JP2020074665A - Power distribution panel - Google Patents

Power distribution panel Download PDF

Info

Publication number
JP2020074665A
JP2020074665A JP2019195725A JP2019195725A JP2020074665A JP 2020074665 A JP2020074665 A JP 2020074665A JP 2019195725 A JP2019195725 A JP 2019195725A JP 2019195725 A JP2019195725 A JP 2019195725A JP 2020074665 A JP2020074665 A JP 2020074665A
Authority
JP
Japan
Prior art keywords
branch
switch
diagnosis
energization
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2019195725A
Other languages
Japanese (ja)
Other versions
JP6924505B2 (en
Inventor
浩典 東田
Hironori Higashida
浩典 東田
博 津崎
Hiroshi Tsuzaki
博 津崎
一馬 松本
Kazuma Matsumoto
一馬 松本
貴弘 野口
Takahiro Noguchi
貴弘 野口
武 鎌田
Takeshi Kamata
武 鎌田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tempearl Industrial Co Ltd
Original Assignee
Tempearl Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2017255205A external-priority patent/JP6652954B2/en
Application filed by Tempearl Industrial Co Ltd filed Critical Tempearl Industrial Co Ltd
Priority to JP2019195725A priority Critical patent/JP6924505B2/en
Publication of JP2020074665A publication Critical patent/JP2020074665A/en
Priority to JP2020217893A priority patent/JP6986784B2/en
Priority to JP2020217892A priority patent/JP6986783B2/en
Application granted granted Critical
Publication of JP6924505B2 publication Critical patent/JP6924505B2/en
Priority to JP2021189450A priority patent/JP7149020B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Distribution Board (AREA)

Abstract

To provide a high-convenience power distribution panel.SOLUTION: A power distribution panel 100 comprises: a trunk switch 110 which cuts off a cable run by a trip operation in a case that an electrification state is abnormal; and multiple branch switches 130 connected to an output side of the trunk switch 110. The power distribution panel 100 further comprises the branch switch 130 including a branch electrification detection function for detecting the presence/absence of abnormality in the electrification state of the cable run of the brach switch 130 and outputting a branch electrification signal D2. The branch switch 130 includes a branch relay 131 for electrically controlling opening/closing of the cable run on the basis of the branch electrification signal D2. Moreover, the branch relay 131 is disposed on a printed circuit board.SELECTED DRAWING: Figure 19

Description

本発明は、住宅等において使用される分電盤に関するものである。   The present invention relates to a distribution board used in a house or the like.

一般的な分電盤は、ボディに収納された主幹開閉器(特許文献1では、主幹分岐回路遮断器)と、複数の分岐開閉器(特許文献1では、分岐回路遮断器)によって構成されている。ボディの前面側には、カバーが設けられており、そのカバーには、主幹開閉器や分岐開閉器等の操作部である操作レバーが配設されたボス部を露出させる窓孔が形成されている(例えば、特許文献1)。   A general distribution board is composed of a main switch (in Patent Document 1, a main branch circuit breaker) housed in a body and a plurality of branch switches (in Patent Document 1, a branch circuit breaker). There is. A cover is provided on the front side of the body, and a window hole is formed in the cover to expose a boss portion in which an operation lever, which is an operation unit such as a main switch and a branch switch, is arranged. (For example, Patent Document 1).

このような一般的な分電盤において、主幹開閉器および分岐開閉器の過電流や漏電等の異常を検知すると、操作レバー(特許文献2では、操作ハンドル)が傾倒または起立することにより回路を遮断するトリップ動作を行うようになっている。このように、機械的な動作によって回路の遮断を行うため、例えば、故障が生じた場合に主幹開閉器や分岐開閉器を交換する必要がある。一般的に、分岐開閉器は主幹開閉器と比較して、定格容量(定格電圧や定格電流等)が小さく設定される。また、例えば、大電流を使用する複数の負荷装置(例えば、電子レンジやドライヤー等)が単一の分岐開閉器に接続されることがある。このような状況から、分岐開閉器は、主幹開閉器と比較してトリップ動作や使用者の操作等による接続/遮断の動作回数が多くなり、主幹開閉器と比較してその交換頻度が高くなる傾向がある。   In such a general distribution board, when an abnormality such as an overcurrent or a leakage of the main switch or the branch switch is detected, the operation lever (in Patent Document 2, the operation handle) tilts or stands up to open the circuit. It is designed to perform a trip operation that shuts off. As described above, since the circuit is cut off by the mechanical operation, it is necessary to replace the main switch or the branch switch when a failure occurs, for example. Generally, the branch switch is set to have a smaller rated capacity (rated voltage, rated current, etc.) than the main switch. Also, for example, a plurality of load devices that use a large current (for example, a microwave oven, a dryer, etc.) may be connected to a single branch switch. Under such circumstances, the branch switch has a larger number of trips and connection / disconnection operations due to the user's operation, etc. than the main switch, and its replacement frequency is higher than that of the main switch. Tend.

特許文献2には、分岐開閉器(特許文献2では、分岐ブレーカ)の交換作業が容易な分電盤が開示されている。このものでは、分岐開閉器は、ブレーカ取付け板上に着脱可能に取り付けられ、この取付け板の裏側に形成された隙間を通って電力計測器と分岐開閉器の信号出力端とを配線している。これにより、故障等により交換の必要が生じた分岐開閉器を交換する際に、配線が邪魔にならない。   Patent Document 2 discloses a distribution board which facilitates replacement work of a branch switch (branch breaker in Patent Document 2). In this device, the branch switch is detachably mounted on the breaker mounting plate, and the electric power measuring device and the signal output end of the branch switch are wired through a gap formed on the back side of the mounting plate. .. As a result, the wiring does not get in the way when replacing the branch switch that needs to be replaced due to a failure or the like.

また、特許文献3には、ベース台の短手方向の両側において、長手方向に並べて配設された複数の分岐開閉器(特許文献3では、分岐ブレーカ)と、ベース台上に保持されたメインバー上に配設された表示ユニットとを備えた分電盤が開示されている。表示ユニットは、対応する分岐ブレーカに隣接するように配設された複数のLEDを有している。この特許文献3の分電盤において、表示ユニットのLEDは、予め設定された電流閾値と電流センサが検出した電流値との比較に応じて点灯や点滅を行う。   Further, in Patent Document 3, a plurality of branch switches (branch breakers in Patent Document 3) arranged side by side in the longitudinal direction on both sides in the lateral direction of the base, and a main body held on the base. A distribution board having a display unit arranged on a bar is disclosed. The display unit has a plurality of LEDs arranged adjacent to the corresponding branch breaker. In the distribution board of Patent Document 3, the LED of the display unit is turned on or blinks according to a comparison between a preset current threshold value and a current value detected by the current sensor.

特開2002−78120号公報JP, 2002-78120, A 特開2009−207237号公報JP, 2009-207237, A 特開2008−136280号公報JP, 2008-136280, A

しかしながら、特許文献1〜3に開示されているような従来の分電盤では、分電盤のサイズが主幹開閉器および分岐開閉器の数に依存して大きくなるという課題がある。すなわち、例えば、屋内で使用する負荷装置数の増加等に伴って分岐開閉器数を増加させるのに伴い、分電盤のサイズを大きくする必要があるという課題がある。仮に、既存の住宅等で分岐開閉器を増設する場合において、増設する分岐開閉器数が既設の分電盤のサイズに基づいて規定される分岐開閉器数を超えるとき、分電盤を増設(追加)するか、既設の分電盤よりもサイズの大きい分電盤と交換する必要がある。   However, in the conventional distribution boards as disclosed in Patent Documents 1 to 3, there is a problem that the size of the distribution board becomes large depending on the number of main switches and branch switches. That is, for example, there is a problem that it is necessary to increase the size of the distribution board as the number of branch switches is increased along with an increase in the number of load devices used indoors. If a branch switch is to be added to an existing house, etc., if the number of branch switches to be added exceeds the number of branch switches specified based on the size of the existing distribution board, the distribution board is added ( It is necessary to add) or replace the distribution board with a larger size than the existing distribution board.

さらに、従来の分岐開閉器は、例えば、バイメタル等を構成部品に含む熱動電磁方式であるため、通電電流により発熱する。この発熱による影響を緩和するため、すなわち冷却効果を確保するために、分岐開閉器の配置間隔の確保および周辺空間の確保が必要であり、従来の分電盤では、そのサイズを小さくすることは容易ではない。   Furthermore, since the conventional branch switch is a thermodynamic electromagnetic system that includes bimetal or the like in its constituent parts, for example, it generates heat due to an energized current. In order to mitigate the effect of this heat generation, that is, in order to ensure the cooling effect, it is necessary to secure the arrangement intervals of the branch switches and the peripheral space. It is not possible to reduce the size of the conventional distribution board. It's not easy.

また、前述のとおり、分岐開閉器は、例えば、予め定めた所定期間毎等での交換を要し、主幹開閉器と比較して、その交換頻度が高くなる。分電盤は、玄関やトイレの天井等の比較的暗くかつ高い位置に設けられことが多いため、分岐開閉器の交換作業は面倒であるという課題がある。   Further, as described above, the branch switch needs to be replaced, for example, every predetermined period, and the frequency of replacement is higher than that of the main switch. Since the distribution board is often installed in a relatively dark and high position such as the entrance or the ceiling of the toilet, the task of replacing the branch switch is troublesome.

これらの課題に対して、主幹開閉器および分岐開閉器を、共にリレー(例えば、ラッチリレーや半導体リレー)等の電気制御されるユニットに置きかえることが考えられる。これらのユニットは、既存の分電盤に採用されている主幹開閉器や分岐開閉器と比較して、通電電流による発熱が小さく、各々のユニットを構成する素子のサイズも小さくすることができる。そのため、分岐開閉器数が増加した場合においても、一定の大きさのケース内に主幹開閉器および分岐開閉器を収納することができる。   To solve these problems, it is conceivable to replace the main switch and the branch switch with an electrically controlled unit such as a relay (for example, a latch relay or a semiconductor relay). These units generate less heat due to the energizing current and can also reduce the size of the elements constituting each unit, as compared with the main switch and the branch switch used in the existing distribution board. Therefore, even if the number of branch switches is increased, the main switch and the branch switches can be housed in a case of a certain size.

しかしながら、主幹開閉器および分岐開閉器にリレーを用いた場合、例えば、通電状態が保持された状態でリレーの駆動部が壊れることにより、リレーを取り外さない限り通電状態が維持される、すなわち負荷側に電流が流れ続ける故障が発生する場合がある。分電盤には、例えば100V〜200V程度の電圧が印加され、また、例えば20A〜100A程度の電流が流れることを考えると、このような通電状態が継続する可能性を有する構成は好ましくない。   However, when a relay is used for the main switch and the branch switch, the energized state is maintained unless the relay is removed, for example, because the drive part of the relay is broken while the energized state is maintained, that is, the load side. There may be a failure in which current continues to flow. Considering that a voltage of, for example, about 100 V to 200 V is applied to the distribution board and a current of, for example, about 20 A to 100 A flows, such a configuration having a possibility of continuing such an energized state is not preferable.

また、従来の分電盤では、主幹開閉器や分岐開閉器が過電流や漏電等により遮断したとき、どの分岐開閉器がどのような原因で遮断したのかが不明確であるという課題がある。例えば、特許文献3では、分岐開閉器の使用状況を発光ダイオードの点灯により表示する技術が開示されているが、分岐開閉器が遮断した場合の遮断原因を報知する方法については開示されていない。また、分電盤は、玄関やトイレの天井等の比較的暗く、かつ高い位置に設けられことが多いため、特許文献3に開示されているような表示方法では、分岐開閉器数が増えた場合に、遮断された分岐開閉器の判別等がしにくいという課題がある。特に、停電等が発生し、周囲が暗くなっている状況では、遮断された分岐開閉器の判別等がしにくいという課題がある。   Further, the conventional distribution board has a problem that when the main switch or the branch switch is cut off due to an overcurrent, an electric leakage, etc., it is unclear which branch switch caused the break and what cause. For example, Patent Document 3 discloses a technique of displaying the usage status of a branch switch by lighting a light emitting diode, but does not disclose a method of notifying the cause of the break when the branch switch is blocked. Further, since the distribution board is often installed in a relatively dark and high position such as the entrance or the ceiling of the toilet, the number of branch switches is increased by the display method disclosed in Patent Document 3. In this case, there is a problem that it is difficult to distinguish the blocked branch switch. In particular, in a situation where the surroundings are dark due to a power outage or the like, there is a problem that it is difficult to distinguish the blocked branch switch.

本発明は、上記課題を解決するためになされたものであり、その主な目的は、分電盤の安全性を確保しつつ、利便性を向上させた分電盤を提供することにある。   The present invention has been made to solve the above problems, and a main object of the present invention is to provide a distribution board that is improved in convenience while ensuring the safety of the distribution board.

本発明に係る分電盤は、通電状態に異常がある際にトリップ動作により電気接続を遮断する主幹開閉器と、分岐通電信号に基づいてリレーを制御することにより電気接続を遮断する分岐開閉器とを接続して構成したものである。   The distribution board according to the present invention includes a main switch that cuts off electrical connection by a trip operation when there is an abnormality in an energized state, and a branch switch that cuts off electrical connection by controlling a relay based on a branch energization signal. It is configured by connecting and.

すなわち、本発明の第1態様では、分電盤は、主幹開閉器と、該主幹開閉器の出力側に分岐リレー接続部を介して接続された複数の分岐開閉器とを収納する筐体を備えている。さらに、分電盤は、分岐開閉器の電路の通電状態の異常の有無を検知して分岐通電信号を出力する分岐通電検知機能を包含する分岐開閉器を備えている。また、前記分岐通電信号を受けて分岐開閉器の電路の接続のオンオフを制御する開閉制御信号を出力する制御部を備えている。そして、主幹開閉器は、該主幹開閉器の通電状態に異常があるとき、トリップ動作により該主幹開閉器の電路を遮断するものであり、分岐開閉器は、開閉制御信号を受け、該開閉制御信号に基づいて該分岐開閉器の電路の開閉を電気制御する切替ユニットを有しているものであって、複数の前記分岐開閉器と前記分岐通電検知部がプリント基板上に配置されたものである。   That is, in the first aspect of the present invention, the distribution board has a housing that houses the main switch and a plurality of branch switches connected to the output side of the main switch via the branch relay connection unit. I have it. Furthermore, the distribution board is provided with a branch switch including a branch energization detection function that detects whether or not there is an abnormality in the energization state of the electric path of the branch switch and outputs a branch energization signal. A control unit is provided which receives the branch energization signal and outputs an opening / closing control signal for controlling on / off of connection of an electric path of the branch switch. The main switch is to shut off the electric path of the main switch by a trip operation when the energization state of the main switch is abnormal, and the branch switch receives the open / close control signal and receives the open / close control. A switch unit that electrically controls the opening and closing of the electric path of the branch switch based on a signal, wherein the plurality of branch switches and the branch energization detection unit are arranged on a printed circuit board. is there.

本態様によると、主幹開閉器は、トリップ動作により電路を遮断する、すなわち、機械的手段により電路の遮断を行うため、分岐開閉器の通電状態に異常がある際に安全かつ確実に電路を遮断することができる。一方で、分岐開閉器は、分岐通電信号に基づく切替ユニットの電気制御により、その電路の開閉(接続/遮断)を行う。一般的に、このような電気制御による切替ユニットは、機械的手段により電路を遮断する装置と比較して、長寿命であり、かつ小型化することが可能である。したがって、本開示に係る分電盤は、分電盤をすべて機械的手段により構成した場合と比較して、長寿命であり、かつ小型化することができる。さらに、電気制御による切替ユニットは、機械的手段により電路を遮断する装置と比較して、発熱を抑制することができる。したがって、冷却効果を確保するための各分岐開閉器間の空間確保や周辺空間の確保が不要となり、分電盤を小型化することができる。また、電気制御による切替ユニットは、例えば、プリント基板のような基板への実装が可能であり、例えば、あらかじめ複数の分岐開閉器とその配線とが実装された基板を準備することにより、施工時等における分電盤の設置作業、部品取り替え作業を容易化することができる。   According to this aspect, since the main switch breaks the electric circuit by the trip operation, that is, the electric circuit is cut off by the mechanical means, the electric circuit is safely and reliably cut off when the energization state of the branch switch is abnormal. can do. On the other hand, the branch switch opens and closes (connects / disconnects) the electric path by electrical control of the switching unit based on the branch energization signal. Generally, such a switching unit based on electric control has a long life and can be downsized as compared with a device that cuts off an electric path by mechanical means. Therefore, the distribution board according to the present disclosure has a long life and can be downsized as compared with the case where all the distribution boards are configured by mechanical means. Further, the electrically controlled switching unit can suppress heat generation as compared with a device that interrupts an electric path by mechanical means. Therefore, it is not necessary to secure the space between the branch switches or the peripheral space for securing the cooling effect, and the distribution board can be downsized. Further, the switching unit by electric control can be mounted on a substrate such as a printed circuit board, for example, by preparing a substrate on which a plurality of branch switches and their wiring are mounted in advance, during construction. It is possible to facilitate the work of installing the distribution board and the work of replacing parts in the case such as.

本発明の第2態様では、第1態様記載の分電盤において、分岐開閉器の状態を表示するとともに、その表示部分で使用者の操作を受けるタッチパネルと、タッチパネルへの操作に基づいて、分岐開閉器の電路の接続をオンオフ制御する開閉制御信号を切替ユニットに出力する制御部とを備えている。そして、切替ユニットは、分岐通電信号および開閉制御信号のうちの少なくともいずれか一方に基づいて分岐開閉器の電路の接続をオンオフ制御するものである。   According to a second aspect of the present invention, in the distribution board according to the first aspect, while displaying the state of the branch switch, a touch panel that is operated by the user at the display portion, and a branch based on the operation on the touch panel. And a control unit for outputting an opening / closing control signal for controlling on / off of the connection of the electric path of the switch to the switching unit. The switching unit controls ON / OFF of the connection of the electric path of the branch switch based on at least one of the branch energization signal and the switching control signal.

