JP2020054050A - Power generation system - Google Patents

Power generation system Download PDF

Info

Publication number
JP2020054050A
JP2020054050A JP2018179158A JP2018179158A JP2020054050A JP 2020054050 A JP2020054050 A JP 2020054050A JP 2018179158 A JP2018179158 A JP 2018179158A JP 2018179158 A JP2018179158 A JP 2018179158A JP 2020054050 A JP2020054050 A JP 2020054050A
Authority
JP
Japan
Prior art keywords
power
output
power generation
generation system
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018179158A
Other languages
Japanese (ja)
Other versions
JP7309336B2 (en
Inventor
山田 和夫
Kazuo Yamada
和夫 山田
隆人 小林
Takahito Kobayashi
隆人 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sharp Corp
Original Assignee
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sharp Corp filed Critical Sharp Corp
Priority to JP2018179158A priority Critical patent/JP7309336B2/en
Publication of JP2020054050A publication Critical patent/JP2020054050A/en
Application granted granted Critical
Publication of JP7309336B2 publication Critical patent/JP7309336B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

To provide a power generation system which enables a manager to previously grasp planned power and further by which power is outputted as planned without variation.SOLUTION: A power generation system (10) comprises a photovoltaic power generation device (14) and a power storage device (15) which are connected to a DC bus line (13) and previously notifies a manager (40) of predictive output power of the power generation system that is calculated based on predictive photovoltaic power generation output and an amount of electric power stored in the power storage device.SELECTED DRAWING: Figure 1

Description

本発明は太陽光発電装置を備えた発電システムに関する。   The present invention relates to a power generation system including a solar power generation device.

太陽光発電モジュール(太陽光発電装置)に並列接続された蓄電池モジュールを備える太陽光発電システムが従来技術として知られている。このように、蓄電池モジュールを備えることで、急激な変動の起こりやすい太陽光発電出力を平滑化することができ、また、昼間に発電した電力を夜間に消費するなどの、タイムシフトを実現することが期待されている。   BACKGROUND ART A photovoltaic power generation system including a storage battery module connected in parallel to a photovoltaic power generation module (photovoltaic power generation device) is known as a related art. By providing the storage battery module in this manner, it is possible to smooth the photovoltaic power generation output, which is likely to undergo rapid fluctuation, and to realize a time shift such as consuming the power generated during the daytime at night. Is expected.

特許5401003号公報Japanese Patent No. 5401003

しかしながら、上述のような従来技術において、電力事業者等の管理者からは、どの程度の電力が発電システムから得られるのかが事前に不明であり、電力系統全体を計画的に運用していく上で、課題があった。   However, in the conventional technology as described above, it is unknown in advance from a manager such as an electric power company how much power is to be obtained from the power generation system. There was a problem.

本発明の一態様は、管理者が事前に計画電力を把握することができるようになるとともに、計画どおりに変動の無い出力ができる発電システムを実現することを目的とする。   An object of one embodiment of the present invention is to realize a power generation system that allows a manager to grasp planned power in advance and that can output without fluctuation as planned.

上記の課題を解決するために、本発明の一態様に係る発電システムは、DC母線に接続された太陽光発電装置及び蓄電装置を備え、電力系統からのAC電力の受電端に接続されたAC母線に、前記DC母線のDC電力をAC電力に変換して出力する発電システムであって、前記太陽光発電装置の予測太陽光発電出力を算出し、前記予測太陽光発電出力と前記蓄電装置が蓄えている電力量とに基づいて、1日を分割した所定の期間中に前記発電システムが出力する予測出力電力を算出し、算出された前記予測出力電力を、管理者に事前に通知する構成を備えている。   In order to solve the above problems, a power generation system according to one embodiment of the present invention includes a solar power generation device and a power storage device connected to a DC bus, and an AC power supply terminal connected to a power receiving end of AC power from a power system. A power generation system that converts a DC power of the DC bus into AC power and outputs the power to a bus, calculates a predicted photovoltaic output of the photovoltaic device, and calculates the predicted photovoltaic output and the power storage device. A configuration in which a predicted output power output by the power generation system during a predetermined period obtained by dividing one day is calculated based on the stored power amount, and a calculated notification output power is notified to an administrator in advance. It has.

本発明の一態様によれば、電力系統の管理者が事前に出力電力を把握することができるようになるとともに、計画どおりに変動の無い出力ができる発電システムを実現できる。   According to one embodiment of the present invention, a power system can be realized in which an administrator of a power system can grasp output power in advance and output without fluctuation as planned.

本発明の実施形態1に係る発電システムの構成を示す模式図である。1 is a schematic diagram illustrating a configuration of a power generation system according to Embodiment 1 of the present invention. 本発明の実施形態1に係る発電システムの動作を示すフローチャートである。It is a flowchart which shows operation | movement of the electric power generation system which concerns on Embodiment 1 of this invention. 本発明の実施形態1に係る発電システムの動作を説明するための、電力および蓄電量を示す図である。It is a figure for explaining operation of the electric power generation system concerning Embodiment 1 of the present invention, and shows electric power and the amount of stored electricity. 本発明の実施形態1に係る発電システムの電力および蓄電量の推移を示す図である。It is a figure showing transition of electric power of a power generation system concerning Embodiment 1 of the present invention, and the amount of storage. 本発明の実施形態2に係る発電システムの電力および蓄電量の推移を示す図である。It is a figure which shows transition of the electric power of the electric power generation system and Embodiment 2 of this invention which are stored.

〔実施形態1〕
本発明の実施形態1について、詳細に説明する。
[Embodiment 1]
Embodiment 1 of the present invention will be described in detail.

(発電システムの構成)
図1は、実施形態1の発電システム10を示す模式図である。図において、電力メータ22が、商用電力系統20の需要者の受電端21に設けられている。発電システム10は、AC母線30を介して電力メータ22に接続されている。需要者の負荷31もまた、AC母線30を介して電力メータ22に接続されている。図示されるように、受電端21における、需要者が商用電力系統20から受電する電力が受電電力Pu、逆潮流している場合の電力が逆潮流電力Prである。これらの電力量は電力メータ22で検出が可能である。また、負荷31が消費する電力は負荷消費電力Peである。
(Configuration of power generation system)
FIG. 1 is a schematic diagram illustrating a power generation system 10 according to the first embodiment. In the figure, a power meter 22 is provided at a power receiving end 21 of a consumer of a commercial power system 20. The power generation system 10 is connected to the power meter 22 via the AC bus 30. The consumer load 31 is also connected to the power meter 22 via the AC bus 30. As shown in the figure, the power received by the customer from the commercial power system 20 at the power receiving end 21 is the received power Pu, and the power when the power is flowing backward is the reverse power flow Pr. These amounts of power can be detected by the power meter 22. The power consumed by the load 31 is the load power consumption Pe.

発電システム10は、計測装置11、AC−DC変換装置12、DC母線13、太陽光発電装置14(太陽光発電モジュール)、蓄電装置15、制御装置16、通信装置17を備えている。太陽光発電装置14は、DC母線13に接続され、AC−DC変換装置12を介してAC母線30に対し、AC電力に変換した電力を供給する。太陽光発電装置14が発電する電力は、太陽光発電出力Pgである。DC母線13には、蓄電装置15も接続される。蓄電装置15はDC母線13から電力を受け取って充電し、貯蔵し、DC母線13に対して貯蔵した電力を出力(放電)できる装置である。蓄電装置15は、リチウムイオン電池、鉛蓄電池、NaS電池、レドックスフロー電池等の、2次電池を備えた装置であり得る。   The power generation system 10 includes a measurement device 11, an AC-DC converter 12, a DC bus 13, a solar power generation device 14 (photovoltaic power generation module), a power storage device 15, a control device 16, and a communication device 17. The photovoltaic power generator 14 is connected to the DC bus 13, and supplies the AC bus 30 with power converted into AC power via the AC-DC converter 12. The power generated by the photovoltaic power generator 14 is the photovoltaic power output Pg. Power storage device 15 is also connected to DC bus 13. The power storage device 15 is a device that can receive and charge power from the DC bus 13, store the power, and output (discharge) the stored power to the DC bus 13. The power storage device 15 may be a device including a secondary battery such as a lithium ion battery, a lead storage battery, a NaS battery, and a redox flow battery.

AC−DC変換装置12は、商用電力系統20側のAC母線30と、太陽光発電装置14側のDC母線13との間に配置され、双方向にAC−DC変換が可能な装置である。   The AC-DC converter 12 is disposed between the AC bus 30 on the commercial power system 20 side and the DC bus 13 on the photovoltaic power generator 14, and is a device capable of bidirectional AC-DC conversion.

