JP2019521267A - Reverse tenon building structure and technology process to withstand earthquakes, strong winds and tsunamis - Google Patents

Reverse tenon building structure and technology process to withstand earthquakes, strong winds and tsunamis Download PDF

Info

Publication number
JP2019521267A
JP2019521267A JP2019501521A JP2019501521A JP2019521267A JP 2019521267 A JP2019521267 A JP 2019521267A JP 2019501521 A JP2019501521 A JP 2019501521A JP 2019501521 A JP2019501521 A JP 2019501521A JP 2019521267 A JP2019521267 A JP 2019521267A
Authority
JP
Japan
Prior art keywords
tenon
building
ground
reverse
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019501521A
Other languages
Japanese (ja)
Inventor
理中 蒋
理中 蒋
曄 張
曄 張
Original Assignee
理中 蒋
理中 蒋
曄 張
曄 張
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from PCT/CN2016/000372 external-priority patent/WO2017024751A2/en
Application filed by 理中 蒋, 理中 蒋, 曄 張, 曄 張 filed Critical 理中 蒋
Priority claimed from PCT/CN2017/000310 external-priority patent/WO2018010402A1/en
Publication of JP2019521267A publication Critical patent/JP2019521267A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • E04H9/0237Structural braces with damping devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • E04H9/145Floods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Hydrology & Water Resources (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Revetment (AREA)

Abstract

地震、強風と津波に耐える逆向きほぞの建物構造及びその技術プロセスであり、逆向きの押圧結合されたほぞ構造を採用し、ほぞリングを本館のリングガーダーと基礎グランドの間の分割空間に蟄居させ、本館をグラウンドビームの上に吊り下げるように押圧結合させ、逆向きほぞがまるで眠っているドラゴンのように本構造を経過したいずれの地の律動、風の侵入と潮の押し寄せを捕える。前記地の律動には、地震の方向においての縦波と横波、形状においての扇形波、スイング波とクロール波が含まれ、前記風の侵入には、複合風力の中で風力トルクの垂直と提携が含まれ、前記潮の押し寄せには、津波潮汐による推進が含まれる。形のあるほぞの移動により上記の三種類の無形の災害エネルギーを捕えることで、建物と基礎の変位における破壊を交換し、建物の損傷を排除し、元々再建しなければならない三脚ベアリングほぞ浮きの基礎と解体工事と工事建設をすべて免除する。本構造および技術プロセスは多分野で使用でき、新築建物の耐震プリセットと既存建物の補強を体系的に解決するとともに、地震、津波および強風の破壊を除去するための包括的なソリューションを提供する。【選択図】図43A reverse tenon building structure that withstands earthquakes, strong winds, and tsunamis, and its technical process. Adopts a reverse tense tenon structure and places the tenon ring in the divided space between the main building's ring girder and the foundation ground. The main building is pressed and coupled so that it hangs on the ground beam, and the reverse mortise captures the rhythm, wind intrusion, and tide intrusion that has passed through the structure like a sleeping dragon. The ground rhythms include longitudinal and transverse waves in the direction of the earthquake, fan-shaped waves in the shape, swing waves and crawl waves, and the wind intrusion is tied up with the vertical of the wind torque in the combined wind power The tidal current includes propulsion by tsunami tide. By capturing the above three types of intangible disaster energy through the movement of a shaped tenon, the destruction in the displacement of the building and foundation is replaced, the damage to the building is eliminated, and the tripod bearing tenon that must be rebuilt originally Exempt all foundation, dismantling and construction. This structure and technology process can be used in many fields, systematically solving seismic presets for new buildings and reinforcement of existing buildings, as well as providing a comprehensive solution to eliminate earthquake, tsunami and strong wind destruction. [Selection] Figure 43

Description

本発明は、地震、津波と超強風における建物の耐震性、防湿性、防風技術及び構造の組み合わせに関する。大きくは、新築建物のプレインストールと既存建物の補強の二種類が含まれる。   The present invention relates to the combination of earthquake resistance, dampproofness, wind protection technology and construction of buildings in earthquakes, tsunamis and super winds. Largely, there are two types of pre-installed new buildings and reinforcement of existing buildings.

鼎ベアリングほぞ浮き(中国語:鼎承卯浮)の建物構造;「グラウンド建物:地震、津波及び超強風の災害における液体タンクの防災及び保全の包括的なソリューション及びその構造と施設」。PCT/CN2016/000372;11・7月・2016。   鼎 Bearing 鼎 浮 き (Chinese: 鼎 建 物) building structure; "Ground building: Comprehensive solution for liquid tank disaster prevention and maintenance in earthquake, tsunami and super wind disasters and its structure and facility". PCT / CN2016 / 000372; 11 · July · 2016.

逆向きほぞの建物構造及び本構造を実施するための技術プロセスは下記の通りである。逆向きほぞ(Inverted fastening mortise)は、サイズに関する符号がつけられていない、点在するほぞを統合する方法、又は、全体のものをばらばらにする方法で本館とベアリング基礎構造の間に集束され分割結合の方法でなるようにする。上向きへは本館の垂下力に耐えるように、下向きへはグランドの反発力を相殺するように、外向きへはリングガーダーの強固な密封力によって押されるように、内向きへは同じ種類のほぞの押出と摩擦力によって限定される。自身の自然属性と地球の物理属性とを特定の局部の空間に共存させることにより、構造の分合型とエネルギーの予約型を作り上げる。   The reverse tenon building structure and the technical process for implementing this structure are as follows. Inverted fasting mortise is a method of integrating the scattered tenons that is not signed with respect to size, or divided and divided between the main building and the bearing infrastructure in a way that separates the whole thing Make it a way of bonding. The same kind of tenon inwards, in the same direction, so as to withstand the drooping force of the main building upwards, to counteract the repulsive force of the grounds downwards, and to be pushed outward by the strong sealing force of the ring girder Limited by the extrusion and friction force of By coexistence of their own natural attributes and the physical attributes of the earth in a specific local space, they create an integrated type of structure and a reserved type of energy.

上記の三種類のタイプの災害のいずれかがその方向とエネルギーで本構造に侵入した場合、本構造の集束性と押圧結合性が破壊され、押圧結合力を失った押圧結合されたほぞは伏合ほぞになって、その滑り性と移動性の性能が釈放され、移動ほぞの滑りは建物と基礎の間の空間的変位を補償し、侵入されたエネルギーの衝突を相互に作用させる。本構造を経過したいずれの地の律動、風の侵入と潮の押し寄せはすべて本構造において捕え、融和される。   If any of the above three types of disasters penetrate the structure with its direction and energy, the integrity of the structure and the pressure bond are destroyed and the press-bonded tenon which has lost the pressure bond is a bow Together, the slippery and mobile performance is released, and the slippage of the moving tenon compensates for the spatial displacement between the building and the foundation, causing the collision of the invaded energy to interact. The rhythms, winds and tides of any land that has passed through this structure are all captured and integrated in this structure.

新築建物のプレインストールと既存建物の補強、歴史的な古い土木建物、規制のない「手抜き」工事の救助プロジェクトが含まれる。地震活動帯、季節風のゾーンと候風ゾーンの建物について、災害後のほぞ流失実施補充メカニズムを採用することにより,ほぞの集束状態と押圧結合性の特徴を再び取り戻し、災害に対する物理的効果を永遠に残させる。   It includes pre-installation of new buildings and reinforcement of existing buildings, historic old civil engineering buildings and rescue projects of unregulated “hands-off” construction. By adopting the post-disaster mortise loss replenishment mechanism for buildings with seismic activity zone, monsoon wind zone and mound wind zone, regain the characteristics of tenon's focusing state and pressure connectivity and make the physical effect on disaster forever Leave to leave.

