JP2020051229A - Water closet - Google Patents

Water closet Download PDF

Info

Publication number
JP2020051229A
JP2020051229A JP2018184768A JP2018184768A JP2020051229A JP 2020051229 A JP2020051229 A JP 2020051229A JP 2018184768 A JP2018184768 A JP 2018184768A JP 2018184768 A JP2018184768 A JP 2018184768A JP 2020051229 A JP2020051229 A JP 2020051229A
Authority
JP
Japan
Prior art keywords
water
water supply
switching valve
valve body
cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018184768A
Other languages
Japanese (ja)
Other versions
JP7212308B2 (en
Inventor
翼 三宅
Tsubasa Miyake
翼 三宅
末永 光宏
Mitsuhiro Suenaga
光宏 末永
隆 吉岡
Takashi Yoshioka
隆 吉岡
康一郎 檜皮
Koichiro Hiwada
康一郎 檜皮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toto Ltd
Original Assignee
Toto Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toto Ltd filed Critical Toto Ltd
Priority to JP2018184768A priority Critical patent/JP7212308B2/en
Publication of JP2020051229A publication Critical patent/JP2020051229A/en
Application granted granted Critical
Publication of JP7212308B2 publication Critical patent/JP7212308B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sanitary Device For Flush Toilet (AREA)

Abstract

To provide a water closet capable of mitigating a strange noise and an impact occurring at the time of changeover of a switching valve body.SOLUTION: A water closet comprises: a toilet bowl body; a water supply channel which makes it possible to supply washing water from a water storage tank to a rim water discharge port and a jet water discharge port; a switching unit 22 which switches water supply routes so that a second washing process of discharging washing water in the water supply channel at least from the jet water discharge port is performed after a first washing process of discharging the washing water in the water supply channel from the rim water discharge port is performed; and a booster pump for supplying the washing water from the water storage tank to the water supply channel. In the second washing process, the switching unit can set a switching valve body 34 to a first valve opening position by opening it by a first opening stroke amount relative to a valve closing position, and set the switching valve body to a second valve opening position by opening it by a second opening stroke amount h2 which is smaller than the first opening stroke amount relative to the valve closing position.SELECTED DRAWING: Figure 7

Description

本発明は、水洗大便器に係り、特に、加圧した洗浄水によって洗浄される水洗大便器に関する。   The present invention relates to flush toilets, and more particularly, to flush toilets that are flushed with pressurized flush water.

従来から、加圧した洗浄水によって洗浄される水洗大便器として、例えば、特許文献1、2に記載されているような水洗大便器が知られている。
まず、特許文献1に記載されている従来の水洗大便器においては、水道水をリム吐水口に直接供給して吐出させることによりリム吐水を実行する一方、タンクに貯水された洗浄水をポンプで加圧してジェット吐水口から吐出させることによりジェット吐水を実行する、いわゆる、「ハイブリッド洗浄」によるボウル部の洗浄を実行するようになっている。
また、上述した特許文献1に記載されている従来の水洗大便器においては、水道に直結されているリム吐水用の給水経路と、ジェット吐水用の洗浄水が貯水されるタンクに給水するジェット吐水用の給水経路とが電気的な切替弁(電磁弁等)により切替可能となっており、この電気的な切替弁の切替動作は、コントローラの制御により電気的な信号で行われるようになっている。これにより、便器洗浄が開始された際には、まず、リム吐水口から洗浄水を吐水するリム吐水が行われ、つぎに、このリム吐水を継続した状態でジェット吐水口から洗浄水を吐水するジェット吐水が行われるようになっている。
さらに、特許文献2に記載されている従来の水洗大便器においては、タンクに貯水された洗浄水をポンプで加圧し、このポンプで加圧された洗浄水のみによりリム吐水及びジェット吐水のそれぞれを実行するようになっている。また、この水洗大便器においては、ポンプで加圧された洗浄水の吐水流路が電気的な切替弁(電磁弁等)によりリム吐水用の給水経路とジェット吐水用の給水経路のそれぞれに切替可能となっており、この電気的な切替弁の切替動作がコントローラの制御により電気的な信号で行われるようになっている。
これらの特許文献1、2に記載されている従来の水洗大便器については、低水圧の地域や場所に設置した場合においても、タンクに貯水された洗浄水をポンプで加圧して吐水を行うことができるようになっているため、便器の洗浄性能を確保することができるようになっている。
BACKGROUND ART Conventionally, flush toilets described in Patent Literatures 1 and 2 have been known as flush toilets that are washed with pressurized flush water.
First, in the conventional flush toilet described in Patent Literature 1, rim spouting is performed by directly supplying and discharging tap water to a rim spout, while washing water stored in a tank is pumped. The bowl portion is washed by so-called "hybrid washing" in which jet water is executed by pressurizing and discharging from the jet water outlet.
Further, in the conventional flush toilet described in Patent Document 1 described above, a water supply path for rim water discharge directly connected to the water supply and a jet water discharge for supplying water to a tank storing the wash water for jet water discharge. The water supply path can be switched by an electric switching valve (an electromagnetic valve or the like), and the switching operation of the electric switching valve is performed by an electric signal under the control of the controller. I have. Thereby, when the toilet flushing is started, first, rim spouting for spouting the washing water from the rim spout is performed, and then, while the rim spouting is continued, the washing water is spouted from the jet spout. Jet spouting is performed.
Further, in the conventional flush toilet described in Patent Literature 2, the flush water stored in the tank is pressurized by a pump, and the rim spout and jet spout are respectively performed only by the flush water pressurized by the pump. It is supposed to run. Further, in this flush toilet, the water discharge flow path of the wash water pressurized by the pump is switched to a water supply path for rim water discharge and a water supply path for jet water discharge by an electric switching valve (such as a solenoid valve). The switching operation of the electric switching valve is performed by an electric signal under the control of the controller.
Regarding the conventional flush toilet described in these Patent Documents 1 and 2, even when the flush toilet is installed in a low water pressure area or place, the flush water stored in the tank is pressurized with a pump to discharge water. As a result, the flushing performance of the toilet can be ensured.

特開2010−156201号公報JP 2010-156201 A 特開2017−66758号公報JP-A-2017-66758

しかしながら、上述した特許文献1に記載されている従来の水洗大便器においては、水道水の直圧によるリム吐水用の給水経路やポンプの加圧によるジェット吐水用の給水経路のそれぞれに対して給水する手段や装置等を設ける必要があるため、その分、部品点数も多くなり、装置全体が大型化してしまうという問題がある。
特に、水道水をリム吐水口へ直接供給するリム吐水用の給水経路においては、水頭圧(いわゆる、ヘッド圧)を考慮すると、切替弁をリム吐水口よりも高い位置に配置することが好ましい。しかしながら、このように切替弁をリム吐水口よりも高い位置に配置した場合には、水洗大便器の高さ方向のスペースを要することになるため、装置の小型化を阻害する要因となっている。
However, in the conventional flush toilet described in Patent Document 1 described above, water is supplied to each of a water supply path for rim water discharge by direct pressure of tap water and a water supply path for jet water discharge by pressurization of a pump. Therefore, there is a problem that the number of parts is increased and the entire device is increased in size.
In particular, in a rim spout water supply path for directly supplying tap water to the rim spout, it is preferable to dispose the switching valve at a position higher than the rim spout in consideration of the head pressure (so-called head pressure). However, when the switching valve is disposed at a position higher than the rim spout, a space in the height direction of the flush toilet is required, which is a factor that hinders downsizing of the device. .

また、上述した特許文献2に記載されている従来の水洗大便器においては、共通のポンプで加圧された洗浄水をリム吐水口とジェット吐水口に供給する構造により、水洗大便器の高さ寸法を抑制することができる。しかしながら、切替弁によりリム吐水用の給水経路からジェット吐水用の給水経路に切り替える際には、加圧ポンプにより比較的大きな水圧がかかった状態の洗浄水について、リム吐水用の給水経路からジェット吐水用の給水経路に切り替える必要がある。
したがって、このように給水経路に比較的大きな水圧がかかった状態において電気的な切替弁(電磁弁等)を駆動させるためには、比較的大きなトルクが必要とされるため、その分、切替弁が大型化してしまうという問題がある。
これに対して、比較的低い水圧がかかった状態において切替弁を予め作動させておくことにより、切替動作に必要なトルクを小さくすることもできる。しかしながら、切替弁が全開状態となった時にポンプの回転数を上昇させると、特に、ジェット吐水において、サイホンの発生に寄与しない無駄水が発生してしまうことが懸念されるという問題もある。
そこで、加圧ポンプによって発生する給水路内の水圧に応じて、リム吐水用の給水経路やジェット吐水用の給水経路を開閉することにより流路切替を行う切替部に着目し、この切替部を含む装置の小型化を実現することを目的として鋭意開発を行っている。
しかしながら、水圧による流路切替を行う際において、給水が停止すると共に切替弁が急激に着座することによって大きな衝撃や音が発生するという新たな課題を見出した。
Further, in the conventional flush toilet described in Patent Document 2 described above, the flush water pressurized by a common pump is supplied to a rim spout and a jet spout, so that the height of the flush toilet is increased. Dimensions can be reduced. However, when switching from the water supply path for rim water discharge to the water supply path for jet water discharge by the switching valve, the jet water discharge from the water supply path for rim water discharge is performed for the wash water under a relatively large water pressure by the pressurizing pump. It is necessary to switch to the water supply route for
Therefore, in order to drive an electric switching valve (such as an electromagnetic valve) in a state where a relatively large water pressure is applied to the water supply path, a relatively large torque is required. However, there is a problem that the size is increased.
On the other hand, by operating the switching valve in advance in a state where a relatively low water pressure is applied, the torque required for the switching operation can be reduced. However, when the rotation speed of the pump is increased when the switching valve is fully opened, there is a problem that waste water not contributing to the generation of siphons may be generated, especially in jet water discharge.
Therefore, focusing on a switching unit that switches the flow path by opening and closing a water supply path for rim water discharge and a water supply path for jet water discharge according to the water pressure in the water supply path generated by the pressurizing pump, We are keenly developing for the purpose of realizing the miniaturization of the equipment including this.
However, when switching the flow path by water pressure, a new problem has been found in that the supply of water is stopped and the switching valve is suddenly seated, generating a large impact and noise.

そこで、本発明は、上述した従来技術の課題を解決するためになされたものであり、切替弁体の切替時に発生する異音や衝撃を緩和させることができる水洗大便器を提供することを目的としている。   Therefore, the present invention has been made to solve the above-described problems of the related art, and an object of the present invention is to provide a flush toilet that can reduce abnormal noise and impact generated when switching a switching valve body. And

