋼管の上端は、前記第二鉄骨梁の上端よりも上側に位置する。 The building unit connection structure according to claim 3 is the building unit connection structure according to claim 1 or claim 2, wherein the lower end of the connecting steel pipe is located below the lower end of the second steel beam, The upper end of the connecting steel pipe is located above the upper end of the second steel beam.

請求項3に係る建物ユニット連結構造によれば、連結鋼管の下端は、第二鉄骨梁の下端よりも下側に位置する。これにより、水平力作用時に、第一鉄骨梁から第一鋼管柱の柱頭部に作用した圧縮力を、連結鋼管の下部の全体で受けることができる。したがって、第一鋼管柱の柱頭部の変形をより確実に抑制することができる。 According to the building unit connection structure according to claim 3, the lower ends of the connecting steel pipes are located below the lower ends of the second steel beams. As a result, when a horizontal force acts, the entire lower portion of the connecting steel pipe can receive the compressive force acting on the column head of the first steel pipe column from the first steel beam. Therefore, deformation of the column head of the first steel pipe column can be suppressed more reliably.

また、連結鋼管の上端は、第二鉄骨梁の上端よりも上側に位置する。これにより、水平力作用時に、第二鉄骨梁の梁端部から第二鋼管柱の柱脚部に作用した圧縮力を、連結鋼管の上部の全体で受けることができる。したがって、第二鋼管の柱脚部の変形をより確実に抑制することができる。 Also, the upper ends of the connecting steel pipes are located above the upper ends of the second steel beams. As a result, when a horizontal force acts, the entire upper portion of the connecting steel pipe can receive the compressive force acting from the beam end portion of the second steel frame beam to the column base portion of the second steel pipe column. Therefore, deformation of the column base portion of the second steel pipe can be suppressed more reliably.

以上説明したように、本発明によれば、上下に隣接する建物ユニットの鋼管柱同士を接合しつつ、鋼管柱に対する鉄骨梁の固定度を高めることができる。 As described above, according to the present invention, it is possible to increase the degree of fixation of the steel beams to the steel pipe columns while joining the steel pipe columns of vertically adjacent building units.

一実施形態に係る建物ユニット連結構造が適用された第一建物ユニット及び第二建物ユニットを分解した分解斜視図である。FIG. 4 is an exploded perspective view of a first building unit and a second building unit to which a building unit connection structure according to one embodiment is applied; 図1に示される第一鋼管柱と第二鋼管柱との連結部を示す立面図である。FIG. 2 is an elevation view showing a connecting portion between a first steel pipe column and a second steel pipe column shown in FIG. 1; 図2に示される第一鋼管柱、第二鋼管柱、及び連結鋼管を分解した分解立面図である。FIG. 3 is an exploded elevation view of the first steel pipe column, the second steel pipe column, and the connecting steel pipes shown in FIG. 2 ; 図2の4-4線断面図である。4 is a cross-sectional view taken along line 4-4 of FIG. 2; FIG. 一実施形態に係る建物ユニット連結構造の変形例が適用された第一鋼管柱と第二鋼管柱との連結部を示す図2に対応する立面図である。FIG. 3 is an elevation view corresponding to FIG. 2 showing a connecting portion between a first steel pipe column and a second steel pipe column to which a modification of the building unit connection structure according to one embodiment is applied; 図5に示される第一鋼管柱、第二鋼管柱、及び連結鋼管を分解した分解立面図である。FIG. 6 is an exploded elevation view of the first steel pipe column, the second steel pipe column, and the connecting steel pipes shown in FIG. 5 ;

以下、図面を参照しながら、一実施形態について説明する。 An embodiment will be described below with reference to the drawings.

(建物)
図1には、ユニット工法によって構築される建物(ユニット建物)10が示されている。建物10は、複数の建物ユニット20を備えている。複数の建物ユニット20は、箱状(直方体状)に形成されている。また、複数の建物ユニット20は、現場において水平方向に配列されるとともに、複数段に積み上げられる。これらの建物ユニット20によって、建物10が構築されている。
(building)
FIG. 1 shows a building (unit building) 10 constructed by the unit construction method. The building 10 comprises multiple building units 20 . A plurality of building units 20 are formed in a box shape (rectangular parallelepiped shape). In addition, the plurality of building units 20 are arranged horizontally at the site and piled up in multiple stages. A building 10 is constructed by these building units 20 .

(建物ユニット)
複数の建物ユニット20は、例えば、同じ形状、及び同じ大きさとされている。各建物ユニット20は、複数の鋼管柱(鋼管隅柱)30と、複数の上側鉄骨梁40Uと、複数の下側鉄骨梁40Lとを有している。これらの鋼管柱30、上側鉄骨梁40U、及び下側鉄骨梁40Lは、箱状の建物ユニット20の各辺に沿って配置されており、工場等において予め接合されている。
(building unit)
The multiple building units 20 have, for example, the same shape and size. Each building unit 20 has a plurality of steel pipe columns (steel pipe corner posts) 30, a plurality of upper steel beams 40U, and a plurality of lower steel beams 40L. These steel pipe columns 30, the upper steel beam 40U, and the lower steel beam 40L are arranged along each side of the box-shaped building unit 20 and are joined in advance at a factory or the like.

複数(4本)の鋼管柱30は、角形鋼管によって形成されている。また、鋼管柱30は、建物ユニット20の四隅にそれぞれ立てられている。 The plurality (four) of steel pipe columns 30 are formed of rectangular steel pipes. The steel pipe columns 30 are erected at the four corners of the building unit 20, respectively.

複数の上側鉄骨梁40Uは、隣り合う鋼管柱30の柱頭部30U(図2参照)にそれぞれ架設されている。これらの上側鉄骨梁40Uは、建物ユニット20の上端側の平面架構を構成している。この平面架構には、天井パネル(天井材)22が取り付けられる。なお、天井パネル22は、省略可能である。 The plurality of upper steel beams 40U are installed on the column heads 30U (see FIG. 2) of the adjacent steel pipe columns 30, respectively. These upper steel beams 40U constitute a planar frame on the upper end side of the building unit 20. As shown in FIG. A ceiling panel (ceiling material) 22 is attached to this plane frame. Note that the ceiling panel 22 can be omitted.

複数の下側鉄骨梁40Lは、隣り合う鋼管柱30の柱脚部30L(図2参照)にそれぞれ架設されている。また、複数の下側鉄骨梁40Lは、建物ユニット20の下端側の平面架構を構成している。この平面架構には、床パネル(床材)24が取り付けられる。なお、床パネル24は、省略可能である。 The plurality of lower steel beams 40L are installed on the column base portions 30L (see FIG. 2) of the steel pipe columns 30 adjacent to each other. In addition, the plurality of lower steel beams 40L constitute a planar frame on the lower end side of the building unit 20. As shown in FIG. A floor panel (floor material) 24 is attached to this planar frame. Note that the floor panel 24 can be omitted.

隣り合う一対の鋼管柱30には、上側鉄骨梁40U及び下側鉄骨梁40Lが架設されている。これらの一対の鋼管柱30、上側鉄骨梁40U、及び下側鉄骨梁40Lは、建物ユニット20の周囲の立面架構を構成している。この立面架構には、壁パネル(壁材)26、又は図示しない窓(サッシュ)が取り付けられる。なお、壁パネル(壁材)26、及び窓(サッシュ)は、省略可能である。 An upper steel frame beam 40U and a lower steel frame beam 40L are constructed between a pair of adjacent steel pipe columns 30 . The pair of steel pipe columns 30, the upper steel beam 40U, and the lower steel beam 40L form a vertical frame around the building unit 20. As shown in FIG. A wall panel (wall material) 26 or a window (sash) (not shown) is attached to the vertical frame. Note that the wall panel (wall material) 26 and the window (sash) can be omitted.

