JP2019161706A - Power transfer system - Google Patents

Power transfer system Download PDF

Info

Publication number
JP2019161706A
JP2019161706A JP2018041323A JP2018041323A JP2019161706A JP 2019161706 A JP2019161706 A JP 2019161706A JP 2018041323 A JP2018041323 A JP 2018041323A JP 2018041323 A JP2018041323 A JP 2018041323A JP 2019161706 A JP2019161706 A JP 2019161706A
Authority
JP
Japan
Prior art keywords
power
communities
community
interchange
commercial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018041323A
Other languages
Japanese (ja)
Other versions
JP7121902B2 (en
Inventor
実 麻植
Minoru Asaue
実 麻植
蓑輪 義文
Yoshibumi Minowa
義文 蓑輪
満 松川
Mitsuru Matsukawa
満 松川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Co Ltd
Original Assignee
Nissin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=67992748&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2019161706(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Nissin Electric Co Ltd filed Critical Nissin Electric Co Ltd
Priority to JP2018041323A priority Critical patent/JP7121902B2/en
Publication of JP2019161706A publication Critical patent/JP2019161706A/en
Application granted granted Critical
Publication of JP7121902B2 publication Critical patent/JP7121902B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

To transfer power between multiple power communities without influencing power quality of a commercial power system.SOLUTION: The present invention relates to a power transfer system 100 used for multiple power communities C1 and C2 each receiving power supply from a commercial power system 1 and performing a power demand/supply operation using a load 2, a power storage device 3 and distributed power sources 4, and configured to transfer power between the multiple power communities C1 and C2. The power transfer system comprises: a power line 16 connecting the multiple power communities C1 and C2 without interposing the commercial power system 1; a power transfer apparatus 17 provided in the power line 16 and configured to regulate power to be transferred between the multiple power communities C1 and C2; and a control device 19 which controls the power transfer apparatus 17.SELECTED DRAWING: Figure 1

Description

本発明は、電力融通システムに関するものである。   The present invention relates to a power interchange system.

この種の電力融通システムとしては、特許文献1に示すように、太陽光発電設備及び負荷設備等を組み合わせて1つのグループ(電力コミュニティ)とし、グループ間で電力を融通するシステムが考えられている。なお、各グループは、商用電力系統からの電力供給を受けるとともに、太陽光発電設備及び負荷設備等によって電力需給動作が行われる。   As this type of power accommodation system, as shown in Patent Document 1, a system that combines solar power generation equipment, load equipment, and the like into one group (power community), and that accommodates power between the groups is considered. . Each group receives power supply from a commercial power system, and power supply and demand operations are performed by solar power generation equipment and load equipment.

この電力融通システムは、各グループの経済性を考慮した上で他のグループに対して電力の融通を行うものであり、他のグループへ電力を融通する場合には、商用電力系統に逆潮流する必要がある。   This power interchange system performs power interchange with other groups in consideration of the economics of each group. When power is interchanged with other groups, the power flows back to the commercial power system. There is a need.

しかしながら、商用電力系統に逆潮流すると、商用電力系統の電力品質において悪影響を与える懸念がある。   However, there is a concern that a reverse power flow to the commercial power system will adversely affect the power quality of the commercial power system.

特開2004−274851号公報JP 2004-274851 A

そこで本発明は、上記問題点を解決すべくなされたものであり、商用電力系統の電力品質に悪影響を与えることなく複数の電力コミュニティ間で電力を融通することをその主たる課題とするものである。   Therefore, the present invention has been made to solve the above-mentioned problems, and has as its main subject the interchange of power among a plurality of power communities without adversely affecting the power quality of the commercial power system. .

すなわち本発明に係る電力融通システムは、商用電力系統から電力供給を受けるとともに負荷と蓄電装置と分散電源とによる電力需給動作を行う複数の電力コミュニティに用いられ、前記複数の電力コミュニティの間でそれらの電力を融通する電力融通システムであって、前記複数の電力コミュニティを前記商用電力系統を介さずに接続する電力線と、前記電力線に設けられ、前記複数の電力コミュニティの間で融通される電力を調整する電力融通機器と、前記電力融通機器を制御する制御装置とを備えることを特徴とする。   That is, the power interchange system according to the present invention is used in a plurality of power communities that receive power supply from a commercial power system and perform power supply and demand operations using a load, a power storage device, and a distributed power source. A power interchange system that accommodates a plurality of power communities, a power line that connects the plurality of power communities without going through the commercial power system, and a power that is provided in the power line and that is interchanged between the plurality of power communities. It comprises a power accommodation device to be adjusted and a control device for controlling the power accommodation device.

このような本発明であれば、複数の電力コミュニティを商用電力系統とは別の電力線で接続し、当該電力線に設けられた電力融通機器を制御して電力を融通するので、商用電力系統への逆潮流が不要となる。その結果、電力融通において商用電力系統の電力品質に悪影響を与えることはない。
また、商用電力系統の停電時には、電力線を介して別の電力コミュニティからの電力供給が可能となり、停電範囲の縮小化を図ることができ、BCP(事業継続計画)に対応した動作を実現することができる。さらに、複数の電力コミュニティの間で電力を融通することで、デマンドレスポンス(DR)に対応した動作やバーチャルパワープラント(VPP)に対応した動作を実現することができる。その上、電力を融通することによって、太陽光発電装置等の再生可能エネルギー発電装置の出力抑制制御を防ぐことができ、再生可能エネルギーを有効活用することができる。
In the present invention, a plurality of power communities are connected by a power line different from the commercial power system, and power is accommodated by controlling a power accommodation device provided in the power line. No reverse power flow is required. As a result, there is no adverse effect on the power quality of the commercial power system in power interchange.
In addition, in the event of a power failure in the commercial power system, power can be supplied from another power community via the power line, the range of power failure can be reduced, and operations that comply with BCP (Business Continuity Plan) can be realized. Can do. Furthermore, the operation | movement corresponding to a demand response (DR) and the operation | movement corresponding to a virtual power plant (VPP) are realizable by accommodating electric power between several electric power communities. In addition, by accommodating power, output suppression control of a renewable energy power generation device such as a solar power generation device can be prevented, and renewable energy can be used effectively.

前記電力コミュニティが前記商用電力系統の受電点に整流器を有する場合には、当該電力コミュニティ内では直流配電が行われる。受電点に整流器が設けられているので、電力コミュニティから商用電力系統への逆潮流を構造的に防ぐことができる。
交流電力での送電においては電力線のインピーダンスによる電圧降下や電力損失が発生し、送電効率が低くなる。このため、電力融通システムは、前記電力線及び前記電力融通機器により前記複数の電力コミュニティの間で直流電力を融通することが望ましい。この構成であれば、高効率の電力送電が可能となる。
When the electric power community has a rectifier at the receiving point of the commercial electric power system, direct current distribution is performed in the electric power community. Since the rectifier is provided at the power receiving point, the reverse power flow from the power community to the commercial power system can be structurally prevented.
In power transmission using AC power, a voltage drop or power loss occurs due to the impedance of the power line, resulting in low transmission efficiency. For this reason, it is desirable that the power interchange system accommodates DC power among the plurality of power communities by the power line and the power interchange device. With this configuration, highly efficient power transmission is possible.

電力融通システムは、複数のコミュニティにおけるBCP、DR及びVPPに対応した動作を一括して管理するための管理装置を備えることが望ましい。この場合、前記制御装置は、前記管理装置に通信回線を介して接続され、前記管理装置からの制御指令に応じて前記電力融通機器を制御することが望ましい。   The power interchange system desirably includes a management device for collectively managing operations corresponding to BCP, DR, and VPP in a plurality of communities. In this case, it is desirable that the control device is connected to the management device via a communication line, and controls the power interchange apparatus in accordance with a control command from the management device.

具体的には、前記電力融通機器は、前記電力線を開閉するスイッチを有しており、前記制御装置は、前記管理装置からの融通開始指令を受け付けて前記スイッチを閉じることが考えられる。   Specifically, it is conceivable that the power accommodation device has a switch that opens and closes the power line, and the control device receives an accommodation start command from the management device and closes the switch.