上述した課題を解決するために、本発明は、加圧した洗浄水によって洗浄される水洗大便器であって、洗浄水を貯水する貯水タンクと、ボウル部と、洗浄水を吐水するリム吐水口及びジェット吐水口と、排水トラップ部と、を備えた便器本体と、上記貯水タンクから洗浄水を上記リム吐水口及び上記ジェット吐水口のそれぞれに供給可能にする給水路と、この給水路に設けられて上記リム吐水口及び上記ジェット吐水口のそれぞれに洗浄水を供給する給水経路を切り替える切替部であって、まず、上記給水路内の洗浄水を上記リム吐水口から吐水する第1洗浄工程を実行させ、その後、上記給水路内の洗浄水を少なくとも上記ジェット吐水口から吐水する第2洗浄工程を実行させるように上記給水経路を切り替える上記切替部と、上記貯水タンクから上記給水路に供給する洗浄水を加圧し、上記給水路の洗浄水の流量を調整可能にする加圧ポンプであって、上記第1洗浄工程時に圧送する洗浄水の第1流量よりも上記第2洗浄工程時に圧送する洗浄水の第2流量の方が大きくなるように調整可能である上記加圧ポンプと、を有し、上記切替部は、上記加圧ポンプにより加圧された洗浄水の水圧を受けて機械的に作動する切替弁体を備え、この切替弁体は、上記加圧ポンプによって発生した水圧に応じて、上記第1洗浄工程において閉弁し、上記第2洗浄工程において開弁するように構成され、上記切替部は、上記第2洗浄工程において、上記切替弁体を閉弁位置に対して第1開口ストローク量で開弁させて第1開弁位置に設定可能であり、且つ、上記切替弁体を上記閉弁位置に対して上記第1開口ストローク量よりも小さい第2開口ストローク量で開弁させて第2開弁位置に設定可能であることを特徴としている。
このように構成された本発明においては、切替部により、給水路内の洗浄水をリム吐水口から吐水する第1洗浄工程が実行され、その後、給水路内の洗浄水を少なくともジェット吐水口から吐水する第2洗浄工程が実行されて給水経路が切り替えられる。
この際、第1洗浄工程においては、切替部の切替弁体が閉弁位置となり、その後、洗浄工程が第1洗浄工程から第2洗浄工程に切り替わるときには、水圧を受けている切替弁体が閉弁位置に対して第1開口ストローク量で第1開弁位置まで開弁することができる。
また、第2洗浄工程が終了する直前においては、切替弁体が閉弁位置に対して第1開口ストローク量よりも小さい第2開口ストローク量で第2開弁位置に速やかに移動することができ、その後、第2洗浄工程が終了すると、切替弁体が第2開弁位置から閉弁位置まで緩やかに閉弁することができる。
さらに、洗浄工程が第1洗浄工程から第2洗浄工程に切り替わる際に、切替弁体が閉弁位置から第1開弁位置まで開弁するタイミングでは第1開口ストローク量が大きくなり、また、切替弁体が第2洗浄工程の第1開弁位置から第2洗浄工程終了後の閉弁位置まで閉弁するタイミングにおいても、切替弁体のストローク量が大きくなる。
そこで、切替弁体の閉弁位置と第1開弁位置との間の途中に第2開口ストローク量の第2開弁位置を設定することにより、切替弁体のストローク量を刻むことができる。
これにより、洗浄工程が第1洗浄工程から第2洗浄工程に切り替わり、切替弁体が閉弁位置から第1開弁位置まで開弁するタイミングや、第2洗浄工程の第1開弁位置から第2洗浄工程終了後の閉弁位置まで閉弁するタイミングにおいて、切替弁体の切替時に発生する異音等を緩和させることができると共に、開弁状態の切替弁体が閉止した際に切替弁体側や着座側で発生する衝撃等を緩和させることもできる。
In order to solve the above-mentioned problem, the present invention is a flush toilet flushed with pressurized flush water, comprising a water storage tank for storing flush water, a bowl portion, and a rim spout for flushing flush water. A toilet body having a jet water outlet, a drain trap section, a water supply path for supplying washing water from the water storage tank to each of the rim water outlet and the jet water outlet, and a water supply path provided in the water supply path. A switching unit that switches a water supply path that supplies cleaning water to each of the rim water outlet and the jet water outlet, and a first cleaning step of first discharging cleaning water in the water supply channel from the rim water outlet. The switching unit that switches the water supply path so as to execute a second cleaning step of discharging at least the wash water in the water supply path from the jet water outlet, and the water storage tank. A pressurizing pump for pressurizing the washing water to be supplied to the water supply passage from the water supply passage and adjusting a flow rate of the washing water in the water supply passage. The pressurizing pump being adjustable so that the second flow rate of the cleaning water to be pumped during the second cleaning step is larger, and the switching unit is configured to perform the cleaning pressurized by the pressurizing pump. A switching valve element that is mechanically actuated in response to the water pressure of the water; the switching valve element is closed in the first cleaning step according to the water pressure generated by the pressurizing pump; The switching unit can be set to the first valve opening position by opening the switching valve body with the first opening stroke amount with respect to the valve closing position in the second cleaning step. And the switching valve body with respect to the valve closing position. It is characterized in that it is set to the second open position by opening in the second opening stroke smaller than the first opening stroke.
In the present invention configured as described above, the switching unit performs the first cleaning step of discharging the cleaning water in the water supply channel from the rim water discharge port, and then performs the cleaning water in the water supply channel from at least the jet water discharge port. The second cleaning step of discharging water is executed, and the water supply path is switched.
At this time, in the first cleaning step, the switching valve element of the switching unit is brought to the valve closing position, and thereafter, when the cleaning step is switched from the first cleaning step to the second cleaning step, the switching valve element receiving the water pressure is closed. The valve can be opened to the first valve opening position by the first opening stroke amount with respect to the valve position.
In addition, immediately before the second cleaning step is completed, the switching valve body can quickly move to the second valve opening position with the second opening stroke smaller than the first opening stroke with respect to the valve closing position. After that, when the second cleaning step is completed, the switching valve body can gently close the valve from the second valve opening position to the valve closing position.
Further, when the cleaning step is switched from the first cleaning step to the second cleaning step, the first opening stroke amount becomes large at the timing when the switching valve body opens from the valve closing position to the first valve opening position, and the switching is performed. Also at the timing when the valve element closes from the first valve opening position in the second cleaning step to the valve closing position after the end of the second cleaning step, the stroke amount of the switching valve element increases.
Therefore, by setting the second valve opening position of the second opening stroke amount halfway between the valve closing position and the first valve opening position of the switching valve member, the stroke amount of the switching valve member can be reduced.
As a result, the cleaning step is switched from the first cleaning step to the second cleaning step, and the timing at which the switching valve body opens from the valve-closed position to the first valve-opening position, and the timing from the first valve-opening position of the second cleaning step to the first valve-opening position. (2) At the timing of closing the valve to the valve closing position after the completion of the cleaning step, abnormal noise and the like generated at the time of switching of the switching valve body can be mitigated, and when the switching valve body in the open state is closed, the switching valve side And the impact generated on the seating side can also be reduced.

本発明において、好ましくは、上記切替部は、上記第2洗浄工程において、上記切替弁体を上記閉弁位置に対して上記第1開口ストローク量で開弁させた上記第1開弁位置に設定した後、上記切替弁体を上記閉弁位置に対して上記第2開口ストローク量で開弁させた上記第2開弁位置に設定可能である。
このように構成された本発明においては、第2洗浄工程で切替弁体が第2洗浄工程の第1開弁位置から第2洗浄工程終了後の閉弁位置まで閉弁方向に移動している際に、その途中に第2開口ストローク量の第2開弁位置を設定することができる。
これにより、開弁状態の切替弁体を閉弁方向に移動させる際に、切替弁体の開口ストローク量を第1開口ストローク量から第2開口ストローク量を経て段階的に小さい開口ストローク量に設定することができるため、切替弁体が閉止する直前で閉弁速度を低下させることができる。
したがって、開弁状態の切替弁体が閉弁方向に向って移動する力を閉止する直前に抑制することができる。よって、第2開口ストローク量で開弁している閉止間際の切替弁体が閉止した際に、切替弁体側や着座側で発生する異音や衝撃等を抑制することができる。
In the present invention, preferably, the switching unit is set to the first valve opening position where the switching valve body is opened by the first opening stroke amount with respect to the valve closing position in the second cleaning step. After that, the switching valve body can be set to the second valve opening position where the valve is opened by the second opening stroke amount with respect to the valve closing position.
In the present invention thus configured, the switching valve body moves in the valve closing direction from the first valve opening position in the second cleaning step to the valve closing position after the end of the second cleaning step in the second cleaning step. At this time, the second valve opening position of the second opening stroke amount can be set halfway.
Accordingly, when the switching valve body in the valve open state is moved in the valve closing direction, the opening stroke amount of the switching valve body is set to a stepwise smaller opening stroke amount from the first opening stroke amount through the second opening stroke amount. Therefore, the valve closing speed can be reduced immediately before the switching valve body closes.
Therefore, the force of the switching valve body in the valve open state moving in the valve closing direction can be suppressed immediately before closing. Therefore, it is possible to suppress abnormal noise, impact, and the like generated on the switching valve body side and the seating side when the switching valve body that is opened by the second opening stroke amount just before closing is closed.

本発明において、好ましくは、上記切替部は、上記第2洗浄工程において、上記便器本体でサイホン作用が発生した以後に開弁している状態の上記切替弁体の上記第1開口ストローク量を上記第2開口ストローク量に変更する。
このように構成された本発明においては、第2洗浄工程において便器本体でサイホン作用が発生した以後の状態では、サイホン作用により便器本体のボウル部から排水トラップ部へ洗浄水が引っ張られる排出力が既に発生している。
したがって、切替弁体の第1開口ストローク量を第2開口ストローク量に変更することにより、ジェット吐水口から吐水される洗浄水の流量が低下したとしても、便器本体の洗浄性能に及ぼす影響を極めて小さくすることができる。
よって、便器本体の洗浄性能を確保しながら、切替弁体側や着座側で発生する異音や衝撃等を抑制することができる。
In the present invention, preferably, the switching unit sets the first opening stroke amount of the switching valve body in a state of being opened after the siphon action has occurred in the toilet body in the second cleaning step. Change to the second opening stroke amount.
In the present invention thus configured, in a state after the siphon action has occurred in the toilet body in the second washing step, the discharge force by which the washing water is pulled from the bowl portion of the toilet body to the drain trap portion by the siphon action is reduced. Has already occurred.
Therefore, by changing the first opening stroke amount of the switching valve body to the second opening stroke amount, even if the flow rate of the washing water spouted from the jet spouting port decreases, the effect on the flushing performance of the toilet body is extremely reduced. Can be smaller.
Therefore, it is possible to suppress abnormal noise and impact generated on the switching valve body side and the seating side while securing the cleaning performance of the toilet body.

本発明において、好ましくは、上記切替部は、さらに、上記第2洗浄工程の後、連続して上記リム吐水口から洗浄水を吐水する第3洗浄工程を実行するように給水経路を切り替えるものであり、上記加圧ポンプは、上記第2洗浄工程時に圧送する洗浄水の上記第2流量よりも上記第3洗浄工程時に圧送する洗浄水の第3流量の方が小さくなるように調整可能である。
このように構成された本発明においては、加圧ポンプが、第2洗浄工程時に圧送する洗浄水の第2流量よりも第3洗浄工程時に圧送する洗浄水の第3流量の方が小さくなるように調整可能であることにより、第2洗浄工程の後に第3洗浄工程が実行されると、給水路内の水圧が低圧状態に調整されるため、第2洗浄工程時の給水経路が閉鎖されて、第3洗浄工程時の給水経路に速やかに切り替えることができる。
また、第2洗浄工程の後の第3洗浄工程では、洗浄水の流量(第3流量)が第2洗浄工程の洗浄水の流量(第2流量)よりも低下するものの、切替部の閉止状態の切替弁体には、洗浄水が継続して供給される。
しかしながら、第2洗浄工程における終了直前の第2開口ストローク量の第2開弁位置の開弁状態の切替弁体が閉止するまで間においても、切替弁体には水圧による抵抗が開弁する方向に作用している。これにより、切替弁体の急激な閉止動作を抑制することができ、その後、第2洗浄工程が終了すると同時に、切替弁体を即座に着座することできる。
よって、第2開口ストローク量で開弁している閉止間際の切替弁体が閉止した際に、切替弁体側や着座側で発生する異音や衝撃等を効果的に抑制することができる。
In the present invention, preferably, the switching unit further switches a water supply path so as to execute a third cleaning step of continuously discharging cleaning water from the rim water outlet after the second cleaning step. The pressure pump is adjustable so that the third flow rate of the cleaning water pumped in the third cleaning step is smaller than the second flow rate of the cleaning water pumped in the second cleaning step. .
In the present invention configured as above, the third flow rate of the cleaning water pumped in the third cleaning step is smaller than the second flow rate of the cleaning water pumped in the second cleaning step. When the third cleaning step is performed after the second cleaning step, the water pressure in the water supply path is adjusted to a low pressure state, so that the water supply path in the second cleaning step is closed. In addition, it is possible to quickly switch to the water supply path in the third cleaning step.
In the third cleaning step after the second cleaning step, the flow rate of the cleaning water (third flow rate) is lower than the flow rate of the cleaning water in the second cleaning step (second flow rate), but the switching unit is in the closed state. The washing water is continuously supplied to the switching valve body.
However, even before the switching valve body in the opened state at the second valve opening position of the second opening stroke amount immediately before the end of the second cleaning step is closed, the resistance due to the hydraulic pressure is applied to the switching valve body. Is acting on. Thereby, the rapid closing operation of the switching valve body can be suppressed, and thereafter, the switching valve body can be immediately seated at the same time when the second cleaning step is completed.
Therefore, when the switching valve body close to the closing position, which is opened with the second opening stroke, closes, it is possible to effectively suppress abnormal noise and impact generated on the switching valve body side and the seating side.

本発明の水洗大便器によれば、切替弁体の切替時に発生する異音や衝撃を緩和させることができる。   ADVANTAGE OF THE INVENTION According to the flush toilet of this invention, the abnormal noise and impact which generate | occur | produce at the time of switching of a switching valve body can be reduced.

本発明の一実施形態による水洗大便器の全体概略構成図である。1 is an overall schematic configuration diagram of a flush toilet according to an embodiment of the present invention. 本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、閉弁状態を示す。It is a longitudinal section of a change valve device of a flush toilet by one embodiment of the present invention, and shows a valve closed state. 本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、切替弁体が閉弁位置に対して第1開口ストローク量(最大ストローク量)で第1開弁位置(最大開弁位置)まで開弁した状態を示す。1 is a vertical sectional view of a switching valve device for a flush toilet according to an embodiment of the present invention, in which a switching valve body is in a first opening stroke amount (maximum stroke amount) with respect to a valve closing position in a first opening position (maximum opening amount); (Valve position). 本発明の一実施形態による水洗大便器の基本動作を示すタイムチャートである。It is a time chart which shows the basic operation of the flush toilet according to one embodiment of the present invention. 本発明の一実施形態による水洗大便器の全体概略構成図であり、切替弁装置の開弁状態を示す。1 is an overall schematic configuration diagram of a flush toilet according to an embodiment of the present invention, showing an open state of a switching valve device. 本発明の一実施形態による水洗大便器において、加圧ポンプの回転数に対するリム吐水、ジェット吐水、及び、リム・ジェット吐水のそれぞれの流量Q[L/min]と圧力[kPa]との関係を示す特性図である。In the flush toilet according to one embodiment of the present invention, the relationship between the flow rate Q [L / min] and the pressure [kPa] of the rim spout, the jet spout, and the rim / jet spout with respect to the rotation speed of the pressurizing pump is shown. FIG. 本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、切替弁体が閉弁位置に対して第1開口ストローク量よりも小さい第2開口ストローク量で第2開弁位置まで開弁した状態(閉弁間際の状態)を示す。FIG. 4 is a longitudinal sectional view of the switching valve device of the flush toilet according to the embodiment of the present invention, in which the switching valve body is in a second opening position with a second opening stroke smaller than the first opening stroke with respect to the valve closing position. This shows a state in which the valve has been opened up to the maximum (a state immediately before the valve is closed).

