JP2022152874A - Protrusion prevention method for existing pc steel rod, and existing pc steel rod protrusion prevention tool used for the same - Google Patents

Protrusion prevention method for existing pc steel rod, and existing pc steel rod protrusion prevention tool used for the same Download PDF

Info

Publication number
JP2022152874A
JP2022152874A JP2021055809A JP2021055809A JP2022152874A JP 2022152874 A JP2022152874 A JP 2022152874A JP 2021055809 A JP2021055809 A JP 2021055809A JP 2021055809 A JP2021055809 A JP 2021055809A JP 2022152874 A JP2022152874 A JP 2022152874A
Authority
JP
Japan
Prior art keywords
sleeve
existing
steel bar
wedge
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2021055809A
Other languages
Japanese (ja)
Other versions
JP7524121B2 (en
Inventor
拓也 原田
Takuya Harada
知樹 岩生
Tomoki Iwao
明夫 正司
Akio Shoji
謙一 高橋
Kenichi Takahashi
博 渡瀬
Hiroshi Watase
洋輔 東
Yosuke Azuma
智紀 堀井
Tomonori Horii
一成 野田
Kazunari Noda
睦彦 大西
Mutsuhiko Onishi
亮介 小林
Ryosuke Kobayashi
実花 成子
Mika Naruko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Nippon Expressway Co Ltd
Kobelco Wire Co Ltd
Central Nippon Expressway Co Ltd
East Nippon Expressway Co Ltd
Nippon Expressway Research Institute Co Ltd
Oriental Shiraishi Corp
Original Assignee
Shinko Wire Co Ltd
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
East Nippon Expressway Co Ltd
Nippon Expressway Research Institute Co Ltd
Oriental Shiraishi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Wire Co Ltd, West Nippon Expressway Co Ltd, Central Nippon Expressway Co Ltd, East Nippon Expressway Co Ltd, Nippon Expressway Research Institute Co Ltd, Oriental Shiraishi Corp filed Critical Shinko Wire Co Ltd
Priority to JP2021055809A priority Critical patent/JP7524121B2/en
Priority claimed from JP2021055809A external-priority patent/JP7524121B2/en
Publication of JP2022152874A publication Critical patent/JP2022152874A/en
Application granted granted Critical
Publication of JP7524121B2 publication Critical patent/JP7524121B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

To prevent a steel rod from protruding from a concrete member due to large impact force generated when an existing PC steel rod is broken.SOLUTION: A protrusion prevention tool 30 is constituted by a sleeve S and a wedge W both of which are divided so that it can be installed to an existing steel rod B. Concrete 20 is beaten at two places of a first position P(1) with 0.25 m to 2.0 m of a first length L(1) from the vicinity of an upper floor slab 14 and a second position P(2) with 0.25 m to 2.0 m of the first length L(1) from the vicinity of a lower floor slab 16. The existing PC steel rod B is exposed at the two places. The protrusion prevention tool is installed to the exposed existing steel rod B so that the narrowing direction of tapers of the wedge W and the sleeve S becomes a direction to a nearer surface, which is the direction to the upper floor slab 14 as to the first position P(1) and the direction to the lower floor slab 16 as to the second position P(2), with respect to the exposed existing steel rod B.SELECTED DRAWING: Figure 2

Description

本発明は、土木建築分野におけるコンクリート製の梁、桁またはその他の建築部材等において好適に使用されるプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒(PC鋼線、PC鋼より線を含まない)が時間の経過やグラウト充填量の不足等による腐食により破断(本発明においては破断の原因は限定されるものではない)した場合に(鋼棒であるがゆえに)瞬時に発生する大きな衝撃力を好適に受け止めることによりコンクリート部材の外にPC鋼棒が突出することを防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具に関する。 The present invention relates to an existing PC steel bar (PC steel wire, PC steel rather than PC steel wire) that imparts a compressive force to a prestressed concrete member that is suitably used in concrete beams, girders, or other building members in the field of civil engineering and construction. (not including wire) breaks due to corrosion due to the passage of time or insufficient grout filling (the cause of breakage is not limited in the present invention) (because it is a steel bar) The present invention relates to an existing PC steel bar protrusion prevention method and an existing PC steel bar protrusion prevention tool used therein, which can prevent a PC steel bar from protruding out of a concrete member by suitably receiving a large impact force.

なお、本発明において、楔体、楔、くさび、クサビ、ウェッジ(wedge)と記載する場合があるが、これらは同じ構造を備える。また、本発明は既設のPC鋼棒を対象としているために単にPC鋼棒と記載している場合であっても既設PC鋼棒であることを示すものとなる。 In the present invention, wedges, wedges, wedges, wedges, and wedges may be used, but they have the same structure. In addition, since the present invention is directed to existing PC steel bars, even when the term is simply referred to as PC steel bars, it indicates existing PC steel bars.

2000年(平成12年)以前に建設されたPC構造の箱桁橋には緊張材としてPC鋼棒が多数使用されており、橋梁の老朽化に伴ってPC鋼棒においても腐食が進行している場合がある。特に、グラウトの注入時にシース内に気泡が残った場合や、グラウト材そのものに問題があった場合などに十分な防錆力が得られず、PC鋼棒の腐食が進行して破断にいたることがある。また、アンカーなどに利用した場合には、地盤の動きによりPC鋼棒の緊張が増し、設計以上の張力となってPC鋼棒が破断することもある。 Many prestressed concrete (PC) steel bars are used as tendons in PC box girder bridges constructed before 2000, and as the bridges age, corrosion progresses in the prestressed steel bars as well. There may be In particular, if air bubbles remain in the sheath when grout is injected, or if there is a problem with the grout material itself, sufficient rust prevention cannot be obtained, and corrosion of the PC steel bar progresses, leading to breakage. There is Also, when used as an anchor or the like, ground movement increases the tension of the PC steel bar, and the tension may exceed the design level, resulting in breakage of the PC steel bar.

その際、PC鋼棒が緊張されている(PC鋼棒が緊張されることによりPC構造物に圧縮力が付与されている)ため、破断したPC鋼棒は構造物表面から飛び出し、コンクリートの破片を周囲に落下させる危険があった。すなわち、PC鋼棒には大きな緊張力が付与されており、その破断は(たとえばPC鋼より線等と異なり)全断面が瞬時に破断するために破断による衝撃力は大きく、特に路面に対して鉛直に配置されたPC鋼棒が破断すると、その衝撃力で路盤が盛り上がるなどにより車両走行に支障を来すおそれ、コンクリートの破片を周囲に落下させたりするおそれがある。 At that time, since the PC steel rod is under tension (a compressive force is applied to the PC structure due to the tension of the PC steel rod), the fractured PC steel rod jumps out from the surface of the structure and forms concrete fragments. There was a danger of dropping the In other words, a large tension is applied to a PC steel bar, and its breakage (unlike, for example, a PC steel stranded wire) results in an instantaneous breakage of the entire cross section. When a vertically placed PC steel bar breaks, the roadbed may swell due to the impact force, which may hinder the running of the vehicle, and may cause concrete fragments to fall to the surroundings.

PC鋼棒の飛び出しの衝撃力で路盤が盛り上がったりコンクリート片が落下したりすると、人や走行車両などに対して不測の事態を招くおそれがある。そのため、PC鋼棒端部が位置する箇所のPC構造物の表面に鋼板を配置し、その上にアラミド繊維シートなどをエポキシ樹脂のような接着剤で貼り付けることによって、PC鋼棒の破断飛び出しによるコンクリート片の落下を防止する対策がとられていた。 If the roadbed swells or concrete pieces fall due to the impact force of the PC steel rod popping out, there is a risk that an unexpected situation will be caused to people or traveling vehicles. Therefore, by placing a steel plate on the surface of the PC structure where the end of the PC steel bar is located, and attaching an aramid fiber sheet or the like on it with an adhesive such as epoxy resin, the breakage of the PC steel bar Measures were taken to prevent concrete pieces from falling due to

このようにPC構造物の表面に鋼板やアラミド繊維シートなどを貼り付ける従来の対策では、路面上に設置する場合には、その取り付け作業が極めて面倒であるうえ、構造物の外面に取り付けた場合には、(外面の仕上げ状態にもよるが)構造物の外観上が好ましくない可能性があった。また、鋼板が薄すぎる場合や腐食した場合、あるいはPC鋼棒の飛び出しエネルギーが大きすぎる場合には、PC鋼棒の飛び出しを抑えきれず、コンクリートの破片が周囲に落下することを防止できなかった。 In this way, with the conventional countermeasure of sticking a steel plate or an aramid fiber sheet on the surface of a PC structure, when installing it on the road surface, the installation work is extremely troublesome, and when it is installed on the outer surface of the structure, , there was a possibility that the appearance of the structure (depending on the finish of the outer surface) was not desirable. In addition, when the steel plate is too thin or corroded, or when the PC steel rod has too much energy to fly out, the projection of the PC steel rod cannot be suppressed, and concrete fragments cannot be prevented from falling to the surroundings. .

このような従来の事情に鑑み、PC構造物の表面に外観を損なうような鋼板やアラミド繊維シートなどの部材を付加することなく、破断したPC鋼棒の飛び出しを確実に防止して、コンクリートの破片の落下を防ぐことができるPC鋼棒の飛び出し防止機構付き定着構造を、たとえば特開2007-314970号公報(特許文献1)は開示する。
この特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造は、PC鋼棒が挿入される貫通部を有するアンカー部材と、PC鋼棒に螺合しかつアンカー部材に当接する固定ナットとで、PC鋼棒端部を固定する定着構造において、
In view of such conventional circumstances, it is proposed to reliably prevent fractured PC steel bars from popping out without adding members such as steel plates or aramid fiber sheets that impair the appearance of the PC structure surface, thereby improving the strength of the concrete. Japanese Unexamined Patent Application Publication No. 2007-314970 (Patent Document 1), for example, discloses a fixing structure with a PC steel bar pop-out prevention mechanism that can prevent fragments from falling.
The anchoring structure with a mechanism for preventing the PC steel rod from popping out disclosed in Patent Document 1 includes an anchor member having a through portion into which the PC steel rod is inserted, and a fixing nut that is screwed onto the PC steel rod and abuts the anchor member. In the fixing structure for fixing the PC steel bar end,

(1)PC鋼棒の固定端側および緊張端側の各アンカー部材の外周部に、それぞれ径方向外側に突出して設けた帯状凸部と、
(2)PC鋼棒の緊張端側において、アンカー部材に固定したアンカーボルトにPC鋼棒端面に対向して固定された飛出防止板と、
(3)PC鋼棒の固定端側において、アンカー部材の固定端側に当接する前記固定ナットとともに、PC鋼棒に螺合しかつアンカー部材の緊張端側に当接する飛出防止ナットとを、備えることを特徴とする。
(1) band-shaped protrusions protruding radially outward from the outer peripheral portions of the anchor members on the fixed end side and the tension end side of the PC steel bar;
(2) A jump-out prevention plate fixed to an anchor bolt fixed to an anchor member on the strained end side of the PC steel bar so as to face the end face of the PC steel bar;
(3) on the fixed end side of the PC steel bar, the fixing nut abutting on the fixed end side of the anchor member and the jump-out prevention nut screwed on the PC steel bar and abutting on the tensioned end side of the anchor member, It is characterized by having

これらの(1)~(3)の構成により、供用後にPC鋼棒が万一判断した場合にも、緊張端側からのPC鋼棒の飛び出しを飛出防止板で防ぐとともに、固定端側からのPC鋼棒の飛び出しは固定ナットと飛出防止ナットのダブルナットによって防止する。その際、破断したPC鋼棒の飛び出しエネルギーは緊張端側および固定端側のアンカー部材に伝達されるが、これらのアンカー部材の外周部には径方向外側に突出した帯状凸部が設けてあるため、飛び出しエネルギーは帯状凸部からコンクリート躯体に逃がされ、PC鋼棒の飛び出しおよびコンクリート片の落下を有効に防止することができる。 With these configurations (1) to (3), even in the unlikely event that the PC steel bar should be judged after service, the jump-out prevention plate prevents the PC steel bar from jumping out from the strained end side, and the fixed end side The projection of the PC steel bar is prevented by a double nut consisting of a fixing nut and a projection prevention nut. At that time, the popping energy of the fractured PC steel bar is transmitted to the anchor members on the tense end side and the fixed end side. Therefore, the popping energy is released to the concrete frame from the belt-like protrusion, and it is possible to effectively prevent the popping out of the PC steel rod and the fall of the concrete piece.

特開2007-314970号公報Japanese Patent Application Laid-Open No. 2007-314970

しかしながら、上述した特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造は、プレストレストコンクリート部材を初めて施工する場合に好適に採用されるものに過ぎず、2000年(平成12年)以前に建設されたPC構造の箱桁橋には緊張材としてPC鋼棒が多数使用されており、橋梁の老朽化に伴ってPC鋼棒においても腐食が進行しているという背景の元で、既設のプレストレストコンクリート部材に特許文献1に開示された技術を適用することは施工上大きな問題があり実質的に施工することができない。 However, the fixation structure with a mechanism for preventing the PC steel bar from popping out disclosed in the above-mentioned Patent Document 1 is only suitable for the first time construction of prestressed concrete members, and before 2000 (Heisei 12). Many PC steel bars are used as tendons in PC box girder bridges constructed in The application of the technique disclosed in Patent Document 1 to the prestressed concrete member of No. 1 poses a serious problem in terms of construction and cannot be substantially constructed.

特に、このような既設のPC構造物の一例である箱桁橋に対して、長年にわたりPC構造物に圧縮力を付与し続けているPC鋼棒が腐食破断した場合でも路面に変状が生じないようにするために、PC鋼棒破断時の衝撃力を受け止めて路面に変状が生じなくコンクリート片が落下することのない工法の開発が望まれており、供用中の箱桁橋に対して交通規制を行わずに実施できる工法の開発が強く望まれている。このような強い要望に対して、特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造が好適に適用できないという問題点がある。また、中間定着具など突出防止を目的に設置し、PC鋼棒破断時の衝撃力を完全に受け止めた場合には、中間定着具とコンクリート表面との間(区間)で残存する圧縮力は変わらない状態か大きい状態であるため、その区間におけるPC鋼棒がさらに破断した場合にはPC鋼棒が突出する可能性がある。 In particular, for a box girder bridge, which is an example of such an existing PC structure, even if the PC steel rods that continue to apply compressive force to the PC structure for many years are corroded and broken, deformation of the road surface will occur. In order to prevent this, it is desired to develop a construction method that absorbs the impact force when the PC steel bar breaks and does not deform the road surface and prevent concrete pieces from falling. There is a strong demand for the development of construction methods that can be implemented without traffic restrictions. In response to such a strong demand, there is a problem that the fixing structure with a mechanism for preventing the PC steel bar from jumping out disclosed in Patent Document 1 cannot be suitably applied. In addition, if an intermediate anchor is installed for the purpose of preventing protrusion, and the impact force when the PC steel bar is broken is completely received, the compressive force remaining between the intermediate anchor and the concrete surface (section) will not change. Since it is in a state of no or large, there is a possibility that the PC steel bar will protrude if the PC steel bar in that section is further broken.

本発明は、従来技術の上述の問題点に鑑みて開発されたものであり、その目的とするところは、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することである。さらには、PC鋼棒が破断した際に発生する大きな衝撃力を受け止めて、かつ、その衝撃力を緩衝することにより、既設PC鋼棒突出防止具とコンクリート表面との間(区間)で残存した圧縮力を小さくすることができ、その区間におけるPC鋼棒がさらに破断した場合のPC鋼棒の突出の可能性を低くすることのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することである。 The present invention has been developed in view of the above-mentioned problems of the prior art, and the purpose thereof is to solve the problem when an existing PC steel bar, which applies a compressive force to a prestressed concrete member in service, breaks. Existing PC steel bar protrusion prevention method and existing PC steel bar protrusion prevention tool used for the existing PC steel bar protrusion prevention method that can prevent the PC steel bar from protruding out of the concrete member due to the large impact force that occurs when the concrete member is in service. is to provide Furthermore, by receiving the large impact force generated when the PC steel bar breaks and buffering the impact force, the existing PC steel bar protrusion prevention tool and the concrete surface (section) An existing PC steel bar protrusion prevention method that can reduce the compressive force and reduce the possibility of PC steel bar protrusion in the event that the PC steel bar further breaks in that section, and the existing PC steel bar protrusion used therefor provide protection.

上記目的を達成するため、本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具は、以下の技術的手段を講じている。
すなわち、本発明のある局面に係る既設PC鋼棒突出防止工法は、既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに前記既設PC鋼棒に装着可能な構造を備えたスリーブとを含む突出防止具を用いて、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めて前記コンクリート部材の
外部に前記既設PC鋼棒が突出することを防止する工法であって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から前記既設PC鋼棒に沿って0.25m~2.0mの位置のコンクリートを斫って、前記既設PC鋼棒を露出させる露出ステップと、前記ウェッジのテーパーが狭まる方向が前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した既設PC鋼棒に装着するウェッジ装着ステップと、前記スリーブのテーパーが狭まる方向が前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した既設PC鋼棒に装着するスリーブ装着ステップと、前記スリーブを前記ウェッジに組み合わせられるスリーブとして機能させるスリーブ機能化ステップと、前記分割された状態で前記露出した前記既設PC鋼棒に装着された2以上のウェッジ片を、前記ウェッジのテーパーの向きと前記スリーブのテーパーの向きとを一致させて、スリーブとして機能させた前記スリーブに挿入する挿入ステップとを含む。
In order to achieve the above object, the existing PC steel bar protrusion prevention method and the existing PC steel bar protrusion prevention tool used therefor according to the present invention take the following technical means.
That is, the existing PC steel bar protrusion prevention method according to one aspect of the present invention includes a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and a taper combined with the wedge. and a sleeve having a structure that can be attached to the existing PC steel bar. A construction method for receiving force to prevent the existing PC steel bar from protruding outside the concrete member, wherein the existing PC steel bar is removed from the surface of the concrete member from which the existing PC steel bar is expected to protrude. An exposing step of scraping off the concrete at a position of 0.25 m to 2.0 m along the bar to expose the existing PC steel bar, and so that the taper of the wedge narrows toward the surface, a wedge mounting step of mounting two or more split wedge pieces on the exposed existing PC steel bar; and mounting the sleeve on the existing PC steel bar so that the tapered direction of the sleeve is directed toward the surface. a sleeve mounting step of mounting a sleeve having a structure to the exposed existing PC steel bar; a sleeve functionalization step of functioning the sleeve as a sleeve that can be combined with the wedge; an inserting step of inserting two or more wedge pieces attached to an existing PC steel bar into the sleeve functioning as a sleeve by matching the taper direction of the wedge with the taper direction of the sleeve.

好ましくは、前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超える場合において、前記露出ステップは、前記表面から0.25m~2.0mの第一位置のコンクリートおよび前記他の表面から0.25m~2.0mの第二位置のコンクリートを2箇所斫って、前記2箇所において前記既設PC鋼棒を露出させるステップを含み、前記第一位置および前記第二位置は、前記表面、前記第一位置、前記第二位置、前記他の表面の順であって、前記ウェッジ装着ステップは、斫り1箇所に対して1個のウェッジを用いて、前記ウェッジのテーパーが狭まる方向が近い方の前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、前記スリーブ装着ステップは、斫り1箇所に対して1個のスリーブを用いて、前記スリーブのテーパーが狭まる方向が近い方の前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含むように構成することができる。 Preferably, the length is along the existing PC steel bar, and the existing PC steel bar is expected to protrude from the surface of the concrete member from which the existing PC steel bar is expected to protrude. In the case where the length L to the other surface of the concrete member exceeds 2.5m to 3.5m, the exposing step removes the concrete and the other concrete at a first position 0.25m to 2.0m from the surface. A step of scraping concrete at a second position 0.25 m to 2.0 m from the surface to expose the existing PC steel bar at the two positions, wherein the first position and the second position are the In the order of the surface, the first position, the second position, and the other surface, the wedge mounting step uses one wedge for one pinch, and the taper of the wedge narrows. and attaching two or more split wedge pieces to the exposed existing PC steel bar such that the two or more split wedge pieces are oriented toward the nearer surface, and the sleeve attaching step includes: Using one sleeve, a sleeve having a structure that can be attached to the existing PC steel bar so that the tapered direction of the sleeve is in the direction of the closer surface is attached to the exposed existing It can be configured to include the step of attaching to a PC steel bar.

