JP2021029090A - Battery monitoring device - Google Patents

Battery monitoring device Download PDF

Info

Publication number
JP2021029090A
JP2021029090A JP2019148147A JP2019148147A JP2021029090A JP 2021029090 A JP2021029090 A JP 2021029090A JP 2019148147 A JP2019148147 A JP 2019148147A JP 2019148147 A JP2019148147 A JP 2019148147A JP 2021029090 A JP2021029090 A JP 2021029090A
Authority
JP
Japan
Prior art keywords
signal
unit
transmission
battery
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2019148147A
Other languages
Japanese (ja)
Other versions
JP7238683B2 (en
Inventor
俊貴 小嶋
Toshiki Kojima
俊貴 小嶋
達宏 沼田
Tatsuhiro NUMATA
達宏 沼田
真和 幸田
Masakazu Koda
真和 幸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2019148147A priority Critical patent/JP7238683B2/en
Publication of JP2021029090A publication Critical patent/JP2021029090A/en
Application granted granted Critical
Publication of JP7238683B2 publication Critical patent/JP7238683B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

To simplify communication wiring between a monitoring unit and a control unit.SOLUTION: A monitoring unit 20 is installed for each of battery groups 94 into which a plurality of cell batteries 95 included in a battery pack 90 are grouped, and acquires battery information, which is information on the cell batteries 95. The battery pack 90 is connected to a predetermined load 99 so as to be able to supply power by a predetermined power supply path α. At least part of a transmission path δ is composed of the power supply path α. A signal transmission unit 41 transmits a transmission signal Sd, which is a predetermined electric signal, to the transmission path δ. A signal change unit 43 makes the transmission signal Sd have the battery information by changing the state of the transmission signal Sd based on the battery information acquired by the monitoring unit 20. A signal detection unit 47 detects the transmission signal Sd from the transmission path δ. Based on the above, the battery information is conveyed from the monitoring unit 20 to the control unit 10.SELECTED DRAWING: Figure 1

Description

本発明は、車両等に搭載される組電池を監視する電池監視装置に関する。 The present invention relates to a battery monitoring device that monitors an assembled battery mounted on a vehicle or the like.

電池監視装置の中には、次のように構成されたものがある。電池監視装置は、監視部と制御部とを有する。監視部は、組電池が有する複数のセル電池をグループ分けした電池群毎に設置されており、セル電池に関する情報である電池情報を取得する。制御部は、監視部と無線通信可能に構成されており、監視部から電池情報を受信する。そして、このような技術を示す特許文献としては、次の特許文献1がある。 Some battery monitoring devices are configured as follows. The battery monitoring device has a monitoring unit and a control unit. The monitoring unit is installed for each battery group in which a plurality of cell batteries of the assembled battery are grouped, and acquires battery information which is information on the cell battery. The control unit is configured to enable wireless communication with the monitoring unit, and receives battery information from the monitoring unit. The following Patent Document 1 is a patent document showing such a technique.

特許6093448号公報Japanese Patent No. 6093448

上記の電池監視装置では、無線通信を行っているため、各監視部と制御部との間の通信配線が不要である。しかし、通信の安定性等を考慮して、当該無線通信に加えて又は当該無線通信に代えて、通信配線を介して監視部と制御部とを通信可能に接続しておくことも考えられる。その場合、当該通信配線は、煩雑ではなく、極力シンプルであることが好ましい。 Since the above battery monitoring device performs wireless communication, communication wiring between each monitoring unit and the control unit is unnecessary. However, in consideration of communication stability and the like, it is also conceivable to connect the monitoring unit and the control unit so as to be communicable via communication wiring in addition to or instead of the wireless communication. In that case, it is preferable that the communication wiring is not complicated and is as simple as possible.

本発明は、上記事情に鑑みてなされたものであり、監視部と制御部との通信配線を、シンプルにすることを目的とする。 The present invention has been made in view of the above circumstances, and an object of the present invention is to simplify the communication wiring between the monitoring unit and the control unit.

本発明の電池監視装置は、監視部と制御部と通信部とを有する。前記監視部は、組電池が有する複数のセル電池をグループ分けした電池群毎に設置されおり、前記セル電池に関する情報である電池情報を取得する。前記通信部は、前記電池情報を前記監視部から前記制御部に伝える。前記組電池は、所定の負荷に所定の給電経路により給電可能に接続されている。 The battery monitoring device of the present invention has a monitoring unit, a control unit, and a communication unit. The monitoring unit is installed for each battery group in which a plurality of cell batteries included in the assembled battery are grouped, and acquires battery information which is information on the cell battery. The communication unit transmits the battery information from the monitoring unit to the control unit. The assembled battery is connected so as to be able to supply power to a predetermined load by a predetermined power supply path.

前記通信部は、伝達経路と信号発信部と信号変更部と信号検出部とを有する。前記伝達経路は、少なくとも一部が前記給電経路により構成されている。前記信号発信部は、所定の電気信号である伝達信号を前記伝達経路に発信する。前記信号変更部は、前記監視部により取得された前記電池情報に基づいて前記伝達信号の状態を変更することにより前記伝達信号に前記電池情報を持たせる。前記信号検出部は、前記伝達経路から前記伝達信号を検出する。そして、前記通信部は、前記伝達信号の前記変更及び前記検出に基づいて前記電池情報を前記制御部に伝える。 The communication unit includes a transmission path, a signal transmission unit, a signal change unit, and a signal detection unit. The transmission path is composed of at least a part of the power supply path. The signal transmitting unit transmits a transmission signal, which is a predetermined electric signal, to the transmission path. The signal changing unit changes the state of the transmission signal based on the battery information acquired by the monitoring unit, so that the transmission signal has the battery information. The signal detection unit detects the transmission signal from the transmission path. Then, the communication unit transmits the battery information to the control unit based on the change and the detection of the transmission signal.

本発明によれば、信号発信部が伝達信号を伝達経路に発信し、その伝達信号を信号変更部が変更し、その伝達信号を信号検出部が検出することにより、監視部から制御部に電池情報を伝えることができる。しかも、その伝達経路の少なくとも一部は給電経路により構成されているため、給電経路を利用して伝達経路を形成することができる。そのため、監視部と制御部との通信配線を構成する伝達経路を、シンプルにすることができる。 According to the present invention, the signal transmitting unit transmits a transmission signal to the transmission path, the transmission signal is changed by the signal changing unit, and the signal detecting unit detects the transmission signal, whereby the monitoring unit transfers the battery to the control unit. Can convey information. Moreover, since at least a part of the transmission path is composed of the power supply path, the power supply path can be used to form the transmission path. Therefore, the transmission path constituting the communication wiring between the monitoring unit and the control unit can be simplified.

第1実施形態の電池監視装置を示す回路図Circuit diagram showing the battery monitoring device of the first embodiment 伝達信号の状態変更の例を示すグラフGraph showing an example of changing the state of the transmitted signal 伝達信号の状態変更の別例を示すグラフGraph showing another example of changing the state of the transmitted signal 通信制御を示すフローチャートFlowchart showing communication control 第2実施形態の電池監視装置を示す回路図Circuit diagram showing the battery monitoring device of the second embodiment 第3実施形態の通信制御を示すフローチャートFlow chart showing communication control of the third embodiment 第4実施形態の電池監視装置を示す回路図A circuit diagram showing the battery monitoring device of the fourth embodiment 地絡検出回路及び第2通信部を示すブロック図Block diagram showing the ground fault detection circuit and the second communication unit 第5,第6実施形態の地絡検出回路及び第2通信部を示すブロック図Block diagram showing the ground fault detection circuit and the second communication unit of the fifth and sixth embodiments. 第6実施形態の通信制御を示すフローチャートFlow chart showing communication control of the sixth embodiment 第7実施形態の電池監視装置を示す回路図Circuit diagram showing the battery monitoring device of the 7th embodiment 第8実施形態の電池監視装置を示す回路図Circuit diagram showing the battery monitoring device of the eighth embodiment 第8実施形態の伝達信号の状態変更の例を示すグラフA graph showing an example of changing the state of the transmission signal according to the eighth embodiment. 第9実施形態の伝達信号の状態変更の例を示すグラフA graph showing an example of changing the state of the transmission signal according to the ninth embodiment.

次に本発明の実施形態について図面を参照しつつ説明する。ただし、本発明は、実施形態に限定されるものではなく、発明の趣旨を逸脱しない範囲で適宜変更して実施できる。 Next, an embodiment of the present invention will be described with reference to the drawings. However, the present invention is not limited to the embodiments, and can be appropriately modified and implemented without departing from the spirit of the invention.

[第1実施形態]
図1は、第1実施形態の電池監視装置71を示す回路図である。電池監視装置71は、車両に搭載された組電池90を監視する。組電池90は、直列に接続されている複数のセル電池95を有する。以下では、それら複数のセル電池95をグループ分けした各グループを、「電池群94」という。組電池90は、所定の負荷99に所定の給電経路αにより給電可能に接続されている。その所定の負荷99は、例えば、車両に搭載されたモータのインバータ等の車載電気機器である。組電池90と給電経路αと負荷99とは、所定の第2基準電位V2が基準電位になる第2基準電位回路62に設けられている。第2基準電位V2は、例えば、車体のグランド電位よりも所定電位(例えば組電池90の電圧の半分)低い電位である。
[First Embodiment]
FIG. 1 is a circuit diagram showing the battery monitoring device 71 of the first embodiment. The battery monitoring device 71 monitors the assembled battery 90 mounted on the vehicle. The assembled battery 90 has a plurality of cell batteries 95 connected in series. In the following, each group in which the plurality of cell batteries 95 are grouped will be referred to as a “battery group 94”. The assembled battery 90 is connected to a predetermined load 99 so as to be able to supply power by a predetermined power supply path α. The predetermined load 99 is, for example, an in-vehicle electric device such as an inverter of a motor mounted on a vehicle. The assembled battery 90, the power supply path α, and the load 99 are provided in the second reference potential circuit 62 in which the predetermined second reference potential V2 becomes the reference potential. The second reference potential V2 is, for example, a potential lower than a predetermined potential (for example, half the voltage of the assembled battery 90) than the ground potential of the vehicle body.

電池監視装置71は、制御部10と監視部20と第1通信部30と第2通信部40とを有する。 The battery monitoring device 71 includes a control unit 10, a monitoring unit 20, a first communication unit 30, and a second communication unit 40.

