JP2022062292A - Molding apparatus and molding method - Google Patents

Molding apparatus and molding method Download PDF

Info

Publication number
JP2022062292A
JP2022062292A JP2019039825A JP2019039825A JP2022062292A JP 2022062292 A JP2022062292 A JP 2022062292A JP 2019039825 A JP2019039825 A JP 2019039825A JP 2019039825 A JP2019039825 A JP 2019039825A JP 2022062292 A JP2022062292 A JP 2022062292A
Authority
JP
Japan
Prior art keywords
metal pipe
pressure
gas
molding
pipe material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019039825A
Other languages
Japanese (ja)
Inventor
正之 石塚
Masayuki Ishizuka
公宏 野際
Kimihiro NOGIWA
章博 井手
Akihiro Ide
紀条 上野
Norieda UENO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP2019039825A priority Critical patent/JP2022062292A/en
Priority to PCT/JP2020/004984 priority patent/WO2020179359A1/en
Publication of JP2022062292A publication Critical patent/JP2022062292A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/041Means for controlling fluid parameters, e.g. pressure or temperature

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

To provide a molding apparatus and a molding method in which molding time of a metallic pipe can be reduced.SOLUTION: The molding apparatus molding a metal pipe with a pipe part in a hollow shape comprises, when molding a metal pipe: a gas supply unit which supplies the heated metal pipe material with high pressure gas; and a controller which control gas supply of the gas supply unit. The controller controls, when molding the metal pipe, the gas supply unit to stop the high pressure gas supply after detecting that internal pressure of the metal pipe material becomes the specified maximum pressure value. A first period from the time when the internal pressure becomes the specified maximum pressure to the time when the high pressure gas supply stops is shorter than a second period from the time when the high pressure gas is started to supply to the time when the internal pressure becomes the specified maximum pressure.SELECTED DRAWING: Figure 4

Description

本発明は、成形装置及び成形方法に関し、特に金属パイプの成形装置及び成形方法に関する。 The present invention relates to a molding apparatus and a molding method, and more particularly to a metal pipe molding apparatus and a molding method.

従来、加熱した金属パイプ材料内に気体を供給して膨張させることによって、パイプ部及びフランジ部を有する金属パイプの成形を行う成形装置が知られている。例えば、下記特許文献1には、互いに対になる上下金型と、上下金型の間に保持された金属パイプ材料内に気体を供給する気体供給部と、当該金属パイプ材料を加熱する加熱機構と、上記上型及び下型が合わさることによって形成されるキャビティ部とを備える成形装置が開示されている。 Conventionally, a molding apparatus for forming a metal pipe having a pipe portion and a flange portion by supplying a gas into a heated metal pipe material and expanding the material is known. For example, Patent Document 1 below describes a pair of upper and lower dies, a gas supply unit that supplies gas into a metal pipe material held between the upper and lower dies, and a heating mechanism for heating the metal pipe material. And a molding apparatus including a cavity portion formed by combining the upper mold and the lower mold are disclosed.

国際公開第2017/150110号International Publication No. 2017/150110

上記特許文献1では、金属パイプ材料をパイプ部に成形させる際、金属パイプ材料の内部圧力を高圧(例えば、数10MPa)に保持する期間が設定されている。この期間は、例えば金属パイプ材料の内部圧力を高圧まで昇圧するために要する期間よりも長く設定される。このため、上記特許文献1に示される金属パイプの成形方法によれば、金属パイプの成形時間がかかってしまう課題がある。 In Patent Document 1, when the metal pipe material is formed into a pipe portion, a period for maintaining the internal pressure of the metal pipe material at a high pressure (for example, several tens of MPa) is set. This period is set longer than, for example, the period required to boost the internal pressure of the metal pipe material to a high pressure. Therefore, according to the method for forming a metal pipe shown in Patent Document 1, there is a problem that it takes a long time to form the metal pipe.

本発明は、金属パイプの成形時間を短縮可能な成形装置及び成形方法を提供することを目的とする。 An object of the present invention is to provide a molding apparatus and a molding method capable of shortening the molding time of a metal pipe.

本発明者らは、鋭意検討の結果、成形後の金属パイプの形状は、金属パイプ材料の内部圧力の最大値(所定の最大圧力値)に大きく依存することを見出した。加えて、上記内部圧力を高圧に保持することは、内部圧力の最大値の設定と比較すると、金属パイプの形状への影響が小さいことも見出された。これらの知見に基づいて、本発明者らは、以下に説明する事項を見出した。 As a result of diligent studies, the present inventors have found that the shape of the metal pipe after molding largely depends on the maximum value (predetermined maximum pressure value) of the internal pressure of the metal pipe material. In addition, it was also found that maintaining the internal pressure at a high pressure has a small effect on the shape of the metal pipe as compared with the setting of the maximum value of the internal pressure. Based on these findings, the present inventors have found the matters described below.

本発明の一側面に係る成形装置は、中空形状を呈するパイプ部を有する金属パイプを成形する成形装置であって、金属パイプを成形するとき、加熱された金属パイプ材料内に高圧ガスを供給する気体供給ユニットと、気体供給ユニットの気体供給を制御する制御部と、を備える。金属パイプを成形するとき、制御部は、金属パイプ材料の内部圧力が所定の最大圧力値に到達したことの検知後に高圧ガスの供給を停止するように、気体供給ユニットを制御し、内部圧力が所定の最大圧力値に到達してから高圧ガスの供給が停止するまでの第1期間は、高圧ガスの供給が開始してから内部圧力が所定の最大圧力値に到達するまでの第2期間よりも短い。 The molding apparatus according to one aspect of the present invention is a molding apparatus for molding a metal pipe having a pipe portion having a hollow shape, and supplies a high-pressure gas into a heated metal pipe material when molding the metal pipe. It includes a gas supply unit and a control unit that controls the gas supply of the gas supply unit. When forming a metal pipe, the control unit controls the gas supply unit to stop the supply of high pressure gas after detecting that the internal pressure of the metal pipe material has reached a predetermined maximum pressure value, and the internal pressure is reduced. The first period from the arrival of the predetermined maximum pressure value to the stop of the supply of the high pressure gas is from the second period from the start of the supply of the high pressure gas to the time when the internal pressure reaches the predetermined maximum pressure value. Is also short.

この成形装置では、金属パイプ材料の内部圧力を所定の最大圧力値に保持しなくてもよいので、上記第1期間を上記第2期間よりも短く設定できる。これにより、金属パイプ材料への高圧ガスの供給から、金属パイプの成形装置からの取り出しまでに要する期間を短縮できる。したがって上記成形装置を用いることによって、金属パイプの成形時間を短縮できる。 In this molding apparatus, since it is not necessary to keep the internal pressure of the metal pipe material at a predetermined maximum pressure value, the first period can be set shorter than the second period. As a result, the time required from the supply of the high-pressure gas to the metal pipe material to the removal of the metal pipe from the molding apparatus can be shortened. Therefore, by using the above-mentioned molding apparatus, the molding time of the metal pipe can be shortened.

上記成形装置は、金属パイプの内部に収容される高圧ガスを排出する排気機構をさらに備え、制御部は、内部圧力が所定の最大圧力値に到達したことの検知後に高圧ガスを排出するように、排気機構を制御してもよい。このような排気機構を用いて金属パイプの内部に収容される高圧ガスを排出することにより、金属パイプを迅速に冷却できる。このため、金属パイプの成形時間を良好に短縮できる。 The molding apparatus further includes an exhaust mechanism for discharging the high-pressure gas contained inside the metal pipe, and the control unit discharges the high-pressure gas after detecting that the internal pressure has reached a predetermined maximum pressure value. , The exhaust mechanism may be controlled. By using such an exhaust mechanism to discharge the high-pressure gas contained inside the metal pipe, the metal pipe can be cooled quickly. Therefore, the molding time of the metal pipe can be satisfactorily shortened.

本発明の他の一側面に係る成形方法は、加熱された金属パイプ材料内に高圧ガスを供給することによって、中空形状を呈するパイプ部を有する金属パイプを成形する工程を備える。金属パイプを成形する工程では、金属パイプ材料の内部圧力が所定の最大圧力値に到達したことの検知後に高圧ガスの供給を停止し、内部圧力が所定の最大圧力値に到達してから高圧ガスの供給が停止するまでの第1期間は、高圧ガスの供給が開始してから内部圧力が所定の最大圧力値に到達するまでの第2期間よりも短い。 The molding method according to another aspect of the present invention includes a step of forming a metal pipe having a pipe portion having a hollow shape by supplying a high-pressure gas into a heated metal pipe material. In the process of forming a metal pipe, the supply of high-pressure gas is stopped after detecting that the internal pressure of the metal pipe material has reached a predetermined maximum pressure value, and the high-pressure gas is stopped after the internal pressure reaches a predetermined maximum pressure value. The first period until the supply of the high-pressure gas is stopped is shorter than the second period from the start of the supply of the high-pressure gas until the internal pressure reaches a predetermined maximum pressure value.

この成形方法では、金属パイプ材料の内部圧力を所定の最大圧力値に保持しなくてもよいので、上記第1期間を上記第2期間よりも短く設定できる。これにより、金属パイプ材料への高圧ガスの供給から、金属パイプの成形装置からの取り出しまでに要する期間を短縮できる。したがって上記成形方法によれば、金属パイプの成形時間を短縮できる。 In this molding method, since it is not necessary to keep the internal pressure of the metal pipe material at a predetermined maximum pressure value, the first period can be set shorter than the second period. As a result, the time required from the supply of the high-pressure gas to the metal pipe material to the removal of the metal pipe from the molding apparatus can be shortened. Therefore, according to the above molding method, the molding time of the metal pipe can be shortened.

上記成形方法は、内部圧力が所定の最大圧力値に到達したことの検知後に高圧ガスを排出する工程をさらに備えてもよい。この場合、金属パイプの内部に収容される高圧ガスを排出することにより、金属パイプを迅速に冷却できる。このため、金属パイプの成形時間を良好に短縮できる。 The molding method may further include a step of discharging high-pressure gas after detecting that the internal pressure has reached a predetermined maximum pressure value. In this case, the metal pipe can be cooled quickly by discharging the high-pressure gas contained inside the metal pipe. Therefore, the molding time of the metal pipe can be satisfactorily shortened.

本発明の一側面によれば、金属パイプの成形時間を短縮可能な成形装置及び成形方法を提供できる。 According to one aspect of the present invention, it is possible to provide a molding apparatus and a molding method capable of shortening the molding time of a metal pipe.

図1は、実施形態に係る成形装置の概略構成図である。FIG. 1 is a schematic configuration diagram of a molding apparatus according to an embodiment. 図2(a)は電極が金属パイプ材料を保持した状態を示す図であり、図2(b)は電極に気体供給ノズルが当接した状態を示す図であり、図2(c)は電極の正面図である。FIG. 2A is a diagram showing a state in which the electrode holds the metal pipe material, FIG. 2B is a diagram showing a state in which the gas supply nozzle is in contact with the electrode, and FIG. 2C is a diagram showing the electrode. It is a front view of. 図3は、実施形態に係る成形金型の概略断面図である。FIG. 3 is a schematic cross-sectional view of the molding die according to the embodiment. 図4は、金属パイプの成形方法を示すフローチャートである。FIG. 4 is a flowchart showing a method of forming a metal pipe. 図5は、実施形態に係る金属パイプの成形工程のタイミングチャートである。FIG. 5 is a timing chart of the metal pipe molding process according to the embodiment. 図6(a),(b)は、成形金型の動作と金属パイプ材料の形状の変化を示す図である。6 (a) and 6 (b) are diagrams showing the operation of the molding die and the change in the shape of the metal pipe material. 図7(a),(b)は、成形金型の動作と金属パイプ材料の形状の変化を示す図である。7 (a) and 7 (b) are diagrams showing the operation of the molding die and the change in the shape of the metal pipe material. 図8は、比較例に係る金属パイプの成形工程のタイミングチャートである。FIG. 8 is a timing chart of a metal pipe molding process according to a comparative example. 図9は、変形例に係る金属パイプの成形工程のタイミングチャートである。FIG. 9 is a timing chart of a metal pipe molding process according to a modified example.

