JP2022111491A - Composite structure body and method to suppress stone existing on ground from rolling - Google Patents

Composite structure body and method to suppress stone existing on ground from rolling Download PDF

Info

Publication number
JP2022111491A
JP2022111491A JP2021006941A JP2021006941A JP2022111491A JP 2022111491 A JP2022111491 A JP 2022111491A JP 2021006941 A JP2021006941 A JP 2021006941A JP 2021006941 A JP2021006941 A JP 2021006941A JP 2022111491 A JP2022111491 A JP 2022111491A
Authority
JP
Japan
Prior art keywords
polyurethane foam
stone
stones
rolling
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021006941A
Other languages
Japanese (ja)
Inventor
大輔 遠藤
Daisuke Endo
和秀 沢田
Kazuhide Sawada
紳二 藤井
Shinji Fujii
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inoac Housing and Construction Materials Co Ltd
Original Assignee
Inoac Housing and Construction Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inoac Housing and Construction Materials Co Ltd filed Critical Inoac Housing and Construction Materials Co Ltd
Priority to JP2021006941A priority Critical patent/JP2022111491A/en
Publication of JP2022111491A publication Critical patent/JP2022111491A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

To provide a composite structure body that can simply suppress rolling of stones and a method that can suppress rolling of stones existing on ground surface.SOLUTION: A composite structure body 10 includes stones 11 lying on ground surface G and a polyurethane foam body 20 attached on the stones 11 so as to follow their surface shapes. The polyurethane foam body 20 has a high performance of entering gaps and filling the voids, compared to filling materials such as mortar and concrete. Therefore, the polyurethane foam body 20 adhering to the stones 11 can suppress the stones from rolling around.SELECTED DRAWING: Figure 1

Description

特許法第30条第2項適用申請有り 令和2年11月10日 2020年度 土科学センター財団講演会にて、「不安定転石群に対する新しい発生源対策工法」に関する研究について公開した。Patent Law Article 30, Paragraph 2 Application Applied Nov. 10, 2020 At the 2020 Earth Science Center Foundation Lecture Meeting, we published research on "a new source control method for unstable boulder groups".

本開示は、複合構造体、及び地面の上に存在する石の転動を抑制する工法に関する。 TECHNICAL FIELD The present disclosure relates to a composite structure and a construction method for suppressing rolling of stones existing on the ground.

特許文献1には、斜面上の浮石の落石、滑動を防止する落石防止工法が開示されている。この方法は、対象浮石の下方側に、浮石の全部または一部を被覆するにいたるまで擁壁を構築して浮石を支持する方法である。 Patent Literature 1 discloses a rockfall prevention construction method for preventing floating rocks from falling and sliding on a slope. In this method, a retaining wall is built below the target floating stone to cover all or part of the floating stone to support the floating stone.

特開2004-251073号公報Japanese Patent Application Laid-Open No. 2004-251073

しかし、特許文献1のような方法では、擁壁を構築するために大量のコンクリートと、コンクリートを打設するための枠や重機等の大掛かりな設備が用いられる。このため、より簡便に、落石を防止する技術が求められている。 However, in the method as disclosed in Patent Document 1, a large amount of concrete and large-scale equipment such as a frame and heavy machinery for pouring the concrete are used to construct the retaining wall. Therefore, there is a demand for a more simple technique for preventing falling rocks.

本開示は、上述した課題を解決するためになされたものであり、簡便に、石の転動を抑制できる複合構造体を提供することを目的とする。また、簡便に、石の転動を抑制できる地面の上に存在する石の転動を抑制する工法を提供することを目的とする。 The present disclosure has been made to solve the above-described problems, and an object thereof is to provide a composite structure that can easily suppress the rolling of stones. Another object of the present invention is to provide a construction method for easily suppressing the rolling of stones present on the ground.

本開示の複合構造体は、
地面の上に存在する石と、
前記石の表面形状に沿って付着したポリウレタン発泡体と、を備える。
The composite structures of the present disclosure are
stones on the ground and
and a polyurethane foam conforming to the stone surface.

ポリウレタン発泡体は、例えば、モルタルやコンクリート等の間詰め材に比して、隙間に入り込んで空隙を埋める性能が高い。このため、石に付着したポリウレタン発泡体によって、石の転動を抑制することができる。 Polyurethane foams, for example, have a high performance of entering gaps and filling voids, compared to filling materials such as mortar and concrete. Therefore, the rolling of the stones can be suppressed by the polyurethane foam adhering to the stones.

