JP2022177565A - Arc stud welding device and arc stud welding method - Google Patents

Arc stud welding device and arc stud welding method Download PDF

Info

Publication number
JP2022177565A
JP2022177565A JP2021083916A JP2021083916A JP2022177565A JP 2022177565 A JP2022177565 A JP 2022177565A JP 2021083916 A JP2021083916 A JP 2021083916A JP 2021083916 A JP2021083916 A JP 2021083916A JP 2022177565 A JP2022177565 A JP 2022177565A
Authority
JP
Japan
Prior art keywords
welding
time
stud
base material
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021083916A
Other languages
Japanese (ja)
Inventor
祐介 松岡
Yusuke Matsuoka
裕貴 木俣
Yuki Kimata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2021083916A priority Critical patent/JP2022177565A/en
Priority to CN202210241926.4A priority patent/CN115365622B/en
Publication of JP2022177565A publication Critical patent/JP2022177565A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/20Stud welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding Control (AREA)

Abstract

To provide a technique that can suppress variation in welding time, in arc stud welding.SOLUTION: An arc stud welding device, which generates an arc between a base material and a stud material to weld the materials to each other, comprises: a stud gun that holds the stud material, executes, for each of a plurality of weld points, a separating-operation of separating the stud material from the base material after starting welding and an approaching-operation of making the stud material approach the base material after the separating-operation; an obtaining section that obtains a required time after when starting the approaching-operation until a contact time point when the stud material comes into contact with the base material; a determining section that determines whether or not there is a time difference between the required time obtained by the obtaining section and a predetermined reference time; and an operation control section that controls the approaching-operation and the separating-operation by the stud gun. The operation control section, when it is determined that the time difference occurs, controls the required time by adjusting a starting time point in succeeding welding so as to reduce the time difference.SELECTED DRAWING: Figure 6

Description

本開示は、アークスタッド溶接装置、および、アークスタッド溶接方法の技術に関する。 The present disclosure relates to technology of an arc stud welding apparatus and an arc stud welding method.

従来、スタッドガンに取り付けられたスタッド材をアークスタッド溶接により母材に接合する技術が知られている(特許文献1)。アークスタッド溶接では、まず、スタッド材の基端を母材に接触させた状態において、スタッド材と母材との間に通電して、スタッド材を母材から離間させることで、スタッド材と母材との間にアークを発生させる。次に、スタッド材と母材との間に発生したアークによって、母材が所望の溶融状態となった時点で、スタッドガンの移動機構によってスタッド材を母材に向けて接近させて、スタッド材と母材とを接触させることで、スタッド材を母材に接合する。 Conventionally, there is known a technique of joining a stud material attached to a stud gun to a base material by arc stud welding (Patent Document 1). In arc stud welding, first, while the base end of the stud is in contact with the base material, an electric current is applied between the stud and the base material to separate the stud from the base material. Generate an arc between the material. Next, when the arc generated between the stud material and the base material brings the base material into a desired molten state, the stud material is moved toward the base material by the moving mechanism of the stud gun, and the stud material is melted. The stud material is joined to the base material by bringing the base material into contact with the base material.

特開2001-105141号公報Japanese Patent Application Laid-Open No. 2001-105141

本願発明者らは、アークスタッド溶接における溶接品質のばらつきの原因が、スタッドガンの移動機構における摺動抵抗やスタッドガンに設けられた母材押さえの消耗に起因する所要時間のばらつきにあることを見出した。所要時間とは、アークの発生後に、スタッド材が母材に対して接近を開始してからスタッド材と母材とが接触するまでの時間である。 The inventors of the present application have found that the cause of variations in welding quality in arc stud welding is variations in the required time due to sliding resistance in the stud gun moving mechanism and wear of the base metal retainer provided in the stud gun. Found it. The required time is the time from when the stud material starts approaching the base material after the arc is generated until the stud material and the base material come into contact with each other.

本開示は、以下の形態として実現することが可能である。 The present disclosure can be implemented as the following forms.

(1)本開示の一形態によれば、アークスタッド溶接装置が提供される。このアークスタッド溶接装置は、母材とスタッド材との間にアークを発生させて溶接するアークスタッド溶接装置であり、前記スタッド材を把持するスタッドガンであって、溶接を開始した後に、前記母材から前記スタッド材を離間させる離間動作と、前記離間動作の後に、前記母材に対して前記スタッド材を接近させる接近動作と、を複数の溶接点ごとに実行するスタッドガンと、前記接近動作の開始時点から、前記スタッド材と前記母材とが接触する接触時点までの所要時間を取得する取得部と、前記取得部によって取得された前記所要時間と、予め定められた基準時間と、の間に時間差が生じているか否かの判定を行う判定部と、前記スタッドガンの前記接近動作と前記離間動作とを制御する動作制御部と、を備え、前記動作制御部は、前記時間差が生じていると判定された場合に、前記時間差を低減するように、後の溶接における前記開始時点を調整することによって、前記所要時間を制御する。この形態によれば、動作制御部が時間差を低減するように接近動作の開始時点を調整することで、接近動作の開始時点から接触時点までの所要時間を基準時間に近づけることができる。その結果、アークスタッド溶接における溶接品質のばらつきを抑制できる。
(2)上記形態であって、前記動作制御部は、前記所要時間が前記基準時間よりも長い場合には、前記開始時点を前記時間差に応じて早く調整することで前記所要時間を制御してもよい。この形態によれば、所要時間が基準時間よりも長い場合には、接近動作の開始時点を時間差に応じて早く調整することで、所要時間を基準時間に近づけることができる。
(3)上記形態であって、前記動作制御部は、前記所要時間が前記基準時間よりも短い場合には、前記開始時点を前記時間差に応じて遅く調整することで前記所要時間を制御してもよい。この形態によれば、所要時間が基準時間よりも短い場合には、接近動作の開始時点を時間差に応じて遅く調整することで、所要時間を基準時間に近づけることができる。
(4)上記形態であって、前記複数の溶接点は、同一の前記母材のうちで異なる位置にあり、前記取得部は、前記所要時間を前記複数の溶接点ごとに取得し、前記判定部は、前記複数の溶接点ごとに前記判定を行い、前記動作制御部は、前記複数の溶接点ごとに、前記所要時間を制御してもよい。この形態によれば、複数の溶接点に対してスタッド材を溶接する場合において、複数の溶接点ごとに所要時間を基準時間に近づけることができる。
(5)上記形態であって、前記判定部は、前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差である平均時間差を用いて前記判定を行い、前記動作制御部は、前記平均時間差を低減するように、後の溶接における前記開始時点を調整してもよい。この形態によれば、複数の溶接点の所要時間を考慮して、後の溶接における開始時点を調整できる。
(6)上記形態であって、前記複数の溶接点はN以上(Nは2以上の整数)であり、前記複数の溶接点への前記溶接は1点目からN点目まで順に実行され、前記判定部は、1点前の前記溶接点からM点前(MはNよりも小さい整数)の前記溶接点までの前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差を前記平均時間差として用いてもよい。この形態によれば、複数の溶接点の所要時間を考慮して、後の溶接における開始時点を調整できる。
(7)上記形態であって、前記母材の数は2以上であり、前記複数の溶接点のそれぞれは、前記2以上の母材のうちで対応する位置に形成され、前記取得部は、前記所要時間を前記複数の溶接点ごとに取得し、前記判定部は、前記複数の溶接点ごとに前記判定を行い、前記動作制御部は、前記複数の溶接点ごとに、前記所要時間を制御してもよい。この形態によれば、2以上の母材のうちで対応する位置に形成される複数の溶接点に対して溶接が行われる場合に、複数の溶接点ごとの特性や傾向を考慮した上で、後の溶接における開始時点を調整できる。
(8)上記実施形態であって、前記判定部は、前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差である平均時間差を用いて前記判定を行い、前記動作制御部は、前記平均時間差を低減するように、後の溶接における前記開始時点を調整してもよい。この形態によれば、2以上の母材のうちで対応する位置に形成される複数の溶接点に対して溶接が行われる場合に、複数の溶接点ごとの特性や傾向を考慮した上で、後の溶接における開始時点を調整できる。
(9)上記形態であって、前記アークスタッド溶接装置は、さらに、前記母材を押さえるための母材押さえを備えてもよい。この形態によれば、溶接対象となる母材を母材押さえによって固定した状態で溶接を行うことができる。よって、安定した姿勢においてスタッドガンと母材とを接触させることができる。
(10)本開示の他の形態によれば、アークスタッド溶接方法が提供される。このアークスタッド溶接方法は、母材とスタッド材との間にアークを発生させて溶接するアークスタッド溶接方法であり、前記スタッド材を把持するスタッドガンによって、溶接を開始した後に、前記母材から前記スタッド材を離間させる離間工程と、前記離間工程の後に、前記母材に対して前記スタッド材を接近させる接近工程と、を複数の溶接点ごとに実行し、さらに、前記接近工程を開始した開始時点から、前記スタッド材と前記母材とが接触する接触時点までの所要時間を取得する取得工程と、前記取得工程によって取得された前記所要時間と、予め定められた基準時間と、の間に時間差が生じているか否かの判定を行う判定工程と、を備え、前記接近工程は、前記時間差が生じていると判定された場合に、前記時間差を低減するように、後の溶接における前記開始時点を調整することによって、前記所要時間を制御する工程を含む。この形態によれば、動作制御部が時間差を低減するように接近工程の開始時点を調整することで、接近工程の開始時点から接触時点までの所要時間を基準時間に近づけることができる。その結果、アークスタッド溶接における溶接品質のばらつきを抑制できる。
本開示は、上記のアークスタッド溶接装置、および、アークスタッド溶接方法以外の種々の形態で実現することが可能である。例えば、アークスタッド溶接装置の製造方法やアークスタッド溶接装置の制御方法、その制御方法を実現するコンピュータプログラム、そのコンピュータプログラムを記録した一時的でない記録媒体等の形態で実現することができる。
(1) According to one aspect of the present disclosure, an arc stud welding device is provided. This arc stud welding apparatus is an arc stud welding apparatus that generates an arc between a base material and a stud material for welding, and is a stud gun that holds the stud material. a stud gun that performs, for each of a plurality of welding points, a separating operation for separating the stud material from the material, and an approaching operation for approaching the stud material to the base material after the separating operation; and the approaching operation. from the start time to the contact time when the stud material and the base material contact, an acquisition unit that acquires the required time, the required time acquired by the acquisition unit, and a predetermined reference time. and an operation control unit for controlling the approaching operation and the separating operation of the stud gun, wherein the operation control unit controls the time difference. If so, the duration is controlled by adjusting the starting point in subsequent welds to reduce the time difference. According to this aspect, the time required from the start of the approach motion to the contact time can be brought closer to the reference time by adjusting the start time of the approach motion so that the motion control unit reduces the time difference. As a result, variations in welding quality in arc stud welding can be suppressed.
(2) In the above mode, when the required time is longer than the reference time, the operation control unit controls the required time by adjusting the start point earlier according to the time difference. good too. According to this aspect, when the required time is longer than the reference time, the required time can be brought closer to the reference time by adjusting the start point of the approaching motion earlier according to the time difference.
(3) In the above mode, when the required time is shorter than the reference time, the operation control unit controls the required time by adjusting the start point later according to the time difference. good too. According to this aspect, when the required time is shorter than the reference time, the required time can be brought closer to the reference time by adjusting the start point of the approaching motion later according to the time difference.
(4) In the above aspect, the plurality of welding points are located at different positions in the same base material, and the acquisition unit acquires the required time for each of the plurality of welding points, and determines the The unit may make the determination for each of the plurality of welding points, and the operation control unit may control the required time for each of the plurality of welding points. According to this aspect, when welding stud materials to a plurality of welding points, the required time can be brought close to the reference time for each of the plurality of welding points.
(5) In the above aspect, the determination unit performs the determination using an average time difference, which is a difference between the average time required for each of the plurality of welding points and the reference time, and performs the operation. The controller may adjust the start time for subsequent welds to reduce the average time difference. According to this form, the starting point of subsequent welding can be adjusted in consideration of the time required for a plurality of welding points.
(6) In the above mode, the plurality of welding points is N or more (N is an integer of 2 or more), and the welding to the plurality of welding points is sequentially performed from the first point to the Nth point, The judging unit determines an average time of the required time for each of the plurality of welding points from the welding point one point before to the welding point M points before (M is an integer smaller than N), and the reference time. , may be used as the average time difference. According to this form, the starting point of subsequent welding can be adjusted in consideration of the time required for a plurality of welding points.
(7) In the above aspect, the number of the base metals is two or more, each of the plurality of welding points is formed at a corresponding position in the two or more base metals, and the obtaining section includes: The required time is obtained for each of the plurality of welding points, the determination unit performs the determination for each of the plurality of welding points, and the operation control unit controls the required time for each of the plurality of welding points. You may According to this aspect, when welding is performed to a plurality of welding points formed at corresponding positions among two or more base materials, after considering the characteristics and tendencies of each of the plurality of welding points, You can adjust the starting point in later welds.
(8) In the above embodiment, the determination unit performs the determination using an average time difference, which is a difference between the average time required for each of the plurality of welding points and the reference time, and The motion controller may adjust the start time for subsequent welds to reduce the average time difference. According to this aspect, when welding is performed to a plurality of welding points formed at corresponding positions among two or more base materials, after considering the characteristics and tendencies of each of the plurality of welding points, You can adjust the starting point in later welds.
(9) In the above aspect, the arc stud welding device may further include a base metal holder for holding down the base metal. According to this aspect, welding can be performed in a state in which the base material to be welded is fixed by the base material retainer. Therefore, the stud gun and the base material can be brought into contact with each other in a stable posture.
(10) According to another aspect of the present disclosure, an arc stud welding method is provided. This arc stud welding method is an arc stud welding method in which welding is performed by generating an arc between a base material and a stud material. A separation step of separating the stud members and, after the separation step, an approaching step of approaching the stud members to the base metal are performed for each of a plurality of welding points, and the approaching step is started. Between an acquisition step of acquiring a required time from a start point to a contact point of contact between the stud material and the base material, the required time acquired by the acquisition step, and a predetermined reference time and a determining step of determining whether or not a time difference has occurred in the subsequent welding, and the approaching step reduces the time difference when it is determined that the time difference has occurred. and controlling the duration by adjusting the starting time. According to this aspect, the operation control unit adjusts the start time of the approaching process so as to reduce the time difference, so that the time required from the start of the approaching process to the contact time can be brought closer to the reference time. As a result, variations in welding quality in arc stud welding can be suppressed.
The present disclosure can be implemented in various forms other than the arc stud welding apparatus and arc stud welding method described above. For example, it can be realized in the form of a manufacturing method of an arc stud welding device, a control method of an arc stud welding device, a computer program for realizing the control method, a non-temporary recording medium recording the computer program, or the like.

本実施形態のアークスタッド溶接装置の概略構成を示した模式図。BRIEF DESCRIPTION OF THE DRAWINGS The schematic diagram which showed schematic structure of the arc stud welding apparatus of this embodiment. スタッドガンの構成を示した模式図。The schematic diagram which showed the structure of a stud gun. 本実施形態におけるアークスタッド溶接工程を説明するための図。The figure for demonstrating the arc stud welding process in this embodiment. 溶接時の通電の態様と、ガン位置の推移とを示した模式図。FIG. 4 is a schematic diagram showing the mode of energization during welding and the transition of the gun position; スタッドガンの個体差と使用期間の経過に伴う溶接時間のばらつきを示すグラフ。A graph showing individual differences in stud guns and variations in welding time over time. 第1実施形態における所要時間の制御方法を説明するための概念図。FIG. 4 is a conceptual diagram for explaining a method of controlling the required time in the first embodiment; 所要時間が基準時間よりも長い場合の制御方法を説明するためのグラフ。Graph for explaining the control method when the required time is longer than the reference time. 所要時間が基準時間よりも短い場合の制御方法を説明するためのグラフ。Graph for explaining the control method when the required time is shorter than the reference time. 複数の母材における溶接点ごとの所要時間を示したグラフ。A graph showing the time required for each welding point on multiple base metals.

A.第1実施形態:
図1は、本実施形態のアークスタッド溶接装置1の概略構成を示した模式図である。図1では、アークスタッド溶接装置1を水平な設置面Fに載置した状態を示している。アークスタッド溶接装置1は、母材Wとスタッド材Bとの間にアークAを発生させて溶接する。アークスタッド溶接装置1は、例えば、車両の製造工程において、パネル等の金属部品にスタッド材Bを溶接する場合に用いられる。
A. First embodiment:
FIG. 1 is a schematic diagram showing a schematic configuration of an arc stud welding device 1 of this embodiment. FIG. 1 shows a state in which the arc stud welding device 1 is placed on a horizontal installation surface F. As shown in FIG. The arc stud welding device 1 generates an arc A between a base material W and a stud material B for welding. The arc stud welding device 1 is used, for example, when welding a stud material B to a metal part such as a panel in a vehicle manufacturing process.

母材Wは、金属で形成され、例えば、アルミニウムや合金で形成される。母材Wは、アークスタッド溶接(以下、溶接)によってスタッド材Bが接合される面としての溶接面WSを有する。本実施形態では、母材Wは板状を成している。 The base material W is made of metal, such as aluminum or an alloy. The base material W has a welding surface WS as a surface to which the stud material B is joined by arc stud welding (hereinafter referred to as welding). In this embodiment, the base material W has a plate shape.