図1は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 1 shows the seismic effects of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood piles, piles of piles, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図2は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 2 shows the seismic effects of China's traditional clay buildings, one of the most collapsible buildings, including historical plywood piles, piles of piles, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図3は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 3 is a seismic effect diagram of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood mixed earth buildings, piles of earthen blocks, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図4は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 4 is a seismic effect diagram of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood mixed earth buildings, piles of earthen blocks, piles of stone blocks and elevated floors. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図5は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 5 is a seismic effect diagram of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood mixed earth buildings, piles of earthen blocks, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図6は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 6 shows the seismic effects of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood piles, piles of piles, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図7は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 7 is a seismic effect diagram of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood mixed earth buildings, piles of earthen blocks, piles of stone blocks and stilts. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図8は、中国の伝統的な粘土建物、最も倒壊やすい建物の耐震効果図であり、歴史上の合板の練り土建物、土塊の積み上げ建物、石塊の積み上げ建物と高床式建物が含まれる。本発明に係る逆向きほぞ構造に加えて、既に広く適用されている構造ビーム、柱及びフレームせん断フレームもを示す。Figure 8 shows the seismic effects of China's traditional clay buildings, the most easily collapsible buildings, including historical plywood piles, piles of soil blocks, piles of stone blocks and elevated floors. In addition to the reverse tenon structure according to the invention, it also shows structural beam, column and frame shear frames that are already widely applied. 図9は、本逆向きほぞ構造の耐力壁のリングガーダー構造の建築前構造の平面図と閉鎖状態の平面図を示す。FIG. 9 shows a plan view and a plan view of a closed state of the pre-architectural structure of the ring girder structure of the bearing wall of this reverse direction tenon structure. 図10は、本逆向きほぞ構造の耐力壁のリングガーダー構造の建築前構造の平面図と閉鎖状態の平面図を示す。FIG. 10 shows a plan view and a plan view of a closed state of the pre-architectural structure of the ring girder structure of the bearing wall of this reverse direction tenon structure. 図11は、本構造の要件を満たすために予め作る必要があるほぞブロッキングボードを示す。FIG. 11 shows the tenon blocking board that needs to be made in advance to meet the requirements of the present structure. 図13は、壁とウォールスカートの耐荷重のリングガーダーの建築前構造の平面図を示す。FIG. 13 shows a plan view of the pre-architectural structure of the load bearing ring girder of the wall and the wall skirt. 図12は、本構造の実施により達成される逆向きほぞの壁の耐荷重を示す。FIG. 12 illustrates the load carrying capacity of the reverse tenon achieved by implementation of the present structure. 図14は、この効果を達成するために予め作る必要があるウォールスカートリブ付きのほぞブロッキングプレート及びアダプターボルトを示す。FIG. 14 shows wall-skirt ribbed tenon blocking plates and adapter bolts that need to be prefabricated to achieve this effect. 図15は、本構造の実施におけるグラウンドビームのウォールスカートの耐荷重を示す。FIG. 15 shows the load bearing of the ground beam wall skirt in the implementation of the present structure. 図16は、同じタイプの既存の旧築及び基礎の状況を示す。FIG. 16 shows the status of existing old constructions and foundations of the same type. 図17は、同じタイプの既存の旧築及び基礎の状況を示す。FIG. 17 shows the situation of existing old constructions and foundations of the same type. 図18は、本構造の遊離グランドを追加建築した本館と基礎を示す。FIG. 18 shows a main building and a foundation on which a free ground of this structure is additionally built. 図19は、本構造の遊離グランドを追加建築した本館と基礎を示す。FIG. 19 shows a main building and a foundation on which a free ground of this structure is additionally built. 図20は、フレームせん断フレームを追加建築した後、リングガーダーのプレインストール及び全体のものをばらばらにする方法でインプランした場合の概略図を示す。FIG. 20 shows a schematic view of the ring shearer pre-installed and planed in a manner to break the whole apart after the frame shear frame is added. 図21は、フレームせん断フレームを追加建築した後、リングガーダーのプレインストール及び全体のものをばらばらにする方法でインプランした場合の概略図を示す。FIG. 21 shows a schematic view of the ring shearer pre-installed and planed in a manner to break the whole apart after the frame shear frame has been added. 図22は、フレームせん断フレームを追加建築した後、リングガーダーのプレインストール及び全体のものをばらばらにする方法でインプランした場合の概略図を示す。FIG. 22 shows a schematic diagram of the ring shearer pre-installed and planed in a manner to break the whole apart after the frame shear frame has been added. 図23は、フレームせん断フレームを追加建築した後、リングガーダーのプレインストール及び全体のものをばらばらにする方法でインプランした場合の概略図を示す。FIG. 23 shows a schematic view of the ring shearer pre-installed and planed in a manner to break the whole apart after building additional frame shear frames. 図24は、救済に成功した後、分割線をコアとした建築製品を示す。FIG. 24 shows a building product cored with a dividing line after a successful rescue. 図25は、救済に成功した後、分割線をコアとした建築製品を示す。FIG. 25 shows a building product with a dividing line as its core after a successful rescue. 図26は、救済に成功した後、分割線をコアとした建築製品を示す。FIG. 26 shows a building product with a dividing line as its core after a successful rescue. 図27は、救済に成功した後、分割線をコアとした建築製品を示す。FIG. 27 shows a building product with a dividing line as its core after a successful rescue. 図28は、該建築製品の施工を完了させるために、事前に準備すべきほぞプレスプレートを示す。FIG. 28 shows the tenon press plate to be prepared in advance to complete the construction of the building product. 図29は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 29 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図30は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 30 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図31は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 31 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図32は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 32 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図33は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 33 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図34は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 34 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図35は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 35 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図36は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 36 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図37は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 37 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図38は、無縦波地震又は縦波、横波の交互の地震における壁の耐荷重とウォールスカートの耐荷重の耐震効果図を示す。FIG. 38 shows a seismic effect diagram of the load capacity of the wall and the load capacity of the wall skirt in a non-longitudinal wave earthquake or an alternating wave of longitudinal wave and transverse wave. 図39は、城の建物及びハイツ建物の耐震概略図を示す。FIG. 39 shows a seismic schematic of the castle and heights buildings. 図40は、該製品の施工前に、事前に準備すべきガルウィングプレートを示す。FIG. 40 shows the gull wing plate to be prepared in advance prior to installation of the product. 図41は、ガルウィングプレートを使用し、ほぞ補充シリンダーを追加したリングガーダーの側面図及び平面図を示す。FIG. 41 shows a side view and a top view of a ring girder using gull wing plates and adding a tenon refill cylinder. 図42は、ガルウィングプレートを使用し、ほぞ補充シリンダーを追加したリングガーダーの側面図及び平面図を示す。FIG. 42 shows side and top views of a ring girder using gull wing plates and with a tenon refill cylinder. 図43は、地震における本構造の効果図を示す。FIG. 43 shows an effect diagram of the present structure in an earthquake. 図44は、地震における本構造の効果図を示す。FIG. 44 shows an effect diagram of the present structure in an earthquake. 図45は、地震における本構造の効果図を示す。FIG. 45 shows an effect diagram of the present structure in an earthquake. 図46は、地震における本構造の効果図を示す。FIG. 46 shows an effect diagram of the structure in an earthquake. 図47は、古城を救済するためにプレインストールすべきほぞプレスプレートを示す。FIG. 47 shows the tenon press plate to be pre-installed to rescue the castle. 図48は、本構造を古城に適用した後、建物と基礎の分割結合の方法でおける立体図及び平面図を示す。FIG. 48 shows a three-dimensional view and a plan view in a method of split connection of a building and a base after applying the present structure to a castle. 図49は、ほぞ補充メカニズムに必要なほぞ補充シリンダーを示す。Figure 49 shows the tenon refill cylinder required for the tenon refill mechanism. 図50は、本構造を古城に適用した後、建物と基礎の分割結合の方法でおける立体図及び平面図を示す。FIG. 50 shows a three-dimensional view and a plan view in the method of split connection of a building and a foundation after applying the present structure to a castle. 図51は、地震における本製品の効果図を示す。FIG. 51 shows an effect diagram of the product in an earthquake. 図52は、地震における本製品の効果図を示す。FIG. 52 shows an effect diagram of the product in an earthquake. 図53は、地震における本製品の効果図を示す。FIG. 53 shows an effect diagram of the product in an earthquake. 図54は、地震における本製品の効果図を示す。FIG. 54 shows an effect diagram of the product in an earthquake. 図55は、既にリングガーダーを有する古城及びハイツ建物に対して、より便利で実用的な改善目安を示す。FIG. 55 shows a more convenient and practical improvement measure for castles and heights buildings that already have ring girders. 図56は、元のリングガーダーを改善するための目安を示す。FIG. 56 shows a guideline for improving the original ring girder. 図57は、中高層建物又は高層建物の側面図及びグラウンドベアリングの断面図を示す。FIG. 57 shows a side view of a middle or high-rise building or a high-rise building and a cross-sectional view of a ground bearing. 図58は、中高層建物又は高層建物の側面図及びグラウンドベアリングの断面図を示す。FIG. 58 shows a side view of a high-rise or high-rise building and a cross-sectional view of a ground bearing. 図59は、ベアリング柱構造に対して行う施設的救済における2つの方法を示す。FIG. 59 illustrates two methods of institutional remediation for bearing post structures. 図60は、ベアリング柱構造に対して行う施設的救済における2つの方法を示す。FIG. 60 illustrates two methods of institutional remediation for bearing post structures. 図61は、壁の耐荷重の救済術を実施するためのほぞの補充時にグラウンドビームにおける片面枠、ほぞを収納できる片面ほぞ収納台及びほぞカバープレートを示す。FIG. 61 shows a single sided frame in the ground beam, a single sided tenon storage cradle and tenon cover plate capable of storing tenons at the time of refilling the tenon to perform load bearing relief of the wall. 図62は、追加された遊離グランド及びリングガーダーにおいて壁と係合している壁の掘削孔及び基礎分割の切断線を示す。Figure 62 shows the cut lines of the borehole and base division of the wall engaging the wall in the added free ground and ring girder. 図63は、壁の耐荷重の救済術を実施するためのほぞの補充時にグラウンドビームにおける片面枠、ほぞを収納できる片面ほぞ収納台及びほぞカバープレートを示す。FIG. 63 shows a single sided frame in the ground beam, a single sided tenon storage cradle and tenon cover plate capable of storing the tenon at the time of refilling the tenon to perform load bearing relief of the wall. 図64は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。FIG. 64 shows the interaction of the wall bearing type ring girder, refill tenon, tenon storage and main building compounded in the original building against the free ground of the aft bearing foundation in an earthquake. 図65は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。FIG. 65 shows the interaction of the wall bearing type ring girder, refill tenon, tenon storage and main building compounded in the original building against the free ground of the aft bearing foundation in an earthquake. 図66は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。FIG. 66 shows the interaction of the wall bearing type ring girder, refill tenon, tenon housing and main building compounded in the original building against the free ground of the rear bearing foundation in an earthquake. 図67は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。FIG. 67 shows the interaction of the wall bearing type ring girder, refill tenon, tenon storage and main building compounded in the original building against the free ground of the aft bearing foundation in an earthquake. 図68は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。Figure 68 shows the interaction of the wall bearing type ring girder, refill tenon, tenon storage and main building compounded in the original building against the free ground of the aft bearing foundation in an earthquake. 図69は、元の建物に配合された壁ベアリング型のリングガーダー、補充ほぞ、ほぞ収納台及び本館が後部ベアリング基礎の遊離グランドに対する地震における相互作用を示す。Figure 69 shows the interaction of the wall bearing type ring girder, refill tenon, tenon storage and main building compounded in the original building against the free ground of the aft bearing foundation in an earthquake. 図70は、ウォールスカートの耐荷重の救済術を実施するためのほぞの補充時におけるグラウンドビームの四辺枠、ほぞを収納できる四辺ほぞ収納台を示す。FIG. 70 shows the four sides of the ground beam at the time of refilling the tenon for performing load relief of the wall skirt, and the four-side tenon storage stand capable of storing the tenon. 図71は、ウォールスカートの耐荷重の救済術を実施するためのほぞの補充時におけるグラウンドビームの四辺枠、ほぞを収納できる四辺ほぞ収納台を示す。FIG. 71 shows the four sides of the ground beam at the time of refilling the tenon for performing load relief of the wall skirt, and the four-side tenon storage stand capable of storing the tenon. 図72は、本館及び二重基礎のグラウンドビームのために設計された壁の掘削孔及び分割位置の切断線を示す。FIG. 72 shows a cut line of the borehole and the dividing position of the wall designed for the ground beam of the main building and the double foundation. 図73は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 73 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図74は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 74 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図75は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 75 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図76は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 76 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図77は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 77 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図78は、ウォールスカートの耐荷重のグラウンドビームを追加した後の本館、及びほぞ収納台、補充ほぞと二重基礎の遊離グランドとの間の地震における相互作用を示す。FIG. 78 shows the interaction of the main building after the addition of the load-bearing ground beam of the wall skirt, and the tenon storage platform, the earthquake between the refill tenon and the double ground free ground. 図79は、基礎を追加した後の二重基礎と、リサークルリングガーダーや補充ほぞや滑り止め斜面を追加した建物、基礎ベアリングの状況を示す。FIG. 79 shows the situation of a double foundation after adding a foundation, a building with a recircle ring girder, a refill tenon and a non-slip slope, and foundation bearings. 図80は、基礎を追加した後の二重基礎と、リサークルリングガーダーや補充ほぞや滑り止め斜面を追加した建物、基礎ベアリングの状況を示す。FIG. 80 shows the state of a double foundation after adding a foundation, a building with a recircle ring girder, a refill tenon and an antislip slope, and foundation bearings. 図81は、超強風に見舞われた本館に滑り止め斜面の滑り辺が追加された後、本館の複合垂直力のシフト且つつぼの内部における建物、基礎及びほぞの相互作用を示す。FIG. 81 shows the interaction of buildings, foundations and tenons inside the compound vertical force shift and pot of the main building after the non-slip slope's sliding side has been added to the main building experienced a super wind. 図82は、風が止んだ後、本館が複合垂直力で自動的に調整さ元の位置に戻る状況を示す。FIG. 82 shows a situation where the main building automatically returns to the original adjusted position by combined vertical force after the wind has stopped. 図83は、津波の潮汐により動かされた後、本館が全体滑り、ほぞ補充及び滑り止め斜面により停止される状況を示す。FIG. 83 shows a situation where the main building is stopped by the general slip, tenon refilling and non-slip slope after being moved by the tsunami tide.

図面の説明を明確にするために、図面において、災害に対して誇張の手法を使用している。現実の生活の中では、そのように大きな災害は起こらない。図面において、太い矢印は震災の波を表し、小さな矢印は補充ほぞ線を表し、細い矢印は風力トルク線を表し、点線の矢印は複合風力線と津波潮汐の線を表し、矢印のない線は機能的な線である。   In order to make the description of the drawings clear, the drawings use an exaggeration approach to disasters. In real life, such a big disaster does not occur. In the drawing, thick arrows represent earthquake waves, small arrows represent replenishment mortise lines, thin arrows represent wind torque lines, dotted arrows represent combined wind lines and tsunami tide lines, and lines without arrows. Is a functional line.

まず、サイズに関する符号がつけられていない、ほぞの分類を確定する。候補となるほぞは生地が堅くて、比重が大きいはずである。直径は1cm未満であり、粒の大きさによって名をつけられる。直径が1cmよりわずかに小さいの場合は大豆ほぞと呼ばれ、直径が黄豆と似た場合は黄豆ほぞと呼ばれ、直径が緑豆と似た場合は緑豆ほぞと呼ばれ、小麦粒と似た場合は小麦粒ほぞと呼ばれ、屑米と似た場合は屑米ほぞと呼ばれ、粟米と似た場合は粟米ほぞと呼ばれる。   First, determine the tenon classification that is not labeled for size. The candidate tenon should have a firm texture and a high specific gravity. The diameter is less than 1 cm and is named by the particle size. If the diameter is slightly smaller than 1 cm, it is called soybean tenon, if its diameter is similar to yellow bean it is called yellow bean tenon, if its diameter is similar to green bean it is called green bean tenon, if it resembles wheat grain Is called wheat grain tenon, similar to scrap rice is called scrap rice tenon, and similar to rice bran is called rice bran tenon.