建物ユニット20は、他の建物ユニット20の上に積み上げられる。なお、以下では、説明の便宜上、一段目の建物ユニット20を第一建物ユニット20Aとし、二段目に配置された建物ユニット20を第二建物ユニット20Bとする。また、第一建物ユニット20Aの鋼管柱30を第一鋼管柱30Aとし、第二建物ユニット20Bの鋼管柱30が第二鋼管柱30Bとする。 A building unit 20 is stacked on top of another building unit 20 . In the following, for convenience of explanation, the building unit 20 on the first stage will be referred to as the first building unit 20A, and the building unit 20 arranged on the second stage will be referred to as the second building unit 20B. Also, the steel pipe column 30 of the first building unit 20A is referred to as the first steel pipe column 30A, and the steel pipe column 30 of the second building unit 20B is referred to as the second steel pipe column 30B.

また、第一建物ユニット20Aの上側鉄骨梁40Uは、第一鉄骨梁の一例である。また、第二建物ユニット20Bの下側鉄骨梁40Lは、第二鉄骨梁の一例である。 Also, the upper steel beam 40U of the first building unit 20A is an example of the first steel beam. Also, the lower steel beam 40L of the second building unit 20B is an example of the second steel beam.

(建物ユニット連結構造)
第二建物ユニット20Bの複数の第二鋼管柱30Bは、第一建物ユニット20Aの複数の第一鋼管柱30Aの上にそれぞれ配置される。複数の第一鋼管柱30Aと、複数の第二鋼管柱30Bとは、連結鋼管50を介してそれぞれ連結される。以下、第一建物ユニット20Aの第一鋼管柱30Aと、第二建物ユニット20Bの第二鋼管柱30Bとの連結構造について詳説する。
(building unit connection structure)
The multiple second steel pipe columns 30B of the second building unit 20B are arranged on top of the multiple first steel pipe columns 30A of the first building unit 20A. The plurality of first steel pipe columns 30A and the plurality of second steel pipe columns 30B are connected via connecting steel pipes 50, respectively. The connection structure between the first steel pipe column 30A of the first building unit 20A and the second steel pipe column 30B of the second building unit 20B will be described in detail below.

図2には、図1に点線で示される領域Rに対応する立面図が示されている。図2に示されるように、水平方向に配列された第一建物ユニット20Aは、各々の第一鋼管柱30Aを隣接させた状態で配置されている。 FIG. 2 shows an elevation view corresponding to the region R indicated by the dashed lines in FIG. As shown in FIG. 2, the horizontally arranged first building units 20A are arranged with their respective first steel pipe columns 30A adjacent to each other.

また、第一建物ユニット20Aの第一鋼管柱30Aの上には、第二建物ユニット20Bの第二鋼管柱30Bが配置されている。さらに、第一建物ユニット20Aの上側鉄骨梁40Uの上には、第二建物ユニット20Bの下側鉄骨梁40Lが配置されている。 Moreover, the second steel pipe column 30B of the second building unit 20B is arranged on the first steel pipe column 30A of the first building unit 20A. Furthermore, the lower steel beam 40L of the second building unit 20B is arranged on the upper steel beam 40U of the first building unit 20A.

(連結鋼管)
図2及び図3に示されるように、第一鋼管柱30A及び第二鋼管柱30Bの断面形状は、同じとされている。また、第一鋼管柱30A及び第二鋼管柱30Bの断面サイズは、同じとされている。この第一鋼管柱30Aと第二鋼管柱30Bとは、連結鋼管50を介して軸力Nを伝達可能に連結されている。
(connected steel pipe)
As shown in FIGS. 2 and 3, the first steel pipe pillar 30A and the second steel pipe pillar 30B have the same cross-sectional shape. Also, the cross-sectional sizes of the first steel pipe pillar 30A and the second steel pipe pillar 30B are the same. The first steel pipe column 30A and the second steel pipe column 30B are connected via a connecting steel pipe 50 so as to be able to transmit the axial force N. As shown in FIG.

具体的には、連結鋼管50は、角形鋼管によって形成されている。この連結鋼管50の断面形状は、第一鋼管柱30A及び第二鋼管柱30Bの断面形状と同じとされている。また、連結鋼管50の断面サイズは、第一鋼管柱30A及び第二鋼管柱30Bの断面サイズよりも若干小さくされている。この連結鋼管50の下部は、第一鋼管柱30Aの柱頭部30U内に嵌め込まれている。一方、連結鋼管50の上部は、第二鋼管柱30Bの柱脚部30L内に嵌め込まれている。 Specifically, the connecting steel pipe 50 is formed of a rectangular steel pipe. The cross-sectional shape of the connecting steel pipe 50 is the same as the cross-sectional shape of the first steel pipe column 30A and the second steel pipe column 30B. Also, the cross-sectional size of the connecting steel pipe 50 is slightly smaller than the cross-sectional size of the first steel pipe column 30A and the second steel pipe column 30B. The lower portion of the connecting steel pipe 50 is fitted into the column head portion 30U of the first steel pipe column 30A. On the other hand, the upper portion of the connecting steel pipe 50 is fitted into the column base portion 30L of the second steel pipe column 30B.

連結鋼管50の内部には、セメント系充填材52が充填されている。セメント系充填材52は、例えば、硬化したコンクリート、硬化したモルタル、又は硬化したグラウト等によって形成されている。また、セメント系充填材52は、連結鋼管50の下端50Aから上端50Bに渡って充填されている。この連結鋼管50によって、第一鋼管柱30Aの柱頭部30U及び第二鋼管柱30Bの柱脚部30Lが補強されている。 The interior of the connecting steel pipe 50 is filled with a cement-based filler 52 . The cement-based filler 52 is made of, for example, hardened concrete, hardened mortar, hardened grout, or the like. Moreover, the cement-based filler 52 is filled from the lower end 50A of the connecting steel pipe 50 to the upper end 50B. The connecting steel pipe 50 reinforces the column head portion 30U of the first steel pipe column 30A and the column base portion 30L of the second steel pipe column 30B.

なお、セメント系充填材52は、例えば、第一鋼管柱30Aの柱頭部30Uに連結鋼管50の下部を嵌め込んだ状態で、連結鋼管50の内部に充填しても良い。また、セメント系充填材52は、例えば、工場又は現場サイト等において、連結鋼管50の内部に充填しても良い。 The cement-based filler 52 may be filled inside the connecting steel pipe 50 in a state in which the lower portion of the connecting steel pipe 50 is fitted in the column head 30U of the first steel pipe column 30A, for example. Moreover, the cement-based filler 52 may be filled inside the connecting steel pipes 50 at, for example, a factory or a site site.

第一鋼管柱30Aの柱頭部30U内には、第一軸力伝達プレート32Aが設けられている。第一軸力伝達プレート32Aは、平面視にて、矩形状に形成されている。また、第一軸力伝達プレート32Aは、第一鋼管柱30Aの柱頭部30U内に嵌め込まれている。この第一軸力伝達プレート32Aの外周部は、第一鋼管柱30Aの柱頭部30Uの内周面に溶接等によって接合されている。 A first axial force transmission plate 32A is provided in the column head portion 30U of the first steel pipe column 30A. The first axial force transmission plate 32A is formed in a rectangular shape in plan view. Also, the first axial force transmission plate 32A is fitted into the column head portion 30U of the first steel pipe column 30A. The outer peripheral portion of the first axial force transmission plate 32A is joined to the inner peripheral surface of the column head 30U of the first steel pipe column 30A by welding or the like.