さらに好ましくは、前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超えない場合において、前記露出ステップは、前記表面および前記他の表面のいずれかから0.25m~2.0mの位置のコンクリートを1箇所斫って、前記1箇所において前記既設PC鋼棒を露出させるステップを含み、前記ウェッジ装着ステップは、斫り1箇所に対して2個のウェッジを用いて、前記2個のウェッジのテーパーが狭まる方向が互いに対面する方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、前記スリーブ装着ステップは、斫り1箇所に対して2個のスリーブを用いて、前記2個のスリーブのテーパーが狭まる方向が互いに対面する方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含むように構成することができる。 More preferably, the length is along the existing PC steel bar, and the existing PC steel bar is expected to protrude from the surface of the concrete member from which the existing PC steel bar is expected to protrude. and the length L to the other surface of said concrete member does not exceed 2.5m to 3.5m, said exposing step is 0.25m to 2.0m from either said surface and said other surface. and exposing the existing PC steel bar at the one location by scraping the concrete at the position of 1, and the wedge mounting step uses two wedges for one scraping location to install the two mounting two or more divided wedge pieces on the exposed existing PC steel bar so that the tapered directions of the wedges face each other; Two sleeves are used for one location, and the sleeves having a structure that can be attached to the existing PC steel bar are exposed so that the tapered directions of the two sleeves face each other. It can be configured to include a step of attaching to the existing PC steel bar.

さらに好ましくは、前記挿入ステップは、前記ウェッジを前記スリーブに、ジャッキを用いることなく作業者の手作業により挿入するステップを含むように構成することができる。
また、本発明の別の局面に係る既設PC鋼棒突出防止具は、上述したいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備える内筒側のスリーブ片と前記内筒側のスリーブ片の外側に設けられる外筒側のスリーブ片とに分割されるスリーブと、を含み、前記内筒側のスリーブ片および前記外筒側のスリーブ片について、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能な切欠き部を少なくとも内筒側スリーブ片が備え、前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする
。また、前記外筒側のスリーブ片は、たとえばFRP(Fiber Reinforced Plastics:繊維強化プラスチック)製のシートで、前記内筒側のスリーブ片と前記外筒側のスリーブ片とは前記内筒側のスリーブ片の外周にシート状の前記外筒側のスリーブ片を巻き付けることにより前記スリーブとして一体化されるものであっても構わない。この場合には、シート状の前記外筒側のスリーブ片の切欠き部は必須の構成ではない。
More preferably, the inserting step includes manually inserting the wedge into the sleeve by an operator without the use of a jack.
Further, an existing PC steel bar protrusion preventive tool according to another aspect of the present invention is a protrusion preventive tool used in any of the existing PC steel bar protrusion preventing methods described above, wherein A wedge divided into two or more wedge pieces when viewed from a plane perpendicular to a direction, an inner cylinder side sleeve piece provided with a taper combined with the wedge, and an outer cylinder side provided outside the inner cylinder side sleeve piece and a sleeve that is divided into a sleeve piece and a sleeve piece, and regarding the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side, the existing PC steel when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar At least the sleeve piece on the inner cylinder side has a notch into which a rod can be inserted, and the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side are joined together to form a sleeve that is integrated with the wedge. It is characterized by functioning as a sleeve that is The sleeve piece on the outer cylinder side is, for example, a sheet made of FRP (Fiber Reinforced Plastics), and the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side are the same as the sleeve on the inner cylinder side. It may be integrated as the sleeve by winding a sheet-like sleeve piece on the outer cylinder side around the outer circumference of the piece. In this case, the notched portion of the sheet-like sleeve piece on the outer cylinder side is not essential.

好ましくは、前記内筒側のスリーブ片の外周面に設けられたキー溝と前記外筒側のスリーブ片の内周面に設けられたキー溝とに跨ってキーが設けられて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されるように構成することができる。
さらに好ましくは、前記内筒側のスリーブ片の外周面に設けられた雄ねじと前記外筒側のスリーブ片の内周面に設けられた雌ねじとが螺合されて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されるように構成することができる。
Preferably, a key is provided across a key groove provided on the outer peripheral surface of the sleeve piece on the inner cylinder side and a key groove provided on the inner peripheral surface of the sleeve piece on the outer cylinder side. and the sleeve piece on the outer cylinder side are joined together to be integrated as a sleeve.
More preferably, a male thread provided on the outer peripheral surface of the sleeve piece on the inner cylinder side and a female thread provided on the inner peripheral surface of the sleeve piece on the outer cylinder side are screwed together with the sleeve piece on the inner cylinder side. It can be configured to be integrated as a sleeve by joining the sleeve piece on the outer cylinder side.

また、本発明のさらに別の局面に係る既設PC鋼棒突出防止具は、上述したいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能なスリット部を備えるスリーブと、を含み、前記スリット部において互いに対向する壁面が連結部材を用いて連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする。 Further, an existing PC steel bar protrusion prevention tool according to still another aspect of the present invention is a protrusion prevention tool used in any of the existing PC steel bar protrusion prevention methods described above, wherein the existing PC steel bar is A wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction, and a taper combined with the wedge, and the existing PC steel bar viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar. a sleeve having a slit portion into which a rod can be inserted, wherein wall surfaces facing each other in the slit portion are connected using a connecting member, thereby regulating the interval between the slit portions when viewed from the vertical plane. It is characterized by functioning as a sleeve combined with the wedge.

好ましくは、前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されるように構成することができる。
さらに好ましくは、前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制され、前記雄ねじの径を変更することにより、前記垂直な面から見た前記スリット部の間隔を規制した際に前記連結部材の剛性が変更されて前記PC鋼棒が破断した際の緩衝能力を調整できるように構成することができる。
Preferably, the connecting member includes a female threaded hole provided in at least one of the wall surfaces facing each other and a male screw passing through the hole provided in the other wall surface, and the male screw is inserted into the female screw hole. By screwing together and connecting the wall surfaces, the interval between the slit portions viewed from the vertical plane can be regulated.
More preferably, the connecting member includes a female threaded hole provided in at least one of the wall surfaces facing each other and a male screw passing through the hole provided in the other wall surface, and the male screw is inserted into the female screw hole. are screwed together to connect the wall surfaces, thereby regulating the distance between the slit portions when viewed from the vertical plane. By changing the diameter of the male screw, the distance between the slit portions when viewed from the vertical plane The rigidity of the connecting member is changed when the gap is regulated, and the buffering capacity can be adjusted when the PC steel bar breaks.

さらに好ましくは、前記スリーブにおけるテーパーが広がる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面にて前記スリーブに接合される、平板状のプレートをさらに含み、前記プレートは、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能、かつ、前記ウェッジにおけるテーパーが広がる方向の端部に設けられたウェッジ突起部が突出可能な切欠き部を備え、前記プレートが前記スリーブの端面に接合されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ウェッジ突起部が前記プレートの切欠部から突出するように構成することができる。 More preferably, it further includes a flat plate joined to the sleeve at an end face in the direction in which the taper of the sleeve expands and perpendicular to the longitudinal direction of the existing PC steel bar, wherein the plate is the A notch into which the existing PC steel bar can be inserted when viewed from the plane perpendicular to the longitudinal direction of the existing PC steel bar, and into which the wedge protrusion provided at the end of the wedge in the direction in which the taper widens can protrude. The wedge is positioned at a predetermined position of the sleeve by joining the plate to the end surface of the sleeve, and the wedge protrusion protrudes from the notch of the plate. can.

さらに好ましくは、3次元形状のワイヤークリップをさらに含み、前記ワイヤークリップは、前記スリーブにおける、前記既設PC鋼棒の長手方向の長さに対応する直線部と、前記直線部よりも前記スリーブにおけるテーパーが広がる側に、前記ウェッジにおけるテーパーが広がる方向の端部の外周上に設けられたウェッジ溝部に嵌入される円弧部と、前記直線部よりも前記スリーブにおけるテーパーが狭まる側に、前記スリーブにおけるテーパーが狭まる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面に設けられたスリーブ穴部に嵌入される嵌入片と、を少なくとも備え、前記ワイヤークリップの円弧部が前記ウェッジ溝部に嵌入されるとともに、前記ワイヤークリップの嵌入片が前記スリーブ穴部に嵌入されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ワイヤークリップの直線部が前記スリーブの外周に沿って配置されるように構成することができる。 More preferably, a three-dimensional wire clip is further included, and the wire clip comprises a linear portion corresponding to the length of the existing PC steel rod in the longitudinal direction of the sleeve and a taper in the sleeve that is greater than the linear portion. and an arc portion that is fitted into a wedge groove provided on the outer circumference of the end in the direction in which the taper of the wedge widens; and a fitting piece that is inserted into a sleeve hole provided in the end surface of the existing PC steel bar perpendicular to the longitudinal direction, the arc portion of the wire clip being in the wedge groove portion. The wedge is positioned at a predetermined position in the sleeve by fitting the fitting piece of the wire clip into the sleeve hole, and the straight portion of the wire clip is aligned with the outer circumference of the sleeve. It can be configured to be arranged along.

本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具によると、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することができる。さらには、本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具によると、PC鋼棒が破断した際に発生する大きな衝撃力を受け止めて、かつ、その衝撃力を緩衝することにより、既設PC鋼棒突出防止具とコンクリート表面との間(区間)で残存した圧縮力を小さくすることができ、その区間におけるPC鋼棒がさらに破断した場合のPC鋼棒の突出の可能性を低くすることができる。 According to the existing PC steel bar protrusion prevention method and the existing PC steel bar protrusion prevention tool used in the method according to the present invention, it occurs when the existing PC steel bar that applies compressive force to the prestressed concrete member in service breaks. It is possible to prevent the PC steel rod from protruding out of the concrete member due to a large impact force by working while the concrete member is in service. Furthermore, according to the existing PC steel bar protrusion prevention method and the existing PC steel bar protrusion prevention tool used in the existing PC steel bar protrusion prevention method according to the present invention, the large impact force generated when the PC steel bar breaks is received and the impact force is reduced. By buffering, it is possible to reduce the compressive force remaining between the existing PC steel bar protrusion prevention tool and the concrete surface (section), and the protrusion of the PC steel bar when the PC steel bar further breaks in that section can be reduced. can reduce the possibility of

本発明の実施の形態に係る突出防止具30の使用が想定されるPC構造物(プレストレストコンクリート部材)の一例であるPC箱桁橋10を説明するための図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a diagram for explaining a PC box girder bridge 10, which is an example of a PC structure (prestressed concrete member) for which a protrusion prevention tool 30 according to an embodiment of the present invention is assumed to be used; 図1における上床版から下床版までの長さL(既設PC鋼棒に沿った長さであって、既設PC鋼棒が突出することが予測されるコンクリート部材の表面から既設PC鋼棒が突出することが予測されるコンクリート部材の他の表面までの長さL)が長い場合の突出防止具30の使用態様を説明するための図である。The length L from the upper floor slab to the lower floor slab in FIG. FIG. 10 is a diagram for explaining a mode of use of the protrusion preventive tool 30 when the length L) to the other surface of the concrete member expected to protrude is long. 図2における長さLが短い場合の突出防止具30(2個の突出防止具30を組み合わせた突出防止具32)の使用態様を説明するための図である。FIG. 3 is a diagram for explaining a usage mode of a protrusion preventive tool 30 (a protrusion preventive tool 32 combining two protrusion preventive tools 30) when the length L in FIG. 2 is short; 突出防止具30を構成する(A)スリーブ100(スリーブSに相当)および(B)ウェッジ140(ウェッジWに相当)の平面図である。FIG. 3 is a plan view of (A) a sleeve 100 (corresponding to a sleeve S) and (B) a wedge 140 (corresponding to a wedge W) that constitute the protrusion prevention tool 30; 図4のスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能する状態を示す(A)平面図および(B)せん断キーの機能を説明するための図である。(A) A plan view showing a state in which the sleeve 100 (corresponding to the sleeve S) in FIG. 4 functions as a sleeve combined with the wedge 140 (corresponding to the wedge W), and (B) a diagram for explaining the function of the shear key. is. 図4のスリーブ100(スリーブSに相当)およびウェッジ140(ウェッジWに相当)を用いた突出防止具30を、PC構造物から露出させた既設PC鋼棒に装着する手順を説明するための図である。FIG. 5 is a view for explaining the procedure of mounting the protrusion prevention tool 30 using the sleeve 100 (corresponding to the sleeve S) and the wedge 140 (corresponding to the wedge W) of FIG. 4 to the existing PC steel bar exposed from the PC structure. is. 突出防止具30を構成する(A)(スリーブ100とは別の)スリーブ200(スリーブSに相当)および(B)(ウェッジ140とは別の)ウェッジ240(ウェッジWに相当)の平面図である。(A) A plan view of a sleeve 200 (corresponding to the sleeve S) (different from the sleeve 100) and (B) a wedge 240 (corresponding to the wedge W) (different from the wedge 140) that constitute the projection preventing device 30 be. 図7のスリーブ200(スリーブSに相当)およびウェッジ240(ウェッジWに相当)を用いた突出防止具30を、PC構造物から露出させた既設PC鋼棒に装着する手順を説明するための図である。FIG. 8 is a view for explaining the procedure of mounting the protrusion prevention tool 30 using the sleeve 200 (corresponding to the sleeve S) and the wedge 240 (corresponding to the wedge W) of FIG. 7 to the existing PC steel bar exposed from the PC structure. is. 突出防止具30を構成する(スリーブ100およびスリーブ200とは別の)スリーブS10、スリーブS11またはスリーブS20(スリーブSに相当)が、ウェッジW(ウェッジ140と同じ)に組み合わせられるスリーブとして機能する状態を示す平面図である。A state in which the sleeve S10, the sleeve S11, or the sleeve S20 (which is different from the sleeve 100 and the sleeve 200) constituting the projection preventing device 30 (corresponding to the sleeve S) functions as a sleeve combined with the wedge W (same as the wedge 140). It is a plan view showing the. 供試体を用いて本発明の実施の形態に係る突出防止具30を評価した試験結果を示す図(その1)である。FIG. 10 is a diagram (part 1) showing test results of evaluating the protrusion preventive tool 30 according to the embodiment of the present invention using a specimen. 本発明の実施の形態の第1の変形例に係る突出防止具を説明するための図である。It is a figure for demonstrating the protrusion prevention tool based on the 1st modification of embodiment of this invention. 本発明の実施の形態の第2の変形例に係る突出防止具を説明するための図である。It is a figure for demonstrating the protrusion prevention tool based on the 2nd modification of embodiment of this invention. 供試体を用いて本発明の実施の形態に係る突出防止具30を評価した試験結果を示す図(その2)である。FIG. 10 is a diagram (part 2) showing test results of evaluating the protrusion preventive tool 30 according to the embodiment of the present invention using a specimen; 床版およびウェブを模した供試体を用いた破断・突出実験における試験装置全体の概要図である。FIG. 2 is a schematic diagram of the entire test apparatus in a fracture/protrusion experiment using specimens simulating floor slabs and webs. 上床版水準の試験体概要図である。It is a schematic diagram of a test piece at the level of the upper floor slab. 下床版水準の試験体概要図である。It is a schematic diagram of a test piece at the level of the lower floor slab. 緩衝定着具水準の試験体概要図である。FIG. 2 is a schematic diagram of a test body at the level of a buffer fixture; A区間における舗装あり-1m水準の残留変位を示す図である。FIG. 10 is a diagram showing the residual displacement at the level of −1 m with pavement in section A. FIG. A区間における舗装あり-2m水準の残留変位を示す図である。FIG. 10 is a diagram showing the residual displacement at the level of −2 m with pavement in section A. FIG. B区間における舗装なし水準のコンクリート天端の状況を示す図である。It is a figure which shows the condition of the concrete crest of the unpaved level in B section. C区間における舗装あり-8m水準の残留変位を示す図である。FIG. 10 is a diagram showing the residual displacement at the level of −8 m with pavement in section C. FIG. 床版およびウェブを模した供試体を用いた破断・突出実験における破断エネルギーを示す図である。FIG. 3 is a diagram showing breaking energy in a breaking/protrusion experiment using specimens simulating floor slabs and webs.

以下において、本発明の実施の形態に係る、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する突出防止具、および、その突出防止具を用いて既設のプレストレストコンクリート部材を供用しながら実施することのできる既設PC鋼棒突出防止工法について詳しく説明する。なお、この突出防止具自体の構造は定着具に類似する部分を含む場合があり、かつ、衝撃力を和らげるという意味では緩衝材であるために、この突出防止具は緩衝定着具とももいえるために、本明細書においては突出防止具と緩衝定着具とを区別しない場合がある。ただし、この突出防止具は、後述する既設PC鋼棒突出防止工法が完了した時点では(既設PC鋼棒が破断するまでは)定着しているものではない点で定着具と異なる。 In the following, according to the embodiment of the present invention, the existing PC steel rod protrudes outside the concrete member by receiving the impact force when the existing PC steel rod that applies compressive force to the existing prestressed concrete member breaks. A protrusion preventive tool for preventing this from occurring and an existing PC steel bar protrusion preventing method that can be implemented while using the existing prestressed concrete member using the protrusion preventive tool will be described in detail. In addition, since the structure of the projection preventive device itself may include a part similar to the fixing device, and since it is a buffer material in the sense of softening the impact force, the projection preventing device can also be said to be a buffer fixing device. In addition, in this specification, there is a case where a distinction is not made between a projection preventer and a cushioning fixture. However, this projection prevention tool is different from the fixing tool in that it is not fixed (until the existing PC steel bar is broken) when the existing PC steel bar protrusion prevention construction method described later is completed.

ここで、以下の説明において参照する図については、本発明の容易な理解のために、内部ではなく外形で表現すべき部分を内部を透視するように表現している場合があったり、外形ではなく断面で表現すべき部分を外形で表現している場合があったり、断面ではなく外形で表現すべき部分を断面で表現している場合があったり、断面であってもハッチングを付していない場合があったり、断面でないのにハッチングを付している場合があったり、詳細な構造を省略した場合があったり、詳細な構造を省略したために同じ部材であっても図面間で一致しない場合があったりする。 Here, with respect to the drawings referred to in the following description, in order to facilitate understanding of the present invention, there are cases in which portions that should be represented by the external shape rather than the internal part are expressed so as to see through the internal part, or that the external shape is There are cases where parts that should be expressed as cross sections are expressed as outlines, and parts that should be expressed as outlines are expressed as cross sections, and even cross sections are not hatched. There are cases where there is no cross section, there are cases where hatching is added even though it is not a cross section, there are cases where detailed structures are omitted, and even if the same members are the same, they do not match between drawings due to detailed structures being omitted. There are cases.

<突出防止具の使用が想定される構造物およびその部位>
まず、図1を参照して、本発明の実施の形態に係る突出防止具(緩衝定着具)30の使用が想定されるPC構造物(プレストレストコンクリート部材)の一例であるPC箱桁橋10について説明する。
図1に示すPC箱桁橋10とは、その言葉の通りに、橋の形が箱の形(箱形40)をした橋梁であって、車は橋の上(舗装路面12)を通り、箱の中の空洞SPは橋の点検時などに作業者が入れるようになっている。また、箱の上面を?える柱20の部分(ウェブ20またはコンクリート20と記載する場合がある)には、コンクリート製のものや鋼製のものがあり、ここではプレストレストコンクリート製である。
<Structures and their parts where protrusion prevention devices are assumed to be used>
First, referring to FIG. 1, a PC box girder bridge 10, which is an example of a PC structure (prestressed concrete member) in which a protrusion prevention device (shock-fixing device) 30 according to an embodiment of the present invention is assumed to be used, is described. explain.
The PC box girder bridge 10 shown in FIG. The hollow SP inside the box is designed for workers to enter when inspecting the bridge. Also, the top of the box? The portion of the column 20 (sometimes referred to as web 20 or concrete 20) that extends may be made of concrete or steel, here made of prestressed concrete.

さらに詳しくは、PC箱桁橋10は、上床版14および下床版16ならびに2本以上のウェブ20から構成されているために、曲げモーメントによる大きな圧縮力に抵抗できる特性やPC鋼材(ここではPC鋼棒)を有効に配置できること、また、ねじり剛性が大きいなどの断面特性を利用して、連続桁橋、ラーメン橋などの長大橋や曲線橋に数多く採用されている。 More specifically, since the PC box girder bridge 10 is composed of the upper deck 14, the lower deck 16, and two or more webs 20, it has the property of resisting a large compressive force due to a bending moment and the PC steel material (here, Due to its ability to effectively arrange PC steel bars and its cross-sectional characteristics such as high torsional rigidity, it is widely used in long-span bridges such as continuous girder bridges and rigid-frame bridges, as well as curved bridges.

本実施の形態に係る突出防止具30は、このPC箱桁橋10の上床版14と下床版16との間に鉛直方向に配設されたPC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する。
まず、このようなPC箱桁橋10に対して供用しながら施工可能な既設PC鋼棒突出防止工法について、上床版14から下床版16までの長さL(既設PC鋼棒Bに沿った長さであって、既設PC鋼棒Bが突出することが予測されるコンクリート部材の表面から既設PC鋼棒が突出することが予測されるコンクリート部材の他の表面までの長さLと略等しい)が長い場合と、その長さLが短い場合の突出防止具30の使用態様について説明する。
The projection prevention tool 30 according to the present embodiment receives the impact force when the PC steel rods vertically arranged between the upper floor slab 14 and the lower floor slab 16 of the PC box girder bridge 10 are broken. to prevent the existing PC steel rod from protruding outside the concrete member.
First, regarding the existing PC steel bar protrusion prevention method that can be constructed while being used for such a PC box girder bridge 10, the length L from the upper deck slab 14 to the lower deck 16 (along the existing PC steel bars B It is approximately equal to the length L from the surface of the concrete member from which the existing PC steel bar B is expected to protrude to the other surface of the concrete member from which the existing PC steel bar is expected to protrude. ) is long and when the length L is short.