監視部20は、第2基準電位回路62に電池群94毎に設置されており、各監視部20は、セル電池95の電圧に関する情報である電池情報を検出する監視回路25を有する。詳しくは、監視回路25は、自身に対応する電池群94の両端、及びその電池群94を構成する複数のセル電池95の各間に、検出線26により電気的に接続されている。そして、各セル電池95の電圧を検出する。 The monitoring unit 20 is installed in the second reference potential circuit 62 for each battery group 94, and each monitoring unit 20 has a monitoring circuit 25 that detects battery information which is information on the voltage of the cell battery 95. Specifically, the monitoring circuit 25 is electrically connected by a detection line 26 between both ends of the battery group 94 corresponding to itself and each of the plurality of cell batteries 95 constituting the battery group 94. Then, the voltage of each cell battery 95 is detected.

制御部10は、第2基準電位V2とは異なる所定の第1基準電位V1が基準電位となる第1基準電位回路61に設けられている。第1基準電位V1は、例えば、車体のグランド電位である。制御部10は、各監視部20に対して指令を出すCPU15を有する。 The control unit 10 is provided in the first reference potential circuit 61 in which a predetermined first reference potential V1 different from the second reference potential V2 becomes the reference potential. The first reference potential V1 is, for example, the ground potential of the vehicle body. The control unit 10 has a CPU 15 that issues a command to each monitoring unit 20.

第1通信部30は、各監視部20に設けられている子機32と、制御部10に設けられている親機37とを有する。各子機32と親機37とは通信線γにより、通信可能に接続されている。よって、第1通信部30は、給電経路αを介さずに電池情報を監視部20から制御部10に伝える。 The first communication unit 30 has a slave unit 32 provided in each monitoring unit 20 and a master unit 37 provided in the control unit 10. Each slave unit 32 and the master unit 37 are communicably connected by a communication line γ. Therefore, the first communication unit 30 transmits the battery information from the monitoring unit 20 to the control unit 10 without going through the power supply path α.

詳しくは、各子機32は、監視回路25が検出した電池情報を取得して、その電池情報を親機37に送信する。そして、親機37は、子機32から受信した電池情報をCPU15に入力する。また、親機37は、CPU15が出す指令を取得して、その指令を子機32に送信する。そして、子機32は、親機37から受信した指令を監視回路25に入力する。これらにより、第1通信部30は、各監視部20と制御部10との通信を行う。以下では、この第1通信部30による通信を「第1通信」という。 Specifically, each slave unit 32 acquires the battery information detected by the monitoring circuit 25 and transmits the battery information to the master unit 37. Then, the master unit 37 inputs the battery information received from the slave unit 32 to the CPU 15. Further, the master unit 37 acquires a command issued by the CPU 15 and transmits the command to the slave unit 32. Then, the slave unit 32 inputs the command received from the master unit 37 to the monitoring circuit 25. As a result, the first communication unit 30 communicates with each monitoring unit 20 and the control unit 10. Hereinafter, the communication by the first communication unit 30 is referred to as "first communication".

第2通信部40は、いずれかのセル電池95の電圧が異常である電圧異常時にのみ、電池情報を監視部20から制御部10に送信する。以下では、この第2通信部40による通信を「第2通信」という。第2通信部40は、制御部10に設けられている信号発信部41及び信号検出部47と、監視部20に設けられている信号変更部43と、監視部20から制御部10にまで延びる伝達経路δとを有する。 The second communication unit 40 transmits battery information from the monitoring unit 20 to the control unit 10 only when the voltage of any cell battery 95 is abnormal. Hereinafter, the communication by the second communication unit 40 is referred to as "second communication". The second communication unit 40 extends from the signal transmission unit 41 and the signal detection unit 47 provided in the control unit 10, the signal change unit 43 provided in the monitoring unit 20, and the monitoring unit 20 to the control unit 10. It has a transmission path δ.

伝達経路δは、第2基準電位回路62に設けられている伝達経路第2部δ2と、第1基準電位回路61に設けられている伝達経路第1部δ1との両部(δ2,δ1)を有し、当該両部(δ2,δ1)間には絶縁素子45が設けられている。絶縁素子45は、当該両部(δ2,δ1)間の基準電位差を保ちつつ、当該両部(δ2,δ1)を電気的に接続している。その絶縁素子45は、本実施形態ではコンデンサであるが、それ以外の、例えばフォトカプラ等の絶縁素子であってもよい。 The transmission path δ is both a part (δ2, δ1) of the transmission path second part δ2 provided in the second reference potential circuit 62 and the transmission path first part δ1 provided in the first reference potential circuit 61. An insulating element 45 is provided between the two portions (δ2, δ1). The insulating element 45 electrically connects both parts (δ2, δ1) while maintaining a reference potential difference between the two parts (δ2, δ1). The insulating element 45 is a capacitor in this embodiment, but may be another insulating element such as a photocoupler.

伝達経路第2部δ2は、信号変更部43から検出線26にまで延びて検出線26に合流してから、検出線26の一部を経由して給電経路αに合流し、給電経路αの一部を経由してから、給電経路αから分かれる形で絶縁素子45にまで延びる経路である。よって、伝達経路第2部δ2は、一部が給電経路αにより構成されている。他方、伝達経路第1部δ1は、絶縁素子45から第1基準電位V1に接続されている部分を経由して、第2基準電位回路62の内側に入り込む形で監視部20内にまで延びる経路である。そして、監視部20内において、伝達経路第1部δ1の端部は、所定の抵抗体44及びそれに直列に接続されているスイッチ42を介して、伝達経路第2部δ2の端部に電気的に接続されている。 The transmission path second part δ2 extends from the signal changing unit 43 to the detection line 26, joins the detection line 26, and then joins the power supply path α via a part of the detection line 26, and the power supply path α It is a path that extends from the feeding path α to the insulating element 45 after passing through a part of the path. Therefore, the transmission path second part δ2 is partially composed of the feeding path α. On the other hand, the transmission path first portion δ1 is a path extending from the insulating element 45 to the inside of the monitoring unit 20 via the portion connected to the first reference potential V1 and entering the inside of the second reference potential circuit 62. Is. Then, in the monitoring unit 20, the end of the transmission path first part δ1 is electrically connected to the end of the transmission path second part δ2 via a predetermined resistor 44 and a switch 42 connected in series with the resistor 44. It is connected to the.

信号発信部41は、制御部10内において、伝達経路第1部δ1に所定の電気信号である伝達信号Sdを発信する。その伝達信号Sdとしては、例えば、電流変動により情報を伝える電流変動信号や、電圧変動により情報を伝える電圧変動信号にすることができる。 The signal transmission unit 41 transmits a transmission signal Sd, which is a predetermined electric signal, to the transmission path first unit δ1 in the control unit 10. The transmitted signal Sd can be, for example, a current fluctuation signal that transmits information by current fluctuation or a voltage fluctuation signal that transmits information by voltage fluctuation.

伝達信号Sdが電流変動信号の場合、信号発信部41は、伝達経路δに電圧変動を発生させることにより電流変動を発生させ、信号変更部は、その電流変動の状態を変更し、信号検出部47は、その変更された電流変動を伝達信号Sdとして検出する。この場合、電圧変動については積極的に発生させる必要がないため、電圧変動により生じる他の装置への影響を小さく抑えることができる。 When the transmission signal Sd is a current fluctuation signal, the signal transmission unit 41 generates a current fluctuation by generating a voltage fluctuation in the transmission path δ, and the signal change unit changes the state of the current fluctuation and the signal detection unit. 47 detects the changed current fluctuation as a transmission signal Sd. In this case, since it is not necessary to positively generate the voltage fluctuation, the influence of the voltage fluctuation on other devices can be suppressed to a small value.

他方、伝達信号Sdが電圧変動信号の場合、信号発信部41は、伝達経路δに電圧変動を発生させ、信号変更部は、その電圧変動の状態を変更し、信号検出部47は、その変更された電圧変動を伝達信号Sdとして検出する。この場合、信号発信部41が発生させて信号変更部43が変更した電圧変動を、その電圧変動のまま信号検出部47が検出することになるので、電池情報を信号変更部43から信号検出部47に直接的に伝えやすい。 On the other hand, when the transmission signal Sd is a voltage fluctuation signal, the signal transmission unit 41 causes a voltage fluctuation in the transmission path δ, the signal change unit changes the state of the voltage fluctuation, and the signal detection unit 47 changes the voltage fluctuation state. The voltage fluctuation is detected as a transmission signal Sd. In this case, since the signal detection unit 47 detects the voltage fluctuation generated by the signal transmission unit 41 and changed by the signal change unit 43 as it is, the battery information is transmitted from the signal change unit 43 to the signal detection unit 43. Easy to tell directly to 47.

信号変更部43は、監視回路25から電池情報を取得して、その電池情報に基づいて伝達信号Sdの状態を変更することにより伝達信号Sdに電池情報を持たせる。詳しくは、信号変更部43は、監視部20内において、スイッチ42のON,OFFを切り替えることにより、伝達信号Sdの状態を変更する。 The signal changing unit 43 acquires battery information from the monitoring circuit 25 and changes the state of the transmission signal Sd based on the battery information so that the transmission signal Sd has the battery information. Specifically, the signal changing unit 43 changes the state of the transmission signal Sd by switching ON / OFF of the switch 42 in the monitoring unit 20.

具体的には、スイッチ42がONになると、実質的に抵抗体44の抵抗値が、伝達経路第1部δ1と伝達経路第2部δ2との両部(δ1,δ2)間の抵抗値になる。他方、スイッチ42がOFFになると、実質的に当該両部(δ1,δ2)間の絶縁抵抗値が、当該両部(δ1,δ2)間の抵抗値になる。それにより、伝達経路δにおいて伝達信号Sdの伝わり易さが変化して、伝達信号Sdの状態が変更される。 Specifically, when the switch 42 is turned on, the resistance value of the resistor 44 is substantially changed to the resistance value between both parts (δ1, δ2) of the transmission path first part δ1 and the transmission path second part δ2. Become. On the other hand, when the switch 42 is turned off, the insulation resistance value between the two parts (δ1, δ2) becomes substantially the resistance value between the two parts (δ1, δ2). As a result, the ease of transmission of the transmission signal Sd changes in the transmission path δ, and the state of the transmission signal Sd is changed.

