JP2019193327A - Power conversion device - Google Patents

Power conversion device Download PDF

Info

Publication number
JP2019193327A
JP2019193327A JP2018079872A JP2018079872A JP2019193327A JP 2019193327 A JP2019193327 A JP 2019193327A JP 2018079872 A JP2018079872 A JP 2018079872A JP 2018079872 A JP2018079872 A JP 2018079872A JP 2019193327 A JP2019193327 A JP 2019193327A
Authority
JP
Japan
Prior art keywords
power
value
output
receiving point
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018079872A
Other languages
Japanese (ja)
Inventor
義彦 小道
Yoshihiko Komichi
義彦 小道
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2018079872A priority Critical patent/JP2019193327A/en
Publication of JP2019193327A publication Critical patent/JP2019193327A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Inverter Devices (AREA)

Abstract

To obtain a power conversion device capable of restricting reverse flow power within a predetermined time, even though a sunshine amount and consumption power of a load device are varied.SOLUTION: There is provided a power conversion device 2 capable of supplying power to at least one of a power system 3 and a load device by converting DC power into AC power, comprising: a power conversion part 10 for converting the DC power supplied from a DC power supply 1 into the AC power according to a control target value; a power reception point power measuring part 103 for measuring power reception point power; a time measuring part 104 for measuring a continuing time in a state where the power reception point power exceeds a power threshold value based on an output power command value; and an output control part 105 for changing the control target value to a value smaller than a calculated value, when the continuing time exceeds a time threshold value, while calculating the control target value in such a manner that the power reception point power approaches a power value indicated by the output power command value.SELECTED DRAWING: Figure 2

Description

本発明は、直流電源から供給される直流電力を交流電力へ変換して電力系統および家電製品などの負荷装置に交流電力を供給することが可能な電力変換装置に関する。   The present invention relates to a power converter capable of converting DC power supplied from a DC power source into AC power and supplying AC power to a load device such as an electric power system and home appliances.

電力系統に連系された電力変換装置は、太陽電池、燃料電池、直流発電機などに代表される直流電源から供給される直流電力を交流電力へ変換し、変換した交流電力を家電製品などの負荷装置および電力系統の少なくとも1つへ出力する。負荷装置の消費電力よりも電力変換装置が出力する交流出力電力が大きい場合、電力会社へ売電することができる。電力変換装置から電力系統へ電流が流れることを逆潮流という。   The power converter connected to the power system converts DC power supplied from a DC power source represented by solar cells, fuel cells, DC generators, etc. into AC power, and converts the converted AC power into household appliances, etc. Output to at least one of the load device and the power system. When the AC output power output from the power conversion device is larger than the power consumption of the load device, the power can be sold to the power company. The flow of current from the power converter to the power system is called reverse power flow.

太陽光発電システムに代表される再生可能エネルギーが急速に普及したことにより、電力の供給が需要を上回る可能性があり、この場合、逆潮流が制限されることがある。例えば、逆潮流を制限するために、電力変換装置を含む発電システム全体を電力系統から切り離すことができる逆電力継電器が設けられる場合がある。逆電力継電器は、予め設定された検出レベル以上の逆潮流状態が予め定められた時間以上継続すると、遮断器によってシステム全体を電力系統から切り離す。一般的に、検出レベルはシステムの定格容量の5%、時間の閾値は0.5秒とされる。また、電力系統から電力変換装置の出力電力を指示する出力電力指令値が供給される場合にも、逆潮流が制限される。出力電力指令値に従って動作する電力変換装置では、技術仕様により、逆潮流状態となると、5分以内に電力変換装置の定格出力の5%未満となるように、交流出力電力を制限することが求められている。   Due to the rapid spread of renewable energy represented by solar power generation systems, the supply of power may exceed demand, and in this case, reverse power flow may be limited. For example, in order to limit a reverse power flow, a reverse power relay that can disconnect the entire power generation system including the power converter from the power system may be provided. The reverse power relay disconnects the entire system from the power system by a circuit breaker when a reverse power flow state of a preset detection level or higher continues for a predetermined time or longer. Generally, the detection level is 5% of the rated capacity of the system, and the time threshold is 0.5 seconds. The reverse power flow is also limited when an output power command value that instructs the output power of the power converter is supplied from the power system. For power converters that operate in accordance with the output power command value, it is required to limit the AC output power so that it becomes less than 5% of the rated output of the power converter within 5 minutes in a reverse power flow state due to technical specifications. It has been.

特許文献1には、逆潮流が許容されないシステムにおいて、電力系統からの受電点電力を計測して、受電点電力が予め定められた閾値を超える場合に、電力変換装置への直流入力電力を制限して、電力変換装置からの交流出力電力を制限する技術が開示されている。受電点電力は、電力変換装置の定格出力値に対する相対的な電力値を示し、受電点電力の極性が正の場合に逆潮流電力、極性が負の場合に順潮流電力をそれぞれ意味する。受電点電力に基づいて直流入力電力を制限することで、逆潮流電力を抑制しつつ、負荷装置には電力の供給を継続することが可能になる。   In Patent Document 1, in a system that does not allow reverse power flow, the power received from the power system is measured, and when the power received by the power exceeds a predetermined threshold, the DC input power to the power converter is limited. And the technique which restrict | limits the alternating current output power from a power converter device is disclosed. The power receiving point power indicates a relative power value with respect to the rated output value of the power converter, and means reverse flow power when the polarity of the power receiving power is positive and forward power when the polarity is negative. By limiting the DC input power based on the power receiving point power, it is possible to continue supplying power to the load device while suppressing reverse power flow.

特許第5620304号公報Japanese Patent No. 5620304

しかしながら、上記特許文献1に記載の技術によれば、電力会社などから供給される受電点電力の指令値である出力電力指令値に従って動作する電力変換装置では、日照量、負荷装置の消費電力が急に変動した場合、受電点電力が大きく変動することがあり、技術仕様により定められた条件を満たすことができない場合があるという問題があった。   However, according to the technique described in Patent Document 1, in a power conversion device that operates according to an output power command value that is a command value of receiving power supplied from an electric power company or the like, the amount of sunlight and the power consumption of the load device are low. When it fluctuates suddenly, there is a problem that the power at the receiving point may fluctuate greatly, and the conditions defined by the technical specifications may not be satisfied.

本発明は、上記に鑑みてなされたものであって、日照量、負荷装置の消費電力が変動したとしても、予め定められた時間以内に逆潮流電力を制限することが可能な電力変換装置を得ることを目的とする。   The present invention has been made in view of the above, and provides a power conversion device capable of limiting reverse power flow within a predetermined time even if the amount of sunlight and power consumption of a load device fluctuate. The purpose is to obtain.

上述した課題を解決し、目的を達成するために、本発明に係る電力変換装置は、直流電力を交流電力に変換して電力系統および負荷装置の少なくとも1つに供給可能であって、制御目標値に従って、直流電源から供給される直流電力を交流電力に変換する電力変換部と、受電点電力を計測する受電点電力計測部と、受電点電力が出力電力指令値に基づく電力閾値を超えている状態の継続時間を計測する時間計測部と、受電点電力が出力電力指令値の示す電力値に近づくように制御目標値を算出すると共に、継続時間が時間閾値を超える場合、制御目標値を算出した値よりも小さい値に変更する出力制御部と、を備えることを特徴とする。   In order to solve the above-described problems and achieve the object, a power conversion device according to the present invention can convert DC power into AC power and supply it to at least one of an electric power system and a load device. According to the value, the power conversion unit that converts the DC power supplied from the DC power source into AC power, the power receiving point power measuring unit that measures the power receiving point power, and the power receiving point power exceeds the power threshold based on the output power command value A time measurement unit for measuring the duration of the current state and a control target value so that the receiving point power approaches the power value indicated by the output power command value, and if the duration exceeds the time threshold, the control target value is And an output control unit that changes the value to a value smaller than the calculated value.

本発明によれば、日照量、負荷装置の消費電力が変動したとしても、予め定められた時間以内に逆潮流電力を予め定められた値よりも小さくすることが可能な電力変換装置を得ることができるという効果を奏する。   According to the present invention, even if the amount of sunshine and the power consumption of the load device fluctuate, a power conversion device capable of reducing the reverse power flow to a value smaller than a predetermined value within a predetermined time is obtained. There is an effect that can be.