また、前記電力融通機器は、電力変換器を有しており、前記制御装置は、前記管理装置からの融通開始指令を受け付けて前記電力変換器を制御することが考えられる。   In addition, it is conceivable that the power accommodation device has a power converter, and the control device receives the accommodation start command from the management device and controls the power converter.

このように構成した本発明によれば、商用電力系統の電力品質に悪影響を与えることなく複数の電力コミュニティ間で電力を融通することができる。   According to the present invention configured as described above, power can be interchanged among a plurality of power communities without adversely affecting the power quality of the commercial power system.

第1実施形態の電力融通システムの構成を示す模式図である。It is a schematic diagram which shows the structure of the electric power interchange system of 1st Embodiment. 第1実施形態における電力融通システムのスイッチが開放した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the switch of the power interchange system in 1st Embodiment opened. 第1実施形態における電力融通システムのスイッチが開放した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the switch of the power interchange system in 1st Embodiment opened. 第1実施形態における電力融通システムのスイッチが閉じた状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the switch of the power interchange system in 1st Embodiment closed. 第1実施形態における電力融通システムのスイッチが閉じた状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the switch of the power interchange system in 1st Embodiment closed. 第2実施形態の電力融通システムの構成を示す模式図である。It is a schematic diagram which shows the structure of the electric power interchange system of 2nd Embodiment. 第2実施形態における電力融通システムのDC/DC変換器が動作した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the DC / DC converter of the power interchange system in 2nd Embodiment operate | moved. 第2実施形態における電力融通システムのDC/DC変換器が動作した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the DC / DC converter of the power interchange system in 2nd Embodiment operate | moved. 第2実施形態における電力融通システムのDC/DC変換器が動作した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the DC / DC converter of the power interchange system in 2nd Embodiment operate | moved. 第2実施形態における電力融通システムのDC/DC変換器が動作した状態での動作状態を示す模式図である。It is a schematic diagram which shows the operation state in the state which the DC / DC converter of the power interchange system in 2nd Embodiment operate | moved. 第2実施形態における管理装置の下げDR要求に対する動作を示すフローチャートである。It is a flowchart which shows the operation | movement with respect to the fall DR request | requirement of the management apparatus in 2nd Embodiment. 第2実施形態における管理装置の上げDR要求に対する動作を示すフローチャートである。It is a flowchart which shows the operation | movement with respect to the raise DR request | requirement of the management apparatus in 2nd Embodiment. 第2実施形態における管理装置のVPP要求に対する動作を示すフローチャートである。It is a flowchart which shows the operation | movement with respect to the VPP request | requirement of the management apparatus in 2nd Embodiment.

<<第1実施形態>>
以下に、本発明に係る電力融通システムの一実施形態について、図面を参照して説明する。
<< First Embodiment >>
Hereinafter, an embodiment of a power interchange system according to the present invention will be described with reference to the drawings.

本実施形態の電力融通システム100は、図1に示すように、複数の電力コミュニティC1、C2の間でそれらの電力を融通するものである。以下では、2つの電力コミュニティC1、C2の間で電力を融通する例を示すが、3つ以上の電力コミュニティにも適用することができる。   As shown in FIG. 1, the power accommodation system 100 according to the present embodiment accommodates power among a plurality of power communities C1 and C2. In the following, an example is shown in which power is interchanged between the two power communities C1 and C2, but the present invention can also be applied to three or more power communities.

<1.電力コミュニティ>
各電力コミュニティC1、C2は、商用電力系統1から電力供給を受けるとともに負荷2と蓄電装置3と分散電源4とによる電力需給動作を行うものである。電力コミュニティC1、C2における商用電力系統1の受電点には、受電遮断器5と、交流電力を直流電力に変換する整流器6と、直流遮断器7とが設けられている。これにより電力コミュニティC1、C2は、直流配電回路を構成する。
<1. Electricity community>
Each of the power communities C1 and C2 receives power supply from the commercial power system 1 and performs power supply and demand operations by the load 2, the power storage device 3, and the distributed power supply 4. A power receiving breaker 5, a rectifier 6 for converting AC power into DC power, and a DC circuit breaker 7 are provided at a power receiving point of the commercial power system 1 in the power communities C1 and C2. As a result, the power communities C1 and C2 constitute a DC distribution circuit.

具体的に各電力コミュニティC1、C2の直流配電回路には、負荷2として直流負荷2a及び交流負荷2b、蓄電装置3として二次電池3a、分散電源4として太陽光発電装置等の再生可能エネルギー発電装置4aや発電機(不図示)等が接続されている。直流負荷は2a、DC/DC変換器8を介して直流配電回路に接続されており、交流負荷2bは、AC/DC変換器9を介して直流配電回路に接続されている。二次電池3aは、DC/DC変換器10を介して直流配電回路に接続されており、再生可能エネルギー発電装置4aは、DC/DC変換器11を介して直流配電回路に接続されている。なお、電力コミュニティC1、C2の構成は上記に限られず、それらの一部から構成されるものであっても良いし、他の需要設備を有するものであっても良い。   Specifically, the DC distribution circuit of each of the power communities C1 and C2 includes a DC load 2a and an AC load 2b as the load 2, a secondary battery 3a as the power storage device 3, and a renewable energy power generation such as a solar power generator as the distributed power source 4. The apparatus 4a, a generator (not shown), etc. are connected. The DC load 2a is connected to the DC power distribution circuit via the DC / DC converter 8, and the AC load 2b is connected to the DC power distribution circuit via the AC / DC converter 9. The secondary battery 3 a is connected to the DC power distribution circuit via the DC / DC converter 10, and the renewable energy power generation device 4 a is connected to the DC power distribution circuit via the DC / DC converter 11. In addition, the structure of the electric power communities C1 and C2 is not limited to the above, and may be composed of a part of them or may have other demand facilities.

また各電力コミュニティC1、C2は、電力コミュニティC1、C2内の各変換器8〜11及び分散電源4等を制御して電力需給動作を行わせる制御装置12と、外部の管理装置14と有線又は無線の通信回線により接続された通信装置13とを有している。   Each of the power communities C1 and C2 controls the converters 8 to 11 and the distributed power supply 4 in the power communities C1 and C2 and performs a power supply / demand operation and an external management device 14 wired or And a communication device 13 connected by a wireless communication line.

なお、電力コミュニティC1、C2としては、例えば地域を区画して構成した複数の需要家から構成されるグループや、同一事業者が所有する複数の建屋、工場から構成されるグループ等のように、商用電力系統に連系されている複数の需要設備から構成されるグループである。   In addition, as the electric power communities C1 and C2, for example, a group composed of a plurality of consumers configured by dividing an area, a plurality of buildings owned by the same operator, a group composed of factories, and the like, It is a group consisting of multiple demand facilities linked to the commercial power system.

<2.電力融通システム100>
具体的に電力融通システム100は、複数の電力コミュニティC1、C2を管理する管理装置14と、複数の電力コミュニティC1、C2の間の電力を融通するための電力融通設備15とを備えている。
<2. Power interchange system 100>
Specifically, the power accommodation system 100 includes a management device 14 that manages a plurality of power communities C1 and C2, and a power accommodation facility 15 for accommodating power between the plurality of power communities C1 and C2.

管理装置14は、いわゆるリソースアグリゲータや親局と呼ばれるものであり、送配電事業者又は小売電気事業者からのDR要求、VPP要求及びBCP要求などに応じて、複数の電力コミュニティC1、C2及び電力融通設備15に制御指令を送信するものである。   The management device 14 is a so-called resource aggregator or master station, and a plurality of power communities C1, C2 and power according to a DR request, a VPP request, a BCP request, etc. from a power transmission / distribution company or a retail electric company. A control command is transmitted to the accommodation facility 15.