つぎに、添付図面を参照して、本発明の一実施形態による水洗大便器について説明する。
なお、以下、本明細書中において「洗浄水の流量」や「吐水流量」等という表現の中で使用されている「流量」という用語については、単位時間当たりの体積変化[L/min](いわゆる、「体積流量」又は「瞬間流量」とも呼ぶ)を意味している。
図1は、本発明の一実施形態による水洗大便器の全体概略構成図である。
図1に示すように、本発明の一実施形態による水洗大便器1は、陶器等からなる便器本体2、及び、この便器本体2の後方に配置された機能部4をそれぞれ備えている。
便器本体2は、ボウル部6、リム吐水口8aを含むリム給水路8、ジェット吐水口10aを含むジェット給水路10、及び、排水トラップ管路12(排水トラップ部)をそれぞれ備えている。
Next, a flush toilet according to an embodiment of the present invention will be described with reference to the accompanying drawings.
Hereinafter, the term “flow rate” used in expressions such as “flow rate of cleaning water” and “flow rate of spouting water” in this specification refers to a volume change per unit time [L / min] ( (So-called “volume flow” or “instantaneous flow”).
FIG. 1 is an overall schematic configuration diagram of a flush toilet according to an embodiment of the present invention.
As shown in FIG. 1, a flush toilet 1 according to an embodiment of the present invention includes a toilet body 2 made of pottery and the like, and a functional unit 4 disposed behind the toilet body 2.
The toilet main body 2 includes a bowl portion 6, a rim water supply channel 8 including a rim water discharge port 8a, a jet water supply channel 10 including a jet water discharge port 10a, and a drain trap pipe line 12 (a drain trap portion).

機能部4は、上流側から下流側に向って、給水管14、電磁弁16、貯水タンク18、加圧ポンプ20、及び、切替弁装置22等を備えている。
給水管14は、その上流側が水道に直結されている。また、電磁弁16は、貯水タンク18の上流側の給水管14の途中に設けられ、コントローラ24(制御部)の制御により開閉されるようになっている。これにより、給水管14内の洗浄水が貯水タンク18内に供給又は停止されるようになっている。
The functional unit 4 includes a water supply pipe 14, a solenoid valve 16, a water storage tank 18, a pressurizing pump 20, a switching valve device 22, and the like from the upstream side to the downstream side.
The upstream side of the water supply pipe 14 is directly connected to the water supply. The solenoid valve 16 is provided in the water supply pipe 14 on the upstream side of the water storage tank 18 and is opened and closed under the control of the controller 24 (control unit). Thereby, the washing water in the water supply pipe 14 is supplied or stopped in the water storage tank 18.

さらに、加圧ポンプ20は、貯水タンク18から下流側に延びる給水路26に設けられている。この加圧ポンプ20は、低揚程で大流量に適した、いわゆる、「軸流ポンプ」等が採用されているが、その構造の詳細について、周知技術であるため、説明を省略する。
また、加圧ポンプ20の羽根車(図示せず)の回転数N[rpm]は、コントローラ24の制御により調整可能となっている。
Further, the pressure pump 20 is provided in a water supply passage 26 extending from the water storage tank 18 to the downstream side. The pressurizing pump 20 employs a so-called “axial flow pump” or the like that is suitable for a low head and a large flow rate, but the details of its structure are well-known in the art, and a description thereof will be omitted.
The rotation speed N [rpm] of the impeller (not shown) of the pressurizing pump 20 can be adjusted by the control of the controller 24.

また、切替弁装置22は、加圧ポンプ20の下流側の給水路26に設けられており、その詳細な構造については後述するが、加圧ポンプ20により加圧された洗浄水の水圧を受けて開閉するようになっている。これにより、切替弁装置22は、便器本体2のリム吐水口8a及び上記ジェット吐水口10aのそれぞれに洗浄水を供給する給水経路を切り替える切替部として機能するようになっている。   The switching valve device 22 is provided in the water supply passage 26 on the downstream side of the pressurizing pump 20, and receives the pressure of the washing water pressurized by the pressurizing pump 20, although its detailed structure will be described later. Open and close. Thus, the switching valve device 22 functions as a switching unit that switches a water supply path that supplies cleaning water to each of the rim water outlet 8a of the toilet body 2 and the jet water outlet 10a.

つぎに、図1〜図3を参照して、切替弁装置22の詳細について説明する。
まず、図2は、本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、閉弁状態を示す。また、図3は、本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、切替弁体が閉弁位置に対して第1開口ストローク量(最大ストローク量)で第1開弁位置(最大開弁位置)まで開弁した状態を示す。
Next, the switching valve device 22 will be described in detail with reference to FIGS.
First, FIG. 2 is a longitudinal sectional view of a switching valve device of a flush toilet according to an embodiment of the present invention, and shows a closed state. FIG. 3 is a vertical cross-sectional view of a switching valve device for a flush toilet according to an embodiment of the present invention, in which the switching valve element has a first opening stroke amount (maximum stroke amount) with respect to a valve closing position. This shows a state where the valve has been opened to the valve opening position (maximum valve opening position).

図1〜図3に示すように、切替弁装置22は、上流側給水路28(第1流路)と、リム給水路30(第2流路)と、ジェット給水路32(第3流路)と、切替弁体34とを備えている。
まず、図1〜図3に示すように、上流側給水路28(第1流路)は、加圧ポンプ20から延びる給水路26に接続されており、その下流側が切替弁体34まで鉛直方向上方に延びている。すなわち、切替弁体34は、上流側給水路28(第1流路)の軸方向上の対向する位置に配置されている。
つぎに、図1〜図3に示すように、リム給水路30(第2流路)は、切替弁体34よりも上流側に位置している上流側給水路28の途中の分岐部B1から分岐しており、その下流側が便器本体2のリム吐水口8aの上流側のリム給水路8に接続されている。
また、図1〜図3に示すように、ジェット給水路32(第3流路)においては、切替弁体34により開閉される上流端(上流側給水路28の上端且つ下流端)より下流側の流域が側方に延びている。さらに、ジェット給水路32(第3流路)の下流側は、便器本体2のジェット吐水口10aの上流側のジェット給水路10に接続されている。
As shown in FIGS. 1 to 3, the switching valve device 22 includes an upstream water supply passage 28 (first flow passage), a rim water supply passage 30 (second flow passage), and a jet water supply passage 32 (third flow passage). ) And a switching valve element 34.
First, as shown in FIGS. 1 to 3, the upstream water supply passage 28 (first flow passage) is connected to the water supply passage 26 extending from the pressurizing pump 20, and the downstream side thereof extends vertically to the switching valve body 34. It extends upward. That is, the switching valve body 34 is disposed at a position axially opposed to the upstream water supply passage 28 (first flow passage).
Next, as shown in FIGS. 1 to 3, the rim water supply passage 30 (second flow passage) extends from the branch portion B <b> 1 in the middle of the upstream water supply passage 28 located upstream of the switching valve body 34. It is branched and the downstream side is connected to the rim water supply passage 8 on the upstream side of the rim water outlet 8a of the toilet body 2.
In addition, as shown in FIGS. 1 to 3, in the jet water supply passage 32 (third flow passage), a downstream side from an upstream end (an upper end and a downstream end of the upstream water supply passage 28) opened and closed by the switching valve body 34. Basin extends laterally. Furthermore, the downstream side of the jet water supply path 32 (third flow path) is connected to the jet water supply path 10 on the upstream side of the jet water discharge port 10 a of the toilet body 2.

ちなみに、図1に示すように、切替弁装置22のリム給水路30又は便器本体2のリム給水路8のいずれか一方の途中には、定流量弁35が設けられている。
これにより、便器本体2のリム給水路8を通過して、リム吐水口8aからボウル部6内に吐水されるリム吐水が外部へ飛び散る等の機外漏水を抑制することができるようになっている。
なお、本実施形態においては、リム給水路8に定流量弁35を設けているが、切替弁装置22に定流量機能を付与してもよい。
Incidentally, as shown in FIG. 1, a constant flow valve 35 is provided in the middle of either the rim water supply passage 30 of the switching valve device 22 or the rim water supply passage 8 of the toilet body 2.
Accordingly, it is possible to suppress external water leakage such as rim water discharged from the rim water outlet 8a into the bowl portion 6 passing through the rim water supply passage 8 of the toilet body 2 and splashing to the outside. I have.
In the present embodiment, the constant flow valve 35 is provided in the rim water supply passage 8, but the switching valve device 22 may be provided with a constant flow function.

また、図1〜図3に示すように、切替弁体34は、ジェット給水路32の上流端のみに開閉可能に設けられており、上流側給水路28の分岐部B1に位置するリム給水路30の上流端よりも上方に位置している。これにより、切替弁体34は、リム給水路30については常時開放状態にする一方、ジェット給水路32(第3流路)のみについて開閉するものとなっている。
特に、図1及び図2に示すように、切替弁体34が閉弁している状態では、上流側給水路28内の洗浄水のすべてが、分岐部B1からリム給水路30(第2流路)及び便器本体2側のリム給水路8を経てリム吐水口8aに供給されるようになっている。
一方、図3に示すように、切替弁体34が開弁している状態では、上流側給水路28内の洗浄水の一部が、分岐部B1からリム給水路30(第2流路)及び便器本体2側のリム給水路8を経てリム吐水口8aに供給されるようになっていると共に、上流側給水路28内の洗浄水の大半以上が、分岐部B1からジェット給水路32(第3流路)及び便器本体2側のジェット給水路10を経てジェット吐水口10aに供給されるようになっている。
As shown in FIGS. 1 to 3, the switching valve body 34 is provided only at the upstream end of the jet water supply passage 32 so as to be openable and closable, and is located at the branch portion B1 of the upstream water supply passage 28. 30 is located above the upstream end. As a result, the switching valve body 34 always opens the rim water supply passage 30 while opening and closing only the jet water supply passage 32 (third flow passage).
In particular, as shown in FIGS. 1 and 2, when the switching valve body 34 is closed, all of the washing water in the upstream water supply passage 28 flows from the branch portion B1 to the rim water supply passage 30 (second flow passage). The water is supplied to the rim water outlet 8a via the rim water supply passage 8 on the side of the toilet body 2 and the rim water supply passage 8a.
On the other hand, as shown in FIG. 3, when the switching valve body 34 is open, a part of the washing water in the upstream water supply passage 28 flows from the branch portion B1 to the rim water supply passage 30 (second passage). In addition, the water is supplied to the rim spout 8a through the rim water supply passage 8 on the toilet body 2 side, and most or more of the washing water in the upstream water supply passage 28 passes from the branch portion B1 to the jet water supply passage 32 ( The water is supplied to the jet water discharge port 10a through the third water flow path) and the jet water supply path 10 on the toilet body 2 side.

さらに、図2及び図3に示すように、切替弁体34は、ダイヤフラム型の弁体部34aと、この弁体部34aを支持する支持部34bと、弁体部34a及び支持部34bに対して垂直な軸方向(作動軸方向)に延びる弁軸部34cとを備えている。
弁体部34aは、鉛直方向に延びる上流側給水路28の中心軸線C1方向(流路軸方向)上の対向する位置に配置されている。
これにより、弁体部34aの下面(受圧面S0)が加圧ポンプ20により加圧された上流側給水路28内の洗浄水の水圧を受けて、切替弁体34が閉止状態から開弁動作を開始するようになっている。
ここで、弁体部34aの下面(受圧面S0)が加圧ポンプ20により加圧された上流側給水路28内の洗浄水の水圧を受けて、切替弁体34が閉止状態から開弁動作を開始するときの水圧を「境界水圧P0[kPa]」とすると、弁体部34aの下面(受圧面S0)が加圧ポンプ20により加圧された上流側給水路28内の洗浄水の所定水圧(境界水圧P0[kPa])以上の水圧を受けた場合には、切替弁体34(34a、34b、34b)が上流側給水路28の流路軸方向と同一方向(弁軸部34cの軸方向(作動軸方向))に機械的に作動することができようになっている。これにより、ジェット給水路32の上流端が水圧に応じて弁体部34aにより開閉可能となっている。
なお、本実施形態において、「切替弁体34が機械的に作動する」とは、切替弁体34が電気信号による制御や電磁力等により電気的に作動(電気的に開閉)する電気式の弁体とは異なることを意味しており、切替弁体34が開閉時に水圧等が直接的に作用することにより押圧されて機械的に作動(機械的に開閉)する機械式の弁体であることを意味している。
Further, as shown in FIGS. 2 and 3, the switching valve body 34 includes a diaphragm-shaped valve body portion 34a, a support portion 34b that supports the valve body portion 34a, and a valve body portion 34a and a support portion 34b. And a valve shaft portion 34c extending in a vertical axial direction (operating axial direction).
The valve body portion 34a is disposed at a position facing the upstream water supply passage 28 extending in the vertical direction in the direction of the central axis C1 (flow path axial direction).
As a result, the lower surface (pressure receiving surface S0) of the valve body portion 34a receives the pressure of the wash water in the upstream water supply passage 28 pressurized by the pressurizing pump 20, and the switching valve body 34 is opened from the closed state. To start.
Here, the lower surface (pressure receiving surface S0) of the valve body portion 34a receives the water pressure of the wash water in the upstream water supply passage 28 pressurized by the pressurizing pump 20, and the switching valve body 34 is opened from the closed state. Is assumed to be “boundary water pressure P0 [kPa]”, the lower surface (pressure receiving surface S0) of the valve body portion 34a is flushed with the cleaning water in the upstream water supply passage 28 pressurized by the pressure pump 20. When receiving a water pressure equal to or higher than the water pressure (boundary water pressure P0 [kPa]), the switching valve body 34 (34a, 34b, 34b) is in the same direction as the flow path axial direction of the upstream water supply passage 28 (of the valve shaft portion 34c). It can be mechanically operated in the axial direction (operating axial direction). Thus, the upstream end of the jet water supply passage 32 can be opened and closed by the valve body portion 34a according to the water pressure.
In the present embodiment, “the switching valve body 34 is mechanically operated” means that the switching valve body 34 is electrically operated (electrically opened and closed) by control by an electric signal or by electromagnetic force or the like. This means that the switching valve body 34 is mechanically actuated (mechanically opened / closed) when the switching valve body 34 is pressed by the direct action of water pressure or the like during opening and closing. Means that.