本発明の実施の形態1に係る電力変換装置の構成を示す図The figure which shows the structure of the power converter device which concerns on Embodiment 1 of this invention. 図1に示す制御部の機能構成を示す図The figure which shows the function structure of the control part shown in FIG. 図2に示す制御部の動作を示すフローチャートThe flowchart which shows operation | movement of the control part shown in FIG. 図1に示す電力変換装置の受電点電力の変動を示す図The figure which shows the fluctuation | variation of the receiving point electric power of the power converter device shown in FIG. 本発明の実施の形態2にかかる電力変換装置の制御部の動作を示すフローチャートThe flowchart which shows operation | movement of the control part of the power converter device concerning Embodiment 2 of this invention. 実施の形態2にかかる電力変換装置の受電点電力の変動を示す図The figure which shows the fluctuation | variation of the receiving point electric power of the power converter device concerning Embodiment 2. FIG. 図1に示す電力変換装置の機能を実現するための専用のハードウェアである処理回路を示す図The figure which shows the processing circuit which is the hardware for exclusive use for implement | achieving the function of the power converter device shown in FIG. 図1に示す電力変換装置の機能をソフトウェアを用いて実現するための構成を示す図The figure which shows the structure for implement | achieving the function of the power converter device shown in FIG. 1 using software.

以下に、本発明の実施の形態に係る電力変換装置を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Below, the power converter concerning an embodiment of the invention is explained in detail based on a drawing. Note that the present invention is not limited to the embodiments.

実施の形態1.
図1は、本発明の実施の形態1に係る電力変換装置2の構成を示す図である。電力変換装置2は、直流電源1と電力系統3との間に接続されており、例えば、電力系統3につないで運転する系統連係インバータ装置である。
Embodiment 1 FIG.
FIG. 1 is a diagram showing a configuration of a power conversion device 2 according to Embodiment 1 of the present invention. The power conversion device 2 is connected between the DC power source 1 and the power system 3, and is, for example, a system-linked inverter device that operates by being connected to the power system 3.

なお、図示していないが、電力変換装置2は、分電盤を介して電力系統3に電気的に接続されると共に、分電盤に備わる分岐ブレーカを介して、複数の電気機器などの電気負荷と電気的に接続されている。以下、説明の便宜上、複数の電気機器をまとめたものを負荷装置と称する。以下、負荷装置の消費電力と言う場合、複数の電気機器のそれぞれの消費電力の合計を指す。   Although not shown, the power conversion device 2 is electrically connected to the power system 3 through the distribution board and is connected to the electric power of a plurality of electric devices through the branch breakers provided in the distribution board. It is electrically connected to the load. Hereinafter, for convenience of description, a group of a plurality of electric devices is referred to as a load device. Hereinafter, the power consumption of the load device refers to the total power consumption of each of the plurality of electric devices.

直流電源1は、例えば、建物の屋上または地面の上などに設置される太陽電池である。太陽電池は、複数の太陽電池モジュールを直列接続した太陽電池ストリングであってもよく、複数の太陽電池ストリングを有する太陽電池アレイであってもよい。なお、直流電源1は、太陽電池に限定されず、燃料電池または直流電力発電機であってもよい。   The DC power supply 1 is a solar cell installed on the roof of a building or on the ground, for example. The solar cell may be a solar cell string in which a plurality of solar cell modules are connected in series, or a solar cell array having a plurality of solar cell strings. Note that the DC power source 1 is not limited to a solar cell, and may be a fuel cell or a DC power generator.

電力変換装置2は、直流電源1から供給される直流電力を交流電力へ変換する機能を有する。電力変換装置2は、変換して得られる交流電力を、負荷装置および電力系統3に供給することができる。電力系統3は、商用系統または非商用の電力系統である。   The power conversion device 2 has a function of converting DC power supplied from the DC power source 1 into AC power. The power conversion device 2 can supply AC power obtained by conversion to the load device and the power system 3. The power system 3 is a commercial system or a non-commercial power system.

電力変換装置2から出力される交流電流の大きさは、直流電源1から電力変換装置2に供給される直流電力の大きさに基づいて変化する。直流電源1から電力変換装置2に供給される直流電力が大きいほど、電力変換装置2が出力する交流電力は大きくなる。   The magnitude of the alternating current output from the power converter 2 changes based on the magnitude of the DC power supplied from the DC power source 1 to the power converter 2. The greater the DC power supplied from the DC power source 1 to the power converter 2, the greater the AC power output by the power converter 2.

電力変換装置2から出力される交流電力が負荷装置の消費電力よりも小さい場合、交流電力は、電力変換装置2から分電盤を介して負荷装置へ供給されると共に、電力系統3から分電盤を介して負荷装置へ供給される。電力系統3から負荷装置へ供給される交流電力は、カレントセンサ31,32で計測することが可能である。   When the AC power output from the power conversion device 2 is smaller than the power consumption of the load device, the AC power is supplied from the power conversion device 2 to the load device via the distribution board, and also distributed from the power system 3. It is supplied to the load device via the panel. The AC power supplied from the power system 3 to the load device can be measured by the current sensors 31 and 32.

電力変換装置2が出力する交流電力が負荷装置の消費電力よりも大きい場合、電力変換装置2が生成した電力と負荷装置が消費する電力との差分である余剰電力が分電盤を介して電力系統3へ供給される。電力変換装置2から電力系統3へ電力を供給することを逆潮流という。電力変換装置2から電力系統3へ供給される交流電力は、電圧検出部15およびカレントセンサ31,32で計測することが可能である。   When the AC power output from the power conversion device 2 is larger than the power consumption of the load device, the surplus power that is the difference between the power generated by the power conversion device 2 and the power consumed by the load device is power via the distribution board. Supplied to system 3. Supplying power from the power conversion device 2 to the power system 3 is called reverse power flow. The AC power supplied from the power converter 2 to the power system 3 can be measured by the voltage detector 15 and the current sensors 31 and 32.

電力変換装置2は、電力変換部10と、開閉器11と、電圧検出部12,13,14,15と、電流検出部16,17,18と、制御部20とを備える。電力変換装置2は、直流電源1に接続される入力端子41,42と、配電盤を介して負荷装置および電力系統3に接続される出力端子43,44とを有している。   The power conversion device 2 includes a power conversion unit 10, a switch 11, voltage detection units 12, 13, 14, 15, current detection units 16, 17, 18, and a control unit 20. The power conversion device 2 has input terminals 41 and 42 connected to the DC power source 1 and output terminals 43 and 44 connected to the load device and the power system 3 through a switchboard.

電力変換部10は、昇圧コンバータ部21と、インバータ部22と、フィルタ回路部23とを有する。電力変換部10は、制御部20が算出する制御目標値に従って、直流電源1から入力端子41,42を介して入力される直流電力を交流電力へ変換し、変換した交流電力を出力する。電力変換部10から出力された交流電力は、開閉器11および出力端子43,44を介して、電力変換装置2から出力される。   The power conversion unit 10 includes a boost converter unit 21, an inverter unit 22, and a filter circuit unit 23. The power conversion unit 10 converts the DC power input from the DC power supply 1 through the input terminals 41 and 42 into AC power according to the control target value calculated by the control unit 20, and outputs the converted AC power. The AC power output from the power converter 10 is output from the power converter 2 via the switch 11 and the output terminals 43 and 44.

昇圧コンバータ部21は、直流電源1から入力された直流電力の電圧を電力系統3の電圧振幅よりも高い電圧へ昇圧する。昇圧コンバータ部21は、コンデンサC1,C2、リアクトルL1、スイッチング素子Q1およびダイオードD1を備える。昇圧コンバータ部21は、制御部20からスイッチング素子Q1をオンオフ制御する駆動信号Sg1を受け取り、当該駆動信号Sg1に従って、直流電源1からの直流電圧を昇圧する。図1に示す昇圧コンバータ部21は、昇圧チョッパ回路であるが、昇圧コンバータ部21は、かかる例に限定されず、例えばトランス式のDC(Direct Current)−DCコンバータであってもよい。   Boost converter unit 21 boosts the voltage of DC power input from DC power supply 1 to a voltage higher than the voltage amplitude of power system 3. Boost converter unit 21 includes capacitors C1 and C2, a reactor L1, a switching element Q1, and a diode D1. Boost converter unit 21 receives drive signal Sg1 for controlling on / off of switching element Q1 from control unit 20, and boosts the DC voltage from DC power supply 1 in accordance with drive signal Sg1. The boost converter unit 21 shown in FIG. 1 is a boost chopper circuit, but the boost converter unit 21 is not limited to such an example, and may be, for example, a transformer type DC (Direct Current) -DC converter.