具体的に管理装置14は、上記要求を受け取った場合に、電力コミュニティC1、C2の通信装置13から電力コミュニティC1、C2の電力需給状態を示す状態データを取得する。ここで、電力コミュニティC1、C2の電力需給状態は、二次電池3aの充電状態(SOC)、再生可能エネルギー発電装置4aの発電状況、負荷容量等を含む。そして、管理装置14は、それら電力コミュニティC1、C2の電力需給状態に応じて、各電力コミュニティC1、C2に制御指令を送信するとともに、電力融通設備15に制御指令を送信する。   Specifically, when the management device 14 receives the request, the management device 14 acquires state data indicating the power supply / demand states of the power communities C1 and C2 from the communication devices 13 of the power communities C1 and C2. Here, the power supply and demand status of the power communities C1 and C2 includes the state of charge (SOC) of the secondary battery 3a, the power generation status of the renewable energy power generation device 4a, the load capacity, and the like. Then, the management device 14 transmits a control command to each of the power communities C1 and C2 and transmits a control command to the power accommodation facility 15 according to the power supply and demand state of the power communities C1 and C2.

電力融通設備15は、複数の電力コミュニティC1、C2を商用電力系統1を介さずに接続する電力線16と、電力線16に設けられ、複数の電力コミュニティC1、C2の間で融通される電力を調整する電力融通機器17と、管理装置14と有線又は無線の通信回線により接続された通信装置18と、電力融通機器17を制御する制御装置19とを備えている。   The power interchange facility 15 is provided on the power line 16 that connects the plurality of power communities C1 and C2 without going through the commercial power system 1, and adjusts the power exchanged between the plurality of power communities C1 and C2. Power communication device 17, a communication device 18 connected to the management device 14 via a wired or wireless communication line, and a control device 19 that controls the power interchange device 17.

電力線16は、その一端が一方の電力コミュニティC1の直流配電回路に接続されており、他端が他方の電力コミュニティC2の直流配電回路に接続されている。これにより電力線16は直流電力を送電するものとなる。   One end of the power line 16 is connected to the DC power distribution circuit of one power community C1, and the other end is connected to the DC power distribution circuit of the other power community C2. As a result, the power line 16 transmits DC power.

電力融通機器17は、電力線16の断接(開閉)を切り替えるスイッチである。このスイッチ171としては、例えば半導体スイッチ、又は、半導体スイッチと機械式スイッチとを組み合わせたハイブリッドスイッチなどの高速切り替えが可能な切替スイッチを用いることができる。例えば半導体スイッチを用いた場合には、遮断時間を2m秒以下にすることができる。また、ハイブリッドスイッチを用いた場合には、遮断時間を2m秒以下にすることができるだけでなく、通電損失をゼロにすることができる。なお、このスイッチ171は、制御装置19により開閉制御される。   The power interchange device 17 is a switch that switches connection / disconnection (opening / closing) of the power line 16. As this switch 171, for example, a semiconductor switch or a changeover switch capable of high-speed switching such as a hybrid switch in which a semiconductor switch and a mechanical switch are combined can be used. For example, when a semiconductor switch is used, the cutoff time can be set to 2 milliseconds or less. In addition, when the hybrid switch is used, not only the interruption time can be set to 2 msec or less, but also the energization loss can be reduced to zero. The switch 171 is controlled to open and close by the control device 19.

制御装置19は、管理装置14からの制御指令を受け付けてスイッチ171を開閉制御するものである。具体的に制御装置19は、管理装置14からの融通開始指令を受け付けてスイッチ171を閉じる。   The control device 19 receives a control command from the management device 14 and controls opening / closing of the switch 171. Specifically, the control device 19 receives an interchange start command from the management device 14 and closes the switch 171.

次に、電力融通システム100の動作について簡単に説明する。   Next, the operation of the power interchange system 100 will be briefly described.

送配電事業者又は小売電気事業者からのDR要求、VPP要求及びBCP要求があった場合、管理装置14は、各電力コミュニティC1、C2の電力需給状態を確認する。   When there is a DR request, a VPP request, and a BCP request from a power transmission / distribution company or a retail electricity company, the management device 14 checks the power supply / demand status of each of the power communities C1, C2.

管理装置14は、各電力コミュニティC1、C2の電力需給状態に応じて各電力コミュニティC1、C2の制御指令を作成し、対応する電力コミュニティC1、C2の通信装置13に送信する。また、管理装置14は、電力融通設備15の制御指令を作成して対応する電力融通設備15の通信装置18に送信する。   The management device 14 creates control commands for the power communities C1 and C2 according to the power supply and demand status of the power communities C1 and C2, and transmits the control commands to the communication devices 13 of the corresponding power communities C1 and C2. In addition, the management device 14 creates a control command for the power accommodation facility 15 and transmits it to the communication device 18 of the corresponding power accommodation facility 15.

そして、電力コミュニティC1、C2の制御装置12は、受信した制御指令に基づいて各変換器8〜11及び分散装置4等を制御する。また、電力融通設備15の制御装置19は、受信した制御指令に基づいてスイッチ171を制御する。これにより、複数の電力コミュニティC1、C2の間で電力が融通される。   And the control apparatus 12 of electric power community C1, C2 controls each converter 8-11, the dispersion | distribution apparatus 4, etc. based on the received control command. Further, the control device 19 of the power accommodation facility 15 controls the switch 171 based on the received control command. As a result, power is interchanged between the plurality of power communities C1 and C2.

以下に電力融通システム100による電力コミュニティC1、C2の具体的な動作について図2〜図5を参照して説明する。なお、図2〜図5に示す電力の需給状態は一例であり、各装置の状況(例えば二次電池3aの過充電等)に応じて種々変更される。   Hereinafter, specific operations of the power communities C1 and C2 by the power interchange system 100 will be described with reference to FIGS. The power supply and demand states shown in FIGS. 2 to 5 are examples, and various changes are made according to the status of each device (for example, overcharge of the secondary battery 3a).

(1)電力融通設備15のスイッチ171が開放した状態 (1) State in which switch 171 of power interchange facility 15 is open

(1−1)1つの電力コミュニティC1において、何らかの事象(受電設備の保守点検等)により、商用電力系統1からの電力供給が無くなった場合には、当該電力コミュニティC1においては、二次電池3a及び再生可能エネルギー発電装置4aと負荷2a、2bとによる電力需給動作を行う(図2参照)。これにより、BCPに対応した動作及びDRに対応した動作が可能となる。 (1-1) In one power community C1, when there is no power supply from the commercial power system 1 due to some event (maintenance and inspection of the power receiving facility), the secondary battery 3a in the power community C1 And the electric power supply-and-demand operation by the renewable energy electric power generating apparatus 4a and load 2a, 2b is performed (refer FIG. 2). As a result, an operation corresponding to BCP and an operation corresponding to DR are possible.

一方、商用電力系統1からの電力供給を受けている電力コミュニティC2においては、商用電力系統1からの電力供給を受けながら、二次電池3a及び再生可能エネルギー発電装置4aと負荷2a、2bとによる電力需給動作を行う(図2参照)。これにより、DRに対応した動作が可能となる。   On the other hand, in the power community C2 receiving power supply from the commercial power system 1, while receiving power supply from the commercial power system 1, the secondary battery 3a and the renewable energy power generator 4a and the loads 2a and 2b are used. Electric power supply / demand operation is performed (see FIG. 2). Thereby, the operation corresponding to DR becomes possible.

(1−2)全電力コミュニティC1、C2が商用電力系統1と連系している場合には、各電力コミュニティC1、C2内の負荷2a、2bに対する商用電力系統1、二次電池3a及び再生可能エネルギー発電装置4aの需給状況を監視して、商用電力系統1に対してDRに対応した動作を行う(図3参照)。このとき、各電力コミュニティC1、C2の受電点に整流器6を設けているので、商用電力系統1への逆潮流動作を行うこと無く、DRに対応した動作を行うことができる。これにより、商用電力系統1の電力品質に悪影響を与えることはない。また、安価な深夜電力を二次電池3aに充電しても、商用電力系統1への電力回生(売電)することもない。 (1-2) When all the power communities C1 and C2 are linked to the commercial power system 1, the commercial power system 1, the secondary battery 3a and the regeneration for the loads 2a and 2b in each power community C1 and C2 The supply and demand situation of the possible energy power generation device 4a is monitored, and an operation corresponding to DR is performed on the commercial power system 1 (see FIG. 3). At this time, since the rectifier 6 is provided at the receiving point of each of the power communities C1 and C2, the operation corresponding to the DR can be performed without performing the reverse power flow operation to the commercial power system 1. Thereby, the power quality of the commercial power system 1 is not adversely affected. Further, even if inexpensive midnight power is charged to the secondary battery 3a, power regeneration (power sale) to the commercial power system 1 is not performed.