より具体的には、スイッチ42がONになると、伝達経路δが閉回路を形成することにより、伝達信号Sdが信号検出部47に伝わる伝達状態a1になる。他方、スイッチ42がOFFになると、伝達経路δが開回路を形成することにより、伝達信号Sdが信号検出部47に伝わらないか伝わり難い非伝達状態a0になる。 More specifically, when the switch 42 is turned on, the transmission path δ forms a closed circuit, so that the transmission signal Sd is transmitted to the signal detection unit 47 in the transmission state a1. On the other hand, when the switch 42 is turned off, the transmission path δ forms an open circuit, so that the transmission signal Sd is not transmitted to the signal detection unit 47 or is in a non-transmission state a0 which is difficult to be transmitted.

図2は、伝達信号Sdの状態変更の例を示すグラフである。図2(a)〜(c)の横軸は、時間である。図2(a)(c)の縦軸は、電流であってもよいし、電圧であってもよい。図2(b)の縦軸は、スイッチ42のON,OFFを示している。 FIG. 2 is a graph showing an example of changing the state of the transmission signal Sd. The horizontal axis of FIGS. 2A to 2C is time. The vertical axis of FIGS. 2A and 2C may be a current or a voltage. The vertical axis of FIG. 2B shows ON / OFF of the switch 42.

図2(a)に示すように、信号発信部41が発信する伝達信号Sdは、例えば複数のパルスを有するパルス信号にすることができる。 As shown in FIG. 2A, the transmission signal Sd transmitted by the signal transmission unit 41 can be, for example, a pulse signal having a plurality of pulses.

図2(b)に示すように、信号変更部43は、例えば、各セル電池95の電圧が正常である電圧正常時には、スイッチ42をOFFにし、いずれかのセル電池95の電圧が異常である電圧異常時には、スイッチ42のONにするようにすることができる。 As shown in FIG. 2B, for example, the signal changing unit 43 turns off the switch 42 when the voltage of each cell battery 95 is normal, and the voltage of any cell battery 95 is abnormal. When the voltage is abnormal, the switch 42 can be turned on.

それにより、図2(c)に示すように、信号検出部47が検出する伝達信号Sdは、電圧正常時には非伝達状態a0になり、電圧異常時には伝達状態a1になる。そして、非伝達状態a0は、電圧正常時である旨の電池情報を示し、伝達状態a1は、電圧異常時である旨の電池情報を示すものとすることができる。 As a result, as shown in FIG. 2C, the transmission signal Sd detected by the signal detection unit 47 is in the non-transmission state a0 when the voltage is normal and in the transmission state a1 when the voltage is abnormal. Then, the non-transmission state a0 may indicate the battery information indicating that the voltage is normal, and the transmission state a1 may indicate the battery information indicating that the voltage is abnormal.

図3は、伝達信号Sdの状態変更の別例を示すグラフである。図3(a)については図2(a)と同様である。 FIG. 3 is a graph showing another example of changing the state of the transmission signal Sd. FIG. 3A is the same as FIG. 2A.

図3(b)に示すように、信号変更部43は、例えば、電圧正常時には、スイッチ42をOFFに維持し、電圧異常時には、スイッチ42のON,OFFを繰り返し変更するようにすることができる。 As shown in FIG. 3B, for example, the signal changing unit 43 can keep the switch 42 OFF when the voltage is normal, and repeatedly change the ON and OFF of the switch 42 when the voltage is abnormal. ..

それにより、図3(c)に示すように、信号検出部47が検出する伝達信号Sdは、電圧正常時には非伝達状態a0に維持され、電圧異常時には伝達状態a1と非伝達状態a0とに繰り返し変更されることになる。さらに、この伝達信号Sdにおいて、例えば、伝達状態a1は「1」を示す情報を持ち、非伝達状態a0は「0」を示す情報を持つようにすることができる。これら「1」「0」を示す情報の組合せによれば、単に電圧異常があるか否かの電池情報のみならず、具体的にどのセル電池95が電圧異常であるかや、電圧値や電流値等の電池情報をも、伝達信号Sdに持たせることができる。 As a result, as shown in FIG. 3C, the transmission signal Sd detected by the signal detection unit 47 is maintained in the non-transmission state a0 when the voltage is normal, and repeats the transmission state a1 and the non-transmission state a0 when the voltage is abnormal. It will be changed. Further, in the transmission signal Sd, for example, the transmission state a1 may have information indicating "1", and the non-transmission state a0 may have information indicating "0". According to the combination of the information indicating "1" and "0", not only the battery information as to whether or not there is a voltage abnormality, but also specifically which cell battery 95 has the voltage abnormality, the voltage value and the current. Battery information such as a value can also be provided in the transmission signal Sd.

再び図1を参照しつつ説明する。信号検出部47は、検出した伝達信号SdをCPU15に入力する。CPU15は、その伝達信号Sdを解析することにより、電池情報を取得する。 This will be described again with reference to FIG. The signal detection unit 47 inputs the detected transmission signal Sd to the CPU 15. The CPU 15 acquires battery information by analyzing the transmission signal Sd.

次に、電池監視装置71が行う通信制御について説明する。監視部20は、セル電池95の電圧が異常であるか否かの判定を行い、いずれかのセル電池95の電圧が異常であると判定したことを条件に、第2通信部40により電池情報を制御部10に伝える。 Next, the communication control performed by the battery monitoring device 71 will be described. The monitoring unit 20 determines whether or not the voltage of the cell battery 95 is abnormal, and on the condition that the voltage of any cell battery 95 is determined to be abnormal, the second communication unit 40 determines the battery information. Is transmitted to the control unit 10.

図4は、電池監視装置71による通信制御を示すフローチャートである。まず、監視回路25が、電池情報を取得する(S101)。次に、監視部20が、自身に対応する電池群94を構成する各セル電池95の電圧が、所定の正常範囲内であるか否かを判定する(S102)。所定の正常範囲内である場合(S102:YES)、第2通信を行うことなく、通信制御を終了する。他方、S102でセル電池95の電圧が所定の正常範囲内でないと判定した場合(S102:NO)、電池情報を第2通信により監視部20から制御部10に送信する(S103)。それにより、制御部10のCPU15が、電池情報を取得して(S104)、組電池90の異常を把握する。 FIG. 4 is a flowchart showing communication control by the battery monitoring device 71. First, the monitoring circuit 25 acquires battery information (S101). Next, the monitoring unit 20 determines whether or not the voltage of each cell battery 95 constituting the battery group 94 corresponding to itself is within a predetermined normal range (S102). If it is within the predetermined normal range (S102: YES), the communication control is terminated without performing the second communication. On the other hand, when it is determined in S102 that the voltage of the cell battery 95 is not within the predetermined normal range (S102: NO), the battery information is transmitted from the monitoring unit 20 to the control unit 10 by the second communication (S103). As a result, the CPU 15 of the control unit 10 acquires the battery information (S104) and grasps the abnormality of the assembled battery 90.

本実施形態によれば、次の効果が得られる。第1通信部30とは別に、第2通信部40を有するため、通信の冗長性を確保できる。そのため、第1通信が不能になった際にも、第2通信により、監視部20から制御部10に電池情報を送信することができる。 According to this embodiment, the following effects can be obtained. Since the second communication unit 40 is provided separately from the first communication unit 30, communication redundancy can be ensured. Therefore, even when the first communication becomes impossible, the battery information can be transmitted from the monitoring unit 20 to the control unit 10 by the second communication.

また、伝達経路δの一部が給電経路αにより構成されているため、給電経路αを利用して伝達経路δを形成することができる。そのため、第2通信部40の通信配線である伝達経路δを、シンプルにすることができる。 Further, since a part of the transmission path δ is composed of the feeding path α, the transmission path δ can be formed by using the feeding path α. Therefore, the transmission path δ, which is the communication wiring of the second communication unit 40, can be simplified.

また、セル電池95の電圧異常時にのみ第2通信をおこなうので、常時第2通信を行う場合に比べて、第2通信による通信量を抑えることができる。 Further, since the second communication is performed only when the voltage of the cell battery 95 is abnormal, the amount of communication by the second communication can be suppressed as compared with the case where the second communication is always performed.

また、伝達経路δは、第2基準電位回路62に設けられている伝達経路第2部δ2と、第1基準電位回路61に設けられている伝達経路第1部δ1との両部(δ2,δ1)を有し、当該両部(δ2,δ1)は、絶縁素子45により当該両部(δ2,δ1)間の電位差を保ちつつ電気的に接続されている。そして、信号発信部41は、伝達経路第1部δ1に伝達信号Sdを発信し、信号変更部43は、伝達経路第2部δ2でその伝達信号Sdの状態を変更し、信号検出部47は、伝達経路第1部δ1からその変更された伝達信号Sdを検出する。そのため、信号発信部41及び信号検出部47と信号変更部43とが、異なる基準電位回路(61,62)にあるにも関わらず、伝達経路δにより、信号発信部41及び信号検出部47と信号変更部43との間で、伝達信号Sdを伝達することができる。 Further, the transmission path δ is both parts (δ2, δ2) of the transmission path second part δ2 provided in the second reference potential circuit 62 and the transmission path first part δ1 provided in the first reference potential circuit 61. It has δ1), and both parts (δ2, δ1) are electrically connected by an insulating element 45 while maintaining a potential difference between the two parts (δ2, δ1). Then, the signal transmission unit 41 transmits the transmission signal Sd to the transmission path first part δ1, the signal change unit 43 changes the state of the transmission signal Sd in the transmission path second part δ2, and the signal detection unit 47 changes the state of the transmission signal Sd. , The changed transmission signal Sd is detected from the transmission path first part δ1. Therefore, although the signal transmission unit 41, the signal detection unit 47, and the signal change unit 43 are in different reference potential circuits (61, 62), the signal transmission unit 41, the signal detection unit 47, and the signal detection unit 47 are provided by the transmission path δ. The transmission signal Sd can be transmitted to and from the signal changing unit 43.

また、信号変更部43は、スイッチ42のON,OFFというシンプルな構成で、伝達信号Sdの状態を変更することができる。また、信号変更部43は、伝達経路第1部δ1と伝達経路第2部δ2と間の抵抗値を変化させることにより、シンプルな構成で伝達信号Sdの状態を変更することができる。 Further, the signal changing unit 43 can change the state of the transmission signal Sd with a simple configuration of turning on and off the switch 42. Further, the signal changing unit 43 can change the state of the transmission signal Sd with a simple configuration by changing the resistance value between the transmission path first part δ1 and the transmission path second part δ2.