次に、新築建物のプレインストールは統合する方法でワンステップに介入し、旧築の再建や救済は全体のものを分割して設ける方法でステップバイステップで設け、分割結合の方法で埋め込むか、または、貼り付けて複合するか、または、携帯して離れる方式で浸透される。
そのうち、逆向きほぞの建物、基礎の分合割れ目が細長いのは線分割であり、グラウンドビームの耐荷重は壁の耐荷重を指す。即ち、壁の足を支点にし、ウォールスカートの下においてほぞなしで移動する。分合割れ目が太いのはスペース分割であり、グラウンドビームの耐荷重はウォールスカートの耐荷重を指す。即ち、グラウンドビームウォールスカートを支点にし、スタンド移動面は元の基礎よりはるかに広く、ウォールスカートの下においてほぞの移動がある。
Next, pre-install of new buildings intervenes in one step in an integrated way, reconstruction of old construction or relief is provided step by step in a method of dividing the whole thing and embedded or embedded by a division coupling method, Alternatively, it may be pasted and composited, or it may be carried away by hand.
Among them, the reverse tenon building, the joint split of the foundation is elongated in the line division, and the load capacity of the ground beam refers to the load capacity of the wall. That is, with the foot of the wall as a fulcrum, it moves without a tenon under the wall skirt. The thick split joints are space divisions, and the load capacity of the ground beam refers to the load capacity of the wall skirt. That is, with the ground beam wall skirt as a fulcrum, the stand travel surface is much wider than the original foundation and there is a tenon travel under the wall skirt.

異なる災害と異なる防災効果によって、本発明におけるほぞなし補充メカニズムとほぞあり補充メカニズムは、逆向きほぞとして段階的有効と恒久的有効の二種類になるようにする。
体に合わせて服を作る仕立て屋のように、症状を当てて処方を决める医者のように、建築家は異なる災害に従って形而上学にかってに選択するのではなく弁証的に選択すべきである。
選択的には、以下をおすすめする。
By means of different disasters and different disaster prevention effects, the tenonless replenishment mechanism and tenoning replenishment mechanism in the present invention are made into two types of reverse tenon, ie, stepwise effectiveness and permanent effectiveness.
Like a tailor who makes clothes to the body, like a doctor who gives prescriptions and gives symptoms according to different symptoms, architects should make a dialectic choice rather than to choose metaphysically according to different disasters .
Optionally, we recommend the following.

新築の倒壊しやすい住宅における統合型の免震介入
逆向きほぞ1の技術プロセスは以下の通りである。図11に示すように、ほぞブロッキングコンクリートプレートを鋳造し、コンクリートプレートの上向き粗面と外向き粗面には露出鉄筋を保留し、下向き平滑面と内向き平滑面のプレート面には固定とロックに使用されるはねじ穴がある。コンクリートプレートの高さはリングガーダーの50%であるべきであり、厚さは4-5cmであるべきであり、長さはお互いに異なり、反対側のコンクリートプレートと交差する方法で接続されている。平滑面はガラススチール金型か鋼プレート金型によって作成され、粗面は粘土モルタルかコンクリートスラリーによって同じ金型で分かれている。メンテナンス後、きれいになるまで洗浄する。
Integrated Seismic Isolation Intervention in a Newly-Damaged Home The reverse tenon 1 technical process is as follows. As shown in FIG. 11, cast tenon blocking concrete plates, retain exposed reinforcing bars on the upward and downward rough surfaces of the concrete plate, and fix and lock on the plate surfaces of the downward and inward smooth surfaces. There are screw holes to be used. The height of the concrete plate should be 50% of the ring girder, the thickness should be 4-5 cm, the length is different from each other and connected in a way that intersects the opposite concrete plate . The smooth surface is created by a glass steel mold or steel plate mold and the rough surface is separated by clay mortar or concrete slurry in the same mold. After maintenance, wash until clean.

リングガーダーの建物とベアリング基礎には、内部及び外部の遊離グランドが含なれる。地震の自由波の波長を回避し、リングガーダー型を架設して置く。膨張した合板を同じ平面にある金型の内部に入れる。合板を上へ移動し、ほぞブロッキングプレートに移入し、内側の滑らかな面と外側の粗い面に分け、両側はボルトで固定且つロックする。二枚のプレートの間はほぞの溝であり、二枚のプレートの外側はリングガーダーのウォールスカートである。ほぞの溝中の合板を取り除き、金型の内部の合板にプラスチックフィルムを覆い、切り口に達するまで大豆ほぞを溝内に入れ、リングガーダーの鉄筋及び保留露出鉄筋を結び、プレートの切り口までコンクリートを充填する。黄豆ほぞの両側にそれぞれ二つの屑米ほぞを入れ、黄豆ほぞをタッピングする。溝に黄豆ほぞを追加してリッジパンの形を作り、プラスチックフィルムを覆い、それを石で押し伸ばす。全負荷になるまで両側から中央まで金型にコンクリートを充填する。ほぞの上のフィルムを慎重に保護しながら、振動棒によってコンクリートをタッピングする。   The ring girder building and bearing foundations include internal and external free ground. Avoid the wavelength of the free wave of the earthquake and set up a ring girder type. Place the expanded plywood inside the mold in the same plane. The plywood is moved upwards, transferred to the tenon blocking plate, divided into an inner smooth surface and an outer rough surface, bolted and locked on both sides. Between the two plates is a tenon groove and the outside of the two plates is a ring girder wall skirt. Remove the plywood in the tenon groove, cover the plastic film on the inner plywood of the mold, put the soybean tenon in the groove until it reaches the cut, tie the ring girder's reinforcing bar and the holding exposed reinforcing bar, and concrete to the plate's cut To fill. Put two scraped rice tenons on both sides of the yellow bean tenon, and tap the yellow bean tenon. Add a yellow bean tenon to the groove to create a ridge pan shape, cover the plastic film, and stretch it with stone. Fill the mold with concrete from both sides to the center until full load. While carefully protecting the film on the tenon, tap the concrete with a vibrating bar.

本館が完成されたら、乾燥収縮されている合板を取り出す。図12の耐震グラウンドビームは、フレームせん断フレームで固定されたあらゆる倒壊しやすい建物に適する。
逆向きほぞ2の技術プロセスは以下の通りである。図14と同様の方法によって、ほぞプレス翼を備えたほぞほぞブロッキングプレートを製作する。グラウンドビーム1と同じプロセスで、翼を備えたほぞほぞブロッキングプレートの内側は滑らかな面であり、外側は粗い面であり、外側の細くなった合板と内側の屑米ほぞの層上に広がる。ボルトで固定し、ほぞの溝を作る。グラウンドビームの型枠を架設し、鉄筋及び保留露出鉄筋を結ぶ。ほぞの中の余分な屑米ほぞを取り除き、切り口まで緑豆ほぞを入れ、切り口までなるようにコンクリートを型枠に充填する。緑豆ほぞの両側に二周の屑米ほぞを入れ、タッピングする。リッジパンの形になるまで黄豆ほぞを追加し、プラスチックフィルムを覆い、石で押し伸ばす。全負荷になるまで両側から中央まで金型にコンクリートを充填する。ほぞの上のフィルムを慎重に保護しながら、振動棒によってコンクリートをタッピングする。本館が完成されたら、両側の細い合板を取り出す。図15の耐震性グラウンドビームは、耐震期におけるウォールスカートの耐荷重やウォールスカートの滑りの点でグラウンドビーム1よりも効果的である。
When the main building is completed, take out the plywood that has been shrunk dry. The seismic ground beam of FIG. 12 is suitable for any collapsible building secured by a frame shear frame.
The reverse tenon 2 technical process is as follows. A tenon tenon blocking plate with tenon press wings is produced in the same manner as in FIG. In the same process as ground beam 1, the inner side of the tenon blocking plate with wings is a smooth surface, the outer side is a rough surface, and extends over the layers of outer narrowing plywood and inner scrap rice tenon. Fix with bolts and make tenon grooves. Build the ground beam formwork and connect the rebar and the rebar exposed rebar. Remove the excess scraped rice tenon in the tenon, put the green bean tenon to the cut end, and fill the formwork with concrete to reach the cut end. Put two rounds of scrap rice tenon on both sides of the green bean tenon and tap. Add the yellow bean tenon until it is in the shape of a ridge pan, cover the plastic film and push out with stone. Fill the mold with concrete from both sides to the center until full load. While carefully protecting the film on the tenon, tap the concrete with a vibrating bar. When the main building is completed, take out thin plywood on both sides. The earthquake resistant ground beam of FIG. 15 is more effective than the ground beam 1 in terms of load resistance of the wall skirt during the earthquake resistant period and slippage of the wall skirt.

既存の建物の免震、「手抜き」工事の救助における全体のものをばらばらにする補強
粘土建物、れんが造りのオープンポケット型建築物、混合建物、高床式建物、石造建物の既存の建物における逆向きほぞ3の技術プロセスは、上記のコンクリート建物と同じである。元の基礎の上に内側と外側の遊離グランドを建てられた後に、本館のフレームせん断フレームを追加建築する。まずグラウンドビームを追加し、次にフレームを追加するとき、グラウンドビーム部はセメントなしの非固化混合と灰色の粘土でセグメント金型に充填する。グラウンドビームの幅は壁の幅の3倍になるべきである。フレームせん断フレームが凝固された後に金型を除去する。その後、番号に従い中央から両側まで順番に、内側と外側同時に粘土グラウンドビームをコンクリートビームに変える。
Seismic isolation of existing buildings, reinforcement to break down the whole thing in the rescue of “hands-off” constructions Reverse direction in existing buildings of clay buildings, brick open pocket buildings, mixed buildings, stilts, stone buildings The tenon 3 technical process is the same as the above concrete building. After the inner and outer free grounds are built on the original foundation, the frame shear frame of the main building will be additionally built. When adding the ground beam first and then adding the frame, the ground beam section is filled into the segmented mold with cement free non-solidified mix and gray clay. The width of the ground beam should be three times the width of the wall. Remove the mold after the frame shear frame is solidified. Then, according to the numbering, turn the clay ground beam into a concrete beam at the same time inside and outside simultaneously, from center to both sides.

非衝撃式掘削機により、取り除かれた粘土ビームの番号付き壁を掘削し、二つの穴の間に残った角を切り取り、残留物をきれいにした後に型枠を再度覆い、中央部のほぞがパンのように膨張するまで小麦粒ほぞを型枠に入れる。ほぞの盛り上がりをプラスチックフィルムで覆い、型枠の両側に近い位置で細い膨張した木板でフィルムを隔ててほぞの盛り上がりを絞り、残りのフィルムで木棒を覆う。カバーフィルムの左右両端のジョイントにそれぞれ複数の小袋のほぞを詰め込み、ほぞの漏れを防ぐために押出する。内側と外側のグラウンドビームの連結鉄筋を結び、小袋のほぞのフィルムを覆う。全負荷になるまで中央から両端までコンクリートをほぞの中に充填し、両端から中央まで振動棒によってコンクリートをタッピングする。番号に従い同様に操作する。   With a non-impact drilling machine, excavate the numbered wall of the removed clay beam, cut out the remaining angle between the two holes, clean the residue and re-cover the formwork, with the tenon in the center pan Put the wheat grain tenon into the mold until it expands like. Cover the rise of the tenon with plastic film, separate the film with a thin expanded wooden board close to the sides of the formwork, squeeze the rise of the tenon, and cover the wooden rod with the remaining film. The tenons of a plurality of sachets are respectively packed into the joints at the left and right ends of the cover film and extruded to prevent tenon leakage. Tie the connecting bars of the inner and outer ground beams and cover the tenon film of the sachet. Fill the tenon with concrete from the center to both ends until full load and tap the concrete with a vibrating rod from both ends to the center. Operate similarly according to the number.

二つの部分を接続するときは、ほぞを入れた後に小袋のほぞの取り出す。ほぞを取り出した後に構造物が空にならないように、小袋のほぞを取り出すと同時にコンクリートを充填する。内壁と外壁の両方が同時に行われ、各耐力壁が同じ方法で行われる。図26、図27における追加グラウンドビームの耐震効果は、グラウンドビーム1及びグラウンドビーム2と同じである。   When connecting two parts, take out the tenon of the sachet after putting the tenon. Take out the tenon of the sachet and fill it with concrete at the same time so that the structure does not empty after taking out the tenon. Both inner and outer walls are done simultaneously, each bearing wall being done in the same way. The seismic effects of the additional ground beams in FIGS. 26 and 27 are the same as ground beam 1 and ground beam 2.