第一軸力伝達プレート32Aは、上側鉄骨梁40Uの下端40Aよりも下側に配置されている。この第一軸力伝達プレート32Aの上に、連結鋼管50の下端50Aが載置されている。これにより、連結鋼管50から第一軸力伝達プレート32Aを介して、第一鋼管柱30Aに軸力Nが伝達される。また、連結鋼管50の下端50Aは、上側鉄骨梁40Uの下端40Aよりも下側に配置されている。 The first axial force transmission plate 32A is arranged below the lower end 40A of the upper steel beam 40U. A lower end 50A of the connecting steel pipe 50 is placed on the first axial force transmission plate 32A. Thereby, the axial force N is transmitted from the connecting steel pipe 50 to the first steel pipe column 30A via the first axial force transmission plate 32A. Further, the lower end 50A of the connecting steel pipe 50 is arranged below the lower end 40A of the upper steel beam 40U.

第二鋼管柱30Bの柱脚部30L内には、第二軸力伝達プレート32Bが設けられている。第二軸力伝達プレート32Bは、平面視にて、矩形状に形成されている。また、第二軸力伝達プレート32Bは、第二鋼管柱30Bの柱脚部30L内に嵌め込まれている。この第二軸力伝達プレート32Bの外周部は、第二鋼管柱30Bの柱脚部30Lの内周面に溶接等によって接合されている。 A second axial force transmission plate 32B is provided in the column base portion 30L of the second steel pipe column 30B. The second axial force transmission plate 32B is formed in a rectangular shape in plan view. Also, the second axial force transmission plate 32B is fitted into the column base portion 30L of the second steel pipe column 30B. The outer peripheral portion of the second axial force transmission plate 32B is joined to the inner peripheral surface of the column base portion 30L of the second steel pipe column 30B by welding or the like.

第二軸力伝達プレート32Bは、下側鉄骨梁40Lの上端40Bよりも上側に配置されている。この第二軸力伝達プレート32Bは、連結鋼管50の上端50Bに載置されている。つまり、第二軸力伝達プレート32Bは、連結鋼管50を介して第一軸力伝達プレート32Aに支持されている。 The second axial force transmission plate 32B is arranged above the upper end 40B of the lower steel beam 40L. The second axial force transmission plate 32B is mounted on the upper end 50B of the connecting steel pipe 50. As shown in FIG. That is, the second axial force transmission plate 32B is supported by the first axial force transmission plate 32A via the connecting steel pipes 50. As shown in FIG.

これにより、第二鋼管柱30Bから第二軸力伝達プレート32Bを介して連結鋼管50に軸力Nが伝達される。また、連結鋼管50の上端50Bは、下側鉄骨梁40Lの上端40Bよりも上側に配置されている。 Thereby, the axial force N is transmitted from the second steel pipe column 30B to the connecting steel pipe 50 via the second axial force transmission plate 32B. Further, the upper end 50B of the connecting steel pipe 50 is arranged above the upper end 40B of the lower steel beam 40L.

なお、第二軸力伝達プレート32Bが連結鋼管50を介して第一軸力伝達プレート32Aに支持された状態で、第一鋼管柱30Aの柱頭部30Uと第二鋼管柱30Bの柱脚部30Lとの間には、隙間が形成される。これと同様に、第二軸力伝達プレート32Bが連結鋼管50を介して第一軸力伝達プレート32Aに支持された状態で、上側鉄骨梁40Uと下側鉄骨梁40Lとの間には、隙間が形成される。 In a state in which the second axial force transmission plate 32B is supported by the first axial force transmission plate 32A via the connecting steel pipes 50, the column head portion 30U of the first steel pipe column 30A and the column base portion 30L of the second steel pipe column 30B A gap is formed between Similarly, when the second axial force transmission plate 32B is supported by the first axial force transmission plate 32A via the connecting steel pipes 50, there is a gap between the upper steel beam 40U and the lower steel beam 40L. is formed.

(第一セメント系硬化体)
図2に示されるように、第一建物ユニット20Aの上側鉄骨梁40Uは、H形鋼によって形成されている。この上側鉄骨梁40Uは、上下方向に互いに対向する上側フランジ42及び下側フランジ44と、上側フランジ42及び下側フランジ44を接続するウェブ46とを有している。
(first cement-based hardening body)
As shown in FIG. 2, the upper steel beam 40U of the first building unit 20A is made of H-shaped steel. The upper steel beam 40U has an upper flange 42 and a lower flange 44 facing each other in the vertical direction, and a web 46 connecting the upper flange 42 and the lower flange 44 .

上側鉄骨梁40Uの梁端部40Eには、一対の第一セメント系硬化体60Aが設けられている。一対の第一セメント系硬化体60Aは、例えば、硬化したコンクリート、硬化したモルタル、又は硬化したグラウト等によって形成されている。また、各第一セメント系硬化体60Aは、直方体状(ブロック状)に形成されている。 A pair of first cement-based hardening bodies 60A are provided at beam ends 40E of the upper steel beam 40U. The pair of first cementitious hardened bodies 60A are formed of, for example, hardened concrete, hardened mortar, or hardened grout. Each first cementitious hardening body 60A is formed in a rectangular parallelepiped (block-like) shape.

図4に示されるように、一対の第一セメント系硬化体60Aは、上側鉄骨梁40Uのウェブ46の両側に配置されている。また、各第一セメント系硬化体60Aは、上側鉄骨梁40Uの上側フランジ42と下側フランジ44との間に配置されている。 As shown in FIG. 4, a pair of first cementitious hardening bodies 60A are arranged on both sides of the web 46 of the upper steel beam 40U. Each first cementitious hardening body 60A is arranged between the upper flange 42 and the lower flange 44 of the upper steel beam 40U.

ウェブ46、及び一対の第一セメント系硬化体60Aには、貫通孔46H,60Hがそれぞれ形成されている。これらの貫通孔46H,60Hに挿入された通しボルト70の両端部にナット72を締め込むことにより、一対の第一セメント系硬化体60Aがウェブ46に固定されている。この一対の第一セメント系硬化体60Aによって、上側鉄骨梁40Uの梁端部40Eが補強されている。 Through holes 46H and 60H are formed in the web 46 and the pair of first cementitious hardening bodies 60A, respectively. A pair of first cementitious hardening bodies 60A are fixed to the web 46 by tightening nuts 72 on both ends of through bolts 70 inserted into these through holes 46H, 60H. The beam end portion 40E of the upper steel frame beam 40U is reinforced by the pair of first cement-based hardening bodies 60A.

図2に示されるように、第一セメント系硬化体60Aの側面60Sは、第一鋼管柱30Aの柱頭部30Uの側面30Sに接触(面接触)されている。これにより、水平力作用時に、上側鉄骨梁40Uから第一セメント系硬化体60Aの側面60Sを介して、第一鋼管柱30Aの柱頭部30Uの側面30Sに圧縮力Pが伝達される。 As shown in FIG. 2, the side surface 60S of the first cementitious hardening body 60A is in contact (surface contact) with the side surface 30S of the stigma 30U of the first steel pipe column 30A. As a result, when a horizontal force acts, the compressive force P is transmitted from the upper steel beam 40U to the side surface 30S of the column head 30U of the first steel pipe column 30A via the side surface 60S of the first cementitious hardened body 60A.

(第二セメント系硬化体)
図2に示されるように、第二建物ユニット20Bの下側鉄骨梁40Lは、H形鋼によって形成されている。この下側鉄骨梁40Lは、上下方向に互いに対向する上側フランジ42及び下側フランジ44と、上側フランジ42及び下側フランジ44を接続するウェブ46とを有している。
(second cementitious hardening body)
As shown in FIG. 2, the lower steel beam 40L of the second building unit 20B is made of H-beam. The lower steel beam 40L has an upper flange 42 and a lower flange 44 facing each other in the vertical direction, and a web 46 connecting the upper flange 42 and the lower flange 44 .