本態様によると、使用者の操作を受けて分岐開閉器の電路の接続をオンオフ制御可能にしたタッチパネルを有している。タッチパネルは、表示の追加や複数の情報を重ねて表示することや、レイアウトを変更して表示することなどが可能であり、分岐開閉器の電路の接続情報、分岐開閉器の通電状態等を使用者にわかりやすく表示することができる。さらに、タッチパネルに分電盤以外の情報を表示することも可能である。具体的には、例えば、本態様に係る分電盤を台所などに設置し、定常時には、分電盤に関する情報表示に代えて、テレビやインターネット等の情報を表示したり、インターネットでの使用者による検索(レシピ等の検索)等を可能にすることができる。   According to this aspect, the touch panel has the on / off controllable connection of the electric path of the branch switch in response to the user's operation. The touch panel can be used to add a display, display multiple pieces of information in piles, change the layout, etc., and use the connection information of the branch switch electrical circuits and the energization status of the branch switches. It can be displayed in an easy-to-understand manner. Further, information other than the distribution board can be displayed on the touch panel. Specifically, for example, the distribution board according to this aspect is installed in a kitchen or the like, and in a steady state, instead of displaying information about the distribution board, information such as a television or the Internet is displayed, or a user on the Internet. It is possible to enable a search (search for a recipe or the like) by.

また、第2態様記載の分電盤において、主幹開閉器および複数の分岐開閉器が収納された筐体を備え、タッチパネルは、筐体の表面からの操作が可能に配設され、主幹開閉器は、該主幹開閉器の電路の接続をオンオフ制御可能に構成された操作レバーを有し、操作レバーは、タッチパネルの左側において、筐体の外部に露出するように配設されていて、該筐体外部からの操作が可能に構成してもよい。   Further, in the distribution board according to the second aspect, the housing includes a main switch and a plurality of branch switches, and the touch panel is arranged so as to be operable from the surface of the main switch. Has an operation lever configured to control ON / OFF of connection of an electric path of the main switch, and the operation lever is disposed on the left side of the touch panel so as to be exposed to the outside of the case, It may be configured to be operable from outside the body.

本態様によると、主幹開閉器の操作レバーを筐体の左側表面に操作可能に露出させている。一般的に、分電盤は、玄関やトイレの天井等の比較的暗く、かつ高い位置に設けられことが多いため、その筐体の左右方向のスペースが限られている場合も多い。本態様では、操作レバーの右側にタッチパネルの領域分のスペースが形成されている。これにより、使用者による傾倒または起立操作を要する操作レバーに対して、右手による操作を容易にすることができる。   According to this aspect, the operation lever of the master switch is operably exposed on the left surface of the housing. In general, the distribution board is often installed in a relatively dark and high position such as the entrance or the ceiling of the toilet, so that the lateral space of the housing is often limited. In this aspect, a space corresponding to the area of the touch panel is formed on the right side of the operation lever. As a result, it is possible to facilitate the operation with the right hand on the operation lever that requires the tilting or standing operation by the user.

また、分電盤において、主幹開閉器の通電状態を検知して主幹通電信号を出力する主幹通電検知部を備えている。そして、制御部は、分岐通電信号に基づく分岐開閉器の通電状態および主幹通電信号に基づく主幹開閉器の通電状態のうちの少なくともいずれか一方が通電異常状態にあるとき、該通電異常状態であることをタッチパネルに表示してもよい。   In addition, the distribution board is provided with a master conduction detection unit that detects a conduction state of the master switch and outputs a master conduction signal. Then, the control unit is in the energization abnormal state when at least one of the energized state of the branch switch based on the branch energization signal and the energized state of the main switch based on the main energization signal is in the energization abnormal state. This may be displayed on the touch panel.

本態様によると、使用者は、オンオフ制御されている開閉器(主幹開閉器と分岐開閉器とをあわせて単に開閉器と称する場合がある。以下同様とする。)の情報に加えて、通電異常状態にある開閉器を瞬時にかつ明確に把握することができる。さらに、例えば、制御部が、分岐通電信号から受ける通電異常状態として、通電状態の異常の有無に加えて、通電状態の異常の内容の情報を読み取るように設定することにより、異常状態の種別を表示することができる。このような表示をすることにより、使用者は次に必要な行動、作業等を把握することができる。具体的には、例えば、居住者が自身で解決可能な異常なのか、あるいは電力会社や電気工事士等の有資格者等に通報を要する異常なのかを瞬時に把握することができる。   According to this aspect, the user is energized in addition to the information of the switch that is on / off controlled (the main switch and the branch switch may be simply referred to as a switch. The same applies hereinafter). The switch in an abnormal state can be grasped instantly and clearly. Further, for example, by setting the control unit to read the information on the content of the abnormality in the energized state in addition to the presence / absence of the abnormality in the energized state as the energization abnormal state received from the branch energization signal, the type of the abnormal state can be determined. Can be displayed. With such a display, the user can grasp the next necessary action, work, and the like. Specifically, for example, it is possible to instantly grasp whether the resident has an abnormality that can be solved by himself or an abnormality that requires notification to a qualified person such as an electric power company or an electrician.

また、分電盤において、タッチパネルは、通電異常状態の表示において、通電異常状態にある開閉器を示す情報を他の情報よりも目立つように強調して表示してもよい。   Further, in the distribution board, the touch panel may emphasize and display information indicating the switch in the abnormal power supply state so as to stand out more than other information in the display of the abnormal power supply state.

本態様のように通電異常状態を他の情報よりも目立つように強調して表示することにより、通電異常状態にある開閉器をより容易かつ瞬時に、明確に把握することができる。これにより、使用者は次に必要な行動、作業等をより容易かつ瞬時に把握することができる。このような表示をすることにより、使用者は次に必要な行動、作業等を把握したり、開閉器の復帰作業を実施したりすることができる。なお、他の情報よりも目立つように強調して表示するとは、他の情報を完全に省いて、異常報知情報を目立つように表示部に強調して表示することも含む概念である。   By emphasizing and displaying the current-carrying abnormal state more conspicuously than other information as in this aspect, it is possible to more easily and instantly and clearly grasp the switch in the current-carrying abnormal state. As a result, the user can more easily and instantly grasp the next necessary action, work or the like. By displaying such a display, the user can grasp the next necessary action, work, or the like, and can perform the work for returning the switch. It should be noted that the phrase "emphasized and displayed so as to be more conspicuous than other information" is a concept including that the other information is completely omitted and the abnormality notification information is conspicuously displayed on the display unit.

また、分電盤において、主幹開閉器および複数の分岐開閉器が収納された筐体と、筐体と一体的に設けられ、該筐体の内外を電気接続可能に構成されており、該筐体内において各分岐開閉器の負荷側配線と接続された負荷側コネクタとを備えていることを特徴としてもよい。   In addition, in the distribution board, a main body switch and a plurality of branch switches are housed in a housing, the housing is provided integrally with the housing, and the inside and outside of the housing are electrically connectable. It may be characterized in that a load side connector connected to the load side wiring of each branch switch is provided in the body.

この態様によると、各分岐開閉器の負荷側配線は負荷側コネクタに接続されている、すなわち負荷側コネクタを介して外部の負荷装置と接続可能に構成されている。これにより、例えば、新たに分電盤を施工する際に、従来の分電盤では、各分岐開閉器に対して負荷装置の配線を接続する必要があったのに対して、本態様では、負荷装置の配線と接続された負荷装置側のコネクタを分電盤の筐体と一体的に設けられた負荷側コネクタに接続することにより施工を行うことが可能になる。これにより、施工の作業容易性が向上する。さらに、例えば、分岐開閉器の故障や接続機器の配線変更がある場合に、分電盤内の配線の変更をすることなく、負荷装置側のコネクタへの配線を変更して、負荷装置と分岐開閉器との接続変更を行うことができる。   According to this aspect, the load-side wiring of each branch switch is connected to the load-side connector, that is, connectable to an external load device via the load-side connector. Thereby, for example, when a new distribution board is constructed, in the conventional distribution board, it was necessary to connect the wiring of the load device to each branch switch, whereas in the present embodiment, Construction can be performed by connecting the connector on the load device side, which is connected to the wiring of the load device, to the load side connector integrally provided with the casing of the distribution board. This improves the workability of construction. In addition, for example, if there is a failure of the branch switch or wiring change of the connected equipment, the wiring to the connector on the load device side can be changed without changing the wiring inside the distribution board to branch the load device. The connection with the switch can be changed.

また、分電盤において、主幹開閉器および複数の分岐開閉器が収納された筐体と、筐体と一体的に設けられ、該筐体の内外を電気接続可能に構成されており、該筐体内において主幹開閉器の入力側と接続された電源側コネクタと、電源側コネクタに接続され、主幹開閉器が遮断された際に制御部およびタッチパネルのうちの少なくともいずれか一方に電源を供給するバッテリーとを備えていることを特徴としてもよい。   In addition, in the distribution board, a main body switch and a plurality of branch switches are housed in a housing, the housing is provided integrally with the housing, and the inside and outside of the housing are electrically connectable. A power supply side connector connected to the input side of the master switch in the body, and a battery that is connected to the power supply side connector and supplies power to at least one of the control unit and the touch panel when the master switch is cut off. It may be characterized by having and.

この態様によると、バッテリーは電源側コネクタに接続されている。すなわち、主幹開閉器を経由することなく、電源側コネクタを介して外部の電源に接続されている、このような構成とすることにより、主幹開閉器が遮断されている場合においても、外部の電源からの電力が供給されていればバッテリーは充電される。これにより、例えば、停電時や、長期間にわたって主幹開閉器が遮断されているとき(例えば、長期間の不在、引っ越し等)でも、制御部やタッチパネルを動作させることができる。   According to this aspect, the battery is connected to the power supply side connector. That is, it is connected to an external power source through the power supply side connector without passing through the main switch. With such a configuration, even if the main switch is cut off, the external power source is If the power is supplied from the battery, the battery will be charged. Thereby, for example, the control unit and the touch panel can be operated even during a power failure or when the main switch is cut off for a long period of time (for example, absence of a long period of time, moving, etc.).

本発明によれば、通電状態に異常がある際にトリップ動作により電路を遮断する主幹開閉器を備え、分岐開閉器の電路の開閉を電気制御により実現することにより安全性を確保しつつ、分電盤の利便性を高めることができる。   According to the present invention, a main switch that shuts off the electric circuit by a trip operation when there is an abnormality in the energized state is provided, and while opening and closing the electric circuit of the branch switch by electrical control, while ensuring safety, The convenience of the electric board can be improved.

実施形態に係る分電盤の斜視図であり、(a)は右斜め上側から見た斜視図、(b)は右斜め下側から見た斜視図である。It is a perspective view of the distribution board which concerns on embodiment, (a) is the perspective view seen from diagonally right upper side, (b) is the perspective view seen from diagonally right lower side. 実施形態に係る分電盤のカバーを外して右斜め上側から見た斜視図である。It is the perspective view which removed the cover of the distribution board which concerns on embodiment, and was seen from the diagonally right upper side. 実施形態に係る分電盤の回路構成例を示した図である。It is a figure showing an example of circuit composition of a distribution board concerning an embodiment. 分岐リレーと分岐リレー接続部との接続を説明するための図である。It is a figure for demonstrating the connection of a branch relay and a branch relay connection part. 主幹開閉器の初期通電診断フローを示すフロー図である。It is a flow figure showing an initial electrification diagnostic flow of a master switch. 主幹開閉器のON診断のフロー図である。It is a flow chart of ON diagnosis of a master switch. 主幹開閉器のON診断のフロー図である。It is a flow chart of ON diagnosis of a master switch. 分岐リレーのON診断のフロー図である。It is a flow chart of ON diagnosis of a branch relay. 分岐リレーがON/OFF操作されたときの分岐リレーのON診断のフロー図である。It is a flowchart of ON diagnosis of a branch relay when the branch relay is turned ON / OFF. 主幹開閉器の定常時診断のフロー図である。It is a flow diagram of a steady state diagnosis of the main switch. 主幹開閉器の定常時診断のフロー図である。It is a flow diagram of a steady state diagnosis of the main switch. 主幹開閉器の定常時診断のフロー図である。It is a flow diagram of a steady state diagnosis of the main switch. 分岐リレーの定常時診断のフロー図である。It is a flow diagram of the steady state diagnosis of the branch relay. ピークカット処理のフロー図である。It is a flowchart of a peak cut process. 定常状態におけるタッチパネルの表示例を示した図である。It is a figure showing an example of a display of a touch panel in a steady state. タッチパネルの初期表示画面の一例を示した図である。It is the figure which showed an example of the initial display screen of a touch panel. 主幹開閉器の異常状態におけるタッチパネルの表示例を示した図である。It is the figure which showed the example of a display of the touch panel in the abnormal state of the master switch. 分岐リレーの異常状態におけるタッチパネルの表示例を示した図である。It is the figure which showed the example of a display of the touch panel in the abnormal state of a branch relay. 実施形態に係る分電盤の他の回路構成例を示した図である。It is a figure showing other examples of circuit composition of the distribution board concerning an embodiment.

以下、本発明の実施形態を図面に基づいて詳細に説明する。以下の好ましい実施形態の説明は、本質的に例示に過ぎず、本発明、その適用範囲あるいはその用途を制限することを意図するものではない。また、発明の理解を容易にするために、実質的に同一または類似の事項についての説明を省略する場合がある。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. The description of the preferred embodiments below is merely exemplary in nature and is not intended to limit the present invention, its application range, or its application. Further, in order to facilitate understanding of the invention, description of substantially the same or similar matters may be omitted.

(分電盤の構成)
図1は実施形態に係る分電盤の斜視図であり、図2は分電盤のカバーを外して右斜め上側から見た斜視図であり、図3は分電盤の回路構成例を示した図である。
(Composition of distribution board)
FIG. 1 is a perspective view of a distribution board according to an embodiment, FIG. 2 is a perspective view of the distribution board seen from an upper right side with a cover of the distribution board removed, and FIG. 3 shows a circuit configuration example of the distribution board. It is a figure.

図1〜図3に示すように、分電盤100は、外部の電源からの電力の供給を受ける主幹開閉器110と、後述する主幹電流測定部121および主幹異常検出部122を有する主幹通電検知部120並びに分岐リレー接続部123を介して主幹開閉器110の負荷装置側に接続された複数の分岐開閉器130と、これらを収納する矩形箱状の筐体101とを備えている。分岐開閉器130は、切替ユニットとしての分岐リレー131を備えている。本実施形態では、分岐リレー131はラッチリレーであるものとして説明する。   As shown in FIGS. 1 to 3, the distribution board 100 includes a master switch 110 that receives power from an external power source, and a master current detection unit that includes a master current measurement unit 121 and a master abnormality detection unit 122 described below. It is provided with a plurality of branch switches 130 connected to the load device side of the main switch 110 via a section 120 and a branch relay connection section 123, and a rectangular box-shaped casing 101 for housing these. The branch switch 130 includes a branch relay 131 as a switching unit. In this embodiment, the branch relay 131 will be described as a latch relay.

なお、分岐リレー131はラッチリレーに限定されず、例えば、半導体リレーのような他のリレーであってもよい(後述する“その他の実施形態”および図19参照)。また、切替ユニットとして、例えば、非接触給電方式の切替手段のようなリレー以外の切替手段を用いて電路の開閉の切替えをしてもよい。なお、本開示において、リレーとは、有接点リレー、無接点リレーおよび有接点リレーと無接点リレーとを組み合わせたハイブリッド型のリレーを含む概念である。   The branch relay 131 is not limited to the latch relay, and may be another relay such as a semiconductor relay (see “Other Embodiments” and FIG. 19 described later). As the switching unit, for example, switching means other than a relay such as a contactless power feeding type switching means may be used to switch between opening and closing of the electric path. In the present disclosure, the relay is a concept including a contact relay, a non-contact relay, and a hybrid type relay combining a contact relay and a non-contact relay.

筐体101は、主幹開閉器110および分岐リレー131等が配設され、かつ前面が開口した矩形箱状のボックス101aと、ボックス101aの開口を覆うカバー101bとを備えている。ボックス101aは、ねじやフック(図示しない)等によって壁面等に取り付けされる。また、ボックス101aとカバー101bとは、例えば長手方向(図1における左右方向)の側面において、ねじ(図示しない)によってねじ止めされる。   The housing 101 is provided with a main box switch 110, a branch relay 131, and the like, and includes a rectangular box-shaped box 101a having an open front surface, and a cover 101b that covers the opening of the box 101a. The box 101a is attached to a wall surface or the like with screws or hooks (not shown). Further, the box 101a and the cover 101b are screwed to each other, for example, on the side surfaces in the longitudinal direction (the left-right direction in FIG. 1) with screws (not shown).

なお、上記のねじ止め固定される場所は、例えば、カバー101bの前側からのねじ止め固定でもよい。また、ボックス101aやカバー101bに嵌合部(図示しない)を設け、その嵌合部の嵌合によってボックス101aとカバー101bとを固定してもよい。なお、本実施形態の説明において、“前”とはカバー101b側を、“後”とはボックス101a側を指すものとする。   The place where the above-mentioned screw fixing is performed may be, for example, a screw fixing from the front side of the cover 101b. Further, a fitting portion (not shown) may be provided on the box 101a and the cover 101b, and the box 101a and the cover 101b may be fixed by fitting the fitting portion. In the description of the present embodiment, “front” refers to the cover 101b side, and “rear” refers to the box 101a side.

カバー101bの前面には、上端から下端までの間において、右側端部からカバー101bの左右中間の左側寄りまで広がるタッチパネル200が設けられている。カバー101b前面においてタッチパネル200左側の上下方向の中間部分には、タッチパネル200を初期表示状態に戻すためのホームボタン104が設けられている。   On the front surface of the cover 101b, a touch panel 200 is provided between the upper end and the lower end and extends from the right end portion to the left side in the middle of the cover 101b. A home button 104 for returning the touch panel 200 to the initial display state is provided in the vertical middle portion on the left side of the touch panel 200 on the front surface of the cover 101b.