逆向きほぞ4の技術プロセスは以下の通りである。図28に示すように、ほぞプレスプレートを予め作り、同様に上は滑らかな面であり、下が粗い面であり、露出鉄筋を保留する。番号付き壁を切断し、残渣を清掃した後、元の型枠内に屑米ほぞを一層の薄く展開し、ほぞプレスプレートを元の金型に移入し、内側と外側の両方にそれぞれ膨張した合板を詰める。ほぞプレスプレートを押出し、割れ目から溢れた余分な屑米ほぞを取り出す。小麦粒ほぞを入れ、割れ目の上に蒸しパン形の盛り上がりを作る。蒸しパン形の盛り上がりの上にプラスチックフィルムを覆い、石で押し伸ばす。グラウンドビームの内側と外側の連結鉄筋及び保留露出鉄筋を結び、型枠を覆い、全負荷になるまでコンクリートを中央から両端にかけて充填し、タッピングする。プロセスは前の段落と同じである。該当ほぞプレスプレートのグラウンドビームの地震におけるほぞの滑りは、新しい鋳造されたほぞなしプレートのグラウンドビームより強い。   The reverse tenon 4 technical process is as follows. As shown in FIG. 28, a tenon press plate is prefabricated, again with a smooth surface at the top and a rough surface at the bottom, retaining exposed reinforcing bars. After cutting the numbered wall and cleaning the residue, the waste rice tenon was further spread thinly in the original formwork, the tenon press plate was transferred to the original mold, and it was expanded to both inside and outside respectively Pack the plywood. Extrude the tenon press plate and take out the excess scraped rice tenon that overflowed from the crack. Put the wheat grain tenon, and build a steamed bread-shaped climax on the crack. Cover the plastic film on top of the steamed bread shape and push it out with stone. Connect the inside and the outside of the ground beam with the connecting and holding rebar, cover the formwork, fill the concrete from the center to both ends until full load, and tap. The process is the same as in the previous paragraph. The tenon slip in the earthquake of the ground beam of the corresponding tenon press plate is stronger than the ground beam of the new cast tenon plate.

逆向きほぞ5の技術プロセスは以下の通りである。セグメント金型と同じ長さである図11の短いほぞブロッキングプレートを予め作る。四枚のプレートで壁内と壁外の二つのほぞの溝を分割し、壁の足やビームスカートやほぞブロッキングプレートの下を含めて膨張した合板を詰め、プラスチックフィルムで覆う。両者はいずれもほぞの溝へ伸ばさない。ほぞブロッキングプレートの内側は滑らかな面であり、外側は粗い面であり、ボルトを固定した後、切断壁とほぞブロッキングプレートの下側の位置の間に5cmの隙間を保つ。グラウンドビームの内側と外側の連結鉄筋及び保留露出鉄筋を結び、壁の下の空のスロットに沿ってコンクリート充填し、耐力壁と接触するようにタッピングする。番号に従ってすべての壁の足を取り替えた後、小麦粒ほぞを内側と外側の滑り溝に入れ、小麦粒のほぞの両側に少量の粟米ほぞを入れ、ほぞの層をタッピングし、リッジパンの形になるように小麦粒のほぞを追加し、プラスチックフィルムを覆い、石で押し伸ばす。元の型枠を再び覆い、両側から壁に沿ってコンクリートを充填し、全負荷になったら振動棒によってタッピングする。   The reverse tenon 5 technical process is as follows. Prefabricate the short tenon blocking plate of FIG. 11 which is the same length as the segment mold. Divide the inner and outer tenon grooves with four plates, and fill the expanded plywood including the foot of the wall and under the beam skirt and tenon blocking plate, and cover with plastic film. Both do not extend into the tenon groove. The inner side of the tenon blocking plate is a smooth surface and the outer side is a rough surface, and after fixing the bolts, a 5 cm gap is kept between the cutting wall and the lower position of the tenon blocking plate. Connect the inside and the outside of the ground beam with the connecting and holding rebars, fill in concrete along the empty slot below the wall, and tap it to contact the load bearing wall. After replacing all the wall feet according to the number, put the wheat grain tenon in the inside and outside sliding groove, put a small amount of glutinous rice tenon on both sides of the wheat grain tenon, tap the tenon layer and make a ridge bread shape Add wheat grain tenon to cover, cover plastic film, and stretch with stone. Cover the original form again, fill with concrete along the wall from both sides and tap with a vibrating rod when full load.

建設が完了した後、乾燥収縮されている合板を取り出す。本発明に係る逆向きほぞのグラウンドビームは、地震の縦波があるときは自動的にこぼれ、本館の壁の耐荷重が壁、ウォールスカートの共同のベアリングとなり、地震横波や大小縦波を捕えることになる。   After construction is complete, take out the plywood that has been shrunk dry. The reverse tenon ground beam according to the present invention automatically spills when there is an earthquake longitudinal wave, and the load bearing capacity of the main building wall becomes a joint bearing of the wall and wall skirt, and catches the seismic transverse wave and the large longitudinal wave It will be.

逆向きほぞ6の技術プロセスは以下の通りである。同様に番号に従って固定点で切断し、壁の足の中の残留物を取り除く。遊離グランド上の内側と外側のほぞブロッキングプレートは、内側が滑らかで外側が粗い、壁を越えて立っている。膨張した合板を元の型及びほぞブロッキングプレートの下に詰め、プラスチックフィルムを覆う。壁の外縁とほぞブロッキングプレートとの間に外側に沿って3cmの隙間があり、壁の下縁とほぞブロッキングプレートの間に下側に沿って3cmの隙間がある。ボルトが固定された後、上端に達するまで小麦粒のほぞを滑り溝に入れ、小麦粒ほぞの両側に少量の粟米ほぞを入れる。小麦粒のほぞをタッピングし、高さを補足しないまま、ほぞの表面層にプラスチックフィルムを覆い、内側と外側のビームを結び、鉄筋を連結し、露出鉄筋を保留した後、型枠を覆い、ほぞを両側にほぞを押す。型にコンクリートを入れ、ほぞのフィルムを保護し、全負荷になるまで中央から両側までタッピングする。その後、番号に従ってグラウンドビームを取り替える。ほぞを失うことによって起こされる空を防ぐために、セグメントのグラウンドビームを変更するとき、先にほぞを入れ、次にほぞ袋を取り出す。全部の段落が密着されたら、乾燥収縮されている合板を取り出す。これにより、リングガーダー全体が浮き沈む。
本リングガーダーが地震縦波を受けると、元の本館の壁の耐荷重はウォールスカートの耐荷重と変換される。同期に地震における大小縦波、横波を捕える以外に、本逆向きほぞの滑り量がより多い。
The reverse tenon 6 technical process is as follows. Similarly, cut at the fixed point according to the number and remove the residue in the wall foot. The inner and outer tenon blocking plates on the loose ground are smooth inside and rough outside and stand beyond the wall. Pack the expanded plywood under the original mold and tenon blocking plate and cover the plastic film. There is a 3 cm gap along the outside between the outer edge of the wall and the tenon blocking plate and a 3 cm gap along the lower side between the lower edge of the wall and the tenon blocking plate. After the bolt is fixed, put the wheat grain tenon into the sliding groove until the top end is reached, and put a small amount of glutinous rice tenon on both sides of the wheat grain tenon. Tapping the wheat grain tenon, covering the plastic film on the tenon surface layer, tying the inner and outer beams, connecting the reinforcing bars, holding the exposed reinforcing bars, then covering the formwork, without complementing the height Push the tenon to the sides. Put the concrete in the mold, protect the tenon film, and tap from the center to both sides until full load. Then replace the ground beam according to the number. When changing the ground beam of the segment to prevent the sky caused by losing the tenon, put the tenon first and then take out the tenon bag. When all the paragraphs are in close contact, take out the plywood which has been shrunk dry. As a result, the entire ring girder floats up and down.
When this ring girder receives seismic longitudinal waves, the load capacity of the original main building wall is converted to the load capacity of the wall skirt. In addition to capturing large and small longitudinal waves and shear waves in an earthquake synchronously, the amount of slippage of this reverse tenon is larger.

城及びハイツ建物の統合耐震
逆向きほぞ7の技術プロセスは以下の通りである。図40に示すように、ガルウィングプレートを予め作り、同様に内側は滑らかな面であり、外側は粗い面であり、露出鉄筋を保留する。リングガーダーに建てられた遊離グランドの上で、ガルウィングプレートは本館のベアリングに基づいてリングに接続され、角の余分な部分を切り取り、型枠を取り巻き、ガルウィングプレートの外側の脇の下の位置から型枠までそれぞれ膨張した合板を充填し、プラスチックフィルムを覆い、ほぞの溝にはみ出さず、割れ目からガルウィングプレートの脇下の位置まで屑米ほぞを入れる。リングガーダーの鉄筋及び保留露出鉄筋を結び、型枠の両側から中央までコンクリートを入れる。割れ目から振動棒によって屑米ほぞを振動させ、いっぱいになるまで小麦粒のほぞを埋め、型枠にコンクリートを追加し、割れ目にほぞ補充シリンダーを取り付け、保留露出鉄筋を結び、全負荷になるまで型枠にコンクリートを入れ、緑豆ほぞをほぞ補充シリンダーに入れ、コンクリートを振動させた後、シリンダー内のほぞを振動させるとともに、ほぞ止めルーズリーフをロックする。
The integrated seismic and reverse tenon 7 technological processes of the castle and the Heights building are as follows. As shown in FIG. 40, the gull wing plate is prefabricated, again with a smooth surface on the inner side and a rough surface on the outer side to retain the exposed rebar. On the free ground built on the ring girder, the gull wing plate is connected to the ring based on the bearings of the main building, and cut off the extra part of the corner, encircling the formwork, the formwork from the underarm position on the outside of the gullwing plate Fill each with the expanded plywood, cover the plastic film, do not protrude into the groove of the tenon, and place the waste rice tenon from the crack to the position under the gull wing plate. Connect the ring girder rebar and retained exposed rebar, and put the concrete from both sides of the form to the center. Vibrate the waste rice tenon with a vibrating bar from the crack, fill the tenon of wheat grain until full, add concrete to the form, attach the tenon refill cylinder to the crack, tie the rebar exposed rebar, until full load Put the concrete in the form, put the green bean tenon into the tenon refill cylinder, vibrate the concrete, then vibrate the tenon in the cylinder and lock the tenon stop loose leaf.

本館が完了された後、乾燥収縮されている合板を取り出す。本発明におけるグラウンドビームの逆向きほぞは、本グラウンドビームを通るすべての地震波を捕えることができるだけでなく、流失されたほぞを補足することによって耐震機能を強化し、補充ほぞの直径を大きくし、揺れが強いほど免震の機能は強くなる。
After the main building is completed, take out the plywood that has been shrunk dry. The reverse tenon of the ground beam in the present invention not only can capture all the seismic waves passing through this ground beam, but also strengthens the earthquake resistance function by complementing the lost tenon, and increases the diameter of the refill tenon, The stronger the shaking, the stronger the seismic isolation function.

古城、古いハイツ建物の免震救済
逆向きほぞ8の技術プロセスは以下の通りである。図47及び49に示すように、ほぞプレスプレート、ほぞ補充シリンダーを予め作る。同様にほぞ補充シリンダーの外は粗い面であり、裏は滑らかな面である。外部のグランドを基準に遊離グランドを再建する。遊離グランドが外部のグランドより低い場合は、下水道を見直すべきである。中央から両側へ番号順に壁を切断し、上の線から下の線へ、右から左へ余分な壁を切って、残余を清掃する。グラウンドビームのスチールフレームを結ぶ。屑米ほぞをカット部分の下に敷き込んだ後、ほぞプレスプレートの回りに約5cmの細かい膨張した合板を置き、ほぞプレスプレートを移動し合板を押さえる。合板の上にセグメント化された層状の方法でリングガーダーを鋳造する。
Seismic Isolation Relief for Old Castles and Old Heights Buildings The reverse tenon 8 technical processes are as follows. As shown in FIGS. 47 and 49, a tenon press plate, tenon refill cylinder is prefabricated. Similarly, the outside of the tenon refill cylinder is rough and the back is smooth. Reconstruct the free ground based on the external ground. If the free ground is lower than the external ground, the sewer should be reviewed. Cut the walls in numerical order from the center to both sides, cut the excess wall from the top line to the bottom line, right to left, and clean the rest. Tie the ground beam steel frame. After scraping the waste rice tenon under the cut part, place about 5 cm of fine expanded plywood around the tenon press plate, move the tenon press plate and hold down the plywood. The ring girder is cast in a segmented layered manner onto the plywood.