つぎに、図2に示すように、上流側給水路28(第1流路)は、ほぼ円筒状に形成されており、切替弁体34の弁体部34aの中心O1は、上流側給水路28の中心軸線C1(第1流路中心軸線)上に位置している。
これにより、図2に示す閉弁状態の上流側給水路28内の洗浄水の水圧(静圧)P1及び図3に示す開弁状態の上流側給水路28内の洗浄水の水圧(動圧)P2について、弁体部34aの受圧面S0に対して周方向全体に亘ってほぼ均等に作用させることができるようになっている。よって、切替弁体34による給水経路の切替時の動作をより安定化させることができるようになっている。
Next, as shown in FIG. 2, the upstream water supply passage 28 (first flow passage) is formed in a substantially cylindrical shape, and the center O1 of the valve body portion 34a of the switching valve body 34 is connected to the upstream water supply passage. 28 is located on the central axis C1 (first channel central axis).
Thereby, the water pressure (static pressure) P1 of the washing water in the upstream water supply path 28 in the closed state shown in FIG. 2 and the water pressure (dynamic pressure) of the washing water in the upstream water supply path 28 in the open state shown in FIG. ) P2 can be made to act almost uniformly on the pressure receiving surface S0 of the valve body portion 34a over the entire circumferential direction. Therefore, the operation at the time of switching the water supply path by the switching valve body 34 can be further stabilized.

つぎに、図2及び図3に示すように、切替弁装置22は、さらに、圧縮コイルばね36(付勢部)と、環状シール部材38(緩衝部)と、支持部材40(支持部)とをそれぞれ備えている。
圧縮コイルばね36(付勢部)は、その下端が切替弁体34の支持部34bにより支持されていると共に、上端が支持部材40(支持部)により支持されている。
また、この圧縮コイルばね36(付勢部)は、圧縮された撓み量に応じて、切替弁体34(34a、34b、34b)に対して閉弁させる方向の付勢する付勢力を作用するようになっている。
Next, as shown in FIGS. 2 and 3, the switching valve device 22 further includes a compression coil spring 36 (biasing portion), an annular seal member 38 (buffer portion), and a support member 40 (support portion). Are provided.
The lower end of the compression coil spring 36 (biasing portion) is supported by the support portion 34b of the switching valve body 34, and the upper end is supported by the support member 40 (support portion).
Further, the compression coil spring 36 (biasing portion) acts on the switching valve body 34 (34a, 34b, 34b) in accordance with the compressed amount of bending to exert a biasing force for biasing in the direction of closing the valve. It has become.

例えば、図2に示すように、閉弁状態の切替弁体34の弁体部34aの受圧面S0に対して所定水圧(境界水圧P0[kPa])未満の水圧(静圧)P1が作用している場合には、圧縮コイルばね36の付勢力F1が水圧(静圧)P1相当の流体力を上回るため、切替弁体34の閉止状態が維持されるようになっている。
そして、閉弁状態の切替弁体34の弁体部34aの受圧面S0に所定水圧(境界水圧P0[kPa])以上の水圧(静圧)P1が作用した場合には、図3に示すように、切替弁体34の弁体部34aが上昇して開弁状態に切り替わるようになっている。
さらに、図3に示すように、開弁状態の切替弁体34の弁体部34aの受圧面S0に所定水圧(境界水圧P0[kPa])以上の水圧(動圧)P2(≧P0)が作用している場合には、水圧(動圧)P2相当の流体力が圧縮コイルばね36の圧縮撓みに応じた付勢力F2を上回るため、切替弁体34が付勢力F2に抗して開弁方向に作動しており、切替弁体34の開弁状態が維持されるようになっている。
For example, as shown in FIG. 2, a water pressure (static pressure) P1 lower than a predetermined water pressure (boundary water pressure P0 [kPa]) acts on the pressure receiving surface S0 of the valve body portion 34a of the switching valve body 34 in the closed state. In this case, the urging force F1 of the compression coil spring 36 exceeds the fluid force corresponding to the hydraulic pressure (static pressure) P1, so that the switching valve body 34 is kept closed.
Then, when a water pressure (static pressure) P1 higher than a predetermined water pressure (boundary water pressure P0 [kPa]) acts on the pressure receiving surface S0 of the valve body portion 34a of the switching valve body 34 in the closed state, as shown in FIG. Then, the valve body portion 34a of the switching valve body 34 is raised to switch to the valve open state.
Further, as shown in FIG. 3, a water pressure (dynamic pressure) P2 (≧ P0) equal to or higher than a predetermined water pressure (boundary water pressure P0 [kPa]) is applied to the pressure receiving surface S0 of the valve body portion 34a of the switching valve body 34 in the open state. When it is acting, since the fluid force corresponding to the hydraulic pressure (dynamic pressure) P2 exceeds the urging force F2 corresponding to the compression deflection of the compression coil spring 36, the switching valve body 34 opens against the urging force F2. The switching valve body 34 is maintained in the open state.

つぎに、図2及び図3に示すように、環状シール部材38(緩衝部)は、円形断面を有するOリング、又は、円形断面以外のXパッキンやYパッキン等の環状のシール部材である。
この環状シール部材38は、切替弁体34の弁軸部34cが挿入されることにより、切替弁体34の弁軸部34cの外周面の上部に取り付けられた状態で支持部材40により保持される。これにより、切替弁体34の弁軸部34cは、環状シール部材38を介して支持部材40により作動軸方向に摺動可能に支持された状態となる。
また、図2及び図3に示すように、環状シール部材38(緩衝部)は、切替弁体34の作動軸方向に対して垂直な方向の緩衝力f0を切替弁体34の弁軸部34cに作用するようになっている。
これにより、環状シール部材38は、支持部材40の内部スペースV1が大気開放される程度に、切替弁体34の弁軸部34cの外周面に接触している。これにより、切替弁体34の弁軸部34cが作動軸方向に摺動した際には、環状シール部材38が切替弁体34の弁軸部34cに対して動摩擦力等を作用させて、摺動抵抗を付与することができるようになっている。
Next, as shown in FIGS. 2 and 3, the annular seal member 38 (buffer) is an O-ring having a circular cross section, or an annular seal member other than the circular cross section, such as X packing or Y packing.
The annular seal member 38 is held by the support member 40 in a state where the annular seal member 38 is attached to an upper portion of the outer peripheral surface of the valve shaft portion 34c of the switching valve body 34 by inserting the valve stem 34c of the switching valve body 34. . Thus, the valve shaft portion 34c of the switching valve body 34 is supported by the support member 40 via the annular seal member 38 so as to be slidable in the operation axis direction.
As shown in FIGS. 2 and 3, the annular seal member 38 (buffer) applies a buffering force f0 in a direction perpendicular to the operating axis direction of the switching valve body 34 to the valve shaft 34 c of the switching valve body 34. To act on.
Thereby, the annular seal member 38 is in contact with the outer peripheral surface of the valve shaft portion 34c of the switching valve body 34 to the extent that the internal space V1 of the support member 40 is opened to the atmosphere. Thus, when the valve shaft portion 34c of the switching valve body 34 slides in the operating axis direction, the annular seal member 38 applies a kinetic friction force or the like to the valve shaft portion 34c of the switching valve body 34 to slide. Dynamic resistance can be provided.

ちなみに、図1〜図3に示すように、切替弁装置22における切替弁体34(34a、34b、34b)、圧縮コイルばね36、環状シール部材38、支持部材40のそれぞれについては、貯水タンク18のオーバーフロー水位WOよりも上方に位置している。
これらにより、貯水タンク18内の洗浄水がオーバーフロー水位に到達したとしても、これらの部材34,36,38,40が水没することを確実に防ぐことができ、切替弁装置22の動作不良や劣化を防ぐことができるようになっている。
Incidentally, as shown in FIGS. 1 to 3, each of the switching valve element 34 (34 a, 34 b, 34 b), the compression coil spring 36, the annular seal member 38, and the support member 40 in the switching valve device 22 is the water storage tank 18. Is located above the overflow water level WO.
Accordingly, even if the washing water in the water storage tank 18 reaches the overflow water level, it is possible to reliably prevent the members 34, 36, 38, and 40 from being submerged, and to operate the switching valve device 22 poorly or deteriorate. Can be prevented.

つぎに、図2に示すように、切替弁装置22の上流側給水路28(第1流路)の分岐部B1からリム給水路30(第2流路)に沿って延びる中心軸線C2(第2流路中心軸線)は、分岐部B1から上流側給水路28(第1流路)の下流側に向って延びる中心軸線C1(第1流路中心軸線)に対して角度θで交差している。
ここで、本実施形態においては、角度θが90度(直角)に設定されている例(θ=90°)について説明するが、角度θについては、0度よりも大きく且つ90度未満(0°<θ<90°)の角度(鋭角)になるように設定されてもよい。
これらにより、図1〜図3に示すように、上流側から上流側給水路28(第1流路)の分岐部B1に流れ込んだ洗浄水が、分岐部B1の下流側の上流側給水路28に流れ込むと共に、分岐部B1からリム給水路30(第2流路)にも分岐して流れ込み易くすることができるようになっている。
また、上流側給水路28(第1流路)からリム給水路30(第2流路)へ分岐する分岐部B1付近又はその下流側の上流側給水路28やリム給水路30内で渦流が発生することを効果的に抑制することができるようになっている。
Next, as shown in FIG. 2, a center axis C <b> 2 (the second axis C <b> 2) extending from the branch portion B <b> 1 of the upstream water supply passage 28 (the first flow passage) of the switching valve device 22 along the rim water supply passage 30 (the second flow passage). The two flow path central axes intersect at an angle θ with a central axis C1 (first flow path central axis) extending from the branch portion B1 toward the downstream side of the upstream water supply passage 28 (first flow path). I have.
Here, in the present embodiment, an example (θ = 90 °) in which the angle θ is set to 90 degrees (right angle) will be described. However, the angle θ is larger than 0 degree and smaller than 90 degrees (0 °). ° <θ <90 °) (an acute angle).
As a result, as shown in FIGS. 1 to 3, the washing water flowing from the upstream side into the branch portion B1 of the upstream water supply passage 28 (first flow passage) is converted into the upstream water supply passage 28 downstream of the branch portion B1. Into the rim water supply passage 30 (second flow passage) from the branch portion B1 to facilitate the flow.
In addition, a vortex flows in the upstream water supply passage 28 or the rim water supply passage 30 near or downstream of the branch portion B1 branching from the upstream water supply passage 28 (first flow passage) to the rim water supply passage 30 (second flow passage). This can be effectively suppressed.

つぎに、図3に示すように、切替弁装置22のジェット給水路32(第3流路)は、上流側から下流側に向って、遷移流路部32a、及び、主流路部32bをそれぞれ備えている。
まず、ジェット給水路32の遷移流路部32aは、切替弁体34より開閉される上流端32c(上流側給水路28の下流端)から主流路部32bまで遷移するように形成された流路である。
また、ジェット給水路32の主流路部32bは、遷移流路部32aの下流端から側方、すなわち、上流側給水路28(第1流路)の鉛直方向に延びる中心軸線C1に対して直交する方向に延びるように形成された流路である。
さらに、ジェット給水路32の遷移流路部32aの上流端32c(上流側給水路28の下流端)は、主流路部32bの上端32dよりも下方に位置している。
これらにより、図3に示すように、切替弁体34が開弁した状態では、上流側給水路28(第1流路)の下流端32cからジェット給水路32(第3流路)の遷移流路部32aに洗浄水が流入した際、遷移流路部32aの上流端32cと主流路部32bの上端32dとの間の流域を広く確保することができるようになっている。
したがって、切替弁体34の開弁時に、上流側給水路28(第1流路)からジェット給水路32(第3流路)に流れ込む際に渦流が発生することを効果的に抑制することができるようになっている。
Next, as shown in FIG. 3, the jet water supply path 32 (third flow path) of the switching valve device 22 includes a transition flow path part 32a and a main flow path part 32b from the upstream side to the downstream side. Have.
First, the transition flow path portion 32a of the jet water supply path 32 is a flow path formed to transition from the upstream end 32c (downstream end of the upstream water supply path 28) opened and closed by the switching valve body 34 to the main flow path portion 32b. It is.
In addition, the main flow path portion 32b of the jet water supply channel 32 is orthogonal to the center axis C1 extending laterally from the downstream end of the transition flow channel portion 32a, that is, the vertical direction of the upstream water supply channel 28 (first flow path). The flow path is formed so as to extend in the direction of the flow path.
Further, the upstream end 32c (the downstream end of the upstream water supply passage 28) of the transition flow passage 32a of the jet water supply passage 32 is located below the upper end 32d of the main flow passage 32b.
As a result, as shown in FIG. 3, when the switching valve body 34 is opened, the transition flow from the downstream end 32c of the upstream water supply passage 28 (first passage) to the jet water supply passage 32 (third passage). When the washing water flows into the passage 32a, a wide basin between the upstream end 32c of the transition passage 32a and the upper end 32d of the main passage 32b can be secured.
Therefore, when the switching valve body 34 is opened, it is possible to effectively suppress generation of a vortex when flowing from the upstream water supply passage 28 (first flow passage) to the jet water supply passage 32 (third flow passage). I can do it.

ここで、図2及び図3に示すように、切替弁装置22の上流側給水路28(第1流路)における分岐部B1よりも上流側の第1流路断面積A1は、上流側給水路28(第1流路)における分岐部B1よりも下流側の第2流路断面積A2とは異なっている。
ここで、本実施形態においては、第2流路断面積A2が第1流路断面積A1よりも大きく設定されている(A2>A1)。
Here, as shown in FIGS. 2 and 3, the first flow path cross-sectional area A1 on the upstream side of the branch portion B1 in the upstream water supply path 28 (first flow path) of the switching valve device 22 is determined by the upstream water supply. The flow path 28 (first flow path) is different from the second flow path cross-sectional area A2 downstream of the branch portion B1.
Here, in the present embodiment, the second flow path cross-sectional area A2 is set to be larger than the first flow path cross-sectional area A1 (A2> A1).