下側鉄骨梁40Lの梁端部40Eには、一対の第二セメント系硬化体60Bが設けられている。一対の第二セメント系硬化体60Bは、例えば、硬化したコンクリート、硬化したモルタル、又は硬化したグラウト等によって形成されている。また、各第二セメント系硬化体60Bは、直方体状(ブロック状)に形成されている。 A pair of second cement-based hardening bodies 60B are provided at the beam ends 40E of the lower steel beam 40L. The pair of second cementitious hardened bodies 60B are made of, for example, hardened concrete, hardened mortar, or hardened grout. Moreover, each second cement-based hardening body 60B is formed in a rectangular parallelepiped shape (block shape).

図4に示されるように、一対の第二セメント系硬化体60Bは、下側鉄骨梁40Lのウェブ46の両側に配置されている。また、各第二セメント系硬化体60Bは、下側鉄骨梁40Lの上側フランジ42と下側フランジ44との間に配置されている。 As shown in FIG. 4, a pair of second cementitious hardening bodies 60B are arranged on opposite sides of the web 46 of the lower steel beam 40L. Each second cement-based hardening body 60B is arranged between the upper flange 42 and the lower flange 44 of the lower steel beam 40L.

ウェブ46、及び一対の第二セメント系硬化体60Bには、貫通孔46H,60Hがそれぞれ形成されている。これらの貫通孔46H,60Hに挿入された通しボルト70の両端部にナット72を締め込むことにより、一対の第二セメント系硬化体60Bがウェブ46に固定されている。この一対の第二セメント系硬化体60Bによって、下側鉄骨梁40Lの梁端部40Eが補強されている。 Through holes 46H and 60H are formed in the web 46 and the pair of second cementitious hardening bodies 60B, respectively. A pair of second cementitious hardening bodies 60B are fixed to the web 46 by tightening nuts 72 on both ends of through bolts 70 inserted into these through holes 46H and 60H. The beam end portion 40E of the lower steel frame beam 40L is reinforced by the pair of second cement-based hardening bodies 60B.

図2に示されるように、第二セメント系硬化体60Bの側面60Sは、第一鋼管柱30Aの柱頭部30Uの側面30Sに接触(面接触)されている。これにより、水平力作用時に、下側鉄骨梁40Lから第二セメント系硬化体60Bの側面60Sを介して、第一鋼管柱30Aの柱頭部30Uの側面30Sに圧縮力Pが伝達される。 As shown in FIG. 2, the side surface 60S of the second cementitious hardened body 60B is in contact (surface contact) with the side surface 30S of the stigma 30U of the first steel pipe column 30A. As a result, when a horizontal force acts, the compressive force P is transmitted from the lower steel beam 40L to the side surface 30S of the column head 30U of the first steel pipe column 30A via the side surface 60S of the second cementitious hardened body 60B.

(作用)
次に、本実施形態の作用について説明する。
(Action)
Next, the operation of this embodiment will be described.

図2に示されるように、第一建物ユニット20Aの第一鋼管柱30Aと、第二建物ユニット20Bの第二鋼管柱30Bとは、連結鋼管50を介して軸力(鉛直荷重)Nを伝達可能に連結されている。 As shown in FIG. 2, the first steel pipe column 30A of the first building unit 20A and the second steel pipe column 30B of the second building unit 20B transmit an axial force (vertical load) N through the connecting steel pipe 50. connected as possible.

具体的には、連結鋼管50の下部は、第一鋼管柱30Aの柱頭部30U内に嵌め込まれている。また、連結鋼管50の下端50Aは、第一軸力伝達プレート32Aの上に載置されている。一方、連結鋼管50の上部は、第二鋼管柱30Bの柱脚部30L内に嵌め込まれている。これにより、第一鋼管柱30Aの柱頭部30Uと第二鋼管柱30Bの柱脚部30Lとが連結鋼管50を介して連結される。 Specifically, the lower portion of the connecting steel pipe 50 is fitted into the column head portion 30U of the first steel pipe column 30A. A lower end 50A of the connecting steel pipe 50 is placed on the first axial force transmission plate 32A. On the other hand, the upper portion of the connecting steel pipe 50 is fitted into the column base portion 30L of the second steel pipe column 30B. As a result, the column head portion 30U of the first steel pipe column 30A and the column base portion 30L of the second steel pipe column 30B are connected via the connecting steel pipe 50.

また、連結鋼管50の内部には、セメント系充填材52が充填されている。この連結鋼管50の上端50Bには、第二軸力伝達プレート32Bが載置されている。つまり、第二軸力伝達プレート32Bは、連結鋼管50を介して第二軸力伝達プレート32Bに支持されている。 Moreover, the inside of the connecting steel pipe 50 is filled with a cement-based filler 52 . A second axial force transmission plate 32B is mounted on the upper end 50B of the connecting steel pipe 50 . That is, the second axial force transmission plate 32B is supported by the second axial force transmission plate 32B via the connecting steel pipes 50. As shown in FIG.

これにより、第二鋼管柱30Bの軸力Nが、第二軸力伝達プレート32Bから連結鋼管50、及びセメント系充填材52に伝達される。連結鋼管50、及びセメント系充填材52に伝達された軸力Nは、第一軸力伝達プレート32Aを介して第二鋼管柱30Bに伝達される。 Thereby, the axial force N of the second steel pipe column 30B is transmitted from the second axial force transmission plate 32B to the connecting steel pipe 50 and the cement-based filler 52. The axial force N transmitted to the connecting steel pipes 50 and the cement-based filler 52 is transmitted to the second steel pipe column 30B via the first axial force transmission plate 32A.

このように本実施形態では、連結鋼管50及びセメント系充填材52を介して、第一鋼管柱30Aの柱頭部30Uと第二鋼管柱30Bの柱脚部30Lとを、軸力Nを伝達可能に連結することができる。 Thus, in this embodiment, the axial force N can be transmitted between the column head portion 30U of the first steel pipe column 30A and the column base portion 30L of the second steel pipe column 30B via the connecting steel pipes 50 and the cement-based filler 52. can be concatenated to

また、本実施形態では、第一鋼管柱30Aの柱頭部30U及び第二鋼管柱30Bの柱脚部30Lに連結鋼管50を嵌め込むことにより、第一鋼管柱30Aと第二鋼管柱30Bとを容易に連結することができる。したがって、第一建物ユニット20A及び第二建物ユニット20Bの施工性が向上する。 Further, in this embodiment, the first steel pipe pillar 30A and the second steel pipe pillar 30B are connected by fitting the connecting steel pipe 50 into the column head 30U of the first steel pipe pillar 30A and the column base 30L of the second steel pipe pillar 30B. Can be easily connected. Therefore, the workability of the first building unit 20A and the second building unit 20B is improved.

なお、連結鋼管50は、第一建物ユニット20Aの設置前に、第一鋼管柱30Aの柱頭部30Uに予め嵌め込んでも良い。また、連結鋼管50は、第一建物ユニット20Aの設置後に、第一鋼管柱30Aの柱頭部30Uに嵌め込んでも良い。 Note that the connecting steel pipe 50 may be previously fitted to the column head portion 30U of the first steel pipe column 30A before installing the first building unit 20A. Also, the connecting steel pipe 50 may be fitted into the column head portion 30U of the first steel pipe column 30A after the first building unit 20A is installed.

また、本実施形態では、第二軸力伝達プレート32Bが連結鋼管50を介して第二軸力伝達プレート32Bに支持された状態で、第一鋼管柱30Aの柱頭部30Uと第二鋼管柱30Bの柱脚部30Lとの間に隙間が形成される。この隙間によって、第一鋼管柱30A及び第二鋼管柱30Bの施工誤差等を吸収することができる。 Further, in the present embodiment, the column head portion 30U of the first steel pipe column 30A and the second steel pipe column 30B are connected in a state in which the second axial force transmission plate 32B is supported by the second axial force transmission plate 32B via the connecting steel pipes 50. A gap is formed between the column base portion 30L and the column base portion 30L. This gap can absorb construction errors and the like of the first steel pipe column 30A and the second steel pipe column 30B.