本開示の地面の上に存在する石の転動を抑制する工法は、
前記石の表面形状に沿ってポリウレタン発泡体を付着させることで、前記石の転動を抑制する工法である。
The construction method for suppressing the rolling of stones existing on the ground of the present disclosure includes:
In this construction method, the rolling of the stone is suppressed by attaching a polyurethane foam along the surface shape of the stone.

この工法によれば、ポリウレタンフォーム原料を注入するだけで、石の表面形状に沿って付着したポリウレタン発泡体を形成することができる。このため、煩雑な工程を行うことなくポリウレタン発泡体を形成して、石の転動を抑制することができる。 According to this construction method, a polyurethane foam adhering to the surface shape of the stone can be formed simply by injecting the polyurethane foam raw material. Therefore, it is possible to form a polyurethane foam without performing complicated steps and suppress the rolling of stones.

本開示によれば、簡便に、石の転動を抑制できる複合構造体を提供することができる。また、本開示によれば、簡便に、石の転動を抑制できる地面の上に存在する石の転動を抑制する工法を提供することができる。 According to the present disclosure, it is possible to easily provide a composite structure capable of suppressing rolling of stones. In addition, according to the present disclosure, it is possible to provide a method of simply suppressing the rolling of stones existing on the ground that can suppress the rolling of stones.

実施形態1に係る複合構造体を示す図である。1 is a diagram showing a composite structure according to Embodiment 1; FIG. 石の転動を抑制する工法を説明する説明図である。It is explanatory drawing explaining the construction method which suppresses rolling of a stone. 実証実験について説明する説明図である。It is an explanatory view explaining demonstration experiment. 実施例に係る実験の様子を示す写真である。It is a photograph which shows the state of the experiment based on an Example. ポリウレタン発泡体におけるテストピースへの付着面の写真である。It is a photograph of the adhesion surface to the test piece in the polyurethane foam.

ここで、本開示の望ましい例を示す。
前記ポリウレタン発泡体は、前記石の下面側に付着しているとよい。この構成によれば、石の初期の転動を抑制することができ、効果的に石の転動を抑制することができる。
A preferred example of the present disclosure will now be presented.
The polyurethane foam may be attached to the underside of the stone. According to this configuration, initial rolling of the stone can be suppressed, and rolling of the stone can be effectively suppressed.

複数の前記石が、部分的に隙間が開いた状態で集合しており、
前記ポリウレタン発泡体は、前記隙間に充填され、複数の前記石の各々に付着しているとよい。転動は、滑動とは異なり、複数の石の各部が異なる方向に向けて移動し得る。上記の構成によれば、ポリウレタン発泡体が複数の石の各々に付着して、複数の石の転動を相互に抑制することによって、複数の石の転動を抑制できる。
A plurality of the stones are gathered with a gap partially opened,
The polyurethane foam may fill the gaps and adhere to each of the plurality of stones. Rolling, unlike sliding, may move parts of the stones in different directions. According to the above configuration, the polyurethane foam adheres to each of the plurality of stones to mutually suppress the rolling of the plurality of stones, thereby suppressing the rolling of the plurality of stones.

まず、本開示の一実施形態の複合構造体10について、図1を参照して説明する。なお、本開示はこれらの例示に限定されるものではなく、特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 First, a composite structure 10 according to an embodiment of the present disclosure will be described with reference to FIG. The present disclosure is not limited to these examples, but is indicated by the scope of the claims, and is intended to include all modifications within the scope and meaning equivalent to the scope of the claims.

図1に示すように、複合構造体10は、ポリウレタン発泡体20によって、地面G上に存在する浮石及び転石などの石11の転動を抑制したものである。地面Gは、斜面に限定されないが、斜面である場合に本開示の技術がより有効である。 As shown in FIG. 1, the composite structure 10 suppresses the rolling of stones 11 such as floating stones and boulders existing on the ground G by means of a polyurethane foam 20 . The ground G is not limited to a slope, but the technique of the present disclosure is more effective when it is a slope.