[第2実施形態]
次に図5を参照しつつ、第2実施形態について説明する。以下の実施形態では、それ以前の実施形態のものと同一の又は対応する部材等は、同一の符号を付する。本実施形態については、第1実施形態をベースに、これと異なる点を中心に説明する。
[Second Embodiment]
Next, the second embodiment will be described with reference to FIG. In the following embodiments, the same or corresponding members and the like as those in the previous embodiments are designated by the same reference numerals. The present embodiment will be described with reference to the first embodiment and focusing on differences from the first embodiment.

図5は、第2実施形態の電池監視装置72を示す回路図である。子機32と親機37とは、通信線γで接続されておらず、無線通信を行うように構成されている。よって、第1通信部30は、電池情報等を無線信号により伝える。 FIG. 5 is a circuit diagram showing the battery monitoring device 72 of the second embodiment. The slave unit 32 and the master unit 37 are not connected by a communication line γ and are configured to perform wireless communication. Therefore, the first communication unit 30 transmits battery information and the like by wireless signals.

本実施形態によれば、第1通信部30は無線通信を行うので、第1実施形態と違い、通信線γが不要となる。そのため、通信線γにより第1通信部30が煩雑になるのが回避されると共に、制御部10に対する各監視部20の配置制約等が緩和される。 According to the present embodiment, since the first communication unit 30 performs wireless communication, unlike the first embodiment, the communication line γ is unnecessary. Therefore, it is possible to prevent the first communication unit 30 from becoming complicated due to the communication line γ, and the restrictions on the arrangement of each monitoring unit 20 with respect to the control unit 10 are relaxed.

[第3実施形態]
次に図6を参照しつつ、第3実施形態について説明する。本実施形態については、第1実施形態をベースに、これと異なる点を中心に説明する。本実施形態の電池監視装置73は、セル電池95の電圧異常時にではなく、第1通信の異常時にのみ第2通信を行う。具体的には、監視部20は、自身と制御部10との第1通信が正常であるか異常であるかの判定を行い、異常であると判定したことを条件に、第2通信を行う。より具体的には、各監視部20は、自身から制御部10に第1通信により電池情報を伝達できる場合に、第1通信が正常であると判定し、自身から制御部10に第1通信により電池情報の伝達できない場合に、第1通信が異常であると判定する。
[Third Embodiment]
Next, the third embodiment will be described with reference to FIG. The present embodiment will be described with reference to the first embodiment and focusing on differences from the first embodiment. The battery monitoring device 73 of the present embodiment performs the second communication only when the first communication is abnormal, not when the voltage of the cell battery 95 is abnormal. Specifically, the monitoring unit 20 determines whether the first communication between itself and the control unit 10 is normal or abnormal, and performs the second communication on the condition that it is determined to be abnormal. .. More specifically, each monitoring unit 20 determines that the first communication is normal when the battery information can be transmitted from itself to the control unit 10 by the first communication, and the first communication from itself to the control unit 10. When the battery information cannot be transmitted, it is determined that the first communication is abnormal.

図6は、電池監視装置73による通信制御を示すフローチャートである。まず、監視回路25が、電池情報を取得する(S301)。次に、監視部20が、自身と制御部10との第1通信が正常であるか否かを判定する(S302)。第1通信が正常であると判定した場合(S302:YES)、このまま第2通信を行うことなく、通信制御を終了する。他方、S302で、自身と制御部10との第1通信が異常と判定した場合(S302:NO)、第2通信を行う(S303)。それにより、制御部10のCPU15が電池情報を取得する(S103)。 FIG. 6 is a flowchart showing communication control by the battery monitoring device 73. First, the monitoring circuit 25 acquires battery information (S301). Next, the monitoring unit 20 determines whether or not the first communication between itself and the control unit 10 is normal (S302). When it is determined that the first communication is normal (S302: YES), the communication control is terminated without performing the second communication as it is. On the other hand, when it is determined in S302 that the first communication between itself and the control unit 10 is abnormal (S302: NO), the second communication is performed (S303). As a result, the CPU 15 of the control unit 10 acquires the battery information (S103).

本実施形態によれば、第1通信の通信異常時にのみ第2通信を行うため、常時第2通信を行う場合に比べて、第2通信による通信量を抑えることができる。 According to the present embodiment, since the second communication is performed only when the communication abnormality of the first communication is abnormal, the amount of communication by the second communication can be suppressed as compared with the case where the second communication is always performed.

[第4実施形態]
次に図7,図8を参照しつつ、第4実施形態について説明する。本実施形態については、第3実施形態をベースに、これと異なる点を中心に説明する。
[Fourth Embodiment]
Next, the fourth embodiment will be described with reference to FIGS. 7 and 8. The present embodiment will be described with reference to the third embodiment, focusing on differences from the third embodiment.

図7は、本実施形態の電池監視装置74を示す回路図である。電池監視装置74は、第2基準電位回路62の第1基準電位V1に対する地絡を検出する地絡検出回路50を有する。その地絡検出回路50は、制御部10に設けられている検査信号発信部51及び検査信号検出部57と、第1基準電位回路61及び第2基準電位回路62の両方に跨る検査経路εとを有する。検査信号発信部51は、所定の発信部Yにより構成されており、第2通信部40の信号発信部41も、その発信部Yにより構成されている。また、検査信号検出部57は、所定の検出部Zにより構成されており、第2通信部40の信号検出部47も、その検出部Zにより構成されている。 FIG. 7 is a circuit diagram showing the battery monitoring device 74 of the present embodiment. The battery monitoring device 74 has a ground fault detection circuit 50 that detects a ground fault with respect to the first reference potential V1 of the second reference potential circuit 62. The ground fault detection circuit 50 includes an inspection signal transmitting unit 51 and an inspection signal detecting unit 57 provided in the control unit 10, and an inspection path ε straddling both the first reference potential circuit 61 and the second reference potential circuit 62. Has. The inspection signal transmission unit 51 is composed of a predetermined transmission unit Y, and the signal transmission unit 41 of the second communication unit 40 is also composed of the transmission unit Y. Further, the inspection signal detection unit 57 is composed of a predetermined detection unit Z, and the signal detection unit 47 of the second communication unit 40 is also composed of the detection unit Z.

検査経路εは、第2基準電位回路62の第1基準電位V1に対する絶縁抵抗59を経由する経路である。検査経路εは、第2基準電位回路62に設けられている検査経路第2部ε2と、第1基準電位回路61に設けられている検査経路第1部ε1とを有する。 The inspection path ε is a path that passes through the insulation resistance 59 with respect to the first reference potential V1 of the second reference potential circuit 62. The inspection path ε has an inspection path second part ε2 provided in the second reference potential circuit 62 and an inspection path first part ε1 provided in the first reference potential circuit 61.

詳しくは、検査経路第2部ε2は、絶縁抵抗59から伝達経路第2部δ2にまで延びて伝達経路第2部δ2に合流してから、伝達経路第2部δ2と共に絶縁素子45にまで延びる経路である。 Specifically, the inspection path second part ε2 extends from the insulation resistance 59 to the transmission path second part δ2, joins the transmission path second part δ2, and then extends to the insulating element 45 together with the transmission path second part δ2. It is a route.

他方、検査経路第1部ε1は、絶縁素子45から伝達経路第1部δ1と共に第1基準電位V1に接続される部分に延びてから、伝達経路第1部δ1から分かれる形で絶縁抵抗59にまで延びる経路である。よって、検査経路第1部ε1の一部は、伝達経路第1部δ1により構成され、また逆に、伝達経路第1部δ1の一部は、検査経路第1部ε1により構成されている。 On the other hand, the inspection path first part ε1 extends from the insulating element 45 to the portion connected to the first reference potential V1 together with the transmission path first part δ1, and then separates from the transmission path first part δ1 to the insulation resistance 59. It is a route that extends to. Therefore, a part of the inspection path first part ε1 is composed of the transmission path first part δ1, and conversely, a part of the transmission path first part δ1 is composed of the inspection path first part ε1.

検査経路第1部ε1には、抵抗体等の電気抵抗を有する素子54が設けられている。検査信号発信部51は、検査経路第1部ε1における素子54よりも一方側に所定の電気信号である検査信号Seを発信する。信号検出部47は、検査経路第1部ε1における素子54よりも他方側から検査信号Seを検出する。その検査信号Seは、CPU15に入力される。CPU15は、その検査信号Seの状態を解析することにより、地絡の発生の有無を判定する。 An element 54 having an electric resistance such as a resistor is provided in the inspection path first part ε1. The inspection signal transmitting unit 51 transmits an inspection signal Se, which is a predetermined electrical signal, to one side of the element 54 in the inspection path first unit ε1. The signal detection unit 47 detects the inspection signal Se from the other side of the element 54 in the inspection path first unit ε1. The inspection signal Se is input to the CPU 15. The CPU 15 determines whether or not a ground fault has occurred by analyzing the state of the inspection signal Se.

詳しくは、第2基準電位回路62が地絡しておらず、絶縁抵抗59の抵抗値が充分に大きい場合には、直列に接続されている絶縁抵抗59及び素子54の抵抗値の合計に対する、素子54の抵抗値の割合が充分に小さくなることにより、素子54により分圧される検査信号Seの電圧が充分に小さくなる。他方、第2基準電位回路62が地絡して、絶縁抵抗59が小さくなった場合には、絶縁抵抗59及び素子54の抵抗値の合計に対する素子54の抵抗値の割合が充分に小さくはならず、素子54により分圧される検査信号Seの電圧が大きくなる。CPU15は、その違いを検出することにより、第2基準電位回路62の地絡の有無を判定する。なお、地絡検出回路50のこのような基本構成については、公知であるため、より詳細な説明については省略する。 Specifically, when the second reference potential circuit 62 is not grounded and the resistance value of the insulation resistance 59 is sufficiently large, the total resistance value of the insulation resistance 59 and the element 54 connected in series is increased. When the ratio of the resistance value of the element 54 becomes sufficiently small, the voltage of the inspection signal Se divided by the element 54 becomes sufficiently small. On the other hand, when the second reference potential circuit 62 is grounded and the insulation resistance 59 becomes small, the ratio of the resistance value of the element 54 to the total resistance values of the insulation resistance 59 and the element 54 should not be sufficiently small. Instead, the voltage of the inspection signal Se, which is divided by the element 54, becomes large. The CPU 15 determines the presence or absence of a ground fault in the second reference potential circuit 62 by detecting the difference. Since such a basic configuration of the ground fault detection circuit 50 is known, a more detailed description thereof will be omitted.