また、ホームボタン104の左側の上下方向の中間部分には、後述する主幹開閉器110の主幹突状部112の大きさよりも若干大きく形成され、前後方向に貫通する矩形の貫通孔102aが設けられている。これにより、ボックス101aにカバー101bが取り付けされた際に、主幹開閉器110の主幹突状部112および後述する操作レバー113がカバー101bの外側に露出する。同様に、カバー101bのタッチパネル200左側の下端部寄りの部位には、後述するバッテリー表示部161、マイク162およびスピーカ163をそれぞれ外部に露出するために、これらの大きさよりもそれぞれ若干大きく形成され、前後方向に貫通する矩形の貫通孔102b,102c,102dが設けられている。また、カバー101bの下面右端部には、タッチパネル200をオンオフ制御するための電源ボタン103が設けられている。   In addition, a rectangular through hole 102a, which is formed to be slightly larger than the size of a trunk protrusion 112 of a trunk switch 110, which will be described later, and which penetrates in the front-rear direction is provided in an intermediate portion on the left side of the home button 104 in the vertical direction. ing. As a result, when the cover 101b is attached to the box 101a, the trunk protrusions 112 of the trunk switch 110 and the operation lever 113 described later are exposed to the outside of the cover 101b. Similarly, in a portion of the cover 101b near the lower end portion on the left side of the touch panel 200, a battery display portion 161, a microphone 162, and a speaker 163, which will be described later, are formed to be slightly larger than these sizes in order to be exposed to the outside. Rectangular through holes 102b, 102c, and 102d are provided to penetrate in the front-rear direction. A power button 103 for on / off controlling the touch panel 200 is provided at the right end of the lower surface of the cover 101b.

図2に示すように、ボックス101a上面の長手方向両側には、電源側コネクタ151と負荷側コネクタ156とがボックス101aから上側に向かうようにそれぞれ一体的に突設されている。電源側コネクタ151は、筐体101の内外で電気接続が可能に構成された複数の接続端子を有し、外部の電源と接続された接続ケーブル301のコネクタ301aと接続可能に構成されている。電源側コネクタ151の接続端子は、筐体101の内部において、主幹開閉器110の入力端子と接続されている。このような構成とすることにより、主幹開閉器110は電源側コネクタ151および接続ケーブル301を介して外部の電源と接続される。   As shown in FIG. 2, a power supply side connector 151 and a load side connector 156 are integrally provided so as to project upward from the box 101a on both sides in the longitudinal direction of the upper surface of the box 101a. The power supply side connector 151 has a plurality of connection terminals configured to be electrically connected inside and outside the housing 101, and is configured to be connectable to the connector 301a of the connection cable 301 connected to an external power supply. The connection terminal of the power supply side connector 151 is connected to the input terminal of the master switch 110 inside the housing 101. With such a configuration, the main switch 110 is connected to an external power source via the power source side connector 151 and the connection cable 301.

主幹開閉器110は、矩形箱状の主幹ベース部111と、主幹ベース部111の前側に一体的に突設された矩形箱状の主幹突状部112と、主幹突状部112に形成した貫通窓から前側に突設され、使用者の起立/傾倒操作を受けて主幹開閉器110の電路の接続/遮断をオンオフ制御可能に構成された操作レバー113とを備えている。さらに、主幹開閉器110は、トリップ動作により主幹開閉器110の電路を開閉可能に構成された電路遮断機構(図示しない)を備えている。電路遮断機構は、電磁式の瞬時引外し装置、バイメタル式の時延形引外し装置、トリップコイル等によって構成されており、過電流、短絡電流、漏電、過電圧等の主幹開閉器110の負荷装置側における通電状態に異常があるとき、主幹開閉器110の電路を、機械的に自動遮断する(以下、トリップ動作ともいう)機構である。   The main trunk switch 110 includes a rectangular box-shaped main trunk base 111, a rectangular box-shaped main trunk protrusion 112 integrally provided on the front side of the main trunk base 111, and a penetration formed in the main trunk protrusion 112. The control lever 113 is provided so as to project from the window to the front side and is configured to be able to perform on / off control of connection / disconnection of the electric path of the master switch 110 in response to a user's standing / tilting operation. Further, the master switch 110 is equipped with a circuit breaker (not shown) configured to open and close the circuit of the master switch 110 by a trip operation. The circuit breaker is composed of an electromagnetic type instantaneous trip device, a bimetal type time-delay trip device, a trip coil, etc., and is a load device for the main switch 110 such as overcurrent, short-circuit current, earth leakage, and overvoltage. It is a mechanism that mechanically automatically cuts off the electric path of the master switch 110 (hereinafter, also referred to as trip operation) when the power supply state on the side is abnormal.

主幹通電検知部120は、主幹電流測定部121と、主幹異常検出部122とを備えており、主幹開閉器110の通電状態の異常の有無を検知して、その検知結果を示す主幹通電信号D1を出力する。主幹電流測定部121は、短絡および過電流を検知するためのものであり、具体的には、電路を流れる電流を測定し(例えば、特開2000−299934号公報、特開2008−131765号公報参照)、その測定結果を主幹電流信号D11として出力する。主幹異常検出部122は、過電圧および漏電を検知するためのものであり、具体的には、電圧および電路に設けられた変流器からの検出信号に基づく漏電電流を測定し(例えば、特開2009−081928号公報参照)、その測定結果を主幹異常信号D12として出力する。本開示では、主幹通電信号D1とは、主幹電流信号D11および主幹異常信号D12の両方またはいずれか一方を指すものとする。   The master energization detection unit 120 includes a master current measurement unit 121 and a master abnormality detection unit 122, detects whether or not there is an abnormality in the energization state of the master switch 110, and the master energization signal D1 indicating the detection result. Is output. The main current measuring unit 121 is for detecting a short circuit and an overcurrent, and specifically measures the current flowing through the electric path (for example, Japanese Patent Laid-Open Nos. 2000-299934 and 2008-131765). Reference), and outputs the measurement result as a main current signal D11. The trunk abnormality detection unit 122 is for detecting overvoltage and leakage, and specifically, measures the leakage current based on the voltage and the detection signal from the current transformer provided in the electric path (see, for example, Japanese Patent Laid-Open Publication No. 2000-242242). (See Japanese Patent Publication No. 2009-081928), and outputs the measurement result as a trunk abnormality signal D12. In the present disclosure, the master conduction signal D1 refers to both or either of the master current signal D11 and the master abnormality signal D12.

図3および図4に示すように、分岐リレー接続部123は、主幹通電検知部120の負荷装置側に接続されており、主幹開閉器110および主幹通電検知部120を介して外部の電源から供給された電力を分岐して各分岐リレー131に出力する。具体的には、分岐リレー接続部123は、ボックス101aの右側の上下方向中間において、ボックス101aの長手方向に延びる矩形状体であり、この分岐リレー接続部123の上下方向の両側面には、端子差込口123aが分岐リレー接続部123の長手方向に所定のピッチで並べて形成されている。端子差込口123aは、分岐リレー接続部123の前側において、ボックス101aの長手方向に所定のピッチで並べて形成されたN極端子差込口123bと、各N極端子差込口123bと対応するように分岐リレー接続部123の後側において、ボックス101aの長手方向に所定のピッチで並べて形成されたL極端子差込口123cとからなる。   As shown in FIGS. 3 and 4, the branch relay connection unit 123 is connected to the load device side of the master energization detection unit 120, and is supplied from an external power source via the master switch 110 and the master energization detection unit 120. The generated power is branched and output to each branch relay 131. Specifically, the branch relay connection part 123 is a rectangular body extending in the longitudinal direction of the box 101a in the middle of the right side of the box 101a in the vertical direction. The terminal insertion ports 123a are formed side by side at a predetermined pitch in the longitudinal direction of the branch relay connection portion 123. The terminal insertion ports 123a correspond to the N pole terminal insertion ports 123b formed side by side at a predetermined pitch in the longitudinal direction of the box 101a on the front side of the branch relay connection part 123, and each N pole terminal insertion port 123b. As described above, on the rear side of the branch relay connection portion 123, the L pole terminal insertion ports 123c are formed side by side at a predetermined pitch in the longitudinal direction of the box 101a.

複数の分岐リレー131は、分岐リレー接続部123の上下方向の両側において、ボックス101aの長手方向に並べて配設されている。各分岐リレー131は、その一側面から突設された2本の一次側N極端子131bおよび2本の一次側L極端子131cを備えており、各分岐リレー131は、一次側N極端子131bおよび一次側L極端子131cを、分岐リレー接続部123のN極端子差込口123bおよびL極端子差込口123cに差し込むことで分岐リレー接続部123に接続される。   The plurality of branch relays 131 are arranged side by side in the longitudinal direction of the box 101a on both sides in the vertical direction of the branch relay connection portion 123. Each branch relay 131 includes two primary side N-pole terminals 131b and two primary side L-pole terminals 131c protruding from one side surface thereof, and each branch relay 131 has a primary-side N pole terminal 131b. And the primary side L pole terminal 131c is connected to the branch relay connection part 123 by inserting it into the N pole terminal insertion port 123b and the L pole terminal insertion port 123c of the branch relay connection part 123.

図2および図3に示すように、各分岐リレー131の負荷装置側には、分岐通電検知部140が配設されており、各分岐通電検知部140の負荷装置側配線は、それぞれ負荷側コネクタ156に接続されている。負荷側コネクタ156は、外部の負荷装置A,B,Cと接続された接続ケーブル302のコネクタ302aと接続可能に構成されている。   As shown in FIGS. 2 and 3, a branch energization detection unit 140 is disposed on the load device side of each branch relay 131, and the load device side wiring of each branch energization detection unit 140 is a load side connector. It is connected to 156. The load-side connector 156 is configured to be connectable to the connector 302a of the connection cable 302 connected to the external load devices A, B, and C.

分岐通電検知部140は、分岐電流測定部141と、分岐異常検出部142とを備えており、分岐開閉器130の通電状態の異常の有無を検知して、その検知結果を示す分岐通電信号D2を出力する。分岐電流測定部141は、短絡電流および過電流を検出するためのものであり、具体的には、電路を流れる電流を測定し(例えば、特開2000−299934号公報、特開2008−131765号公報参照)、その測定結果を分岐電流信号D21として出力する。分岐異常検出部142は、トラッキングおよび漏電を検知するためのものであり、具体的には、電圧の測定、および電路に設けられた変流器からの検出信号に基づく漏電電流を測定し(例えば、特開2009−081928号公報参照)、その測定結果を分岐異常信号D22として出力する。本開示では、分岐通電信号D2とは、分岐電流信号D21および分岐異常信号D22の両方またはいずれか一方を指すものとする。   The branch energization detection unit 140 includes a branch current measurement unit 141 and a branch abnormality detection unit 142, detects whether there is an abnormality in the energization state of the branch switch 130, and outputs a branch energization signal D2 indicating the detection result. Is output. The branch current measuring unit 141 is for detecting a short circuit current and an overcurrent, and specifically, measures the current flowing through the electric path (for example, Japanese Patent Laid-Open Nos. 2000-299934 and 2008-131765). (See the official gazette), and outputs the measurement result as a branch current signal D21. The branch abnormality detection unit 142 is for detecting tracking and leakage, and specifically, measures the voltage and the leakage current based on the detection signal from the current transformer provided in the electric path (for example, , JP 2009-081928 A), and outputs the measurement result as a branch abnormality signal D22. In the present disclosure, the branch energization signal D2 refers to either or both of the branch current signal D21 and the branch abnormality signal D22.

分電盤100は、ボックス101a内において、電源側コネクタ151に接続され、停電等により主幹開閉器110への電力供給が遮断されたことを検知し、検知結果に基づいて停電検知信号D3を出力する停電検知部152と、電源側コネクタ151および停電検知部152を介して外部の電源に接続されたバッテリー153と、制御部としての信号処理部154と、バッテリー153の残量が所定の閾値以下であることを示すバッテリー表示部161と、マイク162と、スピーカ163と、装置外部との通信を可能にする通信部164と、タッチパネル200との間で信号の受渡しを行うパネル入出力部165とを備えている。   The distribution board 100 is connected to the power supply side connector 151 in the box 101a, detects that the power supply to the master switch 110 is cut off due to a power failure or the like, and outputs a power failure detection signal D3 based on the detection result. Power outage detection unit 152, a battery 153 connected to an external power source via the power supply side connector 151 and the power outage detection unit 152, a signal processing unit 154 as a control unit, and the remaining amount of the battery 153 is less than or equal to a predetermined threshold value. A battery display unit 161, a microphone 162, a speaker 163, a communication unit 164 that enables communication with the outside of the device, and a panel input / output unit 165 that exchanges signals with the touch panel 200. Is equipped with.

バッテリー153は、信号処理部154、パネル入出力部165およびタッチパネル200に接続されており、信号処理部154、パネル入出力部165およびタッチパネル200は、バッテリー153を介して外部の電源からの電源供給を受ける。これにより、例えば停電時でも使用者はタッチパネル200の表示の確認や操作をすることができる。なお、信号処理部154は、主幹通電検知部120の負荷装置側とも接続されており、定常時に主幹開閉器110および主幹通電検知部120を介して電源の供給を受けるようにしてもよい。   The battery 153 is connected to the signal processing unit 154, the panel input / output unit 165 and the touch panel 200, and the signal processing unit 154, the panel input / output unit 165 and the touch panel 200 are supplied with power from an external power source via the battery 153. Receive. This allows the user to check and operate the display on the touch panel 200 even during a power failure, for example. The signal processing unit 154 may also be connected to the load device side of the master energization detection unit 120, and may receive power supply via the master switch 110 and the master energization detection unit 120 in a steady state.

バッテリー153は、上記のように電源側コネクタ151および停電検知部152を介して外部の電源に接続されている、すなわち、主幹開閉器110の入力側に接続されている。このような構成とすることにより、主幹開閉器110が遮断されている場合においても、外部の電源からの電力が供給されていればバッテリー153は充電される。例えば、長期間にわたって主幹開閉器110が遮断されたとき(例えば、長期間の不在、引っ越し等)でも、主幹開閉器110の操作レバー113を“ON”操作する前に、タッチパネル200による操作やタッチパネル200への表示等を実施することができる。なお、バッテリー153は、信号処理部154およびタッチパネル200のうちのいずれか一方にのみ接続されていてもよいし、他のブロック、例えば、マイク162やスピーカ163に接続して、これらの非常用電源として使用してもよい。   The battery 153 is connected to an external power source via the power supply side connector 151 and the power failure detection unit 152 as described above, that is, connected to the input side of the master switch 110. With such a configuration, the battery 153 is charged even when the main switch 110 is cut off, if the power is supplied from the external power source. For example, even when the main switch 110 is shut off for a long period of time (for example, absent for a long period of time, moving, etc.), before the operation lever 113 of the main switch 110 is turned “ON”, the operation by the touch panel 200 or the touch panel is performed. The display etc. to 200 can be implemented. Note that the battery 153 may be connected to only one of the signal processing unit 154 and the touch panel 200, or may be connected to another block, for example, the microphone 162 or the speaker 163 to provide an emergency power source for these. May be used as.

信号処理部154は、分電盤100内の各ブロックを制御する機能を有する。例えば、信号処理部154は、バッテリー153の充電状態を監視し、満充電時の充電停止等の充電制御を行ったり、バッテリー153の残量が所定の閾値未満になった場合およびその後閾値以上の残量に復帰した場合にバッテリー表示部161に表示制御信号を出力したりする。バッテリー表示部161は、例えば磁気反転表示素子を用いて構成され、信号処理部154からの信号を受けて表示を切り替える。このような構成をすることにより、バッテリー表示部161は、信号処理部154からの信号が停止した後でも継続して、バッテリー153の残量が閾値未満であることを表示することができる。   The signal processing unit 154 has a function of controlling each block in the distribution board 100. For example, the signal processing unit 154 monitors the state of charge of the battery 153, performs charge control such as stopping charging at the time of full charge, and when the remaining amount of the battery 153 is less than a predetermined threshold value and thereafter a threshold value or more. When the battery level is restored, a display control signal is output to the battery display unit 161. The battery display unit 161 is configured by using, for example, a magnetic reversal display element, and receives a signal from the signal processing unit 154 to switch the display. With such a configuration, the battery display unit 161 can continuously display that the remaining amount of the battery 153 is less than the threshold value even after the signal from the signal processing unit 154 is stopped.

また、例えば、信号処理部154は、主幹通電検知部120の主幹通電信号D1、分岐通電検知部140の分岐通電信号D2および停電検知部152の停電検知信号D3を受けて、主幹通電信号D1、分岐通電信号D2、停電検知信号D3に基づいて、パネル入出力部165を介してタッチパネル200の表示内容の制御を行ったり、スピーカ163からの警報情報等の報知を制御したり、通信部164を介して検知結果の送信を行ったりする。さらに、信号処理部154は、タッチパネル200からの操作入力情報、マイク162からの音声入力情報、分岐通電検知部140の分岐通電信号D2に基づいて、分岐開閉器130の電路の接続をオンオフ制御する、すなわち、分岐リレー131をオンオフ制御する開閉制御信号CS1を分岐リレー131に出力し、分岐開閉器130(分岐リレー131)の電路の開閉を制御する。なお、以降の説明において、信号処理部154がパネル入出力部165を介してタッチパネル200の画面表示等を制御したり、パネル入出力部165を介してタッチパネル200の操作情報を受けたりすることについて、パネル入出力部165を経由する旨の記載を省略する場合がある。   Further, for example, the signal processing unit 154 receives the main trunk energization signal D1 of the main trunk energization detection unit 120, the branch energization signal D2 of the branch energization detection unit 140, and the power failure detection signal D3 of the power failure detection unit 152, and receives the main trunk energization signal D1. Based on the branch energization signal D2 and the power failure detection signal D3, the display content of the touch panel 200 is controlled via the panel input / output unit 165, the alarm information from the speaker 163 is controlled, and the communication unit 164 is controlled. The detection result is transmitted via the. Further, the signal processing unit 154 controls the connection of the electric path of the branch switch 130 on and off based on the operation input information from the touch panel 200, the voice input information from the microphone 162, and the branch energization signal D2 of the branch energization detection unit 140. That is, the switching control signal CS1 for controlling the on / off of the branch relay 131 is output to the branch relay 131 to control the opening / closing of the electric path of the branch switch 130 (branch relay 131). In the following description, the signal processing unit 154 controls the screen display of the touch panel 200 via the panel input / output unit 165, and receives the operation information of the touch panel 200 via the panel input / output unit 165. In some cases, the description of passing through the panel input / output unit 165 may be omitted.

(分電盤の通電状況の診断)
次に、分電盤100の通電状況の診断フロー(例えば短絡、過電流、漏電、過電圧、トラッキング等の異常の有無の診断フロー)について図面を参照しながら詳細に説明する。
(Diagnosis of power distribution status of distribution board)
Next, the flow of diagnosis of the energization status of the distribution board 100 (for example, the flow of diagnosis of presence or absence of abnormality such as short circuit, overcurrent, leakage, overvoltage, tracking) will be described in detail with reference to the drawings.