また、図2及び図3に示すように、切替弁装置22のジェット給水路32(第3流路)の主流路32bの第3流路断面積A3は、上流側給水路28(第1流路)における分岐部B1よりも下流側の第2流路断面積A2よりも大きく設定されている(A3>A2)。
さらに、図2及び図3に示すように、切替弁装置22の上流側給水路28(第1流路)における分岐部B1よりも下流側の第2流路断面積A2は、リム給水路30(第2流路)の第4流路断面積A4よりも大きく設定されている(A2>A4)。
また、図2及び図3に示すように、切替弁装置22の上流側給水路28(第1流路)における分岐部B1よりも上流側の第1流路断面積A1は、リム給水路30(第2流路)の第4流路断面積A4よりも大きく設定されている(A1>A4)。
As shown in FIGS. 2 and 3, the third flow path cross-sectional area A3 of the main flow path 32b of the jet water supply path 32 (third flow path) of the switching valve device 22 is the same as the upstream water supply path 28 (first flow path). The flow path is set to be larger than the second flow path cross-sectional area A2 on the downstream side of the branch portion B1 (A3> A2).
Further, as shown in FIGS. 2 and 3, the second flow path cross-sectional area A2 of the upstream water supply path 28 (first flow path) of the switching valve device 22 downstream of the branch portion B1 is equal to the rim water supply path 30. The second flow path is set to be larger than the fourth flow path cross-sectional area A4 (A2> A4).
As shown in FIGS. 2 and 3, the first flow path cross-sectional area A1 on the upstream side of the branch portion B1 in the upstream water supply path 28 (first flow path) of the switching valve device 22 is equal to the rim water supply path 30. The fourth flow path cross-sectional area A4 of the (second flow path) is set to be larger (A1> A4).

つぎに、図1〜図6を参照して、本発明の一実施形態による水洗大便器1の動作(作用)を説明する。
図4は、本発明の一実施形態による水洗大便器の基本動作を示すタイムチャートである。また、図5は、本発明の一実施形態による水洗大便器の全体概略構成図であり、切替弁装置の開弁状態を示す。
さらに、図6は、本発明の一実施形態による水洗大便器において、加圧ポンプの回転数に対するリム吐水、ジェット吐水、及び、リム・ジェット吐水のそれぞれの流量Q[L/min]と圧力[kPa]との関係を示す特性図である。
なお、図6に示す特性図においては、加圧ポンプ20の回転数N毎に描かれた流量Q[L/min]と圧力[kPa]との関係を示す曲線が等高線状に複数描かれている。また、図6では、リム吐水、ジェット吐水、及び、リム・ジェット吐水のそれぞれに対応する流量Q[L/min]と圧力[kPa]との関係を示す曲線がそれぞれ放物線状に描かれている。さらに、図6では、切替弁体34が稼働したときに取り得る流量Q[L/min]と圧力[kPa]との関係の軌跡を太線及びバツ印で示している。
Next, an operation (action) of the flush toilet 1 according to one embodiment of the present invention will be described with reference to FIGS.
FIG. 4 is a time chart showing the basic operation of the flush toilet according to one embodiment of the present invention. FIG. 5 is an overall schematic configuration diagram of a flush toilet according to one embodiment of the present invention, and shows a switching valve device in an open state.
Further, FIG. 6 shows a flush toilet according to an embodiment of the present invention, in which the flow rate Q [L / min] and pressure [R / min] and the pressure [ [kPa].
In the characteristic diagram shown in FIG. 6, a plurality of curves showing the relationship between the flow rate Q [L / min] and the pressure [kPa] drawn for each rotation speed N of the pressurizing pump 20 are drawn in a contour line. I have. In FIG. 6, curves indicating the relationship between the flow rate Q [L / min] and the pressure [kPa] corresponding to the rim water discharge, the jet water discharge, and the rim / jet water discharge, respectively, are drawn in a parabolic shape. . Further, in FIG. 6, the trajectory of the relationship between the flow rate Q [L / min] and the pressure [kPa] that can be obtained when the switching valve element 34 is operated is indicated by a thick line and crosses.

まず、図4に示すように、時刻t0の待機状態後の時刻t1において、便器洗浄スイッチ(図示せず)が操作されると、コントローラ24の制御により電磁弁16及び加圧ポンプ20のそれぞれの電源がオフ状態からオン状態となる。これにより、加圧ポンプ20が作動し、加圧ポンプ20の回転数N[rpm]が回転数N1[rpm](例えば、N1=3000rpm)まで上昇する。この加圧ポンプ20の作動により、図1に示すように、貯水タンク18内の洗浄水は、給水路26を経て切替弁装置22の上流側給水路28(第1流路)に供給される。
このとき、図1及び図2に示すように、切替弁装置22の切替弁体34においては、圧縮コイルばね36が切替弁体34に作用する付勢力F1が、切替弁装置22の上流側給水路28(第1流路)内の水圧P1(境界水圧P0未満の静圧、P1<P0)が弁体部34aの受圧面S0に作用する流体力を上回っている。これにより、弁体部34aは、上昇することなく、最低位置にあり、ジェット給水路32の遷移流路部32aの上流端32c(上流側給水路26の下流端)を閉止している状態(閉弁状態)となる。
したがって、図1及び図6に示すように、加圧ポンプ20から回転数N1で切替弁装置22の上流側給水路28内に供給された洗浄水W1(図6の水圧P1[kPa]及び流量Q1[L/min])は、上流側給水路28の分岐部B1からリム給水路30(第2流路)のみに供給されるため、ジェット給水路32(第3流路)に供給されることはない。
そして、このリム給水路30内の洗浄水は、定流量弁35を通過し、便器本体2のリム給水路8のリム吐水口8aからボウル部6に吐水される。これにより、図4に示す時刻t1から時刻t2までの時間(例えば、t2−t1=2.5秒)では、リム吐水口8aからの1回目のリム吐水が実行され、第1洗浄工程として、1回目のリム洗浄(いわゆる、「前リム洗浄」)が実行される。
First, as shown in FIG. 4, at time t1 after the standby state at time t0, when the toilet flush switch (not shown) is operated, each of the electromagnetic valve 16 and the pressure pump 20 is controlled by the controller 24. The power is turned on from the off state. Accordingly, the pressurizing pump 20 is operated, and the rotational speed N [rpm] of the pressurizing pump 20 increases to the rotational speed N1 [rpm] (for example, N1 = 3000 rpm). By the operation of the pressurizing pump 20, the washing water in the water storage tank 18 is supplied to the upstream water supply passage 28 (first flow passage) of the switching valve device 22 via the water supply passage 26, as shown in FIG. .
At this time, as shown in FIGS. 1 and 2, in the switching valve body 34 of the switching valve device 22, the urging force F1 acting on the switching valve body 34 by the compression coil spring 36 causes the upstream water supply of the switching valve device 22. The water pressure P1 (static pressure lower than the boundary water pressure P0, P1 <P0) in the passage 28 (first flow passage) exceeds the fluid force acting on the pressure receiving surface S0 of the valve body 34a. Thus, the valve body portion 34a is at the lowest position without being raised, and closes the upstream end 32c (the downstream end of the upstream water supply passage 26) of the transition flow passage portion 32a of the jet water supply passage 32 (see FIG. (Valve closed state).
Therefore, as shown in FIGS. 1 and 6, the washing water W1 (the water pressure P1 [kPa] and the flow rate shown in FIG. 6) supplied from the pressurizing pump 20 to the upstream water supply passage 28 of the switching valve device 22 at the rotation speed N1. Q1 [L / min]) is supplied from the branch portion B1 of the upstream water supply path 28 to only the rim water supply path 30 (second flow path), and is therefore supplied to the jet water supply path 32 (third flow path). Never.
Then, the washing water in the rim water supply passage 30 passes through the constant flow valve 35 and is discharged from the rim water outlet 8 a of the rim water supply passage 8 of the toilet body 2 to the bowl portion 6. Thereby, during the time from time t1 to time t2 shown in FIG. 4 (for example, t2-t1 = 2.5 seconds), the first rim water discharge from the rim water discharge port 8a is executed, and as the first cleaning step, The first rim cleaning (so-called “pre-rim cleaning”) is performed.

つぎに、図4に示すように、時刻t2において、加圧ポンプ20の回転数N[rpm]が回転数N1[rpm]から回転数N2[rpm](例えば、N2=5000rpm)まで上昇する(N2>N1)。そして、図4の時刻t2から時刻t3までの時間(例えば、t3−t2=1.0秒)、加圧ポンプ20の回転数N[rpm]がほぼ一定の回転数N2[rpm]に維持される。
このとき、図2、図3及び図5に示すように、切替弁装置22の切替弁体34においては、切替弁装置22の上流側給水路28(第1流路)内の水圧(静圧)P1が弁体部34aの受圧面S0に作用する流体力が、圧縮コイルばね36が切替弁体34に作用する付勢力F1を上回るようになる。
これにより、図4の時刻t2では、弁体部34aが、ジェット給水路32の遷移流路部32aの上流端32c(上流側給水路26の下流端)を閉止している状態(図2参照)から第1開口ストローク量(最大ストローク量)h1[mm]だけ上昇する。
すなわち、切替弁体34が閉止位置H0に対して上方の最高開弁位置(第1開弁位置)で開弁している状態となる(図3参照)。
また、図3に示すように、開弁した状態の弁体部34aの受圧面S0においては、水圧(動圧)P2が作用するようになり、この水圧(動圧)P2に相当する流体力についても圧縮コイルばね36による付勢力F2を上回っているため、切替弁体34の開弁状態が維持される(図3参照)。
したがって、図5及び図6に示すように、加圧ポンプ20から回転数N2で切替弁装置22の上流側給水路28内に供給された洗浄水W1(図6の水圧P2[kPa]及び流量Q2[L/min])のうちの一部の洗浄水W2(図6の水圧P2[kPa]及び流量Q3[L/min])が、リム吐水用として、上流側給水路28の分岐部B1からリム給水路30(第2流路)に供給される。
同時に、図5及び図6に示すように、加圧ポンプ20から回転数N2で切替弁装置22の上流側給水路28内に供給された洗浄水W1(図6の水圧P2[kPa]及び流量Q2[L/min])のうちの残部の洗浄水W3(図6の水圧P2[kPa]及び流量Q4[L/min])が、ジェット吐水用として、上流側給水路28の分岐部B1からジェット給水路32(第3流路)に供給される。
そして、図5に示すように、リム給水路30内の洗浄水W2(流量Q3[L/min])は、定流量弁35を通過し、便器本体2のリム給水路8のリム吐水口8aからボウル部6に吐水される。これにより、2回目のリム吐水が実行され、第2洗浄工程として、2回目のリム洗浄(いわゆる、「中リム洗浄」)が実行される。
同時に、図5に示すように、ジェット給水路32内の洗浄水W3については、リム給水路30内の洗浄水W2(流量Q3[L/min])よりも大きい流量Q4[L/min](Q4>Q3)で流れ、便器本体2のジェット給水路10のジェット吐水口10aからボウル部6に吐水される。これにより、1回目のジェット吐水が実行され、第2洗浄工程として、1回目のジェット洗浄が実行される。
Next, as shown in FIG. 4, at time t2, the rotation speed N [rpm] of the pressure pump 20 increases from the rotation speed N1 [rpm] to the rotation speed N2 [rpm] (for example, N2 = 5000 rpm) ( N2> N1). Then, during the period from time t2 to time t3 in FIG. 4 (for example, t3−t2 = 1.0 second), the rotation speed N [rpm] of the pressure pump 20 is maintained at a substantially constant rotation speed N2 [rpm]. You.
At this time, as shown in FIGS. 2, 3, and 5, in the switching valve body 34 of the switching valve device 22, the hydraulic pressure (static pressure) in the upstream water supply passage 28 (first flow passage) of the switching valve device 22. 3.) The fluid force of P1 acting on the pressure receiving surface S0 of the valve body portion 34a exceeds the urging force F1 of the compression coil spring 36 acting on the switching valve body 34.
Accordingly, at time t2 in FIG. 4, the valve body portion 34a closes the upstream end 32c (the downstream end of the upstream water supply passage 26) of the transition flow passage 32a of the jet water supply passage 32 (see FIG. 2). ) To the first opening stroke amount (maximum stroke amount) h1 [mm].
That is, the switching valve body 34 is opened at the highest valve opening position (first valve opening position) above the closing position H0 (see FIG. 3).
Further, as shown in FIG. 3, a hydraulic pressure (dynamic pressure) P2 acts on the pressure receiving surface S0 of the valve body portion 34a in the opened state, and a fluid force corresponding to the hydraulic pressure (dynamic pressure) P2 is applied. Is greater than the biasing force F2 of the compression coil spring 36, the switching valve body 34 is kept open (see FIG. 3).
Therefore, as shown in FIGS. 5 and 6, the cleaning water W1 (the water pressure P2 [kPa] and the flow rate shown in FIG. 6) supplied from the pressurizing pump 20 to the upstream water supply passage 28 of the switching valve device 22 at the rotation speed N2. Q2 [L / min]), a part of the cleaning water W2 (water pressure P2 [kPa] and flow rate Q3 [L / min] in FIG. 6) is used for rim water discharge, and the branch B1 of the upstream water supply passage 28 is used. Is supplied to the rim water supply passage 30 (second flow passage).
At the same time, as shown in FIGS. 5 and 6, the washing water W1 (the water pressure P2 [kPa] and the flow rate shown in FIG. 6) supplied from the pressurizing pump 20 to the upstream water supply passage 28 of the switching valve device 22 at the rotation speed N2. Q2 [L / min]), the remaining washing water W3 (water pressure P2 [kPa] and flow rate Q4 [L / min] in FIG. 6) is used for jet water discharge from the branch B1 of the upstream water supply passage 28. The water is supplied to the jet water supply path 32 (third flow path).
Then, as shown in FIG. 5, the wash water W2 (flow rate Q3 [L / min]) in the rim water supply passage 30 passes through the constant flow valve 35, and the rim water outlet 8a of the rim water supply passage 8 of the toilet main body 2. From the bowl 6. As a result, the second rim discharge is performed, and the second rim cleaning (so-called “medium rim cleaning”) is performed as the second cleaning step.
At the same time, as shown in FIG. 5, the cleaning water W3 in the jet water supply channel 32 has a flow rate Q4 [L / min] (which is larger than the cleaning water W2 (flow rate Q3 [L / min]) in the rim water supply channel 30). The water flows at Q4> Q3), and is discharged from the jet water discharge port 10a of the jet water supply passage 10 of the toilet body 2 to the bowl portion 6. Thereby, the first jet water discharge is executed, and the first jet cleaning is executed as the second cleaning step.