図2は長さLが2.5m~3.5mを超える場合の突出防止具30の使用態様を、図3
は長さLが2.5m~3.5mを超えない場合の突出防止具32の使用態様を、それぞれ示す模式的な図である。なお、詳しくは後述するが、突出防止具30は、既設PC鋼棒Bを内面に挟み込むとともに外面にテーパーを備えたウェッジWと、そのウェッジWのテーパー面に沿った内面を備えたスリーブSとが組み合わせられて使用される。さらに、突出防止具32は、2個の突出防止具30が組み合わせられて使用される。また、これらのスリーブSおよびウェッジWに用いる材料としては金属、樹脂、化学繊維等であって特に限定されるものではないが、以下においてはPC鋼材の定着具として通常用いられる種類の金属であるとして説明する。
FIG. 2 shows how the protrusion preventive tool 30 is used when the length L exceeds 2.5 m to 3.5 m, and FIG.
4A and 4B are schematic diagrams respectively showing the manner of use of the protrusion preventive member 32 when the length L does not exceed 2.5 m to 3.5 m. Although details will be described later, the protrusion prevention tool 30 consists of a wedge W having an inner surface sandwiching the existing PC steel bar B and having a tapered outer surface, and a sleeve S having an inner surface along the tapered surface of the wedge W. are used in combination. Furthermore, the protrusion preventer 32 is used by combining two protrusion preventers 30 . The materials used for these sleeves S and wedges W are metals, resins, chemical fibers, etc., and are not particularly limited. In the following description, the types of metals commonly used as fasteners for PC steel materials are used. described as.

図2を参照して、長さLが2.5m~3.5mを超える場合の突出防止具30の使用態様について説明する。この図2に模式的に示すように、この突出防止具30は、表面(ここでは上床版14近傍)から第一長さL(1)が0.25m~2.0mの第一位置P(1)のコンクリート20、および、他の表面(ここでは下床版16近傍)から第一長さL(1)が0.25m~2.0mの第二位置P(2)のコンクリート20の2箇所のコンクリート20を斫って、2箇所において既設PC鋼棒を露出させて、その露出させた既設PC鋼棒Bに対して施工される。なお、図2に示すように、長さL、第一長さL(1)は上述した範囲であって、かつ、第一位置P(1)および第二位置P(2)の位置関係は、表面(ここでは上床版14近傍)、第一位置P(1)、第二位置P(2)、他の表面(ここでは下床版16近傍)の順である。 With reference to FIG. 2, the manner of using the protrusion preventive tool 30 when the length L exceeds 2.5 m to 3.5 m will be described. As schematically shown in FIG. 2, the protrusion prevention tool 30 is positioned at a first position P ( 1) of the concrete 20 and 2 of the concrete 20 of the second position P (2) where the first length L (1) is 0.25 m to 2.0 m from the other surface (here, near the lower floor slab 16) The existing PC steel bars are exposed at two points by scraping off the concrete 20 at the points, and construction is performed on the exposed existing PC steel bars B. As shown in FIG. 2, the length L and the first length L(1) are within the ranges described above, and the positional relationship between the first position P(1) and the second position P(2) is , the surface (near the upper floor slab 14 here), the first position P(1), the second position P(2), and the other surface (near the lower floor slab 16 here).

そして、斫り1箇所に対して、1個のウェッジWおよび1個のスリーブSを、ウェッジWおよびスリーブSのテーパーが狭まる方向が近い方の表面への方向(第一位置P(1)においては上床版14の方向、第二位置P(2)においては下床版16の方向)になるように、露出したPC鋼棒に装着する。より詳しくは、第一位置P(1)に対して1個のウェッジWおよび1個のスリーブS、ならびに、第二位置P(2)に対して1個のウェッジWおよび1個のスリーブSが使用される。 Then, one wedge W and one sleeve S are attached to one pinched portion in the direction toward the surface in which the tapering direction of the wedge W and the sleeve S is closer (at the first position P (1) is in the direction of the upper floor slab 14, and in the direction of the lower floor slab 16 at the second position P(2)). More specifically, one wedge W and one sleeve S for the first position P(1) and one wedge W and one sleeve S for the second position P(2). used.

図3を参照して、長さLが2.5m~3.5mを超えない場合の突出防止具32の使用態様について説明する。図3に模式的に示すように、この突出防止具32は、表面(ここでは上床版14近傍)から第二長さL(2)または他の表面(ここでは下床版16近傍)から第三長さL(3)が0.25m~2.0mの第三位置P(3)のコンクリートのコンクリート20を斫って、1箇所において既設PC鋼棒を露出させて、その露出させた既設PC鋼棒Bに対して施工される。なお、図1に示すように、長さL、第二長さL(2)および第三長さL(3)は上述した範囲であって、かつ、第三位置P(3)の位置関係は、表面(ここでは上床版14近傍)、第三位置P(3)、他の表面(ここでは下床版16近傍)の順である。 Referring to FIG. 3, a description will be given of how the protrusion preventive member 32 is used when the length L does not exceed 2.5 m to 3.5 m. As schematically shown in FIG. 3, the protrusion preventive tool 32 extends a second length L (2) from the surface (near the upper floor slab 14 here) or a second length L (2) from another surface (near the lower floor slab 16 here). 3. The concrete 20 of the concrete at the third position P (3) with a length L (3) of 0.25 m to 2.0 m is scraped to expose the existing PC steel bar at one point, and the exposed existing It is constructed for PC steel bar B. In addition, as shown in FIG. 1, the length L, the second length L (2), and the third length L (3) are within the ranges described above, and the positional relationship of the third position P (3) are the surface (near the upper floor slab 14 here), the third position P(3), and the other surface (near the lower floor slab 16 here) in that order.

そして、斫り1箇所に対して、2個のウェッジWおよび2個のスリーブSを、2個のウェッジWのテーパーが狭まる方向が互いに対面する方向になるように、かつ、2個のスリーブSのテーパーが狭まる方向が互いに対面する方向になるように、露出したPC鋼棒に装着する。より詳しくは、第三位置P(3)に対して2個のウェッジWおよび2個のスリーブSが、それぞれテーパーが狭まる方向が互いに対面する方向になるように使用される。 Then, two wedges W and two sleeves S are arranged with respect to one pinched portion so that the tapered directions of the two wedges W are in the directions facing each other, and the two sleeves S attached to the exposed PC steel bar so that the narrowing direction of the taper faces each other. More specifically, two wedges W and two sleeves S are used for the third position P(3) such that the narrowing directions of the tapers face each other.

図3に示す施工方法によると、図2に示す施工方法に対して、作業手間(斫り作業を含む)と施工費用の削減とを図ることができる点で好ましい。
なお、図2において、第一位置P(1)のみだけでもPC鋼棒の飛び出しの衝撃力で路盤(舗装路面12)が盛り上がることを防止できるために、本発明においては図2における第一位置P(1)のみ、または、図2における第二位置P(2)のみ、であっても構わない。
The construction method shown in FIG. 3 is preferable to the construction method shown in FIG. 2 in that it is possible to reduce work labor (including scraping work) and construction costs.
In addition, in FIG. 2, only the first position P(1) can prevent the roadbed (paved road surface 12) from rising due to the impact force of the PC steel rod popping out. It may be only P(1) or only the second position P(2) in FIG.

ここで、これらの図2および図3における、第一長さL(1)、第二長さL(2)および第三長さL(3)が0.25m~2.0mであることについて説明する。図2に示すように、既設PC鋼棒Bの破断する位置はコンクリート20に埋設されたPC鋼棒のどの位置で発生するのかはわからない。図2に示すように、表面(ここでは上床版14近傍)から0.25m~2.0mよりも下床版16側であって、かつ、他の表面(ここでは下床版
16近傍)から0.25m~2.0mよりも上床版14側の範囲を、破断想定位置として想定している。当然であるが、このように想定した破断想定位置以外である、さらに上床版14寄りであってもさらに下床版16寄りであっても、PC鋼棒が破断する可能性があるものの、たとえば、上床版14と第一位置P(1)に設けられた突出防止具30との間でPC鋼棒が破断した場合であっても上床版方向へのPC鋼棒の破断エネルギーは小さく、かぶりコンクリートにより破断エネルギーを吸収することができるために、このような0.25m~2.0mが設定されている(下床版16と第二位置P(2)に設けられた突出防止具30との間でPC鋼棒が破断した場合も同じ)。ここで、かぶりコンクリート部分におけるコンクリートのかぶり不足など懸念がある場合、この部分のグラウトの充填不良が見つかった場合等には、この区間のみグラウトを再注入することでPC鋼棒の破断に対する抵抗力を増すことができる点で好ましい。
Here, regarding that the first length L (1), the second length L (2) and the third length L (3) in these FIGS. 2 and 3 are 0.25 m to 2.0 m explain. As shown in FIG. 2, it is not known at which position of the PC steel bar embedded in the concrete 20 that the existing PC steel bar B will break. As shown in FIG. 2, the lower floor slab 16 side from 0.25 m to 2.0 m from the surface (here, the vicinity of the upper floor slab 14), and from another surface (here, the vicinity of the lower floor slab 16) A range of 0.25 m to 2.0 m on the side of the upper floor slab 14 is assumed as the assumed fracture position. Naturally, there is a possibility that the PC steel bar will break at a position other than the assumed breakage position assumed in this way, even if it is closer to the upper floor slab 14 or closer to the lower floor slab 16, but for example , even if the PC steel rod breaks between the upper floor slab 14 and the protrusion prevention tool 30 provided at the first position P(1), the breaking energy of the PC steel rod in the direction of the upper floor slab is small, Such 0.25 m to 2.0 m is set because the concrete can absorb the breaking energy (the lower floor slab 16 and the protrusion prevention tool 30 provided at the second position P (2) The same applies when a PC steel bar breaks between Here, if there is a concern such as insufficient concrete cover in the cover concrete part, or if a poor filling of grout in this part is found, grout can be reinjected only in this section to increase the resistance to fracture of the PC steel bar. It is preferable in that it is possible to increase the

これらの図2に示す施工方法において用いられる突出防止具30、および、図3に示す施工方法において用いられる突出防止具32のいずれをも構成する既設PC鋼棒Bを内面に挟み込むとともに外面にテーパーを備えたウェッジWと、そのウェッジWのテーパー面に沿った内面を備えたスリーブSとについて詳しく説明する。ここで、突出防止具32のスリーブSについては、既設PC鋼棒Bの長手方向に後述するスリーブ100またはスリーブ200を2個並べて使用するのではなく、軸方向に一体化され、1つの部材に2つのテーパーを備えた1個の複合スリーブを使用しても構わない。以下においては、突出防止具32のスリーブSについては、既設PC鋼棒Bの長手方向に後述するスリーブ100またはスリーブ200を2個並べて使用するものとして説明する。このため、後述する施工手順(既設PC鋼棒突出防止工法)については、図2の第一位置P(1)についてのみ説明する。 The existing PC steel bar B constituting both the protrusion preventive tool 30 used in the construction method shown in FIG. 2 and the protrusion preventive tool 32 used in the construction method shown in FIG. and the sleeve S having an inner surface along the tapered surface of the wedge W will be described in detail. Here, regarding the sleeve S of the protrusion prevention tool 32, instead of using two sleeves 100 or 200, which will be described later, arranged side by side in the longitudinal direction of the existing PC steel bar B, they are integrated in the axial direction into one member. A single composite sleeve with two tapers may be used. In the following description, regarding the sleeve S of the protrusion prevention tool 32, it is assumed that two sleeves 100 or 200, which will be described later, are arranged side by side in the longitudinal direction of the existing PC steel bar B and used. For this reason, only the first position P(1) in FIG. 2 will be described in the later-described construction procedure (existing PC steel bar projection prevention method).

なお、本実施の形態に係る突出防止具においては、スリーブSは大きく分別すると2種類あり(図4~図8に示す内筒外筒タイプと図9に示すスリット壁面連結タイプ)、ウェッジWは2種類あるために(ウェッジWは分割数のみ異なり、スリーブSは構造が大きく異なる)、
・図4~図6を用いてスリーブSとしてスリーブ100(内筒外筒タイプのせん断キー接合型)を説明するとともにウェッジWとしてウェッジ140(3分割)を説明して、
・図7および図8を用いてスリーブSとしてスリーブ200(内筒外筒タイプのねじ螺合型)を説明するとともにウェッジWとしてウェッジ240(2分割)を説明して、
・図9を用いてスリーブSとしてスリーブS10およびS20(スリット壁面連結タイプ)を説明する(図9におけるウェッジWはウェッジ240(3分割)と同じ)。
In addition, in the protrusion preventive device according to the present embodiment, the sleeve S can be broadly classified into two types (the inner cylinder-outer cylinder type shown in FIGS. 4 to 8 and the slit wall connection type shown in FIG. 9), and the wedge W Since there are two types (the wedge W differs only in the number of divisions, and the sleeve S differs greatly in structure),
4 to 6, the sleeve 100 (inner and outer cylinder type shear key joint type) will be explained as the sleeve S, and the wedge 140 (divided into three) will be explained as the wedge W.
7 and 8, a sleeve 200 (inner cylinder and outer cylinder type threaded type) will be described as the sleeve S, and a wedge 240 (divided into two) will be described as the wedge W.
- Sleeves S10 and S20 (slit wall connection type) will be described as sleeves S with reference to FIG. 9 (wedge W in FIG. 9 is the same as wedge 240 (divided into three)).

さらに、これらに共通して用いることのできる2つの変形例を図11および図12を用いて説明する。
なお、本発明に係る突出防止具として採用可能な中間定着具が公知である。公知技術であるために詳しくは説明しないが、すでに緊張力が導入され、両端部が構造物に定着されている緊張材(PC鋼棒を含むPC鋼材)の中間部に取り付けられて、緊張材に緊張力が導入された状態を維持したまま周囲にある構造物に緊張材を定着させるものである。たとえば、特開2018-017029号公報に記載された、互いに分離可能で対となる半割ブロックを結合して定着ブロックが形成され、対となる半割ブロック間に形成された中空孔に緊張状態の緊張材が挿通され、その後に対となる半割ブロックを緊張材の軸線方向に配列された複数列のボルトにより互いに結合させるものである。この中空孔でスリーブを形成してこのスリーブに対応するウェッジを組み合わせて中間定着具(特開2018-017029号公報に記載の中間定着具においてスリーブにウェッジを組み合わせた構成は、半割スリーブと半割ウェッジを用いて半割スリーブをボルト締結する構成となりこの構成は本願の一出願人により出願された実開昭57-084220号公報に記載の中間定着具と略等しい)としたものを、以下の説明において、先行技術または比較例として記載する場合がある。
Furthermore, two modifications that can be used in common to these will be described with reference to FIGS. 11 and 12. FIG.
An intermediate fixing member that can be employed as the protrusion prevention member according to the present invention is known. Although not described in detail because it is a well-known technique, the tension is already introduced, and the tendon is attached to the middle part of the tendon (PC steel material including PC steel bar) whose both ends are fixed to the structure, and the tendon The tendon is fixed to the surrounding structure while maintaining the state in which the tension force is introduced into the structure. For example, as described in Japanese Unexamined Patent Application Publication No. 2018-017029, a fixing block is formed by connecting a pair of separable half blocks, and a hollow hole formed between the pair of half blocks is in a tension state. The prestressing tendons are inserted through the prestressing tendons, and then the paired half blocks are joined together by a plurality of rows of bolts arranged in the axial direction of the prestressing tendons. A sleeve is formed by the hollow hole, and a wedge corresponding to the sleeve is combined with an intermediate fixing device (in the intermediate fixing device described in Japanese Patent Application Laid-Open No. 2018-017029, the sleeve and the wedge are combined). A split wedge is used to fasten the half sleeves with bolts, and this configuration is substantially the same as the intermediate fixing device described in Japanese Utility Model Laid-Open No. 57-084220 filed by one of the applicants of the present application). may be described as a prior art or a comparative example in the description.

<1:内筒外筒タイプ:せん断キー接合型>
まず、スリーブ100およびウェッジ140について説明する。
突出防止具30(または突出防止具32において2個使用される突出防止具30であるが以下においては単に突出防止具30と記載する)を構成する、スリーブ100の平面図を図4(A)に、ウェッジ140の平面図を図4(B)に、図4に示すスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能する状態を示す平面図を図5(A)に、スリーブとして機能する状態におけるせん断キーの機能を説明するための図を図5(B)に、それらのスリーブ100およびウェッジ140を用いてスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能するようにして、突出防止具30を、PC構造物から露出させた既設PC鋼棒Bに装着する手順を説明するための図を図6に、それぞれ示す。
<1: Inner cylinder and outer cylinder type: Shear key joint type>
First, sleeve 100 and wedge 140 will be described.
FIG. 4(A) is a plan view of a sleeve 100 that constitutes a protrusion preventer 30 (or two protrusion preventers 30 used in the protrusion preventer 32, but hereinafter simply referred to as the protrusion preventer 30). 4B is a plan view of the wedge 140, and a plan view showing a state in which the sleeve 100 (corresponding to the sleeve S) shown in FIG. 4 functions as a sleeve combined with the wedge 140 (corresponding to the wedge W). FIG. 5A is a diagram for explaining the function of the shear key in a state of functioning as a sleeve, and FIG. , and functioning as a sleeve combined with a wedge 140 (corresponding to the wedge W) to explain the procedure of attaching the protrusion prevention tool 30 to the existing PC steel bar B exposed from the PC structure. 6, respectively.

この突出防止具30は、図4(A)に示すスリーブ100とそのスリーブ100に組み合わせられる図4(B)に示すウェッジ140とにより構成される。なお、図4(A)において左側に描かれた側面図(一部断面図)は右側に描かれた正面図に示す矢示X方向から見た図であって、図4(B)において左側に描かれた側面図および右側に描かれた正面図は3分割されたウェッジ片を組み合わせてウェッジ140とした図である。ここで、正面図とは既設PC鋼棒Bの長手方向に垂直な面から見た図であって、側面図とは、既設PC鋼棒Bの長手方向に平行な面から見た図である(以下において同じ)。 This protrusion prevention tool 30 is composed of a sleeve 100 shown in FIG. 4A and a wedge 140 shown in FIG. In addition, the side view (partial cross-sectional view) drawn on the left side in FIG. 4A is a view seen from the arrow X direction shown in the front view drawn on the right side, The side view drawn in FIG. 1 and the front view drawn on the right side are the wedges 140 formed by combining three wedge pieces. Here, the front view is a view seen from a plane perpendicular to the longitudinal direction of the existing PC steel bar B, and the side view is a view seen from a plane parallel to the longitudinal direction of the existing PC steel bar B. (same below).

図4(B)に示すように、ウェッジ140は、既設PC鋼棒Bの長手方向に垂直な面から見て2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)に分割されている。このように分割されているので、既設の既設PC鋼棒Bに装着することができる。また、ウェッジ140は3つのウェッジ片を組み合わせることによりテーパー140Tを備えることになる。 As shown in FIG. 4B, the wedge 140 is composed of two or more wedge pieces (here, three wedge pieces 142, It is divided into wedge pieces 144 and wedge pieces 146). Since it is divided in this way, it can be attached to the existing PC steel bar B already installed. Also, the wedge 140 is provided with a taper 140T by combining three wedge pieces.