以下、本発明の一側面に係る成形装置及び成形方法の好適な実施形態について図面を参照しながら説明する。なお、各図において同一部分又は相当部分には同一符号を付し、重複する説明は省略する。 Hereinafter, preferred embodiments of the molding apparatus and molding method according to one aspect of the present invention will be described with reference to the drawings. In each figure, the same parts or corresponding parts are designated by the same reference numerals, and duplicate description will be omitted.

<成形装置の構成>
図1は、成形装置の概略構成図である。図1に示されるように、中空形状を呈する金属パイプを成形する成形装置10は、互いに対となる上型(金型)12及び下型(金型)11を有する成形金型(成形部)13と、上型12及び下型11の少なくとも一方を移動させる駆動機構80と、上型12と下型11との間に配置される金属パイプ材料14を保持するパイプ保持機構30と、パイプ保持機構30で保持されている金属パイプ材料14に通電して加熱する加熱機構50と、上型12及び下型11の間に保持され加熱された金属パイプ材料14内にガス(気体)を供給するための気体供給ユニット60と、パイプ保持機構30で保持された金属パイプ材料14の内部に気体供給ユニット60からの気体を供給するための一対の気体供給部40,40と、成形金型13を強制的に水冷する水循環機構72とを備えると共に、上記駆動機構80の駆動、上記パイプ保持機構30の駆動、上記加熱機構50の駆動、及び上記気体供給ユニット60の気体供給をそれぞれ制御する制御部70と、を備える。なお以下では、金属パイプは、成形装置10にて成形完了後の中空物品を指し、金属パイプ材料14は、成形装置10にて成形完了前の中空物品を指す。
<Structure of molding equipment>
FIG. 1 is a schematic configuration diagram of a molding apparatus. As shown in FIG. 1, the molding apparatus 10 for molding a metal pipe exhibiting a hollow shape has a molding mold (molding portion) having an upper mold (mold) 12 and a lower mold (mold) 11 paired with each other. 13, a drive mechanism 80 for moving at least one of the upper mold 12 and the lower mold 11, a pipe holding mechanism 30 for holding the metal pipe material 14 arranged between the upper mold 12 and the lower mold 11, and a pipe holding mechanism. Gas (gas) is supplied to the heating mechanism 50 that energizes and heats the metal pipe material 14 held by the mechanism 30 and the metal pipe material 14 that is held and heated between the upper mold 12 and the lower mold 11. A gas supply unit 60 for supplying gas, a pair of gas supply units 40, 40 for supplying gas from the gas supply unit 60 inside the metal pipe material 14 held by the pipe holding mechanism 30, and a molding mold 13. A control unit including a water circulation mechanism 72 for forcibly cooling water, and controlling the drive of the drive mechanism 80, the drive of the pipe holding mechanism 30, the drive of the heating mechanism 50, and the gas supply of the gas supply unit 60, respectively. 70 and. In the following, the metal pipe refers to a hollow article after molding is completed by the molding apparatus 10, and the metal pipe material 14 refers to a hollow article before molding is completed by the molding apparatus 10.

成形金型13は、金属パイプ材料14を金属パイプに成形するために用いられる型である。このため、成形金型13に含まれる下型11及び上型12のそれぞれには、金属パイプ材料14が収容されるキャビティ(凹部)が設けられる(詳細は後述する)。 The molding die 13 is a die used for molding the metal pipe material 14 into a metal pipe. Therefore, each of the lower mold 11 and the upper mold 12 included in the molding die 13 is provided with a cavity (recess) in which the metal pipe material 14 is accommodated (details will be described later).

下型11は、大きな基台15に固定されている。下型11は、大きな鋼鉄製ブロックで構成され、その上面にキャビティ16を備える。下型11には冷却水通路19が形成されている。また、下型11は、略中央に下から差し込まれた熱電対21を備えている。熱電対21は、スプリング22により上下移動自在に支持されている。熱電対21は測温手段の一例を示したに過ぎず、輻射温度計又は光温度計のような非接触型温度センサであってもよい。通電時間と温度との相関が得られれば、測温手段は省いてもよい。 The lower mold 11 is fixed to a large base 15. The lower mold 11 is composed of a large steel block and has a cavity 16 on the upper surface thereof. A cooling water passage 19 is formed in the lower mold 11. Further, the lower mold 11 includes a thermocouple 21 inserted from below substantially in the center. The thermocouple 21 is supported by a spring 22 so as to be vertically movable. The thermocouple 21 is merely an example of a temperature measuring means, and may be a non-contact temperature sensor such as a radiation thermometer or an optical thermometer. If the correlation between the energization time and the temperature is obtained, the temperature measuring means may be omitted.

下型11の左右端(図1における左右端)近傍には、電極収納スペース11aが設けられている。電極収納スペース11a内には、上下に進退動可能に構成された電極(下側電極)17,18が設けられる。下型11と下側電極17との間及び下側電極17の下部、並びに下型11と下側電極18との間及び下側電極18の下部には、通電を防ぐための絶縁材91がそれぞれ設けられている。それぞれの絶縁材91は、パイプ保持機構30を構成するアクチュエータ(不図示)の可動部である進退ロッド95に固定されている。このアクチュエータは、下側電極17,18等を上下動させるためのものであり、アクチュエータの固定部は、下型11と共に基台15側に保持されている。 An electrode storage space 11a is provided in the vicinity of the left and right ends (left and right ends in FIG. 1) of the lower mold 11. In the electrode storage space 11a, electrodes (lower electrodes) 17 and 18 configured to be able to move up and down are provided. An insulating material 91 for preventing energization is provided between the lower mold 11 and the lower electrode 17 and the lower portion of the lower electrode 17, and between the lower mold 11 and the lower electrode 18 and the lower portion of the lower electrode 18. Each is provided. Each insulating material 91 is fixed to an advancing / retreating rod 95 which is a movable portion of an actuator (not shown) constituting the pipe holding mechanism 30. This actuator is for moving the lower electrodes 17, 18 and the like up and down, and the fixed portion of the actuator is held on the base 15 side together with the lower mold 11.

下側電極17,18の上面には、金属パイプ材料14の下側外周面に対応した半円弧状の凹溝17a,18aがそれぞれ形成されている(図2(c)を参照)。このため、下型11側に位置する一対の下側電極17,18は、パイプ保持機構30の一部を構成しており、金属パイプ材料14を上型12と下型11との間で昇降可能に支えることができる。下側電極17,18にて支持される金属パイプ材料14は、例えば凹溝17a,18aにて嵌め込まれ載置される。下側電極17,18の正面(金型の外側方向の面)には、凹溝17a,18aに向って周囲がテーパー状に傾斜して窪んだテーパー凹面17b,18bが形成されている。なお、絶縁材91には、上記凹溝17a,18aに連通すると共に、金属パイプ材料14の外周面に対応した半円弧状の凹溝が形成されている。 Semi-circular concave grooves 17a and 18a corresponding to the lower outer peripheral surface of the metal pipe material 14 are formed on the upper surfaces of the lower electrodes 17 and 18, respectively (see FIG. 2C). Therefore, the pair of lower electrodes 17 and 18 located on the lower mold 11 side form a part of the pipe holding mechanism 30, and the metal pipe material 14 is moved up and down between the upper mold 12 and the lower mold 11. Can be supported as much as possible. The metal pipe material 14 supported by the lower electrodes 17 and 18 is fitted and placed in, for example, the concave grooves 17a and 18a. Tapered concave surfaces 17b and 18b are formed on the front surfaces of the lower electrodes 17 and 18 (the outer surface of the mold) so that the periphery is tapered toward the concave grooves 17a and 18a. The insulating material 91 communicates with the concave grooves 17a and 18a, and has a semicircular concave groove corresponding to the outer peripheral surface of the metal pipe material 14.

上型12は、下型11と同様に大きな鋼鉄製ブロックによって構成されており、駆動機構80を構成するスライド81(詳細は後述)に固定されている。上型12の下面にはキャビティ24が形成されている。キャビティ24は、下型11のキャビティ16に対向する位置に設けられている。上型12の内部には、冷却水通路25が設けられている。 The upper mold 12 is composed of a large steel block like the lower mold 11, and is fixed to a slide 81 (details will be described later) constituting the drive mechanism 80. A cavity 24 is formed on the lower surface of the upper mold 12. The cavity 24 is provided at a position facing the cavity 16 of the lower mold 11. A cooling water passage 25 is provided inside the upper die 12.

上型12の左右端(図1における左右端)近傍には、下型11と同様な電極収納スペース12aが設けられている。電極収納スペース12a内には、下型11と同じく、上下に進退動可能に構成された電極(上側電極)17,18が設けられる。上型12と上側電極17との間及び上側電極17の上部、並びに上型12と上側電極18との間及び上側電極18の上部には、通電を防ぐための絶縁材92がそれぞれ設けられている。それぞれの絶縁材92は、パイプ保持機構30を構成するアクチュエータ(不図示)の可動部である進退ロッド96に固定されている。このアクチュエータは、上側電極17,18等を上下動させるためのものであり、アクチュエータの固定部は、上型12と共に駆動機構80側に保持されている。 An electrode storage space 12a similar to that of the lower mold 11 is provided in the vicinity of the left and right ends (left and right ends in FIG. 1) of the upper mold 12. Similar to the lower mold 11, electrodes 17 and 18 configured to be able to move up and down in the electrode storage space 12a are provided. Insulating material 92 for preventing energization is provided between the upper mold 12 and the upper electrode 17 and the upper part of the upper electrode 17, and between the upper mold 12 and the upper electrode 18 and the upper part of the upper electrode 18, respectively. There is. Each insulating material 92 is fixed to an advancing / retreating rod 96 which is a movable portion of an actuator (not shown) constituting the pipe holding mechanism 30. This actuator is for moving the upper electrodes 17, 18 and the like up and down, and the fixed portion of the actuator is held on the drive mechanism 80 side together with the upper mold 12.