つぎに、図4に示すように、時刻t3において、加圧ポンプ20の回転数N[rpm]が回転数N2[rpm]から、この回転数N2よりも低く且つ第1洗浄工程の回転数N1よりも高い回転数N3[rpm](例えば、N3=4000rpm)まで下降する(N1<N3<N2)。そして、図4の時刻t3から時刻t4の時間(例えば、t4−t3=1.2秒)まで、加圧ポンプ20の回転数N[rpm]がほぼ一定の回転数N3[rpm]に維持される。
また、図4の時刻t3から時刻t4までの時間では、加圧ポンプ20の回転数N3[rpm]が、図4の時刻t2から時刻t3の期間の加圧ポンプ20の回転数N2[rpm]よりも低下した分だけ、時刻t3から時刻t4までの時間の切替弁装置22の上流側給水路28(第1流路)内の水圧(動圧)P3[kPa]及び流量Q5[L/min](図6参照)のそれぞれについても、時刻t2から時刻t3までの時間の水圧(動圧)P2及び流量Q2[L/min](図6参照)よりも低下する(P3<P2、Q5<Q2)。
しかしながら、図4の時刻t3から時刻t4までの時間においても、切替弁装置22の上流側給水路28(第1流路)内の水圧(動圧)P3が弁体部34aの受圧面S0に作用する流体力が、圧縮コイルばね36が切替弁体34に作用する付勢力F2を上回っているため、切替弁体34の開弁状態が維持される。
これらにより、2回目のリム吐水の実行が維持されながら、2回目のジェット吐水が実行され、第2洗浄工程として、2回目のリム洗浄(いわゆる、「中リム洗浄」)が継続されながら、2回目のジェット洗浄が実行される。
これらの結果、図4に示す時刻t2から時刻t4までの時間では、リム吐水口8aからのリム吐水とジェット吐水口10aからのジェット吐水とにより、いわゆる、「リム・ジェット吐水」が実行され、第2洗浄工程として、中リム洗浄及びジェット洗浄の双方が並行に実行される。
Next, as shown in FIG. 4, at time t3, the rotation speed N [rpm] of the pressure pump 20 is lower than the rotation speed N2 from the rotation speed N2 [rpm], and the rotation speed N1 in the first cleaning step. The rotation speed is lowered to a higher rotation speed N3 [rpm] (for example, N3 = 4000 rpm) (N1 <N3 <N2). Then, the rotation speed N [rpm] of the pressure pump 20 is maintained at a substantially constant rotation speed N3 [rpm] from time t3 to time t4 (for example, t4-t3 = 1.2 seconds) in FIG. You.
In addition, during the period from time t3 to time t4 in FIG. 4, the rotation speed N3 [rpm] of the pressure pump 20 is changed to the rotation speed N2 [rpm] of the pressure pump 20 during the period from time t2 to time t3 in FIG. The water pressure (dynamic pressure) P3 [kPa] and the flow rate Q5 [L / min] in the upstream water supply passage 28 (first flow passage) of the switching valve device 22 during the period from the time t3 to the time t4 by the amount reduced from ] (See FIG. 6) also falls below the hydraulic pressure (dynamic pressure) P2 and the flow rate Q2 [L / min] (see FIG. 6) during the period from time t2 to time t3 (P3 <P2, Q5 <). Q2).
However, even during the period from time t3 to time t4 in FIG. 4, the water pressure (dynamic pressure) P3 in the upstream water supply passage 28 (first flow passage) of the switching valve device 22 is applied to the pressure receiving surface S0 of the valve body portion 34a. Since the acting fluid force exceeds the urging force F2 acting on the switching valve body 34 by the compression coil spring 36, the valve opening state of the switching valve body 34 is maintained.
As a result, the second jet squirting is performed while the second rim squirting is maintained, and the second rim cleaning (so-called “medium rim cleaning”) is continued as the second cleaning step. The second jet cleaning is performed.
As a result, during the time from time t2 to time t4 shown in FIG. 4, the so-called “rim / jet water discharge” is executed by the rim water discharge from the rim water discharge port 8a and the jet water discharge from the jet water discharge port 10a. As the second cleaning step, both the middle rim cleaning and the jet cleaning are performed in parallel.

ここで、図7は、本発明の一実施形態による水洗大便器の切替弁装置の縦断面図であり、切替弁体が閉弁位置に対して第1開口ストローク量よりも小さい第2開口ストローク量で第2開弁位置まで開弁した状態(閉弁間際の状態)を示す。
図4の時刻t3から時刻t4までの時間では、加圧ポンプ20の回転数が、図4の時刻t2から時刻t3の期間の加圧ポンプ20の回転数N2[rpm]からN3[rpm]まで低下したことにより、切替弁体34の弁体部34aが、図3に示す第1開口ストローク量(最大ストローク量)h1[mm]から図7に示す第2開弁位置H2まで低下する。
すなわち、図7に示すように、切替弁体34は、閉止位置H0に対して第1開口ストローク量h1より小さい第2開口ストローク量h2[mm](h2<h1)だけ開弁している状態(閉弁間際の状態)となる(図7参照)。
これらにより、切替弁装置22の切替弁体34、第2洗浄工程(中リム洗浄/ジェット洗浄工程)において、便器本体2でサイホン作用が発生した以後において、開弁している状態の第1開口ストローク量h1から第2開口ストローク量h2に変更される。
Here, FIG. 7 is a longitudinal sectional view of the switching valve device of the flush toilet according to one embodiment of the present invention, in which the switching valve body has a second opening stroke smaller than the first opening stroke amount with respect to the valve closing position. This shows a state in which the valve has been opened to the second valve opening position by an amount (a state immediately before the valve is closed).
In the time from time t3 to time t4 in FIG. 4, the rotation speed of the pressure pump 20 is changed from the rotation speed N2 [rpm] to N3 [rpm] of the pressure pump 20 during the period from time t2 to time t3 in FIG. Due to the decrease, the valve body portion 34a of the switching valve body 34 decreases from the first opening stroke amount (maximum stroke amount) h1 [mm] shown in FIG. 3 to the second valve opening position H2 shown in FIG.
That is, as shown in FIG. 7, the switching valve body 34 is opened with respect to the closed position H0 by the second opening stroke amount h2 [mm] (h2 <h1) smaller than the first opening stroke amount h1. (A state immediately before the valve is closed) (see FIG. 7).
As a result, the switching valve body 34 of the switching valve device 22, the first opening in a state where the valve is opened after the siphon action has occurred in the toilet body 2 in the second cleaning step (medium rim cleaning / jet cleaning step). The stroke amount h1 is changed to the second opening stroke amount h2.

つぎに、図4に示すように、時刻t4において、加圧ポンプ20の回転数N[rpm]が回転数N3[rpm]から、第1洗浄工程の回転数N1よりも低い回転数N4[rpm](例えば、N4=2500rpm)まで下降する(N4<N1<N3)。そして、図4の時刻t4から時刻t5までの時間(例えば、t5−t4=5.0秒)まで、加圧ポンプ20の回転数N[rpm]がほぼ一定の回転数N4[rpm]に維持される。
また、図4の時刻t4から時刻t5までの時間では、加圧ポンプ20の回転数N4[rpm]が、図4の時刻t1から時刻t2までの時間の加圧ポンプ20の回転数N1[rpm]よりも低下した分だけ、時刻t4から時刻t5までの時間の切替弁装置22の上流側給水路28(第1流路)内の水圧(静圧)P4[kPa]及び流量Q6[L/min](図6参照)のそれぞれについても、時刻t2から時刻t3までの時間の水圧(静圧)P1及び流量Q1[L/min](図6参照)よりも低下する(P4<P1、Q6<Q1)。
このとき、図1及び図2に示すように、切替弁装置22の切替弁体34においては、圧縮コイルばね36が切替弁体34に作用する付勢力F1が、切替弁装置22の上流側給水路28(第1流路)内の水圧(静圧)P4が弁体部34aの受圧面S0に作用する流体力を上回っている。これにより、時刻t4以後の切替弁体34の弁体部34aは、最低位置まで下降しており、ジェット給水路32の遷移流路部32aの上流端32c(上流側給水路26の下流端)を再び閉止している状態(閉弁状態)となる。
したがって、図1及び図6に示すように、加圧ポンプ20から回転数N4で切替弁装置22の上流側給水路28内に供給された洗浄水(図6の水圧P4[kPa]及び流量Q6[L/min])は、上流側給水路28の分岐部B1からリム給水路30(第2流路)のみに供給されるため、ジェット給水路32(第3流路)に供給されることはない。
そして、このリム給水路30内の洗浄水は、図4に示す時刻t4から時刻t5までの時間(例えば、t5−t4=5.0秒)では、リム吐水口8aからの3回目のリム吐水が実行され、第3洗浄工程として、3回目のリム洗浄(いわゆる、「後リム洗浄」)が実行される。
Next, as shown in FIG. 4, at time t4, the rotation speed N [rpm] of the pressurizing pump 20 changes from the rotation speed N3 [rpm] to a rotation speed N4 [rpm] lower than the rotation speed N1 of the first cleaning step. ] (For example, N4 = 2500 rpm) (N4 <N1 <N3). Then, the rotation speed N [rpm] of the pressure pump 20 is maintained at a substantially constant rotation speed N4 [rpm] from the time t4 to the time t5 in FIG. 4 (for example, t5-t4 = 5.0 seconds). Is done.
Further, during the time from time t4 to time t5 in FIG. 4, the rotation speed N4 [rpm] of the pressure pump 20 is changed to the rotation speed N1 [rpm] of the pressure pump 20 during the time from time t1 to time t2 in FIG. ], The water pressure (static pressure) P4 [kPa] and the flow rate Q6 [L / L] in the upstream water supply passage 28 (first flow passage) of the switching valve device 22 during the period from time t4 to time t5. min] (see FIG. 6) also falls below the water pressure (static pressure) P1 and the flow rate Q1 [L / min] (see FIG. 6) during the period from time t2 to time t3 (P4 <P1, Q6). <Q1).
At this time, as shown in FIGS. 1 and 2, in the switching valve body 34 of the switching valve device 22, the urging force F1 acting on the switching valve body 34 by the compression coil spring 36 causes the upstream water supply of the switching valve device 22. The hydraulic pressure (static pressure) P4 in the passage 28 (first passage) exceeds the fluid force acting on the pressure receiving surface S0 of the valve body 34a. As a result, the valve body portion 34a of the switching valve body 34 after the time t4 is lowered to the lowest position, and the upstream end 32c of the transition flow passage portion 32a of the jet water supply passage 32 (the downstream end of the upstream water supply passage 26). Is closed again (valve closed state).
Therefore, as shown in FIGS. 1 and 6, the washing water (water pressure P4 [kPa] and flow rate Q6 shown in FIG. 6) supplied from the pressurizing pump 20 into the upstream water supply passage 28 of the switching valve device 22 at the rotation speed N4. [L / min]) is supplied from the branch portion B1 of the upstream water supply passage 28 to only the rim water supply passage 30 (second flow passage), and is therefore supplied to the jet water supply passage 32 (third flow passage). There is no.
Then, during the time from time t4 to time t5 shown in FIG. 4 (for example, t5-t4 = 5.0 seconds), the washing water in the rim water supply channel 30 is discharged from the rim water outlet 8a for the third time. Is performed, and a third rim cleaning (so-called “post-rim cleaning”) is performed as a third cleaning step.

ちなみに、図1、図4及び図5に示すように、給水管14から貯水タンク18への給水については、コントローラ24による電磁弁16の開閉制御により行われ、図4の時刻t1から時刻t6までの時間において、電磁弁16が開弁状態となり、貯水タンク18への給水が実行される。   Incidentally, as shown in FIGS. 1, 4 and 5, water is supplied from the water supply pipe 14 to the water storage tank 18 by opening and closing control of the electromagnetic valve 16 by the controller 24, and from time t1 to time t6 in FIG. At the time, the electromagnetic valve 16 is opened, and the water supply to the water storage tank 18 is performed.

なお、図4に示す時刻t0〜t6、及び、加圧ポンプ20の回転数N1〜N4等については、水洗大便器1の仕様により適宜変更することが可能であり、限定されるものではない。   The times t0 to t6 shown in FIG. 4, the rotation speeds N1 to N4 of the pressurizing pump 20, and the like can be appropriately changed according to the specifications of the flush toilet 1, and are not limited.

なお、本実施形態においては、第1ストローク量h1と第2ストローク量h2とが設定可能なように構成されているが、第1ストローク量h1より小さいストローク量であれば、例えば第3のストローク量を設定するなど複数のストローク量が設定可能なように構成されていてもよい。また、切替弁体34の閉止速度を低下させるように、加圧ポンプ20を制御してもよい。   In the present embodiment, the first stroke amount h1 and the second stroke amount h2 are configured to be settable. However, if the stroke amount is smaller than the first stroke amount h1, for example, the third stroke amount h1 A plurality of stroke amounts may be set, such as by setting the amount. Further, the pressurizing pump 20 may be controlled so as to decrease the closing speed of the switching valve body 34.