インバータ部22は、フルブリッジ接続されたスイッチング素子Q2,Q3,Q4,Q5を備え、制御部20からスイッチング素子Q2,Q3,Q4,Q5をオンオフ制御する駆動信号Sg2,Sg3,Sg4,Sg5を受け取る。スイッチング素子Q2,Q3,Q4,Q5が、駆動信号Sg2,Sg3,Sg4,Sg5のそれぞれに従ってオンオフを繰り返して電流の流れる向きを周期的に切り替えることで、昇圧コンバータ部21からの直流電力は交流電力へ変換される。スイッチング素子Q1,Q2,Q3,Q4,Q5は、MOSFET(Metal−Oxide−Semiconductor Field−Effect Transistor)、IGBT(Insulated Gate Bipolar Transistor)などの半導体スイッチング素子である。   The inverter unit 22 includes switching elements Q2, Q3, Q4, and Q5 connected in a full bridge, and receives drive signals Sg2, Sg3, Sg4, and Sg5 from the control unit 20 for on / off control of the switching elements Q2, Q3, Q4, and Q5. . The switching elements Q2, Q3, Q4, and Q5 are repeatedly turned on and off according to the drive signals Sg2, Sg3, Sg4, and Sg5 to periodically switch the direction of current flow, so that the DC power from the boost converter unit 21 is AC power. Converted to The switching elements Q1, Q2, Q3, Q4, and Q5 are semiconductor switching elements such as MOSFET (Metal-Oxide-Semiconductor Field-Effect Transistor) and IGBT (Insulated Gate Bipolar Transistor).

フィルタ回路部23は、リアクトルL2,L3およびコンデンサC3を備えるLCフィルタである。フィルタ回路部23は、インバータ部22から出力される電圧を平滑化し、交流制限波波形を生成する。   The filter circuit unit 23 is an LC filter including reactors L2 and L3 and a capacitor C3. The filter circuit unit 23 smoothes the voltage output from the inverter unit 22 and generates an AC limited wave waveform.

開閉器11は、電力変換部10と出力端子43,44との間の接続と切断とを行う。開閉器11は、制御部20からの制御に従って、電力変換部10と出力端子43,44との間を接続または切断する。制御部20は、電力変換装置2および電力系統3の少なくとも一方に異常が発生した場合、開閉器11をオフにして電力変換部10と出力端子43,44との間を切断する。制御部20は、電力変換装置2および電力系統3のいずれも正常である状態で電力変換装置2を運転状態にする場合、開閉器11をオンにして電力変換部10と出力端子43,44との間を接続する。   The switch 11 performs connection and disconnection between the power conversion unit 10 and the output terminals 43 and 44. The switch 11 connects or disconnects the power conversion unit 10 and the output terminals 43 and 44 according to control from the control unit 20. When an abnormality occurs in at least one of the power conversion device 2 and the power system 3, the control unit 20 turns off the switch 11 and disconnects the power conversion unit 10 from the output terminals 43 and 44. When the control unit 20 puts the power conversion device 2 into an operating state in a state where both the power conversion device 2 and the power system 3 are normal, the switch 11 is turned on and the power conversion unit 10 and the output terminals 43 and 44 are turned on. Connect between.

電圧検出部12は、直流電源1から入力端子41,42を介して電力変換部10へ入力される直流電力の電圧の瞬時値である入力電圧値Vsを検出する。電圧検出部13は、直流母線電圧の瞬時値である母線電圧値Vpnを検出する。電圧検出部14は、電力変換部10の出力端電圧Vfoを検出する。電圧検出部15は、単相3線式の電力系統3において中性点を基準としたU−O間電圧の瞬時値VuおよびW−O間電圧の瞬時値Vwを検出する。   The voltage detection unit 12 detects an input voltage value Vs that is an instantaneous value of the voltage of DC power input from the DC power supply 1 to the power conversion unit 10 via the input terminals 41 and 42. The voltage detector 13 detects a bus voltage value Vpn that is an instantaneous value of the DC bus voltage. The voltage detection unit 14 detects the output terminal voltage Vfo of the power conversion unit 10. The voltage detection unit 15 detects the instantaneous value Vu of the U-O voltage and the instantaneous value Vw of the W-O voltage with respect to the neutral point in the single-phase three-wire power system 3.

電流検出部16は、直流電源1から入力端子41を介して電力変換部10へ入力される直流電力の電流の瞬時値である入力電流値Isを検出する。電流検出部17は、電力変換部10から出力端子43へ出力される交流電力の電流の瞬時値である出力電流値Iioを検出する。電流検出部18は、単相3線式の電力系統3および負荷装置に接続された電力変換装置2において、カレントセンサ31,32によって計測される逆潮流電流の瞬時値Iru、または順潮流電流の瞬時値Irwを検出する。   The current detection unit 16 detects an input current value Is that is an instantaneous value of the current of DC power input from the DC power supply 1 to the power conversion unit 10 via the input terminal 41. The current detection unit 17 detects an output current value Iio that is an instantaneous value of a current of AC power output from the power conversion unit 10 to the output terminal 43. In the power converter 2 connected to the single-phase three-wire power system 3 and the load device, the current detection unit 18 is an instantaneous value Iru of the reverse flow current measured by the current sensors 31 and 32 or a forward flow current. The instantaneous value Irw is detected.

制御部20は、電力変換部10に駆動信号Sg1〜Sg5を供給することで電力変換部10を制御し、直流電源1から供給される直流電力を交流電力へ変換させて変換後の交流電力を出力端子43,44から出力させる。直流電源1が太陽電池である場合、直流電源1への日照量に応じて直流電源1が出力可能な直流電力の大きさが変わる。制御部20は、直流電源1が供給可能な直流電力を検出し、検出結果に基づいて電力変換部10を制御するMPPT(Maximum Power Point Tracking)制御を実行することができる。制御部20がMPPT制御を実行することで、電力変換部10は、直流電源1が供給可能な最大の直流電力に対応する交流電力を出力することができる。   The control unit 20 controls the power conversion unit 10 by supplying the drive signals Sg1 to Sg5 to the power conversion unit 10, converts the DC power supplied from the DC power supply 1 into AC power, and converts the converted AC power. Output from the output terminals 43 and 44. When the DC power source 1 is a solar cell, the magnitude of DC power that can be output by the DC power source 1 varies depending on the amount of sunlight to the DC power source 1. The control unit 20 can detect DC power that can be supplied from the DC power source 1 and can perform MPPT (Maximum Power Point Tracking) control for controlling the power conversion unit 10 based on the detection result. When the control unit 20 executes the MPPT control, the power conversion unit 10 can output AC power corresponding to the maximum DC power that the DC power supply 1 can supply.

以下、本実施の形態では、出力電力指令値がゼロであるケースについて説明する。電力会社から供給される出力電力指令値がゼロである場合に加えて、予め設定された検出レベルおよび検出時間以上の逆潮流状態を継続すると、遮断器によって発電設備全体を電力系統3と切断する逆電力継電器を設置する場合も出力電力指令値がゼロである場合に相当する。一般的に、逆潮流検出レベルはシステム定格容量の5%、検出時間は0.5秒である。なお、出力電力指令値は0%に限らず、電力系統3は、電力供給状況に応じて、0%以上100%未満の任意の値に出力電力指令値を設定することができる。なお、電力会社から供給される出力電力指令値は、電力系統3を提供する電力会社が設けた図示しない制御装置からインターネットなどのネットワークを介して、電力変換装置2の制御部20へ入力される。   Hereinafter, in the present embodiment, a case where the output power command value is zero will be described. In addition to the case where the output power command value supplied from the electric power company is zero, if the reverse power flow state exceeding the preset detection level and detection time is continued, the entire power generation facility is disconnected from the power system 3 by the circuit breaker. The case where the reverse power relay is installed also corresponds to the case where the output power command value is zero. Generally, the reverse power flow detection level is 5% of the system rated capacity, and the detection time is 0.5 seconds. Note that the output power command value is not limited to 0%, and the power system 3 can set the output power command value to any value between 0% and less than 100% according to the power supply status. Note that the output power command value supplied from the power company is input to the control unit 20 of the power conversion apparatus 2 via a network such as the Internet from a control apparatus (not shown) provided by the power company that provides the power system 3. .