上側電極17,18の下面には、金属パイプ材料14の上側外周面に対応した半円弧状の凹溝17a,18aがそれぞれ形成されている(図2(c)を参照)。このため、上側電極17,18は、パイプ保持機構30の他の一部を構成している。上下一対の電極17,18で金属パイプ材料14を上下方向から挟持すると、金属パイプ材料14の外周を全周に渡って密着するように取り囲むことができる。上側電極17,18の正面(金型の外側方向の面)には、凹溝17a,18aに向って周囲がテーパー状に傾斜して窪んだテーパー凹面17b,18bが形成されている。なお、絶縁材92には、上記凹溝17a,18aに連通すると共に、金属パイプ材料14の外周面に対応した半円弧状の凹溝が形成されている。 Semi-circular concave grooves 17a and 18a corresponding to the upper outer peripheral surface of the metal pipe material 14 are formed on the lower surfaces of the upper electrodes 17 and 18, respectively (see FIG. 2C). Therefore, the upper electrodes 17 and 18 form another part of the pipe holding mechanism 30. When the metal pipe material 14 is sandwiched between the pair of upper and lower electrodes 17 and 18 from the vertical direction, the outer periphery of the metal pipe material 14 can be surrounded so as to be in close contact with the entire circumference. On the front surface of the upper electrodes 17 and 18 (the surface in the outer direction of the mold), tapered concave surfaces 17b and 18b are formed in which the periphery is inclined in a tapered shape toward the concave grooves 17a and 18a. The insulating material 92 communicates with the concave grooves 17a and 18a, and has a semicircular concave groove corresponding to the outer peripheral surface of the metal pipe material 14.

図3は、成形金型13の概略断面図である。図3に示されるように、下型11の上面には、下型11の中央のキャビティ16表面を基準ラインLV2とすると、キャビティ16の一方側(図3において右側、図1において紙面奥側)に第1突起11bが形成されており、キャビティ16の他方側(図3において左側、図1において紙面手前側)に第2突起11cが形成されている。第1突起11b及び第2突起11cにおいて基準ラインLV2からの突出量は略同一である。一方、上型12の下面には、上型12の中央のキャビティ24表面を基準ラインLV1とすると、キャビティ24の一方側(図3において右側)に第1突起12bが形成されており、キャビティ24の他方側(図3において左側)に第2突起12cが形成されている。第1突起12b及び第2突起12cにおいて基準ラインLV1からの突出量は略同一である。 FIG. 3 is a schematic cross-sectional view of the molding die 13. As shown in FIG. 3, on the upper surface of the lower mold 11, if the surface of the cavity 16 in the center of the lower mold 11 is the reference line LV2, one side of the cavity 16 (the right side in FIG. 3 and the back side of the paper surface in FIG. 1). The first protrusion 11b is formed on the cavity 16, and the second protrusion 11c is formed on the other side of the cavity 16 (the left side in FIG. 3 and the front side of the paper surface in FIG. 1). The amount of protrusion from the reference line LV2 is substantially the same in the first protrusion 11b and the second protrusion 11c. On the other hand, on the lower surface of the upper die 12, if the surface of the cavity 24 in the center of the upper die 12 is set as the reference line LV1, the first protrusion 12b is formed on one side (right side in FIG. 3) of the cavity 24, and the cavity 24 is formed. A second protrusion 12c is formed on the other side (left side in FIG. 3). The amount of protrusion from the reference line LV1 is substantially the same in the first protrusion 12b and the second protrusion 12c.

図1に戻って、駆動機構80は、上型12及び下型11同士が合わさるように上型12を移動させるスライド81と、スライド81を移動させるための駆動力を発生するシャフト82と、該シャフト82で発生した駆動力をスライド81に伝達するためのコネクティングロッド83とを備えている。シャフト82は、スライド81上方にて左右方向に延在していると共に回転自在に支持されており、その軸心から離間した位置にて左右端から突出して左右方向に延在する偏心クランク82aを有している。この偏心クランク82aと、スライド81の上部に設けられると共に左右方向に延在している回転軸81aとは、コネクティングロッド83によって連結されている。駆動機構80では、制御部70によってシャフト82の回転を制御することにより偏心クランク82aの上下方向の高さを変化させ、この偏心クランク82aの位置変化をコネクティングロッド83を介してスライド81に伝達することにより、スライド81の上下動を制御できる。ここで、偏心クランク82aの位置変化をスライド81に伝達する際に発生するコネクティングロッド83の揺動(回転運動)は、回転軸81aによって吸収される。なお、シャフト82は、例えば制御部70によって制御されるモータ等の駆動に応じて回転又は停止する。 Returning to FIG. 1, the drive mechanism 80 includes a slide 81 for moving the upper die 12 so that the upper die 12 and the lower die 11 are aligned with each other, a shaft 82 for generating a driving force for moving the slide 81, and the same. It is provided with a connecting rod 83 for transmitting the driving force generated by the shaft 82 to the slide 81. The shaft 82 extends in the left-right direction above the slide 81 and is rotatably supported, and the eccentric crank 82a that protrudes from the left-right end and extends in the left-right direction at a position separated from the axis thereof. Have. The eccentric crank 82a and the rotating shaft 81a provided on the upper part of the slide 81 and extending in the left-right direction are connected by a connecting rod 83. In the drive mechanism 80, the rotation of the shaft 82 is controlled by the control unit 70 to change the height of the eccentric crank 82a in the vertical direction, and the position change of the eccentric crank 82a is transmitted to the slide 81 via the connecting rod 83. Thereby, the vertical movement of the slide 81 can be controlled. Here, the swing (rotational motion) of the connecting rod 83 generated when the position change of the eccentric crank 82a is transmitted to the slide 81 is absorbed by the rotating shaft 81a. The shaft 82 rotates or stops according to the drive of a motor or the like controlled by, for example, the control unit 70.

加熱機構(電力供給部)50は、電力供給源55、及び、電力供給源55と電極17,18とを電気的に接続する電力供給ライン52を備える。電力供給源55は、直流電源及びスイッチを含み、電力供給ライン52、電極17,18を介して金属パイプ材料14に通電可能になっている。本実施形態では、電力供給ライン52は、下側電極17,18に接続されているが、これに限られない。制御部70は、上記加熱機構50を制御することによって、金属パイプ材料14を焼入れ温度(例えば、AC3変態点温度以上)まで加熱できる。 The heating mechanism (power supply unit) 50 includes a power supply source 55 and a power supply line 52 that electrically connects the power supply source 55 and the electrodes 17 and 18. The power supply source 55 includes a DC power supply and a switch, and can energize the metal pipe material 14 via the power supply line 52 and the electrodes 17 and 18. In the present embodiment, the power supply line 52 is connected to the lower electrodes 17 and 18, but is not limited to this. By controlling the heating mechanism 50, the control unit 70 can heat the metal pipe material 14 to the quenching temperature (for example, AC3 transformation point temperature or higher).

一対の気体供給部40の各々は、ブロック41を介して基台15上に載置固定されるシリンダユニット42と、シリンダユニット42の作動に合わせて進退動するシリンダロッド43と、シリンダロッド43の先端に連結された気体供給ノズル44とを有する。シリンダユニット42は、シリンダロッド43を介して気体供給ノズル44を金属パイプ材料14に対して進退駆動させる部分である。気体供給ノズル44は、パイプ保持機構30にて保持された金属パイプ材料14の内部に連通可能に構成されている部分であり、上記内部に膨張成形のための気体供給を実施する。気体供給ノズル44は、その先端が先細になるように設けられるテーパー面45と、その内部に設けられるガス通路46とを備える。テーパー面45は、電極17,18のテーパー凹面17b,18bに丁度嵌合当接できる形状に構成されている(図2(b)を参照)。テーパー面45は、絶縁材によって構成されてもよい。ガス通路46は、気体供給ユニット60と金属パイプ材料14の内部とをつなぐ気体の通路である。本実施形態では、気体供給ノズル44が金属パイプ材料14の内部に連通されているとき、ガス通路46内の圧力と、金属パイプ材料14の内部圧力とは、互いに同一とみなす。 Each of the pair of gas supply units 40 is a cylinder unit 42 that is placed and fixed on a base 15 via a block 41, a cylinder rod 43 that moves forward and backward according to the operation of the cylinder unit 42, and a cylinder rod 43. It has a gas supply nozzle 44 connected to the tip. The cylinder unit 42 is a portion that drives the gas supply nozzle 44 to move forward and backward with respect to the metal pipe material 14 via the cylinder rod 43. The gas supply nozzle 44 is a portion that is configured to communicate with the inside of the metal pipe material 14 held by the pipe holding mechanism 30, and supplies gas for expansion molding to the inside. The gas supply nozzle 44 includes a tapered surface 45 provided so that its tip is tapered, and a gas passage 46 provided inside the tapered surface 45. The tapered surface 45 is configured so as to be able to fit and contact the tapered concave surfaces 17b and 18b of the electrodes 17 and 18 (see FIG. 2B). The tapered surface 45 may be made of an insulating material. The gas passage 46 is a gas passage connecting the gas supply unit 60 and the inside of the metal pipe material 14. In the present embodiment, when the gas supply nozzle 44 is communicated with the inside of the metal pipe material 14, the pressure in the gas passage 46 and the internal pressure of the metal pipe material 14 are regarded as the same as each other.

気体供給ユニット60は、ガス源61と、このガス源61によって供給されたガスを貯留するアキュムレータ(ガス貯留部)62と、このアキュムレータ62から気体供給部40のシリンダユニット42まで延びている第1チューブ63と、この第1チューブ63に介設されている圧力制御弁64及び切替弁65と、アキュムレータ62から気体供給部40の気体供給ノズル44まで延びている第2チューブ(配管)67と、この第2チューブ67に介設されている圧力制御弁68及び逆止弁69とを有する。圧力制御弁64は、気体供給ノズル44の金属パイプ材料14に対する押力に適応した作動圧力のガスをシリンダユニット42に供給する役割を果たす。逆止弁69は、第2チューブ67内でガスが逆流することを防止する役割を果たす。 The gas supply unit 60 is a first gas source 61, an accumulator (gas storage unit) 62 for storing the gas supplied by the gas source 61, and a first extending from the accumulator 62 to the cylinder unit 42 of the gas supply unit 40. A tube 63, a pressure control valve 64 and a switching valve 65 interposed in the first tube 63, a second tube (pipe) 67 extending from the accumulator 62 to the gas supply nozzle 44 of the gas supply unit 40, and the like. It has a pressure control valve 68 and a check valve 69 interposed in the second tube 67. The pressure control valve 64 serves to supply gas with an operating pressure adapted to the pushing force of the gas supply nozzle 44 against the metal pipe material 14 to the cylinder unit 42. The check valve 69 serves to prevent gas from flowing back in the second tube 67.

圧力制御弁68は、制御部70の制御により、第2チューブ67内の圧力を調節するバルブである。例えば、金属パイプ材料14を仮膨張させるための作動圧力(以下、第1到達圧力とする)を有するガス(以下、低圧ガスとする)と、金属パイプを成形するための作動圧力(以下、第2到達圧力とする)を有するガス(以下、高圧ガスとする)とを、第2チューブ67内に供給する役割を果たす。これにより、第2チューブ67に接続される気体供給ノズル44に低圧ガス及び高圧ガスを供給できる。低圧ガス及び高圧ガスは、それぞれ空気でもよいし、窒素ガス等でもよい。なお、第2到達圧力は、例えば第1到達圧力の約2倍~10倍である。すなわち、第2到達圧力は、第1到達圧力よりも高い。第2到達圧力は、例えば10MPa以上35MPa以下である。 The pressure control valve 68 is a valve that adjusts the pressure in the second tube 67 under the control of the control unit 70. For example, a gas having an operating pressure for temporarily expanding the metal pipe material 14 (hereinafter referred to as a first ultimate pressure) (hereinafter referred to as a low pressure gas) and an operating pressure for forming a metal pipe (hereinafter referred to as a first pressure). It serves to supply the gas having (hereinafter referred to as high pressure gas) having (2) reaching pressure into the second tube 67. As a result, low-pressure gas and high-pressure gas can be supplied to the gas supply nozzle 44 connected to the second tube 67. The low-pressure gas and the high-pressure gas may be air or nitrogen gas, respectively. The second ultimate pressure is, for example, about 2 to 10 times the first ultimate pressure. That is, the second ultimate pressure is higher than the first ultimate pressure. The second ultimate pressure is, for example, 10 MPa or more and 35 MPa or less.