(2)管理装置14から送信される電力融通指令に基づいて、電力融通設備15の制御装置19がスイッチ171を閉じた状態(直流連系した状態) (2) A state in which the control device 19 of the power accommodation facility 15 closes the switch 171 based on the power accommodation command transmitted from the management device 14 (a state in which DC connection is established).

(2−1)商用電力系統1が停電した場合、各電力コミュニティC1、C2の二次電池3a及び再生可能エネルギー発電装置4aから各電力コミュニティC1、C2の負荷2a、2bに電力を供給するとともに、電力コミュニティC1、C2の間でも直流電力の需給動作を行う(図4参照)。電力コミュニティC1、C2内の二次電池3a及び再生可能エネルギー発電装置4aからの電力供給が無くなっても、別の電力コミュニティC1、C2から電力線16及びスイッチ171を介して、当該電力コミュニティC1、C2の負荷2a、2bに対して直流電力による電力供給が可能となる。これにより、BCPに対応した動作及びVPPに対応した動作を行うことができる。なお、電力供給される負荷2a、2bは、予め定められた優先順位に基づいて負荷選択を行う。 (2-1) When the commercial power system 1 fails, the secondary battery 3a of each power community C1, C2 and the renewable energy power generator 4a supply power to the loads 2a, 2b of each power community C1, C2. The DC power supply / demand operation is also performed between the power communities C1 and C2 (see FIG. 4). Even if there is no power supply from the secondary battery 3a and the renewable energy power generation device 4a in the power communities C1 and C2, the power communities C1 and C2 are connected from another power community C1 and C2 via the power line 16 and the switch 171. It is possible to supply electric power by DC power to the loads 2a and 2b. Thereby, the operation corresponding to BCP and the operation corresponding to VPP can be performed. Note that the loads 2a and 2b to which power is supplied perform load selection based on a predetermined priority order.

(2−2)1つの電力コミュニティC1へC2からの電力供給を受ける(図5参照)。これにより、商用電力系統1からの電力供給が無くなった電力コミュニティC1での負荷停電範囲を無くす、或いは狭めることが可能となり、BCPに対応した動作及びVPPに対応した動作を行うことができる。 (2-2) Receive power supply from C2 to one power community C1 (see FIG. 5). As a result, it is possible to eliminate or narrow the load power outage range in the power community C1 in which power supply from the commercial power system 1 is lost, and it is possible to perform an operation corresponding to BCP and an operation corresponding to VPP.

(2−3)全電力コミュニティC1、C2が商用電力系統1と連系している場合には、各電力コミュニティC1、C2内の負荷2a、2bに対する商用電力系統1、二次電池3a及び再生可能エネルギー発電装置4aの需給状況を監視して、各電力コミュニティC1、C2の二次電池3a及び再生可能エネルギー発電装置4aから各電力コミュニティC1、C2の負荷2a、2bに電力を供給するとともに、電力コミュニティC1、C2の間でも直流電力の需給動作を行う。これにより、商用電力系統1に対してDRに対応した動作を行うことができる。このとき、各電力コミュニティC1、C2の受電点に整流器6を設けているので、商用電力系統1への逆潮流動作を行うこと無く、DRに対応した動作を行うことができる。これにより、商用電力系統1の電力品質に悪影響を与えることはない。また、太陽光発電装置等の再生可能エネルギー発電装置4aの出力抑制制御を防ぐことができ、再生可能エネルギーを有効活用することができる。 (2-3) When all the power communities C1 and C2 are linked to the commercial power system 1, the commercial power system 1, the secondary battery 3a and the regeneration for the loads 2a and 2b in each power community C1 and C2 While monitoring the supply and demand situation of the renewable energy power generation device 4a and supplying power from the secondary battery 3a of each power community C1, C2 and the renewable energy power generation device 4a to the loads 2a, 2b of each power community C1, C2, The DC power supply / demand operation is also performed between the power communities C1 and C2. Thereby, the operation | movement corresponding to DR with respect to the commercial power grid | system 1 can be performed. At this time, since the rectifier 6 is provided at the receiving point of each of the power communities C1 and C2, the operation corresponding to the DR can be performed without performing the reverse power flow operation to the commercial power system 1. Thereby, the power quality of the commercial power system 1 is not adversely affected. Moreover, the output suppression control of the renewable energy power generation device 4a such as a solar power generation device can be prevented, and the renewable energy can be effectively used.

<第1実施形態の効果>
このように構成した本実施形態の電力融通システム100によれば、複数の電力コミュニティC1、C2を商用電力系統1とは別の電力線16で接続し、当該電力線16に設けられたスイッチ171を制御して電力を融通するので、商用電力系統1への逆潮流が不要となる。その結果、電力融通において商用電力系統1の電力品質に悪影響を与えることはない。
<Effects of First Embodiment>
According to the power interchange system 100 of the present embodiment configured as described above, a plurality of power communities C1 and C2 are connected by a power line 16 different from the commercial power system 1, and the switch 171 provided on the power line 16 is controlled. Thus, since the power is accommodated, the reverse power flow to the commercial power system 1 becomes unnecessary. As a result, the power quality does not adversely affect the power quality of the commercial power system 1.

また、商用電力系統1の停電時には、電力線16を介して別の電力コミュニティC1、C2からの電力供給が可能となり、停電範囲の縮小化を図ることができ、BCPに対応した動作を実現することができる。さらに、複数の電力コミュニティC1、C2の間で電力を融通することで、DRに対応した動作やVPPに対応した動作を実現することができる。その上、電力を融通することによって、太陽光発電装置等の再生可能エネルギー発電装置4aの出力抑制制御を防ぐことができ、再生可能エネルギーを有効活用することができる。   In addition, in the event of a power failure in the commercial power system 1, it is possible to supply power from other power communities C1 and C2 via the power line 16, so that the power failure range can be reduced and an operation corresponding to BCP can be realized. Can do. Furthermore, by accommodating power between the plurality of power communities C1 and C2, operations corresponding to DR and operations corresponding to VPP can be realized. In addition, by accommodating power, it is possible to prevent output suppression control of the renewable energy power generation device 4a such as a solar power generation device, and to effectively use the renewable energy.

<<第2実施形態>>
次に本発明の第2実施形態について説明する。
<< Second Embodiment >>
Next, a second embodiment of the present invention will be described.

第2実施形態の電力融通システム100は、図6に示すように、前記第1実施形態とは電力融通設備15における電力融通機器17及び制御装置19の構成が異なる。つまり、第2実施形態の電力融通機器17は双方向型のDC/DC変換器172であり、制御装置19は管理装置14からの融通開始指令を受け付けて当該DC/DC変換器172を制御するものである。   As shown in FIG. 6, the power accommodation system 100 of the second embodiment is different from the first embodiment in the configurations of the power accommodation equipment 17 and the control device 19 in the power accommodation facility 15. In other words, the power accommodation device 17 of the second embodiment is a bidirectional DC / DC converter 172, and the control device 19 receives the accommodation start command from the management device 14 and controls the DC / DC converter 172. Is.

以下に電力融通システム100による電力コミュニティのC1、C2動作について図7〜図10を参照して説明する。なお、図7〜図10に示す電力の需給状態は一例であり、各装置の状況(例えば二次電池3aの過充電等)に応じて種々変更される。   Below, C1 and C2 operation | movement of the electric power community by the electric power interchange system 100 is demonstrated with reference to FIGS. The power supply / demand states shown in FIGS. 7 to 10 are merely examples, and various changes are made according to the status of each device (for example, overcharge of the secondary battery 3a).