出力電力指令値が0%である場合、直流電源1の出力が十分あり定格出力運転が可能であったとしても、受電点電力を0%に制限する必要がある。電力変換装置2が負荷装置に交流電力を供給可能であって、電力会社との契約形態が余剰買取である場合、電力変換装置2は、出力電力指令値が0%であったとしても、電力系統3へ逆潮流しない範囲であれば、出力電力を増加させることができる。例えば、負荷装置の消費電力が5kWであれば、出力電力指令値が0%であったとしても、電力変換装置2は、5kWまでであれば交流電流を出力することができる。余剰買取とは、電力変換装置2が生成した電力と負荷装置が消費する電力との差分である余剰電力を買い取る契約形態である。制御部20は、通常時、電力変換装置2の出力電力の制御目標値を、受電点電力が出力電力指令値の示す電力値に近づくように算出する。これにより、電力変換部10からの出力電力は、出力電力指令値が示す電力と、負荷装置の消費電力との合計に近づくように制御される。   When the output power command value is 0%, it is necessary to limit the power receiving point power to 0% even if the output of the DC power source 1 is sufficient and the rated output operation is possible. When the power conversion device 2 can supply AC power to the load device and the contract form with the power company is surplus purchase, the power conversion device 2 is able to supply power even if the output power command value is 0%. The output power can be increased as long as it does not flow backward to the grid 3. For example, if the power consumption of the load device is 5 kW, even if the output power command value is 0%, the power conversion device 2 can output an alternating current if it is up to 5 kW. The surplus purchase is a contract form in which surplus power that is the difference between the power generated by the power conversion device 2 and the power consumed by the load device is purchased. The control unit 20 calculates the control target value of the output power of the power converter 2 so that the power receiving point power approaches the power value indicated by the output power command value during normal times. Thereby, the output power from the power converter 10 is controlled so as to approach the sum of the power indicated by the output power command value and the power consumption of the load device.

制御部20は、電圧検出部15によって検出される電圧値と、カレントセンサ31,32を用いる電流検出部18によって検出される電流値とを用いて、電力系統3からの順潮流電力と、電力系統3への逆潮流電力とを検出することができる。   The control unit 20 uses the voltage value detected by the voltage detection unit 15 and the current value detected by the current detection unit 18 using the current sensors 31 and 32, and the forward flow power from the power system 3 and the power The reverse flow power to the grid 3 can be detected.

図2は、図1に示す制御部20の機能構成を示す図である。制御部20は、受電点電圧演算部101と、受電点電流演算部102と、受電点電力計測部103と、時間計測部104と、出力制御部105と、駆動信号生成部106とを有する。   FIG. 2 is a diagram showing a functional configuration of the control unit 20 shown in FIG. The control unit 20 includes a power reception point voltage calculation unit 101, a power reception point current calculation unit 102, a power reception point power measurement unit 103, a time measurement unit 104, an output control unit 105, and a drive signal generation unit 106.

受電点電圧演算部101は、電圧検出部15が出力する、単相3線式の電力系統3において中性点を基準としたU−O間電圧の瞬時値VuおよびW−O間電圧の瞬時値Vwに基づいて、受電点電圧を演算する。受電点電圧演算部101は、演算によって求めた受電点電圧を受電点電力計測部103に出力する。受電点電流演算部102は、電流検出部18が出力する逆潮流電流の瞬時値Iruまたは順潮流電流の瞬時値Irwに基づいて、受電点電流を演算する。受電点電流演算部102は、演算によって求めた受電点電流を受電点電力計測部103に出力する。   The power receiving point voltage calculation unit 101 outputs the instantaneous value Vu of the U-O voltage with reference to the neutral point and the instantaneous voltage of the W-O voltage in the single-phase three-wire power system 3 output from the voltage detection unit 15. Based on the value Vw, a receiving point voltage is calculated. The power receiving point voltage calculating unit 101 outputs the power receiving point voltage obtained by the calculation to the power receiving point power measuring unit 103. The power receiving point current calculation unit 102 calculates the power receiving point current based on the instantaneous value Iru of the reverse flow current output from the current detection unit 18 or the instantaneous value Irw of the forward flow current. The power receiving point current calculation unit 102 outputs the power receiving point current obtained by the calculation to the power receiving point power measurement unit 103.

受電点電力計測部103は、受電点電圧演算部101が出力する受電点電圧と、受電点電流演算部102が出力する受電点電流とに基づいて、受電点電力を演算により求めて、電力系統3からの受電点電力Prを計測する。受電点電力計測部103は、計測した受電点電力Prを時間計測部104に出力する。   The power receiving point power measuring unit 103 calculates the power receiving point power based on the power receiving point voltage output from the power receiving point voltage calculating unit 101 and the power receiving point current output from the power receiving point current calculating unit 102, and The power receiving point power Pr from 3 is measured. The power receiving point power measuring unit 103 outputs the measured power receiving point power Pr to the time measuring unit 104.

時間計測部104は、受電点電力計測部103が出力する受電点電力に基づいて、電力系統3への逆潮流電力が出力電力指令値に基づく電力閾値を超えている状態の継続時間を計測する。時間計測部104は、計測する継続時間が時間閾値を超えた場合、受電点電力計測部103に通知する。時間計測部104から通知を受けると、受電点電力計測部103は、出力制御部105に受電点電力Prを出力する。   The time measuring unit 104 measures the duration of the state in which the reverse flow power to the power system 3 exceeds the power threshold value based on the output power command value based on the receiving point power output from the receiving point power measuring unit 103. . The time measuring unit 104 notifies the power receiving point power measuring unit 103 when the measurement duration exceeds the time threshold. When receiving the notification from the time measuring unit 104, the power receiving point power measuring unit 103 outputs the power receiving point power Pr to the output control unit 105.

出力制御部105は、時間計測部104が計測する継続時間が時間閾値を超えていない通常時には、受電点電力Prが、出力電力指令値の示す電力値に近づくように、電力変換部10の出力電力の制御目標値を算出する。出力制御部105は、算出した制御目標値に基づいて、出力電流指令値Iioおよび入力電圧指令値Vpnを演算する。このとき、出力制御部105は、出力端子43,44間に印加される交流電力の電圧の瞬時値である出力端電圧Vfoと、出力端子43へ出力される交流電力の電流の瞬時値である出力電流値Iioと、母線電圧値Vpnとの検出値を用いて、出力電力が制御目標値となるように、出力電流指令値Iioおよび入力電圧指令値Vpnを求める。 The output control unit 105 outputs the power conversion unit 10 so that the power reception point power Pr approaches the power value indicated by the output power command value at the normal time when the duration measured by the time measurement unit 104 does not exceed the time threshold. A power control target value is calculated. The output control unit 105 calculates the output current command value Iio * and the input voltage command value Vpn * based on the calculated control target value. At this time, the output control unit 105 is an output terminal voltage Vfo that is an instantaneous value of the voltage of the AC power applied between the output terminals 43 and 44 and an instantaneous value of the current of the AC power that is output to the output terminal 43. Using the detected values of the output current value Iio and the bus voltage value Vpn, the output current command value Iio * and the input voltage command value Vpn * are obtained so that the output power becomes the control target value.

出力制御部105は、時間計測部104が計測する継続時間が時間閾値を超えた場合、強制的に、電力変換部10の制御目標値を、受電点電力Prが出力電力指令値の示す電力値に近づくように算出した値よりも小さい値に変更する。具体的には、出力制御部105は、電力変換部10の制御目標値を、出力電力指令値に変更して、出力電力を制限する。本実施の形態では出力電力指令値が示す値は0であるため、出力制御部105は、電力変換部10の出力電力の値が0となるように調整した出力電流指令値Iioおよび入力電圧指令値Vpnを駆動信号生成部106に出力する。 When the duration measured by the time measurement unit 104 exceeds the time threshold, the output control unit 105 forcibly sets the control target value of the power conversion unit 10 and the power value indicated by the power receiving point power Pr as the output power command value. The value is changed to a value smaller than the calculated value so as to approach. Specifically, the output control unit 105 limits the output power by changing the control target value of the power conversion unit 10 to an output power command value. In this embodiment, since the value indicated by the output power command value is 0, the output control unit 105 adjusts the output current command value Iio * and the input voltage so that the output power value of the power conversion unit 10 is 0. Command value Vpn * is output to drive signal generator 106.