第2チューブ67は、逆止弁69から二股に分岐しており、一方の気体供給部40まで延びる供給ラインL1と、他方の気体供給部40まで延びる供給ラインL2とを有する。供給ラインL1,L2のそれぞれは、対応するガス通路46に接続されている。このため、ガス通路46には気体供給ユニット60からガスが供給される。本実施形態では、供給ラインL1,L2の内部圧力と各ガス通路46の内部圧力とを同一とみなす。 The second tube 67 is bifurcated from the check valve 69 and has a supply line L1 extending to one gas supply unit 40 and a supply line L2 extending to the other gas supply unit 40. Each of the supply lines L1 and L2 is connected to the corresponding gas passage 46. Therefore, gas is supplied to the gas passage 46 from the gas supply unit 60. In the present embodiment, the internal pressures of the supply lines L1 and L2 and the internal pressures of the gas passages 46 are regarded as the same.

また、成形装置10は、第2チューブ67内の圧力を検知する圧力検知部85と、第2チューブ67内の気体を排気する排気機構200とを備える。圧力検知部85は、対応する供給ラインの内部圧力を検知する圧力センサであり、供給ラインL1,L2のそれぞれに取り付けられている。各圧力検知部85は、制御部70に接続されている。上述したように、気体供給ノズル44が金属パイプ材料14の内部に連通されているとき、ガス通路46内の圧力と金属パイプ材料14の内部圧力とは同一とみなされ、且つ、第2チューブ67の内部圧力と各ガス通路46の内部圧力とは同一とみなされる。このため、気体供給ノズル44が金属パイプ材料14の内部に連通されているとき、圧力検知部85は、金属パイプ材料14の内部の圧力を検知すると言える。 Further, the molding apparatus 10 includes a pressure detecting unit 85 that detects the pressure in the second tube 67, and an exhaust mechanism 200 that exhausts the gas in the second tube 67. The pressure detection unit 85 is a pressure sensor that detects the internal pressure of the corresponding supply line, and is attached to each of the supply lines L1 and L2. Each pressure detection unit 85 is connected to a control unit 70. As described above, when the gas supply nozzle 44 is communicated inside the metal pipe material 14, the pressure in the gas passage 46 and the internal pressure of the metal pipe material 14 are considered to be the same, and the second tube 67. The internal pressure of each gas passage 46 is considered to be the same. Therefore, when the gas supply nozzle 44 is communicated with the inside of the metal pipe material 14, it can be said that the pressure detecting unit 85 detects the pressure inside the metal pipe material 14.

排気機構200は、第2チューブ67の内部に収容される気体を排出する機構である。図1においては、排気機構200は、第2チューブ67の供給ラインL1に接続されている。例えば、気体供給ノズル44が金属パイプ材料14の内部に連通されているとき、排気機構200は、ガス通路46内に収容される気体、及び金属パイプ材料14の内部(もしくは成形された金属パイプの内部)に収容される気体も排出する。排気機構200は、排気口201と、バルブ202とを有する。バルブ202は、排気口201と第2チューブ67との間に配置されている。バルブ202の開閉は、制御部70によって制御される。バルブ202は、例えば圧力制御弁でもよい。また、バルブ202より上流には逆止弁が設けられてもよい。なお、供給ラインL2にも排気機構200が接続されている。これにより、金属パイプ材料14の内部に収容される気体を急速に排出できる。 The exhaust mechanism 200 is a mechanism for discharging the gas contained in the second tube 67. In FIG. 1, the exhaust mechanism 200 is connected to the supply line L1 of the second tube 67. For example, when the gas supply nozzle 44 communicates with the inside of the metal pipe material 14, the exhaust mechanism 200 allows the gas contained in the gas passage 46 and the inside of the metal pipe material 14 (or the molded metal pipe). The gas contained in (inside) is also discharged. The exhaust mechanism 200 has an exhaust port 201 and a valve 202. The valve 202 is arranged between the exhaust port 201 and the second tube 67. The opening and closing of the valve 202 is controlled by the control unit 70. The valve 202 may be, for example, a pressure control valve. Further, a check valve may be provided upstream of the valve 202. The exhaust mechanism 200 is also connected to the supply line L2. As a result, the gas contained in the metal pipe material 14 can be rapidly discharged.

制御部70は、圧力検知部85の検知結果等に応じて気体供給ユニット60及び排気機構200を制御する。例えば、制御部70は、金属パイプを成形するとき、低圧ガスもしくは高圧ガスを金属パイプ材料14の内部に供給するために、気体供給ユニット60(例えば、アキュムレータ62及び圧力制御弁68)を制御する。これにより、第2チューブ67内、ガス通路46内、及び金属パイプ材料14の内部が昇圧する。また、制御部70は、金属パイプを成形するとき、金属パイプ材料14の内部圧力が所定の圧力値に到達したことの検知後に高圧ガスの供給を停止するように、気体供給ユニット60を制御する。例えば、第2チューブ67内、ガス通路46内、及び金属パイプ材料14の内部における圧力が同一とみなされる条件にて圧力検知部85が所定の圧力値を検知後、制御部70は、高圧ガスの供給を停止するように気体供給ユニット60を制御する。所定の圧力値は、例えば上述した第1もしくは第2の到達圧力の値である。以下では、上述した第2到達圧力の値もしくは第2到達圧力の90%以上である値を、最大圧力値MP(図5を参照)とする。 The control unit 70 controls the gas supply unit 60 and the exhaust mechanism 200 according to the detection result of the pressure detection unit 85 and the like. For example, when molding a metal pipe, the control unit 70 controls a gas supply unit 60 (for example, an accumulator 62 and a pressure control valve 68) in order to supply a low-pressure gas or a high-pressure gas to the inside of the metal pipe material 14. .. As a result, the pressure inside the second tube 67, the inside of the gas passage 46, and the inside of the metal pipe material 14 are increased. Further, the control unit 70 controls the gas supply unit 60 so as to stop the supply of the high-pressure gas after detecting that the internal pressure of the metal pipe material 14 has reached a predetermined pressure value when molding the metal pipe. .. For example, after the pressure detection unit 85 detects a predetermined pressure value under the condition that the pressures in the second tube 67, the gas passage 46, and the inside of the metal pipe material 14 are considered to be the same, the control unit 70 determines the high pressure gas. The gas supply unit 60 is controlled so as to stop the supply of the gas. The predetermined pressure value is, for example, the value of the first or second ultimate pressure described above. In the following, the value of the second ultimate pressure or the value of 90% or more of the second ultimate pressure described above is referred to as the maximum pressure value MP (see FIG. 5).

金属パイプの成形速度を向上する観点から、金属パイプ材料14の内部圧力が最大圧力値MPに到達したタイミングと、気体供給ユニット60による高圧ガスの供給停止タイミングとの間は、短いほどよい。例えば、制御部70は、金属パイプ材料14の内部圧力が最大圧力値MPに到達したことの検知後、直ちに気体の供給を停止するように、気体供給ユニット60を制御してもよい。換言すると、制御部70は、金属パイプ材料14の内部圧力が最大圧力値MPに到達したことを検知したと同時、もしくは当該検知から1秒以内に、高圧ガスの供給を停止するように気体供給ユニット60を制御してもよい。もしくは、金属パイプ材料14の内部圧力が最大圧力値MPに到達してから高圧ガスの供給が停止するまでの期間(第1期間)は、高圧ガスの供給が開始してから当該内部圧力が最大圧力値MPに到達するまでの期間(第2期間)よりも短くてもよい。 From the viewpoint of improving the molding speed of the metal pipe, the shorter the time between the timing when the internal pressure of the metal pipe material 14 reaches the maximum pressure value MP and the timing when the supply of high-pressure gas is stopped by the gas supply unit 60 is preferable. For example, the control unit 70 may control the gas supply unit 60 so as to stop the gas supply immediately after detecting that the internal pressure of the metal pipe material 14 has reached the maximum pressure value MP. In other words, the control unit 70 supplies gas so as to stop the supply of high-pressure gas at the same time as detecting that the internal pressure of the metal pipe material 14 has reached the maximum pressure value MP, or within 1 second from the detection. The unit 60 may be controlled. Alternatively, during the period from when the internal pressure of the metal pipe material 14 reaches the maximum pressure value MP to when the supply of high-pressure gas is stopped (first period), the internal pressure is maximum after the supply of high-pressure gas starts. It may be shorter than the period until the pressure value MP is reached (second period).

制御部70は、金属パイプ材料14の内部圧力が最大圧力値MPに到達したことの検知後に高圧ガスを排出するように、排気機構200を制御する。例えば、制御部70は、バルブ202を開状態に制御する。これにより、第2チューブ67内、ガス通路46内、及び金属パイプ材料14の内部が急速に減圧される。金属パイプの成形速度を向上する観点から、金属パイプ材料14の内部圧力が最大圧力値MPに到達したタイミングと、排気機構200による排気のタイミングとの間は、短いほどよい。例えば、制御部70は、金属パイプ材料14の内部圧力が最大圧力値MPに到達したことの検知後、直ちに高圧ガスを排出するように排気機構200を制御してもよい。換言すると、制御部70は、金属パイプ材料14の内部圧力が最大圧力値MPに到達したことを検知したと同時、もしくは当該検知から1秒以内に、高圧ガスを排出するように排気機構200を制御してもよい。また、排気機構200による高圧ガスの排気タイミングは、気体供給ユニット60による高圧ガスの供給停止タイミングと同時でもよいし、異なってもよい。高圧ガスの排気タイミングと、高圧ガスの供給停止タイミングとが異なる場合、高圧ガスの排気タイミングは、高圧ガスの供給停止タイミングの後でもよい。 The control unit 70 controls the exhaust mechanism 200 so that the high-pressure gas is discharged after detecting that the internal pressure of the metal pipe material 14 has reached the maximum pressure value MP. For example, the control unit 70 controls the valve 202 in the open state. As a result, the inside of the second tube 67, the inside of the gas passage 46, and the inside of the metal pipe material 14 are rapidly depressurized. From the viewpoint of improving the molding speed of the metal pipe, the shorter the time between the timing when the internal pressure of the metal pipe material 14 reaches the maximum pressure value MP and the timing of exhaust by the exhaust mechanism 200, the better. For example, the control unit 70 may control the exhaust mechanism 200 so as to discharge the high-pressure gas immediately after detecting that the internal pressure of the metal pipe material 14 has reached the maximum pressure value MP. In other words, the control unit 70 sets the exhaust mechanism 200 so as to discharge the high-pressure gas at the same time as detecting that the internal pressure of the metal pipe material 14 has reached the maximum pressure value MP, or within 1 second from the detection. You may control it. Further, the exhaust timing of the high-pressure gas by the exhaust mechanism 200 may be the same as or different from the timing of stopping the supply of the high-pressure gas by the gas supply unit 60. When the high-pressure gas exhaust timing and the high-pressure gas supply stop timing are different, the high-pressure gas exhaust timing may be after the high-pressure gas supply stop timing.