複合構造体10は、地面Gの上に存在する石11と、石11の表面形状に沿って付着したポリウレタン発泡体20と、を備えている。石11は、任意の立体形状であり、少なくとも一部に凸部を有している。また、石11の表面は、凹凸を有している。一見滑らかな表面を有するように見える石であっても、例えば、ポリウレタンフォーム原料が進入し得る程度の小さな凹部を有している。ポリウレタン発泡体20において石11に付着した面は、このような石11の表面形状に倣った形をなしている。本開示において、「付着」とは、石11とポリウレタン発泡体20が互いの凹凸構造を嵌合させることによる機械的な接合を主に意味する。このため、石11には、ポリウレタン発泡体20との化学的及び物理的な接合を妨げるような土、砂、コケ等の汚れがついていてもよい。 The composite structure 10 comprises a stone 11 lying on the ground G and a polyurethane foam 20 attached along the surface contour of the stone 11 . The stone 11 has an arbitrary three-dimensional shape and has a convex portion at least partially. Moreover, the surface of the stone 11 has unevenness. Even a stone that appears to have a smooth surface may have small depressions into which, for example, a polyurethane foam material may enter. The surface of the polyurethane foam 20 attached to the stone 11 has a shape that follows the surface shape of the stone 11 . In the present disclosure, "adhesion" mainly means mechanical bonding by fitting the concave-convex structures of the stone 11 and the polyurethane foam 20 to each other. As such, stone 11 may be contaminated with soil, sand, moss, or the like that interferes with chemical and physical bonding with polyurethane foam 20 .

石11は、部分的に隙間13が開いた状態で複数集合している。複数の石11は、例えば、互いに積み重なって集合している。隙間13は、複数の石11の間に網目状に形成されていてもよく、また、2つに割れた石11の間に割れ目状に形成されていてもよい。なお、本実施形態では、複数の石11を備えた複合構造体10、及び複数の石11の転動を抑制する工法の例を説明するが、複合構造体10、及び石11の転動を抑制する工法は、1つの石に適用されてもよい。 A plurality of stones 11 are gathered with gaps 13 partially opened. The plurality of stones 11 are, for example, piled up on each other. The gap 13 may be formed like a mesh between a plurality of stones 11, or may be formed like a crack between the stones 11 split into two. In this embodiment, a composite structure 10 including a plurality of stones 11 and an example of a construction method for suppressing rolling of the plurality of stones 11 will be described. The suppression method may be applied to a single stone.

ポリウレタン発泡体20は、石11の下面12側に付着している。ポリウレタン発泡体20は、下段の石11と地面Gとの間の隙間13を埋めている。ポリウレタン発泡体20は、下段の石11の周囲にも及んで、下段の石11を囲むようにして設けられている。ポリウレタン発泡体20は、擁壁等の構造物に比して強度は小さいものの、石11全体を包み込むようにして石11の転動を抑制している。 A polyurethane foam 20 is attached to the lower surface 12 side of the stone 11 . A polyurethane foam 20 fills the gap 13 between the lower stone 11 and the ground G. The polyurethane foam 20 extends around the lower stone 11 and is provided so as to surround the lower stone 11.例文帳に追加The polyurethane foam 20 has a lower strength than a structure such as a retaining wall, but suppresses rolling of the stone 11 by enveloping the entire stone 11 .

ポリウレタン発泡体20は、複数の積み重なった石11のうち下段の石11であり、かつ、地面Gの斜面下側に位置する石11Aに付着している。ポリウレタン発泡体20は、石11Aにおける地面Gの斜面下側の面に付着する部分21を有している。ポリウレタン発泡体20の部分21は、石11Aが地面Gを転がる際に、初期の転動を抑制するストッパーとして機能する。石11Aの転動は、他の石11にも波及して、大規模な落石の要因となり得る。このような他の石11への影響が大きい石11Aの転動を抑制することで、大規模な落石を効果的に防止できる。 The polyurethane foam 20 is adhered to the stone 11A which is the lower stone 11 among the plurality of stacked stones 11 and which is located on the lower side of the slope of the ground G. The polyurethane foam 20 has a portion 21 that adheres to the surface of the stone 11A on the lower side of the slope of the ground G. The portion 21 of the polyurethane foam 20 functions as a stopper that suppresses initial rolling when the stone 11A rolls on the ground G. Rolling of the stone 11A may affect other stones 11 and cause a large-scale rockfall. By suppressing the rolling of the stone 11A, which greatly affects other stones 11, a large-scale rockfall can be effectively prevented.

ポリウレタン発泡体20は、隙間13に充填され、複数の石11の各々に付着している。ポリウレタン発泡体20は、複数の下段の石11が存在する範囲の略全域に亘って設けられている。換言すれば、ポリウレタン発泡体20は、隣り合う下段の石11同士の間に網目状に設けられている。 The polyurethane foam 20 fills the gaps 13 and adheres to each of the plurality of stones 11 . The polyurethane foam 20 is provided over substantially the entire range where the plurality of lower stones 11 are present. In other words, the polyurethane foam 20 is provided in a mesh shape between the adjacent lower stones 11 .