計測装置11は、発電システム10に出入りする電力を計測できる装置である。図1では、計測装置11が、AC母線30に配置されるように示されるが、発電システム10に出入りする電力が計測できれば、この位置に限られない。計測装置11は、発電システム10がAC母線30側に出力する出力電力Po及び、発電システム10がAC母線30側から受け入れる供給電力Psを計測する。計測装置は、電力管理者が別途設置し、システムの出力を監視する電力メータであってもよい。出力電力Poは、負荷31で消費され、またあるいは商用電力系統20に逆潮流する。供給電力Psは、発電システム10が商用電力系統20から受け取る電力でもある。   The measuring device 11 is a device that can measure electric power entering and exiting the power generation system 10. In FIG. 1, the measurement device 11 is shown as being arranged on the AC bus 30, but the position is not limited to this position as long as the power that enters and exits the power generation system 10 can be measured. The measuring device 11 measures the output power Po that the power generation system 10 outputs to the AC bus 30 side and the supply power Ps that the power generation system 10 receives from the AC bus 30 side. The measuring device may be a power meter separately installed by a power manager and monitoring the output of the system. The output power Po is consumed by the load 31 and / or flows backward to the commercial power system 20. The supply power Ps is also the power that the power generation system 10 receives from the commercial power system 20.

制御装置16は、発電システム10を構成する各装置と情報のやり取りを行い、AC−DC変換装置12の動作の制御を行う装置である。さらに、制御装置16は電力メータ22から電力に関する情報を取得できてもよい。また、制御装置16は蓄電装置15を監視・制御する。蓄電装置15は、制御装置16の指示により、所要の充放電を実施する。また、制御装置16は通信装置17を制御する。計測装置11、AC−DC変換装置12、制御装置16とが、まとめてパワーコンディショニングサブシステム(PCS)と呼称されるものであってもよい。   The control device 16 is a device that exchanges information with each device constituting the power generation system 10 and controls the operation of the AC-DC conversion device 12. Further, the control device 16 may be able to acquire information on the power from the power meter 22. The control device 16 monitors and controls the power storage device 15. The power storage device 15 performs required charging / discharging according to an instruction from the control device 16. Further, the control device 16 controls the communication device 17. The measurement device 11, the AC-DC conversion device 12, and the control device 16 may be collectively called a power conditioning subsystem (PCS).

通信装置17は、制御装置16の指示により、管理者40に対して、発電システム10の出力電力Poの計画等についての通知を含めた、情報の伝達を行う。管理者40は、発電システム10の上位システムである商用電力系統20の電力の少なくとも一部についての何らかの管理を行うものである。管理者40は、商用電力系統20の管理を行う系統運用者であり得、また、商用電力系統20への電力の小売り量を把握し、管理する電力小売事業者、リソースアグリゲータであり得る。また、通信装置17は、制御装置16の指示により、日照量情報提供者50からの日照量予測の受信を含めた、情報のやり取りを行う。日照量情報提供者50は、天候の予報に基づいた将来の日照量の予測から、発電システム10に日照量予測情報の提供を行うものである。   The communication device 17 transmits information including a notification of a plan of the output power Po of the power generation system 10 to the manager 40 according to an instruction of the control device 16. The administrator 40 performs some management of at least a part of the electric power of the commercial electric power system 20 which is a higher system of the power generation system 10. The administrator 40 may be a system operator that manages the commercial power system 20, and may be a power retailer or a resource aggregator that grasps and manages a retail amount of power to the commercial power system 20. In addition, the communication device 17 exchanges information including the reception of the sunshine forecast from the sunshine information provider 50 in accordance with the instruction of the control device 16. The sunshine information provider 50 provides the sunshine forecast information to the power generation system 10 based on the prediction of the future sunshine based on the weather forecast.

(発電システムの動作のフロー)
図2は、実施形態1の発電システム10の動作を示すフローチャートである。図3は、発電システム10における、太陽光発電装置14の発電する太陽光発電出力Pg、発電システム10の出力電力Po、発電システム10の計画出力(予測出力電力)、蓄電装置15の蓄電量Sその他を示すグラフである。図3(a)に各電力が示され、図3(b)に蓄電量が示される。これらに基づいて、発電システム10の操作を説明する。
(Operation flow of the power generation system)
FIG. 2 is a flowchart illustrating the operation of the power generation system 10 according to the first embodiment. FIG. 3 shows the photovoltaic power generation output Pg generated by the photovoltaic power generation device 14, the output power Po of the power generation system 10, the planned output (predicted output power) of the power generation system 10, and the storage amount S of the power storage device 15 in the power generation system 10. It is a graph which shows others. FIG. 3A shows each electric power, and FIG. 3B shows the amount of stored power. The operation of the power generation system 10 will be described based on these.

一日を分割したN番目の期間を期間T(N)とし、図3では、期間T(N−1)から期間T(N+1)までが示されている。図3には、期間T(N−1)終了直前時点の状況が示されており、期間T(N−1)終了直前までの太陽光発電出力Pg、蓄電量Sが示されている。期間T(N)、期間T(N+1)中の各線は、計画値もしくは予測値である。各期間の長さToは、30分から2時間程度であり、典型的には1時間とすることができる。すなわち、一日の分割数は、12以上程度とすることが好ましい。   The N-th period obtained by dividing one day is referred to as a period T (N), and FIG. 3 illustrates a period from the period T (N-1) to the period T (N + 1). FIG. 3 shows the situation immediately before the end of the period T (N-1), and shows the photovoltaic power output Pg and the storage amount S until immediately before the end of the period T (N-1). Each line in the period T (N) and the period T (N + 1) is a planned value or a predicted value. The length To of each period is about 30 minutes to 2 hours, and can be typically 1 hour. That is, the number of divisions per day is preferably about 12 or more.

期間の長さToは、電力管理者が保有する他の電源の起動時間や発電効率のよい運転時間周期、または電力取引市場における電力調達取引が終了(ゲートクローズ)し、系統運用者に需給バランス調整の権限が移ってから実際の電力消費までの時間(日本において、2018年現在では1時間前にゲートクローズし、系統運用者に需給調整の責が移る、電力小売事業者は計画値同時同量を達成できない場合、インバランス清算を行う)等に依存し適宜、設定することができる。   The length of the period To depends on the start-up time of another power source and the operation time period with good power generation efficiency held by the power manager, or the end of the power procurement transaction in the power trading market (gate closing), and the supply and demand balance to the grid operator. The time from the transfer of the authority for adjustment to the actual power consumption (in Japan, the gate closes one hour ago as of 2018, and the responsibility for supply and demand adjustment shifts to the grid operator. If the amount cannot be achieved, imbalance liquidation is performed) and the like can be set as appropriate.

この期間は、電力管理者が有効な期間で、できる限り短くすることが重要である。この期間は必要な電池容量と大きく関連し、期間が短いほど、蓄電池容量を小さくすることが可能となる。また発電量の予測も電池容量の決定に重要な要素であり、予測精度が向上するほど、電池容量を少なくすることが可能となる。これら構成により、安定した出力を行う太陽光発電システムの運用コストを下げることが可能となる。   This period is effective for the power manager, and it is important that the period be as short as possible. This period is greatly related to the required battery capacity, and the shorter the period, the smaller the storage battery capacity. The prediction of the power generation is also an important factor in determining the battery capacity, and the more accurate the prediction, the smaller the battery capacity becomes. With these configurations, it is possible to reduce the operation cost of a photovoltaic power generation system that performs stable output.

発電システム10において、制御装置16は、期間T(N)の開始前に、期間T(N+1)における発電システム10の計画出力Pop(N+1)を通信装置17を通じて管理者40に通知する。この時点で既に、期間T(N)中の太陽光発電装置14による予測太陽光発電量Wpv(N)は算出され、これに基いた、発電システム10の計画出力Pop(N)が、管理者40に通知されている。予測太陽光発電量Wpv(N)は、図3(a)において、期間T(N)中の、ハッチングを行った領域の面積として示されている。   In the power generation system 10, the control device 16 notifies the planned output Pop (N + 1) of the power generation system 10 in the period T (N + 1) to the manager 40 through the communication device 17 before the start of the period T (N). At this point in time, the predicted solar power generation amount Wpv (N) by the solar power generation device 14 during the period T (N) has already been calculated, and the planned output Pop (N) of the power generation system 10 based on this has been calculated by the administrator. 40 has been notified. The predicted solar power generation amount Wpv (N) is shown as the area of the hatched region in the period T (N) in FIG.

