JP2022111400A - Securing structure for column and securing method for column - Google Patents

Securing structure for column and securing method for column Download PDF

Info

Publication number
JP2022111400A
JP2022111400A JP2021006792A JP2021006792A JP2022111400A JP 2022111400 A JP2022111400 A JP 2022111400A JP 2021006792 A JP2021006792 A JP 2021006792A JP 2021006792 A JP2021006792 A JP 2021006792A JP 2022111400 A JP2022111400 A JP 2022111400A
Authority
JP
Japan
Prior art keywords
base plate
fixing
scaffolding board
scaffolding
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2021006792A
Other languages
Japanese (ja)
Other versions
JP7347452B2 (en
Inventor
貴晴 伊藤
Takaharu Ito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2021006792A priority Critical patent/JP7347452B2/en
Publication of JP2022111400A publication Critical patent/JP2022111400A/en
Application granted granted Critical
Publication of JP7347452B2 publication Critical patent/JP7347452B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

To provide a securing structure for a column and a securing method for the column requiring no arrangement of fire curing under a scaffold board and no other temporary scaffolds when a column for a handrail and like and allowing the column to be easily secured only through operation from an upper surface side of the scaffold board.SOLUTION: A securing structure for a column is to secure the column onto a scaffold board supported with support members. The securing structure is provided with: a base plate arranged on a lower end part of the column; a first securing member configured to penetrate and engage downward from an upper face side of the scaffold board and engaging the base plate with the scaffold board; and a second securing member configured to penetrate and engage from the upper face side of the scaffold board to the support member at a position where the scaffold board is supported with the support member and engaging the base plate with the support member.SELECTED DRAWING: Figure 1

Description

本発明は、手摺等の支柱を足場等の床板に固定するための支柱の固定構造及び固定方法に関するものである。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a post fixing structure and fixing method for fixing a post such as a handrail to a floor board such as a scaffold.

従来、手摺等の支柱を足場板に固定する方法として、支柱の下端部を足場板に溶接して固定する方法や、手摺の支柱の下端部にベースプレートを設け、このベースプレートを足場板にボルトで締結して固定する方法等がある。例えば、特許文献1には、支柱の下端部に設けられた上部台座と、足場を支持する横架材(支持材)の下部に設けられた下部台座とを、ボルト及びナットによって固定することで、足場上に支柱を固定する構成が開示されている。 Conventionally, as a method of fixing a post such as a handrail to a scaffolding board, there is a method of fixing the lower end of the post to the scaffolding board by welding, or a method of providing a base plate at the lower end of the handrail post and bolting this base plate to the scaffolding board. There is a method of fastening and fixing. For example, in Patent Document 1, an upper pedestal provided at the lower end of a column and a lower pedestal provided at the bottom of a horizontal member (support member) that supports a scaffold are fixed with bolts and nuts. , discloses an arrangement for fixing a strut on a scaffold.

登録実用新案第3150645号公報Registered Utility Model No. 3150645

しかし、支柱を足場板に溶接して固定する方法では、支柱を固定しようとする足場板の下方に機械設備等が有る場合、足場板の下方に溶接の火花が落下するのを防ぐための火気養生をする必要があった。また、支柱のベースプレートを足場板にボルトで締結して固定する方法では、支柱を固定しようとする足場板の下方に作業スペース等が有る場合、固定用ナットを足場板の下側から押さえるための他の仮設足場を設ける必要があった。このため、支柱を固定しようとする足場板の下方の空間の利用に制限が生じていた。例えば、支柱を足場板に固定する作業中に、足場板の下方の空間における生産活動を停止する必要があった。また、これとは逆に、支柱を固定しようとする足場板の下方に製造ライン等が存在し、これを停止できない場合には、足場板に支柱を取り付ける作業を実施することが困難であった。 However, in the method of fixing the post to the scaffolding board by welding, if there is machinery below the scaffolding board to which the post is to be fixed, fire is required to prevent welding sparks from falling below the scaffolding board. I needed to nurture. In addition, in the method of fixing the base plate of the post to the scaffolding board with bolts, if there is work space below the scaffolding board to which the post is to be fixed, the fixing nut must be held down from the underside of the scaffolding board. Other temporary scaffolding had to be provided. For this reason, the use of the space under the scaffold board to which the support is to be fixed is restricted. For example, it was necessary to stop production activities in the space below the scaffolding board during the work of fixing the posts to the scaffolding board. Conversely, if there is a production line or the like below the scaffolding board to which the support is to be fixed, and this cannot be stopped, it is difficult to carry out the work of attaching the support to the scaffolding board. .

上記課題を解決するため、本発明は、手摺等の支柱を足場板に固定する際に、足場板の下方に火気養生や他の仮設足場を設ける必要がなく、足場板の上面側からの作業のみで支柱を簡単に固定することのできる、支柱の固定構造及び支柱の固定方法を提供することを目的とする。 In order to solve the above problems, the present invention eliminates the need to provide fire protection or other temporary scaffolding under the scaffolding board when fixing a support such as a handrail to the scaffolding board, thereby enabling work from the upper surface side of the scaffolding board. To provide a support fixing structure and a support fixing method capable of easily fixing the support with a chisel.