スタッド材Bは、溶接によって母材Wに溶接された状態において、母材Wとは異なる他の部材と母材Wとを接合するための部材である。スタッド材Bは、いわゆるスタッドボルトやスタッドナットである。スタッド材Bは、金属で形成され、棒状を成す。本実施形態では、スタッド材Bは、台付きのスタッドボルトである。 The stud material B is a member for joining the base material W to another member different from the base material W in a state of being welded to the base material W by welding. The stud member B is a so-called stud bolt or stud nut. The stud member B is made of metal and has a rod shape. In this embodiment, the stud member B is a stud bolt with a base.

アークスタッド溶接装置1は、スタッドガン2と、ロボット3と、制御装置4と、ボルトフィーダ6と、電源装置7と、母材支持台9と、センサ11と、を備える。 The arc stud welding device 1 includes a stud gun 2, a robot 3, a control device 4, a bolt feeder 6, a power supply device 7, a base material support 9, and a sensor 11.

図2は、スタッドガン2の構成を示した模式図である。図2では、スタッドガン2と母材Wとの断面を模式的に表している。また、図2では、後述する図3に示す工程(2)におけるスタッドガン2と母材Wとの位置関係を表している。上述のスタッド材Bは、頭部B1と、軸部B2と、突出部B3とを備える。頭部B1は、後述するスタッドガン2のチャック27に把持される。突出部B3は、溶接において、母材Wの溶接面WSと接触する。軸部B2は、頭部B1と突出部B3との間に位置する。溶接後に、母材Wと他の部材とを接合させる際には、スタッド材Bの頭部B1を介して軸部B2が他の部材と嵌合することで、母材Wと他の部材とが接合される。なお、スタッド材Bの形状は、これに限られるものではない。スタッド材Bには、他の部材と嵌合させるためのネジ山や溝が形成されていてもよい。また、頭部B1と軸部B2とは同じ径で一体に形成されてもよい。以下において、スタッド材Bのうちで頭部B1が位置する側をスタッド材Bの基端Ba、突出部B3が位置する側をスタッド材Bの先端Bbとする。 FIG. 2 is a schematic diagram showing the configuration of the stud gun 2. As shown in FIG. In FIG. 2, the cross section of the stud gun 2 and the base material W is represented typically. 2 shows the positional relationship between the stud gun 2 and the base material W in step (2) shown in FIG. 3 which will be described later. The stud material B described above includes a head portion B1, a shaft portion B2, and a projection portion B3. The head B1 is gripped by a chuck 27 of the stud gun 2, which will be described later. The projecting portion B3 contacts the welding surface WS of the base material W during welding. The shaft portion B2 is positioned between the head portion B1 and the projecting portion B3. When the base material W and another member are joined after welding, the base material W and the other member are joined together by fitting the shaft portion B2 to the other member via the head portion B1 of the stud material B. are spliced. In addition, the shape of the stud material B is not restricted to this. The stud material B may be formed with threads or grooves for fitting with other members. Moreover, the head portion B1 and the shaft portion B2 may be integrally formed with the same diameter. In the following description, the side of the stud member B on which the head B1 is located is referred to as the base end Ba of the stud member B, and the side of the stud member B on which the projecting portion B3 is located is referred to as the distal end Bb of the stud member B.

スタッドガン2は、スタッド材Bを把持し、制御装置4の指令に応じて、母材Wからスタッド材Bを離間させる離間動作と、離間動作の後に、母材Wに対してスタッド材Bを接近させる接近動作と、を複数の溶接点ごとに実行する。スタッドガン2の一端2a側は、後述するスタッドガン支持部37(図1)に支持される。スタッドガン2は、ロボット3を介して、制御装置4と電気的に接続されている。スタッドガン2は、ケース20と、ガンコイル21と、固定磁極部材22と、シリンダ23と、可動磁極部材24と、付勢部材25と、チャック27と、母材押さえ29と、を備える。 The stud gun 2 grips the stud material B, separates the stud material B from the base material W according to a command from the control device 4, and after the separating operation, pushes the stud material B against the base material W. and an approaching operation for each of a plurality of welding points. One end 2a side of the stud gun 2 is supported by a stud gun support portion 37 (FIG. 1), which will be described later. Stud gun 2 is electrically connected to control device 4 via robot 3 . The stud gun 2 includes a case 20 , a gun coil 21 , a fixed magnetic pole member 22 , a cylinder 23 , a movable magnetic pole member 24 , an urging member 25 , a chuck 27 and a base material presser 29 .

ケース20は、スタッドガン2の外殻を成す円筒形状の部材である。ケース20は、ガンコイル21と、固定磁極部材22と、シリンダ23と、可動磁極部材24と、付勢部材25と、チャック27と、を収容する。鉛直方向においてスタッドガン2の一端2aとは反対側に位置する他端2bは、母材Wの溶接面WSと対向している。本実施形態では、固定磁極部材22と、シリンダ23と、可動磁極部材24と、チャック27とは、スタッドガン2の一端2aから他端2bに向かう方向において、この順に設けられている。 The case 20 is a cylindrical member forming the outer shell of the stud gun 2 . Case 20 accommodates gun coil 21 , fixed magnetic pole member 22 , cylinder 23 , movable magnetic pole member 24 , biasing member 25 and chuck 27 . The other end 2b of the stud gun 2 located on the side opposite to the one end 2a of the stud gun 2 in the vertical direction faces the welding surface WS of the base material W. As shown in FIG. In this embodiment, the fixed magnetic pole member 22, the cylinder 23, the movable magnetic pole member 24, and the chuck 27 are provided in this order in the direction from the one end 2a of the stud gun 2 to the other end 2b.

ガンコイル21は、ケース20の内周面のうち、スタッドガン2の一端2a側において、固定磁極部材22の周囲に設けられる。ガンコイル21は、銅線などの金属製の線を円筒形に巻いたコイルであり、電源装置7から供給されるガンコイル電圧によって磁界を発生させる。なお、溶接において、ガンコイル21を通電させた状態(以下、通電状態)と、ガンコイル21を通電させない状態(以下、非通電状態)と、における各構成要素の具体的な動作は、図3および図4を用いて後述する。 The gun coil 21 is provided around the fixed magnetic pole member 22 on the inner peripheral surface of the case 20 on the one end 2 a side of the stud gun 2 . The Gunn coil 21 is a coil formed by winding a wire made of metal such as copper wire into a cylindrical shape, and generates a magnetic field by a Gunn coil voltage supplied from the power supply 7 . In welding, the specific operation of each component in a state in which the gun coil 21 is energized (hereinafter referred to as an energized state) and a state in which the gun coil 21 is not energized (hereinafter referred to as a non-energized state) is shown in FIGS. 4 will be described later.

固定磁極部材22は、ケース20の内部のうち、スタッドガン2の一端2a側、かつ、ガンコイル21の内側に設けられる。換言すると、固定磁極部材22は、水平方向に延びるケース20の一端2a側の中央部に位置していると言える。固定磁極部材22は磁性体であり、例えば、鉄などの磁性体として機能し得る金属によって形成される。固定磁極部材22は、励磁されたガンコイル21によって発生する磁界によって、磁化された電磁石となる。 The fixed magnetic pole member 22 is provided inside the case 20 on the one end 2 a side of the stud gun 2 and inside the gun coil 21 . In other words, it can be said that the fixed magnetic pole member 22 is positioned in the central portion on the one end 2a side of the case 20 extending in the horizontal direction. The fixed magnetic pole member 22 is a magnetic material, and is made of, for example, a metal such as iron that can function as a magnetic material. The fixed magnetic pole member 22 becomes an electromagnet magnetized by the magnetic field generated by the excited gun coil 21 .

シリンダ23は、可動磁極部材24を摺動可能に収容する円筒形状の部材である。シリンダ23は、ケース20の内部のうち、固定磁極部材22よりも他端2b側において、固定磁極部材22に近接する位置に設けられる。シリンダ23の一方の底面は一端2a側に、他方の底面は他端2b側に位置する。シリンダ23の他端2b側の底面は、後述するロッド242を一端2a側と他端2b側との間において摺動可能に収容するための開口部が設けられる。この開口部の直径は、後述するヘッド241の直径よりも小さくなるように設けられている。また、シリンダ23の側面のうちで内周面は、可動磁極部材24が摺動する摺動面である。図2では、シリンダ23の側面の一部はガンコイル21と対向する位置に設けられている。 The cylinder 23 is a cylindrical member that slidably accommodates the movable magnetic pole member 24 . The cylinder 23 is provided inside the case 20 at a position closer to the fixed magnetic pole member 22 on the other end 2 b side than the fixed magnetic pole member 22 . One bottom surface of the cylinder 23 is located on the one end 2a side, and the other bottom surface is located on the other end 2b side. The bottom surface of the cylinder 23 on the side of the other end 2b is provided with an opening for accommodating a rod 242, which will be described later, slidably between the side of the one end 2a and the side of the other end 2b. The diameter of this opening is provided to be smaller than the diameter of a head 241, which will be described later. The inner peripheral surface of the side surfaces of the cylinder 23 is a sliding surface on which the movable magnetic pole member 24 slides. In FIG. 2 , a portion of the side surface of the cylinder 23 is provided at a position facing the gun coil 21 .

可動磁極部材24は、摺動可能にシリンダ23の内部に設けられる。可動磁極部材24は磁性体であり、例えば、鉄などの磁性体として機能し得る金属によって形成される。そのため、固定磁極部材22が磁化された状態において、可動磁極部材24は、固定磁極部材22に電磁的に吸引される。可動磁極部材24は、ヘッド241と、ロッド242と、テール243と、を備える。ヘッド241は円盤状である。また、ロッド242は棒状である。テール243は円盤状である。可動磁極部材24は、ヘッド241とロッド242とテール243とがこの順で一体に構成された、いわゆるピストンである。ヘッド241の直径は、シリンダ23の直径よりも小さく、かつ、シリンダ23の開口部の直径よりも大きく設けられる。また、ロッド242の直径は、ヘッド241の直径よりも小さく、かつ、シリンダ23の開口部の直径よりも小さく設けられる。これにより、シリンダ23の開口部から可動磁極部材24が外れることなく、摺動可能となる。また、テール243が他端2b側に設けられることで、付勢部材25を伸縮させ得る。図2では、可動磁極部材24がシリンダ23内において摺動する領域を摺動領域Sとして図示している。摺動領域Sは、鉛直方向において、前述したシリンダ23の一方の底面と、他方の底面と、の間の範囲を指す。 The movable magnetic pole member 24 is slidably provided inside the cylinder 23 . The movable magnetic pole member 24 is a magnetic material, and is made of, for example, a metal such as iron that can function as a magnetic material. Therefore, the movable magnetic pole member 24 is electromagnetically attracted to the fixed magnetic pole member 22 while the fixed magnetic pole member 22 is magnetized. The movable magnetic pole member 24 has a head 241 , a rod 242 and a tail 243 . The head 241 is disc-shaped. Also, the rod 242 is rod-shaped. The tail 243 is disc-shaped. The movable magnetic pole member 24 is a so-called piston in which a head 241, a rod 242 and a tail 243 are integrated in this order. The diameter of the head 241 is set smaller than the diameter of the cylinder 23 and larger than the diameter of the opening of the cylinder 23 . Also, the diameter of the rod 242 is smaller than the diameter of the head 241 and smaller than the diameter of the opening of the cylinder 23 . As a result, the movable magnetic pole member 24 can be slid without coming off the opening of the cylinder 23 . Further, the biasing member 25 can be expanded and contracted by providing the tail 243 on the other end 2b side. In FIG. 2, the region where the movable magnetic pole member 24 slides within the cylinder 23 is shown as a sliding region S. As shown in FIG. The sliding region S refers to a range between one bottom surface and the other bottom surface of the cylinder 23 described above in the vertical direction.

付勢部材25は、可動磁極部材24をスタッドガン2の他端2b側に向けて付勢する。付勢部材25は、いわゆるコイルバネである。付勢部材25は、摺動領域Sにおける可動磁極部材24の摺動に応じて、伸縮する。 The biasing member 25 biases the movable magnetic pole member 24 toward the other end 2 b of the stud gun 2 . The biasing member 25 is a so-called coil spring. The biasing member 25 expands and contracts as the movable magnetic pole member 24 slides in the sliding area S. As shown in FIG.

チャック27は、スタッド材Bを把持する。具体的には、チャック27は、スタッド材Bのうち、一端2a側に位置する頭部B1を把持する。チャック27は、テール243と一体となるように装着された状態で、テール243よりも他端2b側に設けられる。チャック27は、スタッド材Bを把持するための把持部271を有する。図2では、2つの把持部271が水平方向において対向するように設けられ、一方の把持部271と他方の把持部271とがスタッド材Bの頭部B1を挟み込むようにして把持している。そのため、スタッド材Bの位置は、可動磁極部材24を摺動させることで、可動磁極部材24の摺動に追従して変化する。このように、ソレノイド機構を備えたスタッドガン2のチャック27がスタッド材Bを把持することで、母材Wに対してスタッド材Bが接近または離間する。 The chuck 27 grips the stud material B. As shown in FIG. Specifically, the chuck 27 grips the head portion B1 of the stud material B located on the one end 2a side. The chuck 27 is provided closer to the other end 2b than the tail 243 while being mounted integrally with the tail 243 . The chuck 27 has a gripping portion 271 for gripping the stud member B. As shown in FIG. In FIG. 2, two gripping portions 271 are provided so as to face each other in the horizontal direction, and the one gripping portion 271 and the other gripping portion 271 grip the head portion B1 of the stud B so as to sandwich it. Therefore, by sliding the movable magnetic pole member 24, the position of the stud member B changes following the sliding of the movable magnetic pole member 24. As shown in FIG. In this way, the stud material B approaches or separates from the base material W by gripping the stud material B with the chuck 27 of the stud gun 2 having a solenoid mechanism.

母材押さえ29は、ケース20の外表面のうち、母材Wの溶接面WSと対向する他端2b側に配置されている。母材押さえ29は、棒状であり、母材Wと接触する接触面29aを有する。母材押さえ29の接触面29aが母材Wの溶接面WSの一部に接触することで、スタッドガン2は、母材Wに対して安定した姿勢においてスタッド材Bを接近または離間させることができる。母材押さえ29は、例えば、銅で形成される。 The base material retainer 29 is arranged on the other end 2b side of the outer surface of the case 20 facing the welding surface WS of the base material W. As shown in FIG. The base material retainer 29 is rod-shaped and has a contact surface 29a that contacts the base material W. As shown in FIG. The contact surface 29a of the base material retainer 29 contacts a part of the welding surface WS of the base material W, so that the stud gun 2 moves the stud material B toward or away from the base material W in a stable posture. can. The base material retainer 29 is made of copper, for example.

なお、スタッドガン2の構成要素や配置等はこれに限られるものではない。スタッドガン2は、スタッド材Bを把持して接近動作と離間動作とを実行すると共に、母材Wと対向するスタッドガン2の他端2b側からアークAを発生させるための機構を備えていればよい。また、スタッドガン2において母材押さえ29は必須の構成要素ではない。 Note that the components, arrangement, etc. of the stud gun 2 are not limited to those described above. The stud gun 2 grips the stud material B and performs an approaching operation and a separating operation. Just do it. Also, the base material retainer 29 is not an essential component in the stud gun 2 .

ロボット3は、図1に示すように、スタッドガン2の一端2aを支持すると共に、スタッドガン2の位置および姿勢を変化させる移動機構である。図1に示す例では、ロボット3は、多関節ロボットであり、設置面Fに配置されるアーム30と、基台35と、スタッドガン支持部37とを備える。スタッドガン支持部37は、アーム30の先端に設けられており、スタッドガン2を支持する。 The robot 3 is a moving mechanism that supports one end 2a of the stud gun 2 and changes the position and attitude of the stud gun 2, as shown in FIG. In the example shown in FIG. 1, the robot 3 is an articulated robot, and includes an arm 30 arranged on the installation surface F, a base 35, and a stud gun support portion 37. As shown in FIG. The stud gun support portion 37 is provided at the tip of the arm 30 and supports the stud gun 2 .

制御装置4は、ロボット3と、ボルトフィーダ6と、電源装置7とを制御すると共に、ロボット3を介して、スタッドガン2の動作を制御する。制御装置4は、CPU40と各種プログラムを記憶する記憶部47とを備える。制御装置4は、ロボット3、ボルトフィーダ6、および、電源装置7と電気的に接続されている。制御装置4は、記憶部47に記憶された各種プログラムを展開することにより、取得部41と、判定部43と、動作制御部45として機能する。CPU40の少なくとも一部の機能は、ハードウェア回路によって実現されてもよい。 The control device 4 controls the robot 3 , the bolt feeder 6 and the power supply device 7 , and also controls the operation of the stud gun 2 via the robot 3 . The control device 4 includes a CPU 40 and a storage section 47 that stores various programs. The control device 4 is electrically connected with the robot 3 , the bolt feeder 6 and the power supply device 7 . The control device 4 functions as an acquisition unit 41 , a determination unit 43 , and an operation control unit 45 by developing various programs stored in the storage unit 47 . At least part of the functions of the CPU 40 may be realized by hardware circuits.