期間T(N−1)の終了直前に、制御装置16は、その時点で蓄電装置15に蓄えられている電力量である蓄電量S(N−1)を蓄電装置15から取得する(ステップS1)。   Immediately before the end of the period T (N-1), the control device 16 acquires the power storage amount S (N-1), which is the amount of power stored in the power storage device 15 at that time, from the power storage device 15 (step S1). ).

次に、制御装置16は、既決値である、期間T(N)中の予測太陽光発電量Wpv(N)、計画出力Pop(N)とを用いて、蓄電量S(N−1)に基づき、期間期間T(N)の終了時の蓄電装置15の推定蓄電量S(N)を算出する(ステップS2)。   Next, the control device 16 uses the predicted values of the predicted solar power generation amount Wpv (N) during the period T (N) and the planned output Pop (N), which are the determined values, to obtain the storage amount S (N−1). Based on this, the estimated power storage amount S (N) of the power storage device 15 at the end of the period period T (N) is calculated (step S2).

続いて、制御装置16は、通信装置17に指示して、日照量情報提供者50から、期間T(N+1)の日照量予測の情報を取得する(ステップS3)。そうして、取得した日照量の予測に基づいて、太陽光発電装置14の期間T(N+1)における各時刻の太陽光発電出力Pgの予測値(予測太陽光発電出力)を算出し、その積分である予測太陽光発電量Wpv(N+1)を算出する(ステップS4)。太陽光発電出力Pgの予測値は、図3(a)において、破線で示されている。予測太陽光発電量Wpv(N+1)は、図3(a)において、期間T(N+1)中の、ハッチングを行った領域の面積として示されている。   Subsequently, the control device 16 instructs the communication device 17 to acquire information on the amount of sunshine forecast during the period T (N + 1) from the sunshine amount information provider 50 (step S3). Then, based on the obtained prediction of the amount of sunlight, the predicted value (predicted photovoltaic power output) of the photovoltaic power output Pg at each time in the period T (N + 1) of the photovoltaic power generation device 14 is calculated and integrated. Is calculated (step S4). The predicted value of the photovoltaic power output Pg is indicated by a broken line in FIG. The predicted solar power generation amount Wpv (N + 1) is shown as the area of the hatched region in the period T (N + 1) in FIG.

更に、制御装置16は、予測太陽光発電量Wpv(N+1)、推定蓄電量S(N)に基づき、期間T(N+1)終了時点の蓄電装置15の蓄電量が、目標蓄電量Sp(N+1)となるように、期間T(N+1)の計画出力Pop(N+1)を決定する(ステップS5)。   Further, based on the predicted solar power generation amount Wpv (N + 1) and the estimated power storage amount S (N), the control device 16 sets the power storage amount of the power storage device 15 at the end of the period T (N + 1) to the target power storage amount Sp (N + 1). The planned output Pop (N + 1) for the period T (N + 1) is determined so as to be as follows (step S5).

続いて、制御装置16は通信装置17を通じて、期間T(N)の開始前に、期間T(N+1)の発電システム10の計画出力Pop(N+1)を管理者40に通知する(ステップS6)。   Subsequently, the control device 16 notifies the administrator 40 of the planned output Pop (N + 1) of the power generation system 10 during the period T (N + 1) before the start of the period T (N) via the communication device 17 (step S6).

期間T(N)中、制御装置16は、変動する太陽光発電出力Pgに対し、蓄電装置15の充放電動作を制御することで、発電システム10の出力電力Poが、一定値である計画出力Pop(N)となるように動作させる(ステップS7)。   During the period T (N), the control device 16 controls the charging / discharging operation of the power storage device 15 with respect to the fluctuating photovoltaic power generation output Pg, so that the output power Po of the power generation system 10 is a planned output having a constant value. The operation is performed so as to be Pop (N) (step S7).

こうして、図2に示された一期間分の一連のフローが終了する。発電システム10は、このフローを繰り返し実行する。   Thus, a series of flows for one period shown in FIG. 2 ends. The power generation system 10 repeatedly executes this flow.

(算出方法の具体的な例示)
上述の各ステップにおける数値の算出方法を、より具体的に例示する。蓄電装置15の充電時、放電時、貯蔵中の損失、AC−DC変換装置12の変換損失、その他の発電システム10内の損失が無視できる場合には以下の様に算出できる。これらの損失が無視できない場合には、適宜に各部の効率を掛け合わせて算出すればよい。
(Specific examples of calculation method)
The method of calculating the numerical value in each of the above steps will be described more specifically. When the loss during charging, discharging, and storage of the power storage device 15, the conversion loss of the AC-DC converter 12, and other losses in the power generation system 10 can be neglected, the following calculation can be performed. If these losses cannot be neglected, they may be calculated by appropriately multiplying the efficiency of each unit.

ステップS2における、蓄電装置15の推定蓄電量S(N)については、次の通りである。   The estimated power storage amount S (N) of the power storage device 15 in step S2 is as follows.

予測太陽光発電量Wpv(N)と、計画出力Pop(N)に期間T(N)の長さToを乗じた値である電力量Pop(N)・Toとの差分Wpv(N)−Pop(N)・Toを求める。この差分を、蓄電量S(N−1)からの増減として、推定蓄電量S(N)を求める。推定蓄電量S(N)は、当該差分が正のときは、蓄電量S(N−1)から増加し、負のときは減少する。期間T(N)終了時における目標蓄電量との差異は、期間T(N−1)終了時における目標蓄電量と現実の蓄電量S(N−1)との差異に由来する。   Difference Wpv (N) -Pop between predicted solar power generation amount Wpv (N) and electric power amount Pop (N) · To which is a value obtained by multiplying planned output Pop (N) by length To of period T (N). (N) · To is found. This difference is calculated as an increase or decrease from the charged amount S (N−1), and the estimated charged amount S (N) is obtained. The estimated power storage amount S (N) increases from the power storage amount S (N−1) when the difference is positive, and decreases when the difference is negative. The difference from the target power storage amount at the end of the period T (N) is derived from the difference between the target power storage amount at the end of the period T (N-1) and the actual power storage amount S (N-1).

ステップS5における、計画出力Pop(N+1)については、以下の通りである。   The planned output Pop (N + 1) in step S5 is as follows.

予測太陽光発電量Wpv(N+1)と、計画出力Pop(N+1)に期間T(N+1)の長さToを乗じた値である電力量Pop(N+1)・Toとの差分Wpv(N+1)−Pop(N)・Toを考える。この差分が、推定蓄電量S(N)から目標蓄電量Sp(N+1)への増減分と等しくなるように、期間T(N+1)中の計画出力Pop(N+1)を定める。   Difference Wpv (N + 1) −Pop between predicted solar power generation amount Wpv (N + 1) and electric power amount Pop (N + 1) · To which is a value obtained by multiplying planned output Pop (N + 1) by length To of period T (N + 1). Consider (N) · To. The planned output Pop (N + 1) during the period T (N + 1) is determined so that this difference is equal to the increase / decrease from the estimated charged amount S (N) to the target charged amount Sp (N + 1).

この際に、計画出力Pop(N+1)が負の値となる場合には、発電システム10は、期間T(N+1)中に、その大きさの供給電力Psを商用電力系統20から受け入れ、蓄電装置15に貯蔵するように動作する。この場合、制御装置16は、期間T(N+1)の発電システム10の計画出力Pop(N+1)をマイナス値として管理者40に通知する。   At this time, when the planned output Pop (N + 1) becomes a negative value, the power generation system 10 receives the supplied power Ps of that magnitude from the commercial power system 20 during the period T (N + 1), and 15 to be stored. In this case, the control device 16 notifies the manager 40 of the planned output Pop (N + 1) of the power generation system 10 during the period T (N + 1) as a negative value.

(選択的な動作)
上述の通り、発電システム10において、期間T(N)の開始までに、発電システム10の期間T(N+1)の計画出力Pop(N+1)が算出され、管理者40に通知される。
(Selective action)
As described above, in the power generation system 10, the planned output Pop (N + 1) of the power generation system 10 during the period T (N + 1) is calculated by the start of the period T (N), and is notified to the manager 40.