駆動信号生成部106は、出力制御部105が出力する出力電流指令値Iioおよび入力電圧指令値Vpnに基づいて、電力変換部10のスイッチング素子Q1〜Q5に入力する駆動信号Sg1〜Sg5を生成し、生成した駆動信号Sg1〜Sg5を電力変換部10に出力する。電力変換部10は、制御目標値に基づいて算出された駆動信号Sg1〜Sg5に従って動作するため、制御目標値に従って動作することになる。 The drive signal generation unit 106 generates drive signals Sg1 to Sg5 input to the switching elements Q1 to Q5 of the power conversion unit 10 based on the output current command value Iio * and the input voltage command value Vpn * output from the output control unit 105. The generated drive signals Sg <b> 1 to Sg <b> 5 are output to the power conversion unit 10. Since the power conversion unit 10 operates according to the drive signals Sg1 to Sg5 calculated based on the control target value, the power conversion unit 10 operates according to the control target value.

図3は、図2に示す制御部20の動作を示すフローチャートである。制御部20は、受電点電圧演算部101が受電点電圧を演算し、受電点電流演算部102が受電点電流を演算し、受電点電力計測部103が受電点電圧および受電点電流に基づいて受電点電力Prを演算することで、受電点電力Prを取得する(ステップS101)。   FIG. 3 is a flowchart showing the operation of the control unit 20 shown in FIG. In the control unit 20, the receiving point voltage calculating unit 101 calculates the receiving point voltage, the receiving point current calculating unit 102 calculates the receiving point current, and the receiving point power measuring unit 103 is based on the receiving point voltage and the receiving point current. The power receiving point power Pr is obtained by calculating the power receiving point power Pr (step S101).

時間計測部104は、受電点電力計測部103が出力する受電点電力Prが0を超えたか否かを判断する(ステップS102)。受電点電力Prが0を超えた場合(ステップS102:Yes)、時間計測部104は、逆潮流電力が出力電力指令値を超えている状態の継続時間Pr_over_timeにαを加える(ステップS103)。ここで、αは、受電点電力を演算する演算周期に応じた値であり、例えば、受電点電力の演算周期が5秒である場合、αの値を5とすることができ、演算毎に、ステップS102の条件を満たしている場合、継続時間Pr_over_timeに5が加算される。   The time measuring unit 104 determines whether or not the power receiving point power Pr output from the power receiving point power measuring unit 103 exceeds 0 (step S102). When the power receiving point power Pr exceeds 0 (step S102: Yes), the time measuring unit 104 adds α to the duration Pr_over_time when the reverse flow power exceeds the output power command value (step S103). Here, α is a value corresponding to the calculation cycle for calculating the power reception point power. For example, when the calculation cycle of the power reception point power is 5 seconds, the value of α can be set to 5 for each calculation. When the condition of step S102 is satisfied, 5 is added to the duration time Pr_over_time.

受電点電力Prが0を超えていない場合(ステップS102:No)、時間計測部104は、継続時間Pr_over_timeをリセットして0にする(ステップS104)。ステップS103またはステップS104において、継続時間Pr_over_timeの値が更新された後、時間計測部104は、継続時間Pr_over_timeの値が時間閾値βを超えたか否かを判断する(ステップS105)。ここで時間閾値βは、電力変換装置2の制御応答に基づいて定められる。例えば、時間閾値βは、逆潮流電力が出力電力指令値0を超えている状態が許容される時間と、出力電力を変更するためにかかる時間とに基づいて定められる。例えば、逆潮流電力が出力電力指令値0を超えている状態が許容される時間が5分であり、出力電力を変更するためにかかる時間が20秒である場合、時間閾値βの値を、5分すなわち300秒から20秒を減算した280秒とすることができる。逆潮流電力が出力電力指令値0を超えている状態が許容される時間は、例えば、出力制御機能付きの電力変換装置2の技術仕様により要求される値である。出力電力を変更するためにかかる時間が長いほど、時間閾値βの値は小さくなる。   When the power receiving point power Pr does not exceed 0 (step S102: No), the time measuring unit 104 resets the duration time Pr_over_time to 0 (step S104). After the value of duration Pr_over_time is updated in step S103 or step S104, time measurement unit 104 determines whether or not the value of duration Pr_over_time exceeds time threshold value β (step S105). Here, the time threshold β is determined based on the control response of the power conversion device 2. For example, the time threshold value β is determined based on the time during which the reverse flow power is allowed to exceed the output power command value 0 and the time taken to change the output power. For example, if the time allowed for the reverse power flow to exceed the output power command value 0 is 5 minutes and the time taken to change the output power is 20 seconds, the value of the time threshold β is 5 minutes, that is, 280 seconds obtained by subtracting 20 seconds from 300 seconds. The time during which the reverse flow power is allowed to exceed the output power command value 0 is, for example, a value required by the technical specifications of the power conversion device 2 with an output control function. The longer the time taken to change the output power, the smaller the value of the time threshold β.

継続時間Pr_over_timeの値が時間閾値βを超えた場合(ステップS105:Yes)、駆動信号生成部106は、出力電力の制御目標値を0として、出力電力が制御目標値となるように駆動信号Sg1〜Sg5を生成する(ステップS106)。継続時間Pr_over_timeの値が時間閾値βを超えていない場合(ステップS105:No)、駆動信号生成部106は、制御目標値を、受電点電力Prが出力電力指令値が示す電力に近づくように算出し、算出した制御目標値に基づいて、駆動信号Sg1〜Sg5を生成する(ステップS107)。   When the value of the duration Pr_over_time exceeds the time threshold β (step S105: Yes), the drive signal generation unit 106 sets the output power control target value to 0 and sets the drive power Sg1 so that the output power becomes the control target value. To Sg5 are generated (step S106). When the value of the duration Pr_over_time does not exceed the time threshold β (step S105: No), the drive signal generation unit 106 calculates the control target value so that the receiving point power Pr approaches the power indicated by the output power command value. Then, based on the calculated control target value, the drive signals Sg1 to Sg5 are generated (step S107).

図4は、図1に示す電力変換装置2の受電点電力の変動を示す図である。出力電力指令値に従って動作する電力変換装置2の技術仕様では、逆潮流状態となると、5分以内に電力変換装置の定格出力の5%未満となるように、交流出力電力を制限することが求められている。図4の例では、受電点電力が+5%以上の状態が5分以上継続することは許容されない。   FIG. 4 is a diagram illustrating fluctuations in power reception point power of the power conversion device 2 illustrated in FIG. 1. According to the technical specifications of the power conversion device 2 that operates according to the output power command value, it is required to limit the AC output power so that it becomes less than 5% of the rated output of the power conversion device within 5 minutes when a reverse power flow state occurs. It has been. In the example of FIG. 4, it is not allowed that the power receiving point power is + 5% or more for 5 minutes or more.

図4の区間T1では、電力変換装置2の交流出力電力よりも負荷装置の消費電力が大きいため、電力系統3から負荷装置へ順潮流しており、逆潮流状態にはなっていない。区間T1から区間T2に切り替わるタイミングで、日照量が急増し、電力変換装置2の交流出力電力が急増する。これにより、負荷装置の消費電力よりも電力変換装置2の交流出力電力が大きくなるため、制御部20では、受電点電力が0%となるように、出力電力の制御目標値を算出する。ここでは、出力電力指令値が0であるため、制御目標値は、負荷装置の消費電力と等しくなる。制御目標値は、負荷装置の消費電力が大きいほど大きい値となる。   In section T1 of FIG. 4, since the power consumption of the load device is larger than the AC output power of the power conversion device 2, the forward flow is from the power system 3 to the load device, and the reverse flow state is not established. At the timing of switching from the section T1 to the section T2, the amount of sunlight increases rapidly, and the AC output power of the power converter 2 increases rapidly. Thereby, since the AC output power of the power conversion device 2 is larger than the power consumption of the load device, the control unit 20 calculates the control target value of the output power so that the power receiving point power becomes 0%. Here, since the output power command value is 0, the control target value is equal to the power consumption of the load device. The control target value increases as the power consumption of the load device increases.