取得部41は、接近動作の開始時点から、スタッド材Bの先端Bbと母材Wの溶接面WSとが接触する接触時点までの所要時間T1を取得する。具体的には、取得部41は、図1に示すセンサ11からの検出信号を取得し、取得した検出信号を用いてスタッド材Bの先端Bbと母材Wの溶接面WSとが接触する接触時点を判定する。センサ11は、スタッド材Bの位置に関する情報を検出する。センサ11は、例えば、レーザ変位計などの変位センサであり、スタッド材Bの先端Bbの変位量を検出する。接近動作の開始時点における、スタッド材Bの先端Bbと、母材Wの溶接面WSとの距離は、予め定められていたり、予め測定されたりすることで、記憶部47に記憶されている。取得部41は、センサ11から取得したスタッド材Bの先端Bbの変位量が接近動作の開始時点における離間距離L(図3)と同じになるまでの所要時間T1を、制御装置4の図示しないタイマーで計測することで取得する。なお、センサ11は、変位センサに限定されるものではない。例えば、撮像装置がセンサ11として用いられてもよい。この場合、スタッド材Bおよび母材Wを一定時間ごとに撮像し、取得部41が検出信号としての撮像画像を用いて接触時点を判定することで、所要時間T1を取得してもよい。 The acquisition unit 41 acquires the required time T1 from the start of the approaching operation to the contact point at which the tip Bb of the stud material B and the welding surface WS of the base material W come into contact with each other. Specifically, the acquisition unit 41 acquires the detection signal from the sensor 11 shown in FIG. Determine time. A sensor 11 detects information about the position of the stud material B. FIG. The sensor 11 is, for example, a displacement sensor such as a laser displacement meter, and detects the amount of displacement of the tip Bb of the stud material B. As shown in FIG. The distance between the tip Bb of the stud material B and the welding surface WS of the base material W at the start of the approaching operation is determined in advance or measured in advance and stored in the storage unit 47 . The obtaining unit 41 obtains the required time T1 until the amount of displacement of the tip Bb of the stud material B obtained from the sensor 11 becomes the same as the distance L (FIG. 3) at the start of the approaching operation. Acquired by measuring with a timer. Note that the sensor 11 is not limited to a displacement sensor. For example, an imaging device may be used as the sensor 11 . In this case, the stud material B and the base material W may be imaged at regular time intervals, and the acquisition unit 41 may determine the contact point using the imaged image as the detection signal, thereby acquiring the required time T1.

判定部43は、取得部41によって取得された所要時間T1と、予め定められた基準時間TSと、の間に時間差T2が生じているか否かの判定を行う。具体的には、判定部43は、所要時間T1と基準時間TSとの差を算出し、差がゼロでない場合に時間差T2が生じていると判定する。なお、他の実施形態では、判定部43は、差が予め定められた閾値以上である場合に時間差T2が生じていると判定してもよい。 The determination unit 43 determines whether or not there is a time difference T2 between the required time T1 acquired by the acquisition unit 41 and the predetermined reference time TS. Specifically, the determination unit 43 calculates the difference between the required time T1 and the reference time TS, and determines that the time difference T2 occurs when the difference is not zero. Note that, in another embodiment, the determination unit 43 may determine that the time difference T2 has occurred when the difference is equal to or greater than a predetermined threshold.

動作制御部45は、スタッドガン2の接近動作と離間動作とを制御する。具体的には、動作制御部45は、後述する制御信号と、後述するガン信号と、を送信することで、電源装置7の動作を制御する。これにより、動作制御部45は、電源装置7からスタッドガン2に供給される電圧や電流を制御することでスタッドガン2の動作を制御する。また、動作制御部45は、判定部43において、時間差T2が生じていると判定された場合に、時間差T2を低減するために、後の溶接における接近動作の開始時点を調整することによって、所要時間T1を基準時間TSに近づける制御を実行する。具体的には、動作制御部45は、所要時間T1が基準時間TSよりも長い場合には、後の溶接において、接近動作の開始時点を時間差T2に応じて早く調整することで、所要時間T1を基準時間TSに近づける。また、動作制御部45は、所要時間T1が基準時間TSよりも短い場合には、後の溶接において、接近動作の開始時点を時間差T2に応じて遅く調整することで、所要時間T1を制御する。このように、時間差T2に応じて接近動作の開始時点が調整されることで、所要時間T1を基準時間TSに近づけることができる。 The motion control unit 45 controls the approaching motion and the separating motion of the stud gun 2 . Specifically, the operation control unit 45 controls the operation of the power supply device 7 by transmitting a control signal, which will be described later, and a gun signal, which will be described later. Thereby, the operation control section 45 controls the operation of the stud gun 2 by controlling the voltage and current supplied from the power supply 7 to the stud gun 2 . In addition, when the determination unit 43 determines that the time difference T2 has occurred, the operation control unit 45 adjusts the starting time point of the approach operation in the subsequent welding to reduce the time difference T2. Control is executed to bring the time T1 closer to the reference time TS. Specifically, when the required time T1 is longer than the reference time TS, the operation control unit 45 adjusts the starting point of the approaching operation earlier according to the time difference T2 in the subsequent welding, thereby reducing the required time T1. is brought close to the reference time TS. Further, when the required time T1 is shorter than the reference time TS, the operation control unit 45 controls the required time T1 by adjusting the starting point of the approaching operation later according to the time difference T2 in the subsequent welding. . In this way, by adjusting the start point of the approaching motion according to the time difference T2, the required time T1 can be brought closer to the reference time TS.

記憶部47は、RAMとROM等の記憶装置によって構成される。記憶部47は、アークスタッド溶接装置1の動作を制御するための各種プログラムやデータを記憶する。また、記憶部47には、例えば、母材Wの材料や形状、大きさ等の母材Wに係るデータや母材Wに対してスタッド材Bを溶接する際の溶接条件等のデータが記憶される。 The storage unit 47 is configured by storage devices such as RAM and ROM. The storage unit 47 stores various programs and data for controlling the operation of the arc stud welding device 1 . In addition, the storage unit 47 stores, for example, data related to the base material W such as the material, shape, and size of the base material W, and data such as welding conditions for welding the stud material B to the base material W. be done.

ボルトフィーダ6は、制御装置4の指示によりスタッド材Bをスタッドガン2に供給する。ボルトフィーダ6は、制御装置4を介してスタッドガン2と通信可能に接続されている。ボルトフィーダ6は、制御装置4からスタッド材Bを供給する指示を受け取った場合に、図示しない搬送経路によって、スタッド材Bをスタッドガン2に供給する。 The bolt feeder 6 feeds the stud material B to the stud gun 2 according to instructions from the control device 4 . The bolt feeder 6 is communicably connected to the stud gun 2 via the control device 4 . When the bolt feeder 6 receives an instruction to supply the stud material B from the control device 4, the bolt feeder 6 supplies the stud material B to the stud gun 2 via a transport path (not shown).

電源装置7は、溶接時の通電装置である。具体的には、電源装置7は、溶接電源としての機能と、ガンコイル電源としての機能と、を含む。溶接電源としての機能とは、溶接時に母材Wとスタッド材Bとの間にアークAを発生させるための溶接電圧をスタッドガン2に印加する動作である。ガンコイル電源としての機能とは、ガンコイル21にガンコイル電圧を印加する動作である。電源装置7は、溶接電圧の印加の有無や印加電圧を制御する制御信号と、ガンコイル電圧の印加の有無を制御するガン信号と、を制御装置4から受信する。この制御信号と、ガン信号と、の少なくとも一方の信号を受信した場合に、電源装置7は、制御装置4からの制御内容を示す信号に従って電圧を印加する。 The power supply device 7 is an energization device for welding. Specifically, the power supply device 7 includes a function as a welding power supply and a function as a gun coil power supply. The function as a welding power source is the operation of applying a welding voltage to the stud gun 2 for generating an arc A between the base material W and the stud material B during welding. The function as a gun coil power source is the operation of applying a gun coil voltage to the gun coil 21 . The power supply device 7 receives from the control device 4 a control signal for controlling whether or not the welding voltage is applied and the applied voltage, and a gun signal for controlling whether or not the gun coil voltage is applied. When receiving at least one of the control signal and the gun signal, the power supply device 7 applies a voltage according to the signal indicating the content of control from the control device 4 .

母材支持台9は、母材Wを支持する台である。図1に示す例では、母材支持台9の形状は、直方体である。母材支持台9は、ロボット3と同様に、水平な設置面Fに載置される。 The base material support base 9 is a base for supporting the base material W. As shown in FIG. In the example shown in FIG. 1, the shape of the base material support 9 is a rectangular parallelepiped. The base material support 9 is mounted on a horizontal installation surface F, like the robot 3 .

なお、アークスタッド溶接装置1の構成や機能等は、本開示に限られるものではない。アークスタッド溶接装置1において、制御装置4に対して電気的に接続されるスタッドガン2およびロボット3は複数であってもよい。例えば、アークスタッド溶接装置1は、1つの制御装置4に対して、複数のロボット3を備え、複数のロボット3のそれぞれにはスタッドガン2が装着されていてもよい。この場合、複数のロボット3および複数のスタッドガン2のそれぞれによって、複数の母材Wに対して同時に溶接を行えるように構成されてもよい。 In addition, the configuration, function, and the like of the arc stud welding device 1 are not limited to the present disclosure. A plurality of stud guns 2 and robots 3 may be electrically connected to the controller 4 in the arc stud welding device 1 . For example, the arc stud welding apparatus 1 may include a plurality of robots 3 for one control device 4, and the stud gun 2 may be attached to each of the plurality of robots 3. In this case, the plurality of robots 3 and the plurality of stud guns 2 may be configured to weld the plurality of base materials W at the same time.

図3は、本実施形態におけるアークスタッド溶接工程を説明するための図である。図4は、本実施形態における溶接時の通電の態様と、ガン位置の推移とを示した模式図である。図3では、アークスタッド溶接装置1を用いて、母材Wとスタッド材Bとを溶接させるアークスタッド溶接工程を工程(1)~工程(5)の5つの工程に分けて図示している。図3の各工程は、工程(1)、工程(2)、工程(3)、工程(4)、工程(5)の順に実行される。図4には、図3における工程(1)~(5)に対応する工程番号を付している。図4のグラフは、上から順に、溶接電流、溶接電圧、ガンコイル電圧、ガン位置の工程(1)~工程(5)における推移を表している。溶接電流は、溶接電圧の印加に応じてスタッドガン2に供給される電流である。図4において、溶接電流と、溶接電圧と、ガンコイル電圧と、の推移は、図3の工程(2)の開始時を基準(ゼロ)とした場合における値の変化を表している。また、図4におけるガン位置は、母材Wの溶接面WSとスタッド材Bの先端Bbとが接触した状態を基準(ゼロ)とした場合の鉛直方向におけるスタッド材Bの先端Bbの位置変化を表している。 FIG. 3 is a diagram for explaining the arc stud welding process in this embodiment. FIG. 4 is a schematic diagram showing the mode of energization during welding and the transition of the gun position in this embodiment. In FIG. 3, the arc stud welding process of welding the base material W and the stud material B using the arc stud welding apparatus 1 is divided into five processes (1) to (5). Each step in FIG. 3 is executed in order of step (1), step (2), step (3), step (4), and step (5). In FIG. 4, step numbers corresponding to steps (1) to (5) in FIG. 3 are given. The graphs in FIG. 4 show transitions of welding current, welding voltage, gun coil voltage, and gun position in steps (1) to (5) in order from the top. A welding current is a current supplied to the stud gun 2 in response to application of a welding voltage. In FIG. 4, transitions of the welding current, the welding voltage, and the gun coil voltage represent changes in values when the starting time of step (2) in FIG. 3 is taken as a reference (zero). Further, the gun position in FIG. 4 is the change in the position of the tip Bb of the stud B in the vertical direction when the state where the welding surface WS of the base material W and the tip Bb of the stud B are in contact with each other is set as a reference (zero). represent.

工程(1)は、溶接を開始する前の準備工程である。本実施形態では、溶接開始前において、スタッド材Bの先端Bbの位置は、母材押さえ29の接触面29aの位置よりも母材Wに近づく方向に突出している。工程(1)では、スタッド材Bの先端Bbおよび母材押さえ29の接触面29aと、母材Wの溶接面WSとは接触していない。また、工程(1)は溶接開始前であるため、溶接電圧およびガンコイル電圧は、スタッドガン2に対して印加されていない。そのため、図4に示すように、溶接電流、溶接電圧、および、ガンコイル電圧はゼロのまま一定の値を示している。また、ガン位置は、母材Wの溶接面WSにスタッド材Bの先端Bbが接触した状態を基準としているため、工程(1)については図示していない。 Step (1) is a preparatory step before starting welding. In this embodiment, the position of the tip Bb of the stud material B protrudes toward the base material W from the position of the contact surface 29a of the base material retainer 29 before welding is started. In step (1), the contact surface 29a of the tip Bb of the stud material B and the base material retainer 29 and the welding surface WS of the base material W are not in contact with each other. Moreover, since the process (1) is before the start of welding, the welding voltage and the gun coil voltage are not applied to the stud gun 2 . Therefore, as shown in FIG. 4, the welding current, the welding voltage, and the gun coil voltage show constant values at zero. Further, since the gun position is based on the state where the tip Bb of the stud material B is in contact with the welding surface WS of the base material W, step (1) is not illustrated.

図3に示すように、工程(2)は、スタッド材Bを把持したスタッドガン2を初期位置に移動させる工程である。工程(2)では、スタッドガン2の母材押さえ29の接触面29aを母材Wの溶接面WSに接触する状態にする。このとき、可動磁極部材24はチャック27を介してスタッド材Bと一体になっている。そのため、前述した工程(1)において、母材押さえ29の接触面29aに対して、スタッド材Bの先端Bbが突出していた分だけ、可動磁極部材24はスタッドガン2の一端2a側に移動した状態となる。付勢部材25は、工程(2)において、可動磁極部材24の移動に伴い、より圧縮された状態となっている。これにより、母材押さえ29の接触面29aが母材Wの溶接面WSに載置されることで、スタッド材Bの先端Bbと母材Wの溶接面WSとが接触した状態となる。以下において、この状態におけるスタッドガン2の先端Bbの位置を初期位置とする。よって、前述したガン位置は、初期位置を基準(ゼロ)とした場合の鉛直方向におけるスタッド材Bの高さ位置、すなわち、スタッド材Bの先端Bbと母材Wとの離間距離Lを表しているとも言える。 As shown in FIG. 3, step (2) is a step of moving the stud gun 2 holding the stud material B to the initial position. In step (2), the contact surface 29a of the base material retainer 29 of the stud gun 2 is brought into contact with the welding surface WS of the base material W. As shown in FIG. At this time, the movable magnetic pole member 24 is integrated with the stud material B via the chuck 27 . Therefore, in the above-described step (1), the movable magnetic pole member 24 moves toward the one end 2a of the stud gun 2 by the amount that the tip Bb of the stud material B protrudes from the contact surface 29a of the base material retainer 29. state. The biasing member 25 is in a more compressed state as the movable magnetic pole member 24 moves in step (2). As a result, the contact surface 29a of the base material retainer 29 is placed on the welding surface WS of the base material W, so that the tip Bb of the stud material B and the welding surface WS of the base material W come into contact with each other. Hereinafter, the position of the tip Bb of the stud gun 2 in this state is assumed to be the initial position. Therefore, the gun position described above represents the height position of the stud material B in the vertical direction when the initial position is taken as a reference (zero), that is, the separation distance L between the tip Bb of the stud material B and the base material W. It can be said that there are

工程(3)は、スタッドガン2に溶接電圧を印加して、母材Wの溶接面WSとスタッド材Bの先端Bbとの間に微弱なアークAを発生させる工程である。図4に示すように、工程(3)の開始時点では、スタッドガン2に対して、溶接電圧を印加することで、微弱な溶接電流が供給され始める。この微弱な溶接電流が継続的に供給されることで、母材Wの溶接面WSとスタッド材Bの先端Bbとの間にアークAが発生する。工程(3)で発生させるアークAは、工程(4)において発生させるアークAとしてのメインアークを誘発させるアークAであり、いわゆるパイロットアークである。このアークAの発生によって、母材Wの溶接面WSとスタッド材Bとの間には反発力が生じる。この反発力に起因して、スタッド材Bは、付勢部材25の付勢力に抗して母材Wの溶接面WSから離間する方向に浮き上がる。すなわち、工程(3)は、離間動作を実行する離間工程とも言える。 Step (3) is a step of applying a welding voltage to the stud gun 2 to generate a weak arc A between the welding surface WS of the base material W and the tip Bb of the stud material B. As shown in FIG. As shown in FIG. 4, at the start of step (3), a weak welding current begins to be supplied to the stud gun 2 by applying a welding voltage. An arc A is generated between the welding surface WS of the base material W and the tip Bb of the stud material B by continuously supplying this weak welding current. Arc A generated in step (3) is arc A that induces a main arc as arc A generated in step (4), and is a so-called pilot arc. Due to the generation of this arc A, a repulsive force is generated between the welding surface WS of the base material W and the stud material B. As shown in FIG. Due to this repulsive force, the stud material B rises in the direction away from the welding surface WS of the base material W against the biasing force of the biasing member 25 . That is, the step (3) can also be said to be a separating step of executing the separating operation.