上述した本発明の一実施形態の水洗大便器1によれば、切替弁装置22により、給水路内28の洗浄水W1をリム吐水口8aから吐水する第1洗浄工程(前リム洗浄工程)が実行され、その後、給水路28内の洗浄水をリム吐水口8a及びジェット吐水口10aのそれぞれから吐水する第2洗浄工程(中リム洗浄/ジェット洗浄工程)が実行されて給水経路30,32が切り替えられる。
この際、第1洗浄工程(前リム洗浄工程)においては、切替弁装置22の切替弁体34が閉弁位置H0となり、その後、洗浄工程が第1洗浄工程(前リム洗浄工程)から第2洗浄工程(中リム洗浄/ジェット洗浄工程)に切り替わるときには、図3に示すように、水圧P2を受けている切替弁体34が閉弁位置H0に対して第1開口ストローク量h1で第1開弁位置H1まで開弁することができる。
また、第2洗浄工程(中リム洗浄/ジェット洗浄工程)が終了する直前においては、切替弁体34が閉弁位置H0に対して第1開口ストローク量h1よりも小さい第2開口ストローク量h2で第2開弁位置H2まで速やかに移動することができる。その後、第2洗浄工程(中リム洗浄/ジェット洗浄工程)が終了すると、切替弁体34が第2開弁位置H2から閉弁位置H0まで緩やかに閉弁することができる。
さらに、洗浄工程が第1洗浄工程(前リム洗浄工程)から第2洗浄工程(中リム洗浄/ジェット洗浄工程)に切り替わる際に、切替弁体34が閉弁位置H0から第1開弁位置H1まで開弁するタイミングでは第1開口ストローク量h1が大きくなり、また、切替弁体34が第2洗浄工程(中リム洗浄/ジェット洗浄工程)の第1開弁位置H1から第2洗浄工程終了後の閉弁位置H0まで閉弁するタイミングにおいても、切替弁体34のストローク量が大きくなる。
そこで、切替弁体34の閉弁位置H0と第1開弁位置H1との間の途中に第2開口ストローク量h2の第2開弁位置H2を設定することにより、切替弁体34のストローク量を刻むことができる。
これにより、洗浄工程が第1洗浄工程(前リム洗浄工程)から第2洗浄工程(中リム洗浄/ジェット洗浄工程)に切り替り、切替弁体34が閉弁位置H0から第1開弁位置H1まで開弁するタイミングや、第2洗浄工程(中リム洗浄/ジェット洗浄工程)の第1開弁位置H1から第2洗浄工程終了後の閉弁位置H0まで閉弁するタイミングにおいて、切替弁体34の切替時に発生する異音等を緩和させることができると共に、開弁状態の切替弁体34が閉止した際に切替弁体側や着座側で発生する衝撃等を緩和させることもできる。
According to the flush toilet 1 of one embodiment of the present invention described above, the switching valve device 22 performs the first cleaning step (pre-rim cleaning step) of discharging the cleaning water W1 in the water supply passage 28 from the rim water discharge port 8a. After that, a second cleaning step (medium rim cleaning / jet cleaning step) of discharging the cleaning water in the water supply channel 28 from each of the rim water discharge port 8a and the jet water discharge port 10a is performed, and the water supply paths 30, 32 are formed. Can be switched.
At this time, in the first cleaning step (pre-rim cleaning step), the switching valve body 34 of the switching valve device 22 is in the valve closing position H0, and then the cleaning step is changed from the first cleaning step (pre-rim cleaning step) to the second cleaning step. When switching to the cleaning step (middle rim cleaning / jet cleaning step), as shown in FIG. 3, the switching valve element 34 receiving the hydraulic pressure P2 is first opened with the first opening stroke amount h1 with respect to the valve closing position H0. The valve can be opened to the valve position H1.
Immediately before the end of the second cleaning step (middle rim cleaning / jet cleaning step), the switching valve body 34 has a second opening stroke amount h2 smaller than the first opening stroke amount h1 with respect to the valve closing position H0. It is possible to quickly move to the second valve opening position H2. Thereafter, when the second cleaning step (middle rim cleaning / jet cleaning step) is completed, the switching valve body 34 can gently close the valve from the second valve opening position H2 to the valve closing position H0.
Further, when the cleaning process is switched from the first cleaning process (pre-rim cleaning process) to the second cleaning process (medium rim cleaning / jet cleaning process), the switching valve body 34 is moved from the valve closing position H0 to the first valve opening position H1. At the timing when the valve is opened to the maximum opening stroke amount h1, the switching valve body 34 is moved from the first valve opening position H1 of the second cleaning step (medium rim cleaning / jet cleaning step) to the second cleaning step. Also at the timing when the valve is closed to the valve closing position H0, the stroke amount of the switching valve body 34 becomes large.
Therefore, the stroke amount of the switching valve body 34 is set by setting the second valve opening position H2 of the second opening stroke amount h2 halfway between the valve closing position H0 and the first valve opening position H1 of the switching valve body 34. Can be engraved.
Thereby, the cleaning process is switched from the first cleaning process (pre-rim cleaning process) to the second cleaning process (medium rim cleaning / jet cleaning process), and the switching valve body 34 is moved from the valve closing position H0 to the first valve opening position H1. The switching valve body 34 is opened at the timing when the valve is opened from the first valve opening position H1 of the second cleaning step (medium rim cleaning / jet cleaning step) to the valve closing position H0 after the end of the second cleaning step. In addition to the above, it is possible to mitigate abnormal noise and the like generated at the time of switching, and to alleviate the impact and the like generated on the switching valve body side and the seating side when the switching valve body 34 in the open state is closed.

また、本実施形態の水洗大便器1によれば、図4の時刻t3から時刻t4までの時間では、加圧ポンプ20の回転数が、図4の時刻t2から時刻t3の期間の加圧ポンプ20の回転数N2[rpm]からN3[rpm]まで低下したことにより、第2洗浄工程(中リム洗浄/ジェット洗浄工程)で切替弁体34が、第2洗浄工程(中リム洗浄/ジェット洗浄工程)の第1開弁位置H1から第2洗浄工程終了後の閉弁位置H0まで閉弁方向に移動している際に、その途中に第2開口ストローク量h2の第2開弁位置H2を設定することができる。
これにより、開弁状態の切替弁体34を閉弁方向に移動させる際に、加圧ポンプ20の回転数をN2からN3に低下させることにより、切替弁体34の開口ストローク量を第1開口ストローク量h1から第2開口ストローク量h2を経て段階的に小さい開口ストローク量に設定することができる。よって、切替弁体34が閉止する直前で閉弁速度を低下させることができる。
したがって、開弁状態の切替弁体34が閉弁方向に向って移動する力F3(図7参照)を閉止する直前に抑制することができる。よって、第2開口ストローク量h2で開弁している閉止間際の切替弁体34が閉止した際に、切替弁体側や着座側で発生する異音や衝撃等を抑制することができる。
In addition, according to the flush toilet 1 of the present embodiment, during the time from time t3 to time t4 in FIG. 4, the rotation speed of the pressure pump 20 increases during the period from time t2 to time t3 in FIG. Since the number of rotations of 20 has decreased from N2 [rpm] to N3 [rpm], the switching valve body 34 is moved in the second cleaning step (medium rim cleaning / jet cleaning) in the second cleaning step (medium rim cleaning / jet cleaning step). During the movement in the valve closing direction from the first valve opening position H1 of the step (2) to the valve closing position H0 after the end of the second cleaning step, the second valve opening position H2 of the second opening stroke amount h2 is changed during the movement. Can be set.
Accordingly, when the switching valve element 34 in the valve open state is moved in the valve closing direction, the rotation speed of the pressurizing pump 20 is reduced from N2 to N3, so that the opening stroke amount of the switching valve element 34 is reduced by the first opening. A small opening stroke amount can be set stepwise from the stroke amount h1 through the second opening stroke amount h2. Therefore, the valve closing speed can be reduced immediately before the switching valve body 34 closes.
Therefore, the force F3 (see FIG. 7) of the switching valve body 34 in the valve open state moving in the valve closing direction can be suppressed immediately before closing. Therefore, when the switching valve body 34 just before closing, which is opened with the second opening stroke h2, is closed, abnormal noise, impact, and the like generated on the switching valve body side and the seating side can be suppressed.

さらに、本実施形態の水洗大便器1によれば、第2洗浄工程(中リム洗浄/ジェット洗浄工程)において便器本体2でサイホン作用が発生した以後の状態では、サイホン作用により便器本体2のボウル部6から排水トラップ管路12へ洗浄水が引っ張られる排出力が既に発生している。
したがって、切替弁体34の第1開口ストローク量h1を第2開口ストローク量h2に変更することにより、ジェット吐水口10aから吐水される洗浄水W3の流量が低下したとしても、便器本体2の洗浄性能に及ぼす影響を極めて小さくすることができる。
よって、便器本体2の洗浄性能を確保しながら、切替弁体側や着座側で発生する異音や衝撃等を抑制することができる。
Furthermore, according to the flush toilet 1 of the present embodiment, in a state after the siphon action has occurred in the toilet main body 2 in the second cleaning step (medium rim cleaning / jet cleaning step), the bowl of the toilet main body 2 is operated by the siphon action. A draining force has already been generated to pull the washing water from the part 6 to the drain trap line 12.
Therefore, by changing the first opening stroke amount h1 of the switching valve body 34 to the second opening stroke amount h2, even if the flow rate of the washing water W3 spouted from the jet spouting port 10a is reduced, the flushing of the toilet body 2 is performed. The effect on performance can be made extremely small.
Therefore, it is possible to suppress abnormal noise and impact generated on the switching valve body side and the seating side while securing the cleaning performance of the toilet body 2.

また、本実施形態の水洗大便器1によれば、加圧ポンプ20が、第2洗浄工程(中リム洗浄/ジェット洗浄工程)時に圧送する洗浄水の第2流量Q2よりも第3洗浄工程(後リム洗浄工程)時に圧送する洗浄水の第3流量Q6の方が小さくなる(Q2>Q6)ように調整可能である。
これにより、第2洗浄工程(中リム洗浄/ジェット洗浄工程)の後に第3洗浄工程(後リム洗浄工程)が実行されると、給水路28内の水圧P4が低圧状態に調整されるため、第2洗浄工程(中リム洗浄/ジェット洗浄工程)時のジェット給水路32が切替弁体34により閉鎖されて、第3洗浄工程(後リム洗浄工程)時のリム給水路30に速やかに切り替えることができる。
また、第2洗浄工程(中リム洗浄/ジェット洗浄工程)の後の第3洗浄工程(後リム洗浄工程)では、洗浄水の流量Q6(第3流量)が第2洗浄工程(中リム洗浄/ジェット洗浄工程)の洗浄水の流量Q2(第2流量)よりも低下するものの、切替弁装置22の閉止状態の切替弁体34には、洗浄水が継続して供給される。
しかしながら、第2洗浄工程(中リム洗浄/ジェット洗浄工程)における終了直前の第2開口ストローク量h2の第2開弁位置H2の開弁状態の切替弁体34が閉止するまで間においても、図7に示すように、切替弁体34の受圧面S0には水圧P3による抵抗力が開弁する方向に作用している。
これにより、切替弁体34の急激な閉止動作を抑制することができ、その後、第2洗浄工程(中リム洗浄/ジェット洗浄工程)が終了すると同時に、切替弁体34を即座に着座することできる。
よって、第2開口ストローク量h2で開弁している閉止間際の切替弁体34が閉止した際に、切替弁体側や着座側で発生する異音や衝撃等を効果的に抑制することができる。
In addition, according to the flush toilet 1 of the present embodiment, the pressure pump 20 sets the third cleaning step (the second flow rate Q2) higher than the second flow rate Q2 of the cleaning water pumped during the second cleaning step (medium rim cleaning / jet cleaning step). The third flow rate Q6 of the cleaning water to be pumped during the post-rim cleaning step) can be adjusted so as to be smaller (Q2> Q6).
Accordingly, when the third cleaning step (post-rim cleaning step) is performed after the second cleaning step (middle rim cleaning / jet cleaning step), the water pressure P4 in the water supply passage 28 is adjusted to a low pressure state. The jet water supply path 32 during the second cleaning step (medium rim cleaning / jet cleaning step) is closed by the switching valve body 34, and the jet water supply path 32 is promptly switched to the rim water supply path 30 during the third cleaning step (post-rim cleaning step). Can be.
In the third cleaning step (post-rim cleaning step) after the second cleaning step (middle rim cleaning / jet cleaning step), the flow rate Q6 (third flow rate) of the cleaning water is changed to the second cleaning step (middle rim cleaning / jet cleaning step). Although being lower than the flow rate Q2 (second flow rate) of the cleaning water in the jet cleaning step), the cleaning water is continuously supplied to the switching valve body 34 in the closed state of the switching valve device 22.
However, even before the switching valve body 34 in the open state at the second valve opening position H2 of the second opening stroke amount h2 immediately before the end of the second cleaning step (middle rim cleaning / jet cleaning step) is closed. As shown in FIG. 7, the resistance force by the water pressure P3 acts on the pressure receiving surface S0 of the switching valve body 34 in the direction in which the valve opens.
Thereby, the rapid closing operation of the switching valve body 34 can be suppressed, and thereafter, the switching valve body 34 can be immediately seated at the same time when the second cleaning step (medium rim cleaning / jet cleaning step) is completed. .
Therefore, when the switching valve body 34 just before closing, which is opened with the second opening stroke amount h2, is closed, abnormal noise, impact, and the like generated on the switching valve body side and the seating side can be effectively suppressed. .