(1)電力融通設備15のDC/DC変換器172が停止(開放)した状態は、前記第1実施形態の動作と同様である。 (1) The state where the DC / DC converter 172 of the power accommodation facility 15 is stopped (opened) is the same as the operation of the first embodiment.

(2)管理装置14から送信される電力融通指令に基づいて、電力融通設備15の制御装置19がDC/DC変換器172を動作させる状態(直流連系した状態) (2) A state in which the control device 19 of the power accommodation facility 15 operates the DC / DC converter 172 based on a power accommodation command transmitted from the management device 14 (a state in which DC connection is established).

(2−1)商用電力系統1が停電した場合、各電力コミュニティC1、C2の二次電池3a及び再生可能エネルギー発電装置4aから各電力コミュニティC1、C2の負荷2a、2bに電力を供給する。また電力コミュニティC1、C2の間でも直流電力の需給動作を行う(図7参照)。電力コミュニティC1、C2内の二次電池3a及び再生可能エネルギー発電装置4aからの電力供給が無くなっても、別の電力コミュニティC1、C2から電力線16及びDC/DC変換器172を介して、当該電力コミュニティC1、C2の負荷2a、2bに対して直流電力による電力供給が可能となる。これにより、BCPに対応した動作及びVPPに対応した動作を行うことができる。なお、電力供給される負荷2a、2bは、予め定められた優先順位に基づいて負荷選択を行う。 (2-1) When the commercial power system 1 fails, power is supplied from the secondary battery 3a of each power community C1, C2 and the renewable energy power generator 4a to the loads 2a, 2b of each power community C1, C2. In addition, a DC power supply / demand operation is performed between the power communities C1 and C2 (see FIG. 7). Even if the power supply from the secondary battery 3a and the renewable energy power generation device 4a in the power community C1, C2 is lost, the power is supplied from another power community C1, C2 via the power line 16 and the DC / DC converter 172. It is possible to supply electric power by DC power to the loads 2a and 2b of the communities C1 and C2. Thereby, the operation corresponding to BCP and the operation corresponding to VPP can be performed. Note that the loads 2a and 2b to which power is supplied perform load selection based on a predetermined priority order.

(2−2)1つの電力コミュニティC1において、何らかの事象(受電設備の保守点検等)により、商用電力系統1からの電力供給が無くなった場合には、当該電力コミュニティC1において負荷2a、2bの需要量(負荷容量)が二次電池3a及び再生可能エネルギー発電装置4aの電力供給容量を上回った時に、電力線16及びDC/DC変換器172を介して別の電力コミュニティC2からの電力供給を受ける(図8参照)。これにより、商用電力系統1からの電力供給が無くなった電力コミュニティC1での負荷停電範囲を無くす、或いは狭めることが可能となり、BCPに対応した動作及びVPPに対応した動作を行うことができる。 (2-2) When there is no power supply from the commercial power grid 1 due to some event (maintenance and inspection of the power receiving facility) in one power community C1, demand for the loads 2a and 2b in the power community C1 When the amount (load capacity) exceeds the power supply capacity of the secondary battery 3a and the renewable energy power generation device 4a, the power supply from another power community C2 is received via the power line 16 and the DC / DC converter 172 ( (See FIG. 8). As a result, it is possible to eliminate or narrow the load power outage range in the power community C1 in which power supply from the commercial power system 1 is lost, and it is possible to perform an operation corresponding to BCP and an operation corresponding to VPP.

(2−3)全電力コミュニティC1、C2が商用電力系統1と連系している場合には、各電力コミュニティC1、C2内の負荷2a、2bに対する商用電力系統1、二次電池3a及び再生可能エネルギー発電装置4aの需給状況を監視して、各電力コミュニティC1、C2の二次電池3a及び再生可能エネルギー発電装置4aから各電力コミュニティC1、C2の負荷2a、2bに電力を供給するとともに、電力コミュニティC1、C2の間でも直流電力の需給動作を行う。このとき、各電力コミュニティC1、C2の受電点に整流器6を設けているので、商用電力系統1への逆潮流動作を行うこと無く、DRに対応した動作を行うことができる。これにより、商用電力系統1の電力品質に悪影響を与えることはない。また、太陽光発電装置等の再生可能エネルギー発電装置4aの出力抑制制御を防ぐことができ、再生可能エネルギーを有効活用することができる。 (2-3) When all the power communities C1 and C2 are linked to the commercial power system 1, the commercial power system 1, the secondary battery 3a and the regeneration for the loads 2a and 2b in each power community C1 and C2 While monitoring the supply and demand situation of the renewable energy power generation device 4a and supplying power from the secondary battery 3a of each power community C1, C2 and the renewable energy power generation device 4a to the loads 2a, 2b of each power community C1, C2, The DC power supply / demand operation is also performed between the power communities C1 and C2. At this time, since the rectifier 6 is provided at the receiving point of each of the power communities C1 and C2, the operation corresponding to the DR can be performed without performing the reverse power flow operation to the commercial power system 1. Thereby, the power quality of the commercial power system 1 is not adversely affected. Moreover, the output suppression control of the renewable energy power generation device 4a such as a solar power generation device can be prevented, and the renewable energy can be effectively used.

ここで、電力コミュニティC1、C2毎に受電端の商用電力系統1が異なり、どちらかの商用電力系統1からの受電電力量の抑制又は増加を要求された場合であっても、DC/DC変換器172を動作させることで、VPPに対応した動作を行うことができる(図9参照)。   Here, even if the commercial power system 1 at the receiving end is different for each of the power communities C1 and C2 and the suppression or increase of the received power amount from either commercial power system 1 is requested, DC / DC conversion is performed. By operating the device 172, an operation corresponding to VPP can be performed (see FIG. 9).

また、1つの商用電力系統1の受電端から電力を受けている電力コミュニティC1、C2同士において、それぞれの電力コミュニティC1、C2の要求電力が異なり、且つ、受電端の負荷率(使用率)に余裕があるコミュニティがあった場合、負荷率に余裕のある電力コミュニティC2から、負荷率の厳しい、或いは超過した電力コミュニティC1に電力を融通するようにDC/DC変換器172を動作させることで、VPPに対応した動作を行うことができる(図10参照)。図10では、一方の電力コミュニティC1の消費電力が130kWであり、他方の電力コミュニティC2の消費電力が70kWの状態を示している。この場合、一方の電力コミュニティC1では、130kW分の設備及び契約が必要となるが、電力融通設備15によって他方の電力コミュニティC2から30kWの電力を融通することによって、双方100kWの設備及び契約で運転可能となる。   Moreover, in the power communities C1 and C2 receiving power from the power receiving end of one commercial power system 1, the required power of each power community C1 and C2 is different, and the load factor (usage rate) of the power receiving end is When there is a community having a margin, by operating the DC / DC converter 172 so as to allow power to be exchanged from the power community C2 having a margin in the load factor to the power community C1 having a severe or excessive load factor, An operation corresponding to VPP can be performed (see FIG. 10). In FIG. 10, the power consumption of one power community C1 is 130 kW, and the power consumption of the other power community C2 is 70 kW. In this case, one power community C1 requires a facility and contract for 130 kW, but the power interchange facility 15 allows 30 kW of power from the other power community C2 to operate with both facilities and contract of 100 kW. It becomes possible.

(3)次に管理装置14の機能及び動作の一例について説明する。 (3) Next, an example of the function and operation of the management apparatus 14 will be described.

(3−1)下げDR要求に対する管理装置14の動作(図11参照) (3-1) Operation of the management apparatus 14 in response to the lowered DR request (see FIG. 11)

管理装置14は、各電力コミュニティC1、C2の受電電力を計算する(S1)。そして、下げDRを行うべき電力コミュニティ(以下、下げDRコミュニティという。)を決定する(S2)。下げDRコミュニティがない場合には、下げDRを行わずにS1に戻る(S3)。   The management device 14 calculates the received power of each power community C1, C2 (S1). Then, a power community (hereinafter referred to as a lowered DR community) to be lowered DR is determined (S2). If there is no down DR community, the process returns to S1 without performing down DR (S3).