ここで、スタッド材Bは、スタッドガン2の可動磁極部材24に装着されたチャック27によって把持されている。つまり、母材Wの溶接面WSに対する鉛直方向(進退方向)におけるスタッド材Bの位置は、図2に示した摺動領域Sにおける可動磁極部材24の摺動に追従して変化する。そのため、アークAの発生によって母材Wとスタッド材Bとの間に反発力が生じると、可動磁極部材24は、付勢部材25の付勢力に抗して、スタッドガン2の他端2b側から一端2a側に向けて移動する。図3の工程(3)では、離間動作によって、母材Wの溶接面WSとスタッド材Bの先端Bbとの間に生じた鉛直方向(進退方向)における距離を離間距離Lとして示している。離間距離Lと、可動磁極部材24のヘッド241が摺動領域Sの範囲内において、他端2b側から一端2a側に移動する距離とは一致する。 Here, the stud material B is gripped by a chuck 27 attached to the movable magnetic pole member 24 of the stud gun 2 . That is, the position of the stud member B in the vertical direction (advancing and retreating direction) with respect to the welding surface WS of the base material W changes following the sliding of the movable magnetic pole member 24 in the sliding region S shown in FIG. Therefore, when a repelling force is generated between the base material W and the stud material B due to the generation of the arc A, the movable magnetic pole member 24 resists the biasing force of the biasing member 25 and moves toward the other end 2b of the stud gun 2. , toward the one end 2a side. In step (3) of FIG. 3, the separation distance L is the distance in the vertical direction (advance/retreat direction) between the welding surface WS of the base material W and the tip Bb of the stud member B due to the separation operation. The separation distance L matches the distance that the head 241 of the movable magnetic pole member 24 moves from the other end 2b side to the one end 2a side within the range of the sliding region S.

図4に示すように、工程(4)は、スタッドガン2に印加する溶接電圧を工程(3)よりも増大させて、工程(3)よりも広範囲にアークAを発生させると共に、ガンコイル電圧を印加することで、スタッド材Bと母材Wの溶接面WSとが離間した状態を維持する工程である。これにより、スタッドガン2から放電されるアークAは、図3の工程(4)に示すように、スタッドガン2の他端2b側から母材Wの溶接面WSに向かって広がり、工程(3)におけるアークA(パイロットアーク)よりも広範囲に放電される。工程(4)で発生させるアークAは、母材Wの溶接面WSに対して熱量を加えることで、母材Wを溶融させて溶融池を生成するための、いわゆるメインアークである。図4では、工程(4)におけるアークA(メインアーク)が母材Wに加える熱量を入熱量として示している。 As shown in FIG. 4, in step (4), the welding voltage applied to the stud gun 2 is increased more than in step (3), arc A is generated in a wider range than in step (3), and the gun coil voltage is increased. This is a step in which the stud member B and the welding surface WS of the base member W are kept apart from each other by applying the voltage. As a result, the arc A discharged from the stud gun 2 spreads from the other end 2b side of the stud gun 2 toward the welding surface WS of the base material W, as shown in step (4) in FIG. ) in a wider range than arc A (pilot arc). The arc A generated in step (4) is a so-called main arc for melting the base material W by applying heat to the welding surface WS of the base material W to form a molten pool. In FIG. 4, the amount of heat applied to the base material W by the arc A (main arc) in step (4) is shown as the amount of heat input.

図4に示すように、工程(4)の開始時には、スタッドガン2のガンコイル21にガンコイル電圧が印加される。工程(4)の期間では、通電状態は維持される。ガンコイル21は、前述した通り、通電状態の場合に励磁されて磁界を発生させる。ガンコイル21の周囲に形成されている固定磁極部材22(図2)は、励磁されたガンコイル21によって磁化されて、電磁吸引力を生じる。可動磁極部材24は、磁化された固定磁極部材22の磁力によって、付勢部材25の付勢力に抗して固定磁極部材22が位置するスタッドガン2の一端2a側に電磁的に吸引される。このように、通電状態のときに電磁石として機能する固定磁極部材22を利用して、可動磁極部材24を摺動領域Sの範囲内においてスタッドガン2の一端2a側に吸引させることで、母材Wの溶接面WSに対するスタッド材Bの位置を維持する。 As shown in FIG. 4, a gun coil voltage is applied to the gun coil 21 of the stud gun 2 at the start of step (4). During the period of step (4), the energized state is maintained. As described above, the gun coil 21 is excited to generate a magnetic field when energized. A fixed magnetic pole member 22 (FIG. 2) formed around the gun coil 21 is magnetized by the excited gun coil 21 to produce an electromagnetic attractive force. The movable magnetic pole member 24 is electromagnetically attracted to the one end 2a side of the stud gun 2 where the fixed magnetic pole member 22 is located against the biasing force of the biasing member 25 by the magnetic force of the magnetized fixed magnetic pole member 22 . In this way, by using the fixed magnetic pole member 22 that functions as an electromagnet when energized, the movable magnetic pole member 24 is attracted toward the one end 2a of the stud gun 2 within the range of the sliding area S, thereby removing the base material. Maintain the position of the stud material B with respect to the weld surface WS of W.

工程(4)では、ガンコイル21は、図4に示すように、通電状態で維持される。そのため、図4のガン位置のグラフに示すように、スタッド材Bと母材Wの溶接面WSとの離間距離Lは一定に保たれる。以上より、図4に示すように、工程(3)の途中でガン位置は一定となる。 In step (4), the gun coil 21 is maintained in an energized state, as shown in FIG. Therefore, as shown in the gun position graph of FIG. 4, the separation distance L between the stud material B and the welding surface WS of the base material W is kept constant. From the above, as shown in FIG. 4, the gun position becomes constant during the process (3).

実溶接工程である工程(5)は、母材Wの溶接面WSに対してスタッド材Bを接近させる接近動作を行う工程と、接近動作後の溶接動作とを行う工程と、を備える。工程(5)では、動作制御部45による接近動作の実行により、アークAによって母材Wの溶接面WSに形成された溶融池に対して、スタッド材Bを押し付けて、スタッド材Bを母材Wに溶接する。工程(5)では、図4に示すように、動作制御部45は、ガンコイル21へのガンコイル電圧の印加を停止することで接近動作を実行する。具体的には、工程(5)の開始時に、動作制御部45は、電源装置7へのガン信号の供給を停止する。このガン信号の供給停止により、ガンコイル電圧の印加が停止される。これにより、ガンコイル21は、通電状態から非通電状態に切り替わる。非通電状態では、励磁されていたガンコイル21は消磁される。そのため、通電状態において電磁石として機能していた固定磁極部材22は、ガンコイル21が消磁されることで、電磁吸引力を失う。これにより、可動磁極部材24は、付勢部材25の付勢力によって、一端2a側から他端2b側に向けて移動する。その結果、スタッド材Bが、付勢部材25の付勢力によって母材Wの溶接面WSに押し付けられる。溶接動作は、スタッド材Bが母材Wの溶接面WSに押し付けられた状態を、溶融池が冷却されて固化されるまで保持する動作である。これにより、溶融池が固化することで、スタッド材Bと母材Wとが接合される。以上のように、動作制御部45は、溶接電圧およびガンコイル電圧のスタッドガン2への印加を停止して接近動作を終了した後に、予め定めた時間だけ、付勢部材25の付勢力によって母材Wの溶接面WSに押し付けられた状態を維持する。図3の工程(5)では、母材Wとスタッド材Bとが溶接された部分を溶接点100として図示している。 The step (5), which is the actual welding step, includes a step of performing an approaching operation to bring the stud material B closer to the welding surface WS of the base material W, and a step of performing a welding operation after the approaching operation. In step (5), the operation control unit 45 executes the approaching operation to press the stud material B against the molten pool formed on the welding surface WS of the base material W by the arc A, thereby making the stud material B close to the base material. Weld to W. In step (5), as shown in FIG. 4, the motion control unit 45 stops applying the gun coil voltage to the gun coil 21 to perform the approach motion. Specifically, at the start of step (5), the operation control unit 45 stops supplying the gun signal to the power supply device 7 . By stopping the supply of the gun signal, the application of the gun coil voltage is stopped. As a result, the gun coil 21 is switched from the energized state to the non-energized state. In the non-energized state, the gun coil 21 that has been energized is demagnetized. Therefore, the fixed magnetic pole member 22 functioning as an electromagnet in the energized state loses the electromagnetic attractive force as the gun coil 21 is demagnetized. As a result, the movable magnetic pole member 24 moves from the one end 2a side toward the other end 2b side due to the biasing force of the biasing member 25 . As a result, the stud material B is pressed against the welding surface WS of the base material W by the biasing force of the biasing member 25 . The welding operation is to keep the stud material B pressed against the welding surface WS of the base material W until the molten pool is cooled and solidified. Thereby, the stud material B and the base material W are joined by solidifying the molten pool. As described above, after stopping the application of the welding voltage and the gun coil voltage to the stud gun 2 and ending the approaching operation, the operation control unit 45 causes the base material to be compressed by the biasing force of the biasing member 25 for a predetermined period of time. It remains pressed against the welding surface WS of W. In step (5) of FIG. 3, the portion where the base material W and the stud material B are welded is shown as a welding point 100. As shown in FIG.

ここで、図4に示すように、接近動作によってスタッド材Bの先端Bbが母材Wの溶接面WSに接触するまでの間、すなわちガン位置がゼロになるまでの間において、溶接電圧は、継続的にスタッドガン2に印加される。つまり、アークA(メインアーク)は、接近動作の開始後も継続的に放電されて、母材Wを溶融し続ける。ガン位置がゼロとなった時点で、溶接電圧の印加が停止された後、溶接電流は徐々に低下してゼロとなる。 Here, as shown in FIG. 4, until the tip Bb of the stud material B comes into contact with the welding surface WS of the base material W by the approaching operation, that is, until the gun position becomes zero, the welding voltage is Continuously applied to stud gun 2 . In other words, the arc A (main arc) is continuously discharged and continues to melt the base material W even after the approaching operation is started. When the gun position becomes zero, the application of the welding voltage is stopped, and the welding current gradually decreases to zero.

本実施形態において、溶接時間Tは、離間動作の開始から接近動作の終了までに要する時間とする。すなわち、溶接時間Tは、図4において、溶接電圧の印加を開始する時点(工程(3)の開始時点)から、母材Wとスタッド材Bとが接触する接触時点(ガン位置がゼロとなる時点)までの時間を指す。 In this embodiment, the welding time T is the time required from the start of the separation operation to the end of the approach operation. That is, in FIG. 4, the welding time T ranges from the time when the application of the welding voltage is started (the time when step (3) starts) to the time when the base material W and the stud material B come into contact (the gun position becomes zero). point in time).

以上において説明したアークスタッド溶接において、本願発明者らは、アークAを発生させて溶接を開始してから母材Wとスタッド材Bとの離間距離Lがゼロになるまでの溶接時間Tにばらつきが生じることを見出した。図5は、スタッドガン2の個体差と使用期間の経過に伴う溶接時間Tのばらつきを示すグラフである。図5では、スタッドガン2の個体差を示すため、スタッドガンXとスタッドガンYとの2個体を用いて、それぞれを継続的に使用した場合の溶接時間Tに係るデータを示している。図5の横軸は、スタッドガンXおよびスタッドガンYの使用期間を示している。図5では、使用期間の単位は、1ヵ月とする。また、図5の縦軸は、溶接時間Tを示している。図5では、溶接時間Tの単位は、ミリ秒(ms)で表す。本測定では、予め定められた溶接時間Tの推奨時間は、41.0ミリ秒である。また、本測定では、推奨時間に対する差が2.0ミリ秒以内の場合を良品条件としている。図5では、推奨時間である41.0ミリ秒に対する時間の差が2.0ミリ秒以内となる、39.0ミリ秒から43.0ミリ秒までの範囲を良品条件として、ハッチングを付して示している。 In the arc stud welding described above, the inventors of the present application have found that the welding time T from the start of welding by generating the arc A until the distance L between the base material W and the stud material B becomes zero varies in the welding time T. was found to occur. FIG. 5 is a graph showing individual differences of the stud guns 2 and variations in the welding time T over time. In order to show individual differences in the stud guns 2, FIG. 5 shows data relating to the welding time T when two individual stud guns, the stud gun X and the stud gun Y, are used continuously. The horizontal axis of FIG. 5 indicates the usage period of the stud gun X and the stud gun Y. In FIG. In FIG. 5, the unit of usage period is one month. Moreover, the vertical axis of FIG. 5 indicates the welding time T. As shown in FIG. In FIG. 5, the unit of welding time T is expressed in milliseconds (ms). In this measurement, the recommended predetermined welding time T is 41.0 milliseconds. Also, in this measurement, the condition for a good product is that the difference from the recommended time is within 2.0 milliseconds. In FIG. 5, the range from 39.0 milliseconds to 43.0 milliseconds, in which the time difference from the recommended time of 41.0 milliseconds is within 2.0 milliseconds, is hatched. is shown.

溶接時間Tのデータとして、図5には、平均、および、ばらつき値を示している。図5における平均は、1日に複数回の溶接を行った場合の各溶接時間Tを平均した値である。図5におけるばらつき値は、各平均に対する標準偏差である。図5では、各平均に対するばらつきをばらつき値として4σの範囲内で算出している。図5に係る測定では、使用開始から5ヵ月が経過するまでの間において、任意のタイミングでスタッドガンXとスタッドガンYとの少なくとも一方の溶接時間Tを計測し、平均およびばらつき値を算出している。 As the data of the welding time T, FIG. 5 shows average and variation values. The average in FIG. 5 is a value obtained by averaging each welding time T when welding is performed multiple times in one day. The scatter values in FIG. 5 are the standard deviations for each mean. In FIG. 5, the variation for each average is calculated within the range of 4σ as a variation value. In the measurement according to FIG. 5, the welding time T of at least one of the stud gun X and the stud gun Y was measured at an arbitrary timing during five months from the start of use, and the average and variation values were calculated. ing.

本測定では、溶接時間Tの傾向として少なくとも3つのパターンが見出された。1つ目のパターンは、例えば、溶接時間Tの平均が良品条件の範囲外となる場合である。1つ目のパターンは、スタッドガンYを用いた測定において使用期間が3ヵ月~5ヵ月となる部分に顕著に現れている。2つ目のパターンは、例えば、溶接時間Tの平均は良品条件の範囲内であるが、その平均に対するばらつき値が良品条件の範囲外となる場合である。2つ目のパターンは、スタッドガンYを用いた測定において使用期間が0ヵ月~1ヵ月となる部分に顕著に現れている。3つ目のパターンは、例えば、スタッドガン2の個体差に起因して溶接時間Tに差が生じる場合である。具体的には、スタッドガンXとスタッドガンYとを比較すると、平均およびばらつき値の程度が両者の間で異なる。 In this measurement, at least three patterns were found as tendencies of the welding time T. The first pattern is, for example, the case where the average welding time T is outside the range of acceptable product conditions. The first pattern appears conspicuously in the measurement using the stud gun Y, where the period of use is 3 to 5 months. The second pattern is, for example, a case where the average welding time T is within the acceptable product condition, but the variation value for the average is outside the acceptable product condition range. The second pattern is conspicuous in the portion where the usage period is 0 to 1 month in the measurement using the stud gun Y. A third pattern is, for example, a case where the welding time T varies due to individual differences in the stud guns 2 . Specifically, when stud gun X and stud gun Y are compared, the degree of average and variation values differ between the two.

本測定において見出された溶接時間Tのばらつきの要因として、2つの要因が考えられる。1つ目の要因としては、スタッドガン2の摺動領域Sにおける摺動抵抗の変化である。アークスタッド溶接装置1は、前述した通り、摺動領域Sの範囲内における可動磁極部材24の摺動により、接近動作と離間動作とを実行している。この可動磁極部材24と、シリンダ23の内面を形成する摺動面との間において、摺動時の摺動抵抗が経時的に変化する場合が生じ得る。摺動抵抗は、一般に、使用期間が経過するに従って増大することが多い。 Two factors are conceivable as factors for the variations in the welding time T found in this measurement. The first factor is a change in sliding resistance in the sliding region S of the stud gun 2 . The arc stud welding apparatus 1 performs the approaching operation and the separating operation by sliding the movable magnetic pole member 24 within the range of the sliding region S, as described above. Between the movable magnetic pole member 24 and the sliding surface forming the inner surface of the cylinder 23, the sliding resistance during sliding may change over time. Sliding resistance generally increases in many cases as the period of use elapses.

2つ目の要因としては、母材押さえ29の消耗による離間距離Lの変化である。母材押さえ29の接触面29aは、溶接時に母材Wの溶接面WSと接触している。すなわち、アークAの発生によって母材Wの溶接面WSに対して熱量を加えているとき、母材押さえ29は、アークAの発生箇所の近くに位置する。そのため、母材押さえ29の接触面29a側は、使用期間の経過に伴って劣化しやすい。さらに、母材押さえ29は、溶接のたびに母材Wと接触させてスタッドガン2を支持するため、負荷がかかりやすい。これらを含む種々の要因によって、母材押さえ29は、使用期間の経過に伴い、接触面29a側から徐々に消耗していく。つまり、母材押さえ29の長さは、使用期間の経過に伴い、短くなっていく。母材押さえ29の長さが短くなっていくことで、同一条件において溶接を行ったとしても、母材押さえ29が消耗した分だけ離間距離Lが短くなる。その結果、母材押さえ29が消耗する前と比べて、母材押さえ29が消耗した後では、スタッド材Bの先端Bb側と母材Wの溶接面WSとの離間距離Lが短くなっている。離間距離Lが短くなるほど、接近動作においてスタッド材Bを接近させるために要する時間は短くなる。 The second factor is a change in the separation distance L due to wear of the base material retainer 29 . A contact surface 29a of the base material retainer 29 is in contact with the welding surface WS of the base material W during welding. That is, when heat is applied to the welding surface WS of the base metal W by the generation of the arc A, the base metal retainer 29 is positioned near the arc A generation location. Therefore, the contact surface 29a side of the base material retainer 29 tends to deteriorate with the passage of the period of use. Furthermore, since the base material retainer 29 is brought into contact with the base material W each time welding is performed to support the stud gun 2, a load is likely to be applied thereto. Due to various factors including these, the base material retainer 29 is gradually worn away from the contact surface 29a side as the usage period elapses. That is, the length of the base material retainer 29 becomes shorter as the period of use elapses. As the length of the base material retainer 29 is shortened, even if welding is performed under the same conditions, the separation distance L is shortened by the amount of wear of the base material retainer 29 . As a result, the separation distance L between the front end Bb side of the stud material B and the welding surface WS of the base material W is shorter after the base material retainer 29 is worn than before the base material retainer 29 is worn. . The shorter the separation distance L, the shorter the time required for the stud material B to approach in the approaching operation.