上記課題を解決するための手段は、以下の通りである。
[1] 支持材によって支持された足場板の上に支柱を固定する支柱の固定構造であって、前記支柱の下端部に設けられたベースプレートと、前記足場板のうち前記支持材によって支持されない部位において、前記ベースプレートに係合しつつ前記足場板の上面側から該足場板に係入する第一の固定部材と、前記足場板のうち前記支持材によって支持される部位において、前記ベースプレートに係合しつつ前記足場板の上面側から前記支持材まで係入する第二の固定部材とを有する、支柱の固定構造。
[2] 前記第一の固定部材および前記第二の固定部材は螺合部材である、[1]に記載の支柱の固定構造。
[3] 前記足場板には複数の開口が設けられ、
前記第一の固定部材は、前記足場板の前記開口に挿入され該足場板の下面に係合する係止部材であり、
前記第二の固定部材は、前記ベースプレートの上面側から前記支持材まで螺入する螺合部材である、[1]に記載の支柱の固定構造。
[4] 前記足場板はエキスパンドメタル、パンチングメタル、グレーチング又は金網からなり、該足場板の前記開口は、前記エキスパンドメタル、前記パンチングメタル、前記グレーチング又は前記金網に形成された開口である、[3]に記載の支柱の固定構造。
[5] 前記係止部材は、前記ベースプレートの下面に設けられたフックである、[3]又は[4]に記載の支柱の固定構造。
[6] 前記ベースプレートには貫通孔が設けられ、前記係止部材は、該ベースプレートの前記貫通孔及び前記足場板の前記開口に挿入され該足場板の下面に係合するフックボルトである、[3]又は[4]に記載の支柱の固定構造。
[7] 前記ベースプレートには少なくとも一対の貫通孔が設けられ、前記係止部材は、該ベースプレートの前記一対の貫通孔及び前記足場板の前記開口に挿入され該足場板の下面に係合するU字フックボルトである、[3]又は[4]に記載の支柱の固定構造。
[8] 支持材によって支持された足場板の上に支柱を固定する支柱の固定方法であって、前記支柱の下端部に設けられたベースプレートに係合するように、前記足場板の上面側から下方に固定部材を係入して、前記ベースプレートを前記足場板及び前記支持材に係止する、支柱の固定方法。
Means for solving the above problems are as follows.
[1] A post fixing structure for fixing a post onto a scaffolding board supported by a support material, comprising a base plate provided at the lower end of the post, and a portion of the scaffolding board that is not supported by the support material. a first fixing member that engages with the scaffolding board from the upper surface side of the scaffolding board while engaging with the base plate; and a second fixing member that engages from the upper surface side of the scaffolding board to the support member.
[2] The column fixing structure according to [1], wherein the first fixing member and the second fixing member are threaded members.
[3] The scaffolding board is provided with a plurality of openings,
The first fixing member is a locking member that is inserted into the opening of the scaffolding board and engages with the lower surface of the scaffolding board,
The column fixing structure according to [1], wherein the second fixing member is a screwing member that is screwed into the support member from the upper surface side of the base plate.
[4] The scaffolding board is made of expanded metal, perforated metal, grating or wire mesh, and the opening of the scaffolding board is an opening formed in the expanded metal, perforated metal, grating or wire mesh [3 ].
[5] The post fixing structure according to [3] or [4], wherein the locking member is a hook provided on the lower surface of the base plate.
[6] A through hole is provided in the base plate, and the locking member is a hook bolt that is inserted into the through hole of the base plate and the opening of the scaffolding board and engages the lower surface of the scaffolding board. 3] or the fixing structure of the pillar according to [4].
[7] The base plate is provided with at least a pair of through-holes, and the locking member is inserted into the pair of through-holes of the base plate and the opening of the scaffolding board and engaged with the lower surface of the scaffolding board. The post fixing structure according to [3] or [4], which is a shaped hook bolt.
[8] A method of fixing a post for fixing a post onto a scaffolding board supported by a support material, wherein the post is fixed from the upper surface side of the scaffolding board so as to engage with a base plate provided at the lower end of the post. A method of fixing a column, wherein a fixing member is engaged downward to lock the base plate to the scaffolding board and the support member.

本発明の支柱の固定構造及び支柱の固定方法によれば、足場板の上面側から足場板に係入する第一の固定部材及び第二の固定部材によって、支柱の下端部に設けられたベースプレートが足場板及び支持材に固定されるので、足場板の上面側からの作業のみにより支柱を足場板に簡単に固定することができる。 According to the structure and method for fixing a support post of the present invention, the base plate is provided at the lower end of the support support by the first fixing member and the second fixing member engaging the scaffold board from the upper surface side of the scaffold board. is fixed to the scaffolding board and the supporting member, the post can be easily fixed to the scaffolding board only by working from the upper surface side of the scaffolding board.

そして、第一の固定部材及び第二の固定部材により、火気を使用せずにベースプレートを足場板に固定できるので、火災発生のリスクがなく、足場板の下方に火気養生を行う必要もない。また、足場板の上面側からの作業のみで支柱を簡単に固定できるので、手摺等の支柱を足場板に固定する際に、足場板の下方に他の仮設足場を設ける必要もない。 Since the base plate can be fixed to the scaffold board without using fire by the first fixing member and the second fixing member, there is no risk of fire and there is no need to provide fire protection under the scaffold board. In addition, since the support can be easily fixed only by working from the upper surface side of the scaffold board, there is no need to provide another temporary scaffold below the scaffold board when fixing the support such as a handrail to the scaffold board.

よって、支柱を固定しようとする足場板の下方の空間の利用に制限が生じることがなく、火気養生や他の仮設足場を設ける必要もなく、支柱を足場板に固定するための費用が抑えられる。 Therefore, there is no restriction on the use of the space under the scaffold board to which the support is to be fixed, there is no need to provide fire protection or other temporary scaffolding, and the cost for fixing the support to the scaffold board is reduced. .

さらに、支柱の下端部に設けられたベースプレートを介して、支柱が足場板上に固定されるため、ベースプレートのサイズやベースプレート上における支柱の位置を調整することで、足場板上の所望の位置に支柱を固定できる。 Furthermore, since the post is fixed on the scaffold board via the base plate provided at the lower end of the post, the size of the base plate and the position of the post on the base plate can be adjusted to achieve the desired position on the scaffold board. You can fix the pole.