<主幹開閉器の初期通電診断>
図5は主幹開閉器110が“ON”操作された場合、すなわち主幹開閉器110の操作レバー113が“ON”操作された場合についての診断フローを示した図である。本実施形態では、主幹開閉器110の定格電流は例えば60Aであるものとし、分岐リレー131の定格電流は例えば20Aであるものとして説明する。なお、この定格電流は、発明の理解を容易にするために例示する値であり、発明の技術的範囲を限定する意図を有するものではない。以降の説明においても、定格電流値、定格電圧値、継続時間等の具体的な数値は、発明の理解を容易にするために例示する値であり、発明の技術的範囲を限定する意図を有するものではない。
<Initial energization diagnosis of the main switch>
FIG. 5 is a diagram showing a diagnostic flow when the master switch 110 is operated “ON”, that is, when the operation lever 113 of the master switch 110 is operated “ON”. In the present embodiment, it is assumed that the main switch 110 has a rated current of, for example, 60 A, and the branch relay 131 has a rated current of, for example, 20 A. It should be noted that this rated current is a value exemplified for facilitating the understanding of the invention, and is not intended to limit the technical scope of the invention. Also in the following description, specific numerical values such as rated current value, rated voltage value, and duration are values illustrated to facilitate understanding of the invention, and are intended to limit the technical scope of the invention. Not a thing.

まず、主幹開閉器110の操作レバー113が“ON”操作されると、フローはステップSM11からステップSM12に進み、信号処理部154は、後述する“主幹開閉器のON診断”を開始する。そして、“主幹開閉器のON診断”の診断結果に異常がなかった場合、フローはステップSM13からステップSM14に進み、信号処理部154は、タッチパネル200に定常画面を表示させる。このとき、信号処理部154は、タッチパネル200の表示の明るさを明るさ1(定常表示)に設定して(SM15)、処理を終了する。   First, when the operation lever 113 of the master switchgear 110 is operated "ON", the flow proceeds from step SM11 to step SM12, and the signal processing unit 154 starts "main switchgear ON diagnosis" described later. Then, if there is no abnormality in the diagnosis result of “ON diagnosis of main switch”, the flow proceeds from step SM13 to step SM14, and the signal processing unit 154 causes the touch panel 200 to display a steady screen. At this time, the signal processing unit 154 sets the display brightness of the touch panel 200 to the brightness 1 (steady display) (SM15), and ends the process.

図15は定常状態におけるタッチパネル200の表示例を示した図である。図15(a)は従来の分電盤の操作レバーと同様なイメージ図を用いて、定常時の各分岐開閉器130の通電状態(ON/OFF状態)を表示した表示例を示しており、図15(b)は、ON状態とOFF状態との間で色を異ならせて表示し、その色の違いを用いて定常時の各分岐開閉器130の通電状態(ON/OFF状態)を表示した表示例を示している。なお、通電状態(ON/OFF状態)の表示は、図15(a),(b)の表示方法に限定されず、各分岐開閉器130の通電状態(ON/OFF状態)が認識可能な表示方法であれば、他の表示方法であってもよい。   FIG. 15 is a diagram showing a display example of the touch panel 200 in the steady state. FIG. 15 (a) shows a display example in which the energization state (ON / OFF state) of each branch switch 130 at a steady state is displayed by using an image diagram similar to the operation lever of the conventional distribution board. 15 (b) is displayed in different colors between the ON state and the OFF state, and the difference in the colors is used to display the energization state (ON / OFF state) of each branch switch 130 in the steady state. A display example is shown. The display of the energized state (ON / OFF state) is not limited to the display method of FIGS. 15A and 15B, and the energized state (ON / OFF state) of each branch switch 130 can be recognized. Any other display method may be used as long as it is a method.

なお、タッチパネル200には、図16に示すように、分電盤100の主幹開閉器110や分岐リレー131のオンオフ状態以外の表示をするようにしてもよい。このような表示の切り替えを可能にすることにより、例えば、異常時や主幹開閉器110や分岐リレー131のオンオフ状態設定等の設定時以外は、使用者はテレビやインターネット、写真や動画等を楽しんだり、地図や天気等の情報を検索したりすることができる。図16の表示画面への切り替えは、例えば、ホームボタン104が押された時に画面の切り替えを行う。これにより、異常時や設定時等以外の時間において、タッチパネル200を有効活用することができる。このような分電盤をリビングやキッチン等に配置することにより、普段の生活では分電盤を情報端末として有効活用可能にするとともに、異常時等には使用者が容易に異常状態の確認と主幹開閉器や分岐開閉器の復帰作業をできるようにすることができる。   Note that, as shown in FIG. 16, the touch panel 200 may display a display other than the on / off states of the master switch 110 and the branch relay 131 of the distribution board 100. By making it possible to switch the display in this way, the user can enjoy TV, the Internet, photos, videos, etc., except when there is an abnormality or when the main switch 110 or the branch relay 131 is set to the on / off state. You can also search for information such as maps and weather. The display screen of FIG. 16 is switched, for example, when the home button 104 is pressed. As a result, the touch panel 200 can be effectively used at times other than abnormal times, setting times, and the like. By arranging such a distribution board in the living room, kitchen, etc., it is possible to effectively use the distribution board as an information terminal in everyday life, and at the time of abnormality, the user can easily confirm the abnormal state. It is possible to enable the restoration work of the main switch and the branch switch.

<主幹開閉器のON診断>
図6は、図5のステップSM12の“主幹開閉器のON診断”の詳細を示したフロー図である。
<ON diagnosis of the main switch>
FIG. 6 is a flow chart showing the details of “ON diagnosis of the master switch” in step SM12 of FIG.

まず、信号処理部154は、主幹電流測定部121からの主幹電流信号D11に基づいて、主幹開閉器110の通電状態を確認する(SM210)。   First, the signal processing unit 154 confirms the energization state of the master switchgear 110 based on the master current signal D11 from the master current measuring unit 121 (SM210).

主幹開閉器110の通電がない場合(SM210で“通電無”)、信号処理部154は、停電検知部152からの停電検知信号D3に基づいて、一次側(外部の電源から主幹開閉器110までの間)の通電状態を確認する(SM211)。   When the main switch 110 is not energized (“No energization” in SM210), the signal processing unit 154 determines the primary side (from the external power source to the main switch 110) based on the power failure detection signal D3 from the power failure detection unit 152. During the period), the power supply state is confirmed (SM211).

一次側の通電が確認されない場合(SM211で“通電無”)、信号処理部154は、タッチパネル200に“停電状態”を表示させ(SM212)、その明るさを定常表示である明るさ1よりも明るい明るさ2に設定し(SM213)、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。   When the power supply to the primary side is not confirmed (“No power supply” in SM211), the signal processing unit 154 displays “blackout state” on the touch panel 200 (SM212), and the brightness thereof is higher than the brightness 1 which is the steady display. Bright brightness 2 is set (SM213), and the processes of "ON diagnosis of main switch" and "initial energization diagnosis of main switch" are completed.

一方で、一次側の通電が確認された場合(SM211で“通電有”)、信号処理部154は、タッチパネル200に“主幹異常状態”を表示させ(SM214)、タッチパネル200の明るさを明るさ2に設定し(SM215)、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。このとき、信号処理部154は、主幹開閉器110および主幹通電検知部120を介して電源の供給を受ける。以降の各フロー図においても、特に説明のない場合、信号処理部154は、主幹開閉器110および主幹通電検知部120を介して電源の供給を受ける。なお、信号処理部154が常時バッテリー153から電源の供給を受けるようにしてもよい。また、ステップSM214とステップSM215とは同時に処理してもよい。   On the other hand, when it is confirmed that the primary side has been energized (“energized” in SM211), the signal processing unit 154 causes the touch panel 200 to display “main trunk abnormal state” (SM214), and the brightness of the touch panel 200 is set to be bright. The value is set to 2 (SM215), and the processes of "ON diagnosis of master switch" and "initial energization diagnosis of master switch" are completed. At this time, the signal processing unit 154 is supplied with power via the master switch 110 and the master energization detection unit 120. In each of the subsequent flow charts as well, unless otherwise specified, the signal processing unit 154 receives power supply via the master switch 110 and the master energization detection unit 120. The signal processing unit 154 may be constantly supplied with power from the battery 153. Further, step SM214 and step SM215 may be processed simultaneously.

次に、ステップSM210において、主幹開閉器110の通電があった場合(SM210で“通電有”)について説明する。図7は、ステップSM210で“通電有”となった場合のフロー図を示しており、分電盤100では、主幹開閉器110の“短絡・過電流診断”、“漏電診断”および“過電圧診断”が並行して実施される。以下では、それぞれの診断について図面を参照しながら詳細に説明する。   Next, a case will be described in which the main switch 110 is energized in step SM210 (“energized” in SM210). FIG. 7 shows a flow chart when “energized” is selected in step SM210. In the distribution board 100, “short circuit / overcurrent diagnosis”, “leakage diagnosis” and “overvoltage diagnosis” of the main switch 110 are shown. Are carried out in parallel. Hereinafter, each diagnosis will be described in detail with reference to the drawings.

−短絡・過電流診断−
まず、主幹開閉器110の“短絡・過電流診断”について詳細に説明する。
-Short circuit / overcurrent diagnosis-
First, the “short circuit / overcurrent diagnosis” of the master switch 110 will be described in detail.

信号処理部154は、主幹電流測定部121からの主幹電流信号D11に基づいて、主幹開閉器110の通電電流が所定の閾値(例えば360A、図内では一定値と記載する)以上か否かを判定する(SM221)。主幹開閉器110の通電電流が所定の閾値未満の場合(SM221で“NO”)、フローは後述する“分岐リレーON診断”に進む。   The signal processing unit 154 determines, based on the main current signal D11 from the main current measuring unit 121, whether or not the energizing current of the main switch 110 is equal to or more than a predetermined threshold value (for example, 360A, described as a constant value in the drawing). The judgment is made (SM221). When the energizing current of the main switch 110 is less than the predetermined threshold value (“NO” in SM221), the flow proceeds to “branch relay ON diagnosis” described later.

一方で、主幹開閉器110の通電電流が所定の閾値以上の場合(SM221で“YES”)、信号処理部154は、主幹開閉器110の通電電流が過電流領域か否かを判定する、すなわち、主幹電流信号D11で示された電流が所定の閾値(例えば、1200A)未満か否かを判定する(SM222)。   On the other hand, when the energization current of the master switchgear 110 is equal to or greater than the predetermined threshold (“YES” in SM221), the signal processing unit 154 determines whether the energization current of the master switchgear 110 is in the overcurrent region, that is, Then, it is determined whether the current indicated by the main current signal D11 is less than a predetermined threshold value (for example, 1200 A) (SM222).

主幹開閉器110の通電電流が過電流領域である場合、すなわち、主幹電流信号D11で示された通電電流値が所定の閾値未満である場合(SM222で“YES”)、信号処理部154は、タッチパネル200に“主幹過電流遮断”を表示させ(SM225)、タッチパネル200の明るさを明るさ2に設定する(SM226)。   When the energization current of the main switch 110 is in the overcurrent region, that is, when the energization current value indicated by the main current signal D11 is less than the predetermined threshold value (“YES” in SM222), the signal processing unit 154 determines that “Major overcurrent interruption” is displayed on the touch panel 200 (SM225), and the brightness of the touch panel 200 is set to brightness 2 (SM226).

上記の“主幹過電流遮断”のタッチパネル200での表示例を図17(a)に示しており、タッチパネル200には、例えば“主幹開閉器の過電流が発生したため、主幹開閉器の電源をOFFしました。”と表示され、タッチパネル200の明るさが明るさ2に設定される。その後、使用者(作業者等を含む。以下同じ。)がタッチパネル200の確認ボタンを押すと、信号処理部154は、タッチパネル200の表示を切り替え、例えば、図17(b)に示すように、主幹開閉器110と分岐リレー131のON/OFF状態が表示された従来の分電盤の操作レバーと同様のイメージ図を表示するとともに、そのイメージ図と重ねて主幹開閉器110が過電流によって遮断された旨を表示する(図17(b)左側の左下がり斜線部分参照)。このとき、タッチパネルの明るさは、明るさ2に保たれる。なお、ステップSM225とステップSM226とは同時に処理してもかまわない。以下の診断においても、異常報知情報の表示と明るさの設定は同時に処理してもかまわない。   FIG. 17A shows a display example of the above “main trunk overcurrent interruption” on the touch panel 200. The touch panel 200 turns off the power of the main switch because, for example, “overcurrent of the main switch has occurred. Is displayed. ”And the brightness of the touch panel 200 is set to brightness 2. After that, when the user (including the worker and the like; the same applies hereinafter) presses the confirmation button on the touch panel 200, the signal processing unit 154 switches the display on the touch panel 200, and, for example, as shown in FIG. An image similar to the operation lever of a conventional distribution board in which the ON / OFF states of the main switch 110 and the branch relay 131 are displayed is displayed, and the main switch 110 is cut off due to an overcurrent together with the image. A message to that effect is displayed (see the diagonally downward-sloping portion on the left side of FIG. At this time, the brightness of the touch panel is kept at brightness 2. Note that step SM225 and step SM226 may be processed at the same time. Also in the following diagnosis, the display of the abnormality notification information and the setting of the brightness may be processed at the same time.

このように、主幹開閉器110が過電流で遮断されたことをタッチパネル200に表示することによって、使用者は主幹開閉器110が遮断された原因を容易かつ明確に確認することができる。これにより、使用者は必要な行動、作業等を把握することができる。また、主幹開閉器110が過電流であることを拡大表示し、かつ、その明るさを上げることにより、主幹開閉器110が遮断された原因について、使用者がさらに容易かつ明確に確認できるようにすることができる。なお、上記の例では、図17(a)に示すように拡大表示した後に、使用者の操作を受けて、図17(b)に示すように、操作レバーのイメージ図と重ねて異常状態を表示したが、使用者の操作なしに、例えば一定時間経過後に画面を切り替えるようにしてもよい。また、図17(a)の拡大表示をなくし、図17(b)の表示のみを行うようにしてもよい。また、異常表示部分、すなわち、図17(b)左側の左下がり斜線部分のみを、他の部分と比較して明るく表示することにより、他の情報よりも目立つように強調して表示してもよい。また、図17(a)の表示と図17(b)の表示とを繰り返し切り替えて表示することにより、他の情報よりも目立つように強調して表示してもよい。   In this way, by displaying on the touch panel 200 that the main switch 110 has been interrupted due to overcurrent, the user can easily and clearly confirm the cause of the main switch 110 being interrupted. As a result, the user can grasp necessary actions, work, and the like. Further, by enlarging and displaying the fact that the master switch 110 is overcurrent and increasing the brightness thereof, the user can more easily and clearly confirm the cause of interruption of the master switch 110. can do. In the above example, after an enlarged display as shown in FIG. 17 (a), an abnormal state is displayed in response to the user's operation and as shown in FIG. 17 (b), overlapping the image of the operation lever. However, the screen may be switched without a user operation, for example, after a lapse of a certain time. Alternatively, the enlarged display of FIG. 17A may be eliminated and only the display of FIG. 17B may be performed. In addition, even if the abnormal display portion, that is, only the left-down diagonally shaded portion on the left side of FIG. 17B is displayed brighter than other portions, it is emphasized and displayed more prominently than other information. Good. Further, by repeatedly switching between the display of FIG. 17A and the display of FIG. 17B, the display may be emphasized to be more conspicuous than other information.

再び図7に戻り、ステップSM226の設定終了後、信号処理部154は、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。すなわち、並行処理を実施している主幹開閉器110の“漏電診断”および“過電圧診断”が処理の途中であってもそれらの診断処理を強制的に終了する。   Returning to FIG. 7 again, after the setting of step SM226 is finished, the signal processing unit 154 finishes the processes of “ON diagnosis of the master switch” and “initial energization diagnosis of the master switch”. That is, even if the "leakage diagnosis" and the "overvoltage diagnosis" of the main switch 110 performing the parallel processing are in the middle of the processing, those diagnostic processings are forcibly ended.

一方で、主幹電流信号D11で示された通電電流値が所定の閾値以上である場合(SM222で“NO”)、信号処理部154は、タッチパネル200に“主幹短絡遮断”を示す表示をさせて(SM223)、タッチパネル200の明るさを明るさ2に設定する(SM224)。タッチパネル200の表示例は、上記の過電流による遮断の場合と同様である(図17(a),(b)参照)。ステップSM224の設定終了後、信号処理部154は、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。すなわち、並行処理を実施している主幹開閉器110の“漏電診断”および“過電圧診断”が処理の途中であってもそれらの診断処理を強制的に終了する。   On the other hand, when the energization current value indicated by the main current signal D11 is equal to or higher than the predetermined threshold value (“NO” in SM222), the signal processing unit 154 causes the touch panel 200 to display “main short circuit interruption”. (SM223), the brightness of the touch panel 200 is set to brightness 2 (SM224). The display example of the touch panel 200 is the same as the case of the interruption due to the overcurrent described above (see FIGS. 17A and 17B). After the setting of step SM224 is completed, the signal processing unit 154 ends the processes of “ON diagnosis of the master switch” and “Initial energization diagnosis of the master switch”. That is, even if the "leakage diagnosis" and the "overvoltage diagnosis" of the main switch 110 performing the parallel processing are in the middle of the processing, those diagnostic processings are forcibly ended.

−漏電診断−
次に、主幹開閉器110の“漏電診断”について説明する。
-Leakage diagnosis-
Next, "leakage diagnosis" of the master switch 110 will be described.

信号処理部154は、主幹異常検出部122からの主幹異常信号D12に基づいて、主幹開閉器110の漏電電流が所定の閾値(例えば30mA、図内では一定値と記載する)以上か否かを判定する(SM231)。主幹開閉器110の漏電電流が所定の閾値未満の場合(SM231で“NO”)、フローは後述する“分岐リレーON診断”に進む。   The signal processing unit 154 determines whether the leakage current of the master switchgear 110 is greater than or equal to a predetermined threshold value (for example, 30 mA, described as a constant value in the figure) based on the master malfunction signal D12 from the master malfunction detection unit 122. A judgment is made (SM231). When the leakage current of the main switch 110 is less than the predetermined threshold value (“NO” in SM231), the flow proceeds to “branch relay ON diagnosis” described later.