溶接時間Tの変動は、溶接品質に影響を及ぼす要因の1つである。具体的には、溶接時間Tのうち、所要時間T1が変動した場合、所要時間T1の変動に応じて母材Wに与える熱量に差が生じる。これにより、溶接品質が一定とならず、安定的な品質を確保できない場合が生じ得る。そのため、アークスタッド溶接を行う場合においても、溶接時間Tの変動を抑制することが望ましい。そこで、本実施形態では、制御装置4は、所要時間T1の変動を抑制するための制御を実行する。以下において、本実施形態における所要時間T1の制御方法について説明する。 Variation in welding time T is one of the factors affecting welding quality. Specifically, when the required time T1 of the welding time T fluctuates, the amount of heat given to the base material W varies according to the fluctuation of the required time T1. As a result, the welding quality may not be constant, and a stable quality may not be ensured. Therefore, it is desirable to suppress fluctuations in the welding time T even when arc stud welding is performed. Therefore, in the present embodiment, the control device 4 performs control for suppressing fluctuations in the required time T1. A method of controlling the required time T1 in this embodiment will be described below.

アークスタッド溶接装置1は、取得部41と、判定部43と、動作制御部45とによって、接近動作の開始時点を調整することで、所要時間T1を制御する。まず、取得部41は所要時間T1を取得する。次に、取得部41によって取得された所要時間T1と基準時間TSとの間に時間差T2が生じているか否かを判定部43が判定する。判定部43によって時間差T2が生じていると判定された場合、時間差T2を低減するために、動作制御部45は、後の溶接における接近動作の開始時点を調整する。これにより、所要時間T1が基準時間TSに近づく。 The arc stud welding device 1 controls the required time T<b>1 by adjusting the starting point of the approaching motion using the acquisition unit 41 , the determination unit 43 , and the motion control unit 45 . First, the acquisition unit 41 acquires the required time T1. Next, the determination unit 43 determines whether or not there is a time difference T2 between the required time T1 acquired by the acquisition unit 41 and the reference time TS. When the determination unit 43 determines that the time difference T2 has occurred, the operation control unit 45 adjusts the start point of the approach operation in subsequent welding in order to reduce the time difference T2. As a result, the required time T1 approaches the reference time TS.

実際の溶接においては、スタッドガン2の摺動抵抗の変化や母材押さえ29の消耗は時間の経過に伴って生じ得る。つまり、溶接において、所要時間T1が基準時間TSよりも短くなる要因と、長くなる要因とは併存する。また、制御装置4に対して、複数のロボット3およびスタッドガン2を接続して、複数の母材Wに対して同時に溶接を行う場合、スタッドガン2の個体差によっても溶接時間Tにばらつきが生じる。そこで、本実施形態では、理解の容易のために、所要時間T1が基準時間TSよりも短くなる要因と、所要時間T1が基準時間TSよりも長くなる要因と、のうち、いずれか一方の要因が優位になる場合について説明する。 In actual welding, changes in the sliding resistance of the stud gun 2 and wear of the base metal retainer 29 may occur over time. That is, in welding, there are factors that make the required time T1 shorter than the reference time TS and factors that make it longer. Further, when a plurality of robots 3 and stud guns 2 are connected to the control device 4 to simultaneously weld a plurality of base materials W, the welding time T varies due to individual differences in the stud guns 2. occur. Therefore, in the present embodiment, for ease of understanding, either the factor that makes the required time T1 shorter than the reference time TS or the factor that makes the required time T1 longer than the reference time TS is dominant.

図6は、本実施形態における所要時間T1の制御方法を説明するための概念図である。図6には、図3および図4における工程(2)~工程(5)に対応する工程番号を付している。図6では、溶接時間Tの開始時点から終了時点までのガンコイル電圧の推移と所要時間T1とを、設定状態、過去ルーチン、本ルーチンの3つのパターンでそれぞれ図示している。図6の縦軸は、ガンコイル電圧の変動を示す。図6では、工程(3)の開始前におけるガンコイル電圧を基準(ゼロ)とした場合の値の変化を表している。図6の横軸は、溶接時間Tの経過を表している。図6では、溶接時間Tの経過の単位をミリ秒(ms)としている。 FIG. 6 is a conceptual diagram for explaining a method of controlling the required time T1 in this embodiment. In FIG. 6, step numbers corresponding to steps (2) to (5) in FIGS. 3 and 4 are given. FIG. 6 shows the transition of the gun coil voltage from the start point to the end point of the welding time T and the required time T1 in three patterns of setting state, past routine, and present routine, respectively. The vertical axis of FIG. 6 indicates the variation of the gun coil voltage. FIG. 6 shows changes in values when the gun coil voltage before the start of step (3) is taken as a reference (zero). The horizontal axis of FIG. 6 represents the progress of the welding time T. As shown in FIG. In FIG. 6, the unit of elapsed welding time T is milliseconds (ms).

図6における設定状態は、本実施形態の制御方法において基準となる状態である。設定状態のグラフは、所要時間T1が基準時間TSと一致する場合を指す。すなわち、基準時間TSは、所要時間T1の推奨値として予め定められた時間である。図6では、基準時間TSをNミリ秒としている。 The setting state in FIG. 6 is a reference state in the control method of this embodiment. The setting state graph indicates the case where the required time T1 matches the reference time TS. That is, the reference time TS is a time predetermined as a recommended value of the required time T1. In FIG. 6, the reference time TS is N milliseconds.

図6における過去ルーチンは、制御対象となる溶接が実行される前のルーチンにおいて実行された溶接時のデータである。過去ルーチンにおける所要時間T1に係るデータは、判定部43によって時間差T2を算出するときの所要時間T1として用いられる。過去ルーチンでは、所要時間T1が基準時間TSとしてのNミリ秒よりも1ミリ秒だけ長い場合を図示している。すなわち、過去ルーチンにおける所要時間T1はN+1ミリ秒である。過去ルーチンのグラフでは、基準時間TSと所要時間T1と時間差T2とをそれぞれ図示している。 The past routine in FIG. 6 is data during welding performed in the routine before the welding to be controlled is performed. Data related to the required time T1 in the past routine is used as the required time T1 when the determination unit 43 calculates the time difference T2. The past routine shows a case where the required time T1 is longer than N milliseconds as the reference time TS by 1 millisecond. That is, the required time T1 in the past routine is N+1 milliseconds. The graph of the past routine shows the reference time TS, the required time T1, and the time difference T2.

図6における本ルーチンは、過去ルーチンの所要時間T1を用いて、動作制御部45によって接近動作の開始時点が調整された場合の所要時間T1を示している。図6では、過去ルーチンにおける所要時間T1が基準時間TSよりも1ミリ秒だけ長くなっている。この1ミリ秒という時間差T2を基準時間TSに近づけるため、図6では、動作制御部45は、接近動作の開始時点を時間差T2に相当する1ミリ秒だけ早く調整している。つまり、動作制御部45は、過去ルーチンの所要時間T1を参照して、制御対象となる後の溶接における接近動作の開始時点に過去ルーチンから算出した時間差T2を反映させる。この制御により、図6において、後の溶接における接近動作は、時間差T2に相当する1ミリ秒だけ早く開始される。そのため、所要時間T1を基準時間TSに近づけることができ、所要時間T1の変動が抑制される。 This routine in FIG. 6 shows the required time T1 when the operation control unit 45 adjusts the start point of the approach operation using the required time T1 of the past routine. In FIG. 6, the required time T1 in the past routine is longer than the reference time TS by 1 millisecond. In order to bring this time difference T2 of 1 millisecond closer to the reference time TS, in FIG. 6, the motion control unit 45 adjusts the start point of the approaching motion earlier by 1 millisecond corresponding to the time difference T2. In other words, the operation control unit 45 refers to the required time T1 of the past routine, and reflects the time difference T2 calculated from the past routine to the start point of the approach operation in the subsequent welding to be controlled. With this control, in FIG. 6, the approaching operation in the subsequent welding is started earlier by 1 millisecond corresponding to the time difference T2. Therefore, the required time T1 can be brought closer to the reference time TS, and fluctuations in the required time T1 are suppressed.

このとき、過去ルーチンの所要時間T1に係るデータが複数存在する場合には、判定部43は、複数のデータのうち、任意のデータを選択して時間差T2を算出するように設定されてもよい。判定部43は、例えば、過去ルーチンの所要時間T1に係るデータのうちで複数のデータを平均した平均時間を所要時間T1として用いて、時間差T2を算出してもよい。ここで言う平均時間を用いて算出した時間差T2は、例えば、後述する第1平均時間差D1や第2平均時間差D2、第3平均時間差D3に相当する。また、判定部43は、任意の1つのデータを選択して時間差T2を算出するように設定されてもよい。つまり、本ルーチンにおいて参照される過去ルーチンは、単数のデータであっても複数のデータであってもよい。さらに、過去ルーチンとして選択するデータは、動作制御部45によって接近動作の開始時点が調整されていない非補正状態と、動作制御部45によって接近動作の開始時点が調整されている制御状態と、のいずれの状態に係るデータであってもよい。 At this time, if a plurality of data relating to the required time T1 of the past routine exist, the determination unit 43 may be set to select arbitrary data from among the plurality of data and calculate the time difference T2. . For example, the determination unit 43 may calculate the time difference T2 by using an average time obtained by averaging a plurality of data among the data related to the required time T1 of the past routine as the required time T1. The time difference T2 calculated using the average time referred to here corresponds to, for example, a first average time difference D1, a second average time difference D2, and a third average time difference D3, which will be described later. Further, the determination unit 43 may be set to select any one data and calculate the time difference T2. That is, the past routine referred to in this routine may be a single piece of data or a plurality of pieces of data. Furthermore, the data selected as the past routine includes a non-corrected state in which the approaching motion start time is not adjusted by the motion control section 45, and a control state in which the approaching motion start time is adjusted by the motion control section 45. Data relating to any state may be used.

なお、本実施形態において、接近動作は、前述した通り、ガンコイル電圧の印加を停止するためにガン信号の供給を停止した時点(図6の「ガン信号OFF」)から開始される。よって、本実施形態では、動作制御部45は、ガン信号のONとOFFとの切り替えによって、接近動作の開始時点を調整している。なお、接近動作の開始時点を調整する方法は、これに限られるものではない。 In the present embodiment, as described above, the approach operation is started at the time when the supply of the gun signal is stopped to stop the application of the gun coil voltage ("GUN SIGNAL OFF" in FIG. 6). Therefore, in the present embodiment, the motion control unit 45 adjusts the start point of the approach motion by switching the gun signal between ON and OFF. Note that the method of adjusting the start point of the approach motion is not limited to this.

以下において、複数の溶接点100に対してスタッド材Bを溶接する場合を例に挙げて、本実施形態の具体的な制御方法を説明する。図7は、所要時間T1が基準時間TSよりも長い場合の制御方法を説明するためのグラフである。また、図8は、所要時間T1が基準時間TSよりも短い場合の制御方法を説明するためのグラフである。図7および図8の横軸は、複数の溶接点100に対して行われる溶接のうち、いずれの溶接点100における溶接であるかを示している。図7および図8では、10つの溶接点100に対して溶接が行われる場合を示している。図7および図8の縦軸は、1点目から10点目の溶接点100まで順に実行される各溶接点100の所要時間T1を示している。図7および図8では、所要時間T1の単位をミリ秒(ms)としている。なお、図7および図8では、基準時間TSは38.0ミリ秒としている。 A specific control method of the present embodiment will be described below, taking as an example the case where the stud member B is welded to a plurality of welding points 100 . FIG. 7 is a graph for explaining the control method when the required time T1 is longer than the reference time TS. Also, FIG. 8 is a graph for explaining the control method when the required time T1 is shorter than the reference time TS. The horizontal axis in FIGS. 7 and 8 indicates which welding point 100 is welded among the plurality of welding points 100 . FIGS. 7 and 8 show the case where ten welding points 100 are welded. The vertical axis in FIGS. 7 and 8 indicates the required time T1 for each welding point 100 that is sequentially executed from the first point to the tenth welding point 100 . 7 and 8, the unit of the required time T1 is milliseconds (ms). 7 and 8, the reference time TS is 38.0 milliseconds.

本実施形態では、複数の溶接点100は、同一の母材Wのうちで異なる位置に存在する。複数の溶接点100は、N以上(Nは2以上の整数)である。複数の溶接点100への溶接は、1点目からN点目(本実施形態では10点目)まで順に実行される。 In this embodiment, the plurality of welding points 100 exist at different positions in the same base material W. As shown in FIG. The number of welding points 100 is N or more (N is an integer of 2 or more). Welding to the plurality of welding points 100 is sequentially performed from the first point to the Nth point (the tenth point in this embodiment).

判定部43は、制御の対象となる溶接が実行される前の時点において実行された複数の溶接点100ごとの所要時間T1(過去ルーチン)を用いて、溶接点100ごとに時間差T2が生じているか否かの判定を行う。動作制御部45は、時間差T2が生じていると判定された場合、複数の溶接点100ごとに、接近動作の開始時点を調整することで、所要時間T1を基準時間TSに近づける制御を実行する。本実施形態では、6点目から10点目の溶接点100を制御の対象とする。 The determination unit 43 uses the required time T1 (past routine) for each of the plurality of welding points 100 performed before the welding to be controlled is performed, and determines whether the time difference T2 has occurred for each welding point 100. determine whether or not there is When it is determined that the time difference T2 has occurred, the operation control unit 45 adjusts the starting point of the approach operation for each of the plurality of welding points 100, thereby executing control to bring the required time T1 closer to the reference time TS. . In this embodiment, the sixth to tenth welding points 100 are to be controlled.

判定部43は、動作制御部45による接近動作の開始時点の調整に際して、本ルーチンよりも前に溶接が実行された複数の溶接点100ごとに取得された所要時間T1の平均時間を所要時間T1として用いる。つまり、平均時間は、1点目からN点目(Nは2以上の整数)の溶接点100まで順に溶接が行われる場合に、1点前からM点前(MはNよりも小さい整数)の溶接点100までのそれぞれの所要時間T1を平均した時間である。この平均時間は、前述した過去ルーチンに相当する。図7および図8に示す例では、1点目から10点目の溶接点100まで順に溶接が行われる場合において、1点前から5点前の溶接点100までのそれぞれの所要時間T1を平均した時間を平均時間として用いる。図7および図8では、動作制御部45によって、接近動作の開始時点が調整された場合の各溶接点における所要時間T1の推移を本ルーチンとして二点鎖線で図示している。 When the operation control unit 45 adjusts the start point of the approach operation, the determination unit 43 determines the average time of the required time T1 acquired for each of the plurality of welding points 100 where welding was performed prior to this routine. used as That is, the average time is from 1 point to M points (M is an integer smaller than N) when welding is performed in order from the 1st point to the Nth point (N is an integer equal to or greater than 2) to the welding point 100. is the time obtained by averaging the respective required times T1 to the welding point 100. This average time corresponds to the past routine described above. In the example shown in FIGS. 7 and 8, when welding is performed in order from the first point to the tenth welding point 100, the required time T1 for each welding point 100 from one point to five points before is averaged. The time taken is used as the average time. In FIGS. 7 and 8, transition of the required time T1 at each welding point when the start point of the approach operation is adjusted by the operation control unit 45 is illustrated by a two-dot chain line as this routine.

本実施形態では、取得部41は、所要時間T1を複数の溶接点100ごとに取得する。判定部43は、平均時間と予め定められた基準時間TSとの時間の差として平均時間差D1,D2を算出する。さらに、判定部43は、平均時間差D1,D2を用いて時間差T2が生じているか否かを判定する。動作制御部45は、制御の対象となる後の溶接点100における接近動作の開始時点を平均時間差D1,D2を用いて早くしたり遅くしたりすることで調整する。具体的には、動作制御部45は、所要時間T1が基準時間TSよりも長い場合には、後の溶接において、接近動作の開始時点を後述する第1平均時間差D1に応じて早く調整する。また、動作制御部45は、所要時間T1が基準時間TSよりも短い場合には、接近動作の開始時点を後述する第2平均時間差D2に応じて遅く調整する。よって、本実施形態における所要時間T1を基準時間TSに近づけるための制御は、平均時間差D1、D2を後の溶接点100における溶接時にフィードバックすることで、所要時間T1を基準時間TSに近づける補正制御である。 In this embodiment, the obtaining unit 41 obtains the required time T1 for each of the plurality of welding points 100. FIG. The determination unit 43 calculates average time differences D1 and D2 as differences between the average time and a predetermined reference time TS. Furthermore, the determination unit 43 determines whether or not the time difference T2 occurs using the average time differences D1 and D2. The motion control unit 45 adjusts the start point of the approach motion at the subsequent welding point 100 to be controlled by using the average time differences D1 and D2 to advance or delay it. Specifically, when the required time T1 is longer than the reference time TS, the operation control unit 45 adjusts the starting point of the approaching operation earlier in the subsequent welding according to a first average time difference D1, which will be described later. Further, when the required time T1 is shorter than the reference time TS, the motion control unit 45 adjusts the start point of the approaching motion later according to a second average time difference D2 described later. Therefore, the control for bringing the required time T1 closer to the reference time TS in the present embodiment is correction control for bringing the required time T1 closer to the reference time TS by feeding back the average time differences D1 and D2 during welding at the welding point 100 later. is.