ポリウレタン発泡体20は、軟質ウレタンフォームと硬質ウレタンフォームのいずれであってもよいが、硬質ウレタンフォームであることが好ましい。硬質ウレタンフォームは、軟質ウレタンフォームに比べて独立気泡率が高く、より硬度が高くて復元性の低い発泡体である。硬質ウレタンフォームを用いた場合には、ポリウレタン発泡体20自体にある程度の硬度と保形性が確保され、石11の転動を好適に抑制できる。 The polyurethane foam 20 may be either flexible urethane foam or rigid urethane foam, but is preferably rigid urethane foam. Rigid urethane foam has a higher closed cell rate than soft urethane foam, and is a foam with higher hardness and lower resilience. When hard urethane foam is used, the polyurethane foam 20 itself has a certain degree of hardness and shape retention, and rolling of the stone 11 can be suppressed appropriately.

ポリウレタン発泡体20は、施工現場にて、ポリオールや架橋剤、発泡剤等を主成分とする主剤(A液)とイソシアネートを主成分とする硬化剤(B液)の2液の液体原料を反応させて形成される。すなわち、ポリウレタン発泡体20は、2液性のポリウレタンフォームである。2液性のウレタンフォームの硬化時間は、1液性のポリウレタンフォームの硬化時間に比べて短く、発泡、硬化する前に原料が石11と石11の隙間13から石11の周囲に流出しにくい。2液性のウレタンフォームの硬化時間は、ポリウレタン発泡体20を設ける範囲や隙間13の容積に応じて適宜設計できる。 The polyurethane foam 20 is made by reacting two liquid raw materials, a main agent (liquid A) mainly composed of polyol, a cross-linking agent, a foaming agent, etc., and a curing agent (liquid B) mainly composed of isocyanate at the construction site. formed by letting That is, the polyurethane foam 20 is a two-liquid polyurethane foam. The curing time of the two-liquid polyurethane foam is shorter than that of the one-liquid polyurethane foam, and the raw material is less likely to flow out around the stone 11 from the gap 13 between the stones 11 before foaming and curing. . The curing time of the two-liquid urethane foam can be appropriately designed according to the range in which the polyurethane foam 20 is provided and the volume of the gap 13 .

ポリウレタン発泡体20の発泡倍率は、施工現場に運び込む原料低減の観点から、好ましくは10倍以上であり、より好ましくは20倍以上であり、さらに好ましくは30倍以上である。ポリウレタン発泡体20の発泡倍率の上限値は、特に限定されないが、通常40倍以下である。 The foaming ratio of the polyurethane foam 20 is preferably 10 times or more, more preferably 20 times or more, and still more preferably 30 times or more, from the viewpoint of reducing raw materials to be brought to the construction site. Although the upper limit of the expansion ratio of the polyurethane foam 20 is not particularly limited, it is usually 40 times or less.

次に、地面Gの上に存在する石11の転動を抑制する工法について説明する。本工法は、石11の表面形状に沿ってポリウレタン発泡体20を付着させることで、石11の転動を抑制する工法である。この工法は、石に接着剤を接着させるために、石の接着面を洗浄したり、石に穴を開けてアンカーを打ち込んだりしなくてもよい。すなわち、本工法は、自然状態で存在する石11に対して直接ポリウレタン発泡体20を付着させて行うことができる。 Next, a construction method for suppressing rolling of the stone 11 existing on the ground G will be described. This construction method is a construction method for suppressing rolling of the stone 11 by adhering the polyurethane foam 20 along the surface shape of the stone 11 . This construction method does not require cleaning the bonding surface of the stone or drilling a hole in the stone and driving an anchor in order to bond the adhesive to the stone. That is, this construction method can be performed by directly adhering the polyurethane foam 20 to the stone 11 existing in the natural state.

具体的には、図2に示すように、石11と石11の隙間13にノズル22を差し込んで、ポリウレタンフォーム原料を注入する。複数の石11が多数積み重なっている場合や、ひとつひとつの石11が大きい場合には、隙間13の複数カ所にポリウレタンフォーム原料を注入したり、長尺のノズルを用いたりしてポリウレタンフォーム原料を隙間13の隅々まで行き渡らせればよい。 Specifically, as shown in FIG. 2, a nozzle 22 is inserted into the gap 13 between the stones 11 to inject the polyurethane foam raw material. When a large number of stones 11 are piled up or when each stone 11 is large, the polyurethane foam raw material is injected into the gaps 13 at multiple locations or a long nozzle is used to push the polyurethane foam raw material into the gaps. All you have to do is spread it to every corner of 13.