また、制御部70は、図1に示す(A)から情報が伝達されることによって、熱電対21から温度情報を取得し、加熱機構50及び駆動機構80を制御する。水循環機構72は、水を溜める水槽73と、この水槽73に溜まっている水を汲み上げ、加圧して下型11の冷却水通路19及び上型12の冷却水通路25へ送る水ポンプ74と、配管75とを備える。省略したが、水温を下げるクーリングタワーや水を浄化する濾過器を配管75に介在させることは差し支えない。 Further, the control unit 70 acquires temperature information from the thermocouple 21 by transmitting information from (A) shown in FIG. 1, and controls the heating mechanism 50 and the drive mechanism 80. The water circulation mechanism 72 includes a water tank 73 for storing water, a water pump 74 that pumps up the water stored in the water tank 73, pressurizes it, and sends it to the cooling water passage 19 of the lower mold 11 and the cooling water passage 25 of the upper mold 12. It is provided with a pipe 75. Although omitted, it is permissible to interpose a cooling tower that lowers the water temperature or a filter that purifies the water in the pipe 75.

<成形装置を用いた金属パイプの成形方法>
次に、成形装置10を用いた金属パイプの成形方法について図4を用いながら説明する。図4は、金属パイプの成形方法を示すフローチャートである。最初に、焼入れ可能な鋼種の円筒状の金属パイプ材料14を準備する。この金属パイプ材料14を、例えばロボットアーム等を用いて、下側電極17,18上に載置(投入)する。下側電極17,18には凹溝17a,18aが形成されているので、当該凹溝17a,18aによって金属パイプ材料14が位置決めされる。
<Molding method of metal pipe using molding equipment>
Next, a method of forming a metal pipe using the forming apparatus 10 will be described with reference to FIG. FIG. 4 is a flowchart showing a method of forming a metal pipe. First, a hardenable steel grade cylindrical metal pipe material 14 is prepared. The metal pipe material 14 is placed (loaded) on the lower electrodes 17 and 18 using, for example, a robot arm. Since the concave grooves 17a and 18a are formed in the lower electrodes 17 and 18, the metal pipe material 14 is positioned by the concave grooves 17a and 18a.

次に、制御部70による駆動機構80及びパイプ保持機構30の制御によって、パイプ保持機構30に金属パイプ材料14を保持させる(ステップS1)。ステップS1では、駆動機構80の駆動によりスライド81側に保持されている上型12及び上側電極17,18等が下型11側に移動すると共に、パイプ保持機構30に含まれる上側電極17,18等及び下側電極17,18等を進退動可能としているアクチュエータを作動させることによって、金属パイプ材料14の両方の端部付近を上下からパイプ保持機構30により挟持する。この挟持は、電極17,18に形成される凹溝17a,18a、及び絶縁材91,101に形成される凹溝の存在によって、金属パイプ材料14の両端部付近の全周に渡って密着するような態様で実施される。 Next, the pipe holding mechanism 30 holds the metal pipe material 14 under the control of the drive mechanism 80 and the pipe holding mechanism 30 by the control unit 70 (step S1). In step S1, the upper mold 12, the upper electrodes 17, 18 and the like held on the slide 81 side are moved to the lower mold 11 side by driving the drive mechanism 80, and the upper electrodes 17, 18 included in the pipe holding mechanism 30 are moved. By operating an actuator that allows the lower electrodes 17, 18 and the like to move forward and backward, the vicinity of both ends of the metal pipe material 14 is sandwiched by the pipe holding mechanism 30 from above and below. This pinch is brought into close contact with the metal pipe material 14 over the entire circumference near both ends due to the presence of the concave grooves 17a and 18a formed in the electrodes 17 and 18 and the concave grooves formed in the insulating materials 91 and 101. It is carried out in such an embodiment.

このとき、図2(a)に示されるように、金属パイプ材料14の電極18側の端部は、金属パイプ材料14の延在方向において、電極18の凹溝18aとテーパー凹面18bとの境界よりも気体供給ノズル44側に突出している。同様に、金属パイプ材料14の電極17側の端部は、金属パイプ材料14の延在方向において、電極17の凹溝17aとテーパー凹面17bとの境界よりも気体供給ノズル44側に突出している。また、上側電極17,18の下面と下側電極17,18の上面とは、それぞれ互いに接触している。ただし、金属パイプ材料14の両端部全周に渡って密着する構成に限られず、金属パイプ材料14の周方向における一部に電極17,18が当接するような構成であってもよい。 At this time, as shown in FIG. 2A, the end portion of the metal pipe material 14 on the electrode 18 side is a boundary between the concave groove 18a of the electrode 18 and the tapered concave surface 18b in the extending direction of the metal pipe material 14. It protrudes toward the gas supply nozzle 44. Similarly, the end portion of the metal pipe material 14 on the electrode 17 side protrudes toward the gas supply nozzle 44 from the boundary between the concave groove 17a and the tapered concave surface 17b of the electrode 17 in the extending direction of the metal pipe material 14. .. Further, the lower surfaces of the upper electrodes 17 and 18 and the upper surfaces of the lower electrodes 17 and 18 are in contact with each other, respectively. However, the configuration is not limited to the structure in which the metal pipe material 14 is in close contact with the entire circumference of both ends, and the electrodes 17 and 18 may be in contact with a part of the metal pipe material 14 in the circumferential direction.

次に、制御部70による加熱機構50の制御によって、金属パイプ材料14を通電加熱する(ステップS2)。ステップS2では、制御部70が電力供給部として機能する加熱機構50を制御することによって、金属パイプ材料14に電力を供給する。すると、電力供給ライン52を介して下側電極17,18に伝達される電力が、金属パイプ材料14を挟持している上側電極17,18及び金属パイプ材料14に供給される。そして、金属パイプ材料14自身の電気抵抗により、金属パイプ材料14自体がジュール熱によって発熱する。ステップS2では、熱電対21の測定値が常に監視され、この結果に基づいて通電が制御されてもよい。なお、金属パイプ材料14を通電加熱する前等に、上型12を下型11側に近づけてもよい。 Next, the metal pipe material 14 is energized and heated by the control of the heating mechanism 50 by the control unit 70 (step S2). In step S2, the control unit 70 supplies electric power to the metal pipe material 14 by controlling the heating mechanism 50 that functions as the electric power supply unit. Then, the electric power transmitted to the lower electrodes 17 and 18 via the power supply line 52 is supplied to the upper electrodes 17 and 18 and the metal pipe material 14 sandwiching the metal pipe material 14. Then, due to the electric resistance of the metal pipe material 14 itself, the metal pipe material 14 itself generates heat due to Joule heat. In step S2, the measured value of the thermocouple 21 is constantly monitored, and the energization may be controlled based on this result. The upper mold 12 may be brought closer to the lower mold 11 side before the metal pipe material 14 is energized and heated.

次に、気体供給部40のシリンダユニット42を作動させることによって、気体供給ノズル44を前進させ、金属パイプ材料14の両端に気体供給ノズル44を挿入する(ステップS3)。ステップS3では、各気体供給ノズル44の先端部44Aを金属パイプ材料14の両端に挿入してシールする。これにより、金属パイプ材料14の内部と、ガス通路46とが、気密性よく連通する。ステップS3では、図2(b)に示されるように、金属パイプ材料14において電極17,18から気体供給ノズル44に向かって突出している端部に対して、気体供給ノズル44が押し付けられる。これにより、上記端部が、テーパー凹面17b,18bに沿うように漏斗状に変形する。同様に、金属パイプ材料14における上記端部と反対側の端部もまた、漏斗状に変形する。 Next, by operating the cylinder unit 42 of the gas supply unit 40, the gas supply nozzle 44 is advanced, and the gas supply nozzles 44 are inserted into both ends of the metal pipe material 14 (step S3). In step S3, the tip portions 44A of each gas supply nozzle 44 are inserted into both ends of the metal pipe material 14 and sealed. As a result, the inside of the metal pipe material 14 and the gas passage 46 communicate with each other with good airtightness. In step S3, as shown in FIG. 2B, the gas supply nozzle 44 is pressed against the end of the metal pipe material 14 protruding from the electrodes 17 and 18 toward the gas supply nozzle 44. As a result, the end portion is deformed into a funnel shape along the tapered concave surfaces 17b and 18b. Similarly, the end of the metal pipe material 14 opposite to the end is also deformed into a funnel shape.

次に、制御部70による気体供給ユニット60及び駆動機構80の制御によって、加熱後の金属パイプ材料14を成形金型13によって膨張成形する(ステップS4)。ステップS4では、成形金型13を閉じると共に、ガスを金属パイプ材料14内へ吹き込む。これにより、加熱により軟化した金属パイプ材料14が膨張して成形金型13と接触する。そして、金属パイプ材料14は、成形金型13のキャビティ部の形状に沿うように成形される(具体的な金属パイプ材料14の成形方法については後述する)。 Next, the heated metal pipe material 14 is expanded and molded by the molding die 13 under the control of the gas supply unit 60 and the drive mechanism 80 by the control unit 70 (step S4). In step S4, the molding die 13 is closed and gas is blown into the metal pipe material 14. As a result, the metal pipe material 14 softened by heating expands and comes into contact with the molding die 13. Then, the metal pipe material 14 is molded so as to follow the shape of the cavity portion of the molding die 13 (a specific molding method of the metal pipe material 14 will be described later).

ブロー成形されて膨らんだ金属パイプ材料14の外周面が下型11のキャビティ16に接触して急冷されると同時に、上型12のキャビティ24に接触して急冷(上型12と下型11は熱容量が大きく且つ低温に管理されているため、金属パイプ材料14が接触すればパイプ表面の熱が一気に金型側へと奪われる。)されることによって、金属パイプ材料14の焼き入れが実施される。このような冷却法は、金型接触冷却又は金型冷却と呼ばれる。急冷された直後はオーステナイトがマルテンサイトに変態する(以下、オーステナイトがマルテンサイトに変態することをマルテンサイト変態とする)。冷却の後半は冷却速度が小さくなったので、復熱によりマルテンサイトが別の組織(トルースタイト、ソルバイト等)に変態する。従って、別途焼戻し処理を行う必要がない。また、本実施形態においては、金型冷却に代えて、あるいは金型冷却に加えて、冷却媒体を例えばキャビティ24内に供給することによって冷却が行われてもよい。例えば、マルテンサイト変態が始まる温度までは金型(上型12及び下型11)に金属パイプ材料14を接触させて冷却し、その後型開きすると共に冷却媒体(冷却用気体)を金属パイプ材料14へ吹き付けることにより、マルテンサイト変態を発生させてもよい。 The outer peripheral surface of the blow-molded and swollen metal pipe material 14 contacts the cavity 16 of the lower mold 11 and is rapidly cooled, and at the same time, it contacts the cavity 24 of the upper mold 12 and is rapidly cooled (the upper mold 12 and the lower mold 11 are quenched). Since the heat capacity is large and controlled at a low temperature, if the metal pipe material 14 comes into contact with the metal pipe material 14, the heat on the pipe surface is taken away to the mold side at once), so that the metal pipe material 14 is hardened. To. Such a cooling method is called mold contact cooling or mold cooling. Immediately after being quenched, austenite transforms into martensite (hereinafter, the transformation of austenite into martensite is referred to as martensitic transformation). Since the cooling rate decreased in the latter half of cooling, martensite transforms into another structure (troostite, sorbite, etc.) by reheating. Therefore, it is not necessary to perform a separate tempering process. Further, in the present embodiment, cooling may be performed by supplying a cooling medium, for example, into the cavity 24, instead of cooling the mold or in addition to cooling the mold. For example, the metal pipe material 14 is brought into contact with the mold (upper mold 12 and lower mold 11) to cool until the temperature at which the martensitic transformation begins, and then the mold is opened and the cooling medium (cooling gas) is used as the metal pipe material 14. Martensitic transformation may be generated by spraying on.