伝達信号Sdと検査信号Seとは、互いに周波数が異なる。なお、伝達信号Sdは、その状態が信号変更部43により変更されるが、これにより周波数が変更されるものではない。よって、伝達信号Sdは、信号変更部43による変更に関係なく、検査信号Seと周波数が異なることになる。 The frequencies of the transmission signal Sd and the inspection signal Se are different from each other. The state of the transmitted signal Sd is changed by the signal changing unit 43, but the frequency is not changed by this. Therefore, the frequency of the transmitted signal Sd is different from that of the inspection signal Se regardless of the change by the signal changing unit 43.

検査信号発信部51は、所定の地絡検査時に検査信号Seを検査経路εに発信する。他方、信号発信部41は、第2通信を行うべき時である第2通信時に、すなわち、第1通信の異常時に、伝達信号Sdを伝達経路δに発信する。 The inspection signal transmission unit 51 transmits the inspection signal Se to the inspection path ε at the time of a predetermined ground fault inspection. On the other hand, the signal transmission unit 41 transmits the transmission signal Sd to the transmission path δ at the time of the second communication, that is, when the first communication is abnormal, which is the time when the second communication should be performed.

そして、地絡判定時には、検査信号検出部57が検査経路第1部ε1から検査信号Seを検出し、第2通信時には、信号検出部47が伝達経路第1部δ1から伝達信号Sdを検出する。そして、地絡判定時と第2通信時とが重なる場合には、検査信号Se及び伝達信号Sdの両方が検出されることになる。 Then, at the time of ground fault determination, the inspection signal detection unit 57 detects the inspection signal Se from the inspection path first part ε1, and at the time of the second communication, the signal detection unit 47 detects the transmission signal Sd from the transmission path first part δ1. .. Then, when the ground fault determination time and the second communication time overlap, both the inspection signal Se and the transmission signal Sd are detected.

図8は、地絡検出回路50及び第2通信部40を示すブロック図である。検出部Zは、抽出部Zaと第1フィルタ57fと第2フィルタ47fとを有する。抽出部Zaと第1フィルタ57fとは、検査信号検出部57を構成し、抽出部Zaと第2フィルタ47fとは、信号検出部47を構成する。 FIG. 8 is a block diagram showing the ground fault detection circuit 50 and the second communication unit 40. The detection unit Z includes an extraction unit Za, a first filter 57f, and a second filter 47f. The extraction unit Za and the first filter 57f form an inspection signal detection unit 57, and the extraction unit Za and the second filter 47f form a signal detection unit 47.

以下では、検査経路第1部ε1における伝達経路第1部δ1でもある部分を、共通経路(ε1,δ1)とする。抽出部Zaは、オペアンプ等を有しており、共通経路(ε1,δ1)から電気信号を抽出する。 In the following, the portion of the inspection path first part ε1 that is also the transmission path first part δ1 will be referred to as a common path (ε1, δ1). The extraction unit Za has an operational amplifier or the like, and extracts an electric signal from a common path (ε1, δ1).

第1フィルタ57fは、共通経路(ε1,δ1)から抽出された電気信号から、検査信号Seの周波数帯以外の周波数の電気信号を除去して、すなわち伝達信号Sd等を除去して、検査信号Seを抽出する。その検査信号Seを、CPU15の検査信号取得端子58に入力する。そのため、電気信号に検査信号Seが含まれる場合には、検査信号Seが検査信号取得端子58に入力される。それにより、CPU15が地絡の有無を判定する。 The first filter 57f removes an electric signal having a frequency other than the frequency band of the inspection signal Se from the electric signal extracted from the common path (ε1, δ1), that is, removes the transmission signal Sd and the like to remove the inspection signal. Extract Se. The inspection signal Se is input to the inspection signal acquisition terminal 58 of the CPU 15. Therefore, when the inspection signal Se is included in the electric signal, the inspection signal Se is input to the inspection signal acquisition terminal 58. As a result, the CPU 15 determines the presence or absence of a ground fault.

第2フィルタ47fは、共通経路(ε1,δ1)から抽出された電気信号から、伝達信号Sdの周波数帯以外の周波数の電気信号を除去して、すなわち検査信号Se等を除去して、伝達信号Sdを抽出する。その伝達信号Sdを、CPU15の伝達信号取得端子48に入力する。そのため、電気信号に伝達信号Sdが含まれる場合には、伝達信号Sdが伝達信号取得端子48に入力される。それにより、CPU15が電池情報を取得する。 The second filter 47f removes an electric signal having a frequency other than the frequency band of the transmitted signal Sd from the electric signal extracted from the common path (ε1, δ1), that is, removes the inspection signal Se and the like, and transmits the transmitted signal. Extract Sd. The transmission signal Sd is input to the transmission signal acquisition terminal 48 of the CPU 15. Therefore, when the electric signal includes the transmission signal Sd, the transmission signal Sd is input to the transmission signal acquisition terminal 48. As a result, the CPU 15 acquires battery information.

本実施形態によれば、次の効果が得られる。伝達経路第2部δ2は、その一部が給電経路αを利用して形成されているのに加え、伝達経路第1部δ1は、その一部が検査経路第1部ε1を利用して形成されている。よって、伝達経路δは、給電経路αに加え検査経路εも利用して形成されている。そのため、第2通信部40の通信配線である伝達経路δを、よりシンプルに形成することができる。 According to this embodiment, the following effects can be obtained. A part of the transmission path part 2 δ2 is formed by using the feeding path α, and a part of the transmission path part 1 δ1 is formed by using the inspection path part 1 ε1. Has been done. Therefore, the transmission path δ is formed by using the inspection path ε in addition to the feeding path α. Therefore, the transmission path δ, which is the communication wiring of the second communication unit 40, can be formed more simply.

また、伝達信号Sdと検査信号Seとは、互いに周波数が異なるのに加え、検出部Zは、検査信号Seを抽出する第1フィルタ57fと、伝達信号Sdを抽出する第2フィルタ47fとを有するため、シンプルな構成で伝達信号Sdと検査信号Seとを分離することができる。 Further, the transmission signal Sd and the inspection signal Se have different frequencies from each other, and the detection unit Z has a first filter 57f for extracting the inspection signal Se and a second filter 47f for extracting the transmission signal Sd. Therefore, the transmission signal Sd and the inspection signal Se can be separated with a simple configuration.

[第5実施形態]
次に図9を参照しつつ、第5実施形態の電池監視装置75について説明する。本実施形態については、第4実施形態をベースに、これと異なる点を中心に説明する。
[Fifth Embodiment]
Next, the battery monitoring device 75 of the fifth embodiment will be described with reference to FIG. The present embodiment will be described with reference to the fourth embodiment, focusing on differences from the fourth embodiment.

図9は、本実施形態の地絡検出回路50及び第2通信部40を示すブロック図である。検出部Zは、第1フィルタ57fと第2フィルタ47fとの代わりに、1つの共通フィルタZfを有している。共通フィルタZfは、抽出する周波数帯を可変に構成されている。そして、検出部Zは、第2通信時であるか否かの判定、すなわち、第1通信が異常で伝達信号Sdが発信されるタイミングであるか否かの判定を行う。そして、伝達信号Sdが発信されるタイミングであると判定した場合には、共通フィルタZfにより抽出する周波数を、伝達信号Sdの周波数帯に調節する。他方、それ以外のタイミングでは、共通フィルタZfにより抽出する周波数帯を、検査信号Seの周波数帯に調節する。 FIG. 9 is a block diagram showing the ground fault detection circuit 50 and the second communication unit 40 of the present embodiment. The detection unit Z has one common filter Zf instead of the first filter 57f and the second filter 47f. The common filter Zf has a variable frequency band to be extracted. Then, the detection unit Z determines whether or not it is the second communication, that is, whether or not the first communication is abnormal and the transmission signal Sd is transmitted. Then, when it is determined that it is the timing at which the transmission signal Sd is transmitted, the frequency extracted by the common filter Zf is adjusted to the frequency band of the transmission signal Sd. On the other hand, at other timings, the frequency band extracted by the common filter Zf is adjusted to the frequency band of the inspection signal Se.

本実施形態によれば、1つの共通フィルタZfで、伝達信号Sdと検査信号Seとの両方を抽出することができる。 According to this embodiment, both the transmission signal Sd and the inspection signal Se can be extracted by one common filter Zf.

[第6実施形態]
次に図9,図10を参照しつつ、第6実施形態の電池監視装置76について説明する。本実施形態については、第5実施形態をベースに、これと異なる点を中心に説明する。
[Sixth Embodiment]
Next, the battery monitoring device 76 of the sixth embodiment will be described with reference to FIGS. 9 and 10. The present embodiment will be described with reference to the fifth embodiment, focusing on differences from the fifth embodiment.

伝達信号Sdと検査信号Seとは同じ所定数波数である。そして、共通フィルタZfは、抽出する電気信号の周波数帯を可変には構成されておらず、その所定周波数を含む周波数帯を抽出する。そして、地絡検出回路50は、伝達信号Sdが発信されるタイミングであるか否かの判定を行い、伝達信号Sdが発信されるタイミングであると判定した場合に、検査信号Seの発信を禁止する。 The transmission signal Sd and the inspection signal Se have the same predetermined wave number. The common filter Zf does not variably configure the frequency band of the electric signal to be extracted, and extracts the frequency band including the predetermined frequency. Then, the ground fault detection circuit 50 determines whether or not it is the timing at which the transmission signal Sd is transmitted, and when it is determined that it is the timing at which the transmission signal Sd is transmitted, the transmission of the inspection signal Se is prohibited. To do.

図10は、その電池監視装置76による通信制御を示すフローチャートである。まず、監視回路25が、電池情報を取得する(S601)。次に、地絡検出回路50が、伝達信号Sdが発信されるタイミングであるか否かを判定する(S602)。伝達信号Sdが発信されるタイミングではないと判定した場合(S602:NO)、そのまま通信制御を終了する。他方、S602で伝達信号Sdが発信されるタイミングであると判定した場合(S602:YES)、検査信号発信部51による検査信号Seの発信を禁止する(S603)。次に、制御部10において信号発信部41が伝達信号Sdを発信し、その伝達信号Sdの状態を、監視部20において信号変更部43が必要に応じて変更する(S604)。次に、その伝達信号Sdを、制御部10において信号検出部47が検出する(S605)。それにより、制御部10のCPU15が電池情報を取得する。 FIG. 10 is a flowchart showing communication control by the battery monitoring device 76. First, the monitoring circuit 25 acquires battery information (S601). Next, the ground fault detection circuit 50 determines whether or not it is the timing at which the transmission signal Sd is transmitted (S602). When it is determined that it is not the timing when the transmission signal Sd is transmitted (S602: NO), the communication control is terminated as it is. On the other hand, when it is determined in S602 that the transmission signal Sd is transmitted (S602: YES), the inspection signal transmitting unit 51 prohibits the transmission of the inspection signal Se (S603). Next, the signal transmitting unit 41 transmits the transmission signal Sd in the control unit 10, and the signal changing unit 43 in the monitoring unit 20 changes the state of the transmission signal Sd as necessary (S604). Next, the signal detection unit 47 detects the transmission signal Sd in the control unit 10 (S605). As a result, the CPU 15 of the control unit 10 acquires the battery information.