更に発電システム10の選択的な動作として、制御装置16が通信装置17を通じて、期間T(N+1)中の実際の出力電力Poを管理者40へ通知するものとしてもよい。これにより管理者40が、発電システム10の実際の出力電力Poが、計画出力(予測出力電力)の通りであったか否かを把握することができるようになる。この場合、期間T(N+1)の終了後に、当該通知が完了するものとすればよい。実際の出力電力Poの計画出力Pop(N+1)からの変動が大きい場合に、管理者40が需要者に対して、電力の買い取り費用のカットなどの、ペナルティを科すことができるようにするためである。あるいは、期間中の実際の総出力電力量の、計画出力電力量Pop(N+1)・Tからの相違が大きい場合等も同様である。   Further, as a selective operation of the power generation system 10, the control device 16 may notify the manager 40 of the actual output power Po during the period T (N + 1) via the communication device 17. This allows the manager 40 to know whether or not the actual output power Po of the power generation system 10 was as planned output (predicted output power). In this case, the notification may be completed after the end of the period T (N + 1). This is to allow the manager 40 to impose a penalty on the customer, such as cutting the power purchase cost, when the actual output power Po fluctuates greatly from the planned output Pop (N + 1). is there. Alternatively, the same applies to the case where the difference between the actual total output power during the period and the planned output power Pop (N + 1) · T is large.

また、発電システム10の選択的な動作として、制御装置16が通信装置17を通じて、所定の期間における発電システム10が受け入れた供給電力Ps若しくは、その電力量を管理者40へ通知するものとしてもよい。発電システム10が出力した電力量のうち、発電システム10が商用電力系統20から受け入れた電力量は、太陽光発電装置14が発電した分ではない。一定期間における出力電力Poの総和(積分)から、供給電力Psの総和(積分)を差し引いたものが、太陽光発電装置14が発電した電力量となる。そこで、本通知を行うことで、管理者40は、再生可能エネルギー発電量(太陽光発電装置14の発電量)を正確に知ることができるようになる。   Further, as a selective operation of the power generation system 10, the control device 16 may notify the manager 40 of the supply power Ps received by the power generation system 10 for a predetermined period or the power amount thereof through the communication device 17. . The amount of power received by the power generation system 10 from the commercial power system 20 among the amounts of power output by the power generation system 10 is not the amount generated by the solar power generation device 14. A value obtained by subtracting the sum (integral) of the supplied power Ps from the sum (integral) of the output power Po in a certain period is the amount of power generated by the photovoltaic power generator 14. Thus, by performing this notification, the manager 40 can accurately know the amount of generated renewable energy (the amount of power generated by the solar power generation device 14).

従って、同様の目的で、制御装置16が通信装置17を通じて、こうして算出された一定期間における太陽光発電装置14が発電した電力量を管理者40へ通知するものとしてもよい。一定期間とは、例えば、一月とすることができるが、これに限られるものではない。   Therefore, for the same purpose, the control device 16 may notify the administrator 40 of the amount of power generated by the photovoltaic power generation device 14 in the certain period calculated as described above through the communication device 17. The certain period can be, for example, one month, but is not limited to this.

(発電システムの動作の結果例)
実施形態1においては、各期間T(i)終了時点の目標蓄電量Sp(i)は、蓄電装置15が太陽光発電出力Pgの変動を抑えるために運用される日照時間中において、一定である。目標蓄電量Sp(i)の一定値としては、例えば、蓄電装置15のステートオブチャージ(SOC)の50%に相当する値、すなわち満充電量の半分とすることができる。目標蓄電量Sp(i)が、SOCが0%に近い小さい値に設定されると、蓄電装置15は、放電できる電力量がわずかとなり、太陽光発電出力Pgの急激な減少に追随できなくなる。逆に目標蓄電量Sp(i)が、SOCが100%に近い、大きい値に設定されると、蓄電装置15は、太陽光発電出力Pgの急激な増加に追随できなくなる。従って、目標蓄電量Sp(i)の一定値は、SOCの50%に相当する値には限られないが、これらを考慮して適切な値に設定されることが望ましい。以下の説明では、目標蓄電量Sp(i)をある一定の値として具体的に説明するが、ある程度の変動を許容した、所定の幅を持った目標蓄電量としてもよい。
(Example of operation results of power generation system)
In the first embodiment, the target power storage amount Sp (i) at the end of each period T (i) is constant during the daylight hours when the power storage device 15 is operated to suppress the fluctuation of the solar power output Pg. . The constant value of target power storage amount Sp (i) can be, for example, a value corresponding to 50% of the state of charge (SOC) of power storage device 15, that is, a half of the full charge amount. When the target power storage amount Sp (i) is set to a small SOC value close to 0%, the power storage device 15 has a small amount of power that can be discharged, and cannot follow a rapid decrease in the photovoltaic power output Pg. Conversely, if the target power storage amount Sp (i) is set to a large value where the SOC is close to 100%, the power storage device 15 cannot follow a rapid increase in the solar power generation output Pg. Therefore, the fixed value of the target power storage amount Sp (i) is not limited to a value corresponding to 50% of the SOC, but is desirably set to an appropriate value in consideration of these. In the following description, the target power storage amount Sp (i) is specifically described as a certain value, but may be a target power storage amount having a predetermined width that allows a certain amount of fluctuation.

上記のように規定される発電システム10の動作によって、実際に運用を行った結果の例を図4に示す。図4では、期間T(N−1)から期間T(N+1)までが示されている。この期間は、日照量が時間を追うにつれて大きくなる午前の時間帯にある。よって、図4(a)に破線で示される太陽光発電出力Pgの予測値も、時間とともに大きくなっている。   FIG. 4 shows an example of a result of an actual operation performed by the operation of the power generation system 10 defined as described above. FIG. 4 illustrates a period from the period T (N−1) to the period T (N + 1). This period is in the morning, when the amount of sunlight increases with time. Therefore, the predicted value of the photovoltaic power output Pg indicated by the broken line in FIG.

また、図4(a)には、各期間の発電システム10の計画出力Pop(N−1)、Pop(N)、Pop(N+1)も示されている。実際に発電システム10が出力した出力電力Poは、計画通りであり、図4(a)に示される各期間の計画出力Pop(i)と一致した。   FIG. 4A also shows the planned outputs Pop (N−1), Pop (N), and Pop (N + 1) of the power generation system 10 in each period. The output power Po actually output by the power generation system 10 was as planned, and coincided with the planned output Pop (i) in each period shown in FIG.

期間T(N−1)は、晴れ時々曇りの天候であり、日照量が一定しない状況であった。よって、太陽光発電出力Pgも期間内において大きく変動した。従って、計画出力Pop(N−1)と等しい計画通りの出力電力Poを期間中に亘って出力するために、蓄電装置15の充放電が繰り返された。その結果、図4(b)に示されるように、期間中の蓄電量Sも上下動を繰り返した。しかし、期間T(N−1)中の総発電量は、ほぼ予測太陽光発電量Wpv(N−1)どおりであったため、期間T(N−1)終了時の蓄電量Sは、ほぼ目標蓄電量Sp(N−1)に等しかった。各期間終了時点での目標蓄電量Sp(i)は、図4(b)にドットで示されている。   The period T (N-1) was sunny and sometimes cloudy, and the amount of sunshine was not constant. Therefore, the photovoltaic power output Pg also fluctuated greatly within the period. Therefore, charging and discharging of the power storage device 15 were repeated in order to output the planned output power Po equal to the planned output Pop (N-1) over the period. As a result, as shown in FIG. 4B, the amount of stored power S during the period also repeatedly moved up and down. However, since the total amount of power generation during the period T (N-1) was almost the same as the predicted solar power generation amount Wpv (N-1), the storage amount S at the end of the period T (N-1) was almost equal to the target. It was equal to the charged amount Sp (N-1). The target power storage amount Sp (i) at the end of each period is indicated by a dot in FIG.

期間T(N)は、雲によって太陽光発電装置14のソーラーパネルが陰ることが無く、徐々に強まる日照量予測どおりの日照状況であった。その結果、太陽光発電出力Pgは予測通りに推移した。期間T(N)中の総発電量も、ほぼ予測太陽光発電量Wpv(N)どおりであったため、期間T(N)終了時の蓄電量Sは、ほぼ目標蓄電量S(N)に等しかった。晴天日の午前中のように、日照量が徐々に強まる期間において、一定の計画出力どおりの出力電力Poを得るため、蓄電装置15は、その期間の前半では放電を行い、後半では充電を行う。従って、その期間中の蓄電量Sは、前半に減少し、後半に増加するように推移した。   During the period T (N), the solar panel of the photovoltaic power generator 14 was not shaded by the clouds, and the sunshine condition was expected to gradually increase as expected. As a result, the photovoltaic power output Pg changed as predicted. Since the total power generation amount during the period T (N) was also substantially the same as the predicted solar power generation amount Wpv (N), the storage amount S at the end of the period T (N) was almost equal to the target storage amount S (N). Was. In a period in which the amount of sunshine gradually increases, such as in the morning on a fine day, the power storage device 15 performs discharging in the first half of the period and performs charging in the second half in order to obtain a predetermined output power Po as planned output. . Accordingly, the amount of stored power S during that period decreased in the first half and increased in the second half.