次に、図5、図6(a),(b)及び図7(a),(b)を参照して、成形金型13による具体的な成形の様子の一例について詳細に説明する。図5は、本実施形態に係る金属パイプの成形工程のタイミングチャートである。図5において、縦軸は金属パイプ材料内もしくは金属パイプ内の圧力を示し、横軸は時間を示す。図5に示される期間T1では、上記ステップS1~S3が実施され、期間T2~T6にて上記ステップS4が実施される(図4を参照)。 Next, an example of a specific molding by the molding die 13 will be described in detail with reference to FIGS. 5, 6 (a) and 6 (b) and FIGS. 7 (a) and 7 (b). FIG. 5 is a timing chart of the metal pipe molding process according to the present embodiment. In FIG. 5, the vertical axis shows the pressure in the metal pipe material or the metal pipe, and the horizontal axis shows the time. In the period T1 shown in FIG. 5, the steps S1 to S3 are carried out, and in the periods T2 to T6, the steps S4 are carried out (see FIG. 4).

まず、期間T1にて、パイプ保持機構30にて保持された金属パイプ材料14を、上型12のキャビティ24と下型11のキャビティ16との間に準備する。続いて、駆動機構80によって上型12を下型11側に移動させることによって、成形金型13と金属パイプ材料14との位置関係を調整する(図6(a)を参照)。このとき、上型12の第2突起12cと下型11の第2突起11cとの間の距離は、D1である。続いて、金属パイプ材料14を通電加熱することによって、金属パイプ材料14を軟化させる。そして、気体供給ノズル44を金属パイプ材料14の端部に挿入する。本実施形態では、期間T1にて金属パイプ材料14の温度が950℃前後まで上昇する。なお、本実施形態では、期間T1のみにて金属パイプ材料14を通電加熱するので、後述する期間T2以降にて、金属パイプ材料14の温度は低下する。 First, during the period T1, the metal pipe material 14 held by the pipe holding mechanism 30 is prepared between the cavity 24 of the upper mold 12 and the cavity 16 of the lower mold 11. Subsequently, the upper mold 12 is moved to the lower mold 11 side by the drive mechanism 80 to adjust the positional relationship between the molding die 13 and the metal pipe material 14 (see FIG. 6A). At this time, the distance between the second protrusion 12c of the upper mold 12 and the second protrusion 11c of the lower mold 11 is D1. Subsequently, the metal pipe material 14 is softened by energizing and heating the metal pipe material 14. Then, the gas supply nozzle 44 is inserted into the end portion of the metal pipe material 14. In the present embodiment, the temperature of the metal pipe material 14 rises to around 950 ° C. during the period T1. In this embodiment, since the metal pipe material 14 is energized and heated only during the period T1, the temperature of the metal pipe material 14 drops after the period T2, which will be described later.

また、期間T1の終了間際にて、駆動機構80によって上型12を下型11側にさらに移動させる。これにより、図6(b)に示されるように、上型12と下型11とを完全に閉じず、上型12の第2突起12cと下型11の第2突起11cとの間の距離をD2(D2<D1)にする。このとき、金属パイプ材料14の一部は、上型12と下型11とに接触して圧縮する。これにより、下型11の第1突起11bと上型12の第1突起12bとの間、及び、下型11の第2突起11cと上型12の第2突起12cとの間に、金属パイプ材料14の一部14b,14cが張り出す。金属パイプ材料14の一部14b,14cは、後にフランジ部になる部分である。なお、期間T1の終了間際とは、例えば期間T2の開始時の1秒前から数秒前である。また、期間T1の終了間際の時点までにて、金属パイプ材料14の通電加熱は終了してもよい。 Further, just before the end of the period T1, the upper mold 12 is further moved to the lower mold 11 side by the drive mechanism 80. As a result, as shown in FIG. 6B, the upper die 12 and the lower die 11 are not completely closed, and the distance between the second protrusion 12c of the upper die 12 and the second protrusion 11c of the lower die 11 is reached. Is set to D2 (D2 <D1). At this time, a part of the metal pipe material 14 comes into contact with the upper mold 12 and the lower mold 11 and is compressed. As a result, a metal pipe is provided between the first protrusion 11b of the lower mold 11 and the first protrusion 12b of the upper mold 12, and between the second protrusion 11c of the lower mold 11 and the second protrusion 12c of the upper mold 12. Part 14b, 14c of the material 14 overhangs. A part 14b, 14c of the metal pipe material 14 is a part that later becomes a flange portion. The end of the period T1 is, for example, from 1 second to several seconds before the start of the period T2. Further, the energization heating of the metal pipe material 14 may be completed by the time just before the end of the period T1.

次に、図5に示される期間T2にて、加熱された金属パイプ材料14に低圧ガスを供給する。期間T2では、アキュムレータ62から第2チューブ67及びガス通路46を介して、低圧ガスを金属パイプ材料14内に供給する。このような低圧ガスの供給により、金属パイプ材料14の本体部14aは、キャビティ16,24によって囲まれた空間にて膨張する。また、金属パイプ材料14の一部14b,14cも膨張する(図7(a)を参照)。期間T2以降では、上述した金属パイプ材料14の焼き入れも実施される。 Next, the low pressure gas is supplied to the heated metal pipe material 14 during the period T2 shown in FIG. In period T2, low pressure gas is supplied from the accumulator 62 through the second tube 67 and the gas passage 46 into the metal pipe material 14. Due to the supply of such low pressure gas, the main body portion 14a of the metal pipe material 14 expands in the space surrounded by the cavities 16 and 24. Further, a part 14b and 14c of the metal pipe material 14 also expands (see FIG. 7A). After the period T2, quenching of the metal pipe material 14 described above is also carried out.

次に、図5に示される期間T3にて、低圧ガスの供給を停止する。期間T3では、例えば圧力制御弁68を閉塞することによって、低圧ガスの供給を停止する。また、期間T3の終了間際にて、駆動機構80によって上型12を下型11側にさらに移動させる。これにより、下型11の第1突起11bと上型12の第1突起12bとの間に位置する金属パイプ材料14の一部14a、及び、下型11の第2突起11cと上型12の第2突起12cとの間に位置する金属パイプ材料14の一部14aが押圧される。そして、金属パイプ100のフランジ部100b,100c(図7(b)を参照)が成形される。フランジ部100b,100cは、金属パイプ材料14の長手方向に沿って、金属パイプ材料14の一部が折り畳まれて成形された部分である。なお、期間T3の終了間際とは、例えば期間T4の開始時の1秒前から数秒前である。 Next, the supply of the low pressure gas is stopped at the period T3 shown in FIG. In the period T3, the supply of the low pressure gas is stopped, for example, by closing the pressure control valve 68. Further, just before the end of the period T3, the upper mold 12 is further moved to the lower mold 11 side by the drive mechanism 80. As a result, a part 14a of the metal pipe material 14 located between the first protrusion 11b of the lower mold 11 and the first protrusion 12b of the upper mold 12, and the second protrusion 11c and the upper mold 12 of the lower mold 11 A part 14a of the metal pipe material 14 located between the second protrusion 12c and the second protrusion 12c is pressed. Then, the flange portions 100b and 100c of the metal pipe 100 (see FIG. 7B) are formed. The flange portions 100b and 100c are portions formed by folding a part of the metal pipe material 14 along the longitudinal direction of the metal pipe material 14. The end of the period T3 is, for example, from 1 second to several seconds before the start of the period T4.

次に、図5に示される期間T4にて、加熱された金属パイプ材料14内に高圧ガスを供給する。期間T4では、アキュムレータ62から第2チューブ67及びガス通路46を介して、高圧ガスを金属パイプ材料14の内部に供給する。このような高圧ガスの供給により、金属パイプ材料14の本体部14aは、キャビティ16,24に沿うように膨張し、中空形状を呈するパイプ部100aが成形される。期間T4の終了タイミングは、制御部70が圧力検知部85を介して最大圧力値MP(図5を参照、第2到達圧力とも言う)を検知するタイミングである。すなわち、期間T4では、制御部70が圧力検知部85を介して最大圧力値MPを検知するまで、高圧ガスが金属パイプ材料14の内部に供給される。本実施形態では、期間T4は、例えば少なくとも2秒以上である。 Next, during the period T4 shown in FIG. 5, a high-pressure gas is supplied into the heated metal pipe material 14. In period T4, high pressure gas is supplied from the accumulator 62 to the inside of the metal pipe material 14 via the second tube 67 and the gas passage 46. By supplying such a high-pressure gas, the main body portion 14a of the metal pipe material 14 expands along the cavities 16 and 24, and the pipe portion 100a exhibiting a hollow shape is formed. The end timing of the period T4 is a timing at which the control unit 70 detects the maximum pressure value MP (see FIG. 5, also referred to as a second ultimate pressure) via the pressure detection unit 85. That is, in the period T4, the high-pressure gas is supplied to the inside of the metal pipe material 14 until the control unit 70 detects the maximum pressure value MP via the pressure detection unit 85. In this embodiment, the period T4 is, for example, at least 2 seconds or longer.

次に、図5に示される期間T5にて、制御部70が圧力検知部85を介して最大圧力値MPの検知後、気体供給ユニット60による高圧ガスの供給を停止する。例えば、制御部70による制御にしたがって、アキュムレータ62からの高圧ガスの供給が停止すると共に圧力制御弁68が閉塞される。この期間T5は、少なくとも期間T4よりも短くなるように設定される。本実施形態では、期間T5は、3秒以内である。 Next, during the period T5 shown in FIG. 5, the control unit 70 stops the supply of high-pressure gas by the gas supply unit 60 after detecting the maximum pressure value MP via the pressure detection unit 85. For example, according to the control by the control unit 70, the supply of the high-pressure gas from the accumulator 62 is stopped and the pressure control valve 68 is closed. This period T5 is set to be at least shorter than the period T4. In this embodiment, the period T5 is within 3 seconds.

次に、図5に示される期間T6にて、パイプ部100a内に収容される高圧ガスを排出する。期間T6では、排気機構200のバルブ202を開放することによって、排気口201から高圧ガスを排出する。例えば、期間T6における変曲点IPにて排気機構200のバルブ202が開放される。変曲点IPより後ではパイプ部100a内からガスが排出されるので、圧力が急速に低下する。なお、期間T6の開始タイミングから変曲点IPまでの期間における圧力低下は、金属パイプ100の温度低下に伴ったパイプ部100a内に収容されるガスの温度低下を主因としたものと推察される。 Next, during the period T6 shown in FIG. 5, the high-pressure gas contained in the pipe portion 100a is discharged. In the period T6, the high-pressure gas is discharged from the exhaust port 201 by opening the valve 202 of the exhaust mechanism 200. For example, the valve 202 of the exhaust mechanism 200 is opened at the inflection point IP in the period T6. After the inflection point IP, the gas is discharged from the pipe portion 100a, so that the pressure drops rapidly. It is presumed that the pressure drop during the period from the start timing of the period T6 to the inflection point IP is mainly due to the temperature drop of the gas contained in the pipe portion 100a accompanying the temperature drop of the metal pipe 100. ..