図1(a)、(b)はそれぞれ、本発明の支柱の固定構造及び支柱の固定方法における支柱の全体構成の一例を示す側面図及び縦断面図である。1(a) and 1(b) are respectively a side view and a vertical cross-sectional view showing an example of the overall configuration of a support in the support fixing structure and support fixing method of the present invention. 図2(a)、(b)はそれぞれ、本発明の支柱の固定構造及び支柱の固定方法の一例の要部を示す側面図及び平面図である。2(a) and 2(b) are respectively a side view and a plan view showing an example of the structure for fixing the support and the method for fixing the support according to the present invention. 図3(a)、(b)はそれぞれ、本発明の支柱の固定構造及び支柱の固定方法の他の一例を示す側面図及び平面図である。3(a) and 3(b) are a side view and a plan view, respectively, showing another example of the column fixing structure and the column fixing method of the present invention. 図4(a)、(b)はそれぞれ、本発明の支柱の固定構造及び支柱の固定方法のさらに他の一例を示す側面図及び平面図である。4(a) and 4(b) are a side view and a plan view, respectively, showing still another example of the column fixing structure and column fixing method of the present invention.

以下、図面を参照して、本発明の支柱の固定構造及び支柱の固定方法の実施形態について、具体的に説明する。
<第1実施形態>
図1(a)及び図1(b)に、本発明の第1実施形態の支柱の固定構造における、支柱1の全体構成の側面図及び縦断面図を示す。また、図2(a)及び図2(b)に、本実施形態の支柱の固定構造の要部の側面図及び平面図を示す。
Hereinafter, embodiments of a support fixing structure and a support fixing method according to the present invention will be specifically described with reference to the drawings.
<First embodiment>
FIG. 1(a) and FIG. 1(b) show a side view and a vertical cross-sectional view of the overall configuration of a column 1 in a column fixing structure according to a first embodiment of the present invention. Moreover, the side view and top view of the principal part of the fixing structure of the support|pillar of this embodiment are shown in FIG.2(a) and FIG.2(b).

本実施形態の支柱の固定構造及び支柱の固定方法は、作業床や点検歩廊等の床板を構成する足場板5の上に、手摺8及び中桟9の支柱1を固定するために用いられるものである。本実施形態では、足場板5は、チェッカープレート等の開口を有さない金属板から構成されている。足場板5は、溝形鋼等からなる根太材や床支持鉄骨等の支持材7によって支持されている。 The fixing structure and fixing method of the pillars of this embodiment are used to fix the pillars 1 of the handrails 8 and the middle beams 9 on the scaffolding boards 5 that constitute the floorboards of work floors, inspection corridors, and the like. be. In the present embodiment, the scaffolding board 5 is composed of a metal plate having no openings, such as a checkered plate. The scaffolding board 5 is supported by supporting members 7 such as joists made of channel steel or the like and floor supporting steel frames.

図1(a)及び図1(b)に示すように、支柱1の上端部には、水平方向に延びる手摺8が取り付けられ、支柱1の中間部には、手摺8よりも低い位置で水平方向に延びる中桟9が取り付けられる。支柱1の上端部及び中間部には、手摺8及び中桟9を取り付けるための手摺受15及び中桟受16が、それぞれ設けられている。支柱1は、足場板5上に間隔をあけて複数本設置され、手摺8及び中桟9を支持する。 As shown in FIGS. 1( a ) and 1 ( b ), a horizontally extending handrail 8 is attached to the upper end of the support 1 , and a horizontal rail 8 is attached to the middle of the support 1 at a position lower than the handrail 8 . A middle crosspiece 9 extending in the direction is attached. A handrail receiver 15 and a central crosspiece receiver 16 for attaching the handrail 8 and the central crosspiece 9 are provided at the upper end portion and the intermediate portion of the column 1, respectively. A plurality of posts 1 are installed on a scaffolding board 5 at intervals, and support a handrail 8 and a middle crosspiece 9. - 特許庁

図2(a)及び図2(b)に示すように、本実施形態の支柱の固定構造は、支柱1の下端部に設けられたベースプレート10と、ベースプレート10を足場板5又は支持材7に固定する板金ビス(螺合部材、第一の固定部材、第二の固定部材)12、13を含んで、構成されている。 As shown in FIGS. 2(a) and 2(b), the column fixing structure of this embodiment includes a base plate 10 provided at the lower end of the column 1, and the base plate 10 attached to the scaffolding board 5 or the support member 7. It is configured including fixing sheet metal screws (screw member, first fixing member, second fixing member) 12 and 13 .

図1(a)、図1(b)、図2(a)及び図2(b)に示すように、ベースプレート10の略中央部に支柱1が溶接等により取り付けられている。このようにして支柱1の下端部に設けられたベースプレート10は、足場板5の上面に重ねられる。ベースプレート10のうち支柱1に対して一方の側辺側の部分(図1(a)、図1(b)、図2(a)及び図2(b)においては、ベースプレート10の右側の部分)は、足場板5のうち支持材7によって支持されない部位に重ねられる。また、ベースプレート10のうち支柱1に対して他方の側辺側の部分(図1(a)、図1(b)、図2(a)及び図2(b)においては、ベースプレート10の左側の部分)は、足場板5のうち支持材7によって支持された部位に重ねられる。 As shown in FIGS. 1(a), 1(b), 2(a) and 2(b), a column 1 is attached to a substantially central portion of a base plate 10 by welding or the like. The base plate 10 provided at the lower end of the column 1 in this way is superimposed on the upper surface of the scaffold board 5 . A portion of the base plate 10 on one side with respect to the column 1 (a portion on the right side of the base plate 10 in FIGS. 1(a), 1(b), 2(a) and 2(b)) is superimposed on a portion of the scaffolding board 5 that is not supported by the support member 7. In addition, the portion of the base plate 10 on the other side of the support column 1 (in FIGS. 1(a), 1(b), 2(a) and 2(b), the left side of the base plate 10). portion) is superimposed on the portion of the scaffolding board 5 supported by the support member 7 .