図4(A)に示すように、スリーブ100は、ウェッジ140のテーパー140Tに組み合わせられるテーパー100Tを備えた中空円筒形状の内筒側のスリーブ片110と内筒側のスリーブ片110とせん断キーKにより接合される中空円筒形状の外筒側のスリーブ片120とに分割されている。内筒側のスリーブ片110の外表面116にはせん断キーKを内包するキー溝118が、外筒側のスリーブ片120の内表面126にはせん断キーKを内包するキー溝128が、それぞれ設けられている。また、キー溝からせん断キーKがPC鋼棒Bの長手方向に移動することを抑制するために、たとえば、内筒側のスリーブ片110のキー溝118の溝底面に穴を設けてせん断キーに設けられた突起部を係合させる(さらに、溝底面に雌ねじ穴を切るとともにせん断キーKを貫通する雌ねじ穴を切って全ねじボルト(所謂いもねじと呼ばれることもある全長に亘って雄ねじが切られて端面に六角穴が設けられたボルト)によりせん断キーKの雌ねじ穴と溝底面の雌ねじ穴とを螺合させる)ことも好ましい(せん断キーKに点線で図示)。内筒側のスリーブ片110および外筒側のスリーブ片120は既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部(内筒側のスリーブ片110における本体112の一部を切り欠いた切欠き部114および外筒側のスリーブ片120における本体122の一部を切り欠いた切欠き部124)を備える。 As shown in FIG. 4A, the sleeve 100 includes a hollow cylindrical sleeve piece 110 on the inner cylinder side having a taper 100T that is combined with the taper 140T of the wedge 140, the sleeve piece 110 on the inner cylinder side, and the shear key K. It is divided into a sleeve piece 120 on the side of a hollow cylindrical outer cylinder that is joined by a . A key groove 118 containing the shear key K is provided on the outer surface 116 of the sleeve piece 110 on the inner cylinder side, and a key groove 128 containing the shear key K is provided on the inner surface 126 of the sleeve piece 120 on the outer cylinder side. It is In addition, in order to prevent the shear key K from moving in the longitudinal direction of the PC steel bar B from the key groove, for example, a hole is provided in the groove bottom surface of the key groove 118 of the sleeve piece 110 on the inner cylinder side so that the shear key Engage the provided protrusion (further, cut a female threaded hole in the bottom of the groove and cut a female threaded hole penetrating the shear key K to form a fully threaded bolt (sometimes called a screw). It is also preferable that the female threaded hole of the shear key K and the female threaded hole of the bottom of the groove are screwed together with a bolt having a hexagonal hole on its end face (illustrated by the dotted line on the shear key K). The sleeve piece 110 on the inner cylinder side and the sleeve piece 120 on the outer cylinder side are notches into which the existing PC steel bar B can be inserted (sleeve piece 120 on the inner cylinder side) when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B. A notch portion 114 obtained by notching a portion of the main body 112 in 110 and a notch portion 124 obtained by notching a portion of the main body 122 of the sleeve piece 120 on the outer cylinder side are provided.

さらに、内筒側のスリーブ片110と外筒側のスリーブ片120とは、それぞれのキー溝118(内筒側のスリーブ片110)およびキー溝128(外筒側のスリーブ片120)にせん断キーKが内包されて、スリーブ片110とスリーブ片120とが接合されることによりスリーブ100として一体化されてウェッジ140に組み合わせられるスリーブとして機能することになる。 Furthermore, the sleeve piece 110 on the inner cylinder side and the sleeve piece 120 on the outer cylinder side have a shear key in the key groove 118 (sleeve piece 110 on the inner cylinder side) and the key groove 128 (sleeve piece 120 on the outer cylinder side), respectively. The sleeve piece 110 and the sleeve piece 120 are joined together with K included therein to be integrated as the sleeve 100 and function as a sleeve combined with the wedge 140 .

さらに詳しくは、スリーブ片110は、中心に既設PC鋼棒Bが挿通される(挿通される既設PC鋼棒Bに対応した)テーパー100Tを備えた本体112を備え、その本体112の一部が切欠き部114とされているためにテーパー100Tが全周にわたって存在するものではなく、切欠き部114の部分だけテーパー100Tが存在しないがこの突出防止具30としての機能には問題がない。 More specifically, the sleeve piece 110 has a main body 112 having a taper 100T through which the existing PC steel bar B is inserted (corresponding to the existing PC steel bar B to be inserted). Since the notch 114 is provided, the taper 100T does not exist over the entire circumference, and the taper 100T does not exist only in the notch 114, but the function as the protrusion preventive tool 30 does not pose any problem.

ここで、せん断キーKの機能について図5を参照して説明する。図5(A)は、スリーブ片110とスリーブ片120とが接合されることによりスリーブ100として一体化さ
れてウェッジ140に組み合わせられるスリーブとして機能する状態のスリーブ100とウェッジ140と(より詳しくはせん断キーKと)から構成される突出防止具30の側面図(左側)および正面図(右側)を示している。図5(A)に示すスリーブ100(より詳しくは内筒側のスリーブ片110と外筒側のスリーブ片120)とウェッジ140と(より詳しくはせん断キーKと)から構成される突出防止具30において、既設PC鋼棒Bをウェッジ140が挟持して既設PC鋼棒Bに緊張力が作用すると(より具体的には既設PC鋼棒Bが破断した時に)、ウェッジ140がくさび効果により内筒側のスリーブ片110に喰い込んで(図5(B)の黒塗り矢示)切欠き部114が拡張しよう(切欠き部114の切欠き幅が広がろう)とする(図5(B)の曲線矢示)。このとき、内筒側のスリーブ片110と外筒側のスリーブ片120とは(互いのキー溝118およびキー溝128に内包された)せん断キーKを介して接合されているために、せん断キーKによる引っ掛かりにより内筒側のスリーブ片110の変形(切欠き部114の拡張)がせん断キーKを介して外筒側のスリーブ片120に伝達されるために、内筒側のスリーブ片110の変形(切欠き部114の拡張)を外筒側のスリーブ片120が負担することになる。このため、内筒側のスリーブ片110の変形が抑制されて、所望のくさび効果が発現して、所望の緊張力を(破断した)既設PC鋼棒Bに付与することができる。
The function of the shear key K will now be described with reference to FIG. FIG. 5A shows the sleeve 100 and the wedge 140 (more specifically, the shearing force) in a state in which the sleeve piece 110 and the sleeve piece 120 are joined together to form the sleeve 100 and function as a sleeve combined with the wedge 140 . 2 shows a side view (left side) and a front view (right side) of a protrusion prevention device 30 composed of keys K and ). Protrusion prevention tool 30 composed of sleeve 100 (more specifically sleeve piece 110 on the inner cylinder side and sleeve piece 120 on the outer cylinder side) and wedge 140 (more specifically shear key K) shown in FIG. 5(A) , when the existing PC steel bar B is sandwiched between the wedges 140 and a tension force acts on the existing PC steel bar B (more specifically, when the existing PC steel bar B breaks), the wedge 140 is wedged into the inner cylinder by the wedge effect. It bites into the sleeve piece 110 on the side (the black arrow in FIG. 5(B)) to expand the notch 114 (the width of the notch 114 widens) (FIG. 5(B)). curved arrow). At this time, since the sleeve piece 110 on the inner cylinder side and the sleeve piece 120 on the outer cylinder side are joined via the shear key K (enclosed in the key groove 118 and the key groove 128 of each other), the shear key Deformation of the sleeve piece 110 on the inner cylinder side (expansion of the notch 114) is transmitted to the sleeve piece 120 on the outer cylinder side through the shear key K by being caught by K, so that the sleeve piece 110 on the inner cylinder side The deformation (expansion of the notch portion 114) is borne by the sleeve piece 120 on the outer cylinder side. Therefore, the deformation of the sleeve piece 110 on the inner cylinder side is suppressed, the desired wedge effect is exhibited, and the desired tension can be applied to the (broken) existing PC steel bar B.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。なお、突出防止具30を装着する既設PC鋼棒Bがコンクリートに埋設されている場合にはコンクリートを斫って、緊張状態の既設PC鋼棒Bを露出させる露出ステップが、以下に説明するウェッジ装着ステップの前に必要となるが、露出箇所等についての詳細は上述したため、ここでは繰り返して説明しない(以下において同じ)。 The protrusion prevention tool 30 having such a structure is installed at the first position P(1), the second position P(2) or the third position P(3) shown in FIG. Mounted on B. Here, the procedure for attaching the protrusion prevention tool 30 to the existing PC steel bar B at the first position P(1) in FIG. 2 (because only the direction of the taper is different) will be described. When the existing PC steel bar B to which the protrusion prevention tool 30 is attached is embedded in concrete, the exposing step of exposing the existing PC steel bar B in a tensioned state by scraping the concrete is a wedge described below. Although it is necessary before the mounting step, the details of the exposed portions and the like have been described above, and will not be repeated here (the same applies below).

図6(A)に示すように、ウェッジ140のテーパー140Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する(ウェッジ側の黒塗り矢示参照)。 As shown in FIG. 6(A), two or more wedge pieces (here, divided into three) are divided so that the direction in which the taper 140T of the wedge 140 narrows is the direction toward the surface (here, the upper floor slab 14). 3 wedge pieces 142, 144 and 146) are mounted on the exposed existing PC steel bar B as a wedge mounting step (see black arrows on the wedge side).

スリーブ100のテーパー100Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する(スリーブ側の黒塗り矢示参照)。より詳しくは、図6(A)における左右方向から2つの内筒側のスリーブ片110および外筒側のスリーブ片120を既設PC鋼棒Bへ接近させて装着する。 The sleeve 100 is split in such a way that the taper 100T of the sleeve 100 narrows toward the surface (here, the upper floor slab 14). The sleeve piece 120 on the outer cylinder side is attached to the exposed existing PC steel bar B as a sleeve attachment step (see the black arrow on the sleeve side). More specifically, two sleeve pieces 110 on the inner cylinder side and two sleeve pieces 120 on the outer cylinder side are brought closer to the existing PC steel bar B from the left and right direction in FIG.

次に、図6(B)に示すように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)をスリーブ100として一体化してウェッジ140に組み合わせられるスリーブとして機能させるために(スリーブ機能化ステップのために)、内筒側のスリーブ片110の外周面116に設けられたキー溝118に内包されたせん断キーKが、外筒側のスリーブ片120の内周面126に設けられたキー溝128に内包されるように(逆に、外筒側のスリーブ片120の内周面126に設けられたキー溝128に内包されたせん断キーKが、内筒側のスリーブ片110の外周面116に設けられたキー溝118に内包されるようにでも構わない)、既設PC鋼棒Bの長手方向において内筒側のスリーブ片110と外筒側のスリーブ片120とを接近せしめて(いずれか一方または双方を既設PC鋼棒Bの長手方向にスライドさせて)、内筒側のスリープ片110と外筒側のスリープ片120とを接合させる。これにより分割されていたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)がスリーブとして一体化されてウェッジ140に組み合わせられるスリーブ100として機能させることができるようになる。 Next, as shown in FIG. 6B, the split sleeve pieces (here, two sleeve pieces 110 on the inner cylinder side and a sleeve piece 120 on the outer cylinder side because they are divided into two) are used as the sleeve 100. In order to function as a sleeve integrally combined with the wedge 140 (for the sleeve functionalization step), a shear key K is contained in a keyway 118 provided in the outer peripheral surface 116 of the sleeve piece 110 on the inner cylinder side. , so as to be included in the key groove 128 provided on the inner peripheral surface 126 of the sleeve piece 120 on the outer cylinder side (conversely, in the key groove 128 provided on the inner peripheral surface 126 of the sleeve piece 120 on the outer cylinder side. The enclosed shear key K may be enclosed in the key groove 118 provided on the outer peripheral surface 116 of the sleeve piece 110 on the inner cylinder side), and the inner cylinder side in the longitudinal direction of the existing PC steel bar B The sleeve piece 110 and the sleeve piece 120 on the outer cylinder side are approached (either or both of them are slid in the longitudinal direction of the existing PC steel bar B), and the sleeve piece 110 on the inner cylinder side and the sleeve piece on the outer cylinder side The piece 120 is joined. The sleeve 100 in which the split sleeve pieces (here, the sleeve piece 110 on the inner cylinder side and the sleeve piece 120 on the outer cylinder side because they are divided into two) are integrated as a sleeve and combined with the wedge 140. will be able to function as

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここ
では3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を、ウェッジ140のテーパー140Tの向きとスリーブ100のテーパー100Tの向きとを一致させて、一体化されてウェッジ140に組み合わせられるスリーブとして機能させることができるようになったスリーブ100に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, the two or more split wedge pieces (here, three wedge pieces 142, 144 and 146 because they are divided into three) attached to the exposed existing PC steel bar B are attached to the wedge. The orientation of the taper 140T of 140 and the orientation of the taper 100T of the sleeve 100 are matched, and the sleeve 100 is inserted as an insertion step so that it can function as a sleeve that is integrated and combined with the wedge 140.
In this manner, the protrusion prevention tool 30 is attached to the existing PC steel bar B at the first position P(1) in FIG. Such a work of mounting the protrusion prevention tool 30 to the existing PC steel bar B can be performed while using the prestressed concrete member (for example, the PC box girder bridge 10) (without closing the bridge). .

<2:内筒外筒タイプ:ねじ螺合型>
次に、スリーブ200およびウェッジ240について説明する。
突出防止具30を構成するスリーブ200の平面図を図7(A)に、ウェッジ240の平面図を図7(B)に、それらのスリーブ200およびウェッジ240を用いてスリーブ200(スリーブSに相当)が、ウェッジ240(ウェッジWに相当)に組み合わせられるスリーブとして機能するようにして、突出防止具30を、PC構造物から露出させた既設PC鋼棒Bに装着する手順を説明するための図を図8に、それぞれ示す。
<2: Inner cylinder and outer cylinder type: Threaded type>
Next, sleeve 200 and wedge 240 will be described.
FIG. 7A shows a plan view of the sleeve 200 that constitutes the protrusion preventive device 30, and FIG. ) functions as a sleeve combined with the wedge 240 (corresponding to the wedge W), and the projection prevention tool 30 is attached to the existing PC steel bar B exposed from the PC structure. are shown in FIG. 8, respectively.

この突出防止具30は、図7(A)に示すスリーブ200とそのスリーブ200に組み合わせられる図7(B)に示すウェッジ240とにより構成される。なお、図7(A)において左側に描かれた側面図(一部断面図)は右側に描かれた正面図に示す矢示X方向から見た図であって、図7(B)において左側に描かれた側面図および右側に描かれた正面図は2分割されたウェッジ片を組み合わせてウェッジ240とした図である。 This protrusion prevention tool 30 is composed of a sleeve 200 shown in FIG. 7A and a wedge 240 shown in FIG. In addition, the side view (partial cross-sectional view) drawn on the left side in FIG. 7A is a view seen from the arrow X direction shown in the front view drawn on the right side, and The side view drawn in FIG. 1 and the front view drawn on the right side are views of the wedge 240 formed by combining two wedge pieces.

図7(B)に示すように、ウェッジ240は、既設PC鋼棒Bの長手方向に垂直な面から見て2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)に分割されている。このように分割されているので、既設の既設PC鋼棒Bに装着することができる。また、ウェッジ240は2つのウェッジ片を組み合わせることによりテーパー240Tを備えることになる。 As shown in FIG. 7(B), the wedge 240 is composed of two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B (here, the two wedge pieces 242 and It is divided into wedge pieces 244). Since it is divided in this way, it can be attached to the existing PC steel bar B already installed. Wedge 240 also provides taper 240T by combining two wedge pieces.

図7(A)に示すように、スリーブ200は、ウェッジ240のテーパー240Tに組み合わせられるテーパー200Tを備え外ねじ(雄ねじ)216を備えた内筒側のスリーブ片210と、内筒側のスリーブ片210の外ねじ(雄ねじ)216に螺合される内ねじ(雌ねじ)226を備えた外筒側のスリーブ片220とに分割されている。内筒側のスリーブ片210および外筒側のスリーブ片220は既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部(内筒側のスリーブ片210における本体部212の一部を切り欠いた切欠き部214および外筒側のスリーブ片220における本体部222の一部を切り欠いた切欠き部224)を備える。なお、既設PC鋼棒Bが挿入可能な切欠き部は、内筒側のスリーブ片210が少なくとも備えればよく、外筒側のスリーブ片220と内筒側のスリーブ片110とが接合できる構造であれば既設PC鋼棒Bが挿入可能な切欠き部224を必ずしも備える必要はない。たとえば、外筒側のスリーブ片220は、たとえばFRP製のシートで、内筒側のスリーブ片210と外筒側のスリーブ片220とは、内筒側のスリーブ片210の外周にシート状の外筒側のスリーブ片220を巻き付けることによりスリーブとして一体化されてウェッジ240に組み合わせられるスリーブとして機能するものであれば構わない。この場合には、シート状の外筒側のスリーブ片220の切欠き部224は必須の構成ではないものとなる。さらに、内筒側のスリーブ片210と外筒側のスリーブ片220とは外ねじ(雄ねじ)216と内ねじ(雌ねじ)226とが螺合することによりスリーブ200として一体化されてウェッジ240に組み合わせられるスリーブとして機能することになる。 As shown in FIG. 7A, the sleeve 200 includes an inner cylinder-side sleeve piece 210 having a taper 200T to be combined with the taper 240T of the wedge 240 and an outer thread (male screw) 216, and an inner cylinder-side sleeve piece 210. 210 and a sleeve piece 220 on the outer cylinder side having an inner thread (female thread) 226 that is screwed onto the outer thread (male thread) 216 of the sleeve 210 . The sleeve piece 210 on the inner cylinder side and the sleeve piece 220 on the outer cylinder side are notches into which the existing PC steel bar B can be inserted (sleeve piece on the inner cylinder side) when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B. A notch portion 214 obtained by notching part of the main body portion 212 of the sleeve 210 and a notch portion 224 obtained by notching part of the main body portion 222 of the sleeve piece 220 on the outer cylinder side are provided. At least the sleeve piece 210 on the inner cylinder side should have a notch into which the existing PC steel bar B can be inserted, and the structure allows the sleeve piece 220 on the outer cylinder side and the sleeve piece 110 on the inner cylinder side to be joined. If so, it is not necessary to provide the notch 224 into which the existing PC steel bar B can be inserted. For example, the sleeve piece 220 on the outer cylinder side is, for example, a sheet made of FRP, and the sleeve piece 210 on the inner cylinder side and the sleeve piece 220 on the outer cylinder side have a sheet-like outer surface around the outer circumference of the sleeve piece 210 on the inner cylinder side. It does not matter if it functions as a sleeve that is integrated as a sleeve by winding the sleeve piece 220 on the cylinder side and combined with the wedge 240 . In this case, the notch 224 of the sleeve piece 220 on the sheet-like outer cylinder side is not essential. Furthermore, the sleeve piece 210 on the inner cylinder side and the sleeve piece 220 on the outer cylinder side are integrated as the sleeve 200 by screwing together the outer thread (male thread) 216 and the inner thread (female thread) 226, and combined with the wedge 240. It will function as a sleeve that is

さらに詳しくは、スリーブ片210は、中心に既設PC鋼棒Bが挿通される(挿通される既設PC鋼棒Bに対応した)テーパー200Tを備えた本体212を備え、その本体212の一部が切欠き部214とされているためにテーパー200Tが全周にわたって存在するものではなく、切欠き部214の部分だけテーパー200Tが存在しないがこの突出防止具30としての機能には問題がない。 More specifically, the sleeve piece 210 has a main body 212 with a taper 200T through which the existing PC steel bar B is inserted (corresponding to the existing PC steel bar B to be inserted). Since the notch 214 is provided, the taper 200T does not exist over the entire circumference, and the taper 200T does not exist only at the notch 214, but there is no problem in functioning as the protrusion preventive tool 30. FIG.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。
図8(A)に示すように、ウェッジ240のテーパー240Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する(ウェッジ側の黒塗り矢示参照)。
The protrusion prevention tool 30 having such a structure is installed at the first position P(1), the second position P(2) or the third position P(3) shown in FIG. Mounted on B. Here, the procedure for attaching the protrusion prevention tool 30 to the existing PC steel bar B at the first position P(1) in FIG. 2 (because only the direction of the taper is different) will be described.
As shown in FIG. 8(A), two or more split wedge pieces (here, split into two) are arranged so that the taper 240T of the wedge 240 narrows toward the surface (here, the upper floor slab 14). Two wedge pieces 242 and 244) are attached to the exposed existing PC steel bar B as a wedge attachment step (see black arrows on the wedge side).

スリーブ200のテーパー200Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する(スリーブ側の黒塗り矢示参照)。より詳しくは、図8(A)における左右方向から2つの内筒側のスリーブ片210および外筒側のスリーブ片220を既設PC鋼棒Bへ接近させて装着する。 The sleeve 200 is split in such a way that the taper 200T of the sleeve 200 narrows toward the surface (here, the upper floor slab 14). The sleeve piece 220 on the outer cylinder side is attached to the exposed existing PC steel bar B as a sleeve attachment step (see the black arrow on the sleeve side). More specifically, two sleeve pieces 210 on the inner cylinder side and two sleeve pieces 220 on the outer cylinder side are brought closer to the existing PC steel bar B from the left and right direction in FIG.