日照量および負荷装置の消費電力は常時変動しているため、条件によっては受電点電力が0%になるまでに制御することができず、定格出力の+5%以上の状態を5分以上継続してしまう場合がある。このとき、5分が経過するよりも前に、電力変換部10の制御目標値を、上記の算出した値よりも小さい値、例えば0%に制御することで、技術仕様により求められる条件を満たすことが可能になる。図4の例では、受電点電力が0%以上の状態を5分間継続したタイミング、区間T2から区間T3に切り替わるタイミングで、制御部20は、0%の制御目標値を生成する。この制御目標値に従って動作することで、電力変換装置2からの交流出力電力は0Wになるため、受電点電力は逆潮流状態から順潮流状態へと切り替わる。   Since the amount of sunlight and the power consumption of the load device are constantly changing, it cannot be controlled until the power at the receiving point reaches 0% depending on the conditions, and the state of + 5% or more of the rated output is continued for 5 minutes or more. May end up. At this time, the control target value of the power conversion unit 10 is controlled to a value smaller than the calculated value, for example, 0% before 5 minutes elapses, thereby satisfying the condition required by the technical specifications. It becomes possible. In the example of FIG. 4, the control unit 20 generates a control target value of 0% at a timing at which the power reception point power is 0% or more for 5 minutes and at a timing at which the section T2 is switched to the section T3. By operating according to this control target value, the AC output power from the power conversion device 2 becomes 0 W, so that the power receiving point power is switched from the reverse power flow state to the forward power flow state.

区間T3では、電力変換装置2が交流出力電力0Wの状態で運転を継続しているため、接続された負荷装置の消費電力分の電力が電力系統3から供給されている。続いて、区間T3から区間T4に切り替わるタイミングで、制御部20は、受電点電力が逆潮流状態にならない範囲で電力変換装置2の交流出力電力を増加させ、電力変換装置2が連系運転を継続する。   In the section T3, the power conversion device 2 continues to operate with the AC output power of 0 W, so that power corresponding to the power consumption of the connected load device is supplied from the power system 3. Subsequently, at the timing of switching from the section T3 to the section T4, the control unit 20 increases the AC output power of the power conversion device 2 within a range where the power receiving point power does not enter the reverse power flow state, and the power conversion device 2 performs the interconnection operation. continue.

以上説明したように、本発明の実施の形態1にかかる電力変換装置2は、日照量が変動したり負荷装置の消費電力が変動したりしたとしても、予め定められた時間以内に、逆潮流電力を予め定められた基準内に制限することが可能になる。したがって、技術仕様により定められた基準を満たすことが可能になる。また、電力変換装置2の上記の機能は、別途回路などを追加せずにソフトウェア処理のみで実装することが可能である。このため、部品点数の増加などによるコストの上昇を伴わずに、上記の機能を実現することが可能である。   As described above, the power conversion device 2 according to the first embodiment of the present invention allows the reverse power flow within a predetermined time even if the amount of sunshine changes or the power consumption of the load device fluctuates. It becomes possible to limit the power within a predetermined standard. Therefore, it becomes possible to satisfy the standard defined by the technical specifications. Further, the above function of the power conversion device 2 can be implemented only by software processing without adding a separate circuit or the like. For this reason, it is possible to realize the above functions without increasing costs due to an increase in the number of parts.

実施の形態2.
次に、本発明の実施の形態2について説明する。実施の形態2にかかる電力変換装置2の構成は、図1および図2に示す実施の形態1と同様である。以下では実施の形態1と異なる部分について主に説明する。実施の形態1では、逆潮流が許容されなかったのに対して、実施の形態2では、出力電力指令値までは逆潮流が許容される。
Embodiment 2. FIG.
Next, a second embodiment of the present invention will be described. The configuration of the power conversion device 2 according to the second embodiment is the same as that of the first embodiment shown in FIGS. 1 and 2. In the following, parts different from the first embodiment will be mainly described. In the first embodiment, the reverse power flow is not allowed, whereas in the second embodiment, the reverse power flow is allowed up to the output power command value.

図5は、本発明の実施の形態2にかかる電力変換装置2の制御部20の動作を示すフローチャートである。制御部20は、受電点電圧演算部101が受電点電圧を演算し、受電点電流演算部102が受電点電流を演算し、受電点電力計測部103が受電点電圧および受電点電流に基づいて受電点電力Prを演算することで、受電点電力Prを取得する(ステップS201)。   FIG. 5 is a flowchart showing the operation of the control unit 20 of the power conversion device 2 according to the second embodiment of the present invention. In the control unit 20, the receiving point voltage calculating unit 101 calculates the receiving point voltage, the receiving point current calculating unit 102 calculates the receiving point current, and the receiving point power measuring unit 103 is based on the receiving point voltage and the receiving point current. The power receiving point power Pr is obtained by calculating the power receiving point power Pr (step S201).

時間計測部104は、受電点電力計測部103が出力する受電点電力Prが出力電力指令値に基づく電力閾値Prthを超えたか否かを判断する(ステップS202)。受電点電力Prが電力閾値Prthを超えた場合(ステップS202:Yes)、時間計測部104は、逆潮流電力が出力電力指令値を超えている状態の継続時間Pr_over_timeにαを加える(ステップS203)。ここで、αは、受電点電力を演算する演算周期に応じた値であり、例えば、受電点電力の演算周期が5秒である場合、αの値を5とすることができ、演算毎に、ステップS202の条件を満たしている場合、継続時間Pr_over_timeに5が加算される。   The time measuring unit 104 determines whether or not the power receiving point power Pr output from the power receiving point power measuring unit 103 exceeds a power threshold value Prth based on the output power command value (step S202). When the power receiving point power Pr exceeds the power threshold value Prth (step S202: Yes), the time measurement unit 104 adds α to the duration Pr_over_time when the reverse flow power exceeds the output power command value (step S203). . Here, α is a value corresponding to the calculation cycle for calculating the power reception point power. For example, when the calculation cycle of the power reception point power is 5 seconds, the value of α can be set to 5 for each calculation. If the condition in step S202 is satisfied, 5 is added to the duration time Pr_over_time.

受電点電力Prが電力閾値Prthを超えていない場合(ステップS202:No)、時間計測部104は、継続時間Pr_over_timeをリセットして0にする(ステップS204)。ステップS203またはステップS204において、継続時間Pr_over_timeの値が更新された後、時間計測部104は、継続時間Pr_over_timeの値が時間閾値βを超えたか否かを判断する(ステップS205)。ここで時間閾値βは、電力変換装置2の制御応答に基づいて定められる。例えば、時間閾値βは、逆潮流電力が電力閾値Prthを超えている状態が許容される時間と、出力電力を変更するためにかかる時間とに基づいて定められる。例えば、逆潮流電力が電力閾値Prthを超えている状態が許容される時間が5分であり、出力電力を変更するためにかかる時間が20秒である場合、時間閾値βの値を280秒とすることができる。逆潮流電力が電力閾値Prthを超えている状態が許容される時間は、例えば、出力制御機能付きの電力変換装置2の技術仕様により要求される値である。出力電力を変更するためにかかる時間が長いほど、時間閾値βの値は小さくなる。   When the power receiving point power Pr does not exceed the power threshold value Prth (step S202: No), the time measurement unit 104 resets the duration time Pr_over_time to 0 (step S204). In step S203 or step S204, after the value of the duration Pr_over_time is updated, the time measurement unit 104 determines whether or not the value of the duration Pr_over_time exceeds the time threshold β (step S205). Here, the time threshold β is determined based on the control response of the power conversion device 2. For example, the time threshold β is determined based on the time during which the reverse flow power is allowed to exceed the power threshold Prth and the time taken to change the output power. For example, when the time in which the reverse flow power exceeds the power threshold value Prth is allowed for 5 minutes and the time taken to change the output power is 20 seconds, the value of the time threshold value β is 280 seconds. can do. The time in which the reverse flow power is allowed to exceed the power threshold value Prth is, for example, a value required by the technical specifications of the power conversion device 2 with an output control function. The longer the time taken to change the output power, the smaller the value of the time threshold β.