まず、割れ目にほぞ補充シリンダーを取り付く。リングガーダーのスチールスケルトン及び保留露出鉄筋を結び、型枠を閉め、型枠の両端と周辺に小さなほぞ袋を入れ、鋳造されたコンクリートがこぼれないようにする。小さなほぞ袋の型の中にコンクリートを充填し、全負荷になるまでほぞ補充シリンダーに屑米ほぞを充填する。振動棒によってシリンダー内部のほぞをタッピングし、ほぞ止めルーズリーフを取り付ける。該部分の耐力壁がコンクリートで3cmの高さに埋まるまで、ほぞ袋の型内のコンクリートをタッピングする。四方が連結されるまでこれらのステップを繰り返し、すべての小さなほぞ袋を取り出す。不足している部分に鉄筋コンクリート連結を追加し、全負荷になるまで型内にコンクリートを充填し、振動棒によってタッピングする。該逆向きほぞによれば、いずれの地震の横波と縦波を捕えることができ、いずれの流失されたほぞを補うことができる。本館が完了された後、乾燥収縮されている合板を取り出し、耐震の効果は永続的に存在する。
First, attach the tenon refill cylinder to the split. Tie the ring girder steel skeleton and the retained exposed rebar, close the formwork, put small tenon bags around the formwork at both ends and around, and prevent the cast concrete from spilling. Fill concrete in a small tenon bag mold and fill the tenon refill cylinder with scrap rice tenon until full load. Tap the tenon inside the cylinder with a vibrating rod and attach the tenon stop loose leaf. Tapping the concrete in the mold of the tenon bag until the load-bearing wall of the part is filled with concrete at a height of 3 cm. Repeat these steps until all four sides are connected and take out all the small tenon bags. Add a reinforced concrete connection to the missing part, fill the mold with concrete until full load and tap with a vibrating rod. The reverse tenon can capture the shear and longitudinal waves of any earthquake and can compensate for any runaway tenons. After the main building is completed, take out the plywood which has been dried and shrunk, and the anti-seismic effect is permanent.

城のハイツ旧築、元のグランドと既存のグラウンドビームは一致、より簡単なローカル改造
逆向きほぞ9の技術プロセスは以下の通りである。まず、元の建物の壁の耐荷重をセグメントベアリングに換え、非衝撃型壁掘削機によって穴を開けた後に元の支点のコンクリートを破壊し、すべての壁の耐荷重と破壊された箇所のスチールフレームを保留する。残留物を除去した後、元の支点をコアとして遊離グランドを構築し、遊離グランド上の元の壁の厚さの3倍を超える厚さの基礎を構築する。即ち、内側と外側のグラウンドビームと元の壁の足の幅を標準の底とし、スチールフレームの下に幅5cmの膨張した合板を四枚配置し、新しいグラウンドビームの周囲を形成される。屑米ほぞを円周の内側に入れ、ほぞプレスプレートを移入し、割れ目に合わせてほぞ補充シリンダーを取り付け、一体になるようにほぞ補充シリンダー、ほぞプレスプレートと元のグラウンドビームのスチールフレームを結び付ける。型枠を押し付け、型内にコンクリートを入れ、屑米ほぞをほぞ補充シリンダーに補充し、振動棒によってタッピングし、ほぞ止めルーズリーフを取り付ける。振動棒によって全負荷になるまでコンクリートをタッピングする。
Castle Heights Old, original ground and existing ground beams coincide, easier local remodeling The reverse tenon 9 technical processes are as follows. First, change the load bearing capacity of the original building wall to a segment bearing, puncture the concrete of the original fulcrum after drilling by a non-impact wall drilling machine, and load bearing of all walls and steel of the broken point Hold the frame. After removing the residue, build a free ground with the original fulcrum as the core and build a foundation that is more than 3 times the thickness of the original wall on the free ground. That is, the width of the inner and outer ground beams and the foot of the original wall is taken as the standard bottom, and four expanded plywood sheets 5 cm wide are placed under the steel frame to form the periphery of the new ground beam. Put the waste rice tenon inside the circumference, transfer the tenon press plate, attach the tenon refilling cylinder according to the crack, connect the tenon refilling cylinder, tenon press plate and the original ground beam steel frame so as to be integrated . Press the form, put the concrete into the mold, refill the waste rice tenon into the tenon refill cylinder, tap with the vibrating rod, and attach the tenon stop loose leaf. Tapping the concrete to full load with a vibrating rod.

すべての施工が竣工された後、支点は元の位置に戻り、乾燥収縮されている合板を取り出す。支点のほぞプレスプレートの下端で各点に沿って遊離グランドとリングガーダーとの間の接続を切断機で切断し、ベアリングポイント全体をベアリングポイントの押圧結合されたほぞに移動させる。切断する時は、セグメント別に切断点に同じ厚さのスチールバーが充填され、竣工された後、ベアリングポイントの移動による大きな変位を防ぐためにセグメント別にスチールバーが取り出される。これにより、建物全体が押圧結合されたほぞとともに地震に伴う場合、縦方向と横方向に移動し、ほぞを補うことができる。
After all construction is completed, the fulcrum returns to its original position and takes out the plywood that has been shrunk dry. The connection between the free ground and the ring girder is cut with a cutting machine along each point at the lower end of the tenon press plate of the fulcrum, and the entire bearing point is moved to the press-bonded tenon of the bearing point. At the time of cutting, the steel bar of the same thickness is filled at the cutting point for each segment, and after completion, the steel bar is taken out for the segment to prevent large displacement due to the movement of the bearing point. Thus, when the whole building is pressed and coupled with the tenon accompanied by the earthquake, it can move in the longitudinal direction and the lateral direction to compensate for the tenon.

中高層旧築の免震救済
逆向きほぞ10の技術プロセスは以下の通りである。図61及び図63に従って、片面枠及び片面ほぞ収納台を予め作る。片面枠は内面は滑らかで外面は粗く、露出鉄筋を保留し、片面ほぞ収納台の内側と外側の表面はいずれも滑らかである。
遊離グランドを再建し、遊離グランドは地面と接触することができるし、地面と接触することなく設置することもできる。しかし、高すぎない必要がある。地面と接触する遊離グランドはコンクリートグランドで大丈夫であり、地面と接触しない遊離グランドはスチールフレームのコンクリートで鋳造でなければならない。左右の長さは地震横波の移動や建物の支持に十分なスペースでなければならない。
The seismic isolation remedies of middle-to-high-old buildings are as follows. In accordance with FIGS. 61 and 63, a single-sided frame and a single-sided tenon holder are made in advance. The single sided frame is smooth on the inside and rough on the outside, retains exposed rebar, and the inside and outside surfaces of the single side tenon holder are smooth.
The free ground can be rebuilt, and the free ground can be in contact with the ground, or can be installed without contact with the ground. But it should not be too high. The free ground in contact with the ground is fine with concrete ground, and the free ground not in contact with the ground must be cast with steel frame concrete. The left and right length should be sufficient for seismic shear movement and building support.

非衝撃型壁掘削機によって遊離グランドの上の耐力壁で穴を開け、壁ベースで分割線を切り、壁の内外を通じる。下側の壁の穴は遊離グランドと約10cmの落差を保ち、必要な数と位置は設計に合わせて設定すべきである。分割線を切断するとともに、セグメントごとに同じ厚さの鋼片を埋め込み、埋め込み工程が終了した後に、余分な露出部分を切断機で切断する。切断線と遊離グランドとの間に落差がない。   Drill a hole in the load bearing wall above the free ground with a non-impact wall drilling machine, cut the dividing line at the wall base, and pass through the inside and outside of the wall. The holes in the lower wall should be about 10 cm apart from the free ground, and the number and location needed should be set according to the design. The dividing line is cut, and a steel strip of the same thickness is embedded in each segment, and after the embedding step is completed, the extra exposed portion is cut by a cutting machine. There is no drop between the cutting line and the free ground.

片面枠を設計位置に移入し、新しいグラウンドビームの鉄筋スチールフレームを結び、内側及び外側のグラウンドビームの接続用鉄筋を壁の穴に充填し、鉄筋スチールフレーム及び保留露出鉄筋と結ぶ。型枠を架設して置き、型内の地面に膨張した合板を敷き、プラスチックフィルムを覆う。壁の穴を湿らせ、純粋なセメントペーストを絞り、全負荷になるまでに型内にコンクリートを入れる。片面枠内に大豆ほぞから屑米ほぞまでのいずれのサイズに関する符号がつけられていない、ほぞを入れる。振動棒によってほぞ層とコンクリートををタッピングする。粟米ほぞをフレーム内の周囲に一回り追加する。ほぞ収納台をフレーム内に移動し、前に追加されたのほぞと同じ直径の非標準ほぞをつぼの中に追加する。グラウンドビームのコンクリートを追加し、全負荷になるまで振動棒によってタッピングする。振動棒によってつぼの中のほぞをタッピングし、ほぞカバープレートを覆う。ほぞカバープレートの上のスペースには、より多くのほぞを保管するか又は植木鉢のような装飾を置いて地震の縦波があるときの圧力の強さと複合風力の場合の圧力の浸透を高めることができる。つぼの急激な上昇に起因するほぞの流失を防ぐために、ほぞ収納台のフレームと壁の視点にはほぞの増加に対する制限がある。   Transfer one sided frame to design position, tie new ground beam rebar steel frame, fill inner and outer ground beam connecting rebar into hole in wall, tie with rebar steel frame and hold exposed rebar. Place the formwork by erecting, place the expanded plywood on the ground in the mold and cover the plastic film. Dampen the holes in the wall, squeeze the pure cement paste and put the concrete in the mold until full load. Put a tenon in the single sided frame that does not have a code for any size from soybean tenon to scrap rice tenon. Tapping tenon layer and concrete with a vibrating rod. Add the rice bran tenon one round around the frame. Move the tenon holder into the frame and add a non-standard tenon of the same diameter as the tenon previously added into the jar. Add ground beam concrete and tap with a vibrating rod until full load. Tapping the tenon in the jar with a vibrating rod to cover the tenon cover plate. In the space above the tenon cover plate, store more tenons or place decoration like a flowerpot to increase the strength of pressure and the penetration of pressure in the case of combined wind power when there is an earthquake longitudinal wave Can. In order to prevent the tenon runoff caused by the sharp rise of the wart, there is a limit to the tenon increase in the tenon frame and the wall view.

グラウンドビームが竣工された後、乾燥収縮されている合板を取り出す。頻発風や低頻度地震の到来時には、風力トルクによって複合風力が本館を築き上がり、適時にほぞを耐力壁と新しいグラウンドビームの下の位置に滑って入り込み、地震波の到来に滑り構造体を事前に供給する。壁やウォールスカートによるベアリングは、中高層建物や高層建物に適する。   After the ground beam is completed, take out the plywood that has been shrunk dry. At the arrival of frequent winds and low-frequency earthquakes, wind torque builds up the main building, and timely slides the tenon under the load-bearing wall and the new ground beam and enters the sliding structure in advance for the arrival of seismic waves. Supply. Bearings with walls and wallskirts are suitable for medium and high-rise buildings and high-rise buildings.

逆向きほぞ11の技術プロセスは以下の通りである。図70及び図71に従って、四辺枠及び四辺ほぞ収納台を予め作る。同様に内側は滑らかな面であり、外側は粗い面であり、露出鉄筋を保留し、ほぞ収納台の内側と外側の表面はいずれも滑らかである。
非衝撃型壁掘削機によって新しく建てられた遊離グランド上に必要に応じて壁の穴を開け、建物及び基礎の仕切り線を切る。下の壁の穴と仕切り線の間の落差は約10cmであり、切断線には同時に元と同じ厚さの鋼片を埋め込むべきである。埋め込み工程が終了された後に、露出した鋼片を切断する。分割線と遊離グランドとの間には落差がない。
The reverse tenon 11 technical process is as follows. According to FIG. 70 and FIG. 71, a quadrilateral frame and a quadrilateral tenon storage stand are made in advance. Similarly, the inside is a smooth surface and the outside is a rough surface, which holds exposed reinforcing bars, and the inner and outer surfaces of the tenon holder are smooth.
Drill a hole in the wall as needed on a newly built free ground with a non-impact wall drilling machine and cut the dividing line of the building and foundation. The drop between the hole in the lower wall and the dividing line is about 10 cm, and the cutting line should be embedded with a piece of steel of the same thickness at the same time. After the embedding process is completed, the exposed billet is cut. There is no drop between the dividing line and the free ground.