次に、図8(B)に示すように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)をスリーブ200として一体化してウェッジ240に組み合わせられるスリーブとして機能させるために(スリーブ機能化ステップのために)、内筒側のスリーブ片210の外ねじ(雄ねじ)216と外筒側のスリーブ片220の内ねじ(雌ねじ)226とを螺合させる。これにより分割されていたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)がスリーブとして一体化されてウェッジ240に組み合わせられるスリーブ200として機能させることができるようになる。 Next, as shown in FIG. 8B, the split sleeve pieces (here, two sleeve pieces 210 on the inner cylinder side and a sleeve piece 220 on the outer cylinder side because they are divided into two) are used as a sleeve 200. In order to integrate and function as a sleeve that mates with the wedge 240 (for the sleeve functionalization step), the outer threads (external threads) 216 of the inner sleeve piece 210 and the inner threads ( internal thread) 226 are screwed together. A sleeve 200 in which the split sleeve pieces (here, two sleeve pieces 210 on the inner cylinder side and a sleeve piece 220 on the outer cylinder side because they are divided into two) are integrated as a sleeve and combined with the wedge 240. will be able to function as

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)を、ウェッジ240のテーパー240Tの向きとスリーブ200のテーパー200Tの向きとを一致させて、一体化されてウェッジ240に組み合わせられるスリーブとして機能させることができるようになったスリーブ200に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, two or more split wedge pieces (here, two wedge pieces 242 and 244 because they are split into two) attached to the exposed existing PC steel bar B are attached to the taper 240T of the wedge 240. and the orientation of the taper 200T of the sleeve 200 are matched, and inserted into the sleeve 200 that can be integrated and function as a sleeve combined with the wedge 240 as an insertion step.
In this manner, the protrusion prevention tool 30 is attached to the existing PC steel bar B at the first position P(1) in FIG. Such a work of mounting the protrusion prevention tool 30 to the existing PC steel bar B can be performed while using the prestressed concrete member (for example, the PC box girder bridge 10) (without closing the bridge). .

<3:スリット壁面連結タイプ>
上述したスリーブ100とウェッジ140とから構成される突出防止具30もスリーブ200とウェッジ240とから構成される突出防止具30も、いずれも内筒外筒タイプであったが、次に、スリット壁面連結タイプのスリーブS10、スリーブS11およびスリーブS20を含む突出防止具30について、図9を参照して以下に詳しく説明する。なお、スリーブS10、スリーブS11およびスリーブS20に組み合わせられる図9に示すウェッジWは、上述した3分割されたウェッジ片から構成されるウェッジ140と同じであるために、ここでは繰り返して説明しない。
<3: Slit wall connection type>
Both the protrusion preventer 30 composed of the sleeve 100 and the wedge 140 and the protrusion preventer 30 composed of the sleeve 200 and the wedge 240 described above were of the inner cylinder and outer cylinder type. The projection preventer 30, which includes the coupling type sleeve S10, sleeve S11 and sleeve S20, will be described in detail below with reference to FIG. The wedge W shown in FIG. 9 which is combined with the sleeves S10, S11 and S20 is the same as the wedge 140 composed of the three wedge pieces described above, and will not be described repeatedly.

突出防止具30を構成する、連結部材として頭付き六角穴付きボルト(以下においてキャップボルトと記載)T10を用いたスリーブS10の平面図を図9(A)に、連結部材として頭なし六角穴付きボルト(全ねじボルト、所謂いもねじ、以下において全ねじボルトと記載)T20を用いたスリーブS11の平面図を図9(B)に、スリーブS10およびスリーブS11とは異なるスリーブS20の平面図を図9(C)に、それぞれ示す。なお、図9(C)に示すスリーブS20は連結部材としてキャップボルトT10を用いているが、連結部材として全ねじボルトT20を用いても構わない。 FIG. 9A is a plan view of a sleeve S10 using a headed hexagonal socket head bolt (hereinafter referred to as a cap bolt) T10 as a connecting member, which constitutes the projection prevention tool 30, and a headless hexagonal socket headless connecting member as a connecting member. FIG. 9B is a plan view of a sleeve S11 using a bolt (full-threaded bolt, so-called full-threaded bolt, hereinafter referred to as a full-threaded bolt) T20, and a plan view of a sleeve S20 different from the sleeves S10 and S11. 9(C), respectively. Although the sleeve S20 shown in FIG. 9C uses the cap bolt T10 as the connecting member, the fully threaded bolt T20 may be used as the connecting member.

これらの図9に示すスリット壁面連結タイプは、上述した内筒外筒タイプ(分割型)と異なり、ウェッジWに組み合わせられるテーパーを備えるとともに、既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結されることにより垂直な面から見
たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。
The slit wall connection type shown in FIG. 9 differs from the above-described inner cylinder/outer cylinder type (split type) in that it has a taper that can be combined with the wedge W, and has a taper that can be combined with the wedge W. The wall surfaces facing each other in the slit are connected using a connecting member, so that the gap between the slits viewed from the vertical plane is regulated to form a wedge W It functions as a sleeve to be combined with.

図9(A)に示すスリーブS10および図9(B)に示すスリーブS11は、連結部材が異なるものの(図9(A)がキャップボルトT10で図9(B)が全ねじボルトT20)、スリーブの構造は、部位B10に設けられる穴が穴H10(スリーブS10)と雌ねじ穴H11(スリーブS11)とで異なる以外は同じである。このスリーブS10およびスリーブS11は偏心した中空部(この中空部にウェッジ140および既設PC鋼棒Bが内包される)を備えた中空円筒形状を備える。そして、偏心により、肉厚が厚い側(部位B10および部位B12がある側)に既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結される。 Although the sleeve S10 shown in FIG. 9A and the sleeve S11 shown in FIG. are the same except that the hole provided in the portion B10 is different between the hole H10 (sleeve S10) and the female screw hole H11 (sleeve S11). The sleeves S10 and S11 have a hollow cylindrical shape with an eccentric hollow portion (the hollow portion contains the wedge 140 and the existing PC steel bar B). Then, due to eccentricity, a slit portion into which the existing PC steel bar B can be inserted is provided on the thicker side (the side on which the portion B10 and the portion B12 are located), and the walls facing each other in the slit portion are connected using a connecting member. be done.

図9(A)に示すスリーブS10のように、連結部材がキャップボルトT10である場合には、スリット部において互いに対向する壁面の少なくとも一方(ここでは一方の壁面である)の壁面(ここでは部位B12側の壁面とする)に設けられた雌ねじ穴H12と、他方の壁面(ここでは部位B10側の壁面とする)に設けられた穴H10とを備え、穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。 When the coupling member is a cap bolt T10, as in the sleeve S10 shown in FIG. A female screw hole H12 provided in the wall surface on the B12 side) and a hole H10 provided in the other wall surface (here, the wall surface on the part B10 side), and the hole H10 (not a screw hole but a through hole) The male screw of the passed cap bolt T10 is screwed into the female screw hole H12, and the wall surfaces facing each other are connected to each other, thereby restricting the interval between the slit portions when viewed from the vertical plane, and forming a sleeve combined with the wedge W. It functions as

これに対して、図9(B)に示すスリーブS11のように、連結部材が全ねじボルトT20である場合には、スリット部において互いに対向する壁面の少なくとも一方(ここでは両方の壁面である)の壁面(ここでは部位B12側の壁面とする)に設けられた雌ねじ穴H12と、他方の壁面(ここでは部位B10側の壁面とする)に設けられた雌ねじ穴H11とを備え、雌ねじ穴H11に螺合して通された全ねじボルトT20の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである
図9(B)に示すスリーブS11においては、部位B12側に雌ねじ穴H12を設けるのみならず部位B10側も雌ねじ穴H11を設けた上で連結部材として全ねじボルトT20を用いているために、部位B10側には雌ねじ穴ではなく穴H10を設けた上で連結部材としてキャップボルトT10を用いている図9(A)に示すスリーブS10と比較して、連結部材による過度の締め付けを防止することができる点が異なる。
On the other hand, as in the sleeve S11 shown in FIG. 9B, when the connecting member is a fully threaded bolt T20, at least one (here, both wall surfaces) of the wall surfaces facing each other in the slit portion A female threaded hole H12 provided in the wall surface (here, the wall surface on the part B12 side) and a female threaded hole H11 provided in the other wall surface (here, the wall surface on the side of the part B10), and the female threaded hole H11 The male thread of the fully threaded bolt T20 is screwed into the female threaded hole H12, and by connecting the wall surfaces facing each other, the gap between the slits when viewed from the vertical plane is regulated to form a wedge. In the sleeve S11 shown in FIG. 9B, which functions as a sleeve to be combined with W, not only the female threaded hole H12 is provided on the part B12 side, but also the female threaded hole H11 is provided on the part B10 side as a connecting member. Compared to the sleeve S10 shown in FIG. 9(A), which uses a fully threaded bolt T20, a hole H10 is provided instead of a female threaded hole on the part B10 side, and a cap bolt T10 is used as a connecting member. , in that excessive tightening by the connecting member can be prevented.

次に、図9(C)に示すスリーブS20は、図9(A)に示すスリーブS10および図9(B)に示すスリーブS11と比較して、偏心した中空部(この中空部にウェッジ140および既設PC鋼棒Bが内包される)を備えた中空角柱形状を備える。すなわち、図9(A)に示すスリーブS10および図9(B)に示すスリーブS11が中空円筒形状であるのに対して、図9(C)に示すスリーブS20は中空角柱形状である点が異なる。そして、偏心により、肉厚が厚い側(部位B10および部位B12がある側)に既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能する点は、スリーブS20もスリーブS10およびスリーブS11と同じである。 Next, the sleeve S20 shown in FIG. 9(C) has an eccentric hollow portion (a wedge 140 and a It has a hollow prismatic shape with an existing PC steel bar B included). That is, the sleeve S10 shown in FIG. 9(A) and the sleeve S11 shown in FIG. 9(B) have a hollow cylindrical shape, whereas the sleeve S20 shown in FIG. 9(C) has a hollow prismatic shape. . Then, due to eccentricity, a slit portion into which the existing PC steel bar B can be inserted is provided on the thicker side (the side on which the portion B10 and the portion B12 are located), and the walls facing each other in the slit portion are connected using a connecting member. The sleeve S20 is the same as the sleeves S10 and S11 in that it functions as a sleeve combined with the wedge W by regulating the interval between the slit portions as viewed from the vertical plane.

より詳しくは、図9(A)に示したスリーブS10と同じく、スリーブS20においても、穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。なお、上述したように、図9(C)に示すスリーブS20は連結部材としてキャップボルトT10を用いているが、連結部材として全ねじボルトT20を用いても構わない。このときには、図9(B)に示したスリーブS11と同じく、スリーブS20においても、雌ねじ穴H11を螺合して通された全ねじボルトT20の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリ
ット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。
More specifically, like the sleeve S10 shown in FIG. 9A, in the sleeve S20 as well, the male thread of the cap bolt T10 passed through the hole H10 (not a threaded hole but a through hole) is screwed into the female threaded hole H12. , and the wall surfaces facing each other are connected to regulate the interval between the slit portions when viewed from the vertical plane, thereby functioning as a sleeve combined with the wedge W. As described above, the sleeve S20 shown in FIG. 9C uses the cap bolt T10 as the connecting member, but the fully threaded bolt T20 may be used as the connecting member. At this time, as with the sleeve S11 shown in FIG. 9B, in the sleeve S20 as well, the male threads of the fully threaded bolt T20 threaded through the female threaded hole H11 are screwed into the female threaded hole H12 and face each other. By connecting the wall surfaces to each other, the gap between the slit portions when viewed from the vertical plane is regulated, and it functions as a sleeve that is combined with the wedge W.

図9に示すように、連結部材は、互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、雌ねじ穴に雄ねじが螺合されて壁面が連結されることにより既設PC鋼棒Bの長手方向に垂直な面から見たスリット部の間隔が規制されることにより、スリーブとして機能する。そして、この場合において、雌ねじ穴に螺合する雄ねじの径を変更することにより、既設PC鋼棒Bの長手方向に垂直な面から見たスリット部の間隔を規制した際に連結部材の剛性が変更されるためにPC鋼棒Bが破断した際の緩衝能力を調整できる特徴を備える。 As shown in FIG. 9, the connecting member includes a female threaded hole provided in at least one wall surface facing each other and a male screw passing through the hole provided in the other wall surface, and the female screw hole is provided with a male screw. The wall surfaces are connected by screwing together, thereby regulating the gap between the slits when viewed from the plane perpendicular to the longitudinal direction of the existing PC steel bar B, thereby functioning as a sleeve. In this case, by changing the diameter of the male screw that is screwed into the female screw hole, the rigidity of the connecting member is reduced when the interval between the slits viewed from the plane perpendicular to the longitudinal direction of the existing PC steel bar B is regulated. It has a feature that can adjust the buffering capacity when the PC steel bar B breaks due to the change.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。以下においては、図9(A)に示す突出防止具30を使用する場合について説明する。 The protrusion prevention tool 30 having such a structure is installed at the first position P(1), the second position P(2) or the third position P(3) shown in FIG. Mounted on B. Here, the procedure for attaching the protrusion prevention tool 30 to the existing PC steel bar B at the first position P(1) in FIG. 2 (because only the direction of the taper is different) will be described. In the following, the case of using the protrusion prevention tool 30 shown in FIG. 9(A) will be described.

図示しないが、ウェッジ140のテーパー140Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する。
スリーブ100のテーパー100Tが狭まる方向が表面への方向(ここでは上床版14)になるように、スリット部を備えたスリーブS10を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する。より詳しくは、スリーブS10のスリット部から既設PC鋼棒Bを挿入させて装着する。
Although not shown, two or more divided wedge pieces (here, three wedges because they are divided into three) are used so that the taper 140T of the wedge 140 narrows toward the surface (here, the upper floor slab 14). The strip 142, wedge strip 144 and wedge strip 146) are attached to the exposed existing PC steel bar B as a wedge attachment step.
A sleeve S10 having a slit is mounted on the exposed existing PC steel bar B as a sleeve mounting step so that the taper 100T of the sleeve 100 narrows toward the surface (here, the upper floor slab 14). More specifically, the existing PC steel bar B is inserted through the slit of the sleeve S10 and attached.

次に、スリーブS10のスリット部における互いに対向する壁面の1つを構成する部位に設けられた穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじを雌ねじ穴H12に螺合させて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能させる(スリーブ機能化ステップ)。これによりスリット部を備えたスリーブS10において、スリット部における互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブ(ここではスリーブ100とする)として機能させることができるようになる。 Next, the male screw of the cap bolt T10, which is passed through a hole H10 (a through hole, not a screw hole) provided in a portion forming one of the wall surfaces facing each other in the slit portion of the sleeve S10, is screwed into the female screw hole H12. By connecting the wall surfaces facing each other, the gap between the slit portions as viewed from the vertical plane is regulated to function as a sleeve combined with the wedge W (sleeve functionalization step). As a result, in the sleeve S10 provided with the slit portion, the wall surfaces facing each other in the slit portion are connected, thereby regulating the interval between the slit portions when viewed from the vertical plane, and the sleeve combined with the wedge W (here, the sleeve 100 ) can be made to function as

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を、ウェッジ140のテーパー140Tの向きとスリーブ100のテーパー100Tの向きとを一致させて、一体化されてウェッジ140に組み合わせられるスリーブとして機能させることができるようになったスリーブ100に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, the two or more split wedge pieces (here, three wedge pieces 142, 144 and 146 because they are divided into three) attached to the exposed existing PC steel bar B are attached to the wedge. The orientation of the taper 140T of 140 and the orientation of the taper 100T of the sleeve 100 are matched, and the sleeve 100 is inserted as an insertion step so that it can function as a sleeve that is integrated and combined with the wedge 140.
In this manner, the protrusion prevention tool 30 is attached to the existing PC steel bar B at the first position P(1) in FIG. Such a work of mounting the protrusion prevention tool 30 to the existing PC steel bar B can be performed while using the prestressed concrete member (for example, the PC box girder bridge 10) (without closing the bridge). .

<第1の評価>
このような突出防止具30(既設PC鋼棒突出防止具)およびこの突出防止具30を用いた施工方法(既設PC鋼棒突出防止工法)の評価(コンクリート部材の外にPC鋼棒が突出することを防止することができるか否か等)について、供試体(全長13.7mで破断位置は最大12m)を用いて試験した結果について、図10を参照して説明する。
図10に示すように、ウェブ20を模した供試体(緊張されたPC鋼棒により圧縮力が付与されているプレストレストコンクリート)において、供試体の表面(上述した上床版14近傍に対応する図10における右端)からの長さL(1)の位置の既設PC鋼棒Bに突出防止具30を上述した手順で取り付けた。
<First evaluation>
Evaluation of such a protrusion preventive tool 30 (existing PC steel bar protrusion preventive tool) and a construction method (existing PC steel bar protrusion prevention method) using this protrusion preventive tool 30 (PC steel bar protruding out of concrete member (whether or not it is possible to prevent this), the results of testing using a specimen (total length of 13.7 m, maximum breaking position of 12 m) will be described with reference to FIG.
As shown in FIG. 10, in a test piece simulating a web 20 (prestressed concrete to which a compressive force is applied by a tensioned PC steel bar), the surface of the test piece (Fig. 10 corresponding to the vicinity of the upper deck 14 described above) The protrusion preventive tool 30 was attached to the existing PC steel bar B at the position of the length L(1) from the right end of ( ) in the above-described procedure.

ここで、図10における箱抜きPC打設とは、突出防止具30を既設PC鋼棒Bに取り
付けた後にコンクリートで埋め戻した場合を意味しており、ジャッキを用いず手で押し込んだとは、上述したウェッジ装着ステップにおいてジャッキを用いることなく作業者の手作業によりウェッジWをスリーブSに挿入した場合を意味しており、ジャッキを用いず手で押し込んだ以外は、上述したウェッジ装着ステップにおいてジャッキを用いてウェッジWを(グラフ横軸の圧入力で)スリーブSに挿入した。
Here, the box-out PC driving in FIG. 10 means the case where the protrusion prevention tool 30 is attached to the existing PC steel bar B and then backfilled with concrete, and the manual pushing without using a jack does not mean that the PC steel bar B is backfilled. , means the case where the wedge W is manually inserted into the sleeve S by the operator without using a jack in the wedge mounting step described above. A jack was used to insert the wedge W into the sleeve S (with a pressing force on the horizontal axis of the graph).

また、既設PC鋼棒Bの破断については故意的に切断することにより模擬しており、突出防止具30から2m、4m、8mおよび12mの位置で既設PC鋼棒を切断した。なお、パラメータは挿入ステップにおける(ジャッキまたは手作業)のウェッジをスリーブに挿入する圧入力(図10のグラフの横軸)であって、既設PC鋼棒Bを切断した後の突出防止具30と上床版との間(長さL(1)の範囲)における緊張力(図10のグラフの縦軸)である。 Further, the breakage of the existing PC steel bar B was simulated by intentionally cutting it, and the existing PC steel bar was cut at positions 2 m, 4 m, 8 m and 12 m from the protrusion prevention tool 30 . The parameter is the press force (horizontal axis of the graph in FIG. 10) for inserting the wedge (by jack or manual work) into the sleeve in the insertion step, and the protrusion prevention tool 30 after cutting the existing PC steel bar B and It is the tension (the vertical axis of the graph in FIG. 10) between the upper floor slab (range of length L(1)).

(評価その1)
いずれの場合にも、ウェブ20を模した供試体(コンクリート部材)の外に既設PC鋼棒Bが突出することはなく、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。
(評価その2)
突出防止具30と上床版との間(長さL(1)の範囲)において、図10に示すように、一部を除いて緊張力が残存しており緊張力が0ではないためにこの部分の既設PC鋼棒がずれたり動いたりすることが防止できることが判明した。すなわち、大きな緊張力は残存していなかった。ただし、この再破断が発生する場所は、そもそも上床版14と第一位置P(1)に設けられた突出防止具30との間でPC鋼棒が最初に破断した場合であっても上床版方向へのPC鋼棒の破断エネルギーは小さく、かぶりコンクリートにより破断エネルギーを吸収することができるとして第一長さL(1)、第二長さL(2)および第三長さL(3)を0.25m~2.0mと設定しているために、大きな問題ではない。
(Evaluation 1)
In either case, the existing PC steel bar B does not protrude out of the test piece (concrete member) imitating the web 20, and it can be appropriately prevented from protruding when the existing PC steel bar breaks. I was able to confirm.
(Evaluation 2)
As shown in FIG. 10, between the protrusion prevention tool 30 and the upper floor slab (in the range of length L(1)), the tension remains except for a part and the tension is not 0, so this It was found that it is possible to prevent the existing PC steel bars from slipping or moving. That is, no large tension remained. However, the place where this re-breaking occurs is the upper floor slab even if the PC steel bar first breaks between the upper floor slab 14 and the protrusion prevention tool 30 provided at the first position P(1). The breaking energy of the PC steel bar in the direction is small, and the breaking energy can be absorbed by the cover concrete. is set to 0.25m to 2.0m, this is not a big problem.

(評価その3)
評価その2における一部には、緊張力がほぼ残存していない場合(たとえば作業者の手作業によりウェッジWをスリーブSに挿入した場合)を含むものの、そのように作業者の手作業によりウェッジWをスリーブSに挿入した場合であっても評価その1のように、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。
このように、上述したウェッジ装着ステップにおいては、ウェッジWをスリーブSに、ジャッキを用いて挿入するようにしても構わないし、ジャッキを用いることなく作業者の手作業により挿入するようにしても構わないことが明らかとなった。
(Evaluation 3)
Part of evaluation 2 includes a case where almost no tension remains (for example, when the wedge W is manually inserted into the sleeve S by the operator), but such a wedge is manually inserted by the operator. It was confirmed that even when W was inserted into the sleeve S, it was possible to appropriately prevent protrusion when the existing PC steel bar was broken, as in Evaluation 1.
Thus, in the wedge mounting step described above, the wedge W may be inserted into the sleeve S using a jack, or may be manually inserted by an operator without using a jack. It became clear that no.