まず、図7を参照しながら、所要時間T1が基準時間TSよりも長い場合の制御方法を説明する。図7では、補正制御を行っていない場合における所要時間T1の推移を、非補正状態として点線で示している。図7における非補正状態のグラフのうち、1点目から5点目までの溶接点100に係る所要時間T1は、実測値を表している。また、図7における非補正状態のグラフのうち、6点目から10点目までの溶接点100に係る所要時間T1は、動作制御部45による補正制御を行わない場合に想定される所要時間T1を表している。 First, referring to FIG. 7, a control method when the required time T1 is longer than the reference time TS will be described. In FIG. 7, the transition of the required time T1 when correction control is not performed is indicated by a dotted line as a non-correction state. In the non-corrected state graph in FIG. 7, the required time T1 related to the first to fifth welding points 100 represents an actual measurement value. Further, in the non-corrected state graph in FIG. 7, the required time T1 related to the welding points 100 from the sixth point to the tenth point is the expected required time T1 when the correction control by the operation control unit 45 is not performed. represents.

図7では、複数の溶接点100ごとに取得された所要時間T1の平均時間を第1平均時間として示している。図7では、第1平均時間の推移を1点鎖線で示している。ここで言う、第1平均時間は、1点前の溶接点100から5点前の溶接点100までのそれぞれの所要時間T1を平均した時間である。また、第1平均時間差D1は、各溶接点100における第1平均時間と基準時間TSとの差である。 In FIG. 7, the average time of the required times T1 acquired for each of the plurality of welding points 100 is shown as the first average time. In FIG. 7, the transition of the first average time is indicated by a dashed-dotted line. The first average time referred to here is the time obtained by averaging the respective required times T1 from the welding point 100 one point before to the welding point 100 five points before. Also, the first average time difference D1 is the difference between the first average time at each welding point 100 and the reference time TS.

図7では、6点目以降の溶接点100に対して、順に補正制御が実行される場合を図示している。例えば、6点目の溶接点100に対しては、1点目から5点目の溶接点100までの各所要時間T1に基づいて、第1平均時間と第1平均時間差D1とが判定部43によって算出される。図7における1点目から5点目の溶接点100までの第1平均時間は、40.4ミリ秒である。よって、1点目から5点目の溶接点100までの第1平均時間差D1は、2.4ミリ秒である。そこで、図7に示す例では、動作制御部45は、6点目の溶接点100における接近動作の開始時点を設定状態(所要時間T1が基準時間TSと一致する状態)における接近動作の開始時点よりも2.4ミリ秒だけ早く開始するように調整している。この補正制御により、6点目の溶接点100における所要時間T1は40.6ミリ秒となる。すなわち、補正制御によって、6点目の溶接点100における所要時間T1は、補正制御が実行されない場合に想定される所要時間T1(非補正状態)と比べて、第1平均時間差D1、ここでは2.4ミリ秒だけ基準時間TSに近づけることができる。なお、図7の6点目の溶接点100における非補正状態の所要時間T1は、43.0ミリ秒である。よって、図7の6点目の溶接点100において矢印で示すように、非補正状態の所要時間T1に対して、本ルーチンの所要時間T1を基準時間TSに近づけることができる。 FIG. 7 illustrates a case where the correction control is sequentially executed for the welding points 100 after the sixth point. For example, for the sixth welding point 100, the determination unit 43 determines the first average time and the first average time difference D1 based on each required time T1 from the first point to the fifth welding point 100. Calculated by The first average time from the first point to the fifth weld point 100 in FIG. 7 is 40.4 milliseconds. Therefore, the first average time difference D1 from the first point to the fifth welding point 100 is 2.4 milliseconds. Therefore, in the example shown in FIG. 7, the motion control unit 45 sets the start time of the approach motion at the sixth welding point 100 to the start time of the approach motion in the set state (the state in which the required time T1 matches the reference time TS). adjusted to start 2.4 milliseconds earlier than By this correction control, the required time T1 at the sixth welding point 100 becomes 40.6 milliseconds. That is, due to the correction control, the required time T1 at the sixth welding point 100 is compared with the expected required time T1 (uncorrected state) when the correction control is not executed, the first average time difference D1, here 2 .4 milliseconds can approach the reference time TS. The required time T1 in the non-corrected state at the sixth welding point 100 in FIG. 7 is 43.0 milliseconds. Therefore, as indicated by the arrow at the sixth welding point 100 in FIG. 7, the required time T1 of this routine can be brought closer to the reference time TS than the required time T1 in the uncorrected state.

補正制御の対象が7点目の溶接点100である場合は、2点目の溶接点100から6点目の溶接点100までの各所要時間T1を用いて第1平均時間差D1を算出してもよい。図7における本ルーチンのグラフに示すように、非補正状態における所要時間T1が基準時間TSよりも長い場合に、補正制御を実行することで、後の溶接における所要時間T1を基準時間TSに近づけることができる。これにより、所要時間T1の変動が抑制される。 When the correction control target is the seventh welding point 100, the first average time difference D1 is calculated using each required time T1 from the second welding point 100 to the sixth welding point 100. good too. As shown in the graph of this routine in FIG. 7, when the required time T1 in the non-corrected state is longer than the reference time TS, correction control is performed to bring the required time T1 in subsequent welding closer to the reference time TS. be able to. This suppresses variation in the required time T1.

次に、図8を参照しながら、所要時間T1が基準時間TSよりも短い場合の制御方法を説明する。図7と同様の部分については、適宜説明を省略する。図8における非補正状態は、図7と同義である。 Next, a control method when the required time T1 is shorter than the reference time TS will be described with reference to FIG. Description of the same parts as in FIG. 7 will be omitted as appropriate. The uncorrected state in FIG. 8 is synonymous with FIG.

図8では、複数の溶接点100ごとに取得された所要時間T1の平均時間を第2平均時間として示している。図8では、第2平均時間の推移を1点鎖線で示している。ここで言う、第2平均時間は、1点前の溶接点100から5点前の溶接点100までのそれぞれの所要時間T1を平均した時間である。また、第2平均時間差D2は、第2平均時間と基準時間TSとの差である。 In FIG. 8, the average time of the required times T1 acquired for each of the plurality of welding points 100 is shown as the second average time. In FIG. 8, the transition of the second average time is indicated by the dashed-dotted line. The second average time referred to here is the time obtained by averaging the respective required times T1 from the welding point 100 one point before to the welding point 100 five points before. Also, the second average time difference D2 is the difference between the second average time and the reference time TS.

図8では、6点目以降の溶接点100に対して、順に補正制御が実行される場合を図示している。例えば、6点目の溶接点100に対しては、1点目から5点目の溶接点100までの各所要時間T1に基づいて、第2平均時間と第2平均時間差D2とが判定部43によって算出される。図8における1点目から5点目の溶接点100までの第2平均時間は、35.8ミリ秒である。よって、1点目から5点目の溶接点100までの第2平均時間差D2は、2.2ミリ秒である。そこで、図8に示す例では、動作制御部45は、6点目の溶接点100における接近動作の開始時点を2.2ミリ秒だけ遅く開始するように調整している。この補正制御により、6点目の溶接点100における所要時間T1は36.2ミリ秒となる。すなわち、補正制御によって、6点目の溶接点100における所要時間T1は、補正制御が実行されない場合に想定される所要時間T1(非補正状態)と比べて、第2平均時間差D2、ここでは2.2ミリ秒だけ基準時間TSに近づけることができる。なお、図8の6点目の溶接点100における非補正状態の所要時間T1は、34.0ミリ秒である。よって、図8の6点目の溶接点100において矢印で示すように、非補正状態の所要時間T1に対して、本ルーチンの所要時間T1を基準時間TSに近づけることができる。 FIG. 8 illustrates a case where the correction control is sequentially executed for the welding points 100 after the sixth point. For example, for the sixth welding point 100, the determination unit 43 determines the second average time and the second average time difference D2 based on each required time T1 from the first to fifth welding points 100. Calculated by The second average time from the first point to the fifth weld point 100 in FIG. 8 is 35.8 milliseconds. Therefore, the second average time difference D2 from the first point to the fifth welding point 100 is 2.2 milliseconds. Therefore, in the example shown in FIG. 8, the motion control unit 45 adjusts the start point of the approach motion at the sixth welding point 100 to be delayed by 2.2 milliseconds. Due to this correction control, the required time T1 at the sixth welding point 100 is 36.2 milliseconds. That is, due to the correction control, the required time T1 at the sixth welding point 100 is reduced by the second average time difference D2, which is 2 .2 milliseconds can be brought closer to the reference time TS. The required time T1 in the non-corrected state at the sixth welding point 100 in FIG. 8 is 34.0 milliseconds. Therefore, as indicated by the arrow at the sixth weld point 100 in FIG. 8, the required time T1 of this routine can be made closer to the reference time TS than the required time T1 in the uncorrected state.

補正制御の対象が7点目の溶接点100である場合は、2点目の溶接点100から6点目の溶接点100までの各所要時間T1を用いて第2平均時間差D2を算出してもよい。図8における本ルーチンのグラフで示すように、非補正状態における所要時間T1が基準時間TSよりも短い場合においても、補正制御を実行することで、後の溶接における所要時間T1を基準時間TSに近づけることができる。これにより、所要時間T1の変動が抑制される。 When the correction control target is the seventh welding point 100, the second average time difference D2 is calculated using each required time T1 from the second welding point 100 to the sixth welding point 100. good too. As shown in the graph of this routine in FIG. 8, even when the required time T1 in the non-corrected state is shorter than the reference time TS, by executing the correction control, the required time T1 in the subsequent welding becomes equal to the reference time TS. can get closer. This suppresses variation in the required time T1.

上記実施形態によれば、取得部41は、接近動作の開始時点から、スタッド材Bと母材Wとが接触する接触時点までの所要時間T1を取得する。続いて、判定部43は、取得部41によって取得された所要時間T1と予め定められた基準時間TSとの間に時間差T2が生じているか否かの判定を行う。時間差T2が生じていると判定された場合に、動作制御部45は、時間差T2を低減するように、後の溶接における接近動作の開始時点を調整する。所要時間T1が基準時間TSよりも長い場合には、後の溶接において、接近動作の開始時点を時間差T2に応じて早く調整する。これにより、所要時間T1が基準時間TSよりも長い場合に、時間差T2に応じて、接近動作の開始時点が調整されることで、所要時間T1を基準時間TSに近づけることができる。また、所要時間T1が基準時間TSよりも短い場合には、後の溶接において、接近動作の開始時点を時間差T2に応じて遅く調整する。これにより、所要時間T1が基準時間TSよりも短い場合に、時間差T2に応じて、接近動作の開始時点が調整されることで、所要時間T1を基準時間TSに近づけることができる。その結果、所要時間T1の変動が抑制される。 According to the above-described embodiment, the acquisition unit 41 acquires the required time T1 from the start of the approaching operation to the contact time when the stud material B and the base material W come into contact with each other. Subsequently, the determination unit 43 determines whether or not there is a time difference T2 between the required time T1 acquired by the acquisition unit 41 and the predetermined reference time TS. When it is determined that the time difference T2 has occurred, the motion control unit 45 adjusts the start point of the approach motion in subsequent welding so as to reduce the time difference T2. When the required time T1 is longer than the reference time TS, the starting point of the approaching operation is adjusted earlier according to the time difference T2 in subsequent welding. As a result, when the required time T1 is longer than the reference time TS, the required time T1 can be brought close to the reference time TS by adjusting the starting point of the approaching operation according to the time difference T2. Further, when the required time T1 is shorter than the reference time TS, the start point of the approaching operation is adjusted later according to the time difference T2 in subsequent welding. As a result, when the required time T1 is shorter than the reference time TS, the required time T1 can be brought closer to the reference time TS by adjusting the starting point of the approaching operation according to the time difference T2. As a result, fluctuations in the required time T1 are suppressed.

また、上記実施形態によれば、時間差T2が生じていると判定された場合には、動作制御部45は、時間差T2を低減するように、後の溶接における接近動作の開始時点を複数の溶接点100ごとに調整する。これにより、時間差T2に応じて、複数の溶接点100ごとに接近動作の開始時点を調整することで、所要時間T1を基準時間TSに近づけることができる。 Further, according to the above-described embodiment, when it is determined that the time difference T2 has occurred, the operation control unit 45 sets the approach operation start points in subsequent welding to a plurality of welding times so as to reduce the time difference T2. Adjust every 100 points. Accordingly, by adjusting the starting point of the approach operation for each of the plurality of welding points 100 according to the time difference T2, the required time T1 can be made closer to the reference time TS.

また、上記実施形態によれば、判定部43は、複数の溶接点100ごとの所要時間T1の平均時間と、基準時間TSと、の差である平均時間差D1,D2を用いて、時間差T2が生じているか否かを判定する。これにより、複数の溶接点100ごとの所要時間T1を考慮して、後の溶接における開始時点を調整できる。つまり、スタッドガン2を用いた溶接時の複数の溶接点100における所要時間T1の傾向を加味した上で、所要時間T1を基準時間TSに近づけることができる。また、複数の溶接点100における所要時間T1の中央値となる平均時間を基準時間TSに近づけることができる。例えば、複数の溶接点100における所要時間T1のうちで、他の溶接点100と比べて極端に差が見られた場合(以下、異常値)に有効である。この場合、判定部43は、異常値のみに基づいて時間差T2を算出しないため、本ルーチンでの所要時間T1と基準時間TSとの間で大きく時間差T2が生じる可能性を低減できる。 Further, according to the above embodiment, the determination unit 43 uses the average time differences D1 and D2, which are the differences between the average time required for the required time T1 for each of the plurality of welding points 100, and the reference time TS, to determine whether the time difference T2 is Determine whether or not it has occurred. Accordingly, the starting point of subsequent welding can be adjusted in consideration of the required time T1 for each of the plurality of welding points 100. FIG. In other words, the required time T1 can be brought closer to the reference time TS after considering the tendency of the required time T1 at the plurality of welding points 100 during welding using the stud gun 2 . Also, the average time, which is the median value of the required times T1 at the plurality of welding points 100, can be brought close to the reference time TS. For example, it is effective when the required time T1 at a plurality of welding points 100 is significantly different from other welding points 100 (hereinafter referred to as an abnormal value). In this case, since the determination unit 43 does not calculate the time difference T2 based only on the abnormal value, it is possible to reduce the possibility of a large time difference T2 occurring between the required time T1 and the reference time TS in this routine.

また、上記実施形態によれば、動作制御部45は、所要時間T1が基準時間TSよりも長い場合には、後の溶接において、接近動作の開始時点を第1平均時間差D1に応じて早く調整することで、所要時間T1を基準時間TSに近づける。また、動作制御部45は、所要時間T1が基準時間TSよりも短い場合には、後の溶接において、接近動作の開始時点を第2平均時間差D2に応じて遅く調整することで、所要時間T1を基準時間TSに近づける。これにより、判定部43が平均時間差D1,D2を用いて時間差T2を算出する場合にも、所要時間T1が基準時間TSに対して長い場合と短い場合との両者において、後の溶接における所要時間T1を基準時間TSに近づけることができる。 Further, according to the above embodiment, when the required time T1 is longer than the reference time TS, the operation control unit 45 adjusts the start point of the approaching operation earlier according to the first average time difference D1 in the subsequent welding. By doing so, the required time T1 is brought closer to the reference time TS. Further, when the required time T1 is shorter than the reference time TS, the operation control unit 45 delays the starting point of the approaching operation in the subsequent welding according to the second average time difference D2, thereby reducing the required time T1. is brought close to the reference time TS. As a result, even when the determination unit 43 calculates the time difference T2 using the average time differences D1 and D2, the time required for subsequent welding is determined both when the required time T1 is longer than the reference time TS and when it is shorter than the reference time TS. T1 can be brought closer to the reference time TS.

また、上記実施形態によれば、1点目からN点目(Nは2以上の整数)の溶接点100まで順に溶接が行われる場合に、判定部43は、1点前の溶接点100からM点前(MはNより小さい整数)の溶接点100までのそれぞれの所要時間T1の平均時間と、基準時間TSと、の差である平均時間差D1,D2を用いて時間差T2を判定する。これにより、使用期間の経過等によって、所要時間T1に変動が見られる場合にも、判定部43は、任意の溶接点100におけるデータを選択して過去ルーチンとし、この過去ルーチンを参照することで、時間差T2を算出できる。例えば、使用期間の経過に伴い、所要時間T1が使用開始時と比べて大きく変化が見られる場合、所要時間T1の傾向が異なる時期におけるデータを用いて平均時間を算出しても、実態に即していない場合が生じ得る。これに対して、本実施形態のように、判定部43が過去ルーチンのうちで任意の溶接点100の所要時間T1を用いて時間差T2を算出すれば、動作制御部45は、直近のデータ等の所望のデータに基づいて後の溶接における接近動作の開始時点を調整できる。 Further, according to the above-described embodiment, when welding is performed in order from the first point to the N-th welding point 100 (N is an integer of 2 or more), the determination unit 43 can The time difference T2 is determined using average time differences D1 and D2, which are differences between the average time T1 required to reach the welding point 100 before M points (M is an integer smaller than N) and the reference time TS. As a result, even if the required time T1 varies due to the lapse of the period of use, etc., the determination unit 43 selects data at an arbitrary welding point 100 as a past routine, and refers to this past routine. , the time difference T2 can be calculated. For example, when the required time T1 changes significantly as the usage period progresses compared to when the use started, even if the average time is calculated using data from a period when the trend of the required time T1 is different, the actual situation will be immediately There may be cases where it is not. On the other hand, as in the present embodiment, if the determination unit 43 calculates the time difference T2 using the required time T1 of an arbitrary welding point 100 in the past routine, the operation control unit 45 can calculate the most recent data, etc. The start point of the approximation motion in the subsequent weld can be adjusted based on the desired data of .