そして、足場板5のうち支持材7によって支持されない部位において、ベースプレート10の上面の三箇所に、ベースプレート10に係合しつつ足場板5の上面側から足場板5を貫通するように、板金ビス(螺合部材、第一の固定部材)12がねじ込まれて係入し、ベースプレート10を足場板5に固定している。また、足場板5のうち支持材7によって支持された部位において、ベースプレート10の上面の三箇所に、ベースプレート10に係合しつつ足場板5の上面側から足場板5及び支持材7を貫通するように、板金ビス(螺合部材、第二の固定部材)13がねじ込まれて係入し、ベースプレート10を足場板5及び支持材7に固定している。
<第2実施形態>
図3(a)及び図3(b)に、本発明の第2実施形態の支柱の固定構造及び支柱の固定方法を示す。
At a portion of the scaffolding board 5 not supported by the support member 7, three sheet metal screws are attached to the upper surface of the base plate 10 so as to penetrate the scaffolding board 5 from the upper surface side of the scaffolding board 5 while engaging with the base plate 10. A (screw member, first fixing member) 12 is screwed into engagement to fix the base plate 10 to the scaffolding board 5 . In addition, at a portion of the scaffolding board 5 supported by the supporting material 7, three points on the upper surface of the base plate 10 are inserted through the scaffolding board 5 and the supporting material 7 from the upper surface side of the scaffolding board 5 while engaging with the base plate 10. , a sheet metal screw (screw member, second fixing member) 13 is screwed and engaged to fix the base plate 10 to the scaffolding plate 5 and the support member 7 .
<Second embodiment>
3(a) and 3(b) show a column fixing structure and a column fixing method according to a second embodiment of the present invention.

本実施形態では、足場板6は、エキスパンドメタル、パンチングメタル、グレーチング又は金網から構成されており、その網目等により全面に亘って多数の開口61を有する。図3(a)及び図3(b)は、足場板6がエキスパンドメタルから構成されている場合を示している。 In this embodiment, the scaffold board 6 is made of expanded metal, punched metal, grating, or wire mesh, and has a large number of openings 61 over the entire surface due to the mesh or the like. 3(a) and 3(b) show a case where the scaffold board 6 is made of expanded metal.

本実施形態の支柱の固定構造は、支柱2の下端部に設けられたベースプレート20と、
ベースプレート20を足場板6に固定するフックボルト(係止部材、第一の固定部材)22と、ベースプレート20を支持材7に固定する板金ビス(螺合部材、第二の固定部材)23とを含んで、構成されている。図3(a)に示すように、フックボルト22は、一端にねじ山が形成された丸鋼がL字状に折り曲げられてフック部が設けられた形状を有する。
The column fixing structure of the present embodiment includes a base plate 20 provided at the lower end of the column 2,
A hook bolt (locking member, first fixing member) 22 for fixing the base plate 20 to the scaffolding board 6 and a sheet metal screw (screw member, second fixing member) 23 for fixing the base plate 20 to the support member 7 are provided. Contain and consist of. As shown in FIG. 3(a), the hook bolt 22 has a shape in which a round steel having a screw thread formed at one end thereof is bent into an L shape to provide a hook portion.

本実施形態では、第1実施形態と同様に、ベースプレート20のうち支柱2に対して一方の側辺側の部分(図3(a)及び図3(b)においては、ベースプレート20の右側の部分)は、足場板6のうち支持材7によって支持されない部位に重ねられる。また、ベースプレート20のうち支柱2に対して他方の側辺側の部分(図3(a)及び図3(b)においては、ベースプレート20の左側の部分)は、足場板6のうち前記支持材7によって支持された部位に重ねられる。 In the present embodiment, as in the first embodiment, the portion of the base plate 20 on one side of the column 2 (the portion on the right side of the base plate 20 in FIGS. 3A and 3B) ) is superimposed on a portion of the scaffolding board 6 that is not supported by the support member 7 . In addition, the portion of the base plate 20 on the other side side with respect to the column 2 (the portion on the left side of the base plate 20 in FIGS. 3A and 3B) is the support member of the scaffolding board 6 It is superimposed on the part supported by 7.

図3(b)に示すように、ベースプレート20のうち支柱2に対して一方の側辺側の部分には、貫通孔21が二つ設けられている。そして、ベースプレート20の貫通孔21の各々に、ベースプレート20の下面側からフックボルト22のねじ山を挿入する。そして、ベースプレート20の上面側に突出するフックボルト22のねじ山にナット24が締めこまれることで、フックボルト22がベースプレート20に固定される。その後、ベースプレート20に固定されたフックボルト22のフック部を、足場板6の開口61に挿入して、足場板6の下面に係合させることで、ベースプレート20が足場板6に係止される。 As shown in FIG. 3B, two through-holes 21 are provided in a portion of the base plate 20 on one side of the column 2 . Then, the threads of the hook bolts 22 are inserted into the through holes 21 of the base plate 20 from the lower surface side of the base plate 20 . The hook bolt 22 is fixed to the base plate 20 by tightening the nut 24 onto the screw thread of the hook bolt 22 that protrudes upward from the base plate 20 . After that, the hook portion of the hook bolt 22 fixed to the base plate 20 is inserted into the opening 61 of the scaffolding board 6 and engaged with the lower surface of the scaffolding board 6, whereby the base plate 20 is locked to the scaffolding board 6. .