さらに、本実施形態では、第二軸力伝達プレート32Bが連結鋼管50を介して第一軸力伝達プレート32Aに支持された状態で、上側鉄骨梁40Uと下側鉄骨梁40Lとの間に隙間が形成される。この隙間によって、上側鉄骨梁40U及び下側鉄骨梁40Lの施工誤差等を吸収することができる。したがって、第一建物ユニット20A及び第二建物ユニット20Bの施工性がさらに向上する。 Furthermore, in the present embodiment, a gap is formed between the upper steel beam 40U and the lower steel beam 40L while the second axial force transmission plate 32B is supported by the first axial force transmission plate 32A via the connecting steel pipes 50. is formed. This gap can absorb construction errors and the like of the upper steel beam 40U and the lower steel beam 40L. Therefore, the workability of the first building unit 20A and the second building unit 20B is further improved.

(第一鋼管柱の柱頭部と上側鉄骨梁の梁端部との接合構造)
次に、第一鋼管柱30Aの柱頭部30Uと上側鉄骨梁40Uの梁端部40Eと接合構造の作用について説明する。
(Joint structure between the top of the first steel pipe column and the beam end of the upper steel beam)
Next, the operation of the column head portion 30U of the first steel pipe column 30A, the beam end portion 40E of the upper steel beam 40U, and the joint structure will be described.

図2に示されるように、第一鋼管柱30Aの柱頭部30Uには、上側鉄骨梁40Uの梁端部40Eが接合されている。この第一鋼管柱30Aの柱頭部30Uには、連結鋼管50の下部が嵌め込まれている。 As shown in FIG. 2, the beam end portion 40E of the upper steel beam 40U is joined to the column head portion 30U of the first steel pipe column 30A. The lower portion of the connecting steel pipe 50 is fitted into the column head portion 30U of the first steel pipe column 30A.

これにより、水平力作用時に、第一鋼管柱30Aの柱頭部30Uに上側鉄骨梁40Uの梁端部40Eから圧縮力Pが作用した場合に、当該柱頭部30Uが潰れる等の変形が抑制される。つまり、第一鋼管柱30Aの柱頭部30Uに対する上側鉄骨梁40Uの梁端部40Eの固定度が高められる。 As a result, when a horizontal force acts on the column head portion 30U of the first steel pipe column 30A and a compressive force P is applied from the beam end portion 40E of the upper steel beam 40U, deformation such as crushing of the column head portion 30U is suppressed. . That is, the fixation degree of the beam end portion 40E of the upper steel frame beam 40U to the column head portion 30U of the first steel pipe column 30A is enhanced.

また、第一鋼管柱30Aの柱頭部30Uに伝達される圧縮力Pは、連結鋼管50を介してセメント系充填材52に分散して伝達される。これにより、セメント系充填材52の局所的な破壊等が抑制される。したがって、第一鋼管柱30Aの柱頭部30Uに対する上側鉄骨梁40Uの梁端部40Eの固定度がさらに高められる。 In addition, the compressive force P transmitted to the column head portion 30U of the first steel pipe column 30A is dispersed and transmitted to the cement-based filler 52 via the connecting steel pipe 50 . As a result, local destruction or the like of the cement-based filler 52 is suppressed. Therefore, the degree of fixation of the beam end portion 40E of the upper steel beam 40U to the column head portion 30U of the first steel pipe column 30A is further enhanced.

さらに、連結鋼管50の下端50Aは、上側鉄骨梁40Uの下端40Aよりも下側に位置している。これにより、水平力作用時に、上側鉄骨梁40Uの梁端部40Eから第一鋼管柱30Aの柱頭部30Uに作用する圧縮力Pを、連結鋼管50の下部の全体で受けることができる。したがって、第一鋼管柱30Aの柱頭部30Uの潰れ等の変形をより確実に抑制することができる。 Furthermore, the lower ends 50A of the connecting steel pipes 50 are located below the lower ends 40A of the upper steel beams 40U. Accordingly, when a horizontal force acts, the entire lower portion of the connecting steel pipe 50 can receive the compressive force P acting from the beam end portion 40E of the upper steel beam 40U to the column head portion 30U of the first steel pipe column 30A. Therefore, deformation such as crushing of the column head portion 30U of the first steel pipe column 30A can be suppressed more reliably.

また、セメント系充填材52は、熱容量が大きい。したがって、連結鋼管50にセメント系充填材52を充填することにより、連結鋼管50、第一鋼管柱30Aの柱頭部30Uの耐火性能が高められる。この結果、第一鋼管柱30Aの柱頭部30Uの耐火被覆を省略し、又は耐火被覆を低減することができる。 Moreover, the cement-based filler 52 has a large heat capacity. Therefore, by filling the connecting steel pipe 50 with the cement-based filler 52, the fire resistance of the connecting steel pipe 50 and the column head portion 30U of the first steel pipe column 30A is enhanced. As a result, the fireproof coating of the column head 30U of the first steel pipe column 30A can be omitted or the fireproof coating can be reduced.

さらに、上側鉄骨梁40Uの梁端部40Eには、一対の第一セメント系硬化体60Aが設けられている。一対の第一セメント系硬化体60Aの側面60Sは、第一鋼管柱30Aの柱頭部30Uの側面30Sに接触されている。 Furthermore, a pair of first cement-based hardening bodies 60A are provided at the beam end portion 40E of the upper steel frame beam 40U. The side surfaces 60S of the pair of first cementitious hardened bodies 60A are in contact with the side surfaces 30S of the column head 30U of the first steel pipe column 30A.

これにより、水平力作用時に、上側鉄骨梁40Uから第一鋼管柱30Aの柱頭部30Uに作用する圧縮力Pが、一対の第一セメント系硬化体60Aの側面60Sを介して、第一鋼管柱30Aの柱頭部30Uの側面30Sに分散して伝達される。したがって、第一鋼管柱30Aの柱頭部30Uの変形がさらに抑制される。 As a result, when a horizontal force acts, the compressive force P acting from the upper steel beam 40U to the column head portion 30U of the first steel pipe column 30A is applied to the first steel pipe column via the side surfaces 60S of the pair of first cement-based hardened bodies 60A. It is distributed and transmitted to the side surface 30S of the stigma 30U of 30A. Therefore, deformation of the column head portion 30U of the first steel pipe column 30A is further suppressed.

また、一対の第一セメント系硬化体60Aによって上側鉄骨梁40Uの梁端部40Eのウェブ46を両側から挟み込むことにより、ウェブ46の座屈が抑制される。 Moreover, buckling of the web 46 is suppressed by sandwiching the web 46 of the beam end portion 40E of the upper steel frame beam 40U from both sides by the pair of first cement-based hardening bodies 60A.

さらに、一対の第一セメント系硬化体60Aは、熱容量が大きい。したがって、一対の第一セメント系硬化体60Aを上側鉄骨梁40Uの梁端部40Eに設けることにより、当該梁端部40Eの耐火被覆を省略し、又は耐火被覆を低減することができる。 Furthermore, the pair of first cementitious hardening bodies 60A has a large heat capacity. Therefore, by providing the pair of first cement-based hardening bodies 60A on the beam end portion 40E of the upper steel frame beam 40U, the fireproof coating of the beam end portion 40E can be omitted or reduced.