一方で、主幹開閉器110の漏電電流が所定の閾値以上である場合(SM231で“YES”)、信号処理部154は、主幹開閉器110の漏電電流が所定の閾値以上である期間が一定時間(例えば、0.1秒)以上継続するか否かを判定する(SM232)。   On the other hand, when the leakage current of the master switchgear 110 is equal to or greater than the predetermined threshold value (“YES” in SM231), the signal processing unit 154 determines that the period in which the leakage current of the master switchgear 110 is equal to or greater than the predetermined threshold value is a certain time. It is determined whether (for example, 0.1 seconds) or more continues (SM232).

主幹開閉器110の漏電電流が所定の閾値以上である期間が一定時間以上継続した場合(SM232で“YES”)、信号処理部154は、タッチパネル200に“主幹漏電遮断”を示す表示をさせて(SM233)、タッチパネル200の明るさを明るさ2に設定する(SM234)。タッチパネル200の表示例は、上述の“短絡・過電流遮断”の場合と同様である(図17(a),(b)参照)。ステップSM234の設定終了後、信号処理部154は、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。すなわち、並行処理を実施している主幹開閉器110の“短絡・過電流診断”および“過電圧診断”の処理が途中であってもそれらの診断処理を強制的に終了する。   When the period in which the leakage current of the master switch 110 is equal to or greater than the predetermined threshold value continues for a certain time or more (“YES” in SM232), the signal processing unit 154 causes the touch panel 200 to display “master leakage cutoff”. (SM233), the brightness of the touch panel 200 is set to brightness 2 (SM234). The display example of the touch panel 200 is similar to the case of the above-mentioned “short circuit / overcurrent interruption” (see FIGS. 17A and 17B). After the setting of step SM234 is completed, the signal processing unit 154 finishes the processes of “ON diagnosis of the master switch” and “Initial energization diagnosis of the master switch”. That is, even if the "short circuit / overcurrent diagnosis" and "overvoltage diagnosis" processes of the main switch 110 that are performing the parallel process are in progress, those diagnostic processes are forcibly terminated.

一方で、主幹開閉器110の漏電電流が所定の閾値以上である期間が一定時間未満の場合、すなわち、主幹開閉器110の漏電電流が一定時間未満で所定の閾値未満となった場合(SM232で“NO”)、フローは後述する“分岐リレーON診断”に進む。   On the other hand, when the period during which the leakage current of the master switchgear 110 is equal to or greater than the predetermined threshold value is less than a certain time, that is, the leakage current of the master switchgear 110 is less than the predetermined threshold value in less than the certain time (SM232 "NO"), and the flow proceeds to "branch relay ON diagnosis" described later.

−過電圧診断−
次に、主幹開閉器110の“過電圧診断”について説明する。
-Overvoltage diagnosis-
Next, the "overvoltage diagnosis" of the master switch 110 will be described.

信号処理部154は、主幹異常検出部122からの主幹異常信号D12に基づいて、主幹開閉器110の電圧が所定の閾値(例えば135V、図内では一定値と記載する)以上か否かを判定する(SM241)。主幹開閉器110の電圧が所定の閾値未満の場合(SM241で“NO”)、フローは後述する“分岐リレーON診断”に進む。   The signal processing unit 154 determines whether or not the voltage of the master switch 110 is equal to or higher than a predetermined threshold value (for example, 135 V, described as a constant value in the figure) based on the master malfunction signal D12 from the master malfunction detection unit 122. Yes (SM241). When the voltage of the master switch 110 is less than the predetermined threshold value (“NO” in SM241), the flow proceeds to “branch relay ON diagnosis” described later.

一方で、主幹開閉器110の電圧が所定の閾値以上である場合(SM241で“YES”)、信号処理部154は、主幹開閉器110の電圧が所定の閾値以上である期間が一定時間(例えば、1秒)以上継続するか否かを判定する(SM242)。   On the other hand, when the voltage of the master switchgear 110 is equal to or higher than the predetermined threshold value (“YES” in SM241), the signal processing unit 154 causes the signal processing unit 154 to keep the voltage of the main switchgear 110 equal to or higher than the predetermined threshold value for a certain time (for example, It is determined whether or not to continue for 1 second or more (SM242).

主幹開閉器110の電圧が所定の閾値以上である期間が一定時間以上継続した場合(SM242で“YES”)、信号処理部154は、タッチパネル200に“主幹過電圧遮断”を示す表示をさせて(SM243)、タッチパネル200の明るさを明るさ2に設定する(SM244)。タッチパネル200の表示例は、上述の“短絡・過電流遮断”の場合と同様である(図17(a),(b)参照)。ステップSM244の設定終了後、信号処理部154は、“主幹開閉器のON診断”および“主幹開閉器の初期通電診断”の処理を終了する。すなわち、並行処理を実施している主幹開閉器110の“短絡・過電流診断”および“漏電診断”が処理の途中であってもそれらの診断処理を強制的に終了する。   When the period in which the voltage of the master switch 110 is equal to or higher than the predetermined threshold value continues for a predetermined time or longer (“YES” in SM242), the signal processing unit 154 causes the touch panel 200 to display “master trunk overvoltage interruption” ( SM243), and sets the brightness of the touch panel 200 to brightness 2 (SM244). The display example of the touch panel 200 is similar to the case of the above-mentioned “short circuit / overcurrent interruption” (see FIGS. 17A and 17B). After the setting of step SM244 is completed, the signal processing unit 154 finishes the processes of “ON diagnosis of the master switch” and “Initial energization diagnosis of the master switch”. That is, even if the "short circuit / overcurrent diagnosis" and the "leakage diagnosis" of the main switch 110 performing the parallel processing are in the middle of the processing, those diagnostic processings are forcibly terminated.

一方で、主幹開閉器110の電圧が所定の閾値以上である期間が一定時間未満の場合、すなわち、主幹開閉器110の電圧が一定時間未満で所定の閾値未満となった場合(SM242で“NO”)、フローは後述する“分岐リレーのON診断”に進む。   On the other hand, when the period during which the voltage of the main switchgear 110 is equal to or higher than the predetermined threshold value is less than the predetermined time, that is, when the voltage of the main switchgear 110 is less than the predetermined threshold value within the predetermined time (SM242: “NO "), The flow proceeds to" branch relay ON diagnosis "described later.

上述のとおり、“主幹開閉器のON診断”において、例えば、短絡、過電流、漏電、過電圧、トラッキング等の異常がなかった場合、フローは“分岐リレーのON診断”に進む。具体的には、分岐リレー接続部123に接続された分岐開閉器130(分岐リレー131)がN個(Nは2以上の整数)である場合、N個の分岐リレー131の各々に対して“分岐リレーのON診断”が並列に実行される(SS21〜SS2N)。図8は、図7のステップSS21〜SS2Nの“分岐リレーのON診断”の詳細を示したフロー図であり、N個の分岐リレー131のうちの1つ(説明の便宜上、第1分岐リレー131と称する)についての診断フローを示している。なお、他の分岐リレー131(説明の便宜上、第2〜第N分岐リレーと称する)についても、診断フローは同様である。   As described above, in the "main switch ON diagnosis", for example, when there is no abnormality such as a short circuit, overcurrent, electric leakage, overvoltage, or tracking, the flow proceeds to "branch relay ON diagnosis". Specifically, when the number of branch switches 130 (branch relay 131) connected to the branch relay connection unit 123 is N (N is an integer of 2 or more), “N” is given to each of the branch relays 131. "Branch relay ON diagnosis" is executed in parallel (SS21 to SS2N). FIG. 8 is a flowchart showing details of “branch relay ON diagnosis” in steps SS21 to SS2N in FIG. 7, and one of N branch relays 131 (first branch relay 131 for convenience of explanation). ) Is shown. The diagnostic flow is the same for the other branch relays 131 (for convenience of description, referred to as second to Nth branch relays).

<分岐リレーのON診断>
まず、信号処理部154は、分岐電流測定部141からの分岐電流信号D21に基づいて第1分岐リレー131の通電状態を確認する(SS510)。第1分岐リレー131の通電がない場合(SS510で“通電無”)、信号処理部154は、タッチパネル200に“第1分岐リレーのOFF表示”をさせる(SS511)。具体的には、例えば、第1分岐リレー131が“トイレ”の分岐リレーである場合、“トイレ”に対応する分岐リレーの表示を“OFF”表示に切り替える(図15参照)。このとき、信号処理部154は、タッチパネル200の明るさを変更しない。ステップSS511の表示設定後、フローは、ステップSM13(診断結果異常なし)に進む。
<Branch relay ON diagnosis>
First, the signal processing unit 154 confirms the energization state of the first branch relay 131 based on the branch current signal D21 from the branch current measuring unit 141 (SS510). When the first branch relay 131 is not energized (SS510: “No energization”), the signal processing unit 154 causes the touch panel 200 to “display the first branch relay OFF” (SS511). Specifically, for example, when the first branch relay 131 is a "toilet" branch relay, the display of the branch relay corresponding to "toilet" is switched to "OFF" display (see FIG. 15). At this time, the signal processing unit 154 does not change the brightness of the touch panel 200. After the display setting in step SS511, the flow proceeds to step SM13 (no abnormality in diagnostic result).

一方で、ステップSS510において、第1分岐リレー131の通電があった場合(SS510で“通電有”)、第1分岐リレー131の“短絡・過電流診断”、“漏電診断”および“トラッキング診断”が並行して実施される。以下では、それぞれの診断について図面を参照しながら詳細に説明する。   On the other hand, in step SS510, when the first branch relay 131 is energized (“energized” in SS510), the “short circuit / overcurrent diagnosis”, “leakage diagnosis” and “tracking diagnosis” of the first branch relay 131 are performed. Are carried out in parallel. Hereinafter, each diagnosis will be described in detail with reference to the drawings.

−短絡・過電流診断−
まず、第1分岐リレー131の“短絡・過電流診断”について詳細に説明する。
-Short circuit / overcurrent diagnosis-
First, the “short circuit / overcurrent diagnosis” of the first branch relay 131 will be described in detail.

信号処理部154は、分岐電流測定部141からの分岐電流信号D21に基づいて、第1分岐リレー131の通電電流が所定の閾値(例えば120A、図内では一定値と記載する)以上か否かを判定する(SS521)。第1分岐リレー131の通電電流が所定の閾値未満の場合(SS521で“NO”)、信号処理部154は、タッチパネル200に“第1分岐リレーのON表示”をさせる(SS550)。具体的には、例えば、第1分岐リレー131が“台所”の分岐リレーである場合、“台所”に対応する分岐リレーの表示を“ON”表示に切り替える(図15参照)。このとき、信号処理部154は、タッチパネル200の明るさを変更しない。ステップSS550の表示設定後、フローは、ステップSM13(診断結果異常なし)に進む。   Based on the branch current signal D21 from the branch current measuring unit 141, the signal processing unit 154 determines whether or not the energizing current of the first branch relay 131 is equal to or more than a predetermined threshold value (for example, 120A, described as a constant value in the drawing). Is determined (SS521). When the energization current of the first branch relay 131 is less than the predetermined threshold value (“NO” in SS521), the signal processing unit 154 causes the touch panel 200 to “ON display of the first branch relay” (SS550). Specifically, for example, when the first branch relay 131 is the “kitchen” branch relay, the display of the branch relay corresponding to “kitchen” is switched to the “ON” display (see FIG. 15). At this time, the signal processing unit 154 does not change the brightness of the touch panel 200. After the display setting in step SS550, the flow proceeds to step SM13 (no abnormality in diagnostic result).

一方で、第1分岐リレー131の通電電流が所定の閾値以上の場合(SS521で“YES”)、信号処理部154は、第1分岐リレー131の通電電流が過電流領域か否かを判定する、すなわち、分岐電流信号D21で示された電流が所定の閾値(例えば、400A)未満か否かを判定する(SS522)。   On the other hand, when the energizing current of the first branch relay 131 is equal to or higher than the predetermined threshold (“YES” in SS521), the signal processing unit 154 determines whether the energizing current of the first branch relay 131 is in the overcurrent region. That is, it is determined whether the current indicated by the branch current signal D21 is less than a predetermined threshold value (for example, 400 A) (SS522).

第1分岐リレー131の通電電流が過電流領域である場合、すなわち、分岐電流信号D21で示された通電電流値が所定の閾値未満である場合(SS522で“YES”)、信号処理部154は、開閉制御信号CS1により第1分岐リレー131を“OFF”制御する(SS526)。そして、信号処理部154は、タッチパネル200に“第1分岐リレー過電流遮断”を表示させ(SS527)、タッチパネル200の明るさを明るさ2に設定する(SS528)。上記の“第1分岐リレー過電流遮断”のタッチパネル200での表示例を図18(a)に示す。図18(a)は、第1分岐リレー131が“トイレ”の分岐リレーである場合の例を示しており、タッチパネル200には、例えばトイレに対応する分岐リレーの操作レバーのイメージ図が拡大表示され、タッチパネル200の明るさが明るさ2に設定される。その後、使用者がタッチパネル200の確認ボタンを押すと、信号処理部154は、タッチパネル200の表示を切り替え、例えば、図18(b)に示すように、分岐リレー131のON/OFF状態が表示された従来の分電盤の操作レバーと同様のイメージ図を表示するとともに、このイメージ図と重ねて“トイレ”の分岐リレーが過電流によって遮断された旨を表示する。このとき、タッチパネルの明るさは、明るさ2に保たれる。   When the energization current of the first branch relay 131 is in the overcurrent region, that is, when the energization current value indicated by the branch current signal D21 is less than the predetermined threshold value (“YES” in SS522), the signal processing unit 154 The first branch relay 131 is “OFF” controlled by the opening / closing control signal CS1 (SS526). Then, the signal processing unit 154 causes the touch panel 200 to display “first branch relay overcurrent interruption” (SS527) and sets the brightness of the touch panel 200 to the brightness 2 (SS528). FIG. 18A shows a display example of the above “first branch relay overcurrent interruption” on the touch panel 200. FIG. 18A shows an example in which the first branch relay 131 is a “toilet” branch relay, and the touch panel 200 displays an enlarged image of the operation lever of the branch relay corresponding to the toilet, for example. The brightness of the touch panel 200 is set to brightness 2. After that, when the user presses the confirmation button of the touch panel 200, the signal processing unit 154 switches the display of the touch panel 200, and, for example, the ON / OFF state of the branch relay 131 is displayed as shown in FIG. 18B. In addition to displaying an image diagram similar to the operation lever of the conventional distribution board, it also shows that the branch toilet of the "toilet" was cut off due to overcurrent in addition to this image diagram. At this time, the brightness of the touch panel is kept at brightness 2.

このように、第1分岐リレー131が過電流で遮断されたことをタッチパネル200に表示することによって、使用者はN個の分岐リレー131のうち、第1分岐リレー131が遮断されたことを容易かつ明確に確認することができるとともに、遮断原因についても容易かつ明確に確認することできる。これにより、使用者は必要な行動、作業等を把握することができる。具体的には、例えば、使用者が住居の居住者だった場合、自身で解決可能な異常なのか、あるいは電力会社や電気工事士等の有資格者等に通報を要する異常なのかを瞬時に把握することができる。   In this way, by displaying on the touch panel 200 that the first branch relay 131 is cut off due to overcurrent, the user can easily confirm that the first branch relay 131 among the N branch relays 131 has been cut off. In addition to being able to clearly confirm, the cause of interruption can also be easily and clearly confirmed. As a result, the user can grasp necessary actions, work, and the like. Specifically, for example, if the user is a resident of the residence, it is possible to instantly determine whether it is an abnormality that can be resolved by itself or an abnormality that requires notification to a qualified person such as an electric power company or an electrician. You can figure it out.

また、第1分岐リレー131が過電流であることを拡大表示し、かつ、その明るさを上げることにより、第1分岐リレー131が遮断されたことおよびその原因について、使用者がさらに容易かつ明確に確認できるようにすることができる。なお、図18(a)に示すように、操作レバーの拡大表示時に、遮断原因である“過電流”という表示と併せて、実際の漏電電流値(例えば、10mA)と表示するようにしてもよい。   In addition, by enlarging and displaying the fact that the first branch relay 131 is overcurrent and increasing the brightness thereof, the user can more easily and clearly understand that the first branch relay 131 is cut off and the cause thereof. Can be confirmed. Note that, as shown in FIG. 18A, when the operation lever is enlarged, the actual leakage current value (for example, 10 mA) may be displayed together with the display of "overcurrent" that is the cause of interruption. Good.

前記ステップSS528の設定終了後、信号処理部154は、第1分岐リレー131の“分岐リレーのON診断”を終了する。すなわち、並行処理を実施している第1分岐リレー131に係る“分岐リレーのON診断”の“漏電診断”および“トラッキング診断”が処理の途中であってもそれらの診断処理を強制的に終了する。一方で、“主幹開閉器のON診断”、“主幹開閉器の初期通電診断”、および第2〜第N分岐リレー131に係る“分岐リレーのON診断”の診断は継続する。   After the setting of step SS528 is completed, the signal processing unit 154 ends the “branch relay ON diagnosis” of the first branch relay 131. That is, even if the "leakage diagnosis" and the "tracking diagnosis" of the "branch relay ON diagnosis" related to the first branch relay 131 that is performing the parallel processing are in the middle of processing, those diagnosis processings are forcibly terminated. To do. On the other hand, the "main switch ON diagnostics", "main switch initial power-on diagnostics", and "branch relay ON diagnostics" related to the second to Nth branch relays 131 continue.

一方で、分岐電流信号D21で示された通電電流値が所定の閾値以上である場合(SS522で“NO”)、信号処理部154は、開閉制御信号CS1により第1分岐リレー131を“OFF”制御する(SS523)。そして、信号処理部154は、タッチパネル200に“第1分岐リレー短絡遮断”を示す表示をさせて(SS524)、タッチパネル200の明るさを明るさ2に設定する(SS525)。タッチパネル200の表示例は、上記の過電流による遮断の場合と同様である(図18(a),(b)参照)。ステップSS525の設定終了後、信号処理部154は、第1分岐リレー131の“分岐リレーのON診断”を終了する。   On the other hand, when the energization current value indicated by the branch current signal D21 is equal to or greater than the predetermined threshold value (“NO” in SS522), the signal processing unit 154 turns the first branch relay 131 “OFF” by the switching control signal CS1. Control (SS523). Then, the signal processing unit 154 causes the touch panel 200 to display “first branch relay short circuit interruption” (SS524), and sets the brightness of the touch panel 200 to the brightness 2 (SS525). The display example of the touch panel 200 is the same as the case of the above interruption due to overcurrent (see FIGS. 18A and 18B). After the setting of step SS525 is completed, the signal processing unit 154 ends the “branch relay ON diagnosis” of the first branch relay 131.