そして、足場板6のうち支持材7によって支持された部位において、ベースプレート20の上面の二箇所に、ベースプレート20に係合しつつ足場板6の上面側から足場板6を通過してその下方の支持材7を貫通するように、板金ビス23がねじ込まれて係入し、ベースプレート20を足場板6及び支持材7に固定している。このように、ベースプレート20のうち支柱2に対して他方の側辺側の部分が板金ビス23によって足場板6及び支持材7に固定されることで、ベースプレート20のうち支柱2に対して一方の側辺側の部分を足場板6に係止するフックボルト22の係止状態も固定される。 Then, at a portion of the scaffolding board 6 supported by the support member 7, two points on the upper surface of the base plate 20 are attached to the base plate 20 while passing through the scaffolding board 6 from the upper surface side of the scaffolding board 6 and below it. A sheet metal screw 23 is screwed so as to pass through the support member 7 and is engaged therewith, thereby fixing the base plate 20 to the scaffolding board 6 and the support member 7 . In this way, the portion of the base plate 20 on the other side of the support column 2 is fixed to the scaffolding board 6 and the support member 7 by the sheet metal screws 23, so that one side of the base plate 20 is secured to the support column 2. The locked state of the hook bolt 22 that locks the side portion to the scaffolding board 6 is also fixed.

なお、図3(a)及び図3(b)では、フックボルト22のフック部がベースプレート20の外側に向かって延びる例を示しているが、これに代えて、例えばフックボルト22のフック部がベースプレート20の内側に向かって延びるようにフックボルト22の取付向きを変更してもよい。 3(a) and 3(b) show an example in which the hook portion of the hook bolt 22 extends toward the outside of the base plate 20. Alternatively, for example, the hook portion of the hook bolt 22 may The attachment direction of the hook bolt 22 may be changed so as to extend toward the inside of the base plate 20 .

また、図3(a)及び図3(b)では、ベースプレート20に設けられた貫通孔21にフックボルト22が挿入された例を示しているが、これに代えて、ベースプレート20の下面にフックを溶接等により予め取り付けてもよい。この場合は、ベースプレート20を足場板6の上面で動かして、ベースプレート20の下面に取り付けられたフックを足場板6の開口61に落とし込み、足場板6の下面に係合させる。この状態で、ベースプレート20のうちフックが取り付けられているのとは反対側の部分に板金ビス23をねじ込んで支持材7を貫通するように係入させ、ベースプレート20を足場板6及び支持材7に固定する。
<第3実施形態>
図4(a)及び図4(b)に、本発明の第2実施形態の支柱の固定構造及び支柱の固定方法を示す。
3(a) and 3(b) show an example in which the hook bolt 22 is inserted into the through hole 21 provided in the base plate 20. may be attached in advance by welding or the like. In this case, the base plate 20 is moved on the upper surface of the scaffolding board 6 so that the hook attached to the lower surface of the base plate 20 drops into the opening 61 of the scaffolding board 6 and engages with the lower surface of the scaffolding board 6.例文帳に追加In this state, a sheet metal screw 23 is screwed into the portion of the base plate 20 opposite to the side where the hooks are attached, and is engaged so as to pass through the support member 7 . fixed to
<Third Embodiment>
4(a) and 4(b) show a column fixing structure and a column fixing method according to a second embodiment of the present invention.

本実施形態の支柱の固定構造は、支柱3の下端部に設けられたベースプレート30と、
ベースプレート30を足場板6に固定するU字フックボルト(係止部材、第一の固定部材)32と、ベースプレート30を支持材7に固定する板金ビス(螺合部材、第二の固定部材)33とを含んで、構成されている。図4(a)及び図4(b)に示すように、U字フックボルト32は、両端にねじ山が形成された丸鋼がU字状に折り曲げられて、その中間部にフック部が設けられた形状を有する。
The column fixing structure of the present embodiment includes a base plate 30 provided at the lower end of the column 3,
A U-shaped hook bolt (locking member, first fixing member) 32 for fixing the base plate 30 to the scaffolding board 6, and a sheet metal screw (screw member, second fixing member) 33 for fixing the base plate 30 to the support member 7. It is composed of As shown in FIGS. 4(a) and 4(b), the U-shaped hook bolt 32 is formed by bending a round steel with threads formed at both ends into a U-shape and providing a hook portion at the intermediate portion. It has a defined shape.

本実施形態では、図4(b)に示すように、ベースプレート30のうち支柱3に対して一方の側辺側の部分、すなわち、足場板6のうち支持材7によって支持されない部位に重ねられる部分には、貫通孔31が二対、計四つ設けられている。まず、U字フックボルト32の一端を、足場板6の開口61に挿入して足場板6の下面側をくぐらせ、足場板6の他の開口61から上方に出す。そして、U字フックボルト32上にベースプレート30を被せ、ベースプレート30の貫通孔31の各対に、ベースプレート30の下面側からU字フックボルト32の両端を挿入し、ベースプレート20の上面側に突出させる。この状態で、ベースプレート30の上面側に突出するU字フックボルト32の両端のねじ山にナット34が締め込まれることで、ベースプレート30が足場板6に係止される。 In this embodiment, as shown in FIG. 4(b), the portion of the base plate 30 on one side side with respect to the column 3, that is, the portion of the scaffolding board 6 that overlaps the portion that is not supported by the support member 7. is provided with two pairs of through-holes 31, four in total. First, one end of the U-shaped hook bolt 32 is inserted into the opening 61 of the scaffolding board 6 to pass through the lower side of the scaffolding board 6, and is pulled out from the other opening 61 of the scaffolding board 6. - 特許庁Then, the base plate 30 is put on the U-shaped hook bolts 32, and both ends of the U-shaped hook bolts 32 are inserted into each pair of the through holes 31 of the base plate 30 from the lower surface side of the base plate 30 to project to the upper surface side of the base plate 20. . In this state, the base plate 30 is locked to the scaffolding board 6 by tightening the nuts 34 to the screw threads on both ends of the U-shaped hook bolts 32 projecting upward from the base plate 30 .