四辺枠を設計位置に移入し、型枠を架設して置き、膨張した合板を型の底に広げ、プラスチックフィルムを覆う。新しいグラウンドビームの鉄筋を結び、内外のグラウンドビームを連結する鉄筋を壁の掘削孔に詰め保留露出鉄筋及びグラウンドビームスチールフレームと結ぶ。壁の掘削孔を湿らせ、純粋なセメントペーストを絞り、型枠にコンクリートを入れ、必要に応じて四辺枠内に粟米ほぞを除くいずれの一種の非標準ほぞを追加する。振動棒によってほぞ層とコンクリートををタッピングし、ほぞ層の周囲に粟米ほぞを一回り追加する。ほぞ収納台をフレーム内に移入し、いっぱいになるまで前のほぞと同じ直径の非標準ほぞを追加する。型枠内にコンクリートを補充し、全負荷になるまで振動棒によって振動した後、全負荷になるまで振動棒によってつぼの中のほぞをタッピングし、ほぞカバープレートを覆う。ほぞカバープレートの上のスペースには、より多くの予備ほぞ又は植木鉢のような装飾を置くことができる。ほぞ収納台の上と壁の視点にはほぞの増加に対する制限があって、縦波の剥離力を滑りほぞに返す。竣工された後、合板を取り出す。   Transfer the quadrilateral to the design position, set up the formwork and place, expand the expanded plywood to the bottom of the mold and cover the plastic film. Connect the rebars of the new ground beam, and connect the rebars connecting the inner and outer ground beams into the borehole of the wall and connect with the rebar exposed rebar and ground beam steel frame. Dampen the wellbore in the wall, squeeze the pure cement paste, place the concrete in the formwork and add any kind of non-standard tenon except the rice-rice tenon in the quadrilateral if necessary. Tap the tenon layer and the concrete with a vibrating rod, and add one rice flour tenon around the tenon layer. Transfer the tenon holder into the frame and add a non-standard tenon of the same diameter as the previous tenon until it is full. Refill the formwork with concrete and vibrate with a vibrating bar until full load, then tap the tenon in the pot with full vibrating bar to cover the tenon cover plate. In the space above the tenon cover plate, more decoration such as spare tenons or flowerpots can be placed. The top of the tenon holder and the viewpoint of the wall have restrictions on the tenon increase, and return the longitudinal wave peel force to the sliding tenon. After completion, take out the plywood.

逆向きほぞ10と同様に、複合風力は地震波の到来前に風力トルクによって滑りほぞを新しいグラウンドビームの下の位置に入り込む。ウォールスカートの耐荷重の新しいグラウンドビームは、逆向きほぞ10よりもほぞの滑り量が多い。
逆向きほぞ12及び13の技術プロセスは以下の通りである。上記の逆向きほぞ10或いは11におけるが改造は、室内にベアリング柱があるが壁の耐荷重がない場合は、ベアリング柱を再建すべきである。図59又は図60に示すように、新しい内外遊離グランドを建てた後、同様にベアリング柱の周囲及びコラム間又はコラムと壁との間で建てられた遊離グランドを連結し、ベアリング柱に対して角度噛み合いの円形又は長方形のほぞ収納シリンダーを作る。ベアリングコラムの四隅に深さ10cmの穴を開け、円形又は長方形の金型を作る。金型の内側は主にガラス繊維強化プラスチックで作られる。高い滑りさ以外に、型を保つことができる。ほぞシリンダーの壁の高さは10cm以上であり、シリンダーの底にはほぞを投げるための端があり、シリンダーの高さはコラムの高さの90−95%である。
As with the reverse tenon 10, the combined wind power will slip the tenon into position under the new ground beam by wind torque before the arrival of the seismic wave. The load bearing new ground beam of the wall skirt has more tenon slip than the reverse tenon.
The technical process of reverse tenons 12 and 13 is as follows. For retrofits in the reverse tenon 10 or 11 described above, if there is a bearing post in the room but no wall load bearing, the bearing post should be rebuilt. As shown in FIG. 59 or FIG. 60, after building a new free ground inside and outside, similarly connect free grounds built around the bearing columns and between the columns or between the columns and the wall, Make an angular meshed circular or rectangular tenon storage cylinder. Drill 10 cm deep holes at the four corners of the bearing column to make a circular or rectangular mold. The inside of the mold is mainly made of glass fiber reinforced plastic. Besides the high slippage, the mold can be kept. The height of the tenon cylinder wall is more than 10 cm, the bottom of the cylinder has an end for throwing tenons, and the height of the cylinder is 90-95% of the height of the column.

まず、ベアリング柱の分割線を切断し、鋼片を埋め込み、余分な部分を切り取る。内型を配置してコラムシリンダーに固定し、膨張した合板を金型の底部に置き、フィルムを覆う。円形又は長方形のほぞシリンダーのスチールフレームを結ぶ。掘削穴に集束水を入れ、純粋なセメントペーストを壁の穴に入れ、鉄筋を詰め込み、ほぞの鉄筋スチールフレームと結び、ほぞを投げるための端で外側の金型を覆う。外側の金型は、上部と下部に分けてそれぞれ接続されることができる。   First, cut the dividing line of the bearing post, embed the steel billet, and cut off the excess part. Place the inner mold and secure it to the column cylinder, place the expanded plywood on the bottom of the mold and cover the film. Tie the steel frame of a round or rectangular tenon cylinder. Put focused water in the wellbore, put pure cement paste in the hole in the wall, stuff the rebar, tie it to the rebar steel frame in the tenon, cover the outer mold with the end for throwing the tenon. The outer mold can be divided into upper and lower parts and connected respectively.

まず高い所から同じ規格のほぞを金型コアに入れ、次に高い所から下へコンクリートを金型に入れる。まずほぞ層を振動させ、次にコンクリートを振動させて要件を満たす。次に、コラム間やコラムと壁との間で建てられた遊離グランドに膨張した合板を覆い、フィルムを覆い、型板で囲んで、移動中の建物や基礎の変形を伝達するためにベアリングなしで接続されたグラウンドビームを鋳造する。竣工された後、乾燥収縮されている合板を取り出す。
First, put the tenon of the same standard into the mold core from the high point, and then put the concrete into the mold from the high point down. First vibrate the tenon layer and then vibrate the concrete to meet the requirements. Then cover the expanded plywood on a loose ground built between the columns or between the columns and the walls, cover the film, surround the template, and do not have bearings to transfer the deformation of the moving building or foundation Cast the ground beam connected by. After completion, take out the plywood which has been dried and shrunk.

高層建物の分離的な浸透
逆向きほぞ14の技術プロセスは以下の通りである。高層建物の遊離グランドの周囲は、図79に示す設計における傾斜で高さの差を高めて、風力トルクにおける本館の滑りを防止する。図81における本館の複合垂直力は複合風力の侵入を相殺し、建物の基礎の構造空間を促進し、ほぞの侵入を加速する。図82に示すように、複合風力が停止した後、複合垂直力はセルフ平衡になる。
Separating penetration of high-rise buildings The reverse tenon 14 technology process is as follows. The perimeter of the free ground of the high-rise building increases the height difference at the slope in the design shown in FIG. 79 to prevent main building slippage in wind torque. The complex vertical force of the main building in FIG. 81 offsets the penetration of the complex wind power, promotes the structural space of the foundation of the building, and accelerates the tenon penetration. As shown in FIG. 82, the combined normal forces become self-balanced after the combined wind power is shut off.

図83に示す津波潮汐による推進後の変位は、複合垂直力の平衡中で回帰される。建物は、滑り止め斜面の助けで災害中で移動し、ほぞの増加と移動及び垂直力の回帰を得る。本館の耐風性及び耐震性のために、恒久的なサイクルリザーブを提供する。   The displacement after propulsion by the tsunami tide shown in FIG. 83 is regressed in the equilibrium of the compound vertical force. The building moves in the disaster with the help of non-slip slopes, gaining tenon increase and return of movement and normal force. Provide permanent cycle reserve for wind resistance and earthquake resistance of the main building.

上記の補充ほぞの直径は、要件に応じて調整できる。
地震を防ぐためには、体に合わせて服を作る仕立て屋のように「建てる」のだけではなく、症状を当てて処方を决める医者のように「震する」べきである。地震波には、縦波、横波、建物の亀裂が含まれ、本館が自体で外力に抵抗することであり、作用力と反作用力の対決である。地震に抵抗する唯一の正しい方法は、検索機構によって何度も拒否された「さまざまな災害に応じて選択する」ことである。
The diameter of the above-mentioned refill tenon can be adjusted according to the requirements.
In order to prevent an earthquake, you should not just "build" like a tailor who tailors clothes to your body, but "shake" like a doctor who gives symptoms and licks prescriptions. Seismic waves include longitudinal waves, transverse waves, and cracks in buildings, and the main building itself resists external forces, and it is a confrontation of action force and reaction force. The only correct way to resist earthquakes is to "select in response to various disasters" rejected many times by the search mechanism.

大きな直径のほぞは大きな縦波と大きな横波を消化することができ、小さな直径のほぞは小さな地震波を捕えるに助けが大きいが、大きな横波を解決するにはほとんど役に立たない。同じ規格のほぞにとって、高い震度の地震であるほどかえって分解されやすい。ほぞ滑りにおける地震波の反比伝導、及び地震の予測不可ち事前測定不可は、災害に応じて選択することにいくつかの困難をもたらす。本発明のほぞなし補充メカニズムにおけるの直径の小さいほぞを最初に使用し、次に直径の大きいほぞを使用するツーラインほぞ補充メカニズムと、補充メカニズムにおけるほぞの後に補充するほぞの量の調整可能と直径の調整可能は、さまざまな災害に対して適切に選択し、大きい、小さい、縦方向と横方向の波を捕える方法を提供することで、耐震効果を永遠に持続させ、揺れが強いほど免震の機能は強くなる。   A large diameter tenon can digest large longitudinal waves and large shear waves, and a small diameter tenon can help capture small seismic waves, but it is of little use in solving large shear waves. For the same standard tenon, the higher the earthquake intensity, the easier it is to be disassembled. The anti-specific conduction of seismic waves in mortise and the unpredictable and unpredictability of earthquakes bring some difficulties in selecting in response to disasters. Two-line tenon refilling mechanism using the smaller diameter tenon in the tenonless refilling mechanism of the present invention first and then using the larger diameter tenon, and the adjustable amount and diameter of tenon refilling after tenon in refilling mechanism Tunability, by selecting properly for various disasters, provides a way to capture large, small, longitudinal and transverse waves, sustaining the seismic effect forever, the stronger the shaking, the more seismic isolation Function is stronger.

体に合わせて服を作らないと違和感を感じさせるが、服を着ないと凍死する。さまざまな災害に対して適切に選択することは難しいですが、選択しないと財産や命を失う恐れがある。本発明は建築史における質的な飛躍であり、建築界が避けられないという事実である。地震、津波、強風の中に住んでいる人々が選ばなければならないという選択である。
I feel uncomfortable if I don't make clothes according to my body, but if I don't wear clothes, they will freeze and die. It is difficult to choose properly for various disasters, but if you do not choose it, you risk losing your property and life. The present invention is a qualitative leap in architectural history and is the fact that the architectural world is inevitable. The choice is that people living in earthquakes, tsunamis, and strong winds must choose.