しかも、図3に示されるように、一対の第一セメント系硬化体60Aは、通しボルト70及びナット72によって上側鉄骨梁40Uの梁端部40Eに容易に取り付けることができる。したがって、上側鉄骨梁40Uの施工性が向上する。 Moreover, as shown in FIG. 3, the pair of first cementitious hardening bodies 60A can be easily attached to the beam ends 40E of the upper steel frame beam 40U with through bolts 70 and nuts 72. As shown in FIG. Therefore, the workability of the upper steel beam 40U is improved.

(第二鋼管柱の柱脚部と下側鉄骨梁の梁端部との接合構造)
次に、第二鋼管柱30Bの柱脚部30Lと下側鉄骨梁40Lの梁端部40Eと接合構造の作用について説明する。
(Joint structure between the column base of the second steel pipe column and the beam end of the lower steel beam)
Next, the operation of the column base portion 30L of the second steel pipe column 30B, the beam end portion 40E of the lower steel beam 40L, and the joint structure will be described.

図2に示されるように、第二鋼管柱30Bの柱脚部30Lには、下側鉄骨梁40Lの梁端部40Eが接合されている。この第二鋼管柱30Bの柱脚部30Lには、連結鋼管50の下部が嵌め込まれている。 As shown in FIG. 2, the beam end portion 40E of the lower steel beam 40L is joined to the column base portion 30L of the second steel pipe column 30B. The lower part of the connecting steel pipe 50 is fitted in the column base portion 30L of the second steel pipe column 30B.

これにより、水平力作用時に、第二鋼管柱30Bの柱脚部30Lに下側鉄骨梁40Lの梁端部40Eから圧縮力Pが作用した場合に、当該柱脚部30Lが潰れる等の変形が抑制される。つまり、第二鋼管柱30Bの柱脚部30Lに対する下側鉄骨梁40Lの梁端部40Eの固定度が高められる。 As a result, when a horizontal force acts on the column base portion 30L of the second steel pipe column 30B and a compressive force P from the beam end portion 40E of the lower steel beam 40L acts on the column base portion 30L, deformation such as crushing of the column base portion 30L is prevented. Suppressed. That is, the fixation degree of the beam end portion 40E of the lower steel frame beam 40L to the column base portion 30L of the second steel pipe column 30B is enhanced.

また、第二鋼管柱30Bの柱脚部30Lに伝達される圧縮力Pは、連結鋼管50を介してセメント系充填材52に分散して伝達される。これにより、セメント系充填材52の局所的な破壊等が抑制される。したがって、第二鋼管柱30Bの柱脚部30Lに対する下側鉄骨梁40Lの梁端部40Eの固定度がさらに高められる。 Also, the compressive force P transmitted to the column base portion 30L of the second steel pipe column 30B is distributed and transmitted to the cement-based filler 52 via the connecting steel pipe 50 . As a result, local destruction or the like of the cement-based filler 52 is suppressed. Therefore, the fixing degree of the beam end portion 40E of the lower steel frame beam 40L to the column base portion 30L of the second steel pipe column 30B is further enhanced.

さらに、連結鋼管50の上端50Bは、下側鉄骨梁40Lの上端40Bよりも上側に位置している。これにより、水平力作用時に、下側鉄骨梁40Lの梁端部40Eから第二鋼管柱30Bの柱脚部30Lに作用する圧縮力Pを、連結鋼管50の上部の全体で受けることができる。したがって、第二鋼管柱30Bの柱脚部30Lの潰れ等の変形をより確実に抑制することができる。 Furthermore, the upper ends 50B of the connecting steel pipes 50 are located above the upper ends 40B of the lower steel beams 40L. Thus, when a horizontal force acts, the entire upper portion of the connecting steel pipe 50 can receive the compressive force P acting from the beam end 40E of the lower steel beam 40L to the column base 30L of the second steel pipe column 30B. Therefore, deformation such as crushing of the column base portion 30L of the second steel pipe column 30B can be suppressed more reliably.

また、セメント系充填材52は、前述したように、熱容量が大きい。したがって、連結鋼管50にセメント系充填材52を充填することにより、連結鋼管50、及び第二鋼管柱30Bの柱脚部30Lの耐火性能が高められる。この結果、第二鋼管柱30Bの柱脚部30Lの耐火被覆を省略し、又は耐火被覆を低減することができる。 Moreover, the cement-based filler 52 has a large heat capacity as described above. Therefore, by filling the connecting steel pipe 50 with the cement-based filler 52, the fire resistance of the connecting steel pipe 50 and the column base portion 30L of the second steel pipe column 30B is enhanced. As a result, the fireproof coating of the column base portion 30L of the second steel pipe column 30B can be omitted or the fireproof coating can be reduced.

さらに、下側鉄骨梁40Lの梁端部40Eには、一対の第二セメント系硬化体60Bが設けられている。一対の第二セメント系硬化体60Bの側面60Sは、第二鋼管柱30Bの柱脚部30Lの側面30Sに接触されている。 Furthermore, a pair of second cement-based hardening bodies 60B are provided at the beam ends 40E of the lower steel beam 40L. The side surfaces 60S of the pair of second cementitious hardened bodies 60B are in contact with the side surfaces 30S of the column base portion 30L of the second steel pipe column 30B.

これにより、水平力作用時に、下側鉄骨梁40Lから第二鋼管柱30Bの柱脚部30Lに作用する圧縮力Pが、一対の第二セメント系硬化体60Bの側面60Sを介して、第二鋼管柱30Bの柱脚部30Lの側面30Sに分散して伝達される。したがって、第二鋼管柱30Bの柱脚部30Lの変形がさらに抑制される。 As a result, when a horizontal force acts, the compressive force P acting from the lower steel beam 40L to the column base portion 30L of the second steel pipe column 30B passes through the side surfaces 60S of the pair of second cement-based hardening bodies 60B to the second It is distributed and transmitted to the side surface 30S of the column base portion 30L of the steel pipe column 30B. Therefore, deformation of the column base portion 30L of the second steel pipe column 30B is further suppressed.

また、一対の第二セメント系硬化体60Bによって下側鉄骨梁40Lの梁端部40Eのウェブ46を両側から挟み込むことにより、ウェブ46の座屈が抑制される。 Further, buckling of the web 46 is suppressed by sandwiching the web 46 of the beam end portion 40E of the lower steel frame beam 40L from both sides by the pair of second cement-based hardening bodies 60B.

さらに、一対の第二セメント系硬化体60Bは、熱容量が大きい。したがって、一対の第二セメント系硬化体60Bを下側鉄骨梁40Lの梁端部40Eに設けることにより、当該梁端部40Eの耐火被覆を省略し、又は耐火被覆を低減することができる。 Furthermore, the pair of second cementitious hardening bodies 60B has a large heat capacity. Therefore, by providing the pair of second cement-based hardening bodies 60B on the beam end portion 40E of the lower steel frame beam 40L, the fireproof coating of the beam end portion 40E can be omitted or reduced.

しかも、図3に示されるように、一対の第二セメント系硬化体60Bは、通しボルト70及びナット72によって下側鉄骨梁40Lの梁端部40Eに容易に取り付けることができる。したがって、下側鉄骨梁40Lの施工性が向上する。 Moreover, as shown in FIG. 3, the pair of second cement-based hardening bodies 60B can be easily attached to the beam ends 40E of the lower steel frame beam 40L with through-bolts 70 and nuts 72. As shown in FIG. Therefore, the workability of the lower steel beam 40L is improved.

(変形例)
次に、上記実施形態の変形例について説明する。
(Modification)
Next, a modification of the above embodiment will be described.