なお、アークスタッド溶接装置1による所要時間T1の制御方法は、これに限られるものではない。例えば、複数の溶接点100は、同一の母材Wのうちで11点以上設けられてもよい。判定部43は、例えば、任意の溶接点100として1つ前の溶接点100と3つ前の溶接点100とのそれぞれの所要時間T1から平均時間差D1,D2を算出してもよい。また、時間差T2を算出する際に、平均時間を用いることは必須ではない。判定部43は、例えば、5つの溶接点100において溶接が行われる場合に、1つ前の溶接点100における所要時間T1と基準時間TSとの差を時間差T2としてもよい。 In addition, the control method of the required time T1 by the arc stud welding apparatus 1 is not restricted to this. For example, the plurality of welding points 100 may be provided at 11 or more points in the same base material W. For example, the determining unit 43 may calculate the average time differences D1 and D2 from the required time T1 between the welding point 100 immediately before and the welding point 100 three times before as an arbitrary welding point 100 . Also, it is not essential to use the average time when calculating the time difference T2. For example, when welding is performed at five welding points 100, the determination unit 43 may set the difference between the required time T1 at the welding point 100 one before and the reference time TS as the time difference T2.

B.第2実施形態:
本実施形態では、2以上の母材Wのそれぞれに対して、複数の溶接点100にスタッド材Bを溶接する場合の所要時間T1の制御方法について説明する。本実施形態におけるアークスタッド溶接装置1の構成は、第1実施形態と同様であるため、説明を省略する。また、本実施形態では、所要時間T1の制御方法が第1実施形態とは異なる。
B. Second embodiment:
In this embodiment, a method for controlling the required time T1 when welding the stud material B to a plurality of welding points 100 on each of two or more base materials W will be described. Since the configuration of the arc stud welding device 1 in this embodiment is the same as that of the first embodiment, the description is omitted. Moreover, in the present embodiment, the method of controlling the required time T1 is different from that in the first embodiment.

図9は、2以上の母材Wにおける溶接点100ごとの所要時間T1を示したグラフである。図9に示す例では、2以上の母材Wを識別するための号車番号を付している。本実施形態では、P号車の部品である第1の母材Wと、P+1号車の部品である第2の母材Wと、P+2号車の部品である第3の母材Wと、に対して、この順に溶接が実行される。第1~第3の母材Wは、同一の形状および同一の材質で構成される。第1~第3の母材Wは、例えば、複数の車両を製造する場合に、各車両に使用される同一部品である。 FIG. 9 is a graph showing the required time T1 for each welding point 100 in two or more base materials W. FIG. In the example shown in FIG. 9, car numbers for identifying two or more base materials W are attached. In this embodiment, for the first base material W that is a part of car P, the second base material W that is a part of car P+1, and the third base material W that is a part of car P+2, , welding is performed in this order. The first to third base materials W are made of the same shape and the same material. The first to third base materials W are, for example, the same parts used for each vehicle when manufacturing a plurality of vehicles.

第1~第3の母材Wには、それぞれ1点目からN点目(Nは2以上の整数)の溶接点100まで順に溶接が行われる。図9では、第1の母材W(P号車)に対して、1点目の溶接点100から5点目の溶接点100まで順に溶接が行われる。その後、第2の母材W(P+1号車)に対して、1点目の溶接点100から5点目の溶接点100まで順に溶接が行われる。図9の横軸では、1点目の溶接点100から5点目の溶接点100までを時系列に沿って順に示している。また、図9の縦軸は、所要時間T1を示す。図9では、所要時間T1の単位をミリ秒(ms)としている。図9には、第1の母材Wにおける1点目から5点目までの各溶接点100および第2の母材Wにおける1点目から5点目までの各溶接点100の所要時間T1がそれぞれプロットされている。本実施形態では、第1の母材W(P号車)および第2の母材W(P+1号車)の各溶接点100における所要時間T1は、第3の母材W(P+2号車)の各溶接点100に対して溶接を行う場合における過去ルーチンに相当する。図9では、第1の母材Wおよび第2の母材Wにおける所要時間T1の推移を過去ルーチンとして点線で示している。 Welding is sequentially performed on the first to third base materials W from the first point to the Nth welding point 100 (N is an integer equal to or greater than 2). In FIG. 9, welding is sequentially performed from the first welding point 100 to the fifth welding point 100 on the first base material W (P car). After that, welding is sequentially performed from the first welding point 100 to the fifth welding point 100 to the second base material W (P+1 car). The horizontal axis of FIG. 9 indicates the first welding point 100 to the fifth welding point 100 in chronological order. The vertical axis in FIG. 9 indicates the required time T1. In FIG. 9, the unit of the required time T1 is milliseconds (ms). FIG. 9 shows the required time T1 for each of the first to fifth welding points 100 on the first base material W and the first to fifth welding points 100 on the second base material W. are plotted respectively. In this embodiment, the required time T1 at each welding point 100 of the first base material W (car P) and the second base material W (car P+1) is the same as the time required for each welding of the third base material W (car P+2). This corresponds to the past routine when welding is performed on the point 100 . In FIG. 9, the transition of the required time T1 for the first base material W and the second base material W is indicated by a dotted line as a past routine.

複数の溶接点100のそれぞれは、2以上の母材Wのうちで対応する位置に形成される。本実施形態では、複数の溶接点100のそれぞれは、2以上の母材Wのうちで同一の位置に形成されている。例えば、第1の母材W(P号車)におけるQ点目(Qは1以上N以下の整数)の溶接点100と、第2の母材W(P+1号車)におけるQ点目の溶接点100と、第3の母材W(P+2号車)におけるQ点目の溶接点100とは、各母材Wのうちで同一の位置に形成される。つまり、図9の第1の母材W(P号車)における3点目の溶接点100と、第2の母材W(P+1号車)における3点目の溶接点100と、第3の母材W(P+2号車)における3点目の溶接点100とは同一の位置に形成される。 Each of the multiple welding points 100 is formed at a corresponding position in the two or more base materials W. As shown in FIG. In this embodiment, each of the plurality of welding points 100 is formed at the same position among two or more base materials W. As shown in FIG. For example, the Q-th (Q is an integer of 1 or more and N or less) welding point 100 on the first base material W (P car) and the Q-th welding point 100 on the second base material W (P+1 car) , and the Q-th welding point 100 in the third base material W (P+2 car) are formed at the same position in each base material W. As shown in FIG. That is, the third welding point 100 on the first base material W (car P) in FIG. 9, the third welding point 100 on the second base material W (P+1 car), and the third base material It is formed at the same position as the third welding point 100 on W (P+2 car).

ここで、同一の形状および同一の材質で構成される第1~第3の母材Wに対して、各母材Wのうちで同一の位置に形成される溶接点100に溶接を行う場合、所要時間T1について溶接点100ごとに一定の傾向が見られる場合がある。例えば、図9では、第1の母材W(P号車)と第2の母材W(P+1号車)との同一の位置に形成される溶接点100における所要時間T1について、同様の傾向が見られる。同様の傾向とは、所要時間T1が基準時間TSよりも短い場合と、長い場合と、のいずれであるか、基準時間TSに対する所要時間T1の差の大小などである。よって、同一の形状および同一の材質で構成される2以上の母材Wに対して、各母材Wのうちで同一の位置に形成される溶接点100に溶接を行う場合、溶接点100ごとの特性や傾向を考慮することが好ましい。そこで、本実施形態では、より好ましい所要時間T1の補正制御を実行する。 Here, when welding is performed at the welding point 100 formed at the same position among the first to third base materials W having the same shape and the same material, A certain tendency can be seen for each welding point 100 for the required time T1. For example, in FIG. 9, a similar trend can be seen for the required time T1 at the welding point 100 formed at the same position on the first base material W (P car) and the second base material W (P+1 car). be done. Similar trends include whether the required time T1 is shorter or longer than the reference time TS, the difference between the required time T1 and the reference time TS, and the like. Therefore, when welding is performed to the welding points 100 formed at the same positions in each base material W for two or more base materials W having the same shape and the same material, each welding point 100 It is preferable to consider the characteristics and tendencies of Therefore, in the present embodiment, correction control for a more preferable required time T1 is executed.

本実施形態では、取得部41は、所要時間T1を複数の溶接点100ごとに取得する。判定部43は、動作制御部45による接近動作の開始時点の調整に際して、2以上の母材Wにおいて溶接点100ごとに取得された所要時間T1のうち、同一の位置に形成される溶接点100の所要時間T1の平均時間としての第3平均時間を算出する。さらに、判定部43は、第3平均時間と、基準時間TSと、の差である第3平均時間差D3を用いて、時間差T2が生じているか否かを判定する。第3平均時間は、第1の母材W(P号車)と第2の母材W(P+1号車)とのそれぞれに対して、1点目の溶接点100からN点目(Nは2以上の整数)の溶接点100までのそれぞれの所要時間T1のうち、同一の位置に形成される溶接点100としてのQ点目の溶接点100における所要時間T1を平均した時間である。図9に示す例では、第1の母材W(P号車)のうちで3点目の溶接点100における所要時間T1は、47.0ミリ秒である。また、第2の母材W(P+1号車)のうちで3点目の溶接点100における所要時間T1は、46.0ミリ秒である。よって、図9では、3点目の溶接点100における第3平均時間は、46.5ミリ秒である。なお、図9では、第3平均時間を三角形のプロットで示している。 In this embodiment, the obtaining unit 41 obtains the required time T1 for each of the plurality of welding points 100. FIG. When adjusting the start point of the approach operation by the operation control unit 45, the determination unit 43 determines the welding points 100 formed at the same position among the required time T1 acquired for each welding point 100 in two or more base materials W. A third average time is calculated as an average time of the required time T1 of . Furthermore, the determination unit 43 determines whether or not the time difference T2 occurs using the third average time difference D3, which is the difference between the third average time and the reference time TS. The third average time is the N-th point (N is 2 or more) from the first welding point 100 for each of the first base material W (P car) and the second base material W (P+1 car). is the average of the required times T1 at the Q-th welding point 100 as the welding point 100 formed at the same position, among the respective required times T1 up to the welding point 100 of (integer of ). In the example shown in FIG. 9, the required time T1 at the third welding point 100 in the first base material W (car No. P) is 47.0 milliseconds. The required time T1 at the third welding point 100 in the second base material W (P+1 car) is 46.0 milliseconds. Therefore, in FIG. 9, the third average time at the third welding point 100 is 46.5 milliseconds. In addition, in FIG. 9, the third average time is indicated by a triangular plot.

図9に示す例では、3点目の溶接点100における第3平均時間差は46.5ミリ秒、基準時間TSは38.0ミリ秒であるため、第3平均時間差D3は8.5ミリ秒である。図9では、3点目の溶接点100において、第3平均時間は基準時間TSに対して8.5ミリ秒だけ遅れている。 In the example shown in FIG. 9, the third average time difference at the third welding point 100 is 46.5 milliseconds, and the reference time TS is 38.0 milliseconds, so the third average time difference D3 is 8.5 milliseconds. is. In FIG. 9, at the third welding point 100, the third average time is delayed from the reference time TS by 8.5 milliseconds.

動作制御部45は、順に溶接が行われる2以上の母材Wについて、後に溶接が行われる母材Wのうちで、第3平均時間を算出した溶接点100と同一の位置に形成される溶接点100に対するスタッドガン2の接近動作の開始時点を調整する。すなわち、過去ルーチンから算出したQ点目の溶接点100における第3平均時間差D3を、後に溶接が行われる母材WのQ点目の溶接点100に対して溶接を行う際の開始時点に反映させる。このとき、動作制御部45は、所要時間T1が基準時間TSよりも長い場合には、後の溶接において、接近動作の開始時点を第3平均時間差D3に応じて早く調整する。また、動作制御部45は、所要時間T1が基準時間TSよりも短い場合には、後の溶接において、接近動作の開始時点を第3平均時間差D3に応じて遅く調整する。 For two or more base materials W to be welded in order, the operation control unit 45 controls the welding to be formed at the same position as the welding point 100 for which the third average time is calculated among the base materials W to be welded later. Adjust the start point of the approach operation of the stud gun 2 to the point 100 . That is, the third average time difference D3 at the Q-th welding point 100 calculated from the past routine is reflected in the starting point of welding to the Q-th welding point 100 of the base material W to be welded later. Let At this time, when the required time T1 is longer than the reference time TS, the motion control unit 45 adjusts the start point of the approaching motion earlier according to the third average time difference D3 in the subsequent welding. Further, when the required time T1 is shorter than the reference time TS, the motion control unit 45 adjusts the start point of the approaching motion later according to the third average time difference D3 in the subsequent welding.

図9に示す例では、第1の母材W(P号車)と第2の母材W(P+1号車)との各所要時間T1から算出した3点目の溶接点100における第3平均時間差は8.5ミリ秒である。また、図9に示す例では、第3平均時間は基準時間TSよりも長い。よって、動作制御部45は、後に溶接が行われる第3の母材W(P+2号車)の3点目の溶接点100に対して溶接を行う際に、接近動作を8.5ミリ秒だけ早く開始させる。なお、他の溶接点100としての1点目、2点目、4点目、5点目の溶接点100に対しても、同様の補正制御が行われる。 In the example shown in FIG. 9, the third average time difference at the third welding point 100 calculated from each required time T1 between the first base material W (car P) and the second base material W (car P+1) is 8.5 milliseconds. Also, in the example shown in FIG. 9, the third average time is longer than the reference time TS. Therefore, the motion control unit 45 accelerates the approach motion by 8.5 milliseconds when welding the third welding point 100 of the third base material W (P+2 car) to be welded later. let it start. Similar correction control is performed for the first, second, fourth, and fifth welding points 100 as the other welding points 100 .

なお、複数の溶接点100の形成位置は、これに限られるものではない。複数の溶接点100のそれぞれは、2以上の母材Wのうちで対応する位置に形成されればよい。例えば、同一材質および同一形状を成す2以上の板状母材において、板状母材のうちで厚みが異なる場合を考える。この場合、複数の溶接点100のそれぞれは、2以上の板状母材のうちで厚みが同程度の部分に形成すればよい。例えば、同一材質および同一形状を成す2以上の母材において、母材のうちで部分によって強度が異なる場合を考える。この場合、複数の溶接点100のそれぞれは、2以上の母材のうちで強度が同程度の部分に形成すればよい。このように、複数の溶接点100のそれぞれは、2以上の母材Wのうちで対応する位置に形成されればよい。 In addition, the formation position of several welding points 100 is not restricted to this. Each of the multiple welding points 100 may be formed at a corresponding position in the two or more base materials W. As shown in FIG. For example, let us consider a case where two or more plate-shaped base materials having the same material and the same shape have different thicknesses among the plate-shaped base materials. In this case, each of the plurality of welding points 100 may be formed in a portion having approximately the same thickness among the two or more plate-shaped base materials. For example, consider a case where two or more base materials having the same material and the same shape have different strength depending on the part of the base materials. In this case, each of the plurality of welding points 100 may be formed in a portion having approximately the same strength among the two or more base materials. Thus, each of the plurality of welding points 100 may be formed at corresponding positions in two or more base materials W. As shown in FIG.

上記実施形態によれば、取得部41は、2以上の母材Wにおいて、複数の溶接点100ごとに所要時間T1を取得する。続いて、判定部43は、2以上の母材Wにおいて複数の溶接点100ごとに取得された所要時間T1のうち、対応する位置に形成される溶接点100の所要時間T1の平均時間(第3平均時間)を算出する。さらに、判定部43は、第3平均時間と、基準時間TSと、の差である第3平均時間差D3を用いて、時間差T2が生じているか否かを判定する。動作制御部45は、順に溶接が行われる複数の母材Wについて、後に溶接が行われる母材Wのうちで、平均時間としての第3平均時間を算出した溶接点100と対応する位置に形成される溶接点100に対する接近動作の開始時点を調整する。具体的には、動作制御部45は、所要時間T1が基準時間TSよりも長い場合、後の溶接において、接近動作の開始時点を第3平均時間差D3に応じて早く調整する。動作制御部45は、所要時間T1が基準時間TSよりも短い場合、後の溶接において、接近動作の開始時点を第3平均時間差D3に応じて遅く調整する。これにより、アークスタッド溶接装置1を用いた溶接では、溶接点100ごとの特性や傾向を考慮した上で、所要時間T1を基準時間TSに近づけることができる。その結果、所要時間T1の変動が抑制される。 According to the above embodiment, the acquiring unit 41 acquires the required time T1 for each of the plurality of welding points 100 on two or more base materials W. FIG. Subsequently, the determining unit 43 determines the average time (the average time T1 of the required time T1 of the welding point 100 formed at the corresponding position among the required times T1 acquired for each of the plurality of welding points 100 in the two or more base materials W (the 3 average time). Furthermore, the determination unit 43 determines whether or not the time difference T2 occurs using the third average time difference D3, which is the difference between the third average time and the reference time TS. For a plurality of base materials W to be welded in order, the operation control unit 45 forms the welding point 100 at a position corresponding to the calculated third average time as the average time among the base materials W to be welded later. Adjust the start point of the approach operation to the welding point 100 to be welded. Specifically, when the required time T1 is longer than the reference time TS, the operation control unit 45 adjusts the starting point of the approaching operation earlier in the subsequent welding according to the third average time difference D3. When the required time T1 is shorter than the reference time TS, the motion control unit 45 delays the starting point of the approach motion according to the third average time difference D3 in subsequent welding. As a result, in welding using the arc stud welding device 1, the required time T1 can be brought close to the reference time TS after considering the characteristics and tendencies of each welding point 100. FIG. As a result, fluctuations in the required time T1 are suppressed.