硬化する前のポリウレタン発泡体20は、自重によって下方に流動して、下段の石11と地面Gとの間等に進入する。この際、ポリウレタン発泡体20の硬化時間を長くすることによって、ポリウレタンフォーム原料の流動を促して、ポリウレタンフォーム原料が進入する範囲を大きくしてもよい。また、ポリウレタン発泡体20は、発泡による体積膨張に伴って、隙間13や石11の凹部の隅々まで行き渡る。そして、ポリウレタン発泡体20は、隙間13の一部または全部を埋める形で形成される。注入されたポリウレタンフォーム原料が発泡、硬化すると、隙間13において石11の表面に倣って賦形されたポリウレタン発泡体20が得られる。 The polyurethane foam 20 before hardening flows downward due to its own weight and enters between the lower stone 11 and the ground G and the like. At this time, by lengthening the curing time of the polyurethane foam 20, the flow of the polyurethane foam raw material may be promoted to increase the range into which the polyurethane foam raw material enters. In addition, the polyurethane foam 20 spreads to every corner of the gap 13 and the concave portion of the stone 11 as the volume expands due to foaming. The polyurethane foam 20 is formed so as to partially or completely fill the gap 13 . When the injected polyurethane foam raw material expands and hardens, a polyurethane foam 20 shaped to follow the surface of the stone 11 in the gap 13 is obtained.

以上説明したように、本実施形態の複合構造体10は、地面Gの上に存在する石11と、石11の表面形状に沿って付着したポリウレタン発泡体20と、を備えている。複合構造体10によれば、簡便に、石11の転動を抑制することができる。以下、本開示の作用を実証実験によって説明する。 As described above, the composite structure 10 of this embodiment includes the stone 11 existing on the ground G and the polyurethane foam 20 attached along the surface shape of the stone 11 . According to the composite structure 10, rolling of the stone 11 can be suppressed easily. Hereinafter, the operation of the present disclosure will be described through demonstration experiments.

コンクリートを円柱状に成形したテストピースを試験用の石11として、石11の転動に関する実験を行った。試験用の石11の大きさは、底面の直径100mm、高さ200mmとした。まず、地面Gに相当する板30を準備した。板30の上面31には凸部32を設けた。凸部32は、上面31からの高さを6mmとし、一方向に長い形状とした。凸部32の長さ方向に試験用の石11の高さ方向を合わせて、図3に示すよう、板30の上面31に2つ試験用の石11を載せた。この状態から、上面31の水平面に対する傾斜角度を徐々に大きくしていき、2つ試験用の石11のうち少なくとも一方が凸部32を乗り越えて、傾斜の下方側に転がったときの上面31の傾斜角度(以下、臨界角度と称する)を求めた。 An experiment on the rolling of the stone 11 was conducted by using a test piece of concrete molded into a cylindrical shape as a test stone 11 . The test stone 11 had a bottom diameter of 100 mm and a height of 200 mm. First, a plate 30 corresponding to the ground G was prepared. A convex portion 32 is provided on the upper surface 31 of the plate 30 . The convex portion 32 had a height of 6 mm from the upper surface 31 and was elongated in one direction. Two test stones 11 were placed on the upper surface 31 of the plate 30 as shown in FIG. From this state, the inclination angle of the upper surface 31 with respect to the horizontal plane is gradually increased, and at least one of the two test stones 11 climbs over the convex portion 32 and rolls downward on the inclination. A tilt angle (hereinafter referred to as a critical angle) was obtained.

実施例は、2つの試験用の石11の間にポリウレタンフォーム原料を注入して、ポリウレタン発泡体20を形成した。比較例は、ポリウレタン発泡体20を形成しなかった。実施例及び比較例において、それぞれの臨界角度を求めた。実施例に係る実験の様子を図4の写真に示す。実験の結果、実施例の臨界角度は53.5度であった。比較例の臨界角度は32度であった。すなわち、実施例は、比較例に比して臨界角度が大きかった。この理由は、ポリウレタン発泡体20によって試験用の石11の転動が抑制され、凸部32を乗り越えるのに必要な傾斜角度が大きくなったためであると推測される。 The examples formed polyurethane foam 20 by injecting polyurethane foam material between two test stones 11 . Comparative examples did not form polyurethane foam 20 . In Examples and Comparative Examples, respective critical angles were obtained. The photograph of FIG. 4 shows the state of the experiment according to the example. As a result of experiments, the critical angle of the example was 53.5 degrees. The critical angle for the comparative example was 32 degrees. That is, the example had a larger critical angle than the comparative example. It is presumed that the reason for this is that the rolling motion of the test stone 11 is suppressed by the polyurethane foam 20, and the inclination angle required to get over the protrusion 32 is increased.