なお、期間が午後の時間帯にあって、日照量が時間を追うにつれて小さくなる場合は逆に、蓄電装置15は、その期間の前半では充電を行い、後半では放電を行う。従って、その期間中の蓄電量Sは、前半に増加し、後半に減少するように推移する。   Conversely, when the period is in the afternoon and the amount of sunlight decreases with time, power storage device 15 performs charging in the first half of the period and discharges in the second half. Therefore, the storage amount S during that period changes so as to increase in the first half and decrease in the second half.

期間T(N+1)では、後半に日照予測が外れ、太陽光発電出力Pgが予測より小さく推移した。しかし、蓄電装置15が放電を行うことで、期間T(N+1)中、Pop(N+1)に等しい一定の出力電力Poが維持された。その結果、期間T(N+1)終了時の蓄電量Dは、目標蓄電量Sp(N+1)を下回ることとなった。   In the period T (N + 1), the sunshine prediction was missed in the latter half, and the photovoltaic power output Pg was smaller than the prediction. However, by discharging the power storage device 15, a constant output power Po equal to Pop (N + 1) was maintained during the period T (N + 1). As a result, the storage amount D at the end of the period T (N + 1) is smaller than the target storage amount Sp (N + 1).

このような期間終了時の目標蓄電量からの乖離は、図2の動作フローにおける、ステップS1の制御装置16による蓄電量の取得によって検出される。そうして、ステップS5における先の計画出力の算出に反映されて乖離が修正されることとなる。具体的には、期間T(N+2)については、計画出力Pop(N+2)が管理者40に既に通知されており、出力電力Poをその通りに制御し、計画を守る必要がある。しかし、期間T(N+3)について、計画出力Pop(N+3)の算出に反映されて、乖離が修正されることになる。   Such deviation from the target power storage amount at the end of the period is detected by acquiring the power storage amount by the control device 16 in step S1 in the operation flow of FIG. Then, the deviation is corrected by being reflected in the calculation of the planned output in step S5. Specifically, for the period T (N + 2), the planned output Pop (N + 2) has already been notified to the manager 40, and it is necessary to control the output power Po as it is and keep the plan. However, for the period T (N + 3), the deviation is corrected by being reflected in the calculation of the planned output Pop (N + 3).

なお、目標蓄電量Sp(N)、Sp(N+1)が同じであって、蓄電装置15への充放電は行わない予定であったため、計画出力Pop(N+1)は、太陽光発電出力Pgの予測値の平均値であった。しかし、仮に図3の期間T(N+1)に示されるように、期間T(N+1)終了時の目標蓄電量Sp(N+1)を下げて、放電させる計画である場合には、計画出力Pop(N+1)は、太陽光発電出力Pgの予測値の平均値よりも大きくなる。   Since the target power storage amounts Sp (N) and Sp (N + 1) are the same and charging / discharging of the power storage device 15 is not to be performed, the planned output Pop (N + 1) is a prediction of the photovoltaic power generation output Pg. It was the average of the values. However, as shown in the period T (N + 1) in FIG. 3, if the target storage amount Sp (N + 1) at the end of the period T (N + 1) is to be reduced and the discharge is to be performed, the planned output Pop (N + 1) ) Is larger than the average of the predicted values of the photovoltaic power output Pg.

以上のように、長さToの一定の期間内において、太陽光発電出力Pgが急変する場合、徐々に増加する場合、徐々に減少する場合、予測と外れた場合のいずれの場合においても、発電システム10は、計画出力どおりの、一定の出力を維持できる。   As described above, within a certain period of the length To, when the photovoltaic power output Pg changes suddenly, gradually increases, gradually decreases, The system 10 can maintain a constant output as planned output.

更には、発電システム10の出力は、計画出力(予測出力電力)として、所定の時間前に事前に管理者40に通知されている。しかも、発電システム10は、管理者40に通知された計画出力通りの出力を、確実に出力できる。   Further, the output of the power generation system 10 is notified to the manager 40 in advance as a planned output (predicted output power) a predetermined time before. Moreover, the power generation system 10 can reliably output the output according to the planned output notified to the manager 40.

よって、このような発電システム10によれば、管理者40が系統運用者の場合は、電力系統全体を計画的に運用する上で極めて有用な状況を提供することができるようになる。また、管理者40が電力小売事業者の場合は、計画値同時同量を達成するために有効に活用可能である。従って、上述の機能を備えた発電システム10の運用者に対しては、このような機能を備えない発電システムと比較して、より大きなインセンティブを管理者40から与えることが可能となる。   Therefore, according to such a power generation system 10, when the manager 40 is a system operator, it is possible to provide a situation that is extremely useful in systematically operating the entire power system. Further, when the manager 40 is a power retailer, it can be effectively used to achieve the same amount of planned values at the same time. Accordingly, a greater incentive can be given from the manager 40 to the operator of the power generation system 10 having the above-described functions as compared with a power generation system not having such functions.

このように、電池の蓄電量をできる限り一定に保つ制御を行うということは、太陽光発電の発電電力をできる限り蓄電せずに出力することと同義である。蓄電装置15へ電力の充放電を行うと、現実には一定の電力ロスが存在するため、このような制御をおこなうことによって、発電電力をより効率的に使うことが可能となる。   As described above, performing control to keep the amount of stored power of the battery as constant as possible is equivalent to outputting the generated power of the solar power generation without storing as much as possible. When the power storage device 15 is charged and discharged with power, a certain power loss actually exists. Therefore, by performing such control, the generated power can be used more efficiently.

〔実施形態2〕
本発明の実施形態2について、以下に説明する。なお、説明の便宜上、上記実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。
[Embodiment 2]
Embodiment 2 of the present invention will be described below. For convenience of description, members having the same functions as those described in the above embodiment are denoted by the same reference numerals, and description thereof will not be repeated.

実施形態2に係る発電システムの構成は、図1に示される実施形態1と同様である。また、実施形態2に係る発電システムの動作も図2のフローチャートに示される実施形態1の場合と同様である。ただし、図2のフローチャートのステップS5における具体的な数値の算出方法が異なる。以下にその点について説明する。   The configuration of the power generation system according to the second embodiment is the same as that of the first embodiment shown in FIG. The operation of the power generation system according to the second embodiment is also the same as that of the first embodiment shown in the flowchart of FIG. However, the method of calculating the specific numerical value in step S5 of the flowchart of FIG. 2 is different. This will be described below.

(算出方法の具体的な例示)
計画出力Pop(N+1)の計算方法は、実施形態1の場合と同じである。ただし、計画出力Pop(N+1)が負の値となった場合には、以下の通りとする。
(Specific examples of calculation method)
The method of calculating the planned output Pop (N + 1) is the same as in the first embodiment. However, when the planned output Pop (N + 1) becomes a negative value, the following is performed.

制御装置16は、期間T(N+1)の発電システム10の計画出力Pop(N+1)を0として管理者40に通知する。   The control device 16 notifies the administrator 40 of the planned output Pop (N + 1) of the power generation system 10 during the period T (N + 1) as 0.

発電システム10は、推定蓄電量S(N)が、所定の閾値以上であるときには、期間T(N+1)中に、供給電力Psを商用電力系統20から受け入れることはしない。太陽光発電出力Pgにより、蓄電装置15への充電を行わせるためである。この点、目標蓄電量Sp(i)を一定に保つことを重要視した実施形態1と異なる。   When the estimated power storage amount S (N) is equal to or larger than the predetermined threshold, the power generation system 10 does not receive the supply power Ps from the commercial power system 20 during the period T (N + 1). This is for charging the power storage device 15 with the solar power generation output Pg. In this respect, the present embodiment is different from the first embodiment where importance is attached to keeping the target storage amount Sp (i) constant.