本実施形態によれば、伝達信号Sdが発信されるタイミングであると判定した場合に、検査信号Seの発信を禁止する。そのため、検査信号Seと伝達信号Sdとを同時に発信することはできないが、検査信号Seと伝達信号Sdとの周波数が同じであっても、検査信号Seと伝達信号Sdとの干渉を回避することができる。 According to the present embodiment, when it is determined that the transmission signal Sd is transmitted, the transmission of the inspection signal Se is prohibited. Therefore, the inspection signal Se and the transmission signal Sd cannot be transmitted at the same time, but even if the frequencies of the inspection signal Se and the transmission signal Sd are the same, interference between the inspection signal Se and the transmission signal Sd should be avoided. Can be done.

[第7実施形態]
次に図11を参照しつつ、第7実施形態の電池監視装置77について説明する。本実施形態については、第3実施形態をベースに、これと異なる点を中心に説明する。
[7th Embodiment]
Next, the battery monitoring device 77 of the seventh embodiment will be described with reference to FIG. The present embodiment will be described with reference to the third embodiment, focusing on differences from the third embodiment.

図11は、本実施形態の電池監視装置77を示す回路図である。監視部20内における伝達経路第1部δ1と伝達経路第2部δ2との間には、抵抗体44の代わりにコンデンサ44cが設けられている。よって、スイッチ42がONになると、実質的にコンデンサ44cの電気容量が、伝達経路第1部δ1と伝達経路第2部δ2との両部(δ1,δ2)間の電気容量になる。他方、スイッチ42がOFFになると、当該両部(δ1,δ2)間の規制容量が、当該両部(δ1,δ2)間の電気容量になる。それにより、伝達信号Sdの伝わり易さが変化して、伝達信号Sdの状態が変更される。 FIG. 11 is a circuit diagram showing the battery monitoring device 77 of the present embodiment. A capacitor 44c is provided in place of the resistor 44 between the transmission path first part δ1 and the transmission path second part δ2 in the monitoring unit 20. Therefore, when the switch 42 is turned on, the electric capacity of the capacitor 44c becomes substantially the electric capacity between both parts (δ1, δ2) of the transmission path first part δ1 and the transmission path second part δ2. On the other hand, when the switch 42 is turned off, the regulated capacity between the two parts (δ1, δ2) becomes the electric capacity between the two parts (δ1, δ2). As a result, the ease of transmission of the transmission signal Sd changes, and the state of the transmission signal Sd is changed.

本実施形態によれば、伝達経路第1部δ1と伝達経路第2部δ2と間の電気容量を変化させることにより、シンプルな構成で伝達信号Sdの状態を変更することができる。 According to the present embodiment, the state of the transmission signal Sd can be changed with a simple configuration by changing the electric capacity between the transmission path first part δ1 and the transmission path second part δ2.

[第8実施形態]
次に図12,図13を参照しつつ、第8実施形態の電池監視装置78について説明する。本実施形態については、第3実施形態をベースに、これと異なる点を中心に説明する。
[8th Embodiment]
Next, the battery monitoring device 78 of the eighth embodiment will be described with reference to FIGS. 12 and 13. The present embodiment will be described with reference to the third embodiment, focusing on differences from the third embodiment.

図12は、本実施形態の電池監視装置79を示す回路図である。監視部20内には、スイッチ42及び抵抗体44の代わりに、可変抵抗器42bが設けられている。 FIG. 12 is a circuit diagram showing the battery monitoring device 79 of the present embodiment. A variable resistor 42b is provided in the monitoring unit 20 instead of the switch 42 and the resistor 44.

図13は、本実施形態における伝達信号Sdの状態変更の例を示すグラフである。信号変更部43は、可変抵抗器42bの抵抗値を3段階以上で変更することにより、伝達信号Sdの状態を、振幅Aの大きさの異なる3種類以上の各状態a0〜a3に変更する。それら3種類以上の各状態a0〜a3は、それぞれ異なる情報を持つ。なお、図及び符号では、上記の「3種類以上」の状態a0〜a3は、「4種類」の状態である。ここでいう「振幅A」は、例えば、電圧の振幅であってもよいし、電流の振幅であってもよい。 FIG. 13 is a graph showing an example of changing the state of the transmission signal Sd in the present embodiment. The signal changing unit 43 changes the state of the transmitted signal Sd to each of three or more types a0 to a3 having different magnitudes of the amplitude A by changing the resistance value of the variable resistor 42b in three or more steps. Each of the three or more types of states a0 to a3 has different information. In the figures and symbols, the above-mentioned "three or more types" states a0 to a3 are "four types" states. The "amplitude A" referred to here may be, for example, the amplitude of voltage or the amplitude of current.

具体的には、例えば、次のようにして実施することができる。すなわち、所定の第1閾値以上の振幅Aのパルスが検出されない状態は、非伝達状態a0であるとして、「0」を示す情報を持つものとする。また、振幅Aが上記の第1閾値以上かつ所定の第2閾値未満のパルスがある状態は、第1伝達状態a1であるとして、「1」を示す情報を持つものとする。また、振幅Aが上記の第2閾値以上かつ所定の第3閾値未満のパルスがある状態は、第2伝達状態a2であるとして、「2」を示す情報を持つものとする。また、振幅Aが上記の第3閾値以上のパルスがある状態は、第3伝達状態a3であるとして、「3」を示す情報を持つものとする。 Specifically, for example, it can be carried out as follows. That is, a state in which a pulse having an amplitude A equal to or higher than a predetermined first threshold value is not detected is regarded as a non-transmission state a0, and has information indicating "0". Further, a state in which there is a pulse having an amplitude A equal to or higher than the first threshold value and less than a predetermined second threshold value is regarded as a first transmission state a1 and has information indicating "1". Further, a state in which there is a pulse having an amplitude A equal to or higher than the above-mentioned second threshold value and less than a predetermined third threshold value is regarded as a second transmission state a2 and has information indicating “2”. Further, a state in which there is a pulse having an amplitude A equal to or higher than the above-mentioned third threshold value is regarded as a third transmission state a3, and has information indicating "3".

本実施形態によれば、伝達信号Sdの3種類以上の各状態a0〜a3は、それぞれ異なる情報「0」〜「3」を持つので、伝達信号Sdに含まれる情報量が増え、より詳細な電池情報を送信可能になる。 According to the present embodiment, since each of the three or more states a0 to a3 of the transmission signal Sd has different information "0" to "3", the amount of information included in the transmission signal Sd increases, and more detailed information is provided. Battery information can be transmitted.

[第9実施形態]
次に図14を参照しつつ、第9実施形態の電池監視装置79について説明する。本実施形態については、第3実施形態をベースに、これと異なる点を中心に説明する。
[9th Embodiment]
Next, the battery monitoring device 79 of the ninth embodiment will be described with reference to FIG. The present embodiment will be described with reference to the third embodiment, focusing on differences from the third embodiment.

図14は、本実施形態における伝達信号Sdの状態変更の例を示すグラフである。信号変更部43は、スイッチ42をONにする継続時間を変化させることにより、継続時間Bの異なる2種類以上の各伝達状態b1〜b3を形成する。それら2種類以上の各伝達状態b1〜b3は、それぞれ異なる情報を持つ。なお、図及び符号では、上記の「2種類以上」の伝達状態b1〜b3は、「3種類」の伝達状態である。 FIG. 14 is a graph showing an example of changing the state of the transmission signal Sd in the present embodiment. The signal changing unit 43 forms two or more types of transmission states b1 to b3 having different durations B by changing the duration of turning on the switch 42. Each of the two or more types of transmission states b1 to b3 has different information. In the figures and symbols, the above-mentioned "two or more types" of transmission states b1 to b3 are "three types" of transmission states.

具体的には、例えば、次のようにして実施することができる。すなわち、所定閾値以上の振幅が検出されない場合は非伝達状態b0であるとして、「0」を示す情報を持つものとする。他方、上記の所定閾値以上の振幅が検出された場合、伝達状態b1〜b3であるとする。それらの伝達状態b1〜b3のうち、継続時間Bが所定の第1判定時間未満の場合は、第1伝達状態b1であるとして、「1」を示す情報を持つものとする。また、継続時間Bが上記の第1判定時間以上かつ所定の第2判定時間未満の場合は、第2伝達状態b2であるとして、「2」を示す情報を持つものとする。また、継続時間Bが上記の第2判定時間以上の場合は、第3伝達状態b3であるとして、「3」を示す情報を持つものとする。 Specifically, for example, it can be carried out as follows. That is, when an amplitude equal to or greater than a predetermined threshold value is not detected, it is assumed that the non-transmission state b0 is provided and the information indicating "0" is possessed. On the other hand, when an amplitude equal to or greater than the above-mentioned predetermined threshold value is detected, it is assumed that the transmission states b1 to b3. Among those transmission states b1 to b3, when the duration B is less than the predetermined first determination time, it is considered to be the first transmission state b1 and has information indicating "1". Further, when the duration B is equal to or longer than the above-mentioned first determination time and less than the predetermined second determination time, it is assumed that the second transmission state b2 has information indicating "2". Further, when the duration B is equal to or longer than the above-mentioned second determination time, it is assumed that the third transmission state b3 is provided and the information indicating "3" is possessed.

本実施形態によれば、伝達信号Sdは、伝達状態b1〜b3の継続時間Bの違いによって異なる情報「1」〜「3」を持つので、伝達信号Sdに含まれる情報量が増え、より詳細な電池情報を送信可能になる。 According to the present embodiment, since the transmission signal Sd has different information "1" to "3" depending on the difference in the duration B of the transmission states b1 to b3, the amount of information contained in the transmission signal Sd increases, and more details are given. Battery information can be transmitted.