継続時間Pr_over_timeの値が時間閾値βを超えた場合(ステップS205:Yes)、駆動信号生成部106は、制御目標値を電力閾値Prthに変更して駆動信号Sg1〜Sg5を生成する(ステップS206)。継続時間Pr_over_timeの値が時間閾値βを超えていない場合(ステップS205:No)、駆動信号生成部106は、制御目標値を、受電点電力Prが出力電力指令値が示す電力に近づくように算出し、算出した制御目標値に基づいて、駆動信号Sg1〜Sg5を生成する(ステップS207)。   When the value of the duration Pr_over_time exceeds the time threshold value β (step S205: Yes), the drive signal generation unit 106 changes the control target value to the power threshold value Prth and generates drive signals Sg1 to Sg5 (step S206). . When the value of the duration Pr_over_time does not exceed the time threshold β (step S205: No), the drive signal generation unit 106 calculates the control target value so that the power receiving point power Pr approaches the power indicated by the output power command value. Based on the calculated control target value, drive signals Sg1 to Sg5 are generated (step S207).

図6は、実施の形態2にかかる電力変換装置2の受電点電力の変動を示す図である。ここでは、出力電力指令値の値を20%とする。出力電力指令値に従って動作する電力変換装置2の技術仕様では、逆潮流状態となると、5分以内に電力変換装置の定格出力の5%未満となるように、交流出力電力を制限することが求められている。図6の例では、受電点電力が+25%以上の状態が5分以上継続することは許容されない。   FIG. 6 is a diagram illustrating fluctuations of power reception point power of the power conversion device 2 according to the second embodiment. Here, the value of the output power command value is 20%. According to the technical specifications of the power conversion device 2 that operates according to the output power command value, it is required to limit the AC output power so that it becomes less than 5% of the rated output of the power conversion device within 5 minutes when a reverse power flow state occurs. It has been. In the example of FIG. 6, it is not allowed that the power receiving point power is + 25% or more for 5 minutes or more.

図6の区間T5では、電力変換装置2の交流出力電力と負荷装置の消費電力との差分である余剰電力が定格電力の20%以下の状態で稼働している。区間T5から区間T6に切り替わるタイミングで日照量が急増し、電力変換部10の交流出力電力が急増する。制御部20は、受電点電力が定格電力の20%となるように、制御目標値を受電点電力Prが出力電力指令値が示す電力に近づくように算出し、算出した制御目標値に基づいて電力変換部10を制御する。   In the section T5 of FIG. 6, the surplus power that is the difference between the AC output power of the power conversion device 2 and the power consumption of the load device is operating in a state of 20% or less of the rated power. The amount of sunlight increases rapidly at the timing of switching from the section T5 to the section T6, and the AC output power of the power converter 10 increases rapidly. The control unit 20 calculates the control target value so that the power receiving point power becomes 20% of the rated power so that the power receiving point power Pr approaches the power indicated by the output power command value, and based on the calculated control target value. The power converter 10 is controlled.

日照量および負荷装置の消費電力は常時変動しているため、条件によっては受電点電力が20%になるまでに制御することができず、定格出力の+25%以上の状態を5分以上継続してしまう場合がある。このとき、5分が経過するよりも前に、電力変換部10の交流出力電力を20%に制御することで、技術仕様により求められる条件を満たすことが可能になる。図6の例では、受電点電力が20%以上の状態を5分間継続したタイミング、区間T6から区間T7に切り替わるタイミングで、制御部20は、出力電力の制御目標値を、定格電力の20%に変更する。   Since the amount of sunlight and the power consumption of the load device are constantly changing, it cannot be controlled until the power at the receiving point reaches 20% depending on the conditions, and + 25% or more of the rated output continues for 5 minutes or more. May end up. At this time, the condition required by the technical specifications can be satisfied by controlling the AC output power of the power converter 10 to 20% before 5 minutes elapses. In the example of FIG. 6, the control unit 20 sets the control target value of the output power to 20% of the rated power at the timing when the power reception point power is 20% or more for 5 minutes and at the timing when the section T6 is switched to the section T7. Change to

以上説明したように、本発明の実施の形態2によれば、逆潮流が許容されないシステムに限らず、予め定められた基準まで逆潮流が許容されるシステムにおいても、日照量が変動したり負荷装置の消費電力が変動したりしたとしても、予め定められた時間以内に、逆潮流電力を予め定められた基準内に制限することが可能になる。したがって、技術仕様により定められた基準を満たすことが可能になる。また、電力変換装置2の上記の機能は、別途回路などを追加せずにソフトウェア処理のみで実装することが可能である。このため、部品点数の増加などによるコストの上昇を伴わずに、上記の機能を実現することが可能である。   As described above, according to the second embodiment of the present invention, not only the system in which reverse power flow is not allowed, but also in a system in which reverse power flow is allowed up to a predetermined reference, the amount of sunshine and load Even if the power consumption of the apparatus fluctuates, it becomes possible to limit the reverse power flow within a predetermined standard within a predetermined time. Therefore, it becomes possible to satisfy the standard defined by the technical specifications. Further, the above function of the power conversion device 2 can be implemented only by software processing without adding a separate circuit or the like. For this reason, it is possible to realize the above functions without increasing costs due to an increase in the number of parts.

図7は、図1に示す電力変換装置2の機能を実現するための専用のハードウェアである処理回路61を示す図である。例えば、電力変換装置2の電力変換部10、電圧検出部12,13,14,15、電流検出部16,17,18、制御部20の機能は、専用のハードウェアである処理回路61を用いて実現することができる。処理回路61は、例えば、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)またはこれらを組み合わせたものである。   FIG. 7 is a diagram illustrating a processing circuit 61 that is dedicated hardware for realizing the function of the power conversion device 2 illustrated in FIG. 1. For example, the functions of the power conversion unit 10, the voltage detection units 12, 13, 14, 15, the current detection units 16, 17, 18, and the control unit 20 of the power conversion device 2 use a processing circuit 61 that is dedicated hardware. Can be realized. The processing circuit 61 is, for example, a single circuit, a composite circuit, a programmed processor, a processor programmed in parallel, an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or a combination thereof.

図8は、図1に示す電力変換装置2の機能をソフトウェアを用いて実現するための構成を示す図である。例えば、電力変換装置2の電力変換部10、電圧検出部12,13,14,15、電流検出部16,17,18、制御部20の機能は、プロセッサ62がメモリ63に記憶されたコンピュータプログラムを読み出して実行することにより、実現することができる。また、メモリ63は、プロセッサ62が実行する各処理における一時メモリとしても用いられる。   FIG. 8 is a diagram illustrating a configuration for realizing the functions of the power conversion device 2 illustrated in FIG. 1 using software. For example, the functions of the power conversion unit 10, the voltage detection units 12, 13, 14, 15, the current detection units 16, 17, 18, and the control unit 20 of the power conversion device 2 are computer programs stored in the memory 63 by the processor 62. Can be realized by reading out and executing. The memory 63 is also used as a temporary memory in each process executed by the processor 62.

プロセッサ62は、CPU(Central Processing Unit)であり、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、DSP(Digital Signal Processor)などとも呼ばれる。メモリ63は、例えば、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリー、EPROM(Erasable Programmable ROM)、EEPROM(登録商標)(Electrically EPROM)などの不揮発性または揮発性の半導体メモリ、磁気ディスクなどである。   The processor 62 is a CPU (Central Processing Unit) and is also called a central processing unit, a processing unit, an arithmetic unit, a microprocessor, a microcomputer, a DSP (Digital Signal Processor), or the like. The memory 63 is, for example, a nonvolatile or volatile semiconductor memory such as a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable ROM), an EEPROM (registered trademark) (Electrically EPROM), Magnetic disk etc.

以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。   The configuration described in the above embodiment shows an example of the contents of the present invention, and can be combined with another known technique, and can be combined with other configurations without departing from the gist of the present invention. The part can be omitted or changed.