下げDRコミュニティを決定した場合には、管理装置14は、下げDRコミュニティの電力需要を算出する(S4)。具体的に管理装置14は、下げDRコミュニティの全負荷の需要量を算出する。また、下げDRコミュニティ内の二次電池3aの電池残量を算出する。さらに、下げDRコミュニティ内の発電装置4aの発電能力を算出する。そして、管理装置14は、全負荷の需要量と、電池残量と、発電能力とから下げDRコミュニティの電力需要を算出する。   When the lowered DR community is determined, the management device 14 calculates the power demand of the lowered DR community (S4). Specifically, the management device 14 calculates the demand amount of the full load of the lowered DR community. Further, the remaining battery level of the secondary battery 3a in the lowered DR community is calculated. Further, the power generation capacity of the power generation device 4a in the lowered DR community is calculated. Then, the management device 14 calculates the power demand of the DR community from the demand amount of the full load, the remaining battery level, and the power generation capacity.

管理装置14は、下げDRを行わなくて良い電力コミュニティ(以下、非DRコミュニティという。)の給電能力を算出する(S5)。具体的には、非DRコミュニティの受電端からの給電余裕量を算出する。また、非DRコミュニティの二次電池3aの電池残量を算出する。さらに、非DRコミュニティの発電装置4aの発電能力を算出する。そして、管理装置14は、給電余裕量と、電池残量と、発電能力とから非DRコミュニティの給電能力を算出する。   The management device 14 calculates the power supply capability of a power community (hereinafter referred to as a non-DR community) that does not need to be lowered DR (S5). Specifically, the power supply margin amount from the receiving end of the non-DR community is calculated. Further, the remaining battery level of the secondary battery 3a of the non-DR community is calculated. Furthermore, the power generation capacity of the power generation device 4a of the non-DR community is calculated. Then, the management device 14 calculates the power supply capability of the non-DR community from the power supply margin amount, the battery remaining amount, and the power generation capability.

管理装置14は、下げDRコミュニティの電力需要が非DRコミュニティの給電能力以上であるか否かを判断する(S6)。下げDRコミュニティの電力需要が非DRコミュニティの給電能力以上の場合には、給電対象を下げDRコミュニティの重要負荷又は優先順位の高い負荷に限定して、S2に戻る。   The management apparatus 14 determines whether the power demand of the lowered DR community is equal to or higher than the power supply capability of the non-DR community (S6). If the power demand of the lowered DR community is greater than or equal to the power supply capability of the non-DR community, the power supply target is reduced to a critical load of the DR community or a high priority load, and the process returns to S2.

下げDRコミュニティの電力需要が非DRコミュニティの給電能力未満の場合には、非DRコミュニティの受電端使用率(=電力受電量/受電端容量)が均一になるように給電電力量の分配量を算出する(S7)。   When the power demand of the lowered DR community is less than the power supply capacity of the non-DR community, the distribution amount of the power supply power is set so that the receiving end usage rate (= power receiving amount / receiving end capacity) of the non-DR community is uniform. Calculate (S7).

その後、管理装置14は、算出した分配量を電力指令として電力融通設備15の通信装置18に送信する(S8)。そして、電力融通設備15の制御装置19は、受信した電力指令に基づいてDC/DC変換器172を制御する。   Thereafter, the management device 14 transmits the calculated distribution amount as a power command to the communication device 18 of the power accommodation facility 15 (S8). Then, the control device 19 of the power accommodation facility 15 controls the DC / DC converter 172 based on the received power command.

(3−2)上げDR要求に対する管理装置14の動作(図12参照) (3-2) Operation of the management apparatus 14 in response to the raised DR request (see FIG. 12)

管理装置14は、各電力コミュニティC1、C2の受電電力を算出する(S1)。そして、上げDRを行うべき電力コミュニティ(以下、上げDRコミュニティという。)を決定する(S2)。上げDRコミュニティがない場合には、上げDRを行わずにS1に戻る(S3)。   The management device 14 calculates the received power of each of the power communities C1 and C2 (S1). Then, a power community (hereinafter referred to as a raised DR community) to be raised DR is determined (S2). If there is no increased DR community, the process returns to S1 without performing the increased DR (S3).

上げDRコミュニティを決定した場合には、管理装置14は、上げDRコミュニティの電力余剰量を算出する(S4)。具体的には、上げDRコミュニティの全負荷の需要量を算出する。また、上げDRコミュニティ内の二次電池3aの電池残量を算出する。さらに、上げDRコミュニティ内の発電装置4aの発電量を算出する。そして、管理装置14は、上げDRコミュニティの受電容量と、全負荷の需要量、電池残量及び発電量とから上げDRコミュニティの電力余剰量を算出する。   When the increased DR community is determined, the management apparatus 14 calculates a surplus power amount of the increased DR community (S4). Specifically, the demand amount of the full load of the increased DR community is calculated. Further, the remaining battery level of the secondary battery 3a in the raised DR community is calculated. Further, the power generation amount of the power generation device 4a in the raised DR community is calculated. Then, the management device 14 calculates the power surplus amount of the increased DR community from the power reception capacity of the increased DR community, the demand amount of the full load, the remaining battery level, and the power generation amount.

管理装置14は、上げDRを行わなくて良い電力コミュニティ(以下、非DRコミュニティという。)の電力需要量を算出する(S5)。具体的には、非DRコミュニティの全負荷の需要量を算出する。また、非DRコミュニティ内の二次電池3aの電池残量を算出する。さらに、非DRコミュニティ内の発電装置4aの発電量を算出する。そして、管理装置14は、全負荷の需要量と、電池残量と、発電量とから非DRコミュニティの電力需要量を算出する。   The management device 14 calculates the power demand of a power community (hereinafter referred to as a non-DR community) that does not need to be raised DR (S5). Specifically, the demand amount of the full load of the non-DR community is calculated. Further, the remaining battery level of the secondary battery 3a in the non-DR community is calculated. Furthermore, the power generation amount of the power generation device 4a in the non-DR community is calculated. Then, the management device 14 calculates the power demand amount of the non-DR community from the demand amount of the full load, the battery remaining amount, and the power generation amount.

管理装置14は、非DRコミュニティの電力需要がゼロか否かを判断する(S6)。非DRコミュニティの電力需要がゼロの場合には、上げDRに対応した動作が不可能と判断して、S1に戻る(S7)。   The management device 14 determines whether the power demand of the non-DR community is zero (S6). When the power demand of the non-DR community is zero, it is determined that the operation corresponding to the increased DR is impossible, and the process returns to S1 (S7).

非DRコミュニティの電力需要がゼロではない場合には、非DRコミュニティの受電端使用率が均一になるように給電量の分配量を算出する(S8)。このとき、DRコミュニティは受電端使用率を限界まで上昇させる。例えば、DRコミュニティの二次電池3aが充電可能であれば、二次電池3aが充電される。また、DRコミュニティの発電装置4aは発電されず、負荷2a、2bは需要量が増加するように制御される。なお、二次電池3aが過充電の場合には二次電池3aは充電されない。   When the power demand of the non-DR community is not zero, the distribution amount of the power supply amount is calculated so that the receiving end usage rate of the non-DR community is uniform (S8). At this time, the DR community increases the receiving end usage rate to the limit. For example, if the secondary battery 3a of the DR community can be charged, the secondary battery 3a is charged. Further, the power generation device 4a of the DR community is not generated, and the loads 2a and 2b are controlled so that the demand amount increases. In addition, when the secondary battery 3a is overcharged, the secondary battery 3a is not charged.