なお、順に溶接が行われる母材Wの数および溶接点100の数は、これに限られるものではない。例えば、順に溶接が行われる母材Wの数は、50つであってもよい。この場合、判定部43は、50つ目の母材Wに対する溶接において、1つ目の母材Wから49つ目の母材Wまでの各溶接点100の所要時間T1を用いて第3平均時間差D3を算出してもよい。また、判定部43は、1つ前の母材Wから任意の数、例えば、5つ前の母材Wまでの各溶接点100の所要時間T1を用いて第3平均時間差D3を算出してもよい。また、判定部43によって時間差T2を算出する際に、平均時間を用いることは必須ではない。例えば、5つの母材Wのそれぞれに対して、対応する位置に形成される1つの溶接点に溶接する場合を考える。この場合、判定部43は、5つ目の母材Wに溶接を行うときに、3つ目の母材Wにおける所要時間T1のみを用いて時間差T2を算出してもよい。 The number of base materials W and the number of welding points 100 to be welded in order is not limited to this. For example, the number of base materials W to be welded in sequence may be fifty. In this case, the determining unit 43 uses the required time T1 of each welding point 100 from the first base material W to the 49th base material W in welding to the fiftieth base material W to determine the third average A time difference D3 may be calculated. In addition, the determination unit 43 calculates the third average time difference D3 using the required time T1 of each welding point 100 from the previous base material W to an arbitrary number, for example, 5 previous base materials W. good too. Further, it is not essential to use the average time when the determination unit 43 calculates the time difference T2. For example, consider a case where each of five base materials W is welded to one welding point formed at a corresponding position. In this case, the determining unit 43 may calculate the time difference T2 using only the required time T1 for the third base material W when welding the fifth base material W.

以上で示した全実施形態によれば、アークスタッド溶接の対象となる母材Wが単一の場合と、複数の場合と、の両者において、動作制御部45が接近動作の開始時点を調整することで、所要時間T1を基準時間TSに近づけることができる。よって、溶接の対象となる母材Wの数によらず、所要時間T1を基準時間TSに近づけることができる。 According to all the embodiments described above, the operation control unit 45 adjusts the start point of the approach operation in both the case where the base material W to be arc stud welded is single and the case where the base material W is plural. Thus, the required time T1 can be brought closer to the reference time TS. Therefore, regardless of the number of base materials W to be welded, the required time T1 can be brought close to the reference time TS.

本開示は、上述の実施形態に限られるものではなく、その趣旨を逸脱しない範囲において種々の構成で実現することができる。例えば、発明の概要の欄に記載した各形態中の技術的特徴に対応する実施形態の技術的特徴は、上述の課題の一部又は全部を解決するために、あるいは、上述の効果の一部又は全部を達成するために、適宜、差し替えや、組み合わせを行うことが可能である。また、その技術的特徴が本明細書中に必須なものとして説明されていなければ、適宜、削除することが可能である。 The present disclosure is not limited to the embodiments described above, and can be implemented in various configurations without departing from the scope of the present disclosure. For example, the technical features of the embodiments corresponding to the technical features in each form described in the outline of the invention are used to solve some or all of the above problems, or Alternatively, replacements and combinations can be made as appropriate to achieve all. Also, if the technical features are not described as essential in this specification, they can be deleted as appropriate.

1…アークスタッド溶接装置、2…スタッドガン、2a…一端、2b…他端、3…ロボット、4…制御装置、6…ボルトフィーダ、7…電源装置、9…母材支持台、11…センサ、20…ケース、21…ガンコイル、22…固定磁極部材、23…シリンダ、24…可動磁極部材、25…付勢部材、27…チャック、29…母材押さえ、29a…接触面、30…アーム、35…基台、37…スタッドガン支持部、40…CPU、41…取得部、43…判定部、45…動作制御部、47…記憶部、100…溶接点、241…ヘッド、242…ロッド、243…テール、271…把持部、A…アーク、B…スタッド材、B1…頭部、B2…軸部、B3…突出部、Ba…基端、Bb…先端、D1…第1平均時間差、D2…第2平均時間差、D3…第3平均時間差、F…設置面、L…離間距離、S…摺動領域、T…溶接時間、T1…所要時間、T2…時間差、TS…基準時間、W…母材、WS…溶接面 DESCRIPTION OF SYMBOLS 1... Arc stud welding apparatus, 2... Stud gun, 2a... One end, 2b... The other end, 3... Robot, 4... Control device, 6... Bolt feeder, 7... Power supply device, 9... Base metal support, 11... Sensor , 20... Case 21... Gun coil 22... Fixed magnetic pole member 23... Cylinder 24... Movable magnetic pole member 25... Biasing member 27... Chuck 29... Base material holder 29a... Contact surface 30... Arm, 35... Base 37... Stud gun support part 40... CPU 41... Acquisition part 43... Judgment part 45... Operation control part 47... Storage part 100... Welding point 241... Head 242... Rod, 243... Tail 271... Grasping part A... Arc B... Stud member B1... Head part B2... Shaft part B3... Protruding part Ba... Base end Bb... Tip end D1... First average time difference D2 ... second average time difference, D3... third average time difference, F... installation surface, L... separation distance, S... sliding area, T... welding time, T1... required time, T2... time difference, TS... reference time, W... Base material, WS... Weld surface

Claims (10)

母材とスタッド材との間にアークを発生させて溶接するアークスタッド溶接装置であって、
前記スタッド材を把持するスタッドガンであって、溶接を開始した後に、前記母材から前記スタッド材を離間させる離間動作と、前記離間動作の後に、前記母材に対して前記スタッド材を接近させる接近動作と、を複数の溶接点ごとに実行するスタッドガンと、
前記接近動作の開始時点から、前記スタッド材と前記母材とが接触する接触時点までの所要時間を取得する取得部と、
前記取得部によって取得された前記所要時間と、予め定められた基準時間と、の間に時間差が生じているか否かの判定を行う判定部と、
前記スタッドガンの前記接近動作と前記離間動作とを制御する動作制御部と、を備え、
前記動作制御部は、前記時間差が生じていると判定された場合に、前記時間差を低減するように、後の溶接における前記開始時点を調整することによって、前記所要時間を制御する、アークスタッド溶接装置。
An arc stud welding device for welding by generating an arc between a base material and a stud material,
A stud gun for gripping the stud material, wherein after welding is started, a separating operation for separating the stud material from the base material, and after the separating operation, the stud material is brought closer to the base material. a stud gun that performs an approach motion at each of a plurality of weld points;
an acquisition unit that acquires a required time from the start of the approaching motion to the contact point of contact between the stud material and the base material;
a determination unit that determines whether or not there is a time difference between the required time acquired by the acquisition unit and a predetermined reference time;
an operation control unit that controls the approaching operation and the separating operation of the stud gun;
The operation control unit controls the required time by adjusting the start point in the subsequent welding so as to reduce the time difference when it is determined that the time difference occurs. Device.
請求項1に記載のアークスタッド溶接装置であって、
前記動作制御部は、前記所要時間が前記基準時間よりも長い場合には、前記開始時点を前記時間差に応じて早く調整することで前記所要時間を制御する、アークスタッド溶接装置。
The arc stud welding device according to claim 1,
The arc stud welding apparatus, wherein, when the required time is longer than the reference time, the operation control unit controls the required time by adjusting the start point earlier according to the time difference.
請求項1または請求項2に記載のアークスタッド溶接装置であって、
前記動作制御部は、前記所要時間が前記基準時間よりも短い場合には、前記開始時点を前記時間差に応じて遅く調整することで前記所要時間を制御する、アークスタッド溶接装置。
The arc stud welding device according to claim 1 or 2,
The arc stud welding apparatus, wherein, when the required time is shorter than the reference time, the operation control unit controls the required time by adjusting the start time later according to the time difference.
請求項1から請求項3までのいずれか一項に記載のアークスタッド溶接装置であって、
前記複数の溶接点は、同一の前記母材のうちで異なる位置にあり、
前記取得部は、前記所要時間を前記複数の溶接点ごとに取得し、
前記判定部は、前記複数の溶接点ごとに前記判定を行い、
前記動作制御部は、前記複数の溶接点ごとに、前記所要時間を制御する、アークスタッド溶接装置。
The arc stud welding device according to any one of claims 1 to 3,
The plurality of welding points are at different positions in the same base material,
The acquisition unit acquires the required time for each of the plurality of welding points,
The determination unit performs the determination for each of the plurality of welding points,
The arc stud welding device, wherein the operation control unit controls the required time for each of the plurality of welding points.
請求項4に記載のアークスタッド溶接装置であって、
前記判定部は、前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差である平均時間差を用いて前記判定を行い、
前記動作制御部は、前記平均時間差を低減するように、後の溶接における前記開始時点を調整する、アークスタッド溶接装置。
The arc stud welding device according to claim 4,
The determination unit performs the determination using an average time difference, which is a difference between the average time required for each of the plurality of welding points and the reference time,
The arc stud welding apparatus, wherein the motion control unit adjusts the start time point in subsequent welds to reduce the average time difference.
請求項5に記載のアークスタッド溶接装置であって、
前記複数の溶接点はN以上(Nは2以上の整数)であり、
前記複数の溶接点への前記溶接は1点目からN点目まで順に実行され、
前記判定部は、1点前の前記溶接点からM点前(MはNよりも小さい整数)の前記溶接点までの前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差を前記平均時間差として用いる、アークスタッド溶接装置。
The arc stud welding device according to claim 5,
The plurality of welding points is N or more (N is an integer of 2 or more),
The welding to the plurality of welding points is sequentially performed from the 1st point to the Nth point,
The judging unit determines an average time of the required time for each of the plurality of welding points from the welding point one point before to the welding point M points before (M is an integer smaller than N), and the reference time. , as the average time difference.
請求項1から請求項3までのいずれか一項に記載のアークスタッド溶接装置であって、
前記母材の数は2以上であり、
前記複数の溶接点のそれぞれは、前記2以上の母材のうちで対応する位置に形成され、
前記取得部は、前記所要時間を前記複数の溶接点ごとに取得し、
前記判定部は、前記複数の溶接点ごとに前記判定を行い、
前記動作制御部は、前記複数の溶接点ごとに、前記所要時間を制御する、アークスタッド溶接装置。
The arc stud welding device according to any one of claims 1 to 3,
The number of base materials is 2 or more,
Each of the plurality of welding points is formed at a corresponding position in the two or more base materials,
The acquisition unit acquires the required time for each of the plurality of welding points,
The determination unit performs the determination for each of the plurality of welding points,
The arc stud welding device, wherein the operation control unit controls the required time for each of the plurality of welding points.
請求項7に記載のアークスタッド溶接装置であって、
前記判定部は、前記複数の溶接点ごとの前記所要時間の平均時間と、前記基準時間と、の差である平均時間差を用いて前記判定を行い、
前記動作制御部は、前記平均時間差を低減するように、後の溶接における前記開始時点を調整する、アークスタッド溶接装置。
The arc stud welding device according to claim 7,
The determination unit performs the determination using an average time difference, which is a difference between the average time required for each of the plurality of welding points and the reference time,
The arc stud welding apparatus, wherein the motion control unit adjusts the start time point in subsequent welds to reduce the average time difference.
請求項1から請求項8までのいずれか一項に記載のアークスタッド溶接装置であって、
さらに、前記母材を押さえるための母材押さえを備える、アークスタッド溶接装置。
The arc stud welding device according to any one of claims 1 to 8,
An arc stud welding apparatus further comprising a base material holder for holding down the base material.
母材とスタッド材との間にアークを発生させて溶接するアークスタッド溶接方法であって、
前記スタッド材を把持するスタッドガンによって、溶接を開始した後に、前記母材から前記スタッド材を離間させる離間工程と、
前記離間工程の後に、前記母材に対して前記スタッド材を接近させる接近工程と、を複数の溶接点ごとに実行し、さらに、
前記接近工程を開始した開始時点から、前記スタッド材と前記母材とが接触する接触時点までの所要時間を取得する取得工程と、
前記取得工程によって取得された前記所要時間と、予め定められた基準時間と、の間に時間差が生じているか否かの判定を行う判定工程と、を備え、
前記接近工程は、前記時間差が生じていると判定された場合に、前記時間差を低減するように、後の溶接における前記開始時点を調整することによって、前記所要時間を制御する工程を含む、アークスタッド溶接方法。
An arc stud welding method for welding by generating an arc between a base material and a stud material,
A separating step of separating the stud material from the base material after welding is started by a stud gun that grips the stud material;
After the separating step, an approaching step of approaching the stud material to the base material is performed for each of a plurality of welding points, and
an acquiring step of acquiring a required time from the start of the approaching step to the contact point of contact between the stud and the base material;
a determination step of determining whether or not there is a time difference between the required time acquired by the acquisition step and a predetermined reference time;
said approaching step includes controlling said duration by adjusting said starting point in a subsequent weld to reduce said time lag if said time lag is determined to occur. Stud welding method.
JP2021083916A 2021-05-18 2021-05-18 Arc stud welding device and arc stud welding method Pending JP2022177565A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2021083916A JP2022177565A (en) 2021-05-18 2021-05-18 Arc stud welding device and arc stud welding method
CN202210241926.4A CN115365622B (en) 2021-05-18 2022-03-11 Arc stud welding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021083916A JP2022177565A (en) 2021-05-18 2021-05-18 Arc stud welding device and arc stud welding method

Publications (1)

Publication Number Publication Date
JP2022177565A true JP2022177565A (en) 2022-12-01

Family

ID=84060011

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021083916A Pending JP2022177565A (en) 2021-05-18 2021-05-18 Arc stud welding device and arc stud welding method

Country Status (2)

Country Link
JP (1) JP2022177565A (en)
CN (1) CN115365622B (en)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3765316B2 (en) * 1994-10-18 2006-04-12 ニューフレイ リミテッド ライアビリティ カンパニー Stud welding equipment
JPH1119773A (en) * 1997-06-30 1999-01-26 Daihen Corp Method for controlling short-circuit in pulling-up period of stud welding
DE10059659B4 (en) * 2000-12-01 2004-03-18 Heinz Soyer Bolzenschweisstechnik Gmbh Quality control in stud welding
CN101354369B (en) * 2008-09-12 2011-08-31 西安交通大学 Electric arc stud welding waveform detection device
CN101364106A (en) * 2008-09-19 2009-02-11 广州(从化)亨龙机电制造实业有限公司 Welding quality control system and method for resistance welding
JP6636284B2 (en) * 2015-08-21 2020-01-29 株式会社ダイヘン Arc welding quality judgment system
CN105772912B (en) * 2016-03-30 2018-07-24 胡长建 It is a kind of can automatic adjusument arc stud welding gun
JP7075705B2 (en) * 2017-01-24 2022-05-26 株式会社ダイヘン Arc welding control method
CN110227878B (en) * 2019-06-27 2021-02-26 天津七所高科技有限公司 Method for detecting dislocation or loss of nut by using resistance welding equipment
CN111168230B (en) * 2020-03-04 2022-03-04 济南邦德激光股份有限公司 Focusing device and focusing method of laser cutting machine

Also Published As

Publication number Publication date
CN115365622A (en) 2022-11-22
CN115365622B (en) 2024-04-30

Similar Documents

Publication Publication Date Title
US20210060589A1 (en) Metal manufacturing systems and methods using mechanical oscillation
KR101162840B1 (en) Welding control apparatus for pulse arc welding of consumed electrode type, arc length control method for use with the same, and welding system including the welding control apparatus
EP1749612B1 (en) Arc start control method in robot welding
EP3744460B1 (en) Arc welding controlling method
EP0788418B1 (en) Stud welding device
US9962786B2 (en) Arc welding method, arc welding apparatus, and arc welding controller
JP2022177565A (en) Arc stud welding device and arc stud welding method
CN114535755A (en) High-dynamic wire feeding control method for fusion welding process based on piezoelectric actuator
CN115476023B (en) Arc stud welding method and arc stud welding device
JP4058099B2 (en) Two-electrode arc welding end method
CN110035860B (en) Method and apparatus for welding with improved start-up
JP4864232B2 (en) Consumable two-electrode arc welding end method, welding end control method, and welding robot
US20070007255A1 (en) Stud welding method
JPH0751858A (en) Method of compensating drop period in stud welding
JP4864233B2 (en) Consumable two-electrode arc welding end method, welding end control method, and welding robot
WO2024057602A1 (en) Resistance spot welding method
JP4548387B2 (en) Consumable electrode welding method
JP6104081B2 (en) Arc welding method and welding apparatus
WO2024135829A1 (en) Arc welding method
US20220055134A1 (en) Arc welding method and arc welding device
JP4175316B2 (en) Welding system and method for controlling welding robot
JP4261263B2 (en) Arc spraying start method and arc spraying start / stop method
CN114025905B (en) Spot welding method
JP7158145B2 (en) welding equipment
JPH1158016A (en) Short circuiting transfer type arc welding method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230912

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240625

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240628