そして、足場板6のうち支持材7によって支持された部位において、ベースプレート30の上面の三箇所に、ベースプレート30に係合しつつ足場板6の上面側から足場板6を通過してその下方の支持材7を貫通するように、板金ビス33がねじ込まれて係入し、ベースプレート30を足場板6及び支持材7に固定している。このように、ベースプレート30のうち支柱3に対して他方の側辺側の部分が板金ビス33によって足場板6及び支持材7に固定されることで、ベースプレート30のうち支柱3に対して一方の側辺側の部分を足場板6に係止するU字フックボルト32の係止状態も固定される。 Then, at a portion of the scaffolding board 6 supported by the supporting member 7, three points on the upper surface of the base plate 30 are attached to the base plate 30 while passing through the scaffolding board 6 from the upper surface side of the scaffolding board 6 and below it. A sheet metal screw 33 is screwed so as to pass through the support member 7 and is engaged therewith, thereby fixing the base plate 30 to the scaffolding board 6 and the support member 7 . In this way, the portion of the base plate 30 on the other side of the column 3 is fixed to the scaffolding board 6 and the support member 7 by the sheet metal screw 33, so that the base plate 30 on one side of the column 3 is fixed. The locked state of the U-shaped hook bolt 32 that locks the side portion to the scaffolding board 6 is also fixed.

その他の点については、本実施形態の支柱の支持構造及び支柱の固定方法は、第2実施形態と同様に構成されている。 Other than that, the support structure for the support column and the method for fixing the support column in this embodiment are configured in the same manner as in the second embodiment.

上記各実施形態では、支柱1~3は、作業床や点検歩廊等の床板を構成する足場板5の上に、手摺8及び中桟9の支柱1を固定するためのものであったが、本発明の支柱の固定構造及び支柱の固定方法の適用対象となる支柱はこれに限られず、例えば照明機材の脚や、他の各種機器を載せる台座の脚等となる支柱であってもよい。 In each of the above-described embodiments, the pillars 1 to 3 are for fixing the pillars 1 of the handrail 8 and the middle beam 9 on the scaffolding board 5 that constitutes the floorboards of the work floor, inspection corridor, etc. The pillars to which the pillar fixing structure and pillar fixing method of the invention are applied are not limited to these, and may be, for example, pillars that serve as legs of lighting equipment or legs of a pedestal on which various other devices are placed.

また、上記実施形態では、ベースプレート10、20、30を足場板5、6に固定する第一の固定部材又は第二の固定部材として板金ビス12、13、23、33を用い、足場板5、6の上面側から足場板5、6及び支持材7を貫通するようにねじ込んでいた。しかし、必ずしも支持材7を貫通する必要は無く、支持材7まで到達するようにねじ込まれて係入されていればよい。また、第一の固定部材又は第二の固定部材は、足場板の下面側からナットの締め込み等を行うことを必要とすることなく、足場板の上面側のみからの作業でベースプレートを足場板に係止して固定できる部材であればよく、例えばワンサイドボルト等も使用可能である。 Further, in the above embodiment, the sheet metal screws 12, 13, 23, 33 are used as the first fixing member or the second fixing member for fixing the base plates 10, 20, 30 to the scaffolding boards 5, 6, and the scaffolding boards 5, The scaffolding boards 5, 6 and the supporting member 7 were screwed from the upper surface side of the scaffolding 6 so as to penetrate. However, it is not always necessary to penetrate the supporting member 7, and it is only necessary that it is screwed and engaged so as to reach the supporting member 7. FIG. In addition, the first fixing member or the second fixing member does not need to be tightened with a nut from the bottom side of the scaffolding board, and the base plate can be fixed to the scaffolding board by work only from the top side of the scaffolding board. Any member can be used as long as it can be locked and fixed, and for example, a one-side bolt or the like can be used.

また、上記実施形態では、足場板5、6が、チェッカープレート等の金属板、若しくはエキスパンドメタル、パンチングメタル、グレーチング又は金網であって、金属材料から構成されていたが、これに代えて、FRPや木材等の金属以外の素材からなる足場板に対しても、本発明の支柱の支持構造及び支柱の固定方法を適用できる。 In the above-described embodiment, the scaffolding plates 5 and 6 are metal plates such as checker plates, expanded metal, punching metal, grating, or wire mesh, and are made of metal materials. The supporting structure for supporting columns and the fixing method for supporting columns according to the present invention can also be applied to scaffolding boards made of materials other than metals such as wood and wood.

また、第一の固定部材又は第二の固定部材として用いた板金ビス12、13、23、33やフックボルト22、U字フックボルト32の組み合わせも上記実施形態には限らない。例えば、第2実施形態及び第3実施形態において、ベースプレート30を支持材7に固定する第二の固定部材として、板金ビス23、33ではなくU字フックボルトを用いてもよい。この場合、U字フックボルトを挿入するための開口を支持材7に予め形成しておくことが好ましい。 Further, the combinations of the sheet metal screws 12, 13, 23, 33, the hook bolts 22, and the U-shaped hook bolts 32 used as the first fixing member or the second fixing member are not limited to those of the above embodiments. For example, in the second and third embodiments, U-shaped hook bolts may be used instead of the sheet metal screws 23 and 33 as the second fixing member for fixing the base plate 30 to the support member 7 . In this case, it is preferable to previously form an opening in the support member 7 for inserting the U-shaped hook bolt.

本発明の支柱の固定構造及び支柱の固定方法を適用して足場板の上に支柱を固定する場合について、施工試験を行い、従来の支柱の固定構造及び支柱の固定方法により足場板の上に支柱を固定した際の過去実績との施工費用および足場板の下方の空間の利用制限日数を比較して、本発明の効果を検証した。 In the case of fixing a support post on a scaffolding board by applying the support fixing structure and support fixing method of the present invention, a construction test was conducted, and the conventional support fixing structure and support fixing method were applied to the scaffolding board. The effect of the present invention was verified by comparing the construction cost and the limited number of days of use of the space under the scaffold board with the past results when the support was fixed.