−漏電診断−
次に、第1分岐リレー131の“漏電診断”について説明する。
-Leakage diagnosis-
Next, “leakage diagnosis” of the first branch relay 131 will be described.

信号処理部154は、分岐異常検出部142からの分岐異常信号D22に基づいて、第1分岐リレー131の漏電電流が所定の閾値(例えば15mA、図内では一定値と記載する)以上か否かを判定する(SS531)。第1分岐リレー131の漏電電流が所定の閾値未満の場合(SS531で“NO”)、信号処理部154は、タッチパネル200に“第1分岐リレーのON表示”をさせる(SS550)。   Based on the branch abnormality signal D22 from the branch abnormality detection unit 142, the signal processing unit 154 determines whether or not the leakage current of the first branch relay 131 is a predetermined threshold value (for example, 15 mA, described as a constant value in the figure). Is determined (SS531). When the leakage current of the first branch relay 131 is less than the predetermined threshold value (“NO” in SS531), the signal processing unit 154 causes the touch panel 200 to “ON display of the first branch relay” (SS550).

一方で、第1分岐リレー131の漏電電流が所定の閾値以上である場合(SS531で“YES”)、信号処理部154は、第1分岐リレー131の漏電電流が所定の閾値以上である期間が一定時間(例えば、0.1秒)以上継続するか否かを判定する(SS532)。第1分岐リレー131の漏電電流が所定の閾値以上である期間が一定時間未満の場合(SS532で“NO”)、信号処理部154は、タッチパネル200に“第1分岐リレーのON表示”をさせる(SS550)。   On the other hand, when the leakage current of the first branch relay 131 is greater than or equal to the predetermined threshold value (“YES” in SS531), the signal processing unit 154 determines that the period during which the leakage current of the first branch relay 131 is greater than or equal to the predetermined threshold value. It is determined whether or not to continue for a fixed time (for example, 0.1 seconds) (SS532). When the period in which the leakage current of the first branch relay 131 is equal to or greater than the predetermined threshold value is less than the certain time (“NO” in SS532), the signal processing unit 154 causes the touch panel 200 to “display the first branch relay ON”. (SS550).

第1分岐リレー131の漏電電流が所定の閾値以上である期間が一定時間以上継続した場合(SS532で“YES”)、信号処理部154は、開閉制御信号CS1により第1分岐リレー131を“OFF”制御する(SS533)。そして、信号処理部154は、タッチパネル200に“第1分岐リレー漏電遮断”を表示させ(SS534)、タッチパネル200の明るさを明るさ2に設定する(SS535)。タッチパネル200の表示例は、上述の第1分岐リレー131の“短絡・過電流診断”の場合と同様である(図18(a),(b)参照)。ステップSS535の設定終了後、信号処理部154は、第1分岐リレー131の“分岐リレーのON診断”を終了する。“分岐リレーのON診断”後の処理は、上述の第1分岐リレー131の“短絡・過電流診断”の場合と同様である。   When the period in which the leakage current of the first branch relay 131 is equal to or higher than the predetermined threshold value continues for a certain time or longer (“YES” in SS532), the signal processing unit 154 turns the first branch relay 131 “OFF” by the switching control signal CS1. "Control (SS533). Then, the signal processing unit 154 causes the touch panel 200 to display “first branch relay leakage interruption” (SS534) and sets the brightness of the touch panel 200 to the brightness 2 (SS535). The display example of the touch panel 200 is the same as the case of the above-mentioned “short circuit / overcurrent diagnosis” of the first branch relay 131 (see FIGS. 18A and 18B). After the setting of step SS535 is completed, the signal processing unit 154 ends the “branch relay ON diagnosis” of the first branch relay 131. The process after the "branch relay ON diagnosis" is the same as the above-described "short circuit / overcurrent diagnosis" of the first branch relay 131.

−トラッキング診断−
次に、第1分岐リレー131の“トラッキング診断”について説明する。トラッキング診断とは、トラッキング発生の有無を検知するためのものであり、具体的な回路構成、診断方法等は、例えば特開2001−103657号公報に開示されている。
-Tracking diagnosis-
Next, the “tracking diagnosis” of the first branch relay 131 will be described. The tracking diagnosis is for detecting the presence or absence of tracking occurrence, and a specific circuit configuration, a diagnostic method, and the like are disclosed in, for example, Japanese Patent Laid-Open No. 2001-103657.

まず、信号処理部154は、分岐異常検出部142からの分岐異常信号D22に基づいて、第1分岐リレー131におけるトラッキング発生の有無を判定する(SS541)。第1分岐リレー131にトラッキングが発生していない場合(SS541で“NO”)、信号処理部154は、タッチパネル200に“第1分岐リレーのON表示”をさせる(SS550)。   First, the signal processing unit 154 determines whether tracking has occurred in the first branch relay 131 based on the branch abnormality signal D22 from the branch abnormality detection unit 142 (SS541). When the tracking is not occurring in the first branch relay 131 (“NO” in SS541), the signal processing unit 154 causes the touch panel 200 to “display the first branch relay ON” (SS550).

一方で、第1分岐リレー131にトラッキングが発生している場合(SS541で“YES”)、信号処理部154は、開閉制御信号CS1により第1分岐リレー131を“OFF”制御する(SS542)。そして、信号処理部154は、タッチパネル200に“第1分岐リレートラッキング遮断”を表示させ(SS543)、タッチパネル200の明るさを明るさ2に設定する(SS544)。タッチパネル200の表示例は、上述の第1分岐リレー131の“短絡・過電流診断”の場合と同様である(図18(a),(b)参照)。ステップSS544の設定終了後、信号処理部154は、第1分岐リレー131の“分岐リレーのON診断”を終了する。“分岐リレーのON診断”後の処理は、上述の第1分岐リレー131の“短絡・過電流診断”の場合と同様である。     On the other hand, when tracking is occurring in the first branch relay 131 (“YES” in SS541), the signal processing unit 154 controls “OFF” the first branch relay 131 by the opening / closing control signal CS1 (SS542). Then, the signal processing unit 154 displays “first branch relay tracking cutoff” on the touch panel 200 (SS543), and sets the brightness of the touch panel 200 to brightness 2 (SS544). The display example of the touch panel 200 is the same as the case of the above-mentioned “short circuit / overcurrent diagnosis” of the first branch relay 131 (see FIGS. 18A and 18B). After the setting of step SS544 ends, the signal processing unit 154 ends the “branch relay ON diagnosis” of the first branch relay 131. The process after the "branch relay ON diagnosis" is the same as the above-described "short circuit / overcurrent diagnosis" of the first branch relay 131.

なお、各分岐リレー131の“分岐リレーのON診断”は、各々の分岐リレーがON操作される毎に実施される。具体的には、例えば、使用者がタッチパネル200を介して分岐リレーのON操作をしたとき、“分岐リレーのON診断”が実行される。図9(a)は、分岐リレーがON操作されたときの“分岐リレーのON診断”のフローを示した図である。   The "branch relay ON diagnosis" of each branch relay 131 is performed each time each branch relay is turned ON. Specifically, for example, when the user turns on the branch relay via the touch panel 200, "branch relay ON diagnosis" is executed. FIG. 9A is a diagram showing a flow of “branch relay ON diagnosis” when the branch relay is turned ON.

図9(a)に示すように、第1分岐リレー131がON操作されたとき(SS11)、信号処理部154は、第1分岐リレー131について、“分岐リレーのON診断”(SS21)を行う。具体的なフローは、図8に示した“分岐リレーのON診断”と同じである。そして、この“分岐リレーのON診断”(SS21)で異常が確認されなかった場合、フローはステップSSD1に進み、信号処理部154は、タッチパネル200に“第1分岐リレーのON表示”をさせて、処理を終了する。一方で、“分岐リレーのON診断”の結果、異常があった場合は、図8のフローに基づき、その異常内容がタッチパネル200に表示される。第2〜第N分岐リレー131がON操作された場合(SS12〜SS1N)においても、第1分岐リレー131の場合と同様に、“分岐リレーのON診断”(SS22〜SS2N)が行われ、異常が確認されなかった場合は、ON操作された分岐リレー131について“分岐リレーのON表示”がされ(SSD1)、その後処理が終了する。このとき、信号処理部154は、タッチパネル200の明るさを変更しない。一方で、“分岐リレーのON診断”の結果、異常があった場合は、図8のフローに基づき、その異常内容がタッチパネル200に表示される。   As illustrated in FIG. 9A, when the first branch relay 131 is turned on (SS11), the signal processing unit 154 performs “branch relay ON diagnosis” (SS21) for the first branch relay 131. .. The specific flow is the same as the "branch relay ON diagnosis" shown in FIG. Then, if no abnormality is confirmed in this “branch relay ON diagnosis” (SS21), the flow proceeds to step SSD1 and the signal processing unit 154 causes the touch panel 200 to “ON display of the first branch relay”. , The process ends. On the other hand, if there is an abnormality as a result of the “branch relay ON diagnosis”, the abnormality content is displayed on the touch panel 200 based on the flow of FIG. 8. Even when the second to Nth branch relays 131 are turned on (SS12 to SS1N), the “branch relay ON diagnosis” (SS22 to SS2N) is performed and an abnormality occurs, as in the case of the first branch relay 131. Is not confirmed, “branch relay ON display” is performed for the branch relay 131 that has been turned ON (SSD1), and the process is thereafter terminated. At this time, the signal processing unit 154 does not change the brightness of the touch panel 200. On the other hand, if there is an abnormality as a result of the “branch relay ON diagnosis”, the abnormality content is displayed on the touch panel 200 based on the flow of FIG. 8.

図9(b)は、分岐リレーがOFF操作されたときのフローを示した図である。図9(b)に示すように、第1分岐リレー131がOFF操作されたとき(SS31)、信号処理部154は、開閉制御信号CS1により第1分岐リレー131を“OFF”制御する(SS41)。そして、信号処理部154は、タッチパネル200に“第1分岐リレーのOFF表示”をさせて(SSD2)、処理を終了する。このとき、信号処理部154は、タッチパネル200の明るさを変更しない。第2〜第N分岐リレー131がOFF操作された場合(SS32〜SS3N)においても、第1分岐リレー131の場合と同様に、信号処理部154は、開閉制御信号CS1によりOFF操作された分岐リレー131を“OFF”制御する(SS42〜SS4N)。そして、信号処理部154は、タッチパネル200にOFF操作された分岐リレー131についての“分岐リレーのOFF表示”をさせて(SSD2)、処理を終了する。このとき、信号処理部154は、タッチパネル200の明るさを変更しない。   FIG. 9B is a diagram showing a flow when the branch relay is turned off. As shown in FIG. 9B, when the first branch relay 131 is turned off (SS31), the signal processing unit 154 controls the first branch relay 131 “OFF” by the opening / closing control signal CS1 (SS41). .. Then, the signal processing unit 154 causes the touch panel 200 to “OFF display of the first branch relay” (SSD2), and ends the processing. At this time, the signal processing unit 154 does not change the brightness of the touch panel 200. Even when the second to Nth branch relays 131 are turned off (SS32 to SS3N), the signal processing unit 154, like the case of the first branch relay 131, causes the branch relays turned off by the switching control signal CS1. "OFF" control of 131 (SS42-SS4N). Then, the signal processing unit 154 causes the touch panel 200 to perform “OFF display of branch relay” for the branch relay 131 that has been turned OFF (SSD2), and ends the process. At this time, the signal processing unit 154 does not change the brightness of the touch panel 200.

<定常時通電診断>
図10〜図13は主幹開閉器110および分岐開閉器130(分岐リレー131)の定常時診断(例えば短絡、過電流、漏電、過電圧、トラッキング等の異常の有無の診断)についての診断フローを示した図である。定常時診断は、主幹開閉器110および分岐リレー131の定常動作時に係る診断であり、主幹開閉器110がON操作された後は、常時実施される診断である。図10〜図13に示すように、定常時診断では、主幹開閉器110の各診断(通電診断、短絡診断、過電流診断、漏電診断、過電圧診断)と、第1〜第N分岐リレー131の各々の診断とが並行して実施される。
<Steady-state energization diagnosis>
10 to 13 show a diagnostic flow for the steady state diagnosis of the main switch 110 and the branch switch 130 (branch relay 131) (e.g., diagnosis of presence / absence of abnormality such as short circuit, overcurrent, leakage, overvoltage, tracking). It is a figure. The constant diagnosis is a diagnosis related to the steady operation of the main switch 110 and the branch relay 131, and is a diagnosis that is always performed after the main switch 110 is turned on. As shown in FIGS. 10 to 13, in the steady state diagnosis, each diagnosis of the main switchgear 110 (energization diagnosis, short circuit diagnosis, overcurrent diagnosis, leakage diagnosis, overvoltage diagnosis) and the first to Nth branch relays 131. Each diagnosis is performed in parallel.

−主幹開閉器の通電診断−
図10に示すように、ステップSM300において“定常時通電診断”が開始されると、分電盤100では、主幹電流測定部121からの主幹電流信号D11に基づいて主幹開閉器110の通電状態が確認される(SM310)。ステップSM310において、主幹開閉器110の通電があった場合(SM310で“通電有”)、フローはステップSM310の判定に戻り、主幹開閉器110の通電状態を確認する。換言すると、ステップSM310で“通電有”の期間は、分電盤100ではステップSM310の判定が続けられる。
− Main switch switch energization diagnosis −
As shown in FIG. 10, when the "steady-state energization diagnosis" is started in step SM300, in the distribution board 100, the energization state of the main switch 110 is determined based on the main current signal D11 from the main current measuring unit 121. Confirmed (SM310). In step SM310, when the main switch 110 is energized (“energized” in SM310), the flow returns to the determination in step SM310 to check the energized state of the main switch 110. In other words, during the period in which “energization is present” in step SM310, the distribution board 100 continues to make the determination in step SM310.

一方で、主幹開閉器110の通電がない場合(SM310で“通電無”)、分電盤100では、停電検知部152からの停電検知信号D3に基づいて、一次側(外部の電源から主幹開閉器110までの間)の通電が確認される(SM211)。以降、ステップSM211〜SM215までの診断フローは、“主幹開閉器の初期通電診断”と同じである。   On the other hand, when the main switch 110 is not energized (“No energization” in SM310), in the distribution board 100, based on the power failure detection signal D3 from the power failure detection unit 152, the primary side (main power switching from an external power source is performed). It is confirmed that power is supplied to the container 110) (SM211). After that, the diagnostic flow from steps SM211 to SM215 is the same as the “initial energization diagnostic of the main switch”.

−主幹開閉器の短絡診断−
次に、主幹開閉器110の短絡診断について詳細に説明する。
-Short circuit diagnosis of the main switch-
Next, the short circuit diagnosis of the main switch 110 will be described in detail.

図11に示すように、信号処理部154は、主幹電流測定部121からの主幹電流信号D11に基づいて、短絡電流が検出されるか否か、すなわち、主幹開閉器110の通電電流が所定の閾値(例えば5kA、図内では短絡電流検出と記載する)以上か否かを判定する(SM411)。主幹開閉器110の短絡電流が所定の閾値未満の場合(SM411で“NO”)、フローはステップSM411の判定に戻り、信号処理部154は、主幹開閉器110の通電電流が所定の閾値以上か否かを判定する。換言すると、SM411で“NO”の期間、すなわち、短絡電流が検出されていない期間は、信号処理部154は、ステップSM411の判定を続ける。   As shown in FIG. 11, the signal processing unit 154 determines whether or not a short-circuit current is detected, that is, the energization current of the main switch 110 is predetermined based on the main current signal D11 from the main current measuring unit 121. It is determined whether or not the threshold value (for example, 5 kA, described as short-circuit current detection in the figure) is exceeded (SM411). When the short circuit current of the master switch 110 is less than the predetermined threshold (“NO” in SM411), the flow returns to the determination of step SM411, and the signal processing unit 154 determines whether the energization current of the master switch 110 is the predetermined threshold or more. Determine whether or not. In other words, the signal processing unit 154 continues the determination of step SM411 during the period of "NO" in SM411, that is, during the period when the short-circuit current is not detected.

一方で、主幹電流信号D11で示された通電電流値が所定の閾値以上である場合(SM411で“YES”)、以降のフローは、“主幹開閉器の初期通電診断”のステップSM223およびステップSM224(図7参照)と同じである。   On the other hand, when the energization current value indicated by the master current signal D11 is equal to or greater than the predetermined threshold value (“YES” in SM411), the subsequent flow is the steps SM223 and SM224 of “initial energization diagnosis of the master switch”. (See FIG. 7).

−主幹開閉器の過電流診断−
次に、主幹開閉器110の過電流診断について詳細に説明する。
-Overcurrent diagnosis of the main switch-
Next, the overcurrent diagnosis of the master switch 110 will be described in detail.

図11に示すように、信号処理部154は、主幹電流測定部121からの主幹電流信号D11に基づいて、主幹開閉器110の通電電流が所定の閾値(例えば定格電流の125%に相当する75A、図内では一定値と記載する)以上か否かを判定する(SM421)。主幹開閉器110の通電電流が所定の閾値未満の場合(SM421で“NO”)、フローはステップSM421の判定に戻り、主幹開閉器110の通電電流が所定の閾値以上か否かを判定する。換言すると、SM421で“NO”の期間、すなわち、過電流が検出されていない期間は、信号処理部154は、ステップSM421の判定を続ける。   As shown in FIG. 11, the signal processing unit 154, based on the main current signal D11 from the main current measuring unit 121, the energization current of the main switch 110 is a predetermined threshold value (for example, 75A corresponding to 125% of the rated current). , Which is described as a constant value in the figure) or more (SM421). When the energization current of the main switch 110 is less than the predetermined threshold value (“NO” in SM421), the flow returns to the determination in step SM421 to determine whether the energization current of the main switch 110 is the predetermined threshold value or more. In other words, the signal processing unit 154 continues the determination of step SM421 during the period of "NO" in SM421, that is, during the period when the overcurrent is not detected.