Claims (10)

地震、強風と津波に耐える逆向きほぞの建物構造であって、
サイズに関する符号がつけられていない、異なる直径のもので混在されるほぞを、建物と基礎の構造物との分割空間に逆向きさせることによって、上記の建物と基礎との間にエネルギーの押圧結合の関係を形成し、所属するアースリングビーム(Earth ring beam)の受容体と集束関係を形成し、受容されるほかのほぞと圧迫、流動、摩擦の関係を形成し、
上記の地震、強風と津波という三種類の災害のいずれかがかかる方向からエネルギーを持って侵入した場合、この逆向きほぞの集束状態と押圧結合が破壊され、ほぞの逆向きに離合、遊離、解体、補充結合、再生、再建が発生され、そのうち、離合、遊離、解体はツーライン(two line)ほぞメカニズムによって完成され、事前に設けられたほぞによって建物のライフサイクルの防災が完成され、段階的に有効になり、
補充結合、再生、再建はほぞ補充メカニズムによって完成され、補充ほぞとほぞの直径の調整とによって建物のライフの無限性と免災の拡大性が実現され、恒久的な有効になり、揺れが強いほど強くなり、
新築建物には、整合して設けられ、
旧築建物には、救済する方法で、または、全体のものを分割してステップバイステップで設置し、
地震が頻繁で活発な地域、季節風のゾーンと候風のゾーンの旧築は、分割結合の方法で埋め込むか、または、貼り付けて複合するか、または、携帯して離れる方式で浸透され、
これによって、目に見えない災害のエネルギーを形があるほぞの移動により捕えることで、建物と基礎の変位による破壊を防止することが可能であることを特徴とする逆向きほぞの建物構造。
It is a reverse tenon building structure that withstands earthquakes, strong winds and tsunamis,
The pressure coupling of energy between the above building and the foundation by reversing the tenons mixed with different diameter, not labeled with the size, into the dividing space between the building and the foundation structure Form a focusing relationship with the receptor of the associated Earth ring beam, and form a pressure, flow, friction relationship with the other tenons received,
If any of the above three types of disasters such as earthquakes, strong winds and tsunamis intrudes with energy from the direction from which it is applied, this reverse direction tenon's convergence state and pressure coupling are broken, and tenon reverse direction, separation, liberation, Dismantling, replenishing, regenerating, rebuilding occurs, among which disengaging, liberating, dismantling is completed by the two line tenon mechanism, the pre-established tenon completes the disaster prevention of the building's life cycle, phased Become effective
Replenishment, regeneration and reconstruction are completed by the tenon replenishment mechanism, and adjustment of the tenons and tenons diameter realizes the infiniteness of the life of the building and the extensibility of the disaster prevention, becoming permanent effective and strong shaking Become stronger
In new building, it is established in alignment,
In the old building, install it in a step-by-step manner, or by dividing the whole thing
Areas where earthquakes are frequent and active, monsoon zones and monsoon zones are embedded by means of split bonding, or are pasted and combined, or are carried away and carried away by hand.
By this, it is possible to prevent the destruction by displacement of a building and a foundation by capturing the energy of an invisible disaster by movement of a shaped tenon, and the reverse tenon building structure characterized by the above-mentioned.
前発明の鼎ベアリングほぞ浮きの構造より淘汰された、サイズに関する符号がつけられていないほぞは、それらの直径に従って分類され、
直径が1cmよりわずかに小さいほぞは大豆ほぞと呼ばれ、黄豆に似た直径のほぞは黄豆ほぞと呼ばれ、緑豆に似た直径のほぞは緑豆ほぞと呼ばれ、小麦粒に似た直径のほぞは小麦粒ほぞと呼ばれ、屑米に似た直径のほぞは屑米ほぞと呼ばれ、粟米に似た直径のほぞは粟米ほぞと呼ばれ、
これらのほぞはふるいメッシュを使用し分類されることを特徴とする請求項1に記載の建物構造の技術プロセス。
Tenons that are not labeled with respect to size, which are made from the structure of the heel bearing tenon of the prior invention, are classified according to their diameter,
A tenon slightly smaller than 1 cm in diameter is called soybean tenon, a tenon with a diameter similar to yellow beans is called a yellow bean tenon, a tenon with a diameter similar to green beans is called a green bean tenon, and a diameter similar to wheat grains. A tenon is called wheat grain tenon, a tenon with a diameter similar to scrap rice is called a scrap rice tenon, a tenon with a diameter similar to rice bran is called a rice bran tenon,
The process according to claim 1, characterized in that these tenons are classified using sieve mesh.
逆向きほぞの構造はツーラインほぞ補充メカニズムを採用し、即ち、ほぞ層が広げられた後、前記ほぞ枠の周囲のほぞの平面に1−3号ほど直径のサイズが小さいほぞを一回り入れ、前記ほぞに対するタッピング(tamping)において、上記サイズが小さいほぞが高密度で小さい直径をもっているためほぞ枠の端のほぞ隙間に沈められ、状態の変化を待つことになり、
縦波のない地震が発生された場合、押圧結合されたほぞは滑りながら溝内で移動し、
小さな縦波を伴う地震が発生された場合、直径の小さいほぞが押出によって先にグラウンドビームウォールスカート(ground beam wall skirt)の下に浸透され、ウォールスカートを拡張し、即ち、建物のベアリング面と滑り面に浸透され、建物と基礎が大きな滑り面で結合し、
大きな縦波を伴う地震が発生された場合、押圧結合されたほぞが解体され、直径の大きいほぞがグラウンドビームウォールスカートの下に浸透され、より効果的なほぞの移動が発生されることを特徴とする請求項1に記載の建物構造の技術プロセス。
The reverse tenon structure adopts a two-line tenon replenishment mechanism, that is, after the tenon layer is unfolded, put a tenon with a diameter as small as 1 to 3 into the tenon plane around the tenon frame, In tapping on the tenon, the small size tenon is dense and has a small diameter, so it is sunk in the tenon space at the end of the tenon frame and waits for a change of state,
When an earthquake without longitudinal waves is generated, the press-bonded tenon slides in the groove and
When an earthquake with a small longitudinal wave is generated, the small diameter tenon is first penetrated by extrusion below the ground beam wall skirt and extends the wall skirt, ie with the bearing surface of the building Permeating the sliding surface, the building and the foundation are joined by a large sliding surface,
When an earthquake with a large longitudinal wave is generated, the press-bonded tenon is dismantled, and a tenon with a large diameter is infiltrated under the ground beam wall skirt, and a more effective tenon movement is generated. The technical process of the building structure according to claim 1.
逆向きほぞの収納度と直径の選択はほぞ補充メカニズムを採用し、建物のベアリングポイントと必要な部位にほぞ補充シリンダーを追加設置し、ほぞ補充シリンダー内のほぞと押圧結合されたほぞとが一体になっており、滑りほぞと同じ頻度でほぞの流失を補完し、
ほぞ補充シリンダーはほぞが出るのを止めるためのほぞ止めルーズリーフを有し、何度も追加することができ、補充ほぞの直径は地震の影響の除去を保証するために必要条件に従って調節することができ、建物の滑りほぞの逆比率は揺れが強いほど免震の機能は強くなることを特徴とする請求項1に記載の建物構造の技術プロセス。
The selection of storage and diameter of reverse tenon adopts tenon refilling mechanism, additionally installing tenon refill cylinder at the bearing point and necessary part of the building, and tenon and tenon in tenon refill cylinder are integrated And compensates for the tenon's loss at the same frequency as the sliding tenon,
The tenon refill cylinder has tenon stop loose-leaf to stop the tenon coming out and can be added many times, the diameter of the refill tenon can be adjusted according to the requirements to guarantee the elimination of the effects of the earthquake The technical process of the building structure according to claim 1, wherein the anti-slip function of the building becomes stronger as the reverse ratio of the sliding tenon of the building becomes stronger.
逆向きほぞの構造の押圧結合面の表面は非常に滑らかであり、すべての地面、壁面は摩擦がない状態であり、圧力層の二元合成と一元合成で同じ噛合力と接合力が形成され、
そのほぞを置くための滑らかな表面はガラススチール金型によって取得され、
その噛み合う粗い面はコンクリートと非固化粘土モルタルによって同じ金型でコンパートメント取得され、
すべての必要なほぞブロッキングプレート、ほぞプレスプレート、ほぞプレス翼のほぞブロッキングプレート、ガルウィングプレート、ほぞ補充シリンダー、片面枠、四辺枠、ほぞ収納台が含まれることを特徴とする請求項1に記載の建物構造の技術プロセス。
The surface of the pressure bonding surface of the reverse tenon structure is very smooth, and all the ground and wall surfaces are in a frictionless state, and the same meshing force and bonding force are formed in the binary synthesis and single synthesis of the pressure layer. ,
The smooth surface for placing that tenon is taken by glass steel mold and
The meshing rough surface is acquired in the same mold with concrete and non-solidified clay mortar in the same mold
2. All necessary tenon blocking plates, tenon press plates, tenon press wing tenon blocking plates, gull wing plates, tenon refilling cylinders, single sided frame, quadrilateral frame, tenon storage racks according to claim 1. Technical process of building structure.
逆向きほぞのグランドとビームとの交差部に分割線以上の構造的隙間が存在し、製造する時、コンクリートを鋳造する前にプラスチックフィルムで覆われた膨張した合板又は膨張した薄木板を配置し、本館が完成された後に乾燥収縮されている状態で取り出され、構造分割線は木材とコンクリートのツーラインの収縮によって取得され、
ほぞと接触するグラウンドビームの表面はほぞとフィルムを隔てて互いに合い、コンクリートのグラウンドビームを鋳造する前に覆われたプラスチックフィルムによって取得されることを特徴とする請求項1に記載の建物構造の技術プロセス。
There is a structural gap above the dividing line at the intersection of the reverse tenon gland and the beam, and when manufacturing, place the expanded plywood or expanded thin wood board covered with plastic film before casting the concrete After the main building is completed, it is taken out in a dry and shrunk state, and the structural division line is acquired by the two-line contraction of wood and concrete,
The building structure according to claim 1, characterized in that the surfaces of the ground beams in contact with the tenon are mutually spaced apart with the tenon and film and obtained by a plastic film covered before casting the ground beam of concrete. Technical process.
全体のものをばらばらにする方法で旧築の粘土建物、れんが造りのオープンポケット型建築物、
混合建物、高床式建物、石造建物、及び規制のない「手抜き」工事の救助における逆向きほぞについてステップインプランし、
まず、グランドに遊離グランドを作り、本館にリングガーダーとフレームせん断フレームを追加し、リングガーダーを追加する場合は、セグメント化された型板を共通の金型にまとめた後、設計の要件に従ってグラウンドビームを番号付け、グラウンドビームを鋳造する時に非固化粘土モルタルでグラウンドビームの型枠へ充填し、コンクリートを用いてフレームせん断フレームへ充填し、
フレームせん断フレームが固化された後、粘土グラウンドビームに対して設計番号に従ってコンクリート構造の置換を行い、
全体のものをばらばらにする方法で置き換え、
無板式の現場打ち、ほぞプレスプレート、ほぞブロッキングプレートの押圧結合によるツーラインほぞ或いは補充ほぞの技術で置き換えることを特徴とする請求項1に記載の建物構造の技術プロセス。
Old clay buildings, brick open pocket buildings, in a way that separates the whole thing
Step in on the reverse tenon in the rescue of mixed buildings, stilts, masonry and unregulated "hands out" work,
First, make free ground on the ground, add ring girder and frame shear frame to the main building, and add ring girder, put segmented templates into common mold and then ground according to design requirements Number the beam, fill the ground beam form with non-solidified clay mortar when casting the ground beam, and fill the frame shear frame with concrete,
After the frame shear frame is solidified, replace the concrete structure according to the design number for the clay ground beam,
Replace the whole thing in a disjointed way,
2. A process according to claim 1, wherein the technical process of the building construction according to claim 1, characterized in that it is replaced by a plateless in-situ strike, tenon press plate, two-line tenon or tenon tenon technique by pressing connection of tenon blocking plates.
古城、古いハイツ建物の改造は分割結合の方法で埋め込み方法を採用し、
まず、非衝撃力で古いグラウンドビームの耐荷重ポイントのコンクリートを破壊し、スラグを洗浄し、破壊の時に元のグラウンドビームのスチールフレームを保留し、スチールフレームの支点の下で遊離グランドを再建し、遊離グランドの厚さは元の壁の厚さの3倍以上であることを基準とし、四つの膨張した木材を元のビームの下に四周置き、フィルムを覆い、屑米ほぞを入れ、ほぞプレスプレートに移入し、ほぞ補充シリンダーを取り付け、すべての連結鉄筋をしっかりと結び、型板をプレスし、コンクリートに入れ、
ほぞ補充シリンダーへほぞを補完し、振動タッピングし、ほぞ止めルーズリーフを取り付けた後に振動棒によって型内のコンクリートをタッピングし、
コンクリートが硬化メンテナンスされた後、乾燥収縮されている木材を取り出し、各ほぞプレスプレートの間の元のグラウンドビームについて建物と基礎を切り離すための切断を行い、鋼片の切断工程と埋設工程を同時に行い、竣工された後に鋼片を一個ずつ除去することを特徴とする請求項1に記載の建物構造の技術プロセス。
The castle, the remodeling of the old Heights building adopts the embedding method in the method of split bonding,
First, destroy the concrete of the load bearing point of the old ground beam with non-impact force, wash the slag, retain the steel frame of the original ground beam at the time of destruction and rebuild the loose ground under the fulcrum of the steel frame , Based on the thickness of the loose ground is more than three times the thickness of the original wall, place four expanded wood four times under the original beam, cover the film, put the scrap rice tenon, tenon Transfer to the press plate, attach the tenon refill cylinder, firmly tie all the connecting bars, press the template, put in the concrete,
After filling the tenon to the tenon refill cylinder, vibrating tapping and mounting tenoning loose leaf, tapping the concrete in the mold with the vibrating bar,
After the concrete is hardened and maintained, take out the wood that has been dried and shrunk, cut the ground beam between the tenon press plates to separate the building and the foundation, and simultaneously cut and embed the billet The technical process of the building structure according to claim 1, characterized in that after being done and completed, the steel pieces are removed one by one.
高層建物の改造は切り裂きなしの複合型のスティックイン方法を採用し、
まず、遊離グランドを再建し、次に、壁ベースで建物と基礎の分割線を切り、内側と外側の鉄筋を接続するための穴を開け、分割線と遊離グランドの間に落差がなく、
分割線と下の壁の掘削孔の間に10cmの落差があり、
同期に鋼片を壁に埋め込んだ後、余分な部分を切り取り、予め作られたほぞ収納枠を設計位置に移入し、型の中で組み合わた後、膨張した板を覆い、プラスチックフィルムを覆い、グラウンドビームの鉄筋とすべての連結鉄筋を結び、枠にほぞを入れ、ほぞ枠の周囲に直径の小さいほぞを一回り追加し、
壁の掘削孔を湿らせ、純粋なセメントペーストを絞り、型枠にコンクリートを入れ、ほぞ収納台を枠内に移入し、補充ほぞをつぼの中に追加し、振動棒によってタッピングし、ほぞカバープレートを覆い、
全負荷になるまで振動棒によってコンクリートをタッピングし、竣工された後に乾いた木材を取り出すことにより、本グラウンドビームにおける逆向きほぞは風と地震に対抗できることを特徴とする請求項1に記載の建物構造の技術プロセス。
The remodeling of the high-rise building adopts a combined stick-in method without tearing and
First, rebuild the free ground, then cut the parting line between the building and the foundation with the wall base, drill a hole to connect the inner and outer reinforcing bars, and there is no drop between the parting line and the free ground,
There is a 10 cm drop between the dividing line and the hole in the lower wall,
After embedding the billet in the wall synchronously, cut out the extra part, transfer the prefabricated tenon storage frame to the design position, combine in the mold, cover the expanded board, cover the plastic film, Connect the ground beam reinforcement and all connected reinforcements, insert a tenon into the frame, and add a small diameter tenon around the tenon frame,
Moisten the borehole in the wall, squeeze pure cement paste, place the concrete in the formwork, transfer the tenon holder into the frame, add the refill tenon into the trough, tap with the vibrating rod, tenon cover Cover the plate
The building according to claim 1, characterized in that the reverse tenon in the ground beam can resist wind and earthquakes by tapping the concrete with a vibrating bar until full load and removing the dry wood after completion. Technical process of construction.
遊離グランドの周辺へに対する移動範囲の制限は、適切な勾配と距離を備えた滑り止め斜面を提供し、複合風力や津波潮汐による本館の無限の水平方向のドリフトを止め、滑り止め斜面の制限で本館は縦方向の揚力エネルギー消費で横方向の変位の重ね合わせを代わることを特徴とする請求項1に記載の建物構造の技術プロセス。
Restricting the range of movement to the periphery of the free ground provides a non-slip slope with adequate slope and distance, stops infinite horizontal drift of the main building due to combined wind and tsunami tides, and limits the non-slip slope. The process according to claim 1, characterized in that the main building substitutes the superposition of the lateral displacement with a longitudinal lift energy consumption.
JP2019501521A 2015-12-08 2017-04-21 Reverse tenon building structure and technology process to withstand earthquakes, strong winds and tsunamis Pending JP2019521267A (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201510906027.1A CN105545056B (en) 2015-12-08 2015-12-08 A kind of earthquake, tsunami, superpower wind anti-structure entirely
PCT/CN2016/000372 WO2017024751A2 (en) 2015-12-08 2016-07-11 Ground surface construction; complete disaster relief and preservation technology for liquid tank trailers during earthquakes, tsunami, and super storms, and structure and equipment thereof
CNPCT/CN2016/000372 2016-07-11
PCT/CN2017/000310 WO2018010402A1 (en) 2016-07-11 2017-04-21 Inverted fastening mortise of building structure and technical procedure for resisting earthquake, strong wind, and tsunami