本施工試験では、工場内の上部クレーンの点検歩廊の床板を構成する足場板を対象とした。そして、点検歩廊の全長220mの区間のうち、既存の手摺が設けられている部分を除くチェッカープレート19mとエキスパンドメタル143mの計162mの区間の各々に手摺用の支柱を固定した(本発明例)。 In this construction test, the target was a scaffold board that constitutes the floor board of the inspection corridor of the upper crane in the factory. Then, of the 220m long section of the inspection corridor, 19m of the checker plate and 143m of expanded metal, excluding the portion where the existing handrail is provided, for a total of 162m, was fixed to each of the sections for handrails (example of the present invention). .

チェッカープレートの区間(19m)に対しては、本発明の第1実施形態の支柱の固定構造及び支柱の固定方法を適用した。 The column fixing structure and column fixing method of the first embodiment of the present invention were applied to the section (19 m) of the checker plate.

また、エキスパンドメタルの区間(143m)に対しては、本発明の第2実施形態の支柱の固定構造及び支柱の固定方法を適用した。なお、本発明例では、162mの区間に1.1m間隔で151本の支柱を設置した。 The column fixing structure and column fixing method of the second embodiment of the present invention were applied to the expanded metal section (143 m). In addition, in the example of the present invention, 151 pillars were installed at intervals of 1.1 m in a section of 162 m.

一方、従来の支柱の固定構造及び支柱の固定方法(過去実績)では、各支柱の下端部を支持材に溶接する方法により、本発明例と同じ本数の支柱を設置した(従来例)。なお、従来例では、足場板の下方に火気養生を行った。 On the other hand, in the conventional column fixing structure and column fixing method (past results), the same number of columns as in the example of the present invention were installed by welding the lower end of each column to the support material (conventional example). In addition, in the conventional example, fire curing was performed under the scaffold board.

この結果、本発明例の施工費用は、従来例の2.5分の1となり、施工費用が大幅に抑えられることが確認された。また、従来例では、足場板の下方の空間について10日間に亘って利用制限する必要が生じ、点検歩廊の下方の製造ラインを停止する等、工場の生産活動に影響を生じたのに対し、本発明を適用した場合はこのような利用制限が生じなかった。 As a result, it was confirmed that the construction cost of the example of the present invention was reduced to 1/2.5 of that of the conventional example, and that the construction cost could be greatly reduced. In addition, in the conventional example, it was necessary to restrict the use of the space under the scaffolding board for 10 days, which affected the production activities of the factory, such as stopping the production line under the inspection corridor. When the present invention was applied, such use restrictions did not arise.

1、2、3 支柱
10、20、30 ベースプレート
21、31 貫通孔
12 板金ビス(螺合部材、第一の固定部材)
13、23、33 板金ビス(螺合部材、第二の固定部材)
22 フックボルト(係止部材、第一の固定部材)
32 U字フックボルト(係止部材、第一の固定部材)
24、34 ナット
15 手摺受
16 中桟受
5 金属板(足場板)
6 エキスパンドメタル(足場板)
61 開口
7 支持材
8 手摺
9 中桟
Reference Signs List 1, 2, 3 strut 10, 20, 30 base plate 21, 31 through hole 12 sheet metal screw (screw member, first fixing member)
13, 23, 33 sheet metal screws (screwed member, second fixing member)
22 hook bolt (locking member, first fixing member)
32 U-shaped hook bolt (locking member, first fixing member)
24, 34 nut 15 handrail receiver 16 crosspiece receiver 5 metal plate (scaffold board)
6 Expanded metal (scaffold board)
61 opening 7 support material 8 handrail 9 middle rail

Claims (8)

支持材によって支持された足場板の上に支柱を固定する支柱の固定構造であって、
前記支柱の下端部に設けられたベースプレートと、
前記足場板のうち前記支持材によって支持されない部位において、前記ベースプレートに係合しつつ前記足場板の上面側から該足場板に係入する第一の固定部材と、
前記足場板のうち前記支持材によって支持される部位において、前記ベースプレートに係合しつつ前記足場板の上面側から前記支持材まで係入する第二の固定部材と
を有する、支柱の固定構造。
A stanchion fixing structure for fixing a stanchion on a scaffolding board supported by a support, comprising:
a base plate provided at the lower end of the support;
a first fixing member that engages with the base plate and engages the scaffolding board from the upper surface side of the scaffolding board at a portion of the scaffolding board that is not supported by the support member;
and a second fixing member that engages with the base plate and engages from the upper surface side of the scaffolding board to the supporting member at a portion of the scaffolding board that is supported by the supporting member.
前記第一の固定部材および前記第二の固定部材は螺合部材である、請求項1に記載の支柱の固定構造。 2. The post fixing structure according to claim 1, wherein said first fixing member and said second fixing member are threaded members. 前記足場板は複数の開口を有し、
前記第一の固定部材は、前記足場板の前記開口に挿入され該足場板の下面に係合する係止部材であり、
前記第二の固定部材は、前記ベースプレートの上面側から前記支持材まで螺入する螺合部材である、請求項1に記載の支柱の固定構造。
The scaffolding board has a plurality of openings,
The first fixing member is a locking member that is inserted into the opening of the scaffolding board and engages with the lower surface of the scaffolding board,
2. The post fixing structure according to claim 1, wherein said second fixing member is a screwing member that is screwed into said support member from the upper surface side of said base plate.
前記足場板はエキスパンドメタル、パンチングメタル、グレーチング又は金網からなり、該足場板の前記開口は、前記エキスパンドメタル、前記パンチングメタル、前記グレーチング又は前記金網に形成された開口である、請求項3に記載の支柱の固定構造。 4. The scaffolding plate according to claim 3, wherein the scaffolding plate is made of expanded metal, perforated metal, grating or wire mesh, and the opening of the scaffolding plate is an opening formed in the expanded metal, the perforated metal, the grating or the wire mesh. stanchion fixed structure. 前記係止部材は、前記ベースプレートの下面に設けられたフックである、請求項3又は4に記載の支柱の固定構造。 5. The column fixing structure according to claim 3, wherein said locking member is a hook provided on the lower surface of said base plate. 前記ベースプレートには貫通孔が設けられ、
前記係止部材は、該ベースプレートの前記貫通孔及び前記足場板の前記開口に挿入され該足場板の下面に係合するフックボルトである、請求項3又は4に記載の支柱の固定構造。
A through hole is provided in the base plate,
5. The post fixing structure according to claim 3 or 4, wherein the locking member is a hook bolt inserted into the through hole of the base plate and the opening of the scaffolding board and engaged with the lower surface of the scaffolding board.
前記ベースプレートには少なくとも一対の貫通孔が設けられ、
前記係止部材は、該ベースプレートの前記一対の貫通孔及び前記足場板の前記開口に挿入され該足場板の下面に係合するU字フックボルトである、請求項3又は4に記載の支柱の固定構造。
The base plate is provided with at least a pair of through holes,
5. The strut according to claim 3, wherein the locking member is a U-shaped hook bolt inserted into the pair of through holes of the base plate and the opening of the scaffolding board and engaged with the lower surface of the scaffolding board. Fixed structure.
支持材によって支持された足場板の上に支柱を固定する支柱の固定方法であって、
前記支柱の下端部に設けられたベースプレートに係合するように、前記足場板の上面側から下方に固定部材を係入して、前記ベースプレートを前記足場板及び前記支持材に係止する、支柱の固定方法。
A post fixing method for fixing a post onto a scaffolding board supported by a support, comprising:
A post for locking the base plate to the scaffolding plate and the support member by engaging a fixing member downward from the upper surface side of the scaffolding plate so as to engage with the base plate provided at the lower end of the post. fixing method.
JP2021006792A 2021-01-20 2021-01-20 Support fixing structure and support fixing method Active JP7347452B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021006792A JP7347452B2 (en) 2021-01-20 2021-01-20 Support fixing structure and support fixing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021006792A JP7347452B2 (en) 2021-01-20 2021-01-20 Support fixing structure and support fixing method