なお、上述した本発明の一実施形態による水洗大便器1においては、一例として、図4に示す第2洗浄工程(中リム洗浄/ジェット洗浄工程)において、リム吐水及びジェット吐水の双方を実行させる形態について説明したが、このような形態に限られず、第2洗浄工程において、リム吐水を省略して、ジェット吐水のみを実行するようにしてもよい。   In the flush toilet 1 according to the embodiment of the present invention described above, for example, both the rim spouting and the jet spouting are performed in the second cleaning step (medium rim cleaning / jet cleaning step) shown in FIG. Although the embodiment has been described, the invention is not limited to such an embodiment. In the second cleaning step, the rim spouting may be omitted and only the jet spouting may be performed.

1 水洗大便器
2 便器本体
4 機能部
6 ボウル部
8 リム給水路
8a リム吐水口
10 ジェット給水路
10a ジェット吐水口
12 排水トラップ管路(排水トラップ部)
14 給水管
16 電磁弁
18 貯水タンク
20 加圧ポンプ
22 切替弁装置(切替部)
24 コントローラ(制御部)
26 給水路
28 上流側給水路(第1流路)
30 リム給水路(第2流路)
32 ジェット給水路(第3流路)
32a ジェット給水路の遷移流路部
32b ジェット給水路の主流路部
32c ジェット給水路の遷移流路部の上流端、上流側給水路の下流端
32d ジェット給水路の主流路部の上端
34 切替弁体
34a ダイヤフラム型の弁体部
34b 支持部
34c 弁軸部
35 定流量弁
36 圧縮コイルばね(付勢部)
38 環状シール部材(緩衝部)
40 支持部材(支持部)
A1 流路断面積(第1流路の第1流路断面積)
A2 流路断面積(第1流路の第2流路断面積)
A3 流路断面積(第3流路の第3流路断面積)
A4 流路断面積(第2流路の第4流路断面積)
B1 分岐部
C1 切替弁装置の上流側給水路の中心軸線(第1流路中心軸線)
C2 切替弁装置のリム給水路の中心軸線(第2流路中心軸線)
f0 緩衝力、摩擦力
F1 付勢力
F2 付勢力
F3 開弁状態の切替弁体が閉弁方向に向って移動する力
H0 閉弁位置
H1 最高開弁位置(第1開弁位置)
H2 閉止間際の開弁位置(第2開弁位置)
h1 第1開口ストローク量
h2 第2開口ストローク量
N1 加圧ポンプの回転数
N2 加圧ポンプの回転数
N3 加圧ポンプの回転数
N4 加圧ポンプの回転数
O1 切替弁体の弁体部の中心
P0 境界水圧(所定水圧)
P1 水圧(静圧)
P2 水圧(動圧)
P3 水圧(動圧)
P4 水圧(静圧)
Q1 流量[L/min](第1流量)
Q2 流量[L/min](第2流量)
Q3 流量[L/min]
Q4 流量[L/min]
Q5 流量[L/min]
Q6 流量[L/min](第3流量)
S0 受圧面
V1 内部スペース
W1 上流側給水路(第1流路)の洗浄水
W2 リム給水路(第2流路)の洗浄水
W3 ジェット給水路(第3流路)の洗浄水
WO 貯水タンクのオーバーフロー水位
DESCRIPTION OF SYMBOLS 1 Rinse toilet 2 Toilet main body 4 Function part 6 Bowl part 8 Rim water supply channel 8a Rim water discharge port 10 Jet water supply path 10a Jet water discharge port 12 Drain trap pipe (drain trap part)
14 water supply pipe 16 solenoid valve 18 water storage tank 20 pressurizing pump 22 switching valve device (switching unit)
24 Controller (control unit)
26 water supply channel 28 upstream water supply channel (first channel)
30 Rim water supply channel (second channel)
32 Jet water supply channel (third channel)
32a Transition channel portion of jet water supply channel 32b Main channel portion of jet water channel 32c Upstream end of transition channel portion of jet water channel, downstream end of upstream water channel 32d Upper end of main channel portion of jet water channel 34 Switching valve Body 34a Diaphragm type valve body 34b Supporting part 34c Valve shaft 35 Constant flow valve 36 Compression coil spring (biasing part)
38 Annular seal member (buffer)
40 Supporting member (supporting part)
A1 Channel cross-sectional area (first channel cross-sectional area of first channel)
A2 Channel cross-sectional area (second channel cross-sectional area of first channel)
A3 Channel cross-sectional area (third channel cross-sectional area of third channel)
A4 Channel cross-sectional area (fourth channel cross-sectional area of second channel)
B1 branch part C1 central axis of the upstream water supply channel of the switching valve device (first channel central axis)
C2 Central axis of the rim water supply channel of the switching valve device (second channel central axis)
f0 buffering force, frictional force F1 urging force F2 urging force F3 force of the switching valve body in the valve open state moving in the valve closing direction H0 valve closing position H1 maximum valve opening position (first valve opening position)
H2 Valve opening position just before closing (second valve opening position)
h1 First opening stroke amount h2 Second opening stroke amount N1 Number of rotations of pressure pump N2 Number of rotations of pressure pump N3 Number of rotations of pressure pump N4 Number of rotations of pressure pump O1 Center of valve body of switching valve body P0 Boundary water pressure (predetermined water pressure)
P1 Water pressure (static pressure)
P2 water pressure (dynamic pressure)
P3 water pressure (dynamic pressure)
P4 water pressure (static pressure)
Q1 flow rate [L / min] (first flow rate)
Q2 flow rate [L / min] (second flow rate)
Q3 Flow rate [L / min]
Q4 Flow rate [L / min]
Q5 Flow rate [L / min]
Q6 Flow rate [L / min] (third flow rate)
S0 Pressure receiving surface V1 Internal space W1 Wash water of upstream water supply channel (first flow passage) W2 Wash water of rim water supply passage (second flow passage) W3 Wash water of jet water supply passage (third flow passage) WO Water storage tank Overflow water level

Claims (4)

加圧した洗浄水によって洗浄される水洗大便器であって、
洗浄水を貯水する貯水タンクと、
ボウル部と、洗浄水を吐水するリム吐水口及びジェット吐水口と、排水トラップ部と、を備えた便器本体と、
上記貯水タンクから洗浄水を上記リム吐水口及び上記ジェット吐水口のそれぞれに供給可能にする給水路と、
この給水路に設けられて上記リム吐水口及び上記ジェット吐水口のそれぞれに洗浄水を供給する給水経路を切り替える切替部であって、まず、上記給水路内の洗浄水を上記リム吐水口から吐水する第1洗浄工程を実行させ、その後、上記給水路内の洗浄水を少なくとも上記ジェット吐水口から吐水する第2洗浄工程を実行させるように上記給水経路を切り替える上記切替部と、
上記貯水タンクから上記給水路に供給する洗浄水を加圧し、上記給水路の洗浄水の流量を調整可能にする加圧ポンプであって、上記第1洗浄工程時に圧送する洗浄水の第1流量よりも上記第2洗浄工程時に圧送する洗浄水の第2流量の方が大きくなるように調整可能である上記加圧ポンプと、を有し、
上記切替部は、上記加圧ポンプにより加圧された洗浄水の水圧を受けて機械的に作動する切替弁体を備え、この切替弁体は、上記加圧ポンプによって発生した水圧に応じて、上記第1洗浄工程において閉弁し、上記第2洗浄工程において開弁するように構成され、
上記切替部は、上記第2洗浄工程において、上記切替弁体を閉弁位置に対して第1開口ストローク量で開弁させて第1開弁位置に設定可能であり、且つ、上記切替弁体を上記閉弁位置に対して上記第1開口ストローク量よりも小さい第2開口ストローク量で開弁させて第2開弁位置に設定可能であることを特徴とする水洗大便器。
A flush toilet flushed by pressurized flush water,
A water storage tank for storing washing water;
A bowl body, a toilet body including a rim water outlet and a jet water outlet for discharging cleaning water, and a drain trap unit,
A water supply passage for enabling the washing water to be supplied from the water storage tank to each of the rim water outlet and the jet water outlet,
A switching unit that is provided in the water supply path and switches a water supply path that supplies cleaning water to each of the rim water discharge port and the jet water discharge port. First, the cleaning water in the water supply path is discharged from the rim water discharge port. A switching unit that switches the water supply path so as to execute a second cleaning step of discharging at least the cleaning water in the water supply channel from the jet water discharge port.
A pressurizing pump for pressurizing washing water supplied from the water storage tank to the water supply passage to adjust a flow rate of the washing water in the water supply passage, wherein a first flow rate of the cleaning water to be pumped during the first washing step is provided. The pressurizing pump, which is adjustable so that the second flow rate of the cleaning water to be pumped during the second cleaning step is larger than that of the second cleaning step,
The switching unit includes a switching valve body that is mechanically operated by receiving the water pressure of the cleaning water pressurized by the pressure pump, and the switching valve body is configured to respond to a water pressure generated by the pressure pump. It is configured to close in the first cleaning step and open in the second cleaning step,
The switching unit is capable of setting the switching valve body to a first opening position by opening the switching valve body with respect to a valve closing position by a first opening stroke amount in the second cleaning step, and The flush toilet can be set to a second valve opening position by opening the valve with a second opening stroke smaller than the first opening stroke with respect to the valve closing position.
上記切替部は、上記第2洗浄工程において、上記切替弁体を上記閉弁位置に対して上記第1開口ストローク量で開弁させた上記第1開弁位置に設定した後、上記切替弁体を上記閉弁位置に対して上記第2開口ストローク量で開弁させた上記第2開弁位置に設定可能である請求項1記載の水洗大便器。   The switching unit sets the switching valve body to the first valve opening position in which the switching valve body is opened with the first opening stroke amount with respect to the valve closing position in the second cleaning step, and then sets the switching valve body. 2. The flush toilet according to claim 1, wherein the toilet valve can be set to the second valve-opening position where the valve is opened by the second opening stroke amount with respect to the valve-closing position. 3. 上記切替部は、上記第2洗浄工程において、上記便器本体でサイホン作用が発生した以後に開弁している状態の上記切替弁体の上記第1開口ストローク量を上記第2開口ストローク量に変更する請求項2記載の水洗大便器。   The switching unit changes the first opening stroke amount of the switching valve body that is opened after the siphon action has occurred in the toilet body in the second cleaning step to the second opening stroke amount. The flush toilet according to claim 2. 上記切替部は、さらに、上記第2洗浄工程の後、連続して上記リム吐水口から洗浄水を吐水する第3洗浄工程を実行するように給水経路を切り替えるものであり、
上記加圧ポンプは、上記第2洗浄工程時に圧送する洗浄水の上記第2流量よりも上記第3洗浄工程時に圧送する洗浄水の第3流量の方が小さくなるように調整可能である請求項1乃至3の何れか1項に記載の水洗大便器。
The switching unit further switches a water supply path so as to execute a third cleaning step of continuously discharging cleaning water from the rim water outlet after the second cleaning step,
The pressure pump is adjustable so that a third flow rate of the cleaning water to be pumped in the third cleaning step is smaller than the second flow rate of the cleaning water to be pumped in the second cleaning step. The flush toilet according to any one of claims 1 to 3.
JP2018184768A 2018-09-28 2018-09-28 flush toilet Active JP7212308B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018184768A JP7212308B2 (en) 2018-09-28 2018-09-28 flush toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018184768A JP7212308B2 (en) 2018-09-28 2018-09-28 flush toilet

Publications (2)

Publication Number Publication Date
JP2020051229A true JP2020051229A (en) 2020-04-02
JP7212308B2 JP7212308B2 (en) 2023-01-25

Family

ID=69996263

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018184768A Active JP7212308B2 (en) 2018-09-28 2018-09-28 flush toilet

Country Status (1)

Country Link
JP (1) JP7212308B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145986A (en) * 1998-11-11 2000-05-26 Abe Seikoo Kk Switch valve for washer and car washer used thereof
JP2001123511A (en) * 1999-10-22 2001-05-08 Toto Ltd Washing water supply device for siphon jet type toilet
JP2012140822A (en) * 2011-01-05 2012-07-26 Lixil Corp Toilet bowl washing device
JP2017066758A (en) * 2015-09-30 2017-04-06 Toto株式会社 Water closet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145986A (en) * 1998-11-11 2000-05-26 Abe Seikoo Kk Switch valve for washer and car washer used thereof
JP2001123511A (en) * 1999-10-22 2001-05-08 Toto Ltd Washing water supply device for siphon jet type toilet
JP2012140822A (en) * 2011-01-05 2012-07-26 Lixil Corp Toilet bowl washing device
JP2017066758A (en) * 2015-09-30 2017-04-06 Toto株式会社 Water closet

Also Published As

Publication number Publication date
JP7212308B2 (en) 2023-01-25

Similar Documents

Publication Publication Date Title
JP2022161993A (en) Water closet
JP6774616B2 (en) Flush toilet
JP5333989B2 (en) Toilet device and toilet system
JP2020051215A (en) Water closet
JP7134407B2 (en) flush toilet
JP2022164800A (en) Water closet
US11111658B2 (en) Flush toilet
JP2020051229A (en) Water closet
JP2023168489A (en) Water closet
JP7205686B2 (en) flush toilet
JP7134408B2 (en) flush toilet
KR20120083616A (en) Water distributor of toilet which is operated by 3way valve switching
JP6651762B2 (en) Flush toilet
JP2020105885A (en) Flush toilet bowl
JP2009293259A (en) Ball tap device
CN113775004A (en) Washing water tank device and flush toilet device provided with same
JP4600869B2 (en) Flush toilet
JP6578572B2 (en) Flush toilet
JP2009002054A (en) Water closet
JP2023110606A (en) Drain valve device, washing water tank device, and water closet
JP7415248B2 (en) Wash water tank device and flush toilet device equipped with the same
JP6699068B2 (en) Flush toilet
KR100915254B1 (en) device for operating cleaning water for a chamber pot
JP7317290B2 (en) Flush water tank device and flush toilet device provided with the same
JPH10102568A (en) Toilet stool flushing tank device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220720

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221227

R150 Certificate of patent or registration of utility model

Ref document number: 7212308

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150