(評価その4)
箱抜き部を断面修復(埋め戻し)してもしなくても、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。このため、この突出防止具30を既設PC鋼棒に装着した後に(ウェッジ装着ステップの後に)、斫ったコンクリートを埋め戻す必要がないことが明らかになった。
以上のようにして、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することができる。
(Evaluation 4)
It was confirmed that whether or not the cross-section of the box cutout was repaired (backfilled), it was possible to appropriately prevent the existing PC steel bar from protruding when it was broken. For this reason, it has become clear that it is not necessary to backfill the scraped concrete after installing this protrusion prevention device 30 on the existing PC steel bar (after the wedge installation step).
As described above, when the existing PC steel rods that apply compressive force to the prestressed concrete members in service break, the large impact force that occurs will cause the PC steel rods to protrude out of the concrete members. It is possible to provide an existing PC steel bar protrusion prevention method and an existing PC steel bar protrusion prevention tool used therefor, which can be prevented by work while in service.

<変形例>
以下において、本発明の実施の形態の変形例に係る(既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する)突出防止具について説明する。以下において説明する第1の変形例に係る突出防止具および第2の変形例に係る突出防止具は、狭小かつ暗い空間でウェッジ(くさび、楔)をセットするため施工状況を容易に確認・判断できることを目的としており、さらに詳しくは、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認を容易にするための構造を備える。
なお、ウェッジ自体の存在確認以外およびウェッジのセット位置の保持(脱落防止)の確認以外の既設PC鋼棒突出防止工法については上述した説明と同じであるためにここでは繰り返さない。また、以下において、上述した構造と同じ構造を備えた部材(たとえばウェッジ等)については同じ符号を付しており、その構造も作用効果も同じであるためにここでは繰り返して説明しない。
<Modification>
In the following, according to a modification of the embodiment of the present invention (existing PC steel rods outside the concrete members are attached to receive the impact force when the existing PC steel bars that apply compressive force to the existing prestressed concrete members break) A projection preventing tool for preventing the rod from projecting will be described. The projection prevention tool according to the first modified example and the projection prevention tool according to the second modified example, which will be described below, set the wedge (wedge, wedge) in a narrow and dark space, so that the construction situation can be easily confirmed and judged. More specifically, it has a structure for facilitating confirmation of the existence of the wedge itself and confirmation of holding of the set position of the wedge (prevention of falling off).
The existing PC steel bar protrusion prevention method other than the confirmation of the existence of the wedge itself and the confirmation of the holding of the set position (prevention of falling off) of the wedge is the same as the above description, and will not be repeated here. Also, hereinafter, members having the same structures as those described above (for example, wedges) are denoted by the same reference numerals, and since the structures and effects are the same, the description will not be repeated here.

さらに、以下に示す2つの変形例に係る突出防止具は、図7に示した突出防止具を基本的な構造としているが、図7に示すようにスリーブは外ねじを備えた内筒側のスリーブ片と内筒側のスリーブ片の外ねじに螺合される内ねじを備えた外筒側のスリーブ片とに分割され、内筒側のスリーブ片と外筒側のスリーブ片とは内ねじと外ねじとが螺合することによりスリーブとして一体化されるものには限定されない。たとえば、内筒側のスリーブ片と外筒側のスリーブ片とは、止めねじ取付け穴を通された止めねじが止めねじ用タップに螺合することによりスリーブとして一体化されるものであっても構わない。なお、図11および図12においては、これらの変形例についての容易な理解のために、ハッチングを付していない断面があったり、既設PC鋼棒Bを一部の図にしか記載していない場合があったりする。また、図11(G)は図11(F)のA-A断面を示し、図12(G)は図12(F)のA-A断面を示す。 Further, the protrusion preventers according to the two modifications shown below have the basic structure of the protrusion preventer shown in FIG. 7, but as shown in FIG. It is divided into a sleeve piece and a sleeve piece on the outer cylinder side having an inner thread that is screwed into the outer thread of the sleeve piece on the inner cylinder side, and the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side are internally threaded. It is not limited to the one that is integrated as a sleeve by screwing together the outer thread and the outer thread. For example, the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side may be integrated as a sleeve by screwing a set screw through a set screw mounting hole to a set screw tap. I do not care. In FIGS. 11 and 12, for easy understanding of these modifications, some cross sections are not hatched, and existing PC steel bars B are shown only in some of the figures. There are cases. 11(G) shows the AA section of FIG. 11(F), and FIG. 12(G) shows the AA section of FIG. 12(F).

<<第1の変形例>>
図11に示すように、本変形例に係る突出防止具は、押えプレートタイプであって、ウェッジ自体の存在確認についてはウェッジ後端にスリーブ後端から突出する突起を設けて視認可能にすることにより実現しており、ウェッジのセット位置の保持(脱落防止)についてはスリーブとボルト接続可能な押えプレートを設けて、この押えプレートを所定の位置までボルトにより押え付けることにより実現している。
<<First Modification>>
As shown in FIG. 11, the protrusion prevention tool according to this modification is of the presser plate type, and the presence of the wedge itself is confirmed by providing a protrusion protruding from the rear end of the sleeve at the rear end of the wedge so that it can be visually recognized. In order to maintain the wedge set position (prevent it from falling off), a holding plate that can be connected to the sleeve with bolts is provided, and this holding plate is held down to a predetermined position with bolts.

さらに詳しくは、図11(E)および図11(E)のA-A断面を示す図11(A)に示すように、押えプレート300は、既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部324を備えたたとえば金属製の平板であって、この押えプレート300を後述するスリーブ2100とボルト310により接続(より詳しくは外筒側のスリーブ片2220に設けられた雌ねじ穴2222とボルト310とを螺合させて接続)するためのボルト穴302を備える。 More specifically, as shown in FIG. 11(E) and FIG. 11(A) showing the AA cross section of FIG. It is, for example, a metal flat plate having a notch 324 into which the existing PC steel bar B can be inserted. A bolt hole 302 is provided for threading and connecting the female screw hole 2222 provided in the piece 2220 and the bolt 310 .

図11(B)に示すように、ウェッジ340は上述した3分割タイプのウェッジ140に、ウェッジ340の後端にスリーブ2100の後端から突出する突起342を備えたものである。
図11(C)に示すように、外筒側のスリーブ片2220は上述した外筒側のスリーブ片220にボルト310と螺合するための雌ねじが設けられた雌ねじ穴2222を備えたものである。なお、図11(D)に示すように、内筒側のスリーブ片210は上述した内筒側のスリーブ片210と同じであるために同じ符号を付している。これらの図11(C)に示す外筒側のスリーブ片2220と図11(D)に示す内筒側のスリーブ片210とにより、本変形例に係る突出防止具におけるスリーブ2100が構成される。
As shown in FIG. 11(B), the wedge 340 is obtained by adding a projection 342 to the rear end of the wedge 340 and protruding from the rear end of the sleeve 2100 in addition to the above-described three-split type wedge 140 .
As shown in FIG. 11(C), the sleeve piece 2220 on the outer cylinder side is provided with a female screw hole 2222 provided with a female screw for screwing with the bolt 310 in the above sleeve piece 220 on the outer cylinder side. . As shown in FIG. 11(D), the sleeve piece 210 on the inner cylinder side is the same as the sleeve piece 210 on the inner cylinder side described above, and is given the same reference numerals. The sleeve piece 2220 on the outer cylinder side shown in FIG. 11C and the sleeve piece 210 on the inner cylinder side shown in FIG.

このような構造を備えた本変形例に係る突出防止具において、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認方法について、図11(E)~図11(G)を参照して以下に説明する。
図11(A)に示した押えプレート300以外およびボルト310以外が既設PC鋼棒Bに図11(F)に示すように組付けられると、図11(E)に示す黒塗り矢示の方向へ、押えプレート300以外およびボルト310以外が既設PC鋼棒Bに組付けられた突出防止具へ、ボルト穴302と雌ねじ穴2222との位置が合致するように、押えプレート300がセットされる。
11(E) to 11(G) for a method of confirming the existence of the wedge itself and holding the set position of the wedge (preventing it from coming off) in the projecting prevention tool according to this modified example having such a structure. Reference is made below.
11(A) except for the holding plate 300 and bolts 310 are assembled to the existing PC steel bar B as shown in FIG. F, the holding plate 300 is set so that the positions of the bolt holes 302 and the female screw holes 2222 are aligned with the protrusion prevention tool in which the parts other than the holding plate 300 and the bolts 310 are assembled to the existing PC steel bar B.

押えプレート300のボルト穴302にボルト310を通して、雌ねじ穴2222にボルト310を(ここでは上下2箇所において十分に)螺合させる。このような作業過程において、ウェッジ340自体の存在確認についてはウェッジ340の後端にスリーブ2100の後端から突出する突起342を視覚により容易に確認することができる。また、スリーブ2100とボルト310により押えプレート300が螺合により確実に接続可能であるために、この押えプレート300が所定の位置(ボルト310が雌ねじ穴2222に十分に螺合する位置)までボルト310により押え付けられることにより、セット位置の担保と脱落防止とを容易に実現することができる。 A bolt 310 is passed through the bolt hole 302 of the pressing plate 300, and the bolt 310 is screwed into the female threaded hole 2222 (here, at two upper and lower positions). During this work process, the presence of the wedge 340 itself can be easily confirmed by visually confirming the projection 342 protruding from the rear end of the sleeve 2100 at the rear end of the wedge 340 . In addition, since the holding plate 300 can be securely connected by screwing with the sleeve 2100 and the bolt 310, the holding plate 300 is screwed to a predetermined position (the position where the bolt 310 is fully screwed into the female threaded hole 2222). By being pressed down by the , it is possible to easily secure the setting position and prevent falling off.

<<第2の変形例>>
図12に示すように、本変形例に係る突出防止具は、ワイヤークリップタイプであって、ウェッジ自体の存在確認についてはウェッジが存在しないとワイヤークリップの位置が定まらないために所定の位置にワイヤークリップが存在していることを視認することにより実現しており、ウェッジのセット位置の保持(脱落防止)についてはワイヤークリップでウェッジの端部を拘束するとともにワイヤークリップ端部をスリーブに固定してウェッジとスリーブとの位置関係を決定することにより実現している。
<<Second Modification>>
As shown in FIG. 12, the protrusion prevention tool according to this modification is of the wire clip type, and regarding the existence confirmation of the wedge itself, the position of the wire clip cannot be determined unless the wedge exists. This is achieved by visually confirming the existence of the clip, and the retention of the set position of the wedge (preventing it from falling off) is achieved by restraining the end of the wedge with a wire clip and fixing the end of the wire clip to the sleeve. It is realized by determining the positional relationship between the wedge and the sleeve.

さらに詳しくは、図12(A)に示すように、ワイヤークリップ400は、図12(A)の紙面の上下方向に対称な所定の形状を備えた金属ワイヤーである。このワイヤークリップ400は、後述するスリーブ2200(より詳しくは内筒側のスリーブ片2210の)スリーブのテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入される嵌入片402と、嵌入片402から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200のテーパーが狭まる方向の端面に位置することになる端面片404と、端面片404から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200の外周面(より詳しくは外筒側のスリーブ片220の外周面)に位置することになる外周面片406と、外周面片406から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200のテーパーが広がる方向の端面に位置することになる拘束端面片408と、拘束端面片408から連続してウェッジ140のテーパーが広がる方向の端面に設けられた拘束溝148に嵌入される(図12(F)に示す方向から見た)円弧状の拘束円弧片410とから構成される。 More specifically, as shown in FIG. 12(A), the wire clip 400 is a metal wire having a predetermined shape symmetrical in the vertical direction of the page of FIG. 12(A). The wire clip 400 includes a fitting piece 402 that is fitted into a fitting hole 2212 provided in an end face of a sleeve 2200 (more specifically, a sleeve piece 2210 on the inner cylinder side) in a direction in which the taper of the sleeve 2200 (more specifically, a sleeve piece 2210 on the inner cylinder side) narrows. 402 (in plan view shown in FIG. 12(A)) and an end face piece 404 that is bent at a substantially right angle and positioned on the end face in the direction in which the taper of the sleeve 2200 narrows; ) and the outer peripheral surface piece 406 that is bent at a substantially right angle and positioned on the outer peripheral surface of the sleeve 2200 (more specifically, the outer peripheral surface of the sleeve piece 220 on the outer cylinder side), and from the outer peripheral surface piece 406 ( 12(A)), which is bent substantially at a right angle and located on the end face in the direction in which the taper of the sleeve 2200 widens; 12(F) (viewed from the direction shown in FIG. 12(F)).

このワイヤークリップ400における特徴的な構造は、スリーブ2200のテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入される嵌入片402とウェッジ140の拘束溝148に嵌入される円弧状の拘束円弧片410とを備えることである。なお、図12(A)の寸法Lはスリーブ2200における既設PC鋼棒Bの長手方向の長さに対応している。
図12(B)に示すように、ウェッジ140は、上述した3分割タイプのウェッジ140と同じであるために同じ符号を付している。なお、図4(B)においては、ウェッジ140に拘束溝148の符号を付していない。
A characteristic structure of this wire clip 400 is a fitting piece 402 that is fitted into a fitting hole 2212 provided in the end face of the sleeve 2200 in the direction in which the taper narrows, and an arcuate restraint that is fitted into the restraining groove 148 of the wedge 140. It is provided with an arc piece 410 . 12(A) corresponds to the length of the existing PC steel bar B in the sleeve 2200 in the longitudinal direction.
As shown in FIG. 12(B), the wedges 140 are the same as the three-split type wedges 140 described above, and therefore are denoted by the same reference numerals. In addition, in FIG. 4B, the wedge 140 is not provided with the reference numeral of the restraining groove 148 .

図12(C)に示すように、内筒側のスリーブ片2210は上述した内筒側のスリーブ片210にワイヤークリップ400の嵌入片402が嵌入される嵌合穴2212を備えたものである。なお、図12(C)に示すように、外筒側のスリーブ片220は上述した外筒側のスリーブ片220と同じであるために同じ符号を付している。これらの図12(C)に示す外筒側のスリーブ片220と図12(D)に示す内筒側のスリーブ片2210とにより、本変形例に係る突出防止具におけるスリーブ2200が構成される。
このような構造を備えた本変形例に係る突出防止具において、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認方法について、図12(F)~図12(G)を参照して以下に説明する。
As shown in FIG. 12C, the sleeve piece 2210 on the inner cylinder side has a fitting hole 2212 into which the fitting piece 402 of the wire clip 400 is fitted. As shown in FIG. 12(C), the sleeve piece 220 on the outer cylinder side is the same as the sleeve piece 220 on the outer cylinder side described above, and is given the same reference numerals. The sleeve piece 220 on the outer cylinder side shown in FIG. 12C and the sleeve piece 2210 on the inner cylinder side shown in FIG.
12(F) to 12(G) for a method of confirming the presence of the wedge itself and holding the set position of the wedge (preventing it from falling off) in the projecting prevention tool according to this modified example having such a structure. Reference is made below.

図12(A)に示したワイヤークリップ400以外が既設PC鋼棒Bに組付けられると、図12(E)および図12(G)に示すように、ワイヤークリップ400の嵌入片402がスリーブ2200のテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入されるとともに、ワイヤークリップ400の拘束円弧片410がウェッジ140の拘束溝148に嵌入されるようにして、ワイヤークリップ400がセットされる。このような作業過程において、ウェッジ140自体の存在確認については所定の位置にワイヤークリップ400が存在していることを視認することでウェッジの存在を容易に確認することができる。また、ワイヤークリップ400でウェッジ140端部における拘束溝148を拘束するとともにワイヤークリップ400の端部(嵌入片402)をスリーブ(嵌合穴2212)に固定することによりウェッジとスリーブとの位置関係を決定することによりセット位置の担保と脱落防止とを容易に実現することができる。 When the wire clip 400 other than the wire clip 400 shown in FIG. 12(A) is attached to the existing PC steel bar B, the fitting piece 402 of the wire clip 400 is inserted into the sleeve 2200 as shown in FIGS. 12(E) and 12(G). The wire clip 400 is set in such a manner that the wire clip 400 is fitted into the fitting hole 2212 provided in the end face in the direction in which the taper of the wire clip 400 narrows, and the restraining arc piece 410 of the wire clip 400 is fitted into the restraining groove 148 of the wedge 140. be. In this work process, the existence of the wedge 140 itself can be easily confirmed by visually confirming that the wire clip 400 exists at a predetermined position. In addition, the positional relationship between the wedge and the sleeve is adjusted by restraining the restraint groove 148 at the end of the wedge 140 with the wire clip 400 and fixing the end (fitting piece 402) of the wire clip 400 to the sleeve (fitting hole 2212). By determining, security of the set position and dropout prevention can be easily realized.

<第2の評価>
このような突出防止具30(既設PC鋼棒突出防止具)およびこの突出防止具30を用いた施工方法(既設PC鋼棒突出防止工法)の評価について、参考重量(ウェッジを含む)とともに、供試体を用いて試験した結果について、図13を参照して説明する。
なお、先行技術は特開2018-017029号公報に記載の中間定着具においてスリーブにウェッジを組み合わせた構成でボルト4本締めの中間定着具を突出防止具30として採用したものであって、実施例2が図9(A)に示す突出防止具30であって、実施例3が図9(B)に示す突出防止具30であって、実施例4が図9(C)に示す突出防止具30であって、実施例5が図4~図6に示す突出防止具30である。
<Second evaluation>
Regarding the evaluation of such a protrusion preventive tool 30 (existing PC steel bar protrusion preventive tool) and the construction method using this protrusion preventive tool 30 (existing PC steel bar protrusion prevention method), together with the reference weight (including the wedge), The results of testing using specimens will be described with reference to FIG. 13 .
In the prior art, the intermediate fixing device described in JP-A-2018-017029 adopts an intermediate fixing device in which a wedge is combined with a sleeve and is tightened with four bolts as the protrusion prevention device 30. 2 is a protrusion preventive tool 30 shown in FIG. 9A, Example 3 is a protrusion preventive tool 30 shown in FIG. 9B, and Example 4 is a protrusion preventive tool shown in FIG. 9C. 30, and Example 5 is the protrusion prevention tool 30 shown in FIGS. 4 to 6. FIG.

図13(A)に示すように、先行技術(スリーブ2分割、締結ボルト4本、参考重量8.8kg)に対して、実施例2(スリーブ分割なし、締結ボルト2本、参考重量6.2kg)、実施例3(スリーブ分割なし、締結ボルト2本、参考重量6.1kg)、実施例4(スリーブ分割なし、締結ボルト2本、参考重量6.8kg)、実施例5(スリーブ2分割、締結ボルト2本、参考重量8.0kg)、と、部品点数の低減、重量の低減、締結作業工数の削減が認められ、施工性が向上した。 As shown in FIG. 13(A), in contrast to the prior art (sleeve split into two, fastening bolts four, reference weight 8.8 kg), Example 2 (sleeve not split, fastening bolts two, reference weight 6.2 kg) ), Example 3 (no sleeve split, 2 fastening bolts, reference weight 6.1 kg), Example 4 (no sleeve split, 2 fastening bolts, reference weight 6.8 kg), Example 5 (sleeve split into 2, 2 tightening bolts, reference weight 8.0 kg), reduction in the number of parts, weight reduction, and reduction in fastening work man-hours were recognized, and workability was improved.

次に、性能確認試験結果(静的引張試験)の結果を図13(B)に示す。
試験概要としては、横型引張試験機に(PC鋼材の一例として)PC鋼棒32mm(B種2号)を配置し、一端をPC鋼棒で一般的に使用される定着ナット、他端を本発明に係る突出防止具で定着した状態で引張試験を実施する。試験時の最大荷重を記録して、PC鋼棒の規格最大引張荷重(949kN)に対する最大荷重の割合を示す定着効率を算出する。
Next, the results of the performance confirmation test (static tensile test) are shown in FIG. 13(B).
As an outline of the test, a 32 mm PC steel bar (as an example of PC steel material) (as an example of PC steel material) is placed in a horizontal tensile tester, one end is a fixing nut generally used for PC steel bars, and the other end is this A tensile test is carried out in a state of being fixed by the protrusion prevention tool according to the invention. The maximum load during the test is recorded, and the fixing efficiency, which indicates the ratio of the maximum load to the standard maximum tensile load (949 kN) of the PC steel bar, is calculated.