以上に説明した期間T1~T6を経ることによって、パイプ部100a及びフランジ部100b,100cを有する金属パイプ100を仕上げることができる。これら金属パイプ材料14のブロー成形から金属パイプ100の成形完了までに至るまでの時間は、金属パイプ材料14の種類にもよるが、例えば約数十秒である。なお、上述した期間T6にて高圧ガスを排出することによって、単に成形金型13にて金属パイプ100を冷却することと比較して、金属パイプ100の温度を低下できる。したがって、期間T6後、直ちに金属パイプ100を成形装置10から回収可能な温度(例えば、100℃~200℃)に設定できる。 By passing through the periods T1 to T6 described above, the metal pipe 100 having the pipe portion 100a and the flange portions 100b and 100c can be finished. The time from blow molding of the metal pipe material 14 to completion of molding of the metal pipe 100 is, for example, about several tens of seconds, although it depends on the type of the metal pipe material 14. By discharging the high-pressure gas during the above-mentioned period T6, the temperature of the metal pipe 100 can be lowered as compared with simply cooling the metal pipe 100 with the molding die 13. Therefore, immediately after the period T6, the metal pipe 100 can be set to a temperature (for example, 100 ° C. to 200 ° C.) that can be recovered from the molding apparatus 10.

図7(b)に示す例では、キャビティ16,24は断面矩形状に構成されているため、金属パイプ材料14は当該形状に合わせてブロー成形されることにより、パイプ部100aは矩形筒状に成形される。ただし、キャビティ16,24の形状を変更することによって、断面円形、断面楕円形、断面多角形等あらゆる形状を呈するパイプ部を成形してもよい。 In the example shown in FIG. 7B, since the cavities 16 and 24 are configured to have a rectangular cross section, the metal pipe material 14 is blow-molded according to the shape, so that the pipe portion 100a has a rectangular tubular shape. It is molded. However, by changing the shapes of the cavities 16 and 24, a pipe portion having any shape such as a circular cross section, an elliptical cross section, and a polygonal cross section may be formed.

<作用効果>
次に、本実施形態に係る成形装置10及び成形装置10を用いた金属パイプ100の成形方法の作用効果について、下記に示す比較例に係る成形方法を用いながら説明する。比較例に係る成形方法は、上記特許文献1にて開示される成形方法と同様である。図8は、比較例に係る金属パイプの成形工程のタイミングチャートである。図8に示されるように、比較例に係る成形方法では、期間T5,T6の代わりに期間T11,T12が設定されている。図8に示される期間T11では、パイプ部100a内の圧力を最大圧力値MPに保持している。期間T11では、パイプ部100a内に対して高圧ガスを連続的もしくは間欠的に供給する。期間T11は、期間T3,T4よりも長くなるように設定されている。また、図8に示される期間T12では、高圧ガスの供給を停止する。上記比較例では、パイプ部100aの焼き入れを確実に実施する観点から、期間T12は、期間T11よりも長くなるように設定されている。そして期間T12後、パイプ部100a内のガスを排出している。上記比較例では、期間T11は例えば10秒前後に設定される。
<Action effect>
Next, the operation and effect of the molding apparatus 10 and the molding method of the metal pipe 100 using the molding apparatus 10 according to the present embodiment will be described with reference to the molding method according to the comparative example shown below. The molding method according to the comparative example is the same as the molding method disclosed in Patent Document 1. FIG. 8 is a timing chart of a metal pipe molding process according to a comparative example. As shown in FIG. 8, in the molding method according to the comparative example, the periods T11 and T12 are set instead of the periods T5 and T6. In the period T11 shown in FIG. 8, the pressure in the pipe portion 100a is held at the maximum pressure value MP. In the period T11, the high-pressure gas is continuously or intermittently supplied to the inside of the pipe portion 100a. The period T11 is set to be longer than the periods T3 and T4. Further, during the period T12 shown in FIG. 8, the supply of the high-pressure gas is stopped. In the above comparative example, the period T12 is set to be longer than the period T11 from the viewpoint of surely quenching the pipe portion 100a. Then, after the period T12, the gas in the pipe portion 100a is discharged. In the above comparative example, the period T11 is set to, for example, around 10 seconds.

従来では、上記特許文献1に記載されるような成形装置にて金型の形状に良好に沿った金属パイプを成形するためには、金属パイプ材料の内部圧力をある程度の期間、高圧に維持することが肝要であると考えられていた。このため従来では、上述した比較例のように、金属パイプ材料14の内部圧力を最大圧力値MPに維持する期間T11が設定されていた。しかしながら、さらに検討を進めることによって、成形された金属パイプの形状は、金属パイプ材料の内部圧力の最大値に大きく依存することが見出された。換言すると、金属パイプ材料の膨張度合は、金属パイプ材料の内部圧力の最大値に大きく依存することが見出された。また、内部圧力を所定の最大値に維持して金属パイプ材料を焼き入れしたときの金属パイプの形状と、内部圧力が所定の最大値に到達した後は内部圧力を低下させながら金属パイプ材料を焼き入れしたときの金属パイプの形状とは、互いにほぼ同一であったことも見出された。よって、上記内部圧力を高圧に保持することは、内部圧力の最大値の設定と比較すると、金属パイプの焼き入れへの影響が小さいことが見出された。 Conventionally, in order to form a metal pipe that closely conforms to the shape of a mold with a molding apparatus as described in Patent Document 1, the internal pressure of the metal pipe material is maintained at a high pressure for a certain period of time. It was thought that this was essential. Therefore, conventionally, as in the above-mentioned comparative example, the period T11 for maintaining the internal pressure of the metal pipe material 14 at the maximum pressure value MP has been set. However, further studies have found that the shape of the molded metal pipe largely depends on the maximum value of the internal pressure of the metal pipe material. In other words, it was found that the degree of expansion of the metal pipe material largely depends on the maximum value of the internal pressure of the metal pipe material. In addition, the shape of the metal pipe when the metal pipe material is hardened while maintaining the internal pressure at the predetermined maximum value, and after the internal pressure reaches the predetermined maximum value, the metal pipe material is reduced while reducing the internal pressure. It was also found that the shapes of the metal pipes at the time of quenching were almost the same as each other. Therefore, it was found that maintaining the internal pressure at a high pressure has a small effect on the quenching of the metal pipe as compared with the setting of the maximum value of the internal pressure.

これらの知見に基づいてなされた本実施形態に係る成形装置10を用いた金属パイプ100の成形方法では、金属パイプ材料14の内部圧力を最大圧力値MPに保持しなくてもよい。これにより、上記比較例と異なり期間T11を省略できるので、上記内部圧力が最大圧力値MPに到達してから高圧ガスの供給が停止するまでの期間を短く設定できる。したがって本実施形態によれば、金属パイプ100の成形時間を短縮できる。例えば、本実施形態は、上記比較例と比較して、金属パイプ100の成形時間を約10秒短縮できる。加えて、上記比較例と異なり期間T11を省略することによって、高圧ガスの供給に伴うエネルギーの消費量を低減できる。したがって、従来よりも低コストにて金属パイプ100を成形できる。 In the method for forming the metal pipe 100 using the forming apparatus 10 according to the present embodiment based on these findings, it is not necessary to keep the internal pressure of the metal pipe material 14 at the maximum pressure value MP. As a result, unlike the comparative example, the period T11 can be omitted, so that the period from when the internal pressure reaches the maximum pressure value MP to when the supply of the high-pressure gas is stopped can be set short. Therefore, according to the present embodiment, the molding time of the metal pipe 100 can be shortened. For example, in this embodiment, the molding time of the metal pipe 100 can be shortened by about 10 seconds as compared with the above comparative example. In addition, unlike the above comparative example, by omitting the period T11, the energy consumption associated with the supply of the high-pressure gas can be reduced. Therefore, the metal pipe 100 can be formed at a lower cost than before.

加えて本実施形態では、制御部70は、期間T5が期間T4よりも短くなるように、気体供給ユニット60の高圧ガス供給を制御する。このため、例えば気体供給ユニット60による高圧ガスの単位時間あたりの供給量を高めることによって、期間T4を短縮できる。これに伴って、期間T5をさらに短縮できる。 In addition, in the present embodiment, the control unit 70 controls the high-pressure gas supply of the gas supply unit 60 so that the period T5 is shorter than the period T4. Therefore, for example, the period T4 can be shortened by increasing the supply amount of the high-pressure gas per unit time by the gas supply unit 60. Along with this, the period T5 can be further shortened.

本実施形態では、成形装置10は、金属パイプ100の内部に収容される高圧ガスを排出する排気機構200を備え、制御部70は、内部圧力が最大圧力値MPに到達したことの検知後に高圧ガスを排出するように、排気機構200を制御する。このような排気機構200を用いて金属パイプ100の内部に収容される高圧ガスを積極的に排出することにより、金属パイプを迅速に冷却できる。このため、金属パイプ100の成形時間を良好に短縮できる。 In the present embodiment, the molding apparatus 10 includes an exhaust mechanism 200 that discharges high-pressure gas contained inside the metal pipe 100, and the control unit 70 detects that the internal pressure reaches the maximum pressure value MP, and then the pressure is high. The exhaust mechanism 200 is controlled so as to exhaust the gas. By positively discharging the high-pressure gas contained in the metal pipe 100 by using such an exhaust mechanism 200, the metal pipe can be cooled quickly. Therefore, the molding time of the metal pipe 100 can be satisfactorily shortened.

<変形例>
以下では、上記実施形態の変形例に係る成形装置について説明する。当該変形例の説明において上記実施形態と重複する記載は省略し、上記実施形態と異なる部分を記載する。
<Modification example>
Hereinafter, the molding apparatus according to the modified example of the above embodiment will be described. In the description of the modification, the description overlapping with the above embodiment will be omitted, and the part different from the above embodiment will be described.

図9は、変形例に係る金属パイプの成形工程のタイミングチャートである。図9に示されるように、変形例に係る成形方法では、期間T5,T6の代わりに期間T21が設定されている。期間T21では、パイプ部100aの内部圧力が最大圧力値MPに到達した後、パイプ部100a内に収容される高圧ガスを排出する期間である。期間T21では、期間T4後直ちに高圧ガスの供給が停止されると共に、パイプ部100a内に収容される高圧ガスが排出される。本変形例では、高圧ガスの供給停止と、パイプ部100a内の高圧ガスの排出開始とが同時に実施されるように、制御部70は、気体供給ユニット60のアキュムレータ6及び圧力制御弁68と、排気機構200とを制御する。なお、期間T21では圧力が一定的に減少しているが、これに限られない。 FIG. 9 is a timing chart of a metal pipe molding process according to a modified example. As shown in FIG. 9, in the molding method according to the modified example, the period T21 is set instead of the periods T5 and T6. The period T21 is a period in which the high-pressure gas contained in the pipe portion 100a is discharged after the internal pressure of the pipe portion 100a reaches the maximum pressure value MP. In the period T21, the supply of the high-pressure gas is stopped immediately after the period T4, and the high-pressure gas contained in the pipe portion 100a is discharged. In this modification, the control unit 70 includes the accumulator 6 of the gas supply unit 60 and the pressure control valve 68 so that the supply of the high-pressure gas is stopped and the discharge of the high-pressure gas in the pipe unit 100a is started at the same time. It controls the exhaust mechanism 200. The pressure is constantly decreasing during the period T21, but the pressure is not limited to this.