発電システム10は、推定蓄電量S(N)が、所定の閾値未満であるときに限り、期間T(N+1)中に、その大きさの供給電力Psを商用電力系統20から受け入れ、蓄電装置15に貯蔵するように動作する。蓄電装置15の蓄電量Sが所定の閾値未満に低下すると、一時的な太陽光発電出力Pgの減少を放電により吸収して、出力電力Poを平滑化できる機能が確保できなくなるため、商用電力系統20からの電力の受け入れにより、蓄電量Sを回復させるためである。   The power generation system 10 receives the supply power Ps of that magnitude from the commercial power system 20 during the period T (N + 1) only when the estimated power storage amount S (N) is less than the predetermined threshold, and Operate to store in. When the storage amount S of the power storage device 15 falls below a predetermined threshold, the temporary decrease in the photovoltaic power generation output Pg is absorbed by discharging, and the function of smoothing the output power Po cannot be secured. This is for recovering the power storage amount S by receiving the power from the power storage 20.

(発電システムの動作の結果例)
本発明の実施形態2は、逆潮流電力Prの発生を極力避けて、蓄電装置15を用いたいわゆるタイムシフトにより需要者において太陽光発電装置14の発電分を消費するケースを想定する。このようなケースは、逆潮流電力Prの管理者40による買い取り価格(需要者の売電価格)が、受電電力Puの電力価格(需要者の買電価格)よりも小さい場合に、需要者にとって経済的となるために発生する。
(Example of operation results of power generation system)
The second embodiment of the present invention assumes a case where the power consumption of the photovoltaic power generation device 14 is consumed by the consumer by so-called time shift using the power storage device 15 while avoiding generation of the reverse power flow power Pr as much as possible. In such a case, when the purchase price of the reverse power flow power Pr by the manager 40 (the power price of the consumer) is smaller than the power price of the received power Pu (the power price of the consumer), the demand for the consumer is reduced. Occurs to be economical.

図5は、このような想定に対応した、発電システム10による一日の動作を示した図である。図5(a)には、太陽光発電出力Pg、負荷消費電力Peが示されている。負荷消費電力Peは、朝方と夕方から夜にピークを持ち、昼間の消費が少ない。このような電力需要のパターンは、一般家庭における典型的な消費パターンである。昼間に太陽光発電出力Pgの出力が負荷消費電力Peを上回っており、蓄電装置15が無ければ、売電(逆潮流)となる状況にある。   FIG. 5 is a diagram illustrating a one-day operation by the power generation system 10 corresponding to such an assumption. FIG. 5A shows the photovoltaic power output Pg and the load power consumption Pe. The load power consumption Pe has a peak from morning and evening to night and consumes less daytime. Such a power demand pattern is a typical consumption pattern in a general household. In the daytime, the output of the photovoltaic power generation output Pg exceeds the load power consumption Pe, and if there is no power storage device 15, power is sold (reverse power flow).

逆潮流をなるべく回避するように、各期間終了時の目標蓄電量Sp(i)を図5(b)に示されるように設定する。図5(b)には、運用上の蓄電量Sの上限値及び下限値が合わせて示されている。蓄電量の上限値は、SOCの100%としてよいが、これとは異なる値とすることも可能である。蓄電量の下限値は、SOCの0%としてよいが、これとは異なる値とすることも可能である。これらは、蓄電装置15の特性に応じて、適宜に設定すればよい。   In order to avoid reverse power flow as much as possible, the target power storage amount Sp (i) at the end of each period is set as shown in FIG. FIG. 5B also shows the upper limit value and the lower limit value of the operational storage amount S. The upper limit of the charged amount may be set to 100% of the SOC, but may be different from this. The lower limit value of the charged amount may be 0% of the SOC, but may be a different value. These may be appropriately set according to the characteristics of the power storage device 15.

目標蓄電量Sp(i)は以下のように設定する。目標蓄電量Sp(i)は図5(b)にドットとして示されている。   The target power storage amount Sp (i) is set as follows. The target storage amount Sp (i) is shown as a dot in FIG.

充電開始前の期間に、目標蓄電量Sp(i)は下限値よりもやや高い値(閾値)に設定される。下限値よりもやや高い値であるのは、一時的な太陽光発電出力Pgの減少を放電により吸収して、出力電力Poを平滑化できるようにするためである。このように設定値を低い値とするのは、その後、充電できる余地を十分確保するためである。   During the period before the start of charging, the target charged amount Sp (i) is set to a value (threshold) slightly higher than the lower limit. The reason why the value is slightly higher than the lower limit is to absorb the temporary decrease in the photovoltaic power generation output Pg by discharging so that the output power Po can be smoothed. The reason why the set value is set to a low value in this way is to secure a sufficient room for charging thereafter.

昼間の積極的に充電を行いたい期間に、目標蓄電量Sp(i)を上限値よりもやや低い値(高い所定値)に設定する。上限値よりもやや低い値であるのは、一時的な太陽光発電出力Pgの増加を充電により吸収して、出力電力Poを平滑化できるようにするためである。   During the daytime during which positive charging is desired, the target power storage amount Sp (i) is set to a value slightly lower than the upper limit value (higher predetermined value). The reason why the value is slightly lower than the upper limit value is that a temporary increase in the photovoltaic power generation output Pg is absorbed by charging, and the output power Po can be smoothed.

また、夕方から夜間の放電を行う期間には、そのために、目標蓄電量Sp(i)を期間の経過に従って、徐々に小さく設定する。   In addition, in the period in which the evening to night discharge is performed, the target power storage amount Sp (i) is set gradually smaller as the period elapses.

次に、発電システム10の動作について、時間を追って説明する。   Next, the operation of the power generation system 10 will be described with time.

深夜から早朝、目標蓄電量Sp(i)が閾値に設定され、蓄電量Sもその値で推移する。閾値は、例えばSOC20%に相当する値であり得るが、これに限られない。   From midnight to early morning, the target power storage amount Sp (i) is set as a threshold, and the power storage amount S also changes at that value. The threshold value may be, for example, a value corresponding to SOC 20%, but is not limited thereto.

日照が生じると、太陽光発電装置14が発電を開始する。従って、実施形態1において説明された通り、事前に、発電システム10の計画出力Pop(i)が算出され、管理者40に通知される。計画出力Pop(i)は、図5(a)に示されている。   When sunshine occurs, the photovoltaic power generation device 14 starts power generation. Therefore, as described in the first embodiment, the planned output Pop (i) of the power generation system 10 is calculated in advance and notified to the manager 40. The planned output Pop (i) is shown in FIG.

次に、充電に適した時間帯には、目標蓄電量Sp(i)が高い所定値に設定される。実際の蓄電量Sが低い状態で、目標蓄電量Sp(i)が高い所定値となったため、発電システム10は充電動作を行う必要がある。このとき、ステップS5で算出される計画出力Pop(N+1)は、マイナスとなる。よって、管理者40には、計画出力が0であるように通知され、その期間に発電システム10の出力は行われない。太陽光発電出力Pgは、全て、蓄電装置15の充電に充当される。太陽光発電出力Pgだけで、短期間に目標蓄電量Sp(i)に達することはないため、複数の期間に亘り、充電が継続する。   Next, in a time zone suitable for charging, the target power storage amount Sp (i) is set to a high predetermined value. In a state where the actual charged amount S is low, the target charged amount Sp (i) has a high predetermined value, so that the power generation system 10 needs to perform a charging operation. At this time, the planned output Pop (N + 1) calculated in step S5 is negative. Therefore, the manager 40 is notified that the planned output is 0, and the output of the power generation system 10 is not performed during that period. All of the photovoltaic power output Pg is used for charging the power storage device 15. Since only the photovoltaic power output Pg does not reach the target storage amount Sp (i) in a short period of time, charging continues over a plurality of periods.

充電が進み、ステップS2における蓄電装置15の推定蓄電量S(N)が高い所定値である目標蓄電量Sp(i)に近づくと、ステップS5で算出される計画出力Pop(N+1)がプラスとなる。よって、管理者40には、プラスの計画出力が通知され、その期間に発電システム10の出力が再開される。   When the charging progresses and the estimated power storage amount S (N) of the power storage device 15 in step S2 approaches the target power storage amount Sp (i) which is a high predetermined value, the planned output Pop (N + 1) calculated in step S5 becomes positive. Become. Therefore, the manager 40 is notified of the plus planned output, and the output of the power generation system 10 is restarted during that period.