[他の実施形態]
以上の実施形態は、例えば次のように変更して実施できる。例えば、セル電池95の電圧異常時や第1通信の異常時に限らず、常時第2通信を行うようにしてもよい。また、その場合において、電池監視装置70は、第1通信部30を有さず、第2通信部40のみを有するものにしてもよい。
[Other Embodiments]
The above embodiment can be modified and implemented as follows, for example. For example, the second communication may always be performed not only when the voltage of the cell battery 95 is abnormal or when the first communication is abnormal. Further, in that case, the battery monitoring device 70 may not have the first communication unit 30 but may have only the second communication unit 40.

また例えば、信号発信部41は、制御部10の内部にではなく外部に設けられていてもよい。また例えば、信号変更部43は、監視部20の内部にではなく外部に設けられており、監視部20と有線で通信可能に接続されていてもよい。また例えば、信号検出部47は、制御部10の内部にではなく外部に設けられており、制御部10と有線で通信可能に接続されていてもよい。 Further, for example, the signal transmitting unit 41 may be provided outside the control unit 10 instead of inside the control unit 10. Further, for example, the signal changing unit 43 may be provided outside the monitoring unit 20 instead of inside, and may be connected to the monitoring unit 20 by wire so as to be communicable. Further, for example, the signal detection unit 47 may be provided outside the control unit 10 instead of inside, and may be connected to the control unit 10 by wire so as to be communicable.

また例えば、各図では、給電経路αのマイナス側の経路を利用して伝達経路δを形成しているが、給電経路αのプラス側の経路を利用して伝達経路δを形成してもよい。また例えば、組電池90及び電池監視装置71〜79を、ドローン等の車両以外のモビリティや、固定物等に搭載してもよい。 Further, for example, in each figure, the transmission path δ is formed by using the path on the minus side of the feeding path α, but the transmission path δ may be formed by using the path on the plus side of the feeding path α. .. Further, for example, the assembled battery 90 and the battery monitoring devices 71 to 79 may be mounted on a mobility other than a vehicle such as a drone, a fixed object, or the like.

また例えば、第2実施形態以外においても、子機32と親機37とは、通信線γで接続されておらず、無線通信を行うように構成されていてもよい。また例えば、第1及び第2実施形態以外の各実施形態においても、第2通信部40は、セル電池95の電圧異常時にのみ通信を行うようにしてもよい。また例えば、第7,第8実施形態以外の各実施形態において、抵抗体44をコンデンサ44cにしてもよい。また例えば、第8実施形態において、可変抵抗器42bを可変容量コンデンサにしてもよい。 Further, for example, other than the second embodiment, the slave unit 32 and the master unit 37 may not be connected by the communication line γ and may be configured to perform wireless communication. Further, for example, in each embodiment other than the first and second embodiments, the second communication unit 40 may perform communication only when the voltage of the cell battery 95 is abnormal. Further, for example, in each embodiment other than the 7th and 8th embodiments, the resistor 44 may be a capacitor 44c. Further, for example, in the eighth embodiment, the variable resistor 42b may be a variable capacitance capacitor.

また例えば、第1実施形態等において、電圧正常時には非伝達状態a0にし、電圧異常時には伝達状態a1にするのとは逆に、電圧正常時には伝達状態a1にし、電圧異常時には非伝達状態a0にするようにしてもよい。また例えば、第9実施形態において、継続時間Bの異なる2種類以上の伝達状態b1〜b3を形成するのに代えて、継続時間の異なる2種類以上の非伝達状態を形成するようにしてもよい。 Further, for example, in the first embodiment or the like, the non-transmission state a0 is set when the voltage is normal, and the transmission state a1 is set when the voltage is abnormal. You may do so. Further, for example, in the ninth embodiment, instead of forming two or more types of transmission states b1 to b3 having different durations B, two or more types of non-transmission states having different durations may be formed. ..

α…給電経路、δ…伝達経路、10…制御部、20…監視部、41…信号発信部、43…信号変更部、47…信号検出部、71〜79…電池監視装置、90…組電池、94…電池群、95…セル電池、99…負荷、Sd…伝達信号。 α ... power supply path, δ ... transmission path, 10 ... control unit, 20 ... monitoring unit, 41 ... signal transmission unit, 43 ... signal change unit, 47 ... signal detection unit, 71-79 ... battery monitoring device, 90 ... assembled battery , 94 ... Battery group, 95 ... Cell battery, 99 ... Load, Sd ... Transmission signal.

Claims (20)