例えば、上記の実施の形態1および実施の形態2では、電力閾値は、出力電力指令値と一致していることとしたが、本実施の形態はかかる例に限定されない。電力閾値は、技術仕様を満たすように、出力電力指令値に基づいて定めることができる。   For example, in Embodiment 1 and Embodiment 2 described above, the power threshold value matches the output power command value, but the present embodiment is not limited to such an example. The power threshold value can be determined based on the output power command value so as to satisfy the technical specifications.

また上記の実施の形態1および実施の形態2では、受電点電力Prが電力閾値以上である状態の継続時間が時間閾値を超える場合、制御目標値を出力電力指令値とすることとしたが、本実施の形態はかかる例に限定されない。例えば、継続時間が時間閾値を超える場合、制御目標値を、受電点電力Prが出力電力指令値の示す電力値に近づくように算出された通常時の値よりも小さい値に変更する。変更後の値は、確実に技術仕様を満たすように、上記の算出された通常時の値よりも十分に小さい値であることが望ましい。また、出力電力指令値までは受電点電力が増えてもよいため、制御目標値を出力電力指令値とした場合、出力電力の全てが逆潮流したとしても、技術仕様を満たすことが可能になる。   In the first embodiment and the second embodiment, when the duration of the state where the power receiving point power Pr is equal to or greater than the power threshold exceeds the time threshold, the control target value is set as the output power command value. The present embodiment is not limited to such an example. For example, when the duration exceeds the time threshold, the control target value is changed to a value smaller than the normal value calculated so that the power receiving point power Pr approaches the power value indicated by the output power command value. The changed value is desirably a value sufficiently smaller than the calculated normal value so as to surely meet the technical specifications. In addition, the receiving point power may increase up to the output power command value. Therefore, when the control target value is the output power command value, it is possible to satisfy the technical specifications even if all of the output power flows backward. .

1 直流電源、2 電力変換装置、3 電力系統、10 電力変換部、11 開閉器、12,13,14,15 電圧検出部、16,17,18 電流検出部、20 制御部、21 昇圧コンバータ部、22 インバータ部、23 フィルタ回路部、31,32 カレントセンサ、41,42 入力端子、43,44 出力端子、101 受電点電圧演算部、102 受電点電流演算部、103 受電点電力計測部、104 時間計測部、105 出力制御部、106 駆動信号生成部、C1,C2,C3 コンデンサ、D1 ダイオード、L1,L2,L3 リアクトル、Q1,Q2,Q3,Q4,Q5 スイッチング素子、Sg1,Sg2,Sg3,Sg4,Sg5 駆動信号。   DESCRIPTION OF SYMBOLS 1 DC power supply, 2 Power conversion device, 3 Power system, 10 Power conversion part, 11 Switch, 12, 13, 14, 15 Voltage detection part, 16, 17, 18 Current detection part, 20 Control part, 21 Boost converter part , 22 Inverter unit, 23 Filter circuit unit, 31, 32 Current sensor, 41, 42 Input terminal, 43, 44 Output terminal, 101 Receiving point voltage calculating unit, 102 Receiving point current calculating unit, 103 Receiving point power measuring unit, 104 Time measurement unit, 105 output control unit, 106 drive signal generation unit, C1, C2, C3 capacitor, D1 diode, L1, L2, L3 reactor, Q1, Q2, Q3, Q4, Q5 switching element, Sg1, Sg2, Sg3 Sg4, Sg5 drive signal.

Claims (5)

直流電力を交流電力に変換して電力系統および負荷装置の少なくとも1つに供給可能な電力変換装置であって、
制御目標値に従って、直流電源から供給される直流電力を交流電力に変換する電力変換部と、
受電点電力を計測する受電点電力計測部と、
前記受電点電力が出力電力指令値に基づく電力閾値を超えている状態の継続時間を計測する時間計測部と、
前記受電点電力が前記出力電力指令値の示す電力値に近づくように前記制御目標値を算出すると共に、前記継続時間が時間閾値を超える場合、前記制御目標値を算出した値よりも小さい値に変更する出力制御部と、
を備えることを特徴とする電力変換装置。
A power conversion device capable of converting DC power into AC power and supplying it to at least one of a power system and a load device,
A power conversion unit that converts DC power supplied from a DC power source into AC power according to a control target value;
A receiving point power measuring unit for measuring the receiving point power;
A time measuring unit for measuring a duration of a state in which the power receiving point power exceeds a power threshold value based on an output power command value;
The control target value is calculated so that the power receiving point power approaches the power value indicated by the output power command value, and when the duration exceeds a time threshold, the control target value is set to a value smaller than the calculated value. An output control unit to be changed;
A power conversion device comprising:
前記時間閾値は、前記受電点電力が前記電力閾値を超えている状態が許容される時間と、前記電力変換部からの出力電力を変更するためにかかる時間とに基づいて定められることを特徴とする請求項1に記載の電力変換装置。   The time threshold is determined based on a time during which the power receiving point power is allowed to exceed the power threshold and a time taken to change the output power from the power converter. The power conversion device according to claim 1. 前記出力制御部は、前記継続時間が時間閾値を超える場合、前記制御目標値を前記電力変換部の定格出力値に対する割合で示される予め定められた値に変更することを特徴とする請求項1または2に記載の電力変換装置。   The said output control part changes the said control target value to the predetermined value shown by the ratio with respect to the rated output value of the said power converter, when the said duration exceeds a time threshold value. Or the power converter device of 2. 前記出力制御部は、前記継続時間が時間閾値を超える場合、前記制御目標値を前記出力電力指令値が示す値に変更することを特徴とする請求項1から3のいずれか1項に記載の電力変換装置。   The said output control part changes the said control target value to the value which the said output electric power command value shows, when the said continuation time exceeds a time threshold value, The Claim 1 characterized by the above-mentioned. Power conversion device. 前記出力制御部は、前記制御目標値を変更した後、前記受電点電力が前記出力電力指令値が示す値を超えない範囲で前記制御目標値を大きくすることを特徴とする請求項1から4のいずれか1項に記載の電力変換装置。   5. The output control unit, after changing the control target value, increases the control target value in a range in which the power receiving point power does not exceed a value indicated by the output power command value. The power converter device according to any one of the above.
JP2018079872A 2018-04-18 2018-04-18 Power conversion device Pending JP2019193327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018079872A JP2019193327A (en) 2018-04-18 2018-04-18 Power conversion device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018079872A JP2019193327A (en) 2018-04-18 2018-04-18 Power conversion device

Publications (1)

Publication Number Publication Date
JP2019193327A true JP2019193327A (en) 2019-10-31

Family

ID=68387803

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018079872A Pending JP2019193327A (en) 2018-04-18 2018-04-18 Power conversion device

Country Status (1)

Country Link
JP (1) JP2019193327A (en)

Similar Documents

Publication Publication Date Title
TWI624147B (en) A multiple direct current (dc) voltage sources bi-directional energy converter
US9450512B2 (en) Method for the operational control of an inverter
JP5939096B2 (en) Power converter
EP2761715B1 (en) Power converter islanding detection
JP5284447B2 (en) Distributed power system
US10797485B2 (en) Power conditioner, power supply system, and current control method
EP3823152A1 (en) Power conversion system, conversion circuit control method and program
JP5325507B2 (en) Grid interconnection inverter
JP5211772B2 (en) Power conditioner operation control device and photovoltaic power generation system
JP3805953B2 (en) Power conditioner and solar power generation system using the same
US11329488B2 (en) Power conversion system, method for controlling converter circuit, and program
JP2008228494A (en) Inverter for coordinating system
KR101099919B1 (en) Power conversion control device using solar cell
JP2019193327A (en) Power conversion device
US10727672B2 (en) Power control apparatus, control method of power control apparatus, distributed power supply system, and control method of distributed power supply system
US10886744B2 (en) Power conversion system, power supply system and power conversion device
TWI773963B (en) Power system and power conversion device
US9444365B2 (en) Tracking method and tracking device for a voltage converter for a photovoltaic system
JP7040029B2 (en) Power control device, control method of power control device
JP7209165B2 (en) POWER CONTROL DEVICE, CONTROL METHOD OF POWER CONTROL DEVICE
JP2013026242A (en) Photovoltaic power generation system
WO2014169089A1 (en) Method and apparatus for improving pv module fill factor using a voltage clamping circuit
JP2015154517A (en) PV power conditioner
JP7491270B2 (en) Power conditioner
JP7363858B2 (en) power conditioner