一方で、主幹電流信号D11で示された通電電流値が所定の閾値以上である場合において(SM421で“YES”)、後述するピークカット機能が“OFF”のとき(SM422で“NO”)、信号処理部154は、主幹開閉器110の通電電流が所定の閾値以上である期間が一定時間以上継続するか否かを判定する(SM423)。本実施形態において、上記の所定の閾値以上の通電電流が一定時間以上の期間継続するとは、例えば、定格電流の125%に相当する75A以上の通電電流が2時間以上継続すること、および定格電流の200%に相当する120A以上の通電電流が6分以上継続することのうちの少なくともいずれか一方が発生することである。   On the other hand, when the energization current value indicated by the main current signal D11 is equal to or more than the predetermined threshold value (“YES” in SM421), the peak cut function described later is “OFF” (“NO” in SM422), The signal processing unit 154 determines whether or not the period in which the energization current of the main switch 110 is equal to or greater than a predetermined threshold continues for a certain time or more (SM423). In the present embodiment, when the energizing current equal to or more than the predetermined threshold value continues for a certain time or more, for example, the energizing current of 75 A or more corresponding to 125% of the rated current continues for 2 hours or more, and the rated current That is, at least one of the fact that the energizing current of 120 A or more corresponding to 200% of the above continues for 6 minutes or more occurs.

ステップSM423において、主幹開閉器110の通電電流が所定の閾値以上である期間が一定時間以上継続した場合(SM423で“YES”)、以降のフローは、“主幹開閉器の初期通電診断”のステップSM225およびステップSM226(図7参照)と同じである。一方で、主幹開閉器110の通電電流が所定の閾値以上である期間が一定時間以上継続しなかった場合(SM423で“NO”)、フローはステップSM421の判定に戻る。   In step SM423, if the period in which the energization current of the master switchgear 110 is equal to or greater than the predetermined threshold value continues for a certain time or more (“YES” in SM423), the subsequent flow is the step of “initial energization diagnosis of the master switchgear”. This is the same as SM225 and step SM226 (see FIG. 7). On the other hand, when the period in which the energizing current of the main switch 110 is equal to or greater than the predetermined threshold value does not continue for a certain period of time (“NO” in SM423), the flow returns to the determination in step SM421.

また、主幹電流信号D11で示された通電電流値が所定の閾値以上である場合において(SM421で“YES”)、ピークカット機能が“ON”のとき(SM422で“YES”)、信号処理部154は、使用者によるピークカット動作が設定されているか否かを判定する(SM427)。ピークカット動作が設定されている場合(SM427で“YES”)、フローは後述するステップSM428のピークカット処理に進む。一方で、ピークカット動作が設定されていない場合(SM427で“NO”)、フローはステップSM423に進む。本開示において、ピークカット機能とは、主幹開閉器110の通電電流が、所定の電流を超えた場合に、信号処理部154が予め設けられた分岐リレー131を遮断し、主幹開閉器110が遮断されることを防止する機能である。所定の電流は、工場出荷時に定められる電流であってもよいし、使用者により予め定められる電流であってもよい。また、可変可能としてもよい。また、分岐リレー131を遮断する順番は、予め定められた分岐リレー131に優先順位を設定してこれに基づいて遮断してもよい。なお、所定の電流は、過電流が生じない電流範囲において予め定めておいてもよい。   Further, when the energization current value indicated by the main current signal D11 is equal to or higher than a predetermined threshold value (“YES” in SM421), the signal processing unit is activated when the peak cut function is “ON” (“YES” in SM422). 154 determines whether or not the peak cut operation is set by the user (SM427). When the peak cut operation is set (“YES” in SM427), the flow proceeds to the peak cut process of step SM428 described later. On the other hand, if the peak cut operation is not set (“NO” in SM427), the flow proceeds to step SM423. In the present disclosure, the peak cut function means that when the energizing current of the master switchgear 110 exceeds a predetermined current, the signal processing unit 154 shuts off the branch relay 131 provided in advance, and the master switchgear 110 shuts off. It is a function to prevent being done. The predetermined current may be a current set at the time of factory shipment or a current preset by the user. Further, it may be variable. The branch relay 131 may be shut off in a predetermined order by setting a priority order to the predetermined branch relay 131. It should be noted that the predetermined current may be predetermined in a current range in which overcurrent does not occur.

図14(a)は使用者によるピークカット動作設定のフローを示した図である。   FIG. 14A is a diagram showing a flow of peak cut operation setting by the user.

図14(a)に示すように、例えば、使用者がタッチパネル200上でピークカット設定を開始する操作をした場合、フローはステップSP11からステップSP12に進み、信号処理部154は、ピークカット電流値の設定を行う。具体的には、例えば、信号処理部154は、タッチパネル200にピークカット電流値の入力を促す表示を行い、使用者からのピーク電流値の設定操作を受ける。その設定操作を受けた後、信号処理部154は、設定された電流値が主幹定格電流以下の値であるか否かを判定する(SP13)。設定された電流値が主幹定格電流以下である場合、フローはステップSP15に進み、信号処理部154は、分岐リレー131の遮断優先順位設定を行う。具体的には、例えば、信号処理部154は、タッチパネル200に分岐リレー131のM個(M>0かつM≦Nの整数)の遮断優先順位の入力を促す表示を行い、使用者からの設定操作を受ける。その設定操作を受けた後、信号処理部154は、設定値を記憶する等の設定動作を行い(SP16)、その設定完了後、処理を終了する。   As shown in FIG. 14A, for example, when the user performs an operation to start the peak cut setting on the touch panel 200, the flow proceeds from step SP11 to step SP12, and the signal processing unit 154 sets the peak cut current value. Set. Specifically, for example, the signal processing unit 154 performs a display prompting the touch panel 200 to input a peak cut current value, and receives a peak current value setting operation from the user. After receiving the setting operation, the signal processing unit 154 determines whether or not the set current value is less than or equal to the main rated current (SP13). If the set current value is equal to or less than the main rated current, the flow proceeds to step SP15, and the signal processing unit 154 sets the disconnection priority of the branch relay 131. Specifically, for example, the signal processing unit 154 displays on the touch panel 200 a message prompting the user to input M (M> 0 and an integer of M ≦ N) interruption priorities of the branch relay 131, and the setting by the user. Receive an operation. After receiving the setting operation, the signal processing unit 154 performs a setting operation such as storing the setting value (SP16), and after the setting is completed, the processing is ended.

図14(b)はステップSM428のピークカット処理のフローを示した図である。なお、本実施形態では、ステップSP15で設定された優先順位は2個(M=2)であり、優先順位1位の分岐リレーが第Q分岐リレー131(0<Q≦Nの整数)、優先順位2位の分岐リレーが第R分岐リレー131(0<R≦N、かつ、R≠Qの整数)であるものとする。   FIG. 14B is a diagram showing a flow of the peak cutting process of step SM428. In the present embodiment, the priority set in step SP15 is two (M = 2), and the branch relay having the first priority is the Qth branch relay 131 (integer of 0 <Q ≦ N). It is assumed that the second-ranking branch relay is the R-th branch relay 131 (0 <R ≦ N and R ≠ Q is an integer).

図14(b)に示すように、信号処理部154は、主幹電流測定部121からの主幹電流信号D11に基づいて、主幹開閉器110の通電電流値を読み取り(SP21)、その読み取った電流値(以下、単に読取電流値ともいう)が設定電流値以上か否かを判定する(SP22)。読取電流値が設定電流値未満の場合(SP21で“NO”)、フローはステップSP21の判定に戻り、信号処理部154は、読取電流値が設定電流値以上か否かを判定する。   As shown in FIG. 14B, the signal processing unit 154 reads the energization current value of the master switch 110 based on the master current signal D11 from the master current measuring unit 121 (SP21), and the read current value. It is determined whether (hereinafter, simply referred to as a read current value) is equal to or more than a set current value (SP22). When the read current value is less than the set current value (“NO” in SP21), the flow returns to the determination in step SP21, and the signal processing unit 154 determines whether the read current value is the set current value or more.

一方で、読取電流値が設定電流値以上の場合(SP21で“YES”)、信号処理部154は、ステップSP15で設定された優先順位に基づき、優先順位が1位の第Q分岐リレー131を“OFF”制御する(SP23)とともに、OFF操作された第Q分岐リレー131についての“分岐リレーのOFF表示”をさせて(SP24)、フローはステップSP25に進む。ステップSP25では、信号処理部154は、主幹開閉器110の通電電流値を再度読み取り、読取電流値が設定電流値以上か否かを判定する。   On the other hand, when the read current value is equal to or higher than the set current value (“YES” in SP21), the signal processing unit 154 selects the Q-branch relay 131 having the first priority based on the priority set in step SP15. "OFF" control is performed (SP23), and "OFF display of the branch relay" for the Q-branch relay 131 that has been turned OFF is displayed (SP24), and the flow proceeds to step SP25. In step SP25, the signal processing unit 154 again reads the energization current value of the main switch 110, and determines whether the read current value is equal to or greater than the set current value.

読取電流値が設定電流値以上の場合(SP25で“YES”)、信号処理部154は、ピークカット処理を終了し、フローはSM421に戻る。   When the read current value is equal to or higher than the set current value (“YES” in SP25), the signal processing unit 154 ends the peak cut processing, and the flow returns to SM421.

一方で、読取電流値が設定電流値未満の場合(SP25で“NO”)、フローはステップSP26,SP27を介してステップSP23に戻り、信号処理部154は、ステップSP15で設定された優先順位に基づき、優先順位が2位の第R分岐リレー131を“OFF”制御するとともに、OFF操作された第R分岐リレー131についての“分岐リレーのOFF表示”をさせて(SP24)、フローはステップSP25に進む。   On the other hand, if the read current value is less than the set current value (“NO” in SP25), the flow returns to step SP23 via steps SP26 and SP27, and the signal processing unit 154 sets the priority order set in step SP15. Based on this, the “R” branch relay 131 having the second highest priority is “OFF” controlled, and the “OFF display of the branch relay” for the Rth branch relay 131 that has been turned OFF is displayed (SP24), and the flow is step SP25. Proceed to.

このように、信号処理部154は、ステップSP23からステップSP27までのフローを、読取電流値が設定電流値以上になる、あるいは、Mが“0”になるまで繰り返し、Mが“0”になった後、ピークカット処理を終了する(フローはSM421に戻る)。   In this way, the signal processing unit 154 repeats the flow from step SP23 to step SP27 until the read current value becomes equal to or greater than the set current value or M becomes "0", and M becomes "0". After that, the peak cut processing is ended (the flow returns to SM421).

−主幹開閉器の漏電診断−
次に、主幹開閉器110の漏電診断について説明する。
-Leakage diagnosis of the main switch-
Next, leakage diagnosis of the master switch 110 will be described.

図12に示すように、この“主幹開閉器の漏電診断”において、“主幹開閉器の初期通電診断”(図7参照)と異なるのは、ステップSM231の判定結果が“NO”である場合、およびステップSM232の判定結果が“NO”である場合に、フローがステップSM231の判定に戻る点である。   As shown in FIG. 12, the "leakage diagnosis of the main switch" is different from the "initial energization diagnosis of the main switch" (see FIG. 7) when the determination result of step SM231 is "NO", Further, if the determination result of step SM232 is “NO”, the flow returns to the determination of step SM231.

−主幹開閉器の過電圧診断−
次に、主幹開閉器110の“過電圧診断”について説明する。
-Overvoltage diagnosis of the main switch-
Next, the "overvoltage diagnosis" of the master switch 110 will be described.

図12に示すように、この“過電圧診断”において、“主幹開閉器の初期通電診断”(図7参照)と異なるのは、ステップSM241で“NO”の場合、およびステップSM242で“NO”の場合に、フローがステップSM241の判定に戻る点である。   As shown in FIG. 12, this "overvoltage diagnosis" differs from the "initial energization diagnosis of the main switch" (see FIG. 7) in the case of "NO" in step SM241 and in the case of "NO" in step SM242. In this case, the flow returns to the determination of step SM241.

−分岐リレーの通電診断−
次に、分岐リレー131の通電診断について説明する。ここでは分岐リレー131の通電診断として、第1分岐リレー131の通電診断について説明するが、第2〜第N分岐リレー131についても並行して同様の通電診断が実施される。以下、“分岐リレーの短絡診断”、“分岐リレーの過電流診断”、“分岐リレーの漏電診断”および“分岐リレーのトラッキング診断”においても同様とする。
-Branch relay energization diagnosis-
Next, the energization diagnosis of the branch relay 131 will be described. Here, the energization diagnosis of the first branch relay 131 will be described as the energization diagnosis of the branch relay 131, but the same energization diagnosis is also performed in parallel for the second to Nth branch relays 131. The same applies to “branch relay short-circuit diagnosis”, “branch relay overcurrent diagnosis”, “branch relay leakage diagnosis”, and “branch relay tracking diagnosis”.

図13に示すように、信号処理部154は、分岐電流測定部141からの分岐電流信号D21に基づいて第1分岐リレー131の通電状態を確認する(SS610)。第1分岐リレー131の通電がない場合(SS610で“通電無”)、信号処理部154は、タッチパネル200に“第1分岐リレーのOFF表示”をさせ(SS612)、第1分岐リレー131の診断を終了する。一方で、第1分岐リレー131の通電があった場合(SS610で“通電有”)、第1分岐リレー131の“短絡診断”、“過電流診断”、“漏電診断”および“トラッキング診断”が並行して実施される。以下では、それぞれの診断について図面を参照しながら詳細に説明する。   As shown in FIG. 13, the signal processing unit 154 confirms the energization state of the first branch relay 131 based on the branch current signal D21 from the branch current measuring unit 141 (SS610). When the first branch relay 131 is not energized (SS610: “No energization”), the signal processing unit 154 causes the touch panel 200 to “OFF display of the first branch relay” (SS612), and diagnoses the first branch relay 131. To finish. On the other hand, when the first branch relay 131 is energized (SS 610 is “energized”), the “short circuit diagnosis”, “overcurrent diagnosis”, “leakage diagnosis” and “tracking diagnosis” of the first branch relay 131 occur. It will be conducted in parallel. Hereinafter, each diagnosis will be described in detail with reference to the drawings.

−分岐リレーの短絡診断−
次に、第1分岐リレー131の短絡診断について詳細に説明する。
-Branch relay short circuit diagnosis-
Next, the short circuit diagnosis of the first branch relay 131 will be described in detail.

図13に示すように、信号処理部154は、分岐電流測定部141からの分岐電流信号D21に基づいて、短絡電流が検出されるか否か、すなわち、第1分岐リレー131の通電電流が所定の閾値(例えば2.5kA、図内では短絡電流検出と記載する)以上か否かを判定する(SS611)。第1分岐リレー131の通電電流が所定の閾値未満の場合(SS611で“NO”)、フローはステップSS611の判定に戻り、第1分岐リレー131の通電電流が所定の閾値以上か否かを判定する。換言すると、SS611で“NO”の期間、すなわち、短絡電流が検出されていない期間は、信号処理部154は、ステップSS611の判定を続ける。   As shown in FIG. 13, the signal processing unit 154 determines whether or not a short-circuit current is detected based on the branch current signal D21 from the branch current measuring unit 141, that is, the energizing current of the first branch relay 131 is predetermined. Or more (for example, 2.5 kA, described as short-circuit current detection in the figure) is determined (SS611). When the energizing current of the first branch relay 131 is less than the predetermined threshold value (“NO” in SS611), the flow returns to the determination of step SS611 to determine whether the energizing current of the first branch relay 131 is equal to or more than the predetermined threshold value. To do. In other words, during the period of “NO” in SS611, that is, in the period in which the short-circuit current is not detected, the signal processing unit 154 continues the determination of step SS611.

一方で、分岐電流信号D21で示された通電電流値が所定の閾値以上である場合(SS611で“YES”)、以降のフローは、“分岐リレーのON診断”(図8参照)のステップSS523〜SS525と同じである。   On the other hand, when the energization current value indicated by the branch current signal D21 is greater than or equal to the predetermined threshold value (“YES” in SS611), the subsequent flow is the step SS523 of “ON diagnosis of branch relay” (see FIG. 8). ~ Same as SS525.

−分岐リレーの過電流診断−
次に、第1分岐リレー131の過電流診断について詳細に説明する。
-Branch relay overcurrent diagnosis-
Next, the overcurrent diagnosis of the first branch relay 131 will be described in detail.

図13に示すように、信号処理部154は、分岐電流測定部141からの分岐電流信号D21に基づいて、第1分岐リレー131の通電電流が所定の閾値(例えば定格電流の125%に相当する25A、図内では一定値と記載する)以上か否かを判定する(SS621)。第1分岐リレー131の通電電流が所定の閾値未満の場合(SS621で“NO”)、フローはステップSS621の判定に戻り、第1分岐リレー131の通電電流が所定の閾値以上か否かを判定する。換言すると、SS621で“NO”の期間、すなわち、過電流が検出されていない期間は、信号処理部154は、ステップSS621の判定を続ける。   As shown in FIG. 13, the signal processing unit 154, based on the branch current signal D21 from the branch current measuring unit 141, the energizing current of the first branch relay 131 corresponds to a predetermined threshold value (e.g., 125% of the rated current). 25A, described as a constant value in the figure) or more (SS621). When the energizing current of the first branch relay 131 is less than the predetermined threshold value (“NO” in SS621), the flow returns to the determination of step SS621, and it is determined whether the energizing current of the first branch relay 131 is the predetermined threshold value or more. To do. In other words, the signal processing unit 154 continues the determination of step SS621 during the period of "NO" in SS621, that is, the period in which the overcurrent is not detected.

一方で、分岐電流信号D21で示された通電電流値が所定の閾値以上である場合(SS621で“YES”)、信号処理部154は、第1分岐リレー131の通電電流が所定の閾値以上である期間が一定時間以上継続するか否かを判定する(SS622)。本実施形態において、上記の所定の閾値以上の通電電流が一定時間以上の期間継続するとは、例えば、定格電流の125%に相当する25A以上の通電電流が2時間以上継続すること、および定格電流の200%に相当する40A以上の通電電流が2分以上継続することのうちの少なくともいずれか一方が発生することである。   On the other hand, when the energization current value indicated by the branch current signal D21 is equal to or greater than the predetermined threshold value (“YES” in SS621), the signal processing unit 154 determines that the energization current of the first branch relay 131 is equal to or greater than the predetermined threshold value. It is determined whether or not a certain period continues for a certain time or longer (SS622). In the present embodiment, that the energization current equal to or higher than the predetermined threshold value continues for a predetermined time or longer means, for example, that the energization current of 25 A or more corresponding to 125% of the rated current continues for 2 hours or more, and That is, at least one of 40% or more of the energizing current corresponding to 200% of the above continues for 2 minutes or more.