次に、実施例におけるポリウレタン発泡体20と試験用の石11との接合状態を調べた。図5は、ポリウレタン発泡体20における試験用の石11への付着面の写真である。左側の写真の付着面は右側の試験用の石11への付着面であり、右側の写真の付着面は左側の試験用の石11への付着面である。ポリウレタン発泡体20の付着面は、試験用の石11の側面に沿って断面円弧状に賦形されるとともに、凹部14に嵌る形態で賦形されていた。すなわち、ポリウレタン発泡体20は試験用の石11の表面形状に沿って付着していた。 Next, the state of bonding between the polyurethane foam 20 in the example and the test stone 11 was examined. FIG. 5 is a photograph of the adhesion surface of the polyurethane foam 20 to the test stone 11 . The attachment surface in the left photograph is the attachment surface to the right test stone 11 , and the attachment surface in the right photograph is the attachment surface to the left test stone 11 . The adhering surface of the polyurethane foam 20 was shaped to have an arcuate cross-section along the side surface of the test stone 11 and was shaped to fit into the recess 14 . That is, the polyurethane foam 20 adhered along the surface shape of the test stone 11 .

ポリウレタン発泡体20は、例えば、モルタルやコンクリート等の間詰め材に比して、隙間に入り込んで空隙を埋める性能が高い。この実証実験より、ポリウレタン発泡体20は、発泡され発泡圧により石11の凹部14や、石11の周囲の隙間13を埋めることで、石11の転動を抑制できることが示唆された。 The polyurethane foam 20 has a high performance of entering gaps and filling voids, for example, compared to filling materials such as mortar and concrete. From this demonstration experiment, it was suggested that the polyurethane foam 20 can suppress the rolling of the stone 11 by filling the concave portion 14 of the stone 11 and the gap 13 around the stone 11 by foaming pressure.

さらに、上記の複合構造体10によれば、ポリウレタン発泡体20を用いることにより、非発泡の間詰め材に比して原料の嵩及び重さが抑えられる。特に、石11の転動を抑制する箇所が、道路の整備されていない地山や、設備の搬入が難しい斜面等である場合には、原料や設備の搬入が難しいという課題がある。ポリウレタン発泡体20は簡易な設備で形成することができ、例えば、設備をトロッコや人力等で現場に搬入可能である。このため、ポリウレタン発泡体20の形成に係る原料及び設備の輸送に掛かるコスト低減に寄与できる。 Furthermore, according to the composite structure 10 described above, the use of the polyurethane foam 20 reduces the bulk and weight of the raw material compared to non-foamed filler materials. In particular, if the place where the rolling of the stone 11 is suppressed is a natural ground where roads are not maintained or a slope where it is difficult to carry in equipment, there is a problem that it is difficult to bring in raw materials and equipment. The polyurethane foam 20 can be formed with simple equipment, and for example, the equipment can be brought into the site using a trolley, manpower, or the like. For this reason, it is possible to contribute to cost reduction for transportation of raw materials and equipment for forming the polyurethane foam 20 .

本実施形態のポリウレタン発泡体20は、石11の下面12側に付着している。この構成によれば、石11の初期の転動を抑制することができ、効果的に石11の転動を抑制することができる。 The polyurethane foam 20 of this embodiment adheres to the lower surface 12 side of the stone 11 . According to this configuration, the initial rolling of the stone 11 can be suppressed, and the rolling of the stone 11 can be effectively suppressed.

本実施形態の複合構造体10は、複数の石11が、部分的に隙間13が開いた状態で集合している。ポリウレタン発泡体20は、隙間13に充填され、複数の石11の各々に付着している。転動は、滑動とは異なり、複数の石11の各部が異なる方向に向けて移動し得る。例えば、図4に示す2つの試験用の石11が転動する場合、下側の試験用の石11におけるポリウレタン発泡体20との付着面は上方に向けて移動し、上側の試験用の石11におけるポリウレタン発泡体20との付着面は下方に向けて移動する。上記の構成によれば、ポリウレタン発泡体20が複数の石11の各々に付着して、複数の石11の転動を相互に抑制することによって、複数の石11の転動を抑制できる。 In the composite structure 10 of this embodiment, a plurality of stones 11 are assembled with gaps 13 partially opened. The polyurethane foam 20 fills the gaps 13 and adheres to each of the plurality of stones 11 . Unlike sliding, rolling can move each part of the stones 11 in different directions. For example, when two test stones 11 shown in FIG. 4 roll, the contact surface of the lower test stone 11 with the polyurethane foam 20 moves upward, The attachment surface of the polyurethane foam 20 at 11 moves downward. According to the above configuration, the polyurethane foam 20 adheres to each of the plurality of stones 11 to mutually suppress the rolling of the plurality of stones 11 , thereby suppressing the rolling of the plurality of stones 11 .