その後、管理装置14は、算出した分配量を電力指令として電力融通設備15の通信装置18に送信する(S6)。そして、電力融通設備15の制御装置19は、受信した電力指令に基づいてDC/DC変換器172を制御する。   Thereafter, the management device 14 transmits the calculated distribution amount as a power command to the communication device 18 of the power accommodation facility 15 (S6). Then, the control device 19 of the power accommodation facility 15 controls the DC / DC converter 172 based on the received power command.

(3−3)VPP要求に対する管理装置14の動作(図13参照) (3-3) Operation of the management apparatus 14 in response to the VPP request (see FIG. 13)

管理装置14は、各電力コミュニティC1、C2の受電電力を算出する(S1)。そして、各電力コミュニティC1、C2の受電端使用率(=電力受電量/受電端容量)に差があるか否かを判断する(S2)。受電端使用率に差がなければ、VPPに対する動作を行わずにS1に戻る(S3)。   The management device 14 calculates the received power of each of the power communities C1 and C2 (S1). Then, it is determined whether or not there is a difference in the receiving end usage rate (= power receiving amount / receiving end capacity) of each power community C1, C2 (S2). If there is no difference in the power reception end usage rate, the process returns to S1 without performing the operation for VPP (S3).

受電端使用率に差がある場合には、管理装置14は、電力コミュニティC1、C2の平均受電端使用率を算出する(S4)。ここで、平均受電端使用率は、複数の電力コミュニティC1、C2の電力受電量の総和を複数の電力コミュニティC1、C2の受電端容量で除した値(=Σ電力受電量/Σ受電端容量)である。   When there is a difference in the power receiving end usage rate, the management device 14 calculates the average power receiving end usage rate of the power communities C1 and C2 (S4). Here, the average power receiving end usage rate is a value obtained by dividing the sum of the power receiving amounts of the plurality of power communities C1 and C2 by the receiving end capacities of the plurality of power communities C1 and C2 (= Σ power receiving amount / Σ receiving end capacity). ).

管理装置14は、各電力コミュニティC1、C2の受電端使用率と平均受電端使用率との差を算出する(S5)。   The management apparatus 14 calculates the difference between the power receiving end usage rate and the average power receiving end usage rate of each of the power communities C1 and C2 (S5).

管理装置14は、全電力コミュニティC1、C2の受電端使用率が均一になるように給電量の分配量を算出する(S6)。   The management device 14 calculates the distribution amount of the power supply amount so that the power reception end usage rates of all the power communities C1 and C2 are uniform (S6).

その後、管理装置14は、算出した分配量を電力指令として電力融通設備15の通信装置18に送信する(S7)。そして、電力融通設備15の制御装置19は、受信した電力指令に基づいてDC/DC変換器172を制御する。   Thereafter, the management device 14 transmits the calculated distribution amount as a power command to the communication device 18 of the power accommodation facility 15 (S7). Then, the control device 19 of the power accommodation facility 15 controls the DC / DC converter 172 based on the received power command.

<第2実施形態の効果>
このように構成した本実施形態の電力融通システム100によれば、前記第1実施形態と同様の効果を得ることができるとともに、電力融通設備15としてDC/DC変換器172を用いているので、電力線16で接続された電力コミュニティC1、C2の間で、商用電力系統1からの受電電力を平準化することができる。また、電力融通設備15として絶縁型のDC/DC変換器172を用いることにより、電力コミュニティC1、C2間の地絡事故の波及を防止することができる。さらに、DC/DC変換器172を用いて電力コミュニティC1、C2間を連系することによって、異なる電圧の電力コミュニティC1、C2間での連系が可能となる。
<Effects of Second Embodiment>
According to the power interchange system 100 of the present embodiment configured as described above, the same effect as that of the first embodiment can be obtained, and since the DC / DC converter 172 is used as the power interchange facility 15, The received power from the commercial power system 1 can be leveled between the power communities C1 and C2 connected by the power line 16. Further, by using the insulated DC / DC converter 172 as the power interchange facility 15, it is possible to prevent the occurrence of a ground fault between the power communities C1 and C2. Furthermore, by connecting the power communities C1 and C2 using the DC / DC converter 172, the power communities C1 and C2 having different voltages can be connected.

<変形実施形態>
なお、本発明は前記実施形態に限られるものではない。
<Modified Embodiment>
The present invention is not limited to the above embodiment.

例えば、前記実施形態では、電力線が直流を配電するものであったが、交流を配電するものであっても良い。このとき電力コミュニティが直流配電回路の場合には、電力コミュニティと電力線との間にAC/DC変換器を設けることになる。   For example, in the embodiment, the power line distributes direct current, but it may distribute alternating current. At this time, if the power community is a DC power distribution circuit, an AC / DC converter is provided between the power community and the power line.

前記第1実施形態の構成と第2実施形態の構成を組み合わせたものであっても良い。つまり、電力融通設備15の電力融通機器17がスイッチ171及びDC/DC変換器172の両方を備えたものであっても良い。   The configuration of the first embodiment and the configuration of the second embodiment may be combined. That is, the power accommodation device 17 of the power accommodation facility 15 may include both the switch 171 and the DC / DC converter 172.

3つ以上の電力コミュニティで電力を融通する場合、電力融通設備15は、それぞれの電力コミュニティ同士を電力線16で直接接続する構成であっても良い。この構成であれば、1つの電力コミュニティに接続される別の電力コミュニティの数を増やすことができるので、電力融通の自由度を増すことができる。また、複数の電力コミュニティを電力線によって直列接続しても良い。   When power is accommodated by three or more power communities, the power accommodation facility 15 may be configured to directly connect the power communities to each other via the power line 16. With this configuration, the number of other power communities connected to one power community can be increased, so that the degree of freedom of power interchange can be increased. A plurality of power communities may be connected in series by power lines.

前記実施形態では、電力コミュニティの受電点に整流器を設けているが、AC/DC変換器を設けても良い。   In the said embodiment, although the rectifier is provided in the receiving point of the electric power community, you may provide an AC / DC converter.

その他、本発明は前記実施形態に限られず、その趣旨を逸脱しない範囲で種々の変形が可能であるのは言うまでもない。   In addition, it goes without saying that the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.

100・・・電力融通システム
C1、C2・・・電力コミュニティ
1・・・商用電力系統
2・・・負荷
3・・・蓄電装置
4・・・分散電源
6・・・整流器
14・・・管理装置
16・・・電力線
17・・・電力融通機器
171・・・スイッチ
172・・・電力変換器
19・・・制御装置
DESCRIPTION OF SYMBOLS 100 ... Power interchange system C1, C2 ... Electric power community 1 ... Commercial power system 2 ... Load 3 ... Power storage device 4 ... Distributed power supply 6 ... Rectifier 14 ... Management device 16 ... Power line 17 ... Power interchangeable device 171 ... Switch 172 ... Power converter 19 ... Control device

Claims (5)