続いて、夕方以降の放電に適した時間帯には、目標蓄電量Sp(i)が期間ごとに、徐々に高い所定値から、閾値に下がっていくように設定される。すると、太陽光発電出力Pgはほぼ0であるので、各期間において蓄電装置15が放電する電力が、ステップS5で算出される計画出力Pop(N+1)として、管理者40に通知されることとなる。また、その期間において、計画通りに発電システム10の出力がなされるように動作する。
最終的に、蓄電量Sが閾値まで低減した段階で、放電が終了する。
Subsequently, in a time zone suitable for discharging after the evening, the target power storage amount Sp (i) is set so as to gradually decrease from a predetermined high value to a threshold value for each period. Then, since the photovoltaic power output Pg is almost 0, the power discharged by the power storage device 15 in each period is notified to the administrator 40 as the planned output Pop (N + 1) calculated in step S5. . Further, during that period, the operation is performed so that the output of the power generation system 10 is performed as planned.
Finally, the discharge ends at the stage when the charged amount S has decreased to the threshold value.

以上のように、実施形態2においては、各期間蓄T(i)の目標蓄電量Sp(i)を上述の通り適切に設定することで、発電システム10において、タイムシフト動作が可能となる。   As described above, in the second embodiment, the time shift operation can be performed in the power generation system 10 by appropriately setting the target power storage amount Sp (i) for each period storage T (i) as described above.

また、実施形態1に記載された本発明の効果は、実施形態2においても同様である。   The effects of the present invention described in the first embodiment are the same in the second embodiment.

〔ソフトウェアによる実現例〕
発電システム10の制御装置16は、集積回路(ICチップ)等に形成された論理回路(ハードウェア)によって実現してもよいし、ソフトウェアによって実現してもよい。
[Example of software implementation]
The control device 16 of the power generation system 10 may be realized by a logic circuit (hardware) formed in an integrated circuit (IC chip) or the like, or may be realized by software.

後者の場合、制御装置16は、各機能を実現するソフトウェアであるプログラムの命令を実行するコンピュータを備えている。このコンピュータは、例えば少なくとも1つのプロセッサ(制御装置)を備えていると共に、上記プログラムを記憶したコンピュータ読み取り可能な少なくとも1つの記録媒体を備えている。そして、上記コンピュータにおいて、上記プロセッサが上記プログラムを上記記録媒体から読み取って実行することにより、本発明の目的が達成される。上記プロセッサとしては、例えばCPU(Central Processing Unit)を用いることができる。上記記録媒体としては、「一時的でない有形の媒体」、例えば、ROM(Read Only Memory)等の他、テープ、ディスク、カード、半導体メモリ、プログラマブルな論理回路などを用いることができる。また、上記プログラムを展開するRAM(Random Access Memory)などをさらに備えていてもよい。また、上記プログラムは、該プログラムを伝送可能な任意の伝送媒体(通信ネットワークや放送波等)を介して上記コンピュータに供給されてもよい。なお、本発明の一態様は、上記プログラムが電子的な伝送によって具現化された、搬送波に埋め込まれたデータ信号の形態でも実現され得る。   In the latter case, the control device 16 includes a computer that executes instructions of a program that is software for realizing each function. This computer includes, for example, at least one processor (control device) and at least one computer-readable recording medium storing the program. Then, in the computer, the object of the present invention is achieved by the processor reading the program from the recording medium and executing the program. As the processor, for example, a CPU (Central Processing Unit) can be used. Examples of the recording medium include “temporary tangible medium” such as a ROM (Read Only Memory), a tape, a disk, a card, a semiconductor memory, and a programmable logic circuit. Further, a RAM (Random Access Memory) for expanding the program may be further provided. Further, the program may be supplied to the computer via an arbitrary transmission medium (a communication network, a broadcast wave, or the like) capable of transmitting the program. Note that one embodiment of the present invention can also be realized in the form of a data signal embedded in a carrier wave, in which the above-described program is embodied by electronic transmission.

〔まとめ〕
本発明の態様1に係る発電システムは、DC母線に接続された太陽光発電装置及び蓄電装置を備え、電力系統からのAC電力の受電端に接続されたAC母線に、前記DC母線のDC電力をAC電力に変換して出力する発電システムであって、前記太陽光発電装置の予測太陽光発電出力を算出し、前記予測太陽光発電出力と前記蓄電装置が蓄えている電力量とに基づいて、1日を分割した所定の期間中に前記発電システムが出力する予測出力電力を算出し、算出された前記予測出力電力を、管理者に事前に通知する構成を備えている。
[Summary]
The power generation system according to the first aspect of the present invention includes a solar power generation device and a power storage device connected to a DC bus, and the DC power of the DC bus is connected to an AC bus connected to a power receiving end of the AC power from the power system. Is converted into AC power and output, and calculates a predicted solar power output of the solar power generator, based on the predicted solar power output and the amount of power stored in the power storage device. A configuration in which a predicted output power output by the power generation system during a predetermined period obtained by dividing one day is calculated, and the calculated predicted output power is notified to a manager in advance.

上記の構成によれば、電力系統の管理者が事前に出力電力を把握することができるようになるとともに、計画どおりに変動の無い出力ができる発電システムを実現することを目的とする。   According to the configuration described above, it is an object of the present invention to realize a power generation system that enables an administrator of a power system to grasp output power in advance and that can perform output without fluctuation as planned.

本発明の態様2に係る発電システムは、上記態様1において、前記発電システムが出力した出力電力を、前記管理者に通知する構成を備えていてもよい。   In the power generation system according to the second aspect of the present invention, in the first aspect, a configuration may be provided in which the output power output by the power generation system is notified to the administrator.

上記の構成によれば、電力系統の管理者が、発電システムの実際の出力電力が、予測出力電力から乖離したか否かを把握することができるようになる。   According to the configuration described above, the administrator of the power system can grasp whether or not the actual output power of the power generation system deviates from the predicted output power.

本発明の態様3に係る発電システムは、上記態様1または2において、前記発電システムが前記電力系統から受電した供給電力を、前記管理者に通知する構成を備えていてもよい。   In the power generation system according to the third aspect of the present invention, in the first or second aspect, the power generation system may be configured to notify the manager of supply power received from the power system.

上記の構成によれば、電力系統の管理者が、発電システムの実際の出力電力のうちの、太陽光発電装置が発電した正味の電力を把握することができるようになる。   According to the above configuration, the administrator of the power system can grasp the net power generated by the photovoltaic power generation device among the actual output power of the power generation system.

本発明の態様4に係る発電システムは、上記態様1から3のいずれかにおいて、将来の前記所定の期間経過後に、蓄電装置が蓄えている電力量が、所定の範囲内になるように、前記予測出力電力を決定する構成を備えていてもよい。   The power generation system according to Aspect 4 of the present invention is the power generation system according to any one of Aspects 1 to 3, wherein the amount of power stored in the power storage device is within a predetermined range after a lapse of the predetermined period in the future. A configuration for determining the predicted output power may be provided.

上記の構成によれば、蓄電装置の充放電を最小限とすることができるようになる。   According to the above configuration, charging and discharging of the power storage device can be minimized.

本発明の態様5に係る発電システムは、上記態様1から3のいずれかにおいて、前記電力系統に逆潮流する電力量が小さくなるように前記予測出力電力を決定する構成を備えていてもよい。   In the power generation system according to the fifth aspect of the present invention, in any one of the first to third aspects, the power generation system may include a configuration in which the predicted output power is determined so that the amount of power flowing backward in the power system is reduced.

上記の構成によれば、発電システムの運用者が、電力系統から購入する電力量を小さくすることができるようになる。   According to the above configuration, the operator of the power generation system can reduce the amount of power purchased from the power system.

本発明の各態様に係る制御装置は、コンピュータによって実現してもよく、この場合には、コンピュータを上記制御装置が備える各部(ソフトウェア要素)として動作させることにより上記制御装置をコンピュータにて実現させる制御装置の制御プログラム、およびそれを記録したコンピュータ読み取り可能な記録媒体も、本発明の範疇に入る。   The control device according to each aspect of the present invention may be realized by a computer. In this case, the control device is realized by a computer by operating the computer as each unit (software element) included in the control device. The control program of the control device and a computer-readable recording medium on which the control program is recorded are also included in the scope of the present invention.

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。さらに、各実施形態にそれぞれ開示された技術的手段を組み合わせることにより、新しい技術的特徴を形成することができる。   The present invention is not limited to the embodiments described above, and various modifications are possible within the scope shown in the claims, and embodiments obtained by appropriately combining technical means disclosed in different embodiments. Is also included in the technical scope of the present invention. Furthermore, new technical features can be formed by combining the technical means disclosed in each embodiment.