組電池(90)が有する複数のセル電池(95)をグループ分けした電池群(94)毎に設置されて前記セル電池に関する情報である電池情報を取得する監視部(20)と、制御部(10)と、前記電池情報を前記監視部から前記制御部に伝える通信部(40)と、を有する電池監視装置(71〜79)であって、
前記組電池は、所定の負荷(99)に所定の給電経路(α)により給電可能に接続されており、
前記通信部は、少なくとも一部が前記給電経路により構成されている伝達経路(δ)と、所定の電気信号である伝達信号(Sd)を前記伝達経路に発信する信号発信部(41)と、前記監視部により取得された前記電池情報に基づいて前記伝達信号の状態を変更することにより前記伝達信号に前記電池情報を持たせる信号変更部(43)と、前記伝達経路から前記伝達信号を検出する信号検出部(47)とを有し、前記伝達信号の前記変更及び前記検出に基づいて前記電池情報を前記制御部に伝える、
電池監視装置。
A monitoring unit (20) and a control unit (20), which are installed for each battery group (94) in which a plurality of cell batteries (95) included in the assembled battery (90) are grouped and acquire battery information which is information about the cell battery. A battery monitoring device (71 to 79) including a 10) and a communication unit (40) for transmitting the battery information from the monitoring unit to the control unit.
The assembled battery is connected to a predetermined load (99) so as to be able to supply power by a predetermined power supply path (α).
The communication unit includes a transmission path (δ), which is at least partially composed of the power supply path, a signal transmission unit (41) that transmits a transmission signal (Sd), which is a predetermined electric signal, to the transmission path. The signal change unit (43) that gives the transmission signal the battery information by changing the state of the transmission signal based on the battery information acquired by the monitoring unit, and the transmission signal is detected from the transmission path. It has a signal detection unit (47) to transmit the battery information to the control unit based on the change and the detection of the transmission signal.
Battery monitoring device.
前記通信部である第2通信部(40)と、前記給電経路を介さずに前記電池情報を前記監視部から前記制御部に伝える第1通信部(30)と、を有する請求項1に記載の電池監視装置。 The first aspect of claim 1 includes a second communication unit (40) which is the communication unit, and a first communication unit (30) which transmits the battery information from the monitoring unit to the control unit without going through the power supply path. Battery monitoring device. 前記監視部は、前記セル電池の電圧が異常であるか否かの判定を行い、異常であると判定したことを条件に、前記第2通信部により前記電池情報を前記制御部に伝える、請求項2に記載の電池監視装置。 The monitoring unit determines whether or not the voltage of the cell battery is abnormal, and on the condition that the determination is abnormal, the second communication unit transmits the battery information to the control unit. Item 2. The battery monitoring device according to item 2. 前記第1通信部は、前記電池情報を無線信号により伝えるものである、請求項2又は3に記載の電池監視装置。 The battery monitoring device according to claim 2 or 3, wherein the first communication unit transmits the battery information by a wireless signal. 前記監視部は、前記第1通信部による前記制御部との通信が異常であるか否かの判定を行い、異常であると判定したことを条件に、前記第2通信部により前記電池情報を前記制御部に伝える、請求項2〜4のいずれか1項に記載の電池監視装置。 The monitoring unit determines whether or not the communication with the control unit by the first communication unit is abnormal, and on the condition that the determination is abnormal, the second communication unit outputs the battery information. The battery monitoring device according to any one of claims 2 to 4, which is transmitted to the control unit. 前記給電経路を含む回路(62)の所定電位(V1)に対する地絡を検出する地絡検出回路(50)を有し、
前記地絡検出回路は、少なくとも一部が前記給電経路により構成されている検査経路(ε)と、前記検査経路に所定の電気信号である検査信号を発信する検査信号発信部(51)と、前記検査経路から前記検査信号を検出する検査信号検出部(57)とを有し、検出された前記検査信号の状態に基づいて前記地絡の有無を判定するものであり、
前記伝達経路における前記給電経路により構成されている部分以外の部分の少なくとも一部が、前記検査経路により構成されている、
請求項1〜5のいずれか1項に記載の電池監視装置。
It has a ground fault detection circuit (50) for detecting a ground fault with respect to a predetermined potential (V1) of the circuit (62) including the power feeding path.
The ground fault detection circuit includes an inspection path (ε) in which at least a part thereof is composed of the power feeding path, an inspection signal transmitting unit (51) that transmits an inspection signal which is a predetermined electric signal to the inspection path, and the inspection signal transmitting unit (51). It has an inspection signal detection unit (57) that detects the inspection signal from the inspection path, and determines the presence or absence of the ground fault based on the detected state of the inspection signal.
At least a part of the transmission path other than the part formed by the power supply path is composed of the inspection path.
The battery monitoring device according to any one of claims 1 to 5.
前記伝達信号と前記検査信号とは、互いに周波数が異なる、請求項6に記載の電池監視装置。 The battery monitoring device according to claim 6, wherein the transmission signal and the inspection signal have different frequencies from each other. 前記検査経路における前記伝達経路でもある部分を共通経路として、
前記検査信号検出部は、前記共通経路から前記検査信号を検出するものであり、前記検査信号検出部は、前記伝達信号を除去して前記検査信号を抽出する第1フィルタ(57f)を有し、
前記信号検出部は、前記共通経路から前記伝達信号を検出するものであり、前記信号検出部は、前記検査信号を除去して前記伝達信号を抽出する第2フィルタ(47f)を有する、
請求項7に記載の電池監視装置。
The portion of the inspection route that is also the transmission route is used as a common route.
The inspection signal detection unit detects the inspection signal from the common path, and the inspection signal detection unit has a first filter (57f) that removes the transmission signal and extracts the inspection signal. ,
The signal detection unit detects the transmission signal from the common path, and the signal detection unit has a second filter (47f) that removes the inspection signal and extracts the transmission signal.
The battery monitoring device according to claim 7.
前記地絡検出回路は、前記伝達信号が発信されるタイミングであるか否かの判定を行い、前記伝達信号が発信されるタイミングであると判定した場合に、前記検査信号の発信を禁止する、請求項6〜8のいずれか一項に記載の電池監視装置。 The ground fault detection circuit determines whether or not it is the timing at which the transmission signal is transmitted, and if it is determined that it is the timing at which the transmission signal is transmitted, the transmission of the inspection signal is prohibited. The battery monitoring device according to any one of claims 6 to 8. 前記監視部及び前記信号変更部は、第2基準電位(V2)が基準電位となる第2基準電位回路(62)に設けられており、
前記制御部及び前記信号検出部は、前記第2基準電位とは異なる所定の第1基準電位(V1)が基準電位となる第1基準電位回路(61)に設けられており、
伝達経路は、前記第2基準電位回路に設けられている伝達経路第2部(δ2)と、前記第1基準電位回路に設けられている伝達経路第1部(δ1)との両部を有し、当該両部は、絶縁素子(45)により当該両部間の電位差を保ちつつ電気的に接続されており、
前記信号変更部は、前記伝達経路第2部で前記伝達信号を変更し、前記信号検出部は、前記伝達経路第1部から前記伝達信号を検出する、
請求項1〜9のいずれか1項に記載の電池監視装置。
The monitoring unit and the signal changing unit are provided in a second reference potential circuit (62) in which the second reference potential (V2) is the reference potential.
The control unit and the signal detection unit are provided in a first reference potential circuit (61) in which a predetermined first reference potential (V1) different from the second reference potential becomes a reference potential.
The transmission path has both a transmission path second part (δ2) provided in the second reference potential circuit and a transmission path first part (δ1) provided in the first reference potential circuit. However, the two parts are electrically connected by the insulating element (45) while maintaining the potential difference between the two parts.
The signal changing unit changes the transmission signal in the transmission path second part, and the signal detection unit detects the transmission signal from the transmission path first part.
The battery monitoring device according to any one of claims 1 to 9.
前記伝達経路第1部は、前記監視部内にまで延びており、前記伝達経路第1部における前記絶縁素子とは反対側の端部は、前記監視部内において、前記伝達経路第2部における前記絶縁素子とは反対側の端部と、所定の素子(44,44c)を介して電気的に接続されており、
前記信号変更部は、前記素子による作用を変更することにより、前記伝達信号の状態を変更する、請求項10に記載の電池監視装置。
The transmission path first part extends into the monitoring part, and the end portion of the transmission path first part opposite to the insulating element is the insulation in the transmission path second part in the monitoring part. It is electrically connected to the end on the opposite side of the element via a predetermined element (44,44c).
The battery monitoring device according to claim 10, wherein the signal changing unit changes the state of the transmitted signal by changing the action of the element.
前記信号変更部は、前記伝達経路における所定部分の抵抗値を変更することにより、前記伝達信号の状態を変更する、請求項1〜11のいずれか1項に記載の電池監視装置。 The battery monitoring device according to any one of claims 1 to 11, wherein the signal changing unit changes the state of the transmitted signal by changing the resistance value of a predetermined portion in the transmission path. 前記信号変更部は、前記伝達経路における所定部分の電気容量を変更することにより、前記伝達信号の状態を変更する、請求項1〜11のいずれか1項に記載の電池監視装置。 The battery monitoring device according to any one of claims 1 to 11, wherein the signal changing unit changes the state of the transmitted signal by changing the electric capacity of a predetermined portion in the transmission path. 前記信号変更部は、前記伝達信号の状態を所定の第1状態とそれとは異なる第2状態とに繰り返し変更することにより、前記伝達信号に前記電池情報を持たせる、請求項1〜13のいずれか1項に記載の電池監視装置。 Any of claims 1 to 13, wherein the signal changing unit repeatedly changes the state of the transmitted signal into a predetermined first state and a second state different from the predetermined first state to give the transmitted signal the battery information. The battery monitoring device according to item 1. 前記信号変更部は、前記伝達信号の状態を所定の第1状態とそれとは異なる第2状態とに変更するものであり、前記第1状態であるか前記第2状態であるかに前記電池情報を持たせる、請求項1〜13のいずれか1項に記載の電池監視装置。 The signal changing unit changes the state of the transmitted signal into a predetermined first state and a second state different from the predetermined first state, and the battery information whether it is the first state or the second state. The battery monitoring device according to any one of claims 1 to 13. 前記信号変更部は、前記伝達信号の状態を、振幅(A)の大きさの異なる3種類以上の各状態(a0〜a3)に変更するものであり、前記伝達信号の前記3種類以上の各状態は、それぞれ異なる情報を持つ、請求項1〜15のいずれか1項に記載の電池監視装置。 The signal changing unit changes the state of the transmitted signal into each of three or more types (a0 to a3) having different magnitudes of amplitude (A), and each of the three or more types of the transmitted signal. The battery monitoring device according to any one of claims 1 to 15, wherein the state has different information. 前記信号変更部は、前記伝達信号の状態を所定の第1状態とそれとは異なる第2状態とに繰り返し変更するのに加え、前記第1状態又は前記第2状態を継続する時間である継続時間(B)を変更するものであり、
前記伝達信号は、前記継続時間の違い(b1〜b3)によって異なる情報を持つ、請求項1〜15のいずれか1項に記載の電池監視装置。
In addition to repeatedly changing the state of the transmitted signal between a predetermined first state and a second state different from the predetermined first state, the signal changing unit has a duration that is the time to continue the first state or the second state. It changes (B) and
The battery monitoring device according to any one of claims 1 to 15, wherein the transmission signal has different information depending on the difference in duration (b1 to b3).
前記伝達信号は、電流変動により情報を伝える電流変動信号であり、前記信号検出部は、前記伝達経路における電流変動を前記伝達信号として検出する、請求項1〜17のいずれか一項に記載の電池監視装置。 The transmission signal is a current fluctuation signal that transmits information by current fluctuation, and the signal detection unit detects the current fluctuation in the transmission path as the transmission signal, according to any one of claims 1 to 17. Battery monitoring device. 前記伝達信号は、電圧変動により情報を伝える電圧変動信号であり、前記信号検出部は、前記伝達経路における電圧変動を前記伝達信号として検出する、請求項1〜17のいずれか一項に記載の電池監視装置。 The transmission signal is a voltage fluctuation signal that transmits information by voltage fluctuation, and the signal detection unit detects the voltage fluctuation in the transmission path as the transmission signal, according to any one of claims 1 to 17. Battery monitoring device. 前記伝達経路にスイッチ(42)が設けられ、前記信号変更部は、前記スイッチを制御することにより、前記伝達信号の状態を変化させる、請求項1〜19のいずれか1項に記載の電池監視装置。 The battery monitoring according to any one of claims 1 to 19, wherein a switch (42) is provided in the transmission path, and the signal changing unit changes the state of the transmission signal by controlling the switch. apparatus.
JP2019148147A 2019-08-09 2019-08-09 battery monitor Active JP7238683B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019148147A JP7238683B2 (en) 2019-08-09 2019-08-09 battery monitor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019148147A JP7238683B2 (en) 2019-08-09 2019-08-09 battery monitor

Publications (2)

Publication Number Publication Date
JP2021029090A true JP2021029090A (en) 2021-02-25
JP7238683B2 JP7238683B2 (en) 2023-03-14

Family

ID=74667491

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019148147A Active JP7238683B2 (en) 2019-08-09 2019-08-09 battery monitor

Country Status (1)

Country Link
JP (1) JP7238683B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009089453A (en) * 2007-09-27 2009-04-23 Sharp Corp Battery monitoring circuit and battery control system
JP2016091613A (en) * 2014-10-30 2016-05-23 株式会社日立製作所 Battery system and soc recovery method
JP2016535489A (en) * 2013-10-25 2016-11-10 ヴィート エヌブイ Method and system for supplying pulsed power and data on a bus
WO2018099731A1 (en) * 2016-12-02 2018-06-07 Audi Ag Discharging a battery module, having at least two battery cells, of a battery having at least two battery modules
WO2019073757A1 (en) * 2017-10-13 2019-04-18 パナソニックIpマネジメント株式会社 Battery system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009089453A (en) * 2007-09-27 2009-04-23 Sharp Corp Battery monitoring circuit and battery control system
JP2016535489A (en) * 2013-10-25 2016-11-10 ヴィート エヌブイ Method and system for supplying pulsed power and data on a bus
JP2016091613A (en) * 2014-10-30 2016-05-23 株式会社日立製作所 Battery system and soc recovery method
WO2018099731A1 (en) * 2016-12-02 2018-06-07 Audi Ag Discharging a battery module, having at least two battery cells, of a battery having at least two battery modules
WO2019073757A1 (en) * 2017-10-13 2019-04-18 パナソニックIpマネジメント株式会社 Battery system

Also Published As

Publication number Publication date
JP7238683B2 (en) 2023-03-14

Similar Documents

Publication Publication Date Title
US9967135B2 (en) Communication link monitoring and failover
JP4656153B2 (en) Integrated circuit for battery system and battery cell control
JP4656150B2 (en) Battery system and integrated circuit for lithium battery cell control
US10718797B2 (en) Current detecting apparatus and battery management system
JP5638311B2 (en) Battery pack system, voltage monitoring system, voltage monitoring device, and semiconductor device
KR20120012430A (en) Charging device for vehicle and vehicle
JP2017500837A (en) Battery management system and method for a battery including a plurality of battery cells
JP2012168922A (en) Communication apparatus
US20160277071A1 (en) System for transmitting and receiving a power line communication signal over the power bus of a power electronic converter
US9729198B2 (en) Conditioning device and method for conditioning a data channel of a cell of an electrical energy store
CN107110904B (en) Grounding detection device for vehicle
JPWO2014170942A1 (en) Battery system
US9679726B2 (en) Anti-interference switch signal transmission circuit
US8786127B2 (en) Connecting apparatus for connection of field devices
JP2021029090A (en) Battery monitoring device
CN111884865B (en) Vehicle bus problem point detection equipment and detection method thereof
JP2017514450A (en) Communication system in electrical equipment with batteries
KR100998661B1 (en) Method of monitoring voltage for energy storage device and apparatus using the method
JP7238682B2 (en) battery monitor
JP2017015635A (en) Disconnection detection circuit for ac charger
US10277040B2 (en) Communication system for a battery-management system for a battery, and method for operating at least one predefined coupling network of such a communications system
CN107634742A (en) Signal circuit and vehicle
JP2022067723A (en) Battery control device
JP4213552B2 (en) External antenna detection circuit, wireless device and external antenna switching circuit
JP4555668B2 (en) Track circuit system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220921

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220927

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221125

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230213

R151 Written notification of patent or utility model registration

Ref document number: 7238683

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151