商用電力系統から電力供給を受けるとともに負荷と蓄電装置と分散電源とによる電力需給動作を行う複数の電力コミュニティに用いられ、前記複数の電力コミュニティの間でそれらの電力を融通する電力融通システムであって、
前記複数の電力コミュニティを前記商用電力系統を介さずに接続する電力線と、
前記電力線に設けられ、前記複数の電力コミュニティの間で融通される電力を調整する電力融通機器と、
前記電力融通機器を制御する制御装置とを備える、電力融通システム。
The power interchange system is used in a plurality of power communities that receive power supply from a commercial power system and perform power supply and demand operations using a load, a power storage device, and a distributed power source. The power interchange system accommodates the power among the plurality of power communities. And
A power line connecting the plurality of power communities without going through the commercial power system;
A power accommodation device that is provided in the power line and adjusts the power accommodated between the plurality of power communities;
A power interchange system comprising: a control device that controls the power interchange apparatus.
前記電力コミュニティは前記商用電力系統の受電点に整流器を有しており、
前記電力線及び前記電力融通機器により前記複数の電力コミュニティの間で直流電力を融通する、請求項1記載の電力融通システム。
The power community has a rectifier at the receiving point of the commercial power system,
The power interchange system according to claim 1, wherein DC power is interchanged between the plurality of power communities by the power line and the power interchange device.
前記制御装置は、前記複数の電力コミュニティを管理する管理装置に通信回線を介して接続され、前記管理装置からの制御指令に応じて前記電力融通機器を制御する、請求項1又は2記載の電力融通システム。   3. The power according to claim 1, wherein the control device is connected to a management device that manages the plurality of power communities via a communication line, and controls the power accommodation device according to a control command from the management device. A versatile system. 前記電力融通機器は、前記電力線を開閉するスイッチを有しており、
前記制御装置は、前記管理装置からの融通開始指令を受け付けて前記スイッチを閉じる、請求項3記載の電力融通システム。
The power interchange device has a switch for opening and closing the power line,
The electric power interchange system according to claim 3, wherein the control device receives an interchange start command from the management device and closes the switch.
前記電力融通機器は、電力変換器を有しており、
前記制御装置は、前記管理装置からの融通開始指令を受け付けて前記電力変換器を制御する、請求項3又は4記載の電力融通システム。
The power interchange device has a power converter,
The power interchange system according to claim 3 or 4, wherein the control device receives an interchange start command from the management device and controls the power converter.
JP2018041323A 2018-03-07 2018-03-07 Power interchange system Active JP7121902B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018041323A JP7121902B2 (en) 2018-03-07 2018-03-07 Power interchange system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018041323A JP7121902B2 (en) 2018-03-07 2018-03-07 Power interchange system

Publications (2)

Publication Number Publication Date
JP2019161706A true JP2019161706A (en) 2019-09-19
JP7121902B2 JP7121902B2 (en) 2022-08-19

Family

ID=67992748

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018041323A Active JP7121902B2 (en) 2018-03-07 2018-03-07 Power interchange system

Country Status (1)

Country Link
JP (1) JP7121902B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021064936A1 (en) * 2019-10-03 2021-04-08
WO2021106385A1 (en) * 2019-11-27 2021-06-03 三菱重工業株式会社 Power transaction system and power transaction method
JP2021100334A (en) * 2019-12-23 2021-07-01 古河電気工業株式会社 Power supply system and power receiving and transforming facility
WO2021161424A1 (en) * 2020-02-12 2021-08-19 日本電信電話株式会社 Power management device, priority control method, and program
JP2021197766A (en) * 2020-06-10 2021-12-27 古河電気工業株式会社 Power network
WO2022145336A1 (en) * 2021-01-04 2022-07-07 国立大学法人東北大学 Network system, and method for controlling network system
WO2023199376A1 (en) * 2022-04-11 2023-10-19 日本電信電話株式会社 Control apparatus, power supply system, control method, and program

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003274554A (en) * 2002-03-19 2003-09-26 Hitachi Ltd Power supply method
US20130274947A1 (en) * 2010-04-15 2013-10-17 Science Applications International Corporation System and method for routing power across multiple microgrids having dc and ac buses
JP2015019474A (en) * 2013-07-10 2015-01-29 中電技術コンサルタント株式会社 Electric power interchange system and control procedure determination device for electric power interchange system
WO2015072304A1 (en) * 2013-11-14 2015-05-21 ソニー株式会社 Power supplying device and power receiving device
WO2015105006A1 (en) * 2014-01-08 2015-07-16 ソニー株式会社 Power control device and power control method
JP2015186277A (en) * 2014-03-20 2015-10-22 積水化学工業株式会社 Power management system, power management method, and program
JP2016063721A (en) * 2014-09-22 2016-04-25 株式会社Nttファシリティーズ Power transmission system, power transmission controller, power transmission control method, and program
JP2017153275A (en) * 2016-02-25 2017-08-31 オムロン株式会社 Power supply path control system, power supply path control method and power supply path control program

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003274554A (en) * 2002-03-19 2003-09-26 Hitachi Ltd Power supply method
US20130274947A1 (en) * 2010-04-15 2013-10-17 Science Applications International Corporation System and method for routing power across multiple microgrids having dc and ac buses
JP2015019474A (en) * 2013-07-10 2015-01-29 中電技術コンサルタント株式会社 Electric power interchange system and control procedure determination device for electric power interchange system
WO2015072304A1 (en) * 2013-11-14 2015-05-21 ソニー株式会社 Power supplying device and power receiving device
WO2015105006A1 (en) * 2014-01-08 2015-07-16 ソニー株式会社 Power control device and power control method
JP2015186277A (en) * 2014-03-20 2015-10-22 積水化学工業株式会社 Power management system, power management method, and program
JP2016063721A (en) * 2014-09-22 2016-04-25 株式会社Nttファシリティーズ Power transmission system, power transmission controller, power transmission control method, and program
JP2017153275A (en) * 2016-02-25 2017-08-31 オムロン株式会社 Power supply path control system, power supply path control method and power supply path control program

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021064936A1 (en) * 2019-10-03 2021-04-08
WO2021064936A1 (en) * 2019-10-03 2021-04-08 富士通株式会社 Control method, information processing device, information processing system, and control program
WO2021106385A1 (en) * 2019-11-27 2021-06-03 三菱重工業株式会社 Power transaction system and power transaction method
JP2021100334A (en) * 2019-12-23 2021-07-01 古河電気工業株式会社 Power supply system and power receiving and transforming facility
JP7370850B2 (en) 2019-12-23 2023-10-30 古河電気工業株式会社 Power supply system and substation equipment
WO2021161424A1 (en) * 2020-02-12 2021-08-19 日本電信電話株式会社 Power management device, priority control method, and program
JPWO2021161424A1 (en) * 2020-02-12 2021-08-19
US20230068669A1 (en) * 2020-02-12 2023-03-02 Nippon Telegraph And Telephone Corporation Power management apparatus, priority control method and program
JP7327530B2 (en) 2020-02-12 2023-08-16 日本電信電話株式会社 Power management device, priority control method, and program
JP2021197766A (en) * 2020-06-10 2021-12-27 古河電気工業株式会社 Power network
WO2022145336A1 (en) * 2021-01-04 2022-07-07 国立大学法人東北大学 Network system, and method for controlling network system
WO2023199376A1 (en) * 2022-04-11 2023-10-19 日本電信電話株式会社 Control apparatus, power supply system, control method, and program

Also Published As

Publication number Publication date
JP7121902B2 (en) 2022-08-19

Similar Documents

Publication Publication Date Title
JP7121902B2 (en) Power interchange system
Bharath et al. A review on DC microgrid control techniques, applications and trends
US11362525B2 (en) Full direct-current boost/buck power transmission system and method
TWI437791B (en) Networked dc power system
US10298006B2 (en) Energy storage system and method of driving the same
JP6549190B2 (en) Power compensation device and control method thereof
CN105391097A (en) AC and DC hybrid micro grid coordinated control system
CN104779634B (en) A kind of micro-capacitance sensor energy storage dispatching method
Kumar et al. A review on microgrids with distributed energy resources
JP2016149928A (en) Energy storage system
JP2013229978A (en) Power-system linkage system
KR20180136177A (en) An energy storage system
CN105305493B (en) A kind of light for interconnected operation stores up independent micro-capacitance sensor topology
Saleh et al. Effect of wireless communication delay on DC microgrids performance
KR102176094B1 (en) Energy storage system including energy storage device
KR20170074631A (en) Energy distribuition system in smart grid envirmnent
Kester et al. A smart MV/LV-station that improves power quality, reliability and substation load profile
KR20130136744A (en) Energy storage system and method
CN209994117U (en) Energy storage system
JP2011062067A (en) Dc power distribution system
KR102257906B1 (en) An energy storage system
JP6722295B2 (en) Power conversion system, power supply system, and power conversion device
US20180219379A1 (en) Power plant installation
Martins et al. Design and implementation of a microgrid power management unit using a back-to-back converter in a residential condominium connected at medium voltage
JP7408108B2 (en) power supply system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210219

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220707

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220720

R150 Certificate of patent or registration of utility model

Ref document number: 7121902

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R157 Certificate of patent or utility model (correction)

Free format text: JAPANESE INTERMEDIATE CODE: R157