10 発電システム
11 計測装置
12 AC−DC変換装置
13 DC母線
14 太陽光発電装置
15 蓄電装置
16 制御装置
17 通信装置
20 商用電力系統
21 受電端
22 電力メータ
30 AC母線
31 負荷
40 管理者
50 日照量情報提供者
Reference Signs List 10 power generation system 11 measuring device 12 AC-DC converter 13 DC bus 14 photovoltaic power generator 15 power storage device 16 control device 17 communication device 20 commercial power system 21 power receiving end 22 power meter 30 AC bus 31 load 40 manager 50 sunshine Information provider

Claims (5)

DC母線に接続された太陽光発電装置及び蓄電装置を備え、
電力系統からのAC電力の受電端に接続されたAC母線に、前記DC母線のDC電力をAC電力に変換して出力する発電システムであって、
前記太陽光発電装置の予測太陽光発電出力を算出し、
前記予測太陽光発電出力と前記蓄電装置が蓄えている電力量とに基づいて、1日を分割した所定の期間中に前記発電システムが出力する予測出力電力を算出し、
算出された前記予測出力電力を、管理者に事前に通知することを特徴とする発電システム。
Comprising a photovoltaic power generator and a power storage device connected to the DC bus,
A power generation system that converts the DC power of the DC bus into AC power and outputs the AC power to an AC bus connected to a power receiving end of the AC power from the power system,
Calculating a predicted solar power output of the solar power generator,
Based on the predicted solar power output and the amount of power stored in the power storage device, calculate a predicted output power output by the power generation system during a predetermined period divided into one day,
A power generation system, which notifies a manager of the calculated predicted output power in advance.
前記発電システムが出力した出力電力を、前記管理者に通知することを特徴とする請求項1に記載の発電システム。   The power generation system according to claim 1, wherein the output power output by the power generation system is notified to the manager. 前記発電システムが前記電力系統から受電した供給電力を、前記管理者に通知することを特徴とする請求項1または2に記載の発電システム。   3. The power generation system according to claim 1, wherein the power generation system notifies the manager of supply power received from the power system. 4. 将来の前記所定の期間経過後に、前記蓄電装置が蓄えている電力量が、所定の範囲内になるように、前記予測出力電力を決定することを特徴とする請求項1から3のいずれか1項に記載の発電システム。   4. The power supply device according to claim 1, wherein the predicted output power is determined such that an amount of power stored in the power storage device falls within a predetermined range after a lapse of the predetermined period in the future. 5. The power generation system according to the paragraph. 前記電力系統に逆潮流する電力量が小さくなるように前記予測出力電力を決定することを特徴とする請求項1から3のいずれか1項に記載の発電システム。   The power generation system according to any one of claims 1 to 3, wherein the predicted output power is determined so that the amount of power flowing backward in the power system is reduced.
JP2018179158A 2018-09-25 2018-09-25 power generation system Active JP7309336B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018179158A JP7309336B2 (en) 2018-09-25 2018-09-25 power generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018179158A JP7309336B2 (en) 2018-09-25 2018-09-25 power generation system

Publications (2)

Publication Number Publication Date
JP2020054050A true JP2020054050A (en) 2020-04-02
JP7309336B2 JP7309336B2 (en) 2023-07-18

Family

ID=69994226

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018179158A Active JP7309336B2 (en) 2018-09-25 2018-09-25 power generation system

Country Status (1)

Country Link
JP (1) JP7309336B2 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57122631A (en) * 1981-01-19 1982-07-30 Yokogawa Electric Works Ltd Demand control device
JP2004072900A (en) * 2002-08-06 2004-03-04 Mitsubishi Heavy Ind Ltd System and method for electric power network management
JP2010124605A (en) * 2008-11-19 2010-06-03 Mitsui Sumitomo Insurance Co Ltd Power consumption prediction device, power consumption prediction method and program
JP2012120419A (en) * 2010-11-10 2012-06-21 Mitsubishi Heavy Ind Ltd Operation controller for storage battery, method for controlling operation of storage battery, and program thereof
JP2013143838A (en) * 2012-01-11 2013-07-22 Sanyo Electric Co Ltd Charge/discharge controller
JP2013219941A (en) * 2012-04-10 2013-10-24 Hitachi Power Solutions Co Ltd Control method and control device of power generation system using renewable energy
JP2014023382A (en) * 2012-07-23 2014-02-03 Sharp Corp Photovoltaic power generation system and power supply system
JP2016067195A (en) * 2014-09-16 2016-04-28 積水化学工業株式会社 Energy management system and energy management method
JP2017163769A (en) * 2016-03-11 2017-09-14 パナソニックIpマネジメント株式会社 Energy prediction system
JPWO2017149724A1 (en) * 2016-03-03 2018-10-04 株式会社東芝 Power management system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012006884A1 (en) 2012-04-04 2013-10-10 Merck Patent Gmbh Cyclic amides as MetAP-2 inhibitors

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57122631A (en) * 1981-01-19 1982-07-30 Yokogawa Electric Works Ltd Demand control device
JP2004072900A (en) * 2002-08-06 2004-03-04 Mitsubishi Heavy Ind Ltd System and method for electric power network management
JP2010124605A (en) * 2008-11-19 2010-06-03 Mitsui Sumitomo Insurance Co Ltd Power consumption prediction device, power consumption prediction method and program
JP2012120419A (en) * 2010-11-10 2012-06-21 Mitsubishi Heavy Ind Ltd Operation controller for storage battery, method for controlling operation of storage battery, and program thereof
JP2013143838A (en) * 2012-01-11 2013-07-22 Sanyo Electric Co Ltd Charge/discharge controller
JP2013219941A (en) * 2012-04-10 2013-10-24 Hitachi Power Solutions Co Ltd Control method and control device of power generation system using renewable energy
JP2014023382A (en) * 2012-07-23 2014-02-03 Sharp Corp Photovoltaic power generation system and power supply system
JP2016067195A (en) * 2014-09-16 2016-04-28 積水化学工業株式会社 Energy management system and energy management method
US20170256952A1 (en) * 2014-09-16 2017-09-07 Sekisui Chemical Co., Ltd. Power management system and power management method
JPWO2017149724A1 (en) * 2016-03-03 2018-10-04 株式会社東芝 Power management system
JP2017163769A (en) * 2016-03-11 2017-09-14 パナソニックIpマネジメント株式会社 Energy prediction system

Also Published As

Publication number Publication date
JP7309336B2 (en) 2023-07-18

Similar Documents

Publication Publication Date Title
US11043812B2 (en) Controlling a behind the meter energy storage and dispatch system to improve power efficiency
US10509374B2 (en) Systems and methods for managing power generation and storage resources
US10140670B2 (en) Energy management methods and systems based on financial impact
US8571720B2 (en) Supply-demand balance controller
US9153965B2 (en) System and method for energy storage management
US20170256952A1 (en) Power management system and power management method
JP6592454B2 (en) Power control system, power control method and program
CN104268800B (en) Wind-electricity integration peak regulation balance decision method based on scene library
KR101871236B1 (en) Charging and discharging balance control apparatus of solar connected type mult ESS
JP6069738B2 (en) Charge / discharge control system, charge / discharge control method, and charge / discharge control program
JP2018068076A (en) Storage battery control system and power supply system
KR20200114424A (en) Methods and apparatuses for operating power generator combined with heterogeneous renewable energy
US20210157289A1 (en) Multifunctional energy storage system and operating method thereof
JP2020129962A (en) Power distribution control system, power distribution control method
KR20200119125A (en) Ess(energy storage system) and method for controling of the ess
WO2016185671A1 (en) Storage cell control device
JP2020054050A (en) Power generation system
JP7208095B2 (en) Server device and control method
WO2017163934A1 (en) Power control system, control device, control method, and computer program
JP7345371B2 (en) Power management device, power management method, and power management program
JP7245625B2 (en) Receiving point power prediction device, receiving point power prediction method, and program
JP6971158B2 (en) Power management equipment and programs
JP2018011452A (en) Method for operating storage battery and storage battery operation device
Mishan et al. Dispatchable, Non-dispatchable, Reserve and Arbitrage Power within PV-Storage Integrated Grid
JP2017127129A (en) Storage battery control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210324

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220308

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220421

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220707

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221108

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20230106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230307

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230620

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230705

R150 Certificate of patent or registration of utility model

Ref document number: 7309336

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150