このような試験の結果を図13(B)に示す。実施例2~実施例4においては、定着効率が100%以上となり、破断位置も本発明に係る突出防止具の位置ではなく定着ナットであったことより突出防止具(既設PC鋼棒破断時の定着具)として十分な性能を確認することができた。なお、実施例3については、実施例2と同形状・同ボルト径とすることで同様の性能が見込める。また、実施例5については、他の実施例に比べて定着効率(既設PC鋼棒破断時の突出防止効率に繋がる)は小さいものの、せん断キーKの破壊により最大荷重が決定しているためにおり、せん断キーKの断面形状等を見直すことで定着効率の上昇が見込める。 The results of such tests are shown in FIG. 13(B). In Examples 2 to 4, the fixing efficiency was 100% or more, and the break position was not the position of the protrusion preventive tool according to the present invention, but the fixing nut. It was possible to confirm sufficient performance as a fixing tool). As for Example 3, similar performance can be expected by using the same shape and bolt diameter as those of Example 2. In addition, in Example 5, although the fixing efficiency (which leads to the efficiency of preventing protrusion when the existing PC steel bar is broken) is lower than that of the other examples, the maximum load is determined by the breakage of the shear key K. Therefore, by reviewing the cross-sectional shape of the shear key K, it is expected that the fixing efficiency will be improved.

次に、性能確認試験結果(衝撃試験)について、図13(C)に示す供試体を用いて試験した結果を図13(D)に示す。
試験概要としては、図13(C)に示すように、横型引張試験機にPC鋼棒26mm(B種1号)とPC鋼棒32mm(B種2号)とを接続した状態で設置して、PC鋼棒32mmに専用架台を介して既設PC鋼棒突出防止具(突出防止具30)を配置する。その状態で引張試験を開始し、荷重500kNの時にミニジャッキを用いて60kNの力でくさびを押込んだ後、引張試験を再開してPC鋼棒26mm(規格最大引張荷重574kN以上)を破断させる。
Next, FIG. 13(D) shows the results of a performance confirmation test (impact test) using the specimen shown in FIG. 13(C).
As an overview of the test, as shown in FIG. , the existing PC steel bar protrusion preventive tool (protrusion preventive tool 30) is placed on the PC steel bar 32 mm via a dedicated stand. In that state, the tensile test is started, and after pushing the wedge with a force of 60 kN using a mini jack when the load is 500 kN, the tensile test is restarted and the PC steel bar 26 mm (standard maximum tensile load 574 kN or more) is broken. .

この試験結果を図13(D)に示す。
この図13(D)に示すように、先行技術に対して、本発明の実施の形態に係る突出防止具30である実施例2~実施例5はいずれも残存張力が低く抑えられており、既設PC鋼棒の破断時にその突出を効果的に防止することができることがわかる。より詳しくは、PC鋼棒の突出エネルギーが1.57kN・m以下の時に、残存張力/破断荷重:実施例2=20.9%、実施例3=24.3%、実施例4=24.2%、実施例5=2.02%であって、残存張力/破断荷重が100%未満であることはもちろんのこと、好ましくは半分(50%)以下、さらに好ましくは25%以下に低く抑えられており、既設PC鋼棒の破断時にその突出を効果的に、かつ、確実に、防止することができる。
The test results are shown in FIG. 13(D).
As shown in FIG. 13(D), in comparison with the prior art, the remaining tension is kept low in each of Examples 2 to 5, which are the protrusion prevention tool 30 according to the embodiment of the present invention. It can be seen that the protrusion of the existing PC steel bar can be effectively prevented when it breaks. More specifically, when the projection energy of the PC steel bar is 1.57 kN·m or less, the residual tension/breaking load: Example 2=20.9%, Example 3=24.3%, Example 4=24. 2%, Example 5 = 2.02%, and the residual tension / breaking load is of course less than 100%, preferably less than half (50%), more preferably less than 25% It is possible to effectively and reliably prevent the protrusion of the existing PC steel bar when it breaks.

<床版およびウェブを模した供試体を用いた破断・突出実験>
以下において、本発明の実施の形態に係る突出防止具30によって、PC鋼棒突出の防止の実証や、突出防止具30を入れられない区間である上床版側、または、下床版側の突
出防止の実証するために、床版とウェブを模した供試体で破断・突出実験を行った結果を説明する。なお、以下において、突出防止具を緩衝定着具と記載する場合がある。
<Breakage/protrusion experiment using test pieces simulating floor slabs and webs>
In the following, the protrusion prevention tool 30 according to the embodiment of the present invention will be used to demonstrate the prevention of PC steel bar protrusion, and the protrusion of the upper floor slab side or the lower floor slab side, which is a section where the protrusion prevention tool 30 cannot be inserted. In order to demonstrate the prevention, we will explain the results of a fracture/extrusion experiment using floor slabs and web-like specimens. In addition, below, a protrusion prevention tool may be described as a cushion fixing tool.

<<破断・突出実験:概要>>
過去の検討では、PC鋼棒に設置した緩衝定着具によって、緩衝定着具から下床版区間で切断した場合に、上床版~緩衝定着具間に緊張力が残存すれば合格として扱って評価してきた。しかしながら、緩衝定着具~上床版区間内でPC鋼棒が切断した場合や緩衝定着具~下床版区間内でPC鋼棒が切断した場合を想定した試験ではないため、その場合に上床版や下床版がPC鋼棒の突出に対してどのように抵抗するか検討を行うこととした。具体的には、図2に示すA区間、B区間が破断した際の上床版あるいは下床版の性状を把握する。さらに、過去に行ったPC鋼棒の破断想定の時に合格判定としていた状況が、上床版を有する場合にどのような挙動を示すかの確認を行うため、図2に示すC区間が破断した際の上床版の破壊状況を評価した。
<<Break/Protrusion Experiment: Overview>>
In the past examination, when the cushioning fixture installed on the PC steel bar cut the section from the cushioning fixture to the lower floor slab, if tension remained between the upper floor slab and the cushioning fixture, it was evaluated as a pass. rice field. However, since this test does not assume the case where the PC steel bar is cut in the section between the cushioning fixture and the upper floor slab, or the case where the PC steel bar is cut in the section between the cushioning fixture and the lower floor slab, the upper floor slab and It was decided to examine how the lower floor slab resists the protrusion of the PC steel bars. Specifically, the properties of the upper floor slab or the lower floor slab when the sections A and B shown in FIG. 2 are broken are grasped. Furthermore, in order to confirm what kind of behavior will be shown when there is an upper floor slab in the situation that was judged to be acceptable when the PC steel bar was fractured in the past, when the C section shown in Fig. 2 was fractured The fracture condition of the upper floor slab of

図14に試験装置全体の概要図を示す。供試体は上床版あるいは下床版とウェブで構成されるものとした。ウェブ内にはPC鋼棒を配置し、所定の緊張力を導入し、想定する箇所でPC鋼棒を切断できるように切断孔を有する形状とした。また、グラウトについては充填不足の状況を想定したため、グラウトの充填は行わないこととした。上床版あるいは下床版とウェブは分割して製作しており、PC鋼棒によって接続する構造を採用した。 FIG. 14 shows a schematic diagram of the entire test apparatus. The specimen consisted of an upper deck or lower deck and a web. A PC steel bar was placed in the web, a predetermined tension was introduced, and the web was shaped to have a cutting hole so that the PC steel bar could be cut at an assumed location. As for the grout, it was decided that grout would not be filled because it was assumed that the filling would be insufficient. The upper floor slab or lower floor slab and the web are manufactured separately, and a structure in which they are connected by PC steel bars was adopted.

以下に、詳細な試験体の概要を示す。はじめに上床版水準の試験体概要を図15に示す。上床版は舗装が敷設されているため、舗装を有する上床版を作製した。上床版は厚さ500mmとし、その上に基層としてFB13を35mm厚さ、表層として高機能I型を40mm厚さとして舗装を施工した。上床版内には、PC鋼棒の定着具を設置しており、後打ちコンクリートを後埋めする形で再現した。後打ちコンクリートは切断時において強度が約46N/mm2となる普通コンクリートを使用した。なお、PC鋼棒のかぶりについては、安全側の評価となるよう上床版天端までPC鋼棒が位置するようにし、かぶり0mmとした。PC鋼棒へ導入した緊張力は、環境条件によって異なる。そのため、本試験ではPC鋼棒破断時期を建設後10年、外気温度を6℃(北海道)、ウェブ厚さ500mm、鋼棒配置間隔を1000mmと仮定し、プレストレスの減少量を道路橋示方書より算出し、PC鋼棒に導入する緊張力は583kN(上床版側)とした。定着具はせん断補強鋼棒の定着システムとして一般的にディビダーク工法が用いられ、その定着具はアンカーグロッケが一般的に採用されているため、それを採用した。PC鋼棒の切断位置について、上床版を想定した実験では支圧板から切断位置までの距離が1000mmあるいは2000mmとなる位置で切断を行った。切断方法は、ディスクサンダーによる切断とした。破断エネルギーは1000mmで1.05kN・m、2000mmで2.10kN・mである。 A detailed outline of the specimen is shown below. First, Fig. 15 shows the outline of the upper floor slab level test piece. Since the upper floor slab is paved, a paved upper floor slab was produced. The upper floor slab had a thickness of 500 mm, and pavement was constructed with FB13 as a base layer having a thickness of 35 mm and a surface layer having a thickness of 40 mm as a surface layer. In the upper floor slab, a fixture of PC steel rods was installed, and the post-cast concrete was recreated in the form of post-filling. Ordinary concrete having a strength of about 46 N/mm 2 when cut was used as post-cast concrete. Regarding the cover of the PC steel bar, the cover was set to 0 mm so that the PC steel bar was positioned up to the top of the upper floor slab so that the evaluation was on the safe side. The tension force introduced into the PC steel bar varies with environmental conditions. Therefore, in this test, it is assumed that the PC steel bar fracture time is 10 years after construction, the outside temperature is 6 ° C (Hokkaido), the web thickness is 500 mm, and the steel bar arrangement interval is 1000 mm. , and the tension introduced into the PC steel bar was set to 583 kN (upper floor slab side). For the fixture, the Dividark method is generally used as a fixing system for shear reinforcing steel bars, and the anchor glocke is generally used for the fixture, so it was adopted. Regarding the cutting position of the PC steel bar, in the experiment assuming the upper floor slab, cutting was performed at a position where the distance from the bearing plate to the cutting position was 1000 mm or 2000 mm. The cutting method was cutting with a disk sander. The breaking energy is 1.05 kN·m at 1000 mm and 2.10 kN·m at 2000 mm.

次に、下床版水準の試験体概要を図16に示す。下床版の場合、PC鋼棒の定着部はデットアンカー形式となるため、本試験においても定着体が埋め込みとなるようにした。下床版は厚さ500mmとした。下床版のコンクリート強度は46N/mm2とし、PC鋼棒のかぶりは、実施工を参考にかぶり50mmとした。PC鋼棒へ導入した緊張力は、上床版水準と同様に583kNとした。また、定着具についても上床版水準と同様とした。PC鋼棒の切断位置について、下床版を想定した実験では支圧板から切断位置までの距離が1000mmとなる位置で切断を行った。また、下床版の設置方向について、本来は下床版であるため、切断位置と比較して下方向となるべきであるが、今回は実験の都合上切断位置に対して上方向となるように設置・切断を行った。破断エネルギーは1.05kN・mである。 Next, FIG. 16 shows an outline of a test piece at the level of the lower floor slab. In the case of the lower floor slab, since the anchoring part of the PC steel rod is a dead anchor type, the anchoring body was embedded in this test as well. The thickness of the lower floor slab was 500 mm. The concrete strength of the lower floor slab was set to 46 N/mm 2 , and the cover of the PC steel bar was set to 50 mm with reference to the actual work. The tension force introduced to the PC steel bar was 583 kN, the same as the level of the upper floor slab. In addition, the fixtures were the same as those for the upper floor slabs. Regarding the cutting position of the PC steel bar, in the experiment assuming the lower floor slab, cutting was performed at a position where the distance from the bearing plate to the cutting position was 1000 mm. Also, regarding the installation direction of the lower floor slab, since it is the lower floor slab, it should be downward compared to the cutting position, but for the convenience of the experiment, it was set to be upward relative to the cutting position. was installed and cut to The breaking energy is 1.05 kN·m.

次に、C区間で破断した場合に緩衝定着具を介して上床版の破壊形態がどのようになるのかを確認するために行った試験体の概要を図17に示す(緩衝定着具水準)。上床版の厚さ、舗装条件、PC鋼棒の設置条件、緊張力、後打ちコンクリートの条件等は上床版水準と同様とした。本水準では、上床版側に設置した緩衝定着具よりも下床版側においてPC鋼棒の切断を実施した。具体的に緩衝定着具は定着具から1000mm位置に設置し、箱抜き部の後埋め処理は行わなかった。切断位置は、定着具から8000mm位置とした
。今回試行した緩衝定着具は、過去の検討で試作した定着具を用いた。また、箱抜き内に緩衝定着具を設置して発生する隙間については、鋼板を詰めて設置することで、スリーブやウェッジが脱落することを防いだ。破断エネルギーは8.38kN・mである。
Next, Fig. 17 shows an outline of a test piece that was conducted to confirm how the upper floor slab will be destroyed through the cushioning fixture when it breaks in the C section (cushioning fixture level). The thickness of the upper floor slab, pavement conditions, installation conditions of PC steel bars, tension, post-cast concrete conditions, etc. were the same as those of the upper floor slab. In this standard, the cutting of the PC steel rod was carried out on the lower floor slab side of the cushioning fixture installed on the upper floor slab side. Specifically, the cushioning fixture was installed at a position 1000 mm from the fixture, and no post-filling treatment was performed in the box cutout portion. The cutting position was 8000 mm from the fixing tool. The cushioning fixture that was tried this time used the fixture that was prototyped in the past study. In addition, the gap generated by installing the cushioning fixture inside the box was filled with steel plates to prevent the sleeve and wedge from falling off. The breaking energy is 8.38 kN·m.

<<突出確認実験:結果>>
・舗装有り-1m水準の結果(A区間)
舗装有り-1mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、1m位置でPC鋼棒を切断した場合であっても、舗装を有する本供試体はPC鋼棒部で突出する様子は確認できなかった。また、舗装の残留変位は、最大変位が3mmで、その範囲は10cm程度であった(図18)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
・舗装有り-2m水準の結果(A区間)
舗装有り-2mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、2m位置でPC鋼棒を切断した場合であっても、舗装を有する本供試体はPC鋼棒部で突出する様子は確認できなかった。また、舗装の残留変位は、最大変位が6mmで、その範囲は15cm程度であった(図19)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
<<Protrusion Confirmation Experiment: Results>>
・Pavement - 1m level result (A section)
The situation after the test of this standard for -1 m with pavement will be explained. The meshes are shown at intervals of 200 mm, but even when the PC steel bar was cut at a position of 1 m, it could not be confirmed that the pavement protruded from the PC steel bar. Moreover, the residual displacement of the pavement had a maximum displacement of 3 mm and a range of about 10 cm (Fig. 18). After the test, the paving part was lifted out and the condition of the post-strike part was checked.
・Result of pavement - 2m level (A section)
We will explain the situation after the test of this standard for -2m with pavement. The meshes are shown at intervals of 200 mm, but even when the PC steel bar was cut at a position of 2 m, it could not be confirmed that the PC steel bar protruded in this test piece having pavement. Moreover, the residual displacement of the pavement had a maximum displacement of 6 mm and a range of about 15 cm (Fig. 19). After the test, the paving part was lifted out and the condition of the post-strike part was checked.

・舗装なし水準の結果(B区間)
舗装なし水準について、本水準の試験後の状況を図20に示す。メッシュは100mm間隔で示しているが、下床版から1m位置でPC鋼棒を切断した場合であっても、50mmのかぶりを有する本供試体はPC鋼棒部で突出することはなかった。変状を確認すると、コンクリート床版の天端において、ひび割れの発生を確認し、PC鋼材位置を中心に放射状に発生していた。ひび割れの幅は0.05mm以下であり、微細なひび割れであった。また、コンクリート床版の残留変位やコンクリートの浮き・剥離等は確認できなかった。
・緩衝定着具-8m水準の結果(C区間)
緩衝定着具-8mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、上床版から8m位置でPC鋼棒を切断した場合であっても、緩衝定着具や舗装を有する本供試体はPC鋼棒が突出しなかった。また、舗装の残留変位は、最大変位が7mmで、その範囲は15cm程度であった(図21)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
・Results of unpaved level (B section)
Figure 20 shows the condition after the test of this level for the level without pavement. The meshes are shown at intervals of 100 mm, but even when the PC steel bar was cut at a position of 1 m from the lower floor slab, this specimen with a cover of 50 mm did not protrude from the PC steel bar. When confirming the deformation, cracks were confirmed to have occurred at the top of the concrete floor slab, and they were occurring radially around the PC steel material position. The width of the crack was 0.05 mm or less, and the crack was fine. In addition, residual displacement of the concrete floor slabs, lifting and peeling of concrete, etc. could not be confirmed.
・Results of cushioning fixture -8m level (C section)
I will explain the situation after the test of this standard for the cushioning fixture -8m. The meshes are shown at intervals of 200 mm, but even when the PC steel bars were cut at a position of 8 m from the upper floor slab, the PC steel bars did not protrude in this specimen having cushioning fixtures and pavement. Moreover, the residual displacement of the pavement had a maximum displacement of 7 mm and a range of about 15 cm (Fig. 21). After the test, the paving part was lifted out and the condition of the post-strike part was checked.

・箱抜き箇所の観察
PC鋼棒を切断時の緩衝定着具の挙動を把握するため、箱抜き箇所を観察した。PC鋼棒破断前の時点では、緩衝定着具のスリーブとウェッジとは接している。次に、切断後の時点では、ウェッジと隙間を埋めるために設置していた支圧板に隙間が生じていた。これについて、動画により確認したところ、PC鋼棒の破断に伴って、ウェッジがスリーブに押し込まれ、その後PC鋼棒の反動で伸びる際にウェッジが同じく移動し、再度スリーブへ押し込まれる状況が何回か繰り返し行われ、最終的にウェッジがスリーブへ押し込まれた状態になった。過去の検討では、箱抜き内を後打ちした際には、残留する緊張力が大きくなることから、上記のような現象が起こりにくい可能性が示唆されるが、緩衝定着具によってPC鋼棒の破断時のエネルギーをウェッジとスリーブにより吸収しているものと推察される。
・Observation of the unboxed area The unboxed area was observed in order to grasp the behavior of the buffer fixture when cutting the PC steel bar. Before the PC steel bar breaks, the sleeve and the wedge of the cushioning fixture are in contact. Next, after the cutting, there was a gap between the wedge and the pressure plate installed to fill the gap. When I checked this with a video, the wedge was pushed into the sleeve when the PC steel bar broke, and then when the PC steel bar stretched, the wedge moved in the same way and was pushed into the sleeve again several times. was repeated until the wedge was pushed into the sleeve. In past studies, it is suggested that the above phenomenon may be less likely to occur when post-strike is performed inside the box, because the residual tension increases. It is presumed that the wedge and sleeve absorb the energy at the time of fracture.

・切断試験のまとめ
A区間(緩衝定着具~上床版間)でPC鋼棒が切断した場合を想定した供試体の破断実験から、上床版からの距離が1mあるいは2mの両方とも、PC鋼棒が突出することはなかった。また、上床版の上に敷設した舗装の変状は残留変位が6mm程度であり、損傷程度も軽微と判断できるものであった。したがって、緩衝定着具の設置は、上床版天端から2m以内に設置すれば、その区間でPC鋼棒が破断したとしても、舗装条件が同程度であればPC鋼棒が突出することがないと判断ができる。
・Summary of the cutting test From the breaking test of the test piece assuming the case where the PC steel bar was cut in section A (between the buffer fixture and the upper floor slab), the distance from the upper floor slab was 1 m or 2 m. did not stand out. Moreover, the residual displacement of the pavement laid on the upper floor slab was about 6 mm, and the degree of damage was judged to be minor. Therefore, if the cushioning fixture is installed within 2m from the top of the upper floor slab, even if the PC steel bar breaks in that section, the PC steel bar will not protrude if the pavement conditions are the same. can be judged.

B区間(緩衝定着具~下床版間)でPC鋼棒が切断した場合を想定した供試体の破断実
験から、下床版からの距離が1m以下の場合、PC鋼棒が突出することはなかった。また、下床版はひび割れが放射状に発生した程度で、コンクリートの浮きやはく落などは確認できなかったことから、損傷程度は軽微と判断できるものであった。したがって、緩衝定着具の設置は、下床版下端から1m以内に設置すれば、その区間でPC鋼棒が破断したとしても、かぶり条件や配筋条件が同程度であればPC鋼棒が突出することがないと判断できる。
From the fracture test of the specimen assuming the case where the PC steel rod was cut in section B (between the buffer fixture and the lower floor slab), when the distance from the lower floor slab was 1 m or less, the PC steel rod did not protrude. I didn't. In addition, since the lower floor slab only had radial cracks, and no lifting or peeling of concrete was observed, the degree of damage was judged to be minor. Therefore, if the cushioning fixture is installed within 1m from the lower end of the lower deck, even if the PC steel bar breaks in that section, the PC steel bar will protrude if the covering conditions and bar arrangement conditions are the same. It can be determined that there is nothing to do.