本実施形態における、地面Gの上に存在する石11の転動を抑制する工法は、石11の表面形状に沿ってポリウレタン発泡体20を付着させることで、石11の転動を抑制する工法である。この工法によれば、簡便に、石11の転動を抑制することができる。 In this embodiment, the method of suppressing the rolling of the stone 11 existing on the ground G is a method of suppressing the rolling of the stone 11 by adhering the polyurethane foam 20 along the surface shape of the stone 11. is. According to this construction method, rolling of the stone 11 can be suppressed easily.

一般的に行われている根固め工法は、石を下方から支えて、石の転動を抑制するため、石を支える擁壁の位置、大きさ、及び範囲の設計に専門的な知識が必要となる。一方、本実施形態の石11の転動を抑制する工法は、ポリウレタンフォーム原料を注入することにより、石11の表面形状に沿って付着したポリウレタン発泡体20を形成することができる。これは、石11の形状や地面Gの形状が複雑でも、ポリウレタン発泡体20が石11や地面Gの形状に追従させることができるためである。つまり、ポリウレタン発泡体20の硬化速度や原料粘度、セルの状態等を変更することで、石11の凹部や石11と石11の間の隙間13の奥方までポリウレタンフォーム原料を行き渡らせることができる。このため、擁壁のような複雑な設計をしなくても、原料の成形条件を変更することにより石11へポリウレタン発泡体20を付着させ、石11の転動を抑制できる。 The commonly used foot protection method supports stones from below and prevents them from rolling, so specialized knowledge is required to design the position, size, and range of the retaining walls that support the stones. becomes. On the other hand, the method of suppressing rolling of the stone 11 of the present embodiment can form the polyurethane foam 20 attached along the surface shape of the stone 11 by injecting the polyurethane foam raw material. This is because the polyurethane foam 20 can follow the shapes of the stones 11 and the ground G even if the shapes of the stones 11 and the ground G are complicated. In other words, by changing the curing speed, raw material viscosity, cell state, etc. of the polyurethane foam 20, it is possible to spread the polyurethane foam raw material deep into the recesses of the stones 11 and the gaps 13 between the stones 11. . Therefore, the polyurethane foam 20 can be adhered to the stone 11 by changing the molding conditions of the raw material, and the rolling of the stone 11 can be suppressed without a complicated design such as a retaining wall.

<他の実施形態>
今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えるべきである。
ポリウレタン発泡体は、石の下面側ではなく、上面側に付着していてもよい。さらに、ポリウレタン発泡体が石に付着する範囲は限定されない。例えば、ポリウレタン発泡体は、石における地面の斜面下側の面にのみ付着していてもよい。
ポリウレタン発泡体は、1つの石のみに付着していてもよい。
上記の実施形態では、互いに積み重なって集合した石において、下段の石にポリウレタン発泡体が付着していたが、ポリウレタン発泡体は下段以外の石に付着していてもよい。また、ポリウレタン発泡体は下段の石と、その石に積み重なった石とに付着していてもよい。
地面は水平面であってもよい。
石の転動を抑制する工法は、実施の形態で説明した工程の他に、別の任意の工程を行ってもよい。
<Other embodiments>
It should be considered that the embodiments disclosed this time are illustrative in all respects and not restrictive.
The polyurethane foam may adhere to the top side of the stone instead of the bottom side. Furthermore, the extent to which the polyurethane foam adheres to the stone is not limited. For example, the polyurethane foam may adhere only to the surface of the stone that is below the ground slope.
The polyurethane foam may be attached to only one stone.
In the above embodiment, the polyurethane foam is attached to the lower stones of the stones that are stacked and aggregated, but the polyurethane foam may be attached to stones other than the lower stones. Also, the polyurethane foam may adhere to the lower stone and the stone stacked on top of it.
The ground may be a horizontal plane.
In addition to the steps described in the embodiments, the method for suppressing the rolling of stones may be any other step.