Publications (1)

Publication Number Publication Date
JP2019521267A true JP2019521267A (en) 2019-07-25

Family

ID=55824569

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019501521A Pending JP2019521267A (en) 2015-12-08 2017-04-21 Reverse tenon building structure and technology process to withstand earthquakes, strong winds and tsunamis

Country Status (4)

Country Link
US (1) US20190145076A1 (en)
JP (1) JP2019521267A (en)
CN (2) CN105545056B (en)
CA (1) CA3030771C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IN2015MU02042A (en) * 2015-05-26 2015-06-05 Yashraj Mahesh
WO2018010402A1 (en) * 2016-07-11 2018-01-18 蒋理中 Inverted fastening mortise of building structure and technical procedure for resisting earthquake, strong wind, and tsunami
CN105545056B (en) * 2015-12-08 2018-08-17 蒋理中 A kind of earthquake, tsunami, superpower wind anti-structure entirely
CN109840384B (en) * 2019-02-20 2022-06-17 中南建筑设计院股份有限公司 Design method of sectional reinforced concrete connecting beam with dual functions of bearing and energy consumption
CN111636466A (en) * 2020-05-29 2020-09-08 叶长青 Wooden earthquake-resistant building
CN112963002B (en) * 2021-02-08 2022-10-18 华北水利水电大学 Method for cutting, removing weight and reinforcing existing beam connecting part and reinforcing structure
CN113404176A (en) * 2021-02-08 2021-09-17 临沂职业学院 Pre-buried formula shock isolation device of building
CN115822313A (en) * 2023-02-07 2023-03-21 上海市地震局 Brick wall reinforcing structure and manufacturing method thereof
CN117168742B (en) * 2023-11-03 2024-02-13 云南平皓建设检测鉴定有限公司 Anti-seismic detection device and detection method for house building

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54924U (en) * 1977-06-06 1979-01-06
JPS62211470A (en) * 1986-03-11 1987-09-17 大成建設株式会社 Structure for attenuating external force of structure
JPS63114781A (en) * 1986-10-31 1988-05-19 三井建設株式会社 Earthquakeproof damper
JPH07269165A (en) * 1994-03-31 1995-10-17 Ohbayashi Corp Vibration control structure
JP2001107600A (en) * 1999-10-06 2001-04-17 Showa Electric Wire & Cable Co Ltd Vibration damping device
JP3134768U (en) * 2007-06-12 2007-08-23 信夫 高橋 Weak seismic structure for wooden structures
WO2014092662A1 (en) * 2012-12-13 2014-06-19 Kaya Cemalettin Anti-earthquake building system
CN104295143A (en) * 2013-10-09 2015-01-21 蒋理中 Earthquake relieving technology (structure) for seismic soil building
CN105484550A (en) * 2015-12-08 2016-04-13 蒋理中 Seismic earth building earthquake eliminating technology and structure thereof
CN105545056A (en) * 2015-12-08 2016-05-04 蒋理中 Earthquake, tsunami, and superstrong wind all-prevention technology, and load protection technology and structure for oil and water storage tank (in disaster)

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6397528B1 (en) * 1997-09-10 2002-06-04 The Cantor Seinuk Group, P.C. Coupled truss systems with damping for seismic protection of buildings
US6247275B1 (en) * 1999-08-06 2001-06-19 Tayco Developments, Inc. Motion-magnifying seismic shock-absorbing construction
US20010032420A1 (en) * 2000-01-25 2001-10-25 Ma-Chi Chen Gravity balance frame
CN201296931Y (en) * 2008-10-15 2009-08-26 梁伟 Single-layer ball-bearing-type earthquake-proof foundation
CN101949175A (en) * 2008-12-29 2011-01-19 张文 Automatically-restoring windproof earthquake-resistant building structure and construction method
AT508047A1 (en) * 2009-03-18 2010-10-15 Univ Wien Tech SUPPORT STRUCTURE
IT1395591B1 (en) * 2009-09-10 2012-10-16 Balducci STRUCTURAL SYSTEM FOR SEISMIC PROTECTION OF BUILDINGS.
JP4510932B1 (en) * 2009-10-05 2010-07-28 淳致 萬谷 Seismic isolation device
JP2011184984A (en) * 2010-03-10 2011-09-22 Hitoshi Asakawa Simple base isolation (ballast) construction method for detached house
JP6075953B2 (en) * 2012-01-11 2017-02-08 シバタ工業株式会社 Seismic isolation structure
US9080339B2 (en) * 2013-03-14 2015-07-14 Timothy A. Hayes Structural connection mechanisms for providing discontinuous elastic behavior in structural framing systems
JP6178262B2 (en) * 2014-02-24 2017-08-09 株式会社東芝 Tank holding device and fixed structure
JP2019525034A (en) * 2016-06-29 2019-09-05 パトコ リミテッド ライアビリティ カンパニーPatco, Llc Quadruple v-shaped panel assembly
US20180334826A1 (en) * 2017-05-17 2018-11-22 WSP USA Buildings Inc. Asymmetric damping system for, and method of, protecting structures subjected to external dynamic forces

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54924U (en) * 1977-06-06 1979-01-06
JPS62211470A (en) * 1986-03-11 1987-09-17 大成建設株式会社 Structure for attenuating external force of structure
JPS63114781A (en) * 1986-10-31 1988-05-19 三井建設株式会社 Earthquakeproof damper
JPH07269165A (en) * 1994-03-31 1995-10-17 Ohbayashi Corp Vibration control structure
JP2001107600A (en) * 1999-10-06 2001-04-17 Showa Electric Wire & Cable Co Ltd Vibration damping device
JP3134768U (en) * 2007-06-12 2007-08-23 信夫 高橋 Weak seismic structure for wooden structures
WO2014092662A1 (en) * 2012-12-13 2014-06-19 Kaya Cemalettin Anti-earthquake building system
CN104295143A (en) * 2013-10-09 2015-01-21 蒋理中 Earthquake relieving technology (structure) for seismic soil building
CN105484550A (en) * 2015-12-08 2016-04-13 蒋理中 Seismic earth building earthquake eliminating technology and structure thereof
CN105545056A (en) * 2015-12-08 2016-05-04 蒋理中 Earthquake, tsunami, and superstrong wind all-prevention technology, and load protection technology and structure for oil and water storage tank (in disaster)

Also Published As

Publication number Publication date
CN105545056B (en) 2018-08-17
CN105545056A (en) 2016-05-04
CA3030771A1 (en) 2018-01-18
CA3030771C (en) 2021-07-27
CN107949678A (en) 2018-04-20
US20190145076A1 (en) 2019-05-16

Similar Documents

Publication Publication Date Title
JP2019521267A (en) Reverse tenon building structure and technology process to withstand earthquakes, strong winds and tsunamis
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
CN206070562U (en) Subassembly formula underground structure
CN103195085B (en) Downward story-adding basement and construction method thereof
CN107060071B (en) The method in chain assembled building blocks assembling members assembly house
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
CN103790295B (en) Reinforced concrete stairs structure and construction method thereof
CN103590841B (en) Supporting method for primary support of underground excavated chamber
CN104818728A (en) Permanent supporting system with basement floor and supporting piles capable of working together
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN104532957A (en) Inversed construction method for adding basement in existing building
CN107165177A (en) A kind of side slope supporting construction method
CN106121035A (en) A kind of overlapping assembled integral basement of flat slab system
CN104727481B (en) Factorial praluction energy-conserving construction wall and preparation method
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN106065668B (en) A kind of construction techniques
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN103437488B (en) Slab for buildings
CN212896955U (en) Assembled steel-concrete combined shear wall
RU133153U1 (en) MONOLITHIC SPATIAL FOUNDATION PLATFORM
CN2584693Y (en) Building wall
Dipasquale et al. Local seismic culture in the Mediterranean region
CN209066483U (en) A kind of assembled ecology retaining wall

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190403

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190305

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190710

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200330

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200407

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200707

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210325

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210831

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20220329