C区間でPC鋼棒が切断した場合を想定した供試体の破断実験から、上床版からの切断位置までの距離が8mでその間に緩衝定着具を有する場合、PC鋼棒が突出することはなかった。また、上床版の上に敷設した舗装の変状は残留変位が7mm程度であり、損傷程度も軽微と判断できるものであった。さらに、今回の実験では、緩衝定着具設置箇所の箱抜き部を後打ちしていなかった。そのため、後打ちを実施すれば、緩衝機能がより緩衝できるものと推察される。なお、緩衝定着具を上床版側と下床版側に2箇所設置した場合、緩衝定着具間の距離は7m以内であればPC鋼棒が突出することがないと判断できる。 From the fracture test of the specimen assuming the case where the PC steel rod is cut in section C, when the distance from the upper floor slab to the cutting position is 8 m and there is a buffer fixture in between, the PC steel rod does not protrude. rice field. Moreover, the residual displacement of the pavement laid on the upper floor slab was about 7 mm, and the degree of damage was judged to be minor. Furthermore, in this experiment, post-strapping was not performed on the box-out portion where the shock-absorbing fixture was installed. Therefore, it is presumed that the buffering function can be further buffered if the post-injection is performed. In addition, when two cushioning fixtures are installed on the upper floor slab side and the lower floor slab side, it can be determined that the PC steel rod will not protrude if the distance between the cushioning fixtures is within 7m.

以下に参考として、各試験時の破断エネルギーを図22に示す。
なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
For reference, FIG. 22 shows the breaking energy in each test.
It should be noted that the embodiments disclosed this time should be considered as examples in all respects and not restrictive. The scope of the present invention is indicated by the scope of the claims rather than the above description, and is intended to include all modifications within the meaning and range of equivalents of the scope of the claims.

たとえば、以下のような変更がその一例として挙げられる。
・既設PC鋼棒突出防止具(突出防止具30)は、既設PC鋼棒Bを把持するウェッジとそのウェッジを格納するスリーブとで構成され、ウェッジとスリーブとは金属製または樹脂製であることが好ましい。
・ウェッジとスリーブとは、既設PC鋼棒に取り付け可能な構造であればよく、上述した構造は一例に過ぎない。
・ウェッジは2分割以上であればよく、スリーブは半割部品をボルトで締結できるものであってもPC鋼棒が通るスリット(切欠き部)を有するものであっても、その形状が円柱形状、中空円筒形状、中実円筒形状、角柱形状、多角柱形状であっても構わない。
Examples include the following changes.
・The existing PC steel bar protrusion preventive tool (protrusion preventive tool 30) consists of a wedge that grips the existing PC steel bar B and a sleeve that stores the wedge. The wedge and the sleeve are made of metal or resin. is preferred.
- The wedge and the sleeve may have any structure as long as they can be attached to the existing PC steel bar, and the structure described above is merely an example.
・The wedge can be divided into two parts or more, and the sleeve can be bolted to the halves, or have a slit (notch) through which the PC steel rod can pass, and the shape is cylindrical. , a hollow cylindrical shape, a solid cylindrical shape, a prismatic shape, or a polygonal prismatic shape.

・スリーブはPC鋼棒の長手方向(材軸)に対してテーパーは1方向(突出防止具30)、または、相対する向きに2方向(突出防止具32)有していても構わない。
・スリーブおよびウェッジのテーパー角度は任意であるが、5度~15度程度が好ましい。
・スリーブおよびウェッジのPC鋼棒の長手方向の長さは任意であるが、20mm~200mm程度が好ましい。
・スリーブおよびウェッジに用いられる材料は金属であっても樹脂であっても化学繊維であっても構わない。
- The sleeve may taper in one direction (protrusion preventer 30) or in two opposite directions (protrusion preventer 32) with respect to the longitudinal direction (material axis) of the PC steel bar.
・Although the taper angle of the sleeve and wedge is arbitrary, it is preferably about 5 to 15 degrees.
・The longitudinal length of the PC steel bars of the sleeve and wedge is arbitrary, but is preferably about 20 mm to 200 mm.
- The material used for the sleeve and wedge may be metal, resin, or chemical fiber.

本発明は、プレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合のPC鋼棒突出防止対策に好ましく、既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを防止することができる点で特に好ましい。 INDUSTRIAL APPLICABILITY The present invention is preferable for prevention of protrusion of PC steel bars when existing PC steel bars that apply compressive force to prestressed concrete members are broken. This is particularly preferable in that the PC steel rod can be prevented from protruding out of the concrete member.

10 PC箱桁橋
100 スリーブ
110、120 スリーブ片
140 ウェッジ
142、144、146 ウェッジ片
200 スリーブ
210、220 スリーブ片
240 ウェッジ
242、244 ウェッジ片
S スリーブ
W ウェッジ
B 既設PC鋼棒
10 PC box girder bridge 100 Sleeve 110, 120 Sleeve piece 140 Wedge 142, 144, 146 Wedge piece 200 Sleeve 210, 220 Sleeve piece 240 Wedge 242, 244 Wedge piece S Sleeve W Wedge B Existing PC steel bar

Claims (12)

既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに前記既設PC鋼棒に装着可能な構造を備えたスリーブとを含む突出防止具を用いて、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めて前記コンクリート部材の外部に前記既設PC鋼棒が突出することを防止する工法であって、
前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から前記既設PC鋼棒に沿って0.25m~2.0mの位置のコンクリートを斫って、前記既設PC鋼棒を露出させる露出ステップと、
前記ウェッジのテーパーが狭まる方向が前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した既設PC鋼棒に装着するウェッジ装着ステップと、
前記スリーブのテーパーが狭まる方向が前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した既設PC鋼棒に装着するスリーブ装着ステップと、
前記スリーブを前記ウェッジに組み合わせられるスリーブとして機能させるスリーブ機能化ステップと、
前記分割された状態で前記露出した前記既設PC鋼棒に装着された2以上のウェッジ片を、前記ウェッジのテーパーの向きと前記スリーブのテーパーの向きとを一致させて、スリーブとして機能させた前記スリーブに挿入する挿入ステップとを含む、既設PC鋼棒突出防止工法。
A wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of an existing PC steel bar, and a sleeve having a taper combined with the wedge and having a structure capable of being attached to the existing PC steel bar. The existing PC steel bar protrudes outside the concrete member by receiving the impact force when the existing PC steel bar that imparts a compressive force to the existing prestressed concrete member breaks, using a protrusion prevention tool including A construction method for preventing
The existing PC steel rod is exposed by scraping off the concrete at a position of 0.25 m to 2.0 m along the existing PC steel rod from the surface of the concrete member where the existing PC steel rod is expected to protrude. an exposure step that causes
a wedge mounting step of mounting two or more divided wedge pieces on the exposed existing PC steel bar so that the tapered direction of the wedge is directed toward the surface;
a sleeve attaching step of attaching a sleeve having a structure attachable to the existing PC steel bar to the exposed existing PC steel bar so that the tapered direction of the sleeve is directed toward the surface;
a sleeve functionalization step that causes the sleeve to function as a sleeve that can be combined with the wedge;
The two or more wedge pieces attached to the exposed existing PC steel bar in the divided state are made to function as sleeves by matching the taper direction of the wedge with the taper direction of the sleeve. and an inserting step of inserting the sleeve into the existing PC steel bar protrusion prevention method.
前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超える場合において、
前記露出ステップは、前記表面から0.25m~2.0mの第一位置のコンクリートおよび前記他の表面から0.25m~2.0mの第二位置のコンクリートを2箇所斫って、前記2箇所において前記既設PC鋼棒を露出させるステップを含み、
前記第一位置および前記第二位置は、前記表面、前記第一位置、前記第二位置、前記他の表面の順であって、
前記ウェッジ装着ステップは、斫り1箇所に対して1個のウェッジを用いて、前記ウェッジのテーパーが狭まる方向が近い方の前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、
前記スリーブ装着ステップは、斫り1箇所に対して1個のスリーブを用いて、前記スリーブのテーパーが狭まる方向が近い方の前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含む、請求項1に記載の既設PC鋼棒突出防止工法。
The length along the existing PC steel bar, and the concrete member from which the existing PC steel bar is expected to protrude from the surface of the concrete member from which the existing PC steel bar is expected to protrude. When the length L to the other surface of exceeds 2.5 m to 3.5 m,
The exposing step includes scraping concrete at a first position 0.25 m to 2.0 m from the surface and concrete at a second position 0.25 m to 2.0 m from the other surface, and exposing the existing PC steel bar in
The first position and the second position are in the order of the surface, the first position, the second position, and the other surface,
In the wedge mounting step, one wedge is used for one pinch, and two or more wedge pieces are divided so that the tapered direction of the wedge is directed toward the closer surface. to the exposed existing PC steel bar;
In the sleeve mounting step, one sleeve is used for one pinched portion, and the tapered direction of the sleeve can be mounted on the existing PC steel bar so that the tapered direction of the sleeve is in the direction of the closer surface. 2. The existing PC steel bar protrusion prevention method according to claim 1, comprising the step of attaching a sleeve having a structure to the exposed existing PC steel bar.
前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超えない場合において、
前記露出ステップは、前記表面および前記他の表面のいずれかから0.25m~2.0mの位置のコンクリートを1箇所斫って、前記1箇所において前記既設PC鋼棒を露出させるステップを含み、
前記ウェッジ装着ステップは、斫り1箇所に対して2個のウェッジを用いて、前記2個のウェッジのテーパーが狭まる方向が互いに対面する方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、
前記スリーブ装着ステップは、斫り1箇所に対して2個のスリーブを用いて、前記2個
のスリーブのテーパーが狭まる方向が互いに対面する方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含む、請求項1に記載の既設PC鋼棒突出防止工法。
The length along the existing PC steel bar, and the concrete member from which the existing PC steel bar is expected to protrude from the surface of the concrete member from which the existing PC steel bar is expected to protrude. When the length L to the other surface of does not exceed 2.5 m to 3.5 m,
The exposing step includes a step of scraping concrete at a position of 0.25 m to 2.0 m from either the surface or the other surface to expose the existing PC steel bar at the one point,
In the wedge mounting step, two wedges are used for one pinch, and two or more divided wedge pieces are attached so that the tapered directions of the two wedges face each other. attaching to the exposed existing PC steel bar;
In the sleeve mounting step, two sleeves are used for one pinched position, and the tapered directions of the two sleeves are in the directions facing each other, and can be mounted on the existing PC steel bar. 2. The method of preventing protrusion of an existing PC steel bar according to claim 1, comprising the step of attaching a sleeve having a structure to the exposed existing PC steel bar.
前記挿入ステップは、前記ウェッジを前記スリーブに、ジャッキを用いることなく作業者の手作業により挿入するステップを含む、請求項1~請求項3のいずれかに記載の既設PC鋼棒突出防止工法。 The existing PC steel bar protrusion prevention method according to any one of claims 1 to 3, wherein said inserting step includes a step of manually inserting said wedge into said sleeve without using a jack. 請求項1~請求項4のいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、
前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、
前記ウェッジに組み合わせられるテーパーを備える内筒側のスリーブ片と前記内筒側のスリーブ片の外側に設けられる外筒側のスリーブ片とに分割されるスリーブと、を含み、
前記内筒側のスリーブ片および前記外筒側のスリーブ片について、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能な切欠き部を少なくとも内筒側スリーブ片が備え、
前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする、既設PC鋼棒突出防止具。
A protrusion prevention tool used in the existing PC steel bar protrusion prevention method according to any one of claims 1 to 4,
a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar;
a sleeve divided into an inner cylinder-side sleeve piece having a taper combined with the wedge and an outer cylinder-side sleeve piece provided outside the inner cylinder-side sleeve piece,
With regard to the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side, at least the sleeve on the inner cylinder side has a notch into which the existing PC steel rod can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod. a piece is provided,
An existing PC steel bar protrusion prevention tool, characterized in that the sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side are joined to be integrated as a sleeve and function as a sleeve that is combined with the wedge. .
前記内筒側のスリーブ片の外周面に設けられたキー溝と前記外筒側のスリーブ片の内周面に設けられたキー溝とに跨ってキーが設けられて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されることを特徴とする、請求項5に記載の既設PC鋼棒突出防止具。 A key is provided across a key groove provided on the outer peripheral surface of the sleeve piece on the inner cylinder side and a key groove provided on the inner peripheral surface of the sleeve piece on the outer cylinder side, and the sleeve piece on the inner cylinder side is provided. 6. The existing PC steel bar protrusion prevention tool according to claim 5, wherein the sleeve piece is joined to the sleeve piece on the outer cylinder side to be integrated as a sleeve. 前記内筒側のスリーブ片の外周面に設けられた雄ねじと前記外筒側のスリーブ片の内周面に設けられた雌ねじとが螺合されて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されることを特徴とする、請求項5に記載の既設PC鋼棒突出防止具。 A male thread provided on the outer peripheral surface of the sleeve piece on the inner cylinder side and a female thread provided on the inner peripheral surface of the sleeve piece on the outer cylinder side are screwed together so that the sleeve piece on the inner cylinder side and the outer cylinder side are screwed together. 6. The existing PC steel bar protrusion preventive tool according to claim 5, wherein the sleeve piece is joined to form an integrated sleeve. 請求項1~請求項4のいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、
前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、
前記ウェッジに組み合わせられるテーパーを備えるとともに、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能なスリット部を備えるスリーブと、を含み、
前記スリット部において互いに対向する壁面が連結部材を用いて連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする、既設PC鋼棒突出防止具。
A protrusion prevention tool used in the existing PC steel bar protrusion prevention method according to any one of claims 1 to 4,
a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar;
a sleeve having a taper to be combined with the wedge and having a slit into which the existing PC steel bar can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar;
Wall surfaces facing each other in the slit portion are connected using a connecting member, whereby the interval between the slit portions as viewed from the vertical plane is regulated, and functions as a sleeve that is combined with the wedge, Existing PC steel bar protrusion prevention tool.
前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、
前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されることを特徴とする、請求項8に記載の既設PC鋼棒突出防止具。
The connecting member includes a female screw hole provided in at least one wall surface of the wall surfaces facing each other and a male screw passing through the hole provided in the other wall surface,
9. The existing PC steel according to claim 8, wherein the male screw is screwed into the female screw hole to connect the wall surface, thereby regulating the interval between the slit portions when viewed from the vertical plane. Stick projection prevention tool.
前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、
前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制され、
前記雄ねじの径を変更することにより、前記垂直な面から見た前記スリット部の間隔を規制した際に前記連結部材の剛性が変更されて前記PC鋼棒が破断した際の緩衝能力を調整できることを特徴とする、請求項8に記載の既設PC鋼棒突出防止具。
The connecting member includes a female screw hole provided in at least one wall surface of the wall surfaces facing each other and a male screw passing through the hole provided in the other wall surface,
The male screw is screwed into the female threaded hole to connect the wall surface, thereby regulating the interval between the slit portions when viewed from the vertical plane,
By changing the diameter of the male screw, the rigidity of the connecting member is changed when the interval between the slits viewed from the vertical plane is regulated, and the buffering capacity when the PC steel bar is broken can be adjusted. The existing PC steel bar protrusion prevention tool according to claim 8, characterized by:
前記スリーブにおけるテーパーが広がる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面にて前記スリーブに接合される、平板状のプレートをさらに含み、
前記プレートは、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能、かつ、前記ウェッジにおけるテーパーが広がる方向の端部に設けられたウェッジ突起部が突出可能な切欠き部を備え、
前記プレートが前記スリーブの端面に接合されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ウェッジ突起部が前記プレートの切欠部から突出することを特徴とする、請求項5~請求項10のいずれかに記載の既設PC鋼棒突出防止具。
further comprising a flat plate joined to the sleeve at an end face in the direction in which the taper of the sleeve widens and perpendicular to the longitudinal direction of the existing PC steel rod,
The plate allows the existing PC steel bar to be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and the wedge protrusion provided at the end of the wedge in the direction in which the taper widens can protrude. Equipped with a notch,
The wedge is positioned at a predetermined position of the sleeve by joining the plate to the end face of the sleeve, and the wedge protrusion protrudes from the notch of the plate. The existing PC steel bar protrusion prevention tool according to any one of claims 5 to 10.
3次元形状のワイヤークリップをさらに含み、
前記ワイヤークリップは、
前記スリーブにおける、前記既設PC鋼棒の長手方向の長さに対応する直線部と、
前記直線部よりも前記スリーブにおけるテーパーが広がる側に、前記ウェッジにおけるテーパーが広がる方向の端部の外周上に設けられたウェッジ溝部に嵌入される円弧部と、
前記直線部よりも前記スリーブにおけるテーパーが狭まる側に、前記スリーブにおけるテーパーが狭まる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面に設けられたスリーブ穴部に嵌入される嵌入片と、を少なくとも備え、
前記ワイヤークリップの円弧部が前記ウェッジ溝部に嵌入されるとともに、前記ワイヤークリップの嵌入片が前記スリーブ穴部に嵌入されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ワイヤークリップの直線部が前記スリーブの外周に沿って配置されることを特徴とする、請求項5~請求項10のいずれかに記載の既設PC鋼棒突出防止具。
further including a three-dimensional wire clip,
The wire clip is
a linear portion of the sleeve corresponding to the longitudinal length of the existing PC steel bar;
an arc portion fitted into a wedge groove portion provided on the outer circumference of the end portion of the wedge in the direction in which the taper widens in the wedge, on the side where the taper in the sleeve widens from the straight portion;
Fitting into a sleeve hole provided on the side where the taper of the sleeve narrows relative to the straight portion, the end face of the sleeve in the direction in which the taper narrows and the end face perpendicular to the longitudinal direction of the existing PC steel bar. having at least one piece and
The arc portion of the wire clip is fitted into the wedge groove portion and the fitting piece of the wire clip is fitted into the sleeve hole portion, whereby the wedge is positioned at a predetermined position of the sleeve and the The existing PC steel bar protrusion prevention tool according to any one of claims 5 to 10, characterized in that the straight portion of the wire clip is arranged along the outer circumference of the sleeve.
JP2021055809A 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods Active JP7524121B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021055809A JP7524121B2 (en) 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021055809A JP7524121B2 (en) 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods

Publications (2)

Publication Number Publication Date
JP2022152874A true JP2022152874A (en) 2022-10-12
JP7524121B2 JP7524121B2 (en) 2024-07-29

Family

ID=

Similar Documents

Publication Publication Date Title
Kwon et al. Behavior of post-installed shear connectors under static and fatigue loading
Parks et al. Seismic Repair of Severely Damaged Precast Reinforced Concrete Bridge Columns Connected with Grouted Splice Sleeves.
US20060201083A1 (en) Tensioning anchor suitable for blind-hole tendon anchoring and tendon repair
Yang et al. Repair of RC bridge columns with interlocking spirals and fractured longitudinal bars–An experimental study
JP2003328561A (en) Reinforcing method for concrete member and tensioning device for tendon used therein
Sennah et al. Vehicle crash testing on a GFRP-reinforced PL-3 concrete bridge barrier
JP2020100976A (en) Shear reinforcement construction method for pc box girder bridge
KR100492335B1 (en) Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus
Pitrakkos The tensile stiffness of a novel anchored blind-bolt component for moment-resisting connections to concrete-filled hollow sections
JP2022152874A (en) Protrusion prevention method for existing pc steel rod, and existing pc steel rod protrusion prevention tool used for the same
Hoang et al. Experimental and dynamic response analysis of cable-stayed bridge due to sudden cable loss
Lee et al. Seismic performance of reinforced concrete column-foundation connections using combo-type mechanical splices
JP2004225411A (en) Anchoring bolt device for bridge pier or the like
Coogler et al. Experimental study of offset mechanical lap splice behavior
JP7524121B2 (en) Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods
JP2011043025A (en) Method for reinforcing structure using tensional material
Watanabe et al. Evaluation for flexural-load capacity of prestressed concrete girders with broken tendons
Zobel et al. Performance of strand splice repairs in prestressed concrete bridges
JP7186670B2 (en) Concrete floor slab repair method
JPH1060824A (en) Bridge-drop prevention device of concrete bridge and construction method thereof
Wang et al. Experimental investigation of deconstructable steel-concrete shear connections in sustainable composite beams
JP2006112189A (en) Tensional material anchoring tool
Yang et al. Repair of earthquake-damaged bridge columns with interlocking spirals and fractured bars
KR100347073B1 (en) Method to reinforce concrete structur and apparatus thereof
Wang et al. Behavior of sustainable composite floor systems with deconstructable clamping connectors

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240305

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240528

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240709

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240717