上記実施形態では、第二鋼管柱30Bの柱脚部30Lに第二軸力伝達プレート32Bが設けられている。しかし、第二軸力伝達プレート32Bを省略し、第一鋼管柱30Aの柱頭部30Uに第二鋼管柱30Bの柱脚部30Lを載置しても良い。この場合、第二鋼管柱30Bの柱脚部30Lから第一鋼管柱30Aの柱頭部30Uに軸力が伝達される。つまり、連結鋼管50によって、第一鋼管柱30Aと第二鋼管柱30Bとが、軸力を伝達可能に連結される。 In the above embodiment, the second axial force transmission plate 32B is provided on the column base portion 30L of the second steel pipe column 30B. However, the second axial force transmission plate 32B may be omitted, and the column base portion 30L of the second steel pipe column 30B may be placed on the column head portion 30U of the first steel pipe column 30A. In this case, the axial force is transmitted from the column base portion 30L of the second steel pipe column 30B to the column head portion 30U of the first steel pipe column 30A. That is, the first steel pipe column 30A and the second steel pipe column 30B are connected by the connecting steel pipe 50 so as to be able to transmit the axial force.

また、図5及び図6に示される変形例では、隣接する一対の連結鋼管50が軸力伝達プレート80を介して連結されている。軸力伝達プレート80は、平面視にて、矩形状に形成されている。 5 and 6, a pair of adjacent connecting steel pipes 50 are connected via an axial force transmission plate 80. As shown in FIGS. The axial force transmission plate 80 is formed in a rectangular shape in plan view.

軸力伝達プレート80は、一対の連結鋼管50の材軸方向の中間部に設けられている。具体的には、軸力伝達プレート80は、外ダイアフラムのように、一対の連結鋼管50の材軸方向の中間部を横切っている。この軸力伝達プレート80の外周部は、一対の連結鋼管50から外側へ張り出している。 The axial force transmission plate 80 is provided at an intermediate portion of the pair of connecting steel pipes 50 in the material axial direction. Specifically, the axial force transmission plate 80 crosses the axially intermediate portion of the pair of connecting steel pipes 50 like an outer diaphragm. The outer peripheral portion of the axial force transmission plate 80 protrudes outward from the pair of connecting steel pipes 50 .

軸力伝達プレート80の外周部は、隣接する一対の第一鋼管柱30Aの上端に係合されている。この状態で、一対の連結鋼管50の下部が、一対の第一鋼管柱30Aの柱頭部30U内にそれぞれ嵌め込まれている。また、一対の連結鋼管50の上部は、隣接する一対の第二鋼管柱30Bの柱脚部30L内にそれぞれ嵌め込まれている。 The outer peripheral portion of the axial force transmission plate 80 is engaged with the upper ends of the pair of adjacent first steel pipe columns 30A. In this state, the lower portions of the pair of connecting steel pipes 50 are fitted into the column heads 30U of the pair of first steel pipe columns 30A, respectively. Also, the upper portions of the pair of connecting steel pipes 50 are respectively fitted into the column base portions 30L of the pair of adjacent second steel pipe columns 30B.

一対の第二鋼管柱30Bの柱脚部30Lは、軸力伝達プレート80を介して一対の第一鋼管柱30Aの柱頭部30Uに載置されている。換言すると、一対の第二鋼管柱30Bの柱脚部30Lは、軸力伝達プレート80を介して一対の第一鋼管柱30Aの柱頭部30Uに支持されている。これにより、一対の第二鋼管柱30Bの軸力Nが、軸力伝達プレート80を介して一対の第一鋼管柱30Aに伝達される。 Column base portions 30L of the pair of second steel pipe columns 30B are mounted on column head portions 30U of the pair of first steel pipe columns 30A via axial force transmission plates 80 . In other words, the column base portions 30L of the pair of second steel pipe columns 30B are supported by the column head portions 30U of the pair of first steel pipe columns 30A via the axial force transmission plates 80 . Thereby, the axial force N of the pair of second steel pipe columns 30B is transmitted to the pair of first steel pipe columns 30A via the axial force transmission plate 80 .

このように第一鋼管柱30Aの柱頭部30Uと第二鋼管柱30Bの柱脚部30Lとの間に、軸力伝達プレート80を介在させても良い。 Thus, the axial force transmission plate 80 may be interposed between the column head portion 30U of the first steel pipe column 30A and the column base portion 30L of the second steel pipe column 30B.

また、本変形例では、一対の連結鋼管50が、軸力伝達プレート80を介して連結されている。これにより、一対の連結鋼管50を介して一対の第一鋼管柱30Aが連結されるとともに、一対の連結鋼管50を介して一対の第二鋼管柱30Bが連結される。 Also, in this modification, the pair of connecting steel pipes 50 are connected via the axial force transmission plate 80 . Thereby, the pair of first steel pipe columns 30A are connected via the pair of connecting steel pipes 50, and the pair of second steel pipe columns 30B are connected via the pair of connecting steel pipes 50.

そのため、本変形例では、水平力に対して、一対の第一鋼管柱30Aが一体に抵抗するとともに、一対の第二鋼管柱30Bが一体に抵抗する。したがって、建物10の耐震性能が向上する。 Therefore, in this modified example, the pair of first steel pipe columns 30A integrally resists the horizontal force, and the pair of second steel pipe columns 30B integrally resists. Therefore, the earthquake resistance performance of the building 10 is improved.

なお、本変形例では、軸力伝達プレート80を介して一対の連結鋼管50が連結されている。しかし、軸力伝達プレート80は、1本の連結鋼管50の材軸方向の中間部に設けることも可能である。 In addition, in this modification, the pair of connecting steel pipes 50 are connected via the axial force transmission plate 80 . However, the axial force transmission plate 80 can also be provided at an intermediate portion of one connecting steel pipe 50 in the material axial direction.

また、本変形例では、第一軸力伝達プレート32A及び第二軸力伝達プレート32Bが省略されている。しかし、第一鋼管柱30Aに第一軸力伝達プレート32Aを設けるとともに、第二鋼管柱30Bに第二軸力伝達プレート32Bを設け、これらの第一軸力伝達プレート32A、第二軸力伝達プレート32B、及び連結鋼管50を介して軸力Nを伝達しても良い。この場合、軸力伝達プレート80は、軸力を伝達せず、一対の連結鋼管50を連結する連結プレートとなる。 Also, in this modified example, the first axial force transmission plate 32A and the second axial force transmission plate 32B are omitted. However, the first axial force transmission plate 32A is provided on the first steel pipe column 30A, and the second axial force transmission plate 32B is provided on the second steel pipe column 30B. The axial force N may be transmitted via the plate 32B and the connecting steel pipe 50. In this case, the axial force transmission plate 80 serves as a connection plate that connects the pair of connection steel pipes 50 without transmitting the axial force.

次に、上記実施形態では、セメント系充填材52が、硬化したコンクリート、硬化したモルタル、又は硬化したグラウト等によって形成されている。しかし、セメント系充填材52は、例えば、硬化した鋼繊維補強コンクリート等の繊維補強コンクリートによって形成されても良い。この場合、第一鋼管柱30A及び第二鋼管柱30Bの剛性及び靭性が向上するとともに、耐火性能が向上する。 Next, in the above embodiment, the cement-based filler 52 is formed of hardened concrete, hardened mortar, hardened grout, or the like. However, cementitious filler 52 may also be formed by fiber-reinforced concrete, such as hardened steel fiber-reinforced concrete, for example. In this case, the rigidity and toughness of the first steel pipe column 30A and the second steel pipe column 30B are improved, and the fire resistance is improved.

また、上記実施形態では、上側鉄骨梁40Uの梁端部40Eに一対の第一セメント系硬化体60Aが設けられている。しかし、一対の第一セメント系硬化体60Aは、必要に応じて設ければ良く、適宜省略可能である。これと同様に、一対の第二セメント系硬化体60Bは、必要に応じて設ければ良く、適宜省略可能である。 Further, in the above embodiment, the pair of first cement-based hardening bodies 60A are provided at the beam end portion 40E of the upper steel frame beam 40U. However, the pair of first cementitious hardening bodies 60A may be provided as required, and can be omitted as appropriate. Similarly, the pair of second cementitious hardening bodies 60B may be provided as required, and can be omitted as appropriate.