Publications (2)

Publication Number Publication Date
JP2022111400A true JP2022111400A (en) 2022-08-01
JP7347452B2 JP7347452B2 (en) 2023-09-20

Family

ID=82655767

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021006792A Active JP7347452B2 (en) 2021-01-20 2021-01-20 Support fixing structure and support fixing method

Country Status (1)

Country Link
JP (1) JP7347452B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5821631U (en) * 1981-08-05 1983-02-10 日立プラント建設株式会社 Fixing devices such as handrails
US5182889A (en) * 1991-01-14 1993-02-02 Dennis Johnson Barrier system
JPH07103680B2 (en) * 1990-08-08 1995-11-08 株式会社巴コーポレーション Maintenance / management corridor
US20040261339A1 (en) * 2001-08-13 2004-12-30 Horton Peter Donald Safety barrier
JP2010185185A (en) * 2009-02-10 2010-08-26 Sekisui House Ltd Temporary handrail and its construction method
JP2020070682A (en) * 2018-11-02 2020-05-07 三進金属工業株式会社 Construct support structure for steel floors

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5821631U (en) * 1981-08-05 1983-02-10 日立プラント建設株式会社 Fixing devices such as handrails
JPH07103680B2 (en) * 1990-08-08 1995-11-08 株式会社巴コーポレーション Maintenance / management corridor
US5182889A (en) * 1991-01-14 1993-02-02 Dennis Johnson Barrier system
US20040261339A1 (en) * 2001-08-13 2004-12-30 Horton Peter Donald Safety barrier
JP2010185185A (en) * 2009-02-10 2010-08-26 Sekisui House Ltd Temporary handrail and its construction method
JP2020070682A (en) * 2018-11-02 2020-05-07 三進金属工業株式会社 Construct support structure for steel floors

Also Published As

Publication number Publication date
JP7347452B2 (en) 2023-09-20

Similar Documents

Publication Publication Date Title
US7802773B2 (en) Reusable fall restrain supports and fall arrestor
GB2578952A (en) Height-adjustable jack and vertical modular component support using the same
JP2008035953A (en) Support fitting for stretching safety rope
KR101435948B1 (en) safty barrier for steel beam installation
KR101775645B1 (en) Bridge inspection passage
WO2012014581A9 (en) Strut-equipped tie member and temporary scaffold
CN110043018B (en) Floor edge scaffold fixing mechanism and application method thereof
CN210888012U (en) Steel column safety operation platform
JP2022111400A (en) Securing structure for column and securing method for column
US20130193286A1 (en) Portable and resuable connection device having secure anchor point
US20180347217A1 (en) Quick Deploy and Takedown Guardrail Sysytem
JP2008031667A (en) Funnel-shaped protective shelf device
EP2706167B1 (en) Wall bracket
KR101757279B1 (en) Building scaffolding equipment by way of wire rope in the boiler system
JP5409955B1 (en) Steel bridge structure
KR101350921B1 (en) Temporary Girder Bridge Bracket
KR101757282B1 (en) Topside load support structure of scaffolding by way of rope in boiler system including wire clamp clamping outside of wire rope when load increased
KR102335856B1 (en) Safety railing for steel beam installation
JP6464459B2 (en) Column base bracket, building unit including column base bracket, and installation method thereof
JP2015031015A (en) Suspended ceiling structure
KR19990030347A (en) Handrail device of steel structure
KR20000049555A (en) Sliding form
JPS642908Y2 (en)
US20230265645A1 (en) Modular space frame support system, work platform system and methods of erecting the same
JP2010071042A (en) Temporary handrail

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220822

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230501

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230704

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230731

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230821

R150 Certificate of patent or registration of utility model

Ref document number: 7347452

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150