ステップSS622において、第1分岐リレー131の通電電流が所定の閾値以上である期間が一定時間以上継続した場合(SS622で“YES”)、以降のフローは、“分岐リレーのON診断”(図8参照)のステップSS526〜SS528と同じである。一方で、第1分岐リレー131の通電電流が所定の閾値以上である期間が一定時間以上継続しなかった場合(SS622で“NO”)、フローはステップSS621の判定に戻る。   In step SS622, when the period in which the energizing current of the first branch relay 131 is equal to or more than the predetermined threshold value continues for a certain time or more (“YES” in SS622), the subsequent flow is “ON diagnosis of branch relay” (FIG. 8). This is the same as steps SS526 to SS528 of the reference). On the other hand, when the period in which the energizing current of the first branch relay 131 is equal to or greater than the predetermined threshold value does not continue for a certain period of time (“NO” in SS622), the flow returns to the determination in step SS621.

−分岐リレーの漏電診断−
次に、第1分岐リレー131の漏電診断について詳細に説明する。
− Leakage diagnosis of branch relay −
Next, the leakage diagnosis of the first branch relay 131 will be described in detail.

図13に示すように、この“分岐リレーの漏電診断”において、“分岐リレーのON診断”(図8参照)と異なるのは、ステップSS531の判定結果が“NO”である場合、およびステップSS532の判定結果が“NO”である場合に、フローがステップSS531の判定に戻る点である。   As shown in FIG. 13, the “branch relay leakage diagnosis” differs from the “branch relay ON diagnosis” (see FIG. 8) when the determination result in step SS531 is “NO”, and in step SS532. This is the point where the flow returns to the determination of step SS531 when the determination result of is NO.

−分岐リレーのトラッキング診断−
次に、第1分岐リレー131のトラッキング診断について詳細に説明する。
-Tracking diagnosis of branch relay-
Next, the tracking diagnosis of the first branch relay 131 will be described in detail.

図13に示すように、この“トラッキング診断”において、“分岐リレーのON診断”(図8参照)と異なるのは、ステップSS541で“NO”の場合に、フローがステップSS541の判定に戻る点である。   As shown in FIG. 13, this “tracking diagnosis” differs from the “branch relay ON diagnosis” (see FIG. 8) in that, in the case of “NO” in step SS541, the flow returns to the determination in step SS541. Is.

(その他の実施形態)
図19は、分岐リレー131として、半導体リレーを用い、この分岐リレー131および分岐通電検知部140(分岐電流測定部141、分岐異常検出部142)をプリント基板166上に実装した例を示している。このものでは、各分岐異常検出部142の負荷側配線は、プリント基板166に一体的に設けられたコネクタ167に接続される。そして、このコネクタ167と負荷側コネクタ156とが、例えばケーブル168等によって接続される。このような構成とすることにより、分電盤100のサイズをさらに小型化することができる。なお、図19において、コネクタ167を省き、プリント基板166を拡張して、プリント基板166が直接負荷側コネクタ156に接続されるようにしてもよい。また、分岐リレー131および分岐通電検知部140に加えて、例えば、信号処理部154、通信部164、パネル入出力部165等をプリント基板166上に実装してもよい。
(Other embodiments)
FIG. 19 shows an example in which a semiconductor relay is used as the branch relay 131, and the branch relay 131 and the branch energization detecting section 140 (branch current measuring section 141, branch abnormality detecting section 142) are mounted on the printed board 166. .. In this structure, the load side wiring of each branch abnormality detection unit 142 is connected to the connector 167 integrally provided on the printed circuit board 166. Then, the connector 167 and the load-side connector 156 are connected by a cable 168 or the like, for example. With such a configuration, the size of the distribution board 100 can be further reduced. 19, the connector 167 may be omitted and the printed circuit board 166 may be expanded so that the printed circuit board 166 is directly connected to the load side connector 156. Further, in addition to the branch relay 131 and the branch energization detection unit 140, for example, the signal processing unit 154, the communication unit 164, the panel input / output unit 165 and the like may be mounted on the printed board 166.

また、図19に示すように、分電盤100は、主幹開閉器110および停電検知部152の入力側と電源側コネクタ151との間に配設され、信号処理部154からの制御を受けて、外部の電源と主幹開閉器110および停電検知部152とを接続する電路の接続/遮断をオンオフ制御可能に構成された切替部169をさらに備えていてもよい。信号処理部154は、所定の外部トリガを受けたとき、切替部169をオフ制御して、外部の電源と主幹開閉器110および停電検知部152とを接続する電路を遮断する、すなわち、分電盤100を外部の電源(例えば商用電源)と切り離す。上記の所定のトリガは、例えば商用電源が停電したときに受けるトリガである。これにより、例えば、分電盤100が自家発電装置のような他の電源に接続されていた場合において、商用電源が停電したとき、自家発電電力が商用電源側に逆潮流しないようにすることができる。すなわち、分電盤100の単独運転を防止することができる。なお、切替部169は、主幹開閉器110と電源側コネクタ151とを接続する配線と、停電検知部152の入力側との間に配設されていてもよい(図示しない)。このように切替部169を配設した場合においても、停電時の逆潮流を防止し、分電盤100の単独運転を防止することができる。   As shown in FIG. 19, the distribution board 100 is arranged between the input side of the main switch 110 and the power failure detection section 152 and the power supply side connector 151, and under the control of the signal processing section 154. Further, a switching unit 169 configured to be able to perform on / off control of connection / disconnection of an electric path connecting an external power source to the main switch 110 and the power failure detection unit 152 may be further provided. When the signal processing unit 154 receives a predetermined external trigger, the signal processing unit 154 controls the switching unit 169 to be turned off to cut off the electric path connecting the external power supply to the main switch 110 and the power failure detection unit 152, that is, the power distribution. The board 100 is disconnected from an external power source (for example, commercial power source). The above-mentioned predetermined trigger is, for example, a trigger received when the commercial power supply fails. Accordingly, for example, when the distribution board 100 is connected to another power source such as a private power generation device, when the commercial power supply fails, the privately generated power can be prevented from flowing backward to the commercial power supply side. it can. That is, the independent operation of the distribution board 100 can be prevented. The switching unit 169 may be arranged between the wiring connecting the master switch 110 and the power supply side connector 151 and the input side of the power failure detection unit 152 (not shown). Even when the switching unit 169 is arranged in this manner, it is possible to prevent reverse power flow at the time of power failure and prevent the distribution board 100 from operating independently.

また、上述の実施形態では、主幹開閉器110の遮断時のタッチパネル200での表示例を図17(a)であるものとし、分岐リレー131の遮断時のタッチパネル200での表示例を図18(a)であるものとしたが、これに限定されない。例えば、主幹開閉器110の遮断時に図18(a)のように表示してもよいし、分岐リレー131の遮断時に図17(a)のように表示してもよい。   Further, in the above-described embodiment, it is assumed that the display example on the touch panel 200 when the main switch 110 is cut off is shown in FIG. 17A, and the display example on the touch panel 200 when the branch relay 131 is cut off is shown in FIG. However, the present invention is not limited to this. For example, it may be displayed as shown in FIG. 18A when the main switch 110 is cut off, or may be displayed as shown in FIG. 17A when the branch relay 131 is cut off.

また、上述の実施形態では、分電盤100が分岐開閉器130と分岐通電検知部140とを備える例について説明したが、分岐通電検知部140を省いて、各分岐開閉器130が分岐通電検知部140の機能を包含するようにしてもよい。また、信号処理部154、通信部164、およびパネル入出力部165の機能を統合し、これらの機能を包含する1つの制御部を設けてもよい。   Further, in the above-described embodiment, an example in which the distribution board 100 includes the branch switch 130 and the branch energization detection unit 140 has been described, but the branch energization detection unit 140 is omitted and each branch switch 130 detects the branch energization. You may make it include the function of the part 140. Further, the functions of the signal processing unit 154, the communication unit 164, and the panel input / output unit 165 may be integrated, and one control unit that includes these functions may be provided.

本開示に係る分電盤は、安全性を確保しつつ、高い利便性を有するようにしているため、住居用途や店舗用途等として屋内外で使用される分電盤として有用である。   INDUSTRIAL APPLICABILITY The distribution board according to the present disclosure is highly useful while ensuring safety, and thus is useful as a distribution board used indoors or outdoors for residential use, store use, and the like.

100 分電盤
101 筐体
110 主幹開閉器
113 操作レバー
120 主幹通電検知部
130 分岐開閉器
131 分岐リレー(切替ユニット)
140 分岐通電検知部
151 電源側コネクタ
153 バッテリー
154 信号処理部(制御部)
156 負荷側コネクタ
200 タッチパネル
D1 主幹通電信号
D2 分岐通電信号
CS1 開閉制御信号
100 distribution board 101 case 110 master switch 113 operation lever 120 master energization detection unit 130 branch switch 131 branch relay (switch unit)
140 Branch Energization Detection Unit 151 Power Supply Side Connector 153 Battery 154 Signal Processing Unit (Control Unit)
156 Load side connector 200 Touch panel D1 Master energization signal D2 Branch energization signal CS1 Switching control signal

Claims (2)

主幹開閉器と、該主幹開閉器の出力側に分岐リレー接続部を介して接続された複数の分岐開閉器とを収納する筐体を備える分電盤であって、
前記分岐開閉器の電路の通電状態の異常の有無を検知して分岐通電信号を出力する分岐通電検知機能を包含する分岐開閉器と、前記分岐通電信号を受けて分岐開閉器の電路の接続のオンオフを制御する開閉制御信号を出力する制御部とを備え、
前記主幹開閉器は、該主幹開閉器の通電状態に異常があるときに機械的に自動遮断するトリップ動作により該主幹開閉器の電路を遮断すると共に、使用者の開閉操作を受けて該電路を開閉できる開閉器であり、
前記分岐開閉器は、前記開閉制御信号を受け、該分岐開閉器の通電状態に異常があるときに該分岐開閉器の電路を遮断すると共に、使用者の開閉操作を受けて該電路を開閉できる開閉器であって、
複数の前記分岐開閉器と前記分岐通電検知部がプリント基板上に配置された
ことを特徴とする分電盤。
A distribution board comprising a main switch, and a housing for housing a plurality of branch switches connected to an output side of the main switch via a branch relay connection part,
A branch switch including a branch energization detection function that detects the presence or absence of an abnormality in the energization state of the electric path of the branch switch and outputs a branch energization signal; and a connection of the electric path of the branch switch that receives the branch energization signal. And a control unit that outputs an open / close control signal that controls on / off,
The trunk switch shuts off the electric path of the master switch by a trip operation that mechanically automatically shuts off when there is an abnormality in the energization state of the main switch, and the main switch is opened and closed by a user. It is a switch that can be opened and closed,
The branch switch receives the switching control signal, shuts off the electric path of the branch switch when the energized state of the branch switch is abnormal, and opens and closes the electric path in response to a user's opening / closing operation. A switch,
A distribution board, wherein a plurality of the branch switches and the branch energization detector are arranged on a printed circuit board.
請求項1記載の分電盤において、
前記分岐開閉器の状態を表示するとともに、その表示部分で使用者の操作を受けるタッチパネルをさらに備え、前記制御部は、
前記タッチパネルへの操作に基づいて、前記分岐開閉器の電路の接続をオンオフ制御する開閉制御信号を前記分岐開閉器に出力し、
前記分岐開閉器は、前記分岐通電信号および前記タッチパネルの操作に対応する開閉制御信号のうちの少なくともいずれか一方に基づいて前記分岐開閉器の電路の接続をオンオフ制御することを特徴とする分電盤。

The distribution board according to claim 1,
While displaying the state of the branch switch, further comprising a touch panel that is operated by the user in the display portion, the control unit,
Based on an operation on the touch panel, outputs an open / close control signal for controlling on / off of connection of the electric path of the branch switch to the branch switch,
The branch switch controls ON / OFF of connection of an electric path of the branch switch based on at least one of the branch energization signal and an opening / closing control signal corresponding to operation of the touch panel. Board.

JP2019195725A 2017-12-29 2019-10-28 Distribution board Active JP6924505B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2019195725A JP6924505B2 (en) 2017-12-29 2019-10-28 Distribution board
JP2020217893A JP6986784B2 (en) 2019-10-28 2020-12-25 Distribution board
JP2020217892A JP6986783B2 (en) 2019-10-28 2020-12-25 Distribution board
JP2021189450A JP7149020B2 (en) 2019-10-28 2021-11-22 Distribution board

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017255205A JP6652954B2 (en) 2017-12-29 2017-12-29 Switchboard
JP2019195725A JP6924505B2 (en) 2017-12-29 2019-10-28 Distribution board

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2017255205A Division JP6652954B2 (en) 2017-12-29 2017-12-29 Switchboard

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2020217892A Division JP6986783B2 (en) 2019-10-28 2020-12-25 Distribution board
JP2020217893A Division JP6986784B2 (en) 2019-10-28 2020-12-25 Distribution board

Publications (2)

Publication Number Publication Date
JP2020074665A true JP2020074665A (en) 2020-05-14
JP6924505B2 JP6924505B2 (en) 2021-08-25

Family

ID=70610586

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019195725A Active JP6924505B2 (en) 2017-12-29 2019-10-28 Distribution board

Country Status (1)

Country Link
JP (1) JP6924505B2 (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0748016A2 (en) * 1995-06-08 1996-12-11 GEWISS S.p.A. Electric power supply switch box, particularly for household use
US5604385A (en) * 1995-05-22 1997-02-18 Target Hi-Tech Electronics Ltd. Apparatus for and method of evenly distributing an electrical load across a three phase power distribution network
JPH1082801A (en) * 1996-09-05 1998-03-31 Central Res Inst Of Electric Power Ind Display device for consumed power quantity in power consumer
JPH10336885A (en) * 1997-05-30 1998-12-18 Tempearl Ind Co Ltd Earthquake sensor unit
JPH1132427A (en) * 1997-07-10 1999-02-02 Mitsubishi Electric Corp Distribution system
JP2004153930A (en) * 2002-10-30 2004-05-27 Tempearl Ind Co Ltd Distribution board
JP2008259396A (en) * 2007-03-15 2008-10-23 Matsushita Electric Works Ltd Distribution board
JP2009005564A (en) * 2007-06-25 2009-01-08 Panasonic Electric Works Co Ltd Electric energy monitoring system
JP2009026758A (en) * 2007-07-17 2009-02-05 General Electric Co <Ge> Breaking device and method for fault current
JP2011055643A (en) * 2009-09-02 2011-03-17 Michinori Kawasaki Power supply system
JP2011066975A (en) * 2009-09-16 2011-03-31 Kaga Inc Load control unit for house wiring, and house wiring system using the same
JP2011217572A (en) * 2010-04-02 2011-10-27 Nitto Electric Works Ltd Distribution panel apparatus
JP2013003864A (en) * 2011-06-17 2013-01-07 Yahoo Japan Corp Power saving information providing device, method, system and program
JP2015523042A (en) * 2012-05-02 2015-08-06 サーバー テクノロジー インコーポレイテッド Relay with integrated power sensor

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5604385A (en) * 1995-05-22 1997-02-18 Target Hi-Tech Electronics Ltd. Apparatus for and method of evenly distributing an electrical load across a three phase power distribution network
JP2000514279A (en) * 1995-05-22 2000-10-24 ターゲット−ハイテック エレクトロニクス リミテッド Apparatus and method for equally distributing electrical loads to a three-phase distribution network
EP0748016A2 (en) * 1995-06-08 1996-12-11 GEWISS S.p.A. Electric power supply switch box, particularly for household use
JPH1082801A (en) * 1996-09-05 1998-03-31 Central Res Inst Of Electric Power Ind Display device for consumed power quantity in power consumer
JPH10336885A (en) * 1997-05-30 1998-12-18 Tempearl Ind Co Ltd Earthquake sensor unit
JPH1132427A (en) * 1997-07-10 1999-02-02 Mitsubishi Electric Corp Distribution system
JP2004153930A (en) * 2002-10-30 2004-05-27 Tempearl Ind Co Ltd Distribution board
JP2008259396A (en) * 2007-03-15 2008-10-23 Matsushita Electric Works Ltd Distribution board
JP2009005564A (en) * 2007-06-25 2009-01-08 Panasonic Electric Works Co Ltd Electric energy monitoring system
JP2009026758A (en) * 2007-07-17 2009-02-05 General Electric Co <Ge> Breaking device and method for fault current
JP2011055643A (en) * 2009-09-02 2011-03-17 Michinori Kawasaki Power supply system
JP2011066975A (en) * 2009-09-16 2011-03-31 Kaga Inc Load control unit for house wiring, and house wiring system using the same
JP2011217572A (en) * 2010-04-02 2011-10-27 Nitto Electric Works Ltd Distribution panel apparatus
JP2013003864A (en) * 2011-06-17 2013-01-07 Yahoo Japan Corp Power saving information providing device, method, system and program
JP2015523042A (en) * 2012-05-02 2015-08-06 サーバー テクノロジー インコーポレイテッド Relay with integrated power sensor

Also Published As

Publication number Publication date
JP6924505B2 (en) 2021-08-25

Similar Documents

Publication Publication Date Title
JP6349127B2 (en) Distribution board
KR100809910B1 (en) Digital cabinet panel
CA2619151C (en) Transfer switch with generator maintenance indicator
JP2009163960A (en) Dc switch
US20080179958A1 (en) Automatic Transfer Switch With Monitor Mode and Method Employing the Same
BR112013017800B1 (en) DISARMING UNIT AND ELECTRICAL SWITCHING APPLIANCE
JP6986784B2 (en) Distribution board
JP6317158B2 (en) Distribution board
JP6924505B2 (en) Distribution board
JP6986783B2 (en) Distribution board
JP6792886B2 (en) Distribution board
JP6792887B2 (en) Distribution board
JP7149020B2 (en) Distribution board
JP6652955B2 (en) Switchboard
JP6652954B2 (en) Switchboard
JP6577011B2 (en) Distribution board
JP6549691B2 (en) Distribution board
JP6623245B2 (en) Distribution board
JP4981657B2 (en) Distribution board
JP5108670B2 (en) DC switch
JP2009146778A (en) Dc connecting device
JP2008289301A (en) Distribution board with monitoring function
KR100907298B1 (en) Automatic power switching unit for performing switching operation in load disconnected status
KR20090079497A (en) The power distribution board with Auxiliary Power Unit
JP6455771B2 (en) Collective switchgear and distribution board device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191029

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200901

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20201030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210622

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210726

R150 Certificate of patent or registration of utility model

Ref document number: 6924505

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150