このような変形例においても、上記実施形態と同様の実施効果が奏される。加えて、高圧ガスの供給停止タイミングと、高圧ガスの排出開始タイミングとを最大限近づけることによって、金属パイプ100のさらなる生産性向上が可能である。 Even in such a modified example, the same implementation effect as that of the above embodiment is obtained. In addition, the productivity of the metal pipe 100 can be further improved by bringing the timing of stopping the supply of the high-pressure gas and the timing of starting the discharge of the high-pressure gas as close as possible.

以上、本発明の好適な実施形態について説明したが、本発明は上記実施形態及び上記変形例に何ら限定されるものではない。例えば、上記実施形態における成形装置は加熱機構を必ずしも有していなくてもよく、金属パイプ材料はすでに加熱されていてもよい。また、上記実施形態及び上記変形例においては、フランジ部を有する金属パイプが成形されているが、これに限られない。上記実施形態及び上記変形例では、成形装置に装着される金型の形状に応じて、種々の形状を呈する金属パイプを成形できる。なお、金属パイプがフランジ部を有さない場合、金属パイプ材料に対する低圧ガスの供給を省略してもよい。 Although the preferred embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment and the above-mentioned modification. For example, the molding apparatus in the above embodiment does not necessarily have a heating mechanism, and the metal pipe material may already be heated. Further, in the above-described embodiment and the above-mentioned modification, a metal pipe having a flange portion is formed, but the present invention is not limited to this. In the above embodiment and the above modification, metal pipes having various shapes can be molded according to the shape of the mold mounted on the molding apparatus. When the metal pipe does not have a flange portion, the supply of the low pressure gas to the metal pipe material may be omitted.

上記実施形態及び上記変形例では、第2チューブが有する一対の供給ラインの両方に排気機構が取り付けられるが、これに限られない。排気機構は、上記一対の供給ラインの一方のみに取り付けられてもよい。加えて、圧力検知部もまた上記一対の供給ラインの一方のみに取り付けられてもよい。もしくは、圧力検知部は、第2チューブ内の圧力を検知しなくてもよい。例えば、圧力検知部は、ガス通路もしくは金属パイプ材料の内部の圧力を直接検知できる態様でもよい。 In the above embodiment and the above modification, the exhaust mechanism is attached to both of the pair of supply lines included in the second tube, but the present invention is not limited to this. The exhaust mechanism may be attached to only one of the pair of supply lines. In addition, the pressure detector may also be attached to only one of the pair of supply lines. Alternatively, the pressure detecting unit does not have to detect the pressure in the second tube. For example, the pressure detecting unit may be in a mode in which the pressure inside the gas passage or the metal pipe material can be directly detected.

上記実施形態及び上記変形例において、第2チューブとガス通路との間にはバルブなどが設けられてもよい。この場合、第2チューブ内に予め低圧ガス及び高圧ガスを供給できるので、金属パイプ材料の成形時間を短縮できる。第2チューブ内に予め低圧ガス及び高圧ガスを供給する場合、圧力検知部はガス通路もしくは金属パイプ材料の内部の圧力を検知できる態様であればよい。 In the above embodiment and the above modification, a valve or the like may be provided between the second tube and the gas passage. In this case, since the low-pressure gas and the high-pressure gas can be supplied in advance into the second tube, the molding time of the metal pipe material can be shortened. When the low-pressure gas and the high-pressure gas are supplied into the second tube in advance, the pressure detecting unit may be in a manner capable of detecting the pressure inside the gas passage or the metal pipe material.

上記実施形態及び上記変形例では、ガス源は、高圧ガスを供給するための高圧ガス源と、低圧ガスを供給するための低圧ガス源との両方を有してもよい。 In the above-described embodiment and the above-mentioned modification, the gas source may have both a high-pressure gas source for supplying a high-pressure gas and a low-pressure gas source for supplying a low-pressure gas.

10…成形装置、11…下型、12…上型、13…成形金型、14…金属パイプ材料、30…パイプ保持機構、40…気体供給部、42…シリンダユニット、44…気体供給ノズル、46…ガス通路、50…加熱機構、60…気体供給ユニット、61…ガス源、62…アキュムレータ、63…第1チューブ、67…第2チューブ、68…圧力制御弁、70…制御部、80…駆動機構、85…圧力検知部、100…金属パイプ、100a…パイプ部、100b,100c…フランジ部、200…排気機構、201…排気口、202…バルブ、L1,L2…供給ライン、T1~T6,T11,T12,T21…期間。 10 ... Molding device, 11 ... Lower mold, 12 ... Upper mold, 13 ... Molding mold, 14 ... Metal pipe material, 30 ... Pipe holding mechanism, 40 ... Gas supply unit, 42 ... Cylinder unit, 44 ... Gas supply nozzle, 46 ... gas passage, 50 ... heating mechanism, 60 ... gas supply unit, 61 ... gas source, 62 ... accumulator, 63 ... first tube, 67 ... second tube, 68 ... pressure control valve, 70 ... control unit, 80 ... Drive mechanism, 85 ... Pressure detection unit, 100 ... Metal pipe, 100a ... Pipe part, 100b, 100c ... Flange part, 200 ... Exhaust mechanism, 201 ... Exhaust port, 202 ... Valve, L1, L2 ... Supply line, T1 to T6 , T11, T12, T21 ... Period.

Claims (4)

中空形状を呈するパイプ部を有する金属パイプを成形する成形装置であって、
前記金属パイプを成形するとき、加熱された金属パイプ材料内に高圧ガスを供給する気体供給ユニットと、
前記気体供給ユニットの気体供給を制御する制御部と、を備え、
前記金属パイプを成形するとき、前記制御部は、前記金属パイプ材料の内部圧力が所定の最大圧力値に到達したことの検知後に前記高圧ガスの供給を停止するように、前記気体供給ユニットを制御し、
前記内部圧力が前記所定の最大圧力値に到達してから前記高圧ガスの供給が停止するまでの第1期間は、前記高圧ガスの供給が開始してから前記内部圧力が前記所定の最大圧力値に到達するまでの第2期間よりも短い、
成形装置。
A molding device for molding a metal pipe having a pipe portion having a hollow shape.
When molding the metal pipe, a gas supply unit that supplies high-pressure gas into the heated metal pipe material and
A control unit for controlling the gas supply of the gas supply unit is provided.
When molding the metal pipe, the control unit controls the gas supply unit so as to stop the supply of the high-pressure gas after detecting that the internal pressure of the metal pipe material has reached a predetermined maximum pressure value. death,
In the first period from when the internal pressure reaches the predetermined maximum pressure value until the supply of the high-pressure gas is stopped, the internal pressure is the predetermined maximum pressure value after the supply of the high-pressure gas is started. Shorter than the second period to reach
Molding equipment.
前記金属パイプの内部に収容される前記高圧ガスを排出する排気機構をさらに備え、
前記制御部は、前記内部圧力が前記所定の最大圧力値に到達したことの検知後に前記高圧ガスを排出するように、前記排気機構を制御する、請求項1に記載の成形装置。
Further provided with an exhaust mechanism for discharging the high-pressure gas housed inside the metal pipe,
The molding apparatus according to claim 1, wherein the control unit controls the exhaust mechanism so that the high-pressure gas is discharged after detecting that the internal pressure has reached the predetermined maximum pressure value.
加熱された金属パイプ材料内に高圧ガスを供給することによって、中空形状を呈するパイプ部を有する金属パイプを成形する工程を備える成形方法であって、
前記金属パイプを成形する前記工程では、前記金属パイプ材料の内部圧力が所定の最大圧力値に到達したことの検知後に前記高圧ガスの供給を停止し、
前記内部圧力が前記所定の最大圧力値に到達してから前記高圧ガスの供給が停止するまでの第1期間は、前記高圧ガスの供給が開始してから前記内部圧力が前記所定の最大圧力値に到達するまでの第2期間よりも短い、
成形方法。
A molding method comprising a step of molding a metal pipe having a pipe portion having a hollow shape by supplying a high-pressure gas into a heated metal pipe material.
In the step of forming the metal pipe, the supply of the high-pressure gas is stopped after detecting that the internal pressure of the metal pipe material has reached a predetermined maximum pressure value.
In the first period from when the internal pressure reaches the predetermined maximum pressure value until the supply of the high-pressure gas is stopped, the internal pressure is the predetermined maximum pressure value after the supply of the high-pressure gas is started. Shorter than the second period to reach
Molding method.
前記内部圧力が前記所定の最大圧力値に到達したことの検知後に前記高圧ガスを排出する工程をさらに備える、請求項3に記載の成形方法。 The molding method according to claim 3, further comprising a step of discharging the high-pressure gas after detecting that the internal pressure has reached the predetermined maximum pressure value.
JP2019039825A 2019-03-05 2019-03-05 Molding apparatus and molding method Pending JP2022062292A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019039825A JP2022062292A (en) 2019-03-05 2019-03-05 Molding apparatus and molding method
PCT/JP2020/004984 WO2020179359A1 (en) 2019-03-05 2020-02-07 Molding device and molding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019039825A JP2022062292A (en) 2019-03-05 2019-03-05 Molding apparatus and molding method

Publications (1)

Publication Number Publication Date
JP2022062292A true JP2022062292A (en) 2022-04-20

Family

ID=72338301

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019039825A Pending JP2022062292A (en) 2019-03-05 2019-03-05 Molding apparatus and molding method

Country Status (2)

Country Link
JP (1) JP2022062292A (en)
WO (1) WO2020179359A1 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8899085B2 (en) * 2011-12-30 2014-12-02 The Coca-Cola Company System and method for forming a metal beverage container using blow molding
JP6771271B2 (en) * 2015-03-31 2020-10-21 住友重機械工業株式会社 Molding equipment
WO2017150110A1 (en) * 2016-03-01 2017-09-08 住友重機械工業株式会社 Molding device and molding method

Also Published As

Publication number Publication date
WO2020179359A1 (en) 2020-09-10

Similar Documents

Publication Publication Date Title
CN106536080B (en) Molding apparatus and molding method
US11267034B2 (en) Forming device and forming method
US20160279693A1 (en) Molding apparatus
CN110014066B (en) Molding device
CN106457345B (en) Molding device
US11298738B2 (en) Forming device and forming method
JP6670543B2 (en) Molding apparatus and molding method
JP6210939B2 (en) Molding system
JP6463008B2 (en) Molding equipment
JP6396249B2 (en) Molding equipment
WO2015194600A1 (en) Molding system
JP6417138B2 (en) Molding equipment
JP6173261B2 (en) Molding system
JP2021185002A (en) Molding equipment and molding method
WO2020179359A1 (en) Molding device and molding method
JP6990519B2 (en) Molding equipment
JP2021170557A (en) Energization heating apparatus
JP7080085B2 (en) Molding equipment
JP6960772B2 (en) Energizing heating device
WO2018179975A1 (en) Electric conduction heating device
US20200391273A1 (en) Elctrical heating apparatus
JP2022023127A (en) Electrification heating device
JP2018167284A (en) Metal body and electric conduction heating method