また、上記実施形態では、第一鋼管柱30A、第二鋼管柱30B、及び連結鋼管50が、角形鋼管によって形成されている。しかし、第一鋼管柱、第二鋼管柱、及び連結鋼管は、丸形鋼管によって形成されても良い。 Further, in the above embodiment, the first steel pipe column 30A, the second steel pipe column 30B, and the connecting steel pipe 50 are formed of square steel pipes. However, the first steel pipe pillar, the second steel pipe pillar, and the connecting steel pipe may be formed of round steel pipes.

また、上記実施形態では、第一鉄骨梁及び第二鉄骨梁の一例としての上側鉄骨梁40U及び下側鉄骨梁40Lが、H形鋼によって形成されている。しかし、第一鉄骨梁及び第二鉄骨梁は、H形鋼に限らず、I形鋼、C形鋼等の形鋼や、角形鋼管等の鋼管鋼等であっても良い。 In the above embodiment, the upper steel beam 40U and the lower steel beam 40L, which are examples of the first steel beam and the second steel beam, are made of H-shaped steel. However, the first steel frame beam and the second steel frame beam are not limited to the H-shaped steel, and may be shaped steel such as I-shaped steel and C-shaped steel, steel pipes such as square steel pipes, and the like.

以上、本発明の一実施形態について説明したが、本発明はこうした実施形態に限定されるものでなく、一実施形態及び各種の変形例を適宜組み合わせて用いても良いし、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。 Although one embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, and one embodiment and various modifications may be used in combination as appropriate. It goes without saying that various aspects can be implemented without departing from the scope.

20A 第一建物ユニット
20B 第二建物ユニット
30A 第一鋼管柱
30U 柱頭部(第一鋼管柱の柱頭部)
30B 第二鋼管柱
30L 柱脚部(第一鋼管柱の柱脚部)
40U 上側鉄骨梁(第一鉄骨梁)
40A 下端(第一鉄骨梁の下端)
40E 梁端部(第一鉄骨梁の梁端部)
40L 下側鉄骨梁(第二鉄骨梁)
40B 上端(第二鉄骨梁の上端)
40E 梁端部(第二鉄骨梁の梁端部)
50 連結鋼管
50A 下端(連結鋼管の下端)
50B 上端(連結鋼管の上端)
52 セメント系充填材
60A 第一セメント系硬化体
60B 第二セメント系硬化体
N 軸力

20A First building unit 20B Second building unit 30A First steel pipe column 30U Column head (column head of first steel pipe column)
30B Second steel pipe column 30L Column base (column base of first steel pipe column)
40U upper steel beam (first steel beam)
40A lower end (lower end of first steel beam)
40E beam end (beam end of first steel beam)
40L lower steel beam (second steel beam)
40B upper end (upper end of the second steel beam)
40E beam end (beam end of second steel beam)
50 Lower end of connecting steel pipe 50A (lower end of connecting steel pipe)
50B upper end (upper end of connecting steel pipe)
52 Cement-based filler 60A First cement-based hardening body 60B Second cement-based hardening body N Axial force

Claims (3)

第一鋼管柱と、前記第一鋼管柱の柱頭部に梁端部が接合される第一鉄骨梁と、を有する第一建物ユニットと、
前記第一鋼管柱の上に配置される第二鋼管柱と、前記第二鋼管柱の柱脚部に梁端部が接合される第二鉄骨梁と、を有する第二建物ユニットと、
内部にセメント系充填材が充填され、下部が前記第一鋼管柱の前記柱頭部内に嵌め込まれるとともに、上部が前記第二鋼管柱の前記柱脚部内に嵌め込まれ、前記第一鋼管柱と前記第二鋼管柱とを連結する連結鋼管と、
を備える建物ユニット連結構造。
a first building unit having a first steel pipe column and a first steel frame beam having a beam end joined to a column head of the first steel pipe column;
a second building unit having a second steel pipe column arranged on top of the first steel pipe column, and a second steel beam having a beam end joined to a column base portion of the second steel pipe column;
The inside is filled with a cement-based filler, the lower part is fitted into the column head of the first steel pipe column, the upper part is fitted into the column base of the second steel pipe column, and the first steel pipe column and the second steel pipe column are fitted. A connecting steel pipe that connects the two steel pipe columns,
A building unit connection structure comprising:
前記第一鉄骨梁の前記梁端部に設けられ、前記第一鋼管柱の前記柱頭部と接触する第一セメント系硬化体と、
前記第二鉄骨梁の前記梁端部に設けられ、前記第二鋼管柱の前記柱脚部と接触する第二セメント系硬化体と、
を備える請求項1に記載の建物ユニット連結構造。
a first cementitious hardening body provided at the beam end of the first steel beam and in contact with the column head of the first steel pipe column;
a second cement-based hardening body provided at the beam end of the second steel beam and in contact with the column base of the second steel pipe column;
The building unit connecting structure according to claim 1, comprising:
前記連結鋼管の下端は、前記第二鉄骨梁の下端よりも下側に位置し、
前記連結鋼管の上端は、前記第二鉄骨梁の上端よりも上側に位置する、
請求項1又は請求項2に記載の建物ユニット連結構造。

The lower end of the connecting steel pipe is located below the lower end of the second steel beam,
The upper end of the connecting steel pipe is located above the upper end of the second steel beam,
The building unit connection structure according to claim 1 or 2.

JP2021094167A 2021-06-04 2021-06-04 Building unit connection structure Pending JP2022186105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021094167A JP2022186105A (en) 2021-06-04 2021-06-04 Building unit connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021094167A JP2022186105A (en) 2021-06-04 2021-06-04 Building unit connection structure

Publications (1)

Publication Number Publication Date
JP2022186105A true JP2022186105A (en) 2022-12-15

Family

ID=84441882

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021094167A Pending JP2022186105A (en) 2021-06-04 2021-06-04 Building unit connection structure

Country Status (1)

Country Link
JP (1) JP2022186105A (en)

Similar Documents

Publication Publication Date Title
KR101880494B1 (en) Core wall seismic reinforcement structure and construction method of the same
JP5486278B2 (en) How to install the viscoelastic damper
JP2011241627A (en) Steel earthquake resisting wall, and building equipped with the same
JP5275545B2 (en) Seismic wall and its construction method
JP2011006966A (en) Steel earthquake resisting wall, and building with the same
JP6695514B1 (en) Basic structure of steel frame
JP2016050377A (en) Joint structure between column base part and steel beam
JP2022186105A (en) Building unit connection structure
JP6390360B2 (en) Structure and method for joining reinforced concrete beam and steel pipe column
WO2022219899A1 (en) Column and beam structure of building, building, construction method for building, and building member
JPH10159379A (en) Vibration control structure of building, and vibration damper
JP2022122012A (en) Junction structure and method of constructing junction structure
JP2019218713A (en) Bearing wall
JP2019199759A (en) Bearing wall
JP2011256598A (en) Concrete wall mounting structure
JP2013136898A (en) Pole structure
JP2011006967A (en) Steel plate connecting structure and building having the same
JPH07207755A (en) Connection part structure of reinforced concrete column and steel structure beam
JP2010127037A (en) Boundary beam, method for designing boundary beam, method for constructing boundary beam, and building
JP4881084B2 (en) Seismic structure
JP7368849B2 (en) Vibration damper
JP7443643B2 (en) wall structure
JP7127921B1 (en) building unit
KR102235422B1 (en) Modul unit joint structure and modul unit method thereby
KR20180125704A (en) Residential composite steel