石の転動を抑制する工法は、ロープ伏工法、ワイヤロープ掛け工法、グラウンドアンカー工法等と併用されてもよい。さらに、石の転動を抑制する工法は、落石対策以外にも、庭石や石灯篭などの転動防止のために用いられてもよい。 The construction method for suppressing the rolling of stones may be used in combination with the rope laying construction method, the wire rope hanging construction method, the ground anchor construction method, and the like. Furthermore, the method of suppressing the rolling of stones may be used to prevent the rolling of garden stones, stone lanterns, and the like, in addition to countermeasures against falling rocks.

10…複合構造体
11,11A…石
12…下面
13…隙間
14…凹部
20…ポリウレタン発泡体
21…部分
22…ノズル
30…板
31…上面
32…凸部
DESCRIPTION OF SYMBOLS 10... Composite structure 11,11A... Stone 12... Lower surface 13... Gap 14... Recessed part 20... Polyurethane foam 21... Part 22... Nozzle 30... Plate 31... Upper surface 32... Protruding part

Claims (4)

地面の上に存在する石と、
前記石の表面形状に沿って付着したポリウレタン発泡体と、を備えた複合構造体。
stones on the ground and
and a polyurethane foam conforming to the stone surface.
前記ポリウレタン発泡体は、前記石の下面側に付着している、請求項1に記載の複合構造体。 2. The composite structure of claim 1, wherein said polyurethane foam is attached to the underside of said stone. 複数の前記石が、部分的に隙間が開いた状態で集合しており、
前記ポリウレタン発泡体は、前記隙間に充填され、複数の前記石の各々に付着している、請求項1又は請求項2に記載の複合構造体。
The plurality of stones are gathered with a gap partially opened,
3. A composite structure according to claim 1 or claim 2, wherein said polyurethane foam fills said interstices and adheres to each of said plurality of stones.
地面の上に存在する石の転動を抑制する工法であって、
前記石の表面形状に沿ってポリウレタン発泡体を付着させることで、前記石の転動を抑制する工法。
A construction method for suppressing rolling of stones existing on the ground,
A method of suppressing rolling of the stone by attaching polyurethane foam along the surface shape of the stone.
JP2021006941A 2021-01-20 2021-01-20 Composite structure body and method to suppress stone existing on ground from rolling Pending JP2022111491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021006941A JP2022111491A (en) 2021-01-20 2021-01-20 Composite structure body and method to suppress stone existing on ground from rolling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021006941A JP2022111491A (en) 2021-01-20 2021-01-20 Composite structure body and method to suppress stone existing on ground from rolling

Publications (1)

Publication Number Publication Date
JP2022111491A true JP2022111491A (en) 2022-08-01

Family

ID=82655895

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021006941A Pending JP2022111491A (en) 2021-01-20 2021-01-20 Composite structure body and method to suppress stone existing on ground from rolling

Country Status (1)

Country Link
JP (1) JP2022111491A (en)

Similar Documents

Publication Publication Date Title
JP3091481B2 (en) Cage structure
JP2022174014A (en) Constructing element for making tunnel, tunnel comprising such element, and method of constructing such element and such tunnel
KR20180001914A (en) Anchor block for slope reinforcement and slope reinforcement methode using the same
JP6933916B2 (en) Embankment raising structure
JP2022111491A (en) Composite structure body and method to suppress stone existing on ground from rolling
KR20180021144A (en) Packaging method and packaging structure
CN109537393B (en) Municipal works road laying structure
JP2015183363A (en) Earthquake-resistant and rainfall-resistant measure slope stabilization method for earth structure using small-diameter square rod-like reinforcement body
JP3660177B2 (en) Construction method of lightweight embankment
JP2016145500A (en) Retaining wall, developed land and developing method of developed land
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
JP7309147B2 (en) Caisson, pneumatic caisson construction method and structure
KR102199615B1 (en) High performance reinforced earth retaining wall structure, and construction method thereof
JP4868589B2 (en) Support structure for construction foundation and construction method
KR102296412B1 (en) Method of filling void space with polyurthane foam for emergency treatment
CN109837918B (en) Slope protection device and construction method thereof
JP6892045B2 (en) Floating prevention structure and construction method for existing pipelines
JP2019206803A (en) Foundation structure for wind power generator
US4685835A (en) Method of increasing the compressibility of liquid-saturated material
KR102145237B1 (en) Multipurpose block
CN109537394B (en) Road paving method
JP5791553B2 (en) Road reinforcement method
JP6247896B2 (en) Elevated structure
JP7512214B2 (en) Anchor installation method, rope laying method, and anchor structure
JP6944224B1 (en) Foundation structure for structures

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210121

A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20230421

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240110

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20240201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240312

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20240319

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20240426